26.01.2015 Views

ICPE ACTEL's solutions used in offshore and ... - Petroleumclub.ro

ICPE ACTEL's solutions used in offshore and ... - Petroleumclub.ro

ICPE ACTEL's solutions used in offshore and ... - Petroleumclub.ro

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Power management efficiency – exemple<br />

One drill<st<strong>ro</strong>ng>in</st<strong>ro</strong>ng>g rig (<st<strong>ro</strong>ng>offshore</st<strong>ro</strong>ng> or onshore) uses<br />

Diesel motor- generator sets of CAT 3512 type,<br />

1500 kVA(1050 kW), 3 x 600 V, 50 Hz.<br />

Register rule:<br />

1 drill<st<strong>ro</strong>ng>in</st<strong>ro</strong>ng>g rig = 1 Diesel motor- generator set spare part + 4 Diesel motorgenerator<br />

sets<br />

Maxim power = 2 pumps x 2 motors x 850 kW + 1 turn table x 600 kW =<br />

4000 kw<br />

Number of necessary sets for work<st<strong>ro</strong>ng>in</st<strong>ro</strong>ng>g = 4000 kW/1050 kW = 4 x CAT 3512<br />

sets<br />

About parameter <st<strong>ro</strong>ng>and</st<strong>ro</strong>ng> depth drill<st<strong>ro</strong>ng>in</st<strong>ro</strong>ng>g is possible a necessary power less<br />

3000 kW.<br />

Classical solution<br />

1 set rested <st<strong>ro</strong>ng>in</st<strong>ro</strong>ng> operation, no-load : consumption = 500l/h oil gas<br />

Power management solution<br />

- equilibration of work time of motors on the rig<br />

- economies of 500 l oil gas /h/set<br />

- decreas<st<strong>ro</strong>ng>in</st<strong>ro</strong>ng>g with 30% the ma<st<strong>ro</strong>ng>in</st<strong>ro</strong>ng>tenance cost<br />

- at 5 sets, 1 set rest spare.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!