NoetixViews for Oracle Payables - Noetix Technical Support
NoetixViews for Oracle Payables - Noetix Technical Support
NoetixViews for Oracle Payables - Noetix Technical Support
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Noetix</strong>Answers <strong>for</strong> <strong>Oracle</strong> Human Resources<br />
The following answers have been modified in this module:<br />
HR_Budgets<br />
For easy identification of records, the following columns have been added to the “What is the<br />
current in<strong>for</strong>mation about the monthly human resources budget” answer:<br />
• Columns prefaced with Job_Defn$<br />
• Jobd$<br />
• Organization<br />
• Period_Name<br />
• Posd$<br />
• Columns prefaced with Position$<br />
The Jobd$ and Posd$ columns appear <strong>for</strong> only the standard <strong>for</strong>m of the<br />
view. The columns prefaced with Job_Defn$ and Position$ appear <strong>for</strong> only the global <strong>for</strong>m of the<br />
view.<br />
HR_Emp_Terms_Hist<br />
The business group parameter of the answer has been modified to accept partial text strings.<br />
HR_Emp_Total_Comp<br />
The business group parameter of the answer has been modified to accept partial text strings.<br />
<strong>Noetix</strong>Answers <strong>for</strong> <strong>Oracle</strong> Install Base<br />
The following answer has been modified in this module:<br />
CSI_Instance_Relationships<br />
An answer column prefixed with ItemRel$ has been added <strong>for</strong> the System Items key flexfield.<br />
<strong>Noetix</strong>Answers <strong>for</strong> <strong>Oracle</strong> Master Scheduling/MRP<br />
The following answers have been modified in this module:<br />
Column, parameter added to answers <strong>for</strong> Master Scheduling/MRP, Capacity.<br />
For the XOP <strong>for</strong>m of the views, the Organization_Name column and organization name<br />
parameter have been added to the following answers:<br />
• CRP_Bill_Of_Resources: What resources are needed to build an item<br />
• MRP_Daily_Plans: What are the daily planning details <strong>for</strong> an item in a given plan<br />
designator<br />
• MRP_Designators: What are the names of the different Master Schedules<br />
• MRP_Exception_Items:<br />
o What are the items that raised exceptions in the MRP planning process <strong>for</strong> a given plan<br />
designator<br />
o Which items does MRP predict will have a shortage<br />
• MRP_Exception_Orders:<br />
o What orders received an exception by an MRP Plan<br />
o Which discrete jobs does MRP recommend expediting<br />
• MRP_Gross_Requirements: What are the gross requirements <strong>for</strong> a given item<br />
<strong>Noetix</strong> Corporation 32 support.noetix.com