NOVEMBER 10, 2001 - September 11 Digital Archive
NOVEMBER 10, 2001 - September 11 Digital Archive
NOVEMBER 10, 2001 - September 11 Digital Archive
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
, .<br />
FDNY ~<br />
IN CID ENT ACTION PLAN<br />
OPE~I~_~~\.. TIONAL<br />
PERIOD<br />
<strong>NOVEMBER</strong> <strong>10</strong>, <strong>2001</strong><br />
0700 -0700<br />
PLAN 48
<strong>11</strong>/14/01 FDNY -WTC ORGANIZATIONAL LIST I<br />
FDNY Duane St. Command Post 646-613-0228/1591/7293<br />
NYPD Lt. McArdle 212-227-00<strong>10</strong> or 5564 ~<br />
Pager 914-771- 2889<br />
NYPD-PBMS D.I. John Codiglia 212-625-28<strong>10</strong><br />
PAPD Lt. Mark Winslow 212-608-5<strong>11</strong>1/5<strong>11</strong>5/9393<br />
OEM Kevin Culley (IC Liaison) 202-297- 7680<br />
DEP Paul Bennet or acting 917-769-1282/718-595-6777<br />
DDC 0500-1400 Tom O'Connor 917-560-5365<br />
Tom Amoia 917-681-7572<br />
Ed McGinley 347-245-0387<br />
1300-2200 Lou Mendes 646-235-3394<br />
Joe Deluca 347-386- 7329<br />
2<strong>10</strong>0-0600 Charlie Kaczorowski 646-772-2406<br />
DOH Dr. Jim Miller 917-642-2809<br />
NYSDECP Capt. T. Revella 646-756-3136<br />
DSNY Al Rahner 646-235-3040<br />
Red Cross Bill Bosak 516-287-5598<br />
NYCSO .Lt. Scali 646- 756-3125<br />
NYNG Capt. Colombo 973-615-6219 or 212-941-5281<br />
Lt. Erazo 917-577-2136<br />
DC AS George Frangoulis 646-772-8158<br />
CON ED George Greenwood 212-460-2602<br />
USPHS Ronald Herring 347-231-4632<br />
Salvo Army Capt. Denis James 917-587-4068<br />
Verizon Beth Drohan 646-613-9247 or 917-301-8864(cell)<br />
Dan Lynaugh 212-965-5702/5703/5704/5705<br />
Empire City John Roesch 212-242-<strong>11</strong>73//<strong>11</strong>80<br />
Sandra DiBernardo<br />
MT A Ken Mooney 718-243-4446<br />
John Ferrelli 718-243-3147<br />
Mike Fradua 718-243-4358<br />
NYDOL PESH Maureen Cox 518-225-6931<br />
EP A Neil Norrell 212-608- 7097 or 732-689-00<strong>10</strong><br />
Msword/FDNY -WTC Organization List (Telephone #)<br />
I
~~<br />
nn~~ ~<br />
3:§~~ ~ S<br />
=~ =<br />
ne; ~ ~<br />
~ !~ i' 8~ =<br />
;"C; n~~.<br />
~ "I§ ~~~<br />
= So... 'P ~ ~ L<br />
~ i =~2<br />
~ ~~i QS ~~ ~~f ~~Q ~~@<br />
~~~ ~oo ~ ~ ~e ir~~ S';~<br />
...~~ 00 ~~~ I =ri Iia"~i' = :z<br />
~:! ~1 :300 itO =~= ...<br />
ii"
~ .<br />
.~OI.;-09-<strong>2001</strong> 14:59 F.03,'03<br />
FDNY<br />
Daily lAP Progress Report for Agency<br />
nTLL Y CONSTRUCIION<br />
BaJlkers Trust Debris Removal<br />
; lST AFFIN G cHAi'i GES -Nt A -J<br />
<strong>11</strong>/<strong>10</strong>/<strong>2001</strong><br />
ACCO:MPLISH1\IIENTS -Debris removal continues on floors <strong>11</strong> thru 23,<br />
,~."f';~~<br />
PLANNED ACTIONS (Next 24 hours) -Primary goal is to continue<br />
\ debris removal o~ the <strong>11</strong> tb ~ 23rd floors jn order to gain acces~ to col., C-8. D.ebris i<br />
, removal work will now proceed ftom the 23 rd floor do~-n. Cutting torch work ~ll be<br />
Inecessary for all the aforementioned work. Torch work will start no earlier than 06:30<br />
and wil] end by ] 7:00. Hand line fue prevention/suppression support from FDNY will be I<br />
CSS8ry during this time on a floor by floor basis.<br />
'<br />
~~;/:;,"<br />
It.,<br />
rJ: :-.,~<br />
,~'"~<br />
.'i,,;!:i'f'<br />
I<br />
ANTICIPATED ACTIONS (Next 72 hours) -Continuing debris<br />
removal from upper to lower floors. Hand line fire prevention/suppression support from<br />
ffiNY win be necessary during this time on a floor by floor basis. Torch work will be I<br />
scheduled to take place from 06:30 -17:00 daily.<br />
- I<br />
FAX DAIL Y CHANGES TO FD INCffiENT COMMAND CENTER.. 646.613-g406 NO<br />
LATER TRA.N 1500 HOURS FOR INCLUSION IN FOLLOWING DA YS IAP.<br />
TOTAL P.et3
I t~Ov-09-<strong>2001</strong> 14: 59<br />
.P.02/03<br />
FDNY<br />
Daily lAP Progress Report for Agency<br />
Th~L Y CONSTRUCfION<br />
WTCSITEPROPER<br />
BANKERS TRUST TRACKED ON SEPARATE SHEET<br />
--<br />
<strong>11</strong>/<strong>10</strong>/<strong>2001</strong><br />
L::::~~:~::~~_:=-~~:=~-~=~~=J<br />
A CCO MPLISH:L\'lENTS<br />
-Debris Removal from WTC 2.<br />
-Support Dewatering and Tiebacks 'With BOVIS<br />
-Continue Demolition of WTC #4<br />
-Install new pemlanent work perimeter with Jersey Barriers/Fencing on top<br />
-Debris removal along east slUIIY wall<br />
-Erect Crane Platforms for W'TC #5<br />
PLANNED ACTIONS (Next 24 hours)<br />
-Debris Removal from WTC 2.<br />
1 -Support Dewatering and Tiebacks \'-ith BOVIS<br />
-Continue WTC #4 Demolition (FDNY Support Required for Steel Cutting)<br />
-Erect Crane Platforms for WTC #S .<br />
-Install new pennanent work perimeter with Jersey Bazriers/Fencing on top<br />
-Debris removal along east slurry wall<br />
~TICIPATED ACnONS (Next 12 bours)<br />
I = NO WORK ON <strong>11</strong>/12<br />
-Begin Demolition of WTC #s<br />
-Debris Removal from WTC 2.<br />
-Support Dewatering and Tiebacks Ytith HOVIS<br />
-Continue to Erect Crane PlatforJIls for WTC #5<br />
-Debris removal along east slurry wall<br />
F AX D~~ Y CHANGES TO FD INCIDENT COM1vtAND CENTER. 646-613 -8406 NO<br />
LA TER THAN 1500 HOURS F'OR INCLUSION IN FOLLOWING DAYS IAP .
NOU <strong>10</strong> <strong>2001</strong> 06: 19 FR UERIZON 212 965<strong>10</strong>16 TO 16466138406 P.01<br />
..<br />
FDNY V "-<br />
Daily lAP Progress Report for Agency ~-~~ r ~~~,~- ~<br />
iSTAFFINGCHANGES ( I<br />
I fJ It I<br />
:- \ I<br />
\ ACCOMPLISHMENTS \ I<br />
I<br />
T ..e;\( fho/\ e /2.eS r()r~ t/'O,.." J v f('C) U r~.J...s I<br />
I<br />
\ I<br />
, !<br />
I<br />
I<br />
I ;<br />
I<br />
i<br />
I!<br />
, --,<br />
I PLANNED ACTIONS (Next 24 hours)<br />
I Sf", rt (.,..oI.J ~ r low (..All ft..s k,' A/"j ft,u ~+. (f"e h ,\tJ) /7'0 Wtl)tJ )<br />
I<br />
I ~~.-- O/\J S '"' ~. rJ "'""( J t ! I \ 0 ~ ~ C () N t j \f\J VI e .~.,.,'(),..<br />
k., ~ )<br />
J<br />
! t:)r > vNJfrOfCIJAJ. c~~«s ~ 1-(.., ,.Ie-e~s. 1<br />
" ',.!<br />
I<br />
,c-.<br />
I ,I<br />
! j<br />
I<br />
L. --_J<br />
'ANTICIPATED ACTIONS (Next 72 hours) ~I<br />
i<br />
i<br />
! -c.ONt-I\i'\)~ L.A/Df k. 0"", W/tJ~l"'\/J/2>N Sf. be~,/~J I<br />
i 1 \(L9 w.eJ t- s- +, l T~lt;,.o~_o.)"< 8i..-'.;(r,A('tV))<br />
I<br />
i<br />
:<br />
i<br />
1<br />
i --~ j<br />
FAX DAIt if CHANGES TO FD INCIDENT COMMAND CENTER. 646-613-8406 NO LATER<br />
THAN 1500 HOURS FOR ~CLUSION rN FOLLOWrNG DAYS lAP.
NO~ <strong>10</strong> <strong>2001</strong> 06:18 FR UERIZON 212 865<strong>10</strong>15 TO 16466138406 P.~2<br />
FDNY --\ /' -/ S I<br />
tlV\tll(C l(:tI Y '.4.~Wo.lj<br />
Daily lAP Progress Report for Agency ! i<br />
, I<br />
I ST AFFIN G CHANGES! \<br />
~<br />
A.J(A I<br />
I i A CC 0 MPL ISHMENTS ~<br />
I , """---<br />
I<br />
I<br />
I<br />
i"1 I<br />
l<br />
I<br />
1_- :<br />
I<br />
t<br />
I<br />
I<br />
I<br />
I ~1(IO) S~().rt<br />
G:l,.-(Ga.v~t,-()6A...I Ou Bdrclo.y s~. fro",,", i<br />
~e S~t..t.~.@ru 5th l).f: n-e !\AJ~erJCct/oN ~f &r( (o.y !<br />
I<br />
tJ,,~ Gr-eew
~ I<br />
:1Fie FIRE DEPARTMENT<br />
/"1;l1r<br />
<strong>10</strong>0 DUANE STREET<br />
l.Ij,:7n~ NEW YORK, NY <strong>10</strong>007<br />
a<br />
TEL. 646.613.1757<br />
Wew or~ FAX 646.613.1649<br />
WTC COMMAND<br />
TO:<br />
WTC Task Force<br />
FROM: Peter E. Hayden Incident Commander<br />
SUBJECT:<br />
Command Post Staffing - <strong>10</strong>0 Duane Street<br />
WTC Task Force<br />
Duane Street Command Post<br />
Effective Saturday, November <strong>10</strong>,<strong>2001</strong>, the Command Post will discontinue 24-hour operations.<br />
The hours of operations for the Command Post will be 0700 -1900 hours, 7 days a week.<br />
The Operations Post will be the FD contact point from 1900 -0700 hours.<br />
Command Post (<strong>10</strong>0 Duane Street) 0700 -1900 hours<br />
646.613.1757<br />
646.613.0078<br />
646.613.1513<br />
646.613.0465 (fax)<br />
0 erations Post uarters of En 'ne <strong>10</strong>/ Ladder <strong>10</strong> 1900 -0700 hours<br />
212.425.4278<br />
212.480.1489<br />
212.425.0972<br />
212.425.4281 (fax)<br />
Peter Hayden<br />
Incident Commander<br />
WTC Task Force<br />
C.c.:<br />
Bureau of Operations<br />
OEM<br />
DDC<br />
-1 -
..FDNY<br />
Daily lAP Request Form for Agency<br />
ACCOMPLISHMENTS (torch cutting, confined space entries, planned<br />
entries and vehicle removals)<br />
PLANNED ACTIONS (Next 24 hours for torch cutting, confined space<br />
entries, planned entries and vehicle removals)<br />
ANTICIPATED ACTIONS (Next 72 hours for torch cutting, confined<br />
space entries, planned entries and vehicle removals)<br />
i ,I ",co ~,'. ""<br />
FAX DAILY REQUESTS TO FD INCillENT COMMAND CENTER, 646-613-8406 NO LATER<br />
THAN 1500 HOURS FOR INCLUSION IN FOLLOWING DAYS lAP. NO CUTTING, ENTRIES<br />
OR VEHICLE REMOV ALS WILL BE ALLOWED WITHOUT PRIOR FD APPROV AL.<br />
..~~: