THERMAL POWER PLANTS<br />
NAME OF OBJECT COUNTRY CAPACITY PLANT PERFORMANCES<br />
TYPE AND SCOPE<br />
OF SERVICES<br />
TPP* Zenica B&H 2x7,5 MW<br />
TPP Fo~a B&H 3.5 MW<br />
TPP Madžari, Skopje Macedonia 2x2,5 MW<br />
TPP Kakanj I B&H 2x32 MW<br />
TPP Kakanj II B&H 2x32 MW<br />
TPP Tuzla I B&H 2x32 MW<br />
Direct cooling system,<br />
coal fired<br />
Steam supply to the<br />
woodworking industrial complex<br />
Direct cooling system,<br />
10 000 kJ/kg coal,<br />
up to 52% ash<br />
Direct cooling system,<br />
10 000 kJ/kg coal up<br />
to 52% ash<br />
Closed cooling system, towers<br />
with natural air draught<br />
12 000 kJ/kg coal<br />
Preliminary and main design<br />
and delivery of the part of<br />
equipment<br />
Complete engineering<br />
Preliminary<br />
and main design<br />
Complete engineering<br />
Complete engineering<br />
Preliminary design of the plant<br />
and main designs of piping<br />
TPP Rtanj Serbia 1x12,5 MW Complete engineering<br />
TPP Kanpur, India India 2x32 MW<br />
TPP Tuzla II B&H 100/110 MW<br />
TPP Plomin I Indonesia 1x110 MW<br />
TPP Kalakot, India India 3x7,5 MW<br />
TPP Kakanj III B&H 100/110 MW<br />
TPP Palembang, Indonesia Indonesia 2x12,5<br />
TPP Tuzla III B&H 1x200 MW<br />
TPP Tuzla B&H 1x200 MW<br />
Direct and closed cooling<br />
system with wet cooling tower,<br />
coal fired<br />
Duo-block with closed cooling<br />
system, towers with natural air<br />
draught,<br />
12 000 kJ/kg coal<br />
Direct cooling system,<br />
22 000 kJ/kg coal<br />
Closed cooling system, towers<br />
with forced air draught,<br />
coal fired<br />
Closed cooling system, towers<br />
with forced draught,<br />
10 000 kJ/kg coal,<br />
up to 52% ash<br />
Direct cooling system,<br />
fuel oil fired<br />
Closed cooling system, towers<br />
with natural air draught,<br />
12000 kJ/kg<br />
Transport of fly ash from ESP<br />
(electrostatic precipitator)<br />
to the selling plant<br />
(silo+loading into trucks)<br />
Preliminary and main design<br />
and delivery of the part of<br />
equipment<br />
Preliminary and main<br />
design and delivery<br />
of the part of equipment<br />
A part of design and<br />
delivery of equipment<br />
Complete engineering<br />
Preliminary and main design<br />
and delivery of equipment<br />
Complete engineering<br />
Preliminary and main design<br />
and delivery of equipment<br />
Complete engineering<br />
E N E R G O E N G I N E E R I N G - T H E R M A L P O W E R A N D P R O C E S S P L A N T S