4. Summary<br />
Total of three (3) landfills onsite.<br />
South Landfill (Closed)<br />
Size<br />
Permitted Capacity<br />
Approximately 20 Acres<br />
1,500,00 CY<br />
Date Material Last Deposited July 1993<br />
Materials Deposited<br />
Ash, filter cake, hazardous and non-hazardous<br />
waste<br />
North Landfill (Active)<br />
Size<br />
Permitted Capacity<br />
Date material Last Deposited<br />
Materials Being Deposited<br />
Approximately 20 Acres<br />
815,00 CY<br />
Current<br />
Ash, filter cake, RCRA empty drums,<br />
construction debris, hazardous and nonhazardous<br />
waste.<br />
East Landfill (Future)<br />
Size Approximately<br />
Permitted Capacity<br />
45 Acres<br />
658,00 CY<br />
Non-Commercial Waste Water Treatment Operations<br />
A. Recirculated Process Water<br />
Water utilized in the gas quenching operation is treated on-site in the water treatment plant prior<br />
to reuse in quench operations. Quench water is pumped to a primary neutralization tank for<br />
partial neutralization with a lime slurry. Final pH adjustment is accomplished in a secondary<br />
neutralization tank with caustic. The quench water then flows into two (2) clarifiers where metal<br />
hydroxides settle out as sludge. Treated water flows from the clarifiers to the cooling towers to<br />
be cooled and then recycled back to the gas quenching system for reuse.<br />