Project Scheduling
Project Scheduling
Project Scheduling
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Project</strong> <strong>Scheduling</strong><br />
1. CPM for Activity on Arrows<br />
Critical activities & critical path<br />
‣ Activities with TF = 0 are critical<br />
‣ These activities need special attention during construction<br />
‣ A set of critical activities form a critical path<br />
‣ the critical path is a continuous path of critical activities<br />
‣ The critical path is the longest one in the network<br />
‣ More than critical path can be formed<br />
13/01/2002 Emad Elbeltagi ٧<br />
Example<br />
<strong>Project</strong> <strong>Scheduling</strong><br />
1. CPM for Activity on Arrows<br />
5<br />
B<br />
d1<br />
1<br />
3<br />
A C E<br />
3<br />
9<br />
d=3 4 5<br />
11<br />
D<br />
d2<br />
6<br />
7<br />
13/01/2002 Emad Elbeltagi ٨