14 - Port Canaveral
14 - Port Canaveral
14 - Port Canaveral
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>14</strong><br />
Illustration of new Cruise Terminal 6<br />
Illustration of new Cargo Berths & Marine Terminals 5/6 and 8<br />
7<br />
Recent, Ongoing and Future <strong>Port</strong> Projects<br />
15<br />
1 Cruise Terminal 6<br />
• New cruise terminal and berth able<br />
to accommodate next-generation<br />
4,000-passenger ships (scheduled<br />
for occupancy in 2012)<br />
2 New Parking Garage<br />
• Additional parking for Cruise<br />
Terminal 5 and new Cruise<br />
Terminal 6 (scheduled for<br />
completion in 2012)<br />
3 New Cargo Terminals<br />
• North cargo area site being<br />
developed for Bluewater Terminals,<br />
which includes a bulk conveyor<br />
(scheduled for completion in 2011)<br />
4 Cargo Berth 5/6 &<br />
Marine Terminal<br />
• New cargo berth (scheduled for<br />
completion in 2013)<br />
• Adjacent land available for<br />
development as terminal/<br />
storage facility<br />
5 Cargo Berth 8 & Marine Terminal<br />
• New cargo berth (scheduled for<br />
completion in 2013-<strong>14</strong>)<br />
• Adjacent land available for<br />
development as terminal/<br />
storage facility<br />
6 Inter-Agency Maritime<br />
Operations Center (IMOC)<br />
• New home of <strong>Port</strong> <strong>Canaveral</strong><br />
Police Department (dedicated<br />
March 2011)<br />
• Two additional buildings being<br />
designed for site: North side Fire<br />
Station and Operations Building<br />
7 Future Widening &<br />
Deepening of Channel<br />
• Proposed project to increase width<br />
of the harbor channel from 400<br />
feet (current) to 500 feet and<br />
deepening to accommodate larger<br />
ships<br />
Widening West Turning<br />
Basin Entrance<br />
• Current project to allow larger<br />
ships to enter the basin (scheduled<br />
for completion in 2012)<br />
9 Avocet Lagoon<br />
• New park proposed for 4-acre site<br />
near <strong>Canaveral</strong> Lock which will<br />
include an observation tower for<br />
viewing boats and local wildlife,<br />
including manatees<br />
10 Hotel & Conference Center<br />
• <strong>Port</strong>-owned 26-acre site on the<br />
Banana River, proposed for future<br />
development as landmark hotel/<br />
visitor destination complex<br />
11 Amphitheater<br />
• Potential future facility for<br />
entertainment and other<br />
public events in The Cove<br />
redevelopment area<br />
12 Cove Marketplace<br />
• Open-air marketplace featuring<br />
local artisans and Florida-themed<br />
products; open to cruise port-ofcall<br />
passengers and other <strong>Port</strong><br />
visitors (launched February 2011)<br />
13 <strong>Canaveral</strong> Cove Phase II<br />
• Welcome Center complex: 10,000<br />
square foot Welcome Center with<br />
additional 12,500 square foot<br />
exhibit or event space<br />
• Infrastructure improvements:<br />
new road; sidewalks; parking;<br />
stormwater system improvements<br />
• Pedestrian Promenade: walkway<br />
connecting George King Boulevard<br />
with waterfront<br />
(All scheduled for completion in 2013)<br />
<strong>14</strong> Jetty Park Expansion<br />
& Improvements<br />
• Pavilion general store<br />
improvements and new lounge<br />
(scheduled for completion in 2011)<br />
• 10 cabins; 25 new campsites;<br />
40 upgraded hookup sites; 2<br />
additional picnic pavilions; new<br />
paved and stabilized roadways;<br />
infrastructure in playground for<br />
future interactive fountain<br />
15 Customs & Border Protection<br />
Relocation to New Building<br />
• 1.65-acre site at 200 George King<br />
Boulevard leased by U.S. Customs<br />
and Border Protection<br />
• Former <strong>Canaveral</strong> <strong>Port</strong> Authority<br />
headquarters building demolished<br />
in preparation for construction of<br />
new CBP offices<br />
2<br />
6<br />
5<br />
1<br />
2011<br />
State of the<br />
3<br />
8<br />
4<br />
9<br />
12<br />
13<br />
11<br />
10<br />
445 Challenger Rd, Suite 301 • Cape <strong>Canaveral</strong>, FL 32920 USA • 1-888-767-8226 TEL: 321-783-7831 • FAX: 321-784-6223 • www.portcanaveral.com<br />
D E V E L O P M E N T P L A N<br />
WJP#9866 /2500 /4-11
PORT CANAVERAL<br />
DEVELOPMENT MAP<br />
BANANA<br />
RIVER<br />
PORT<br />
ENTRANCE<br />
NORTH<br />
TO LOCK/BARGE CANAL/<br />
INTRACOASTAL WATERWAY<br />
AVOCET LAGOON<br />
TO COCOA/ORLANDO<br />
SR 401<br />
CHARLES M. ROWLAND DR.<br />
Pier and Berth Draft Limits<br />
Depth in Feet<br />
SOUTH CARGO PIERS<br />
PARKING<br />
PARKING<br />
GARAGE<br />
Depth in Meters<br />
1 34 10.3<br />
2 36 10.9<br />
3 36 10.9<br />
4 39 11.8<br />
5 39 11.8<br />
TANKER BERTHS<br />
1 39 11.8<br />
2 39 11.8<br />
NORTH CARGO PIERS<br />
1 38 11.5<br />
2 38 11.5<br />
3 32 9.7<br />
4 34 10.3<br />
5/6 35 10.6<br />
8 35 10.6<br />
CRUISE TERMINALS<br />
2 33 10.0<br />
3 33 10.0<br />
4 31 9.4<br />
5 32 9.7<br />
6 35 10.6<br />
8 31 9.4<br />
10 33 10.0<br />
CRUISE TERMINAL DR.<br />
BOAT RAMPS<br />
PARKING<br />
CT5 & 6<br />
PARKING<br />
GARAGE<br />
PKG<br />
CT8<br />
PARKING<br />
PARKING<br />
GARAGE<br />
CT6<br />
CT10<br />
RODNEY S. KETCHAM<br />
PARK<br />
CT5<br />
DISNEY<br />
CRUISE<br />
LINE<br />
PARKING<br />
S.R. 528 BEACHLINE<br />
BANANA<br />
RIVER<br />
Gulf of<br />
Mexico<br />
NCB8<br />
SCALLOP DR.<br />
WEST<br />
TURNING<br />
BASIN<br />
35 MLW feet /<br />
10.6 meters<br />
MARINA DISTRICT<br />
COMMERCIAL PARK<br />
F L O R I D A<br />
MULLET ROAD<br />
HOTEL AND<br />
CONFERENCE<br />
CENTER<br />
Atlantic<br />
Ocean<br />
MARINE<br />
TERMINAL<br />
SNAPPER RD.<br />
FIRE<br />
STATION<br />
COAST<br />
GUARD<br />
OPERATIONS<br />
FACILITY<br />
GROUPER RD.<br />
NCB5/6<br />
BLUEWATER DR.<br />
MARINE<br />
TERMINAL<br />
SECURITY<br />
GATE<br />
PORT<br />
ENTRANCE<br />
SOUTH<br />
CITY OF<br />
CAPE CANAVERAL<br />
<strong>Port</strong> <strong>Canaveral</strong><br />
Latitude: 28° 24’ 46” North<br />
Longitude: 80° 3’ 49” West<br />
MARINE<br />
TERMINAL<br />
INTER-AGENCY<br />
MARITIME<br />
OPERATIONS<br />
CENTER<br />
MAGELLAN RD.<br />
NORTH<br />
INTERMODAL<br />
GATE<br />
DAVE NISBET DR.<br />
PORT PROPERTY<br />
BLUE WATER<br />
TERMINALS<br />
BULK<br />
CONVEYOR<br />
THE COVE/<br />
RESTAURANT/<br />
RETAIL AREA<br />
GLEN CHEEK DR.<br />
COVE MARKETPLACE<br />
ROAD EXPANSION<br />
CARGO<br />
YARD<br />
HANSON<br />
SLAG<br />
CEMEX<br />
SILOS<br />
NCP4<br />
SR 401<br />
BOAT<br />
RAMPS<br />
CANAVERAL COVE FPL<br />
PHASE II<br />
FUTURE<br />
AMPHITHEATER<br />
A1A SOUTH<br />
(ASTRONAUT BLVD.)<br />
BEACHES/HOTELS<br />
PAYNE WAY<br />
FLOUNDER ST.<br />
ATLANTIS RD.<br />
OFFICE<br />
PARK<br />
Atlanta, GA<br />
(436 miles/703 km)<br />
Birmingham, AL<br />
(507 miles/817 km)<br />
Charleston, SC<br />
(310 miles/499 km)<br />
Charlotte, NC<br />
(471 miles/757 km)<br />
CONTAINER RD.<br />
SEAPORT<br />
CANAVERAL<br />
FUEL TERMINAL<br />
CARGO RD.<br />
SNOOK RD.<br />
DOLPHIN RD.<br />
GEORGE J. KING BLVD.<br />
WHSE.<br />
COLUMBIA RD.<br />
MORTON<br />
SALT<br />
CPA<br />
CARGO<br />
YARD<br />
NCP3<br />
FPL BARGE<br />
BERTH<br />
FREDDIE<br />
PATRICK<br />
PARK<br />
GENON<br />
OFFICE<br />
PARK<br />
FTZ<br />
DISCOVERY RD.<br />
ARMY WAREHOUSE RD.<br />
TRANSPORTATION<br />
WHARF<br />
RO/RO<br />
RAMP<br />
SCP5<br />
NCP2 NCP1<br />
SDDC<br />
832ND<br />
CAPE CANAVERAL<br />
DETACHMENT<br />
POMPANO ST.<br />
MIDDLE<br />
TURNING<br />
BASIN<br />
40 MLW feet /<br />
12.1 meters, planned<br />
to 43 MLW feet<br />
TB2<br />
CHALLENGER RD.<br />
PASS & I.D.<br />
SCP4<br />
MARLIN ST.<br />
BULK<br />
CONVEYOR<br />
CANAVERAL PORT<br />
AUTHORITY<br />
MARITIME CENTER<br />
FIRE STATION,<br />
PORT CANAVERAL<br />
MARITIME ACADEMY<br />
& TOWER<br />
TB1<br />
CONTINENTAL<br />
CEMENT<br />
Distances to key markets from the <strong>Port</strong><br />
Freeport, The Bahamas<br />
(171 miles/275 km)<br />
Jacksonville, FL<br />
(<strong>14</strong>0 miles/226 km)<br />
Knoxville, TN<br />
(560 miles/901 km)<br />
Miami, FL<br />
(183 miles/295 km)<br />
Nassau, The Bahamas<br />
(3<strong>14</strong> miles/505 km)<br />
FTZ<br />
POMPANO ST.<br />
WACHOVIA<br />
BANK<br />
SCP3<br />
SPRINT RD.<br />
HERRING ST.<br />
HERCULES RD.<br />
PORT<br />
BADGING<br />
MARTIN MARIETTA<br />
MATERIALS<br />
AGGREGATE<br />
TERMINAL<br />
Orlando, FL<br />
(31 miles/50 km)<br />
Raleigh, NC<br />
(522 miles/840 km)<br />
Richmond, VA<br />
(653 miles/1053 km)<br />
Savannah, GA<br />
(254 miles/410 km)<br />
Tampa, FL<br />
(123 miles/198 km)<br />
NAVAL<br />
ORDNANCE<br />
TEST UNIT<br />
(NOTU)<br />
POSEIDON<br />
WHARF<br />
SCP2<br />
HERRING ST.<br />
ASI WAREHOUSES<br />
AND STORAGE<br />
YARDS<br />
NORTH ATLANTIC AVE.<br />
BASIN RD.<br />
SCP 1<br />
SOUTH<br />
INTERMODAL<br />
GATE<br />
CAPE<br />
CANAVERAL<br />
AIR FORCE<br />
STATION<br />
FUTURE CUT TO WIDEN CHANNEL<br />
Channel 40 MLW Feet/12.1 meters, planned to 44 MLW feet<br />
CT2<br />
CT3<br />
CHRISTOPHER COLUMBUS DR.<br />
CT2 PARKING<br />
CUSTOMS &<br />
BORDER PATROL<br />
(CBP)<br />
CBP EXPANSION<br />
KENNEDY<br />
SPACE<br />
CENTER<br />
CT3 PARKING<br />
GEORGE J. KING BLVD.<br />
TRANSMONTAIGNE<br />
FUEL TERMINAL<br />
Map Legend<br />
TRIDENT<br />
BASIN<br />
PARKING<br />
= NORTH SIDE OF PORT<br />
A SIDE CRUISE TERMINALS<br />
CT5 — Carnival Cruise Lines<br />
Norwegian Cruise Line<br />
CT8 — Disney Cruise Line<br />
CT10 — Carnival Cruise Lines<br />
Royal Caribbean International<br />
= SOUTH SIDE OF PORT<br />
B SIDE CRUISE TERMINALS<br />
CT2 — Victory Casino Cruises<br />
CT3 — Carnival Ecstasy<br />
(Beginning Nov. 7, 2011)<br />
CT4<br />
CT4 PARKING<br />
CAMPING<br />
CABINS<br />
GUARD<br />
GATE<br />
SUBMARINE<br />
WHARF<br />
MILITARY<br />
PROPERTY<br />
REGISTRATION<br />
JETTY<br />
PARK<br />
PAVILION<br />
CAMPGROUNDS<br />
JETTY PARK DR.<br />
CITY OF<br />
CAPE CANAVERAL<br />
CONCESSIONS,<br />
BAIT & SNACK BAR<br />
BEACHES & FISHING<br />
PARKING<br />
= GATE<br />
CT = CRUISE TERMINAL<br />
NCB = NORTH CARGO BERTH<br />
NCP = NORTH CAGO PIER<br />
SCP = SOUTH CARGO PIER<br />
TB = TANKER BERTH<br />
CARGO TERMINALS<br />
CONTROLLED ACCESS ROADS<br />
FTZ (Foreign Trade Zone)<br />
FUEL STORAGE<br />
POTENTIAL FUTURE PROJECTS<br />
MARINA DISTRICT<br />
PARKS<br />
THE COVE/RESTAURANTS/RETAIL AREA<br />
UNDER CONSTRUCTION<br />
Entrance Channel 44 MLW feet / 13.4 meters,<br />
planned to 46 MLW feet<br />
BOARDWALK<br />
MALCOLM E. McLOUTH<br />
FISHING PIER<br />
BEACH CONCESSIONS<br />
& RENTALS<br />
YEAR-ROUND<br />
LIFEGUARDS<br />
ATLANTIC<br />
OCEAN