30.01.2015 Views

expression of interest for prime - Cochin Shipyard

expression of interest for prime - Cochin Shipyard

expression of interest for prime - Cochin Shipyard

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. Period <strong>of</strong> work in CSL & Methodology <strong>of</strong> payment<br />

The selected and finally short listed firms / <strong>prime</strong> contractors will be awarded the full related work <strong>of</strong><br />

vessels as per the “Scope <strong>of</strong> work” <strong>for</strong> a duration <strong>of</strong> 3 years and can be extended to 2 more years<br />

depending upon satisfactory per<strong>for</strong>mance or till the completion <strong>of</strong> existing projects. Further extension can<br />

be made based on mutual agreement. The works are construction <strong>of</strong> small vessels like <strong>of</strong>f shore vessels,<br />

tugs, dredgers etc.<br />

The yard proposes to adopt a lump sum payment method <strong>for</strong> the vessel/ part <strong>of</strong> vessel with stage payment<br />

based on cardinal activities. However the firm can indicate the payment methodology and the exact<br />

methodology will be decided at the end <strong>of</strong> selection process after discussion with selected firms. The firm<br />

shall be conversant with the existing tax laws with respect to Kerala state and central government.<br />

CSL will have operation <strong>of</strong> more than one new building project at a time. Yard at their sole discretion may<br />

allocate a project full or part <strong>of</strong> the vessel or all the projects in the same series depending upon the<br />

capability <strong>of</strong> firm on competitive quotation/ pricing. The firm which is most competitive will be <strong>of</strong>fered<br />

the job. The yard is planning to have MoU with the selected firms based on which a portion <strong>of</strong> future<br />

orders could be taken. Exact details <strong>of</strong> MoU will be finalized based on selection <strong>of</strong> capable firms <strong>for</strong> the<br />

above works.<br />

F. Attached <strong>for</strong>mat may be filled by the firm while submitting the EOI. Any details <strong>for</strong> which further documents<br />

need to be submitted the same shall also be furnished. We are sourcing out firm <strong>for</strong> each type A, B or C.<br />

A firm is expected to respond <strong>for</strong> one category. However if they are <strong>interest</strong>ed <strong>for</strong> two or more separate <strong>for</strong>m<br />

shall be filled.<br />

Deputy General Manager<br />

Small Ship Division

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!