20.01.2015 Views

green blue energy factory – bulgaria market analysis - GBEfactory

green blue energy factory – bulgaria market analysis - GBEfactory

green blue energy factory – bulgaria market analysis - GBEfactory

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Audited industrial systems – results (consumption of over 3000 MWh/year)<br />

PARAMETER DIMENSION VALUE<br />

Audited industrial systems No. 154<br />

Annual <strong>energy</strong> consumption GWh/year 2 927<br />

Energy savings from ESM GWh/year 378<br />

Cost savings from ESM Mln. BGN/year 52,1<br />

СО 2<br />

reduction th. Т./year 187,7<br />

Required investments for ESM Mln. BGN 183,4<br />

Average payback period Year 3,5<br />

Average share of savings % 12,6<br />

Source: Sustainable <strong>energy</strong> development association<br />

<br />

<br />

3.6 Conclusions to the RES sector’s state survey:<br />

The accessible potential of all RES in the country is around 6 000 ktoe. The biggest<br />

accessible potential of all RES in the country is for the biomass (~2 700 ktoe) followed by<br />

the water <strong>energy</strong> (~2 280 ktoe), the solar <strong>energy</strong> (~390 ktoe), geothermal <strong>energy</strong> (~350<br />

ktoe) and the wind <strong>energy</strong> (~280 ktoe).<br />

The average payback period of investments from the proposed <strong>energy</strong> saving measures is<br />

around 3,5 years. At the same time, the RES systems in the industry and the housing stock<br />

have a considerably longer period of payback – over 5-6 years.<br />

Sustainable <strong>energy</strong> development in the conditions of our country including optimal use of<br />

conventional fuels may be achieved by combining measures introducing RES with<br />

measures improving the <strong>energy</strong> efficiency.<br />

During the next 10 years, the water <strong>energy</strong> and the biomass will have the most significant<br />

share in the production of electric power from RES, and to meet the needs of heating,<br />

cooling and boiler hot water – the biomass and geothermal <strong>energy</strong>.<br />

Substantial particularity of the RES is the economic expedience for the realization of<br />

small investment projects as a consequence of the potential redistribution that necessitates<br />

decentralization of the transforming/processing powers.<br />

As a result of the preliminary <strong>analysis</strong> of the state of the RES sector in Bulgaria the <strong>market</strong><br />

survey is directed with priority to the following areas:<br />

<br />

<br />

<br />

By types of RES – biomass, solar collectors for heating <strong>energy</strong>, biogas of recycled<br />

waste, thermal sources – with the largest potential<br />

Sectors – chemistry, commercial chains, hotels in cross-country section – with<br />

significant <strong>energy</strong> intensity and suitable for the project purposes<br />

Regions – national scope and Stara Zagora of broad scope of surveyed entities<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!