9. TC 77<br />

9.1 PowerPoint slide prepared by Mr Imeson on functional safety and overlap<br />

between TC77 MT15 and SC 65A<br />

Mr Imeson presented the above and the Committee considered an email from<br />

Keith Armstrong on 65A/5<strong>04</strong>/NP together with the replies received and<br />

document 77/353A/DC: Distribution of SC65A/5<strong>04</strong>/NP to IEC TC77. This<br />

document cancelled and replaced 77/353/DC.<br />

It was agreed that the UK would nominate Mr Armstrong and Mr Cryer to<br />

participate.<br />

ACTION: SECRETARY<br />

9.2 Report from Richard Hoad of the meeting of TC 77 held 21 September 2007<br />

in Sydney<br />

Noted.<br />

9.3 77/347/RM Preliminary Minutes for the meeting held in Sydney, Australia, on<br />

21st September 2007<br />

Noted.<br />

9.4 Report from Mr Carpenter of the meeting of IEC TC77 WG13 held in Tokyo,<br />

Japan 19 - 21 November 2007<br />

The purpose of the meeting had been to progress the revision of IEC<br />

Technical Report (TR) 61000-2-5 – Classification of Electromagnetic<br />

Environments.<br />

It was had been proposed that all environments be derived from the overlap<br />

of three archetypical environments: Domestic, Commercial and Industrial.<br />

Mr Carpenter reported that the outcome was likely to be a much simpler set<br />

of environmental conditions which would not result in too much change to the<br />

generic standard. It was agreed that it was desirable to have as few<br />

conditions as possible. Mr Carpenter would distribute the content in<br />

GEL/210/12 when this was discussed next time.<br />

ACTION: MR CARPENTER<br />

9.5 Report from Mr Armstrong of the 9th meeting of TC 77 MT15 held in<br />

Maulberg, Germany, 3-5 December 2007<br />

Noted. All the comments from the national committees had been discussed.<br />

9.6 Final consolidated version of the comments on 77/344/CD IEC 61000-1-2 as<br />

received by GEL 210/12/1, discussed and modified by them on the 19 Oct 07,<br />

and approved by GEL 210 on 8th November 2007.<br />

Noted.<br />

9.7 77/349/INF Measurement Uncertainty within TC 77<br />

At the meeting of GEL/210/12 held 6 September 2007 consideration was<br />

given to producing a simplified document on uncertainty for use by nonmathematicians.<br />

The Swiss national committee had wanted a JWG with<br />

CISPR on this and was putting in a formal NP. It was recommended that the<br />

UK accepted the NP when issued. Regarding a simplified document on the<br />

subject, Mr Carpenter had a separate draft which was a basic introduction to<br />

measurement uncertainty. Mr Carpenter would circulate this to the committee<br />

for development. Mr Alexander volunteered to be involved by<br />

correspondence in this work. Mr Imeson also nominated Phil Carter<br />

(EMCTLA). It was suggested that the document could be an information<br />

document/guide to CISPR 16-4.<br />

ACTION: MR CARPENTER, MR ALEXANDER, MR CARTER, MEMBERS<br />

9.8 77/350/INF Current Structure of IEC TC77<br />

Noted.<br />