17.01.2015 Views

Facility Audit: Deer Park, TX - Clean Harbors

Facility Audit: Deer Park, TX - Clean Harbors

Facility Audit: Deer Park, TX - Clean Harbors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Facility</strong> History<br />

Year Event<br />

1969 Land purchased<br />

1971 Installation of 2.8 meter (diameter) rotary kiln<br />

1974 Landfill operation (South)<br />

1980 Installation of PCB Shredder System<br />

1981 Received TSCA Letter of Authorization (First in USA)<br />

1985 Installation of 3.6 meter slagging rotary kiln (replacing 2.8 m kiln)<br />

1988 Received RCRA Part B Permit (First in USA)<br />

1988 Installation of 4.4 meter slagging rotary kiln<br />

1989 Installation of Rotary Reactor (bulk solids burner)<br />

1989 Installation of shredder on front wall of 4.4 meter kiln<br />

1990 MTR landfill operation (North)<br />

1991 Installation of glove boxes for cylinder gas disposal and drum liquid aspiration<br />

1993 Stabilization & Encapsulation <strong>Facility</strong> on-line<br />

1994 MTR landfill permitted (East)<br />

1994 Industry of the Year - <strong>Deer</strong> <strong>Park</strong> Chamber of Commerce<br />

1995 Awarded E.I. Digest for no Notice of Violations for the year<br />

1996 Closure of South Landfill certified by TCEQ<br />

1997 Merger with Laidlaw Environmental Services, Inc.<br />

1998 Merger with Safety-Kleen<br />

2002 Acquired by <strong>Clean</strong> <strong>Harbors</strong><br />

2004 Installed WESP’s for MACT compliance<br />

2005 Development of the Comprehensive Performance Test (CPT)<br />

2006 CPT was performed and submitted for Train I<br />

2007 TCEQ request to lower the pressure drop and the water flow rates for Train I<br />

USEPA request to lower the PCB operating temperature for Train I<br />

East Landfill permit issued in June<br />

2008 TCEQ/USEPA issued a MACT Finding of Compliance for Train I<br />

East Landfill Operation began in February<br />

Dioxin/Furan testing performed on Train II<br />

Expect Class 3 Permit Modification to lower RCRA operating conditions on<br />

Trains I and II<br />

Site Characterization<br />

<strong>Clean</strong> <strong>Harbors</strong>’ facility in <strong>Deer</strong> <strong>Park</strong>, Texas, delivers state-of-the-future technological solutions<br />

for companies seeking the safest, responsible incineration of hazardous waste. With an<br />

unparalleled commitment to customer value, convenience and satisfaction, <strong>Deer</strong> <strong>Park</strong> maximizes<br />

security and minimizes risk for large and small generators.<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!