green blue energy factory â bulgaria market analysis - GBEfactory
green blue energy factory â bulgaria market analysis - GBEfactory
green blue energy factory â bulgaria market analysis - GBEfactory
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.3 Prices of <strong>energy</strong> carriers of RES<br />
Preferential prices for selling electric power of renewable sources and hydroelectric stations<br />
with installed power of up to 10 MW specified by Decision № Ц – 18/20.06.2011.<br />
Wind electric plants<br />
Electric plants<br />
Price<br />
BGN/<br />
MWh<br />
1. Operating up to 2 250 hours 191,00<br />
2. Operating over 2 250 hours 173,06<br />
3. Operating with asynchronous generator with cage rotor 137,06<br />
Photovoltaic electric plants<br />
1. Up to 30 kW p, installed on roofs and facades 605,23<br />
2. Over 30 kW p up to 200 kW p, installed on roofs and facades<br />
596,50<br />
3. Over 200 kW p up to 1 000 kW p, installed on roofs and facades 583,77<br />
4. Up to 30 kW p<br />
576,50<br />
5. Over 30 kW p up to 200 kW p 567,41<br />
6. Over 200 kW p 485,60<br />
Electric plants operating with biomass<br />
1. Derived from wood residues, from forest clearing, forestry and other tree trimming waste with<br />
an installed capacity of up to 5 MW<br />
255,51<br />
2. Derived from wood residues, from forest clearing, forestry and other tree trimming waste with<br />
an installed capacity of up to 5 MW combined cycle.<br />
282,15<br />
3. Derived from wood residues, from forest clearing, forestry and other tree trimming waste with<br />
an installed capacity of over 5 MW<br />
227,20<br />
4. Operating with agricultural crops with an installed capacity up to 5 МW 195,03<br />
5. Operating with <strong>energy</strong> crops with an installed capacity of up to 5 МW 185,99<br />
6. Electric plants up to 150 kW, operating through an indirect use of biomass of vegetable and<br />
animal substances<br />
432,81<br />
7. Electric plants over 150 kW up to 1 MW, operating through an indirect use of biomass of<br />
vegetable and animal substances<br />
8. Electric plants over 1 МW up to 5 МW, operating through an indirect use of biomass of<br />
vegetable and animal substances<br />
405,61<br />
335,19<br />
9. Electric plants over 1 МW up to 5 МW, operating through an indirect use of biomass of<br />
vegetable and animal substances with combined production of electric and thermal power<br />
348,61<br />
10. EP up to 150 kW, operating through indirect use of the <strong>energy</strong> of household waste 263,83<br />
11. EP over 150 кW up to 1 МW, operating through indirect use of the <strong>energy</strong> of household waste 253,03<br />
12. EP over 1 МW up to 5 МW, operating through indirect use of the <strong>energy</strong> of household waste 243,86<br />
13. EP up to 150 кW, operating through indirect use of the <strong>energy</strong> от household sewage 158,05<br />
14. EP over 150 кW up to 1 МW, operating through indirect use of the <strong>energy</strong> от household 132,05<br />
sewage<br />
15. EP over 1 МW to 5 МW operating through indirect use of the <strong>energy</strong> от household sewage 119,27<br />
Note: Value added tax not included in the prices.<br />
7