Facility Audit: Deer Park, TX - Clean Harbors
Facility Audit: Deer Park, TX - Clean Harbors
Facility Audit: Deer Park, TX - Clean Harbors
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Facility</strong> History<br />
Year Event<br />
1969 Land purchased<br />
1971 Installation of 2.8 meter (diameter) rotary kiln<br />
1974 Landfill operation (South)<br />
1980 Installation of PCB Shredder System<br />
1981 Received TSCA Letter of Authorization (First in USA)<br />
1985 Installation of 3.6 meter slagging rotary kiln (replacing 2.8 m kiln)<br />
1988 Received RCRA Part B Permit (First in USA)<br />
1988 Installation of 4.4 meter slagging rotary kiln<br />
1989 Installation of Rotary Reactor (bulk solids burner)<br />
1989 Installation of shredder on front wall of 4.4 meter kiln<br />
1990 MTR landfill operation (North)<br />
1991 Installation of glove boxes for cylinder gas disposal and drum liquid aspiration<br />
1993 Stabilization & Encapsulation <strong>Facility</strong> on-line<br />
1994 MTR landfill permitted (East)<br />
1994 Industry of the Year - <strong>Deer</strong> <strong>Park</strong> Chamber of Commerce<br />
1995 Awarded E.I. Digest for no Notice of Violations for the year<br />
1996 Closure of South Landfill certified by TCEQ<br />
1997 Merger with Laidlaw Environmental Services, Inc.<br />
1998 Merger with Safety-Kleen<br />
2002 Acquired by <strong>Clean</strong> <strong>Harbors</strong><br />
2004 Installed WESP’s for MACT compliance<br />
2005 Development of the Comprehensive Performance Test (CPT)<br />
2006 CPT was performed and submitted for Train I<br />
2007 TCEQ request to lower the pressure drop and the water flow rates for Train I<br />
USEPA request to lower the PCB operating temperature for Train I<br />
East Landfill permit issued in June<br />
2008 TCEQ/USEPA issued a MACT Finding of Compliance for Train I<br />
East Landfill Operation began in February<br />
Dioxin/Furan testing performed on Train II<br />
Expect Class 3 Permit Modification to lower RCRA operating conditions on<br />
Trains I and II<br />
Site Characterization<br />
<strong>Clean</strong> <strong>Harbors</strong>’ facility in <strong>Deer</strong> <strong>Park</strong>, Texas, delivers state-of-the-future technological solutions<br />
for companies seeking the safest, responsible incineration of hazardous waste. With an<br />
unparalleled commitment to customer value, convenience and satisfaction, <strong>Deer</strong> <strong>Park</strong> maximizes<br />
security and minimizes risk for large and small generators.<br />
6