feb/march <strong>2013</strong><br />

<strong>Asphalt</strong><strong>Review</strong><br />

Above: An aerial view of the Phillip Island circuit<br />

and work crews re-surfacing the iconic raceway


ASPHALT REVIEW<br />

CEO’S REPORT<br />

John Lambert,<br />

CEO, AAPA<br />

I have previously highlighted the joint<br />

AAPA and Austroads project to validate the<br />

hypothesis that warm mix asphalt (WMA) and<br />

hot mix asphalt (HMA) performed the same<br />

in practice.<br />

The project has now been completed and<br />

a final report prepared by Kieran Sharp from<br />

ARRB confirms that the WMA mixes used did<br />

perform the same as the HMA controls over<br />

the two year study period.<br />

As a result, several state road authorities<br />

have already adopted warm mix in their<br />

specifications. In these states; industry,<br />

government and the community will all benefit<br />

from the lower greenhouse emissions, better<br />

compaction, zero fumes, etc.<br />

A report on the project will be included in<br />

the next edition of <strong>Asphalt</strong> <strong>Review</strong>. However;<br />

my reason for mentioning this project is not<br />

only to highlight the results, but to focus on<br />

the important role that AAPA plays in bringing<br />

about change in our industry.<br />

AAPA is involved in a number of projects<br />

around Australia, bringing industry, road<br />

authority and research organisations’<br />

expertise together.<br />

The <strong>Asphalt</strong> <strong>Pavement</strong> Solutions – for Life<br />

project is a major project aimed at proving<br />

that perpetual pavement designs can be<br />

applied in Australia. Perpetual pavements<br />

are designed to last indefinitely with just<br />

occasional replacement of the top wearing<br />

course. Importantly, they use less asphalt<br />

than the current <strong>Australian</strong> designs for high<br />

volume pavements.<br />

Another major project is into what really<br />

happens at a worksite/traffic boundary and<br />

this project is discussed in this edition of<br />

Roads. In this project VicRoads supported<br />

one of their staff to manage the study<br />

and industry members encouraged their<br />

employees to participate. There are also<br />

many projects undertaken within each<br />

state focussing on current issues relevant to<br />

industry and road authorities.<br />

As well as projects, AAPA provides technical<br />

information and training to its members.<br />

This includes organising study tours to key<br />

organisations around the world and then<br />

disseminating that information at feedback<br />

sessions across Australia.<br />

At the recent feedback session for the 2012<br />

Europe Study Tour, AAPA also held a seminar<br />

on using high modulus asphalt as a structural<br />

base. This seminar included open and frank<br />

discussion on the European experience where<br />

these asphalts are used extensively.<br />

At the meeting it was agreed that AAPA<br />

should organise a project similar to the WMA<br />

validation project to validate the use of these<br />

asphalts in Australia. Such a project would<br />

have manufacturers and suppliers provide<br />

pavement sections that would be monitored<br />

by industry and road authorities.<br />

Like the WMA project, this undertaking<br />

would aim to validate the hypothesis that<br />

these asphalts worked as well (or better)<br />

than normal <strong>Australian</strong> designed and<br />

constructed pavements. It would not need<br />

to test the fundamental design concept as<br />

this has already been well proven overseas.<br />

If the hypothesis was proven to be correct, it<br />

would lead to the quick adoption of designs<br />

that would result in thinner pavements and<br />

considerable savings in materials and costs.<br />

To separately “prove” that new<br />

technologies and materials work in each<br />

state is wasteful. If it can be shown that they<br />

work overseas and have been validated in<br />

at least one <strong>Australian</strong> state they should be<br />

able to be applied nationally.<br />

Road authorities, industry and research<br />

bodies working together through AAPA<br />

makes a lot of sense, particularly when<br />

<strong>Australian</strong> governments are seeking to<br />

reduce costs, but not quality. In the words<br />

of one road authority chief executive, “…we<br />

do not want “gold plated” work…”, but we<br />

do want quality roads at a reasonable price.<br />

Also, if there are any failures as a result<br />

of this approach, we will work together to<br />

rectify them.<br />

I believe that we are entering a time when<br />

industry, government and research bodies<br />

will increasingly work together to achieve.<br />

I also believe there is a growing focus on<br />

outcomes and performance, and away from<br />

prescriptive specifications.<br />

As a result, in the future, governments<br />

will specify the performance required and<br />

industry will design and construct to achieve<br />

that performance. Then if issues arise,<br />

industry and government will work together<br />

to resolve them.<br />

AAPA will continue to play a key role<br />

in achieving these outcomes and all of us<br />

work together to deliver quality pavements,<br />

applying innovative and new solutions<br />

where appropriate.<br />

To separately “prove” that new technologies and<br />

materials work in each state is wasteful. If it can<br />

be shown that they work overseas and have been<br />

validated in at least one <strong>Australian</strong> state they<br />

should be able to be applied nationally.<br />

20 ROADS FEB/MARCH <strong>2013</strong>


AUSTRALIA PTY LTD<br />

Heavy Duty, tough<br />

and it has all the moves!<br />

Roadtec RX600e<br />

Introducing the all new Roadtec RX-600e Profiler which offers gutsy power<br />

combined with high maneuverability, it’s well balanced, productive and comes<br />

with a Guardian Monitoring system featuring two-way communication and all<br />

vital machine data, plus an optional 3 year warranty.<br />

This Profiler from Roadtec has all of the features of the older versions and then<br />

some, so if you are looking for a new class of Profiler, the RX600e is the one<br />

you’ve been waiting for…<br />

• Suitable for motorway and smaller urban jobs.<br />

• Can cut depths up to 330mm and various widths from 1.9m, 2m or 2.184m wide.<br />

• 620 horsepower Cummins engine.<br />

• Available with either three or four tracks.<br />

• A656 Grade 80 steel used throughout the frame.<br />

• Bolt-On Track Pads.<br />

• Dual water Spray Bars.<br />

• Guardian Monitoring system featuring two-way communication.<br />

• Optional Dust Extraction<br />

John Montague<br />

National Account Manager<br />

Roadtec & Carlson<br />

0419 965 077<br />

jmontague@astecaustralia.com.au<br />

1300 278 322<br />

1300 ASTEC AUS<br />

P (+61) 07 3714 8800<br />

F (+61) 07 3714 8899<br />

www.astecaustralia.com.au<br />

enquiries@astecaustralia.com.au<br />

The Astec Response Promise ensures that our customers are confident with<br />

their decision to choose Astec to improve their business performance.<br />

We pride ourselves on the ability to supply high quality products from a range<br />

of quality brands, which are backed up with our promise to supply, maintain<br />

and service the products we proudly represent.<br />

Our Promise Guarantees:<br />

• Australia-wide service<br />

• An emphasis on customer profitability<br />

• 24/7 serviceability (If you’re working, we’re working)<br />

• Up-to-date spare parts availability and pricing<br />

Astec Australia Pty Ltd Head Office: PO Box 142 13/243 Bradman Street Acacia Ridge, Queensland 4110 (+61) 07 3714 8800


ASPHALT REVIEW<br />

CHAIRMAN’S REPORT<br />

Sergio Cinerari,<br />

Chairman, AAPA<br />

In this edition of <strong>Asphalt</strong> <strong>Review</strong>, there is an<br />

article on the resurfacing of the Phillip Island<br />

Motor Racing Track.<br />

As you will read, I took the opportunity<br />

to spend some time on the project with my<br />

Downer colleagues. It was good to get out and<br />

about on this type project as in my opinion<br />

it was typical of the challenges that our<br />

people confront and overcome regularly as<br />

our industry goes about meeting the everincreasing<br />

requirements of our stakeholders.<br />

It impressed upon me how far we have<br />

come over many years in terms of the<br />

standard of work our industry can produce.<br />

But my real reason for mentioning this project<br />

is to highlight the importance of innovation<br />

and how our industry applies it.<br />

This is the third time that I have been<br />

involved in the resurfacing of Phillip Island<br />

and each time I have noted the client’s<br />

expectations in terms of the surfacing has<br />

increased, always seeking a smoother, longerlasting<br />

and safer outcome.<br />

In the most recent project the client wanted<br />

the highest possible quality of surface, one<br />

that could be used successfully for the many<br />

different applications demanded of this track.<br />

Importantly, a surface that would exceed the<br />

international best practice expectations for a<br />

Moto GP track.<br />

Working together, the owner, contractor and<br />

consultants developed an optimum design for<br />

track geometry and asphalt mix; this was then<br />

coupled to a construction methodology that<br />

employed the most appropriate equipment<br />

and methods including establishing a large<br />

mobile asphalt plant on site.<br />

The team working together did not follow<br />

a formulae, but applied the best available<br />

knowledge within the industry, both in<br />

Australia and overseas, to achieve the best<br />

results for our client.<br />

More than building a racetrack what was<br />

truly impressive was how all stakeholders<br />

came together to deliver a critical piece of<br />

infrastructure and how innovative our industry<br />

can be when a challenge is put before us. It<br />

causes me to think, shouldn’t this be the way<br />

our industry always works<br />

It is easy to follow state road authority<br />

specifications, but with ever-increasing budget<br />

pressure and higher user expectation, the<br />

challenge on our industry to deliver efficient<br />

solutions has never been greater.<br />

I know that our industry has a wealth of skill<br />

and knowledge that, when applied, has the<br />

power to bring new and exciting solutions to<br />

all our clients. Working together, state road<br />

authorities and industry can develop optimum<br />

solutions to achieve long-lasting and smooth<br />

pavements utilising the most efficient processes.<br />

AAPA’s study into perpetual pavement is<br />

an example of how industry and state road<br />

authorities are working together to amend the<br />

current design process to make long-lasting<br />

pavements without using wasteful amounts<br />

of materials. AAPA is currently working with<br />

ARRB and state road authorities to develop<br />

interim specifications to apply these designs as<br />

soon as possible.<br />

Also in recent times, I note an increased<br />

willingness of several state road authorities<br />

to work with industry to identify and apply<br />

innovative solutions to achieve long-lasting<br />

pavements at lowest cost.<br />

The work done by AAPA will give us all the<br />

tools to challenge some our more conservative<br />

designs and work with our SRA clients in order<br />

to create more efficient solutions, assisting<br />

them in meeting the continual infrastructure<br />

maintenance challenge that they confront on<br />

an ongoing basis.<br />

Innovation and the challenging long held<br />

assumptions are the keys to the longterm<br />

success of any endeavour and this<br />

is particularly true when it comes to road<br />

surfacing. As an industry, we have shown<br />

ourselves to be resilient and clever; I therefore<br />

encourage our association, government<br />

and industry members to work together<br />

to always strive to develop innovative and<br />

effective solutions, challenging those longheld<br />

paradigms thus allowing us all to meet<br />

the challenges of delivering and maintaining<br />

critical infrastructure across Australia.<br />

“More than building a racetrack what was truly<br />

impressive was how all stakeholders came together<br />

to deliver a critical piece of infrastructure and how<br />

innovative our industry can be when a challenge is<br />

put before us. It causes me to think, shouldn’t this be<br />

the way our industry always works”<br />

22 ROADS FEB/MARCH <strong>2013</strong>


Partnering with road paving businesses<br />

Adding value through focus, expertise and innovation<br />

Bitumen Polymer Modified Bitumen Bitumen Emulsions<br />

Polymer Modified Bitumen Emulsions Recycling Agents Rejuvinating Agents<br />

Joint & Crack Sealants Precoats Cutbacks Cold Mixes Dust Suppressants<br />

Laboratory Testing Services Research & Development Projects<br />

Sydney & Melbourne: ph +61 2 9638 0150 Perth: ph +61 8 9431 7351<br />

Brisbane: Bitumen Import Terminal ph: +61 7 3895 2183 Brisbane PMB/Emulsion plant ph: +61 7 3260 2622<br />

www.samibitumen.com.au


ASPHALT REVIEW<br />

Roadwork Safety –<br />

Innovation and<br />

Future Directions<br />

The following paper is an abridged version of a presentation to AAPA’s 15th Road Construction<br />

and Surfacing Health and Safety Conference, in Melbourne during 2012. It highlights the<br />

experience of Michael Rose in roadwork safety in Victoria; however, the information contained<br />

in it is relevant across the whole of Australia. In particular it highlights the hierarchy of controls.<br />

This recognises that the behaviour of roadworkers and passing motorists is the primary risk on<br />

worksites. Physical separation (elimination of the risk) is therefore the most effective strategy and<br />

is top of the hierarchy of control.<br />

By Michael Rose CFSIA RSP Aust, Manager Project Safety, VicRoads Major Projects.<br />

Introduction – evolution and innovation<br />

of safety controls at VicRoads<br />

This paper provides an overview of the evolution and innovation in<br />

roadwork safety at VicRoads over the past decade, and highlights the<br />

current safety challenges still facing our industry.<br />

Prior to the introduction of the Worksite Safety–Traffic Management<br />

Code of Practice (2004 version) there were eight fatalities reported<br />

in Victoria for works on or adjacent to traffic over a 26-month period,<br />

including three on VicRoads works. There have been no fatalities since<br />

the Code was introduced on VicRoads major projects.<br />

The development of the hierarchy of safety controls for worksite<br />

traffic management and the classification of work on or adjacent to<br />

roads used by traffic as high risk work under Occupational Health<br />

and Safety (OHS) legislation for all classes of road have been major<br />

contributing factors to the safety improvements. Despite this good work<br />

we have not yet achieved zero injuries or fatalities in all areas.<br />

Major road projects are frequently faced with up to 16 classified<br />

high risk construction work activities. However, the activities involving<br />

mobile plant operation within work zones was demonstrated during<br />

2011 to be our highest risk area with at least five fatalities around<br />

Australia.<br />

The Hierarchy of Safety Controls for Roadwork<br />

The Hierarchy of Safety Controls for Worksite Traffic Management was<br />

first introduced by VicRoads in 2005 via the Worksite Safety–Traffic<br />

Management Code of Practice (2004 version). At the same time, the<br />

OHS Act 2004 was introduced mandating the hierarchy of controls<br />

approach through the defined concept of Ensuring Health and Safety<br />

(OHS Act, Section 20).<br />

The introduction of the OHS Regulations in 2007 further reinforced<br />

that works on or adjacent to roads used by traffic is a high risk activity<br />

for construction work. It also established the statutory obligation to<br />

eliminate the traffic hazard where reasonably practicable or reduce the<br />

risks by following the established hierarchy of safety controls.<br />

The hierarchy of controls may be described as:<br />

1. Elimination;<br />

2. Substitution;<br />

3. Isolation;<br />

4. Engineering;<br />

5. Administrative;<br />

6. Personal protective equipment; and<br />

7. A combination of controls<br />

The WorkSafe Test of Reasonably Practicable<br />

The OHS Act 2004 Section 20 requires hazards be eliminated, so far as<br />

reasonably practicable, or reduced via the hierarchy of safety controls,<br />

so far as is reasonably practicable. The WorkSafe test for practicability<br />

requires the following factors to be considered.<br />

• How likely is it that there will be some harm;<br />

• How serious could the consequences be;<br />

• What do, or should, you know about the hazard and ways of<br />

eliminating or reducing it<br />

• Are suitable ways to eliminate or reduce the hazard or risk available;<br />

and<br />

• How much will it cost to eliminate or reduce the hazard or risk (This<br />

is not a defence at law and needs to be balanced against the duty of<br />

care for workers with a presumption in favour of health and safety.<br />

Therefore cost is not as a credible reason against deployment).<br />

Evolution of practices in traffic<br />

management safety in Victoria<br />

The following describes evolved practices in traffic management<br />

safety in Victoria since 2006, using the hierarchy of traffic controls and<br />

commencing with the most effective and reliable controls:<br />

a. Elimination of Hazard - Road Closure to Eliminate the Traffic Hazard<br />

Full or partial road closure is the highest level control used. Road<br />

closures should be well communicated in advance to the public<br />

to reduce inconvenience. Road closures also facilitate increased<br />

productivity with reduction in construction times due to the removal of<br />

traffic and the unrestricted access provided.<br />

24 ROADS FEB/MARCH <strong>2013</strong>


15 TH<br />

INTERNATIONAL<br />

FLEXIBLE PAVEMENTS<br />

CONFERENCE<br />

22-25 September <strong>2013</strong> | Royal International Convention Centre | Brisbane | Australia<br />

ABOUT THE CONFERENCE<br />

This signifi cant Conference will feature eminent presenters from Australia and around<br />

the world, including invited key speakers. A balanced, relevant technical program,<br />

supplemented by a major supporting exhibition, will make this Conference the<br />

highlight of the <strong>2013</strong> fl exible pavements calendar both in Australia and internationally.<br />

The <strong>Australian</strong> <strong>Asphalt</strong> <strong>Pavement</strong> Association presented its fi rst International<br />

Technical Conference in Sydney, Australia, in 1971, and since then has<br />

conducted a conference fourteen times in total with either an International or<br />

National Flexible <strong>Pavement</strong> Conference being staged by AAPA every two years.<br />

In addition to the speaking streams, the conference will have a social program<br />

and a major exhibition of equipment and related products and services.<br />

CONFERENCE TOPICS<br />

The conference focus is primarily on technical issues associated within<br />

the fl exible pavements and industry. It is for all forms of fl exible pavements<br />

including for roads, airfi elds, paths, car-parks, industrial and port areas.<br />

Technical papers will address issues such as specifi cations, procedures and<br />

equipment. All facets of fl exible pavements will be covered, including research,<br />

manufacture, construction, maintenance and test methods. This will include a<br />

focus on perpetual pavements (long life pavements).<br />

In today’s world, environmental sustainability is a key issue and papers will<br />

address issues such as asphalt perpetual pavements, life cycle impact, warm<br />

mix asphalt, recycled asphalt and emulsions, and the environmental and the<br />

economic benefi ts of maintenance.<br />

As a guide, papers may be in the following key areas:<br />

• Delivering new age solutions<br />

• <strong>Asphalt</strong> perpetual pavements<br />

• High modulus asphalt<br />

• Increased use of warm mix and RAP<br />

(Reclaimed <strong>Asphalt</strong> <strong>Pavement</strong>s)<br />

• Sustainability<br />

• Quality assurance<br />

• Developments in thin surfacings<br />

• Specifi cations<br />

• Environmental aspects<br />

(smoothness matters)<br />

• <strong>Asphalt</strong> mix design<br />

• Sprayed seal design/construction<br />

• Binders<br />

• Life cycle costing<br />

• Asset management<br />

• Roads, paths and car-parks<br />

• Airfi eld, industrial and port<br />

pavements and hard-stands<br />

• Asset management<br />

• <strong>Pavement</strong> management and<br />

maintenance<br />

The conference will also include a sessions for senior managers. This may<br />

address issues such as contracts, national harmonisation of health and safety<br />

laws, and other business related issues affecting the surfacing industry.<br />

INTERNATIONAL LINKS<br />

Speakers will be invited from international <strong>Asphalt</strong> Organisations, Research<br />

Institutes, Road Agencies and Companies to ensure that the conference will<br />

truly provide an international perspective.<br />

The conference will also provide ample networking opportunities, including a<br />

social program, so that all delegates can mix and hear from their colleagues.<br />

FIRST CALL FOR PAPERS<br />

The First Call for Papers is now open. This call in particular will be<br />

advantageous to international speakers who need more notice in order to plan<br />

the logistics of attending. To allow for this, Abstracts from persons outside of<br />

Australia will be given fast-track consideration.<br />

Abstracts will be reviewed by the AAPA National Technology Committee for<br />

suitability. When an Abstract is accepted, it is on the condition that the fi nal<br />

Technical Paper is acceptable to the National Technology Committee.<br />

To be considered as an offi cial speaker/presenter during the conference,<br />

please submit an applicable abstract (100-150 words). Content should be<br />

suffi cient to outline the thrust of the paper. All submissions to be forwarded to:<br />

Scott Matthews AAPA Conference Convenor<br />

t +61 3 8534 5004 e scott.matthews@commstrat.com.au<br />

Dates:<br />

10th January <strong>2013</strong>: First call for papers open<br />

29th <strong>March</strong> <strong>2013</strong>: First call for papers close<br />

22th August <strong>2013</strong>: Technical papers due<br />

MORE INFORMATION<br />

For more information on the conference including program,<br />

venue and registration please visit our conference website<br />

www.aapaconference.com.au or contact the conference convenor.<br />

The conference website will be regularly updated with new information as the<br />

conference develops.<br />

More Information on Speaking, Sponsorship & Exhibition<br />

Contact Scott Matthews, BEng<br />

Conference Convenor<br />

p +6 13 8534 5004 e scott.matthews@commstrat.com.au<br />

Platinum Sponsor:<br />

Gold Sponsors:<br />

Registration Enquiries<br />

Registration Manager<br />

t +61 3 8534 5050 e registration@commstrat.com.au<br />

www.aapaconference.com.au


ASPHALT REVIEW<br />

This control achieves the primary objective of hazard elimination,<br />

where reasonably practicable to do so, as required under the OHS<br />

Regulation 5.1.7.<br />

b. Isolation of Hazard – Temporary Safety Barriers<br />

Isolation of traffic from the work zone through the use of temporary<br />

safety barriers has also proven to be an effective control, particularly<br />

for longer term works adjacent to high volume traffic. They are usually<br />

deployed where the works will be more than two weeks duration in<br />

Victoria.<br />

Speed limits are reduced to a maximum of 80 km/h past barriers<br />

in Victoria, to reduce impact energy and provide an allowance for<br />

heavier vehicle impacts when workers are present on site. On freeway<br />

works alone since 2006, more than 500 million vehicles have passed<br />

temporary barrier protected worksites in Victoria without penetration<br />

or other serious incident when deployed parallel to the road.<br />

Concrete barriers are the most common for the high speed-high<br />

volume roads such as freeways, although steel barriers are increasing<br />

in popularity. Performance of free standing concrete barriers in terms<br />

of deflection under impact is superior to free standing steel barriers<br />

However, anchoring the steel barriers improves their performance.<br />

The speed limits may also be reduced to 60 km/h instead of 80 km/h<br />

in these situations to further reduce heavy vehicle impact severity.<br />

Barrier screens have proven very effective as both debris and anti-<br />

‘gawk’ screens.<br />

Permanent barriers are being installed because statistics show that a<br />

significant number of vehicles are running off the road and crashing in<br />

these areas.<br />

Lane closures and speed reductions are unreliable controls on their<br />

own because drivers do not always slow down and micro sleeping<br />

drivers may pass through the worksite at any time.<br />

c. Isolation of Hazard – (Short Term Works) Truck Mounted<br />

Attenuator (TMA)<br />

Where road closure (level 1 control) or safety barriers (level 2 control)<br />

are not reasonably practicable Truck Mounted Attenuators (TMAs)<br />

(level 3 control) are proving an effective physical isolation particularly<br />

for short-to-medium term works. Their effectiveness continues to be<br />

demonstrated even when they are impacted by heavy vehicles.<br />

Many, but not all of the worksites, may also be protected by lane<br />

closures, signs and speed reductions. Bollards may also be used but<br />

these will not protect against a vehicle which is not under effective<br />

control of its driver. Fatigued drivers, drugs/alcohol and distractions<br />

such as electronic devices are some of the possible causes for drivers<br />

losing control.<br />

TMAs are now applied on all classes of roads in Victoria and are<br />

mandatory on urban freeways and for line marking operations on all<br />

roads. They are required to be TL-3 rated (100 km/h, 2 tonne vehicle<br />

impact tested and approved), with a minimum weight of 10.4 tonne<br />

GVM. Fifteen tonne GVM TMAs are gaining popularity for high speed<br />

road applications and particularly freeways and interstate highways<br />

where heavy trucks will be encountered.<br />

For low speed roads (< 60 km/h) the use of works vehicles to “shadow”<br />

and provide some degree of physical protection for pedestrian workers<br />

against errant vehicles entering the worksite is always a good practice.<br />

Such vehicles need to be heavier than two tonnes, such as small trucks;<br />

otherwise they may be shunted significant distances.<br />

d. Isolation of Hazard – Clearance to Traffic<br />

Where it is not reasonably practical to eliminate the traffic hazard by<br />

closing roads or placing physical barriers between the actual work<br />

zone and traffic, various combinations of controls or conventional<br />

traffic management are available to be deployed and may include a<br />

clearance or lateral vehicle recovery/buffer zone between traffic and<br />

the workplace.<br />

Note that the Worksite Safety –Traffic Management Code of Practice<br />

(2010 version) requires that the reason why the higher level controls<br />

are not considered practical be documented taking into account<br />

the WorkSafe Test of Reasonably Practicable. This reason needs<br />

to be credible because clearance to traffic controls do not provide<br />

any physical protection and are a lower level control - unless the<br />

combination of controls includes a TMA or similar protection.<br />

e. Combination of Controls<br />

A combination of controls is usually deployed at roadwork sites.<br />

Controls which eliminate hazards through road closures or isolate<br />

through physical protection should be present to comply with the OHS<br />

Act concept of Ensuring Health and Safety via elimination of the hazard,<br />

or reducing the risk through applying the hierarchy of safety controls.<br />

Typically signage and speed reductions are deployed on short term<br />

works, although these controls are behavioural controls and not as<br />

reliable as the higher level controls (level 1 to 3 above).<br />

Behavioural controls require effective reinforcement and or<br />

enforcement to be effective and the police, VicRoads Transport<br />

Safety Services and Department of Justice Officers provide much<br />

support in this area, providing the traffic management scheme is<br />

correctly deployed.<br />

Combining highly visible electronic Variable Speed Limit Signage<br />

(VSLS) with signs warning that speed limits are enforced together with<br />

visible patrol cars and camera presence is as demonstrated on the<br />

longer term major worksites such as the M80 Upgrade Project.<br />

The technology exists now for this to be potentially extended to<br />

smaller shorter term worksites. In the United Kingdom, point-to-point<br />

speed cameras are in place on all long term roadwork workplaces.<br />

Speed Display Trailers, VMS Displays and Temporary Speed Humps<br />

are also available as part of the combination of controls approach.<br />

The safety challenge presented by the movement<br />

of powered mobile plant and vehicles within site<br />

The construction industry which includes road construction is<br />

experiencing a significant number of fatalities and serious injuries<br />

from work involving the movement of powered mobile plant and<br />

other vehicles within sites. It is evident that the traditional controls of<br />

reversing/tracking alarms and flashing lights are not entirely effective.<br />

Reversing is the major cause and, although dump trucks are mainly<br />

involved, they are by no means the only source of serious injury.<br />

During 2011, there were five identified road construction plant<br />

reverse-over type fatalities in Australia over a 12 month period: two in<br />

Queensland, one in New South Wales, one in Victoria (road sweeper)<br />

and more recently one in Canberra (grader). Because of the number<br />

of fatalities this is our industry’s major high risk area and presents the<br />

challenge to our industry to seek more effective and reliable controls to<br />

prevent such incidents.<br />

Construction plant and vehicle blind spots<br />

It should be recognised that one of the reasons why workers and<br />

other pedestrians are reversed over by plant and vehicles on road<br />

construction sites is because of the large blind spots behind and<br />

sometimes beside them.<br />

CCTV cameras, reversing alarms and proximity warning devices are<br />

being used to reduce the risk but reverse over fatalities still occur so we<br />

26 ROADS FEB/MARCH <strong>2013</strong>


need to seek controls higher in the hierarchy of controls that depend<br />

less on behaviour.<br />

Internal Traffic Management Plans (ITMP) as described below should<br />

assist to improve site safety where mobile plant and vehicles are<br />

separated from pedestrian workers as far as practical from plant and<br />

truck operating areas.<br />

Everyone who works on road construction sites needs training<br />

to understand the risk of mobile plant and trucks where the driver/<br />

operator cannot see them.<br />

Safe Work Method Statements (SWMS) could seek to control this<br />

risk by requiring workers to be more than six metres from the rear of<br />

plant but it is safer to not be behind plant or within its swing radius at<br />

any time.<br />

The US National Institute of Occupational Safety and Health (NIOSH)<br />

has produced Construction Equipment Visibility Diagrams for most of<br />

the commonly expected mobile plant and vehicles. These diagrams<br />

show the operators visibility profiles around the plant from the<br />

viewpoint of the operator. The US Work Zone Safety Clearing House<br />

also produces a “Know the Blind Spots” Poster.<br />

Internal traffic management plans (ITMP)<br />

An ITMP is used to safely coordinate the interaction between<br />

pedestrians (workers and public), construction plant, delivery<br />

trucks and incidental visitors in the work space of a road<br />

construction work zone. In the US, they are referred to as Internal<br />

Traffic Control Plans (ITCP).<br />

Similar, but less sophisticated plans, have been used previously on<br />

VicRoads major project sites combined with UHF radio communications.<br />

However, the fundamental principles are applicable to all roadwork<br />

sites (including smaller sites) for internal traffic management.<br />

Based on the US experience, the fundamental principles for setting<br />

up an effective ITMP are:<br />

• Isolate workers and other pedestrians from mobile plant and works<br />

vehicles;<br />

• Reduce the need to back up;<br />

• Limit vehicle access points to work zone;<br />

• Coordinate truck and mobile plant movements;<br />

• Provide signs within the work zone to give guidance to pedestrian<br />

workers, equipment and trucks;<br />

• Design buffer spaces to separate pedestrian workers from errant<br />

vehicles and work zone equipment; and<br />

• Inform all on-site personnel of ITMP provisions.<br />

Two examples of the isolation of pedestrians from mobile plant and<br />

other vehicles on recent VicRoads major projects are:<br />

• Leighton Contractors introduced its Pedestrian No Go Zones on the<br />

M80 Upgrade Project early in 2011. It was the first highly visible<br />

ITMP to be introduced on a VicRoads Project. Leighton was recently<br />

presented with the VicRoads Major Project Safety Innovation Award<br />

in recognition of the establishment of the Pedestrian No Go Zones,<br />

and trial of GPS Personal Warning Devices for mobile plant operators<br />

and personnel authorised to work near plant, but outside of<br />

minimum approach distances.<br />

The concept had origins in the mining industry where they are<br />

sometimes called “Red Zones”. It requires compliance with behavioural<br />

controls, just as drivers are required to do on public roads but the<br />

system does isolate plant operations from pedestrians and gives the<br />

lead plant operator authority to give permission to other vehicles to<br />

enter the zone and pass other plant.<br />

Plant is required to stop all movement and rest the booms in the<br />

case of excavators pending the safe passing by plant and vehicles<br />

authorised to pass/enter the area. If it is necessary for a pedestrian to<br />

enter or approach plant they must seek permission over the radio and<br />

machines will be stopped until they are sighted and, if necessary, given<br />

permission to come closer.<br />

All permissions and instructions must be confirmed over the<br />

radio before entering the Red Zone. Some areas are made absolute<br />

Pedestrian No Go Zones where pedestrians entry is completely<br />

prohibited. Appropriate signage is then displayed.<br />

General Warning Sign – Also a reminder to contact the Lead Plant Operator by Radio<br />

and wait for permission to enter. Details of the radio frequency and name of the lead<br />

operator are provided on an adjacent Safe Notice Board. They are not provided if the<br />

area has been declared an absolute ‘Pedestrian No Go Zone’<br />

Safe Notice Board - Details are not provided when an area has been declared an<br />

absolute Pedestrian No Go Zone.<br />

• Working in a residential area always presents a challenge for road<br />

construction with respect to the separation of mobile plant and other<br />

construction vehicles from the public.<br />

BMD Constructions has just commenced the duplication of Clyde<br />

Road at Berwick in Victoria in an area where access to businesses<br />

and residences needs to be maintained and effective isolation of<br />

construction plant and vehicles from the public is necessary. BMD,<br />

together with VicRoads, is seeking more effective isolation between<br />

mobile plant and vehicles to achieve compliance with expectations in<br />

this area.<br />

ROADS FEB/MARCH <strong>2013</strong> 27


ASPHALT REVIEW<br />

Temporary public access is always required and on this project<br />

they will be established to a high standard of surfacing to accommodate<br />

disabled persons, elderly and those with need for wheeled walkers<br />

and prams. The new public access paths have been well delineated<br />

and signed.<br />

High security type fencing has been deployed on site to better<br />

contain and separate the public from road construction plant and<br />

vehicles. This is more effective than para-webbing or bunting flags in<br />

the containment of pedestrians and is less prone to weather damage.<br />

Public walkway on right behind security fence<br />

A motorised wheel chair passes over the temporary walkway without difficulty – the<br />

surfacing will be further sealed.<br />

The safety challenge presented by work near<br />

overhead and underground services<br />

Most utility services are placed in the road reserves and contact with<br />

underground and overhead utility services was far too frequent in past<br />

years during road construction and similar works.<br />

Activities which have shown the potential to strike services include:<br />

• Excavation works with excavators or backhoes;<br />

• Scraping or grading works;<br />

• Pile and post driving;<br />

• Coring and geotechnical studies;<br />

• Auger works; and<br />

• Steel pickets<br />

It was also common practice prior to 2004 to use plant such as<br />

excavators and backhoes to probe for underground services, often with<br />

predictable negative consequences and damage to services.<br />

VicRoads worked with our contractors in the major projects area<br />

to identify controls and best practice approaches in the civil road<br />

construction area, applying the WorkSafe Framework and Supporting<br />

Publications as the foundation guidelines.<br />

The VicRoads Worksite Safety Newsletter and Safety Alerts were used to<br />

communicate identified best practices for the benefit of the construction<br />

industry and this has significantly eliminated contacts as a result.<br />

Individual behaviour remains the major cause of incidents and this<br />

presents a major challenge.<br />

What was evident during the development of the WorkSafe<br />

Framework was the significant dependence on behavioural controls<br />

in this area. Under the hierarchy of safety controls, behavioural or<br />

administrative controls are clearly the least reliable and effective.<br />

However, higher level controls need to be practical and available in<br />

construction equipment to remove our reliance on human behaviour.<br />

For overhead electrical assets the WorkSafe Handbook for Using<br />

Earthmoving Equipment near Overhead Electrical Assets describes the<br />

hierarchy of controls and gives examples applicable to this equipment<br />

which is frequently involved in contacts with overhead services.<br />

Elimination of the risk through relocation of services prior to road<br />

construction work commencing is now frequently used, but does<br />

require cooperation by the relevant asset owner. Isolation of services is<br />

also used where practical, particularly where works could intrude into<br />

the No Go Zone for overhead electrical services.<br />

There have been innovations in the engineering control areas with<br />

respect to height limiters of excavators which show promise, but may<br />

require a different approach to the task if they cannot reach high<br />

enough to load trucks directly.<br />

Underground service contact incidents have been more prevalent<br />

than overhead services in VicRoads’ experience although both have<br />

significantly reduced in general.<br />

Actions required by contractors to<br />

comply with WorkSafe Framework<br />

The best practice approach to excavation work must follow the<br />

WorkSafe Framework for Undertaking Work near Overhead and<br />

Underground Assets. Industry standards for construction works have<br />

not yet been agreed so in the interim the best practice approach as<br />

detailed in the WorkSafe Framework must be followed or exceeded.<br />

Contractors’ documented safe working procedures must reflect the safe<br />

systems of work specified in the WorkSafe Framework. These detailed<br />

procedures must clearly describe how the system of work will comply with<br />

the WorkSafe Framework and include as-constructed drawings rather than<br />

schematics when possible or a larger size plan that is easy to read.<br />

Permits to Excavate are now commonly required by the principal<br />

contractors to ensure that all safety procedures have been<br />

implemented prior to the works commencing. The procedures should<br />

include requirements to:<br />

• Dial before You Dig;<br />

• “Prove” the location of services using appropriate non-destructive<br />

excavation technology;<br />

• Positively mark the services locations when they have been positively<br />

“proved”;<br />

• Record new locations when services are relocated for future<br />

reference;<br />

• Not permit machines to work closer than the distances listed in the<br />

WorkSafe Framework unless permission has been given by the asset<br />

owner;<br />

• Not assume services are laid in a straight line or that the depth will<br />

be consistent;<br />

• Undertake non-destructive proving excavation if some services are<br />

not traceable;<br />

28 ROADS FEB/MARCH <strong>2013</strong>


• Engage trained personnel competent in safety precautions and<br />

SWMS for this work; and<br />

• Notify EnergySafe, WorkSafe and/or the asset owner as required<br />

within required timeframes should any electrical cables or gas pipes<br />

be struck or damaged.<br />

Work near overhead electrical services<br />

On a recent VicRoads project, an excavator engaged in auger drilling<br />

works was being relocated (tracking) from one work area to another on<br />

a construction site and contacted live power lines. Fortunately no one<br />

was injured, but power was cut and caused major traffic delays for a<br />

number of hours as a result.<br />

The movement of powered mobile plant on site is classified as High<br />

Risk Construction Work under the OHS Construction Regulations 2007,<br />

Regulation 5.1.3. This requires a SWMS to identify plant movement<br />

hazards such as power line contact and effective controls to prevent<br />

this contact. Ideally, the controls should not depend significantly on<br />

administrative or behavioural controls.<br />

Excavators and other earthmoving equipment with a design envelope<br />

which can reach into the No Go Zone and/or the Limits of Approach<br />

must comply with the WorkSafe Handbook for Using Earthmoving<br />

Equipment near Overhead Electrical Assets. The risks from contact or<br />

arcing are more significant in this situation and higher order controls<br />

under the hierarchy of controls are now expected by WorkSafe.<br />

The SWMS for this type of work should document:<br />

• the heights and voltages of overhead electrical assets;<br />

• the height of the earthmoving equipment being used;<br />

• the need for a trained designated Spotter; and<br />

• any other high risk hazards associated with the works including work<br />

near traffic.<br />

The Handbook provides guidance in this high-risk construction work<br />

which if implemented will be deemed to have met an employer’s<br />

obligation regarding the risks of working near overhead electrical assets.<br />

The Handbook also identifies the hierarchy of control for this work<br />

and recommends a higher level of control when working within the No<br />

Go Zone and Limits of Approach as defined, if the machines operating<br />

envelope will reach into either of these areas.<br />

This supports the Act and Regulations which mandate that hazards<br />

be controlled by elimination or via the hierarchy of controls applicable<br />

to the hazard, so far as reasonably practicable.<br />

Higher level controls include power isolation, smaller excavator or<br />

excavator height limiting devices fitted to the equipment. The Limit of<br />

Approach may be specified within the asset owners required permit or<br />

in the WorkSafe Handbook.<br />

Moving forward – focus areas<br />

Further to the safety challenges presented to the construction industry<br />

discussed in this paper, the following table shows the top seven areas<br />

of incident prevalence on VicRoads major project sites since 2003.<br />

Behavioural type controls dominate in most areas at present,<br />

although this is changing as the hierarchy of controls is identified for<br />

the specific high-risk works area. Red indicates serious injury or fatality<br />

experience, orange indicates a significant number of incidents without<br />

serious injury and green indicates good experience largely due to the<br />

implementation of higher level controls.<br />

This paper has described most of the major areas where, because of the<br />

high risks and incident experience, safety innovation has been a priority.<br />

The views expressed in this paper are those of the author and not<br />

necessarily those of VicRoads.<br />

HIGH RISK WORK AREA COMMENTS DOMINANT CONTROLS<br />

1. Plant / Reverse over No incidents on major project sites. One fatality and<br />

one serious leg injuries on short term regional site. At<br />

least 5 recent fatalities around the country. Is a major<br />

cause of serious injuries around the world.<br />

Behavioural<br />

2 Worksite Traffic Management<br />

– Short Term.<br />

Serious Leg Injuries on major project short term site during<br />

lane closure removal. However, the challenge is greater<br />

where short term works are involved whether static or mobile<br />

and a greater use of crash attenuators / TMAs is indicated.<br />

Lane closures and signs dominate on small projects<br />

TMAs Behavioural<br />

3 Plant Rollovers No fatalities. No incidents for a number of months but has been<br />

a major incident area particularly after the drought finished.<br />

Behavioural<br />

5 Overhead & Underground<br />

Services Contacts<br />

No fatalities or serious injuries. Contacts have significantly<br />

reduced due to WorkSafe Framework uptake and systems in<br />

place, but have recently shown a small increase in incidents.<br />

Behavioural<br />

6 Falls No fatalities or serious injuries for 10 years.<br />

Requires continuous attention.<br />

7 Excavations No incidents or serious injuries for 10 years. Step<br />

batters dominate as an engineering control, followed<br />

by shields. Requires continuous attention.<br />

Guardrails, No Go Zones.<br />

Engineering, Behavioural<br />

8 Worksite Traffic Management<br />

– Long Term<br />

No fatalities for 10 years. The hierarchy of safety controls<br />

and the Worksite Safety – Traffic Management Code has<br />

made a significant difference to longer term projects. The<br />

top 3 controls dominate: road closure, barriers, TMAs.<br />

Road closure,<br />

ROADS FEB/MARCH <strong>2013</strong> 29


ASPHALT REVIEW<br />

The AAPA connection<br />

to upgrading motor<br />

racing icon<br />

From time to time <strong>Asphalt</strong> <strong>Review</strong> features a project undertaken by one of our members. The<br />

featured project in this edition was undertaken by Downer Australia and is a project that will<br />

have great interest to many of us - the resurfacing of the Phillip Island Grand Prix Track.<br />

The Phillip Island track is one of the iconic places in Australia. Not only is it in a beautiful<br />

environment, it is also a place that has a great deal of motor sport history. Therefore when<br />

Downer was asked to resurface the track, they knew they had a major responsibility not only to<br />

their client, but also to the whole of the motor sport community. They sent their most experienced<br />

person – the person who had managed the surfacing of Phillip Island on two previous occasions<br />

– Sergio Cinerari.<br />

Sergio is not only a very experienced operator, he is also the Chief Operating Officer of<br />

Downer Australia East and the current Chairman of AAPA. It just shows that no matter how<br />

senior you become, once you have bitumen in your blood, you still love getting out and<br />

making pavements.<br />

30 ROADS FEB/MARCH <strong>2013</strong>


Phillip Island Grand Prix Track Resurfacing<br />

Phillip Island Grand Prix Circuit is a place that stirs emotions in motor<br />

sport fans around Australia, whether it be V8 Supercars, Moto GP or<br />

World Superbikes. The combination of a fast flowing world-class circuit<br />

married with a picturesque setting on the coastline of Victoria’s Phillip<br />

Island make this a special place.<br />

When the circuit operators – PI Operations, which is charged with<br />

managing the circuit for owner Linfox – reaslised it was time for a<br />

new wearing surface, it looked into its history to guide a pathway for<br />

selecting a new asphalt wearing surface.<br />

Downer Australia East Chief Operating Officer, Sergio Cinerari, had<br />

been intimately involved in the previous two upgrades and asphalt<br />

overlays at the circuit in 1989 and 1998. The upgrade in 1989 was<br />

probably the most significant performed on the circuit in its history. The<br />

circuit was widened to around 10m and significant asphalt correction<br />

work performed to iron out bumps prior to a full width overlay.<br />

These works were to prepare the circuit for its first event on the<br />

world stage in late 1989, the first <strong>Australian</strong> Moto GP. The upgrade<br />

works were performed in 1989 utilising a small 100 tonne per hour<br />

mobile asphalt plant established on the site.<br />

By 1998, the circuit was in need of a new wearing surface. The works<br />

performed in 1989 had stood the test of time, so the scope in 1998<br />

was to purely overlay the circuit. This time, the asphalt was produced<br />

in Melbourne and carted to Phillip Island where it was put through a<br />

transfer vehicle and placed over four days. The paving method involved<br />

completing a half-circuit of the track each day at 5m wide, resulting in<br />

two transverse joins and a full length longitudinal cold join around the<br />

centre of the track.<br />

The mix placed in 1998 was a 14mm dense graded mix with C320<br />

binder which performed admirably for over 13 years. It was due to<br />

the success of the previous two upgrades and overlays that Fergus<br />

Cameron, Managing Director of PI Operations contacted Sergio Cinerari<br />

in <strong>Feb</strong>ruary 2012 to commence the process of planning for the next<br />

overlay scheduled for December 2012.<br />

Right from the first meeting, the team from Linfox were very clear on<br />

their goal, they wanted the “best racetrack in the world”. PI Operations<br />

also employed the services of Aurecon to work with Downer and the<br />

wider Linfox team to determine the most cost effective solution to<br />

meet their goals. The only high-level constraints were that this was to<br />

be a remove-and-replace operation, not a pure overlay on top of the<br />

existing surface; the mix needed to have a similar look and texture to<br />

the existing surface and the general geometry of the track needed to<br />

remain the same.<br />

Over a period of a couple of months, the methods available to deliver<br />

the works were developed and costed, along with the advantages and<br />

risks associated with each delivery method. At the same time, work<br />

ROADS FEB/MARCH <strong>2013</strong> 31


ASPHALT REVIEW<br />

Sergio Cinerari (left) and<br />

Fergus Cameron (MD of<br />

Phillip Island Operations)<br />

in front of asphalt plant<br />

brought to Phillip Island.<br />

commenced on the asphalt mix design. Records of the job mix from<br />

1998 were still available which served as a valuable reference point<br />

during the development of the new mix design.<br />

As we all know things change with time, and while the previously<br />

used source rock was still readily available, the grading of the<br />

aggregates available now was not the same. Together with this, the<br />

sand incorporated into the mix in 1998 was no longer available.<br />

Considerable effort was put into fine tuning the mix design to ensure<br />

that it did not only meet the specification requirements, but was the<br />

mix that delivered optimal performance from the materials.<br />

The collaborative approach employed by Linfox enabled open<br />

discussion amongst the parties. This ensured all the issues were<br />

investigated, discussed and the “best for track” outcome decided based<br />

on risk and cost. The selection of the binder for the project was an<br />

excellent example of this process.<br />

The current surface placed in 1998 incorporated C320 binder;<br />

however, the decision was made to move to an A35P polymer modified<br />

binder for the 2012 homologation works. The collaborative approach<br />

enabled Linfox to work with Downer and Aurecon to understand the<br />

performance benefits of the modified binder and to be able to weigh<br />

these up against the higher initial cost to arrive at the best value for<br />

money solution.<br />

This process was aided by a visit to Downer’s Research and<br />

Development laboratory in Somerton where the Linfox team were able<br />

to touch and feel the different variants of the mix design and physically<br />

see the difference in performance and surface texture offered by each.<br />

The profiling asphalt production and paving methods followed a similar<br />

decision process before being agreed upon.<br />

While the existing surface of the track was generally in good<br />

condition, several bumps and hollows had developed over the past 13<br />

years, so the team agreed that this was not a project where just milling<br />

off a nominal 40mm and replacing it would meet the brief.<br />

In keeping with best practice which dictates that you attend to ride<br />

issues as early in the process as possible, the decision was made to<br />

mill the track to level. To facilitate this, a laser scan of the track was<br />

undertaken by Aurecon and a new design surface overlayed on the<br />

existing, with the “ideal” design manipulated as required to match<br />

structures such as existing ripple strips. The profiling of the track would<br />

then be undertaken utilising Paveset level control on the profilers with<br />

a Specification tolerance of plus or minus 3mm.<br />

To achieve the original goal, the decision was made to establish a<br />

large mobile plant on site. This decision was reached to enable the track<br />

to be paved full-width with two pavers in echelon, ensuring that each<br />

paver could be fed with enough mix to maintain an ideal consistent<br />

paving speed of five metres per minute. The added advantage of the<br />

plant on site was to minimise the time between production of the<br />

mix and placement. This would ensure consistently optimum asphalt<br />

temperature and promote homogeneous compaction of the mix.<br />

An Astec T400 Double Barrel continuous mixing plant was<br />

transported to site for the task. “The establishment of the plant into<br />

the infield of the track presented its own challenges,” commented<br />

Martin Kinski, Downer Project Manager.<br />

“With the long wheel base and low clearance of the mobile plant<br />

trailers, we had to complete pre-works involving widening and flattening<br />

of the access into the site and demolishing the veranda off the old hay<br />

shed inside the circuit to accommodate the swept path of the mobile<br />

plant trailers. The track is used around 300 days per year, so the window<br />

of opportunity to move the trailers over the track was small.<br />

“A short three-day window existed immediately following the Motto<br />

GP in late October; however, the plant had to be moved in overnight<br />

due to the transport traffic leaving the track during the day with<br />

everything from temporary stands, portable buildings and marquees<br />

all having to be removed over the same three-day day period,”<br />

commented Martin.<br />

“It wasn’t just a case of towing the nine oversized trailers in; firstly<br />

we needed to build a temporary pavement over the track, move the<br />

plant in and then remove the ramp. All this needed be completed and<br />

the site left clean and ready for racing the following day.”<br />

With the plant moved into the site, the erection and commissioning<br />

was performed during early November while the track was still in<br />

operation, followed by mix trials later in the month.<br />

To minimise costs, the RAP profiled from the track was to be utilised<br />

to construct the hardstand area for the virgin aggregates. Once<br />

again, this presented challenges as the profiling of the track was not<br />

commencing until seven days before the new surface was to be placed.<br />

This necessitated the early production, testing and stockpiling of the<br />

aggregates at the quarry so they could be available for transport into<br />

the track over only four days.<br />

The track was closed from Monday 3rd December, with profiling<br />

commencing immediately that morning, utilising two 2m Profilers with<br />

fine milling drums. Despite some ice cold, windy and wet weather<br />

early in the week, the bulk of the track was milled out in only three<br />

days, with final clean-up, patching of laminations and any other defects<br />

occurring over the remainder of the week. The tight tolerance had been<br />

met and the surface rode well. All was ready for the application of the<br />

new asphalt.<br />

The track was planned to be paved in two days totalling 4,700<br />

tonnes. The location of the two transverse joins had been pre-agreed<br />

as part of the planning of the job, so the target for each shift needed<br />

was achieved.<br />

32 ROADS FEB/MARCH <strong>2013</strong>


“This project is a great example of how a successful outcome can be delivered<br />

through careful planning and the intimate involvement of all the stakeholders,<br />

openly discussing and resolving the issues as they arise”<br />

Three paving crews were involved in the project even though only two<br />

pavers were being utilised. “One of the keys to achieving a smooth ride is to<br />

pave at a constant speed without stopping” explained Martin.<br />

“To facilitate this, we needed people available to relieve the crews for<br />

breaks and meals. We also required additional spotters to manage the<br />

significant reversing risk the project posed. At 300 tonnes per hour, a truck<br />

needed to be reversed in, tipped into one of the two transfer vehicles and<br />

exited every two minutes, all day long.”<br />

It was recognised that the marshal stations located around the track<br />

provided the perfect location for the spotters. They had a clear view of the<br />

operation while being located in a safe position off the circuit.<br />

Paving in echelon and placing over 2000t per shift is not unusual for the<br />

industry; however, the difference with this project was that this needed to be<br />

achieved from day one, unlike a larger volume project where your production<br />

ramps up as the process is refined and everyone settles into their roles. In<br />

some respects, this would be like expecting Casey Stoner to ride his fastest<br />

lap around Phillip Island on his first lap of the circuit, only having practiced on<br />

other circuits.<br />

To manage this risk, the project team, including the cartage drivers, were<br />

split into groups and participated in an intensive training and induction<br />

session upon their arrival at the circuit and given the opportunity to ask<br />

questions about the project and how it was to be executed.<br />

Following this, the team had the opportunity to trial the process in a<br />

construction trial that was placed on the newly completed additional runoff<br />

area on the outside of Turn 1 at the end of Gardner Straight. Sign-off of the<br />

process and quality of the construction trial meant that all was in readiness<br />

for the main game on Tuesday and Wednesday.<br />

Day 1 of the track surfacing commenced between Turns 11 and 12 near<br />

the pit lane entry, around turn 12 and onto Gardner Straight. It was here that<br />

the paving methodology departed significantly from that performed in 1998.<br />

In the previous overlay, Gardner Straight had been placed in three<br />

paver runs with two crowns due to it widening out to just over 12<br />

metres. This required the 3rd paver run to be removed at the end of<br />

the straight, right at the fastest point of the circuit. While executed<br />

well in 1998, this is a risky manoeuvre that requires the pavers to be<br />

stopped, widths changed and then paving recommenced.<br />

To remove this risk, the project team identified the opportunity<br />

to slightly redesign the shape of the main straight to create a single<br />

crown and two paving runs between the white lines of the track.<br />

This redesign also had the advantage of removing a water ponding<br />

issue that had developed about half way along the straight.<br />

“The fact that we were profiling two levels gave us the opportunity<br />

to change the configuration of the paving runs on the main straight”<br />

said Martin. “We worked closely with the Aurecon team to achieve<br />

the desired outcome while still ensuring we did not materially alter<br />

the level or overall geometry of the track noticeably. Paving at six<br />

metres wide is easily achievable if the pavers are set up correctly.”<br />

The first day of paving was completed successfully and set the<br />

scene for an equally successful day on the Wednesday to complete<br />

the 4,700 tonne project.<br />

“This project is a great example of how a successful outcome can<br />

be delivered through careful planning and the intimate involvement<br />

of all the stakeholders, openly discussing and resolving the issues as<br />

they arise,” stated Sergio Cinerari who was on site full-time during<br />

the paving of the project.<br />

“While of significant importance, this project is the smallest<br />

volume we have ever moved and established a plant of this size for<br />

and is a demonstration of the commitment of the Linfox team to<br />

provide the best opportunity to achieve their goals” said Sergio.<br />

“Now we will wait for the world’s opinion on how we performed”.<br />

ROADS FEB/MARCH <strong>2013</strong> 33


ASPHALT REVIEW<br />

CPEE postgraduate<br />

re-accreditation<br />

The Centre of <strong>Pavement</strong><br />

Engineering Education is a<br />

specialised training and higher<br />

education provider strongly<br />

supported by AAPA. Its focus<br />

is on providing post graduate<br />

education in pavement related<br />

areas, including at the Graduate<br />

Diploma and Masters level.<br />

CPEE has always maintained<br />

the highest quality in its courses<br />

and accreditation under new<br />

national rules that will further<br />

highlight CPEE’s high standards.<br />

In today’s busy business world<br />

it is often easy to forget the<br />

value of higher education. But a<br />

CPEE qualification not only gives<br />

current and useable knowledge, it<br />

also provides a valuable and long<br />

lasting means of highlighting a<br />

person’s interest and knowledge<br />

in our industry to both employers<br />

and potential employers.<br />

The following note highlights<br />

the process that CPEE is going<br />

through to show that it continues<br />

to offer the highest quality post<br />

graduate training.<br />

CPEE offers a number of postgraduate<br />

courses, some as a private provider and<br />

others jointly with its university partner, the<br />

University of Tasmania. Its private provider<br />

courses were first accredited in 2003 and<br />

re-accredited in 2008.<br />

This year CPEE is required to apply to<br />

the recently created Tertiary Education<br />

Quality and Standards Agency (TEQSA) for<br />

re-accreditation of the Graduate Certificate<br />

in <strong>Pavement</strong> Technology and the Master of<br />

<strong>Pavement</strong> Technology. At the same time<br />

CPEE is also applying for renewal of its<br />

registration as a private provider.<br />

The new national body replaces the state<br />

based agencies, such as the VRQA in Victoria,<br />

and brings all <strong>Australian</strong> higher education<br />

providers under the one set of requirements.<br />

CPEE will be one of the first providers to be<br />

reviewed under this new body in <strong>2013</strong>.<br />

Along with the new body comes a<br />

completely new set of standards and<br />

requirements for accreditation and<br />

certification within the Higher Ed space.<br />

Following the introduction of the new<br />

standards CPEE began adapting its own<br />

processes to meet these leading up to its<br />

re-accreditation.<br />

<strong>Australian</strong> Qualifications Framework (AQF)<br />

qualifications, other than those offered<br />

by the universities and self-accrediting<br />

institutions, are able to be offered by a non<br />

self-accrediting higher education institution.<br />

The courses offered by CPEE as a non<br />

self-accrediting higher education provider<br />

are registered and evaluated against the<br />

Higher Education Standards Framework. This<br />

Framework comprises five domains: Provider<br />

Standards; Qualification Standards, Teaching<br />

and Learning Standards; Information<br />

Standards and Research Standards. These<br />

standards are collectively the Threshold<br />

Standards which all providers must meet to<br />

enter and remain within Australia’s higher<br />

education system.<br />

The preparation of substantial submissions<br />

in response to the TEQSA re-accreditation<br />

and re-registration requirements has not<br />

impacted on CPEE offering any of its distance<br />

education courses in <strong>2013</strong>.<br />

In all six courses are offered: - the<br />

Graduate Certificate in Infrastructure Asset<br />

Management; the Graduate Diploma of<br />

Infrastructure Asset Management; the<br />

Graduate Certificate in Road Engineering &<br />

Construction; and the Graduate Diploma<br />

of Road Engineering & Construction jointly<br />

with the University of Tasmania and its own<br />

Graduate Certificate in <strong>Pavement</strong> Technology<br />

and Master of <strong>Pavement</strong> Technology.<br />

All in all these changes are seen by CPEE as<br />

a positive for ensuring the quality of higher<br />

education providers and the courses they offer.<br />

Details of all CPEE courses can be found on<br />

the CPEE website www.pavementeducation.<br />

edu.au<br />

AAPA<br />

Training<br />

Report<br />

AAPA Training is Australia’s foremost provider<br />

of quality training courses on all aspects of<br />

asphalt and bituminous surfacing.<br />

The Training Centre presents a program<br />

of around 90 courses each year in all capital<br />

cities and many regional centres, in addition<br />

to customised courses presented on request.<br />

AAPA’s major courses are:<br />

• <strong>Asphalt</strong> Placement & Compaction;<br />

• Bituminous Surfacing Principles & Practice;<br />

• Fundamentals of Bituminous Surfacing;<br />

• <strong>Pavement</strong> Maintenance Practices;<br />

• PMBs & Bitumen Emulsions;<br />

• Selection of <strong>Pavement</strong> Surfacings;<br />

• Sprayed Sealing Design;<br />

• Sprayed Sealing Selection & Design;<br />

• Sprayed Sealing Field Procedures; and<br />

• Working Safely with Bitumen<br />

Information on each of these courses is<br />

available from the AAPA website under the<br />

heading Training/Course Outlines.<br />

All AAPA presenters are recognised experts<br />

in their field, and will ensure that delegates<br />

receive authoritative, up-to-date and relevant<br />

information, delivered in an informal and<br />

supportive learning environment.<br />

Certificates of Attendance, Statements of<br />

Attainment, comprehensive course notes<br />

and access to the latest technical industry<br />

documentation and specifications are<br />

additional benefits offered by the AAPA<br />

Training Centre.<br />

Flying start for <strong>2013</strong> courses<br />

Strong demand for AAPA’s highly-regarded<br />

training courses means an early start to the<br />

<strong>2013</strong> training programme.<br />

Queensland welcomed in the New Year with<br />

a series of “Working Safely With Bitumen”<br />

presentations in January, commencing in<br />

Toowoomba, Brisbane, Mackay, Townsville<br />

and concluding in Cairns – all to capacity<br />

audiences.<br />

“It is always somewhat of a challenge<br />

presenting training courses in Queensland at<br />

this time of year, but it is an opportune time<br />

for some of our clients. AAPA’s presenters<br />

have always been either in advance or behind<br />

adverse weather episodes in the region – we<br />

34 ROADS FEB/MARCH <strong>2013</strong>


put it down to good planning and a large<br />

amount of luck,” Training Centre Manager, Ed<br />

Butler said. “However, the floods did come<br />

close this year.”<br />

The month of <strong>Feb</strong>ruary has also been very<br />

busy and, at the time of writing this report,<br />

it is shaping up to be the busiest month in<br />

the Training Centre’s history, with 16 training<br />

courses scheduled for Queensland, Northern<br />

Territory, Victoria, New South Wales and<br />

Western Australia.<br />

<strong>Feb</strong>ruary is also the month where we are<br />

commencing to offer on-line training course<br />

registrations. This will initially be offered for<br />

three courses to be held in <strong>March</strong>.<br />

The new system will streamline the process<br />

of registration, automatically generating<br />

confirmation details (venue address, start/<br />

finish times, etc.) and invoicing, as well as<br />

providing on-line payment facilities (24/7).<br />

In time, the system will be available for all<br />

training course registrations.<br />

<strong>2013</strong> TRAINING COURSE PROGRAMME (as at 16/01/13)<br />

Another expert joins the team<br />

Following another hugely successful year, the<br />

AAPA Training Centre is pleased to announce<br />

that David Bligh will join the expert team as<br />

a presenter of AAPA training courses, based<br />

in NSW.<br />

Recently retired from Roads & Maritime<br />

Services (formerly RTA), David brings with<br />

him a vast amount of knowledge and<br />

experience in the flexible pavements industry<br />

over many years.<br />

David joins Robert Busuttil, John Patane,<br />

Greg Miller and Barry Gundersen in the<br />

delivery of industry-leading training courses.<br />

Training Course Programme<br />

The following programme lists all of the<br />

currently programmed courses for <strong>2013</strong>.<br />

However AAPA is also pleased to offer<br />

customised courses to organisation that<br />

request them.<br />

These can be offered anywhere in Australia<br />

and can be held in companies’ own premises<br />

or at premises sourced by AAPA. If your<br />

company wishes to discuss a customised<br />

course, please contact the Training Centre.<br />

To register for AAPA Training refer to the<br />

AAPA website/Training.<br />

Email: trainingcentre@aapa.asn.au<br />

Fax: (03) 9853 5914<br />

Mail: AAPA Training Centre, Level 2, 5<br />

Wellington Street, Kew Victoria<br />

3101<br />

Telephone: (03) 9853 5322<br />

Call the AAPA Training Centre for more details. Telephone: (03) 9853 5322<br />

Facsimile: (03) 9853 5914 E-mail: trainingcentre@aapa.asn.au Web: www.aapa.asn.au<br />

ROADS FEB/MARCH <strong>2013</strong> 35


ASPHALT REVIEW<br />

Pilot vehicles<br />

used in NT to<br />

enhance safety<br />

Vehicle Couplings Warning<br />

Every two months, AAPA holds a<br />

teleconference with representatives of<br />

each of its Branch’s Health and Safety<br />

Committees. This hook-up provides an<br />

opportunity for those involved in health and<br />

safety to share information between states.<br />

At the last teleconference, concern<br />

was expressed about the condition of<br />

some of the couplings on vehicles that<br />

enter our worksites.<br />

A visual inspection of some couplings<br />

showed cracks or other failures. It was<br />

also noted that some vehicles did not<br />

have working warning devices to inform<br />

a driver that the handbrake had not been<br />

applied before they left the vehicle.<br />

These comments prompted those<br />

participating in the teleconference<br />

to suggest the condition of vehicles<br />

entering a worksite should be monitored,<br />

particularly for visible defects such as<br />

cracks in couplings and draw bars.<br />

This warming has been sent to<br />

all members of AAPA through its<br />

newsletter. But it is a warning that<br />

everyone involved with heavy vehicles<br />

should be aware of and ensure that they<br />

conduct regular inspections.<br />

Safety is a feature of this edition of Roads/<br />

<strong>Asphalt</strong> <strong>Review</strong>. It is worth highlighting what one<br />

government department is doing to enhance safety.<br />

The Northern Territory Department of<br />

Infrastructure has implemented a requirement<br />

to help protect workers and the passing traffic<br />

adjacent to sealing works. This requires that while<br />

one side of a road is closed for sealing, traffic<br />

passing on the other side must follow a pilot or<br />

escort vehicle.<br />

Sealing sites can be up to four kilometres long and<br />

each site is controlled by three traffic controllers.<br />

One controller operates at each end of the sites<br />

with the third driving the pilot vehicle. The traffic<br />

controllers also take it in turn to drive the vehicle,<br />

providing them with a break from the weather.<br />

Vehicles are usually driven at around 60kph until<br />

they approach the actual work site. They are then<br />

slowed to about 25 kph.<br />

This approach ensures that vehicles all slow to a<br />

safe speed, reducing the risk to those working on<br />

site. It also makes it safer and more comfortable<br />

for the drivers as everyone is required to do the<br />

same speed. All of us have had the experience of an<br />

impatient driver sitting right on our tail wanting to<br />

go faster as we drive at the posted speed limit.<br />

Using pilot vehicles is not new, but it is a great<br />

way of improving safety and should be part of<br />

the worksite safety strategy applied wherever it<br />

is practical.<br />

AAPA/Austroads<br />

Work Tips updated<br />

AAPA and Austroads jointly prepare a range of Work Tips. These<br />

contain practical information for people working in the flexible<br />

pavements industry – they guide workers to help them achieve<br />

the highest standards expected from asphalt and sprayed sealed<br />

pavements.<br />

Work Tips are developed by a joint AAPA/Austroads<br />

committee with input from a wide range of technical experts<br />

across out industry. They are also regularly reviewed to ensure<br />

they remain current.<br />

New and updated Work Tips are then approved by the AAPA<br />

National Technology Committee and by the <strong>Pavement</strong> Task<br />

Force of Austroads.<br />

Once approved Work Tips are made available for free<br />

download from the AAPA website. www.aapa.asn.au.<br />

Two Work Tips have recently been updated and are now<br />

available. These are:<br />

Work Tip 15: <strong>Asphalt</strong> Production Process Control<br />

This Work Tip provides a guide to the application of statistical<br />

process control charts to the production of asphalt.<br />

Work Tip 17: Air Voids in <strong>Asphalt</strong><br />

This Work Tip outlines the influence of air voids on the<br />

performance of dense graded asphalt mixes, and emphasises<br />

the importance of compaction in achieving intended service<br />

properties.<br />

A full list of Work Tips follows:<br />

36 ROADS FEB/MARCH <strong>2013</strong>


work tips - full list<br />

1. Priming of <strong>Pavement</strong>s<br />

2. Storage & Handling of<br />

Bituminous Emulsions<br />

3. <strong>Asphalt</strong> Riding Quality<br />

4. <strong>Asphalt</strong> Joints<br />

5. Cold Planing<br />

6. Polymer Modified Binders<br />

7. Treatment of Flushed or Bleeding Surfaces<br />

8. Treatment of Cracks in Flexible <strong>Pavement</strong>s<br />

9. Preparing <strong>Pavement</strong>s for Resealing<br />

10. <strong>Asphalt</strong> Paving with<br />

Automated Level Control<br />

11. Surface Characteristics of<br />

Bituminous Surfacing<br />

12. Compaction of <strong>Asphalt</strong><br />

13. Temperature Characteristics<br />

Binders in <strong>Asphalt</strong><br />

14. Sprayed Seal Cutting Practice<br />

15. <strong>Asphalt</strong> Statistical Process Control<br />

16. Reinstatement of Road Openings<br />

17. Air Voids in <strong>Asphalt</strong><br />

18. Sprayed Sealing – Selection<br />

of Initial Treatments<br />

19. Sprayed Sealing – Selecting<br />

Aggregate Size<br />

20. Sprayed Sealing – Joints<br />

and Application Rates<br />

21. Sprayed Sealing – Uniformity and Neatness<br />

22. Sprayed Sealing – Minimising Handwork<br />

23. Sprayed Sealing – Aggregate Precoating<br />

24. Sprayed Sealing – Rolling<br />

of Cover Aggregate<br />

25. Geotextile Reinforced Sprayed Seals<br />

26. <strong>Asphalt</strong> Handwork<br />

27. Sprayed Sealing – Cutting Back<br />

of Polymer Modified Binders<br />

28. Sprayed Seals – Removal<br />

of Loose Aggregate<br />

29. Sprayed Seals – Determining<br />

Sprayer Forward Speed<br />

30. <strong>Asphalt</strong> Shape Correction<br />

31. <strong>Asphalt</strong> Paving Speed<br />

32. Sprayed Seals – a Brief Description<br />

33. Sprayed Seals – Selection<br />

of Spraying Nozzles<br />

34. Sprayed Seals – Calibration<br />

of Bitumen Sprayers<br />

35. Sprayed Seals – Spreader Calibration<br />

and Aggregate Application Rates<br />

36. Sprayed Seals – Pre-spraying<br />

to Correct Surface Texture<br />

37. Cape Seals<br />

38. Sprayed Sealing – Surface Enrichment<br />

39. Dust Laying with Bitumen Emulsion<br />

40. Sprayed Sealing – Volume<br />

Binder Correction<br />

41. Coring of <strong>Asphalt</strong> <strong>Pavement</strong>s<br />

42. Nuclear Density Testing of<br />

<strong>Asphalt</strong> <strong>Pavement</strong>s<br />

43. Primersealing of <strong>Pavement</strong>s<br />

44. High Pressure Water Retexturing<br />

45. Skin Patching May 2006<br />

45. <strong>Asphalt</strong> Cooling Rates<br />

46. Sprayed Sealing of Drought &<br />

Salt-Affected <strong>Pavement</strong>s<br />

47. Treatment of Flushed Seals<br />

Using Chemical Solvents<br />

48. Preparation of <strong>Pavement</strong>s for<br />

Priming and Primersealing<br />

“Take-home”<br />

actions from<br />

the AAPA H&S<br />

Conference<br />

At the 15th Road Construction<br />

and Surfacing Health and<br />

Safety Conference, delegates<br />

were asked to take home<br />

at least one idea they could<br />

put into practice in their<br />

workplace.After a few weeks,<br />

each delegate was asked what<br />

they learnt at the conference<br />

that they put into place on<br />

the job.The response was<br />

surprising with at least 45<br />

actions taken.<br />

<strong>Review</strong>ing these actions it is easy to see that<br />

many of the comments made by presenters<br />

or at the workshops were of interest to many<br />

people, while others may have been relevant<br />

to an individual, possibly due to particular<br />

circumstances in their workplace.<br />

A common response was to remind<br />

staff of the importance of workplace<br />

safety. Unfortunately, we can all be guilty<br />

of sometimes becoming complacent and<br />

that is when incidents happen. Several<br />

delegates took back a message to their<br />

work colleagues about the outcomes of<br />

workplace injuries. Several are following the<br />

suggestion at the conference that workers<br />

be asked to write down what would happen<br />

if they were killed or seriously injured at<br />

work and didn’t go home. Then they were<br />

asked to pose the same question to their<br />

wife/husband and family.<br />

Other delegates noted the lack of reporting<br />

of near misses. Without having information<br />

about near misses supervisors and senior<br />

management may be unaware of what is<br />

actually happening. Several delegates took<br />

home the idea of using different terminology<br />

to help everyone understand the meaning of<br />

a near miss. Dante Cremasco from Downer<br />

used the term “Mate that was bloody close”<br />

to more accurately describe a near miss.<br />

Several delegates are now using that term.<br />

The use of ICE (In Case of Emergency) cards<br />

to be carried by all workers on site was also<br />

recognised as a valuable idea. This came from<br />

the Boral safety exercise where one worker was<br />

considered to have been killed. The police had<br />

no way of finding that person’s home address so<br />

they would have been able to notify their next<br />

of kin. As a result, at least one traffic control<br />

company has issued ICE cards to all its workers.<br />

One delegate left the conference with a<br />

clear understanding that awareness of safety<br />

and frequent reminders were important. So<br />

one of her actions was to mention safety<br />

frequently. This included adding a safety<br />

message to her emails.<br />

Several delegates also highlighted<br />

the importance of using appropriate<br />

safety equipment.<br />

Truck crash attenuators, temporary<br />

speed bumps and some of the new<br />

personnel sensing equipment are all<br />

important safety devices. But these must<br />

be combined with a safety culture. All<br />

workers and management must “walk the<br />

talk” and always ensure that safety is the<br />

highest priority.<br />

Frequent tool box meetings and<br />

strategies such as Sharpe Bros Safety Bro<br />

campaign are all part of achieving safety.<br />

The 2012 Conference had a strong<br />

focus on workshops. Many delegates also<br />

commented that these provide a great<br />

opportunity to discuss common issues and<br />

to help workers and management achieve a<br />

goal of zero workplace incidents. Or more<br />

correctly, a goal of never saying “Mate –<br />

that was bloody close”.<br />

ROADS FEB/MARCH <strong>2013</strong> 37


ASPHALT REVIEW<br />

BP bitumen facility meets<br />

northern Queensland demand<br />

The BP Bitumen import and manufacturing<br />

facility located within the Port of Townsville<br />

was officially opened on 7 <strong>Feb</strong>ruary by<br />

David Crisafulli, Queensland Minister for<br />

Local Government.<br />

The new multi-million dollar investment<br />

comprises two 5,000 tonne and two 3,000<br />

tonne storage tanks, two 1,000 tonne<br />

“day” tanks, a two-bay loading gantry and a<br />

polymer modified binder production plant.<br />

“Regional Queensland needs to continue<br />

to promote the economic opportunities that<br />

are available in our part of the world.” Mr<br />

Crisafulli said in opening the plant.<br />

“With a population nearing 200,000<br />

and an ideal location to service the<br />

northern part of the state, there are<br />

golden opportunities for businesses to<br />

invest in Townsville.”<br />

Project activity began in 2009 and<br />

included the green-field construction of the<br />

new facility and significant upgrades to the<br />

nearby product wharf.<br />

The facility can now supply up to 120,000<br />

tonnes of bitumen each year to help meet<br />

strong demand for road building materials<br />

in northern Queensland.<br />

“Townsville’s strength lies in its diversity<br />

of industry and it is always pleasing to see<br />

another trade that will further support local<br />

and regional growth, jobs, and business<br />

come online,” Barry Holden, Port of<br />

Townsville CEO, said.<br />

“BP Australia has been proactive in<br />

investing in the new infrastructure required<br />

to make this bitumen trade a reality and we<br />

congratulate the company on the initiative.”<br />

The $50 million project was completed<br />

safely and supported some 80 jobs during<br />

the construction and commissioning phase.<br />

Mike Bailey, BP Bitumen General<br />

Manager, said; “We see strong growth<br />

in northern Queensland for both paving<br />

grade bitumen and our speciality products<br />

designed for roads subject to high stress<br />

and wear. We are delighted with the<br />

performance of our new plant and are<br />

pleased to be contributing to Queensland’s<br />

prosperity.”<br />

The Townsville facility is capable of<br />

supplying Class 170 and Class 320 paving<br />

grade bitumens compliant to <strong>Australian</strong><br />

Back Row from left to right: Kevin McCullough (General<br />

Manager - Sunstate Group); Marissa Nichols (Manager<br />

- Program Development & Performance - Department<br />

of Transport and Main Roads); David Atkinson<br />

(Regional Manager North - Department of Transport<br />

and Main Roads); Paul Smith (Deputy Director General<br />

- Department of Transport and Main Roads); Rob Vos<br />

(AAPA Regional Executive); Mike McGuinness (Head<br />

of Sales and Marketing - BP Australia); David Crisafulli<br />

(Minister for Local Govt); Mike Bailey (National Bitumen<br />

Manager - BP Australia);<br />

Front Row from left to right: Les Millar (Chief Operations<br />

Officer - Sunstate Group); Sam Priebe (General Manager<br />

- Aspic Infrastructure); Adrian Grbac (National Sales<br />

Manager - BP Australia); Brett Whitbread (Northern<br />

Region Manager - Boral <strong>Asphalt</strong>); Rob McGuire (General<br />

Manager - Boral <strong>Asphalt</strong> QLD)<br />

Standard AS2008, as well as all grades of<br />

polymer modified binders compliant to the<br />

Austroads AG:PT/T190 specification and<br />

Queensland’s MRTS 18.<br />

Dr Graham Wilson, BP Bitumen Technical<br />

Manager, explained; “The importation of<br />

bitumen into Townsville and our other import<br />

facilities in Brisbane and Hobart is supported<br />

by a comprehensive quality control process.<br />

This ensures compliance to the <strong>Australian</strong><br />

Standard and to our stringent HSE standards,<br />

as well as performance on the road.”<br />

BP Bitumen has recently begun operations<br />

at a new combined bitumen and marine oil<br />

import facility in Brisbane. Taken together the<br />

Brisbane and Townsville projects represent an<br />

investment of over $100 million.<br />

38 ROADS FEB/MARCH <strong>2013</strong>