Kaunisvaara –<br />

Mine Development Scope<br />

Item Tapuli Sahavaara<br />

Ore Reserves 101Mt @ 26.10%Fe 75Mt @ 41.2% Fe<br />

Waste 295.6 Mt 400.1 Mt<br />

Overburden 14.6Mm 3 8.5Mm 3<br />

Ore mined 6 Mtpa 6 Mtpa<br />

Waste mined +/- 22 Mtpa +/- 34 Mtpa<br />

Strip ratio 2.92:1 5.33:1<br />

Development start Q1 2011 Q3 2013<br />

First concentrate Q1 2013 Q3 2014<br />

First shipment Q1 2013 Q3 2014<br />

Production through 2030 2027<br />

Source: Kaunisvaara DFS<br />