20.01.2015 Views

2012-Transformer-loss_eva... - Institute of Integrated Electrical ...

2012-Transformer-loss_eva... - Institute of Integrated Electrical ...

2012-Transformer-loss_eva... - Institute of Integrated Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS 4<br />

Figure 2.<br />

Cash Flow. Concept <strong>of</strong> Net Present Value<br />

Figure 1.<br />

Illustration <strong>of</strong> Levelization<br />

LECN =<br />

$1, 573.32<br />

kW<br />

year<br />

Applying the values and solving for CRF:<br />

CRF =<br />

0.1587(1 + 0.1587)35<br />

(1 + 0.1587) 35 − 1 = 0.159621<br />

The Net Present Value (NPV) is determined using the<br />

following equation:<br />

Where:<br />

∑35<br />

NP V = (1 + r) −N (1 + i) N (CY EC)<br />

N=1<br />

r and N is as given in CRF calculation<br />

i is the escalation rate equivalent to 3% 9<br />

CYEC is the Current Year Energy Cost equivalent to<br />

$0.1444/kWh<br />

The first term in the NPV equation equates the rate <strong>of</strong> energy<br />

in the Nth year which is (1 + i) N (CY EC) in terms <strong>of</strong> the<br />

present values. In other words it determines how much must<br />

be invested today at an interest rate “r” in order to have (1 +<br />

i) N (CY EC) in the future. Figure 2 illustrates the principle.<br />

The sum <strong>of</strong> these present values is the Net Present Value.<br />

Substituting variables and solving for NPV:<br />

The value 0.9897 appearing in the equation above is the<br />

Availability Factor (AF). This figure was determined from<br />

2005-2009 transformer outage statistics from System Operations.<br />

Following the same methodology, LECN for Visayas and<br />

Mindanao Grids are as follows:<br />

LECN =<br />

LECN =<br />

$1, 367.81<br />

kW<br />

year<br />

$2, 219.34<br />

kW<br />

year<br />

Rex F. Corpuz is a former Sr. VP <strong>of</strong> the National Transmission Corporation<br />

and a former President <strong>of</strong> National Grid Corporation <strong>of</strong> the Philippines<br />

(NGCP). He is presently the Sr. Technical Adviser at the Office <strong>of</strong> the<br />

President, NGCP. He is also a former Regional Governor <strong>of</strong> IIEE Region<br />

1., e-mail: rfcorpuz@gmail.com<br />

∑35<br />

NP V = (1 + 0.1587) −N (1 + 0.03) N (0.1444) = 1.13697<br />

N=1<br />

The Calculated Levelized No-Load Energy Cost (LECN)<br />

for Luzon Grid is equal to:<br />

LECN = NP V ×CRF ×8760×AF<br />

Gerald R. Pagobo is a Power System Consultant and formerly worked with<br />

the research group <strong>of</strong> NGCP. He received his MS in <strong>Electrical</strong> Engineering<br />

degree from the University <strong>of</strong> the Philippines in 2009. His research interests<br />

include reliability engineering, power system dynamic stability, electricity<br />

market optimization, and computer-based power system modeling and analysis.<br />

Email: grpagobo@gmail.com<br />

LECN = 1.13697×0.159621×8760×0.9897<br />

9 Escalation rate for 2009 figures as used by Project Management. Note a<br />

constant rate <strong>of</strong> 3% is assumed for the entire book life <strong>of</strong> transformer