INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS 4<br />
Figure 2.<br />
Cash Flow. Concept <strong>of</strong> Net Present Value<br />
Figure 1.<br />
Illustration <strong>of</strong> Levelization<br />
LECN =<br />
$1, 573.32<br />
kW<br />
year<br />
Applying the values and solving for CRF:<br />
CRF =<br />
0.1587(1 + 0.1587)35<br />
(1 + 0.1587) 35 − 1 = 0.159621<br />
The Net Present Value (NPV) is determined using the<br />
following equation:<br />
Where:<br />
∑35<br />
NP V = (1 + r) −N (1 + i) N (CY EC)<br />
N=1<br />
r and N is as given in CRF calculation<br />
i is the escalation rate equivalent to 3% 9<br />
CYEC is the Current Year Energy Cost equivalent to<br />
$0.1444/kWh<br />
The first term in the NPV equation equates the rate <strong>of</strong> energy<br />
in the Nth year which is (1 + i) N (CY EC) in terms <strong>of</strong> the<br />
present values. In other words it determines how much must<br />
be invested today at an interest rate “r” in order to have (1 +<br />
i) N (CY EC) in the future. Figure 2 illustrates the principle.<br />
The sum <strong>of</strong> these present values is the Net Present Value.<br />
Substituting variables and solving for NPV:<br />
The value 0.9897 appearing in the equation above is the<br />
Availability Factor (AF). This figure was determined from<br />
2005-2009 transformer outage statistics from System Operations.<br />
Following the same methodology, LECN for Visayas and<br />
Mindanao Grids are as follows:<br />
LECN =<br />
LECN =<br />
$1, 367.81<br />
kW<br />
year<br />
$2, 219.34<br />
kW<br />
year<br />
Rex F. Corpuz is a former Sr. VP <strong>of</strong> the National Transmission Corporation<br />
and a former President <strong>of</strong> National Grid Corporation <strong>of</strong> the Philippines<br />
(NGCP). He is presently the Sr. Technical Adviser at the Office <strong>of</strong> the<br />
President, NGCP. He is also a former Regional Governor <strong>of</strong> IIEE Region<br />
1., e-mail: rfcorpuz@gmail.com<br />
∑35<br />
NP V = (1 + 0.1587) −N (1 + 0.03) N (0.1444) = 1.13697<br />
N=1<br />
The Calculated Levelized No-Load Energy Cost (LECN)<br />
for Luzon Grid is equal to:<br />
LECN = NP V ×CRF ×8760×AF<br />
Gerald R. Pagobo is a Power System Consultant and formerly worked with<br />
the research group <strong>of</strong> NGCP. He received his MS in <strong>Electrical</strong> Engineering<br />
degree from the University <strong>of</strong> the Philippines in 2009. His research interests<br />
include reliability engineering, power system dynamic stability, electricity<br />
market optimization, and computer-based power system modeling and analysis.<br />
Email: grpagobo@gmail.com<br />
LECN = 1.13697×0.159621×8760×0.9897<br />
9 Escalation rate for 2009 figures as used by Project Management. Note a<br />
constant rate <strong>of</strong> 3% is assumed for the entire book life <strong>of</strong> transformer