05.02.2015 Views

Zoning By Law - Town of Ashburnham, Massachusetts

Zoning By Law - Town of Ashburnham, Massachusetts

Zoning By Law - Town of Ashburnham, Massachusetts

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

water bodies. Dry wells shall be used only where other methods are<br />

infeasible, and shall be preceded by oil, grease, and sediment traps to<br />

facilitate removal <strong>of</strong> contamination. All recharge areas shall be permanently<br />

maintained in full working order by the owner.<br />

h. A Special Permit shall be required for the rendering impervious <strong>of</strong> more<br />

than 15%, or 2,500 square feet <strong>of</strong> any lot, provided that a system for<br />

artificial recharge <strong>of</strong> precipitation to groundwater is developed, which shall<br />

not result in degradation <strong>of</strong> groundwater.<br />

3.34 Flood Plain District Regulations<br />

a. In the Floodway, designated on the Flood Boundary and Floodway Map, the<br />

following provisions shall apply:<br />

1.) All encroachments, within the Floodway, including fill, new<br />

construction, substantial improvements to existing structures, and other<br />

development are prohibited unless certification by a registered<br />

pr<strong>of</strong>essional engineer or architect is provided by the applicant<br />

demonstrating that an equal amount <strong>of</strong> compensatory flood storage area,<br />

having an unrestricted hydraulic connection to the same waterway or<br />

water body, is provided within the same property bounds.<br />

Compensatory storage shall mean a volume not previously used for<br />

flood storage on the same property and shall be incrementally equal to<br />

the theoretical volume <strong>of</strong> flood water at each elevation, up to and<br />

including the 100-year flood elevation, which would be displaced by the<br />

proposed project.<br />

2.) Any encroachment meeting the above standard shall comply with the<br />

flood plain requirements <strong>of</strong> the State Building Code.<br />

Except for structures designed for flood control or water storage<br />

purposes, allowed or permitted uses shall not substantially reduce<br />

natural water storage capacities nor substantially affect natural stream<br />

flow.<br />

Septic tanks, cesspools and leaching fields shall not be permitted.<br />

Driveways and roads are permitted where alternative means <strong>of</strong> access<br />

are impractical.<br />

b. Subdivision Standards for the Flood Plain District<br />

All subdivision proposals and other proposed new development shall be<br />

reviewed by the Planning Board’s engineer at the applicants expense to<br />

determine whether such proposals will be reasonably safe from flooding. If<br />

______________________________________________________________________________<br />

ASHBURNHAM ZONING BY-LAWS<br />

Pg. 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!