27.01.2015 Views

Lindenberg Emirates Company Profile

Lindenberg Emirates Company Profile

Lindenberg Emirates Company Profile

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LE-PROFILE | ver.3 | rev.4.5 | 21.06.2010<br />

LINDENBERG-EMIRATES LLC


<strong>Company</strong> <strong>Profile</strong> 3~15<br />

• About <strong>Lindenberg</strong> <strong>Emirates</strong> 3<br />

• Scope of Activities 4<br />

• Completed Projects 5<br />

• Ongoing Projects 6~7<br />

• Representation of <strong>Lindenberg</strong> Anlagen 8<br />

• <strong>Company</strong> Organization Chart 9<br />

• <strong>Company</strong> Manpower Chart 10<br />

• <strong>Company</strong> Registration, Pre-qualification & Classification 11~13<br />

• Project References 14~15<br />

<strong>Lindenberg</strong> Power Division 16~29<br />

• Division <strong>Profile</strong> 16~17<br />

• Scope of Activities 18<br />

• Typical Power Project Organization Chart 19<br />

• Featured Projects 20~28<br />

• Power Stations 29<br />

<strong>Lindenberg</strong> Water & Drainage Division 30~40<br />

• Division <strong>Profile</strong> 30~31<br />

• Scope of Activities 31<br />

• Typical Water Project Organization Chart 32<br />

• Featured Projects 33~40<br />

QHSE Policy 41<br />

<strong>Company</strong> Recourses 42~47<br />

• Workforce & Labour Camp 42<br />

• Store Facilities 43<br />

• Plant, Machinery, Vehicles & Equipments 44~47<br />

Contact Information 48


About <strong>Lindenberg</strong>-<strong>Emirates</strong><br />

Located in the United Arab <strong>Emirates</strong>, with<br />

its center of operation and main office in<br />

Abu Dhabi, <strong>Lindenberg</strong>-<strong>Emirates</strong> LLC<br />

specializes in Engineering, Procurement,<br />

and Construction (EPC) mode of project<br />

delivery.<br />

<strong>Lindenberg</strong>-<strong>Emirates</strong> LLC employs manpower expertise in all aspects of contracting including civil<br />

engineering, pipeline construction, turn-key industrial plants, mechanical and electrical installations,<br />

and services to the electromechanical industry including testing, maintenance and operational work<br />

which is fully supported by computer aided design (CAD) facilities, computerized project monitoring,<br />

accounting, and cost control systems.<br />

3<br />

<strong>Company</strong> Details<br />

• Date Established: 20.11.2001<br />

• Ownership: UAE Partner 51%, <strong>Lindenberg</strong> Anlagen 49%<br />

• Incorporated in:<br />

• Principal Bankers:<br />

Abu Dhabi, United Arab <strong>Emirates</strong><br />

Arab Bank for Investment Foreign Trade<br />

National Bank of Abu Dhabi<br />

HSBC Bank


Scope of Activities<br />

Power Related Activities<br />

• Construction & Installation of Power Transmission and Distribution Networks<br />

• Installation of High Voltage Cables<br />

• Substation Turnkey Low, Medium and High Voltage & Package Substation Installation<br />

• High & Medium Voltage Switchgear & Transformer Installation<br />

• Submarine Cable Installation<br />

Power Related Activities<br />

• Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks<br />

• EPC Projects of Water & Sewerage including Pumping Stations<br />

• Submarine Pipe Laying<br />

Power Related Activities<br />

• On Shore and Off Shore Oil and Gas Field Services<br />

• Maintenance Services for Oil/Gas Production Utilities<br />

• Technical Maintenance for Equipment, Industrial and Petroleum Plant<br />

Repair & Maintenance Works<br />

4<br />

• Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines


Projects Successfully Completed in Abu Dhabi, UAE<br />

• Power Supply for Palaces and Hospitals (2001)<br />

• Supply & Installation of Diesel Generators (2002)<br />

• Power Supply for Palaces and Hospitals Stage3 (2004)<br />

• Supply of Automatic Transfer Switches to ADDC (2006)<br />

• Drainage Network at Marina Al Bateen, Abu Dhabi (2006)<br />

• Water Networks at Al Qadra Village (2007)<br />

• Water Transmission Line from Sweihan to Remah (2009)<br />

• Water Supply to Sadiyat Island (2009)<br />

• Sewerage and Surface Drainage Works (2009)<br />

• Modification of Switching Stations in Abu Dhabi (2009)<br />

• Water Transmission Lines inside Al Reem Island (2010)<br />

Project Value (AED)<br />

177 Million<br />

13 Million<br />

26 Million<br />

130 Thousand<br />

196 Thousand<br />

16 Million<br />

26 Million<br />

108 Million<br />

10 Million<br />

17 Million<br />

56 Million<br />

5


Ongoing Projects - Power<br />

Project Value (AED)<br />

• Power Supply for Palaces and Hospitals Stage3, Phase3 (2005) 103<br />

• Security & Upgrading of 11kV Electrical Networks (2008) 40<br />

• Installation of Underground Cables, Electrical Distribution<br />

Equipment, OHL and Allied Works in Abu Dhabi (2009)<br />

• Procurement of LV Panels Switchgear (2009) 17<br />

• Electrical & Civil Eng. Works for Battery Energy Storage (2009) 142<br />

• Replacement of 11 KV Switchgears and Substations (2010) 82<br />

• Transfer of 11kV Load & Primary Substation in Abu Dhabi (2010) 19.7<br />

• Fast Track Construction Works Contract in Eastern Region (Group 2) 12<br />

• Fast Track Contract for 11KV & LV Networks in Central Region 1.7<br />

• Transfer of Load to New 132/11 kV W24 and E01 Primary Substations 34<br />

10 / year<br />

6


Ongoing Projects – Water & Drainage<br />

Project Value (AED)<br />

• Water Transmission Pipeline in Dubai (2007) 85<br />

• Water Transmission Scheme inside Sadiyat Island (2008) 577<br />

• Water Transmission Pipeline in Baniyas (2008) 86<br />

• EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa<br />

Floating Reservoir Station – Lot D (2010)<br />

• Replacement of Existing Sewer Networks Inside Abu Dhabi Island (2010) 116<br />

174.5<br />

7


Representation of <strong>Lindenberg</strong> Anlagen<br />

<strong>Lindenberg</strong> <strong>Emirates</strong> represents <strong>Lindenberg</strong> Anlagen GmbH Germany for its products and services in<br />

the United Arab <strong>Emirates</strong>.<br />

<strong>Lindenberg</strong> Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power<br />

Generation System and has international presence in more than 72 countries.<br />

8


<strong>Company</strong> Organization Chart<br />

CHAIRMAN<br />

GENERAL MANAGER<br />

GM Secretariat<br />

HR/ADMIN<br />

DEPARTMENT<br />

RECRUITMENT<br />

DEPARTMENT<br />

BUSINESS<br />

DEVELOPMENT<br />

OPERATIONS<br />

LEGAL<br />

DEPARTMENT<br />

HSE<br />

DEPARTMENT<br />

QA/QC<br />

DEPARTMENT<br />

HR/Admin<br />

Manager<br />

Recruitment<br />

Manager<br />

Business Dev.<br />

Manager<br />

Chief Operating<br />

Officer (COO)<br />

Lawyer<br />

HSE Manager<br />

QA/QC Manager<br />

Senior HR/Admin<br />

Officer<br />

Recruitment<br />

Coordinator<br />

Business Dev.<br />

Associate<br />

Legal Advisor<br />

HSE Engineers<br />

QA/QC Engineers<br />

Personnel Officer Safety Officers QA/QC Inspectors<br />

COO Secretariat<br />

DOCUMENT<br />

CONTROL DEPT.<br />

ESTIMATION &<br />

PROPOSAL<br />

PLANT/WORKSHOP<br />

COST CONTROL<br />

PLANNING<br />

DEPARTMENT<br />

CIVIL<br />

DEPARTMENT<br />

POWER DIVISION<br />

WATER &<br />

DRAINAGE DIVISION<br />

CONTRACTS<br />

DEPARTMENT<br />

FINANCE DEPT.<br />

PROCUREMENT &<br />

STORES<br />

IT DEPARTMENT<br />

Senior Document<br />

Controller<br />

Head of Estimation<br />

Department<br />

Plant Manager<br />

Cost Control<br />

Manager<br />

Planning Manager<br />

Civil Department<br />

Manager<br />

Head of Power<br />

Division<br />

Division Manager<br />

Contracts Manager<br />

Finance Manager<br />

Corporate<br />

Purchase Manager<br />

IT Administrator<br />

Senior Estimation<br />

Engineers<br />

Plant Engineer<br />

Lead Cost<br />

Control Engineer<br />

Senior Planning<br />

Engineers<br />

Project Managers<br />

Project Manager<br />

Projects Manager<br />

Contracts Engineer<br />

Accounts Manager<br />

Procurement<br />

Engineers<br />

Network Engineer<br />

Estimation<br />

Engineers<br />

Plant/Workshop<br />

Foreman<br />

Cost Control<br />

Engineers<br />

Planning Engineers<br />

Construction<br />

Managers<br />

Construction<br />

Managers<br />

Project Managers<br />

Chief Accountant<br />

Purchase Officers<br />

IT Assistant<br />

Transport Officer<br />

Project Team &<br />

Work Crew<br />

Project Team &<br />

Work Crew<br />

Construction<br />

Managers<br />

Senior<br />

Accountants<br />

Project Team &<br />

Work Crew<br />

Accountants<br />

9


<strong>Company</strong> Manpower Chart<br />

Staff Category (Total: 426)<br />

Electrician, 62<br />

Drivers - All<br />

Discipline, 58<br />

Foreman &<br />

Supervisors, 51<br />

Pipe Fitters, 31<br />

Skilled & Unskilled Workers (Total: 594)<br />

Engineers - All<br />

Discipline, 68<br />

Land Surveyors, 21<br />

Instrument<br />

Technicians / Fitters,<br />

7<br />

Painters, 7<br />

QA/QC<br />

Engineers, 3<br />

Coordinators, 5<br />

Administrators, 6<br />

Officers & Legal<br />

Advisors, 6<br />

Draftsman - All<br />

Discipline, 12<br />

Document<br />

Controllers, 11<br />

Planning & Cost<br />

Control, 9<br />

Secretaries, 15<br />

Accountants, 14<br />

Safety -<br />

Officers/Inspectors,<br />

13<br />

Storekeepers /<br />

Timekeepers, 19<br />

Project Managers /<br />

Dept. Heads, 15<br />

Laborers, 248<br />

Mechanics, 9<br />

Carpenters, 94<br />

Watchmen, 8<br />

Welders, 15<br />

Operators, 48<br />

Masons, 54<br />

Steel Fixers, 52<br />

Cleaners / Office<br />

Boy, 29<br />

Charged Hands, 23<br />

Reception & Office<br />

Assistants, 7<br />

10<br />

Data as of 16-Jun-2010


Registration / Clients List<br />

<strong>Lindenberg</strong> is registered / pre-qualified in the following companies / government agencies:<br />

11<br />

1. Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

2. Abu Dhabi Future Energy <strong>Company</strong> (MASDAR)<br />

3. Abu Dhabi Gas Industries Ltd. (GASCO)<br />

4. Abu Dhabi Marine Operating <strong>Company</strong> (ADMA-OPCO)<br />

5. Abu Dhabi Ministry of Defense – Military Works Dept.<br />

6. Abu Dhabi National Oil <strong>Company</strong> (ADNOC)<br />

7. Abu Dhabi Oil Refining <strong>Company</strong> (TAKREER)<br />

8. Abu Dhabi Police General Head Quarters<br />

9. Abu Dhabi Polymers Co. Ltd. (Borouge)<br />

10. Abu Dhabi Sewerage Services <strong>Company</strong> (ADSSC)<br />

11. Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

12. Abu Dhabi Water & Electricity Authority (ADWEA)<br />

13. Al Ain Distribution <strong>Company</strong> (AADC)<br />

14. ALDAR Properties PJSC<br />

15. Sorouh Properties<br />

16. The National Central Cooling Co. PJSC (TABREED)<br />

1 2 3 4<br />

5 6 7 8<br />

9 10 11 12<br />

13 14 15 16


<strong>Lindenberg</strong> is Prequalified & Tendering for ADSSC’s STEP Project:<br />

1. <strong>Lindenberg</strong> <strong>Emirates</strong> is currently one of the 5<br />

prequalified companies for the Sewerage<br />

Tunnel Enhancement Project “STEP Project”<br />

comprising of a 45 km tunnel of 5-meter<br />

diameter at a depth of 40-45 meters. The<br />

project is expected to be worth of 3 Billion<br />

AED and will be executed together with a<br />

consortium of Major Korean Construction<br />

Companies.<br />

2. Tender No. O-1506, STEP Deep Tunnel Sewer<br />

Contract T-02<br />

3. Tender No. O-1578, STEP Deep Tunnel Sewer<br />

Contract T-03<br />

12


<strong>Company</strong> Classification at Abu Dhabi Department of Planning & Economy<br />

Sr. No. Field Scope of Works Category<br />

1. WATER PROJECTS<br />

1. Water Transport Plants & Networks<br />

2. Water Distribution Plants & Networks<br />

1 st<br />

1 st<br />

2. ELECTRICAL PROJECTS<br />

1. Power Distribution Networks & Plants<br />

2. Communications Networks<br />

2 nd<br />

5 th<br />

3. SEWERAGE PROJECTS<br />

1. Main Sewerage Networks<br />

2. Sewerage Sub-Networks & House Connections<br />

5 th<br />

5 th<br />

4.<br />

MECHANICAL & ELECTRICAL WORKS<br />

PROJECTS 1. Mechanical and Electrical Works 5 th<br />

5. BUILDING PROJECTS<br />

1. All types of Buildings<br />

2. Metallic Constructions<br />

5 th<br />

5 th<br />

13


Power Projects<br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1 R-99-0157<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals<br />

ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed<br />

2 G-1206 Supply and Installation of 8 Nos. 415 Volts Diesel Generators ADWEA AED 13,039,984 10.04.2002 Mott MacDonald Completed<br />

3 G-1494<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals, Stage-III Phase-III, Lot-1<br />

ADWEA AED 25,914,216 05.02.2003<br />

Lahmeyer<br />

International GmbH<br />

Completed<br />

4 G-1882<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals (Stage-III Phase-III)<br />

ADWEA AED 103,122,825 07.08.2005<br />

Lahmeyer<br />

International GmbH<br />

Ongoing<br />

5 D-7150<br />

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace<br />

in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace<br />

ADDC AED 40,667,381 05.05.2008<br />

Ozen Levent<br />

Power Engineering<br />

Consultancy LLC<br />

Ongoing<br />

6 D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed<br />

7 D-9710/C<br />

8 115979C13E<br />

9 G-6334<br />

Long Term Rate Agreement for Installation of Underground Cables, Electrical<br />

Distribution Equipment, OHL and allied works in Abu Dhabi Eastern Region<br />

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical<br />

Equipment – Low Voltage (LV) Panels Switchgear<br />

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery<br />

Energy Storage (42MW)<br />

ADDC<br />

AED 10,000,000 /<br />

YEAR<br />

06.04.2009 - Ongoing<br />

ADNOC AED 17,432,437 23.04.2009 - Ongoing<br />

ADWEA AED 142,271,120 23.11.2009<br />

Deutsche Energie-<br />

Consult GmbH<br />

Ongoing<br />

10 D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing<br />

11 D-10599<br />

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi<br />

Island & Eastern Region<br />

ADDC AED 19,683,403 10.02.2010 DECON Ongoing<br />

12 D-10624<br />

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu<br />

Dhabi Island<br />

TRANSCO AED 174,524,364 07.03.2010<br />

ILF Consulting<br />

Engineers<br />

Ongoing<br />

14


Water & Drainage Projects<br />

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status<br />

1 D-5630<br />

Urgent Works at Al Qadra Village Owned by<br />

HH Sheikh Mansour Bin Zayed<br />

ADWEA AED 16,877,777 15.04.2006 Italconsult Completed<br />

2 N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed<br />

3 N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007<br />

4 D-6972<br />

5 N-5807<br />

Linking of Delma Two (2) MGD RO Plant to Main Delma Reservoirs Construction<br />

of 119 Water House Connections<br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /<br />

Abu Dhabi Island<br />

ADDC AED 4,633,941 06.08.2007<br />

TRANSCO AED 569,594,995 20.01.2008<br />

Tebodin Consultants &<br />

Engineers<br />

Dr. MH Ali El-Saie<br />

Consulting Engineers<br />

Tebodin Consultants<br />

and Engineers<br />

Completed<br />

Completed<br />

Ongoing<br />

6 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed<br />

7 N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008<br />

Tebodin Consultants<br />

and Engineers<br />

Completed<br />

8 D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Ongoing<br />

9 N-6821<br />

10 O-1463<br />

EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating<br />

Reservoir Station – Lot D<br />

Works Associated with the Replacement of Existing Sewer Networks at Some<br />

Sectors Inside Abu Dhabi Island - Category A<br />

TRANSCO AED 174,524,364 07.03.2010<br />

ILF Consulting<br />

Engineers<br />

Ongoing<br />

ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Awarded<br />

15


Division <strong>Profile</strong><br />

<strong>Lindenberg</strong> Power Division provides expertise in implementing Electromechanical and<br />

Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and<br />

commissioning and maintenance services for diverse industrial projects.<br />

Having the expertise in turnkey contracting on many projects, the Power Division is very familiar<br />

with all criteria necessary for the successful execution of Electromechanical projects. The Power<br />

Division builds these mandatory requirements into all projects:<br />

• Reliable and efficient performance<br />

• Single-point responsibility<br />

• ISO-certified quality control procedures<br />

• Proven safety programs<br />

• Cost controls and reductions<br />

• Productive and on-time scheduling<br />

16


Division <strong>Profile</strong><br />

The Power Division provides a dedicated technical and managerial team necessary to design and<br />

construct new facilities or upgrades. By bringing together every aspect of a power project under a<br />

single management team, the division provides economical and efficient solutions to meet the needs<br />

of a diverse industry base.<br />

The project management team comprised of specialists in the design, construction and operation of<br />

complex type of projects. From concept through acceptance, the division provides the optimal<br />

resources, equipment and services to meet all contractual requirements. The EPC team is<br />

accountable for the following critical functions:<br />

• Planning, organizing and procedures<br />

• Scheduling and tracking<br />

• Cost control<br />

• Document control<br />

• Single-point customer contact<br />

• Progress reporting<br />

17


Scope of Activities<br />

• Contracting works for Power Networks and Distribution Systems<br />

• Underground cable network including jointing, termination, testing and commissioning<br />

• Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations,<br />

Desalination Plants and Sewerage Treatment Plants<br />

• Turnkey contracting works for LV / MV / HV Substations<br />

• EPC works for electric generators<br />

• Installation and commissioning of auxiliary powers, package substation, control panels and<br />

transmission lines<br />

• Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire<br />

suppression systems.<br />

• Control / MCC room fire suppression systems installation<br />

• Submarine Cable Installation<br />

• Industrial Building Construction<br />

• HVAC Works<br />

• LV / MV / HV Switchgear and Transformer Installation<br />

• Installation and Commissioning of Auxiliary Power Supplies<br />

18


Typical Power Project Organization Chart<br />

HEAD OF POWER DIVISION<br />

PROJECT MANAGER<br />

ENGINEERING<br />

PLANNING & QS<br />

CONSTRUCTION<br />

HSE & QA/QC<br />

OFFICE SUPPORT<br />

Civil Engineer<br />

Electrical Engineer<br />

Planning Engineer<br />

QS<br />

Construction Manager /<br />

Project Engineer<br />

HSE Engineer<br />

QA/QC Engineer<br />

Coordinator<br />

Secretary<br />

Draftsman<br />

Storekeeper<br />

Timekeeper<br />

Watchman<br />

Mechanical Engineer<br />

Civil Engineer<br />

Electrical Engineer<br />

Testing & Comm. Eng.<br />

Design Coordinator<br />

Mechanical Foreman<br />

Civil Foreman Electrical Foreman Draftsman (Electrical)<br />

Draftsman (Electromech’l)<br />

19


Featured Projects<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals<br />

Contract No.<br />

Client<br />

R-99-0157<br />

Value AED 176,957,025<br />

Award Date 08.02.2000<br />

Description<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Supply, Installation, Testing & Commissioning Works<br />

20


Featured Projects<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces & Hospitals (Stage-III Phase-III)<br />

Contract No. G-1882<br />

Client<br />

Value AED 103,122,825<br />

Award Date 07.08.2005<br />

Description<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Design, Supply, Installation Testing and Commissioning including remote<br />

control monitoring system, ISMS, and Medium Voltage Panels.<br />

21


Featured Projects<br />

Supply and Installation of 8 Nos. 415 Volts Diesel Generators<br />

Contract No. G-1206<br />

Client<br />

Value AED 13,039,984<br />

Award Date 10.04.2002<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415<br />

Volts Diesel Generators<br />

22


Featured Projects<br />

Security of the Electric Power Supply and Upgrade of the Network for Presidential<br />

Palaces and Hospitals Stage-III Phase-III. Lot-1<br />

Contract No. G-1494<br />

Client<br />

Value AED 25,914,216<br />

Award Date 05.02.2003<br />

Description<br />

Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Design, Supply, Installation Testing and Commissioning Works<br />

23


Featured Projects<br />

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu<br />

Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace<br />

Contract No. D-7150<br />

Client<br />

Value AED 40,667,381<br />

Award Date 05.05.2008<br />

Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Description Design, Supply, Installation Testing and Commissioning of 11KV<br />

Switching Station & replacement of Switchgears, Control Panels, DC<br />

system in Beach Palace Stations B4, B5 Stations & Standby power plant<br />

in H.H.Shk Khalifa Switching station.<br />

24


Featured Projects<br />

Modification of Switching Stations in Abu Dhabi Island<br />

Contract No. D-7720<br />

Client<br />

Value AED 16,999,999<br />

Award Date 06.08.2008<br />

Description<br />

Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Supply, Installation & Commissioning of RMU’s and Modification of Transformer Panel to Feeder Panel in Switching<br />

Stations.<br />

Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu<br />

Dhabi Eastern Region<br />

Contract No.<br />

Client<br />

Value<br />

D-9710/C<br />

Award Date 16.04.2009<br />

Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

AED 10,000,000 per year<br />

Description Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order<br />

Basis<br />

25


Featured Projects<br />

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear<br />

Contract No. 115979C13E<br />

Client<br />

Abu Dhabi National Oil <strong>Company</strong> (ADNOC)<br />

Value AED 17,432,437<br />

Award Date 23.04.2009<br />

Description Supply & Delivery of Low Voltage Panels Switchgear<br />

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery Energy Storage (42MW)<br />

Contract No. G-6334<br />

Client<br />

Value AED 142,271,120<br />

Award Date 23.11.2009<br />

Description<br />

Abu Dhabi Water and Electricity Authority (ADWEA)<br />

Design & Construction of 10 Nos. BESS Substation & Installation Testing Commissioning of NGK Batteries & Supply of<br />

Auxiliary Items.<br />

26


Featured Projects<br />

Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations<br />

Contract No. D-6990<br />

Client<br />

Value AED 81,991,962<br />

Award Date 03.01.2010<br />

Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Description Design & Construction of 1 New 132/11 kV Substation & Modification of 11 kV Network and Replacement with new 11<br />

kV Switchgear @ 2 nos. Substation.<br />

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island & Eastern Region (2010)<br />

Contract No. D-10599<br />

Client<br />

Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 19,683,403<br />

Award Date 10.02.2010<br />

Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and Pipeline Works.<br />

27


Featured Projects<br />

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island<br />

Contract No. D-10624<br />

Client<br />

Value AED 34,028,598<br />

Award Date 25.05.2010<br />

Description<br />

Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.<br />

Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.<br />

28


Power Stations<br />

Power Station with Diesel Engine for operation<br />

on Diesel, Crude Oil and HFO<br />

Turnkey Power Stations up to 12 MW<br />

Powered with Diesel, Gas and Dual Fuel Engines<br />

29<br />

Power Station with Gas Engines<br />

Power Station with Dual Fuel Engines


Division <strong>Profile</strong><br />

In order to accommodate the brisk developments of UAE’s industry, <strong>Lindenberg</strong> Water and Drainage<br />

Division was established to provide water and drainage solutions.<br />

The Division has up-to-date working knowledge of is very well conversant with the requirements in<br />

water supply and water distribution network. The necessary infrastructure, including manpower,<br />

reliable sources of suppliers, equipment are readily available at our disposal.<br />

30


Division <strong>Profile</strong><br />

The Water & Drainage Division is acknowledged as the premier provider of the highest quality<br />

professional service in the field of water and drainage facilities; insuring absolute client satisfaction<br />

through the expertise and experience of its people. The division aims to provide new technologies,<br />

processes, and materials to build and deliver water and drainage facilities that are best suitable for<br />

their class & area of usage.<br />

Scope of Activities<br />

• Water Pipeline Networks<br />

• Water & Irrigation Reservoirs<br />

• Water & Sewerage Pumping Stations<br />

• Sewage Treatment Plants<br />

• Operation & Maintenance of Sewerage<br />

Networks and Pumping Stations<br />

31


Typical Water & Drainage Project Organization Chart<br />

DIVISION MANAGER<br />

PROJECT MANAGER<br />

ENGINEERING<br />

PLANNING & QS<br />

CONSTRUCTION<br />

HSE & QA/QC<br />

OFFICE SUPPORT<br />

Civil Engineer<br />

Electromech’l Engineer<br />

Inst & Ctrl. Engineer<br />

Planning Engineer<br />

QS<br />

Construction Manager /<br />

Project Engineer<br />

HSE Engineer<br />

QA/QC Engineer<br />

Coordinator<br />

Secretary<br />

Draftsman<br />

Storekeeper<br />

Timekeeper<br />

Watchman<br />

Site Engineer Site Engineer Site Engineer<br />

Water Tank Works<br />

(Concrete Construction)<br />

Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control Works<br />

Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman<br />

Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew<br />

Civil Work Crew Pipeline Crew Chamber Crew<br />

32


Featured Projects<br />

Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed<br />

Contract No. D-5630<br />

Client Abu Dhabi Water & Electricity Authority (ADWEA)<br />

Value AED 16,877,777<br />

Award Date 15.04.2006<br />

Description Supply, Construction & Maintain Water Supply Network<br />

33


Featured Projects<br />

DN 1000mm Transmission Pipeline from Sweihan to Remah<br />

Contract No. N-4604<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 25,889,764<br />

Award Date 23.07.2007<br />

Description Supply, Construction, and Installation of Water Transmission Pipelines<br />

34


Featured Projects<br />

Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C<br />

Contract No. N-2622.1<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 108,118,493<br />

Award Date 22.07.2007<br />

Description Supply, Construction, & Installation of Water Supply Network<br />

35


Featured Projects<br />

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi<br />

Island<br />

Contract No. N-5807<br />

Client<br />

Value AED 569,594,995<br />

Award Date 20.01.2008<br />

Description<br />

Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Construction of DI/CS Pipelines<br />

36


Featured Projects<br />

Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)<br />

Contract No. O-1047<br />

Client<br />

Value AED 10,400,000<br />

Award Date 30.01.2008<br />

Description<br />

Abu Dhabi Sewerage Services <strong>Company</strong> (ADSSC)<br />

Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash<br />

Shuhaib<br />

37


Featured Projects<br />

Water Transmission Lines Inside Al Reem Island – Lot A<br />

Contract No. N-5386<br />

Client Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 56,455,067<br />

Award Date 03.02.2008<br />

Description Installation of DI/CS Pipelines<br />

38


Featured Projects<br />

Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway<br />

Contract No. D-7310.1<br />

Client Abu Dhabi Distribution <strong>Company</strong> (ADDC)<br />

Value AED 94,037,448<br />

Award Date 22.05.2008<br />

Description Supply and Replacement of Water Transmission Pipelines<br />

39


Featured Projects<br />

EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir Station - Lot D<br />

Contract No. N-6821<br />

Client<br />

Abu Dhabi Transmission & Despatch <strong>Company</strong> (TRANSCO)<br />

Value AED 174,524,364<br />

Award Date 07.03.2010<br />

Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and Pipeline Works.<br />

Works Associated with the Replacement of Existing Sewer Networks at Some Sectors Inside Abu Dhabi Island - Category A<br />

Contract No. O-1463<br />

Client<br />

Abu Dhabi Sewerage Services <strong>Company</strong> (ADSSC)<br />

Value AED 116,026,699<br />

Award Date 13.06.2010<br />

Description Construction, Replacement & Rehabilitation of Existing Sewer Lines and Manholes Inside Abu Dhabi Island.<br />

40


QHSE Policy<br />

LINDENBERG EMIRATES LLC establishes, implements and<br />

maintains effective QHSE (Quality, Occupational Health & Safety<br />

and Environmental) Management Systems in line with the<br />

requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS<br />

18001:2007, to ensure that customer requirements are met.<br />

This is carried out with the aim of enhancing customer<br />

satisfaction. LINDENBERG EMIRATES LLC complies with<br />

applicable Health, Safety and Environmental legal and other<br />

requirements in order to prevent incidents, injury, ill health, and<br />

pollution and to encourage the conservation of natural resources.<br />

LINDENBERG EMIRATES LLC is committed to the continual<br />

improvement of its QHSE Management Systems through setting<br />

Objectives & Targets and continuously reviewing them; and by<br />

providing training for employees to deal with their day to day<br />

responsibilities safely, competently and in an environmentally<br />

sustainable manner.<br />

LINDENBERG EMIRATES LLC is committed to communicating the<br />

QHSE policy to employees within the organization and to other<br />

interested parties. The policy shall be reviewed periodically to<br />

ensure its suitability, relevance and appropriateness at all times.<br />

LINDENBERG EMIRATES LLC aims to pursue this policy by:<br />

• Instilling and promoting safety consciousness amongst<br />

employees & sub-contractors to prevent ill health, injury<br />

and incidents<br />

• Implementing innovative measures to continuously improve<br />

its QHSE practices<br />

• Meeting applicable legal & other requirements<br />

• Communicating the policy to interested parties<br />

• Minimizing the generation of hazardous and toxic waste<br />

where possible<br />

• Providing safe and healthy working environments for its<br />

employees, customers, and subcontractors<br />

• Preventing the release, spill and leakage of harmful<br />

substances into the environment, and taking immediate<br />

action to contain any accidental discharge<br />

• Encouraging reducing, recycling and re-using materials<br />

where possible.<br />

AHMAD ZAABRI<br />

General Manager<br />

41<br />

LE-IMS-Pol | rev. 0


Workforce and Labour Camp<br />

<strong>Lindenberg</strong>-<strong>Emirates</strong> LLC employs almost 600 Skilled and Unskilled Labors. Labor Camps with all<br />

modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of<br />

the health & safety of the workforce.<br />

Camp Location Size No. of Rooms<br />

Capacity<br />

(No. of Occupants)<br />

Al Faya 1,300 m 2 96 864<br />

Mussafah (M36) 876 m 2 48 290<br />

Al Ain 400 m 2 28 180<br />

TOTAL 2,576 m 2 172 1,334<br />

42


Store Facilities<br />

Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m2 are operational at Mussafah<br />

to help in storing & preserving the materials received for different projects, also used for storage of<br />

our standard erection tools required during installation/ commissioning activities.<br />

43


Plant, Machineries, Vehicles and Equipment<br />

<strong>Lindenberg</strong> <strong>Emirates</strong>’ policy in Vehicles, Equipment and Machinery is to:<br />

• purchase and own all equipment to cover the project needs.<br />

• self-maintain these vehicles, equipment and machinery.<br />

• hire vehicles, equipment and machinery to prevent delays in the project execution.<br />

44


Vehicles and Machineries List<br />

SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE<br />

45<br />

1. Air Compressor, Diesel 289 CFM 6 2008<br />

2. Air Compressor, Electric 200 L 2 2008<br />

3. Asphalt Cutter FS 410D 5 Hp 1 2008<br />

4. Backhoe Loader, CAT 422 E 76 HP/ 1.25Cu.m 1 2007<br />

5. Backhoe Loader, JCB CX3 76 HP/ 1.25Cu.m 2 2008<br />

6. Bar Bending Machine 4 HP/up 34 mm 6 2008<br />

7. Bar Cutting Machine 4 HP/up 34 mm 6 2008<br />

8. Battery Charger 230V / DC12-24V 12 -24 V 1 2008<br />

9. Bus (Daewoo) 66 Seater 1 2008<br />

10. Bus (Tata) 66 Seater 1 2006<br />

11. Butt Wilding Machine 90 mm - 315 mm 2 2008<br />

12. Concrete Mixer 750 750 L 1 2008<br />

13. Concrete Mixer, BB350L 350 L 2 2008<br />

14. Concrete Vibrator, with accessories 4.8 HP 15 2008<br />

15. Dewatering Pumps 300 Cu.m/h 35 2008<br />

16. Diesel Storage Tank 4000 USG 4000 ~ 12000 Gl 11 2008<br />

17. Diesel Water Pump 3, PTD306 Dia 3" 5 2008<br />

18. Double Drum Roller Compactor 825 Kg 9 2008<br />

19. ELE . Welding Machine 225 AMP 225 Amp 5 2008<br />

20. Excavator, CAT 320CL 20 Ton 1 2007<br />

21. Excavator, CAT 330D 30 Ton 1 2007


Vehicles and Machineries List<br />

SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE<br />

46<br />

22. Excavator, Komatsu PC220 20 Ton 2 2008<br />

23. Excavator, Komatsu PC300 30 Ton 2 2008<br />

24. Excavator, Komatsu PC300 30 Ton 2 2009<br />

25. Excavator, Komatsu PC400 40 Ton 1 2008<br />

26. Excavator, Komatsu PC400 40 Ton 5 2009<br />

27. Fast Boat 34' 34 Feet 1 2008<br />

28. Fast Boat 38' 38 Feet 1 2008<br />

29. Flat Bed Truck Trailer 60 Ton 4 2008<br />

30. Ford 4x4 4 x4 4 2007<br />

31. Generator, Diesel 5 ~ 135 KVA 19 2008<br />

32. Generator, Petrol 5 KVA 6 2008<br />

33. Hand Spray Pump With Accessories 1/2 " Dia 3 2008<br />

34. Hiap Truck (Nissan) 6.5 Ton 3 2008<br />

35. Jack Hammer for Air Compressor 34 KG 6 2008<br />

36. Jetting Pump 4" 4" Dia 4 2008<br />

37. Low Bed Truck Trailer 70 Ton 1 2008<br />

38. Mobile Crane 55T 55 Ton 1 2008<br />

39. Mobile Crane 70T 70 Ton 1 2008<br />

40. Mobile Workshop (Nissan Truck) 8 Ton 1 2008<br />

41. Pickup Double Cabin 4x4 1 2006<br />

42. Pipe Carrier Saddles - 1 2008


Vehicles and Machineries List<br />

SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE<br />

47<br />

43. Pipe Wrapping Machine - 1 2008<br />

44. Plate Compactors 132 Kg 11 2008<br />

45. Preassure Pump 1/2 " Dia 2 2008<br />

46. Rolli Craddles uo to 60" 1 2008<br />

47. Side Boom (Komatsu Pipe Lier) 58 Ton 2 2009<br />

48. Six Wheel Tipper (Volvo) 18 Cu.M. 2 2008<br />

49. Skid Steer, CAT 216B 52 HP/0.26 Cu.m 1 2007<br />

50. Submersible Pump 2" Dia 1 2008<br />

51. Table Saw Bench - Power Cutter 315 mm / 4.5 HP 5 2008<br />

52. Toyota Fortuner 4x4 1 2008<br />

53. Tractor - Flatbed (Volvo / Scania) 50 Ton 2 2008<br />

54. Tractor - Lowbed (Volvo) 70 Ton 1 2008<br />

55. Water Tanker (Nissan) 3,000 GL 3 2008<br />

56. Welding Machine, Diesel 400 Amp 6 2008<br />

57. Welding Machine, Electric 400 Amp 2 2008<br />

58. Wheel Excavator, CAT M316D 16 Ton 1 2008<br />

59. Wheel Loader, CAT 950H 196 HP/ 3 Cu.m 1 2007<br />

60. Wheel Loader, CAT 950H 196 HP/ 3 Cu.m 3 2009<br />

61. Wheel Loader, CAT 962H 211 HP/ 3.2 Cu.m 5 2008<br />

62. Wheel Loader, CAT 966H 262 HP/ 4 Cu.m 2 2009<br />

63. Pipe Wrapping Machine - 1 2008


Contact Information<br />

We hope that the information given and detailed in this <strong>Company</strong> <strong>Profile</strong> is sufficient to illustrate the<br />

potential and capabilities of <strong>Lindenberg</strong>. We will be pleased to provide further information on your<br />

request. Kindly contact us.<br />

<strong>Lindenberg</strong> <strong>Emirates</strong> LLc<br />

<strong>Lindenberg</strong> Water & Drainage Division<br />

P.O. Box 42630, Abu Dhabi,<br />

(A Division of <strong>Lindenberg</strong> <strong>Emirates</strong> LLC)<br />

United Arab <strong>Emirates</strong> Tel: +971 2 642 2576<br />

Tel: +971 2 681 1061 Fax: +971 2 642 2579<br />

Fax: +971 2 681 3655 E-mail: lwd@lindenberg.ae<br />

E-mail: info@lindenberg.ae<br />

48<br />

<strong>Lindenberg</strong> Power Division<br />

Projects Office, Passport Road, Abu Dhabi<br />

(A Division of <strong>Lindenberg</strong> <strong>Emirates</strong> LLC) Tel: +971 2 642 2131, Fax: +971 2 642 2031<br />

Tel: +971 2 642 2576 Legal Department, Salam St, Abu Dhabi<br />

Fax: +971 2 642 2571 Tel: +971 2 672 2993, Fax: +971 2 6748455<br />

E-mail: lpd@lindenberg.ae<br />

Al Ain Office, Moujae Area, Al Ain<br />

Tel: +971 3 755 8155, Fax: +971 3 755 8156<br />

Website: www.lindenberg.ae<br />

*Each Project has its own Site Office(s)


P.O. Box 42630, Abu Dhabi, United Arab <strong>Emirates</strong><br />

Tel: +971 2 6811061, Fax: +971 2 6813655<br />

E-mail: info@lindenberg.ae<br />

Website: www.lindenberg.ae

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!