Short-Term Stationary Work
Short-Term Stationary Work
Short-Term Stationary Work
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Intermediate <strong>Work</strong><br />
• Intermediate-<strong>Term</strong> <strong>Stationary</strong> <strong>Work</strong><br />
Support:<br />
• In intermediate-term stationary work zones, it might not be feasible or practical to use<br />
procedures or devices that would be desirable for long-term stationary temporary<br />
traffic control zones, such as altered pavement markings, temporary traffic barriers,<br />
and temporary roadways.<br />
• The increased time to place and remove these devices in some cases could<br />
significantly lengthen the project, thus increasing exposure time. In other instances,<br />
there might be insufficient payback time to economically justify more elaborate<br />
temporary traffic control measures.<br />
Standard:<br />
• Since intermediate-term operations extend into nighttime, retroreflective and/or<br />
illuminated devices shall be used in intermediate-term stationary work zones.