4. Summary<br />

Total of three (3) landfills onsite.<br />

South Landfill (Closed)<br />

Size<br />

Permitted Capacity<br />

Approximately 20 Acres<br />

1,500,00 CY<br />

Date Material Last Deposited July 1993<br />

Materials Deposited<br />

Ash, filter cake, hazardous and non-hazardous<br />

waste<br />

North Landfill (Active)<br />

Size<br />

Permitted Capacity<br />

Date material Last Deposited<br />

Materials Being Deposited<br />

Approximately 20 Acres<br />

815,00 CY<br />

Current<br />

Ash, filter cake, RCRA empty drums,<br />

construction debris, hazardous and nonhazardous<br />

waste.<br />

East Landfill (Future)<br />

Size Approximately<br />

Permitted Capacity<br />

45 Acres<br />

658,00 CY<br />

Non-Commercial Waste Water Treatment Operations<br />

A. Recirculated Process Water<br />

Water utilized in the gas quenching operation is treated on-site in the water treatment plant prior<br />

to reuse in quench operations. Quench water is pumped to a primary neutralization tank for<br />

partial neutralization with a lime slurry. Final pH adjustment is accomplished in a secondary<br />

neutralization tank with caustic. The quench water then flows into two (2) clarifiers where metal<br />

hydroxides settle out as sludge. Treated water flows from the clarifiers to the cooling towers to<br />

be cooled and then recycled back to the gas quenching system for reuse.<br />