2.3 Structuring <strong>the</strong> procurement process<br />
In this secti<strong>on</strong> we make some general comments about <strong>the</strong> tendering principles but do not<br />
resp<strong>on</strong>d to each <strong>and</strong> every principle.<br />
Whilst we mainly add <strong>and</strong> amplify <strong>the</strong> draft guide principles we would like to draw to your<br />
attenti<strong>on</strong> <strong>the</strong> fact that we do not support <strong>the</strong> comment made in 6.6 without qualificati<strong>on</strong>.<br />
O<strong>the</strong>r Factors:<br />
“ Opportunities for bundling of multiple projects into a single c<strong>on</strong>tract should also be<br />
c<strong>on</strong>sidered, where this is likely to deliver efficiencies at a program level.”<br />
The reas<strong>on</strong> for our oppositi<strong>on</strong> is outlined at 2.3.2 below.<br />
2.3.1 Tendering Principles<br />
As noted in secti<strong>on</strong> 1 in 2007 CCF (Victoria) in c<strong>on</strong>juncti<strong>on</strong> with <strong>the</strong> Institute of Public Works<br />
Engineering Australia <strong>and</strong> <strong>the</strong> Municipal Associati<strong>on</strong> of Victoria published a best practice<br />
guide for tendering <strong>and</strong> c<strong>on</strong>tract management.<br />
The principles of good practice in tendering in that <strong>Guide</strong> remain a sound benchmark <strong>and</strong><br />
are generally reflected in both <strong>the</strong> tendering <strong>and</strong> c<strong>on</strong>tracting principles in this draft guide.<br />