Hydro Development - 50,000 MW Hydro Initiative<br />

‣ 50,000 MW Hydro Initiative was launched in 2003 <strong>and</strong><br />

Preliminary Feasibility Report (PFRS) of 162 projects<br />

totaling to 48,000 MW has been prepared.<br />

‣ Out of this 77 projects with total capacity of about 37000<br />

MW for which first year tariff is expected to be less than<br />

Rs.2.50/unit were selected for execution.<br />

‣ In 11th plan, a capacity addition of over 15,500 MW has<br />

been earmarked keeping in view the present<br />

preparedness of these projects.<br />

‣ Projects totaling to a capacity of 30,000 MW have been<br />

identified for 12th Plan.<br />

‣ 13 th Plan 31,000 MW<br />

‣ 14 th Plan 36,494 MW