26.01.2015 Views

Startup and Shutdown - ITW Futura Coatings

Startup and Shutdown - ITW Futura Coatings

Startup and Shutdown - ITW Futura Coatings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Daily <strong>Startup</strong><br />

(con’t)<br />

• Check wet cups - Replace plasticizer<br />

as required<br />

• Open both material supply valves<br />

<strong>and</strong> pressurize the transfer pumps.<br />

• Switch on all material heaters <strong>and</strong><br />

insure they are set to the proper<br />

temperature.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!