green blue energy factory â bulgaria market analysis - GBEfactory
green blue energy factory â bulgaria market analysis - GBEfactory
green blue energy factory â bulgaria market analysis - GBEfactory
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Audited industrial systems – results (consumption of over 3000 MWh/year)<br />
PARAMETER DIMENSION VALUE<br />
Audited industrial systems No. 154<br />
Annual <strong>energy</strong> consumption GWh/year 2 927<br />
Energy savings from ESM GWh/year 378<br />
Cost savings from ESM Mln. BGN/year 52,1<br />
СО 2<br />
reduction th. Т./year 187,7<br />
Required investments for ESM Mln. BGN 183,4<br />
Average payback period Year 3,5<br />
Average share of savings % 12,6<br />
Source: Sustainable <strong>energy</strong> development association<br />
<br />
<br />
3.6 Conclusions to the RES sector’s state survey:<br />
The accessible potential of all RES in the country is around 6 000 ktoe. The biggest<br />
accessible potential of all RES in the country is for the biomass (~2 700 ktoe) followed by<br />
the water <strong>energy</strong> (~2 280 ktoe), the solar <strong>energy</strong> (~390 ktoe), geothermal <strong>energy</strong> (~350<br />
ktoe) and the wind <strong>energy</strong> (~280 ktoe).<br />
The average payback period of investments from the proposed <strong>energy</strong> saving measures is<br />
around 3,5 years. At the same time, the RES systems in the industry and the housing stock<br />
have a considerably longer period of payback – over 5-6 years.<br />
Sustainable <strong>energy</strong> development in the conditions of our country including optimal use of<br />
conventional fuels may be achieved by combining measures introducing RES with<br />
measures improving the <strong>energy</strong> efficiency.<br />
During the next 10 years, the water <strong>energy</strong> and the biomass will have the most significant<br />
share in the production of electric power from RES, and to meet the needs of heating,<br />
cooling and boiler hot water – the biomass and geothermal <strong>energy</strong>.<br />
Substantial particularity of the RES is the economic expedience for the realization of<br />
small investment projects as a consequence of the potential redistribution that necessitates<br />
decentralization of the transforming/processing powers.<br />
As a result of the preliminary <strong>analysis</strong> of the state of the RES sector in Bulgaria the <strong>market</strong><br />
survey is directed with priority to the following areas:<br />
<br />
<br />
<br />
By types of RES – biomass, solar collectors for heating <strong>energy</strong>, biogas of recycled<br />
waste, thermal sources – with the largest potential<br />
Sectors – chemistry, commercial chains, hotels in cross-country section – with<br />
significant <strong>energy</strong> intensity and suitable for the project purposes<br />
Regions – national scope and Stara Zagora of broad scope of surveyed entities<br />
18