EXPRESSION OF INTEREST FOR PRIME PARTNERS<br />
HULL , PIPING & MACHINERY AND PAINTING WORKS<br />
<strong>Cochin</strong> <strong>Shipyard</strong> Limited (CSL) invites “Expression <strong>of</strong> Interest” from reputed<br />
organization <strong>for</strong> enlisting them as <strong>prime</strong> partners <strong>for</strong> Hull, Piping & Machinery and<br />
Surface Preparation & painting <strong>for</strong> Ship Building projects <strong>of</strong> CSL <strong>for</strong> a specified<br />
period <strong>of</strong> minimum five years.<br />
The <strong>interest</strong>ed firms are requested to <strong>for</strong>ward the details separately <strong>for</strong> each category<br />
<strong>of</strong> work in the prescribed application <strong>for</strong>m. Application <strong>for</strong>m and more details are<br />
available in CSL website: www.cochinshipyard.com<br />
Last date <strong>of</strong> receipt <strong>of</strong> EOI - up to 1500hrs on 30.04.2011<br />
Sd/-<br />
Deputy General Manager (SSD)
EXPRESSION OF INTREST FOR SELECTION OF PRIME PARTNER IN Hull, Pipe &<br />
Machinery And Painting WORKS<br />
1. Offers are invited from firms <strong>for</strong> short listing them <strong>for</strong> the following jobs<br />
• Hull block grand assembly & erection in docks - Hull <strong>prime</strong> Partner<br />
• Pipe fabrication, onboard installation, machinery installation and all hull outfitting works-<br />
Pipe & Machinery <strong>prime</strong> Partner<br />
• Surface preparation and painting <strong>of</strong> on- block and on board vessels till delivery - Supply cum Apply<br />
method - Painting <strong>prime</strong> Partner<br />
2. Yard Pr<strong>of</strong>ile<br />
<strong>Cochin</strong> <strong>Shipyard</strong> was incorporated in the year 1972 as a fully owned Government <strong>of</strong> India company. During the last<br />
three decades the company has emerged as a <strong>for</strong>erunner in the Indian Shipbuilding & Ship repair industry.<br />
Main Features<br />
• A category I Mini Ratna Company with ‘Excellent’ rating since several years.<br />
• Capacity to build ships upto 1,10,000 DWT and repair upto 1,25,000 DWT.<br />
• Only shipyard in India to have implemented Integrated Management System ( ISO 9001:2008 + ISO 14001:2004<br />
+ OHSAS 18001:2007)<br />
• ISPS code complied.<br />
• Building the first indigenous aircraft carrier <strong>for</strong> India Navy.<br />
• Two full fledged ancillary units adjacent to the yard.<br />
Major Facilities<br />
Dock Size Capacity Cranage<br />
Dock No.1 270 x 45 x12 M 125,000 DWT 60t, 40t, 10t<br />
Dock No.2 255 x 43 x 9 M 110,000 DWT 300t, 150t & 50t
Land<br />
Quay 1 – <strong>for</strong> Repairs<br />
Quay 2 – <strong>for</strong> Repairs<br />
Quay 3 – <strong>for</strong> Fitting Out<br />
Steel Fabrication Facility<br />
Covered Shop Area<br />
Steel Stockyard<br />
Marine Coating Shop<br />
CNC Plasma Cutting Machine<br />
Plate Rolling Machine<br />
Cranes ( Max 300 T)<br />
Mobile Cranes ( Max 150 T)<br />
Transporters ( Max 150 T)<br />
170 Acres<br />
290 M<br />
208 M<br />
460 M<br />
2000 TPM<br />
65,000 Sq. M<br />
18,000 Sq. M<br />
2 Nos<br />
2 Nos<br />
1 No<br />
80 Nos<br />
5 Nos<br />
2 Nos<br />
Order Book Status<br />
In the recent years the yard is more focused on building <strong>of</strong>fshore supporting vessels like PSVs, AHTS, Tugs etc.<br />
Present order book contains 14 <strong>of</strong>fshore supporting vessels which includes ‘Clean Design’ category <strong>of</strong> vessels <strong>for</strong><br />
different <strong>for</strong>eign owners, and 20 nos <strong>of</strong> Fast Patrol Vessel <strong>for</strong> Coast Guard.<br />
3. The terms and conditions are enclosed herewith.<br />
4. Any clarification <strong>for</strong> the terms and conditions can be had from the <strong>of</strong>fice <strong>of</strong> Deputy General Manager, Small<br />
Ship Division.<br />
5. After ascertaining capabilities, past per<strong>for</strong>mance etc. the short listed candidates will be called <strong>for</strong> discussion at<br />
CSL. The firms are requested to give the details <strong>of</strong> their company including the financial and technical<br />
capabilities, the nature <strong>of</strong> work presently done, number <strong>of</strong> employees in their rolls etc.<br />
6. Application <strong>for</strong> Expression <strong>of</strong> <strong>interest</strong> has to be submitted to the <strong>of</strong>fice <strong>of</strong> Deputy General Manager , Small<br />
Ship Division, <strong>Cochin</strong> <strong>Shipyard</strong> Ltd, <strong>Cochin</strong> -682015, Kerala State, India superscripting “ Application <strong>for</strong><br />
Hull <strong>prime</strong> Partner”, Application <strong>for</strong> Pipe and machinery <strong>prime</strong> partner” or “Application <strong>for</strong> Surface<br />
preparation and painting <strong>prime</strong> partner” on or be<strong>for</strong>e 30 April 2011.
1. Scope<br />
TERMS & CONDITIONS<br />
A. Hull - Erection <strong>of</strong> all hull Blocks/units in dry dock and make vessel ready <strong>for</strong> launching after<br />
ensuring welding and structural integrity <strong>of</strong> tanks/boundaries <strong>of</strong> vessels. At a later stage block<br />
fabrication can also be included in the work content. However the yard reserves the right to<br />
allocate full or part <strong>of</strong> a vessel depending upon the capability <strong>of</strong> the firm. The indicative vessels<br />
envisaged are Off shore vessels PSVs, AHTS, Tugs, Dredgers other similar vessels <strong>of</strong> length x<br />
width up to 100 x 22 meter<br />
B. Outfitting – To undertake pipe spool fabrication, pressure testing, blasting, pickling &<br />
galvanizing, onboard installation, commissioning <strong>of</strong> total piping systems, all hull outfitting,<br />
machinery installation and commissioning/dock trials <strong>of</strong> equipments <strong>of</strong> vessels. However the<br />
yard reserves the right to allocate full or part <strong>of</strong> a vessel depending upon the capability <strong>of</strong> the<br />
firm. The indicative vessels envisaged are Off shore vessels PSVs, AHTS, Tugs, Dredgers other<br />
similar vessels <strong>of</strong> length x width up to 100 x 22 meter.<br />
C. Surface preparation and painting – To undertake surface preparation and painting works <strong>of</strong> both on<br />
block and onboard the vessels. The idea is to allocate one vessel with a specified painting scheme as per<br />
the technical specification <strong>of</strong> the vessel so that both supply <strong>of</strong> paints as well as application as per the<br />
specified thickness can be carried out till the delivery <strong>of</strong> vessels. The work involves apart from block<br />
blasting in coating shops , the tank painting, hull exterior preparation and ptg in dock, preparation like –<br />
power tooling inside compartments and machinery spaces, water blasting on decks , tank coating<br />
including blasting as specified in the scheme.<br />
2. Division <strong>of</strong> activities and facilities<br />
A. Scope <strong>of</strong> Firm – Hull<br />
1. Preparation <strong>of</strong> work schedule <strong>for</strong> entire work.<br />
2. Maintain sufficient Man power <strong>for</strong> executing work.<br />
3. Block erection, Fit up, fairing, welding, Dry survey, Grinding, minor modification.<br />
4. Tank testing – air test, hydraulic test, prior outfit, post outfit - as applicable. Required fresh water <strong>for</strong> hydraulic<br />
test shall be arranged by partner.<br />
5. Rectification <strong>of</strong> survey comments, any other minor work to meet class and Owner s requirement.<br />
6. Marking and identification.<br />
7. NDT- DP<br />
8. Preparation and application <strong>of</strong> one coat <strong>of</strong> <strong>prime</strong>r on burnt areas.<br />
9. Supply cum arranging required general and spot lightings in block and onboard to meet yard safety standards.<br />
Lights / wires and execution by contractor. Yard will supply only power.<br />
10. Auto level <strong>for</strong> erection <strong>of</strong> blocks.<br />
11. Measuring tools<br />
12. Supply cum arranging required ventilation blowers / exhaust fans to meet yard safety standards.<br />
13. Supply cum arranging required staging / materials to meet yard safety standards.<br />
14. Collection <strong>of</strong> CSL supplied materials from stores.<br />
15. Scrap removal and maintain clean work environment.<br />
16. Transportation <strong>of</strong> blocks / materials between shop and vessel construction site<br />
17. Required number <strong>of</strong> electric ovens - Portable type electrode drying<br />
18. Required number <strong>of</strong> pneumatic flux chippers<br />
19. Required number <strong>of</strong> Tank testing - air test kit.<br />
20. Required number <strong>of</strong> welding machinery (Manual & Co2) / Rectifier set etc along with necessary length cables.<br />
21. Cutting torches with hoses <strong>of</strong> necessary length etc.<br />
22. Welding consumables approved by CSL
23. Other consumables like grinding wheels, buffing wheels along with necessary machinery.<br />
24. IRS/ DNV / ABS class approved qualified welders and welder identity card.<br />
25. Required number <strong>of</strong> Trans<strong>for</strong>mers – 110V and 24V<br />
26. Required number <strong>of</strong> Portable cutting machines IK 72 T/ IK 12 MAX 3 SP-300 / IK 54D<br />
27. All necessary PPEs<br />
28. Required number <strong>of</strong> Tested slings, wire rope, light weight chain pulleys (<strong>of</strong> capacities 2, 3, 5&10 Tons),<br />
shackles, bottle screws (2,4& 6Tons) and other lifting items.<br />
29. Sufficient light weight - hydraulic jacks with pumps (Horizontal / vertical) ( <strong>of</strong> capacities 2,5,10,25,50 & 100<br />
Tons), push pull jacks ( <strong>of</strong> capacities 25 &50 Tons)& mechanical jacks (<strong>of</strong> capacities 2, 3, 5&10 Tons),<br />
30. Cotton boiler suits, hand tools<br />
31. Safety items.<br />
32. Container <strong>for</strong> storage and site <strong>of</strong>fice.<br />
33. Material transporting vehicles like multipurpose pick up van.<br />
34. Necessary man power <strong>for</strong> executing the project including Quality control, safety, rigging etc.<br />
35. All statutory laws / labour welfare etc. existing in yard shall be complied.<br />
36. Round the clock working whenever required.<br />
37. The firm shall be conversant with the existing labour situation/ practices in CSL.<br />
38. Transport to & fro from yard/ accommodation <strong>for</strong> the employees, if required.<br />
39. Separate team set up to handle works, Staging, material movement, onboard electrical servicing, material<br />
movement, planning, Store management/ procurement /custom <strong>for</strong>malities, safety, inspection & quality<br />
control, HR <strong>for</strong> laisoning CSL <strong>of</strong>ficials <strong>for</strong> entry pass etc shall be set up by the firm. The organization structure<br />
<strong>of</strong> the firm shall cater to minimum above which can be further expanded depending upon the requirements.<br />
Note: The above are given <strong>for</strong> guidance. Any other related activity / required items which normally happens in<br />
ship building and not mentioned in yard scope shall also be included in the scope.<br />
Scope <strong>of</strong> Firm –<br />
B. Piping, machinery installation/commissioning and Hull Outfitting.<br />
1. Preparation <strong>of</strong> work schedule <strong>for</strong> entire work.<br />
2. Maintain sufficient Man power <strong>for</strong> executing work.<br />
3. Fabrication <strong>of</strong> pipe spools, Fit up, welding, Dry survey, Grinding shop inspection and testing.<br />
4. Arrangement <strong>of</strong> skids <strong>for</strong> fabrication.<br />
5. Procurement <strong>of</strong> identified materials <strong>for</strong> the work like flanges, fittings et, bolts, nut, zero asbestos free gasket,<br />
pipe clamps, out fit angles/ pr<strong>of</strong>iles, rods, chequered plates, flushing oil which are non-class etc.<br />
6. Pickling <strong>of</strong> pipes applying one coat <strong>prime</strong>r.<br />
7. Blasting and galvanizing <strong>of</strong> pipes.<br />
8. Blasting and applying one coat <strong>of</strong> <strong>prime</strong>r on miscellaneous items including pipes wherever required.<br />
9. Procurement/ fabrication <strong>of</strong> pipe clamps as per drawings.<br />
10. Procurement/ fabrication miscellaneous outfit items as per drawings.<br />
11. Onboard installation, pressure testing and commissioning <strong>of</strong> pipes including flushing <strong>of</strong> oil pipes.<br />
12. Installation and final commissioning <strong>of</strong> machinery including sea trials.<br />
13. Rectification <strong>of</strong> survey comments, any other minor work to meet class and Owner s requirement.<br />
14. Marking and identification.<br />
15. NDT- DP<br />
16. Scrap removal and maintain clean work environment.<br />
17. Collection <strong>of</strong> CSL supplied materials from stores.<br />
18. Transportation <strong>of</strong> materials between shop and vessel.<br />
19. Blasting and applying one coat <strong>of</strong> <strong>prime</strong>r. Copper slag supply under contractor’s scope.<br />
20. Required number <strong>of</strong> welding machinery (Manual & Co2) / Rectifier set etc.<br />
21. Welding consumables approved by CSL<br />
22. IRS/ DNV / ABS class approved qualified welders and welder identity card<br />
23. Supply cum arranging required general and spot lightings in block and onboard to meet yard safety standards.<br />
Lights / wires and execution by contractor. Yard will supply only power.
24. Supply cum arranging required ventilation blowers / exhaust fans to meet yard safety standards.<br />
25. Supply cum arranging required staging / materials to meet yard safety standards<br />
26. Required number <strong>of</strong> Trans<strong>for</strong>mers – 110V and 24V<br />
27. All necessary PPEs<br />
28. Pickling including raw materials. Tanks will be provided by yard but consumables shall be contractors’ scope.<br />
29. Galvanizing including to and fro arrangements between yard and galvanizing plant.<br />
30. Required number <strong>of</strong> Tested slings, wire rope, chain pulleys, shackles, hydraulic jacks and other lifting items<br />
<strong>for</strong> the works to be executed.<br />
31. Flushing pump set and pressure testing pumps<br />
32. Cotton boiler suits, hand tools<br />
33. Container <strong>for</strong> storage and site <strong>of</strong>fice.<br />
34. Material transporting vehicles like. like multipurpose pick up van<br />
35. Necessary man power <strong>for</strong> executing the project including Quality control, safety, rigging etc.<br />
36. All statutory laws / labour welfare etc. existing in yard shall be complied.<br />
37. Round the clock working whenever required.<br />
38. Transport/ accommodation <strong>for</strong> the employees, if required.<br />
39. The firm shall be conversant with the existing labour situation/ practices in CSL.<br />
40. Safety items<br />
41. Separate team set up to handle works, Staging, material movement, onboard electrical servicing, material<br />
movement, planning, Store management/ procurement, safety, inspection & quality control, HR <strong>for</strong> laisoning<br />
CSL <strong>of</strong>ficials <strong>for</strong> entry pass/ custom <strong>for</strong>malities etc shall be set up by the firm. The organization structure <strong>of</strong><br />
the firm shall cater to minimum above which can be further expanded depending upon the requirements.<br />
Note: The above are given <strong>for</strong> guidance. Any other related activity / required items which normally happens in<br />
ship building and not mentioned in yard scope shall also be included in the scope.<br />
Scope <strong>of</strong> Firm –<br />
C. Surface preparation and painting<br />
1. Maintain sufficient Man power <strong>for</strong> executing work.<br />
2. Procurement <strong>of</strong> required quantity <strong>of</strong> paints as per the desired thickness application on the vessel.<br />
3. Blasting and applying one coat <strong>of</strong> <strong>prime</strong>r on miscellaneous items including pipes wherever required.<br />
4. Inspection / rectification based on comments <strong>of</strong> paint representative, owner’s reps and yard personnel.<br />
Calibrated inspection equipments shall be under firm’s scope.<br />
5. Associated waste removal and cleaning,<br />
6. Arranging block movements.<br />
7. Collection <strong>of</strong> CSL supplied materials, if any, from stores.<br />
8. Transportation <strong>of</strong> materials between shop and vessel.<br />
9. Blasting and applying one coat <strong>of</strong> <strong>prime</strong>r / or system coats <strong>of</strong> hull blocks<br />
10. Onboard preparation right from hull exterior onwards and painting on all areas as per the scheme till the<br />
delivery <strong>of</strong> vessels.<br />
11. Hot work area preparation and touch ups.<br />
12. Final cleaning <strong>of</strong> vessel.<br />
13. Close co-ordination with yard other teams like hull, piping. Electrical and accommodation teams.<br />
14. Class inspection <strong>for</strong> vessels having PSPC notation and maintaining <strong>of</strong> documents.<br />
15. Supply cum arranging required general and spot lightings in block and onboard to meet yard safety standards.<br />
Lights / wires and execution by contractor. Yard will supply only power.<br />
16. Supply cum arranging required ventilation blowers / exhaust fans, Humidifiers to meet yard safety / painting<br />
standards.<br />
17. Supply cum arranging required staging / materials to meet yard safety standards<br />
18. Required number <strong>of</strong> Trans<strong>for</strong>mers – 110V and 24V<br />
19. All necessary PPEs including blasting suits, helmets, visors etc.<br />
20. Required number <strong>of</strong> Tested slings, wire rope, other lifting items <strong>for</strong> the works to be executed.<br />
21. Cotton boiler suits, hand tools<br />
22. Container <strong>for</strong> storage and site <strong>of</strong>fice.<br />
23. Material transporting vehicles like. like multipurpose pick up van
24. Necessary man power <strong>for</strong> executing the project including Quality control, safety, rigging etc.<br />
25. All statutory laws / labour welfare etc. existing in yard shall be complied.<br />
26. Round the clock working.<br />
27. Transport/ accommodation <strong>for</strong> the employees, if required.<br />
28. The firm shall be conversant with the existing labour situation/ practices in CSL.<br />
29. Safety items<br />
30. Arranging Tank coating equipments, compressors, dehumidifiers, consumables, water blasting equipments,<br />
painting machine and accessories <strong>for</strong> the areas wherever required,<br />
31. Portable compressors <strong>for</strong> painting when compressed air at the utility point is not available.<br />
32. Grinding machines, buffing machines, various types <strong>of</strong> painting brushes, other consumables,<br />
33. Separate team set up to handle works, Staging, material movement, onboard electrical servicing, material<br />
movement, planning, Store management/ procurement, safety, inspection & quality control, HR <strong>for</strong> laisoning<br />
CSL <strong>of</strong>ficials <strong>for</strong> entry pass/ custom <strong>for</strong>malities etc shall be set up by the firm. The organization structure <strong>of</strong><br />
the firm shall cater to minimum above which can be further expanded depending upon the requirements.<br />
Note: The above are given <strong>for</strong> guidance. Any other related activity / required items which normally happens in<br />
ship building and not mentioned in yard scope shall also be included in the scope.<br />
Scope <strong>of</strong> <strong>Cochin</strong> <strong>Shipyard</strong> Limited<br />
• Supply <strong>of</strong> oxygen, nitrogen, argon, acetylene, LPG, CO 2<br />
• Supply <strong>of</strong> compressed air at the utility point.<br />
• Electric supply <strong>of</strong> 440V and 230V at the designated switchboards.<br />
• Water.<br />
• Load testing tanks <strong>for</strong> DG commissioning. ( For machinery team)<br />
• Blocks concrete/ wood <strong>for</strong> erection <strong>of</strong> units<br />
• Gangways/ tower etc.<br />
• Issuing <strong>of</strong> entry pass <strong>for</strong> employees. But all necessary <strong>for</strong>malities shall be completed by firm.<br />
• Required area <strong>for</strong> construction activities land/ dock/ berths etc.<br />
• Cranage, material movement equipment, transporter, <strong>for</strong>klift etc subject to non- availability on<br />
account <strong>of</strong> maintenance.<br />
• X-ray, UT tests etc <strong>for</strong> normal scope.<br />
• Drawings <strong>for</strong> the works.<br />
• All surveyed hull blocks.<br />
• Pipes/ elbows cut and <strong>for</strong>med based on drawing from yard/ site sketches by the firm ( For piping<br />
teams)<br />
• Material supply <strong>for</strong> outfitting all major machinery and other items to be discussed during<br />
finalization. (Piping & Machinery team)<br />
• Communication connection/ internet/ telephone. Initial and monthly charges shall be on payment<br />
basis.<br />
• Pickling Tanks will be provided by yard but consumables shall be contractors’ scope ( For Piping team)<br />
• Any yard facility not specifically mentioned in above can be spared to contractor based on<br />
availability subject to reasonable rental charges.<br />
• Regarding storage facility & <strong>of</strong>fice space final decision will be made after the selection <strong>of</strong> <strong>prime</strong><br />
contractors.<br />
• Major safety extinguishers etc.<br />
• Paint coating shops as per requirement with existing facilities and those which are updated as and<br />
when.(For painting team)<br />
D. Eligibility Criteria<br />
Organization must have sufficient financial strength to undertake the jobs. Further past experience<br />
In undertaking hull or outfitting related engineering works/ business will be advantageous.
E. Period <strong>of</strong> work in CSL & Methodology <strong>of</strong> payment<br />
The selected and finally short listed firms / <strong>prime</strong> contractors will be awarded the full related work <strong>of</strong><br />
vessels as per the “Scope <strong>of</strong> work” <strong>for</strong> a duration <strong>of</strong> 3 years and can be extended to 2 more years<br />
depending upon satisfactory per<strong>for</strong>mance or till the completion <strong>of</strong> existing projects. Further extension can<br />
be made based on mutual agreement. The works are construction <strong>of</strong> small vessels like <strong>of</strong>f shore vessels,<br />
tugs, dredgers etc.<br />
The yard proposes to adopt a lump sum payment method <strong>for</strong> the vessel/ part <strong>of</strong> vessel with stage payment<br />
based on cardinal activities. However the firm can indicate the payment methodology and the exact<br />
methodology will be decided at the end <strong>of</strong> selection process after discussion with selected firms. The firm<br />
shall be conversant with the existing tax laws with respect to Kerala state and central government.<br />
CSL will have operation <strong>of</strong> more than one new building project at a time. Yard at their sole discretion may<br />
allocate a project full or part <strong>of</strong> the vessel or all the projects in the same series depending upon the<br />
capability <strong>of</strong> firm on competitive quotation/ pricing. The firm which is most competitive will be <strong>of</strong>fered<br />
the job. The yard is planning to have MoU with the selected firms based on which a portion <strong>of</strong> future<br />
orders could be taken. Exact details <strong>of</strong> MoU will be finalized based on selection <strong>of</strong> capable firms <strong>for</strong> the<br />
above works.<br />
F. Attached <strong>for</strong>mat may be filled by the firm while submitting the EOI. Any details <strong>for</strong> which further documents<br />
need to be submitted the same shall also be furnished. We are sourcing out firm <strong>for</strong> each type A, B or C.<br />
A firm is expected to respond <strong>for</strong> one category. However if they are <strong>interest</strong>ed <strong>for</strong> two or more separate <strong>for</strong>m<br />
shall be filled.<br />
Deputy General Manager<br />
Small Ship Division
APPLICATION FOR<br />
EXPRESSION OF INTEREST (EOI )<br />
COCHIN SHIPYARD LIMITED<br />
<strong>Cochin</strong> 682 015<br />
(Small Ship Division)
A. Pr<strong>of</strong>ile<br />
BIO-DATA CUM APPLICATION FOR PRIME PARTNER<br />
S/N DESCRIPTION DETAIL<br />
1 Name and address <strong>of</strong> the Prime Partner<br />
2<br />
3<br />
Have you had local set up at present if so,<br />
pl furnish details– contact address (Postal<br />
address with pin code and Telephone/ fax/<br />
email)<br />
Nature <strong>of</strong> Business<br />
(Details <strong>of</strong> constitution <strong>of</strong> the company i.e.<br />
sole proprietorship, partnership, private<br />
limited etc.)<br />
4 Year <strong>of</strong> establishment<br />
5<br />
Name and address <strong>of</strong> owner/ partners/<br />
directors<br />
6<br />
Have you understood or are in general<br />
compliance with the terms & conditions in<br />
the EOI Deviations if any shall be clearly<br />
indicated.<br />
(Signature <strong>of</strong> the Partner and seal)
B. Human Resources, Infrastructures and Experience<br />
S/N DESCRIPTION DETAIL<br />
Existing number <strong>of</strong> staffs. ( Biodata <strong>of</strong> key<br />
personnel’s may be enclosed)<br />
Permanent<br />
Temporary<br />
1<br />
2<br />
i. Fitter Structural<br />
ii. Fitter Machinery<br />
iii. Fitter Electrical<br />
iv. Welders<br />
v. Painters<br />
vi. Project Managers<br />
vii. Supervisors<br />
viii. Engineers<br />
ix. Unskilled workers<br />
x. Others (Specify)<br />
Equipments and tools (Specify Number and<br />
details <strong>of</strong> type, capacity etc))<br />
i. Welding sets<br />
ii. Cutting sets<br />
iii. Grinding machine<br />
iv. Drilling machine<br />
v. Lifting and handling tools<br />
vi. Others<br />
3 Existing Workshop Facilities (in detail)<br />
(Signature <strong>of</strong> the Partner and seal)
4<br />
Previous experience in ship building/ship<br />
repair /other heavy engineering works<br />
[Specify major jobs with clients address]<br />
(Signature <strong>of</strong> the Partner and seal)
C. Finance<br />
Indicate category wise value <strong>of</strong> the jobs done in the last three years (Documentary pro<strong>of</strong> may be<br />
attached)<br />
S/N Name <strong>of</strong> Job Period Client Value <strong>of</strong> Job<br />
1<br />
(Signature <strong>of</strong> the Partner and seal)
S/N DESCRIPTION DETAIL<br />
2<br />
Indicate category <strong>for</strong> which enlistment is<br />
sought <strong>for</strong>: ( indicate Yes/ No)<br />
A. Hull Prime Partner<br />
B. Piping & Machinery Prime Partner<br />
C. Painting Partner<br />
3<br />
Reference from the banker’s regarding<br />
financial stability<br />
4<br />
Copy <strong>of</strong> audited balance sheet and pr<strong>of</strong>it &<br />
loss a/c <strong>for</strong> last 3 years<br />
5 Litigation if any pending in the court <strong>of</strong> law<br />
6<br />
Your expectation <strong>of</strong> mode payment by CSL<br />
Signature:<br />
Name:<br />
Signature:<br />
Address Name <strong>of</strong> <strong>of</strong> Contractor: Firm:<br />
Address:<br />