20.01.2015 Views

Operating Instructions - Inventflow

Operating Instructions - Inventflow

Operating Instructions - Inventflow

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Operating</strong><br />

<strong>Instructions</strong><br />

Progressive Cavity Pump<br />

Holding Band Re-assembly<br />

Dokument<br />

document<br />

Blatt<br />

sheet<br />

Ausgabe<br />

issue<br />

OM.HBD.01e<br />

2 (2)<br />

A / 23.02.95<br />

• Check after mounting of holding band<br />

The holding band must run all the way round the<br />

groove of the universal joint sleeve.<br />

The holding band (HBD) must be bent back and<br />

sheared off at the holding band loop (SCL) in such a<br />

way that the holding band (HBD) is unable to slip<br />

back through the holding band loop (SCL). If this has<br />

not been accomplished, then the holding band<br />

(HBD) must be replaced by a new one.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!