20.01.2015 Views

Batch No 3-Defect List Recommendation - IHDP

Batch No 3-Defect List Recommendation - IHDP

Batch No 3-Defect List Recommendation - IHDP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CODES Name of the Beneficiary Welfare Centre <strong>IHDP</strong> <strong>No</strong>: DS Division Consultants Comment and <strong>Recommendation</strong><br />

1 Halitha New Safra B NSB 01 Kalpity<br />

2 H Rasathy New Safra B NSB 02 Kalpity<br />

3 Ansaf New Safra B NSB 03 Kalpity<br />

4 Abuslihu New Safra B NSB 04 Kalpity<br />

5 Ajurdeen New Safra B NSB 06 Kalpity<br />

6 Amlan Ahamed New Safra B NSB 07 Kalpity<br />

7 Mussamil New Safra B NSB 08 Kalpity<br />

8 Mukthar New Safra B NSB 09 Kalpity<br />

9 A Thahir New Safra B NSB 10 Kalpity<br />

10 S Jabir New Safra B NSB 13 Kalpity<br />

11 Sehu Dawood New Safra B NSB 14 Kalpity<br />

12 Kawlath Umma New Safra B NSB 16 Kalpity<br />

13 Muheenutheen New Safra B NSB 15 Kalpity<br />

14 Haneefa New Safra B NSB 18 Kalpity<br />

All doors & door frames to be coated with wood preservative.Payment of 7th installment recommended on completion<br />

of the above tasks.<br />

1. Install one door frame 2. Anchor wall plates 3.Use asbestos sheet,tiles or aluminium sheets as roof materials for the<br />

toilet. Payment of 7th installment recommended on rectification of the above defect.<br />

1. Repalce one door 2. All doors & door frames to be coated with wood preservative. 3. Wall plates to be anchored as<br />

adviced by the technical officer.Payment of 7th installment recommended on rectification of the above defect.<br />

1. <strong>Defect</strong>ive door to be replaced using good timber 2. Wall plates to be anchored as adviced by the technical<br />

officer.Payment of 7th installment recommended on rectification of the above defect.<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Install one door 3. Wall plates to be anchored<br />

as adviced by the technical officers 4.Toilet door to be repalaced. Payment of 7th installment recommended on<br />

rectification of the above defect.<br />

1. Floor concreting to be completed in all the areas & rendering done finishing smooth. 2. All doors, windows & frames<br />

to be coated with wood preservative. 3. <strong>Defect</strong>ive window sashes to be replaced as adviced by the technical officer. 4.<br />

Poor quality tiles to be replaced with good tiles & ridging completed using ridge tiles. 5. Wall plates to be anchored as<br />

adviced by the technical officers 6. Toilet to be constructed with a soakage pit. Payments to be withheld until the<br />

defects mentioned above are rectified.<br />

1. Concrete floor to be finish smooth with cement sand floating 2. All doors, windows & frames to be coated with wood<br />

preservative. 3. Wall plates to be anchored as adviced by the technical officers 4. Install a door for the toilet.. Payment<br />

of 7th installment recommended on rectification of the above defect.<br />

1. Ridging to be completed using ridge tiles as asbestos ridges. 2. Wall plates to be anchored as adviced by the<br />

technical officers.Payment of 7th installment recommended on completion of the above tasks.<br />

Wall plates to be anchored as adviced by the technical officer.Payment of 7th installment recommended on completion<br />

of the above tasks.<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Wall plates to be anchored as adviced by the<br />

T.Os.Payment of 7th installment recommended on completion of above.<br />

1. Floor concrete to be finished smooth using cement,sand slurry 2. Wall plates to be anchored as adviced by the<br />

technical officers. 3. All doors, windows & frames to be coated with wood preservative. Payment of 7th installment<br />

recommended on completion of the above.<br />

1. Laid concrete floor to be finished smooth using cement slurry. 2. Doors frames & window frames to be installed &<br />

shutters provided,all timber elements to be coated with wood preservative. 3. Wall plates to be anchored as adviced by<br />

the technical officers. 4. Toilet door to be replaced.Payment of 7th installment recommended only after rectification of<br />

the above defects.In addition, there is no live boundary on the 4th side,which is a donor requirement.<br />

1. Window sashes to be provided. 2. All doors, windows & frames to be coated with wood preservative. 3. Wall plates<br />

to be anchored as adviced by the technical officer. Payment of 7th installment recommended on completion of the<br />

above tasks.<br />

1. Doors & windows to be coated with a wood preservative. 2. Wall plates to be anchored as adviced by the technical<br />

officers. 3. It is noted that there is no boundary (Live) on the 4th side which is a donor requirement. Payment of 7th<br />

installment recommended on completion of the above tasks.<br />

1. 2 window sashes to be provided. 2. Wall plates to be anchored as adviced by the technical officers. 3. Toilet door<br />

15 Faizal New Safra B NSB 19 Kalpity<br />

to be replaced. 4.I t is noted that there are no live fences on 2 boundaries.Though this is not a defect & is understood<br />

that this is a donor requirement.Payment of 7th installment recommended, after attending to the above.<br />

16 Abdul Hammed New Safra B NSB /M/ 01 Kalpity <strong>No</strong> visible defects in this house.Payment of 7th installment recommended.<br />

17 Abdul Salam New Safra B NSB /M/ 02 Kalpity <strong>No</strong> visible defects in this house.Payment of 7th installment recommended.<br />

18 S Manzoor New Safra B NSB /M/ 03 Kalpity<br />

1. Kitchen concrete floor to be finished smooth using cement slurry. 2. All doors, windows & frames to be coated with<br />

wood preservative. 3. Wall plates to be anchored as adviced by the technical officers.Payment of 7th installment<br />

recommended on rectification of the above defect.<br />

19 S M Uwais Salamath Puram SAL 30 Kalpity<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Wall plates to be anchored as adviced by the<br />

technical officers. 3.Toilet door frame to be replaced.Payment of 7th installment recommended on rectification of the<br />

above defect.<br />

20 Adam Bawa Salamath Puram SAL 46 Kalpity<br />

1. 3 window sashes to be installed. 2.Wall plates to be anchored as adviced by the technical officers. Payment of 7th<br />

installment recommended on completion of the above tasks.<br />

1.Wall plates to be anchored as adviced by the technical officers. 2.Toilet door frame to be changed.Payment of 7th<br />

21 Abdul Fari Salamath Puram SAL 14 Kalpity installment recommended on completion of the above tasks.<br />

22 Sadakku Salamath Puram SAL/M/ 09 Kalpity<br />

1. Doors & windows to be installed 2.Wall plates to be anchored as adviced by the technical officers.Payment of 7th<br />

installment recommended on completion of the above.<br />

1. Doors & windows to be installed including the toilet door 2.Wall plates to be anchored as adviced by the technical<br />

23 M C M Ibrahim Salamath Puram SAL 26 Kalpity officers.Payment of 7th installment recommended on completion of the above deficiencies.<br />

1. Doors & windows to be installed & wood preservative applied. 2.Wall plates to be anchored as adviced by the<br />

24 K M Meera Sahib Salamath Puram SAL 44 Kalpity technical officers.Payment of 7th installment recommended only after completion of the above.<br />

25 S A Nawfiya Salamath Puram SAL 02 Kalpity<br />

1. Floor rendering to be done in one room 2. One door to be installed 3. 4 window sashes to be installed. 4. Doors,<br />

windows & frames to be coated with wood preservative. 5. Wall plates to be anchored as adviced by the technical<br />

officers. 6.Toilet to be constructed with a soakage pit.Payment of 7th installment recommended only after rectification<br />

of the above defects.<br />

26 <strong>No</strong>or Mohamed Salamath Puram SAL 23 Kalpity<br />

27 M P Asraf Salamath Puram SAL 40 Kalpity<br />

1. Complete internal plastering of one room. 2. Replace the defective door of one room. 3. All doors, windows & frames<br />

to be coated with wood preservative. 4. Wall plates to be anchored as adviced by the technical officers. 5. Toilet door<br />

to be replaced. Payment of 7th installment recommended only after rectification of the above defects.<br />

1. Wall plates to be anchored as adviced by the technical officers. 2. Toilet to be constructed with a soakage pit. 3. It<br />

is also noted that there is no live fence on the 4th boundary. Payment of 7th installment recommended on rectification<br />

of the above defects.<br />

28 N Hamsa Salamath Puram SAL/M/ 03 Kalpity Toilet to be constructed with a soakage pit. Payment of 7th installment recommended on completion of the above task.<br />

29 Meera Mohideen Salamath Puram SAL 15 Kalpity<br />

1. Wall plates to be anchored as adviced by the technical officers. 2.Construction of toilet to be completed with a<br />

soakage pit. Payment of 7th installment recommended on completion of the above tasks.<br />

30 M M Unais Salamath Puram SAL/M/ 08 Kalpity<br />

1. All windows & window frames to be coated with a wood preservative 2. Wall plates to be anchored as adviced by<br />

the technical officers. 3. Replace the toilet door. 4. Install roof for the toilet. Payment of 7th installment recommended<br />

on rectification of the defects.<br />

31 Thasim Rajeeba Salamath Puram SAL/M/ 11 Kalpity<br />

1. Concrete floor to be rendered smooth using cement slurry. 2. Apply wood preservative on doors & door frames. 3.<br />

Install windows. 4. Construct the toilet & the soakage pit.Payment of 7th installment recommended on rectification of<br />

the above defects.<br />

32 Nihmathullah Salamath Puram SAL 12 Kalpity<br />

1. Concrete floor to be rendered smooth using cement,sand mortar. 2. Door to be instaled. 3. Windows to be installed.<br />

4. Wall plates to be anchored as adviced by the technical officers.Payment of the 7th installment recommended on<br />

rectification of the above defects.<br />

33 Abdeen Salamath Puram SAL/M/ 10 Kalpity<br />

1. All floors concreted to be rendered smooth using cement,sand mortar. 2. Install 2 doors 3. Install 2 window sashes.<br />

4. Doors, windows & frames to be coated with a wood preservative. 5. Install the toilet door.Payment of the 7th<br />

installment recommended on rectification of the above defects.


34 Saleem Salamath Puram SAL 01 Kalpity<br />

35 M Thulkkuful Salamath Puram SAL 24 Kalpity<br />

1.Install all doors in the main building & apply a coat of wood preservative. 2. Install all windows, applying wood<br />

preservative 3. Wall plates to be anchored as adviced by the technical officers. 4.Install roof for the the toilet & fix a<br />

door 5. Construct the soakage pit.Payment of the 7th installment recommended only after rectification of the above<br />

defects.<br />

1. Install all door & windows,applying wood preservative. 2. Wall plates to be anchored as adviced by the technical<br />

officers. 3. Construct the toilet & the soakage pit.Payment of the 7th installment recommended only after rectification of<br />

the above deficiencies.<br />

36 M Haymeerkahan Salamath Puram SAL 36 Kalpity<br />

1. Install a door in one room. 2. Applying wood preservative in doors & door frames. 3. Wall plates to be anchored as<br />

adviced by the technical officers.Payment of the 7th installment recommended on completion of the above task.<br />

37 Idrees Salamath Puram SAL 34 Kalpity<br />

1.Doors & door frames to be coated with a wood preservative. 2.Wall plates to be anchored as adviced by the<br />

technical officers. 3. Replace the toilet door.Payment of the 7th installment recommended only after rectification of the<br />

above defects.<br />

38 M M Ameerdeen Salamath Puram SAL 27 Kalpity<br />

Wall plates to be anchored as adviced by the technical officers.Payment of the 7th installment recommended on<br />

completion of the above task.<br />

39 A J M Yahiyakhan Salamath Puram SAL 17 Kalpity<br />

1. Install the rear door. 2. Wall plates to be anchored as adviced by the technical officers. 3. Replace the toilet<br />

door.Payment of the 7th installment recommended on completion of the above task.<br />

40 A C Jifry Salamath Puram SAL 09 Kalpity<br />

Wall plates to be anchored as adviced by the technical officers.Payment of the 7th installment recommended on<br />

completion of the above task.<br />

1 .Wall plates to be anchored as adviced by the technical officers. 2. It is noted that there is no live fence on the 4th<br />

41 A M Abdul Eader Salamath Puram SAL 41 Kalpity<br />

boundary, which is a donor requirement.Payment of the 7th installment recommended on completion of the above<br />

task.<br />

42 A H Sainudeen Salamath Puram SAL 45 Kalpity<br />

1. Wall plates to be anchored as adviced by the technical officers. 2. Replace the toilet door.Payment of the 7th<br />

installment recommended on completion of the above task.<br />

43 Haneefa Umma Salamath Puram SAL 16 Kalpity<br />

1. Wall plates to be anchored as adviced by the technical officers. 2. Install a door for the toilet.Payment of the 7th<br />

installment recommended on completion of the above task.<br />

44 Amanullah Salamath Puram SAL 22 Kalpity<br />

Wall plates to be anchored as adviced by the technical officers.Payment of the 7th installment recommended on<br />

completion of the above task.<br />

45 A Mawsoon Salamath Puram SAL/M/ 14 Kalpity<br />

Wall plates to be anchored as adviced by the technical officers.Payment of the 7th installment recommended on<br />

completion of the above task.<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Replace the toilet door..Payment of the 7th<br />

46 Meera Umma Salamath Puram SAL 25 Kalpity installment recommended on completion of the above.<br />

47 Haneefa Iskhan Salamath Puram SAL 06 Kalpity<br />

1.Doors & door frames to be coated with a wood preservative. 2.Wall plates to be anchored as adviced by the<br />

technical officers. 3. Replace the toilet door.Payment of the 7th installment recommended on rectification of the above<br />

defects.<br />

48 Cassim Dawood Salamath Puram SAL 50 Kalpity<br />

1. Wall plates to be anchored as adviced by the technical officers. 2. Replace the toilet door.Payment of the 7th<br />

installment recommended on completion of the above task.<br />

49 A M Kiyas Zam-Zam Nagar ZAM 09 Kalpity<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Wall plates to be anchored as adviced by the<br />

technical officers. 3. Replace the toilet door. Payment of 7th installment recommended on rectification of the above<br />

defect.<br />

50 Riswan Zam-Zam Nagar ZAM 10 Kalpity<br />

1. Wall plates to be anchored as adviced by the technical officers. 2. Replace the toilet door. 3. Install the toilet<br />

roof.Payment of 7th installment recommended on rectification of the above defect.<br />

51 Farook Sahir Zam-Zam Nagar ZAM 18 Kalpity<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Install the doors in the house. 3. Wall plates to<br />

be anchored as adviced by the technical officers. 4. Replace the toilet door. Payment of 7th installment recommended<br />

on rectification of the above defect.<br />

52 Fathumma Zam-Zam Nagar ZAM 06 Kalpity<br />

1. Rest of the floor area to be constructed & finished smooth. 2. Internal wall plaster to be done. 3.Lintel to be<br />

constructed. 4. Door shutters to be installed, applying wod preservative to shutters & frames. 5. Windows to be<br />

installed. 6. Wall plates to be anchored as adviced by the TO. 7. Toilet & soakage pit to be constructed . Payment of<br />

7th installment recommended only after completion of the above tasks.<br />

53 Sareefa Zam-Zam Nagar ZAM/M/ 28 Kalpity<br />

1. All doors, windows & frames to be coated with wood preservative. 2. Toilet & soakage pit to be<br />

constructed.Payment of 7th installment recommended only after completion of the above tasks.<br />

54 Nilfa Zam-Zam Nagar ZAM/M/ 05 Kalpity<br />

1. Install all doors applying wood preservative. 2. Install all window sashes applying wood preservative.Payment of 7th<br />

installment recommended only after completing the above tasks.<br />

55 Mohomed Cassim Sakeela Zam-Zam Nagar ZAM 21 Kalpity<br />

1. Wall plates to be anchored as adviced by the technical officers. 2. Replace the toilet door. Payment of 7th<br />

installment recommended on completion the above tasks.<br />

56 A S Mohomed Faiz Zam-Zam Nagar ZAM 17 Kalpity<br />

1. Install 2 window sashes 2. Wall plates to be anchored as adviced by the technical officers. 3. Replace the toilet<br />

door.Payment of 7th installment recommended on rectification of the above defect.<br />

57 Junaidah Zam-Zam Nagar ZAM/M/ 01 Kalpity<br />

1. Reconstruct the pit as adviced by the technical officers. 2. Toilet door to be replaced. Payment of 7th installment<br />

recommended on completion the above.<br />

58 Farsan Ayishabeevi Zam-Zam Nagar ZAM 13 Kalpity<br />

1. Install the missing door shutter 2. Wall plates to be anchored as adviced by the technical officers. Payment of 7th<br />

installment recommended on completion the above tasks.<br />

59 A H M Alam Zam-Zam Nagar ZAM/M/ 06 Kalpity Replace the toilet door. Payment of 7th installment recommended on completion the above.<br />

60 Sabura Abdeen Zam-Zam Nagar ZAM 12 Kalpity<br />

1. Install the missing door 2. Install all window sashes 3. Wall plates to be anchored as adviced by the technical<br />

officers. Payment of 7th installment recommended on attending to the the above defects.<br />

61 A S M Iqbal Jameen Zam-Zam Nagar ZAM 24 Kalpity<br />

1. All doors & windows to be fixed . 2. Toilet door to be fixed. 3. Toilet roof to be constructed. Payment of 7th<br />

installment recommended after rectification of the above defects.<br />

62 Sam Sunmasha Zam-Zam Nagar ZAM 19 Kalpity<br />

1. Install the door in the rare. 2. Install all window sashes 3. Wall plates to be anchored as adviced by the technical<br />

officers. Payment of 7th installment recommended on rectification of the above defects.<br />

63 Abdul Sareef Zam-Zam Nagar ZAM 02 Kalpity<br />

1. Apply wood preservative on roof timber. 2. Anchor wall plates as adviced by the technical officers. 3. Replace the<br />

toilet door. Payment of 7th installment recommended on rectification of the above defects.<br />

64 Rafaideen Ashar Nagar ASH 04 Kalpity<br />

Wall plates to be anchored as adviced by the technical officers. Payment of 7th installment recommended on attending<br />

to the the above.<br />

65 H M Thahir Ashar Nagar ASH 23 Kalpity<br />

Wall plates to be anchored as adviced by the technical officers. Payment of 7th installment recommended on attending<br />

to the the above task.<br />

66 K P Shahul Ameer Ashar Nagar ASH 29 Kalpity<br />

1. Anchor wall plates as adviced by the technical officers. 2. Replace the toilet door.Payment of 7th installment<br />

recommended on attending to the the above.<br />

67 N Janoriya Ashar Nagar ASH 31 Kalpity Replace the toilet door.Payment of 7th installment recommended on attending to the the above.<br />

68 M K Rahman Ashar Nagar ASH/M/ 08 Kalpity Toilet & soakage pit to be constructed.Payment of 7th installment recommended on attending to the the above.<br />

69 M I Nawas Ashar Nagar ASH 05 Kalpity<br />

1. Install 2 window sashes 2. Anchor wall plates as adviced by the T.O.s. 3. Replace the toilet door.Payment of 7th<br />

installment recommended on completion the above.<br />

70 Thawfeeq Ashar Nagar ASH 02 Kalpity<br />

1. Apply wood preservative to doors,windows & frames. 2. Anchor wall plates as adviced by the T.O.s. 3. Install toilet<br />

door. Payment of 7th installment recommended on rectification of the above defects.<br />

71 R Haneefa Hassaniya Puram HAS 08 Kalpity<br />

72 Muzammil Hassaniya Puram HAS 23 Kalpity<br />

73 Rizwan Hassaniya Puram HAS 18 Kalpity<br />

74 R Ajees Hassaniya Puram HAS 03 Kalpity<br />

1. Doors & door frames to be coated with a wood preservative. 2. Wall plates to be anchored as adviced by the<br />

technical officers. 3. Install the toilet door.Payment of 7th installment recommended on completion the above tasks.<br />

1.Floor concrete to be rendered smooth using cement slurry. 2. windows & frames to be coated with a wood<br />

preservative. 3. Complete anchoring of wall plates at all corners as adviced by the technical officers. 4. Construct toilet<br />

with a soakage pit.Payment of 7th installment recommended on rectification of the above defects.<br />

1. Install all doors. 2. Replace 2 window sashes as advised by the T.O.s. 3. Anchor wall plates as advised by the<br />

T.O.s.Payment of 7th installment recommended on completion the above tasks.<br />

1. Install doors & windows. 2. Anchor wall plates 3. Construct toilet & soakage pit .Payment of 7th installment<br />

recommended on completion the above defects.


75 Faseela Hassaniya Puram HAS 05 Kalpity<br />

76 Sabeerullah Hassaniya Puram HAS 11 Kalpity<br />

1. Apply wood preservative to doors & door frames. 2. Anchor wall plates. 3. Construct toilet with soakage pit.<br />

Payment of 7th installment recommended on rectification of the above defects.<br />

1. Anchor wall plates. 2. Construct the toilet & complete the lid on the soakage pit & the pipe connectors. Payment of<br />

7th installment recommended on rectification of the above defects.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!