11.07.2015 Views

addendum 1 to request for proposal step 2 - Port Canaveral

addendum 1 to request for proposal step 2 - Port Canaveral

addendum 1 to request for proposal step 2 - Port Canaveral

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ADDENDUM 1TO REQUEST FOR PROPOSALSTEP 2- TECHNICAL AND PRICE PROPOSAL FORCRUISE TERMINAL NO. 6 MOBILE GANGWAYPUR-RFP-11-9/CN 11-003FORCANAVERAL PORT AUTHORITYSeptember 29, 2011This <strong>addendum</strong> is issued as part of the Bidding Documents <strong>for</strong> the above described project. The changesincorporated in this <strong>addendum</strong> shall be considered as a part of the documents and shall supersede, amend, add<strong>to</strong>, clarify, or subtract from those conditions shown in the original documents. The bidder shall take care <strong>to</strong>coordinate modifications herein with all trades and disciplines related <strong>to</strong> the work. The Bidder shallacknowledge receipt of this <strong>addendum</strong> on the Bid Form by <strong>addendum</strong> number and date. Failure <strong>to</strong> do so maysubject Bidder <strong>to</strong> disqualification.SENT VIA U-SEND-IT – 2 PAGES TOTAL________________________________________(NAME OF YOUR COMPANY)NOTE:PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIAE-MAIL OR FAX <strong>to</strong> KAREN PAPPAS. KPAPPAS@PORTCANAVERAL.COM or (321) 783-3522 FaxTHIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.GENERAL1. THE PROPOSAL SUBMISSION DATE REMAINS WEDNESDAY,OCTOBER 5, 2011at 2:00 PM (EDT).SPECIFICATIONS1. There are no specification changes at this time.DRAWINGS1. There are no drawing changes at this time.QUESTIONS AND RESPONSES:1. QUESTION 001: The Bid Bond, according <strong>to</strong> the specifications, should be in anamount equal <strong>to</strong> 5% of the "<strong>to</strong>tal <strong>proposal</strong> amount". Can you please in<strong>for</strong>m if this "<strong>to</strong>tal<strong>proposal</strong> price" includes or excludes the Additive Alternate Bid Item 1?RESPONSE: Bid Bond amount shall be based on the "Sum of Base Bid Items 1through 3" as identified on the Proposal Bid Form. "Additive Alternate Bid Item 1" doesnot need <strong>to</strong> be included in the Bid Bond amount.PUR-RFP-11-9/CN 11-003 ADDENDUM 1/PAGE 1 OF 2 STEP 2


STEP 2 - CT 6 MOBILE GANGWAYPUR-RFP-11-9/CN 11-0032. QUESTION 002: Are the Proposers <strong>to</strong> submit a base bid <strong>for</strong> each option identified inthe plans?RESPONSE: No. Each proposer can select an option which best suits them <strong>to</strong> submittheir base bid amount. A Proposer can submit an alternate base bid design, differentfrom the options presented as long as sufficient details allow <strong>for</strong> a complete review bythe Design Engineer and the <strong>Canaveral</strong> <strong>Port</strong> Authority and meet the requirementsidentified <strong>for</strong> building and ship connections, slope, life safety, s<strong>to</strong>res access.END OF ADDENDUM #1Issued via USendItbyauthority of the <strong>Canaveral</strong> <strong>Port</strong> AuthorityPUR-RFP-11-9/CN 11-003 ADDENDUM 1/PAGE 2 OF 2 STEP 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!