S.<strong>No</strong> Name of the Beneficiary Welfare Centre <strong>IHDP</strong> <strong>No</strong>: DS DivisionConsultants Comment and <strong>Recommendation</strong>1 Yaseen Mujeeb Ali Jinnah ALI 05 Kalpitiya1. Doors & Windows items are to be done. 2. Internal plastering to be done. Payment of 7th installment recommendedafter completion of the above works.2 S Nilam Ali Jinnah ALI 19 Kalpitiya1. Item 1.3 floor work has not done 2.The toilet door,roof work & the squoting pan work has to be done.Payment of 7thinstallment recommended on rectification of above item 1 & 2.3 Saiadu Hameed Ali Jinnah ALI 13 Kalpitiya Toilet door to be changed.Payment of 7th installment recommended on completion of above work.4 S A Rahmon Ali Jinnah ALI 07 Kalpitiya1. Item 1.2, 1.3 & 1.4 floor concreting has to be done. 2. Wall plates anchoring not done. 3. The tolet item has notconstructed. 4.Wood presrvative to be done for door,window frames & sashes. Payment of 7th installment may berecommended after completion of above items 3(1), (4) & (3).5 Murthalla Ali Jinnah ALI 09 Kalpitiya1. Item (1.4)& (1.5) floor concreting has to be done. 2. Item (3.2) door lock has to be provided for the safety room. 3.Item (3.6) & (4.4) wood preservative & painting has to be done.Payment of 7th installment may be recommended oncompletion of above items.6 M Ibrahim Ali Jinnah ALI 04 Kalpitiya1. For this items (3.6) & (4.4) wood preservative & painting has to be done. 2. Toilet door frames with frame two(2)sashes & the roof work ha sto be done. Payment of 7th installment may be recommended on completion of aboveitems.7 A P Thawfeek Ali Jinnah ALI 18 Kalpitiya1. Item (3.6) wood preservative & painting ahs to be done for all door shashes. 2. Item (4) window sashes are notfixed.Payment of 7th installment may be recommended on completion of above items (1) (2) (3)8 M L M Ibrahim Ali Jinnah ALI 49 Kalpitiya1. Item (1.5) flooring has to be done. 2. Items (3.6) & (4.9) door frame & sashes to be applied with wood preservative& complete with painting. 3. Item (8) toilet door & door frames & sashes has to be done.Payment of 7th installmentmay be recommended on completion of above works items (1) (2) & (3)9 R Rameek Ali Jinnah ALI 32 Kalpitiya1. Item (1.3), (1.5) &(1.6) floor rendering & finishing has to be done . 2. Item (4) balance window shashes has to beprovided.Payment of 7th installment may be recommended on completion of above items (1) &(2).10 M K Nafeel Ali Jinnah ALI 38 Kalpitiya1. Item (3.1) of the safety room door shash has to be changed. 2. Item (4) window frames & shashes to be fixed. 3.Item (8) the toilet door frames & shashes & the roof has to be repaired.Payment of 7th installment recommended oncompletion of above works.11 M Sareef Ali Jinnah ALI 23 Kalpitiya <strong>No</strong> visible defect found in this home.Payment of 7th installment recommended for this house.12 K Moorthi Ali Jinnah ALI 08 Kalpitiya1. Item (3.2) door lock to be provided. 2. Item (3.6) & (4.4) wood preservative to be applied.Payment of 7th installmentrecommended on completion of above items.13 Nazar Ali Jinnah ALI 12 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied. 2. Item 1.3, 1.4, 1.5 floor rendering & shoaking to bedone.Payment of 7th installment recommended on completion of above works.14 A K Uwais Ali Jinnah ALI 21 Kalpitiya <strong>No</strong> visible defect found in this home.Payment of 7th installment recommended for this house.15 A L Nizar Ali Jinnah ALI 02 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied.Payment of 7th installment recommended on completion ofabove works.16 A Majeed Ali Jinnah ALI 01 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied.Payment of 7th installment recommended on completion ofabove works.17 M Niyas Ali Jinnah ALI 34 Kalpitiya1. Item (2.3) internal plastering has not done. 2. Item (3) & (4) door & window frames & shashes to be fixed. 3. Toilethas to be constructed. Payment of 7th installment recommended on completion of above works on item (1), (2), (3) &(4).18 A Cadeer Ali Jinnah ALI 36 KalpitiyaThe benificery has not done the items (1), (2) ,(3) ,(4) , (6) & (8). Payment of 7th installment recommended oncompletion of all items (1), (2) ,(3) ,(4) , (6) & (8).19 A M Fareena Ali Jinnah ALI 27 Kalpitiya <strong>No</strong> visible defect found in this home.Payment of 7th installment recommended for this house.20 P A Majeed Ali Jinnah ALI 16 Kalpitiya1.The benificery is unable to complete this items (1), (2) ,(3) ,(4) , (6) & (8). 2. Wall plates to beanchored(5.8).Payment of 7th installment recommended on completion of all works under item (1), (2) ,(3) ,(4) , (6) &(8) shown under this defect list.21 Mohamed Rauf Ali Jinnah ALI 24 Kalpitiya1. The floor not concreted & finished in. 2. Internal walls to be plastered. 3. Item (3.6) & (4.4) wood preservative to beapplied 4. The toilet door frame & shashes to be changed.Payment of 7th installment recommended on completion ofall works under the item (1), (2) ,(3) & (4) .22 S M Mohamed Ali Ali Jinnah ALI /M/16 Kalpitiya1. Items (1.3),(1.4),(1.5) floor rendering & shoaking has to be done. 2. Items (2.3) internal plastering to be done. 3.tems (3) & (4) door & window shashes to be fixed. 4. Items (8) the toilet not constructed.Payment of 7th installmentrecommended on completion of all works mentioned above.23 Raifa Umma Ali Jinnah ALI 14 Kalpitiya <strong>No</strong> visible defects.Payment of 7th installment recommended.24 Mohamed Abubakar Ali Jinnah ALI 05 Kalpitiya <strong>No</strong> visible defects.Payment of 7th installment recommended.25 Sivathamma Ali Jinnah ALI /M/12 Kalpitiya <strong>No</strong> visible defects found.Payment of 7th installment recommended.26 S Aseez Ali Jinnah ALI 10 Kalpitiya <strong>No</strong> visible defects found.Payment of 7th installment recommended.27 A P Seinambu Ali Jinnah ALI 31 Kalpitiya1. Items (1.4) the floor concrete & rendering to be done. 2. Items (8) repairs in toilet such as plastering & fixing of newsquoting pan.Payment of 7th installment recommended on completion of above works.28 Fazil Ali Jinnah ALI 37 Kalpitiya1.Item (3.6) & (4.4) wood preservative to be applied for door , window frames & shashes.Payment of 7th installmentrecommended on completion of above works.29 Subaitha Umma Ali Jinnah ALI 26 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied for this door , window , frames & shashes.Payment of 7thinstallment recommended on completion of above said works.30 M S Ranees Ali Jinnah ALI 44 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied.Payment of 7th installment recommended on completion ofabove said works.31 I Haleena Umma Ali Jinnah ALI 15 Kalpitiya1. Safety room to be fixed with door shash. 2. All window sha shes to be fixed with Iron grill. 3. Item (3.6) & (4.4) alldoor & window frames & shashes to be applied with wood preservative. 4. Item (6) provide drainage pipe & do plasterfor the exposed surface of the pit. 5. Door shashes to be changed for the toilet.Payment of 7th installmentrecommended on completion of above said works.32 S A C Salik Ali Jinnah ALI 17 Kalpitiya1. Item (1.3)(1.4) &(1.5) floor area not rendered & soaked has to be done. 2.Item (4) window shashes not fixed for theeither sides. 3. Toilet has to be constructed.Payment of 7th installment recommended on completion of above saidworks.33 Badurdeen Ali Jinnah ALI /M/07 Kalpitiya1.Item (1.5) concreted floor not finished smooth 2 .Item (3) & (4) door & window shashes are not fixed.Payment of 7thinstallment recommended on completion of above said works.34 S A Rasik Ali Jinnah ALI 40 Kalpitiya1.Item (3.6) door shashes are not applied with wood preservative. 2. Item (4) window shashes are not fixed. 3.Toilet isnot constructed.Payment of 7th installment recommended on completion of above said works.1. Item (3.6) & (4.4) the shashes are not applied with wood preservative. 2. Toilet to be constructed. 7th35 M Ameer Ali Jinnah ALI 30 Kalpitiya installment recommended on completion of above said works.36 A A nasrin Ali Jinnah ALI 22 Kalpitiya1.Items (1.3), (1.4) ,(1.5) & (1.6) floor concrete & finishing not done. 2. Item (2) internal plastering has not done. 3. Item(3) & (4) door & window shashes are not fixed. 4. Wall plates are not anchored. 5. R.C stiffner not provided,provide thestiffner inside this column of wall. Payment of 7th installment recommended on completion of above said works.37 M Nisthar Ali Jinnah ALI 28 Kalpitiya <strong>No</strong> visible defects.Payment of 7th installment recommended.38 J Rafeek Ali Jinnah ALI 11 Kalpitiya1. Main door should provided woith locking arangement. 2.1.Items (5.8) wall plates to be anchored.Payment of 7thinstallment recommended on completion of above said works.39 M D Khaim Ali Jinnah ALI 35 Kalpitiya1.Item (1.5) dining & living area should be concreted & finished smooth. 2. Toilet is to be constructed.payment of 7thinstallment recommended on completion of above said works.40 F Unaida Ali Jinnah ALI 29 Kalpitiya1.Items (1.3), (1.4) ,(1.5) & (1.6) floor concreted but not rendered & finished smooth. 2. The toilet door sashes to befixed.Payment of 7th installment recommended on completion of above said works.41 A C Kaleel Ali Jinnah ALI 33 Kalpitiya1. Item (1.4)& (1.5) floor concreted but not rendered &finished smooth. 2.Item (3) The dining room door shash to befixed. 3. Item (4) the window shashes to be fixed. 4. Wood preservative should be applied for door & window shashes5. The toilet walls not plastered & door shashes to be fixed.Payment of 7th installment recommended on completion ofabove said works.


1. Item (3.6) & (4.4) wood preservative to be applied. 2.One corner of the wall plate to be anchored. 3.Toilet doorshould be changed.Payment of 7th installment recommended on completion of above said works.42 K Akbar New Camp Thihali NCT 13 Kalpitiya43 A L Ajimal New Camp Thihali NCT 01 Kalpitiya <strong>No</strong> visible defects.Payment of 7th installment recommended.44 M C M Haneefa New Camp Thihali NCT 28 Kalpitiya1. Window shashes to be fixed. 2. Wood preservative to be applied for door & window sashes.Payment of 7thinstallment recommended on completion of above said works.45 M T M Mufith New Camp Thihali NCT 27 Kalpitiya 1. Wall plates to be anchored.Payment of 7th installment recommended on completion of above said works.46 Ramalan Beevi New Camp Thihali NCT 05 Kalpitiya1. Door lock is to be provided. 2. Wall plates to be anchored.Payment of 7th installment recommended on completionof above said works.47 P M M Nairoos New Camp Thihali NCT/ M /08 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied. 2. The toilet to be constructed..Payment of 7th installmentrecommended on completion of above said works.48 Munawwar New Camp Thihali NCT 19 Kalpitiya1. Item (3.6) & (4.4) wood preservative to be applied. 2. C.Payment of 7th installment recommended on completion ofabove works.49 M C Nafeer New Camp Thihali NCT 24 Kalpitiya50 Asanar Lebbe New Camp Thihali NCT/ M /05 Kalpitiya1. Wood preservative to be applied for door & window frames & shashes. 2. Roof tile ridging to be done. 3. Wall platesto be anchored. 4. Toilet shash to be changed. Payment of 7th installment recommended on completion of aboveworks.1.Wall plates to be anchored. 2. Toilet door shash & roof to be fixed.Payment of 7th installment recommended oncompletion of above said works.51 Kalel Ul Rahman New Camp Thihali NCT 25 Kalpitiya52 M I Safeek New Camp Thihali NCT 30 Kalpitiya53 A M Hasim New Camp Thihali NCT 20 Kalpitiya54 Abdul salam New Camp Thihali NCT 26 Kalpitiya55 Hassan New Camp Thihali NCT 02 Kalpitiya56 Irfan New Camp Thihali NCT 12 Kalpitiya57 Mohomed Thampi New Camp Thihali MUJ 24 Wanathawillu58 Mubeen Mujahideen Puram MUJ 60 Wanathawillu59 M D Jamath Mujahideen Puram MUJ 06 Wanathawillu60 Nahoor Umma Mujahideen Puram MUJ 30 Wanathawillu61 Sabrin / Sajhun Mujahideen Puram MUJ 75 Wanathawillu62 Kithru Mohomed Mujahideen Puram MUJ 35 Wanathawillu63 M T M Akbar Mujahideen Puram MUJ 74 Wanathawillu64 Baseer Mujahideen Puram MUJ/ M / 11 Wanathawillu65 Jannath Umma Mujahideen Puram MUJ 40 Wanathawillu66 Rasook Khan Mujahideen Puram MUJ/ M / 04 Wanathawillu67 Safa Umma Mujahideen Puram MUJ 49 Wanathawillu68 A K Thansees Mujahideen Puram MUJ/ M / 05 Wanathawillu69 Naleem Mujahideen Puram MUJ 02 Wanathawillu70 Ameen Umma Mujahideen Puram MUJ 52 Wanathawillu71 L Hakeem Mujahideen Puram MUJ 53 Wanathawillu72 Ashraf Deen Mujahideen Puram MUJ 55 Wanathawillu73 Anvar Mujahideen Puram MUJ 36 Wanathawillu74 N M Casim Mujahideen Puram MUJ 37 Wanathawillu75 Jamaldeen Mujahideen Puram MUJ 38 Wanathawillu76 Zeenath Umma Mujahideen Puram MUJ 28 Wanathawillu77 Siyam Umma Mazoor Nagar MAZ/ M /37 Kalpitiya78 M Nasarulla Mazoor Nagar MAZ/ M /36 Kalpitiya79 J A Rahman Mazoor Nagar MAZ 84 Kalpitiya80 Ibrahim Saheebu Mazoor Nagar MAZ 96 Kalpitiya1. Wood preservative to be applied for door & window frames & shashes on item (3.6) & (4.4). 2. Wall plates to beanchored. 3. Toilet roof to be fixed. Payment of 7th installment recommended on completion of above said works.1.Wall plates to be anchored. 2. Toilet door shash to be changed.Payment of 7th installment recommended oncompletion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3. Doorshould be changed.Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored.Payment of 7thinstallment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored.Payment of 7thinstallment recommended on completion of above said works.1.Wall plates to be anchored. 2.Toilet door to be changed.Payment of 7th installment recommended on completion ofabove said works.1.Wall plates to be anchored. 2.Toilet to be constructed.Payment of 7th installment recommended on completion ofabove said works.1. Wood preservative to be applied for door & window frames & shashes .2. Wall plates to be anchored . 3.Toilet to beconstructed.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3.Toilet to beconstructed.1. Wood preservative to be applied for window shashes. 2. Wall plates to be anchored. 3.Toilet to be constructed.Payment of 7th installment recommended on completion of above said works.1. Door shashaes to be applied with wood preservative. 2. Window shashes to be applied 3. wall plates to beanchored. 4. Toilet to be constructed. Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window shashes. 2. Wall plates to be anchored. 3.Toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door, window shashes & frames. 2. Wall plates to be anchored. 3.Toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.1. Flooring works to be done. 2.Door frames & shashes & window shashes to be fixed. 3.Wall plates to be anchored &internal plates not done. 4. Toilet to be constructed.Payment of 7th installment recommended on completion of abovesaid works.1. Doors & window frames,shashes to be applied with wood preservative. 2.Wall plates to be anchored. 3. Toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.1. Internal plates to be done. 2. Door shashes (2nos) & window shashes ( 7nos) tobe fixed. 3. Wood preservative to beapplied for all door & window frames & shashes. 4. Wall plates to be anchored. 5.Toilet to be constructed. Payment of7th installment recommended on completion of above said works.1. Floor concreting to be done. 2.Internal plates to be done. 3. Door shash (2) & window shash (6) to be fixed. 4.Wallplates to be anchored. 5.Toilet to be constructed. Payment of 7th installment recommended on completion of abovesaid works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3.Toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.1. Floor concreting & floor finishing to be done. 2.Internal plates to be done. 3.DF + WF not fixed. 4.Wall plates to beanchored.5.Roof ridging not done. 6.Door shahes at toilet to be changed.Payment of 7th installment recommended oncompletion of above said works.1.Internal plates to be done. 2. Door frame one (1) & door shash two (2) to be fixed. 3. Window shashes (6) to be fixed.4.Wood preservative to be applied 5.Toilet to be constructed.Payment of 7th installment recommended on completionof above said works.1. Two(2) door shashes to be fixed. 2. Wall plates to be anchored. 3.Toilet to be constructed.Payment of 7thinstallment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored as advised bythe T.O. 3.Toilet to be constructed.Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored as advised bythe T.O. 3.Toilet to be constructed.Payment of 7th installment recommended on completion of above said works.1.Item (3.8) Wall plates to be anchored as advised by the T.O.Payment of 7th installment recommended on completionof above said works.1.Wall plates to be anchored as advised by the T.O. 2.Toilet to be constructed.Payment of 7th installmentrecommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored as advised bythe T.O. 3.Toilet to be constructed.Payment of 7th installment recommended on completion of above said works.1. Floor concreting with rendering & smoothing to be done. 2. Door & window shashes to be fixed including appliying ofwood preservative. 3. Toilet door shash to be changed 4. Internal & external front wall plates to be done.Payment of7th installment recommended on completion of above said works.1. Door frames(3) & window frames(4) to be fixed also all shutters to be fixed including applying of wood preservativewith locking arrangements.Payment of 7th installment recommended on completion of above said works.1. One door shash & all window shash to be fixed & should applied the wood preservative. 2.Wall plates to beanchored as advised by the T.O.1. External plates to be done with 1:5 ct. & sand mixture. 2. One door shash to be fixed & wood preservative to beapplied too the frames & shashes. 3. Anchor to the fixed in wall plates with the instruction of T.O. 4. One door shash &the roof work to be done.Payment of 7th installment recommended on completion of above said works.


81 Raseena Mazoor Nagar MAZ 36 Kalpitiya82 Nasrudeen Mazoor Nagar MAZ 70 Kalpitiya83 S Thabsir Mazoor Nagar MAZ 13 Kalpitiya84 Ummu Kulthum Mazoor Nagar MAZ 69 Kalpitiya85 A W Nawmudeen Mazoor Nagar MAZ 88 Kalpitiya86 A Sahoor Deen Mazoor Nagar MAZ 85 Kalpitiya87 Kachi Mohomed Mazoor Nagar MAZ 95 Kalpitiya88 I M M Mastan Mazoor Nagar MAZ 125 Kalpitiya89 Aliyar Mazoor Nagar MAZ 20 Kalpitiya90 Irfan Mazoor Nagar MAZ /M / 14 Kalpitiya91 A R Hidayathullah Mazoor Nagar MAZ /M / 29 Kalpitiya92 Imam Mazoor Nagar MAZ /M / 35 Kalpitiya93 Baduriya Mazoor Nagar MAZ /M / 38 Kalpitiya94 A C Mohomed Thambi Mazoor Nagar MAZ 48 Kalpitiya95 Ilyas Mazoor Nagar MAZ 57 Kalpitiya96 A B Ramila Umma Mazoor Nagar MAZ 83 Kalpitiya97 Mohamed Faisar Mazoor Nagar MAZ 86 Kalpitiya98 M I A Zamadh Mazoor Nagar MAZ 87 Kalpitiya99 Mulawar Nageeb Mazoor Nagar MAZ 92 Kalpitiya100 S K Ritkhan Mazoor Nagar MAZ 93 Kalpitiya101 M Azeem Mazoor Nagar MAZ 100 Kalpitiya102 A Mohomed Niyas Mazoor Nagar MAZ 101 Kalpitiya1. Grills to be fixed for all the window frames for the safety of the house. 2. Wall plates to be anchored as advised bythe T.O. 3. Change the toilet door shash. Payment of 7th installment recommended on completion of above saidworks.1. Wall plates to be anchored Item (5.8) with the instruiction of the T.O. 3. Change the toilet door shash. Payment of7th installment recommended on completion of above said works.1. One door shash & all window shash to be fixed . 2.Wall plates to fixed with the instruiction of T.O. 3. Toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.1. Floor concreting done rendering & flooring has not done. 2. Door shashes to be fixed including wood preservative tobe applied. 3. Windoiw frames to be fixed properly. 4. Wall plates to be anchored with the instruiction of T.O 5.Toilet tobe constructed. 6. Kitchen top lid to be constructed.Payment of 7th installment recommended on completion of abovesaid works.1. Floor concreting has done rendering & flooring to be done. 2. Door frames two(2) & one(1) door shash to be fixedwindow frames all to be fixed with shashes including wood preservative to be applied. 3. Wall plates to fixed with theinstruiction of T.O 4. Toilet to be repaired with the instruiction of T.O. Payment of 7th installment recommended oncompletion of above said works.1. Floor concreting has done rendering & flooring to be done. 2. Door & window frames & shashes to be fixed. 3.Wall plates to anchored with the instruiction of T.O.Payment of 7th installment recommended on completion of abovesaid works.1. Floor concreting has done rendering & flooring to be done. 2. Rare door should be changed. 3. 4 window frames &shashes to be fixed & wood preservative to be applied. 4. Wall plates to anchored with the instruiction of T.O. 5. Toiletto be repaired with the instruiction of T.O. Payment of 7th installment recommended on completion of above saidworks.1. Dooe frames two(2) & all door shashes to be fixed. 2. All window shashes to fixed. 3. Wood preservative to beapplied for all door & window frames & shashes. 4. Toilet to repaired with door,roof work & internal plaster to bedone.Payment of 7th installment recommended on completion of above said works.1. Items (1) (2) (3) (4) (6) (7) & (8) to be done except item (5) where roof tiles fixed without ridging. 2. Wall plates toanchored with the instruiction of T.O.Payment of 7th installment recommended on completion of above said works.1.Floor concreted without rendering & flooring done. 2. Door frame one(1) to be fixed at room & all shashes to be fixed3. Window frames & shashes not fixed. 4. The toilet to be constructed.Payment of 7th installment recommended oncompletion of above said works.1. Internal & front external plastering not done. 2. Window shashes to be fixed.Payment of 7th installmentrecommended on completion of above said works.The items (1) (2) (3) (4) (6) (7) & (8) have not done except the roof work where ridging not done.Payment of 7thinstallment recommended on completion of above said works.1.One door shash at room to be done. 2. Window shashes all to fixed & the wood preservative to be applied for allshashes & frames.Payment of 7th installment recommended on completion of above said works.1. One door shash to be fixed. 2. Wall plates to anchored with the instruiction of T.O. Payment of 7th installmentrecommended on completion of above said works.1.Wall plates to anchored with the instruiction of T.O. Payment of 7th installment recommended on completion ofabove said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3.Toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3.Door shashat toilet to be changed.Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored.Payment of7th installment recommended on completion of above said works.1. Internal & external wall plastering not done. 2. Wall plates not anchored, anchor with the instruiction of T.O. 3. Toiletdranage pipe to changeed. Payment of 7th installment recommended on completion of above said works.1. Bed room window shshes to be fixed & wood preservative to be applied. 2.Wall plates to be anchored. 3. The doorshash damaged to be changed.Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored with theinstructiont of T.O. 3.Toilet under construction.Payment of 7th installment recommended on completion of aboveworks.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. Payment of7th installment recommended on completion of above works.103 S L Jayoob Mazoor Nagar MAZ 126 Kalpitiya1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3.Door shashat toilet to be changed.Payment of 7th installment recommended on completion of above works.104 Abdul Munat Mazoor Nagar MAZ /M/26 Kalpitiya1. Floor rendering & flooring to be done. 2. Internal & external front wall to be done. 3. Wood preservative to be appliedfor door & window frames & shashes. 4. Wall plates to be anchored. 5. Toilet to be constructed.Payment of 7thinstallment recommended on completion of above works.105 M C Janoon Mazoor Nagar MAZ 09 Kalpitiya1. Internal plastering to be done. 2.Wood preservative to be applied for door & window frames & shashes. 4. Wallplates to be anchored. 5. Toilet door shash to be changed.Payment of 7th installment recommended on completion ofabove works.106 M Rizvi Mazoor Nagar MAZ 10 Kalpitiya1. Toilet to be constructed. But the benificery find difficult to provide toilet soakage pit on the wells are located nearly.T.O. to instruct the benificery to construct separate tank to avoid pollution around the located wells.Payment of 7thinstallment recommended on completion of above works.107 Jabir Mazoor Nagar MAZ 14 Kalpitiya 1.Wall plates to be anchored. Payment of 7th installment recommended on completion of above works.108 M M Hana Umma Mazoor Nagar MAZ 28 Kalpitiya109 Fareeda Mazoor Nagar MAZ 53 Kalpitiya110 M S hafeel Mazoor Nagar MAZ 56 Kalpitiya111 Farook Mazoor Nagar MAZ 68 Kalpitiya112 K M Abdul Rahman Mazoor Nagar MAZ 29 Kalpitiya113 M Irfaan Mazoor Nagar MAZ 27 Kalpitiya114 Santhan Beevi Mazoor Nagar MAZ /M/01 Kalpitiya1.Plaster to be done& floor to be rendered & finished smooth. 2. Two(2)door frames & door shash to be fixed withwood preservativ eto be applied. 3. Window frame one(1) & shash to be fixed. 4.Wall plates to be anchored. 5.Toilet tobe constructed.Payment of 7th installment recommended on completion of above works.1. Floor to be rendered & finished smooth. 2. safety room door shash to be fixed including wood preservative to beapplied. 3.Window shashes(5) to be fixed including wood preservativ eto be applied. 4. Wall plates to be anchored.5.Toilet to be constructed.Payment of 7th installment recommended on completion of above works.1. Front door to be changed. 2.Window frames & shashes to fixed &wood preservative to be applied. 3.Wall plates tobe anchored.Payment of 7th installment recommended on completion of above works.1. Floor to be rendered & finished smooth in tiem 1.3,1.4 & 1.5. 2. Door shash to be fixed for one bed room.3.Window shashes to be fixed for all windows & wood preservative to be applied. 4. Wall plates to be anchored.Payment of 7th installment recommended on completion of above works.1. Door shash to be fixed in safety room & wood preservativ eto be applied. 2.Wall plates to be anchored.Payment of7th installment recommended on completion of above works.1. Internal plastering has not done. 2. Safety room need to be fixed with door shash. 3. Wall plates to be anchored. 4.Windowr shash to be fixed 5.The toilet to be constructed. Payment of 7th installment recommended on completion ofabove works.1. Floor not rendered & finished smooth. 2. Ineternal plaster to be done. 3.Window frames & shashes to fixed.Paymentof 7th installment recommended on completion of above works.


115 Abdul Wahab Mazoor Nagar MAZ 78 Kalpitiya116 A W Ajwath Mazoor Nagar MAZ 77 Kalpitiya117 M S Mohideen Thambi Mazoor Nagar MAZ 54 Kalpitiya118 A M Sareef Mazoor Nagar MAZ 55 Kalpitiya119 S Masood Mazoor Nagar MAZ 46 Kalpitiya120 M Saleem Mazoor Nagar MAZ 08 Kalpitiya121 S L Harun Nisha Mazoor Nagar MAZ 24 Kalpitiya122 K M Aboo Hanifa Mazoor Nagar MAZ 32 Kalpitiya123 A W Mohomed Muhusleen Mazoor Nagar MAZ 33 Kalpitiya1. Concrete floor at kitchen not rendered & finished smooth 2. Internal pllates to be done & ridgeing not done. 3. Safetyroom door shash to be fixed. 4. Window shash to be fixerd. 5. Toilet door shash to be fixed.Payment of 7th installmentrecommended on completion of above said works.1. Safety room to be fixed with door shash. 2. All window shashes to be fixed & wood preservative to be applied. 3.Roof ridging to be fixed. 4. Toilet door shash to be fixed.Payment of 7th installment recommended on completion ofabove said works.1. Floor concrete done but not renderd & finished smooth. 2. Internal plates to be done. 3.Door & window shashes tobe done 4. Wall plates to anchored with the instruiction of T.O.Payment of 7th installment recommended on completionof above said works.1. Floor to be rendered & finished smooth at room,kitchen & hall. 2. Internal plates to be done. 3. Door shashes to befixed. 4. Window shashes to be fixed. 5. Wall plates to anchored. 6.Toilet to be constructed.Payment of 7th installmentrecommended on completion of above said works.1. Internal plates to be done. 2.Widow frames & shashes to be fixed. 3. Ridging & kitchen slash to be done. 4. Wallplates to anchored.Payment of 7th installment recommended on completion of above said works.1.Internal plates to be done. 2. Ridging to be done. 3. Wall plates to anchored. 4. Toilet to be constructed.Payment of7th installment recommended on completion of above works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to anchored. 3. Toilet doorshash to be fixed. Payment of 7th installment recommended on completion of above said works.1. Wood preservative to be applied for door & window frames & shashes. 2.Wall plates to anchored. 3. Toilet shahs tobe changed.Payment of 7th installment recommended on completion of above works.1. Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to anchored. Payment of 7thinstallment recommended on completion of above works.124 Ubuwan Adambawa Mazoor Nagar MAZ 34 Kalpitiya1.Door shash at safet room & window shash to be fixed. 2. Wood preservative to be applied foe fences & shashes. 3.Wall plates to be anchored. Payment of 7th installment recommended on completion of above said works.125 Ibrahim sarulabdeen Mazoor Nagar MAZ 49 Kalpitiya1. Safety room door shash to fixed. 2. All windows to be fixed with grills & shashes. 3. Wood preservative to be appliedfor door & window frames & shashes. 4. Roof ridging to be done. 5. Wall plates to anchored. Payment of 7thinstallment recommended on completion of above works.126 Ibrahim Mohomadeen Mazoor Nagar MAZ 63 Kalpitiya1. The safety room window to be fixed with grills. 2. The roof ridging to be done. 3. Wall plates to be anchored. 4. Thetoilet door shash to be changed & apply the wood preservative. Payment of 7th installment recommended oncompletion of above works.127 Nammem Naloor Mazoor Nagar MAZ 67 Kalpitiya1. Wall plates to be anchored. 2. The toilet to be constructed.Payment of 7th installment recommended on completionof above said works.128 A A Mohomed Nazar Mazoor Nagar MAZ 66 Kalpitiya1.Plastering to be done. 2.Wood preservative to be applied for door & window frames & shashes. 3. Wall plates to beanchored with the instruction of T.O. 4. The toilet to be constructed.Payment of 7th installment recommended oncompletion of above said works.129 M I M Rifayis Mazoor Nagar MAZ 129 Kalpitiya1.Plastering to be done. 2. Wood preservative to be applied for door & window frames & shashes. 3. The toilet to beconstructed.Payment of 7th installment recommended on completion of above said works.130 Waseela Umma Mazoor Nagar MAZ 65 Kalpitiya <strong>No</strong> visible defect.Payment of 7th installment recommended.131 U L Mubarak Mazoor Nagar MAZ 121 Kalpitiya 1.The toilet to be constructed.Payment of 7th installment recommended on completion of above said works.132 Fajeeha Umma Mazoor Nagar MAZ/M/04 Kalpitiya 1.Wall plasstring to done.Payment of 7th installment recommended on completion of above said works.133 M S Abdul Raheem Mazoor Nagar MAZ 64 Kalpitiya <strong>No</strong> visible defect.Payment of 7th installment recommended.134 A R Raizdeen Mazoor Nagar MAZ 120 Kalpitiya 1. Door to be fixed in safety room.Payment of 7th installment recommended on completion of above said works.135 Abdul Salam Thusim Mazoor Nagar MAZ 75 Kalpitiya1. Internal plastering to be done. 2.Roof ridging to be done. 3. Window shahses to be fixed & wood preservative to beapplied. 4.Wall plates to be anchored.Payment of 7th installment recommended on completion of above said works.136 M C Harajth Mazoor Nagar MAZ 61 Kalpitiya1.Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3. The toilet tobe constructed.Payment of 7th installment recommended on completion of above said works.137 Rahmuth Beevi Mazoor Nagar MAZ 59 Kalpitiya 1. Wall plates to be anchored.Payment of 7th installment recommended on completion of above said works.138 Kithru Mohomed Mazoor Nagar MAZ 47 Kalpitiya1. Door to be fixed for safety room. 2. Window frames, shashes & grills to be fixed. 3. The ridging to be done. 4. Wallplates to be anchored. 5. The toilet to be constructed.139 B Sara Umma Mazoor Nagar MAZ 42 Kalpitiya1. External wall to be plastered. 2. Ridging to be done. 3. The toilet to be constructed.Payment of 7th installmentrecommended on completion of above said works.140 Habeeb Mohomed Mazoor Nagar MAZ 119 Kalpitiya1. Window frames (3) three & window shashes to be fixed & Wood preservative to be applied. Payment of 7thinstallment recommended on completion of above said works.141 Hijas / Sujana Mazoor Nagar MAZ 35 Kalpitiya1.Window frames (3) three & window shashes to be fixed & Wood preservative to be applied for door & windowframes & shashes. 2. Wall plates to be anchored with the instruction of T.O. 3. The toilet to be constructed.Payment of7th installment recommended on completion of above said works.142 A A M Ramuthar Mazoor Nagar MAZ 19 Kalpitiya1. Kitchen floor to be rendered & finished smooth. 2.Wood preservative to be applied for door & window frames &shashes. 3.Wall plates to be anchored. 4. Toilet door frame & shash to be changed.Payment of 7th installmentrecommended on completion of above said works.143 Nawfir / Rasmiya Mazoor Nagar MAZ 06 Kalpitiya1.Wood preservative to be applied for door & window frames & shashes. 2. Roof ridging to be done. 3. Wall plates tobe anchored .4. The toilet to be constructed.Payment of 7th installment recommended on completion of above saidworks.144 Abdul Hassam Mazoor Nagar MAZ 82 Kalpitiya1. Item (1) flooring (2) Internal plates (3) Door frames (4) Window frame to be done. 2.Roof ridging not done. 3. Wallplates to be anchored with the instruction of T.O. Payment of 7th installment recommended on completion of abovesaid works.145 Suajth / Raliya Mazoor Nagar MAZ 51 Kalpitiya1. Floor concrete,rendering & smoothing to be done. 2. Internal plates to be done. 3. One door shash to be fixed. 4.Window frames two(2) & whole shashes to fixed. 5. Roof ridging to be done. 6.Wall plates to be anchored with theinstruction of T.O. 4. Toilet shash to be fixed.Payment of 7th installment recommended on completion of above saidworks.146 Sitheek Mazoor Nagar MAZ 52 Kalpitiya1. Floor rendering to be done. 2. Door shashes two(2) to be fixed. 3. Window frames to be fixed. 4. Wall plates to beanchored. 5. Toilet door shash to be changed.Payment of 7th installment recommended on completion of above saidworks.147 A M Nasar / Sameena Mazoor Nagar MAZ 38 Kalpitiya1. Floor rendering to be done. 2. Wndow shashes to be fixed & Wood preservative to be applied for door , windowframes & shashes. 3. Roof ridging to be done. 4. Wall plates to be anchored.Payment of 7th installmentrecommended on completion of above said works.148 Abuthalif Mazoor Nagar MAZ 50 Kalpitiya1. Floor rendering & flooring to be done. 2. Door shahs to be fixed. 3. Roof ridging to be done. 4. Window grills &shashes to be fixed. 5. Wall plates to be anchored. Payment of 7th installment recommended on completion of allworks mentioned above.149 Kathar Hasan Mazoor Nagar MAZ 62 Kalpitiya1. Internal plates to be done with 1:5 Ct. mortar. 2. Wall plates to be anchored with the instruction of T.O. <strong>No</strong> paymentof 7th installment recommended on completion of all works mentioned above.150 K M Seinulab Deen Mazoor Nagar MAZ 80 Kalpitiya1. Door frames to be fixed. 2. Wndow shashes to be fixed & Wood preservative to be applied for door , window frames& shashes. 3. Wall plates to be anchored. 4. Toilet door shash to be fixed.Payment of 7th installment recommendedon completion of all works mentioned above.151 N Ummu Sahibu Ashar Nagar ASH /M/09 Kalpitiya1. Floor concrete done rendering & fooring to be done. 2. Door shashes to fixed. 3. Window shashes to be fixed &wood preservative to be applied. 4. The toilet to be constructed.Payment of 7th installment recommended oncompletion of all works mentioned above.152 Jaleel Ashar Nagar ASH 13 Kalpitiya1. Window grills to be fixed for safety room. 2. Wall plates to be anchored with the instruction of T.O. Payment of 7thinstallment recommended on completion of all works mentioned above.


153 Abdul Raheem Ashar Nagar ASH 22 Kalpitiya154 K M Nawfeel Ashar Nagar ASH 26 Kalpitiya155 S Sulaiman Ashar Nagar ASH 15 Kalpitiya156 M J Abdul Rahman Ashar Nagar ASH 18 Kalpitiya157 M H Careem Ashar Nagar ASH 10 Kalpitiya158 Najeem Ashar Nagar ASH 11 Kalpitiya159 A L M Aslam Ashar Nagar ASH 12 Kalpitiya160 Abdul Majeed Rihana Ashar Nagar ASH 14 Kalpitiya161 Y Arfath Ashar Nagar ASH 33 Kalpitiya162 Cader Bava Ashar Nagar ASH 15 Kalpitiya1. Floor concrete done rendering & fooring to be done. 2. Window frames (2) two to be fixed & all window shash to befixed including Wood preservative to be applied for frames & shashes. 3. Wall plates to be anchored. 4. Toilet doorshash to be anchored.Payment of 7th installment recommended on completion of all works mentioned above.1.Door shashes two(2) to be fixed & wood preservative to be applied. 2.Window frame two(2) & all shash to be fixed.3. Wall plates to be anchored. 4. Toilet to be repaired on door shash & roof.Payment of 7th installment recommendedon completion of all works mentioned above.1.Items (1), (2) ,(3) ,(4) , (6) & (8) to be constructed. 2. Wall plates to be anchored. Payment of 7th installmentrecommended on completion of all works mentioned above.1. Floor concrete, rendering & fooring to be done at kitchen. 2. Door frames two(2) & door shashes two(2) to be fixed.3. Window frames two(2) & all shash to be fixed including fixing of grills & wood preservative to be applied for door,window frames & shashes. 4. Wall plates to be anchored. 5. The toilet to be constructed. Payment of 7th installmentrecommended on completion of all works mentioned above.1.Wood preservative to be applied for door & window frames & shashes. 2. Wall plates to be anchored. 3.Door shashto be fixed to the toilet. Payment of 7th installment recommended on completion of above said works.1.Window frame two(2) grills & window shashes all to be fixed & Wood preservative to be applied. 2. Wall plates tobe anchored. 3. Toilet roof to be changed. Payment of 7th installment recommended on completion of all worksmentioned above.1.Door frame two(2) & shashes to be fixed. 2. Window frame one(1) grills & shashes to be fixed. 3. Wood preservativeto be applied for door & window frames & shashes. 4. Wall plates to be anchored. 5. The toilet to be constructed.Payment of 7th installment recommended on completion of all works mentioned above.1. Window frame to be fixed. 2. Wall plates to be anchored. 3. The toilet to be constructed. Payment of 7th installmentrecommended on completion of all works mentioned above.1.Floor rendering & flooring to be done at hall. 2. Door shash one(1) to be fixed. 3. Window frame(1) & all shashes tobe fixed. 4. Wood preservative to be applied for door & window frames & shashes. 5. Wall plates to be anchored.Payment of 7th installment recommended on completion of all works mentioned above.1.Wood preservative to be applied for door & window frames & shashes. 2. Safety grills to be fixed. Payment of 7thinstallment recommended on completion of all works mentioned above.