22.01.2015 Views

Maximizing Secondary Wet Weather Treatment Capacity at ... - pncwa

Maximizing Secondary Wet Weather Treatment Capacity at ... - pncwa

Maximizing Secondary Wet Weather Treatment Capacity at ... - pncwa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Decision to Shift Oper<strong>at</strong>ing Mode is Intuitive<br />

The maximum flow r<strong>at</strong>e to Zone 1 is also an oper<strong>at</strong>or set point. Excess flow is<br />

autom<strong>at</strong>ically directed to Zone 6 of each basin.<br />

So, oper<strong>at</strong>ors don’t need to initi<strong>at</strong>e the change to wet we<strong>at</strong>her step feed.<br />

Shift to Step Feed with RAS Storage is manually initi<strong>at</strong>ed but<br />

autom<strong>at</strong>ically executed<br />

RAS<br />

Adjustable set point<br />

1 2 3 4 5 6 7<br />

Remaining Flow<br />

To <strong>Secondary</strong><br />

Clarifiers<br />

RAS<br />

1 2 3 4<br />

5<br />

6<br />

7<br />

To <strong>Secondary</strong><br />

Clarifiers<br />

Aerobic RAS Storage<br />

Primary Effluent<br />

Pipe Bridge<br />

Anaerobic<br />

Anaerobic/aerobic swing<br />

Aerobic<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!