26.01.2015 Views

Startup and Shutdown - ITW Futura Coatings

Startup and Shutdown - ITW Futura Coatings

Startup and Shutdown - ITW Futura Coatings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Daily <strong>Startup</strong><br />

(con’t)<br />

• Turn proportioner on <strong>and</strong> set to required<br />

pressures. Insure that the “A” <strong>and</strong> “B”<br />

gauges are at approximately equal<br />

pressures (on “Gusmer” equipment, the<br />

pump switch should be in the normal<br />

position).<br />

• When hose heat is up to temperature, open<br />

the material valves at the spray gun <strong>and</strong><br />

check for leaks.<br />

• Test spray until a good spray pattern <strong>and</strong><br />

cure is obtained.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!