Reference - energoinvest
Reference - energoinvest
Reference - energoinvest
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7<br />
STUDIES<br />
CLIENT DESCRIPTION YEAR ACTIVITIES<br />
ELECTRICITY BOARD B&H AND<br />
CANTON OF TUZLA<br />
ELECTRICITY BOARD B&H AND<br />
CENTRAL BOSNIA CANTON<br />
ELECTRICITY BOARD B&H AND<br />
ZENICA - DOBOJ CANTON<br />
ELECTRICITY BOARD B&H AND<br />
HERZEGOVINA - NERETVA<br />
CANTON<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
SPREČA I AND AFFLUENTS OSKOVA AND GOSTELJA<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
SPREČA II AND AFFLUENTS TURIJA AND BRIJESNICA<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
VRBAS<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
BILA<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
GOSTOVIĆA<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
NERETVICA<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
DREŽANKA<br />
20007 1<br />
2000 1<br />
2000 1<br />
2000 1<br />
PUBLIC ENTERPRISE „WATER<br />
ZONE OF STREAM BASIN OF<br />
THE RIVER SAVA“<br />
PUBLIC ENTERPRISE „WATER<br />
ZONE OF STREAM BASIN OF<br />
THE RIVER SAVA“<br />
ELECTRICITY BOARD B&H<br />
WATER BALANCE FOR RIVER BASIN DUNAV<br />
PHASE I STEP I 2003 1,2<br />
WATER BALANCE FOR RIVER BASIN DUNAV<br />
PHASE I STEP II 2004 1,2<br />
STUDY OF EVACUATION OF MULTI AND CATASTROPHIC<br />
WATER WAVES FOR HYDRO POWER PLANT ON NERETVA 2003 1<br />
MINISTRY OF COMMUNICATIONS<br />
AND TRANSPORT<br />
CORRIDOR Vc<br />
PROJECT OF HIGHWAY ROUTE ON CORRIDOR Vc, LOT 3<br />
SOUTH SARAJEVO – NORTH MOSTAR.<br />
PRELIMINARY SOLUTION, PRELIMINARY DESIGN AND<br />
OTHER STUDIES.<br />
2004 1,2<br />
ASA D.O.O. KAKANJ<br />
INTRADE D.O.O. AND<br />
INTRADE ENERGIJA D.O.O.<br />
STUDY OF WATER - POWER DEVELOPMENT OF THE RIVER<br />
STUPČANICA AND STAVNJA<br />
ALTERNATIVE SOLUTIONS OF WATER - POWER<br />
DEVELOPMENT OF UPPER COURSE OF THE RIVER<br />
NERETVA UPSTREAM FROM SETTLEMENT GLAVATIČEVO<br />
- FEASIBILITY STUDY: HPP BJELIMIĆI WITH<br />
RHPP BJELIMIĆI HPP GLAVATIČEVO –<br />
COMPENSATION<br />
- FEASIBILITY STUDY PHASE II: HPP BJELIMIĆI<br />
WITH RHPP BJELIMIĆI HPP GLAVATIČEVO –<br />
COMPENSATION BASIN<br />
2005 1<br />
2006 1,2<br />
E N E R G O E N G I N E E R I N G - H Y D R O C I V I L C O N S T R U C T I O N A N D A R C H I T E C T U R E