ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

January 23, 2013<br />

ADDENDUM <strong>No</strong>. 01<br />

Request for Proposals (RFP) Number IT-022<br />

SAP Upgrade<br />

District’s 4.7C Enterprise System to SAP ECC 6.0<br />

PROJECT ID: 40J-J05.18<br />

NOTICE TO PROPOSERS:<br />

THIS ADDENDUM FORMS A PART OF THE CONTRACT DOCUMENTS AND MODIFIES THE ORIGINAL RFP<br />

DOCUMENTS POSTED January 15, 2013. PLEASE ACKNOWLEDGE RECEIPT OF THE ADDENDUM IN THE SPACE<br />

PROVIDED ON EXHIBIT “9” TO THE ORIGINAL RFP. FAILURE TO DO SO MAY SUBJECT PROPOSER TO<br />

DISQUALIFICATION.<br />

The Contract Documents for the District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

are hereby modified. <strong>Addendum</strong> <strong>No</strong>. 01 consists of the questions received and the answers furnished.<br />

1


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

Request for Proposals (RFP) Number IT-022<br />

SAP Upgrade<br />

RFP Questions & Answers<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

1. It is mentioned in the RFP that the response be limited to total 60<br />

pages. Kindly suggest if the resumes of the proposed consultants<br />

are also counted in these 60 pages<br />

2. There seems to be typo on page 10 of 10 on “SAP Upgrade SOW<br />

Ver 1 10 13” regarding project duration. It mentions the start of<br />

project as Feb 1, 2012 . Kindly suggest the likely start date of the<br />

project.<br />

3. In the SOW document - the required resource does not have any<br />

mention of Functional Finance Lead (FI/CO, FM, GM), Functional<br />

Purchasing (MM/IM/PM) lead and ESS lead etc., have not been<br />

mentioned. Does <strong>LACCD</strong> expect vendor to provide these<br />

resources<br />

4. The pricing form does not ask for Individual Contribution and<br />

Costing. For example, under Classification 3 : Team Members for<br />

“Phase I-Project Preparation", if we have multiple consultants<br />

working, do you want us to provide the total cost or do you want us<br />

to break the cost for each Individual<br />

5. Within SOW Attachment 2, please confirm whether <strong>LACCD</strong> will<br />

assign a dedicated PM apart from the Vendor PMO.<br />

6. Within SOW Attachment 2, please confirm whether, although<br />

the majority of the work will be done onsite, <strong>LACCD</strong> would allow<br />

utilization of Offsite and/or Offshore resources<br />

7. Public Sector references: Is <strong>LACCD</strong> open for corporate<br />

references for SAP Upgrade<br />

8. General Request: We need at least 1 week time from the day<br />

<strong>LACCD</strong> responds to questions and final submission of<br />

response. Will this be provided to all bidders<br />

9. The SAP version mentioned in the SOW section states that it is<br />

4.7C. Is it 4.7 with enterprise version 2 or 4.6C<br />

10. Is Solution Manager 7.0 or above installed If not, is installation<br />

of Solution Manager part of the scope (it is required by SAP to<br />

have Solution Manager installed for an Upgrade)<br />

11. Is Unicode migration a part of upgrade plan If yes, will it be<br />

done in one cycle (along with upgrade) or two cycles (first<br />

technical upgrade, then Unicode conversion)<br />

Resumes are not included in the page count. However,<br />

resumes should be limited to three pages each.<br />

This should read “Feb 1, 2013”, and be advised that the<br />

contract date is subject to Board of Trustee approval.<br />

This is a technical upgrade. Regression testing will be<br />

completed with internal staff.<br />

Individual costs with a total.<br />

Yes, <strong>LACCD</strong> will assign an internal resource. See chart<br />

depicting project responsibility.<br />

On site only.<br />

This is not mandatory, just nice to know. <strong>No</strong> vendor will be<br />

excluded if they only have private sector experience.<br />

This response is posted to the web site one week before<br />

proposals are due.<br />

4.7C Enterprise.<br />

Yes, it needs to be installed as part of the upgrade.<br />

<strong>No</strong>, Unicode is not required.<br />

2


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

12. Describe the security environment in your SAP production Role based.<br />

landscape (Profile vs. Role based)<br />

13. Do you use any third party tool for segregation of duties, such Security Weaver SOD is installed but not used.<br />

as SOD Tools (Virsa, etc.)<br />

14. How would you categorize the Custom Code in your system Some low, some medium and some high.<br />

(Low, Medium, High)<br />

15. How many concurrent users per site/module do you have We do not track by modules.<br />

16. Which different languages do you use English only.<br />

17. What is the Current SAP kernel version, patch number 413<br />

18. What are the interfaces and their versions/release numbers to<br />

external or related systems Can you share a high level<br />

We do not have many external interfaces. If any needs to be<br />

changed as part of the upgrade <strong>LACCD</strong> will make the changes.<br />

interface diagram indicating the various systems<br />

19. What is the current Production database capacity and % 650GB<br />

utilized<br />

20. What is the current Project (PRD) DB growth per month ~10GB per month<br />

21. What is the Back Up procedure (schedule, method & tools) Schedule: Every Sunday at 6pm<br />

Method: Crontab<br />

Tool: BRBACKUP/Data Protector<br />

22. What is the time required for a complete database backup ~3 hours<br />

23. For high availability systems: what specific tools, systems are in <strong>No</strong>ne implemented.<br />

place to ensure high availability<br />

24. Number of servers comprising the Production system (ex: One 1 server (DB + AS)<br />

DB + One CI + two App Servers)<br />

25. Do you currently have excess hardware available to create a<br />

POC/Sandbox/DEV upgrade environment<br />

Information provided in SOW. A parallel environment will be<br />

created with a new DEV, New QAS, new Sandbox<br />

environments<br />

26. Can you share the storage architecture with us Yes. HP StorageWorks P6000 using fibre channel<br />

27. What is the hardware make, model, capacity and speed of HP<br />

SAN<br />

28. Current OS Version and Patch HPUX 11.31-0709<br />

29. Current DB Version and Patch Oracle 10.2.0.4 patch set 3<br />

30. Current SAP Kernel Patch 413<br />

31. Current SAP Version 4.7 Enterprise<br />

32.<br />

Current SAP system Landscapes<br />

See diagram included in RFP.<br />

3


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

33. What are the current process/technology pain points that need Minimize down time and convert the custom programs.<br />

to be addressed during the upgrade or Post Upgrade<br />

34. How many resources from your IT department will be available Any many as is necessary to complete the schedule on time.<br />

for the duration of the upgrade and in what capacity<br />

35. How many business users (i.e. managers, business subject This is a technical upgrade. But the necessary business<br />

matter experts) will be available for the duration of the project resources will be made available.<br />

and in what capacity<br />

36. Are there any <strong>No</strong>n-SAP interfaces If yes, please list in each Again, <strong>LACCD</strong> will handle interfaces changes. See below for<br />

area.<br />

the number of interfaces.<br />

37. How many Unit Tests and Integration test scenarios (preferably There is an extensive list of test cases. Integration test cases<br />

functional area wise) are currently used<br />

as well.<br />

38. How many end to end processes/cycles do you have in each of Need more information in order to answer.<br />

the following functional areas<br />

39. How updated are the test scripts They are updated quarterly and weekly as needed.<br />

40. How many Z objects and Z Tables are in the <strong>LACCD</strong>’s<br />

environment, and how many of these are specific to HR<br />

237 custom tables<br />

796 Custom reports – 379 in HR<br />

40 SAP scripts - 22 in SAP HR<br />

Around 25 Outbound Interfaces<br />

Around 5 Inbound Interfaces<br />

481 Z transactions – 336 in SAP HR<br />

5 Batch Input programs<br />

35 – User Exits<br />

44 –BADI implementations<br />

SAP HR:<br />

148 custom tables<br />

379 Custom reports<br />

22 SAP scripts<br />

Around 20 Outbound Interfaces<br />

Around 3 Inbound Interfaces<br />

336 Z transactions<br />

5 Batch Input programs<br />

15 – User Exits<br />

36 –BADI implementations<br />

4


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

41.<br />

Has the <strong>LACCD</strong> modified any SAP code not using standard<br />

enhancement techniques<br />

Yes. The following SAP objects have been repaired using the<br />

Modification assistant: 41 Programs/includes;13 classes/<br />

interfaces; 28 Function Groups; 18 Data dictionary object<br />

42. How much HR testing did the initial implementation require<br />

(how many resources and how long did it take)<br />

43. In Quality Center, are there any existing test cases that can be<br />

leveraged<br />

44. Are BW and EP being upgrade as well If so, is there work<br />

included in the RFP<br />

45. Why is there no testing listed in the RFP for functionality outside<br />

HR (i.e. FI, MM, PM, etc.)<br />

46.<br />

Does the <strong>LACCD</strong> currently use SAP Solution Manager If so,<br />

what version, what functionalities are utilized and how<br />

extensively<br />

47. In what areas (business, functional, and technical) do <strong>LACCD</strong><br />

individuals require knowledge transfer and training<br />

48.<br />

How many individuals require training, and how long do you<br />

expect that training to take<br />

49. How many people and what skill sets will <strong>LACCD</strong> commit to the<br />

upgrade What percentage of their time will be devoted to the<br />

upgrade<br />

50.<br />

What extension set is <strong>LACCD</strong> using (1.10 or 2.00)<br />

51.<br />

52.<br />

What are all the components installed (i.e. the list from SPAM)<br />

What additional components, if any, have been installed<br />

modifications.<br />

This was many years ago and with different variables. This is a<br />

technical upgrade.<br />

Yes.<br />

BW and EP will be upgraded outside of the ECC 6.0 upgrade.<br />

This is a technical upgrade. Testing outside of HR will be<br />

completed with internal staff.<br />

Yes, Solution Manager v7.01 & v7.1.<br />

-EarlyWatch<br />

-Maintenance Optimizer<br />

-CCMS<br />

This is a technical upgrade. Knowledge transfer will need to<br />

occur.<br />

We do not know how long the training will take until we have an<br />

idea on what needs to be trained. The basis staff is a team of<br />

three (3).<br />

This is a technical upgrade. Regression testing will be handled<br />

internally for everything other than HR payroll and security for<br />

the most part.<br />

2.00<br />

SAP_BASIS; SAP_ABA; SAP_APPL; SAP_HR; ABA_PLUS;<br />

EA-IPPE; PI; PI_BASIS; ST-PI; WP-PI; EA-APPL; EA-DFPS;<br />

EA-FINSERV; EA-GLTRADE; EA-HR; EA-PS; EA-RETAIL;<br />

CPROJECTS; ST-A/PI<br />

See the RFP for a list of the SAP modules in use. Security<br />

Weaver and EPI_USE tools are other modules in place. Also<br />

MRS will be another module.<br />

53. As part of the project, would you be willing to have DB refreshes<br />

performed from a copy of PRD to all non-PRD systems<br />

That depends on the design. We would not rule it out at this<br />

point.<br />

5


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

54. Oracle DB 10.2.0.4.0 is out of support. Do you plan to upgrade Yes. The vendor should include the DB upgrade to 11 as part<br />

your DB to 11<br />

of the deliverables.<br />

55. Unicode or <strong>No</strong>n-Unicode If <strong>No</strong>n-Unicode, do you plan to See note above. <strong>No</strong>n-Unicode.<br />

switch in conjunction with the upgrade<br />

56. Do you have any restrictions which would not allow Local resources only.<br />

development done offshore<br />

57.<br />

How many Z Objects do you have in the system<br />

See answer to question 40.<br />

58. Who will be performing the Q&A Testing See the SOW.<br />

59. How large are the systems <strong>No</strong>t enough information is provided for the District to answer.<br />

60. On the RFP mentions the firm must have 5 years of Upgrade<br />

Experience. We are an SAP Consulting Company. Our<br />

company was formed two years ago but the founder has been<br />

doing SAP Basis for over 14 years (with over 15 SAP<br />

upgrades). Do we qualify for this project<br />

61. Can you please provide the team structure at <strong>LACCD</strong> that will<br />

be working with the consulting firm for the upgrade Would help<br />

to know the shared responsibilities between the consulting firm<br />

and <strong>LACCD</strong>.<br />

62. What is the expected timeline for the complete upgrade Any<br />

specific milestones attached to timeline<br />

63.<br />

What are the other systems (SAP and 3rd party) connected to<br />

ERP system It would be nice to have the landscape.<br />

64. Can we have details of Hardware, OS and databases along with<br />

the type of support <strong>LACCD</strong> has signed up to the respective<br />

vendor<br />

65. Do we have any incumbents for this RFP Any current vendor<br />

working In similar arena bidding on this project If yes, specific<br />

pain points with the current vendor.<br />

66.<br />

Which personnel does the District confirmed “key” personnel<br />

67. Was an upgrade assessment performed by SAP, and if so, is<br />

that assessment available<br />

Yes, if the employee experience is there.<br />

See the responsibility chart that is part of the RFP and SOW.<br />

See the SOW.<br />

See the landscape diagram that is part of the RFP. The 3 rd<br />

party external system that are interfaced are SIS (Student<br />

Information System and Protocol (Scheduling),<br />

See the landscape diagram that is part of the RFP. The vendor<br />

HW is HP.<br />

The RFP defines the intent of the District.<br />

Functional and management resources.<br />

<strong>No</strong>.<br />

6


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

68.<br />

See the RFP and SOW. Functional Test cases outside of HR<br />

Please confirm that test cases will be developed by <strong>LACCD</strong><br />

Payroll and security will be completed for <strong>LACCD</strong> for the most<br />

personnel<br />

part.<br />

69.<br />

We do not gather that information at this time.<br />

How many end to end business process scenarios/test cases<br />

70. Avg no of unique transactions (unique field flow/screen flow) in<br />

each test case<br />

71.<br />

How many data variations in each test case<br />

We do not gather that information at this time.<br />

We do not have that metric. The test cases are very detailed.<br />

72. How many Security Roles <strong>No</strong>t enough information is provided for the District to answer.<br />

73. Is testing automation in scope If yes, do you own HP QTP or<br />

any other test automation tool<br />

74. How many golden transactions/test cases to be tested for<br />

performance testing<br />

75.<br />

Number of virtual users<br />

76. Do you own HP Load Runner/Performance Center with SAP<br />

protocol<br />

77. You have mentioned in your Statement of Work document,<br />

section #4 last paragraph, that you have already procured the<br />

necessary hardware for the upgrade. What hardware have you<br />

procured and is it IA64 – Itanium platform.<br />

78. What is the downtime window for Production (Maximum<br />

possible allowed) and are there any additional restrictions on<br />

downtime<br />

79. Do you have SAP Solution Manager implemented in the<br />

landscape If yes, please confirm the version and whether<br />

maintenance optimizer is used in the landscape; in addition to<br />

that, please provide the support package details.<br />

80. Based on the typical restrictions (academic calendar), have you<br />

decided upon the go-live date (or) Are there any restrictions to<br />

go-live before / after any specific date<br />

81. What are the current pain points with the existing infrastructure,<br />

technical, functional, security, etc. Please provide a detailed<br />

view by module or business process or technical issues.<br />

See RFP. QTP and HP QC are the <strong>LACCD</strong> main testing tools<br />

used to certify quality.<br />

To be determined as part of the upgrade. See modules in use<br />

at <strong>LACCD</strong> as a guide.<br />

All users operate on virtual machines.<br />

<strong>No</strong><br />

Yes, have procured and installed the HW. HP Blades BL870. It<br />

is Itanium.<br />

We need to work within the academic calendar for taking the<br />

system off line. The method for the upgrade is minimizing<br />

down time.<br />

See answer above.<br />

To be determined as part of the blue print. But we do need to<br />

take into account the academic calendar year.<br />

The District needs to move from one release to another. This is<br />

a technical upgrade.<br />

7


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

82. Are there any projects currently being executed If yes, please There are projects in development. But they should have no or<br />

let us know whether there is any impact to upgrade due to the minimal impact on the upgrade project.<br />

current projects<br />

83. Did you ever perform a release upgrade before for the SAP We apply support packs quarterly.<br />

systems in scope If yes, please provide us the details of<br />

source version and target version.<br />

84. Who would be responsible for the ORACLE upgrade database See answer above.<br />

upgrade<br />

85. Please furnish detailed support pack levels & Database size for See above.<br />

each of the systems in the landscape (not limited to ECC, but<br />

also for all the integrated systems such as portal, ITS, etc.)<br />

86. Who is responsible for managing the infrastructure such as Information Technology (IT)<br />

hardware, operating system, backup, etc.<br />

87. Do you currently, or after the upgrade, plan to utilize a High To be determined as part of the blue print phase. But no plans<br />

Availability / Disaster Recovery set up<br />

at this time.<br />

88. Please list all 3rd party applications and their versions (such as BSI Tax Factory version 9H. EPI USE, Security. Weaver.<br />

MQ Series, Gentran, TAXWARE, etc.) being used in the current<br />

SAP Landscape.<br />

89. Which are the third-party add-ons currently installed on the See answers above.<br />

current landscape (i.e. PBS, IXOS, etc.,)<br />

90. Please provide the list of interfaces which are connected to R/3 See answers above.<br />

Landscape<br />

91. Do you foresee any risk with the upgrade project from your There is always some risk. But nothing unusual is identified for<br />

perspective<br />

this project.<br />

92. We assume that a project landscape for each of the systems<br />

(including production) will be built or created for the entire<br />

project duration. Please confirm. If not, please confirm whether<br />

you are planning to perform in-place upgrade In case of inplace<br />

upgrade, please share the plan for code-freeze<br />

93. Please confirm the total number of project systems that are to<br />

be upgraded Are you planning to perform a system copy from<br />

an upgraded system to any of the project systems in the<br />

landscape If yes, please let us know the number of systems<br />

those will be copied from upgraded systems.<br />

The will be determined as part of the blue print. We will build a<br />

dual landscape using a minimize down time strategy. The HW<br />

for the projects is outlined in the SOW. The HW is already on<br />

site and installed for the most part.<br />

See SOW for the project diagram. The plan is not to upgrade<br />

the project box. The plan is to have any projects completed<br />

before the upgrade is completed, or to move the upgrade boxes<br />

as they are made available.<br />

8


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

94. Are you planning to go for selective EHP installation / full EHP The is a technical upgrade only at this time as identified in the<br />

installation If selective installation, Have you decided the SOW.<br />

business functions/technical usage to be activated as part of the<br />

upgrade project If yes, please list details.<br />

95. Is there any other SAP system installed on the same server, if<br />

so please specify the affordability of downtime of these servers.<br />

<strong>No</strong>.<br />

96. Do you have existing test scripts for your scenarios Do you<br />

use any other test automation tools like Test Data Migration<br />

Server (TDMS), Test Acceleration and optimization (TAO), etc.<br />

97. Have you utilized, or plan to utilize, any upgrade impact<br />

analysis using tools like Business Process Change Analyzer<br />

(BPCA), Panaya, etc. If yes, have you been able to identify<br />

how many scenarios are impacted that will need to be tested<br />

98. How many custom objects do you have and do you currently, or<br />

as a result of this upgrade, plan to utilize Custom Code<br />

Lifecycle Management (CCLM)<br />

99.<br />

100.<br />

To what degree can test scripts from previous project be<br />

reused Can the District estimate the number of test scripts to<br />

be developed by area<br />

Has <strong>LACCD</strong> already started the procurement process for the<br />

parallel landscape<br />

101. The current server environment is listed as HPUX 11.23 with<br />

Oracle 10.2/10.3 but also that it is HP Virtualized - please<br />

confirm if the entire current and future landscape is virtualized in<br />

this fashion<br />

102. TREX is mentioned but not shown in the landscape diagrams.<br />

Please confirm how many instances of TREX are used and<br />

what version and OS/DB<br />

103. Are current sandbox systems representative of production<br />

systems (all SAP components and patches, OS patches,<br />

database patches etc.) or will we need to refresh these systems<br />

from PRD/QA as part of this project<br />

Yes, see answers above and the SOW for information on<br />

HPQC.<br />

See the SOW. We look at our project partner to use their own<br />

tools if needed.<br />

See answers above.<br />

The only test scripts the project partner will need to develop are<br />

HR payroll and security and Technical related. Test Scripts<br />

outside for other functional areas will be completed by <strong>LACCD</strong><br />

staff. There is an extensive library of test scripts are already.<br />

See answers above. The HW has already been procured and<br />

installed for the most part.<br />

11.31 is the HP UX version. Oracle is 10.2.0.4. Yes all<br />

virtualized.<br />

One version of TREX. The upgrade of TREX will handled by<br />

<strong>LACCD</strong> staff. TREX is not part of the upgrade scenario.<br />

Yes, they are representative.<br />

9


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

104. Please provide some information about existing backup/restore See answer above.<br />

method and duration. This upgrade will involve a few backups<br />

and we need to know how much time this may add to the<br />

process.<br />

105. Any high-availability or clustering that may impact the upgrade See answers above. HA will not impact the upgrade.<br />

106. Where does Adobe Document Services (ADS) currently run In EP6.0 and BW at this time.<br />

107. Are EarlyWatch Alerts available for PRD systems Yes<br />

108. Apart from ESS which other business services are running on PCR, eBTA(custom), Time Management, MSS, Online Open<br />

the portals<br />

Enrollment(custom) and Work Request(Custom)<br />

109. What is the size of each system 650 GB D/B for each system<br />

110. Is BSI or another payroll tax vendor used Yes, BSI is used.<br />

111. Are there any direct database connections to systems other <strong>No</strong><br />

than SAP R/3 and possibly BSI<br />

112. Are there any other schemas on the database other than SAP <strong>No</strong><br />

R/3 and possibly BSI<br />

113. Are SAPGUI entries maintained on file servers or on individual Individual work stations.<br />

workstations<br />

114. Please provide more detail on the PCR's implemented - is it This is a technical upgrade only.<br />

safe to assume these are standard PCR's on EP 6.0 for MSS,<br />

or are they custom solutions<br />

115. Please provide the list of ESS currently live on 4.7 using ITS Time Entry, Time Statement and Time Accounts and W4<br />

116.<br />

117.<br />

118.<br />

119.<br />

Please provide the list of MSS currently live on 4.7 using EP 6.0<br />

Please provide the number of custom ABAP interface programs<br />

Please provide the number of custom ABAP reports<br />

Please provide the number of custom workflows<br />

120. Please confirm if extended syntax checking is currently used as<br />

a standard for custom ABAP development at <strong>LACCD</strong><br />

121. Please confirm if <strong>LACCD</strong> has customized any of the SAP script<br />

forms<br />

Overview, Employee Review, Reports, PCR, Time<br />

Approval(Custom)<br />

See answers above.<br />

See answers above.<br />

See answers above.<br />

Yes.<br />

<strong>No</strong> standard SAP forms have been repaired. However, there<br />

are 40 Z SAP Script forms<br />

10


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

122. Do the custom RICEFW's use the 'object-oriented' syntax and Yes<br />

coding, e.g. instead of the 'header line' and 'occurs' statements,<br />

has it been replaced it with 'table of' type statements Also,<br />

when an internal table is read, is the LOOP AT...INTO or READ<br />

TABLE....INTO statements used etc.<br />

123. Are the custom RICEFW's unicode enabled Yes<br />

124. Did <strong>LACCD</strong> document the repairs/modifications they made to<br />

standard SAP code<br />

125. Is it safe to assume that <strong>LACCD</strong> will be responsible for all HP<br />

vendor management and sizing for the SAP landscape<br />

126.<br />

Is it possible to have an extension on the due date of the RFP<br />

127. If an extension cannot be granted, can the printed copy arrive<br />

after 1/30/2013<br />

128.<br />

Can changes be made to the SOW that <strong>LACCD</strong> provided<br />

129. When did you start using SAP ( Go-live date) 2002<br />

Yes<br />

The hardware has been already installed. But recommendation<br />

for upgrade as part of the SOW is in scope, if needed.<br />

If an extension is warranted, the District will issue that notice to<br />

all bidders. At this time, an extension is not anticipated<br />

<strong>No</strong>. All documents must be received by the proposal due date<br />

and time (2:00 PM 1/30/13)<br />

130. Do you use any Country Version / Industry Solutions United States and Public Sector ISU<br />

131. What are the SAP modules in use See SOW and answer above.<br />

132. User Information (Please provide the details for Production See answers above.<br />

Server)<br />

133. Can you provide the DB size for all the systems to be 650 GB for each D/B see above.<br />

upgraded<br />

134. What are the transports on a weekly basis <strong>LACCD</strong> does general system updates bi-monthly.<br />

135. Are you using SAP Data Archiving <strong>No</strong><br />

136. What are the types of Front-end Usage (Sapgui or Webgui)<br />

What version<br />

137. Database used Which version See above.<br />

<strong>No</strong>.<br />

SAP GUI and Portal. GUI 6.40-7.30. Portal is EP 6.0 and I.E<br />

8.0<br />

138. If the landscape is using heterogeneous databases, please<br />

specify (DEV, QAS, PRD)<br />

139. Is your current landscape HA Cluster or OS/DB Cluster Please<br />

give details.<br />

Only one D/B is used. Oracle.D/B<br />

<strong>No</strong>. See answer above.<br />

11


ADDENDUM <strong>No</strong>. 01, Request for Proposals (RFP) Number IT-022, SAP Upgrade, District’s 4.7C Enterprise System to SAP ECC 6.0, PROJECT ID: 40J-J05.18<br />

<strong>No</strong>. Vendor Question <strong>LACCD</strong> Answer<br />

140. Interfaces to external or related systems (List Major Sub Yes answer above.<br />

Systems)<br />

141. Please indicate if there are any other systems sharing the SAP <strong>No</strong> they are not shared.<br />

operating system/ DBMS<br />

142. Are you utilizing a JAVA stack Yes, for BW and EP, SLD and NWDI<br />

143. Do you need a separate JAVA stack after ERP/NW update Yes<br />

144. Are you using Solution Manager and if so what version See answer above.<br />

145. Do you plan to do an OD/DB migration to another platform <strong>No</strong><br />

146. Can you provide a detailed list of the interfaces See answers above.<br />

147. Are you utilizing the Translation Workbench (SE63) <strong>No</strong><br />

148. <strong>No</strong>t used NA<br />

149. Can the upgrade occur over a long weekend; is 64 hours<br />

downtime okay<br />

150. How many developers/BASIS support the <strong>LACCD</strong><br />

environment<br />

151.<br />

Can you provide the repository object numbers for the<br />

following<br />

ABAP Queries, BDC, Function Models, Includes, Module Pools,<br />

Programs, Reports, CATTS, Sapscripts, Transactions, User<br />

Exists, Tables, Any other<br />

The schedule for the down time can be determined as part of<br />

the Blue Print.<br />

See answers above. There are 3 basis staff, 7 programmers,<br />

other applications support functional staff, and a QA Lead.<br />

ABAP Queries – 900<br />

Batch Input programs – 5<br />

Function Modules – 370<br />

Module Pools – 19<br />

Includes - 567<br />

Custom reports - 796<br />

Around 25 Outbound Interfaces<br />

Around 5 Inbound Interfaces<br />

SAP scripts - 40<br />

Transactions – 481<br />

User Exits – 35, BADI implementation<br />

152. How many interfaces are in use See answers above.<br />

153. Can you supply a complete catalog of the interfaces See answers above.<br />

154. How many interfaces utilize RFC (SM59) 10<br />

155. What types of interfaces are used (In-/Out-bound, ALE/IDOC,<br />

flatfile, other)<br />

156. Have those interfaces been developed by you or they are 3rd<br />

party products / vendor<br />

All of them.<br />

All build in house, except when part of a 3rd party application.<br />