25.04.2013 Views

The Electrical Engineer - Institute of Integrated Electrical Engineers ...

The Electrical Engineer - Institute of Integrated Electrical Engineers ...

The Electrical Engineer - Institute of Integrated Electrical Engineers ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong><br />

<strong>Engineer</strong>s <strong>of</strong> the Philippines, Inc.<br />

2010 Board <strong>of</strong> Governors and Officers<br />

National President Gregorio Y. Guevarra<br />

VP-Internal Affairs Armando R. Diaz<br />

VP-External Affairs Gregorio R. Cayetano<br />

VP-Technical Affairs Jules S. Alcantara<br />

National Secretary Alex C. Cabugao<br />

Treasurer Ma. Sheila C. Cabaraban<br />

Auditor Larry C. Cruz<br />

Region I Francis R. Calanio<br />

Region II Alvin M. Farrales<br />

Region IV Florencio D. Berenguel<br />

Region V Armin Jesus R. Nagera<br />

Region VI Midelo D. Ocampo<br />

Region VII Nelson M. Rosales<br />

Region VIII Cesar V. Sanchez<br />

Region IX Crisanto C. Sotelo<br />

Immediate Past President Arthur N. Escalante<br />

Officer-in-Charge Ramon R. Ayaton<br />

Department Heads<br />

Administration-OIC Niellisa Joy B, Bandong<br />

Finance -OIC Karen T. Sacdalan<br />

Technical-OIC Marvin H. Caseda<br />

Marketing & Memberhips Allen M. Pido<br />

Publications Committee<br />

Chairman: Nicolas C. Balderrama<br />

Members: Ernesto M. Cabral<br />

Allan C. Nerves<br />

Ronald Vincent M. Santiago<br />

Robinson S. Uy<br />

<strong>The</strong> ELECTRICAL ENGINEER<br />

<strong>The</strong> <strong>Electrical</strong> <strong>Engineer</strong> is published quarterly by the <strong>Institute</strong> <strong>of</strong><br />

<strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the Philippines, Inc. (IIEE), with<br />

editorial and business <strong>of</strong>fices at #41 Monte de Piedad St., Cubao<br />

Quezon City, Philippines. Tel Nos. (632) 722-7383, 727-3552, 412-<br />

5772, 414-5626, Fax Nos. (632) 727-3545 & 410-1899. Website:<br />

www.iiee.org.ph, E-mail: iiee@iiee.org.ph.<br />

<strong>The</strong> present circulation <strong>of</strong> the magazine is 28,000 copies per issue<br />

to members and industry stakeholders.<br />

Editorial Board<br />

Chairman: Jules S. Alcantara<br />

Editorial-in-Chief: Nicolas C. Balderrama<br />

Associate Editor: Ernesto M. Cabral<br />

Technical Consultant: Dr. Allan Nerves<br />

Administrative Officer: Ramon P. Ayaton<br />

Editorial Staff<br />

Editorial Assistant Jenelyn C. Pajutining<br />

Technical Assistant Marvin H. Caseda<br />

Graphic Artist Elwood B. Perez<br />

Advertising and Marketing<br />

Account Executive Joan Q. Delos Santos<br />

727-3552 loc. 101<br />

410-1899<br />

<strong>The</strong> ELECTRICAL ENGINEER<br />

3rd Quarter <strong>of</strong> 2010<br />

Contents<br />

PRESIDENT’S REPORT 6<br />

IIEE NEWS<br />

Chapter and National News 8<br />

QUARTERLY INDUSTRY NEWS DIGEST<br />

• NEA Leads Rehab <strong>of</strong> Southern Coop 22<br />

• TWG to facilitate PSALM’s Optimized<br />

Operations 22<br />

• Meralco Reinforces Good Governance 23<br />

• ERC Issues COC to CEDC’s Cebu-based Unit<br />

Coal-fired Power Plant 23<br />

• PSALM: No Investment with Lehman<br />

Brothers 24<br />

• ERC Resets Commencement <strong>of</strong> Acceptance<br />

testing <strong>of</strong> DUs Electric Meter 24<br />

TECHNICAL FEATURE<br />

• <strong>The</strong> National Grid Power Control Center<br />

By: Engr. Rafael F. Florentino<br />

25<br />

• Proposed Pre-Payment Energy Metering<br />

System for Multi-Tenant Offices and Rented<br />

Building Establishments 30<br />

By: Engr. Ferdinand Milan<br />

• Distributed Generation<br />

By: Engr. Jules S. Alcantara<br />

34<br />

Views or opinions expressed by the authors <strong>of</strong> letters,<br />

articles and research studies published in the <strong>The</strong><br />

<strong>Electrical</strong> <strong>Engineer</strong> Magazine DO NOT necessarily<br />

reflect the views <strong>of</strong> the <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong><br />

<strong>Engineer</strong>s <strong>of</strong> the Philippines, Inc. (IIEE). <strong>The</strong> IIEE trusts<br />

the integrity <strong>of</strong> these authors. <strong>The</strong> IIEE exercises due<br />

review diligence but it is possible that the contents <strong>of</strong><br />

the articles contributed may not be verified due to time<br />

constraints. Articles or visual materials may not be<br />

reproduced without written consent from IIEE. <strong>The</strong> IIEE<br />

reserves the right to accept or refuse submitted materials<br />

for publication. Articles, reactions and feedback from<br />

readers may be sent through e-mail at technical@iiee.<br />

org.ph


Greetings!<br />

From the Office <strong>of</strong><br />

ENGR. JULES S. ALCANTARA, PEE, ASEAN ENGINEER<br />

Vice President for Technical Affairs<br />

Chairman, Editorial Board<br />

TO OUR READERS<br />

<strong>The</strong> Editorial Board welcomes our readers to the 3rd<br />

quarter issue for 2010 <strong>of</strong> <strong>The</strong> <strong>Electrical</strong> <strong>Engineer</strong>.<br />

We wish to extend our appreciation to all the Regional<br />

Governors, Chapter Officers, members and National<br />

<strong>of</strong>ficers for their dedication and commitment in<br />

supporting the activities <strong>of</strong> the <strong>Institute</strong> and for further<br />

formulating such activities that promotes pr<strong>of</strong>essional<br />

growth <strong>of</strong> our fellow electrical practitioners.<br />

<strong>The</strong> third issue features different activities conducted<br />

by the Regions and Chapters for the period. <strong>The</strong>se<br />

activities included the Bicol Regional Conference<br />

hosted by the Camarines Norte Chapter and Western<br />

Visayas Regional Conference hosted by the Capiz<br />

Chapter.<br />

For this quarter, <strong>The</strong> Editorial Board features the<br />

technical papers on Proposed Prepayment Energy-<br />

Metering System for Multi-Tenant Offices and Rented<br />

Building Establishment, National Grid Control System<br />

and on Distributed Generation. <strong>The</strong> Board <strong>of</strong> <strong>Electrical</strong><br />

<strong>Engineer</strong>ing (BEE) further featured articles on<br />

Licensure Examination Requirements and Deputation<br />

Guidelines. <strong>The</strong> IIEE Council <strong>of</strong> Student Chapters<br />

further provided their reports for their activities for<br />

the quarter.<br />

We continue to encourage the members and students<br />

to actively participate in the preparation for research<br />

papers and supporting the plans and programs <strong>of</strong> the<br />

<strong>Institute</strong>.<br />

Thank you and God bless!<br />

CALENDAR OF 2010 major<br />

ACTIVITIES<br />

Southern Mindanao Regional<br />

Conference<br />

February 25-27, 2010<br />

Southern Luzon Regional<br />

Conference<br />

March 18-20, 2010<br />

Central Luzon Regional<br />

Conference<br />

April 28-30, 2010<br />

National Mid-Year<br />

Convention and General<br />

Membership Meeting<br />

May 27-29, 2010<br />

Northern Mindanao Regional<br />

Conference<br />

June 24-26, 2010<br />

Bicol Regional Conference<br />

July 22-24, 2010<br />

Western Visayas Regional<br />

Conference<br />

August 27-29, 2010<br />

Eastern/Central Mindanao<br />

Regional Conference<br />

October 7-9, 2010<br />

35th Annual National<br />

Convention and 3E XPO 2010<br />

November 24-27, 2010<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 5


FROM THE OFFICE OF THE NATIONAL PRESIDENT<br />

Third Quarter 2010<br />

PRESIDENT’S REPORT<br />

Engr. Gregorio Y. Guevarra, PEE<br />

<strong>The</strong> <strong>Institute</strong> is now heading towards the 4th Quarter guided<br />

by its 2010 theme, “IIEE Leading in Green Energy Solutions to<br />

Climate Change”. Because <strong>of</strong> the accomplishments <strong>of</strong> its different<br />

committees and working <strong>of</strong>ficers and members, the 3rd quarter<br />

was an eventful time in the <strong>Institute</strong>.<br />

I. <strong>The</strong> IIEE 35th Founding Anniversary<br />

<strong>The</strong> <strong>Institute</strong> celebrated its 35th year <strong>of</strong> service to<br />

the electrical industry last September 15, 2010 at<br />

the IIEE National Office. <strong>The</strong> celebration started<br />

with a mass <strong>of</strong>ficiated by Father Glenn Gomez and<br />

a simple program participated in by the <strong>Institute</strong>'s<br />

National Officers, Council <strong>of</strong> Former Presidents,<br />

Committee Officers and the IIEE Ladies Auxiliary.<br />

Part <strong>of</strong> the Anniversary Program was the community<br />

outreach by the IIEE Ladies Auxiliary with the<br />

Sisters <strong>of</strong> Mother <strong>The</strong>resa in Tayuman.<br />

For the succeeding years, all the regions are<br />

encouraged to conduct a simultaneous anniversary<br />

celebration, through a thanksgiving mass in their<br />

respective chapters. This will show unity among the<br />

different regions <strong>of</strong> the <strong>Institute</strong> in the celebration<br />

<strong>of</strong> its founding anniversary.<br />

II. Regional Conferences<br />

<strong>The</strong> 11th Bicol Regional Conference was successfully<br />

hosted by the Camarines Norte Chapter on July 22-<br />

24, 2010 at Villa Mila Garden Resort and Convention<br />

Center, Daet Camarines Norte. More than one<br />

hundred fifty electrical practitioners and two<br />

hundred sixty nine student members participated<br />

in the event.<br />

<strong>The</strong> IIEE Capiz Chapter hosted the 13th Western<br />

Visayas Regional Conference on August 26-28,<br />

2010 at the Lakehouse, San Antonio Resort, Baybay,<br />

Roxas City. More than one hundred fifty members<br />

coming from the different chapters gathered in the<br />

event.<br />

III. Chapter Activities<br />

I wish to congratulate all the Chapter Officers<br />

and Regional Governors for the different activities<br />

conducted during the third quarter. <strong>The</strong>se activities<br />

are also featured in this issue. <strong>The</strong> <strong>Institute</strong><br />

continues to encourage all the regional governors<br />

and chapter <strong>of</strong>ficers to continue conducting<br />

activities in relation to the <strong>Institute</strong>'s thrust for this<br />

year.<br />

IV. NCR Conference<br />

6 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

<strong>The</strong> <strong>Institute</strong>, through the NCR Affairs Bureau, held<br />

its 2010 1st NCR General Membership Meeting<br />

and Technical Seminars last July 20, 2010 at the<br />

Meralco Mini <strong>The</strong>ater, Lopez Building, Ortigas Ave.,<br />

Pasig City. <strong>The</strong> event gathered almost one hundred<br />

electrical practitioners coming from the different<br />

private companies and government institutions in<br />

the NCR such as the National Grid Corporation <strong>of</strong> the<br />

Philippines, City and Municipal <strong>Electrical</strong> <strong>Engineer</strong>s


and Electricians, MERALCO Association <strong>of</strong> Cadet<br />

<strong>Engineer</strong>s, Society <strong>of</strong> Philippine Electrotechnical<br />

Constructors and Suppliers, Inc. , National<br />

Power Corporation, Philippine Electricity Market<br />

Corporation and others.<br />

V. Board <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing<br />

<strong>The</strong> Board <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing Pr<strong>of</strong>essional<br />

Regulation Commission in coordination with the<br />

<strong>Institute</strong> conducted the Oathtaking Ceremonies <strong>of</strong><br />

Successful Examinees <strong>of</strong> the May 2010 <strong>Electrical</strong><br />

<strong>Engineer</strong> Licensure Examination on July 10, 2010<br />

at the SMX Convention Center, SM Mall <strong>of</strong> Asia,<br />

Pasay City.<br />

<strong>The</strong> 2nd Licensure Examination for <strong>Electrical</strong><br />

<strong>Engineer</strong>s was held last September 11-12, 2010.<br />

Five examinees for Pr<strong>of</strong>essional <strong>Electrical</strong> <strong>Engineer</strong>,<br />

913 for Registered <strong>Electrical</strong> <strong>Engineer</strong> and 529<br />

for Registered Master Electrician passed the<br />

examination.<br />

VI. Student Affairs<br />

<strong>The</strong> Council <strong>of</strong> Student Chapters (CSC) and<br />

Regional Council <strong>of</strong> Student Chapters (RCSC),<br />

simultaneously conducted the 6th Regional Student<br />

Conference (RSCON), 24th Regional Quiz Show<br />

and 10th Regional Math Wizard last September 24-<br />

26, 2010.<br />

VII. IIEE Advocacy Group<br />

<strong>The</strong> <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s<br />

<strong>of</strong> the Philippines, Inc, (IIEE), through the IIEE<br />

Advocacy Group held an Electric Power Industry<br />

Stakeholders' Forum last September 3, 2010 at<br />

Dusit Thani Hotel, Makati City.<br />

VIII. Forum on the Amendments to RA 7920<br />

<strong>The</strong> Council <strong>of</strong> Former Presidents (CFP) hosted<br />

a Forum on the Amendments to RA7920 and its<br />

Implementing Rules and Regulations (IRR) which<br />

was held last 31st <strong>of</strong> July 2010 at the IIEE National<br />

<strong>of</strong>fice.<br />

IIEE Incumbent <strong>of</strong>ficers, CFP members, Board <strong>of</strong><br />

<strong>Electrical</strong> <strong>Engineer</strong>ing (BEE), Legal and Legislative<br />

Affairs Committee (LELAC), IIEE Legal Counsel and<br />

the Academe attended the Forum.<br />

FROM THE OFFICE OF THE NATIONAL PRESIDENT<br />

IX. External Linkages<br />

<strong>The</strong> <strong>Institute</strong>, represented by the National<br />

President, attended the following meetings and<br />

activities:<br />

• With the Philippine Green Building Initiative at<br />

UAP on July 17<br />

• Signing <strong>of</strong> simplified MOA with PSME<br />

• Attended the China Machinery Exhibit<br />

• PGBI Workshop on September 24 at the UAP<br />

Headquarters.<br />

• Induction <strong>of</strong> chapter <strong>of</strong>ficers <strong>of</strong> Bataan Chapter<br />

on September 18<br />

VIII. Proxy Votes<br />

<strong>The</strong> <strong>Institute</strong> continuous to appeal to the general<br />

membership to support the ratification <strong>of</strong> the<br />

<strong>Institute</strong>'s Amended By-Laws. <strong>The</strong> members may<br />

authorize any <strong>of</strong> the National Officers, respective<br />

regional governor or chapter president to vote in<br />

their behalf by filling out the attached proxy form.<br />

As <strong>of</strong> September 2010, the <strong>Institute</strong> had received<br />

2000 proxy votes.<br />

IX. Membership Benefits<br />

A. Technical Seminars<br />

<strong>The</strong> Pr<strong>of</strong>essional Training and Development<br />

Committee chaired by Engr. Eusebio Gonzales<br />

conducted three seminars for the quarter: (1)<br />

<strong>Electrical</strong> Grounding (2) Substation Design and (3)<br />

SCADA.<br />

B. Membership Renewal<br />

In every regional conference, the <strong>Institute</strong> brings<br />

the membership staff to assist the members in<br />

their membership renewal in IIEE and PRC and to<br />

attend to other membership concerns. With this,<br />

the members will no longer need to visit the IIEE<br />

National Office in Quezon City to renew their IIEE<br />

Membership.<br />

For your individual and chapter concerns or<br />

inquiries, you can contact the IIEE National<br />

Secretariat by snail mail, fax, telephone<br />

or e-mail at : technical@iiee.orgph or<br />

administration@iiee.org.ph.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 7


IIEE NEWS<br />

IIEE LA UNION CHAPTER<br />

HOLDS TECHNICAL SEMINARS<br />

Engr. Francis R. Calanio, Northen Luzon Regional Governor<br />

<strong>The</strong> IIEE La Union Chapter hosted technical seminars on<br />

September 24, 2010 at DMMMSU-Mid La Union Campus,<br />

San Fernando City, La Union.<br />

Four (4) technical seminars were discussed: (1) <strong>Electrical</strong><br />

Safety by Engr. Frumencio “Ming” Tan, Chairman <strong>of</strong> the<br />

IIEE BFP Committee; (2) High Rise Building Design by<br />

Engr. Hipolito A. Leoncio, 2008 IIEE National President;<br />

and (3) TVSS by Engr. Joven Pataueg, IIEE La Union<br />

Chapter Immediate Former President; and (4) Technical<br />

Session by Engr. Jose R. Arellano, IIEE La Union Chapter<br />

Board <strong>of</strong> Director. <strong>The</strong> Panasonic, through Ms. Ellen<br />

Mondelo also conducted a product presentation.<br />

75 practitioneers and 150 students gathered to<br />

participate in the event organized by the <strong>of</strong>ficers <strong>of</strong> La<br />

Union Chapter, headed by its Chapter President Engr.<br />

Ronaldo G. Lamaroza.<br />

List <strong>of</strong> New IIEE Library Books<br />

1. <strong>Electrical</strong> Equipment Maintenance (NFPA)<br />

2. Stored Equipment <strong>Electrical</strong> Energy NFPA III<br />

3. Emergency and Standby Power Standard (NFPA)<br />

4. <strong>Electrical</strong> Inspection Manual<br />

5. <strong>Electrical</strong> Safety in Workplace<br />

6. <strong>Electrical</strong> Inspection Code for Existing Dwellings<br />

7. <strong>Electrical</strong> Design (NEC 2008)<br />

8. <strong>Electrical</strong> Design Instructors Toolkit<br />

9. Lightning Protection Standard (NFPA)<br />

10. Fire Alarm Signaling (NFPA)<br />

11. <strong>Electrical</strong> Systems for Healthcare Facilities<br />

12. National <strong>Electrical</strong> Code (2008)<br />

8 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

Participants <strong>of</strong> IIEE La Union Chapter technical seminars


IIEE NEWS<br />

SOUTHERN CAVITE HOSTS<br />

THE 1st IIEE REGION IV ENGINEERING SUMMIT<br />

Engr. Florencio D. Berenguel, Southern Tagalog Governor<br />

<strong>The</strong> 1st IIEE Southern Tagalog <strong>Engineer</strong>ing Summit<br />

with the theme: “Harnessing <strong>Engineer</strong>ing Pr<strong>of</strong>essions<br />

Toward Green Environment” was successfully hosted by<br />

Southern Cavite Chapter held at Development Academy<br />

<strong>of</strong> the Philippines, Tagaytay City on July 30-31, 2010.<br />

Prior to the event, IIEE-SCC paid a courtesy visit to some<br />

engineering schools within Cavite last July 8, 2010. <strong>The</strong><br />

schools visited were Lyceum <strong>of</strong> the Philippines University,<br />

Cavite State University, and Polytechnic University <strong>of</strong> the<br />

Philippines.<br />

<strong>The</strong> summit aims to address pr<strong>of</strong>essional development<br />

among its delegates through the different technical<br />

seminars. Topics discussed were (1) Technopreneurship<br />

101; (2) Leadership in Energy & Environmental Design<br />

Primer (LEED); (3) Hazardous Waste Management;<br />

(4) Electric Motor Management; (5) Fire Code <strong>of</strong> the<br />

Philippines. (FALAR); (6) Meralco Service Entrance<br />

Requirements; (7) Energy Auditing; (8) Open Access<br />

Forum; (9) Nuclear Energy; (10) Fundamentals <strong>of</strong><br />

Optimal Safety Performance; (11) Successful <strong>Engineer</strong>ing<br />

Management; (12) Renewable Energy; and (13) Direct<br />

Drive Motor on Upgrading Conventional Cooling Drive<br />

System<br />

Part <strong>of</strong> the <strong>Engineer</strong>ing Summit was the Poster Making<br />

Contest. <strong>The</strong> contest was open to all engineering students<br />

from the different schools in the region.<br />

Officers <strong>of</strong> Region IV with the IIEE National President Engr. Gregorio<br />

Y. Guevarra<br />

Entries <strong>of</strong> the Poster Making Contest<br />

As part <strong>of</strong> the evaluation process, each participating<br />

team was given a chance to explain their respective art<br />

work. Judges were PSME Cavite Chapter President Engr.<br />

Almario Senoro, Artist Mrs. Koni Pascual , Gov. Bong<br />

Berenguel and SCC Chapter President Lito Guleng. <strong>The</strong><br />

winners <strong>of</strong> the Poster Making Contest were as follows:<br />

Champion – Lyceum <strong>of</strong> the Philippines University Team<br />

1; 1st Runner up – Lyceum <strong>of</strong> the Philippines University<br />

Team 2 and 2nd Runner up – Technological University <strong>of</strong><br />

the Philippines Cavite.<br />

<strong>The</strong> summit was designed to further develop the<br />

camaraderie among the different engineering disciplines<br />

in the region through a bowling tournament. <strong>The</strong> winners<br />

<strong>of</strong> the Bowling Tournament were as follows:<br />

Champion- Team composed <strong>of</strong> Edmundo Frias, Ariel<br />

Guevarra, Lindsey Salilig and Analyn Berenguel; First<br />

Runner - Team <strong>of</strong> Robin Batacandolo, June Santos,<br />

Jhongie Juance and Trixie;<br />

Second runner up- Team <strong>of</strong> Lito Guleng, Raymar Bawang,<br />

Almario Senoro, and Mrs. Salilig.<br />

Special awards were given to Ms. Lindsey Salilig and Ms.<br />

Analyn Berenguel for the Most Number <strong>of</strong> Consecutive<br />

Strikes. Lito Guleng took the High Game award and the<br />

High Series award went to Bong Berenguel.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 9


IIEE NEWS<br />

SORSOGON CHAPTER CONDUCTS<br />

FREE COMPUTER SEMINARS<br />

FOR ITS IIEE OFFICERS AND MEMBERS<br />

Engr. Domiciano S. Dela Rosa, Jr. , Sorsogon Chapter President<br />

With its commitment to enhance the technical skills<br />

and talents <strong>of</strong> its members, the IIEE Sorsogon Chapter<br />

successfully conducted a four-day “free computer<br />

seminar” last September 04-05 and 11-12, 2009 at<br />

Sorsogon Electric Company 2 (SORECO 2) Mess Hall in<br />

Brgy. Buhatan, Sorsogon City.<br />

<strong>The</strong> seminar was composed <strong>of</strong> four modules: 1. (MODULE<br />

1) Familiarization and Basic Computer; 2. (MODULE 2)<br />

Computer Hardware Set-up; 3. (MODULE 3) Computer<br />

S<strong>of</strong>twares (Bios, OS and Applications) Set-up, and;<br />

4. (MODULE 4) Basic Computer Troubleshooting &<br />

Preventive Maintenance.<br />

This activity was made possible by the IIEE Sorsogon<br />

Chapter Officers, headed by Engr. Dominic S. Dela<br />

Rosa (Chapter President) & Engr. Rannie L. Forcadela<br />

(Chapter VP-Internal Affairs), who also served as the<br />

Lecturers and Instructors <strong>of</strong> this seminar. Ms. Clemen G.<br />

Licup (Chapter Secretary) and Engr. Leah E. Funtanares<br />

(Chapter Treasurer) coordinated and managed the<br />

seminar venue, including the multi-media equipment<br />

and sound system needed in this activity.<br />

<strong>The</strong> IIEE Sorsogon Chapter also would like to thank Atty.<br />

Percival G. Alvarez, OIC-General Manager <strong>of</strong> SORECO 2,<br />

for lending/providing their facilities for free including the<br />

multimedia equipment and sound system. Also, we thank<br />

AN INVITATION<br />

<strong>The</strong> Organizers (L-R): Engr. Aman D. Lanuza, Engr. Dwight<br />

B. Duran, Engr. Dominic S. Dela Rosa, Ms. Clemen G. Licup,<br />

Engr. Leah E. Funtanares and Mr. Mario A. Deuna<br />

Engr. Aman D. Lanuza <strong>of</strong> Sorsogon City <strong>Engineer</strong>ing<br />

Office, Engr. Dwight B. Duran <strong>of</strong> BacMan Geothermal,<br />

Incorporated (BGI), and Mr. Mario A. Deuna (Chapter<br />

BOD), provided free lunches, snacks and transportation.<br />

This seminar aims to provide the IIEE Sorsogon Chapter<br />

members additional technical know-how in computers,<br />

not only on the aspect <strong>of</strong> its operation, but also in carrying<br />

out appropriate preventive and corrective maintenance<br />

<strong>of</strong> its s<strong>of</strong>twares & hardware.<br />

THE ELECTRICAL ENGINEER MAGAZINE invites all the Regional Governors, Chapter<br />

Officers, Students and Members to submit their contributions for publication. We<br />

will highlight significant programs in pursuit <strong>of</strong> the interest <strong>of</strong> the <strong>Institute</strong> and its<br />

community.<br />

You may send your contributed materials, comments and suggestions through<br />

e-mail: technical@iiee.org.ph at least 30 days before the end <strong>of</strong> the every quarter<br />

and coordinate with Engr. Ramon Ayaton or Publications Committee members.<br />

10 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010


<strong>The</strong> IIEE Antique Chapter conducted a blood letting<br />

activity last July 31, 2010 held at PNRC Building San<br />

Jose Antique. With the theme “ SAGIP BUHAY PROJECT “,<br />

the said activity was done with the help <strong>of</strong> our Governor<br />

Exequiel Javier , Mayor Rony Molina and SB Joruel<br />

Galindo. who donated funds we use to buy food and<br />

vitamins for the brave blood donors as our way <strong>of</strong> saying<br />

thank you.<br />

<strong>The</strong> Officers and Board <strong>of</strong> Directors <strong>of</strong> the IIEE Antique<br />

Chapter, headed by their President Engr. Niel P. De<br />

Guzman, unanimously agreed and participated in the<br />

said activity as they have collected 6,000 cc <strong>of</strong> donated<br />

blood. <strong>The</strong> PNRC Antique thru their Administrator Ester<br />

L. Buenaventura gave the IIEE Antique Chapter a<br />

Certificate <strong>of</strong> Appreciation as to show their gratitude for<br />

the project.<br />

IIEE NEWS<br />

IIEE ANTIQUE CHAPTER CONDUCTS TECHNICAL<br />

SEMINAR AND PARTICIPATES<br />

IN BLOOD LETTING PROGRAM OF THE PNRC<br />

By: Engr. Midelo D. Ocampo, Western Visayas Governor<br />

<strong>The</strong> IIEE Antique Chapter during the blood letting program in<br />

PNRC Building San Jose Antique<br />

<strong>The</strong> electrical engineering students <strong>of</strong> UA is taking part in the<br />

actual rewiring <strong>of</strong> the motor control after it was dismantled<br />

previously by Engr. Cancan<br />

<strong>The</strong> IIEE Antique Chapter conducted an actual motor<br />

rewinding and lecture on basic motor operation and<br />

control, participated by the <strong>Electrical</strong> <strong>Engineer</strong>ing<br />

students <strong>of</strong> University <strong>of</strong> Antique, headed by their<br />

Adviser Engr. Esmenos.<strong>The</strong> technical training was held<br />

in Atabay San Jose Antique on September 27, 2010 and<br />

conducted by our own Gabriel H. Cancan III as it was<br />

witnessed by their president Engr. Niel P. De Guzman.<br />

<strong>The</strong> training was a success and although time was too<br />

short they were able to convey the understanding <strong>of</strong><br />

interpreting schematic diagrams in motor control. This<br />

will be the start <strong>of</strong> a series <strong>of</strong> lectures and trainings that<br />

the IIEE Antique Chapter planned to give to the <strong>Electrical</strong><br />

<strong>Engineer</strong>ing students <strong>of</strong> University <strong>of</strong> Antique.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 11


IIEE NEWS<br />

IIEE CEBU CHAPTER HOLDS TECHNICAL SEMINAR<br />

By: Engr. Nelson M. Rosales, Central/Eastern Visayas Governor<br />

<strong>The</strong> IIEE Cebu Chapter conducted a technical<br />

seminar on Practical Discussion/Calculation on<br />

<strong>Electrical</strong> Power Cable Low and Medium Voltage<br />

Types up to 69kV last August 21, 2010 at Cebu<br />

Business Hotel.<br />

Eighty three members gathered to participate<br />

in the event organized by the <strong>of</strong>ficers <strong>of</strong> Cebu<br />

Chapter, headed by its Chapter President Engr.<br />

Rodel Vicente.<br />

IIEE-SOCSARGEN CHAPTER<br />

PERFORMS CIVIC ACTION<br />

IN GK-ORLANDO VILLAGE<br />

<strong>The</strong> IIEE–SOCSARGEN Chapter, in cooperation with the<br />

South Cotabato Electric Cooperative II (SOCOTECO<br />

II) and in coordination with Couples for CHRIST (CFC<br />

Global), performed a civic consciousness activity by<br />

undertaking a basic house electrification project for<br />

the indigent community in the GK–Orlando Village in<br />

Barangay Katangawan, Gen. Santos City, whereby ten<br />

(10) were the beneficiary households in the community.<br />

Some <strong>of</strong> the houses in the GK-Orlando Village that have been<br />

installed with the basic household electrical system, courtesy <strong>of</strong> IIEE-<br />

SOCSARGEN and SOCOTECO II.<br />

By: Engr. Antonio Naval, Socsargen Chapter President<br />

12 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

Members <strong>of</strong> Cebu Chapter particiapted in the technical<br />

seminar<br />

<strong>The</strong> Officers and Members <strong>of</strong> the IIEE-SOCSARGEN Chapter and<br />

the Family Heads <strong>of</strong> the households that benefited from the house<br />

electrification assistance project, which was jointly undertaken by<br />

IIEE-SOCSARGEN and SOCOTECO II Electric Cooperative, in<br />

coordination with Couples for Christ.


IIEE NEWS<br />

IIEE CAMARINES NORTE CHAPTER HOSTS 11TH IIEE<br />

BICOL REGIONAL CONVENTION<br />

More than one hundred forty members and two hundred<br />

sixty nine student members coming from the different<br />

chapters <strong>of</strong> the region participated in the 11th IIEE Bicol<br />

Regional Conference held on July 22-24, 2010 at the<br />

Villa Mila Garden Resort and Conference Center, Daet<br />

Camarines Norte hosted by the Camarines Norte Chapter.<br />

Different activities were conducted before the formal<br />

opening <strong>of</strong> the conference. Among <strong>of</strong> these events were<br />

motorcade, skills olympics, tree planting and Palarong<br />

Panlahi.<br />

In behalf <strong>of</strong> Hon. Mayor Tito S. Siron, Mayor <strong>of</strong> Daet,<br />

Camarines Norte, SANTIAGO M. MELLA JR, his Municipal<br />

Administrator, served as the Guest and Keynote Speaker<br />

during the formal opening <strong>of</strong> the convention. He extended<br />

his congratulations to the chapter for hosting such a<br />

valuable event that promotes pr<strong>of</strong>essional development<br />

among members.<br />

Several topics were discussed during the technical<br />

sessions; (1) CPE Implementing Rules, (2) Substation<br />

Design; (3) Short Circuit Calculation; (4) Fundamentals<br />

<strong>of</strong> Energy Efficient Lighting System Design; (5)<br />

Hazardous and Toxic Waste Management; (6) Effects <strong>of</strong><br />

Poor Power Quality on the Operation and Performance<br />

<strong>of</strong> Electric Motor; (7) Biogas Diversity Sytem; and (8)<br />

Renewable Energy for Electricity Generation.<br />

By: Engr. Armin Jesus R. Nagera, Region V Governor<br />

<strong>The</strong> Chapter Presidents’ Meeting was part <strong>of</strong> the event<br />

Part <strong>of</strong> the two day event were different technical product<br />

presentations from the different notable companies such<br />

as Hytech Power, Inc., CANORECO and Access Frontier<br />

Technologies.<br />

<strong>The</strong> conference also hosted the Chapter Presidents<br />

meeting where chapter representatives from the region<br />

discussed matters regarding member benefits, and the<br />

<strong>Institute</strong>'s internal operation and external linkages.<br />

Also, the 7th Regular Board Meeting was held in the<br />

CANORECO <strong>of</strong>fice.<br />

<strong>The</strong> closing ceremonies capped the two<br />

day conference. Engr. Lorenzo Canlas,<br />

Jr., 1999 Camarines Norte Chapter<br />

President and the General Manager<br />

<strong>of</strong> CANORECO served as keynote<br />

speaker <strong>of</strong> the event. Engr. Armin<br />

Jesus Nagera, Bicol Regional Governor<br />

extended his warmest appreciation to<br />

all the exhibitors, guests, delegates,<br />

<strong>of</strong>ficers and the working committee <strong>of</strong><br />

11th Bicol Regional Conference who<br />

made the event a success.<br />

<strong>The</strong> IIEE National Officers with Engr.<br />

Armin Jesus Nagera, Bicol Region Governor<br />

during the Opening Ceremonies <strong>of</strong><br />

Exhibits<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 13


IIEE NEWS<br />

IIEE CAPIZ CHAPTER CONDUCTS<br />

13TH IIEE WESTERN VISAYAS<br />

REGIONALCONFERENCE<br />

<strong>The</strong> IIEE Capiz Chapter successfully conducted the<br />

13th Western Visayas Regional Conference, with<br />

the <strong>Institute</strong>'s 2010 theme, “IIEE Leading in Green<br />

Energy Solutions to Climate Change” on August<br />

26-28, 2010 at the Lakehouse, San Antonio Resort,<br />

Baybay, Roxas City.<br />

More than one hundred fifty members coming<br />

from the different chapters gathered to widen<br />

their technical skills and further strengthen the<br />

camaraderie among the chapters <strong>of</strong> the region.<br />

<strong>The</strong> first day <strong>of</strong> the event witnessed the motorcade<br />

from San Antonio Resort to Downtown Roxas City<br />

main road. Also, the bowling and firing tournament<br />

were held with an aim <strong>of</strong> developing the camaraderie<br />

among the members in the region.<br />

Hon. Ronnie T. Dadivas, Vice Mayor <strong>of</strong> Roxas City<br />

commended the Capiz Chapter for its dedication<br />

in holding an event that promotes pr<strong>of</strong>essional<br />

development among the electrical practitioners<br />

in the region. He also welcomed all the visitors<br />

coming from the other chapters and regions to the<br />

Seafood Capital <strong>of</strong> the Philippines.<br />

With its objective <strong>of</strong> providing quality services to<br />

fellow practitioners, the Capiz Chapter came up<br />

with the line-up <strong>of</strong> technical sessions and product<br />

presentations. Topics discussed during the technical<br />

sessions included: (1) High Rise Building <strong>Electrical</strong><br />

Design; (2) <strong>Electrical</strong> Grounding and Bonding;<br />

(3) Meeting the Interrupting Requirement <strong>of</strong> the<br />

Philippine <strong>Electrical</strong> Code; (4) Hazardous and Toxic<br />

Waste Management (DENR-EMB); (5) Solar House;<br />

(6) Nuclear Energy; (7) Introduction to Sustainable<br />

Energy Management; (8) Renewable Energy for<br />

Electricity Generation; (9) How to Become a PEE;<br />

and (10) Substation Maintenance.<br />

Notable companies who participated in technical<br />

product presentations were; (1)Asiaphil; (2) Pazific<br />

Power; (3) American Wires and Cables; (4) Grid<br />

North; (5) Firefly; (6) Hydrauking; and (7) PPI.<br />

14 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

<strong>The</strong> conference hosted the Chapter Presidents<br />

meeting that discussed the concerns <strong>of</strong> chapter<br />

representatives. <strong>The</strong> meeting also created<br />

an avenue for hearing the suggestions <strong>of</strong> the<br />

Chapter Presidents on how to improve the internal<br />

operations <strong>of</strong> the <strong>Institute</strong>.<br />

Engr. Midelo D. Ocampo, Region Vl Regional<br />

Governor expressed his appreciation to all the<br />

exhibitors, guests, delegates, <strong>of</strong>ficers who traveled<br />

and supported the event during the closing<br />

ceremonies. He also commended the working<br />

committee <strong>of</strong> 13th Regional Conference for making<br />

the event a success.


Successful PEE, REE and RME Examinees<br />

take Oath <strong>of</strong> Pr<strong>of</strong>ession<br />

Three examinees for (3) Pr<strong>of</strong>essional <strong>Electrical</strong> <strong>Engineer</strong>,<br />

457 out <strong>of</strong> 1,611 for Registered <strong>Electrical</strong> <strong>Engineer</strong> and<br />

539 out <strong>of</strong> 1,408 for Registered Master Electrician who<br />

passed the <strong>Electrical</strong> <strong>Engineer</strong> Licensure Examinations<br />

took their Oath <strong>of</strong> Pr<strong>of</strong>ession before the Board on July<br />

10, 2010 at the SMX Convention Center, SM Mall <strong>of</strong> Asia,<br />

Pasay City.<br />

<strong>The</strong> Oathtaking ceremony were conducted by the<br />

Board <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing Pr<strong>of</strong>essional Regulation<br />

Commission, chaired by Hon. Fortunato C. Leynes, and<br />

with members Hon. Jaime V. Mendoza and Hon. Francis<br />

V. Mapile. <strong>The</strong> event was made in coordination with<br />

the <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the<br />

Philippines, Inc. (IIEE).<br />

<strong>The</strong> May 2010 licensure examinations was given by<br />

the members <strong>of</strong> the Board <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing in<br />

Manila, Baguio, Cagayan De Oro, Cebu, Davao, Iloilo and<br />

Legazpi. Three (3) days after the last day <strong>of</strong> examination,<br />

the result was released.<br />

<strong>The</strong> top performing schools in the May 2010 REE<br />

Licensure Examination as per Commission Resolution<br />

<strong>The</strong> 2010 EE Board Passers<br />

IIEE NEWS<br />

COUNCIL OF FORMER PRESIDENTS HOLDS FORUM<br />

THE AMENDMENTS TO RA 7920<br />

<strong>The</strong> Council <strong>of</strong> Former Presidents (CFP) hosted a Forum<br />

on the Amendments to RA7920 and its Implementing<br />

Rules and Regulations (IRR) which was held last 31st <strong>of</strong><br />

July 2010 at the IIEE National <strong>of</strong>fice.<br />

IIEE Incumbent <strong>of</strong>ficers, CFP members, Board <strong>of</strong><br />

<strong>Electrical</strong> <strong>Engineer</strong>ing (BEE), Legal and Legislative<br />

Affairs Committee (LELAC), IIEE Legal Counsel and the<br />

Academe attended the Forum.<br />

<strong>The</strong> CFP, under the Chairmanship <strong>of</strong> Engr. Antonio S.<br />

Herrera, Jr. initiated the forum to solicit and discuss ideas,<br />

comments, suggestions and opinions <strong>of</strong> the concerned<br />

participants on the possible amendments to make it<br />

more responsive to the present needs <strong>of</strong> the electrical<br />

practitioners; as well as the industry and society, as a<br />

whole.<br />

Engr. Emil G. Marabulas, Chairman <strong>of</strong> the IIEE Legal<br />

and Legislative Affairs Committee (LELAC) was tasked<br />

No. 2010-547 series <strong>of</strong> 2010 were the Mindanao State<br />

University-Iligan <strong>Institute</strong> <strong>of</strong> Technology with 21 out <strong>of</strong><br />

21 total number <strong>of</strong> examinees (100% passed) and the<br />

University <strong>of</strong> the Philippines – Los Baños with 20 out 20<br />

total number <strong>of</strong> examinees (100% passed)<br />

by the IIEE – Board <strong>of</strong> Governors to collate proposed<br />

amendments to the RA7920 and its IRR from various<br />

chapters <strong>of</strong> IIEE. During the Forum, he presented<br />

the raw data collected by his Committee. Different<br />

opinions, suggestions and reactions were heard from the<br />

participants.<br />

<strong>The</strong> Board <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing (BEE) Chairman,<br />

Fortunato C. Leynes suggested to Engr. Marabulas to<br />

present the proposed amendments gathered by the<br />

LELAC in matrix form to the PRC thru the BEE. <strong>The</strong><br />

Chairman also said that he will communicate with Atty.<br />

Carlos Almelor, Secretary for the Pr<strong>of</strong>essional Regulatory<br />

Board (PRB) to seek advice pertaining to the RA7920<br />

amendments. Further, Chairman Leynes suggested that<br />

the proposed amendments to RA7920 and its IRR be<br />

published in the <strong>Electrical</strong> <strong>Engineer</strong> Magazine so that<br />

IIEE members will be duly informed and their possible<br />

reactions may also be obtained.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 15


IIEE NEWS<br />

NCR Affairs Bureau holds<br />

2010 1st NCR General Membership Meeting<br />

and Technical Seminars<br />

<strong>The</strong> <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the<br />

Philippines, Inc. (IIEE), held its 2010 1st NCR General<br />

Membership Meeting and Technical Seminars last July<br />

20, 2010 at the Meralco Mini <strong>The</strong>ater, Lopez Building,<br />

Ortigas Ave., Pasig City, with the 2010 theme, “IIEE<br />

Leading in Green Energy Solutions to Climate Change”.<br />

This one-day gathering was aimed at supporting the<br />

pr<strong>of</strong>essional growth <strong>of</strong> the electrical practitioners coming<br />

from the National Capital Region, to campaign the<br />

ratification <strong>of</strong> the <strong>Institute</strong>'s proposed amended by-laws<br />

through proxy voting and to establish the NCR as a super<br />

region <strong>of</strong> strong and active members by encouraging the<br />

participation <strong>of</strong> IIEE members in the National Capital<br />

Region.<br />

<strong>The</strong> event gathered almost one hundred electrical<br />

practitioners coming from the different private<br />

companies and government institutions in the NCR<br />

such as the National Grid Corporation <strong>of</strong> the Philippines,<br />

City and Municipal <strong>Electrical</strong> <strong>Engineer</strong>s and Electricians,<br />

MERALCO Association <strong>of</strong> Cadette <strong>Engineer</strong>s, Society <strong>of</strong><br />

Philippine Electrotechnical Constructors and Suppliers,<br />

Inc. , National Power Corporation, Philippine Eletricity<br />

Market Corporation and more.<br />

Engr. Armando R. Diaz. Vice President for<br />

Internal Affairs welcomed all the delegates<br />

in his message. He first provided updates<br />

regarding the membership database, IIEE<br />

Foundation, CFL Testing Laboratory and other<br />

internal related activities <strong>of</strong> the <strong>Institute</strong>.<br />

Two technical seminars were conducted to<br />

further develop and upgrade the technical skills<br />

and knowledge <strong>of</strong> the members. In response<br />

to the number 10 agenda <strong>of</strong> the National<br />

President, Engr. Gregorio Y. Guevarra, that is,<br />

to encourage Registered <strong>Electrical</strong> <strong>Engineer</strong>s<br />

to become a Pr<strong>of</strong>essional <strong>Electrical</strong> <strong>Engineer</strong>s,<br />

Hon. Fortunato C. Leynes, Board <strong>of</strong> <strong>Electrical</strong><br />

<strong>Engineer</strong>ing Chairman, discussed the topic<br />

“How to Become A Pr<strong>of</strong>essional <strong>Electrical</strong><br />

<strong>Engineer</strong>”. Parallel to the <strong>Institute</strong>'s advocacy<br />

on promoting green energy solutions to climate<br />

change, Engr. Virgilio S. Luzares presented the<br />

topic “Solar House”.<br />

Notable companies participated in the<br />

technical product presentations, (1) RPV<br />

Electro Technology Philippines, Corp. and (2)<br />

Schneider Electric. Other notable companies<br />

16 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

who supported the programs were Montrio <strong>Electrical</strong> Inc.,<br />

PAMAV Training <strong>Institute</strong>, Germaced- Ten Corporation,<br />

Cabalce <strong>Electrical</strong> Contractors and Asiaphil Group <strong>of</strong> Co.<br />

Engr. Ramon Z. Gatchalian Jr. presided over the 2010<br />

1st NCR General Membership Meeting. He discussed<br />

the aims and objectives <strong>of</strong> the NCR Affairs Bureau in<br />

holding such event. He also presented the organizational<br />

structure <strong>of</strong> the bureau and campaign for the ratification<br />

<strong>of</strong> the <strong>Institute</strong>'s proposed amendments to its by-laws<br />

through proxy voting.<br />

In his closing remarks, Engr. Gatchalian encouraged the<br />

participants to continue supporting the activities <strong>of</strong> the<br />

<strong>Institute</strong>. He further acknowledged all the sponsors,<br />

guests, visitors and delegates who made the event a<br />

success.<br />

Several raffle prizes were given away by the PAMAV<br />

Training <strong>Institute</strong> and Technology, Schneider Electric and<br />

Germaced-Ten Corporation,<br />

<strong>The</strong> event was held in cooperation with the Meralco<br />

Association <strong>of</strong> Cadet <strong>Engineer</strong>s (MACE) and organized by<br />

the IIEE NCR Affairs Bureau headed by Engr.Ramon Z.<br />

Gatchalian, Jr., NCR Affairs Bureau Director.


IIEE NEWS<br />

IIEE Advocacy Group<br />

hosts “Powering Up for Open Access”<br />

An Assessment <strong>of</strong> Retail Competition & Open Access Readiness <strong>of</strong><br />

Electric Power Industry Stakeholders<br />

<strong>The</strong> <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the<br />

Philippines, Inc, (IIEE), through the IIEE Advocacy Group<br />

held an Electric Power Industry Stakeholders' Forum last<br />

September 3, 2010 at Dusit Thani Hotel, Makati City.<br />

<strong>The</strong> event had the following objectives; (1) To draw out<br />

from the participating stakeholder their pending concerns<br />

and assess their readiness for retail competition and open<br />

access; and (2) To provide guidance to the implementing<br />

government agencies in formulating appropriate/<br />

remaining rules to ensure a successful implementation<br />

<strong>of</strong> retail competition and open access.<br />

Notable speakers coming from the different sectors were<br />

Mr. Eduardo Fernandez, Department <strong>of</strong> Energy Officer-In-<br />

Charge Division Chief, Atty. Debora T. Layugan, Energy<br />

Regulatory Commission-Market Operations Service, Mr.<br />

Mario R. Pangilinan, Vice President Corporate Planning<br />

and Communications Philippine Electricity Market<br />

Corporation, Ms. Ma. Cynthia Y. Manrique, National<br />

Grid Corporation Deputy Head, Revenue and Regulatory<br />

Affairs, Atty. Ranulfo Ocampo, PEPOA President, Mr.<br />

Raymond Carl Roseus, RESA President, Mr. Ernesto B.<br />

Pantangco, PIPPA President, and Engr. Noel Pabilona,<br />

Manager, On Semicon.<br />

Engr. Edward L. Mendoza, IIEE Advocacy Group and<br />

President <strong>of</strong> EnergyOPT Inc. served as the Moderator<br />

<strong>of</strong> the Open Forum while Engr. Florigo Varona as the<br />

rapporteur. <strong>The</strong> event was hosted by the IIEE Advocacy<br />

Group and was sponsored by MERALCO, PIPPA, NGCP,<br />

HEAP and INDRA with the support from the government<br />

sector through the Department <strong>of</strong> Energy, Wholesale<br />

Electricity Spot Market, and Energy Regulatory<br />

Commission.<br />

One hundred and ninety-eight persons coming from the different industries participated in the event<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 17


IIEE NEWS<br />

IIEE COUNCIL OF STUDENT CHAPTERS (CSC)<br />

CONDUCTS 6th REGIONAL STUDENT CONFERENCE<br />

<strong>The</strong> <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the<br />

Philippines, Inc. Council <strong>of</strong> Student Chapters (IIEE –<br />

CSC), held its annual Regional Students Conference<br />

with participants from all the nine (9) regions <strong>of</strong> the<br />

IIEE. <strong>The</strong> 6th Regional Student Conference had the<br />

theme “IIEE Leading in green solutions to climate<br />

change”, with calls for both practicing and future<br />

<strong>Electrical</strong> <strong>Engineer</strong>s to innovate and find solutions<br />

to the biggest problem the society is facing. Global<br />

warming is a reminder to all <strong>of</strong> us, in the industry and<br />

in the academe to limit if not totally eradicate carbon<br />

emissions from energy generation and utilization. We<br />

all know that in our field we make use the resources<br />

<strong>of</strong> Mother Nature for our power production. With our<br />

young minds, we can make changes, not only for us<br />

but for the next generation.<br />

<strong>The</strong> 6th Regional Student Conference was held<br />

simultaneously from September 23 to 25, 2010 in all<br />

parts <strong>of</strong> the Philippines. For this year’s conference<br />

we had nine (9) host schools who catered to all the<br />

delegates <strong>of</strong> the conference, namely: University<br />

<strong>of</strong> Saint Louis (Region 1); Bataan Heroes Memorial<br />

College (Region 2); Technological <strong>Institute</strong> <strong>of</strong> the<br />

Philippines – Manila (for the first day) & Meralco Mini<br />

<strong>The</strong>ater (for the second day)(Region 3); Colegio De<br />

San Juan De Letran – Calamba (Region 4); Camarines<br />

Norte State College (Region 5); Central Philippine<br />

University (Region 6); Cebu <strong>Institute</strong> <strong>of</strong> Technology<br />

University (Region 7); Central Mindanao University<br />

(Region 8); and Ateneo De Davao University (for<br />

Region 9). <strong>The</strong> conference started simultaneously last<br />

September 23 with the opening <strong>of</strong> conference and<br />

the 6th Regional Student Congress, at the nine (9)<br />

regions. During the student’s congress, a new set <strong>of</strong><br />

<strong>of</strong>ficers <strong>of</strong> the Regional Council <strong>of</strong> Student Chapters<br />

(RCSC) were elected. <strong>The</strong> newly elected RCSC will<br />

serve their regions for the academic year 2010 –<br />

2011. During this same day we also invited resource<br />

speakers for our technical seminars, to help students<br />

understand what the electrical engineering has to<br />

<strong>of</strong>fer. <strong>The</strong> seminars were conducted for us to gain<br />

practical knowledge that the university may not <strong>of</strong>fer.<br />

September 24, 2010 was the most awaited day for<br />

all the delegates. <strong>The</strong> 10th Regional EE Math Wizard<br />

and the 24th Regional Quiz Show was participated<br />

by 43 schools from the entire Philippines. First held<br />

was the 10th Regional EE Math Wizard. This serves as<br />

By: Gay Lord R. Antolin<br />

18 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

an elimination round for the National Math Wizard to<br />

be held this coming November. <strong>The</strong> teams who will<br />

advance to the National Math.<br />

Wizard are from: Saint Louis University and Don<br />

Mariano Marcos Memorial State University (for Region<br />

1); Bulacan State University, Holy Angel University<br />

and Nueva Ecija University <strong>of</strong> Science and Technology<br />

(for Region 2); Adamson University, Technological<br />

<strong>Institute</strong> <strong>of</strong> the Philippines – Manila and Technological<br />

<strong>Institute</strong> <strong>of</strong> the Philippines – Quezon City (for Region<br />

3); University <strong>of</strong> Batangas, De La Salle University<br />

– Dasmariñas and Polytechnic University <strong>of</strong> the<br />

Philippines – Lopez ( for Region 4); Sorsogon State<br />

College and Bicol University (for Region 5); Western<br />

Visayas College <strong>of</strong> Science and Technology (for<br />

Region 6); Cebu <strong>Institute</strong> <strong>of</strong> Technology University<br />

(for Region 7); Mindanao State University – Iligan<br />

<strong>Institute</strong> <strong>of</strong> Technology and Mindanao University <strong>of</strong><br />

Science and Technology (for Region 8); University <strong>of</strong><br />

Mindanao and Mindanao State University – General<br />

Santos City (for Region 9).<br />

<strong>The</strong> qualifiers for the National Quiz Show which will<br />

be held at SMX convention center are: Don Mariano<br />

Marcos Memorial State University and University <strong>of</strong><br />

Saint Louis (for Region 1); Bataan Peninsula State<br />

University, Bulacan State University and Pangasinan<br />

State University (for Region 2); Technological<br />

<strong>Institute</strong> <strong>of</strong> the Philippines –Manila, Technological<br />

University <strong>of</strong> the Philippines – Manila; Mapua <strong>Institute</strong><br />

<strong>of</strong> Technology and Rizal Technological University (for<br />

region 3); University <strong>of</strong> Batangas, University <strong>of</strong> the<br />

Philippines Los Baños, Laguna State Polytechnic<br />

University and Marinduque State College (for Region<br />

4); Bicol University, Sorsogon State College and<br />

Camarines Norte State College (for Region 5); Central<br />

Philippine University (for Region 6); Cebu <strong>Institute</strong><br />

<strong>of</strong> Technology University (for Region 7); Mindanao<br />

University <strong>of</strong> Science and Technology, Mindanao State<br />

University – Iligan <strong>Institute</strong> <strong>of</strong> Technology, Central<br />

Mindanao University (for Region 8); Mindanao State<br />

University – General Santos City and University <strong>of</strong><br />

Southeastern Philippines – Obrero (for Region 9).<br />

<strong>The</strong> fellowship night was held in the evening <strong>of</strong><br />

September 24. It served as the get together celebration<br />

for all the delegates. In this event, delegates are<br />

welcome to showcase their hidden talents, to promote


networking <strong>of</strong> friends, and to mingle with other school<br />

from the regions. Every region had its own way to<br />

celebrate the night. For some it is a feast <strong>of</strong> music and<br />

fun and for others a show case <strong>of</strong> their culture. In<br />

this event we can witness the rapport <strong>of</strong> the electrical<br />

engineering practioners and electrical engineering<br />

studentry.<br />

Lastly, September 25 was the day for the awarding<br />

ceremony and the EElympics wherein schools from<br />

the different regions gathered for the different<br />

sports events and team building activities. This<br />

event embodies the IIEE – CSC mission, to promote<br />

camaraderie and sportsmanship. During the awarding<br />

ceremony, winners <strong>of</strong> the RMW and RQS are awarded<br />

<strong>of</strong> trophies and medals. We congratulate all the<br />

winners and hope to see you all at the National Math<br />

Wizard and National Quiz Show.<br />

RCSC Officers <strong>of</strong> Region II with the CSC representative<br />

Part <strong>of</strong> the RSCon was the Sports tournament by RCSC Region 4<br />

RCSC Officers <strong>of</strong> Region VI<br />

RCSC Officers <strong>of</strong> Region VIII<br />

"Nothing great will ever be achieved without great men, and men<br />

are great only if they are determined to be so."<br />

--Charles De Gaulle<br />

IIEE NEWS<br />

RCSC Officers <strong>of</strong> Region IX with Engr. Crisanto Sotelo, Southern<br />

Mindanao Regional Governors<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 19


IIEE NEWS<br />

IIEE CELEBRATES 35th FOUNDING ANNIVERSARY<br />

<strong>The</strong> <strong>Institute</strong> celebrated its 35th Founding Anniversary<br />

last September 15, 2010 at the IIEE National Office.<br />

It was graced by the presence <strong>of</strong> IIEE National Officers,<br />

Regional Governors, Commiittee Chairmen and Members<br />

and Former Presidents, together with the Ladies Auxiliary.<br />

<strong>The</strong> celebration started with a thanksgiving mass<br />

celebrated by Father Glenn Gomez and a simple program<br />

participated in by the <strong>Institute</strong>’s Council <strong>of</strong> Former<br />

Presidents, Committee Officers and the IIEE Ladies<br />

Auxiliary.<br />

Engr. Armando R., Diaz, Incumbent Vice President<br />

for Internal Affairs welcomed and acknowledged all<br />

the visitors and guests. Engr. Gregorio Y. Guevarra,<br />

Incumbent National President expressed his appreciation<br />

to all the <strong>of</strong>ficers who worked hard for the betterment <strong>of</strong><br />

the <strong>Institute</strong>.<br />

Engr. Roger M. Avenido, 1986 IIEE National President<br />

Engr. Antonio S. Herrera, 1999 IIEE National President<br />

and Engr. Fe Barrientos, 2001 IIEE National President<br />

shared their experiences with the <strong>Institute</strong> and gave<br />

their inspirational messages to encourage the <strong>of</strong>ficers<br />

to continue serving the <strong>Institute</strong> with dedication and<br />

commitment.<br />

<strong>The</strong> mass was celebrated by Father Glenn Gomez, assisted by<br />

Engr. Ramon Ayaton, IIEE Secretariat OIC<br />

Engr. Jules S. Alcantara, IIEE VP-Technical Affairs made<br />

the closing remarks.<br />

<strong>The</strong> anniversary celebration also witnessed the blessing<br />

<strong>of</strong> the newly established IIEE Foundation CFL Testing<br />

Laboratory at the 4th floor <strong>of</strong> the IIEE National Office in<br />

Cubao, Quezon City<br />

Part <strong>of</strong> the Anniversary Program was the community<br />

outreach by the IIEE Ladies Auxiliary with the Sisters <strong>of</strong><br />

Mother <strong>The</strong>resa in Tayuman.<br />

20 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

Engr. Fe Barrientos giving her inspirational message<br />

<strong>The</strong> IIEE Officers with Father Glenn Gomez during the blessing<br />

<strong>of</strong> the new IIEE CFL Testing Laboratory at the 4th floor <strong>of</strong> the<br />

IIEE Building<br />

<strong>The</strong> mass was followed by a simple dinner and fellowship


QUARTERLY INDUSTRY NEWS DIGEST<br />

NEA leads rehab <strong>of</strong> Southern Coop<br />

September 15, 2010 www.nea.gov.ph<br />

<strong>The</strong> people <strong>of</strong> Tawi-Tawi can expect better electricity<br />

service in the coming days. <strong>The</strong> National Electrification<br />

Administration (NEA) has deployed a management<br />

team to provide assistance to the Tawi-Tawi Electric<br />

Cooperative, Inc. (TAWELCO), a debt-ridden and<br />

problem-plagued electric distribution utility in Southern<br />

Philippines. Since its assumption in April 2009, the<br />

Management Team has instituted various programs to<br />

address the existing problems such as high systems<br />

loss, rampant electricity pilferages and human resource/<br />

institutional instability.<br />

One <strong>of</strong> the strategic initiatives adopted was the Meter<br />

Installation Standardization Program (MISP). <strong>The</strong> MISP<br />

was intended to lessen, if not eliminate the relentless<br />

connivance between meter readers and consumers to<br />

underread the meters thus, resulting to high system<br />

losses. In order to implement the Program, NEA extended<br />

a concessional loan amounting to P11.6 M at an interest<br />

rate <strong>of</strong> 4% to replace 5,645 old and defective kilo watt<br />

hour meters to more efficient and accurate digital/<br />

electronic ones. Significant reduction on system loss <strong>of</strong><br />

about 13.71% has been attained since the Program was<br />

implemented in April 2009.<br />

22 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

<strong>The</strong> reduction meant savings <strong>of</strong> around P1.698 M. Aside<br />

from this initiative, TAWELCO has been continuously<br />

conducting anti-pilferage campaign wherein some 500<br />

consumers were apprehended and penalized to date. <strong>The</strong><br />

Team also addressed the problem on erring personnel<br />

through strict implementation <strong>of</strong> its Employees Code<br />

<strong>of</strong> Ethics. Suspensions and terminations were already<br />

effected.<br />

“NEA will always be behind these ECs which need<br />

assistance. It is our mission to provide a more reliable<br />

and efficient electricity service in order to create a better<br />

and more comfortable live for the people in the rural<br />

areas, like Tawi-Tawi.<br />

Thus, we hope that the reforms that have been introduced<br />

and being implemented by our NEA Management Team,<br />

headed by Engr. Hector Tabilisima will be sustained by<br />

TAWELCO in the future,” said NEA Administrator Edita<br />

S. Bueno.<br />

TAWELCO has attained 100% barangay energization<br />

in 2009 through on-grid and <strong>of</strong>f-grid electrification<br />

schemes. It serves 10,918 consumer connections as <strong>of</strong><br />

July 31, 2010<br />

TWG to facilitate PSALM’s Optimized Operations<br />

September 6, 2010 www.doe.gov.ph<br />

<strong>The</strong> Power Sector Assets and Liabilities Management<br />

Corporation (PSALM) will have a new President,<br />

Emmanuel R. Ledesma Jr., as he takes his oath <strong>of</strong> <strong>of</strong>fice<br />

on September 07, 2010 in Malacanang Palace. <strong>The</strong><br />

PSALM presidency is currently held in acting capacity by<br />

Atty. Luz Caminero.<br />

Ledesma has garnered more than 20 years in the<br />

banking industry, the most recent <strong>of</strong> which is as the<br />

Managing Director and Country Head <strong>of</strong> the Royal<br />

Bank <strong>of</strong> Canada. He finished his undergraduate degree<br />

from the University <strong>of</strong> the Philippines-Diliman with a<br />

degree in Economics and took his Master <strong>of</strong> Business<br />

Administration (MBA) at the J. J. Kellogg Graduate<br />

School <strong>of</strong> Management at the Northwestern University<br />

in Illinois. This is his first posting in government service.<br />

With his appointment, Energy Secretary, Jose Rene<br />

Almendras has facilitated the formation <strong>of</strong> a technical<br />

working group (TWG) in reviewing and enhancing<br />

existing policies and frameworks in the Department<br />

<strong>of</strong> Energy (DOE) including attached agencies thereat<br />

to achieve optimum efficiency in complying with its<br />

mandate.<br />

PSALM, created under the restructured Philippine electric<br />

power industry (Electric Power Industry Reform Act) in<br />

2001, is tasked to manage, privatize and dispose <strong>of</strong> all<br />

existing generation assets, liabilities, real estate and<br />

other disposable resources <strong>of</strong> National Power Corporation<br />

(NPC). In the past few weeks, while figuring in issues<br />

relating to the imposition <strong>of</strong> an additional component in<br />

the universal charge and PSALM’s financial standing, the<br />

DOE has stated that the team will basically highlight its<br />

efficiencies and work towards the improved state <strong>of</strong> a<br />

liberalized power sector.<br />

Lasse Matti A. Holopainen, former DOE Assistant<br />

Secretary and Philippine Electricity Market Corporation<br />

(PEMC) President, has accepted the DOE’s invitation to<br />

become a member <strong>of</strong> the proposed TWG. Mr. Holopainen’s<br />

expertise will focus on the financial review <strong>of</strong> PSALM’s<br />

operations. Atty. Josefina Patricia M. Asirit <strong>of</strong> the DOE,<br />

on the other hand, will provide legal insight for the TWG.<br />

<strong>The</strong> group will review pressing matters that need to be<br />

addressed within the energy family, as well as study<br />

the impact <strong>of</strong> certain movements on the consumers.<br />

One <strong>of</strong> the goals <strong>of</strong> the group will be to obtain the<br />

possible lowest universal charge that can be passed on<br />

to consumers among other things. Other members <strong>of</strong><br />

the TWG are <strong>Engineer</strong> Rolando Bacani, who will provide<br />

technical assistance, and Department <strong>of</strong> Finance (DOF)<br />

Undersecretary John Philip “Sonny” Sevilla.


September 20, 2010<br />

QUARTERLY INDUSTRYNEWS DIGEST<br />

Meralco reinforces good governance<br />

Meralco further reinforces its practice <strong>of</strong> good corporate<br />

governance, putting a communication policy in place<br />

and implementing a period within which <strong>of</strong>ficers and<br />

executives are restricted from making stock market<br />

transactions in the interest <strong>of</strong> good governance and<br />

transparency.<br />

<strong>The</strong> “BE RIGHT Communication Policy” or B RIGHT<br />

COMM” is the campaign slogan adopted by Management<br />

to promote Corporate Governance in Meralco. President &<br />

CEO Manuel V. Pangilinan said that the “BE Right” tagline<br />

“represents the right behavior that should be adopted<br />

and exercised by any director, <strong>of</strong>ficer or employee <strong>of</strong><br />

Meralco in dealing with stakeholders.<br />

As a communication vehicle, the B RIGHT Comm aims<br />

to promote responsible and free interaction between<br />

Management and employees. <strong>The</strong> President said that the<br />

campaign opens the lines <strong>of</strong> communication “not just for<br />

Management to relay directions but also for employees<br />

to express their ideas and concerns to Management<br />

willingly and openly.” <strong>The</strong>se include inputs to save on<br />

costs and improve quality, workplace efficiency and<br />

www.meralco.com.ph<br />

customer service to improve working conditions. It also<br />

encourages disclosure <strong>of</strong> misdeeds or misdemeanors<br />

that may be harmful to the company and its reputation.<br />

“It is our duty as employees to uphold the interest <strong>of</strong> our<br />

company, while protecting the rights <strong>of</strong> our employees,”<br />

the President said.<br />

INTERNATIONAL BEST PRACTICES<br />

In another move to further strengthen good corporate<br />

governance and transparency, Management enjoined its<br />

<strong>of</strong>ficers and executives from buying and selling publiclytraded<br />

Meralco shares within 15 calendar days before<br />

and two trading days after the release <strong>of</strong> the company’s<br />

quarterly and annual financial and operating results.<br />

<strong>The</strong> President & CEO issued a policy on the matter in a<br />

memorandum issued July 16, 2010 to all employees for<br />

their guidance.<br />

<strong>The</strong> President & CEO stressed that this practice, known<br />

as the “blackout period,” is consistent with international<br />

best practices and covers the company’s <strong>of</strong>ficers and<br />

executives.<br />

ERC issues COC to CEDC's Cebu-based Unit 2<br />

Coal-fired Power Plant<br />

August 13, 2010 www.erc.gov.ph<br />

<strong>The</strong> Energy Regulatory Commission (ERC) approved on 2<br />

August 2010 the issuance <strong>of</strong> a Certificate <strong>of</strong> Compliance<br />

(COC) to Cebu Energy Development Corporation’s<br />

(CEDC) 83,700.35 kW Circulating Fluidized Bed (CFB)<br />

Coal-fired <strong>The</strong>rmal Power Unit 2 Plant Facility located at<br />

Brgy. Daanlungsod, Toledo City, Province <strong>of</strong> Cebu.<br />

<strong>The</strong> said unit is one <strong>of</strong> the three applied for by CEDC for<br />

COCs. This Toledo City facility is comprised <strong>of</strong> three (3)<br />

units with an aggregate installed capacity <strong>of</strong> 246 MW. Unit<br />

No. 1 was awarded a COC by the ERC in February 2010<br />

upon its commissioning and completion <strong>of</strong> documentary<br />

requirements. Unit No. 2 was commissioned and<br />

inspected by the ERC in July 2010. Unit 3 is expected to<br />

be commissioned and connected to the Visayas grid after<br />

its completion date targeted in January 2011.<br />

CEDC is a joint venture between Global Formosa Power<br />

Holdings, Inc. (GFPHI) and Abovant Holdings, Inc. (AHI).<br />

Said parties entered into a Memorandum <strong>of</strong> Agreement<br />

(MOA) to form a joint venture for the purpose <strong>of</strong> constructing<br />

a new Coal-fired <strong>The</strong>rmal Power Plant complex in Toledo<br />

City, Cebu. GFPHI owns 56% <strong>of</strong> the company while and<br />

AHI owns 44%. <strong>The</strong> construction <strong>of</strong> the complex started<br />

in January 2008 and will be completed in January 2011.<br />

CEDC has an Electric Power Purchase Agreement (EPPA)<br />

with the Visayan Electric Company (VECO) for the sale<br />

<strong>of</strong> a contracted capacity <strong>of</strong> 105 MW with a cooperation<br />

period <strong>of</strong> 25 years starting on its commercial operation.<br />

Also, CEDC has a MOA with the National Grid Corporation<br />

<strong>of</strong> the Philippines (NGCP) for transmission services via an<br />

interconnection to the 138 KV NGCP Talavera Substation.<br />

A bypass transmission line, that will interconnect the<br />

CEDC and Toledo Power to the NGCP Naga Substation, is<br />

presently undergoing construction which will eventually<br />

directly connect CEDC and Toledo Power to the facilities<br />

<strong>of</strong> VECO. <strong>The</strong> bypass transmission line will also ease<br />

up power congestion that may occur along the Talavera<br />

transmission line.<br />

“We are elated with this positive development in the power<br />

generation sector since it will augment the short power<br />

supply in the Visayas.. This development will benefit the<br />

electricity consumers in terms <strong>of</strong> improved standards <strong>of</strong><br />

living and economic growth,” ERC Chairperson Zenaida<br />

G. Cruz-Ducut stated.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 23


QUARTERLY INDUSTRY NEWS DIGEST<br />

PSALM: No investment with Lehman Brothers<br />

September 23 2010 www.doe.gov.ph<br />

<strong>The</strong> Power Sector Assets and Liabilities Management<br />

(PSALM) Corporation belied the claim <strong>of</strong> Eastern Samar<br />

Representative Ben Evardone that the privatization<br />

firm lost PhP100 million in its deal with an international<br />

investment company that went bankrupt in 2008.<br />

PSALM clarified that the deal it entered into with<br />

Lehman Brothers Special Financing Inc. (LBFSI) on<br />

18 July 2007 was not an investment but a hedging<br />

transaction, specifically a Principal Only Swap (POS),<br />

which can be likened to an insurance purchase where<br />

PSALM pays an annual expense premium <strong>of</strong> 2.687% on<br />

the notional amount <strong>of</strong> USD100 million for 19 years. In<br />

exchange, PSALM or the government has the right to buy<br />

dollars at PhP44.788 in 2028 regardless <strong>of</strong> the foreign<br />

exchange rate at that time. Counterparties for the POS<br />

deal were selected based on a comprehensive selection<br />

process under the guidance <strong>of</strong> the Government Policy<br />

Procurement Board, the Department <strong>of</strong> Finance, and the<br />

Bureau <strong>of</strong> the Treasury.<br />

24 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

When Lehman went bankrupt, PSALM invoked the<br />

International Swaps and Derivatives Association, Inc.<br />

(ISDA) agreement, terminated the transaction on<br />

03 November 2008, and replaced it with a new POS<br />

with the same terms and conditions. ISDA is a trade<br />

organization <strong>of</strong> participants in the market for over-thecounter<br />

derivatives. It is headquartered in New York, and<br />

has created a standardized contract (the ISDA Master<br />

Agreement) to enter into derivatives transactions.<br />

In addition, PSALM filed for claims in the New York court<br />

for approximately USD3.4 million representing the cost<br />

<strong>of</strong> the replacement and other expenses (legal fees,<br />

damages, etc) as may be allowed under provisions <strong>of</strong><br />

the ISDA.<br />

Contrary to Rep. Evardone's allegation published in<br />

news reports, PSALM did not use the proceeds from the<br />

privatization <strong>of</strong> power assets in the deal, pointing out that<br />

until May 2008 it was the National Power Corporation that<br />

had paid the required premiums. PSALM made it clear<br />

that the hedging transaction was used as an insurance<br />

against foreign exchange volatility.<br />

ERC resets commencement <strong>of</strong> acceptance testing <strong>of</strong><br />

DUs' electric meters<br />

July 27, 2010<br />

<strong>The</strong> Energy Regulatory Commission (ERC) resolved<br />

to start the implementation <strong>of</strong> the sampling method<br />

<strong>of</strong> acceptance testing <strong>of</strong> all distribution utilities’ (DUs)<br />

electric meters on the first working day <strong>of</strong> January 2011.<br />

This is embodied in ERC Resolution No. 15, Series <strong>of</strong> 2010<br />

which effectively resets the original timeline from July<br />

2010. <strong>The</strong> deferment was in consideration <strong>of</strong> the fact that<br />

most DUs have not secured the Meter Shop accreditation<br />

which is a major prerequisite for the implementation <strong>of</strong><br />

the sampling method <strong>of</strong> acceptance testing. <strong>The</strong> ERC,<br />

as <strong>of</strong> 28 June 2010, has already approved a total <strong>of</strong><br />

fifty-seven (57) applications filed by fifty-seven (57)<br />

distribution utilities (DUs) for a Certificate <strong>of</strong> Authority<br />

(CA) to maintain a Meter Shop. <strong>The</strong> Philippines has one<br />

hundred forty (140) DUs composed <strong>of</strong> 120 rural electric<br />

cooperatives and 20 private utilities.<br />

<strong>The</strong> requirement for every DUs to undertake electric meter<br />

testing and calibration is pursuant to ERC Resolution No.<br />

12, Series <strong>of</strong> 2010 entitled, “A Resolution Adopting the<br />

Rules and Procedures for the Test and Maintenance <strong>of</strong><br />

Electric Meters <strong>of</strong> Distribution Utilities,” which took effect<br />

in July 2009. In the said Rules and Procedures, the<br />

DUs providing meter electric service are also required<br />

to maintain their individually-owned or group <strong>of</strong> DU-<br />

www.erc.gov.ph<br />

owned Meter Shop, unless specifically exempted by the<br />

ERC. <strong>The</strong> Meter Shop will be responsible for the routine<br />

testing, repair, and calibration <strong>of</strong> electric meters and other<br />

auxiliary devices and equipment essential to the metering<br />

<strong>of</strong> electric power and energy. Thus, the DUs need to file<br />

their respective applications to maintain a Meter Shop,<br />

or if not practicable, an exemption should also be sought<br />

from the ERC. DUs granted with accreditation will be<br />

issued a Certificate <strong>of</strong> Authority (CA) to maintain a Meter<br />

Shop, which shall be valid for three (3) years and may<br />

be renewed upon application. <strong>The</strong> renewal will depend<br />

on the ERC’s assessment on whether the meter shop had<br />

been operating satisfactorily and consistently compliant<br />

with CA requirements and with the said Rules.<br />

“<strong>The</strong> ERC promulgated the subject Rules and Procedures<br />

to ensure the accuracy <strong>of</strong> the DUs’ billing meters and<br />

protect the interest <strong>of</strong> the electricity consumers.<br />

Meanwhile, the DUs are also given consideration to<br />

comply with the Meter Shop accreditation requirement<br />

by providing them ample time to secure the same and<br />

by extending the time to start the electric meter testing<br />

to early next year,” ERC Chairperson & CEO Zenaida G.<br />

Cruz-Ducut concluded.


Background<br />

<strong>The</strong> National Grid Power Control Center<br />

by Engr. Rafael F. Florentino<br />

Former Chairman <strong>of</strong> the Board <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing<br />

<strong>The</strong> National Power Corporation (NPC) used to be<br />

the entity that controls the operations <strong>of</strong> the entire<br />

power grid. It is now separate from the National<br />

Transmission Corporation (TransCo) which owns<br />

all transmission and most sub-transmission lines<br />

originally owned by NPC.<br />

Most <strong>of</strong> NPC’s generating plants have also been<br />

privatized through the Power Sector Assets and<br />

Liabilities Management (PSALM). Hence, NPC’s<br />

functions have been greatly reduced to owning<br />

and operating the remaining unsold power plants,<br />

the missionary function <strong>of</strong> watershed management<br />

and the management <strong>of</strong> the Small Power Utilities<br />

Group or SPUG which owns and operates small<br />

generating plants in isolated islands and power<br />

barges scattered throughout the Philippine islands.<br />

<strong>The</strong> National Grid Corporation <strong>of</strong> the Philippines<br />

(NGCP) is the private concessionaire <strong>of</strong> TransCo.<br />

It acts as the system operator <strong>of</strong> the nationwide<br />

electrical transmission and sub-transmission<br />

system. It ensures and maintains the reliability,<br />

adequacy, security, stability and integrity <strong>of</strong> the<br />

nationwide electrical grid.<br />

Interconnection <strong>of</strong> the 3 Grids<br />

<strong>The</strong> Visayas grid is connected to the Luzon grid<br />

by a 350 kV D.C. transmission line. <strong>The</strong>re is an<br />

A.C. to D.C. converter station at Naga Substation<br />

in Camarines Sur which connects to an overhead<br />

HVDC line to Sorsogon, Sorsogon. From here, a<br />

submarine cable connects the line to Samar. <strong>The</strong><br />

HVDC line terminates at Ormoc Substation in Leyte<br />

where power is converted back from D.C. to A.C.<br />

at 230 kV.<br />

From Ormoc Substation, the system radiates to<br />

230 kV, 138 kV and 69 kV lines which runs through<br />

the islands <strong>of</strong> Cebu, Negros, Bohol and Panay. <strong>The</strong><br />

island <strong>of</strong> Palawan is not served from the Visayas<br />

grid. It is served by isolated diesel units which<br />

form part <strong>of</strong> the Small Power Utilities Group or<br />

SPUG which is owned by NPC. Other privately<br />

owned generating plants also serve the needs <strong>of</strong><br />

consumers in the service areas <strong>of</strong> SPUG.<br />

TECHNICAL FEATURE<br />

<strong>The</strong> Visayas Grid is controlled by the Visayas<br />

Regional Control Center at Banilad , Cebu City. This<br />

control center coordinates and furnishes technical<br />

information or data to the National Grid Power<br />

Control Center in Quezon City so as to complete<br />

the nation’s power statistics. Coordination between<br />

the Luzon and Visayas control centers is imperative<br />

especially if there is shortage <strong>of</strong> power in either the<br />

Luzon or Visayas grids.<br />

<strong>The</strong> Mindanao grid is not yet connected to the<br />

Visayas grid, but will be in the near future. It<br />

will also need submarine cables from Leyte via<br />

the Panaon Island to the northern tip <strong>of</strong> Surigao<br />

in Mindanao. <strong>The</strong> Mindanao grid has also its own<br />

Regional Control Center located in Iligan City. This<br />

center likewise furnishes the National Grid Power<br />

Control Center with technical data so as to know<br />

the entire nation’s power situation.<br />

<strong>The</strong> Power Control Centers for each grid are all<br />

computerized and similar to each other.<br />

<strong>The</strong> maps <strong>of</strong> the three grids are shown.<br />

LUZON GRID<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 25


TECHNICAL FEATURE<br />

VISAYAS GRID<br />

26 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

MINDANAO GRID


11 May 2010<br />

INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS OF THE PHILIPPINES, INC.<br />

CONTINUING PROFESSIONAL EDUCATION FOR ELECTRICAL ENGINEERING<br />

41 Monte de Piedad St., Cubao Quezon City 1111<br />

ENGR. GREGORIO Y. GUEVARRA<br />

National President<br />

IIEE<br />

41 Monte de Piedad St., Cubao, Quezon City<br />

Dear Engr. Guevarra:<br />

CPE CORNER<br />

Since last year, the PRC has revived the Continuing Pr<strong>of</strong>essional Education Program through PRC<br />

Resolution No. 2008-466. From then on, the CPE Council has continuously disseminated information<br />

about the (CPE) requirements for the renewal <strong>of</strong> PRC license. IIEE for its part, is an accredited provider<br />

for <strong>Electrical</strong> <strong>Engineer</strong>ing and all IIEE Chapters are covered with this accreditation.<br />

With this, we are requesting that all IIEE Chapters planning to apply for CPE credit units their program/<br />

seminars/trainings for the year to kindly submit all documents and requirements for application as<br />

stated below for CPE programs for accreditation at least thirty (30) days prior to the date <strong>of</strong> conduct <strong>of</strong><br />

the event.<br />

1. IIEE-CPE Form No. 2009-07 (IIEE Program Form)<br />

2. CPE Form No. 05-2008 (PRC Program Form)<br />

3. Outline <strong>of</strong> the (Abstract <strong>of</strong> Topic/Seminar)<br />

4. Resume <strong>of</strong> Speaker/ Facilitator/Reactors<br />

5. Program <strong>of</strong> Activities<br />

Please note that any application received by the IIEE CPE Council after the specified time will not be<br />

entertained. For further information, please contact Ms. Mary Ann B. Guillen, IIEE-CPE Staff at tel.<br />

(02) 727-3552 loc. 107 or email inquiry at cpe@iiee.org.ph or refer to the www.iiee.org.ph.<br />

Respectfully yours,<br />

HIPOLITO A. LEONCIO<br />

Chairman<br />

IIEE CPE Council<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 27


Abstract<br />

Proposed Prepayment Energy-Metering System<br />

for Multi-Tenant Offices and Rented Building<br />

Accommodations<br />

By: Engr. Ferdinand D. Milan<br />

This study can be used as a scheme for the adaptation <strong>of</strong> an alternative sub-metering system intended for all<br />

commercial buildings with several tenant <strong>of</strong>fices and rented accommodations using a prepayment energy submeter.<br />

This prepayment energy meter provides important benefits to both tenants and building owner (landlord)<br />

during regular working <strong>of</strong>fice hours. With prepayment meters, the <strong>of</strong>fice tenants can easily manage and control<br />

their energy usage without expecting any future obligation on energy bills like in conventional energy sub-meters.<br />

<strong>The</strong> prepayment energy meters cancels paper bills and remove disagreement between tenant and the landlord<br />

due to unexpected increase in energy utilization. <strong>The</strong> prepayment sub-meter to be installed in each <strong>of</strong>fice tenant<br />

is designed with magnetic strip card with KW-HR denomination value to validate electrical energy to energize the<br />

<strong>of</strong>fice equipment.<br />

Keyword: prepayment energy system, prepaid sub-meter, prepaid denominations, multi-tenant <strong>of</strong>fice; energy-user<br />

card<br />

Background<br />

Today, a technology in electric sub-metering like<br />

prepayment meters has been developed. <strong>The</strong>se types <strong>of</strong><br />

meters are prepayment electricity that uses the same<br />

concept as prepayment cellular phones and phone cards<br />

in which consumer pay in advance <strong>of</strong> consumption.<br />

Prepayment energy metering system <strong>of</strong>fers a win-win<br />

proposition especially to the building owners and <strong>of</strong>fice<br />

tenants (UtiliSol 2005). <strong>The</strong> following benefits could<br />

provide by prepayment energy metering system:<br />

• It puts control the usage <strong>of</strong> electricity in the hands <strong>of</strong><br />

consumer where a customer allows making real-time<br />

and informing decisions on their consumption<br />

• Cancels billing dispute and mistakes.<br />

• It improves accelerated cash flow, lowers administrative<br />

costs, theft avoidance, no meter reading and billing<br />

statement is needed.<br />

• Provides cost-effective solution with equitable benefits<br />

to both tenants and landlords.<br />

By installing the prepayment meters, the landlord and<br />

tenants can manage their own consumption and become<br />

more aware <strong>of</strong> their electricity usage. <strong>The</strong>se prepayment<br />

meters are designed where power is credited to the<br />

meter by means <strong>of</strong> use-only-once token. This token is a<br />

magnetic strip card that comes in different denominations.<br />

<strong>The</strong> card is fed into a slot on the front <strong>of</strong> the meter so<br />

that the value <strong>of</strong> card is credited. Prepayment energy<br />

system can help mitigate problems on electrical-energy<br />

related carbon emission due to increasing demand on<br />

fossil fuel aside from transportation.<br />

Significance<br />

This research study is intended for all building<br />

establishment designed with multi-<strong>of</strong>fices and rented<br />

building accommodations through the adaptation <strong>of</strong><br />

prepayment energy metering system to be used for<br />

possible solution to the disagreement between the<br />

building owner and the tenants especially when tenant<br />

cannot pay their energy bills on time while others leave<br />

their accommodation unnoticeably. For the end-users,<br />

like students with limited budget without expecting<br />

future obligations on electricity bills, and for the <strong>of</strong>fice<br />

tenants, to effectively manage and control their operating<br />

energy consumption. This study can be used also by the<br />

government and private sector as a basis to address<br />

problem on increasing demand <strong>of</strong> fossil fuel and fuel cost<br />

due to uncontrolled electrical energy utilization.<br />

Results and Discussion<br />

TECHNICAL PAPER<br />

Proposed Prepayment Energy Metering System<br />

for Multi-Tenant Offices and Rented Building<br />

Establishment<br />

Figure 1 illustrates the existing electrical distribution<br />

system <strong>of</strong> STG Building designed with several sub-meters<br />

located on meter cabinet at per floor level while Figure<br />

2 exhibits the proposed electrical distribution system<br />

design with several prepaid sub-meters. Each prepaid<br />

sub-meter is connected with over-current protection at its<br />

line side. This design layout is appropriate for all type <strong>of</strong><br />

building structure designed with rented accommodation<br />

like student’s flat which could provide convenience<br />

to both tenant and the landlord, and provide effective<br />

control and management during the operation <strong>of</strong> <strong>of</strong>fice<br />

appliances.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 29


TECHNICAL PAPER<br />

Figure: 1 – Existing Distribution System Diagram <strong>of</strong> STG Building with Conventional<br />

Sub-Meters<br />

Figure 3 presents the proposed energy submeters<br />

for the tenant <strong>of</strong>fices <strong>of</strong> STG Building<br />

Establishment. Each sub-meter is located inside<br />

the <strong>of</strong>fice area which is accessible to each <strong>of</strong>fice<br />

tenant in order that the prepayment meter with<br />

prepaid energy user card can be accessed and<br />

utilized conveniently. Each prepaid sub-meter is<br />

protected with over-current protection to avoid<br />

extensive damage <strong>of</strong> internal circuitry. Each<br />

prepaid energy meters is connected through<br />

the rerouted sub-feeder lines toward the panel<br />

board. <strong>The</strong>se prepaid sub-meters are then<br />

connected and supplied by main feeder system<br />

<strong>of</strong> the STG Building to individual panel board.<br />

If a prepaid sub-meter is fully exhausted, no<br />

power therefore is transmitted to the tenant’s<br />

electrical panel. It may resume only when the<br />

KW-HR denomination through energy user card<br />

is reloaded once again.<br />

Prepaid KW-HR Denomination<br />

Figure 4 below demonstrate how a prepayment<br />

energy system can be used by each tenant <strong>of</strong><br />

STG Building using a magnetic strip card to be<br />

validated in a prepaid sub-meter. <strong>The</strong> strip card<br />

is used to validate the “KW-HR prepaid card”<br />

through the loading machine to be provided<br />

by the landlord. Each tenant <strong>of</strong>fice will have<br />

an allotted equivalent prepaid denomination<br />

depending on operating energy. Table 1 presents<br />

the different electrical load appliances typically<br />

used by the tenant <strong>of</strong>fices <strong>of</strong> STG Building while<br />

Table 2 reflects the daily average energy usage<br />

by the tenants. <strong>The</strong> energy usage is evaluated<br />

based on the quantity <strong>of</strong> equipment and its<br />

power rating in a given period <strong>of</strong> time based on<br />

regular working hours per day and it is evaluated<br />

using the equation hence, Total Energy Usage<br />

(TEU) = No. <strong>of</strong> Units x Power Rating x (1/1000)<br />

x Average Working Hours, Kw-hr.<br />

30 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

Figure:2 – Concept Diagram for the Proposed Prepayment Energy Sub-<br />

Metering System<br />

Figure: 3 – Proposed Prepayment Energy Sub-Meters for Commercial<br />

Establishment Designed with Multi-Tenant Offices and Rented Accommodation


Source: RPV <strong>Electrical</strong> September 2007<br />

Figure: 4 – A magnetic card strip is inserted on the prepaid meter to<br />

energize the <strong>of</strong>fice appliances<br />

<strong>The</strong> load operates intermittently and it depends on how<br />

much power is drawn by <strong>of</strong>fice appliances from the<br />

sub-feeder line. To determine the equivalent prepaid<br />

denominations to be purchased by each tenant from the<br />

landlord, the energy usages and average operating costs<br />

relative to the rate cost <strong>of</strong> energy2 <strong>of</strong> each tenant were<br />

evaluated based on Table 1. <strong>The</strong> average energy usage per<br />

day <strong>of</strong> Travel Agency Company is calculated at 20.32Kwhrs<br />

while the Law firm and <strong>Engineer</strong>ing firm’s <strong>of</strong>fice are<br />

38.52Kw-hrs and 7.62Kw-hrs per day. <strong>The</strong> Law Firm’s<br />

<strong>of</strong>fice has an EEC per day <strong>of</strong> around and Php7,507.50 for<br />

24-day <strong>of</strong>fice work while the Travel Agency Firm has an<br />

average EEC per day <strong>of</strong> around Php152.40 and equivalent<br />

monthly energy cost <strong>of</strong> Php3, 962.24 in 24 days while<br />

the average energy equivalent cost (AEEC) per day <strong>of</strong><br />

<strong>Engineer</strong>ing Firm’s <strong>of</strong>fice is Php57.1 or Php1,485.90 in<br />

Table:1 – Typical <strong>Electrical</strong> Load Appliances <strong>of</strong><br />

Tenant Offices<br />

Table: 2 – Energy Cost Data Summary <strong>of</strong> Tenant’s Office<br />

24-working days. <strong>The</strong>se energy costs were correlated<br />

with the average energy usage (AEU) to exhibit the<br />

prepaid denominations. Based on historical energy usage<br />

data, each tenant can estimate prepaid denominations.<br />

(i.e. 5Kw-hr has an estimated denomination <strong>of</strong> PhP37.50<br />

or 100Kw-hr for Php630.50) 2 Based on Local Power<br />

Distributors Commercial Rate Basis @ P7.50 per KW-HR<br />

(Ave. Rate)<br />

Conclusion<br />

TECHNICAL PAPER<br />

Prepayment system <strong>of</strong> electricity through prepaid submeters<br />

with energy user card provides advantages and<br />

economic benefits to the building owners, tenants, and<br />

even to the local power distributors where effective<br />

control and management <strong>of</strong> energy consumption is<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 31


TECHNICAL PAPER<br />

critical. <strong>The</strong> proposed layout could be adapted for all<br />

<strong>of</strong>fices <strong>of</strong> STG Building without paper bills required and<br />

eliminates disagreement between tenant and landlord<br />

due to unexpected increase in energy consumption.<br />

Recommendation<br />

For all commercial <strong>of</strong>fice building designed with<br />

individual sub-meters locates and place the<br />

prepayment sub-meter inside each tenant <strong>of</strong>fice.<br />

For the landlord, verify regularly the average<br />

rate structure cost <strong>of</strong> energy from the local power<br />

distributor.<br />

Install a circuit breaker between the existing subfeeder<br />

line and the line side <strong>of</strong> prepayment sub-meter<br />

for additional protection due to possible short-circuits<br />

or overloading <strong>of</strong> sub-meter.<br />

For the landlord, provide necessary monitoring chart<br />

reflecting the prepaid KW-HR denominations matrix.<br />

For building owner (landlord), locate the KW-HR<br />

user’s card validation machine at ground floor level<br />

where it is accessible to each tenant.<br />

For possible lost <strong>of</strong> user’s card, the landlord to<br />

provide extra magnetic strip card for immediately<br />

replacement and validation.<br />

Each prepaid sub-meter has KW-HR indicating<br />

system that provides early signal when validated<br />

denomination is almost exhausted.<br />

32 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010<br />

For building establishment designed with several<br />

consignments like rented stalls, and other<br />

accommodation, assess the type and ratings <strong>of</strong> load<br />

to be controlled and match the rated specifications <strong>of</strong><br />

the prepaid sub-meter.<br />

Policies and guidelines shall be provided by concern<br />

government agency to properly implement and<br />

regulate the use <strong>of</strong> prepayment energy system in<br />

commercial establishment deigned with multi-tenant<br />

<strong>of</strong>fices and rented accommodations.<br />

References<br />

Solid-State Electricity Meters, Holland, 2002<br />

Prepayment Electricity, UtiliSol 2005/2007<br />

Prepayment Energy Meters, UK ,2002<br />

Prepayment Power Metering,2000<br />

Prepayment Meters Scratch Card System,2002<br />

Electric Meters, F D Gordon, 2007<br />

Article on Power Peak Tariffs, Power and Water<br />

Corporation, ABN,2005<br />

Article on Prepayment Recommended for Low Income<br />

Customers, New Zealand, 2007<br />

Article on Prepaid Meters Supply to Sudan, S. Enslin,2004<br />

Principles <strong>of</strong> <strong>Engineer</strong>ing Instrumentation, D.C. Ramsey,<br />

1996<br />

Prepayment Energy Meter,2007, W. Janda<br />

Engr. Ferdinand D. Milan<br />

E-mail Address: ferdinandmilan@yahoo.com<br />

Tel.No. 911-09-64 local 336 /438-06-36/09196685758<br />

<strong>The</strong> author is a graduate <strong>of</strong> Technological <strong>Institute</strong> <strong>of</strong> the<br />

Philippines, Quezon City with a bachelor’s degree in <strong>Electrical</strong><br />

<strong>Engineer</strong>ing in October 1991 and became a registered electrical<br />

engineer last April 1992. He is involved in several related<br />

electrical design and installations. He is currently connected<br />

to Systems Energizer, Incorporated as Consulting <strong>Engineer</strong>.<br />

He obtained his Master <strong>of</strong> Science in <strong>Electrical</strong> <strong>Engineer</strong>ing,<br />

MSEE (Major in Power) at Technological University <strong>of</strong> the Philippines, Manila last May,<br />

2002 with the thesis entitled “Programmed-Based Empirical Formula for Transformer<br />

K-Factor Rating Through Harmonics Pollution Analysis”. He is currently working in<br />

TIP QC teaching pr<strong>of</strong>essional subjects in electrical engineering program (power<br />

system analysis, electric circuit analysis, system design, and safety management).<br />

Currently, he is an Energy Audit Team member for NCR and Vice Chair for IIEE<br />

Academic Affairs and an IIEE Life Member. He pursues his doctoral degree in PhD in<br />

Technology Management at TUP Manila


DISTRIBUTED GENERATION<br />

By Engr. Jules S. Alcantara<br />

IIEE VP Technical (2010), PEE, ASEAN <strong>Engineer</strong>, MS Energy Mngt, M. Engg (EE), CESO V<br />

Distributed Generation (DG) is generally defined as<br />

small scale electric power generation within distribution<br />

networks or on the customer side <strong>of</strong> the network. Other<br />

terms used are “embedded generation”, “dispersed<br />

generation”, “decentralized generation”, “Distributed<br />

Energy Resource (DER)” and “Distributed Resource<br />

(DR)”. <strong>The</strong> terms “cogeneration”, “RE” and “small power<br />

production” refer to types <strong>of</strong> DGs.<br />

<strong>The</strong> Philippine Renewable Energy Act <strong>of</strong> 2008 defines DG<br />

as up to 100 kW. <strong>The</strong> Electric Power Research <strong>Institute</strong><br />

(EPRI) defines the rating <strong>of</strong> DG to be up to 50 MW.<br />

<strong>The</strong> IEEE Standard 1547-2003 covers capacities up to<br />

10,000 KW.<br />

<strong>The</strong>re are three types <strong>of</strong> DGs: (a) solid-state or static<br />

invertors (b) induction machines (c) synchronous<br />

machines. <strong>The</strong> inverter type acts as current source while<br />

the rotating machines act as voltage source. <strong>The</strong> former<br />

type supplies lower fault current levels than the rotating<br />

machines.<br />

<strong>The</strong>re are currently 12 million DG units installed in the<br />

US with a total capacity <strong>of</strong> about 200,000 MW. Many<br />

<strong>of</strong> these units are used as back-up units to provide<br />

emergency power during shortages or unavailability <strong>of</strong><br />

power from the grid.<br />

<strong>The</strong> purposes and benefits <strong>of</strong> the DG include the following:<br />

1. DGs provide active power within the distribution<br />

network;<br />

2. It ensures continuity and availability <strong>of</strong> power<br />

for critical business processes;<br />

3. It may result in improvement <strong>of</strong> system reliability<br />

– A study on the Pennsylvania/New Jersey/<br />

Maryland interconnection (PJM) system by the<br />

Oak Bridge National Laboratory indicated that<br />

capacity expansion with ten small plants showed<br />

a better Loss <strong>of</strong> Load Probability than an<br />

expansion <strong>of</strong> a single large plant <strong>of</strong> the same<br />

size;<br />

4. DGs are highly efficient (overall efficiency<br />

greater than 75% ) and financially attractive<br />

when the DG industrial owner captures the heat<br />

generated from the DG technology for use in<br />

production processes, for hot water domestic<br />

use and other uses.<br />

5. DGs resolve power quality problems <strong>of</strong> voltage<br />

sags and disruptions;<br />

6. <strong>The</strong> use <strong>of</strong> alternative/renewable energy<br />

resources for DG enhances environmental<br />

conditions since it may have zero emissions. <strong>The</strong><br />

TECHNICAL PAPER<br />

Philippine Renewable Energy Act formally<br />

jumpstarts non-utility-owned small scale<br />

distributed generation technologies <strong>of</strong> the<br />

renewable type;<br />

7. New fuel powered and waste-to-energy DG<br />

technologies have low emissions that also<br />

enhances environmental conditions;<br />

8. New technologies in DG have made it possible<br />

to tailor energy systems to the specific needs <strong>of</strong><br />

the consumer;<br />

9. DGs may provide ancillary services including<br />

voltage support/reactive power and back-up;<br />

10. Peak power requirements are reduced;<br />

11. Reduces and <strong>of</strong>fsets investments in generation,<br />

transmission or distribution facilities that would<br />

otherwise be recovered through rates. <strong>The</strong>re are<br />

also savings in T & D losses and Congestion<br />

costs;<br />

12. Reduces vulnerability to terrorism and<br />

improvements in infrastructure resilience;<br />

13. Reduces land-use effects and Right-<strong>of</strong>-<br />

Way acquisitions to build new power plants,<br />

electric transmission and distribution lines;<br />

14. Short construction times compared to central<br />

generators;<br />

15. Inherent system stability due to multiplicity <strong>of</strong><br />

inputs;<br />

16. Weather related interruptions are more easily<br />

predicted and <strong>of</strong> shorter duration.<br />

<strong>The</strong> IEEE 1547-2003 Standard for Interconnecting<br />

Distributed Resources with Electric Power Systems is<br />

a standard developed by the <strong>Institute</strong> <strong>of</strong> <strong>Electrical</strong> and<br />

Electronics <strong>Engineer</strong>s (IEEE) meant to provide a set <strong>of</strong><br />

technical criteria and requirements in the interconnection<br />

<strong>of</strong> distributed generation resources into the power grid<br />

in the United States. It facilitates the tapping and use <strong>of</strong><br />

excess capacity <strong>of</strong> electricity from alternative sources.<br />

<strong>The</strong> US Congress in its US Energy Policy Act <strong>of</strong> 2005<br />

established the IEEE 1547 as the national standard for<br />

the DG interconnection. Other applicable standards are<br />

the UL and National <strong>Electrical</strong> Code <strong>of</strong> the NFPA (USA)<br />

while the Philippines has the existing Philippine <strong>Electrical</strong><br />

Code (IIEE), the Philippine Grid Code and the Philippine<br />

Distribution Code. However, technical standards for DG<br />

interconnection differ from country to country.<br />

Some <strong>of</strong> the technical issues to be addressed in the<br />

interconnection <strong>of</strong> DGs to the existing power system are<br />

the following:<br />

1. Voltages outside an acceptable range (IEEE<br />

1547-2003 mandates tripping in 0.16 sec for<br />

U1.2 pu);<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 33


TECHNICAL PAPER<br />

2. Recloser coordination- Reclosers are designed<br />

to operate correctly with one side as the fault<br />

current source. Introduction <strong>of</strong> DGs may reverse<br />

the flow resulting in misoperation <strong>of</strong> the<br />

reclosers;<br />

3. System Grounding – An improper system<br />

grounding could lead to overvoltage to ground<br />

when the substation feeder opens during a SLG<br />

fault and the DG circuit breaker does not trip for<br />

some time;<br />

4. Power quality – DG should be designed to<br />

minimize injection <strong>of</strong> harmonic disturbance, does<br />

not inject DC current and does not cause<br />

objectionable flickers;<br />

5. Scheme to de-energize for faults on the<br />

connected system – <strong>The</strong> DGs may have to use<br />

utility grade protective relays to properly isolate<br />

the DG from the fault.<br />

6. Short circuit current protection coordination<br />

– downstream DGs reduce the reach <strong>of</strong> protective<br />

relays since DGs contribute to short circuit<br />

currents. Switchgears may have its interrupting<br />

capacity upgraded due to high available<br />

fault levels. Solutions include Is-Limiters and<br />

higher impedance <strong>of</strong> transformers and<br />

generators. Coordination studies will be needed.<br />

7. Tripping for frequency deviations ( IEEE 1547-<br />

2003 mandates tripping in 0.16 sec if f>60.5 or<br />

f


IIEE SNAPSHOTS<br />

<strong>The</strong> <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the<br />

Philippines, Inc. (IIEE) and the Society <strong>of</strong> Philippines<br />

Electrotechnical Constructors and Suppliers, Inc.<br />

(SPECS) signed a Memorandum <strong>of</strong> Agreement on<br />

September 3, 2010.<br />

<strong>The</strong> MOA included the special participation <strong>of</strong> the Asean<br />

Federation <strong>of</strong> <strong>Electrical</strong> <strong>Engineer</strong>ing Contractors-<br />

Federation <strong>of</strong> Asian and Pacific <strong>Electrical</strong> Contractors<br />

Association Conference 2010 on the IIEE’s 35th Annual<br />

National Convention<br />

Occidental Mindoro Chapter headed by its President Engr. Ricky<br />

Gonzales hosted the 10th leg <strong>of</strong> J2U.2 on September 25, 2010 San<br />

Jose Occidental Mindoro.<br />

<strong>The</strong> <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the Philippines,<br />

Inc. (IIEE) and the Manila Electric Company (MERALCO) signed a<br />

Memorandum <strong>of</strong> Agreement (MOA) on September 15, 2010 at the IIEE<br />

National Office.<br />

<strong>The</strong> MOA stipulated the active participation and support <strong>of</strong> MERALCO<br />

to the forthcoming IIEE’s 35th Annual National Convention and 3E Xpo<br />

2010: A Special in <strong>Electrical</strong>, Electronics and Energy Exposition with the<br />

Special Participation <strong>of</strong> AFEEC/FAPECA Conference.<br />

Participants <strong>of</strong> the 6th Regional Student Conference hosted by the<br />

Camarines Norte Chapter last September 22, 2010.<br />

THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010 35


36 THE ELECTRICAL ENGINEER MAGAZINE 3RD QUARTER 2010


2010 NATIONAL<br />

OFFICERS:<br />

GREGORIO Y. GUEVARRA<br />

President<br />

ARMANDO R. DIAZ<br />

VP-Internal Affairs<br />

GREGORIO R. CAYETANO<br />

VP-External Affairs<br />

JULES S. ALCANTARA<br />

VP-Technical Affairs<br />

ALEX C. CABUGAO<br />

Secretary<br />

MA. SHEILA C. CABARANAN<br />

Treasurer<br />

LARRY C. CRUZ<br />

Auditor<br />

REGIONAL GOVERNORS:<br />

FRANCIS R. CALANIO<br />

Region I<br />

ALVIN M. FARRALES<br />

Region II<br />

FLORENCIO D. BERENGUEL<br />

Region IV<br />

ARMIN JESUS R. NAGERA<br />

Region V<br />

MIDELO D. OCAMPO<br />

Region VI<br />

NELSON M. ROSALES<br />

Region VII<br />

CESAR V. SANCHEZ<br />

Region VIII<br />

CRISANTO C. SOTELO<br />

Region IX<br />

ARTHUR N. ESCALANTE<br />

Immediate Former President<br />

INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS<br />

OF THE PHILIPPINES, INC.<br />

RAMON P. AYATON<br />

Officer-in-Charge<br />

41 Monte de Piedad Street, Cubao 1111, Quezon City, Metro Manila<br />

Tel Nos. (632) 722 7383, 727 3552, 412 5772, 414 5626<br />

Fax Nos. (632) 727 3545, 410 1899<br />

Email: iiee@iiee.org.ph Website www.iiee.org.ph<br />

PROXY FORM<br />

<strong>The</strong> undersigned members <strong>of</strong> the <strong>Institute</strong> <strong>of</strong> <strong>Integrated</strong> <strong>Electrical</strong> <strong>Engineer</strong>s <strong>of</strong> the<br />

Philippines, Inc. (IIEE), hereby APPOINT, NAME AND CONSTITUTE<br />

(Name <strong>of</strong> your National Officer or Regional Governor or Chapter President)<br />

as our PROXY to represent us and vote on our behalf during the approval <strong>of</strong> the<br />

proposed amendments to the IIEE Constitution and By-Laws on November 25 2010 at<br />

such meetings to be called for the purpose, as fully to all intents and purposes as we<br />

might or could do if present and voting in person at the aforesaid meeting or meetings.<br />

In case <strong>of</strong> the non-attendance <strong>of</strong> our above-named proxy, we authorize and<br />

empower the Chairman <strong>of</strong> such meeting to be our duly contituted proxy with all the<br />

powers appurtenant thereto.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

11.<br />

12.<br />

13.<br />

14.<br />

15.<br />

PRC Cert. No. I-APO-02<br />

Signed this day <strong>of</strong> 2010 at .<br />

Name<br />

Surname, First Name, Middle Initial<br />

Signature


Powering Business Worldwide<br />

Eaton’s <strong>Electrical</strong> Sector is a global leader in power distribution, power quality,<br />

control and automation, and monitoring products. When combined with<br />

Eaton’s full-scale engineering services, these products provide customer-<br />

driven PowerChain Management ® solutions to serve the power system needs<br />

<strong>of</strong> the data center, industrial, institutional, public sector, utility, commercial,<br />

residential, IT, mission critical, alternative energy and OEM markets<br />

worldwide.<br />

For more information, please contact us at:<br />

E: EatonSEA@eaton.com<br />

W: www.eaton.com/electrical

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!