NUCLEAR POWER PLANTS<br />
CLIENT LOCATION POWER YEAR ACTIVITIES<br />
ELECTRICITY BOARD<br />
OF B&H SARAJEVO<br />
ALEKSIN HAN<br />
(EXPERIMENTAL)<br />
12,5 MW 1968. 1.2.<br />
HEATING AND ENERGY PLANTS<br />
CLIENT LOCATION POWER YEAR ACTIVITIES<br />
»RMK ZENICA« B&H<br />
ZENICA<br />
3x25/32 HI aud 3 turboblowers<br />
1954 1.2.3.4.<br />
ENERGOINVEST OIL<br />
REFINERY B&H<br />
R.T.B. BOR<br />
SERBIA&MONTENEGRO<br />
BOS. BROD 32/40 t/h 1957. 1.2.3.4.<br />
BOR 40/50 t/h 1957. 1.2.3.4.<br />
»SODA-SO« TUZLA B&H LUKAVAC 6,5 MW 1975. 1.2.3.4.<br />
»INCEL« BANJA LUKA<br />
B&H<br />
I.P.K. VRBAS<br />
SERBIA&MONTENEGRO<br />
BANJA LUKA I 10 MW 1959. 1.2.3.4.<br />
VRBAS 3 MW 1959. 1.2.3.4.6.<br />
I.P.K. BELJE CROATIA BRANJIN VRH 3,5 MW 1959. 1.2.3.4.6.<br />
R.T.P. BOR<br />
SERBIA&MONTENEGRO<br />
»INCEL« BANJA LUKA<br />
B&H<br />
»OHIS« SKOPJE<br />
MACEDONIA<br />
BOR 12,5 MW 1961. 1.2.3.4.6.<br />
BANJA LUKA II 16 MW 1964. 1.2.3.4.6.<br />
SKOPLJE 5 MW 1960. 1.2.<br />
»UPI« B&H BIJELJINA 2 MW 1960. 1.2.<br />
»KRIVAJA« B&H ZAVIDOVI]I 8 MW 1961. 1.2.<br />
ELECTRICITY BOARD<br />
OF SLOVENIA<br />
ELECTRICITY BORAD<br />
OF VOJVODINA<br />
SERBIA&MONTENEGRO<br />
LJUBLJANA 2.32 MW 1960. 1.2.<br />
KRANJ 32 MW 1965. 1.2.<br />
NOVI SAD 16 MW 1960. 1.2.<br />
ZEPS SER&MON NOVI BEOGRAD 2x32 MW 1968. 1.2.<br />
»SODA SO« TUZLA B&H TUZLA - 1960. 1.2.<br />
E N E R G O E N G I N E E R I N G - H Y D R O C I V I L C O N S T R U C T I O N A N D A R C H I T E C T U R E