Operating Instructions - Inventflow
Operating Instructions - Inventflow
Operating Instructions - Inventflow
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Operating</strong><br />
<strong>Instructions</strong><br />
Progressive Cavity Pump<br />
Holding Band Re-assembly<br />
Dokument<br />
document<br />
Blatt<br />
sheet<br />
Ausgabe<br />
issue<br />
OM.HBD.01e<br />
2 (2)<br />
A / 23.02.95<br />
• Check after mounting of holding band<br />
The holding band must run all the way round the<br />
groove of the universal joint sleeve.<br />
The holding band (HBD) must be bent back and<br />
sheared off at the holding band loop (SCL) in such a<br />
way that the holding band (HBD) is unable to slip<br />
back through the holding band loop (SCL). If this has<br />
not been accomplished, then the holding band<br />
(HBD) must be replaced by a new one.