Reclamation Process for Evaluating<br />

Dam <strong>Overtopping</strong> <strong>Failure</strong> Mode<br />

• Initial screening with PMF<br />

• If PMF can not be safely passed, additional flood<br />

studies are conducted<br />

• Initial flood study – flood frequency curves based<br />

on peaks and volumes<br />

• Refined flood studies – frequency flood<br />

hydrographs developed and routed<br />

• If risks are unacceptable, Corrective Action<br />

Study (CAS) is initiated<br />

• At onset <strong>of</strong> CAS, an inflow design flood is<br />

selected that will result in acceptable risks<br />

13