13.01.2015 Views

Draft of contract agreement - SFCI

Draft of contract agreement - SFCI

Draft of contract agreement - SFCI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. That the supplier will be liable to entertain al the complaints regarding defects<br />

sand failures and will be liable to remove the defects or replace the parts free <strong>of</strong> charges or<br />

to repair the defective parts to the<br />

extent that such replacement or repairs are attributable to/or arise from faulty<br />

workmanship or material or design in the manufacturing <strong>of</strong> the equipment, provided defects<br />

are brought to the notice <strong>of</strong> supplier during the warranty period. The liability will be<br />

restricted upto one month from the date <strong>of</strong> expiry <strong>of</strong> warranty period. In the event <strong>of</strong> any<br />

failure on the part <strong>of</strong> the supplier to fulfill the liability, the Corporation will be entitled to<br />

realize the cost <strong>of</strong> expenditure together with the damages or loss, if any.<br />

3. The supplier shall, if required replace or repair the goods or such portion there<strong>of</strong><br />

as is rejected by the Corporation free <strong>of</strong> cost at the ultimate destination. The supplier shall<br />

pay to the Corporation value there<strong>of</strong> at the <strong>contract</strong> price and all other expenditure damages<br />

and losses, if any, as may arise by reasons <strong>of</strong> the improper functioning <strong>of</strong> the equipments<br />

and breach <strong>of</strong> the conditions herein specified.<br />

The supplier shall give a bank guarantee to the extent <strong>of</strong> l0% <strong>of</strong> the total value <strong>of</strong> the<br />

equipments as per format given in section VI.<br />

4. All replacements and repairs that the Corporation shall call upon the supplier to<br />

deliver or perform under the warranty shall be delivered and performed by the supplier<br />

promptly and satisfactorily failing which the Corporation shall be at liberty to enforce the<br />

Bank guarantee for due performance <strong>of</strong> the equipment and recover the damages and losses<br />

as per clause 3 above.<br />

5. If the supplier so desired, the replaced parts can be taken over by him for disposal<br />

as he deems fit within the period <strong>of</strong> one month from the date <strong>of</strong> replacement.<br />

6. The equipment shall carry l5 months warranty commencing from the date <strong>of</strong><br />

receipt <strong>of</strong> equipment at the site or l2 months from the date <strong>of</strong> commissioning <strong>of</strong> equipment<br />

whichever is earlier. The warranty period for replaced parts will extent only to l2 month<br />

from the date <strong>of</strong> its replacement but for fast moving parts the guarantee shall be extended to<br />

the remaining period <strong>of</strong> equipment warrantee.<br />

x. LIQUIDITY DAMAGES:<br />

1. If the supplier fails to deliver any or all the material covered by the <strong>contract</strong>, the<br />

Corporation reserve the right in addition to the legal remedies to cancel the <strong>contract</strong> as a<br />

whole or any portion there<strong>of</strong> and hold the supplier liable for all the damages, sustained by<br />

virtue <strong>of</strong> said cancellation and failing to perform the <strong>contract</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!