20.01.2015 Views

Scottsdale Fashion Square - Macerich

Scottsdale Fashion Square - Macerich

Scottsdale Fashion Square - Macerich

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Scottsdale</strong> <strong>Fashion</strong> <strong>Square</strong><br />

Phase 10-Barney’s Expansion 7014 E. Camelback Road, <strong>Scottsdale</strong>, AZ 85251<br />

HVAC SYSTEMS (Cont’d.)<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

<br />

The exhaust fan shall be ducted to ceiling grilles located approximately in<br />

the center and rear of the leased premises. The system shall be designed<br />

to cause the exhaust air to gravitate from the mall common area to the odor<br />

producing area and then to the exhaust system.<br />

tomer<br />

service area.<br />

<br />

<br />

<br />

and approval.<br />

Discharge of all exhaust fans shall be kept at a minimum of 20 feet from all<br />

mall air intakes.<br />

<br />

be in operation during all hours that the tenant is operating its business in the<br />

<br />

VAV BOXES<br />

1. All VAV boxes shall use a thermostat/controller provide by the Landlord’s BAS<br />

contractor at Tenant’s expense.<br />

2. <br />

3. <br />

be purchased and connected through the Landlord’s BAS contractor Integrated<br />

Controls Systems at Tenant’s expense.<br />

Integrated Controls Systems<br />

<br />

602-454-6310<br />

<br />

4. Any BAS controls that must be relocated shall be done by the Landlord’s BAS<br />

contractor at Tenant’s expense.<br />

5. VAV boxes must be manufactured by Envirotec, Titus or Trane. Note that VAV<br />

<br />

lead time for ordering VAV boxes in their critical path construction<br />

schedule.<br />

Contact - Dave Mure’<br />

Phone: 480-483-9622<br />

6. -<br />

<br />

controls contractor, Envirotec.<br />

7. <br />

-<br />

<br />

each VAV box for service.<br />

8. The Tenant’s electrical contractor is responsible for rough in of a single<br />

<br />

-<br />

<br />

ROOFING<br />

1. <br />

<br />

roof penetrations required by Tenant and approved by the Landlord shall<br />

<br />

<br />

2. <br />

<br />

<br />

Tenant Design Criteria<br />

Updated: September, 2008<br />

V. Technical Criteria<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!