14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong><br />

<strong>Balasore</strong> <strong>District</strong><br />

<strong>Balasore</strong>, Orissa<br />

Technical Support Institution (TSI)<br />

NABARD Consultancy Services<br />

Nabcons Cell, NABARD, Orissa Regional Office<br />

2/1, Ankur, Nayapalli Civic Center, Bhubaneswar – 751015<br />

Orissa, India<br />

www.nabcons.com


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> <strong>2011</strong> <strong>12</strong><br />

<strong>Balasore</strong> <strong>District</strong><br />

Technical Support Institution (TSI)<br />

NABARD Consultancy Services<br />

Nabcons Cell, NABARD, Orissa Regional Office<br />

2/1, Ankur, Nayapalli Civic Center, Bhubaneswar – 751015<br />

Orissa, India<br />

www.nabcons.com


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SECTION – I<br />

TSI: NABARD Consultancy Services (NABCONS)


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

ABBREVIATIONS<br />

AAY : Antyodaya Anna Yojana<br />

ACA : Additional Central Assistance<br />

ACSO : Assistant Civil Supply Officer<br />

ADB : Asian Development Bank<br />

AHVY : Ambedkar Hastsilpa Vikash Yojana<br />

AI : Artificial Insemination<br />

AIBP : Accelerated Irrigation Benefit Programme<br />

AIDS : Acquired Immune Deficiency Syndrome<br />

ANM : Auxiliary Nurse Midwifery<br />

APL : Above Poverty Line<br />

ARWSP : Accelerated Rural Water Supply Programme<br />

ASCAD : Assistance to States for Control of Animal Diseases<br />

ASCO : Assistant Soil Conservation Officer<br />

ASHA : Accredited Social Health Activist<br />

ASI : Assistant Sub Inspector<br />

ATMA : Agricultural Technology Management Agency<br />

AUWSP : Accelerated Urban Water Supply Programme<br />

AWW : Anganwadi Worker<br />

BDO : Block Development Officer<br />

BFDA : Brackish Water Fish Farmers Development Agency<br />

BGJY : Biju Gram Jyoti Yojana<br />

BKVY : Biju Krushak Vikas Yojana<br />

BPL : Below Poverty Line<br />

BRGF : Backward Region Grant Fund<br />

CAD : Computer Aided Design<br />

CBOs : Community Based Organizations<br />

CD : Community Development<br />

CDPO : Child Development Project Officer<br />

CEO : Chief Executive Officer<br />

CFC : Common Facility Center<br />

CHC : Community Health Center<br />

CRSP : Central Rural Sanitation Programme<br />

CSO : Civil Supply Officer<br />

CWC : Child Welfare Committee<br />

DDP : Desert Development Programme<br />

DFO : Divisional Forest Officer<br />

DHH : <strong>District</strong> Headquarter Hospital<br />

DPAP : Drought Prone Area Programme<br />

DPC : <strong>District</strong> <strong>Plan</strong>ning Committee<br />

DPR : Detailed Project Report<br />

DRDA : <strong>District</strong> Rural Development Agency<br />

DSO : <strong>District</strong> Sports Officer<br />

EGS : Education Guarantee Scheme<br />

F & ARD : Fisheries & Animal Resource Development<br />

FFDA : Fish Farmers Development Agency<br />

FPS : Fair Price Shops<br />

FRU : First Referral Units<br />

GDI : Gender Development Index<br />

GER : Gross Enrolment Ratio<br />

GFATM : Global Funds for AIDS, TB & Malaria<br />

GGY : Gopabandhu Grameen Yojana<br />

GLGR : Grass Land and Grass Reserve<br />

GoI : Government of India<br />

GP : Gram Panchayat<br />

GPS : Global Positioning System<br />

ha : Hectares<br />

H & FW : Health & Family Welfare<br />

H & UD : Housing & Urban Development<br />

HDI : Human Development Index<br />

TSI: NABARD Consultancy Services (NABCONS) i


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

HSD : High Speed Diesel<br />

IAY : Indira Awas Yojana<br />

ICDS : Integrated Child Development Scheme<br />

ICMR : Indian Council of Medical Research<br />

IDSP : Integrated Disease Surveillance Programme<br />

IMR : Infant Mortality Rate<br />

ISOPOM : Integrated Scheme for Oilseeds, Pulses and Maize<br />

ITDA : Integrated Tribal Development Agency<br />

ITI : Industrial Training Institute<br />

IUD : Intra Uterine Devices<br />

IWDP : Integrated Watershed Development Projects<br />

KCC : Kissan Credit Cards<br />

Km : Kilometer<br />

KSK : Krishi Sahayak Kendra<br />

KVK : Krushi Vigyan Kendra<br />

LAC : Livestock Aid Center<br />

LSG : Local Self Government<br />

LUE : Leprosy Eradication Units<br />

MADA : Modified Area Development Approach<br />

MDM : Mid–Day–Meal<br />

MIDP : Manual for Integrated <strong>District</strong> <strong>Plan</strong>ning<br />

MIS : Management of Information Systems<br />

MMR : Maternal Mortality Rate<br />

MORD : Ministry of Rural Development<br />

MRCS : Mulberry Rearing Co-operatives Society<br />

MSME : Micro Small & Medium Enterprises<br />

MSSRF : M.S. Swaminathan Research Foundation<br />

MT : Metric Tons<br />

NABARD : National Bank for Agriculture & Rural Development<br />

NAC : Notified Area Council<br />

NBMMP : National Biogas & Manure Management Programme<br />

NER : Net Enrolment Ratio<br />

NFBS : National Family Benefit Scheme<br />

NFHS : National Family & Health Survey<br />

NGO : Non Government Organization<br />

NHM : National Horticulture Mission<br />

NLEP : National Leprosy Eradicated Programme<br />

NOAP : National Old Age Pension<br />

NPCB National Programme for Control of Blindness<br />

NPCBBC : National Project for Cattle and Buffalo Breeding<br />

NPEGEL : National Programme for Education of Girls at Elementary Level<br />

NREGS : National Rural Employment Guarantee Scheme<br />

NRHM : National Rural Health Mission<br />

NWDPRA : National Watershed Development Programme in Rural Areas<br />

OBC : Other Backward Castes<br />

OBCFDC : Orissa Backward Caste Finance Development Corporation<br />

OFSDP : Orissa Forestry Sector Development Project<br />

OLIC : Orissa Lift Irrigation Corporation<br />

OSDMA : Orissa State Disaster Mitigation Authority<br />

OSFDC : Orissa Scheduled Castes & Scheduled Tribes Development Finance Corporation<br />

OSPCB : Orissa State Pollution Control Board<br />

OSRP : Orissa State Roads Project<br />

OUAT : Orissa University of Agriculture & Technology<br />

OWSSB : Orissa Water Supply & Sewerage Board<br />

PACs : Primary Agricultural Cooperative Society<br />

PDS : Public Distribution System<br />

PHC : Primary Health Center<br />

PIP : Programme Implementation <strong>Plan</strong><br />

PLP : Potential Linked Credit <strong>Plan</strong><br />

PMEGP : Prime Minister's Employment Generation Programme<br />

PPP : Public Private Partnership<br />

TSI: NABARD Consultancy Services (NABCONS) ii


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

PPTCT : Prevention of Parent to Child Transmission of HIV/AIDS<br />

PRI : Panchayati Raj Institution<br />

PS : Panchayat Samiti<br />

PSU : Project Support Unit<br />

PWS : Pipe Water Supply<br />

Q/ha : Quintals/ha<br />

RCMS : Regional Cooperative Marketing Societies<br />

RD : Rural Development<br />

REGP : Rural Employment Generation Programme<br />

RGGVY : Rajeev Gandhi Grameen Vidyutikaran Yojna<br />

RHA : Rehabilitation of Handicraft Artisans<br />

RHI : Reproductive Health Index<br />

RIDF : Rural Infrastructure Development Fund<br />

RKBY : Rashtriya Krishi Bima Yojana<br />

RKVY : Rashtriya Krishi Vikas Yojana<br />

RMC : Regulated Market Committee<br />

RPWS : Rural Pipe Water Supply<br />

RRTTS : Regional Research & Technology Transfer Station<br />

RVEP : Remote Village Electrification Programme<br />

RWSS : Rural Water Supply and Sanitation<br />

S & ME : School & Mass Education<br />

SC : Scheduled Caste<br />

SDPO : Sub Divisional Police Officer<br />

SGRY : Sampoorna Gramin Rojgar Yojana<br />

SGSY : Swarnajayanti Gramya Swarojgar Yojana<br />

SHG : Self Help Group<br />

SI : Sub Inspector<br />

SJSRY : Swarna Jayanti Sahari Rojgar Yojana<br />

SLSWCA : State Level Single Window Clearance Authority<br />

SNP : Supplementary Nutrition Programme<br />

SOAP : State Old Age Pension<br />

SRC : Special Relief Commissioner<br />

SRI : System of Rice Intensification<br />

SRR : Seed Replacement Rate<br />

SRS : Sample Registration System<br />

SSA : Sarva Sikshya Abhiyan<br />

SSI : Small Scale Industries<br />

ST : Scheduled Tribe<br />

STW : Shallow Tube Well<br />

TFC : Twelfth Finance Commission<br />

TSC : Total Sanitation Campaign<br />

TSI : Technical Support Institution<br />

TSP : Tribal Sub <strong>Plan</strong> Area<br />

UIDSSMT : Urban Infrastructure Development Scheme for Small and Medium Towns<br />

ULB : Urban Legislative Body<br />

UPHC : Upgraded Primary Health Center<br />

UTPS : Urea Treated Paddy Straw<br />

VAAY : Valmiki Ambedkar Awas Yojana<br />

VCTC : Voluntary Counseling and Testing Center<br />

VSS : Vana Surakshya Samiti<br />

W & CD : Women & Child Development<br />

WHO : World Health Organization<br />

WP : Work <strong>Plan</strong><br />

WSHGs : Women Self Help Groups<br />

ZP : Zilla Parishad<br />

TSI: NABARD Consultancy Services (NABCONS) iii


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CONTENTS<br />

Section - I<br />

Chapters Title Page No.<br />

One Page Summary x<br />

Executive Summary xi<br />

Copy of DPC proceedings and approval of plan xvii<br />

I <strong>District</strong> Background & Profile 1<br />

1.1. Introduction 1<br />

1.2. Methodology 1<br />

1.3. Profile of the <strong>District</strong> 6<br />

1.3.1. Historical Background 6<br />

1.3.2. Administrative setup 8<br />

1.3.3. Demographic Profile 8<br />

1.4. Development Indicators 11<br />

II SWOT Analysis 18<br />

2.1. Agriculture & Allied Activities 18<br />

2.1.1. Crop Husbandry 18<br />

2.1.2. Soil Conservation and Land Development 31<br />

2.1.3. Horticulture 32<br />

2.1.4. Animal Husbandry & Dairy Development 34<br />

2.1.5. Fisheries 38<br />

2.1.6. <strong>Plan</strong>tations 42<br />

2.1.7. Food, storage and warehousing 42<br />

2.1.8. Agricultural Research & Education 42<br />

2.1.9. Agricultural Financial Institutions 43<br />

2.1.10. Cooperation 43<br />

2.1.11. Agricultural Marketing 44<br />

2.2. Rural Development 44<br />

2.3. Special Area Programmes 46<br />

2.4. Energy 46<br />

2.5. Industry and Minerals 49<br />

2.6. Transport 51<br />

2.7. Science, Technology and Environment 52<br />

2.8. General Economic Services 52<br />

2.9. Social Services 58<br />

2.9.1. General Education 58<br />

2.9.2. Higher Education 60<br />

2.9.3 Technical Education 61<br />

2.9.4 Sports & Youth Services 61<br />

2.9.5. Art and Culture 62<br />

2.9.6. Medical & Public Health 62<br />

2.9.7. Water Supply & Sanitation 65<br />

2.9.8. Rural and Urban Housing 66<br />

2.9.9. Development of SCs, STs & OBCs 66<br />

2.9.10. Labour & Employment 67<br />

2.9.11. Social security, social welfare, women empowerment and child welfare 68<br />

III <strong>District</strong> Vision – 2020 Corresponding to <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> 72<br />

3.1. Background 72<br />

3.2. Vision 2020 statement 72<br />

3.3. Sector wise Vision Statement/Development Goals for the year 2020 72<br />

3.4. Future Growth Engines 80<br />

3.5. Projections for Development Indicators during the plan period 82<br />

IV Resource Envelope for <strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong> 85<br />

V<br />

Resource Envelop for Gram Panchayats/Blocks/ULBs for the<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

97<br />

5.1. Resource allocation to Blocks & GPs 97<br />

5.2. Resource base available at Block/Panchayat Samiti level 104<br />

5.3. Own Resources of Gram Panchayats 104<br />

TSI: NABARD Consultancy Services (NABCONS) iv


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Chapters Title Page No.<br />

5.4. Resources available at ULB Level 105<br />

VI Sectoral <strong>District</strong> <strong>Plan</strong>s/Schemes 107<br />

6.1. CDAP (Agriculture and Allied Activities) 107<br />

6.1.1. Crop Husbandry 107<br />

6.1.2. Horticulture 1<strong>12</strong><br />

6.1.3. Soil & Water Conservation 115<br />

6.1.4. Animal Husbandry & Dairy Development 116<br />

6.1.5. Cooperation 118<br />

6.1.6. Fisheries 119<br />

6.1.7. Agricultural Credit <strong>12</strong>0<br />

6.2. Rural Development <strong>12</strong>1<br />

6.3. Special Area Programmes <strong>12</strong>5<br />

6.4. Irrigation & Flood Control <strong>12</strong>6<br />

6.5. Energy <strong>12</strong>9<br />

6.6. Industry & Minerals 131<br />

6.7. Transport 135<br />

6.8. Science Technology & Environment 138<br />

6.9. General Economic Services 140<br />

6.10. Social Services 140<br />

6.10.1. Education 140<br />

6.10.2. Sports & Youth Services 144<br />

6.10.3. Health 145<br />

6.10.4. Rural Water Supply & Sanitation 149<br />

6.10.5. Urban Water Supply 150<br />

6.10.6. Urban Development 151<br />

6.10.7. Rural Housing 152<br />

6.10.8. Welfare of SC, ST & OBC 153<br />

6.10.9. Social Security, Social Welfare & Nutrition 154<br />

6.11. General Services 157<br />

6.<strong>12</strong>. Financial Performance of the district 158<br />

VII Tribal Sub-<strong>Plan</strong> (TSP) 176<br />

VIII Scheduled Caste Sub-<strong>Plan</strong> (SCSP) 183<br />

IX Gopabandhu Gramin Yojana (GGY) 190<br />

X Gender Sub-<strong>Plan</strong> 193<br />

10.1. Gender based Stock taking/Situation Analysis{ 193<br />

10.2. Financial allocation for Women Component in total <strong>Plan</strong> outlay 194<br />

XI Review of <strong>Plan</strong> Documents 199<br />

XII Recommendations/Comments of DPC for <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> 214<br />

Section – II<br />

Annexure No. Title<br />

Page<br />

No.<br />

Annexure - I GN Statement A: <strong>Annual</strong> <strong>Plan</strong> - <strong>2011</strong>-<strong>12</strong>: Proposed Outlays 1<br />

Annexure - II<br />

GN Statement B: <strong>Annual</strong> <strong>Plan</strong> - <strong>2011</strong>-<strong>12</strong>: Proposed Outlays (From State<br />

Budget)<br />

11<br />

Annexure - III<br />

GN Statement C (Part I): <strong>Annual</strong> <strong>Plan</strong> - <strong>2011</strong>-<strong>12</strong>: PROPOSED Outlays<br />

(Rural)<br />

21<br />

Annexure - IV<br />

GN Statement C (Part II): <strong>Annual</strong> <strong>Plan</strong> - <strong>2011</strong>-<strong>12</strong>: PROPOSED Outlays<br />

(Urban)<br />

31<br />

Annexure – V<br />

GN Statement C (Part III): <strong>Annual</strong> <strong>Plan</strong> - <strong>2011</strong>-<strong>12</strong>: PROPOSED Outlays<br />

(Rural+Urban)<br />

41<br />

Annexure – VI Annexure – I: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Proposed Outlays (Scheme wise) 51<br />

Annexure – VII Annexure – II: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Physical Targets and Achievements 61<br />

Annexure – VIII<br />

Annexure – III: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Proposed Outlays (BHARAT<br />

NIRMAN Programmes)<br />

74<br />

Annexure – IX<br />

Annexure – IV: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Proposed Outlays (Central<br />

Sponsored & Central <strong>Plan</strong> Schemes)<br />

75<br />

Annexure – X<br />

Annexure – V-A: Annul <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Financial outlays (Proposal for<br />

TSP)<br />

82<br />

TSI: NABARD Consultancy Services (NABCONS) v


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Annexure No. Title<br />

Page<br />

No.<br />

Annexure – XI<br />

Annexure – V-B: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Physical Targets and<br />

Achievements (Proposal for TSP)<br />

93<br />

Annexure – XII<br />

Annexure – VI-A: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Financial Outlays (Proposal for<br />

SCSP)<br />

104<br />

Annexure – XIII<br />

Annexure – VI-B: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Physical Targets and<br />

Achievements (Proposal for SCSP)<br />

115<br />

Annexure – XIV<br />

Annexure – VII: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Financial Targets & Expenditure<br />

for Voluntary Sector<br />

<strong>12</strong>6<br />

Annexure – XV<br />

Annexure – VIII-A: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Financial Outlays (Proposal<br />

for women component)<br />

<strong>12</strong>7<br />

Annexure – XVI<br />

Annexure – VIII-B: <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>: Physical Targets and<br />

Achievements (Proposal for women component)<br />

137<br />

Annexure – XVII Photographs of <strong>District</strong> and Block level Workshops conducted by the TSI 149<br />

Annexure – XVIII Block and GP Level Information 152<br />

Annexure – XIX<br />

Proposed list of work to be undertaken under GGY during the year<br />

<strong>2011</strong>-<strong>12</strong><br />

165<br />

Annexure – XX<br />

Proposed list of work to be undertaken under MGNREGS during the<br />

year <strong>2011</strong>-<strong>12</strong><br />

182<br />

Annexure - XXI<br />

Abstract of Additional Fund Requirement (<strong>2011</strong>-<strong>12</strong>) - Summary of<br />

Visioning and <strong>Plan</strong>ning Exercise conducted at ZP, PS & GP level<br />

230<br />

List of Tables<br />

Sl.<br />

No.<br />

Table No. Title<br />

Page<br />

No.<br />

1. Table 1.1. Sequence of activities undertaken for <strong>Plan</strong> Formulation 2<br />

2. Table 1.2. Profile of participants of <strong>Plan</strong>ning workshops conducted at <strong>District</strong>/Block/ULB level 2<br />

3. Table 1.3. Major issues and Prioritized needs identified in the workshops 4<br />

4. Table 1.4. Overview of <strong>Balasore</strong> <strong>District</strong> 6<br />

5. Table 1.5. Administrative units 8<br />

6. Table 1.6. Demographic Characteristics of <strong>Balasore</strong> district 8<br />

7. Table 1.7. Social Group Composition <strong>Balasore</strong> district vs Orissa State 9<br />

8. Table 1.8.<br />

Details of Tribal Concentrated Gram Panchayats (ST Population more than <strong>District</strong><br />

percentage)<br />

10<br />

9. Table 1.9.<br />

Details of Scheduled Caste Concentrated Gram Panchayats (SC Population more than<br />

<strong>District</strong> percentage)<br />

10<br />

10. Table 1.10. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa 11<br />

11. Table 1.11. Important Development Indicators of <strong>Balasore</strong> vis-à-vis Orissa 11<br />

<strong>12</strong>. Table 1.<strong>12</strong>. Public infrastructure and services 14<br />

13. Table 1.13. Public Infrastructure and service quality: Anganwadi Centers 15<br />

14. Table 1.14. A Public Infrastructure and service quality: Schools (A) 15<br />

15. Table 1.14. B<br />

Status on Infrastructure lacking in Government Schools (Primary & Upper Primary<br />

Education) (B)<br />

15<br />

16. Table 1.14. C Status on Infrastructure lacking in Government Schools (Secondary Education) (C) 15<br />

17. Table 1.15. Public Infrastructure and service quality: Health Institutions 16<br />

18. Table 1.16. Essential documentary services 16<br />

19. Table 1.17. Employment and Self-employment (A) 16<br />

20. Table 1.18. Employment and Self-employment (B) 16<br />

21. Table 1.19. Information on Economy & Commerce - Agriculture and allied farm sector activities 17<br />

22. Table 1.20. Information on Economy & Commerce - Industry and Commerce 17<br />

23. Table 1.21. Household amenities 17<br />

24. Table 2.1. Agro-Climatic Zones of Orissa 18<br />

25. Table 2.2. Blocks covered under different Agro Ecological situations of <strong>Balasore</strong> district 19<br />

26. Table 2.3. Rivers flowing through different Blocks of the district 19<br />

27. Table 2.4. Distribution of Gram Panchayats on the basis of Topography 20<br />

28. Table 2.5. Monthly Normal Rainfall in <strong>Balasore</strong> district 20<br />

29. Table 2.6. Monthly Normal Temperature and Relative Humidity in <strong>Balasore</strong> district 20<br />

30. Table 2.7. Small Rivers/Nallas that causes flood in the district 22<br />

31. Table 2.8. Seasonality of Hazard in <strong>Balasore</strong> district 22<br />

32. Table 2.9. History of Disaster in <strong>Balasore</strong> <strong>District</strong> 22<br />

33. Table 2.10. No. of villages Prone to Tsunami (Located within 1.5 kms from the Sea) 22<br />

34. Table 2.11. Flood Prone Gram Panchayats 23<br />

35. Table 2.<strong>12</strong>.<br />

Year wise number of villages having crop loss of 50% and above in Kharif season due to<br />

natural calamities<br />

23<br />

36. Table 2.13. Cylone/Flood Shelters established in the district 23<br />

37. Table 2.14. Land Utilization Statistics of <strong>Balasore</strong> vis-à-vis Orissa (2008-09) 23<br />

38. Table 2.15. Ranking of Blocks according to area under cultivation 24<br />

39. Table 2.16. Soil test data for different blocks of <strong>Balasore</strong> district 25<br />

40. Table 2.17. Operational land holding size (Farmers category) in <strong>Balasore</strong> district vis-à-vis Orissa 25<br />

TSI: NABARD Consultancy Services (NABCONS) vi


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Table No. Title<br />

41. Table 2.18.<br />

(2001) – Part I<br />

Operational land holding size (Farmers category) in <strong>Balasore</strong> district vis-à-vis Orissa<br />

(2001) – Part II<br />

25<br />

42. Table 2.19. Source wise irrigated area in <strong>Balasore</strong> district vis-à-vis Orissa (2008-09) 26<br />

43. Table 2.20. Status of L.I. Points under Lift Irrigation Division, <strong>Balasore</strong> 26<br />

44. Table 2.21. Block wise list of Minor Irrigation Projects in the district 27<br />

45. Table 2.22. Number of Pani Panchayats in the district 27<br />

46. Table 2.23. Comparison of Cropping Intensity (%) (2008-09) 28<br />

47. Table 2.24. Season wise area under cultivation of different crops (2008-09) 28<br />

48. Table 2.25. Productivity of major crops <strong>Balasore</strong> district vis-à-vis Orissa (2008-09) 29<br />

49. Table 2.26. Estimated Marketable Surplus/Deficit of Rice during 2008-09 29<br />

50. Table 2.27. Area under HYV of Paddy in <strong>Balasore</strong> district vis-à-vis Orissa 30<br />

51. Table 2.28. Fertilizer Consumption rate (2008-09) 30<br />

52. Table 2.29. Agro-input outlets available in the district 30<br />

53. Table 2.30. No. of Watershed Projects functioning in the district 32<br />

54. Table 2.31. Area under fruit crops in <strong>Balasore</strong> district vis-à-vis Orissa 32<br />

55. Table 2.32.<br />

Area and production of vegetable and flowers in <strong>Balasore</strong> district vis-à-vis Orissa (2008-<br />

09)<br />

32<br />

56. Table 2.33. Area under Betel vine cultivation in the district 33<br />

57. Table 2.34. Government Nurseries of horticultural crops operating in district 33<br />

58. Table 2.35. Livestock Population in <strong>Balasore</strong> district (17th Livestock Census 2003) 35<br />

59. Table 2.36. Indicators of livestock production in <strong>Balasore</strong> <strong>District</strong> 35<br />

60. Table 2.37. Contribution of different species to milk production 36<br />

61. Table 2.38. Block wise No. of Veterinary Institutions 36<br />

62. Table 2.39. Availability of Go mitra’s in GPs without any veterinary institution 37<br />

63. Table 2.40. Other Infrastructure/Veterinary Institutions available in the district 37<br />

64. Table 2.41. Details of activities of BBAMUL in <strong>Balasore</strong> district 37<br />

65. Table 2.42. Potential Resources available in the district for Fresh Water Pisciculture 38<br />

66. Table 2.43 Estimated Fish production from different Fresh Water sources (2009-10) 38<br />

67. Table 2.44. Estimated Fish production from Brackish Water sources (2009-10) 39<br />

68. Table 2.45.<br />

Production potential vis-à-vis current level of production of fish from different sources in<br />

the district (2009-10)<br />

40<br />

69. Table 2.46. Fish Nurseries available in the district (2009-10) 40<br />

70. Table 2.47. Organizations involved in dry fish production in the district 40<br />

71. Table 2.48. Other marine fishery resources available in <strong>Balasore</strong> district 40<br />

72. Table 2.49.<br />

Agricultural Produce Marketing, Processing and Storage Facilities available in the<br />

district<br />

42<br />

73. Table 2.50. Details of Financial Institutions available in the district 43<br />

74. Table 2.51. Performance of PACs in <strong>Balasore</strong> district 43<br />

75. Table 2.52. Block wise number of BPL families 44<br />

76. Table 2.53.<br />

Block wise number of villages targeted for electrification under RGGVY in <strong>Balasore</strong><br />

district<br />

46<br />

77. Table 2.54. No. of Remote Villages identified in <strong>Balasore</strong> district 47<br />

78. Table 2.55. Details of SSI units in the <strong>District</strong> 49<br />

79. Table 2.56. Details of Road and Rail Network in the district 51<br />

80. Table 2.57. Type of forest in the district 52<br />

81. Table 2.58. Administrative Structure of <strong>Balasore</strong> Wildlife Division 52<br />

82. Table 2.59. List of Identified Tourist Centers in the district <strong>Balasore</strong> 53<br />

83. Table 2.60. Ration cards position under civil supply 56<br />

84. Table 2.61. No. of PDS outlets in <strong>Balasore</strong> district 57<br />

85. Table 2.62. Shortfall of PDS Outlets 57<br />

86. Table 2.63. Key Educational Indicators of <strong>Balasore</strong> <strong>District</strong> 58<br />

87. Table 2.64. Type of Schools in <strong>Balasore</strong> <strong>District</strong> 59<br />

88. Table 2.65.<br />

Status on Infrastructure lacking in Government Schools (Primary & Upper Primary<br />

Education)<br />

59<br />

89. Table 2.66. Class Rooms available in Government Schools (Primary & Upper Primary Education) 60<br />

90. Table 2.67.<br />

Status on Infrastructure lacking in Government Schools<br />

(Secondary Education)<br />

60<br />

91. Table 2.68. Status on availability of Class Rooms in Secondary Schools 60<br />

92. Table 2.69. No. of colleges in <strong>Balasore</strong> <strong>District</strong> 60<br />

93. Table 2.70. No. of Play ground in <strong>Balasore</strong> <strong>District</strong> 61<br />

94. Table 2.71. Availability of Library and Information Center/Reading Rooms 62<br />

95. Table 2.72. Health Indicators of <strong>Balasore</strong> <strong>District</strong> vis-à-vis Orissa 62<br />

96. Table 2.73. Health facilities available in the district 63<br />

97. Table 2.74. Health facilities available in the district 63<br />

98. Table 2.75. Achievement in formation and strengthening of Gaon Kalyan Samities (GKS) 63<br />

99. Table 2.76. Achievement in appointment of ASHA (till September 2010) 64<br />

100. Table 2.77. Janani Surakshya Yojana Programme trend during 2006 to 2009 64<br />

101. Table 2.78. Disease surveillance report of <strong>Balasore</strong> district (2006-07) 64<br />

102. Table 2.79. Drinking water facilities available in <strong>Balasore</strong> district 65<br />

103. Table 2.80. Achievement under Total Sanitation Campaign (Till 31st July 2010) 65<br />

TSI: NABARD Consultancy Services (NABCONS) vii<br />

Page<br />

No.


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Table No. Title<br />

Page<br />

No.<br />

104. Table 2.81. Target and Achievement under bankable IGS of OSFDC during 2009-10 66<br />

105. Table 2.82. Details of Registrations in Employment Exchanges of <strong>Balasore</strong> district 67<br />

106. Table 2.83.<br />

No. of Centers functioning and students enrolled under National Child Labour Project in<br />

the district<br />

68<br />

107. Table 2.84. Coverage under Supplementary Nutrition Programme 68<br />

108. Table 2.85. Performance of Mid-Day-Meal Programme 68<br />

109. Table 2.86. Facilities available in Anganwadi Centers (AWCs) of <strong>Balasore</strong> district 70<br />

110. Table 2.86. Coverage under Social Security Scheme (2009-10) 70<br />

111. Table 4.1. Sector wise Resource Envelope and Gap in <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> 85<br />

1<strong>12</strong>. Table 4.2. Abstract of Financial Resources available at <strong>District</strong> level 86<br />

113. Table 4.3. Details of Financial Resources available at <strong>District</strong> level 86<br />

114. Table 5.1. Block wise allocation of funds for MGNREGS <strong>2011</strong>-<strong>12</strong> 97<br />

115. Table 5.2. Panchayat wise allocation of funds for MGNREGS <strong>2011</strong>-<strong>12</strong> 98<br />

116. Table 5.3. Block wise allocation of funds for GGY <strong>2011</strong>-<strong>12</strong> 100<br />

117. Table 5.4. Panchayat wise allocation of funds for GGY <strong>2011</strong>-<strong>12</strong> 100<br />

118. Table 5.5. Block wise allocation of funds for IAY <strong>2011</strong>-<strong>12</strong> 103<br />

119. Table 5.6. Block wise allocation of funds for Mo Kudia <strong>2011</strong>-<strong>12</strong> 103<br />

<strong>12</strong>0. Table 5.7. Block wise allocation of funds for SGSY <strong>2011</strong>-<strong>12</strong> 103<br />

<strong>12</strong>1. Table 5.8. Resource base available at all the Blocks (<strong>2011</strong>-<strong>12</strong>) 104<br />

<strong>12</strong>2. Table 5.9. Own resource generation by Gram Panchayats of <strong>Balasore</strong> district 104<br />

<strong>12</strong>3. Table 5.10. Sources of Own Resources of Gram Panchayats 105<br />

<strong>12</strong>4. Table 5.11. Heads of expenditure of own Resources of Gram Panchayats 105<br />

<strong>12</strong>5. Table 5.<strong>12</strong>. Resources available to ULBs (<strong>2011</strong>-<strong>12</strong>) 105<br />

<strong>12</strong>6. Table 6.1. Details of activities and physical targets: RIDF – XIII (PLIP) 108<br />

<strong>12</strong>7. Table 6.2. Details of activities and physical targets: Rice Development (Work <strong>Plan</strong>) 108<br />

<strong>12</strong>8. Table 6.3. Details of activities and physical targets: Sugarcane Development (Work <strong>Plan</strong>) 109<br />

<strong>12</strong>9. Table 6.4. Details of activities and physical targets: Jute Technology Mission 109<br />

130. Table 6.5. Details of activities and physical targets: ISOPOM Oilseeds 110<br />

131. Table 6.6. Details of activities and physical targets: Seed Village Programme 110<br />

132. Table 6.7.<br />

Details of activities and physical targets: Farm Mechanization (Macro Management)<br />

(Work <strong>Plan</strong>)<br />

110<br />

133. Table 6.8. Details of activities and physical targets: NFSM 111<br />

134. Table 6.9. Details of activities and physical targets: RKVY 1<strong>12</strong><br />

135. Table 6.10. Details of activities and physical targets: Horticulture 114<br />

136. Table 6.11. Details of activities and physical targets: Soil Conservation 116<br />

137. Table 6.<strong>12</strong>. Details of activities and physical targets: Animal Husbandry 117<br />

138. Table 6.13. Details of activities and physical targets: Cooperation 118<br />

139. Table 6.14. Details of activities and physical targets: Fisheries <strong>12</strong>0<br />

140. Table 6.15. Abstract of <strong>Plan</strong> Outlays: Agriculture & Allied Activities <strong>12</strong>0<br />

141. Table 6.16. Key Activities selected for SGSY in the district <strong>12</strong>2<br />

142. Table 6.17. Performance of SGSY in <strong>Balasore</strong> district <strong>12</strong>2<br />

143. Table 6.18. Programme wise <strong>Plan</strong> Outlays & Grants: Rural Development <strong>12</strong>5<br />

144. Table 6.19. Details of activities and physical targets: Rural Development <strong>12</strong>5<br />

145. Table 6.20. Programme wise <strong>Plan</strong> Outlays: Special Area Programmes <strong>12</strong>5<br />

146. Table 6.21. Details of activities & physical targets: Special Area Programmes <strong>12</strong>6<br />

147. Table 6.22. Details of activities & physical targets: Irrigation & Flood Control <strong>12</strong>7<br />

148. Table 6.23. Programme wise <strong>Plan</strong> Outlays: Irrigation & Flood Control <strong>12</strong>8<br />

149. Table 6.24. Present Status of implementation of RGGVY in <strong>Balasore</strong> district 130<br />

150. Table 6.25. Number of Villages Targeted for Electrification under RGGVY 130<br />

151. Table 6.26. Programme wise <strong>Plan</strong> Outlays: Energy 131<br />

152. Table 6.27. Programme wise <strong>Plan</strong> Outlays: Industry & Handloom Sector 133<br />

153. Table 6.28. Details of activities and physical targets: Industry & Minerals 134<br />

154. Table 6.29. Programme wise <strong>Plan</strong> Outlays: Transport 135<br />

155. Table 6.30. Details of activities and physical targets: Transport 136<br />

156. Table 6.31. Block wise list of unconnected habitations targeted under PMGSY 138<br />

157. Table 6.32.<br />

Implementation performance of PMGSY in <strong>Balasore</strong> district<br />

(Physical achievement)<br />

138<br />

158. Table 6.33. Programme wise <strong>Plan</strong> Outlays: Science Technology & Environment 139<br />

159. Table 6.34. Programme wise <strong>Plan</strong> Outlays: Education 143<br />

160. Table 6.35. Details of activities & physical targets: Education 144<br />

161. Table 6.36. Programme wise <strong>Plan</strong> Outlays: Sports & Youth Services 145<br />

162. Table 6.37. Achievement in formation and strengthening of Gaon Kalyan Samities 146<br />

163. Table 6.38. Achievement in appointment of ASHA (till September 2010) 147<br />

164. Table 6.39. Achievement in Janani Surakshya Yojana Programme during 2006-07 to 2009-10 147<br />

165. Table 6.40. Programme wise <strong>Plan</strong> Outlays: Health 148<br />

166. Table 6.41. Details of activities and Physical targets: Rural Water Supply & Sanitation 150<br />

167. Table 6.42. Programme wise <strong>Plan</strong> Outlays: Urban Water Supply & Sanitation 150<br />

168. Table 6.43. Performance of IAY in <strong>Balasore</strong> district 153<br />

169. Table 6.44. Expenditure for vulnerable groups under IAY in <strong>Balasore</strong> district 153<br />

170. Table 6.45. Details of activities & physical targets: Rural Housing 153<br />

171. Table 6.46. Programme wise <strong>Plan</strong> Outlays: Welfare of SC, ST & OBC 154<br />

TSI: NABARD Consultancy Services (NABCONS) viii


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Table No. Title<br />

Page<br />

No.<br />

172. Table 6.47. Programme wise <strong>Plan</strong> Outlays: Social Security, Social Welfare & Nutrition 156<br />

173. Table 6.48. Programme wise <strong>Plan</strong> Outlays: General Services 157<br />

174. Table 6.49. Details of Activities and Physical Targets: General Services 158<br />

175. Table 6.50. Financial Performance of the district during the 10th <strong>Plan</strong> period 158<br />

176. Table 7.1. ST population in different Blocks/ULBs of <strong>Balasore</strong> district 176<br />

177. Table 7.2.<br />

Details of Tribal Concentrated Gram Panchayats (ST Population more than <strong>District</strong><br />

percentage)<br />

176<br />

178. Table 7.3. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa state 176<br />

179. Table 7.4. Key Educational Indicators of <strong>Balasore</strong> <strong>District</strong> 177<br />

180. Table 7.5. Scheme wise Financial Outlay for TSP during <strong>2011</strong>-<strong>12</strong> 177<br />

181. Table 8.1. SC population in different Blocks/ULBs of <strong>Balasore</strong> district 183<br />

182. Table 8.2.<br />

Details of Scheduled Caste Concentrated Gram Panchayats (SC Population more than<br />

<strong>District</strong> percentage)<br />

183<br />

183. Table 8.3. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa state 183<br />

184. Table 8.4. Key Educational Indicators of <strong>Balasore</strong> <strong>District</strong> 184<br />

185. Table 8.5. Scheme wise Financial outlay for SCSP (<strong>2011</strong>-<strong>12</strong>) 184<br />

186. Table 9.1. Performance of GGY in <strong>Balasore</strong> district 190<br />

187. Table 9.2. Block-wise Allocation of Funds for GGY <strong>2011</strong>-<strong>12</strong> 190<br />

188. Table 9.3. Panchayat wise Allocation of Funds for GGY <strong>2011</strong>-<strong>12</strong> 191<br />

189. Table 10.1. Demographic Characteristics of <strong>Balasore</strong> district 193<br />

190. Table 10.2. Literacy rate of Population in <strong>Balasore</strong> district vis-à-vis Orissa 193<br />

191. Table 10.3. Health Indicators of <strong>Balasore</strong> district vis-à-vis Orissa 193<br />

192. Table 10.4. Scheme wise financial allocation for women component 194<br />

193. Table 11.1.<br />

Sector wise comparative statement of outlays proposed in plan document with allocation<br />

received and expenditure incurred FY: 2008-09<br />

200<br />

194. Table 11.2.<br />

Sector wise comparative statement of outlays proposed in plan document with allocation<br />

received and expenditure incurred FY: 2009-10<br />

200<br />

195. Table 11.3.<br />

Sector wise comparative statement of outlays proposed in plan document with allocation<br />

received and expenditure incurred FY: 2010-11<br />

201<br />

196. Table 11.4.<br />

Scheme/Programme wise comparative statement of outlays proposed in plan document<br />

with allocation received and expenditure incurred FY: 2008-09<br />

201<br />

197. Table 11.5.<br />

Scheme/Programme wise comparative statement of outlays proposed in plan document<br />

with allocation received and expenditure incurred FY: 2009-10<br />

204<br />

198. Table 11.6.<br />

Scheme/Programme wise comparative statement of outlays proposed in plan document<br />

with allocation received and expenditure incurred FY: 2010-11<br />

209<br />

TSI: NABARD Consultancy Services (NABCONS) ix


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

BALASORE<br />

One Page Summary of <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Vision: <strong>Balasore</strong>, a district lying in coastal belt of Orissa is a model district of the country where<br />

development of agriculture and allied sectors mainly fishery, livestock rearing, horticulture and agro-based<br />

industries is the key to overall growth in rural economy and ensuring sustainable rural livelihood. Such a<br />

development approach will make the district unique in the state where there will be equitable growth in all<br />

the sectors with equitable benefits to the citizens without compromising quality of life and discrimination<br />

due to gender, caste or creed.<br />

Overview of <strong>District</strong><br />

Indicators Value SWOT Analysis<br />

Geographical area (Sq. km.) 3806<br />

Forest Area (%) 8.66<br />

Sub-divisions (Nos.) 2<br />

Blocks (Nos.) <strong>12</strong><br />

Revenue villages (Nos.) 2971<br />

Inhabited Revenue Villages (Nos.) 2586<br />

Uninhabited Revenue Villages (Nos.) 385<br />

Gram Panchayats (Nos.) 289<br />

Municipalities (Nos.) 1<br />

NAC (Nos.) 3<br />

Major and medium dams (Nos.) Nil<br />

Large and medium industries (Nos.) 19<br />

Total population 2024508<br />

Rural Population (%) 89.11<br />

Urban Population (%) 10.89<br />

Population Density (Persons/sq. km) 532<br />

SC Population (%) 18.84<br />

ST Population (%) 11.28<br />

Decennial Growth Rate (%) 19.33<br />

Sex ratio 953<br />

Literacy rate (Male) % 81.69<br />

Literacy rate (Female) % 58.90<br />

Literacy rate (Total) % 70.56<br />

Average Land Holding size (ha) 0.93<br />

Irrigated Area (% to cultivated area) Kharif 55.58<br />

Irrigated Area (% to cultivated area) Rabi 42.02<br />

Fertilizer Consumption (Kg/ha) 133<br />

Cropping Intensity (%) 154<br />

Sector-wise Resource Envelope <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Sectors<br />

Resource<br />

Availability<br />

Resource<br />

Requirement<br />

<strong>Balasore</strong> is one of the most populous districts of the state<br />

(2.44% of the land mass of the state but accommodates<br />

5.50% of total population). High population density (532),<br />

huge rural population (89.11) and about 3/4 th of rural<br />

families are below poverty line (73%) demand immediate<br />

intervention in livelihood and infrastructure sector. The<br />

BPL families requires intervention in the shape of<br />

livelihood, housing, basic amenities etc. Priority is on<br />

livelihood security for rural poor either through creation of<br />

wage employment opportunities or self employment and<br />

creation of infrastructures in deficient areas.<br />

Located in deltaic region, crisscrossed by a good number of<br />

rivers, rivulets. These water bodies act as physical barriers<br />

and demand huge number of bridges, culverts to make all<br />

corners of the district accessible. People are educated,<br />

socio-culturally active and require an efficient transport<br />

and communication system as an integral part of their<br />

daily needs. Natural calamities also play a destructive role<br />

in the district by damaging road network almost every<br />

year.<br />

The district lack mineral resources, so also major mineral<br />

based industries. Hence, the productive sectors important<br />

for livelihood of rural mass are agriculture, horticulture,<br />

animal husbandry, fishery and other activities allied to<br />

agriculture. Agriculture and allied sectors are the mainstay<br />

of the district’s economy. It provides both direct and<br />

indirect employment to the majority of the workforce<br />

(67%).<br />

Resource<br />

Gap<br />

Agriculture & Allied 9790.97 <strong>12</strong>751.370 2960.400<br />

Rural Development 9039.31 9504.310 465.000<br />

Special Area Programmes 464.75 464.750 -<br />

Irrigation & Flood Control 5084.<strong>12</strong> 5092.<strong>12</strong>0 8.000<br />

Energy 968.46 1403.460 435.000<br />

Industry & Minerals 401.54 401.540 -<br />

Transport 19206.62 26968.620 7762.000<br />

Science, Technology &<br />

Environment<br />

66.43 66.430 -<br />

Social Services 33849.10 44924.900 11075.800<br />

General Services 296.99 3833.990 3537.000<br />

Total 79168.29 105411.49 26243.20<br />

(Rs. in Lakhs)<br />

Lead Sectors: The lead sectors include<br />

Agriculture & Allied, Irrigation & Flood Control,<br />

Rural Development, Transport and Social<br />

Services<br />

Gap filling: Total resource requirement for the<br />

year <strong>2011</strong>-<strong>12</strong> in all sectors is Rs. 105411.49<br />

lakh, as against availability of Rs. 79168.29<br />

lakhs. Thus the resource gap is Rs. 26243.20<br />

lakh, which can be filled up through additional<br />

allocation under flagship programmes namely,<br />

MGNREGS (Rs. 1037.00 lakhs), PMGSY (Rs.<br />

5225.00 lakhs), IAY (Rs. 1180.35 lakhs), CRSP<br />

(Rs. 38.10 lakhs), ARWSP (Rs. 1725.00 lakhs),<br />

NRHM (Rs. 2480.00 lakhs), SSA (Rs. 1717.50<br />

lakhs), BGJY (Rs. 255.35 lakhs), BSVY (Rs.<br />

269.60 lakhs), IHSDP (Rs. 432.00 lakhs), RKVY<br />

(Rs. 260.00 lakhs), RIDF (Rs. 1753.40 lakhs)<br />

and from Finance Commission Grants (Rs.<br />

9869.90 lakhs).<br />

TSI: NABARD Consultancy Services (NABCONS) x


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

EXECUTIVE SUMMARY<br />

The present volume relates to <strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> of <strong>Balasore</strong> district for the<br />

financial year <strong>2011</strong>-<strong>12</strong>. This <strong>Plan</strong> Document has been prepared in a participatory and<br />

consultative manner following guidelines and procedures prescribed in the MIDP (Manual for<br />

Integrated <strong>District</strong> <strong>Plan</strong>ning) developed by <strong>Plan</strong>ning Commission, Government of India. For<br />

preparation of this <strong>Plan</strong> Document, NABCONS, a subsidiary of NABARD was engaged as<br />

Technical Support Institution (TSI) by <strong>Plan</strong>ning & Coordination Department, Government of<br />

Orissa. While preparing this <strong>Annual</strong> <strong>Plan</strong> all attempt has been made by NABCONS to involve<br />

the people’s representatives, PRIs, <strong>District</strong>, Block/ULB and Panchayat level Officers and other<br />

concerned having a stake in the development of the district.<br />

<strong>Balasore</strong> is one of the north-eastern coastal districts of Orissa. The <strong>District</strong> lies in between<br />

latitude: 21 0 03’ to 21 0 59’ North latitude and 86 0 20’ to 87 0 29’ East Longitude. It is bounded<br />

by Bay of Bengal in the East, Mayurbhanj and Keonjhar districts in the West, Medinapore<br />

district of West Bengal in the North and Bhadrak district in the South. The geographical area<br />

of the district is 3806 Sq. km. <strong>Balasore</strong>, is crisscrossed with perennial and estuarine rivers<br />

because of its proximity to sea. Five important rivers of Orissa, namely Subarnarekha,<br />

Budhabalanga, Jalaka, Kansabansa and Sono have passed through this district from west to<br />

east before surging into the Bay of Bengal. The district head quarter, <strong>Balasore</strong> is 214 kms from<br />

the State Capital, Bhubaneswar.<br />

The district is divided into <strong>12</strong> CD blocks namely, Bahanaga, <strong>Balasore</strong>, Baliapal, Basta,<br />

Bhograi, Jaleswar, Khaira, Nilgiri, Oupada, Remuna, Simulia and Soro. For land records and<br />

revenue administration the district is divided in to 7 Tahasils. Regarding, villages and Gram<br />

Panchayats, the district has 2971 revenue villages, out of which 2586 are inhabited and 385<br />

are uninhabited. These villages are under the jurisdiction of 289 Gram Panchayats.<br />

<strong>Balasore</strong> is one of the most populous districts of the state. It occupies only 2.44% of the total<br />

land mass of the state but accommodates 5.50% of total population. The population density of<br />

the district (532) is very high; almost double that of Orissa State (236). The growth rate of<br />

population in the district is high (19.33%) as against 16.25% for the State during 1991-2001.<br />

As per 2001 census, the total population of the district is 2024508. The district recorded sex<br />

ratio of 953 in 2001 Census. Out of <strong>12</strong> CD Blocks, sex ratio is highest in Oupada block (1005)<br />

followed by Khaira (998) and Simulia (971). The district has high concentration of Scheduled<br />

Caste population (18.84%) and low of Scheduled Tribes (11.28%). Population of <strong>Balasore</strong><br />

district mainly belongs to Hindu and Muslim religion. Hindus constitute about 95.72% of the<br />

total population in the district. Percentage of Muslim is 3.77 as against only 2.07 in the entire<br />

state. Population of other religion in the district is marginal. Literacy rates of the district are<br />

much higher than State average. The literacy rates of SC population in the district are better<br />

than that of state population.<br />

Out of the eleven development sectors, social services, transport, rural development, irrigation<br />

& flood control and agriculture are the lead sectors of the district. This is because of the fact<br />

that <strong>Balasore</strong> is one of the most populous districts of the state. In the district, the percentage<br />

of rural population is 89.11% as against 85.01% in Orissa state. Because of huge rural<br />

population and high population density, there is requirement of good number of civic<br />

amenities and infrastructure in rural areas of the district. In addition, 73.72% of the total<br />

families are Below Poverty Line (BPL) (1997). These BPL families requires intervention in the<br />

shape of livelihood, housing, basic amenities etc. Development of the district can’t be possible<br />

unless there is an improvement in the standard of living of this rural population, mostly people<br />

below poverty line. Priority is on livelihood security for rural poor either through creation of<br />

wage employment opportunities or self employment and creation of infrastructures in deficient<br />

areas. These infrastructures not only include basic amenities but also infrastructures required<br />

for development of productive sectors, disaster management etc.<br />

Transport is one of the important sectors in a district like <strong>Balasore</strong>. Because of its location in<br />

deltaic region, the land mass of the district is crisscrossed by a good number of rivers, rivulets,<br />

natural drainage channels, canals etc. Five major rivers flow through the district before<br />

entering the sea. These water bodies act as physical barriers and demand huge number of<br />

bridges, culverts to make all corners of the district accessible. Further, it is a densely<br />

TSI: NABARD Consultancy Services (NABCONS) xi


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

populated district and people are educated, culturally active and socio economically developed.<br />

They require an efficient transport and communication system as an integral part of their daily<br />

needs. In addition to the above facts, natural calamities plays a destructive role in the district<br />

by damaging road network almost every. Frequent occurrence of natural calamities damages<br />

the roads every year. The elevation of rural roads in the district is very low and lack adequate<br />

culverts, bridges for discharge of flood/rain water. As a result, during flood, the roads get<br />

washed away disrupting communication. Keeping the problem in view, importance is being<br />

given on design aspect of the roads being constructed in the district for the last several years.<br />

Adequate drainage facilities with raised elevations are the major consideration in road designs.<br />

Major issues identified in block level workshops conducted are lack of connectivity/good<br />

quality roads, lack of safe drinking water, health and sanitation, provision of irrigation etc.<br />

Keeping these issues in view, plan proposals have been finalized giving adequate emphasis to<br />

lead sectors.<br />

Agriculture and allied sectors are the main-stay of the district’s economy. It provides both<br />

direct and indirect employment to the majority of the workforce (67%). The share of agriculture<br />

in the district income is about 41% in the year 2001-02 which is more than the state share in<br />

NSDP. In fact agriculture is the main source of livelihood of the population supplemented by<br />

livestock rearing, fishery and horticulture. The district lack mineral resources and so also<br />

major and medium industries. Hence, the rural population of the district mainly depends on<br />

agriculture, fishery and other activities allied to agriculture for their livelihood.<br />

Majority of the farmers are either marginal (67.98%) or small (22.11%) with less than 2 ha of<br />

land. These two categories of farmers operate only 65% of total holdings. Percentage of large<br />

and medium farmers (>4 ha) are very less in the district in comparison to state averages.<br />

Average land holding size of the farmers is also very less, .i.e. 0.93 ha as against 1.25 ha in the<br />

Orissa state. This is because of high population density in the district.<br />

<strong>Balasore</strong> district is fairly irrigated. Out of the net area sown 55.58% is irrigated in Kharif<br />

season and 42.02% in Rabi season. This is much higher than state figures, which is only<br />

46.39% in kharif and 22.27% in rabi season.<br />

In kharif season paddy is the principal crop with coverage of 91.81% of the total cropped area<br />

in the season. This is followed by vegetable crops, chilies and jute. Similarly, in rabi season,<br />

pulse crop like mung, biri and vegetables are the principal crop of the area. Sugarcane is<br />

cultivated in 320 ha in the district. Mung and Biri are cultivated in available residual moisture<br />

in the paddy field. Cultivation of cash crops like sunflower, groundnut, potato, onion, spices<br />

etc. is marginal in the district. Paddy is cultivated in vast patches during kharif throughout<br />

the district. In rabi season, paddy is cultivated only under irrigated conditions.<br />

Regarding productivity of major crops cultivated in the district, productivity of kharif paddy is<br />

10.98% lower than state average. Similarly, productivity of sweet potato, turmeric, maize,<br />

garlic, Arhar, groundnut, jute, onion, wheat, castor, sunflower and sugarcane are lower than<br />

state averages. But the yield rate of gram, mung, biri, Til, Mesta, Sunhemp, Ginger, field pae,<br />

Mustard, coriander, potato, cowpea, etc. are marginally higher than state averages. This low<br />

productivity in an important crop like paddy requires the attention of the agriculturists for<br />

immediate intervention. Though natural calamity is one of the important reasons behind this,<br />

yet strategies can be made to improve the productivity.<br />

<strong>Balasore</strong> district is endowed with natural resources, adequate rainfall and suitable climate for<br />

horticulture corp. Though not exploited to the extent possible, the agro-climatic condition of<br />

the district is conducive for cultivation of different fruits, flowers and vegetables. The district is<br />

covered under National Horticulture Mission (NHM), which is functioning in 19 districts of the<br />

state. Because of proximity of the district to cities like Baripada (60 kms), Cuttack (190 kms),<br />

Bhubaneswar (215 kms) and Kolkata (220 kms) and good road connectivity with these places,<br />

there lies huge market potential for marketing of horticultural crops, mainly vegetables,<br />

flowers and mushrooms.<br />

As per the 17 th Livestock Census (2003), the density of cattle, pig and goat in the district is<br />

higher than that of state averages. The density of cattle population in <strong>Balasore</strong> district is 235,<br />

TSI: NABARD Consultancy Services (NABCONS) xii


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

which is almost two and half times of that in Orissa state (92.31). The density of pig, goat and<br />

poultry birds in the district is higher than that of state averages. In spite of such a good<br />

livestock population, the livestock production in the district is very minimal. The per capita<br />

availability of milk is only 45 gms/day as against state figure of 94 gms/day and ICMR<br />

recommendation of 250 gm of milk/day. This is because of low productivity of cows in the<br />

district. Crossbred/improved cows account for only 3.71% of the total cattle population in the<br />

district. This is low as against average percentage of 7.80% in the entire state. The indigenous<br />

cows which account for 95.81% of the total cattle and buffalo population in the district,<br />

contribute only 56.58% to the total milk production in the district.<br />

Diary development is a dynamic sector of the district. The district is covered under Operation<br />

flood and BBAMUL is operating in the district. BBAMUL through Milk Union has taken several<br />

measures to develop this sector in the district. Animal Husbandry Department is also<br />

implementing programmes like NPCBBC (National Project for Cattle and Buffalo Breeding),<br />

ASCAD (Assistance to States for Control of Animal Diseases), Minikit Program, Enrichment of<br />

Paddy straw and Azolla Cultivation all aimed to improve livestock production in the district. In<br />

spite of all these the district lack critical infrastructures like Livestock Breeding Farms, Feed<br />

Mixing <strong>Plan</strong>ts, Poultry Producer Cooperative Society and Fodder Seed<br />

Production/Demonstration Farms which are essential to develope livestock resources and<br />

production in the district. Major emphasis need to be given on creation of Livestock Aid Center<br />

(LAC) with Artificial Insemination (AI) facilities at least in each Gram Panchayat of the district.<br />

It may be mentioned here that 56.06% (162) Gram Panchayats do not have Livestock Aid<br />

Centers.<br />

The agro-climatic conditions of the district favours poultry farming of both broiler and layer<br />

units. Poultry farming provides a source of subsidiary income and gainful employment to large<br />

number of small, medium farmers and agricultural labourers and other rural household<br />

throughout the year. But it is yet to be taken up on a large scale. The district lack critical<br />

infrastructure required for poultry development in the district.<br />

Fisheries sector occupies a pivotal place in national and state economy. It is also an important<br />

source of animal protein and a popular economic activity in a coastal district like <strong>Balasore</strong>.<br />

This sector bears potential for substantial income and opportunities in generating employment<br />

for the unemployment youth. Because of remunerative income from fishery than agriculture,<br />

now-a-days the occupation is not limited to “Keuta” sub caste under Scheduled Caste<br />

category. People of all caste are involved in this occupation, starting from catching fishes to<br />

trading, export etc. <strong>Balasore</strong> is one of the maritime districts of the state bestowed with vast<br />

freshwater, brackish water and marine fisheries resources. Rivers namely, Budhabalang,<br />

Subarnarekha, Sono, Kansabansa, Jalaka etc are flowing in the district having rich fisheries<br />

potential for inland capture fisheries. Also 80 km long coastline of Bay of Bengal bordering the<br />

district provides enough scope for marine and brackish water fishery.<br />

Now a day’s fish is considered as an important nutritive food for every human being for healthy<br />

life. As per WHO guideline per capita requirement of fish is 11kg/year. Accordingly, the district<br />

for its estimated 24.16 lakh population requires about 26574 MT of fish & shell fish. But it has<br />

been estimated that the district produces only <strong>12</strong>391.77 tons of fish & shell fish from fresh<br />

water sources, as production from brackish and marine sectors are mainly exported. Very<br />

marginal quantity of brackish water and marine fishes are consumed within the district. This<br />

availability level from fresh water fishes is able to provide only 5.13 kg/year to each individual<br />

of the district. It is a matter of fact that there are vast water resources in the district and the<br />

present production level is only 30.01% in fresh water fisheries, 21.89% in brackish water<br />

fisheries and 43.97% in marine fisheries. There is a gap of 14182.23 MT of fresh water fish<br />

required to meet the fish demand of the district. In order to fulfill this gap along with<br />

generation of employment and utilizing of idle resources, there is need for development of<br />

fishery resources in a scientific way.<br />

The district lack mineral resources. But the adjoining district of Keonjhar is rich in chromite<br />

and iron deposits. No mineral deposit of economic value beneath the soil of the district has<br />

been reported till date. Only sand sources are there because of flowing of rivers inside the<br />

district. Lack of mineral resources is the main reason behind absence of mineral based<br />

industry in the district. There are 10 major and 9 medium industries in the district. Out of 9<br />

TSI: NABARD Consultancy Services (NABCONS) xiii


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

medium industries, 8 have been closed. A total of 232 registered SSI units are functioning in<br />

the district. The number of unregistered SSI units is approximately 300. But a large number of<br />

cottage and village industries, handicraft units exits in rural areas of the district under<br />

unorganized sector. Data on unregistered units/units under unorganized sector are not<br />

available and need to be surveyed/assessed.<br />

The district <strong>Balasore</strong> has a potential market for its agro-based industrial products. The<br />

adjoining districts like part of Keonjhar and Bhadrak depend on <strong>Balasore</strong>. Paddy and fish are<br />

the chief commodities in the district followed by vegetables, coconut and sunflower. Post<br />

harvest technology and management plays a crucial role in value additions to agriculture. With<br />

improvement in food processing, the farmers of the district will get better price for their<br />

produce and this will create additional employment opportunities. Based on facts stated above<br />

important sectors and activities/programmes which can bring significant growth in the<br />

economy of the district is identified. These sectors have a potential to become future growth<br />

engines for overall development of the district.<br />

Sector-wise Resource Envelope and Gap in <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

(Rs. in Lakhs)<br />

Sectors<br />

<strong>Plan</strong><br />

Outlay<br />

Total<br />

Requirement<br />

Resource<br />

Gap<br />

Gap filling sources<br />

Agriculture & Allied 9790.97 <strong>12</strong>751.370 2960.400 MGNREGS & RIDF<br />

Rural Development 9039.31 9504.310 465.000 MGNREGS/RIDF<br />

Special Area Programmes 464.75 464.750 0.000 -<br />

Irrigation & Flood Control 5084.<strong>12</strong> 5092.<strong>12</strong>0 8.000 RIDF<br />

Energy 968.46 1403.460 435.000 BGJY<br />

Industry & Minerals 401.54 401.540 0.000 -<br />

Transport 19206.62 26968.620 7762.000<br />

MGNREGS/Finance<br />

Commission Grants<br />

Science, Technology &<br />

Environment<br />

66.43 66.430 0.000 -<br />

NRHM, SSA, RIDF &<br />

Social Services 33849.10 44924.900 11075.800 Finance Commission<br />

Grants<br />

General Services 296.99 3833.990 3537.000<br />

Finance Commission<br />

Grants<br />

Total 79168.29 105411.49 26243.20<br />

For development of <strong>Balasore</strong> district in all sectors a sum of Rs. 105411.49 lakh has been<br />

proposed for the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>. Basing on the local requirement, Agriculture and Allied<br />

Activities, Rural Development, Transport, Irrigation & Flood Control and Social Services have<br />

given been high priority in <strong>Balasore</strong> district. The requirement based on the proposals received<br />

from grassroots level is Rs. 105411.49 lakh, as against plan outlay of Rs. 79168.29 lakhs.<br />

Thus the resource gap is Rs. 26243.20 lakh, which can be filled up through additional<br />

allocation under flagship programmes namely, MGNREGS (Rs. 1037.00 lakhs), PMGSY (Rs.<br />

5225.00 lakhs), IAY (Rs. 1180.35 lakhs), CRSP (Rs. 38.10 lakhs), ARWSP (Rs. 1725.00 lakhs),<br />

NRHM (Rs. 2480.00 lakhs), SSA (Rs. 1717.50 lakhs), BGJY (Rs. 255.35 lakhs), BSVY (Rs.<br />

269.60 lakhs), IHSDP (Rs. 432.00 lakhs), RKVY (Rs. 260.00 lakhs), RIDF (Rs. 1753.40 lakhs)<br />

and from Finance Commission Grants (Rs. 9869.90 lakhs).<br />

Outlay for<br />

• Rural areas - Rs. 71034.68 lakhs (89.72%)<br />

• Urban areas – Rs. 8133.61 lakhs (10.28%)<br />

• Tribal Sub <strong>Plan</strong> – Rs. 10225.68 lakhs (<strong>12</strong>.92%)<br />

• SC Sub plan – Rs. 15254.00 lakhs (19.27%)<br />

• Women – Rs. 29941.02 lakhs (37.82%)<br />

Out of the total population in the district ST constitute only 11.28%. Out of the twelve CD<br />

Blocks of the district, Nilgiri is a tribal block under TSP area. Hence there is an ITDA operating<br />

in the district. Further, one of the block namely Jaleswar comes under MADA pockets.<br />

Primitive Tribal Groups do not reside in any part of the district.<br />

TSI: NABARD Consultancy Services (NABCONS) xiv


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

The tribal community residing in the district is mingled with general population and face much<br />

less hardship in comparison to their counterparts in KBK districts. In the annual plan several<br />

plan schemes for development of tribal community in the district has been proposed. Besides<br />

of these specific schemes, allocation in proportion of percentage of population has also been<br />

made in respect of other plan schemes. In the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> the following allocations<br />

has been made for welfare of Scheduled Tribes. Out of total plan outlay of Rs. 79168.29 lakhs,<br />

Rs. 10225.68 lakhs has been allotted for TSP. Similarly, out of the total population in the<br />

district, SC constitutes 18.84%. In the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> allocations has been<br />

made for welfare of Scheduled Castes. Out of total plan outlay of Rs. 79168.29 lakhs,<br />

Rs. 15254.00 lakhs has been allotted for SCSP.<br />

37255.80, 47%<br />

Source of Fund (<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>)<br />

419<strong>12</strong>.49, 53%<br />

Central <strong>Plan</strong> + Central Share of Central Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State Share of Central Sponsored <strong>Plan</strong>s<br />

The plan outlay in year <strong>2011</strong>-<strong>12</strong> is is 24.72% more than plan outlay for the previous<br />

year, i.e., 2010-11. In the <strong>Plan</strong> Outlay of <strong>2011</strong>-<strong>12</strong>, emphasis is given to five lead<br />

sectors of the district. Almost 97.23% of the total outlay has been allotted to these<br />

lead sectors. (Agriculture & allied – <strong>12</strong>.37%; Rural Development – 11.42%; Irrigation &<br />

Flood Control - 6.42%; Transport – 24.26%; Social services – 42.76%). This has been<br />

done keeping in view needs and priorities of the district.<br />

% to total outlay<br />

11.71<br />

<strong>12</strong>.37<br />

Agriculture &<br />

Allied<br />

Activities<br />

Comparison of % allocation to different sectors during 2010-11 and <strong>2011</strong>-<strong>12</strong><br />

9.28<br />

11.42<br />

Rural<br />

Development<br />

0.41<br />

0.59<br />

Special Area<br />

Programmes<br />

7.21<br />

6.42<br />

Irrigation &<br />

Flood Control<br />

1.24<br />

Energy<br />

1.22<br />

TSI: NABARD Consultancy Services (NABCONS) xv<br />

0.16<br />

Sectors<br />

0.51<br />

Industry &<br />

Minerals<br />

2010-11 <strong>2011</strong>-<strong>12</strong><br />

22.84<br />

24.26<br />

Transport<br />

0.1<br />

0.08<br />

Science<br />

Technology &<br />

Environment<br />

46.35<br />

42.76<br />

Social<br />

Services<br />

0.7<br />

0.38<br />

General<br />

Services


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Review of <strong>Annual</strong> <strong>Plan</strong>s<br />

<strong>Plan</strong>ning and Coordination Department, Government of Orissa vide its letter no. 17961/P<br />

dated 15 th December 2010, had directed all TSIs to quickly review previous <strong>Annual</strong> <strong>Plan</strong>s<br />

(2008-09, 2009-10 & 2010-11) from the prospective of their implementation. Accordingly, an<br />

attempt was made by NABCONS to compile informations for the purpose and the review report<br />

is presented below.<br />

Year<br />

Outlay Proposed in <strong>Annual</strong><br />

<strong>Plan</strong> Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

allocation<br />

received<br />

2008-09 44408.56 51813.01 47402.31 91.49<br />

2009-10 61976.66 57057.63 48599.88 85.18<br />

2010-11 63476.63 72926.29 -* -*<br />

*Financial year 2010-11 is continuing<br />

Rs. in lakhs<br />

Comparison of <strong>Plan</strong> outlay with Allocations received and Expenditure<br />

44408.56<br />

51813.01<br />

47402.31<br />

61976.66<br />

57057.63<br />

2008-09 2009-10<br />

Year<br />

48599.88<br />

Outlay Proposed in <strong>Annual</strong> <strong>Plan</strong> Document Allocation Received Expenditure<br />

• In the <strong>Annual</strong> <strong>Plan</strong> of 2008-09, total outlay proposed was Rs. 44408.56 lakhs. As<br />

against this outlay an allocation of Rs. 51813.01 lakhs was received by the district, out<br />

of which Rs. 47402.31 was spent (91.49%). A total of 98 schemes/programmes were<br />

included in this <strong>Annual</strong> <strong>Plan</strong> document. Out of which, allocations were not received in<br />

respect of 7 schemes/programmes. Allocations were received in respect of 4 new<br />

schemes/programmes during the year.<br />

• In the <strong>Annual</strong> <strong>Plan</strong> of 2009-10, total outlay proposed was Rs. 61976.66 lakhs. As<br />

against this outlay an allocation of Rs. 57057.63 lakhs was received by the district, out<br />

of which Rs. 48599.88 was spent (85.18%). A total of 119 schemes/programmes were<br />

included in this <strong>Annual</strong> <strong>Plan</strong> document. Out of which, allocations were not received in<br />

respect of 8 schemes/programmes. Allocations were received in respect of 17 new<br />

schemes/programmes during the year.<br />

• In the <strong>Annual</strong> <strong>Plan</strong> of 2010-11, total outlay proposed was Rs. 63476.63 lakhs. As<br />

against this outlay an allocation of Rs. 72926.29 lakhs was received by the district. A<br />

total of <strong>12</strong>7 schemes/programmes were included in this <strong>Annual</strong> <strong>Plan</strong> document. Out of<br />

which, allocations were not received in respect of 8 schemes/programmes. Allocations<br />

were received in respect of 13 new schemes/programmes during the year<br />

TSI: NABARD Consultancy Services (NABCONS) xvi


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

1.1. Introduction<br />

CHAPTER I<br />

DISTRICT BACKGROUND & PROFILE<br />

The present volume relates to <strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> of <strong>Balasore</strong> district for<br />

the financial year <strong>2011</strong>-<strong>12</strong>. This <strong>Plan</strong> Document has been prepared in participatory and<br />

consultative manner following guidelines and procedures prescribed in the MIDP (Manual<br />

for Integrated <strong>District</strong> <strong>Plan</strong>ning) developed by <strong>Plan</strong>ning Commission, Government of India.<br />

For preparation of this <strong>Plan</strong> Document, NABCONS, a subsidiary unit of NABARD was<br />

engaged as Technical Support Institution (TSI) by <strong>Plan</strong>ning & Coordination Department,<br />

Government of Orissa. While preparing this document all attempt has been made by<br />

NABCONS to involve the people’s representatives, PRIs, <strong>District</strong>, Block and Panchayat level<br />

Officers and other concerned having a stake in the development of the district. The<br />

presentation of the <strong>Plan</strong> Document i.e., Chapterisation has been made as per the guidelines<br />

suggested by <strong>Plan</strong>ning & Coordination Department.<br />

1.2. Methodology<br />

As discussed above, the MIDP was the base document which guided the TSI and the<br />

<strong>District</strong> Administration at each and every stage of the plan formulation process. The<br />

methodology suggested in the MIDP was followed so as to ensure participative and<br />

consultative nature of the plan formulation process. A brief description of the methodology<br />

followed for formulation of this <strong>Annual</strong> <strong>Plan</strong> is presented in the following paragraphs.<br />

1. Prior to start of the process, a <strong>District</strong> Level Consultative Workshop was conducted on<br />

16th August 2010 with participation of all <strong>District</strong> Level Officers, Block Development<br />

Officers, Executive Officers of ULBs, and members of DPC and Zilla Parishad. In this<br />

Consultative Workshop, the objective of the plan preparation, methodology of plan<br />

formulations, how to fill up the GN Statements and relevant annexure were discussed<br />

in detail and the queries of the participants were clarified by the Consultants of the<br />

TSI. The Collector and Member Secretary of the DPC explained to all participants the<br />

importance of this planning exercise and requested all concerned to extend<br />

cooperation to the TSI for successful completion of the exercise.<br />

2. In the said workshop, the <strong>District</strong> <strong>Plan</strong>ning Officer informed about formation of<br />

Sectoral Working Groups by the <strong>District</strong> Administration in the year 2009-10 and role<br />

of these Groups in <strong>Plan</strong> Formulation.<br />

3. After conduct of <strong>District</strong> Level Workshop, NABCONS formed two groups each<br />

consisting of Consultants, Field Supervisors and Investigators. One group was<br />

engaged in conduct of Block and ULB level Workshops and collection of information<br />

from GP, PS and ULBs. Another group was engaged in providing process consultation<br />

to the Sectoral Working Groups in plan formulation.<br />

4. The Block/ULB level Workshops were attended by BDOs, Chairman & Vice Chairman<br />

of Panchayat Samitis/ULBs, Zilla Parishad Members, Block/ULB Level Officials of Line<br />

Departments, Sarpanchs, Ward Members/Councilors, Panchayat Executive Officers,<br />

Members of CBOs and NGOs working in the area. As like <strong>District</strong> Level Workshop, a<br />

detailed discussion was made on objective of the planning exercise, role of different<br />

stake holders, how to fill up formats of Block/ULB/GP level profile, <strong>Plan</strong> formulation<br />

formats etc. In this meeting detailed interaction was made between members of TSI<br />

and Panchayat level functionaries so as to facilitate Panchayat level data collection<br />

process.<br />

5. The sequence of activities of the plan formulation process is presented below in<br />

graphical form.<br />

6. The Photographs of participants of the <strong>District</strong> and Block level Workshops conducted<br />

by the TSI is attached in Annexure XVII.<br />

7. A detailed profile of the participants of the workshop and the key issues and prioritized<br />

needs is presented below.<br />

TSI: NABARD Consultancy Services (NABCONS) 1


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

8. Based on the strategies made and key issues/prioritized needs identified in the<br />

<strong>Plan</strong>ning Workshops conducted at <strong>District</strong>/Block/ULB level, all the information were<br />

collected by the TSI in a participatory and consultative manner.<br />

9. All the above activities were conducted by TSI in close coordination with <strong>District</strong><br />

<strong>Plan</strong>ning Office. Officials from <strong>District</strong> <strong>Plan</strong>ning Office attended each and every<br />

workshops/meetings conducted by TSI at different level. Panchayat and Block level<br />

<strong>Plan</strong>s were collected basing on needs and aspirations of the community and these plan<br />

proposals were integrated while formulating sector wise detailed plan for the entire<br />

district.<br />

10. Resource availability for the district was assessed from various sources for the year<br />

<strong>2011</strong>-<strong>12</strong> to cover up needs and aspirations of the district. Based on resource<br />

availability, prioritization of proposals and allocation of resources to the prioritized<br />

proposal was made.<br />

11. Finally the <strong>Plan</strong> Document for the year <strong>2011</strong>-<strong>12</strong> was prepared and presented to the<br />

members of <strong>District</strong> <strong>Plan</strong>ning Committee (DPC) prior to the conduct of DPC meeting on<br />

07.02.<strong>2011</strong>. The DPC meeting held on 07.02.<strong>2011</strong> has approved the plan document.<br />

Table 1.1. Sequence of activities undertaken for <strong>Plan</strong> Formulation<br />

Steps Details of activities<br />

I <strong>District</strong> Level Consultative Workshop (16th August 2010)<br />

II Block and ULB level Workshops<br />

III Collection of Information, <strong>Plan</strong>s from Block, ULB, Panchayat, PRI Level<br />

IV Formulation of Sectoral <strong>Plan</strong>s by DLOs<br />

V Integration of <strong>Plan</strong> Proposals & preparation of <strong>Annual</strong> <strong>Plan</strong>s<br />

VI Submission of <strong>Plan</strong>s before DPC for approval<br />

VII Approval of <strong>Plan</strong> by the DPC (7th Feb <strong>2011</strong>)<br />

Table 1.2. Profile of participants of <strong>Plan</strong>ning workshops conducted at<br />

<strong>District</strong>/Block/ULB level<br />

Block/ULB Type of Members Nos.<br />

Bahanaga PRI Members 4<br />

Date of Workshop: 25.08.10 Government Officials 32<br />

Members of CSO/NGOs 13<br />

Local People 17<br />

Sub Total 66<br />

<strong>Balasore</strong> Sadar PRI Members 36<br />

Date of Workshop: 30.08.10 Government Officials 34<br />

Members of CSO/NGOs 19<br />

Local People 31<br />

Sub Total <strong>12</strong>0<br />

Baliapal PRI Members 34<br />

Date of Workshop: 02.09.10 Government Officials 31<br />

Members of CSO/NGOs 19<br />

Local People 34<br />

Sub Total 118<br />

Basta PRI Members 39<br />

Date of Workshop: 06.09.10 Government Officials 37<br />

Members of CSO/NGOs 14<br />

Local People 25<br />

Sub Total 115<br />

Bhograi PRI Members 48<br />

Date of Workshop: 04.09.10 Government Officials 41<br />

Members of CSO/NGOs 21<br />

Local People 25<br />

Sub Total 135<br />

Jaleswar PRI Members 42<br />

Date of Workshop: 03.09.10 Government Officials 35<br />

Members of CSO/NGOs 14<br />

Local People 30<br />

TSI: NABARD Consultancy Services (NABCONS) 2


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULB Type of Members Nos.<br />

Sub Total <strong>12</strong>1<br />

Khaira PRI Members 41<br />

Date of Workshop: 27.08.10 Government Officials 38<br />

Members of CSO/NGOs 21<br />

Local People 14<br />

Sub Total 114<br />

Nilgiri PRI Members 39<br />

Date of Workshop: 28.08.10 Government Officials 29<br />

Members of CSO/NGOs 14<br />

Local People 24<br />

Sub Total 106<br />

Oupada PRI Members 21<br />

Date of Workshop: 21.09.10 Government Officials 25<br />

Members of CSO/NGOs 8<br />

Local People 31<br />

Sub Total 85<br />

Remuna PRI Members 41<br />

Date of Workshop: 21.09.10 Government Officials 31<br />

Members of CSO/NGOs 15<br />

Local People 31<br />

Sub Total 118<br />

Simulia PRI Members 34<br />

Date of Workshop: 23.08.10 Government Officials 31<br />

Members of CSO/NGOs 8<br />

Local People 24<br />

Sub Total 97<br />

Soro PRI Members 36<br />

Date of Workshop: 08.09.10 Government Officials 34<br />

Members of CSO/NGOs 8<br />

Local People 29<br />

Sub Total 107<br />

<strong>Balasore</strong> (M) PRI Members 13<br />

Date of Workshop: 06.09.10 Government Officials 3<br />

Members of CSO/NGOs 9<br />

Local People 32<br />

Sub Total 57<br />

Jaleswar (NAC) PRI Members 16<br />

Date of Workshop: 03.09.10 Government Officials 4<br />

Members of CSO/NGOs 14<br />

Local People 31<br />

Sub Total 65<br />

Nilgiri (NAC) PRI Members 11<br />

Date of Workshop: 28.08.10 Government Officials 3<br />

Members of CSO/NGOs 5<br />

Local People 34<br />

Sub Total 53<br />

Soro (NAC) PRI Members 11<br />

Date of Workshop: 08.09.10 Government Officials 6<br />

Members of CSO/NGOs 13<br />

Local People 39<br />

Sub Total 69<br />

<strong>District</strong> Level Workshop PRI Members 33<br />

Date of Workshop: 16.08.10 Government Officials 52<br />

Members of CSO/NGOs 11<br />

Local People 43<br />

Sub Total 139<br />

Total PRI Members 499<br />

Government Officials 466<br />

TSI: NABARD Consultancy Services (NABCONS) 3


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULB Type of Members Nos.<br />

Members of CSO/NGOs 226<br />

Local People 494<br />

Total 1685<br />

% to total participants<br />

29.61<br />

Profile of the participants of the workshop<br />

27.66<br />

PRI Members Government<br />

Officials<br />

Participants<br />

13.41<br />

Members of<br />

CSO/NGOs<br />

29.32<br />

Local People<br />

Table 1.3. Major issues and Prioritized needs identified in the workshops<br />

Block/ULB Major Issues Prioritized Needs<br />

Bahanaga 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of irrigation facilities 2. Construction of irrigation channels<br />

3. Scarcity of drinking water 3. Pipe water supply to every village<br />

4. Inadequate class rooms in school 4. Construction of school building<br />

5. Flood Control 5. Construction of flood embankment/protection<br />

<strong>Balasore</strong> 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of irrigation facilities 2. Construction of water harvesting structure<br />

3. Scarcity of drinking water 3. Pipe water supply to every village<br />

4. Insufficient Anganwadi Centre 4. Setting up Anganwadi Centre<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Baliapal 1. Lack of connectivity 1. Construction of roads<br />

2. Scarcity of drinking water 2. Provision of pipe water supply<br />

3. Problem of Waterlogging 3. Construction of drainage channel<br />

4. Scarcity of fuel 4. <strong>Plan</strong>tation<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Basta 1. Lack of connectivity 1. Construction of roads<br />

2. Scarcity of drinking water 2. Installation of tube well<br />

3. Lack of safe drinking water 3. Provision of pipe water supply<br />

4. Frequent Flood 4. Construction of flood embankment/protection<br />

5. Improvement of Pisciculture 5. Renovation of pond<br />

6. Flood control 6. Construction of flood embankment/protection<br />

Bhograi 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Lack of irrigation facilities 3. Construction of water harvesting structure<br />

4. Problem of waterlogging 4. Construction of drainage channel<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Jaleswar 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Scarcity of fuel 3. Avenue tree plantation<br />

4. Frequent Flood 4. Construction of flood embankment/protection<br />

5. Insufficient Anganwadi Centre 5. New Anganwadi Centre<br />

6. Flood control 6. Construction of flood embankment/protection<br />

Khaira 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

TSI: NABARD Consultancy Services (NABCONS) 4


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULB Major Issues Prioritized Needs<br />

3. Scarcity of fuel 3. Avenue tree plantation<br />

4. Insufficient Anganwadi Centre 4. New Anganwadi Centre<br />

5. Insufficient ANM Centre 5. Setting up of ANM Centre<br />

Nilgiri 1. Lack of connectivity 1. Construction of roads<br />

2. Poor status of Pisciculture 2. Renovation of pond<br />

3. Scarcity of fuel 3. Avenue tree plantation<br />

4. Lack of irrigation facilities 4. Construction of water harvesting structure<br />

5. Scarcity of drinking water 5. Installation of tube well<br />

Oupada 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Scarcity of fuel 3. Avenue tree plantation<br />

Remuna 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Scarcity of fuel 3. Avenue tree plantation<br />

4. Improvement of Pisciculture 4. Renovation of pond<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Simulia 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Lack of irrigation facilities 3. Construction of water harvesting structure<br />

4. Insufficient ANM Centre 4. Setting up of ANM Centre<br />

5. Improvement of Pisciculture 5. Renovation of pond<br />

6. Scarcity of fuel 6. Avenue tree/Energy plantation<br />

Soro 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Lack of irrigation facilities 3. Construction of water harvesting structure<br />

4. Insufficient ANM Centre 4. Setting up of ANM Centre<br />

5. Improvement of Pisciculture 5. Renovation of pond<br />

6. Scarcity of fuel 6. Avenue tree/Energy plantation<br />

7. Insufficient Anganwadi Centre 7. Setting up of Anganwadi Centre<br />

8. Frequent Flood 8. Construction of flood embankment/protection<br />

<strong>Balasore</strong> (M) 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of street lights 2. Provision of street light<br />

3. Lack of safe drinking water 3. Provision of pipe water supply<br />

4. Problem of waterlogging 4. Construction of drainage channel<br />

5. Lack of community toilets 5. Construction of Community toilet<br />

7. Parking of trucks 7. Need for truck terminals<br />

8. Lack of play ground 8. Construction of parks<br />

Jaleswar (N) 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of street lights 2. Provision of street light<br />

3. Lack of safe drinking water 3. Provision of pipe water supply<br />

4. Problem of waterlogging 4. Construction of drainage channel<br />

5. Lack of community toilets 5. Construction of Community toilet<br />

6. Lack of markets 6. Construction of Market complex<br />

7. Parking of trucks 7. Need for truck terminals<br />

Nilgiri (N) 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of street lights 2. Provision of street light<br />

3. Lack of safe drinking water 3. Provision of pipe water supply<br />

4. Problem of waterlogging 4. Construction of drainage channel<br />

5. Lack of community toilets 5. Construction of Community toilet<br />

Soro (N) 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of street lights 2. Provision of street light<br />

3. Lack of safe drinking water 3. Provision of pipe water supply<br />

4. Problem of water logging 4. Construction of drainage channel<br />

5. Lack of community toilets 5. Construction of Community toilet<br />

6. Lack of markets 6. Construction of Market complex<br />

TSI: NABARD Consultancy Services (NABCONS) 5


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

1.3. Profile of the <strong>District</strong><br />

<strong>Balasore</strong> is one of the north-eastern coastal districts of Orissa. The <strong>District</strong> lies in between<br />

latitude: 21 003’ to 21 059’ North latitude and 86 020’ to 87 029’ East Longitude. It is bounded<br />

by Bay of Bengal in the East, Mayurbhanj and Keonjhar districts in the West, Medinapore<br />

district of West Bengal in the North and Bhadrakh district in the South. The geographical<br />

area of the district is 3806 Square km. <strong>Balasore</strong>, is crisscrossed with perennial and<br />

estuarine rivers because of its proximity to sea. Five important rivers of Orissa, namely<br />

Subarnarekha, Budhabalanga, Jalaka, Kansabansa and Sono have passed through this<br />

district from west to east before surging into the Bay of Bengal. The district head quarter,<br />

<strong>Balasore</strong> is 214 kms from the State Capital, Bhubaneswar. A brief overview of the district is<br />

presented in table 1.4.<br />

Table 1.4. Overview of <strong>Balasore</strong> <strong>District</strong><br />

Feature Unit <strong>Balasore</strong> Orissa<br />

Geographical area Sq. km. 3806 155707<br />

Total population (2001 census) Lakh 2024508 36804660<br />

Sub-divisions Number 2 58<br />

Blocks Number <strong>12</strong> 314<br />

Panchayat Samities Number <strong>12</strong> 314<br />

Tahasils Number 7 171<br />

Revenue villages Number 2971 51349<br />

No. of Inhabited Revenue Villages Number 2586 47529<br />

No. of Uninhabited Revenue Villages Number 385 3820<br />

Gram Panchayats Number 289 6234<br />

Nagar Panchayats (Municipalities) Number 1 35<br />

Nagar Panchayats (Notified Area Councils) Number 3 68<br />

Urban habitations (Wards) Number 80 1631<br />

No. of Police Stations Number 21 465<br />

No. of Parliament Constituency Number 1 21<br />

No. of Assembly Constituency Number 7 147<br />

Length of rail network Km. 114.98 2338.93<br />

Railway Stations Nos. 14 225<br />

Passenger halts Nos. 4 56<br />

Length of different type of roads<br />

National Highways Km. 118 3592<br />

State Highways Km. 67 4959<br />

Major <strong>District</strong> Roads Km. 105 3181<br />

Other <strong>District</strong> Roads Km. 326 6092<br />

Rural Roads Km. <strong>12</strong>21 27402<br />

Forest Roads Km. 79 7467<br />

PS Roads Km. 787 20326<br />

GP Roads Km. 1682 139944<br />

Total Km. 4385 2<strong>12</strong>963<br />

Length of road/sq km of geographical area 1.152 1.3677<br />

Irrigated agriculture (Kharif) % to cultivated area 55.58 46.39<br />

Irrigated agriculture (Rabi) % to cultivated area 42.02 22.77<br />

Barren & Wasteland "000" ha 10 840<br />

Forests "000" ha 33 5813<br />

Major and medium dams Number 0 80<br />

Large and medium industries Number 19 334<br />

1.3.1. Historical Background:<br />

<strong>Balasore</strong> district was part of the ancient Kalinga which later became a territory of Toshala<br />

or Utkal till the death of Mukunda Dev. It was annexed by Moghuls in 1568 and remained<br />

as a part of their suzerainty up to the middle of eighteenth century, to be precised up to<br />

1750-51. Then the Marahattas occupied this part of Orissa and it became a part of the<br />

dominion of the Marahatta Kings of Nagpur. The East India Company ceded this part<br />

TSI: NABARD Consultancy Services (NABCONS) 6


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

through a treaty called treaty of Deogaon in 1803 and it became a part of Bengal Presidency<br />

up to 19<strong>12</strong>. But the first English Settlement came into existence in <strong>Balasore</strong> region in 1634<br />

when Sahajahan was the emperor at Delhi. The first English factory was established in this<br />

region in 1640. During this period Dutch and Danish settlements were also founded in this<br />

region. <strong>Balasore</strong> as a separate district was created in October 1828 while it was in the<br />

Bengal Presidency. With the creation of Bihar province, Orissa was diverted along with<br />

<strong>Balasore</strong> district from Bengal to Bihar. But with the creation of Orissa as a separate State<br />

on 1st April 1936 <strong>Balasore</strong> became an integral part of Orissa State. The national movement<br />

of independence surged ahead with the visit of Mahatma Gandhi in 1921. Similarly Praja<br />

Andolan was initiated against the ruler of Nilagiri State.The state of Nilagiri merged with<br />

state of Orissa in January 1948 and became a part of <strong>Balasore</strong> district. On 3rd April 1993<br />

Bhadrak Sub-division of the district became a separate district and from this day <strong>Balasore</strong><br />

remains a district of Orissa with only two Sub-divisions namely <strong>Balasore</strong> and Nilagiri<br />

having 7 Tahasils namely <strong>Balasore</strong>, Soro, Simulia, Nilagiri, Jaleswar, Basta & Baliapal and<br />

<strong>12</strong> Blocks namely Bhograi, Jaleswar, Baliapal, Basta, <strong>Balasore</strong>, Remuna, Nilagiri, Oupada,<br />

Khaira, Soro. Simulia & Bahanaga. The name of the district is derived from the name of the<br />

town, which is old and important. The name <strong>Balasore</strong> is recognised from the Persian word<br />

BALA-E-SHORE which means “Town in the sea”. The historical legends describes that the<br />

district has been named as per the LORD BANESHWAR (LORD SHIVA) of the town which<br />

subsequently changed to <strong>Balasore</strong> during Moghul Rules.<br />

The district <strong>Balasore</strong> accounts for peoples of different religions viz; Hindu, Muslim, Sikh,<br />

Christian etc. with many of caste, creed and community. The copper coin collected from<br />

Bhograi and the collection of statue of Lord Budha from places like Avana, Kupari, Basta &<br />

Ajodhya magnify the existence of Budhaism in <strong>Balasore</strong> and it is expected to be popular<br />

during “Bhoumakar”. The statue of Lord Jaina at Jaleswar, <strong>Balasore</strong> and Avana hints about<br />

Jainism at <strong>Balasore</strong> district and expected to be popular in 10 th to 11 th century. <strong>Balasore</strong> is<br />

highly famous for “Saibapitha”. Many temples of Lord Shiva are seen in various places of<br />

the district. The temples of Lord Shiva are highly popular at Chandaneswar, Baneswar,<br />

Jhadeswar, Panchalingeswar and Maninageswar. <strong>District</strong> <strong>Balasore</strong> has got fame as<br />

“Saktipitha” as found from “Bhudhar Chandi” of Sajangarh, “Danda Kali” of Khantapara<br />

and “Chandi Mandir” of Khajureswar. The Sun temple of Ajodhya, Sergarh, Nilgiri &<br />

Bardhanpur gives picture about “Sun Devotee”. Vaishnab Dharma was also popular from<br />

Gupta dynasty. Vishnu temple at different places of <strong>Balasore</strong> and Khirachora temple (built<br />

during 2nd Narasingh Dev) highlights the fact. Many a Maszids, Churches, Gurudwar (at<br />

Remuna) etc. identify about different religion and place of worship at <strong>Balasore</strong>.<br />

Beyond mythological references, the historical records indicate that the district has been a<br />

strategic point for Mughal, Maratha and British rulers. For Britishers, the place had great<br />

politico-administrative and commercial importance. The district being blessed with long sea<br />

beach provided opportunities for carrying on commercial activities through sea routes.<br />

TSI: NABARD Consultancy Services (NABCONS) 7


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

1.3.2. Administrative setup:<br />

The district is divided into <strong>12</strong> CD blocks namely, Bahanaga, <strong>Balasore</strong>, Baliapal, Basta,<br />

Bhograi, Jaleswar, Khaira, Nilgiri, Oupada, Remuna, Simulia and Soro. For land records<br />

and revenue administration the district is divided in to 7 Tahasils. Regarding, villages and<br />

Gram Panchayats, the district has 2971 revenue villages, out of which 2586 are inhabited<br />

and 385 are uninhabited. These villages are under the jurisdiction of 289 Gram<br />

Panchayats.<br />

Table 1.5. Administrative units<br />

Blocks<br />

Gram<br />

Panchayats<br />

Revenue<br />

Villages<br />

Inhabited<br />

Villages<br />

Uninhabited<br />

Villages<br />

Bahanaga 21 163 148 15<br />

<strong>Balasore</strong> Sadar 27 289 235 54<br />

Baliapal 27 240 187 53<br />

Basta 22 346 297 49<br />

Bhograi 32 353 319 34<br />

Jaleswar 27 257 205 52<br />

Khaira 30 367 339 28<br />

Nilgiri 25 149 136 13<br />

Oupada 11 162 156 6<br />

Remuna 28 318 255 63<br />

Simulia 17 160 152 8<br />

Soro 22 167 157 10<br />

Total 289 2971 2586 385<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

1.3.3. Demographic Profile:<br />

<strong>Balasore</strong> is one of the most populous districts of the state. It occupies only 2.44% of the<br />

total land mass of the state but accommodates 5.50% of total population. The population<br />

density of the district (532) is very high; almost double that of Orissa State (236). Out of <strong>12</strong><br />

CD Blocks, population density is highest in Bhograi block. Further out of <strong>12</strong> CD blocks, 7<br />

have population density more than district average. The growth rate of population in the<br />

district is also high (19.33%) as against 16.25% for the State during 1991-2001.<br />

Persons/sq km<br />

516<br />

572<br />

Population Density (Persons/sq. km.)<br />

756 726 776<br />

498<br />

494<br />

Table 1.6. Demographic Characteristics of <strong>Balasore</strong> district<br />

Blocks Male Female Total Sex Ratio<br />

Bahanaga 62061 58785 <strong>12</strong>0846 947<br />

<strong>Balasore</strong> Sadar 113068 104920 217988 928<br />

Baliapal 90640 85886 176526 948<br />

Basta 83759 79151 162910 945<br />

TSI: NABARD Consultancy Services (NABCONS) 8<br />

450<br />

415<br />

634<br />

534<br />

542<br />

532<br />

236<br />

Bahanaga<br />

Sadar<br />

Baliapal<br />

Basta<br />

Bhograi<br />

Jaleswar<br />

Khaira<br />

Nilgiri<br />

Oupada<br />

Remuna<br />

Simulia<br />

Soro<br />

<strong>District</strong><br />

Orissa<br />

India<br />

Blocks<br />

313


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Blocks Male Female Total Sex Ratio<br />

Bhograi <strong>12</strong>97<strong>12</strong> <strong>12</strong>3578 253290 953<br />

Jaleswar 88406 84923 173329 961<br />

Khaira 79845 79669 159514 998<br />

Nilgiri 55975 54257 110232 969<br />

Oupada 35190 35361 70551 1005<br />

Remuna 94352 88384 182736 937<br />

Simulia 53558 52006 105564 971<br />

Soro 61589 59413 <strong>12</strong>1002 965<br />

<strong>District</strong> (Rural) 948155 906333 1854488 956<br />

<strong>Balasore</strong> (M) 55691 50391 106082 905<br />

Jaleswar (NAC) 10905 10482 21387 961<br />

Nilgiri (NAC) 7558 7199 14757 953<br />

Soro (NAC) 14202 13592 27794 957<br />

<strong>District</strong> (Urban) 88356 81664 170020 924<br />

<strong>District</strong> (Total) 1036511 987997 2024508 953<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

As per 2001 census, the total population of the district is 2024508. Out of this 1036511 are<br />

males and 987997 are females. The district recorded sex ratio of 953 in 2001 Census. Out<br />

of <strong>12</strong> CD Blocks, sex ratio is highest in Oupada block (1005) followed by Khaira (998) and<br />

Simulia (971).<br />

Population size Remark<br />

Total Population 2024508<br />

Rank in the State 4 Ganjam (1); Cuttack (2), Mayurbhanj (3)<br />

Rank in India 195<br />

Population Density<br />

Density (Persons/sq km) 532<br />

Rank in the State 5 Khurda (1), Jagatsinghpur (2), Cuttack (3), Jajpur (4)<br />

Rank in India 191<br />

Growth in Population<br />

Decennial Growth Rate<br />

(1991-2001)<br />

19.33<br />

Rank in the State 5<br />

Rank in India 351<br />

NB: Total No. of <strong>District</strong>s in India (2001): 593<br />

Khurda (1), Nabarangpur (2), Bhadrak (3), Malkanagiri<br />

(4)<br />

The district has high concentration of Scheduled Caste population and low of Scheduled<br />

Tribes. Percentage of Scheduled Castes to total population in the district is 18.84% as<br />

against 16.53% in the entire state. In contrast, the percentage of Scheduled Tribe in<br />

<strong>Balasore</strong> district is only 11.28% as against 22.13% in the entire state.<br />

Table 1.7. Social Group Composition in <strong>Balasore</strong> district vs Orissa State<br />

<strong>Balasore</strong> Orissa<br />

Social group<br />

Population<br />

% to total<br />

population of the Population<br />

% to total<br />

population of<br />

district<br />

the State<br />

SC 381422 18.84 6082063 16.53<br />

ST 228454 11.28 8145081 22.13<br />

Hindu 1937765 95.7153 34726<strong>12</strong>9 94.3525<br />

Muslim 76270 3.7673 761985 2.0703<br />

Christian 5967 0.2947 897861 2.4395<br />

Sikh 162 0.0080 17492 0.0475<br />

Buddhist 40 0.0019 9863 0.0268<br />

Jain 182 0.0089 9154 0.0249<br />

Others 2825 0.1395 361981 0.9835<br />

Religion not stated <strong>12</strong>96 0.0640 20195 0.0549<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

TSI: NABARD Consultancy Services (NABCONS) 9


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

India<br />

Orissa<br />

<strong>Balasore</strong><br />

8.20<br />

SC & ST Population<br />

TSI: NABARD Consultancy Services (NABCONS) 10<br />

11.28<br />

% to total population<br />

Scheduled Caste Schedule Tribe<br />

Population of <strong>Balasore</strong> district mainly belongs to Hindu and Muslim religion. Hindus<br />

constitute about 95.72% of the total population in the district. Percentage of Muslim is 3.77<br />

as against only 2.07 in the entire state. Population of other religion in the district is<br />

marginal.<br />

16.20<br />

16.53<br />

18.84<br />

Table 1.8. Details of Tribal Concentrated Gram Panchayats<br />

(ST Population more than <strong>District</strong> percentage)<br />

Block No. of GPs Name of these GPs<br />

Bahanaga 2 Panpana, Patharpenth<br />

<strong>Balasore</strong> 8<br />

Baliapal 1 Deula,<br />

22.13<br />

Jayadev Kasaba, Genguti, Nagram, Kuradiha, Sindhia, Kasafal,<br />

Parikhi, Bahabalpur<br />

Basta 6<br />

Santoshpur, Sadanandapur, Paunshakuli, Ramanda, Mukulish,<br />

Kulida<br />

Bhograi 1 Jayarampur<br />

Jaleswar 4 Sardarbandha, Praharajpur, Chhotakalma, Chamargan<br />

Khaira 4 Gadapokhari, Nandara, Paithagali, Ratina<br />

Nilgiri 18<br />

Pithahata, Gumutia, Arabandha, Dharmapur, Siadimala, Tilipala,<br />

Narsinghpur, Garadi, Narayanpur, Dhobasil, Matiali, Sajangarh,<br />

Chhatrapur, Bramhapur, Begunia, Kansha, Ajodhya and<br />

Bauriabad<br />

Oupada 7<br />

Aghirapada, Badapohari, Badasahi, Baunshabania, Kandagaradi,<br />

R.R.Pur and Shyamsundarpur<br />

Simulia 2 Bari, Kanthibhauni<br />

Soro 2 Mahumuana, Singhakhuta<br />

Table 1.9. Details of Scheduled Caste Concentrated Gram Panchayats<br />

(SC Population more than <strong>District</strong> percentage)<br />

Blocks<br />

No. of<br />

GPs<br />

Name of these GPs<br />

Bahanaga 11<br />

Panpana, Kharaspur, Dandaharipur, Baripada, Chaka Jagannathpur,<br />

Kalyani, Aruabag, Patharapentha, Avana, Khanthapada, Soud<br />

<strong>Balasore</strong> 7<br />

Chhanua, Ranasahi, Jayadev Kasaba, Rasalpur, Nagram, Sartha,<br />

Sindhia<br />

Baliapal 4 Jamkunda, Nikhira, Srirampur, Bishnupur<br />

Basta 7 Tadada, Santoshpur, Mathani, Irda, Sahada, Chormara, Kulida<br />

Bhograi 7<br />

Rasalpur, Nimatpur, Bajitpur, Sradhapur, Nachinda, Jayarampur,<br />

Narayan Mohanty Padia<br />

Jaleswar 2 Olmara, Praharajpur


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Blocks No. of Name of these GPs<br />

Garsang, Nayakhadi, Khurunta, Gadapokhari, Dungura,<br />

Khaira 16 Baunshagadia, Badajayapur, Antara, Nandar, Kainthagali, Haripur,<br />

Makhanpur, Dagarpada, Gagandhuli, Shyamsundarpur, Palash<br />

Nilgiri 2 Narsinghpur, Ajodhya<br />

Oupada 7<br />

Badapokhari, Baunshabania, R.R.Pur, Iswarpur, Shyamsundarpur,<br />

Fatepur<br />

Remuna 3 Inchudi, Maharajpur, Barunsingh<br />

Simulia <strong>12</strong><br />

Purusottampur, Andarai, Muruna, Bati, Kanheibindha, Abjhuna, Ada,<br />

Markona, Bauripada, Maitapur, Khirkona, Bari<br />

Soro 8<br />

Manipur, Tentei, Manantri, Anantapur, Attapur, Madhusudanpur,<br />

Nadigaon, Mulsingh<br />

Literacy rates of the district are much higher than State average. The literacy rates of SC<br />

population in the district are better than that of state population.<br />

Table 1.10. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa<br />

Parameters <strong>Balasore</strong> <strong>District</strong> Orissa State<br />

Male 81.69 73.35<br />

Literacy rate (Total)<br />

Female 58.90 50.51<br />

Total 70.56 63.08<br />

Male 81.16 72.93<br />

Literacy rate (Rural)<br />

Female 57.40 46.66<br />

Total 69.52 59.84<br />

Male 85.77 87.93<br />

Literacy rate (Urban)<br />

Female 71.20 72.87<br />

Total 78.80 80.84<br />

Literacy rate in SC Population 59.41 55.53<br />

Literacy rate in ST Population 31.88 37.37<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

1.4. Development Indicators:<br />

Important Development Indicators of <strong>Balasore</strong> district in comparison to figures in State of<br />

Orissa is presented in table 1.11. Detailed discussion, sector wise, is presented in<br />

succeeding chapters of the report. Fact sheet on GPs/Blocks is presented in Annexure<br />

XVIII.<br />

Table 1.11. Important Development Indicators of <strong>Balasore</strong> vis-à-vis Orissa<br />

Indicator <strong>Balasore</strong> Orissa<br />

Demography (2001 Census)<br />

Total Population 2024508 36804660<br />

Rural Population (%) 89.11 85.01<br />

Urban Population (%) 10.89 14.99<br />

Population Density (Persons/sq. km) 532 236<br />

Decennial Growth Rate (1991 - 2001) 19.33 16.25<br />

% of <strong>District</strong> population to state population 5.50 -<br />

% Schedule Caste Population 18.84 16.53<br />

% Schedule Tribe Population 11.28 22.13<br />

Participation in Economic Activities<br />

% of workers to total population 31.87 38.79<br />

% of main workers to total population 23.87 26.05<br />

% of marginal workers to total population 7.99 <strong>12</strong>.74<br />

% of non workers to total population 68.13 61.21<br />

% of workers (main & marginal) engaged in cultivation 34.14 29.75<br />

% of workers (main & marginal) engaged as Agricultural Labourers 32.96 35.02<br />

% of workers (main & marginal) engaged in Household Industry 3.64 4.91<br />

% of workers (main & marginal) engaged in other works 29.27 30.32<br />

Agriculture<br />

Land use pattern (% to geographical area)<br />

Forest 8.66 37.33<br />

TSI: NABARD Consultancy Services (NABCONS) 11


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Miscellaneous tree crops and grooves 6.56 2.20<br />

Permanent pastures 4.20 3.17<br />

Cultivable waste 2.36 2.41<br />

Land under Non-agril. uses 8.66 8.34<br />

Barren & uncultivable land 2.62 5.39<br />

Current Fallows 8.92 3.70<br />

Other Fallows 1.31 1.47<br />

Net sown area 56.69 35.99<br />

Geographical area 100.00 100.00<br />

Operational land holding size - Farm categories (% to total farmers) (2001)<br />

Marginal (10.00 ha) 0.08 0.32<br />

Operational land holding size (% to total area of holdings (all categories)) (2001)<br />

Marginal (10.00 ha) 1.43 4.34<br />

Irrigated Area (% to Cultivated Area) 2008-09<br />

Kharif 55.58 46.39<br />

Rabi 42.02 22.77<br />

Cropping Intensity (%) (2008-09) 154 162<br />

Fertilizer Consumption (Kg/ha) (2008-09) 133 62<br />

Productivity of Major Crops (tons/ha)<br />

Kharif<br />

Paddy 1.963 2.205<br />

Maize 1.156 2.252<br />

Arhar 0.821 0.86<br />

Mung 0.515 0.432<br />

Biri 0.527 0.421<br />

Groundnut 1.135 1.521<br />

Til 0.445 0.442<br />

Castor 0.665 0.653<br />

Jute 1.455 1.799<br />

Mesta 0.998 0.847<br />

Sunhemp 1.052 0.889<br />

Sweet Potato 8.000 8.113<br />

Chilies 0.853 0.808<br />

Turmeric 2.398 2.449<br />

Ginger 2.091 2.019<br />

Rabi<br />

Paddy 3.220 3.714<br />

Wheat 1.350 1.520<br />

Maize 1.205 2.935<br />

Mung 0.425 0.465<br />

Biri 0.505 0.485<br />

Kulthi 0.428 0.428<br />

Gram 0.796 0.663<br />

Cowpea 1.014 0.763<br />

Field Pea 0.886 0.715<br />

Groundnut 1.749 1.936<br />

Til 0.480 0.389<br />

Castor 0.600 0.608<br />

Mustard 0.389 0.383<br />

Sunflower 0.810 0.934<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Sweet Potato 8.000 9.501<br />

Potato 11.279 10.325<br />

Onion 8.139 8.814<br />

Chilies 0.934 0.885<br />

Coriander 0.490 0.479<br />

Garlic 3.026 3.231<br />

Sugarcane 65.850 70.250<br />

Livestock Production (2005)<br />

MILK<br />

Milk Production (000 MT) 33.65 <strong>12</strong>82.760<br />

Share from Indigenous Cow 19.04 553.780<br />

Share from Crossbred Cow 13.99 525.860<br />

Share from Buffaloes 0.62 200.560<br />

Share from Goat - 2.560<br />

Average Yield (Per Animal/Day in Kg)<br />

Indigenous Cows 0.456 0.3<strong>12</strong><br />

Crossbred Cows 5.136 5.215<br />

Buffalo 2.632 4.985<br />

Per Capita Availability/Day (gm) 45 94<br />

EGG<br />

Egg Production (Lakhs) 358.51 <strong>12</strong>159.61<br />

Share from Desi Bird 257.77 46<strong>12</strong>.92<br />

Share from Improved Bird 88.60 7255.27<br />

Share from Ducks <strong>12</strong>.14 291.42<br />

Average Yield (Per Bird/Year in Nos.)<br />

Desi Bird 1<strong>12</strong>.375 115.21<br />

Improved Bird 281.000 345.05<br />

Per Capita Availability/Year (Nos.) 18 33<br />

MEAT<br />

Meat Production (MT) 3702.575 92565.150<br />

Share from Bovine NA <strong>12</strong>1.830<br />

Share from Sheep 487.789 8589.780<br />

Share from Goat 1736.463 36811.540<br />

Share from Pig 242.869 5<strong>12</strong>7.540<br />

Share from Poultry <strong>12</strong>35.454 41914.460<br />

Per Capita Availability/Year (Kgs) 1.826 2.515<br />

Health Indicators<br />

Sex ratio (2001 Census) All age group 953 972<br />

Crude Birth Rate (SRS 2008) (per 1000 Population) 20.56 21.40<br />

Crude Death Rate (SRS 2008) (per 1000 Population) 10.00 9.30<br />

Infant Mortality Rate (NFHS-III) (Per 1000 Live Birth) 63 65<br />

Total Fertility Rate (SRS 2007) 2.90 2.40<br />

Maternal Mortality Rate (SRS 2004-06) (per 1,00,000 live births) 315 303<br />

Contraceptive Prevalence rate (Any method) (NFHS-III) 56.50 50.70<br />

Contraceptive Prevalence Rate (Modern Methods) (NFHS-III) 48.93 44.70<br />

Contraceptive Prevalence Rate (Female sterilization) (NFHS-III) 37.56 33.10<br />

Contraceptive Prevalence Rate (Male sterilization) (NFHS-III) 1.65 1.00<br />

Contraceptive Prevalence Rate (IUD) (NFHS-III) 0.54 0.50<br />

Contraceptive Prevalence Rate (Pill) (NFHS-III) 8.45 7.00<br />

Contraceptive Prevalence Rate (Condom) (NFHS-III) 3.65 3.00<br />

% of women who received ANC (Ante Natal Care) (NFHS-III) 88.6 87<br />

% of women who received 3 ANC visits (NFHS-III) 69 61<br />

% of women reported Institutional Delivery (CNAA 2006-07) 43.54 46<br />

Vaccination Coverage (% of children) (NFHS-III) 74 52<br />

Children age below 3 years who are underweight (%) (NFHS-III) 44.00 44<br />

Children age 6-35 months who are anemic (%)(NFHS-III) 74 74<br />

Health Index (2004) 0.415 0.468<br />

Income Index (2004) 0.466 0.545<br />

TSI: NABARD Consultancy Services (NABCONS) 13


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Human Development Index (HDI) value 2004 0.559 0.579<br />

HDI Rank in the State 2004 18 -<br />

Gender Development Index (GDI) value 2001 0.519 0.546<br />

GDI Rank in the State 2001 14 -<br />

Reproductive Health Index (RHI) 1998-99 0.497 0.549<br />

RHI Rank in the state 1998-99 25 -<br />

Education Indicators<br />

Literacy rate (Total) (2001 Census)<br />

Literacy rate (Rural) (2001 Census)<br />

Male 81.69 73.35<br />

Female 58.90 50.51<br />

Total 70.56 63.08<br />

Male 81.16 72.93<br />

Female 57.40 46.66<br />

Total 69.52 59.84<br />

Male 85.77 87.93<br />

Literacy rate (Urban) (2001 Census)<br />

Female 71.20 72.87<br />

Total 78.80 80.84<br />

Literacy rate in SC Population (2001 Census) 59.41 55.53<br />

Literacy rate in ST Population (2001 Census) 31.88 37.37<br />

Overall Literacy Index (2001) 0.709 0.636<br />

Combined Gross Enrolment Ratio (6-14 years) 2003-04 89.16 89.58<br />

Combined Gross Enrolment Ratio Index (6-14 years) 2003-04 0.892 0.896<br />

Education Index 2004 0.770 0.723<br />

Education Index Rank in the State 2001 10 -<br />

Out of School Children (6 to 11 Age group) (% to total child population)<br />

All Community 1.31 3.28<br />

SC 1.46 2.99<br />

ST 2.95 5.43<br />

Minority 1.79 4.28<br />

Out of School Children (11 to 14 Age group) (% to total child population)<br />

All Community 3.58 5.45<br />

SC 4.32 5.06<br />

ST 7.44 9.86<br />

Minority 5.76 6.78<br />

Table 1.<strong>12</strong>. Public infrastructure and services<br />

Infrastructure Availability norm<br />

Actual<br />

status<br />

Requirement Shortfall<br />

Pucca road Each habitation 1548 4158 -2610<br />

Electricity<br />

connection<br />

Each habitation 3690 4158 -468<br />

Piped water Each habitation 1611 4158 -2547<br />

Gram Pan. office Each GP headquarter 258 289 -31<br />

PDS outlet Per 1500 population 1446 1611 -165<br />

Anganwadi Each habitation 3630 4158 -528<br />

Primary school Each village 2227 2586 -359<br />

Secondary school Each Gram Panchayat 556 289 +267<br />

College Per 20000 population 56 <strong>12</strong>1 -65<br />

Single Doctor PHC Per 30000 population 66 81 -15<br />

Sub-centre Per 5000 population 275 483 -208<br />

Hospital At every block headquarter 15 <strong>12</strong> +3<br />

Vet. Dispensary Each block headquarter 21 <strong>12</strong> +9<br />

Livestock Aid center Each Gram Panchayat 114 289 -175<br />

Police station Each block headquarter & ULB 21 16 +5<br />

Police outpost Each Gram Panchayat 18 289 -271<br />

Post office Per 5000 population 74 483 -409<br />

Bank/credit agency Per 5000 population 148 483 -335<br />

TSI: NABARD Consultancy Services (NABCONS) 14


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 1.13. Public Infrastructure and service quality: Anganwadi Centers<br />

Facility Norm<br />

Requirement<br />

as per norm<br />

Actual<br />

status<br />

Provision of<br />

Anganwadi<br />

Per 1500 population 1611 3630 +2019<br />

Location In each habitation* 4158 3630 -528<br />

Housing of<br />

Anganwadi<br />

Dedicated Pucca building 4158 250 -3908<br />

Provision of<br />

ASHA<br />

Per 1000 population 2416 1847 -569<br />

Human<br />

resource<br />

1 AWW and 1 assistant/Anganwadi 8316 5653 -2663<br />

Toilet facility Attached toilet 4158 33 -4<strong>12</strong>5<br />

Water facility Potable drinking water connection 4158 Nil -4158<br />

Wash facility<br />

Separate place for washing hands with<br />

adequate soap and water<br />

4158 <strong>12</strong>2 -4036<br />

Utensils 4158 2026 -2132<br />

Furniture 4158 2026 -2132<br />

Darry/Mat 4158 2026 -2132<br />

Equipment Kit 4158 2026 -2132<br />

Scale 4158 2026 -2132<br />

Register 4158 2026 -2132<br />

Playing equipment 4158 2026 -2132<br />

*<strong>Balasore</strong> is a natural calamity prone district. Flood/cyclone occurs every year. During natural calamities women and<br />

children face problem in accessing Anganwadi center located outside habitation. Hence, in many of the gram<br />

panchayats there is demand to provide Anganwadi in each habitation.<br />

Table 1.14. Public Infrastructure and service quality – Schools (A)<br />

Facility Norm<br />

Requirement as<br />

per norm<br />

Actual<br />

status<br />

Gap<br />

Provision of primary schools Each village 2586 2227 -359<br />

Provision of Upper Primary schools Each village 2586 <strong>12</strong>39 -1347<br />

Provision of Secondary schools Each Gram Pan. 289 556 +267<br />

Table 1.14. Status on Infrastructure lacking in Government Schools (Primary & Upper<br />

Primary Education) (B)<br />

Primary Schools* Upper Primary Schools**<br />

No. of Schools without<br />

No. of<br />

Schools<br />

% to total Schools<br />

No. of<br />

Schools<br />

% to total<br />

Schools<br />

Drinking water facility 158 11.04 33 3.84<br />

Common Toilet facility 941 65.76 585 68.10<br />

Separate Toilet for girls <strong>12</strong>41 86.72 665 77.42<br />

Access ramps 671 46.89 334 38.88<br />

Boundary walls 970 67.78 523 60.88<br />

Play ground 1099 76.80 503 58.56<br />

NB: *Primary School means schools having education facility up to primary only.<br />

**The Upper Primary schools include purely Upper Primary; Primary with Upper Primary; Primary, Upper Primary &<br />

Secondary and Upper Primary & Secondary<br />

Table 1.14. Status on Infrastructure lacking in Government Schools (Secondary<br />

Education) (C)<br />

Available Shortfall<br />

Type of Infrastructure<br />

No. of % to total No. of % to total<br />

Schools Schools Schools Schools<br />

Science Laboratory 29 11.65 220 88.35<br />

Separate Room for Headmaster/Principal 150 60.24 99 39.76<br />

Separate Room for Asst. Headmaster/Vice Principal 3 1.20 246 98.80<br />

Library 47 18.88 202 81.<strong>12</strong><br />

Separate Toilet Blocks for Boys and Girls 180 72.29 69 27.71<br />

Art & Craft Room/Activity Room 4 1.61 245 98.39<br />

Drinking Water facility 245 98.39 4 1.61<br />

TSI: NABARD Consultancy Services (NABCONS) 15<br />

Gap


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 1.15. Public Infrastructure and service quality: Health Institutions<br />

Facility<br />

Health Sub Center<br />

Norm<br />

Requirement<br />

as per norm<br />

Actual<br />

status<br />

Gap<br />

Provision of subcentre<br />

Per 5000 population 483 275 -208<br />

Human resource 1 ANM, 1 MPW and 1 worker 1449 627 -822<br />

Equipment Medical kit etc. 483 275 -208<br />

Housing Dedicated Pucca building 483 87 -396<br />

Health Center (Single doctor PHC)<br />

Provision of single<br />

doctor PHC<br />

Per 30,000 population 81 66 -15<br />

Own building Dedicated Pucca building 81 66 -15<br />

ECG 81 - -81<br />

Hospital (UPHC/CHC)<br />

X-ray and accessories 81 - -81<br />

Provision of rural<br />

hospital<br />

At every block headquarter <strong>12</strong> 14 +2<br />

Own building Dedicated Pucca building <strong>12</strong> 14 +2<br />

X-ray and accessories 14 5 -9<br />

Ambulance services 14 4 -10<br />

Table 1.16. Essential documentary services<br />

Service Norm Status Requirement Shortfall<br />

BPL card circulated<br />

Eligible family (1997<br />

survey)<br />

262454<br />

257,606<br />

+4848<br />

Job card under<br />

MGNREGS<br />

Eligible family 276631<br />

257606<br />

+19025<br />

Table 1.17. Employment and Self-employment (A)<br />

Indicators %<br />

% of workers to total population 31.87<br />

% of main workers to total population 23.87<br />

% of marginal workers to total population 7.99<br />

% of non workers to total population 68.13<br />

% of workers (main & marginal) engaged in cultivation 34.14<br />

% of workers (main & marginal) engaged as Agricultural Labourers 32.96<br />

% of workers (main & marginal) engaged in Household Industry 3.64<br />

% of workers (main & marginal) engaged in other works 29.27<br />

Table 1.18. Employment and Self-employment (B)<br />

Indicators<br />

<strong>Balasore</strong><br />

No. %<br />

Total Applicants in the live register of Employment Exchange<br />

Educational qualification wise No. of applicants in the live register<br />

37293 -<br />

Below Matriculation 9988 26.78<br />

Matriculation 13059 35.02<br />

Under Graduates 6566 17.61<br />

Arts Graduate 5231 14.03<br />

Commerce Graduate 465 1.25<br />

Science Graduate 936 2.51<br />

Civil Engineering Diploma holders 75 0.20<br />

Mechanical Engineering Diploma holders 172 0.46<br />

Electrical Engineering Diploma holders 174 0.47<br />

Instrumentation Engineering Diploma holders 5 0.01<br />

Leather Technology Diploma holders - -<br />

Textile Technology Diploma holders 2 0.00<br />

Others 620 1.66<br />

Total 37293 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 16


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 1.19. Information on Economy & Commerce - Agriculture and allied farm<br />

sector activities<br />

Parameter/Indicator Unit Status<br />

Total agricultural land (including horticulture) ‘000’Ha 258.78<br />

Irrigated agriculture ‘000’Ha<br />

Kharif-138.950 (55.58%)<br />

Rabi- 105.06 (42.02%)<br />

Non-irrigated agriculture ‘000’Ha<br />

Kharif- 111.05 (44.42%)<br />

Rabi-144.94 (57.98%)<br />

Wastelands/uncultivable lands ‘000’Ha 24.00<br />

Average landholding Ha 0.93<br />

Landless families dependent on agriculture % 3.45<br />

Per capita agriculture produce Quintals 4.81<br />

Per capita income from agriculture Rs. 4265<br />

Total dairy livestock Number 901306<br />

Total land under grazing ‘000’Ha 16<br />

Per capita milk availability/day gms 45<br />

Per capita income from dairy business Rs. 378<br />

Total number of registered dairies Number 14<br />

Total number of meat animals Number 372397<br />

Per capita meat availability/year Kilogram 1.826<br />

Per capita income from meat production Rs. 345<br />

Total number of registered poultries Number 85<br />

Total number of fishing families Number 27997<br />

Per capita fish availability/year Kilogram 10.00<br />

Per capita income from fish production Rs. 914<br />

Table 1.20. Information on Economy & Commerce - Industry and Commerce<br />

Parameter/Indicator Unit Status<br />

Total number of large & medium industries Number 19<br />

Total number of registered SSI units Number 232<br />

Total number of un-registered SSI units/HH Industries Number 5406<br />

State owned industrial areas (Industrial Estates) Number 2<br />

SEZs Number Nil<br />

Table 1.21. Household amenities<br />

Sanitation facility Status Requirement Shortfall<br />

Individual Household Latrine (BPL) 210023 281636 71613<br />

Individual Household Latrine (APL) 91874 109209 17335<br />

TSI: NABARD Consultancy Services (NABCONS) 17


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER – II<br />

SWOT ANALYSIS<br />

Strength, Weakness, Opportunities and Threats (SWOT) analysis of each sectors of economy<br />

as well of the district as a whole is an essential pre-requisite for finalization of vision and<br />

annual plans for the district. Unless each sector is analyzed in detail definite conclusion in<br />

terms of need assessment and prediction can not be arrived at. Based on primary and<br />

secondary information collected by the TSI from different sources in <strong>Balasore</strong> district,<br />

SWOT analysis of important sectors is carried out and presented in this Chapter. The<br />

present analysis will provide inputs for finalization of the district vision 2020 and<br />

preparation of <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>.<br />

2.1. Agriculture & Allied Activities:<br />

2.1.1. Crop Husbandry<br />

Agriculture and allied sectors are the main-stay of the district’s economy. It provides both<br />

direct and indirect employment to the majority of the workforce (67%). The share of<br />

agriculture in the district income is about 41% in the year 2001-02 which is more than the<br />

state share in NSDP. In fact agriculture is the main source of livelihood of the population<br />

supplemented by livestock rearing, fishery and horticulture. The district lack mineral<br />

resources and so also major and medium industries. Hence, the rural population of the<br />

district mainly depends on agriculture, fishery and other activities allied to agriculture for<br />

their livelihood.<br />

Agro-Climatic Zones & Agro-Ecological Situations:<br />

The district comes under the North Eastern Coastal Plain Agro Climatic Zone of Orissa<br />

(Table 2.1) and is divided into six Agro-ecological regions viz. Red laterite rainfed, Red<br />

laterite canal irrigated, Alluvial canal irrigated, Alluvial rainfed, Low lying & flood prone and<br />

Saline soil group (Table 2.2). The soil type of this agro-climatic zone mainly consists of<br />

saline, Lateritic, coastal Alluvial and Red & Deltaic Alluvial. The climate is hot and humid<br />

with average annual rainfall of 1568 mm in the agro climatic zone and 1592 mm in the<br />

district.<br />

Table 2.1. Agro-Climatic Zones of Orissa<br />

Normal<br />

Agro-climatic<br />

Zone<br />

1. North Western<br />

Plateau<br />

2. North Central<br />

Plateau<br />

3. North Eastern<br />

Coastal Plain<br />

4. East & South<br />

Eastern Coastal<br />

Plain<br />

5. North Eastern<br />

Ghat<br />

6. Eastern Ghat<br />

High Land<br />

7. South Eastern<br />

Ghat<br />

8. Western<br />

Undulating Zone<br />

Agricultural <strong>District</strong>s Climate<br />

Sundargarh, parts of Deogarh,<br />

Sambalpur & Jharsuguda<br />

Mayurbhanj, major parts of<br />

Keonjhar, (except Anandapur &<br />

Ghasipura block)<br />

<strong>Balasore</strong>, Bhadrak, parts of<br />

Jajpur & hatdihi block of<br />

Keonjhar<br />

<strong>Balasore</strong>, Khurda,<br />

Jagatsinghpur, part of Cuttack ,<br />

Puri, Nayagarh & part of Ganjam<br />

Phulbani, Rayagada, Gajapati,<br />

part of Ganjam & small patches<br />

of Koraput<br />

Major parts of Koraput,<br />

Nabarangpur<br />

Malkangiri & part of Keonjhar<br />

Kalahandi & Nuapada<br />

Hot & moist<br />

sub-humid<br />

Hot & moist<br />

sub-humid<br />

Moist subhumid<br />

Hot &<br />

Humid<br />

Hot &<br />

moist, subhumid<br />

Warm &<br />

humid<br />

Warm &<br />

humid<br />

Hot & moist<br />

sub-humid<br />

Broad Soil groups<br />

TSI: NABARD Consultancy Services (NABCONS) 18<br />

Mean annual<br />

rainfall (mm)<br />

Mean maximum<br />

summer temp<br />

(°C)<br />

Mean minimum<br />

winter temp (°C)<br />

1600 38 15<br />

1534 36.6 11.1<br />

1568 36 14.8<br />

1577 39 11.5<br />

1597 37 10.4<br />

1522 34.1 7.5<br />

Red, Brown forest,<br />

Red & Yellow, Mixed<br />

Red & Black<br />

Lateritic, Red &<br />

Yellow, Mixed Red &<br />

Black<br />

Red, Lateritic, Deltaic<br />

alluvial, Coastal<br />

alluvial & Saline<br />

Saline, Lateritic,<br />

Alluvial, Red & Mixed<br />

red & Black<br />

Brown forest,<br />

Lateritic Alluvial,<br />

Red, Mixed Red &<br />

Black<br />

Red, Mixed Red &<br />

Black, Mixed Red &<br />

Yellow<br />

1710 34.1 13.2 Red, Lateritic, Black<br />

1352 37.8 11.9<br />

Red, Mixed Red &<br />

Black and Black


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Agro-climatic<br />

Zone<br />

9. Western<br />

Central Table<br />

Land<br />

10. Mid Central<br />

Table Land<br />

Agricultural <strong>District</strong>s Climate<br />

Bargarh, Bolangir, Boudh,<br />

Sonepur, parts of Sambalpur &<br />

Jharsuguda<br />

Angul, Dhenkanal, parts of<br />

Cuttack & Jajpur<br />

Source: Orissa Agricultural Statistics, 2006-07<br />

Hot & moist<br />

sub-humid<br />

Hot & moist<br />

sub-humid<br />

Normal<br />

Broad Soil groups<br />

TSI: NABARD Consultancy Services (NABCONS) 19<br />

Mean annual<br />

rainfall (mm)<br />

Mean maximum<br />

summer temp<br />

(°C)<br />

Mean minimum<br />

winter temp (°C)<br />

1614 40 <strong>12</strong>.4<br />

1421 38.7 14<br />

Red & Yellow, Red &<br />

Black, Black, Brown<br />

forest, Lateritic<br />

Alluvial, Red,<br />

Lateritic, Mixed Red<br />

& Black<br />

Table 2.2. Blocks covered under different Agro-Ecological situations of the district<br />

Agro-climatic Zone - North Eastern Coastal Plain<br />

% to<br />

Agro Ecological Situations Blocks Covered<br />

Area in<br />

000 ha<br />

geographical<br />

area of the<br />

Zone<br />

Soil<br />

type<br />

Red laterite rainfed Nilgiri & Oupada 49.062 13.00 Lateritic<br />

Red laterite canal irrigated Khaira 41.514 11.00 Lateritic<br />

Alluvial Canal Irrigated Simulia 22.644 6.00 Alluvium<br />

Alluvial Rainfed<br />

Bahanaga, Jaleswar, Bhograi<br />

& Remuna<br />

98.<strong>12</strong>4 26.00 Alluvium<br />

Low lying & flood prone <strong>Balasore</strong>, Basta & Baliapal 90.576 24.00 Alluvium<br />

Saline Soil Group<br />

Basta, Bahanaga, Baliapal,<br />

Bhograi, Remuna & Soro<br />

75.480 20.00 Saline<br />

Source: Strategic Research and Extension <strong>Plan</strong> of <strong>Balasore</strong> district<br />

Geo-physical features:<br />

The district is situated in the north-eastern coast of Orissa state, to the north of Tropic of<br />

Cancer. Bay of Bengal covers almost 81 kms of boundary of the district. The district is<br />

located in the deltaic region of the state and spreads mainly on the alluvial plains of the<br />

major rivers namely, Budhabalanga, Subarnarekha and Kansabansa. In fact a network of<br />

rivers and creeks constitute the most conspicuous feature of the district. Small rivers<br />

flowing in the district are Sono, Jalaka, Gangahara and Palpada. Because of its location in<br />

deltaic region, though the district possess huge alluvial deposits suitable for cultivation of<br />

crops, yet suffer a lot due to occurrence of flood almost every year .<br />

Table 2.3. Rivers flowing through different Blocks of the district<br />

Block Rivers flowing Block Rivers flowing<br />

Bahanaga Kansabansa Khaira Kansabansa<br />

<strong>Balasore</strong> Budhabalanga, Gangahara Nilgiri Sono, Sapua<br />

Baliapal Subarnarekha Oupada<br />

Basta Subarnarekha, Jalaka, Budhabalanga Remuna Budhabalag, Sono, Gangahara<br />

Bhograi Subarnarekha, Chitei, Bhandaria Simulia Kansabansa<br />

Jaleswar Subarnarekha Soro Kansabansa<br />

Source: Primary survey, 2010<br />

Regarding topography of the district, major parts of the district are plain and North-Western<br />

part is covered with hills or hillocks. Because of proximity to sea, the altitude is very low<br />

almost very close to mean sea level. Topographically, the district is divided in to three well<br />

defined tracts<br />

• Saline tract along the coast<br />

• Arable tract or rice country<br />

• The Sub mountainous tract or forest area<br />

The primary data collected from PRI members reveals that out of 289 Gram Panchayats<br />

(GPs), 185 (64.02%) are located in plain topography. Rests of the Gram Panchayats are<br />

located in unfavourable topography. A total of 30 (10.38%) GPs reported waterlogged


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

condition throughout the year, 20 (6.92%) GPs are located close to the sea, and 27 (9.34)<br />

GPs close to forests (Table 2.4). This unfavourable topography bears a lot of risks against<br />

successful cultivation of crops by the farmers.<br />

Table 2.4. Distribution of Gram Panchayats on the basis of Topography<br />

Type of Topography Total<br />

Details<br />

Hilly<br />

area<br />

Waterlogged<br />

Close to<br />

sea<br />

Plain land<br />

Close to<br />

Forest<br />

No. of<br />

GPs<br />

No. of GPs 27 30 20 185 27 289<br />

% 9.34 10.38 6.92 64.02 9.34 100.00<br />

Source: Primary survey, 2010<br />

Climate:<br />

Climate of the district is characterized by hot summer and high humidity during rainy<br />

season, dry winter and low diurnal range of temperature throughout the year. <strong>Annual</strong><br />

normal rainfall of the district is 1592 mm, which is almost 9% higher than normal rainfall<br />

of the state. This is due to cyclones which cause major precipitations in the area. Cyclones<br />

are frequent in the district because of close proximity to Bay of Bengal. The district is<br />

generally affected by cyclones which are caused when depressions originate in the Bay of<br />

Bengal over Andaman & Nicobar Islands and move towards East Coast of India.<br />

More than 70.97% of the rainfall is received between June to September through south -<br />

west monsoon. Month wise normal rainfall of the district is as detailed below (Table 2.5)<br />

Table 2.5. Monthly Normal Rainfall in the district<br />

Month Normal Rainfall (mm) Period Normal Rainfall (mm) % to total Rainfall<br />

Feb 31.80<br />

Mar<br />

Apr<br />

34.40<br />

62.20<br />

Pre Monsoon 236.90 14.88<br />

May 108.50<br />

Jun 221.50<br />

Jul<br />

Aug<br />

308.60<br />

332.10<br />

Monsoon 1<strong>12</strong>9.80 70.97<br />

Sep 267.60<br />

Oct 170.50<br />

Nov<br />

Dec<br />

34.60<br />

5.50<br />

Post-Monsoon 225.30 14.15<br />

Jan 14.70<br />

Total 1592.00 - 1592.00 100.00<br />

Source: Orissa Agricultural Statistics, 2006-07<br />

Maximum Temperature of the district varies between 29 o C in the month of January to 35 o C<br />

in the month of April. January and December are the coldest month of the year with<br />

average temperature of 14 oC. Humidity of the district generally ranges between 66% in the<br />

month of April and May to 83% in the month of August.<br />

Table 2.6. Monthly Normal Temperature and Relative Humidity in the district<br />

Month<br />

Maximum<br />

Temp ( oC)<br />

Minimum<br />

Temp ( oC)<br />

Relative<br />

Humidity (%)<br />

Month<br />

Maximum<br />

Temp ( oC)<br />

Minimum<br />

Temp ( oC)<br />

Relative<br />

Humidity (%)<br />

Jan 29 13 62 Jul 33 26 81<br />

Feb 34 17 59 Aug 31 25 83<br />

Mar 34 21 60 Sep 33 25 81<br />

Apr 35 25 67 Oct 33 24 69<br />

May 35 25 65 Nov 31 19 69<br />

Jun 34 26 76 Dec 29 15 63<br />

Source: Orissa Agricultural Statistics, 2006-07<br />

Natural Calamities:<br />

<strong>Balasore</strong> is one of the most natural disaster-prone districts of Orissa. Flood, cyclone and<br />

drought regularly devastate the economy of the district. Frequent occurrences of natural<br />

calamities stand as a barrier to economic progress of the district in the agricultural front.<br />

TSI: NABARD Consultancy Services (NABCONS) 20


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Main flood prone areas of the district are located in northern parts of the district covering<br />

Bhograi, Baliapal, Basta, Jaleswar, <strong>Balasore</strong> and Remuna blocks. Also some times<br />

Bahanaga, Soro, Nilgiri, Simulia gets partly affected due to heavy rain and flood.<br />

As the district lies on the coastal belts of Bay of Bengal, it is highly vulnerable to cyclone<br />

and tidal disasters. Out of <strong>12</strong> blocks, <strong>Balasore</strong> sadar, Basta, Baliapal, Jaleswar, Bhograi,<br />

Remuna, Bahanaga and Soro blocks have been identified as severe cyclone prone blocks.<br />

Except Oupada and Khaira blocks, all the blocks of the district has been covered under<br />

vulnerability map of the district.<br />

The rainfall recorded during the last 26 years revealed that only in case of 5 years the<br />

actual rainfall is less than normal rainfall of 1592 mm. In rest 21 years the actual rainfall is<br />

more than normal rainfall of the district.<br />

Rainfall in mm<br />

Rainfall distribution in <strong>Balasore</strong> district during the last 26 years<br />

1984<br />

1985<br />

1986<br />

1987<br />

1988<br />

1989<br />

1990<br />

1991<br />

1992<br />

1993<br />

1994<br />

1995<br />

1996<br />

1997<br />

1998<br />

1999<br />

2000<br />

2001<br />

2002<br />

2003<br />

2004<br />

2005<br />

2006<br />

2007<br />

2008<br />

TSI: NABARD Consultancy Services (NABCONS) 21<br />

Year<br />

Normal Rainfall Actual Rainfall<br />

The river Subarnarekha originates in Chhotnagpur hills of Jharkhand state and enters<br />

<strong>Balasore</strong> district near Olmara of Jaleswar block. Except some small strips of embankments,<br />

the river is mostly without emabnkments. The river falls in to Bay of Bengal near Kirtania of<br />

Bhograi block. During flood, large areas of Jaleswar, Bhograi and Baliapal blocks and a<br />

small pocket of Basta block get affected.<br />

The river Budhabalanga originates from Similipal hills of Mayurbhanj district and enters<br />

<strong>Balasore</strong> near Kalyanpur of Remuna block. There is no flood protection embankment on<br />

either side of the river. It falls in to Bay of Bengal near Balaramgadi. During flood it affects<br />

large areas of Remuna and Balaosre Sadar block. The river is fed by other rivulets like Sono<br />

and Gangahara. Some parts of Nilagiri block and large areas of Remuna block are affected<br />

due to flood in river Sono and Gangahar.<br />

The river Jalaka originates in Mayurbhanj district and the rain water of Mayurbhanj district<br />

is mainly discharged through this river. The river is named as Jambhira in Mayurbhanj<br />

district and Jalaka in Balsore district. It submerges large ares of Basta block during flood.<br />

The river falls in to Bay of Bengal near Kasafala.<br />

River Kansabansa though a small river but affects some areas of Simulia, Khaira, Soro and<br />

Bahanaga blocks during flood.<br />

River Sono is also a small river and has no flood embankment. It falls in the river<br />

Budhabalanga near Govindpur village of Remuna block. Some portion of Nilagiri and<br />

Remuna blocks are badly affected due to flood in this river.<br />

In addition to these rivers, a good number of small rivers/rivulets also cause flood in many<br />

parts of the district. The list of these small rivers/rivulets is presented below.


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Name of the Small<br />

rivers/Nallahs<br />

Jalaka/Panchapada<br />

Table 2.7. Small rivers/Nallas that causes flood in the district<br />

Name of the blocks affected due to<br />

flood<br />

<strong>Balasore</strong> sadar (Partly) & Basta<br />

(Partly)<br />

Name of the Small<br />

rivers/Nallahs<br />

Baharada Basta<br />

Name of the blocks<br />

affected due to flood<br />

Haskura/Palpada Basta & <strong>Balasore</strong> sadar Khalijodi Bhograi<br />

Sartha Nalla <strong>Balasore</strong> sadar Nahara Bhograi<br />

Sapua Nilagiri Chitei Bhogarai<br />

Kantiachera Remuna & <strong>Balasore</strong> Sadar Bhandaria Bhograi<br />

Paganai <strong>Balasore</strong> sadar Pathareswar Bhograi<br />

Gangahar Remuna and <strong>Balasore</strong> sadar Guasul Baliapal<br />

Amrutia <strong>Balasore</strong> Sadar<br />

Source: <strong>District</strong> Disaster Management <strong>Plan</strong>, 2009-10<br />

Particularly during kharif season, vast areas of coastal plains are subject to severe flooding.<br />

Due to continuous submergence of kharif crop under flood water, the crops get completely<br />

damaged. Floods generally take place either early, during transplantation or late during<br />

flowering season, leading to crop loss. Since the flood-prone areas have hardly any scope of<br />

flow irrigation, there is a very little scope of raising a second crop.<br />

Large areas of the district are also drought prone because of irregular distribution and<br />

deficient rainfall. Due to lack of irrigation facilities, the standing crops fails and farmers<br />

face major setback.<br />

Table 2.8. Seasonality of Hazard in the district<br />

Type of hazard<br />

Flood<br />

Cyclone<br />

Heat wave<br />

Drought<br />

January to March<br />

H C A I<br />

April to June<br />

H C A I<br />

July to September<br />

H C A I<br />

October to December<br />

H C A I<br />

H: Human/C: Crop/A: Animals/I: Infrastructure<br />

The super cyclone of 1999 caused heavy loss to all the coastal districts of the state<br />

including <strong>Balasore</strong> district.<br />

The recurrence of natural calamities like flood, cyclone, drought, hailstorm and tide at<br />

regular intervals in the district is affecting the agriculture operations. As a consequence<br />

farmers are reluctant to diversify into commercial agriculture fearing increase in debt<br />

burden due to increase in cost of cultivation. Occurrence of different types of natural<br />

calamities in the district during last several years is as under:-<br />

Table 2.9. History of Disaster in the <strong>District</strong><br />

Type of Disaster Year<br />

Flood<br />

1989, 1990, 1991, 1992, 1993, 1994, 1995, 1998, 1999, 2001, 2003, 2004,<br />

2005, 2006, 2007, 2008, 2010<br />

Cyclone 1990, 1999<br />

Drought 1998, 1999, 2002, 2010<br />

Hailstorm 1989, 1992, 1993<br />

Source: <strong>District</strong> Disaster Management <strong>Plan</strong>, 2009-10<br />

Table 2.10. No. of villages prone to Tsunami (located within 1.5 kms of sea)<br />

Blocks No. of GPs No. of Villages Blocks No. of GPs No. of Villages<br />

Bahanaga 5 16 Khaira - -<br />

<strong>Balasore</strong> Sadar 8 27 Nilgiri - -<br />

Baliapal 6 9 Oupada - -<br />

Basta - - Remuna 3 10<br />

Bhograi 5 14 Simulia - -<br />

Jaleswar - - Soro - -<br />

Total 27 76 - - -<br />

Source: <strong>District</strong> Disaster Management <strong>Plan</strong>, 2009-10<br />

TSI: NABARD Consultancy Services (NABCONS) 22


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 2.11. Flood Prone Gram Panchayats<br />

Blocks No. of GPs Blocks No. of GPs<br />

Bahanaga 8 Khaira -<br />

<strong>Balasore</strong> Sadar 10 Nilgiri 5<br />

Baliapal 14 Oupada -<br />

Basta 11 Remuna <strong>12</strong><br />

Bhograi 14 Simulia 2<br />

Jaleswar 13 Soro 4<br />

Total 93 - -<br />

Source: <strong>District</strong> Disaster Management <strong>Plan</strong>, 2009-10<br />

Most important impact of these natural calamities is loss of crop, one of the main sources of<br />

livelihood of rural masses of the district. Almost every year major number of villages suffers<br />

crop loss of 50% and above, as a result farmers are rarely interested to take up commercial<br />

cultivation of crops adopting improved technologies.<br />

Table 2.<strong>12</strong>. Year wise number of villages having crop loss of 50% and above in Kharif<br />

season due to natural calamities (<strong>Balasore</strong>)<br />

Year<br />

Nos. affected<br />

Blocks Villages<br />

% to total number of<br />

blocks in the district<br />

% to total number of<br />

villages in the district<br />

1999 9 1733 75.00 58.33<br />

2000 2 9 16.67 0.30<br />

2001 0 0 0.00 0.00<br />

2002 <strong>12</strong> 2586 100.00 87.04<br />

2005 5 508 41.67 17.10<br />

2006 <strong>12</strong> 995 100.00 33.49<br />

2007 <strong>12</strong> 2141 100.00 72.06<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

Blocks<br />

Table 2.13. Cyclone/Flood Shelters established in the district<br />

No. of Multi<br />

Purpose Cyclone<br />

Shelters/Flood<br />

Shelters<br />

Other<br />

Cyclone<br />

Shelters<br />

Total Blocks<br />

No. of Multi<br />

Purpose Cyclone<br />

Shelters/Flood<br />

Shelters<br />

Other<br />

Cyclone<br />

Shelters<br />

Bahanaga 5 25 30 Khaira - 9 9<br />

<strong>Balasore</strong><br />

Sadar<br />

4 51 55 Nilgiri - 6 6<br />

Baliapal 11 14 25 Oupada - 2 2<br />

Basta - 0 Remuna 4 16 20<br />

Bhograi 8 15 23 Simulia - 9 9<br />

Jaleswar - 2 2 Soro 1 34 35<br />

Total 33 183 216 - - - -<br />

Source: <strong>District</strong> Disaster Management <strong>Plan</strong>, 2009-10<br />

Land Utilization Pattern:<br />

The land use pattern of the district varies with that of state. Very less area is under forest<br />

coverage limited mainly to Nilgiri and Oupada Blocks. Due to plain terrain and lack of hills<br />

and forests, major chunk of the land is cultivated, i.e., under net area sown (61.42%) (Table<br />

2.14).<br />

Table 2.14. Land Utilization Statistics of <strong>Balasore</strong> vis-à-vis Orissa (2008-09)<br />

Land use type<br />

<strong>Balasore</strong><br />

Area (000ha) %<br />

Orissa<br />

Area (000ha) %<br />

Forest 33 8.66 5813 37.33<br />

Miscellaneous tree crops and grooves 25 6.56 342 2.20<br />

Permanent pastures 16 4.20 494 3.17<br />

Cultivable waste 9 2.36 375 2.41<br />

Land under Non-agril. uses 33 8.66 <strong>12</strong>98 8.34<br />

Barren & uncultivable land 10 2.62 840 5.39<br />

Current Fallows 34 8.92 576 3.70<br />

Other Fallows 5 1.31 229 1.47<br />

Net sown area 216 56.69 5604 35.99<br />

Total Geographical area<br />

Source : Orissa Agricultural Statistics, 2008-09<br />

381 100.00 15571 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 23<br />

Total


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Out of the twelve CD blocks in the district, <strong>Balasore</strong> and Jaleswar blocks rank first and<br />

second, respectively in terms of extent of cultivated area. Out of the total cultivated area in<br />

the district, 11.59% and 11.10% are under <strong>Balasore</strong> and Jaleswar blocks, respectively.<br />

Blocks<br />

Table 2.15. Ranking of Blocks according to area under cultivation<br />

Cultivated<br />

area (000'ha)<br />

% to cultivated<br />

area of the<br />

district<br />

Rank Blocks<br />

Cultivated<br />

area (000'ha)<br />

% to cultivated<br />

area of the<br />

district<br />

Bahanaga 19.810 7.91 8 Khaira 21.910 8.75 4<br />

<strong>Balasore</strong> 29.050 11.59 1 Nilgiri 17.300 6.90 10<br />

Baliapal 20.410 8.15 7 Oupada <strong>12</strong>.320 4.92 <strong>12</strong><br />

Basta 21.830 8.71 5 Remuna 22.850 9.<strong>12</strong> 3<br />

Bhograi 21.500 8.58 6 Simulia 16.710 6.67 11<br />

Jaleswar 27.820 11.10 2 Soro 19.040 7.60 9<br />

Total 250.550 100.00 - - - - -<br />

Source: <strong>District</strong> Agriculture Office, <strong>Balasore</strong><br />

Soil Type:<br />

42.80<br />

T o po g ra ph y o f c u ltiv a te d la n d (in % )<br />

High M e d iu m Low<br />

15.60<br />

41.60<br />

Based on soil type, the district can be broadly divided in to 4 zones.<br />

• Saline soil – Spread over Bhograi blocks, portions of Baliapal, <strong>Balasore</strong>, Remuna,<br />

Bahanaga and Soro blocks along coast line.<br />

• Alluvial soil - Spread over Simulia, Soro, Remuna, <strong>Balasore</strong>, Basta, Bhograi, Baliapal<br />

and Jaleswar blocks.<br />

• Sandy soils – Spread over <strong>Balasore</strong>, Remuna, Oupada, Bahanaga, Soro, Simulia, and<br />

Khaira blocks.<br />

• Laterite soils – Spread over Jaleswar (Raibania area), Basta, Remuna, Nilagiri,<br />

Oupada and Khaira blocks.<br />

The soil survey shows that the district spreads over alluvial plains of the river<br />

Budhabalang, Subarnrekha, Kansabansa and their distributaries. The soil of the district is<br />

mostly alluvium, laterite, saline, clay, clayloam and sandy loam. The soil of central region is<br />

very fertile for paddy and other crops. Soils of Nilgiri Sub-division are mostly gravelly and<br />

lateritic soil, which is less fertile. The coastal belt is flooded with brackish water of<br />

Estuaries Rivers which is unsuitable for cultivation. But presently this area is utilized for<br />

coconut and betel cultivation. Shrimp culture and salt manufacturing units are also<br />

developing in this area recently. The soil in this part is saline because of its nearness to<br />

sea-shore and lack of proper drainage facility. In water logged area water resistant long<br />

duration crop variety is grown.<br />

The soil of the district bear variable physico-chemical characteristics, the colour ranges<br />

from light grey and pale yellow to deep grey, and the textures range from coarse sand to silt<br />

clay to clay. These soils are generally fertile with low status of nitrogen and available<br />

phosphoric acid at certain places. They usually contain sufficient quantity of potash. Soil<br />

TSI: NABARD Consultancy Services (NABCONS) 24<br />

Rank


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

reaction is acidic to neutral in nature. Within 10 kms proximity of the sea, the soils are<br />

saline and narrow strips of sandy soils are also seen. The data presented on soil reaction<br />

status of different blocks (Table 2.16) of the district reveals that almost 44.00% soils are<br />

acidic in nature followed by 5.00% saline and only 51.00% normal in reaction.<br />

Table 2.16. Soil test data for different Blocks of <strong>Balasore</strong> <strong>District</strong><br />

Blocks<br />

No. of Sample<br />

Analyzed<br />

pH (% samples)<br />

Acidic Neutral Alkaline<br />

Av. Nutrient Index<br />

Organic Average<br />

Average K<br />

Carbon (N) P<br />

Bahanaga 2199 45 52 3 1.75 1.10 2.10<br />

<strong>Balasore</strong> 3818 37 57 6 1.76 1.16 1.69<br />

Baliapal 2573 55 40 5 1.67 1.78 1.68<br />

Basta 2863 55 40 5 1.71 1.60 1.58<br />

Bhograi 1906 37 60 3 1.80 1.19 2.07<br />

Jaleswar 3319 37 58 5 1.81 1.<strong>12</strong> 1.84<br />

Nilgiri 2951 49 47 4 1.85 1.05 1.96<br />

Khaira 1991 47 51 2 1.73 1.04 1.93<br />

Oupada 1566 47 50 3 1.97 1.52 1.99<br />

Remuna 3137 39 56 5 1.34 1.14 1.91<br />

Simulia 1843 42 52 6 1.63 1.37 1.75<br />

Soro 2391 46 51 3 1.68 1.14 1.93<br />

Total 30557 44 51 5 1.76 1.25 1.97<br />

Operational land holding size:<br />

The data on operational land holding size of the farmers of the district based on 2001<br />

Agricultural Census is presented in table 2.17 and 2.18. Majority of the farmers are either<br />

marginal (67.98%) or small (22.11%) with less than 2 ha of land. These two categories of<br />

farmers operate only 65% of total holdings. Percentage of large and medium farmers (>4 ha)<br />

are very less in the district in comparison to state averages. Average land holding size of the<br />

farmers is also very less, .i.e. 0.93 ha as against 1.25 ha in the Orissa state. This is because<br />

of high population density in the district.<br />

Table 2.17. Operational land holding size (Farmers category) in <strong>Balasore</strong> district vis-àvis<br />

Orissa (2001) – Part I<br />

<strong>Balasore</strong> Orissa<br />

Farm Category<br />

No. of % to total No. of % to total<br />

farmers farmers farmers farmers<br />

Marginal (10.00 ha) 184 0.08 13375 0.33<br />

Total<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

220055 100.00 4067135 100.00<br />

Table 2.18. Operational land holding size (Farmers category) in <strong>Balasore</strong> district vis-àvis<br />

Orissa (2001) – Part II<br />

Farm Category <strong>Balasore</strong> Orissa<br />

Area (ha)<br />

% to total area<br />

of holdings (all<br />

categories)<br />

Area (ha)<br />

% to total area of<br />

holdings (all<br />

categories)<br />

Marginal (10.00 ha) 29<strong>12</strong> 1.43 220387 4.34<br />

Total 204154 100.00 5081033 100.00<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

TSI: NABARD Consultancy Services (NABCONS) 25


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Average land holding size (in ha)<br />

Irrigation:<br />

0.93<br />

0.98<br />

Average Land Holding size (in ha)<br />

1.13 1.13<br />

TSI: NABARD Consultancy Services (NABCONS) 26<br />

1.25<br />

<strong>Balasore</strong> Bhadrakh Keonjhar<br />

<strong>District</strong>/State<br />

Mayurbhanj Orissa<br />

<strong>Balasore</strong> district is fairly irrigated. Out of total cultivated area 55.58% is irrigated in Kharif<br />

season and 42.02% in Rabi season. This is much higher than state figures, which is only<br />

46.39% in kharif and 22.77% in rabi season. In fact irrigation is required in Kharif season<br />

to save the crop only during drought. But in rabi season irrigation is required throughout<br />

the crop growth period. Hence, irrigation facility in rabi season is essential for the farmers.<br />

But, only 42.02% of the total cultivated area is irrigated in rabi season. Lack of irrigation<br />

prevents the farmers in non-irrigated areas to take up a second crop, mainly cash crops<br />

during Rabi season.<br />

The district has good irrigation potential created from use of ground water and ranks first in<br />

the state in its usage. The average development of ground water in the district is 41.85% as<br />

of March 2001. Block level ground water development varies from 19.42 to 69.71%. Six<br />

Blocks of the district viz., Bhograi, Baliapal, Basta, <strong>Balasore</strong> sadar, Remuna and Bahanaga<br />

have been declared as saline area. Consequently, installation of Shallow Tube Well (STW)<br />

with pumpsets in these blocks have been banned by Govt.<br />

Flow irrigation (Major & Medium Irrigation Projects) is available to cultivated land of three<br />

out of twelve blocks of the district. The district has two Medium Irrigation Projects, i.e.,<br />

Salandi Irrigation Project & Sunei Irrigation Project. Regarding Lift Irrigation Projects, <strong>12</strong>09<br />

LI Projects with command area of 21604 ha exists in the district. Out of this almost half i.e.<br />

48% (577) are defunct because of some or other reasons. Steps need to be taken for revival<br />

of these LI points. In the district a total of 46 Minor Irrigation Projects are there with<br />

command area of 10077 ha.<br />

Table 2.19. Source wise irrigated area in <strong>Balasore</strong> vis-à-vis Orissa (2008-09)<br />

(Area in 000ha)<br />

Source<br />

<strong>Balasore</strong><br />

Kharif Rabi<br />

Orissa<br />

Kharif Rabi<br />

Major & Medium Irrigation Projects (Flow) 29.530 7.180 <strong>12</strong>85.93 563.73<br />

Minor Irrigation Projects (Flow) 8.440 3.150 541.71 73.48<br />

Minor Irrigation Projects (Lift) 39.730 23.950 473.66 269.63<br />

Other Sources 61.250 70.780 565.71 500.34<br />

Total Irrigated Area 138.950 105.06 2867.01 1407.18<br />

% to cultivated area<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

55.58 42.02 46.39 22.77<br />

Table 2.20. Status of L.I. Points under Lift Irrigation Division, <strong>Balasore</strong><br />

Blocks<br />

Total No. of L.I. Points<br />

Nos. Area (ha)<br />

No. of Operable L.I. Points<br />

Nos. Area (ha)<br />

No. of Defunct L.I. Points<br />

Nos. Area (ha)<br />

Bahanaga 214 3463 130 2104 84 1359


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Blocks<br />

Total No. of L.I. Points<br />

Nos. Area (ha)<br />

No. of Operable L.I. Points<br />

Nos. Area (ha)<br />

No. of Defunct L.I. Points<br />

Nos. Area (ha)<br />

<strong>Balasore</strong> Sadar 244 4691 109 2105 135 2586<br />

Khaira 61 931 37 592 24 339<br />

Nilgiri 43 677 27 432 16 245<br />

Oupada 40 556 22 352 18 204<br />

Remuna 341 6317 145 2320 196 3997<br />

Simulia 40 854 20 430 20 424<br />

Soro 226 4115 142 2272 84 1843<br />

Total <strong>12</strong>09 21604 632 10607 577 10997<br />

Source: Office of the Executive Engineer, LI Division, <strong>Balasore</strong><br />

Table 2.21. Blockwise list of Minor Irrigation Projects in the district<br />

Blocks No. of MIPs Ayacut area in ha Blocks No. of MIPs Ayacut area in ha<br />

Bahanaga - - Khaira 8 1105<br />

<strong>Balasore</strong> Sadar 2 80 Nilgiri 11 3418<br />

Baliapal - - Oupada 4 388<br />

Basta 3 2254 Remuna 2 189<br />

Bhograi - - Simulia 1 41<br />

Jaleswar 4 1655 Soro 11 947<br />

Total 46 10077 - - -<br />

Source: Minor Irrigation Division, <strong>Balasore</strong><br />

35% Irrigation Master <strong>Plan</strong><br />

There is a wide difference in geographical distribution of irrigation facility in the state. Some<br />

blocks have more than 50% irrigation facility whereas other blocks have less than 5%<br />

facility. Government have, therefore, decided that a Master <strong>Plan</strong> for each district should be<br />

drawn up so as to provide at least 35% irrigation in every block during the next five years<br />

i.e. from 2005-06 to 2009-10. These less than 35% irrigated area blocks constitute 198<br />

blocks in the entire state, out of which seven blocks are in <strong>Balasore</strong> district and these are<br />

Basta, Baliapal, Bhograi, <strong>Balasore</strong> Sadar, Oupada, Remuna, & Jaleswar. Out of these seven<br />

irrigation deficient blocks, Basta, Baliapal & Jaleswar blocks have achieved 35% irrigation<br />

facility by March 2009.<br />

Table 2.22. Number of Pani Panchayats in the district<br />

Blocks No. of Pani Panchayats Blocks No. of Pani Panchayats<br />

Bahanaga 143 Khaira 36<br />

<strong>Balasore</strong> Sadar 83 Nilgiri 20<br />

Baliapal 49 Oupada 14<br />

Basta 64 Remuna <strong>12</strong>8<br />

Bhograi 79 Simulia 21<br />

Jaleswar 136 Soro 104<br />

Total 877 - -<br />

Source: Strategic Research and Extension <strong>Plan</strong> of <strong>Balasore</strong> district<br />

Cropping Pattern & Cropping Intensity:<br />

Though major part of the geographical area is under cultivation, but the cropping intensity<br />

is low as compared to that of state. The lower cropping intensity is due to less coverage of<br />

cultivated area under assured irrigation facility during Rabi season. Cultivation of<br />

additional area under Rabi season is taken up depending on the availability of residual<br />

moisture after harvest of Kharif crops. As a result the cropping intensity also fluctuates<br />

from year to year.<br />

The cropping intensity can be enhanced by improving irrigation facility including<br />

constructing rain water harvesting structures, developing suitable crop calendars,<br />

practicing pyra cropping etc.<br />

TSI: NABARD Consultancy Services (NABCONS) 27


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 2.23. Comparison of Cropping Intensity (%) (2008-09)<br />

<strong>District</strong>s Cropping Intensity (%) <strong>District</strong>s Cropping Intensity (%)<br />

<strong>Balasore</strong> 154 Keojhar 152<br />

Bhadrak 138 Orissa State 162<br />

Mayurbhanj 130 - -<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

Area under different crops in kharif and rabi season is presented below. In kharif season<br />

paddy is the principal crop with coverage of 91.69% of the total cropped area in the season.<br />

This is followed by vegetable crops, chilies and jute. Similarly, in rabi season, pulse crop<br />

like mung, biri and vegetables are the principal crop of the area. Sugarcane is cultivated in<br />

330 ha in the district. Mung and Biri are cultivated in available residual moisture in the<br />

paddy field. Cultivation of cash crops like sunflower, groundnut, potato, onion, spices etc. is<br />

marginal in the district.<br />

Paddy is cultivated in vast patches during kharif throughout the district. In rabi season,<br />

paddy is cultivated only under irrigated conditions.<br />

Table 2.24. Season wise area under cultivation of different crops (2008-09)<br />

(Area in 000 ha)<br />

Crop<br />

Area<br />

Kharif<br />

% to total cropped area Area<br />

Rabi<br />

% to total cropped area<br />

Rice 211.46 91.69 34.08 36.57<br />

Wheat 0.80 0.86<br />

Maize 0.32 0.14 0.08 0.09<br />

Total Cereals 211.78 91.83 34.96 37.51<br />

Arhar 0.08 0.03<br />

Mung 0.07 0.03 7.52 8.07<br />

Biri 0.23 0.10 6.65 7.14<br />

Kulthi 0.04 0.04<br />

Gram 0.08 0.09<br />

Cowpea 0.36 0.39<br />

Field Pea 0.25 0.27<br />

Other Pulses 0.21 0.09 0.04 0.04<br />

Total Pulses 0.59 0.26 14.94 16.03<br />

Groundnut 0.05 0.02 15.06 16.16<br />

Til 0.09 0.04 1.41 1.51<br />

Castor 0.06 0.03 0.05 0.05<br />

Mustard 4.01 4.30<br />

Sunflower 0.17 0.18<br />

Total Oilseeds 0.20 0.09 20.70 22.21<br />

Jute 1.85 0.80<br />

Mesta 0.08 0.03<br />

Sunhemp 0.42 0.18<br />

Total Fibers 2.35 1.02 0.00 0.00<br />

Sweet Potato 0.10 0.04 0.03 0.03<br />

Potato 0.11 0.<strong>12</strong><br />

Onion 1.01 1.08<br />

Other Vegetables <strong>12</strong>.48 5.41 17.48 18.76<br />

Total Vegetables <strong>12</strong>.58 5.45 18.63 19.99<br />

Chilies 1.70 0.74 2.27 2.44<br />

Coriander 0.98 1.05<br />

Garlic 0.39 0.42<br />

Turmeric 0.88 0.38<br />

Ginger 0.55 0.24<br />

Total Spices 3.13 1.36 3.64 3.91<br />

Sugarcane 0.33 0.35<br />

Gross Cropped Area 230.63 100.00 93.20 100.00<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

Regarding productivity of major crops cultivated in the district, productivity of kharif paddy<br />

is 10.98% lower than state average. Similarly, productivity of sweet potato, turmeric, maize,<br />

garlic, Arhar, groundnut, jute, onion, wheat, castor, sunflower and sugarcane are lower<br />

than state averages. But the yield rate of gram, mung, biri, Til, Mesta, Sunhemp, Ginger,<br />

TSI: NABARD Consultancy Services (NABCONS) 28


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

field pae, Mustard, coriander, potato, cowpea, etc. are marginally higher than state<br />

averages. This low productivity in an important crop like paddy requires the attention of the<br />

agriculturists for immediate intervention. Though natural calamity is one of the important<br />

reasons behind this, yet strategies can be made to improve the productivity.<br />

Table 2.25. Productivity of major crops <strong>Balasore</strong> district vis-à-vis Orissa (2008-09)<br />

Kharif Rabi<br />

Crops <strong>Balasore</strong> Orissa<br />

Difference<br />

(%) +<br />

Crops <strong>Balasore</strong> Orissa<br />

Difference<br />

(%) +<br />

Paddy 1.963 2.205 -10.98 Paddy 3.220 3.714 -13.30<br />

Maize 1.156 2.252 -48.67 Wheat 1.350 1.520 -11.18<br />

Arhar 0.821 0.860 -4.53 Maize 1.205 2.935 -58.94<br />

Mung 0.515 0.432 19.21 Mung 0.425 0.465 -8.60<br />

Biri 0.527 0.421 25.18 Biri 0.505 0.485 4.<strong>12</strong><br />

Groundnut 1.135 1.521 -25.38 Kulthi 0.428 0.428 0.00<br />

Til 0.445 0.442 0.68 Gram 0.796 0.663 20.06<br />

Castor 0.665 0.653 1.84 Cowpea 1.014 0.763 32.90<br />

Jute 1.455 1.799 -19.<strong>12</strong> Field Pea 0.886 0.715 23.92<br />

Mesta 0.998 0.847 17.83 Groundnut 1.749 1.936 -9.66<br />

Sunhemp 1.052 0.889 18.34 Til 0.480 0.389 23.39<br />

Sweet Potato 8.000 8.113 -1.39 Castor 0.600 0.608 -1.32<br />

Chilies 0.853 0.808 5.57 Mustard 0.389 0.383 1.57<br />

Turmeric 2.398 2.449 -2.08 Sunflower 0.810 0.934 -13.28<br />

Ginger 2.091 2.019 3.57 Sweet Potato 8.000 9.501 -15.80<br />

Potato 11.279 10.325 9.24<br />

Onion 8.139 8.814 -7.66<br />

Chilies 0.934 0.885 5.54<br />

Coriander 0.490 0.479 2.30<br />

Garlic 3.026 3.231 -6.34<br />

Sugarcane 65.850 70.250 -6.26<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

In spite of low productivity in paddy, the district is surplus in rice/paddy and find place<br />

among 19 rice surplus districts of the state. As per the estimate of Directorate of<br />

Agriculture, the district has a surplus of 0.15 lakh tons of rice during 2008-09 (Table 2.26).<br />

It was observed that in many of the cases, agriculture is taken up as a traditional practice<br />

by poor farmers for livelihood and not popular among educated youth as commercial high<br />

value venture. Contract farming system in agriculture is yet to be practiced in the district.<br />

Crop production and productivity is affected largely due to erratic monsoon/natural<br />

calamities, problem of water logging, soil salinity, poor extension mechanism, input supply<br />

system, inadequate irrigation facility and marketing support, adoption of traditional method<br />

of cultivation with limited use of manure and quality seeds.<br />

Table 2.26. Estimated Marketable Surplus/Deficit of Rice during 2008-09<br />

(Figures in lakh tonnes)<br />

Details <strong>Balasore</strong> Keojhar Mayurbhanj Bhadrak Orissa<br />

Projected Population (lakhs) 22.92 17.64 25.<strong>12</strong> 15.11 415.34<br />

Adult Equivalent (lakhs) (88%) 20.17 15.52 22.11 13.30 365.50<br />

Total Consumption Requirement<br />

(@400gms/adult/day)<br />

2.94 2.27 3.23 1.94 53.36<br />

Total Requirement (including seed,<br />

feed, wastage)<br />

3.36 2.59 3.69 2.22 60.99<br />

Kharif 2.78 2.74 5.32 3.22 60.92<br />

Production Rabi 0.73 0.04 0.11 0.23 8.24<br />

Total 3.51 2.78 5.43 3.45 69.16<br />

Rice<br />

Surplus/Deficit<br />

Paddy<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

0.15<br />

0.22<br />

0.19<br />

0.28<br />

1.74<br />

2.60<br />

1.23<br />

1.84<br />

8.17<br />

<strong>12</strong>.19<br />

TSI: NABARD Consultancy Services (NABCONS) 29


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Increased productivity and production of crops always depend on use of high yielding<br />

varieties, fertilizers and pesticides etc. In <strong>Balasore</strong> district, almost 73.78% of total paddy<br />

area in Kharif and 100% in Rabi season are under HYV seeds. This is lowest than state<br />

average of 75.16% in kharif season (Table 2.27). But the fertilizer consumption is high, i.e.,<br />

only 133 kg/ha as against state average of 62 kg/ha (Table 2.28).<br />

Table 2.27. Area under HYV of Paddy in <strong>Balasore</strong> district vis-à-vis Orissa<br />

(Area in 000ha)<br />

Details<br />

Kharif Paddy<br />

Total Area HYV Area % Total Area<br />

Rabi Paddy<br />

HYV Area %<br />

<strong>Balasore</strong> 211.46 156.01 73.78 34.08 34.08 100.00<br />

Orissa 4<strong>12</strong>3.64 3099.44 75.16 330.97 330.97 100.00<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

Kg/ha/year<br />

<strong>Balasore</strong><br />

133<br />

Bhadrak <strong>District</strong><br />

150<br />

Keonjhar<br />

Fertilizer Consumption rate (Kg/ha/year)<br />

26<br />

Mayurbhanj<br />

44<br />

Orissa State<br />

62<br />

TSI: NABARD Consultancy Services (NABCONS) 30<br />

104.5<br />

India<br />

<strong>District</strong>s/States<br />

West Bengal<br />

<strong>12</strong>7.5<br />

Andhra Pradesh<br />

203.61<br />

Jharkhand<br />

67.61 67.36<br />

Chhatisgarh<br />

Table 2.28. Fertilizer Consumption rate (2008-09)<br />

<strong>District</strong>/States<br />

Fertilizer Consumption<br />

(kg/ha/year)<br />

<strong>District</strong>/States<br />

Fertilizer Consumption<br />

(kg/ha/year)<br />

<strong>Balasore</strong> 133 India 104.50<br />

Bhadrak <strong>District</strong> 150 West Bengal <strong>12</strong>7.50<br />

Keonjhar 26 Andhra Pradesh 203.61<br />

Mayurbhanj 44 Jharkhand 67.61<br />

Orissa State 62 Chhatisgarh 67.36<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

Table 2.29. Agro-input outlets available in the district<br />

Units/Services No. of units available Units/Services No. of units available<br />

Fertilizer wholesalers 24 Pesticide Retail shops 221<br />

Fertilizer Retail shops 528 Seed wholesalers 5<br />

Pesticide wholesalers 10 Seed Retail shops 61<br />

Source: Primary survey, 2010<br />

Farm Mechanization:<br />

Farm mechanization is an essential ingredient of modern scientific agriculture. It is a key<br />

factor for successful intensive farming system. Use of machineries in farming reduces the<br />

drudgery involved in agricultural operations, enable timely completion of various<br />

agricultural operations especially during peak labour load periods and ultimately increase<br />

farm productivity and returns.<br />

Authenticated secondary data on number of farm implements available in the district is not<br />

available. But field observations and discussion with PRI members reveal that there is a


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

huge deficiency of farm implements which prevents adoption of intensive agricultural<br />

operations in a large scale. There is tremendous scope for farm mechanization in the<br />

district. Further, because of extensive paddy cultivation in the area, small implements like<br />

puddlers, threshers, rotavators, winnowers etc. will be of much help to the farmers in<br />

reaping highest returns from farm land.<br />

2.1.2. Soil Conservation and Land Development:<br />

Sustainable agriculture requires availability of good quality land, water, seed, fertilizer and<br />

pesticides. Out of these items provision of leveled land and water is long term and other are<br />

short term provisions. Land and water need to be judiciously managed to meet optimum<br />

production levels.<br />

Land development activities are aimed at conserving soil and water as also preserving and<br />

improving soil health and thereby increasing crop productivity. One of the major stumbling<br />

blocks in achieving crop diversification in <strong>Balasore</strong> has been predominance of low lying<br />

areas. The situation can be altered and cultivation of high value agriculture and<br />

horticulture crops can be taken up only by bringing about changes in the status of land<br />

through land development activities. Considering the problems of poor drainage/water<br />

logging in low land and salinity of soil in coastal belt, the land development sector needs<br />

greater attention in the district. Besides land leveling and on-farm development works are<br />

required to be taken up in cultivable holdings of individual farmers for deriving optimal<br />

benefits of the irrigation projects.<br />

In the district, major problem is flood, water logging and development of salinity in the<br />

cultivated land due to lack of drainage facility. One division of Irrigation department,<br />

namely, <strong>Balasore</strong> Drainage Division look after drainage of flood water, stabilization of<br />

embankments etc in the low lying belts of the district. In addition, Soil Conservation<br />

Department play a vital role by educating the farmers for adopting improved agricultural<br />

practices and technology, optional use of seeds, chemical/bio-fertilizer, pesticide etc.<br />

through training camp/work shop in the watershed area during implementation of different<br />

watershed development projects funded under NWDPRA.<br />

27 nos. of water harvesting structures have been constructed in <strong>Balasore</strong> district which<br />

provides 20000 ha. of life saving irrigation during moisture stress period. Further 23<br />

watershed projects are under implementation covering a total areaof 10421 ha. Considering<br />

the problem of poor drainage/water logging in low land and salinity of soil in costal belt, the<br />

land development sector needs grater attention.<br />

Land development sector broadly comprises the following activities.<br />

(i) Land leveling, on-farm development works, reclamation of saline soil and improvement<br />

in soil quality.<br />

(ii) Watershed management.<br />

(iii) Soil and water conservation works such as bunding, terracing construction of nalla<br />

bunds, weirs etc.<br />

(iv) Water management such lining of field channels, laying of pipelines for distribution<br />

and creation of water harvesting structures.<br />

National Watershed Development Programmes for Rainfed Areas (NWDPRA) is being<br />

implemented in the district.<br />

The main objectives of the scheme are as follows:<br />

(i.) National Resource Management for enhancement of agricultural productivity and<br />

production on sustainable basis.<br />

(ii.) Restoration of ecological balance in rainfed areas.<br />

(iii.) Creation of sustainable source of income for the village community to reduce labour<br />

migration and solve employment problem through SHG mobilization.<br />

TSI: NABARD Consultancy Services (NABCONS) 31


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block<br />

Table 2.30. No. of Watershed Projects functioning in the district<br />

Watershed Projects<br />

under NWDPRA<br />

Watershed<br />

Projects under<br />

IWDP<br />

Block<br />

Watershed Projects<br />

under NWDPRA<br />

Watershed<br />

Projects under<br />

IWDP<br />

Bahanaga 1 - Khaira 1 3<br />

<strong>Balasore</strong> 1 - Nilgiri 1 6<br />

Baliapal 1 - Oupada 1 4<br />

Basta 1 - Remuna 1 -<br />

Bhograi - - Simulia - -<br />

Jaleswar 1 - Soro 1 -<br />

Total 10 13 - - -<br />

Source: Office of the Assistant Soil Conservation Officer, <strong>Balasore</strong><br />

2.1.3. Horticulture:<br />

Horticulture has been identified as one of the priority sector of development for <strong>Balasore</strong><br />

district. The development of horticulture has importance not only for increasing the<br />

production of fruits and vegetables, but also for improving the rural economy of the district<br />

by generating employment and income particularly for small and marginal farmers.<br />

Horticulture also provides food and nutritional security to poor men who can not afford to<br />

costly nutritional diets.<br />

<strong>Balasore</strong> district is endowed with natural resources, adequate rainfall and suitable climate<br />

for horticulture corp. Though not exploited to the extent possible, the agro-climatic<br />

condition of the district is conducive for cultivation of different fruits, flowers and<br />

vegetables. The district is covered under National Horticulture Mission (NHM), which is<br />

functioning in 19 districts of the state.<br />

Table 2.31. Area under fruit crops in <strong>Balasore</strong> district vis-à-vis Orissa<br />

Area coverage in 000ha (2008-09)<br />

% to total area<br />

% to total area<br />

Crop <strong>Balasore</strong> Orissa<br />

under different<br />

fruit crops in<br />

Crop <strong>Balasore</strong> Orissa<br />

under different<br />

fruit crops in<br />

the State<br />

the State<br />

Mango 4.39 164.25 2.67 Pine Apple 0.04 0.71 5.63<br />

Guava 0.32 14.14 2.26 Pomegranate 0.01 0.20 5.00<br />

Citrus 0.80 27.10 2.95 Cashewnut 0.56 30.46 1.84<br />

Litchi 0.13 4.26 3.05 Other fruits 0.56 51.59 1.09<br />

Sapota 0.07 3.28 2.13 Coconut 1.13 52.22 2.16<br />

Banana 0.71 24.11 2.94 Total 8.78 373.80 2.35<br />

Papaya 0.06 1.48 4.05 - - - -<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

Table 2.32. Area and production of vegetable and flowers in <strong>Balasore</strong> district vis-à-vis<br />

Orissa (2008-09)<br />

Crop<br />

Spices<br />

Details <strong>Balasore</strong> Orissa<br />

% to total area<br />

under State<br />

% to total production<br />

in the State<br />

All type<br />

Vegetables<br />

Area (ha)<br />

Production (q)<br />

6770<br />

84900<br />

147310<br />

2041100<br />

4.60 4.16<br />

All type<br />

Flowers<br />

Area (ha)<br />

Production (q)<br />

3<strong>12</strong>10<br />

3500900<br />

670050<br />

83599800<br />

4.66 4.19<br />

Marigold<br />

Area (ha)<br />

Production (q)<br />

53.00<br />

4305.00<br />

1065<br />

88026<br />

4.98 4.89<br />

Rose<br />

Area (ha)<br />

Production (q)<br />

35.00<br />

36.10<br />

1006<br />

<strong>12</strong>23.3<br />

3.48 2.95<br />

Gladioli<br />

Area (ha)<br />

Production (q)<br />

70.00<br />

63.00<br />

<strong>12</strong>10<br />

1089<br />

5.79 5.79<br />

Tube rose<br />

Area (ha)<br />

Production (q)<br />

36.00<br />

468.00<br />

450<br />

6394<br />

8.00 7.32<br />

Source: Orissa Agricultural Statistics, 2008-09<br />

TSI: NABARD Consultancy Services (NABCONS) 32


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

As per the secondary data collected on area of different horticultural crops in the district<br />

(Table 2.31 & 2.32), major fruit crops grown in the district are mango, guava, citrus,<br />

banana, papaya, pine apple and coconut. Mango covers only 2.67% of total mango areas in<br />

the state. Among vegetables, brinjal, tomato, pea and lady’s finger are major crops of the<br />

district. Commercial flower production has recently been started in the district, but is yet to<br />

make headway. The data presented in table 2.31 and 2.32 reveals that horticulture sector<br />

in <strong>Balasore</strong> district is lagging behind other districts of the state and there is need to<br />

improve this sector.<br />

Table 2.33. Area under Betlevine cultivation in the district<br />

Block No. of Baraj Area (in ha) Block No. of Baraj Area (in ha)<br />

Bhogarai 36273 580.368 Baliapal 21907 350.5<strong>12</strong><br />

Total 58180 930.880 - - -<br />

Source: Office of the Horticulturist, <strong>Balasore</strong><br />

The Government nurseries in the district are as under:-<br />

Table 2.34. Government Nurseries of horticultural crops operating in district<br />

Nurseries Location<br />

Balia<br />

Coconut Nursery<br />

Jaleswar<br />

<strong>Balasore</strong><br />

Soro<br />

Transit Nursery cum block nursery Jaleswar<br />

(for vegetables and fruit seedlings) Bhograi<br />

Nilgiri<br />

Mitrapur<br />

Canning center <strong>Balasore</strong><br />

Source: Office of the Horticulturist, <strong>Balasore</strong><br />

Because of proximity of the district to cities like Baripada (60 kms), Cuttack (190 kms),<br />

Bhubaneswar (215 kms) and Kolkata (220 kms) and good road connectivity with these<br />

places, there lies huge market potential for marketing of horticultural crops, mainly<br />

vegetables, flowers and mushrooms.<br />

Strengths<br />

SWOT Analysis of Agriculture/Horticulture/Irrigation sub sectors<br />

• Fertile agricultural land, alluvial deposit of major rivers (56% are alluvial soil).<br />

• Major part of the district is plain cultivated land (66% of total geographical area are<br />

cultivated land).<br />

• Climate Suitable for cultivation of Betel vine, numerous varieties of agricultural and<br />

horticultural crops (fruits, vegetables, flowers, spices) and mushrooms.<br />

• Availability huge labour force (67% of total workers are engaged in cultivation)<br />

Weakness<br />

• Major parts of the district are prone to natural calamities. About 25 to 60% of the villages<br />

suffer crop loss of 50% and above almost every year.<br />

• Out of the total cultivated land, 36.54% are located in four blocks namely, Baliapal, Basta,<br />

Bhograi and Jaleswar, which are located close to sea, prone to all types of natural<br />

calamities, lack adequate irrigation facilities and the soil type is mostly saline.<br />

• Almost 44% soils are acidic in nature followed by 5% saline and only 51% normal in<br />

reaction.<br />

• Inadequate irrigation during rabi season and also during kharif season at the time of<br />

drought. Lack of irrigation in Rabi season prevents diversification of crop on a large scale.<br />

• Half of the installed Lift Irrigation projects are defunct.<br />

TSI: NABARD Consultancy Services (NABCONS) 33


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Weakness ..contd…<br />

• About 90% of farmers (Small and Marginal farmers: < 2 ha of land) own and operate<br />

only 65% of total cultivated land.<br />

• Small land holding size (Average land holding size is 0.93 ha as against 1.25 ha in<br />

the state). Small land holding size prevents mechanization of farm operations in a<br />

large scale.<br />

• Poor status of farm mechanization.<br />

• Lack of cold storages for preservation of vegetables, flowers etc. during off-season.<br />

• Lack of exclusive market yards for horticulture produces.<br />

• Huge scarcity of field level agricultural staff.<br />

Opportunities<br />

• Strengthening of agriculture extension setup and establishment of soil testing<br />

laboratory and Agro Information Center at Block level will help in increasing<br />

agricultural production.<br />

• Agricultural productivity can be increased through farm mechanization, land<br />

development, developing drainage facilities to save low lying areas from flood<br />

water/water logging.<br />

• Establishment of GP level godowns and full-fledged involvement of PACs in<br />

procurement of paddy will stop distress sale of paddy.<br />

• Establishment of cold storage facilities to prevent distress sale.<br />

• Huge market potential exists in nearby cities namely Dhamra port area, Cuttack,<br />

Bhadrak, Kolkata, Baripada and Jajpur Road (Kaling Nagar)<br />

• Presence of good number of rivers offers lot of scope for installation of LI points on<br />

river banks.<br />

• The district headquarter is well communicated with the above cities by road.<br />

Threats<br />

• Declining interest of people in agricultural and allied activities. Occurrence of natural<br />

calamities and frequent crop loss is a major cause to such a non-remunerative status<br />

of agriculture in the district.<br />

• Because of huge population density (532/sq. km) cultivated land is being converted to<br />

housing purpose on a large scale.<br />

• Frequent flood damages canal and river embankments and affects irrigation.<br />

2.1.4. Animal Husbandry & Dairy Development:<br />

Animal rearing is one of the traditional sources of livelihood of almost all the rural<br />

households of the state. In fact rural households in Orissa rear animals, mainly cattle to<br />

supplement family income. Milk and milk products like cheese, curd and ghee are vital<br />

ingredients of daily diet in rural household. Dung for cooking fuel and manure and draught<br />

power are other utilities which forces almost all rural households to keep cattle in their<br />

houses. In a costal district like <strong>Balasore</strong> cattle dung is the main source of cooking fuel as<br />

forest coverage is marginal. Natural calamities occur almost every year damaging the crop,<br />

the food source for one year, leaving the rural mass in distress. But the domestic animals<br />

became a boon during such time and serve as a source of livelihood. Hence, for a district<br />

like <strong>Balasore</strong>, animal husbandry is considered as one of the key economic activity to bring<br />

prosperity to the rural poor.<br />

TSI: NABARD Consultancy Services (NABCONS) 34


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 2.35. Livestock Population in <strong>Balasore</strong> district (17th Livestock Census 2003)<br />

Species<br />

Indigenous<br />

Nos. %<br />

Crossbreed/Improved<br />

Nos. % Nos.<br />

Total<br />

%<br />

Cattle 863511 96.28 33410 3.72 896921 100.00<br />

Buffalo 4375 99.77 10 0.23 4385 100.00<br />

Sheep 7701 80.57 1857 19.43 9558 100.00<br />

Goat 344604 100.00 0 0.00 344604 100.00<br />

Pig 18132 99.44 103 0.56 18235 100.00<br />

Total <strong>12</strong>38323 97.22 35380 2.78 <strong>12</strong>73703 100.00<br />

Poultry - - - - 891164 100.00<br />

Source: Animal Husbandry Statistical Hand Book, 2005<br />

As per the 17 th Livestock Census (2003), the district has a cattle population of 896921,<br />

buffalo population of 4385, sheep population of 9558, goat population of 344604, pig<br />

population of 18235 and poultry bird population of 891164 (Table 2.35). The density of<br />

cattle, pig, goat and poultry birds in the district is higher than that of state averages.<br />

Population/Sq.km.<br />

235.66<br />

92.31<br />

Density of Livestock Population<br />

9.24<br />

11.29<br />

1.15 2.51<br />

TSI: NABARD Consultancy Services (NABCONS) 35<br />

90.54<br />

38.37<br />

4.79 3.66<br />

234.15<br />

<strong>12</strong>1.99<br />

Cattle Buffalo Sheep Goat Pig Poultry<br />

Species<br />

<strong>Balasore</strong> Orissa<br />

In spite of such a good livestock population, the livestock production in the district is very<br />

minimal (Table 2.36). The per capita availability of milk is only 45 gms/day as against state<br />

figure of 94 gms/day and ICMR recommendation of 250 gm of milk/day. This is because of<br />

low productivity of cows in the district. Crossbred/improved cows account for only 3.71% of<br />

the total cattle population in the district (Table 2.37). This is low as against average<br />

percentage of 7.80% in the entire state. The indigenous cows which account for 95.81% of<br />

the total cattle and buffalo population in the district, contribute only 56.58% to the total<br />

milk production in the district (Table 2.37).<br />

Table 2.36. Indicators of livestock production in <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

MILK<br />

Milk Production (000 MT) 33.65 <strong>12</strong>82.760<br />

Share from Indigenous Cow 19.04 553.780<br />

Share from Crossbred Cow 13.99 525.860<br />

Share from Buffaloes 0.62 200.560<br />

Share from Goat -- 2.560<br />

Average Yield (Per Animal/Day in Kg)<br />

Indigenous Cows 0.456 0.3<strong>12</strong><br />

Crossbred Cows 5.136 5.215<br />

Buffalo 2.632 4.985<br />

Per Capita Availability/Day (gm) 45 94<br />

Per capita requirement/day (gms.) (ICMR recommendation) 250<br />

EGG<br />

Egg Production (Lakhs) 358.51 <strong>12</strong>159.61


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Share from Desi Bird 257.77 46<strong>12</strong>.92<br />

Share from Improved Bird 88.60 7255.27<br />

Share from Ducks <strong>12</strong>.14 291.42<br />

Average Yield (Per Bird/Year in Nos.)<br />

Desi Bird 1<strong>12</strong>.375 115.21<br />

Improved Bird 281.00 345.05<br />

Per Capita Availability/Year (Nos.) 18 33<br />

Per capita requirement/Year (Nos.) (ICMR recommendation) 180<br />

MEAT<br />

Meat Production (MT) 3702.575 92565.150<br />

Share from Bovine NA <strong>12</strong>1.830<br />

Share from Sheep 487.789 8589.780<br />

Share from Goat 1736.463 36811.540<br />

Share from Pig 242.869 5<strong>12</strong>7.540<br />

Share from Poultry <strong>12</strong>35.454 41914.460<br />

Per Capita Availability/Year (Kgs) 1.826 2.515<br />

Per capita requirement/Year (kgs) (ICMR recommendation) 11.00<br />

Source: Animal Husbandry Statistical Hand Book, 2005<br />

Table 2.37. Contribution of different species to milk production<br />

<strong>Balasore</strong> Orissa<br />

Species<br />

% share in % share in Milk % share in % share in Milk<br />

Population Production Population Production<br />

Indigenous Cow 95.81 56.58 83.43 43.17<br />

Crossbred Cow 3.71 41.58 7.80 40.99<br />

Buffaloes 0.49 1.84 8.77 15.64<br />

Source: Animal Husbandry Statistical Hand Book, Government of Orissa, 2005<br />

To render timely veterinary aid in the district there are 21 nos. of Veterinary Dispensaries<br />

and 114 Livestock Aid Centre & Artificial Insemination Centers are functioning in the<br />

district. Besides this one <strong>District</strong> Diagnostic Laboratory and one <strong>District</strong> Training Centre is<br />

providing necessary services to the farmers. The data presented in table 2.38 to 2.40<br />

indicate that the district lack adequate infrastructure to meet the requirement in animal<br />

husbandry sector.<br />

Table 2.38. Block wise No. of Veterinary Institutions<br />

Block<br />

Veterinary<br />

Dispensary<br />

LAC<br />

Artificial Insemination<br />

Center<br />

Operated<br />

Attached<br />

by<br />

Total<br />

to LAC<br />

OMFED<br />

Total<br />

GPs<br />

No. of GPs<br />

without any<br />

veterinary<br />

institution<br />

%<br />

Bahanaga<br />

2 (Gopalpur &<br />

Khantapada)<br />

3 (<strong>Balasore</strong>,<br />

10 14 10 24 21 10 47.62<br />

<strong>Balasore</strong> Rupsa &<br />

Rasalpur)<br />

<strong>12</strong> 0 10 10 27 15 55.56<br />

Baliapal<br />

2 ( Baliapal &<br />

Langaleswar)<br />

9 5 9 14 27 17 62.96<br />

Basta 1 (Basta) 9 14 9 23 22 11 50.00<br />

Bhograi<br />

2 (Dehurda &<br />

Kamarda)<br />

9 9 9 18 32 18 56.25<br />

Jaleswar<br />

2 (Jaleswar,<br />

Raibania)<br />

8 1 7 8 27 18 66.67<br />

Khaira 1 (Khaira)<br />

3 (Nilgiri, Raj<br />

9 0 7 7 30 20 66.67<br />

Nilgiri Berhampur &<br />

Ajodhya)<br />

13 0 13 13 25 <strong>12</strong> 48.00<br />

Oupada 1 (Oupada) 5 0 4 4 11 5 45.45<br />

Remuna 1 (Remuna) 10 1 10 11 28 17 60.71<br />

Simulia<br />

2 (Simulia &<br />

Balikhand)<br />

7 <strong>12</strong> 7 19 17 8 47.06<br />

Soro 1 (Soro) 13 0 13 13 22 11 50.00<br />

Total 21 114 56 108 164 289 162 56.06<br />

Source: Office of the CDVO, <strong>Balasore</strong> <strong>District</strong><br />

TSI: NABARD Consultancy Services (NABCONS) 36


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 2.39. Availability of Go mitra’s in GPs without any veterinary institution<br />

Block Total GPs<br />

No. of GPs without any veterinary institution<br />

With Gomitra % Without Gomitra % Total<br />

Bahanaga 21 9 90.00 1 10.00 10<br />

<strong>Balasore</strong> 27 7 46.67 8 53.33 15<br />

Baliapal 27 8 47.06 9 52.94 17<br />

Basta 22 8 72.73 3 27.27 11<br />

Bhograi 32 5 27.78 13 72.22 18<br />

Jaleswar 27 11 61.11 7 38.89 18<br />

Khaira 30 6 30.00 14 70.00 20<br />

Nilgiri 25 6 50.00 6 50.00 <strong>12</strong><br />

Oupada 11 4 80.00 1 20.00 5<br />

Remuna 28 6 35.29 11 64.71 17<br />

Simulia 17 8 100.00 0 0.00 8<br />

Soro 22 9 81.82 2 18.18 11<br />

Total 289 87 53.70 75 46.30 162<br />

Source: Animal Husbandry Statistical Hand Book, Government of Orissa, 2005<br />

Table 2.40. Other Infrastructure/Veterinary Institutions available in the district<br />

Infrastructure Orissa <strong>Balasore</strong><br />

Livestock Breeding Farms 8 1 (Remuna)<br />

Poultry & Duck Farms 11 1 (Jaleswar) (Private)<br />

Govt. undertaking Feed Mixing <strong>Plan</strong>ts 4 1 (Remuna)<br />

Private Feed Mixing <strong>Plan</strong>ts 36 Nil<br />

Poultry Producer Cooperative Society 46 Nil<br />

Milk Producer’s Cooperative Society 158<br />

Milk Bulk Coolers 102 19<br />

Sheep Breeding Farm 2 Nil<br />

Goat Breeding Farm 6 Nil<br />

Pig Breeding Farm 2 Nil<br />

Fodder Seed Production Farm 7 Nil<br />

Fodder Demonstration Farm 13 1<br />

Goshalas 31 2 (Erward & Soro)<br />

Registered Slaughter Houses 63 Nil<br />

Unregistered Slaughter Houses 2177 140<br />

Source: Animal Husbandry Statistical Hand Book, Government of Orissa, 2005<br />

Diary development is a dynamic sector of the district. The district is covered under<br />

Operation flood and BBAMUL is operating in the district. BBAMUL through Milk Union has<br />

taken several measures to develop this sector in the district. Animal Husbandry<br />

Department is also implementing programmes like NPCBBC (National Project for Cattle and<br />

Buffalo Breeding), ASCAD (Assistance to States for Control of Animal Diseases), Minikit<br />

Program, Enrichment of Paddy straw and Azolla Cultivation all aimed to improve livestock<br />

production in the district. In spite of all these the district lack critical infrastructures like<br />

Livestock Breeding Farms, Feed Mixing <strong>Plan</strong>ts, Poultry Producer Cooperative Society and<br />

Fodder Seed Production/Demonstration Farms which are essential to develope livestock<br />

resources and production in the district. Major emphasis need to be given on creation of<br />

Livestock Aid Center (LAC) with Artificial Insemination (AI) facilities at least in each Gram<br />

Panchayat of the district. It may be mentioned here that 56.06% (162) Gram Panchayats do<br />

not have Livestock Aid Centers.<br />

Table 2.41. Details of activities of BBAMUL in <strong>Balasore</strong> district<br />

(Status as on Oct 2010)<br />

Blocks<br />

No. of Milk<br />

Producer Cooperative<br />

Society<br />

No. of<br />

members<br />

Milk Coolers<br />

Capacity<br />

Bulk<br />

Cooling<br />

units<br />

Milk<br />

Collected/Marketed<br />

Bahanaga 24 <strong>12</strong>14 3000 3 1402<br />

Baliapal 22 598 6000 4 3311<br />

Basta 32 1194 1000 1 3420<br />

Bhograi 31 1019 5500 5 5536<br />

TSI: NABARD Consultancy Services (NABCONS) 37


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Blocks<br />

No. of Milk<br />

Producer Co-<br />

operative Society<br />

No. of<br />

members<br />

Milk Coolers<br />

Capacity<br />

Bulk<br />

Cooling<br />

units<br />

Milk<br />

Collected/Marketed<br />

Jaleswar 23 305 3000 3 1978<br />

Remuna 4 162 1000 1 141<br />

Simulia 18 840 3000 2 953<br />

Soro 4 449 - - 103<br />

Total 158 5781 22500 19 16844<br />

Source: Office of the General Manager, BBAMUL, <strong>Balasore</strong><br />

The agro-climatic conditions of the district favours poultry farming of both broiler and layer<br />

units. Poultry farming provides a source of subsidiary income and gainful employment to<br />

large number of small, medium farmers and agricultural labourers and other rural<br />

household throughout the year. But it is yet to be taken up on a large scale. The district<br />

lack critical infrastructure required for poultry development in the district.<br />

2.1.5. Fisheries<br />

Fisheries sector occupies a pivotal place in national and state economy. It is also an<br />

important source of animal protein and a popular economic activity in a coastal district like<br />

<strong>Balasore</strong>. This sector bears potential for substantial income and opportunities in generating<br />

employment for the unemployment youth. Because of remunerative income from fishery<br />

than agriculture, now-a-days the occupation is not limited to “Keuta” sub caste under<br />

Scheduled Caste category. People of all caste are involved in this occupation, starting from<br />

catching fishes to trading, export etc. <strong>Balasore</strong> is one of the maritime districts of the state<br />

bestowed with vast freshwater, brackish water and marine fisheries resources. Rivers<br />

namely, Budhabalang, Subarnarekha, Sono, Kansabansa, Jalaka etc are flowing in the<br />

district having rich fisheries potential for inland capture fisheries. Also 80 km long coastline<br />

of Bay of Bengal bordering the district provides enough scope for marine and brackish<br />

water fishery.<br />

The fresh water resources of the district comprise potential area of 1463.97 ha under GP<br />

tanks, 315.64 ha under Revenue Tanks, 4478.68 ha under private tank and 2000 ha under<br />

river and canals (Table 2.42). The brackish water area includes 1648.87 ha suitable for<br />

brackish water tanks and 811.50 ha of estuaries (Table 2.44). The 81 km. long coast line in<br />

the district indicates the vast potential of marine fishery resources.<br />

Table 2.42. Potential Resources available in the district for Fresh Water Pisciculture<br />

(Area in ha)<br />

Blocks GP Tank Revenue Tank Private Tank River/Canals<br />

Bahanaga 218.00 10.00 252.07 100.00<br />

<strong>Balasore</strong> 252.53 32.13 1180.65 435.00<br />

Baliapal 50.02 33.20 195.63 100.00<br />

Basta 83.56 18.70 243.64 250.00<br />

Bhograi 87.85 3.56 782.55 300.00<br />

Jaleswar 103.36 26.15 371.5 250.00<br />

Khaira 140.01 30.52 294.15 30.00<br />

Nilgiri <strong>12</strong>4.21 80.70 145.91 20.00<br />

Oupada 68.92 23.25 191.74<br />

Remuna 135.27 6.09 277.23 100.00<br />

Simulia <strong>12</strong>9.29 34.96 178.89 65.00<br />

Soro 70.95 16.38 364.72 350.00<br />

Total 1463.97 315.64 4478.68 2000.00<br />

Source: Office of <strong>District</strong> Fishery Officer-cum-CEO FFDA & BFDA, <strong>Balasore</strong> 2010<br />

Table 2.43. Estimated Fish production from different Fresh Water sources (2009-10)<br />

<strong>Annual</strong> Prouction (Qtls.)<br />

Blocks GP Tank<br />

Revenue<br />

Tank<br />

Private<br />

Tank<br />

River/Canals<br />

Total <strong>Annual</strong> Prouction<br />

(Qtls.)<br />

Bahanaga 3270.00 150.00 8483.2 184.00 <strong>12</strong>087.20<br />

<strong>Balasore</strong> 3030.36 321.30 19316.34 865.00 23533.00<br />

TSI: NABARD Consultancy Services (NABCONS) 38


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Blocks GP Tank<br />

Revenue<br />

Tank<br />

Private<br />

Tank<br />

River/Canals<br />

Total <strong>Annual</strong> Prouction<br />

(Qtls.)<br />

Baliapal 750.30 498.00 7343.5 156.00 8747.80<br />

Basta <strong>12</strong>53.40 280.50 8873.3 515.00 10922.20<br />

Bhograi 1317.75 53.40 9736.05 242.00 11349.20<br />

Jaleswar 1757.<strong>12</strong> 444.55 7971.53 355.50 10528.70<br />

Khaira 1820.13 427.28 4951.29 55.00 7253.70<br />

Nilgiri 1614.73 1049.10 3196.37 20.00 5880.20<br />

Oupada 895.96 302.25 5269.49 10.00 6477.70<br />

Remuna 2029.05 91.35 6<strong>12</strong>8.1 186.00 8434.50<br />

Simulia 1680.77 454.48 4433.25 240.00 6808.50<br />

Soro 1064.25 245.70 9890.05 695.00 11895.00<br />

Total 20483.82 4317.91 95592.47 3523.50 <strong>12</strong>3917.70<br />

Source: Office of <strong>District</strong> Fishery Officer-cum-CEO FFDA & BFDA, <strong>Balasore</strong> 2010<br />

Table 2.44. Estimated Fish production from Brackish Water sources (2009-10)<br />

Blocks<br />

Brackish water<br />

<strong>Annual</strong> Prouction<br />

Area (ha)<br />

(Qtls.)<br />

Area<br />

(ha)<br />

Estuaries<br />

<strong>Annual</strong> Prouction<br />

(Qtls.)<br />

Total <strong>Annual</strong><br />

Prouction (Qtls.)<br />

Bahanaga 81.53 1345.30 158.00 118.70 1464.00<br />

<strong>Balasore</strong> 1175.94 18768.50 180.00 138.00 18906.50<br />

Baliapal 88.80 1595.00 102.00 76.70 1671.70<br />

Basta - - - - -<br />

Bhograi 200.60 2954.00 281.50 215.40 3169.40<br />

Jaleswar - - - - -<br />

Khaira - - - - -<br />

Nilgiri - - - - -<br />

Oupada - - - - -<br />

Remuna 102.00 1653.20 90.00 67.70 1720.90<br />

Simulia - - - - -<br />

Soro - - - - -<br />

Total 1648.87 26316.00 811.50 616.50 26932.50<br />

Source: Office of <strong>District</strong> Fishery Officer-cum-CEO FFDA & BFDA, <strong>Balasore</strong> 2010<br />

Fish production & Demand<br />

Now a day’s fish is considered as an important nutritive food for every human being for<br />

healthy life. As per WHO guideline per capita requirement of fish is 11kg/year. Accordingly,<br />

the district for its estimated 24.16 lakh population requires about 26574 MT of fish & shell<br />

fish. But it has been estimated that the district produces only <strong>12</strong>391.77 tons of fish & shell<br />

fish from fresh water sources, as production from brackish and marine sectors are mainly<br />

exported. Very marginal quantity of brackish water and marine fishes are consumed within<br />

the district. This availability level from fresh water fishes is able to provide only 5.13<br />

kg/year to each individual of the district. It is a matter of fact that there are vast water<br />

resources in the district and the present production level is only 30.01% in fresh water<br />

fisheries, 21.89% in brackish water fisheries and 43.97% in marine fisheries. There is a gap<br />

of 14182.23 MT of fresh water fish required to meet the fish demand of the district. In order<br />

to fulfill this gap along with generation of employment and utilizing of idle resources, there<br />

is need for development of fishery resources in a scientific way.<br />

The statistical data under marine fishery sector is presented in this section. There is 81 km<br />

of coastline in the district where there is production potentialities of 80250 MT of marine<br />

fish & shell fish. Present production level is 35287 MT. Hence, there is a gap of 44963 MT<br />

which has not yet been exploited.<br />

The present mechanized vessels are not equipped with sophisticated electronic devices like<br />

GPS, Fish finder etc. The display board which will transmit satellite data about availability<br />

of fish in the sea has not yet been provided in all landing centers as a result full exploitation<br />

of marine resource has not yet been made.<br />

TSI: NABARD Consultancy Services (NABCONS) 39


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Fishing operation in marine sector is mostly confined to inshore areas. The district is<br />

having 81 km coast line covering five blocks like – Bahanaga, <strong>Balasore</strong>, Baliapal, Bhograi &<br />

Remuna. Few trawlers exploit the off shore area of the sea.<br />

Table 2.45. Production potential vis-à-vis current level of production of fish from<br />

different sources in the district (2009-10)<br />

Source<br />

Production<br />

Potential<br />

Current Level of<br />

Productions (MT)<br />

%<br />

Fresh Water Fisheries 4<strong>12</strong>91.45 <strong>12</strong>391.77 30.01<br />

Brackish Water Fisheries <strong>12</strong>301.85 2693.25 21.89<br />

Marine Fisheries 80250.00 35287.38 43.97<br />

Total 133843.30 50372.40 37.64<br />

Source: Office of <strong>District</strong> Fishery Officer-cum-CEO FFDA & BFDA, <strong>Balasore</strong> 2010<br />

Table 2.46. Fish Nurseries available in the district (2009-10)<br />

Blocks<br />

Government<br />

Nos. Area (ha) Nos.<br />

Private<br />

Area (ha)<br />

Total Area (ha)<br />

Bahanaga - - - - -<br />

<strong>Balasore</strong> Sadar 1 4.68 10 4.96 9.64<br />

Baliapal - - - - -<br />

Basta - - 2 1.24 1.24<br />

Bhograi - - - - -<br />

Jaleswar - - - - -<br />

Khaira - - - - -<br />

Nilgiri - - - - -<br />

Oupada - - - - -<br />

Remuna 3 4.02 4.02<br />

Simulia 2 1.08 1.08<br />

Soro 2 1.00 1.00<br />

Total 1 4.68 19 <strong>12</strong>.30 16.98<br />

Source: Office of <strong>District</strong> Fishery Officer-cum-CEO FFDA & BFDA, <strong>Balasore</strong> 2010<br />

Table 2.47. Organisations involved in dry fish production in the district<br />

Name of the organization Location/Address No. of members<br />

Scampi Farmer’s Club Gudupahi, <strong>Balasore</strong> 300<br />

Sagar Kanya, PMFWCS Bishnupur, Baliapal 65<br />

Sarba Mangala, PMFWCS Sekhpatana, <strong>Balasore</strong> 130<br />

Maa Mangala, PMFWCS Srijanga, <strong>Balasore</strong> 65<br />

Gada Mangala, PMFWCS Bolonga, Baliapal 90<br />

Annapurna, FWCS Kasafala, <strong>Balasore</strong> 130<br />

Source: Strategic Research and Extension <strong>Plan</strong> of <strong>Balasore</strong> district<br />

Table 2.48. Other marine fishery resources available in <strong>Balasore</strong> district<br />

No. of Boats in operation<br />

Block Place Type<br />

Trawller Gillnetter Motorised<br />

Craft<br />

BLC Country<br />

Craft<br />

Total<br />

<strong>Balasore</strong> Chandipur Jetty 407 - 65 - 30 502<br />

<strong>Balasore</strong> Bahabalpur Jetty 149 187 137 - 64 537<br />

<strong>Balasore</strong> Masaahisali FLC - - 35 - - 35<br />

<strong>Balasore</strong> Khandia FLC - - 25 - - 25<br />

Soro Panchubisa Jetty - - 70 - 18 88<br />

Bahanaga Gadei Sagar FLC - - 21 - 40 61<br />

Remuna Jammuca FLC - - 83 - 20 103<br />

Baliapal Hanskara FLC - - 74 - 153 227<br />

Baliapal Choumukh FLC - - 37 - 73 110<br />

Baliapal Kankadapal FLC - - 30 - 130 160<br />

Bhograi Talasari Jetty - 4 158 - 79 241<br />

Bhograi Kirtania Jetty - - 79 - 45 <strong>12</strong>4<br />

Total - - 556 191 814 0 652 2213<br />

Source: Office of <strong>District</strong> Fishery Officer-cum-CEO FFDA & BFDA, <strong>Balasore</strong> 2010<br />

TSI: NABARD Consultancy Services (NABCONS) 40


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SWOT analysis of Animal Husbandry & Fisheries sub sector<br />

Strengths<br />

• Density of cattle, poultry bird and goat in the district is higher than that of state averages. The<br />

density of cattle population in <strong>Balasore</strong> district is 235.66/sq. km, which is more than two and<br />

half times of that in Orissa state (92.31/sq.km.). Similarly, the density of goat is 136% higher<br />

than that of Orissa state.<br />

• Cattle/livestock is a main component of majority of rural household. Farmers rear cows mainly<br />

for milk, dung (cakes for fuel & manure for crop field) and traction power.<br />

• Huge potential for fishery sector in the district. Demand for fresh water fish is met by bringing<br />

fish from out side on regular basis.<br />

• Sufficient availability of ponds, rivers, canals for fresh water fishery and 80 km long coastline<br />

for marine and brackish waster fishery.<br />

Weaknesses<br />

• Low livestock production and poor productivity.<br />

• Low productivity of cows (Indigenous cows which account for 95.81% of the total bovine<br />

population, contribute only 56.58% to the total milk production).<br />

• Buffaloes account for only 0.49% of the total cattle population in the district as against 8.77%<br />

in the entire state.<br />

• Per capita availability of milk is only 45 gms/day as against state figure of 94 gms/day and<br />

ICMR recommendation of 250 gm of milk/day.<br />

• Per capita availability of egg is only 18/day as against state figure of 33/day.<br />

• Per capita availability of meat is only 1.826 kg/year as against state average of 2.515<br />

kg/year.<br />

• Lack of critical infrastructures like Livestock Breeding Farms, Feed Mixing <strong>Plan</strong>ts, Poultry<br />

Producer Cooperative Society and Fodder Seed Production Farms which are essential to<br />

developed livestock resources and production in the district.<br />

• 56.06% (162) Gram Panchayats do not have Livestock Aid Centers.<br />

• Fodder production is not a priority, majority of the farmers depend on paddy straw for feeding<br />

of cattle.<br />

• Lack of infrastructure like ice plants, fish feed plants, pelletisation plants in the district.<br />

Opportunities<br />

• Scope exists for fodder production in individual crop land, field bunds, coconut orchards under<br />

shade, barren and waste land under community ownership (Grassland & Grass Reserve<br />

(GLGR) programme of GoI may be explored).<br />

• Promotion of Urea Treated Paddy Straw (UTPS) as a nutritional feeding material to livestock<br />

will reduce the adverse health impacts of feeding paddy straw directly.<br />

• Development of veterinary infrastructure.<br />

• Filling up of vacant posts of field level staffs<br />

• There is production gap of 70% in fresh water fisheries, 78% in brackish water fishery and<br />

56% in marine fisheries.<br />

• The district is having 81 km at coast line which is a good potential for marine fishery.<br />

• The creek river mouths serve as ideal ground for brackish water culture.<br />

• Doubling of fish production by horizontal and vertical expansion of water resources by utilizing<br />

the available unutilized resources and imparting skill up gradation to fish farmers on modern<br />

scientific pisiculture.<br />

• Mechanized vessels can be equipped with sophisticated electronic devices like GPS, Fish<br />

finder etc. The display board which will transmit satellite data about availability of fish in the<br />

sea may be installed in all landing centers for full exploitation of marine resource.<br />

Threats<br />

• Because of population pressure, natural grazing lands are being encroached upon.<br />

• Fresh water sources like ponds, canal and river water are getting polluted because of high<br />

population pressure.<br />

• Exploitation of local fishermen by outside traders and fish merchants.<br />

TSI: NABARD Consultancy Services (NABCONS) 41


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

2.1.6. <strong>Plan</strong>tations:<br />

<strong>Plan</strong>tation is an important sector in the district’s economy. This sector helps in generation<br />

of employment opportunities, maintains environment and meet the fuel requirement of<br />

rural household. The success of plantation depends on selection of appropriate species,<br />

agro-climatic conditions. Nilgiri sub-division is covered with forest resources in the district.<br />

At present plantation activity in the district is limited to avenue plantation and social<br />

forestry plantations in limited patches. Two nurseries exist in the district, one at Mitrapur<br />

and another at Nilgiri. There exists lot of scope for “Energy <strong>Plan</strong>tation” in barren and waste<br />

land of the district, which will help in reclamation of waste land as well meet rural energy<br />

demand through use of gasification technology. Further, there exists scope for sea shore<br />

plantations to reduce the intensity of cyclones, which is a usual feature in a coastal district<br />

like <strong>Balasore</strong>.<br />

2.1.7. Food, storage and warehousing:<br />

The district is significantly deficient in infrastructural facilities required for storage of farm<br />

produces. Lack of cold storage for storage of potato, vegetables, onion, flowers etc. forces<br />

the farmer to sell at throwaway prices during harvesting seasons. Due to want of storage<br />

and warehousing facilities, paddy procurement is not possible as desired.<br />

Services<br />

Table 2.49. Agricultural Produce Marketing, Processing and Storage Facilities<br />

available in the district<br />

Nos. available<br />

Bahanaga<br />

<strong>Balasore</strong><br />

Baliapal<br />

Basta<br />

Bhograi<br />

Village Hats 8 4 16 9 9 8 9 6 4 6 7 8 94<br />

Livestock market 1 - - - - - - - - 1 - - 2<br />

Rice Mills - - - - - - 1 - - 10 9 2 22<br />

Rice haulers 29 30 35 26 32 45 44 28 5 51 34 38 397<br />

Oil expellers 2 2 1 1 2 4 1 3 1 1 2 3 23<br />

Oil mill - 2 - 1 - - - - - - - - 3<br />

Source: Primary survey, 2010<br />

In addition to the above, 2 Cold Stores are also functioning in the district for preservation of<br />

vegetable and fruits during season. Both are located at <strong>Balasore</strong> district head quarter.<br />

� Kalinga Ice Cold store – <strong>Balasore</strong> Town<br />

� Harekrushna Himghar – <strong>Balasore</strong> Town<br />

2.1.8. Agricultural Research & Education<br />

Location specific research and extension activities on agriculture and allied sectors in the<br />

district are carried out by Orissa University of Agriculture & Technology (OUAT) in its<br />

Krushi Vigyan Kendra (KVK) located at Baliapal. The Krushi Vigyan Kendra (KVK)<br />

functioning at Baliapal is providing necessary technical guidance to the farmers through<br />

training, demonstrations, field visits, exposure visits etc. Extension personnel of KVKs are<br />

taking steps for adoption of location specific technologies developed by Scientists of<br />

Research Station located in the district. Krishi Vigyan Kendra (KVK) is a unique fast line<br />

transfer of technology project, which transfers technologies in agriculture and allied fields<br />

to the farmers, farm women, rural youth, school drop outs and extension functionaries to<br />

increase their knowledge; enhance their skill and change their attitude in concerned sector.<br />

Mandate of KVK are<br />

1. Training to farmers, farm women, rural youth & school drop outs.<br />

2. Training to extension functionaries.<br />

3. Front line demonstration on proved technology in farmer’s field.<br />

4. On-farm Testing for refinement of existing technology.<br />

TSI: NABARD Consultancy Services (NABCONS) 42<br />

Jaleswar<br />

Khaira<br />

Nilgiri<br />

Oupada<br />

Remuna<br />

Simulia<br />

Soro<br />

<strong>District</strong><br />

(Total)


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

2.1.9. Agricultural Financial Institutions:<br />

NABARD in association with other leading commercial Banks are working in the district to<br />

meet the financial requirements of Agricultural sectors. The district has 83 Commercial<br />

Bank branches, 44 Regional Rural Bank branches and 20 Central Cooperative Bank<br />

Branches and one Land Development Bank. In addition, there are 143 Cooperative Societies<br />

functioning in the district to meet the agricultural credit requirement of farmers in the<br />

district.<br />

Indicators<br />

Table No. 2.50. Details of Financial Institutions available in the district<br />

Central<br />

Cooperative<br />

Banks<br />

Land<br />

Development<br />

Bank<br />

No. of Banks 1 1 1 21 - 24<br />

No. of branches 20 1 44 83 143 291<br />

Average population/branch or society 10<strong>12</strong>25 2024508 46011 24690 14158 6981<br />

Average no. of villages/branch or society <strong>12</strong>9 2587 59 31 18 9<br />

Source: <strong>District</strong> Offices of various financial institutions<br />

More than 79% of the total crop loan is financed by Central Cooperative Banks through<br />

Primary Agricultural Cooperative Societies.<br />

2.1.10. Cooperation:<br />

Co-operation play a vital role in transforming socio-economic condition a society and<br />

facilitating increased participation of people. In a predominantly rural and agricultural<br />

economy, co-operatives play a very critical role not only in agricultural credit sector but also<br />

in many other fields. The different type of co-operative societies such as credit cooperatives,<br />

marketing co-operatives, labour co-operatives and consumer co-operatives are<br />

playing vital roles in different societies, economic spheres of the district and serving the<br />

people at large both in Urban and rural areas.<br />

TSI: NABARD Consultancy Services (NABCONS) 43<br />

Regional<br />

Rural Banks<br />

Table 2.51. Performance of PACs in <strong>Balasore</strong> district<br />

Category Nos. Membership<br />

(000’ Nos.)<br />

Primary Agricultural<br />

Cooperative<br />

Societies<br />

Non – Agricultural<br />

Cooperative<br />

Societies<br />

Working<br />

capital<br />

in lakhs<br />

of Rs.<br />

Loan<br />

advance<br />

in lakhs<br />

of Rs.<br />

Commercial<br />

Banks<br />

Loan<br />

overdue<br />

in<br />

lakhs of<br />

Rs.<br />

Cooperative<br />

Societies<br />

Total<br />

Loan<br />

outstanding<br />

in lakhs of<br />

Rs.<br />

143 333 37468 16896 3763 18335<br />

30 10 3449 1134 228 1345<br />

Primary Consumer<br />

Cooperative<br />

Societies<br />

20 508 48 - - -<br />

Source: Office of the Deputy Registrar of Cooperative Societies, <strong>Balasore</strong> Circle, <strong>Balasore</strong><br />

There are 143 Primary Agricultural Cooperative Societies (PACs) working in this district to<br />

provide credit support and agricultural inputs to its member cultivators under both farm<br />

and non farm sectors. <strong>Balasore</strong> Co-operative Agricultural and Rural Development Bank Ltd.<br />

is working in the district to provide long term Agricultural credit to its member cultivators.


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

As discussed above, more than 79% of the total crop loan is financed by Central<br />

Cooperative Banks through PACS. Scale of finance for different crops is updated<br />

every year by the Joint Task Force Committee meeting convened by Cuttack<br />

Central Cooperative Bank. In view of GOI instruction to double Agricultural Credit<br />

(DAC) within 3 years by banks, scale of finance was fixed up realistically to achieve<br />

goal. Contingent plans are also drawn every year to combat aberrant weather<br />

situation like drought, flood, cyclone and other calamities etc. Crop weather watch<br />

group is formed to monitor crop situation/take remedial measures. Farmers<br />

contact campaigns (Krushak sampark mela) were organized by agriculture<br />

department in each block during 2006-07 to create awareness about govt. support<br />

and agricultural development.<br />

Krushak Sahayak Kendras (KSKs) in the district are sponsoring cases for capital<br />

investment schemes on irrigation (STW), dairy, poultry, fisheries, plantation/horticulture,<br />

farm machinery and Agro Service Centers etc. Special emphasis is given for crop<br />

diversification by encouraging cultivation of new variety of crops like scented rice,<br />

vegetables, floriculture, nursery, mushroom and horticulture crops, adoption of<br />

multiple/mixed/inter cropping pattern to increase cropping intensity,<br />

production/productivity. Suitable short duration resistance crop varieties are chosen to be<br />

cultivated in water logged, saline areas, post flood, drought and other adverse weather<br />

condition.<br />

2.1.11. Agricultural Marketing<br />

Adequate marketing network is not available in the district for marketing of agriculture and<br />

horticulture produce like rice, vegetables, fruits, and flowers. Exclusive market yards for<br />

horticulture produces are yet to come up in the district. There is one Regional Cooperative<br />

Marketing Societies RCMS in the district. There are 5 main markets which are under the<br />

control of RMC, <strong>Balasore</strong>.<br />

� Bamapada Market (Kuruda, Remuna Block)<br />

� Anantpur Market (Anantpur, Soro Block)<br />

� Barikpur Market (Bahanaga Block)<br />

� Balikanta Market (Pursottampur, Simulia Block)<br />

� Singila Market (Singila, Basta Block)<br />

Out of the above 5 markets, two namely, Bamapada and Barikpur are also livestock<br />

markets.<br />

2.2. Rural Development:<br />

In <strong>Balasore</strong> district, 89.13% of the total population lives in rural areas (2001 census).<br />

Further, 73.72% of the total families are Below Poverty Line (BPL) (1997). Hence,<br />

development of the district can’t be possible unless there is an improvement in the standard<br />

of living of this rural population. Therefore planners always put much emphasis on rural<br />

development.<br />

People below Poverty Line:<br />

As per 1997 survey conducted by DRDA, out of 349446 rural families in the district 257606<br />

families (73.72%) live below the poverty line. Block wise spread of BPL families is presented<br />

in table 2.52.<br />

Table No. 2.52. Block wise number of BPL families<br />

Block No. of Rural families No. of BPL Rural families<br />

Out of total BPL family<br />

SC ST Women<br />

Bahanaga 22,465 18,181 7052 776 1182<br />

<strong>Balasore</strong> 35,848 28,639 11093 4976 1862<br />

Baliapal 31,395 19,731 6521 1831 <strong>12</strong>82<br />

Basta 30,668 19,935 4920 2990 <strong>12</strong>95<br />

TSI: NABARD Consultancy Services (NABCONS) 44


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block No. of Rural families No. of BPL Rural families<br />

Out of total BPL family<br />

SC ST Women<br />

Bhograi 47,598 35,064 8726 2232 2245<br />

Jaleswar 36,146 25,602 6811 5431 1690<br />

Khaira 26,461 21,3<strong>12</strong> 6695 1732 1343<br />

Nilagiri 28,405 22,044 4070 <strong>12</strong>591 1455<br />

Oupada 14,765 11,305 2575 2682 824<br />

Remuna 33,722 24,746 9397 5099 1608<br />

Simulia 18,822 14,281 3944 1707 914<br />

Soro 23,151 16,766 5379 1780 1106<br />

Total 349,446 257,606 77183 43827 16806<br />

Source: Office of the DRDA, <strong>Balasore</strong> district<br />

The Govt. of India is funding special programs to remove poverty in rural areas through<br />

DRDA of the district. The programmes of MORD are meant to improve the economic<br />

conditions of the rural poor by creating opportunities for gainful employment, improving<br />

social and economic infrastructure and providing universal access to the basis minimum<br />

services etc.<br />

The <strong>District</strong> Rural Development Authority (DRDA), headed by its Project Director has been<br />

implementing various programmes for rural development. The interventions are mainly of<br />

three categories, as under:<br />

Special programme for Rural Development:<br />

These include Drought Prone Area Programme (DPAP), Desert Development Programme<br />

(DDP), and Integrated Watershed Development Projects (IWDP) Scheme. Only National<br />

Watershed Development Programme in Rural Areas (NWDPRA) is being implemented in the<br />

district through Soil Conservation Department, details of activities of which is presented in<br />

agriculture section of this chapter.<br />

Gopabandhu Gramin Yojana (GGY) is a special programme for rural development launched<br />

by the Govt of Orissa in the non-BRGF districts. Each district (non-BRGF) is to get Rs.<br />

10.00 crores from the state every year (during the 11 th plan period). The principal objective<br />

of the programme is to provide additional funds to the targeted districts to provide<br />

infrastructure consisting primarily of bijli (electricity), sadak (road) and pani (water) to every<br />

revenue village in a phased manner. The amount received under GGY is equally reallocated<br />

among the blocks to take up projects. Each block utilizes the fund for creation of<br />

infrastructure as per the felt need of the villages reflected in the Palli Sabha. Village wise<br />

allocation of funds is based on the population.<br />

Rural employment:<br />

Various programmes/schemes like the Swarnajayanti Gram Swarozgar Yojana (SGSY),<br />

Sampoorna Gram Rozgar Yojana (SGRY), National Food for Work Programme and/or<br />

National Employment Guarantee Programme, and Mahatma Gandhi National Rural<br />

Employment Guarantee Scheme (MGNREGS) have been implemented to provide<br />

employment to the poor people at rural level. Of these, only SGSY and MGNREGS are<br />

presently being implemented in the district. Rest of the programmes has been merged<br />

under MGNREGS. <strong>Balasore</strong> district was included under MGNREGS in the year 2007-08<br />

under Phase III of the programme. The programme was started in the district from the year<br />

2008-09.<br />

Other rural development programmes:<br />

Among other rural development projects, Indira Awas Yojna is the major one. This is a<br />

housing scheme which DRDA is implementing for the deserving BPL families. 13 th Finance<br />

Commission (TFC) Award is also being received for rural development activities.<br />

TSI: NABARD Consultancy Services (NABCONS) 45


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

2.3. Special Area Programmes:<br />

Special Areas Programme of the Government of India focuses on the development of specific<br />

areas having distinguished geographical, socio-economic, and/or anthropological<br />

characteristics. In the district of <strong>Balasore</strong>, the Hill Areas Development Programme, and<br />

Border Area Development Programme, etc. is implemented. It is also not a BRGF district.<br />

Further Nilgiri blocks in the district is a tribal block having more than 50% tribal in the<br />

total population. One MADA pocket or tribal cluster is Jaleswar block in the district.<br />

SWOT Analysis of Rural Development sector<br />

Strengths<br />

• Active and efficient community leaders.<br />

• Adequately educated and well aware PRI members.<br />

• MLAs/MPs are active and actively participate in State and National politics. Always<br />

highly placed in State Cabinet/administration.<br />

• High rural literacy rate and conscious public.<br />

• Efficient DRDA and highly effective Zilla Parishad and Panchayat Samiti.<br />

Weaknesses<br />

• Inadequate field staff.<br />

• Lack of interdepartmental coordination.<br />

• Water logging, lack of irrigation and poor quality roads are the major problem in rural<br />

areas.<br />

• Availability of good quality drinking water is a major problem in villages close to sea.<br />

• Delay in receipt of grants of development programmes.<br />

• Wage rate and norms of MG NREGS not attractive for majority of unemployed youths.<br />

Opportunities<br />

• Several Government funded programmes like MG NREGS, GGY, IAY etc.<br />

• 73 rd Constitution Amendment and devolution of power to Panchayati Raj Institutions.<br />

Threats<br />

• Political interference, Corruption at different levels of programme implementation.<br />

• Intra village conflict based on party politics leads to delay in implementation of<br />

programmes.<br />

2.4. Energy:<br />

Energy is one of the prime inputs for economic development as well as improved quality of<br />

life of the people. In <strong>Balasore</strong> district 2443 villages out of 2586 inhabited villages (94.47%)<br />

were electrified by the end of 2005. Govt. of India is also implementing RGGVY (Rajiv<br />

Gandhi Grameen Vidyutikaran Yojana) since 2007 to provide electricity to all rural house<br />

hold in the states within the stipulated time frame of Five years. BGJY (Biju Gram Jyoti<br />

Yojana) is also being implemented in the district to cover villages which are not included<br />

under RGGVY.<br />

Table 2.53. Block wise Number of Villages Targeted for Electrification under RGGVY<br />

in <strong>Balasore</strong> district<br />

Block<br />

Un-Electrified<br />

No. of Villages<br />

De-Electrified Electrified Total<br />

Bahanaga - - 159 159<br />

<strong>Balasore</strong> 16 20 211 247<br />

Baliapal 5 6 183 194<br />

Basta - 13 282 295<br />

Bhograi 6 3 311 320<br />

Jaleswar - 34 174 208<br />

Khaira 17 - 321 338<br />

Nilgiri 6 9 <strong>12</strong>1 136<br />

TSI: NABARD Consultancy Services (NABCONS) 46


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block<br />

Un-Electrified<br />

No. of Villages<br />

De-Electrified Electrified Total<br />

Oupada 23 - 133 156<br />

Remuna 9 7 236 252<br />

Simulia - - 155 155<br />

Soro - - 157 157<br />

Total 82 92 2443 2617<br />

Source: RGGVY website<br />

The villages that would not be covered under the Rajiv Gandhi Gram Vidyutikaran Yojana of<br />

the Centre will be given priority under the Biju Gram Jyoti Yojana. In fact, the state<br />

government decided to take up this initiative after the present Chief Minister failed to get a<br />

positive response from Union Power Minister for amendment of the rules under the RGGVY<br />

that does not provide funds for electrification of hamlets with less than 300 populations.<br />

Under Renewable Energy, the <strong>District</strong> Renewable Energy Cell basically works for promotion<br />

of different non-conventional sources of energy as per provision of different schemes &<br />

programme heads being allotted/sanctioned by the Govt. time to time. Out of different<br />

schemes only NBMMP (National Biogas & Manure Management Programme) and SPV (Solar<br />

Photovoltaic) are the two programmes being implemented in the year 2009-10. Though the<br />

potential in the district is much higher in comparison to the achievement, the progress is<br />

restricted mainly due to two major reasons, i.e. high cost involvement for one beneficiary<br />

and secondly limitation in allocation of physical target to avail the subsidy. The programme<br />

could be more successful if some additional financial assistance can be provided under the<br />

programme. Keeping in view the high cattle density in the district and low fertilizer<br />

consumption, Bio-gas has lot of scope as it will meet the rural energy crisis as well provide<br />

manure for the crop field. There is also enough scope for establishment of biomass based<br />

gasifiers to provide electricity during power failure and also to un-electrified villages. Paddy<br />

is the main crop of the district and there are 20 rice mills operating in the district. Husk<br />

generated from these rice mills can be used for power generation using gasifiers. Similarly,<br />

energy plantation can be undertaken in fallow/wasteland of the district to generate<br />

electricity through gasification technology.<br />

Under RVEP (Remote Village Electrification Programme) 160 villages in 8 Blocks have been<br />

identified as Remote villages to be electrified through non-conventional energy. The<br />

programme is yet to make headway in the district.<br />

Table 2.54. No. of Remote Villages identified in <strong>Balasore</strong> district<br />

Block Sl. No. Village Block Sl. No. Village<br />

<strong>Balasore</strong> 1 Alumada Bhograi 81 Karikubani<br />

<strong>Balasore</strong> 2 Kalabudhi Bhograi 82 Harigochhia<br />

<strong>Balasore</strong> 3 Juari Bhograi 83 Chhappur<br />

<strong>Balasore</strong> 4 Huja Bhograi 84 Chukpadmapur<br />

<strong>Balasore</strong> 5 Gadeipur Bhograi 85 Chuksrabani<br />

<strong>Balasore</strong> 6 Guhipur Bhograi 86 Kismathasamkhajuri<br />

<strong>Balasore</strong> 7 Baurta Bhograi 87 Andharibalibandha<br />

<strong>Balasore</strong> 8 Asuradiha Bhograi 88 Sanakhajuri<br />

<strong>Balasore</strong> 9 Dubarai Bhograi 89 Phateparia<br />

<strong>Balasore</strong> 10 Kinumchanthiapatna Bhograi 90 Puripatrabhori<br />

<strong>Balasore</strong> 11 Badagobara Bhograi 91 Bababhaunri<br />

<strong>Balasore</strong> <strong>12</strong> Nayapara Bhograi 92 Kirtaniajalipahi<br />

Baliapal 13 Surathapur Bhograi 93 Kharibil<br />

Baliapal 14 Badakhanpur Bhograi 94 Samkamedi<br />

Baliapal 15 Ikarbal Bhograi 95 Kuabani<br />

Baliapal 16 Balikuda Jaleswar 96 Baharsaradiha<br />

Baliapal 17 Bodhagathia Jaleswar 97 Balabhadrapur<br />

Baliapal 18 Taligara Jaleswar 98 Krushnanagar<br />

Baliapal 19 Rasolpur Jaleswar 99 Radhanagar<br />

Baliapal 20 Nachandiha Jaleswar 100 Akhua<br />

Baliapal 21 Badakachupara Jaleswar 101 Bejamai<br />

Baliapal 22 Sainidiha Jaleswar 102 Jamujhatia<br />

TSI: NABARD Consultancy Services (NABCONS) 47


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block Sl. No. Village Block Sl. No. Village<br />

Baliapal 23 Tarapur Jaleswar 103 Taladobi<br />

Baliapal 24 Kaunarpur Jaleswar 104 Pasbela<br />

Baliapal 25 Batigadia Jaleswar 105 K. Gobardhanpur<br />

Baliapal 26 Dadanpur Jaleswar 106 Chakmadhab<br />

Baliapal 27 Biridaha Jaleswar 107 Porapura<br />

Baliapal 28 Barabhalipatna Khaira 108 Sarisukapilajha<br />

Baliapal 29 Paikabaisada Khaira 109 Nuanalasada<br />

Baliapal 30 Bagada Khaira 110 Madhusudanpur<br />

Baliapal 31 Kotamuli Khaira 111 Dhad<br />

Baliapal 32 Mahibala Khaira 1<strong>12</strong> Jusiha<br />

Baliapal 33 Bhanapur Khaira 113 Sunsarpur<br />

Baliapal 34 Katarmahal Khaira 114 Gourasaw<br />

Baliapal 35 Sundarpali Khaira 115 Dahi<br />

Baliapal 36 Arudam Khaira 116 Barabati<br />

Baliapal 37 Jamunasuli Khaira 117 Sopagaria<br />

Baliapal 38 Gumunda Khaira 118 Budheisal<br />

Baliapal 39 Bubhirani Khaira 119 Maitapur<br />

Baliapal 40 Antichal Khaira <strong>12</strong>0 Pandkhajuri<br />

Basta 41 Dolbad Khaira <strong>12</strong>1 Monaharpur<br />

Basta 42 Adilpur Khaira <strong>12</strong>2 Sahadakhunta<br />

Basta 43 Dholai Khaira <strong>12</strong>3 Palisajanbad<br />

Basta 44 Gomundia Khaira <strong>12</strong>4 Akhuapal<br />

Basta 45 Damodarpur Khaira <strong>12</strong>5 Mirjapur-4<br />

Basta 46 Patpur Khaira <strong>12</strong>6 Mahatipur<br />

Basta 47 Salbani Oupada <strong>12</strong>7 Padmanavapur<br />

Basta 48 Oriapara Oupada <strong>12</strong>8 Daladali<br />

Basta 49 Lokanathpur Oupada <strong>12</strong>9 Hatikhulai<br />

Basta 50 Kasalpara Oupada 130 Ghodadian<br />

Basta 51 Babacharansapur Oupada 131 Gangadipur<br />

Basta 52 Thandapasa Oupada 132 Batei<br />

Basta 53 Nabinpur Oupada 133 Hiankhie<br />

Basta 54 Bagcharipani Oupada 134 Nuagaon<br />

Basta 55 Mulidabagh Oupada 135 Khuntadihapatana<br />

Basta 56 Damodarpur Oupada 136 Bajera Machandrapur<br />

Basta 57 Padmapur Oupada 137 Chandratikara<br />

Basta 58 Sahipadasamili Oupada 138 Tipura<br />

Basta 59 Nalabaha Oupada 139 Jodagadia<br />

Bhograi 60 Ramagari Oupada 140 Gosianpatana<br />

Bhograi 61 Katimahagab Oupada 141 Talatia<br />

Bhograi 62 Relepeta Oupada 142 Mangalapadu<br />

Bhograi 63 Agarda Remuna 143 Basudevpur<br />

Bhograi 64 Nuagaon Remuna 144 Jupada<br />

Bhograi 65 Upla Remuna 145 Baistanbabar<br />

Bhograi 66 Srikanthapur Remuna 146 Belerisamelibarchhi<br />

Bhograi 67 Bahadulganj Remuna 147 Palapada<br />

Bhograi 68 Badiha Remuna 148 Abdulapur<br />

Bhograi 69 Dobandia Remuna 149 Pahardawaukhunta<br />

Bhograi 70 Bhajabasen Remuna 150 Moulhninapada<br />

Bhograi 71 Sunbandhipur Remuna 151 Anantapani<br />

Bhograi 72 Nayanagar Remuna 152 Dihoria<br />

Bhograi 73 Chakasama Jaleswar Remuna 153 Kantarda<br />

Bhograi 74 Mirkasimpur Remuna 154 Dhuinchand<br />

Bhograi 75 Damanbadu Remuna 155 Maninathpur<br />

Bhograi 76 Teghari Remuna 156 Dakhinapur<br />

Bhograi 77 Nursinghpur Remuna 157 Bahabarpur<br />

Bhograi 78 Malarbadia Remuna 158 Alupatana<br />

Bhograi 79 Bahabalpur Remuna 159 Bukasaladice<br />

Bhograi 80 Choudhuribamuri Remuna 160 Samakhanpur<br />

Source: OREDA, Bhubaneswar<br />

TSI: NABARD Consultancy Services (NABCONS) 48


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SWOT analysis of Energy sector<br />

Strengths<br />

• Higher growth rate of population – increase in demand for energy.<br />

• 94.47% of the villages are electrified.<br />

Weaknesses<br />

• Inadequate maintenance staff.<br />

• Inadequate infrastructure.<br />

• Transformers are old, requiring replacement.<br />

• Theft of transmission wire.<br />

• Transmission loss.<br />

• No power production in the district.<br />

• 160 villages are remote villages, which are difficult to be electrified using conventional<br />

electricity.<br />

Opportunities<br />

• Rajeev Gandhi Grameen Vidyutikaran Yojna.<br />

• Biju Gram Jyoti Yojna & Biju Saharanchal Vidyutikaran Yojna.<br />

• Scope for establishment of Rice husk based gasifier for power generation.<br />

• Scope for energy plantation in barren and wasteland and decentralized power generation.<br />

Threats<br />

• Power theft<br />

• Extensive use of modern household gadgets like TV, Fridge, AC, Washing Machine<br />

demands more energy than speculated. The distribution network along with transformers<br />

etc. unable to bear the load causing frequent power breakdown.<br />

2.5. Industry and Minerals:<br />

The district lack mineral resources. But the adjoining district of Keonjhar is rich in<br />

chromite and iron deposits. No mineral deposit of economic value beneath the soil of the<br />

district has been reported till date. Only sand sources are there because of flowing of rivers<br />

inside the district.<br />

Lack of mineral resources is the main reason behind absence of mineral based industry in<br />

the district. There are 10 major and 9 medium industries in the district. Out of 9 medium<br />

industries, 8 have been closed.<br />

A total of 232 registered SSI units are functioning in the district. The number of<br />

unregistered SSI units is approximately 300. But a large number of cottage and village<br />

industries, handicraft units exits in rural areas of the district under unorganized sector.<br />

Data on unregistered units/units under unorganized sector are not available and need to be<br />

surveyed/assessed.<br />

Table 2.55. Details of SSI units in the <strong>District</strong><br />

Nos. Investment (Rs. in lakhs) Employment (No. of Persons)<br />

232 608.31 1100<br />

Source: <strong>District</strong> Industries Center, <strong>Balasore</strong><br />

Rapid socio economic development and competitive atmosphere created an atmosphere for<br />

self employment in the field of unorganized sector as alternative opportunities for best<br />

utilization of young talent. The district has lot of potential in unexploited sectors.<br />

Agricultural products such as paddy, jute, black gram, green gram, groundnut, mustard,<br />

sugarcane etc., are harvested in selective patches all over the district. During the recent<br />

year banana plantation, sunflower cultivation has been taken up. Pisciculture has so far<br />

TSI: NABARD Consultancy Services (NABCONS) 49


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

played a vital role in socio-economic development of the district. Agro-based industries and<br />

marine industries can be developed to a larger extent for rapid industrialization of the<br />

district.<br />

The district <strong>Balasore</strong> has a potential market for its agro-based industrial products. The<br />

adjoining districts like part of Keonjhar and Bhadrak depend on <strong>Balasore</strong>. FCI is the prime<br />

purchaser of rice produced by the millers. Huge fish harvesting also create a vast demand<br />

for ice blocks. The medium, small scale and cottage industries are able to market their<br />

products within the district.<br />

Two Industrial Estates have been established at <strong>Balasore</strong> and Baliapal and seven Industrial<br />

areas in the district. The Estate is being maintained by IDCO.<br />

Food processing Industries<br />

<strong>Balasore</strong> district has immense potential in food processing industries. Paddy and fish are<br />

the chief commodities in the district followed by vegetables, coconut and sunflower. Post<br />

harvest technology and management plays a crucial role in value additions to agriculture.<br />

With improvement in food processing, the farmers of the district will get better price for<br />

their produce and this will create additional employment opportunities. At present this<br />

district has in this sector potential in enterprises like paddy/jute processing unit, Spices<br />

unit, Oil Ghanies, Desiccated coconut, pickles, Jan, Jelly, Fish processing, Fish pickle<br />

product etc.<br />

SWOT analysis of Industry sector<br />

Strengths<br />

• The <strong>District</strong> possesses fairly educated huge numbers of potential entrepreneurs, workers.<br />

• Construction of Dhamara port and other minor ports will promote industrial growth in the<br />

area.<br />

Weaknesses<br />

• Lack of mineral resources, hence absence of major industries.<br />

• Poor status of handloom and cottage industries.<br />

• Lack of uninterrupted supply of electricity is a major constraint for industrial development<br />

in the district.<br />

• Lack of adequate technical institutions.<br />

Opportunities<br />

• Establishment of Agro-based industries<br />

• Establishment of marine based industries<br />

• The adjoining districts like Mayurbhanj, part of Keonjhar and Bhadrakh depend on<br />

<strong>Balasore</strong>.<br />

• Huge fish harvesting create a vast demand for ice blocks.<br />

• The upcoming of Dhamara Port and industries in Paradeep area are going to open up the<br />

market of industrial products and consumer goods.<br />

• Good road network.<br />

• Availability of agricultural products for Agro based industry.<br />

• Availability of water and manpower<br />

Threats<br />

• Flow of low cost consumer goods from Kolkata.<br />

• Entrepreneurs/Corporate houses are more interested to establish units in Jajpur and<br />

Keonjhar district.<br />

TSI: NABARD Consultancy Services (NABCONS) 50


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

2.6. Transport:<br />

Transport and communication are primary infrastructural requirement of a district to<br />

achieve rapid economic development. The growth of the district and quality of life is<br />

dependent on the adequate transport facilities. <strong>Balasore</strong> district having an area of 3806 sq<br />

kms, has <strong>12</strong> blocks and 2586 inhabited villages.<br />

The National Highway 5 & 60 runs for a length of 118 km. within the district from Simulia<br />

to Laxmanath. These NH are the major communication system connecting <strong>Balasore</strong> with<br />

outside world. It connects the district headquarter with state capital Bhubaneswar,<br />

Cuttack, Mayurbhanj and metros like Kolkata and Chennai. South Eastern Railway line<br />

runs for about 114.98 Kms inside the district with 14 nos. of railway stations and 4 nos. of<br />

passenger halts. The details of the road and rail network in the district are presented below:<br />

Table 2.56. Details of Road and Rail Network in the district<br />

Type Details<br />

National Highway No.5 & 60 118 km<br />

State Highway 67 km<br />

Major <strong>District</strong> Roads 105 km<br />

Other <strong>District</strong> Roads 326 km<br />

Forest Roads 79 km<br />

GP Roads 1682 km<br />

Village Roads <strong>12</strong>21<br />

P.S. Roads 787 km<br />

Classified Village Road -<br />

Railway Routes 114.98<br />

Number of Railway Stations 18<br />

Majority of the villages and Gram Panchayats are connected by good quality roads, but<br />

floods damage the roads every year. In fact, the elevation of rural roads in the district is<br />

very low and lack adequate culverts, bridges for discharge of flood/rain water. As a result,<br />

during flood the roads gets washed away disrupting communication. Keeping the problem<br />

in view, importance is being given on design aspect of the roads being constructed in the<br />

district for the last several years. Adequate drainage facilities with raised elevations are the<br />

major consideration in road designs.<br />

SWOT analysis of Communication and Transport sector<br />

Strengths<br />

• Well connected by road and rail with outside world.<br />

Weaknesses<br />

• Flood damage the roads every year.<br />

• Low elevation of rural roads, lack of adequate culverts, bridges for discharge of<br />

flood/rain water.<br />

Opportunities<br />

• Rural roads need to be upgraded to facilitate easy transport of agricultural<br />

produces and improve the economic status of farmers.<br />

• PMGSY, MGNREGS offer scope for construction and upgrading of roads.<br />

• Major <strong>District</strong> Roads, Urban roads need to have adequate safety measures like<br />

pedestrian bays, traffic safety measures near schools, hospitals, market places<br />

etc.<br />

• Truck terminals need to be constructed in all market places to avoid congestions.<br />

Threats<br />

• Un-expected increase in number of vehicles on road.<br />

• Youths below 18 years are driving vehicles without being properly trained.<br />

TSI: NABARD Consultancy Services (NABCONS) 51


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

2.7. Science, Technology and Environment:<br />

Development can’t be possible without developing science, technology and environment.<br />

These three sectors play a vital role in the process of development by transforming the<br />

economy from that of a primitive to a modern and vibrant one. <strong>Balasore</strong> district is also<br />

trying its best to utilize science and technology in its developmental activities.<br />

In regard to science technology and environment the following activities are in active<br />

operation in the district at present.<br />

Development of the IT sector, and E-governance:<br />

The IT development was initiated in the district with the posting of a <strong>District</strong> Informatics<br />

Officer by NIC at <strong>Balasore</strong> in 2001. Since then most of the IT related jobs of allied offices<br />

through out the district as well as of district Collectorate are taken up and covered<br />

successfully. The aim of NIC was to develop an IT culture within the administration at<br />

district level. With the change of time, IT being an integral part of the common human<br />

being, Government has taken the policy to bring information to common man. To make it<br />

practically possible and promote the same concept NIC has giving stress on<br />

Computerization of Citizen Centric Services and helping district administration for E-<br />

Governance.<br />

Forest & Environment:<br />

<strong>Balasore</strong> district lacks adequate forest coverage. There are 5 types of forests in the <strong>Balasore</strong><br />

district. <strong>Balasore</strong> Wildlife Division came into being with effect from 1 st October 2003. The<br />

details of the same are presented below.<br />

Table 2.57. Type of forest in the district<br />

Type of Forest Area in Sq. Kms.<br />

Reserve forest 202.69<br />

Demarcated Protected Forest 21.54<br />

Un demarcated Forest 0.00<br />

Un Classified Forest 0.16<br />

Other Forests 107.19<br />

Total 332.21<br />

Source: <strong>District</strong> Statistical Hand book- 2007<br />

Table 2.58. Administrative Structure of <strong>Balasore</strong> Wildlife Division<br />

Name of the Wildlife Ranges Range Head Quarter<br />

Jaleswar Chalanti<br />

Chandipur <strong>Balasore</strong><br />

Nilgiri Nilgiri<br />

Kuldiha Nilgiri<br />

Soro Oupada<br />

2.8. General Economic Services<br />

Tourism<br />

The tourism industry has a tremendous prospect for employment generation in the district<br />

and should operate as a mission with higher targets. To succeed in this mission tourism<br />

has to be developed and promoted as a common endeavour by all concerned government as<br />

well as private sector agencies.<br />

<strong>Balasore</strong> district has contributed immensely to the State culture, tourism, literature,<br />

architecture, heritage, natural wonders and religious monuments. The flora and fauna have<br />

always attracted tourists even from abroad since time immemorial. This is one of the most<br />

important districts of Orissa which finds place not only in the National map but also in<br />

International map for its history, geographical situation, culture, marine development and<br />

for important defence institutions like Integrated Test Range (ITR) and Proof and<br />

Experimental Establishment (PXE). The coastal district on the north eastern sea board has<br />

TSI: NABARD Consultancy Services (NABCONS) 52


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

destination of having been called the "Granary of Orissa" with stretches of green paddy<br />

fields, a network of rivers blue hills, extensive meadows and extraordinary breach.<br />

SWOT analysis of Science Environment and Forest sector<br />

Strength:<br />

• Highly literacy rate and plenty of educated youths – scope for development in IT sector.<br />

• 24000 ha of barren and waste/fallow land – unsuitable for cultivation and can be put<br />

under plantation.<br />

• Lack of mines and industries – less chance for acquisition of forest.<br />

Weakness:<br />

• Lack of major/medium industries.<br />

• Degraded forests.<br />

• Scarcity of fuel wood in rural areas after Super Cyclone of 1999, chance of degradation<br />

of forests<br />

Opportunities:<br />

• Orissa Forestry Sector Development Project (OFSDP) is implementing interventions in<br />

forestry sector. Interventions can be taken up in feasible areas of the district.<br />

Threats:<br />

• Damage to forests by illegal migrants<br />

• Migration of educated un-employed youths outside the district.<br />

The district attained its name from the Lord Beleshwar, who as per the legends is<br />

worshipped as God of the district. The archaeological remains in the district are unique.<br />

They reflect a combination of ancient past will vibrant present to be a land of all seasons<br />

and destination for all reasons. The district in fact offers a complete package to satisfy<br />

anyone's wanderlust. Unique temples and scenic spots tucked in nature's lap, wildlife, ideal<br />

treks, quaint little hilly picnic spots, ruined monuments make it an ideal destination for any<br />

tourist. <strong>Balasore</strong> district has 19 tourist spots, a brief narration of the spots is presented<br />

here:<br />

Table 2.59. List of Identified Tourist Centers in the district <strong>Balasore</strong><br />

Place Importance<br />

Ayodhya Religious Center & Archaeological site<br />

Balaramgadi Sea Beach & Fish Trading Center<br />

<strong>Balasore</strong> Urban area<br />

Bardhanpur Religious Center<br />

Bhusandeswar Religious Center<br />

Chandaneswar Religious Center<br />

Chandipur Vanishing Beach<br />

Chasakhanda Baghajatin Memorial<br />

Chowmukh Dagara Sea Beach<br />

Inchudi Historical (Freedom Movement)<br />

Kasaphal Sea Beach<br />

Kupari Religious Center<br />

Langaleswar Religious Center<br />

Laxmannath Welcome Point<br />

Panchalingeswar Religious Center & Scenic Spot<br />

Raibania Fort<br />

Remuna Religious Center<br />

Sajanagarh Religious Center<br />

Talasari Sea Beach<br />

Tripisagadia Religious Center<br />

TSI: NABARD Consultancy Services (NABCONS) 53


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Chandipur: The calm beach at Chandipur is surely one among many of the fine beaches of<br />

the country, where the waters of the Sea recede and precedes five kilometres everyday,<br />

marked by specialists at off shore and proceed rhythmically after a regular interval. The<br />

sand-dunes green with wild creepers and the casuarinas whistling with the breeze create a<br />

fantastic moment for a visitor when he is absorbed in observing the play of the tide.<br />

Khirachora Gopinath: Famous Khirachora Gopinath temple has been a seat of Vaishnavite<br />

Culture for centuries. Madhabendra Puri, the teacher of Shri Chaitanya and Shri Chaitanya<br />

himself visited Remuna and offered their worship to Khirochora Gopinath.<br />

Today hundreds of devotees gather daily for the sacred Darshan of the Lord. Especially<br />

prepared milk is the most delicious prasad of the temple. Remuna is considered as a chunk<br />

of Vrindaban in Orissa.<br />

Panchalingeswar: Ensconced in the verdant of Swarnachuda hill with panoramic views<br />

around Panchaligeswar is a place of scenic beauty, sanctified by five Shiva lingams over<br />

which runs a perennial stream.<br />

Popular as a Shiva shrine, one can lie flat on the rock parallel to the stream to touch and<br />

worship the lingams, which is as exciting as adventurous. It is located nearly 25 km away<br />

from <strong>Balasore</strong> town. It has become an ideal destination for picnickers, with so many natural<br />

streams and beautiful hills,.<br />

Sajanagarh: Sajanagarh is a place which as serving as a military base during the period of<br />

ex-rulers of Nilagiri state. The main attraction of the place is the temple of goddess<br />

"Budarchandi".<br />

On the walls of both temple and boundary beautiful stone works have been made elegantly<br />

of different gods and goddess.<br />

Ayodhya: Ayodhya where assimilation of Jainism, Budhism, Baishnavism, Tantraism<br />

Saivism, Sakthism took place. Once upon a time the place was flourished as a town and it<br />

was the Capital of a king.<br />

A large number of images (remains) have been unearthed from the site. Images of Budha,<br />

Jains, Pareshnath, Shiva, Ganesh, Natraj, Bhairabi, Maricha, Baraha, Tara are famous<br />

among them. Goddess Marichi is the most attractive images found here.<br />

Langaleswar: The place is famous for its location and mythology where Lord Shiva used to<br />

plough the paddy field. In memory of the same plough of Lord Shiva hundreds of pilgrims<br />

gather to worship the Lord Langaleswar who has been named after that plough.<br />

Langaleswar is famous for Saivasim. The location of the temple by the side of river Parvati<br />

too creates a scenic beauty and makes another attraction of the place.<br />

Kashaphal: Kashaphal beach is an ideal fishing harbour. It has a scope for boating on river<br />

Dubdubi and Panchupali. The solitary beach of Kashaphal is an ideal spot for picnic. The<br />

calm and quite rural atmosphere and whistling casuarinas will definitely attract the nature<br />

loving tourist.<br />

Laxmannath: It is situated at a distance of 60 Kilometres from <strong>Balasore</strong>. The old palace,<br />

the gada of Ray mahasay of Laxmannath is the main attraction. The temples of Shyamakali,<br />

Jagannath, Dwadasha Shiva are worth seeing.<br />

Raibania: Raibania is known for its group of forts in reign. Raibania had historic<br />

importance and finds mention in the book Ain-I-Akbari. The fort having a number of tanks,<br />

which was once the place for royal people and is now a plain field littered with archeological<br />

rains.<br />

The Jaychandi bana or the lovely forest of Jay Chandi is now used as picnic spot.<br />

TSI: NABARD Consultancy Services (NABCONS) 54


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Chandaneswar & Talasari: The holy shrine of Lord Chandaneswar is a religious centre not<br />

only for the people of <strong>Balasore</strong> <strong>District</strong> but also places adjacent West Bengal. It is a unique<br />

sight to see the devotees flock together in hundreds everyday and in thousands on festive<br />

occasion like Chadak mela for Darshan of the Lord which falls in April every year.<br />

Bhusandeswar: The place is situated at a distance of 100 Kilometres from <strong>Balasore</strong> district<br />

headquarters. The place is famous for Lord Shiva. This is the largest Shiva Lingam in Asia.<br />

The priest who worships Lord Shiva uses ladder to pour water, milk etc on the top of the<br />

Lord Bhushandeswar. This is also a unique.<br />

Chasakhand: Here is the memorial of freedom fighter Baghajatin. The historic place is<br />

situated at a distance of 10 Kilometres from <strong>Balasore</strong>. Now a days, the place has become a<br />

place for tourists and as many people are coming to witness the heroic death place of Late<br />

Jatindranath to take a look of the beautiful park named after him.<br />

Maninageswar: The temple of Maninageswar at Bardhanpur is an ancient one. Perhaps the<br />

temple was built in the year 1600 A.D. Mythology says that Pandav at the time of their<br />

"Agyantabas" used to take bath at Pandav ghat in the Bay of Bengal very close to<br />

Bardhanpur.<br />

After taking bath they used to have a Darsan of Maninageswar Shiva. While visiting the<br />

spot, one can enjoy the beauty of sea beach which is only 2 Kilometres from the spot.<br />

Chawmukh & Dagara: Chawmukh and Dagara, the two coastal villages in Baliapal block of<br />

<strong>Balasore</strong> district are ore scent with inviting beaches. The calm and serene atmosphere, long<br />

trashes of silvery sands, whistling casuarinas and red crabs are some of the attractions of<br />

these lovely beaches.<br />

Fishing by small boats with the local fisherfolk is very interesting. The beaches along with<br />

the presence of picnickers on New Year's Day and X-mass days every year.<br />

Tipisagadia: It is situated in Khaira block at distance of 48 Kilometres from <strong>Balasore</strong>. Lord<br />

Bakreswar Shiva is the presiding deity. The temple is very old one and located in a place<br />

surrounded by river Kansabansa in all four sides.<br />

Kupari: Kupari is about 67 Kilometres from <strong>Balasore</strong> via: Soro and 30 Kilometres from<br />

Bhadrak via: Agarpada in Khaira block. Sunyamandap and Ambika temples are two<br />

separate pilgrim spots situated in two opposite side of Kupari– Agarpada Road. At Kupari,<br />

some ruins of Buddhist Culture are still found.<br />

Inchudi: It is situated at a distance of 22 Kilometres from <strong>Balasore</strong>. The place is famous<br />

for Labana Satyagraha held in 1930 under the leadership of Sardar Surendranath Das,<br />

Binod Kanungo, Jeebramjee Kothari, Rama Devi and Dr H K Mahatab. One can see the<br />

Smruti sthambha as a mark of sacrifice of the then freedom fighters.<br />

Dinamardinaga & Farasidinga: <strong>Balasore</strong> the Head Quarters of the district was an<br />

important maritime town in mediaeval times through the river Budhabalanga. Some<br />

portions of the town were occupied by the French and the Dutch which were named as<br />

"Farasidinga" and "Dinmardinga".The ruins of the foreign possessions still exist.<br />

There are other temples too which attracts people not just for worship but for servey as<br />

venues for marriages and other sacred functions. They include <strong>Balasore</strong> Laxmi Narayan<br />

temple, Jhadeswar temple, Rameswar temple, Khirachora temple, Nilagiri Jagannath temple<br />

and Banthia Jagannath temple at Motiganj, Dudarchandi Mangla temple, Nimakali temple,<br />

Bahanaga Laxmi Narayan temple and Ram Mandir at Gopalpur.<br />

In addition, the famous Baulagadia village and artisans from Soro area supply stone<br />

sculptures to different countries like USA, United Kingdom, Russia, Bangladesh and<br />

Pakistan. The brass work of Remuna is also popular within and outside the country. Yet,<br />

there are many potential spots which remain unexplored, opine tourism experts.<br />

TSI: NABARD Consultancy Services (NABCONS) 55


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

In fact, the costal district having a series of beautiful hills in the western side has the<br />

potential for eco-tourism, adventure, wild-life tourism and adequate scope for development<br />

of religious tourism.<br />

Active cooperation and coordination among district authorities and political leaders are<br />

required to enhance tourism in the district. Absence of any on-the-spot tourist facility on<br />

these beaches is a bottleneck to popularity.<br />

Civil Supply:<br />

Under civil supplies, the following are the welfare schemes of Govt. operating in <strong>Balasore</strong><br />

district. The main objective of the department is to maintain the supplies (availability) of<br />

essential commodities to make it available at affordable (subsidized) rate. Four different<br />

types cards are provided by the department, based on eligibility of the beneficiary and the<br />

entitlements under each type of card are as follows<br />

• Antyodaya Anna Yojana (AAY) – 35Kg. Rice<br />

• Bellow Poverty Line (BPL) – 25Kg Rice, Sugar & Kerosene<br />

• Annapurna Yojana (AY) - 10Kg Free of cost Rice<br />

• Above Poverty Line (APL) – Wheat & Kerosene as per Allotment Received from<br />

Government.<br />

The department also undertakes activities to check mis-utilization and diversion of PDS<br />

commodities through enforcement and create awareness among the consumers regarding<br />

different scheme of the Govt. for their welfare.<br />

Block/ULBs<br />

Table 2.60. Ration cards position under civil supply<br />

BPL cards<br />

in<br />

circulation<br />

Antodaya Cards in circulation<br />

From From<br />

BPL Non-BPL Total<br />

families families<br />

APL cards<br />

in<br />

circulation<br />

Total<br />

cards<br />

Annapurna<br />

cards<br />

Bahanaga 11075 5174 859 6033 10081 27189 208<br />

<strong>Balasore</strong> Sadar 18554 7676 <strong>12</strong>41 8917 8595 36066 366<br />

Baliapal 13910 5821 523 6344 5763 26017 293<br />

Basta 14294 5151 571 5722 11550 31566 275<br />

Bhograi 25153 9279 1020 10299 6773 42225 458<br />

Jaleswar 17596 7653 842 8495 10364 36455 302<br />

Khaira 14759 6553 666 7219 8631 30609 270<br />

Nilgiri 15797 6040 1009 7049 10555 33401 190<br />

Oupada 8279 3026 251 3277 1985 13541 <strong>12</strong>2<br />

Remuna 17722 7030 591 7621 15516 40859 295<br />

Simulia 9879 4402 116 4518 3906 18303 176<br />

Soro 11160 4906 506 54<strong>12</strong> 7180 23752 205<br />

<strong>Balasore</strong> (M) 3029 620 498 1118 36804 40951 206<br />

Jaleswar (NAC) 1429 322 101 423 7815 9667 34<br />

Nilgiri (NAC) 1780 508 11 519 2893 5192 26<br />

Soro (NAC) 3082 795 49 844 6547 10473 46<br />

<strong>District</strong> total 187498 74956 8854 83810 154958 426266 3472<br />

Source: <strong>District</strong> Civil Supply Office, <strong>Balasore</strong>, 2010<br />

TSI: NABARD Consultancy Services (NABCONS) 56


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

For efficient distribution of food articles, 1446 Fair Price Shops are operating in the district.<br />

The data presented in table 2.62 reveals that there is need for opening of additional PDS<br />

outlets so as to bring average of maximum 1500 persons/PDS outlet.<br />

Block/ULBs<br />

Table 2.61. No. of PDS outlets in <strong>Balasore</strong> district<br />

PDS Outlets/Fair Price Shops managed by<br />

SC Retailers<br />

ST Retailers<br />

Ex-<br />

Servicemen<br />

Women<br />

Gram<br />

Panchayat<br />

Physically<br />

Handicapped<br />

Total No. of<br />

PDS outlets<br />

TSI: NABARD Consultancy Services (NABCONS) 57<br />

Women SHG<br />

Cooperative<br />

Societies<br />

Maitri<br />

General<br />

retailers<br />

Bahanaga 2 7 1 1 4 62 77<br />

<strong>Balasore</strong> Sadar 29 2 13 1 1 7 1<strong>12</strong> 165<br />

Baliapal 10 2 16 9 116 153<br />

Basta 7 2 10 103 <strong>12</strong>2<br />

Bhograi 7 11 1 3 11 104 137<br />

Jaleswar 17 14 17 1 1 3 4 116 173<br />

Khaira 3 1 19 1 1 1 87 113<br />

Nilgiri 2 19 9 2 5 52 89<br />

Oupada 2 4 1 3 23 33<br />

Remuna 8 1 4 6 2 95 116<br />

Simulia 4 7 1 25 42 79<br />

Soro 10 7 3 1 66 87<br />

<strong>Balasore</strong> (M) 3 2 2 2 1 23 33<br />

Jaleswar (NAC) 2 1 3 2 30 38<br />

Nilgiri (NAC) 1 8 9<br />

Soro (NAC) 3 1 3 15 22<br />

Total 104 45 1 <strong>12</strong>2 14 11 39 55 1 1054 1446<br />

Source: <strong>District</strong> Civil Supply Office, <strong>Balasore</strong>, 2010<br />

Block/ULBs<br />

Table 2.62. Shortfall of PDS Outlets<br />

Total<br />

cards<br />

Projected<br />

Population<br />

(<strong>2011</strong>)<br />

Total No.<br />

of PDS<br />

outlets<br />

Population<br />

covered/PDS<br />

outlet<br />

No. of<br />

cards/PDS<br />

outlet<br />

Bahanaga 27189 144206 77 1873 353<br />

<strong>Balasore</strong> Sadar 36066 260<strong>12</strong>5 165 1577 219<br />

Baliapal 26017 210648 153 1377 170<br />

Basta 31566 194401 <strong>12</strong>2 1593 259<br />

Bhograi 42225 302251 137 2206 308<br />

Jaleswar 36455 206833 173 1196 211<br />

Khaira 30609 190348 113 1684 271<br />

Nilgiri 33401 131540 89 1478 375<br />

Oupada 13541 84189 33 2551 410<br />

Remuna 40859 218059 116 1880 352<br />

Simulia 18303 <strong>12</strong>5970 79 1595 232<br />

Soro 23752 144392 87 1660 273<br />

<strong>Balasore</strong> (M) 40951 <strong>12</strong>6588 33 3836 <strong>12</strong>41<br />

Jaleswar (NAC) 9667 25521 38 672 254<br />

Nilgiri (NAC) 5192 17610 9 1957 577<br />

Soro (NAC) 10473 33167 22 1508 476<br />

Total 426266 2415845 1446 1671 295<br />

Source: <strong>District</strong> Civil Supply Office, <strong>Balasore</strong>, 2010


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SWOT analysis of General Economic Service’s sector<br />

Strength:<br />

Tourism:<br />

• The district is endowed with important tourist places like, Khirachora Gopinath,<br />

Chandaneswar, Panchalingeswar, Langaleswar, Inchudi, Chandipur etc.<br />

• Proximity of these tourist places to State Capital, where international airport is located,<br />

enough scope to attract foreign tourists.<br />

Civil supply:<br />

• Educated and well aware public/Active people’s representatives.<br />

Weakness:<br />

Tourism:<br />

• Lack of critical infrastructure like good quality roads, guesthouses, bungalows and<br />

tourist resorts for accommodation of tourists.<br />

Civil Supply:<br />

• Corruption by storage agents/wholesalers/PDS retailers<br />

Opportunities:<br />

Tourism:<br />

• Tourism is the prime focus of present government to earn revenue for state exchequer.<br />

Civil supply:<br />

• New schemes of State Government (Rs. 2/kg of rice to BPL families).<br />

• Involvement of Community Based Organizations (SHGs/Mahila Samities) in PDS<br />

Threat:<br />

Tourism:<br />

• Law and order problem prevents tourist flow.<br />

Civil supply:<br />

• Misuse of Annapurna, Antodaya schemes by beneficiaries, can be prevented through<br />

Bio-metric cards.<br />

2.9. Social Services<br />

2.9.1. General Education:<br />

Education is considered to be one of the important prerequisites of development. It is<br />

considered as an engine of economic growth. Indian states are bound under constitutional<br />

provision to provide free and compulsory education to all children up to the age group of<br />

14yrs. The literacy rate in Orissa during 1951 was 15.8 per cent against the all India<br />

average of 18.3 per cent which increased to 63.8 per cent in 2001 against the All India<br />

average of 64.8 percent. Literacy level in <strong>Balasore</strong> during 2001 is much higher than state<br />

average (Table 2.63). Even the literacy rate of SC & ST community in the district is much<br />

better than state average. The percentage of out of school children in the age group of 6 to<br />

11 and 11 to 14 is less in <strong>Balasore</strong> district than in the state. Only concern is out of school<br />

children in the minority community.<br />

Indicator<br />

Table 2.63. Key Educational Indicators of <strong>Balasore</strong> <strong>District</strong><br />

<strong>Balasore</strong> Orissa<br />

Male 81.69 73.35<br />

Literacy rate (Total) (2001 Census)<br />

Female 58.90 50.51<br />

Total 70.56 63.08<br />

Literacy rate (Rural) (2001 Census)<br />

Male<br />

Female<br />

81.16<br />

57.40<br />

72.93<br />

46.66<br />

TSI: NABARD Consultancy Services (NABCONS) 58


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Total 69.52 59.84<br />

Male 85.77 87.93<br />

Literacy rate (Urban) (2001 Census)<br />

Female 71.20 72.87<br />

Total 78.80 80.84<br />

Literacy rate in SC Population (2001 Census) 59.41 55.53<br />

Literacy rate in ST Population (2001 Census) 31.88 37.37<br />

Overall Literacy Index (2001) 0.709 0.636<br />

Combined Gross Enrolment Ratio (6-14 years) 2003-04 89.16 89.58<br />

Combined Gross Enrolment Ratio Index (6-14 years) 2003-04 0.892 0.896<br />

Education Index 2004 0.770 0.723<br />

Education Index Rank in the State 2001 10 -<br />

Out of School Children (6 to 11 Age group) (% to total child population)<br />

All Community 1.31 3.28<br />

SC 1.46 2.99<br />

ST 2.95 5.43<br />

Minority 1.79 4.28<br />

Out of School Children (11 to 14 Age group) (% to total child population)<br />

All Community 3.58 5.45<br />

SC 4.32 5.06<br />

ST 7.44 9.86<br />

Minority 5.76 6.78<br />

Source: Census of India, 2001 & Information Sheet on Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2009<br />

Type of Schools<br />

Table 2.64. Type of Schools in <strong>Balasore</strong> <strong>District</strong><br />

Un-Aided Private<br />

Government<br />

(including local<br />

bodies)<br />

Primary 1431 3 28 66 94 - 1528<br />

Primary with Upper Primary 620 5 37 18 55 - 680<br />

Only Upper Primary 206 241 20 <strong>12</strong> 32 - 479<br />

Primary, Upper Primary & Secondary 5 2 11 1 <strong>12</strong> - 19<br />

Upper Primary & Secondary 28 26 6 1 7 - 61<br />

Only Secondary 240 154 70 4 74 8 476<br />

Total 2530 431 172 102 274 8 3243<br />

Source: <strong>District</strong> Project Office, Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2010<br />

Table 2.65. Status on Infrastructure lacking in Government Schools<br />

(Primary & Upper Primary Education)<br />

Primary Schools* Upper Primary Schools**<br />

No. of Schools without No. of<br />

% to total<br />

No. of<br />

% to total<br />

Schools<br />

Schools<br />

Schools<br />

Schools<br />

Drinking water facility 158 11.04 33 3.84<br />

Common Toilet facility 941 65.76 585 68.10<br />

Separate Toilet for<br />

girls<br />

<strong>12</strong>41 86.72 665 77.42<br />

Access ramps 671 46.89 334 38.88<br />

Boundary walls 970 67.78 523 60.88<br />

Play ground 1099 76.80 503 58.56<br />

Source: <strong>District</strong> Project Office, Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2010<br />

NB: *Primary School means schools having education facility up to primary only.<br />

**The Upper Primary schools include purely Upper Primary; Primary with Upper Primary;<br />

Primary, Upper Primary & Secondary and Upper Primary & Secondary<br />

TSI: NABARD Consultancy Services (NABCONS) 59<br />

Government<br />

Aided<br />

Recognized<br />

Un-<br />

Recognized<br />

Total<br />

Other Schools<br />

Total No. of<br />

Schools


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 2.66. Class Rooms available in Government Schools<br />

(Primary & Upper Primary Education)<br />

Primary Schools* Upper Primary Schools**<br />

No. of Class Rooms Average No. of Class No. of Class Rooms Average No. of Class<br />

available<br />

Rooms/School<br />

available<br />

Rooms/School<br />

3177 2.22 2809 3.27<br />

Source: <strong>District</strong> Project Office, Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2010<br />

NB: *Primary School means schools having education facility up to primary only.<br />

**The Upper Primary schools include purely Upper Primary; Primary with Upper Primary;<br />

Primary, Upper Primary & Secondary and Upper Primary & Secondary<br />

Infrastructure in schools is another area of concern which needs to be emphasized. The<br />

information collected from office of the Sarva Siksha Abhiyan of the district indicate that<br />

majority of the schools in the district lack critical infrastructure like safe drinking water,<br />

toilets, play ground, electricity etc. These infrastructures need to be immediately provided<br />

in the schools under SSA programme.<br />

Table 2.67. Status on Infrastructure lacking in Government Schools<br />

(Secondary Education)<br />

Available Shortfall<br />

Type of Infrastructure<br />

No. of % to total No. of % to total<br />

Schools Schools Schools Schools<br />

Science Laboratory 29 11.65 220 88.35<br />

Separate Room for Headmaster/Principal 150 60.24 99 39.76<br />

Separate Room for Asst. Headmaster/Vice<br />

Principal<br />

3 1.20 246 98.80<br />

Library 47 18.88 202 81.<strong>12</strong><br />

Separate Toilet Blocks for Boys and Girls 180 72.29 69 27.71<br />

Art & Craft Room/Activity Room 4 1.61 245 98.39<br />

Drinking Water facility 245 98.39 4 1.61<br />

Source: <strong>District</strong> Project Office, Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2010<br />

Table 2.68. Status on availability of Class Rooms in Secondary Schools<br />

Indicators Details<br />

No. of Schools having Secondary education 249<br />

Current Enrolment 33466<br />

Class Rooms available 705<br />

Student Class Room Ratio (SCR) 47<br />

No. of additional Class Rooms required @ SCR 40:1 229<br />

Source: <strong>District</strong> Project Office, Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2010<br />

2.9.2. Higher Education:<br />

The district has 56 colleges offering higher education to the students. There is no university<br />

in the district.<br />

Table 2.69. No. of colleges in <strong>Balasore</strong> <strong>District</strong><br />

Block/ULBs No. of Colleges<br />

Bahanaga 4<br />

<strong>Balasore</strong> 4<br />

Baliapal 3<br />

Basta 4<br />

Bhograi 3<br />

Jaleswar 4<br />

Khaira 4<br />

Nilgiri 5<br />

Oupada 2<br />

Remuna 1<br />

Simulia 3<br />

Soro 4<br />

<strong>Balasore</strong> Municipality 8<br />

TSI: NABARD Consultancy Services (NABCONS) 60


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULBs No. of Colleges<br />

Jaleswar NAC 3<br />

Nilgiri NAC 2<br />

Soro NAC 2<br />

<strong>District</strong> total 56<br />

2.9.3 Technical Education:<br />

Regarding technical education, the district lack adequate number of institutions to meet the<br />

demand. Because of the upcoming of the industries in nearby districts, there is requirement<br />

of technical institutes like ITI, Polytechnics, Diploma schools to provide skill to educated<br />

unemployed youths of the district. The district also deserves an institute on disaster<br />

management where in all research and extension activities will be conducted and skilled<br />

manpower can be generated to handle successfully the natural calamities that occur very<br />

frequently.<br />

2.9.4 Sports & Youth Services:<br />

<strong>Balasore</strong> district lack adequate infrastructure for development of sports in the district. Only<br />

one stadium named <strong>Balasore</strong> Stadium is there inside the <strong>Balasore</strong> municipality area.<br />

Provisions have been made for practice of Athletics, Basketball, Football, Volleyball, Kabadi<br />

etc in the stadium. Further, there is lack of sports infrastructure in rural areas of the<br />

district. Only 44.49% villages have play ground. There is need for at least one play ground<br />

in each village and a mini stadium at each block of the district.<br />

Table 2.70. No. of Play ground in <strong>Balasore</strong> <strong>District</strong><br />

Blocks No. of villages having Play Ground % to total villages<br />

Bahanaga 92 56.44<br />

<strong>Balasore</strong> 109 37.72<br />

Baliapal 98 40.83<br />

Basta <strong>12</strong>8 36.99<br />

Bhograi 175 49.57<br />

Jaleswar 106 41.24<br />

Khaira 182 49.59<br />

Nilgiri 67 44.96<br />

Oupada 72 44.44<br />

Remuna 154 48.42<br />

Simulia 65 40.62<br />

Soro 74 44.31<br />

Total 1322 44.49<br />

Following sports competitions are organized from Block to <strong>District</strong> level for selection of<br />

student for participation in the state level and national level competition.<br />

• Rural Sports competition: For popularization of sports in rural areas under the age<br />

group of 16 years.<br />

• Women sports festival: For creation of sports awareness among the women sports<br />

persons (No age bar for participants)<br />

• Talent Scouting (only for Novices) (For admission in different sports hostel of the state<br />

under the age group of <strong>12</strong> to 16 years reading in class 6th to 8th).<br />

• Excellence Scouting (Gold Digging Scheme) (For admission in sports hostel under the<br />

age group of 16 to 20 years those who are represented at least in National School level,/<br />

inter state level /inter university level.)<br />

Youth Services:<br />

<strong>District</strong> level Youth festival is organized every year for participation in the State Level youth<br />

festival and National level youth festival. The main objective of youth services is<br />

TSI: NABARD Consultancy Services (NABCONS) 61


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• To encourage young persons and support their participation and involvement in the<br />

process of national development.<br />

• To seek ways and means for youth training for self employment.<br />

• To provide opportunity to the youth for economic and social development.<br />

• To provide opportunity for taking part in adventure programme.<br />

• To provide such other programmes for building character of the youth.<br />

2.9.5. Art and Culture:<br />

<strong>Balasore</strong> being a coastal district, shares most of the coastal folk traditions of Orissa like<br />

Odissi, Ghodanacha, Gotipua, Gopala Ogala, etc. However, there are certain rites and<br />

rituals which are celebrated very profusely in all the villages of <strong>Balasore</strong>. The celebrations<br />

are so popular and they are observed in such a manner that they give the appearance of a<br />

folk celebration. These are Ram Leela, Janmasthami, Gopala Ogala, Ghoda Nacha,<br />

Khudurkuni Osha, Gajalaxmi Puja, Panchudola, Baliturtiya, Akshi Turtiya, Raja, Gamha<br />

Purnima, Mana Basa etc. <strong>Balasore</strong> being a predominantly agriculture district, almost all the<br />

festivals and folk celebrations are linked to cultivation/cultural operations in the crop field.<br />

All muslim festivals like Id, Moharum etc. are observed with grandeour.<br />

Old monuments of historical interest are found in the district at a number of places. Folk<br />

art and culture includes the Kendra songs, Khanjani, Palla, Daskathia, Ghodanachha.<br />

<strong>Balasore</strong> district is famous for good quality colorful sculptors and idol of god & goddess,<br />

which one can observe if visit rural areas. Each village temple is colorfully decorated with<br />

idols of god/goddess. Promotion of Rural Artisans, Musicians, Painters, and Sculptors is<br />

one of the essential requirements to maintain the culture and traditions of the district.<br />

There are a number of cultural organizations, and several literary periodicals are published.<br />

However, almost all the promotional activities on art & culture are sponsored privately,<br />

voluntarily, or individually.<br />

Table 2.71. Availability of Library and Information Center/Reading Rooms<br />

<strong>District</strong> Library Information Center & Reading Room Library<br />

1 4 35<br />

Source: <strong>District</strong> Culture Office, <strong>Balasore</strong><br />

2.9.6. Medical & Public Health:<br />

The overall health status of the population residing in <strong>Balasore</strong> district is moderate. Though<br />

the health indicators presented in table 2.72 indicates a better position of <strong>Balasore</strong> district<br />

in the state, yet considering the high literacy rate and health consciousness of the people in<br />

the district, it is not satisfactory.<br />

Table 2.72. Health Indicators of <strong>Balasore</strong> <strong>District</strong> vis-à-vis Orissa<br />

Indicator <strong>Balasore</strong> Orissa<br />

Sex ratio (2001 Census) All age group 953 972<br />

Crude Birth Rate (SRS 2008) (per 1000 Population) 20.56 21.40<br />

Crude Death Rate (SRS 2008) (per 1000 Population) 10.00 9.30<br />

Infant Mortality Rate (NFHS-III) (Per 1000 Live Birth) 63 65<br />

Total Fertility Rate (SRS 2007) 2.90 2.40<br />

Maternal Mortality Rate (SRS 2004-06) (per 1,00,000 live births) 315 303<br />

Contraceptive Prevalence rate (Any method) (NFHS-III) 56.50 50.70<br />

Contraceptive Prevalence Rate (Modern Methods) (NFHS-III) 48.93 44.70<br />

Contraceptive Prevalence Rate (Female sterilization) (NFHS-III) 37.56 33.10<br />

Contraceptive Prevalence Rate (Male sterilization) (NFHS-III) 1.65 1.00<br />

Contraceptive Prevalence Rate (IUD) (NFHS-III) 0.54 0.50<br />

Contraceptive Prevalence Rate (Pill) (NFHS-III) 8.45 7.00<br />

Contraceptive Prevalence Rate (Condom) (NFHS-III) 3.65 3.00<br />

% of women who received ANC (Ante Natal Care) (NFHS-III) 88.6 87<br />

TSI: NABARD Consultancy Services (NABCONS) 62


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

% of women who received 3 ANC visits (NFHS-III) 69 61<br />

% of women reported Institutional Delivery (CNAA 2006-07) 43.54 46<br />

Vaccination Coverage (% of children) (NFHS-III) 74 52<br />

Children age below 3 years who are underweight (%) (NFHS-III) 44.00 44<br />

Children age 6-35 months who are anemic (%)(NFHS-III) 74 74<br />

Health Index (2004) 0.415 0.468<br />

Income Index (2004) 0.466 0.545<br />

Human Development Index (HDI) value 2004 0.559 0.579<br />

HDI Rank in the State 2004 18 -<br />

Gender Development Index (GDI) value 2001 0.519 0.546<br />

GDI Rank in the State 2001 14 -<br />

Reproductive Health Index (RHI) 1998-99 0.497 0.549<br />

RHI Rank in the state 1998-99 25 -<br />

Source: NFHS-III, 2005-06, Office of the CDMO, <strong>Balasore</strong><br />

Table 2.73. Health facilities available in the district<br />

Type Nos.<br />

Health Sub Center 275<br />

Primary Health Center 4<br />

Primary Health Center (New) 66<br />

Community Health Center (CHC) 8<br />

<strong>District</strong> HQ Hospital 1<br />

Sub Divisional Hospital 1<br />

Area Hospital (Khantapada) 1<br />

Other Hospital 3<br />

Post Mortem Center (<strong>District</strong> level) 4<br />

Post Mortem Center (Block level) 4<br />

First Referral Unit 4<br />

Leprosy Eradication Units 1<br />

TB Unit 1<br />

No. of Homoeopathic dispensary 30<br />

No. of Ayurvedic dispensary 22<br />

Source: Office of the CDMO, <strong>Balasore</strong> district<br />

The health facilities in the district are not satisfactory. Hospitals lack adequate staff and<br />

infrastructure. Population covered per health unit is much higher in the district than that<br />

of state figures (Table 2.78). On an average each Health center caters to 28760 people and<br />

health sub center to 8785 people. The figures presented in table 2.74 indicates requirement<br />

of more number of health centers, sub centers, arrangement of beds and appointment of<br />

more doctors in the district.<br />

Table 2.74. Health facilities available in the district<br />

<strong>Balasore</strong> Orissa<br />

Type of facility<br />

Nos.<br />

Population<br />

covered Nos.<br />

Population<br />

covered<br />

(000/Unit)<br />

(000/Unit)<br />

Health Sub Center 275 8.78 6374 5.77<br />

Health Center<br />

(PHC/UPHC/CHC/Hospital)<br />

Source: Office of the CDMO, <strong>Balasore</strong> district<br />

84 28.76 1694 21.72<br />

Table 2.75. Achievement in formation and strengthening of Gaon Kalyan Samities<br />

(GKS)<br />

Achievement in Gaon Kalyan Samities (GKS)<br />

Block/ULBs<br />

Total target<br />

Nos. formed<br />

till Sep 2010<br />

Account<br />

opened<br />

Money<br />

transferred to<br />

Account<br />

Swasthya<br />

Kantha<br />

Bahanaga 155 148 148 148 145<br />

<strong>Balasore</strong> 248 237 237 237 235<br />

Baliapal 172 166 166 165 165<br />

TSI: NABARD Consultancy Services (NABCONS) 63


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULBs<br />

Total target<br />

Achievement in Gaon Kalyan Samities (GKS)<br />

Nos. formed<br />

till Sep 2010<br />

Account<br />

opened<br />

Money<br />

transferred to<br />

Account<br />

Swasthya<br />

Kantha<br />

Basta 258 246 246 246 221<br />

Bhograi 296 294 292 290 251<br />

Jaleswar 189 185 185 185 185<br />

Khaira 320 314 313 3<strong>12</strong> 311<br />

Nilgiri 131 <strong>12</strong>9 <strong>12</strong>9 <strong>12</strong>9 <strong>12</strong>9<br />

Oupada 147 146 144 144 142<br />

Remuna 258 243 239 239 234<br />

Simulia 147 144 144 144 144<br />

Soro 157 152 152 152 146<br />

Total 2478 2404 2395 2391 2308<br />

% achievement 97.01 96.65 96.49 93.14<br />

Source: Office of the CDMO, <strong>Balasore</strong> district<br />

Table 2.76. Achievement in appointment of ASHA (till September 2010)<br />

Block/ULBs Target Achievement<br />

Bahanaga <strong>12</strong>1 <strong>12</strong>0<br />

<strong>Balasore</strong> Sadar 224 208<br />

Baliapal 176 169<br />

Basta 166 157<br />

Bhograi 362 257<br />

Jaleswar 177 173<br />

Khaira 199 165<br />

Nilgiri 162 154<br />

Oupada 90 90<br />

Remuna 136 135<br />

Simulia 105 102<br />

Soro <strong>12</strong>1 117<br />

Total 2039 1847<br />

% achievement 90.58<br />

Source: Office of the CDMO, <strong>Balasore</strong> district<br />

Table 2.77. Janani Surakshya Yojana Programme trend during 2006 to 2009<br />

Year Total Beneficiary Home Deliveries % Institutional Deliveries %<br />

2006-07 11409 952 8.34 10457 91.66<br />

2007-08 27245 963 3.53 26282 96.47<br />

2008-09 32625 296 0.91 32329 99.09<br />

2009-10 27266 175 0.64 27091 99.36<br />

Source: Office of the CDMO, <strong>Balasore</strong> district<br />

Table 2.78. Disease surveillance report of <strong>Balasore</strong> district (2006-07)<br />

Diseases<br />

No. of reported<br />

cases<br />

% to total<br />

cases<br />

No. of<br />

deaths<br />

% to total<br />

deaths<br />

Simple diarrhoea 88959 46.75 - -<br />

Severe diarrhoea 6662 3.50 1 2.13<br />

Bloody diarrhoea 36697 19.29 1 2.13<br />

Acute Jaundice Syndrome 57 0.03 4 8.51<br />

Acute jaundice 57 0.03 4 8.51<br />

Suspected malaria 2249 1.18 11 23.40<br />

Acute Respiratory Tract Infection 55495 29.17 21 44.68<br />

Measles 59 0.03 -<br />

Suspected Meningitis 4 0.00 4 8.51<br />

Heat stroke 29 0.02 1 2.13<br />

Total<br />

Source: Office of the CDMO, <strong>Balasore</strong> district<br />

190268 100.00 47 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 64


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

2.9.7. Water Supply & Sanitation:<br />

Disease surveillance report of <strong>Balasore</strong> indicates that out of total disease cases, almost<br />

2.13% cases are diarrhea, which is caused due to poor quality of drinking water and lack of<br />

sanitation. Hence, in a coastal district like <strong>Balasore</strong>, where natural calamity and salinity of<br />

the soil is a major problem, water supply and sanitation bear significance for improved<br />

quality of life of people.<br />

Rural Water Supply:<br />

The Rural Water Supply and Sanitation organization’s prime duty is to provide safe drinking<br />

water and better sanitation to the rural people of the district. In the district a total of 1611<br />

habitations are covered under Pipe water supply. Pipe water supply and Tube well are<br />

installed by Government to supply safe drinking water. But several tube wells are derelicted<br />

which needs immediate maintenance. There is a need of full coverage of house holds in<br />

Rural sector under Water supply and Sanitation.<br />

Blocks<br />

Table 2.79. Drinking water facilities available in <strong>Balasore</strong> district<br />

100% coverage under Pipe Water<br />

Supply (PWS)<br />

Projected<br />

Population<br />

(<strong>2011</strong>)<br />

Total No.<br />

of<br />

habitations<br />

No. of<br />

running<br />

tubewells<br />

Total No. of<br />

PWS<br />

commissioned<br />

(till July<br />

2010)<br />

Bahanaga 144206 158 1002 26 42 26.58 18187 <strong>12</strong>.61<br />

<strong>Balasore</strong> 260<strong>12</strong>5 344 1377 30 109 31.69 19456 7.48<br />

Baliapal 210648 310 983 28 69 22.26 7860 3.73<br />

Basta 194401 289 1110 48 37 <strong>12</strong>.80 3326 1.71<br />

Bhograi 302251 469 1685 26 136 29.00 24849 8.22<br />

Jaleswar 206833 411 <strong>12</strong>77 43 163 39.66 19792 9.57<br />

Khaira 190348 613 1345 26 413 67.37 91500 48.07<br />

Nilgiri 131540 290 944 46 101 34.83 13146 9.99<br />

Oupada 84189 190 830 15 69 36.32 9359 11.<strong>12</strong><br />

Remuna 218059 626 <strong>12</strong>14 31 321 51.28 64388 29.53<br />

Simulia <strong>12</strong>5970 177 835 17 28 15.82 4200 3.33<br />

Soro 144392 281 963 52 <strong>12</strong>3 43.77 21058 14.58<br />

Total 22<strong>12</strong>961 4158 13565 388 1611 38.74 297<strong>12</strong>1 13.43<br />

Source: Office of the Executive Engineer, RWSS, <strong>Balasore</strong><br />

Rural Sanitation:<br />

TSI: NABARD Consultancy Services (NABCONS) 65<br />

Habitation<br />

% to total<br />

habitations<br />

Regarding Total Sanitation Campaign the status in the district is presented below.<br />

Blocks<br />

Table 2.80. Achievement under Total Sanitation Campaign (Till 31st July 2010)<br />

Individual Household Latrine (BPL) Individual Household Latrine (APL)<br />

Target<br />

Achievement<br />

Balance<br />

Bahanaga 15608 11721 3887 75.10 8027 6278 1749 78.21<br />

<strong>Balasore</strong> Sadar 29026 20572 8454 70.87 9035 6927 2108 76.67<br />

Baliapal 21932 16905 5027 77.08 <strong>12</strong>645 11961 684 94.59<br />

Basta 21377 18253 3<strong>12</strong>4 85.39 9154 8009 1145 87.49<br />

Bhograi 37092 28626 8466 77.18 16805 15984 821 95.11<br />

Jaleswar 28315 21310 7005 75.26 9644 8351 <strong>12</strong>93 86.59<br />

Khaira 23184 15683 7501 67.65 7860 5900 1960 75.06<br />

%<br />

Achievement<br />

Target<br />

Achievement<br />

Balance<br />

Population<br />

% to total<br />

Population<br />

%<br />

Achievement


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Blocks<br />

Individual Household Latrine (BPL) Individual Household Latrine (APL)<br />

Target<br />

Achievement<br />

Balance<br />

Nilgiri 37440 21423 16017 57.22 5257 4422 835 84.<strong>12</strong><br />

Oupada 11180 10596 584 94.78 6225 4804 1421 77.17<br />

Remuna 25735 22692 3043 88.18 9991 8724 <strong>12</strong>67 87.32<br />

Simulia 14253 10778 3475 75.62 7478 5306 2172 70.95<br />

Soro 16494 11464 5030 69.50 7088 5208 1880 73.48<br />

<strong>District</strong> Total 281636 210023 71613 74.57 109209 91874 17335 84.13<br />

Source: WATSAN, <strong>Balasore</strong><br />

2.9.8. Rural and Urban Housing:<br />

To meet the requirement of housing for BPL families in rural areas, Government of India<br />

sponsored Indira Awas Yojana (IAY) is being implemented in the district. IAY is aimed to<br />

provide pucca and fire proof houses and up gradation of dwelling units of the rural poor<br />

below poverty line with assistance of lump sum amount. This is a centrally sponsored<br />

scheme on cost sharing basis between Govt. of India and state Govt. in the ratio of 75:25. In<br />

addition to IAY, Mo Kudia programme of the State Government is also in operation in the<br />

district.<br />

2.9.9. Development of SCs, STs & OBCs:<br />

One ITDA operating in the district at Nilgiri. Further, one of the block comes under MADA<br />

pocket i.e., Jaleswar. Out of the total population in the district SC constitute 18.84% and<br />

ST 11.28%.<br />

The <strong>District</strong> Welfare Department, headed by the <strong>District</strong> Welfare Officer, coordinates the<br />

developmental work for scheduled caste, scheduled tribe, and other backward caste<br />

communities. Several Central as well as State schemes are implemented for this purpose.<br />

The <strong>District</strong> Welfare Department basically intervenes through development of educational<br />

facilities for the SC/ST people.<br />

The existing residential schools in this district are not in good condition. These require<br />

construction of hostel building, additional classrooms, boundary wall, bath & latrine, pipe<br />

water supply and teachers’ quarter.<br />

OSFDC:<br />

The Orissa Scheduled Castes & Scheduled Tribes Development Finance Corporation<br />

(OSCSTDFC) has been financing SCs, STs, Safai Karmacharis (scavengers) to take up small<br />

enterprises. In <strong>Balasore</strong> district major emphasis is on Scheduled Castes.<br />

Table 2.81. Target and Achievement under bankable IGS of OSFDC during 2009-10<br />

Target Achievement<br />

Block/ULBs<br />

No. of SC<br />

Groups<br />

No. of SC<br />

individual<br />

cases<br />

No. of ST<br />

Groups<br />

TSI: NABARD Consultancy Services (NABCONS) 66<br />

%<br />

Achievement<br />

No. of ST<br />

individual<br />

cases<br />

Target<br />

No. of SC<br />

Groups<br />

Achievement<br />

No. of SC<br />

individual<br />

cases<br />

Balance<br />

No. of ST<br />

Groups<br />

%<br />

Achievement<br />

No. of ST<br />

individual<br />

cases<br />

Bahanaga <strong>12</strong> 44 1 6 4<br />

<strong>Balasore</strong> Sadar 5 22 3 22<br />

Baliapal 11 5 62 11 4 24<br />

Basta 6 59 5 103 2 46 5 103<br />

Bhograi 10 4 17 7 4 3 8<br />

Jaleswar 2 166 6 185 2 154 6 61


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULBs<br />

No. of SC<br />

Groups<br />

No. of SC<br />

individual<br />

cases<br />

Target Achievement<br />

No. of ST<br />

Groups<br />

No. of ST<br />

individual<br />

cases<br />

TSI: NABARD Consultancy Services (NABCONS) 67<br />

No. of SC<br />

Groups<br />

No. of SC<br />

individual<br />

cases<br />

No. of ST<br />

Groups<br />

No. of ST<br />

individual<br />

cases<br />

Khaira 1 221 69 1 <strong>12</strong>4 69<br />

Nilgiri 5 43 5 42<br />

Oupada 7 162 5 110 7 100 5 235<br />

Remuna 16 11 45 14 11 1 33<br />

Simulia 6 14 3 10 19<br />

Soro 6 45 60 6 45 10<br />

<strong>Balasore</strong> (M) 10 4 7 1 10<br />

Jaleswar (NAC) 3<br />

Nilgiri (NAC) 10 <strong>12</strong>4 10 85<br />

Soro (NAC)<br />

Total 110 893 26 673 84 625 25 594<br />

% achievement 76.36 69.99 96.15 88.26<br />

Source: Office of the DWO, <strong>Balasore</strong><br />

Scholarship:<br />

In <strong>Balasore</strong> district, the scholarships are provided to SC, ST and OBC students, both<br />

boarders of Residential schools as well day scholars. The scholarship includes expenditure<br />

on supply of free school dresses.<br />

The State-owned O.B.C.F.D.C. has been channelising credit extended by the National<br />

Backward Classes Finance Development Corporation for providing loans to OBC<br />

beneficiaries for taking up income generating activities and enterprises, but after 2001-02<br />

this has been stopped as the recovery rate was reportedly not satisfactory.<br />

2.9.10. Labour & Employment:<br />

In <strong>Balasore</strong> district there are 19 major & medium industries. Hence activity of labour<br />

department is limited. Except in Birla Tyres where there is an occasional labour problem,<br />

all the industrial units are functioning without any disturbances.<br />

The <strong>District</strong> Employment Exchange constitutes the basic unit for implementation and<br />

coordinating all programmes of employment assistance, carrier advice, employment<br />

marketing information and surveys and studies in the <strong>District</strong>. The Director of Employment<br />

is responsible for the efficient functioning of the employment sub-office at sub-divisional<br />

level and Rural Employment Bureau, the lowest formation of the employment service.<br />

The employment service in the <strong>District</strong> deals with the following:<br />

1. Registration of Job-seekers<br />

2. Notification of vacancies.<br />

3. Submission of applicants against notified vacancies.<br />

4. Public relations and publicity.<br />

5. Employment market and Information.<br />

6. Vocational Guidance programme<br />

7. Placement of the persons with disability.<br />

8. Organizing of career conference and career talk in the schools & colleges.<br />

Table 2.82. Details of Registrations in Employment Exchanges of <strong>Balasore</strong> district<br />

Indicators<br />

<strong>Balasore</strong> (2009)<br />

No. %<br />

Orissa (2006)<br />

No. %<br />

No. of Employment Exchanges 3 - 80 -<br />

No. of Registration done during 2006 11192 - 240963 -<br />

Total Applicants in the live register at the end of 2006 37293 - 907298 -<br />

Educational qualification wise No. of applicants in the live register


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicators<br />

<strong>Balasore</strong> (2009)<br />

No. %<br />

Orissa (2006)<br />

No. %<br />

Below Matriculation 9988 26.78 151382 16.68<br />

Matriculation 13059 35.02 391976 43.20<br />

Under Graduates 6566 17.61 166824 18.39<br />

Arts Graduate 5231 14.03 104479 11.52<br />

Commerce Graduate 465 1.25 10<strong>12</strong>9 1.<strong>12</strong><br />

Science Graduate 936 2.51 19578 2.16<br />

Civil Engineering Diploma holders 75 0.20 2243 0.25<br />

Mechanical Engineering Diploma holders 172 0.46 3398 0.37<br />

Electrical Engineering Diploma holders 174 0.47 3366 0.37<br />

Instrumentation Engineering Diploma holders 5 0.01 83 0.01<br />

Leather Technology Diploma holders - - 2 0.00<br />

Textile Technology Diploma holders 2 0.00 47 0.01<br />

Others 620 1.66 53791 5.93<br />

Total<br />

Source: Statistical Abstract of Orissa, 2008<br />

37293 100.00 907298 100.00<br />

Table 2.83. No. of Centers functioning and students enrolled under National Child<br />

Labour Project in the district<br />

Block/ULBs No. of Centers No. of students enrolled<br />

Bahanaga 1 50<br />

<strong>Balasore</strong> Sadar 1 50<br />

Baliapal 2 100<br />

Basta 1 50<br />

Bhograi 1 50<br />

Jaleswar 3 150<br />

Khaira 2 100<br />

Nilgiri 9 450<br />

Oupada 3 150<br />

Remuna 4 200<br />

Simulia 0<br />

Soro 3 150<br />

<strong>Balasore</strong> (M) 4 200<br />

Jaleswar (NAC) 0<br />

Nilgiri (NAC) 3 150<br />

Soro (NAC) 1 50<br />

Total 38 1900<br />

Source: Office of the DLO-cum-Project Director, NCLP, <strong>Balasore</strong><br />

2.9.11. Social security, social welfare, women empowerment and child welfare:<br />

The <strong>District</strong> Department of Social Welfare, headed by a <strong>District</strong> Social Welfare Officer based<br />

at <strong>Balasore</strong> looks after the implementation of various Central and State government<br />

schemes meant for the social welfare, women empowerment, and child welfare. The <strong>District</strong><br />

Social welfare Office started functioning in the district with effect from 1.4.93.<br />

Type of Beneficiaries<br />

Table 2.84. Covergae under Supplementary Nutrition Programme<br />

No. of<br />

Beneficiaries<br />

allotted<br />

Rice<br />

(gm)<br />

Dal<br />

(gm)<br />

Palm<br />

oil (gm)<br />

Turmeric<br />

(gm)<br />

Mild and Moderate Children 239537 80 30 5 0.05 1<br />

Severely Malnourished Children 1115 130 40 - - -<br />

Pregnant and Lactating Women 44521 190 30 - - -<br />

Source: Office of the DSWO, <strong>Balasore</strong><br />

Table 2.85. Performance of Mid-Day-Meal Programme<br />

Details Value<br />

No. of Schools covered 3102<br />

No. of EGS Centers covered -<br />

IF Salt<br />

(gm)<br />

TSI: NABARD Consultancy Services (NABCONS) 68


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Details Value<br />

Total 3102<br />

School strength 365490<br />

EGS strength -<br />

Total 365490<br />

Handing over management to SHGs (No. of schools) 2690<br />

Source: Office of the DSWO, <strong>Balasore</strong><br />

Integrated Child Development Services (ICDS):<br />

All <strong>12</strong> Blocks have been covered under ICDS Programme. The ICDS Programme aims at<br />

providing services to children of 0-6 years in an integrated manner so as to ensure proper<br />

growth and development of children in rural, tribal and slum areas. ICDS is a centrally<br />

sponsored scheme. The objectives of the scheme are<br />

• To improve the nutritional and health status of children in the age group of 0 to 6<br />

years.<br />

• To lay the foundations for proper psychological, physical and social development of the<br />

child.<br />

• To reduce the incidence of mortality, morbidity, malnutrition and school drop-out.<br />

• To achieve effective coordination of policy and implementation amongst the various<br />

departments to promote child development.<br />

• To enhance the capability of the mother to look after the normal health and nutritional<br />

needs of the child through proper nutrition and health education.<br />

In order to reduce the incidence of child mortality and to provide nutritional support to<br />

expectant and lactating mothers, six packages of services are being delivered through ICDS<br />

projects of the <strong>District</strong>.<br />

The six packages of ICDS services are as follows:-<br />

• Nutrition & Health Education<br />

• Immunization programme<br />

• Special Nutrition programme<br />

• Referral services<br />

• Health check up<br />

• Pre-School Education.<br />

All <strong>12</strong> ICDS projects have no official building of their own. The office is functioning in the<br />

space provided by respective BDOs. In the district, in rural areas a total of 3630 Anganwadi<br />

centers are functioning. The average population covered by each Anganwadi center is 666.<br />

<strong>Balasore</strong> is a natural calamity prone district. Flood/cyclone occurs every year. During<br />

natural calamities women and children face problem in accessing Anganwadi center located<br />

outside habitation. Hence, in many of the gram panchayats there is demand to provide<br />

Anganwadi in each habitation. It may be mentioned here that total number of habitations in<br />

the district is 4158.<br />

Out of 3630 Anganwadi centers, only 250 centers (6.89%) are operating in their own<br />

building. Rest 3380 (93.11%) are operating either in Schools or in Community buildings or<br />

in Panchayat offices. Even some are operating in the home of Anganwadi workers.<br />

Grade No. of children %<br />

Normal <strong>12</strong>1375 50.44<br />

Grade I 86800 36.07<br />

Grade II 31362 13.03<br />

Grade III 1037 0.43<br />

Grade IV 78 0.03<br />

Total 240652 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 69


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Regarding facilities available in these Anganwadi Centers, it is revealed from the data<br />

presented in table 2.62 that AWCs in <strong>Balasore</strong> district lack minimum infrastructure<br />

facilities like toilets, safe drinking water, kitchen, stores, utensils etc. These deficiencies<br />

need to be filled up on priority basis otherwise the basic objective of ICDS programme will<br />

be hardly achieved.<br />

Table 2.86. Facilities available in Anganwadi Centers (AWCs) of <strong>Balasore</strong> district<br />

Facility Norm<br />

Requirement<br />

as per norm<br />

Actual<br />

status<br />

Provision of<br />

Anganwadi<br />

Per 1500 population 1611 3630 +2019<br />

Location In each habitation* 4158 3630 -528<br />

Housing of<br />

Anganwadi<br />

Dedicated Pucca building 4158 250 -3908<br />

Provision of<br />

ASHA<br />

Per 1000 population 2416 1847 -569<br />

Human<br />

resource<br />

1 AWW and 1 assistant/Anganwadi 8316 5653 -2663<br />

Toilet facility Attached toilet 4158 33 -4<strong>12</strong>5<br />

Water facility Potable drinking water connection 4158 Nil -4158<br />

Wash facility<br />

Separate place for washing hands with<br />

adequate soap and water<br />

4158 <strong>12</strong>2 -4036<br />

Utensils 4158 2026 -2132<br />

Furniture 4158 2026 -2132<br />

Darry/Mat 4158 2026 -2132<br />

Equipment Kit 4158 2026 -2132<br />

Scale 4158 2026 -2132<br />

Register 4158 2026 -2132<br />

Playing equipment 4158 2026 -2132<br />

Source: Office of the DSWO, <strong>Balasore</strong><br />

*<strong>Balasore</strong> is a natural calamity prone district. Flood/cyclone occurs every year. During natural<br />

calamities women and children face problem in accessing Anganwadi center located outside habitation.<br />

Hence, in many of the gram panchayats there is demand to provide Anganwadi in each habitation.<br />

Social Security Schemes:<br />

Under Social security, schemes like Madhu Babu Pension Yojana, National Old Age Pension<br />

(NOAP), National Family Benefit Scheme (NFBS) are operating in the district. Other Social<br />

welfare schemes operating in the district are Mid–Day–Meal (MDM), Balika Samrudhi<br />

Yojana etc. The details of operation of these programmes are presented in Sectoral schemes<br />

in Chapter VI of the report.<br />

Table 2.87. Coverage under Social Security Scheme (2009-10)<br />

Details MBPY IGNOAP IGNDP IGNWP<br />

Target 50443 65951 6521 23111<br />

Achievement 49158 62977 1143 22386<br />

Source: <strong>District</strong> Social Welfare Officer, <strong>Balasore</strong><br />

TSI: NABARD Consultancy Services (NABCONS) 70<br />

Gap


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Women Issues<br />

Health & Family Welfare<br />

SWOT Analysis of Social Services sector<br />

Strengths<br />

• Very good female literacy rate, Increase in participation of women in grass root politics.<br />

Weaknesses<br />

• Increase in incidence of dowry related torture and deaths, Poor sustainability of Women<br />

SHGs, political interference.<br />

• Natural calamities increases work burden, more time is required for household chores, Unpaid<br />

family labour, Social stigma.<br />

Opportunities<br />

• Mission Shakti & Women SHGs., Reservation of seats for women in LSGs.,<br />

• Development of cottage, handicraft, handloom and sericulture industries.<br />

Threats<br />

• Increased incidence of women abuse, crime etc., Unemployed educated youths involved in<br />

abuse of women.<br />

Strengths<br />

• Located close to major cities like Bhubaneswar, Cuttack of the state. Hence, unlike KBK<br />

districts doctors prefer to serve in the district.<br />

• Majority of the people are conscious about health.<br />

Weaknesses<br />

• Inadequate manpower in all the medical units of the district. Lot of vacancies in the sanctioned<br />

strength mainly in the rank of Doctors, Health Workers, Health Supervisors, ANM, Laboratory<br />

Technicians, Drivers, Sweepers.<br />

• Buildings of most of the Health Institutions require major repairs, water supply, boundary<br />

walls, Staff quarters.<br />

• The <strong>District</strong> is prone to Cyclone, flood and Tsunami. During natural calamities, inadequate<br />

field staff poses lot of problem in serving people in distress.<br />

Opportunities<br />

• Corporate houses which are in the process of establishing Industries in the industrial area<br />

may be approached to provide equipments, sponsor infrastructures and provide ambulances to<br />

meet the needs of the district.<br />

• Implementation of NRHM<br />

Threats<br />

• Solid waste generate from Hospitals, urban areas may create health hazards if not disposed<br />

off properly.<br />

TSI: NABARD Consultancy Services (NABCONS) 71


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

3.1. Background:<br />

CHAPTER III<br />

DISTRICT VISION – 2020<br />

CORRESPONDING TO ANNUAL PLAN <strong>2011</strong>-<strong>12</strong><br />

In a Participatory Development <strong>Plan</strong>ning process, a vision document is essential as it stirs<br />

the imagination and motivates all segments of society to greater efforts for overall holistic<br />

development. As rightly told by former President of India, Dr. A.P.J. Abdul Kalam, “a vision<br />

is not a project report or a plan target. It is an articulation of the desired end results in<br />

broader terms”. Without a vision, plan documents are incomplete. Keeping this in view, it<br />

has been made essential under the process of <strong>Comprehensive</strong> <strong>District</strong> <strong>Plan</strong>ning to prepare<br />

Vision 2020 statement through a participative process starting from the grassroots to<br />

perceive the status of district in terms of overall holistic development over the next 10-15<br />

years. Such a vision statement would be a reference and guiding document during the<br />

process of development of a district. A basic requirement of Vision 2020 Statement is path<br />

of growth and development considering the strength, opportunities, weakness and threats.<br />

The vision statement is neither a prediction of what will actually occur, nor simply a wish<br />

list of desirable but unattainable ends. Rather it is a statement of what we believe is<br />

possible for this district to achieve, provided we are able to fully mobilize all the available<br />

resources – human, natural, organizational, technological and financial.<br />

The objective of <strong>District</strong> vision is to arrive at an intergraded, participatory coordinated idea<br />

of development of local area starting from the grass roots, as what would be the perspective<br />

of development over the next 10 year. It deals with<br />

• What are the needs and potential of the district?<br />

• What are the attainable level over a period of time?<br />

• What goals to be achieved?<br />

Vision 2020 document of district will address three aspects of development.<br />

• Human resource development<br />

• Infrastructure development<br />

• Productive sector development<br />

Human resource development indicator will cover health, education, women and child<br />

welfare, social justice and availability of basic minimum services. Infrastructure<br />

development will cover the target under Bharat Nirman as applicable to the district.<br />

Productive sector would consider what the potential of the district is and what can be<br />

reached by 2020, considering the natural and human resources available in the district.<br />

3.2. Vision 2020 statement:<br />

<strong>Balasore</strong>, a district lying in coastal belt of Orissa is a model district of the country where<br />

development of agriculture and allied sectors mainly fishery, livestock rearing, horticulture<br />

and agro-based industries is the key to overall growth in rural economy and ensuring<br />

sustainable rural livelihood. Such a development approach will make the district unique in the<br />

state where there will be equitable growth in all the sectors with equitable benefits to the<br />

citizens without compromising quality of life and discrimination due to gender, caste or creed.<br />

3.3. Sector wise Vision Statement/Development Goals for the year 2020:<br />

Agriculture<br />

• The present confidence of farmers on cultivation and self reliance is not only<br />

maintained, but also enhanced to a greater extent.<br />

• Agricultural land is about 60% of the total geographical area of the district. Conversion<br />

of agricultural land for other purposes is discouraged and utilization of aerial/vertical<br />

space for habitation purpose is encouraged. Additional land is brought under<br />

TSI: NABARD Consultancy Services (NABCONS) 72


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

cultivation through construction of drainage channels, embankments, flood and water<br />

logging control structures.<br />

• Seed Replacement Rate (SRR) increased up to 50 percent. This is achieved through seed<br />

village and other programmes.<br />

• SRI (System of Rice Intensification) is adopted in almost 75% of the paddy growing<br />

areas. This reduces the cost of rice cultivation.<br />

• Adoption of organic farming technology in 25% of the vegetable, pulse and oilseed<br />

growing areas. Vermicompost units need to be established and Organic Cluster Village<br />

concept will be introduced for ease in cultivation, marketing etc. Assistance and<br />

support is extended to farmers for easy and low cost certification procedure of organic<br />

products and necessary market linkages including export.<br />

• Promotion of non-conventional highly remunerative crops like sunflower, groundnut<br />

spices etc. in growing areas of conventional crops. Crop diversification in almost 50% of<br />

the total extent of medium and upland available in the district.<br />

• Increase in productivity of pulses and oilseed crops through adoption of improved<br />

agricultural technologies.<br />

• Area under aromatic rice, Jute and sugarcane is increased in feasible areas for better<br />

returns from small landholdings.<br />

• Germplasm of indigenous varieties like saline tolerant, water logging resistant local<br />

varieties is preserved for future use in scientific research.<br />

• Development of low cost cold storage facility at GP level and large cold storages at Block<br />

level through private entrepreneurs.<br />

• Mechanization of selected labour intensive farming operations in 25% of the cultivated<br />

areas of the district. Popularization of farm implements is carried out on a large scale.<br />

• Establishment of Agro Technology and Market Information Center at Block level to cater<br />

to the needs of farmers. This includes a soil testing laboratory keeping in view salinity<br />

problem in the soils of the district.<br />

• Credit to the farmers is available at door step at low rate of interest, backed by<br />

farmer friendly insurance packages and hassle free sanctions. High rate of<br />

subsidy for farm machineries.<br />

• Coverage of all eligible farmers under Kissan Credit Cards scheme and RKBY<br />

(Rashtriya Krishi Bima Yojana). Vigorous publicity on KCC and RKBY (Rastriya<br />

Krishi Bima Yojana) is undertaken to boost ground level credit under the sector.<br />

• Adequate field staffs are posted with provision for staff quarters and mobility.<br />

• Survey of the land development work, viz. land leveling, bunding, reclamation, etc. in<br />

respect of private holdings is conducted & applications of the interested farmers are<br />

sponsored to various banks for financing under the sector.<br />

• Large extent of fallow lands on account of water logging & saline areas are developed by<br />

reclamation/treatment for making them suitable for cultivation.<br />

• Paddy cum Pisciculture is practiced in potential areas encouraged by the department.<br />

Horticulture<br />

• Establishment of private nurseries to generate employment and production of sufficient<br />

planting material.<br />

• Revival of all Block level nurseries, to act as resource points for the farmers.<br />

• Backyard plantation of fruit trees to meet the nutritional requirements of children as<br />

well supplements family income.<br />

• Floriculture and vegetable cultivation is promoted as an enterprise on large scale in<br />

rural areas of the district.<br />

TSI: NABARD Consultancy Services (NABCONS) 73


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• At least 50% coverage of fruit orchards and vegetable gardens by sprinkler and drip<br />

irrigation system.<br />

• Large and medium farmers take up environment controlled cultivation through<br />

establishment of green houses, shade net houses, and mulching.<br />

• Food processing units mainly for fruits, vegetables and spices established by<br />

entrepreneurs in all the blocks of the district.<br />

• Mushroom, Beekeeping and Floriculture are given due weightage in all horticulture<br />

related development programmes.<br />

• Development of low cost cold storage facility at GP level and large cold storages at Block<br />

level through private entrepreneurs. Promotion of refrigerated vans on large scale as a<br />

part of cold chain management.<br />

• SHGs are encouraged to take up agriculture/land based economic activities like<br />

minor irrigation, development of waterlogged/saline infected land, farm machinery,<br />

nurseries, post harvest products and other allied activities of animal husbandry,<br />

fishery besides cottage and village industries under non-farm sector .<br />

• Cultivation of medicinal plants like Amla, Stevia, Lemon grass, Tulsi, Bacha, Pipli,<br />

Satwari etc. are encouraged by Govt. Dept and banks in the district. Medicinal plants<br />

like Tulsi, Thalkudi, Ghritkunary, Bramhi, Aswagandha and Patal Garud are grown by<br />

farmers sporadically as backyard plantation for their household requirement. A few<br />

medicinal nurseries have been developed by farmers in Nilgiri, Khaira blocks and small<br />

patch plantation in Simulia and Jaleswar blocks of the district.<br />

• Adequate field staffs are posted with provision for staff quarters with mobility.<br />

Irrigation<br />

• Successful completion of Irrigation Projects under NABARD-RIDF.<br />

• Irrigation potential is increased to 70% of the cultivated land in Rabi season, and<br />

adoption of water management practices in command areas.<br />

• In horticultural crops sprinklers and drip irrigation systems is promoted.<br />

• The defunct LIPs damaged due to flood/cyclone are made functional and formation of<br />

Pani Panchayat expedited.<br />

• 91% of the villages are electrified. Hence Agriculture department and OLIC mobilize<br />

applications under Biju Krushak Vikas Yojana (BKVY) for creation of LI points.<br />

• The 35% irrigation deficient blocks are successfully covered under 35% Master<br />

Irrigation <strong>Plan</strong>.<br />

• Sustainability of all irrigation projects is ensured through involvement of Pani<br />

Panchayats in water sharing, water management and operation and maintenance of<br />

irrigation systems in command areas.<br />

• Construction of water harvesting structures, renovation of ponds to meet the irrigation<br />

requirement of farmers.<br />

• Promotion of Shallow Tube Wells on individual farmer basis.<br />

• Exploitation of ground water potential through dug wells is encouraged.<br />

• Assessment of ground potential is updated/circulated on a regular basis. Problem of<br />

saline ingression is surveyed on Panchayat basis.<br />

• Steady uninterrupted power supply is ensured for agricultural pump sets and LI points.<br />

Animal husbandry<br />

• Population of Crossbreed cattle is low in the district. Artificial Insemination Centers<br />

function at each Gram Panchayat for large scale up gradation of indigenous breeds of<br />

cattle.<br />

• Livestock Aid centers are established in 162 deficient Gram Panchayats.<br />

TSI: NABARD Consultancy Services (NABCONS) 74


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Per capita milk, meat and egg availability crosses that of State figures.<br />

• A transit dairy farm is set up to stabilize milk yield of cows and buffaloes bought from<br />

out side and help farmers to select the animals. The farmers can also be given on-farm<br />

training in dairy.<br />

• Rearing of buffalo is encouraged, which are resistant to climatic stress and fetches<br />

higher price for milk due to more fat and SNF content.<br />

• Dairy Cooperative Societies are revitalized to act as effective channel for supply of feed,<br />

medicine and other health care facilities and also provide market support to the<br />

farmers.<br />

• Formation of meat and egg production cooperative society.<br />

• Hatchery is setup one in each block under management of NGOs/SHGs/Private<br />

entrepreneurs. Central grower unit and satellite layer farming projects are required to<br />

help small layer farmers.<br />

• A poultry feed plant of 10 ton capacity per hour may be established.<br />

• Promotion of backyard poultry on a large scale.<br />

• Barren and wasteland under the jurisdiction of Gram Panchayats to be cover up by<br />

suitable fodder crops. Assistance under Grass Land and Grass Reserve (GLGR)<br />

programme of GoI to be availed for the purpose. Feeding of Azolla and Urea Treated<br />

Paddy Straw is practiced by all cattle owners of the district.<br />

• Establishment of one model Farming System in each Block in which under one unit<br />

poultry, duckery, fishery, fruit crops can be cultivated successfully for higher income to<br />

the farmers. Technical support may be provided by KVK of OUAT.<br />

• Promoting goatery through SHGs, NGOs and Private entrepreneurs. Introduction of<br />

Artificial Insemination in Goats.<br />

• Mobile Veterinary Hospitals with helpline numbers is introduced in sample blocks of<br />

the district on trial basis. Farmers to access the Mobile unit through telephone call and<br />

avail the services on payment of cost.<br />

• Provision for staff quarters, laboratories & training halls in each veterinary institutions<br />

with boundary walls. Each field staff and doctors to be provided with conveyance<br />

allowances.<br />

Pisciculture<br />

• The production of fresh water fishery, brackish water fishery and marine fishery is<br />

increased to 60%, 40% and 90% of the production potentials, respectively. This requires<br />

an increase in production level by almost 50%.<br />

• Since a lot of low lying and water logged areas are there in the district, at least 200Ha<br />

new water area under brackish water sector & 70 Ha under fresh water sector are to be<br />

developed annually for the coming 5 years through different schemes.<br />

• All active fishermen of BPL category are provided with low cost house, boat, and nets.<br />

• All fishermen villages, fishery clusters are well-connected by road and are electrified.<br />

• The unutilized recourses under brackish water sector are developed through BFDA.<br />

(Brackish Water Fish Farmers Development Agency)<br />

• Renovation of existing defunct tanks under private and Govt. ownership. These are to<br />

be covered under different on going programs like MGNREGS/RKVY/SGSY water shed<br />

development Mission/FFDA etc.<br />

• Establishment of at least <strong>12</strong> private fish seed nurseries, one in each block.<br />

• Aqua feed shops is established in each block headquarter to meet the requirement of<br />

fish farmers.<br />

TSI: NABARD Consultancy Services (NABCONS) 75


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Training, awareness camp, exposure visit & skill up gradation. – Scientific training for<br />

skill up gradation of farmers, exposure visit for progressive farmers, entrepreneurs and<br />

interested educated youths will be arranged.<br />

• Uninterrupted power supply to Ice plants, aquaculture farms.<br />

• Credit requirement – Bankers come forward in financing Pisciculture loan since huge<br />

investment is required for excavation & inputs. Subsidy requirement – Subsidy should<br />

be given immediately on completion of project.<br />

• Extension services are strengthened.<br />

• Provision for insurance for inland aquaculture.<br />

• The district has large number of derelict and semi derelict G.P. tanks. The long term<br />

lease allocation policy is simplified to enable suitable entrepreneurs to take up<br />

Pisciculture in these ponds. SHGs are given preference for leasing/allocation.<br />

• Improved methods of integrated fish farming under intensive/semi intensive<br />

•<br />

Pisciculture is popularized. Innovative schemes of poly culture & pearl culture are<br />

taken up experimentally.<br />

Fresh water prawn as monoculture is popularized for which MPEDA support is<br />

available.<br />

• Dry fish units with infrastructure for procurement, packaging, drying platform and<br />

godowns are setup in coastal blocks.<br />

• Renovation of private farm ponds and Panchayat tanks are taken up, with bank finance<br />

for Pisciculture.<br />

• Fish Cooperatives are organized and defunct societies revived.<br />

• Integrated fishery with horticulture, poultry, duckery may be popularized by developing<br />

suitable demonstration model. Paddy cum Pisciculture model is encouraged.<br />

• Ice plants, hatchery, dry fish packaging and processing units are developed in private<br />

sector with banks financial support.<br />

• Infrastructure like fishing harbour, approach road is developed with RIDF support.<br />

Industry:<br />

• Clusters on different sectors like rice mills, agro based industries, ice plants, marine<br />

based industries, automobile spares, auto servicing, I.T. services, etc. have been set up<br />

and maintained at specific places.<br />

• Food processing industrial clusters utilizing agriculture, horticulture & marine<br />

resources are set up in potential areas of the district.<br />

• The entrepreneurs are guided to establish enterprises under subsidy linked schemes<br />

like REGP and SIDBI schemes.<br />

• Promotion of 2000 new enterprises in the district by the end of the year 2020.<br />

• Promotion of 200 Self-Help-Groups under the schemes of SIDBI by the year 2020 in the<br />

areas of wood carving, bamboo craft, appliqué, terracotta, jute and paddy craft.<br />

• Under the self-employment programme, employment opportunity to 10000 educated<br />

unemployed youth in the business sector is available by the year 2020.<br />

• The existing handicraft cooperative societies and industrial co-op. societies are<br />

revived/revamped.<br />

• Industrial estates are developed properly with infrastructure facilities and power<br />

supply. Entrepreneurs are also encouraged to set up units in the industrial growth<br />

centre constructed by IDCO.<br />

• Strategy plan for development of rural industries may be prepared by DIC with available<br />

potential/natural endowment in each block. Cluster development may be taken up in<br />

respective areas for group of artisans/craftsman. Suitable craftsmen, artisans may be<br />

TSI: NABARD Consultancy Services (NABCONS) 76


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

encouraged to set up units like Bell Metal works, terracota, golden grass & Nalia grass,<br />

etc.<br />

• REDP and other skill upgradation training are arranged by DIC in coordination with<br />

NABARD and NGOs. Polytechnic school/ITI may be setup to develop skilled manpower<br />

to help self employment/wage employment.<br />

Handloom:<br />

• Average income per weaver per loom per month in the district is Rs.<strong>12</strong>000/-. Doubling<br />

the present income requires provision of skill up gradation training, technological<br />

intervention, and product diversification and market incentives.<br />

• The production of cloth is enhanced to 10 lakh sq. meters from the present production<br />

of 4 lakh sq. meters. This is to be achieved with same number of weavers but with<br />

provision of modernized looms. The high demand of handloom products and availability<br />

of traditional weavers families in the district is an added opportunities to achieve the<br />

target set for 2020.<br />

• Common Facility Center (CFC) is set up in all villages having more than 60 weavers.<br />

These CFC will be beneficial for lot of activities like pre-loom, post loom activity,<br />

training, workshops and buyer seller meet etc. CAD system is provided to these CFCs in<br />

phases.<br />

Panchayati Raj<br />

• All the Gram Panchayats have adequate infrastructure like building, meeting hall,<br />

electricity, computer, telephone etc. to function as a grass root governance institution.<br />

• Single window system is introduced in all Gram Panchayats to cater to the requirement<br />

of beneficiaries of various programmes.<br />

• Adequate manpower, both technical and non-technical is placed in the Block offices so<br />

as to oversee the developments in the area under their jurisdiction.<br />

• All the twelve Block offices are equipped with MIS. The GoI sponsored/funded<br />

programmes now-a-days requires MIS at grass root level so that progress reports,<br />

utilization certificates etc. are sent regularly for timely release of funds.<br />

Rural Development<br />

• All the 289 Gram Panchayats of the district are connected with all weather road,<br />

electricity, safe drinking water and sanitation facilities.<br />

• All houseless persons are provided with houses.<br />

• There is no unemployment among potential workforce.<br />

• Disaster Relief and Rehabilitation cell operates in all flood and Tsunami prone GPs to<br />

provide emergency services to the affected. Relief and Rehabilitation operation is carried<br />

out with the participation of community leaders.<br />

• Sustainability of all assets created under MGNREGS and other programmes is ensured.<br />

User groups for assets are formed and handed over the charges of operation and<br />

maintenance.<br />

• Funds of different programmes flow in time.<br />

• Adequate manpower, both technical and non-technical/executive is provided so that all<br />

procedural requirements are met and funds are released in time.<br />

• The price guidelines prepared for different schemes like cost of one house under IAY,<br />

material cost of different works under MGNREGS etc. are prepared as per actual<br />

market price with scope for inflation.<br />

Health and sanitation<br />

• IMR & MMR is reduced by 50%.<br />

• All health institutions are adequately staffed. None of the posts remain vacant for a<br />

week even.<br />

TSI: NABARD Consultancy Services (NABCONS) 77


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Malaria, diarrhea, filaria, are controlled significantly. All adult and adolescent of the<br />

district are well aware of the causes and prevention of HIV/ AIDs.<br />

• All categories of health institutions starting from DHH to Sub Center have adequate<br />

staff quarter inside the campus. All the sub centers to act like a residence-cum-sub<br />

center so as to provide emergency first aid during odd hours.<br />

• The bed strength of <strong>District</strong> Headquarter Hospital at <strong>Balasore</strong> is 500. It has specialty<br />

departments with well equipped laboratory and equipments in Medicine, Gynecology,<br />

Neurosurgery, Cardiology, Nephrology, Pediatrics, Surgery, Orthopedics etc.<br />

• The Block level hospitals have well equipped pathological laboratories along with<br />

specialists in the field of pediatrics, gynecology, medicine and surgery. The Block<br />

Hospitals have minimum bed strength of 150 and ambulance facilities.<br />

• The PHCs & PHCs (New) have adequate infrastructure like building, staff quarter,<br />

electricity, ambulance, pathological laboratory etc.<br />

• Sanitation, Security and waste management system is practiced and maintained<br />

properly with the supervision of Zilla Swasthya Samiti.<br />

• Selling of fake and expired medicines is stopped completely.<br />

• Capacity building and recruitment of AYUSH doctors successfully stops treatments by<br />

local quacks.<br />

• Public Health Department and Health Officers of Urban local bodies make adequate<br />

provisions for disinfection, mosquito eradication etc. and maintain hygiene in their<br />

respective area of jurisdiction.<br />

• All the households are covered under Total Sanitation Campaign and safe drinking<br />

water is available throughout the year.<br />

Forest<br />

• Existing forest cover is preserved along with additional casurina and other plantation.<br />

• Successful protection and conservation of forests is ensured through community forest<br />

management/VSS.<br />

• Energy plantations are taken up in barren and wasteland of each gram Panchayats.<br />

Panchayats can generate resources by selling wood to Biomass based Gasifiers.<br />

Gasifiers to be set up by private entrepreneurs to meet the energy demand of rural<br />

areas.<br />

• Avenue and Silvi-cultural plantations are taken up to satisfy local needs of fuel, fodder<br />

and sericulture, etc.<br />

Environment<br />

• Vehicular, industrial, and other kinds of pollution of air, water, and soil is effectively<br />

controlled through regular and computerized public monitoring systems, social audits,<br />

and strict enforcement of law.<br />

• Solid waste management is done properly in urban and port areas.<br />

Urban development<br />

• Adequate roads, sewerage/drainage channels, drinking water, and other facilities are<br />

developed.<br />

• Bus Stand is developed to meet the requirement till 2050.<br />

• Truck terminals are developed in market area to avoid congestion.<br />

• Proper Solid Waste Management System is put in place.<br />

• Earthquake-resistant structures and Rain water harvesting are mandatory in case of<br />

new buildings constructed.<br />

• Multi-storied buildings are promoted so as to utilize aerial space.<br />

TSI: NABARD Consultancy Services (NABCONS) 78


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Parking space, play grounds, parks, green belts, and cultural centers, etc. are<br />

implemented under PPP mode as per the plan.<br />

• Roads are upgraded, widened with one way traffic system.<br />

• Encroachment of roads and vacant government land are minimized.<br />

Education<br />

• The district is highly literate.<br />

• Education facilities in Government Schools are improved so that the community is<br />

attracted more towards these schools than Public Schools.<br />

• Sarva Sikshya Abhiyan meets its objective satisfactorily.<br />

• Each Block has adequate number of Schools and colleges, without any regional<br />

imbalances. These institutions have adequate infrastructure and teaching staff.<br />

• Vocational training centers in the field of agriculture, animal husbandry, fishery,<br />

sericulture, handloom, horticulture are established at least in one of the leading college<br />

at block level. This will provide education required for self – employment of the youths.<br />

• All the educational institutions have adequate infrastructure like buildings, boundary<br />

wall, play ground, toilets, laboratory, library etc. Creation of infrastructure and its<br />

maintenance with the involvement of parents, community leaders.<br />

• Hostel facilities to be developed in each High school to be availed by children of APL<br />

families on payment of cost and children of BPL families on subsidized cost. This will<br />

help in all round development of students in education as well extra curricular<br />

activities.<br />

• Dissemination of knowledge is extended by establishing Pathagars, Reading Rooms, in<br />

rural area and optimum use of the Gramsat.<br />

• Adequate number of teachers is placed in each of the educational institution.<br />

• Development of value based education, adolescence education, sex education; HIV will<br />

be incorporated in the curriculum with higher degree of flexibility.<br />

• Computer based education, TV, and improved means of communication will be<br />

incorporated in the education system to exploit e-based knowledge. This will offer an<br />

exciting new method of learning, making the class room lively and interesting.<br />

• The physical distance between teachers’ residence and work place will be reduced by<br />

local recruitment of Sikhya Sahayak.<br />

• Adequate numbers of technical institutions are opened in the district.<br />

Social welfare:<br />

• Each habitation has one well equipped Anganwadi center.<br />

• All Anganwadi centers in the district have their own building, electricity, playing<br />

equipments and necessary infrastructure.<br />

• The block level ICDS offices need to be strengthened to meet the requirement.<br />

• All deserving persons/groups are secured socio economically through various ongoing<br />

welfare schemes.<br />

• Malnutrition in children reduced to minimum.<br />

• Anganwadi centers effectively function to meet the development of women, children<br />

and adolescent girls.<br />

• Each GP has residential schools for SC & ST students.<br />

• Vocational and Industrial Training Institutes to be set up with reservation for SC/ST<br />

students.<br />

TSI: NABARD Consultancy Services (NABCONS) 79


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Information, public relation, tourism and culture<br />

• The <strong>District</strong> Information and Public Relation Office are active with adequate number of<br />

staff and infrastructure.<br />

• One library cum information center is opened in each block with provision of books,<br />

news papers, periodicals and internet connection.<br />

• Block and <strong>District</strong> level cultural meet cum exhibition is conducted every year. In these<br />

cultural meets folk dances like Kendra songs, Khanjani, Palla, Daskathia,<br />

•<br />

Ghodanachha will be promoted to preserve cultural identity of the district.<br />

All the important tourist places are improved with provision of good quality roads,<br />

street lights, security and guest houses/hotels.<br />

Sports<br />

• One good quality Indoor stadium is established at <strong>Balasore</strong> town.<br />

• The <strong>District</strong> Sports Office is active with adequate number of staff and infrastructure.<br />

• Each Gram Panchayat has a developed play ground and each block a mini stadium.<br />

• Tournaments, Athletic meets are organized every year at GP level, then at block level<br />

and at district level. Participants in <strong>District</strong> Athletic Meet will be selected from grass<br />

root competitions, tournaments.<br />

Roads and Railways<br />

• The upgrading, widening of Jaleswar- Chandaneswar road is completed in time.<br />

• Major rural roads of the district are upgraded with adequate drainage facility.<br />

• Important roads of the district are capable to meet the adverse impact of flood and<br />

other natural calamities.<br />

3.4. Future Growth Engines<br />

In this section important sectors and activities/programmes which can bring significant<br />

growth in the economy of the district is presented. These sectors have a potential to become<br />

future growth engines for overall development of the district.<br />

Agriculture<br />

In agriculture sector the district at present performs average in the state. The district<br />

performs average among other districts in productivity of important crops, which is the<br />

main reason for poor economic status of the farmers. The district has a deficit of rice and<br />

other farm products. But the farmers have the required skill and expertise in crop<br />

cultivation practices. There is lot of scope for improvement. If activities/programmes are<br />

taken up effectively then this sector can be a future growth engine of the district. In the<br />

absence of mineral resources and major/medium industries, agriculture sector is one of the<br />

important sectors which can bring prosperity to the district. Emphasis needs to be given to<br />

the following activities.<br />

• SRI method of cultivation of paddy.<br />

• Promotion of paddy-cum-Pisciculture.<br />

• Organic farming, certification and market linkage for selling of organic products.<br />

• Land development – construction of adequate drainage channels to prevent water<br />

logging and easy drain out of flood water.<br />

• Construction and renovation of farm ponds, installation of STW to increase<br />

irrigation potential in Rabi season.<br />

TSI: NABARD Consultancy Services (NABCONS) 80


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Fisheries<br />

Because of 81 km long coastline and flowing of 5 rivers in the district, there is huge<br />

potential for fishery sector. In case of brackish water and fresh water fishery present<br />

production is only 22 and 30% of the total potential in the district, respectively. Similarly,<br />

in marine sector, present production is 44% of the available potential. There is huge scope<br />

for development in this sector. The following activities may be taken up on priority basis for<br />

significant growth in this sector.<br />

• Development of tank and ponds suitable fresh water resources in the district.<br />

• Development of water area suitable for brackish water shrimp farming.<br />

• Mechanized vessels are to be equipped with sophisticated electronic devices like<br />

GPS, Fish finder etc.<br />

• Display boards transmitting satellite data about availability of fish in the sea are to<br />

be installed in all landing centers.<br />

Horticulture<br />

The climate of the district is most suitable for production of a variety of vegetable crops,<br />

fruits, flowers, mushroom and spices. Proximity of the district to major cities like Dhamra,<br />

Kalinga nagar, Baripada, Bhadrak, Kolkata, Cuttack, and Bhubaneswar offer excellent<br />

market opportunities for horticultural products. The following are the activities suggested<br />

for development of horticulture sector in the district.<br />

• Establishment of private nurseries.<br />

• Promotion of backyard plantation of fruit trees.<br />

• Floriculture.<br />

• Setting up of Food processing units.<br />

• Development of low cost cold storage facility at GP level.<br />

• Setting up of large cold storages at Block level through private entrepreneurs.<br />

• Promotion on refrigerated vans on large scale as a part of cold chain.<br />

Animal husbandry<br />

Animal husbandry is another sector which provides enough scope for development in the<br />

district and can be one among future growth engines. In this sector, the following<br />

activities/programmes can be taken up on priority basis.<br />

• Artificial Insemination Centers is at each Gram Panchayat for large scale up<br />

gradation of indigenous breeds of cattle. Introduction of Artificial Insemination in<br />

Goats.<br />

• Formation of meat and egg production cooperative society.<br />

• Hatchery is setup one in each block under management of NGOs/SHGs/Private<br />

entrepreneurs.<br />

• Promotion of backyard poultry on a large scale.<br />

• Barren and wasteland under the jurisdiction of Gram Panchayats to be cover up<br />

under suitable fodder crops. Assistance under Grass Land and Grass Reserve<br />

(GLGR) programme of GoI to be availed for the purpose.<br />

• Establishment of one model Farming System in each Block in which under one unit<br />

poultry, duckery, fishery, fruit crops can be cultivated successfully for higher<br />

income to the farmers. Technical support may be provided by KVK of OUAT.<br />

TSI: NABARD Consultancy Services (NABCONS) 81


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Mobile Veterinary Hospitals with helpline numbers is introduced in sample blocks of<br />

the district on trial basis. Farmers to access the Mobile unit through telephone call<br />

and avail the services on payment of cost.<br />

Agro Industries<br />

<strong>Balasore</strong> district has immense potential in food processing and marine based industries.<br />

Paddy and fish are the chief commodities in the district followed by vegetables, coconut and<br />

sunflower. With improvement in food processing, the farmers of the district will get better<br />

price for their produce and this will create additional employment opportunities. In this<br />

sector the district has the potential in enterprises like Jute based units, Spices unit, Oil<br />

Ghanies, Desiccated coconut, pickles, Jan, Jelly, Fish processing, Fish pickle product etc.<br />

Huge fish harvesting create a vast demand for ice blocks. The upcoming of Dhamra Port<br />

and proposed ship building yard in nearby Bhadrak district is going to open up the market<br />

of industrial products.<br />

3.5. Projections for Development Indicators during the plan period:<br />

Projections in Education sector<br />

Education Indicators<br />

Current<br />

level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision<br />

2020<br />

Literacy rate (Total) (2001<br />

Census)<br />

Male<br />

Female<br />

Total<br />

81.69<br />

58.90<br />

70.56<br />

90.68<br />

65.38<br />

78.32<br />

97.21<br />

70.09<br />

83.97<br />

Literacy rate (Rural) (2001<br />

Census)<br />

Male<br />

Female<br />

Total<br />

81.16<br />

57.40<br />

69.52<br />

90.09<br />

63.71<br />

77.17<br />

96.58<br />

68.31<br />

82.73<br />

Literacy rate (Urban) (2001<br />

Census)<br />

Male<br />

Female<br />

Total<br />

85.77<br />

71.20<br />

78.80<br />

95.20<br />

79.03<br />

87.47<br />

100.00<br />

84.73<br />

93.77<br />

Literacy rate in SC Population (2001 Census) 59.41 65.95 70.70<br />

Literacy rate in ST Population (2001 Census) 41.88 46.49 49.84<br />

Out of School Children (6 to 11 Age group) (% to total child population)<br />

All Community 1.31 1.18 0.66<br />

SC 1.46 1.31 0.73<br />

ST 2.95 2.66 1.48<br />

Minority 1.79 1.61 0.90<br />

Out of School Children (11 to 14 Age group) (% to total child population)<br />

All Community 3.58 3.22 1.79<br />

SC 4.32 3.89 2.16<br />

ST 7.44 6.70 3.72<br />

Minority 5.76 5.18 2.88<br />

Projections in Health Sector<br />

Indicators<br />

Current<br />

level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision<br />

2020<br />

Sex ratio (2001 Census) All age group 953.00 981.78 1000.00<br />

Crude Birth Rate (SRS 2008) (per 1000<br />

Population)<br />

20.56 18.13 16.65<br />

Crude Death Rate (SRS 2008) (per 1000<br />

Population)<br />

10.00 9.00 8.00<br />

Infant Mortality Rate (NFHS-III) (Per 1000<br />

Live Birth)<br />

63.00 56 32<br />

Total Fertility Rate (SRS 2007) 2.90 2.80 2.50<br />

Maternal Mortality Rate (SRS 2004-06) (per<br />

1,00,000 live births)<br />

315.00 278 165<br />

Contraceptive Prevalence rate (Any method)<br />

(NFHS-III)<br />

56.50 65.00 90.00<br />

Contraceptive Prevalence Rate (Modern 48.93 55.00 90.00<br />

TSI: NABARD Consultancy Services (NABCONS) 82


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicators<br />

Methods) (NFHS-III)<br />

Contraceptive Prevalence Rate (Female<br />

sterilization) (NFHS-III)<br />

Contraceptive Prevalence Rate (Male<br />

sterilization) (NFHS-III)<br />

Contraceptive Prevalence Rate (IUD) (NFHS-<br />

III)<br />

Contraceptive Prevalence Rate (Pill) (NFHS-<br />

III)<br />

Contraceptive Prevalence Rate (Condom)<br />

(NFHS-III)<br />

% of women who received ANC (Ante Natal<br />

Care) (NFHS-III)<br />

% of women who received 3 ANC visits<br />

(NFHS-III)<br />

% of women reported Institutional Delivery<br />

(CNAA 2006-07)<br />

Vaccination Coverage (% of children) (NFHS-<br />

III)<br />

Children age below 3 years who are<br />

underweight (%) (NFHS-III)<br />

Children age 6-35 months who are anemic<br />

(%)(NFHS-III)<br />

Projections in Productive Sector<br />

Current<br />

level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision<br />

2020<br />

37.56 45.00 90.0<br />

1.65 1.85 5.00<br />

0.54 0.61 0.75<br />

8.45 9.48 15.00<br />

3.65 4.10 6.50<br />

88.60 95.00 100.00<br />

69.00 78.00 95.00<br />

43.54 50.00 75.00<br />

74.00 83.03 100.00<br />

44.00 40.00 25.00<br />

74.00 65.00 40.00<br />

Agriculture<br />

Indicators<br />

Productivity of major crops<br />

Kharif<br />

Current level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision 2020<br />

Paddy 1.963 2.205 2.454<br />

Maize 1.156 2.252 1.445<br />

Arhar 0.821 0.860 1.026<br />

Mung 0.515 0.550 0.644<br />

Biri 0.527 0.550 0.659<br />

Groundnut 1.135 1.521 1.419<br />

Til 0.445 0.460 0.556<br />

Castor 0.665 0.700 0.831<br />

Jute 1.455 1.799 1.819<br />

Mesta 0.998 1.000 1.248<br />

Sunhemp 1.052 1.100 1.315<br />

Sweet Potato 8.000 8.113 10.000<br />

Chilies 0.853 0.900 1.066<br />

Turmeric 2.398 2.449 2.998<br />

Ginger<br />

Rabi<br />

2.091 2.150 2.614<br />

Paddy 3.220 3.714 4.025<br />

Wheat 1.350 1.520 1.688<br />

Maize 1.205 2.935 1.506<br />

Mung 0.425 0.465 0.531<br />

Biri 0.505 0.555 0.631<br />

Kulthi 0.428 0.450 0.535<br />

Gram 0.796 0.850 0.995<br />

Cowpea 1.014 1.150 1.268<br />

Field Pea 0.886 0.950 1.108<br />

Groundnut 1.749 1.936 2.186<br />

TSI: NABARD Consultancy Services (NABCONS) 83


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicators Current level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision 2020<br />

Til 0.480 0.550 0.600<br />

Castor 0.600 0.608 0.750<br />

Mustard 0.389 0.450 0.486<br />

Sunflower 0.810 0.934 1.013<br />

Sweet Potato 8.000 9.501 10.000<br />

Potato 11.279 11.500 14.099<br />

Onion 8.139 8.814 10.174<br />

Chilies 0.934 0.970 1.168<br />

Coriander 0.490 0.550 0.613<br />

Garlic 3.026 3.231 3.783<br />

Sugarcane 65.850 70.250 82.313<br />

Horticulture<br />

Indicators Current level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision 2020<br />

% to area coverage in the State<br />

Fruits<br />

Mango 2.67 2.80 3.34<br />

Guava 2.26 2.37 2.83<br />

Citrus 2.95 3.10 3.69<br />

Litchi 3.05 3.20 3.81<br />

Sapota 2.13 2.24 2.66<br />

Banana 2.94 3.09 3.68<br />

Papaya 4.05 4.25 5.06<br />

Pine Apple 5.63 5.91 7.04<br />

Pomegranate 5.00 5.25 6.25<br />

Cashewnut 1.84 1.93 2.30<br />

Other fruits 1.09 1.14 1.36<br />

Coconut 2.16 2.27 2.70<br />

Flowers 0.00<br />

Marigold 4.98 5.23 6.23<br />

Rose 3.48 3.65 4.35<br />

Gladioli 5.79 6.08 7.24<br />

Tube rose 8.00 8.40 10.00<br />

Vegetables 4.66 4.89 5.83<br />

Spices 4.60 4.83 5.75<br />

Animal Husbandry & Fishery<br />

Indicators<br />

Current<br />

level<br />

Projection for plan<br />

period (<strong>2011</strong>-<strong>12</strong>)<br />

Vision<br />

2020<br />

Per Capita Availability of Milk per day (gm) 45 56 90<br />

Per Capita Availability of Egg per year (Nos.) 18 23 36<br />

Per Capita Availability of Meat per year (Kg) 1.826 2.283 3.652<br />

Per Capita Availability of Fish per year (Kg) 5.130 6.413 10.26<br />

TSI: NABARD Consultancy Services (NABCONS) 84


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER IV<br />

RESOURCE ENVELOPE FOR ANNUAL PLAN: <strong>2011</strong>-<strong>12</strong><br />

In any <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>, preparation of Resource Envelope and identification of<br />

Resource Gap in each development sector is a basic requirement. Resource envelope is<br />

basically created by adding all sources of fund flow to the district. The plans estimates for a<br />

year for each and every sector is finalized and the funds are supposed to be released<br />

accordingly. The release of funds may be one-time, or in installments. Sometimes additional<br />

funds may be released under specific circumstances. The resource envelope excluded from<br />

the estimated cost of programmes suggested by implementing agencies/officials indicates<br />

the resource gap. This gap implies that additional funds are to be ensured either from<br />

government sources or from other sources. The need for integrated local area plans based<br />

on specific requirements and needs of each area are identified from the beginning of<br />

planned development. Attempt has been made by TSI to identify grass root level<br />

requirement to that of district level to make the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> for the <strong>Balasore</strong><br />

<strong>District</strong>. The following table indicates the resource gap in the <strong>Annual</strong> <strong>Plan</strong> of <strong>Balasore</strong><br />

district for the year <strong>2011</strong>-<strong>12</strong>. The information was collected by TSI using the formats<br />

supplied by P & C Department.<br />

Table 4.1. Sector-wise Resource Envelope and Gap in <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

(Rs. in Lakhs)<br />

<strong>Plan</strong> Total Resource<br />

Sectors<br />

Gap filling sources<br />

Outlay Requirement Gap<br />

Agriculture & Allied 9790.97 <strong>12</strong>751.370 2960.400 MGNREGS & RIDF<br />

Rural Development 9039.31 9504.310 465.000 MGNREGS/RIDF<br />

Special Area Programmes 464.75 464.750 0.000 -<br />

Irrigation & Flood Control 5084.<strong>12</strong> 5092.<strong>12</strong>0 8.000 RIDF<br />

Energy 968.46 1403.460 435.000 BGJY<br />

Industry & Minerals 401.54 401.540 0.000 -<br />

Transport 19206.62 26968.620 7762.000<br />

Science, Technology &<br />

Environment<br />

MGNREGS/Finance<br />

Commission Grants<br />

66.43 66.430 0.000 -<br />

Social Services 33849.10 44924.900 11075.800<br />

General Services 296.99 3833.990 3537.000<br />

Total 79168.29 105411.49 26243.20<br />

NRHM, SSA, RIDF &<br />

Finance Commission<br />

Grants<br />

Finance Commission<br />

Grants<br />

For development of <strong>Balasore</strong> district in all sectors a sum of Rs. 105411.49 lakh has been<br />

proposed for the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>. Basing on the local requirement, Agriculture and<br />

Allied Activities, Rural Development, Transport, Irrigation & Flood Control and Social<br />

Services have given been high priority in <strong>Balasore</strong> district. The requirement based on the<br />

proposals received from grassroots level is Rs. 105411.49 lakh, as against plan outlay of Rs.<br />

79168.29 lakhs. Thus the resource gap is Rs. 26243.20 lakh, which can be filled up<br />

through additional allocation under flagship programmes namely, MGNREGS (Rs. 1037.00<br />

lakhs), PMGSY (Rs. 5225.00 lakhs), IAY (Rs. 1180.35 lakhs), CRSP (Rs. 38.10 lakhs),<br />

ARWSP (Rs. 1725.00 lakhs), NRHM (Rs. 2480.00 lakhs), SSA (Rs. 1717.50 lakhs), BGJY<br />

(Rs. 255.35 lakhs), BSVY (Rs. 269.60 lakhs), IHSDP (Rs. 432.00 lakhs), RKVY (Rs. 260.00<br />

lakhs), RIDF (Rs. 1753.40 lakhs) and from Finance Commission Grants (Rs. 9869.90 lakhs).<br />

TSI: NABARD Consultancy Services (NABCONS) 85


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sources<br />

Table 4.2. Abstract of Financial Resources available at <strong>District</strong> level<br />

(Rs.in lakhs)<br />

2009-10 2010-11 <strong>2011</strong>-<strong>12</strong><br />

Allocation<br />

Expenditure<br />

Central <strong>Plan</strong> 22538.94 14180.81 22429.49 22429.49 15491.46 15491.46<br />

Central Sponsored <strong>Plan</strong> 23183.27 22136.60 33305.85 33305.85 37420.89 37420.89<br />

State <strong>Plan</strong> 7696.48 8738.99 15596.22 15596.22 25055.33 25055.33<br />

Central/State Finance<br />

Commission Grants, Untied<br />

Funds from State<br />

3638.94 3543.48 1594.73 1594.73 <strong>12</strong>00.61 <strong>12</strong>00.61<br />

Total under <strong>Plan</strong> Schemes 57057.63 48599.88 72926.29 72926.29 79168.29 79168.29<br />

MLA/MP LAD Funds<br />

Local Revenue (Receipts<br />

825.00 787.56 900.00 900.00 1000.00 1000.00<br />

through taxes, cess<br />

available for local use)<br />

215.42 209.45 234.50 234.50 245.70 245.70<br />

Total 58098.05 49596.89 74060.79 74060.79 80413.99 80413.99<br />

TSI: NABARD Consultancy Services (NABCONS) 86<br />

Allocation<br />

Anticipated<br />

Expenditure<br />

Table 4.3. Details of Financial Resources available at <strong>District</strong> level<br />

(FY: 2009-10)<br />

(Rs.in lakhs)<br />

Department<br />

Central <strong>Plan</strong><br />

Sector/Sub-Sector/Scheme Allocation Expenditure<br />

Agriculture Seed Village Programme 9.830 7.290<br />

Agriculture RKVY 814.010 496.450<br />

Agriculture Coconut Development Board Programme 7.220 5.780<br />

Agriculture National Medicianal <strong>Plan</strong>ts Mission Programme 0.850 0.710<br />

Agriculture RKVY 3.750 3.550<br />

F & ARD SMILE Training 0.840 0.850<br />

SC&ST Dev Grants under Provision to Article 275 (1) 70.000 39.040<br />

SC&ST Dev Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 142.290 91.030<br />

Industry Prime Minister's Employment Generation Programme 230.000 224.000<br />

Handl. & Tex. 10% Rebate on Handloom Products 11.000 8.300<br />

Handl. & Tex. <strong>District</strong> Level Exhibition 2.000 0.000<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 9241.000 5198.070<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 5847.000 2638.000<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 6000.000 5321.400<br />

Forest & Env. Development of National Park, Sanctuary & Natural Reserves 29.750 29.750<br />

Forest & Env. Elephant Management Project - Talasari - HVBA 15.550 16.050<br />

Industry National APP training 1.400 1.310<br />

Sports & YA One time seed capital grant (PYKKA) 34.000 34.000<br />

Sports & YA <strong>Annual</strong> acquisition grant 3.100 3.100<br />

Sports & YA <strong>Annual</strong> operation grant 3.720 3.720<br />

Sports & YA Sports Competition 7.000 7.000<br />

H & FW National Programme for Control of Blindness (NPCB) 25.280 25.280<br />

H & FW Integrated Disease Surveillence Programme (IDSP) 10.150 10.150<br />

H & FW National Leprosy Eradication Programme (NLEP) 8.450 8.450<br />

H & FW IMCP <strong>12</strong>.750 0.000<br />

Lab. & Emp. National Child Labour Project 8.000 7.530<br />

Sub total 22538.940 14180.810<br />

Centrally Sponsored <strong>Plan</strong><br />

Agriculture Work <strong>Plan</strong>-Rice Development 36.940 5.480<br />

Agriculture Work <strong>Plan</strong>-Sugarcane Development 0.350 0.000<br />

Agriculture Work <strong>Plan</strong>-Farm Mechanisation 134.000 <strong>12</strong>8.620<br />

Agriculture Jute Technology Mission (MM-II) 14.210 11.580<br />

Agriculture ISOPOM (Pulses) 11.930 7.700<br />

Agriculture ISOPOM (Oil Seeds) 243.930 216.840<br />

Agriculture National Horticulture Mission 66.500 66.290<br />

Agriculture Micro Irrigation Programme 24.000 21.930<br />

Agriculture ISOPOM (Oil Palm) 6.600 6.360<br />

Allocation<br />

Expenditure<br />

<strong>Plan</strong>


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

Agriculture IWDP 95.890 0.000<br />

Agriculture NWDPRA 172.610 161.930<br />

F & ARD<br />

ASCAD (Assistance to State for Control of Livestock<br />

Diseases)<br />

0.650 0.590<br />

F & ARD Saving-cum-Relief Scheme 8.000 7.140<br />

F & ARD Group Accident Insurance Scheme 16.000 15.900<br />

Panchayatiraj Swarnajayanti Gram Swarozgary Yojana (SGSY) 962.110 1055.610<br />

Panchayatiraj National Rural Employment Guarantee Scheme (NREGS) 3016.780 1303.710<br />

Panchayatiraj DRDA Administration 219.520 <strong>12</strong>5.610<br />

DOWR Flood Management Programme (River Bank Protection Work) 1501.410 1501.410<br />

DOWR Flood Management Programme (Major Works) 928.910 507.440<br />

Energy Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 360.000 297.000<br />

Handl. & Tex. IHDS (Cluster Approach) 3.000 2.000<br />

Handl. & Tex. IHDS (Group Approach) 10.000 1.370<br />

Handl. & Tex. IHDS (Marketing Incentive) 6.000 9.160<br />

Handl. & Tex. Health Insurance for weavers 11.260 9.940<br />

Handl. & Tex. Mahatma Gandhi Bunakar Bima Yojana 2.300 1.180<br />

S & ME Sarba Sikshya Abhiyan (SSA) 6014.000 5926.900<br />

S & ME National Programme for Education of Girls at Elementary Level 60.000 46.620<br />

S & ME Kasturiba Gandhi Balika Vidyalaya (KGBV) 19.900 18.330<br />

H & FW Reproductive Child Health (RCH) 977.840 977.840<br />

H & FW Immunization 41.880 41.880<br />

H & FW National Rural Health Mission (NRHM) initiatives 944.430 944.430<br />

H & FW Revised National Tuberculosis Control Programme 35.100 35.100<br />

H & FW National Vector Borne Disease Control Programme 144.300 144.300<br />

Rural Dev. ARWSP - Sinking of Tube Well 199.910 161.100<br />

Rural Dev. ARWSP - Public Water Supply Scheme 913.<strong>12</strong>0 852.360<br />

H & UD Integrated Housing & Urban Development Programme 288.130 288.130<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 54.800 54.800<br />

H & UD Urban Infrastructure Development Scheme for Small & Medium Town 39.970 39.970<br />

H & UD National Urban Information System (NUIS) 0.300 0.300<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 17.690 17.690<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 13.000 13.000<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) <strong>12</strong>.000 13.630<br />

Panchayatiraj Indra Awas Yojana (IAY) 2500.000 2464.060<br />

W & CD Supplementary Nutrition Programme 1080.000 2394.260<br />

W & CD Mid Day Meal Programme 1974.000 2237.110<br />

Sub total<br />

State <strong>Plan</strong><br />

23183.270 22136.600<br />

Agriculture RIDF-XIII (PLIP) 536.200 519.000<br />

Agriculture Promotion of SRI programme 4.000 3.600<br />

Agriculture Mission Sakti Programme 1.000 0.960<br />

F & ARD Bird Flu Training 0.960 0.960<br />

F & ARD Skill Upgradation Training 0.750 0.720<br />

F & ARD Genetic Upgradation of Goat & Deworming 0.060 0.060<br />

F & ARD Development of Inland Fisheries and Aquaculture through FFDA 31.000 30.510<br />

Panchayatiraj Gopabandhu Gramin Yojana (GGY) 1000.000 929.630<br />

SC&ST Dev Construction of Hostel for ST girls 5.000 4.760<br />

DOWR Minor Irrigation Projects (NABARD - RIDF) 266.060 180.000<br />

DOWR Minor Irrigation - Biju Krushak Vikash Yojana 100.000 40.320<br />

DOWR Minor Irrigation- Biju Krushak Vikash Yojana 3.000 3.000<br />

DOWR Saline Embankment Improvement projects (NABARD - RIDF- XIV) 650.000 650.000<br />

DOWR Drainage Projects (NABARD - RIDF - XII) 130.710 681.280<br />

Energy Biju Gram Jyoti Yojana 465.000 420.290<br />

Industry Promotion of Industry Sector 3.500 3.270<br />

Handl. & Tex. Promotion of Handloom Industry 18.000 7.540<br />

Handl. & Tex. Workshed-cum-Housing 6.500 6.750<br />

Rural Dev. Minimum Needs Programme - Constituency Wise Allotment 60.000 60.000<br />

Rural Dev.<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

95.500 223.300<br />

Rural Dev. Completion of incomplete roads and bridges of RIDF and other schemes 40.000 55.000<br />

Rural Dev. Construction of Rural Roads & Bridge under RIDF 150.000 270.000<br />

Rural Dev. Minimum Needs Programme - Constituency Wise 50.000 50.000<br />

Rural Dev. Construction of Rural Road (Improvement/Widening/Critical Roads) 95.500 50.000<br />

TSI: NABARD Consultancy Services (NABCONS) 87


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

Rural Dev. Completion of incomplete roads and bridges of RIDF and other schemes 40.000 45.500<br />

Rural Dev.<br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

160.000 113.000<br />

Rural Dev. Minimum Needs Programme - Constituency Wise 50.000 50.000<br />

Rural Dev. Construction of Rural Road (Improvement/Widening/Critical Roads) 60.000 116.700<br />

Rural Dev. Construction of Rural Roads & Bridge under RIDF 496.000 515.920<br />

Forest & Env. Economic <strong>Plan</strong>tations 10.000 9.780<br />

Forest & Env. Communication & Building - Construction of quarters for forest guards 3.000 3.000<br />

Forest & Env. Bamboo <strong>Plan</strong>tation 0.410 0.440<br />

Forest & Env. Elephant Management <strong>Plan</strong> 6.950 6.760<br />

Forest & Env. Wildlife Protection and Conservation Measures 5.050 5.310<br />

S & ME Mass Education 14.230 15.850<br />

Sports & YA Organising Youth Festival 0.200 0.100<br />

H & FW Rural Ayurvedic Health Services 94.800 94.800<br />

H & FW Urban Ayurvedic Health Services 28.500 28.500<br />

H & FW Primary Health Care (Rural) 145.000 145.000<br />

H & FW Primary Health Care (Urban) 5.450 5.450<br />

H & UD<br />

Urban Water Supply Programme Provision of Over Head<br />

Tank and improvement of water supply to Jaleswar NAC<br />

69.400 66.200<br />

H & UD Infrastructure Grant towards Urban Tourism Destination Towns 29.310 29.310<br />

H & UD Road Development & Maintenance 82.670 82.670<br />

H & UD Urban Greenery 10.000 10.000<br />

H & UD Road Development & Maintenance 82.670 138.070<br />

H & UD Road Development & Maintenance 35.000 35.000<br />

H & UD Road Development & Maintenance 22.200 51.<strong>12</strong>0<br />

H & UD Protection of Water Bodies 5.000 5.000<br />

Panchayatiraj Mo Kudia 450.000 429.940<br />

Industry Craftsmen Training and Apprentice Training 1.310 0.000<br />

W & CD National Old Age Pension 575.000 684.160<br />

W & CD Orissa Disability Pension 60.000 58.130<br />

W & CD Madhubabu Pension Yojana 360.000 474.260<br />

W & CD National Family Benefit Scheme 40.000 38.800<br />

W & CD Bi-cycle to girl students 2.100 1.720<br />

W & CD Mission Sakti 210.000 208.750<br />

W & CD Construction & Repair of AWC building 36.200 35.250<br />

W & CD Reduction of IMR 32.060 31.160<br />

W & CD Grant in Aid to Orphanages 90.000 88.760<br />

W & CD Grant in Aid to Handicapped Welfare Institutions 23.450 22.360<br />

W & CD Handicapped Scholarship 11.850 <strong>12</strong>.470<br />

SC&ST Dev Pre and Post Matric Scholarship to SC, ST & OBC students 322.350 557.310<br />

OWD Construction of Revenue Department Buildings (Non Residential) 180.000 175.220<br />

OWD Construction of Revenue Department Buildings (Residential) 40.800 51.430<br />

OWD Construction of PHC Buildings (Non Residential) 29.840 51.150<br />

OWD Construction of buildng (<strong>Plan</strong>) (Non Residential) Jaleswar RW Division 27.940 21.640<br />

OWD Construction & Maintenance of Buildings (Non Residential) 35.000 32.050<br />

Sub total 7696.480 8738.990<br />

Central/State Finance Commission Grants/Untied funds from State<br />

Panchayatiraj State Finance Commission Grant 650.000 616.460<br />

Panchayatiraj <strong>12</strong>th Finance Commission Grant 2946.000 2884.940<br />

H & UD Special Problem Fund 6.940 6.940<br />

H & UD Incentive Grant to ULBs 20.000 19.730<br />

H & UD <strong>12</strong>th Finance Commission Grant 16.000 15.410<br />

Sub total 3638.940 3543.480<br />

MLA/MP LAD Fund 825.00 787.56<br />

Local Revenue (Receipt through taxes, cess available for local use) 215.42 209.45<br />

Total 58098.050 49596.890<br />

TSI: NABARD Consultancy Services (NABCONS) 88


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

(FY: 2010-11)<br />

Department<br />

Central <strong>Plan</strong><br />

Sector/Sub-Sector/Scheme Allocation<br />

(Rs.in lakhs)<br />

Anticipated<br />

Expenditure<br />

Agriculture Seed Village Programme 51.53 51.53<br />

Agriculture RKVY 3411.04 3411.04<br />

Agriculture National Food Security Mission 74.78 74.78<br />

Agriculture Coconut Development Board Programme 9.63 9.63<br />

Agriculture National Medicianal <strong>Plan</strong>ts Mission Programme 1.<strong>12</strong> 1.<strong>12</strong><br />

Agriculture RKVY 5.95 5.95<br />

F & ARD SMILE Training 3.94 3.94<br />

F & ARD RKVY 366.10 366.10<br />

Cooperation Construction of Rural Godown 508.01 508.01<br />

F & ARD Introduction of Intermediate craft of Improved Design <strong>12</strong>.00 <strong>12</strong>.00<br />

SC&ST Dev. Grants under Provision to Article 275 (1) 83.73 83.73<br />

SC&ST Dev. Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 156.65 156.65<br />

Industry Prime Minister's Employment Generation Programme 228.00 228.00<br />

Handl. & Tex. 10% Rebate on Handloom Products 9.00 9.00<br />

Handl. & Tex. <strong>District</strong> Level Exhibition 2.00 2.00<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 6007.00 6007.00<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 4842.00 4842.00<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 5186.00 5186.00<br />

OWD Central Road Fund 936.00 936.00<br />

OWD One time Additional Central Assistance 300.00 300.00<br />

Forest & Env. Development of National Park, Sanctuary & Natural Reserves <strong>12</strong>.27 <strong>12</strong>.27<br />

Sports & YA One time seed capital grant (PYKKA) 34.00 34.00<br />

Sports & YA <strong>Annual</strong> acquisition grant 3.10 3.10<br />

Sports & YA <strong>Annual</strong> operation grant 3.72 3.72<br />

Sports & YA Sports Competition 7.60 7.60<br />

Sports & YA Prize money for rural sports 6.30 6.30<br />

H & FW National Programme for Control of Blindness (NPCB) 28.45 28.45<br />

H & FW Integrated Disease Surveillence Programme (IDSP) 10.56 10.56<br />

H & FW National Leprosy Eradication Programme (NLEP) 9.<strong>12</strong> 9.<strong>12</strong><br />

W & CD Kishori Shakti Yojana 14.00 14.00<br />

W & CD National Disability Pension 0.50 0.50<br />

W & CD National Child Labour Project 105.39 105.39<br />

Sub total 22429.490 22429.490<br />

Centrally Sponsored <strong>Plan</strong><br />

Agriculture Work <strong>Plan</strong>-Rice Development 8.91 8.91<br />

Agriculture Work <strong>Plan</strong>-Sugarcane Development 2.26 2.26<br />

Agriculture Work <strong>Plan</strong>-Farm Mechanisation 182.59 182.59<br />

Agriculture Jute Technology Mission (MM-II) 25.01 25.01<br />

Agriculture ISOPOM (Pulses) <strong>12</strong>.57 <strong>12</strong>.57<br />

Agriculture ISOPOM (Oil Seeds) 248.14 248.14<br />

Agriculture National Horticulture Mission 155.63 155.63<br />

Agriculture Micro Irrigation Programme 35.00 35.00<br />

Agriculture ISOPOM (Oil Palm) 9.20 9.20<br />

Agriculture NWDPRA 144.64 144.64<br />

F & ARD Assistance to State for Control of Livestock Diseases 81.78 81.78<br />

F & ARD<br />

Development of Inland Fisheries & Aquaculture through<br />

FFDA<br />

72.40 72.40<br />

F & ARD Development of Brakish Water Aquaculture through FFDA 202.48 202.48<br />

F & ARD Saving-cum-Relief Scheme <strong>12</strong>.00 <strong>12</strong>.00<br />

F & ARD Group Accident Insurance Scheme 15.90 15.90<br />

F & ARD Assistance to Mechanisation Programme <strong>12</strong>0.00 <strong>12</strong>0.00<br />

Panchayatiraj Swarnajayanti Gram Swarozgary Yojana ( SGSY ) 1160.50 1160.50<br />

Panchayatiraj National Rural Employment Guarantee Scheme 3556.18 3556.18<br />

Panchayatiraj DRDA Administration 200.00 200.00<br />

DOWR Flood Management Programme (River Bank Protection Work) 1086.19 1086.19<br />

DOWR<br />

Flood Management Programme (Major Works) - Drainage<br />

Division, <strong>Balasore</strong><br />

1522.00 1522.00<br />

Energy Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 326.70 326.70<br />

Handl. & Tex. IHDS (Cluster Approach) 21.28 21.28<br />

Handl. & Tex. IHDS (Group Approach) 11.00 11.00<br />

TSI: NABARD Consultancy Services (NABCONS) 89


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation<br />

Anticipated<br />

Expenditure<br />

Handl. & Tex. IHDS (Marketing Incentive) 9.20 9.20<br />

Handl. & Tex. Health Insurance for weavers 11.55 11.55<br />

Handl. & Tex. Mahatma Gandhi Bunakar Bima Yojana 1.20 1.20<br />

S & ME Sarba Sikshya Abhiyan (SSA) 7504.01 7504.01<br />

S & ME National Programme for Education of Girls at Elementary Level 35.79 35.79<br />

S & ME Kasturiba Gandhi Balika Vidyalaya (KGBV) 44.97 44.97<br />

Sports & YA Sports Festival for Women 1.04 1.04<br />

H & FW Reproductive Child Health (RCH) 1075.62 1075.62<br />

H & FW Immunization 46.07 46.07<br />

H & FW National Rural Health Mission (NRHM) initiatives 1038.87 1038.87<br />

H & FW Revised National Tuberculosis Control Programme 37.20 37.20<br />

H & FW National Vector Borne Disease Control Programme 149.30 149.30<br />

Rural Dev. ARWSP - Sinking of Tube Well 238.50 238.50<br />

Rural Dev. ARWSP - Public Water Supply Scheme 1872.35 1872.35<br />

H & UD AUWSP - Augmentation of Water Supply to <strong>Balasore</strong> town 200.00 200.00<br />

H & UD UIDSSMT - Augmentation of water supply to <strong>Balasore</strong> town 200.00 200.00<br />

H & UD<br />

Integrated Housing & Urban Development Programme<br />

(IHSDP)<br />

316.94 316.94<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 60.28 60.28<br />

H & UD Urban Infrastructure Development Scheme for Small & Medium Town 43.96 43.96<br />

H & UD National Urban Information System (NUIS) 0.30 0.30<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 9.49 9.49<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 10.00 10.00<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 25.00 25.00<br />

Panchayatiraj Indra Awas Yojana (IAY) 7907.20 7907.20<br />

W & CD Supplementary Nutrition Programme 1080.00 1080.00<br />

W & CD Mid Day Meal Programme 2146.65 2146.65<br />

W & CD Construction of AWC Building 28.00 28.00<br />

Sub total<br />

State <strong>Plan</strong><br />

33305.850 33305.850<br />

Agriculture RIDF-XIII (PLIP) 817.80 817.80<br />

W & CD Mission Sakti Programme 3.84 3.84<br />

F & ARD Skill Upgradation Training 0.72 0.72<br />

F & ARD Genetic Upgradation & De-worming of goat 2.00 2.00<br />

Cooperation<br />

Share capital to co-operative credit institutions under<br />

NRC-LTO fund<br />

286.38 286.38<br />

Cooperation<br />

MACP-Infrastructure Strengtheing and Managerial<br />

subsidy to Marketing Co-operatives (PACs & RCMS)<br />

139.00 139.00<br />

Cooperation<br />

Financial assistance in shape of loan/subsidy or share to other cooperatives<br />

(Women co-operatives, Labour co-operative) 8.00 8.00<br />

F & ARD Dev. of freshwater Aquaculture through FFDA 11.38 11.38<br />

F & ARD Exhibition and Organisation of Buyer Seller meet 0.50 0.50<br />

F & ARD Assistance to Mechanisation Programme 25.50 25.50<br />

Panchayatiraj Gopabandhu Gramin Yojana (GGY) 1500.00 1500.00<br />

Rural Dev. Construction of C.C Road (New Scheme) 286.62 286.62<br />

SC&ST Dev. Construction of Hostel for ST Girls 131.50 131.50<br />

DOWR<br />

Minor Irrigation Projects (NABARD - RIDF) - MI<br />

Division, <strong>Balasore</strong><br />

160.00 160.00<br />

DOWR Instream Reservoir (Construction of Check Dam) 236.84 236.84<br />

DOWR Minor Irrigation - Biju Krushak Vikash Yojana 385.61 385.61<br />

DOWR Minor Irrigation- Biju Krushak Vikash Yojana 865.83 865.83<br />

DOWR Saline Embankment Improvement projects (RIDF- XIV) 650.00 650.00<br />

DOWR Bank Protection work (Flood Control) 92.71 92.71<br />

DOWR Drainage Projects (NABARD - RIDF - XIV) 400.00 400.00<br />

Energy Biju Gram Jyoti Yojana 462.30 462.30<br />

Industry Promotion of Industry Sector 4.59 4.59<br />

Handl. & Tex. Promotion of Handloom Industry 14.55 14.55<br />

Handl. & Tex. Workshed-cum-Housing 16.10 16.10<br />

Handl. & Tex. Skill Upgradation Training 7.82 7.82<br />

Rural Dev.<br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

75.00 75.00<br />

Rural Dev.<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

637.30 637.30<br />

Rural Dev. Completion of incomplete roads and bridges and 70.00 70.00<br />

TSI: NABARD Consultancy Services (NABCONS) 90


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme<br />

different stretches of RIDF and other schemes<br />

Allocation<br />

Anticipated<br />

Expenditure<br />

Rural Dev. Construction of Rural Roads & Bridge under RIDF 30.00 30.00<br />

Rural Dev.<br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

45.00 45.00<br />

Rural Dev. Construction of Rural Road (Improvement/Widening/Critical Roads) 57.00 57.00<br />

Rural Dev. Completion of incomplete roads and bridges of RIDF/other schemes 230.00 230.00<br />

Rural Dev. Construction of Rural Roads & Bridge under RIDF 500.00 500.00<br />

Rural Dev. Minimum Needs Programme - Constituency Wise Allotment 40.00 40.00<br />

Rural Dev. Construction of Rural Road (Improvement/Widening/Critical Roads) 523.00 523.00<br />

OWD Construction of Rural Roads & Bridge under RIDF 1148.00 1148.00<br />

Forest & Env. Economic <strong>Plan</strong>tations 10.00 10.00<br />

Forest & Env.<br />

Communication & Building - Construction of quarters for forest<br />

guards 3.00 3.00<br />

Forest & Env. Bamboo <strong>Plan</strong>tation 0.21 0.21<br />

Forest & Env. Elephant Management <strong>Plan</strong> 5.33 5.33<br />

Forest & Env. Wildlife Protection and Conservation Measures 3.52 3.52<br />

S & ME Mass Education 19.25 19.25<br />

Industry Craftsmen Training and Apprentice Training 5.00 5.00<br />

Sports & YA Organizing Youth Festival 0.18 0.18<br />

H & FW Rural Ayurvedic Health Services 99.54 99.54<br />

H & FW Urban Ayurvedic Health Services 29.90 29.90<br />

H & FW Primary Health Care (Rural) 154.00 154.00<br />

H & FW Primary Health Care (Urban) 5.61 5.61<br />

H & UD<br />

Improvement of Sewerage/Drainage system in different<br />

uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri ULBs<br />

Improvement of water supply and replacement of defunct<br />

50.00 50.00<br />

H & UD bore wells up-gradation of sources and laying of pipe lines in<br />

different ULBs<br />

200.00 200.00<br />

H & UD Improvement of W/S to Jaleswar town<br />

Improvement of water supply & S/I system of different non-<br />

60.00 60.00<br />

H & UD residential office building & Govt. Institutions of <strong>Balasore</strong>,<br />

Soro, Nilgiri & Jaleswar ULBs<br />

Improvement of water supply & S/I system of different<br />

80.80 80.80<br />

H & UD residential office building & Govt. Institutions of <strong>Balasore</strong>,<br />

Soro, Nilgiri & Jaleswar ULBs<br />

91.00 91.00<br />

H & UD Improvement of Water Supply to Nilagiri NAC 200.00 200.00<br />

H & UD Improvement of Water Supply to Khirda, Raipur areas of Soro NAC 92.00 92.00<br />

H & UD Infrastructure Grant towards Urban Tourism Destination Towns 11.00 11.00<br />

H & UD Road Development & Maintenance 90.87 90.87<br />

H & UD Urban Greenery 11.00 11.00<br />

H & UD Road Development & Maintenance 149.45 149.45<br />

H & UD Road Development & Maintenance 38.00 38.00<br />

H & UD Road Development & Maintenance 55.26 55.26<br />

H & UD Protection of water bodies 20.00 20.00<br />

Panchayatiraj Mo Kudia 795.85 795.85<br />

W & CD National Old Age Pension 575.00 575.00<br />

W & CD Madhubabu Pension Yojana 370.00 370.00<br />

W & CD National Family Benefit Scheme 92.80 92.80<br />

W & CD Organising Single Window Camps 8.30 8.30<br />

W & CD Bi-cycle to girl students 1.25 1.25<br />

W & CD Mission Sakti 3.50 3.50<br />

W & CD Construction & Repair of AWC building 11.00 11.00<br />

W & CD Reduction of IMR 14.20 14.20<br />

W & CD Grant in Aid to Handicapped Welfare Institutions 23.00 23.00<br />

W & CD Grant in Aid to Orphanages 101.15 101.15<br />

W & CD Secretarial support to <strong>District</strong> JJ Board/Child Welfare Committee 0.35 0.35<br />

W & CD Medical Check up 0.60 0.60<br />

W & CD Sanitation 0.50 0.50<br />

W & CD Handicapped Scholarship 11.60 11.60<br />

W & CD Award to AWW 0.15 0.15<br />

W & CD Monitoring Mechanism & Evaluation 4.50 4.50<br />

W & CD Information Education Communication 3.00 3.00<br />

W & CD Medicine Kit <strong>12</strong>.20 <strong>12</strong>.20<br />

W & CD Computer 0.20 0.20<br />

W & CD Visit Programme 0.50 0.50<br />

TSI: NABARD Consultancy Services (NABCONS) 91


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation<br />

Anticipated<br />

Expenditure<br />

SC&ST Dev. Pre and Post Matric Scholarship to SC, ST & OBC students 1950.32 1950.32<br />

OWD Construction of Revenue Department Buildings (Non Residential) 78.46 78.46<br />

OWD Construction of buildng (<strong>Plan</strong>) Jaleswar RW Division 27.38 27.38<br />

OWD Construction of Revenue Department Buildings (Residential) 111.61 111.61<br />

OWD Construction of PHC Buildings (Non Residential) 9.84 9.84<br />

OWD Construction of PHC Buildings (Residential) 26.50 26.50<br />

OWD Construction & Maintenance of Buildings (Non Residential) <strong>12</strong>.65 <strong>12</strong>.65<br />

Sub total 15596.220 15596.220<br />

Central/State Finance Commission Grants/Untied funds from State<br />

Panchayatiraj State Finance Commission Grant 402.87 402.87<br />

Panchayatiraj <strong>12</strong>th Finance Commission Award 508.71 508.71<br />

Panchayatiraj 13th Finance Commisssion Award 583.28 583.28<br />

H & UD Special Problem Fund to ULBs 7.63 7.63<br />

H & UD Twelfth Finance Commission (TFC) 20.24 20.24<br />

H & UD FDR Grant 20.00 20.00<br />

H & UD Incentive Grant to ULBs 25.00 25.00<br />

H & UD Twelfth Finance Commission (TFC) 27.00 27.00<br />

Sub total 1594.730 1594.730<br />

MLA/MP LAD Fund 900.00 900.00<br />

Local Revenue (Receipt through taxes, cess available for local use) 234.50 234.50<br />

Total 74060.790 74060.790<br />

(FY: <strong>2011</strong>-<strong>12</strong>)<br />

Department Sector/Sub-Sector/Scheme Allocation<br />

(Rs.in lakhs)<br />

Expenditure<br />

Central <strong>Plan</strong><br />

<strong>Plan</strong><br />

Agriculture Seed Village Programme 56.68 56.68<br />

Agriculture Work <strong>Plan</strong>-Farm Mechanisation 211.26 211.26<br />

Agriculture Rastriya Krishi Vikas Yojana (RKVY) 3700.05 3700.05<br />

Agriculture National Food Security Mission (Pulses) 256.92 256.92<br />

Agriculture Coconut Development Board Programme 11.30 11.30<br />

Agriculture National Medicinal <strong>Plan</strong>ts Mission Programme 2.26 2.26<br />

Agriculture Rastriya Krishi Vikas Yojana (RKVY) 6.70 6.70<br />

Agriculture Soil and water conservation measures for development of Farms under RKVY 56.50 56.50<br />

F & ARD SMILE Training 5.00 5.00<br />

F & ARD Exposure visit of farmers under SMILE 2.52 2.52<br />

F & ARD Extension Services 1.00 1.00<br />

F & ARD RKVY-Strengthening of Livestock Service Information & Modernisation of office 315.15 315.15<br />

F & ARD RKVY-Dairy Development <strong>12</strong>0.59 <strong>12</strong>0.59<br />

F & ARD RKVY-Fodder Development 46.50 46.50<br />

F & ARD RKVY-Goat Development <strong>12</strong>.60 <strong>12</strong>.60<br />

F & ARD RKVY-Poultry Development 40.10 40.10<br />

Cooperation Construction of Rural Godown under RKVY 1427.92 1427.92<br />

F & ARD Intro. of Intermediate craft of Improved Design 24.00 24.00<br />

SC&ST Dev. Grants under Provision to Article 275 (1) 86.00 86.00<br />

SC&ST Dev. Special Central Assistance to TSP areas 180.00 180.00<br />

SC&ST Dev. Grants under Provision to Article 275 (1) 15.00 15.00<br />

SC&ST Dev. Special Central Assistance to TSP areas 20.00 20.00<br />

DOWR Installation of Lift Irrigation Projects under RKVY 218.40 218.40<br />

Industry Prime Minister's Emp.Gen. Prog. (PMEGP) 300.00 300.00<br />

Handl. & Tex. 10% Rebate on Handloom Products 10.00 10.00<br />

Handl. & Tex. <strong>District</strong> Level Exhibition 2.00 2.00<br />

Rural Dev. Pradhan Mantri Gram Sadak Yojana (PMGSY) 2500.00 2500.00<br />

OWD Construction of road under Central Road Fund 2577.44 2577.44<br />

OWD One time Additional Central Assistance 200.00 200.00<br />

Forest & Env. Development of National Park, Sanctuary & Natural Reserves 33.00 33.00<br />

Forest & Env. Elephant Management Project 0.60 0.60<br />

Forest & Env. Talsari - HVBA 17.10 17.10<br />

Industry National APP Training in ITI <strong>Balasore</strong> 6.00 6.00<br />

Sports & YA PYKKA-<strong>Annual</strong> acquisition grant 3.10 3.10<br />

Sports & YA PYKKA-<strong>Annual</strong> operation grant 3.72 3.72<br />

Sports & YA PYKKA-Rural Sports Competition 7.60 7.60<br />

TSI: NABARD Consultancy Services (NABCONS) 92


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

<strong>Plan</strong><br />

Sports & YA PYKKA-Prize Money for Rural Sports 6.30 6.30<br />

H & FW National Programme for Control of Blindness (NPCB) 31.30 31.30<br />

H & FW Integrated Disease Surveillance Programme (IDSP) 11.62 11.62<br />

H & FW National Leprosy Eradication Programme (NLEP) 10.03 10.03<br />

SC&ST Dev. Pre Matric Scholarship to SC Boys Students (Boarders) 0.75 0.75<br />

SC&ST Dev. Pre Matric Scholarship to SC Girls Students (Boarders) 7.33 7.33<br />

SC&ST Dev. Pre Matric Scholarship to ST Boys Students (Boarders) 72.52 72.52<br />

SC&ST Dev. Pre Matric Scholarship to ST Girls Students (Boarders) 172.30 172.30<br />

SC&ST Dev. Post Matric Scholarship to SC Students 97.33 97.33<br />

SC&ST Dev. Post Matric Scholarship to ST Students 19.18 19.18<br />

SC&ST Dev. Development of SCs (OSFDC Section) 224.13 224.13<br />

SC&ST Dev. Development of STs (OSFDC Section) <strong>12</strong>9.25 <strong>12</strong>9.25<br />

SC&ST Dev. Pre Matric Scholarship to the students whose parents engaged unclean occupation 15.66 15.66<br />

SC&ST Dev. Pre Matric Scholarship to OBC Students <strong>12</strong>66.16 <strong>12</strong>66.16<br />

SC&ST Dev. Post Matric Scholarship to OBC Students 62.68 62.68<br />

SC&ST Dev. Pre Matric Scholarship to Minorities 71.82 71.82<br />

SC&ST Dev. Post Matric Scholarship to Minorities 6.26 6.26<br />

W&CD IG National Old Age Pension (ACA to States) 597.14 597.14<br />

W&CD National Family Benefit Scheme (ACA to States) 92.80 92.80<br />

W&CD Kishori Shakti Yojana 14.00 14.00<br />

W&CD National Disability Pension 0.50 0.50<br />

W&CD National Child Labour Project 105.39 105.39<br />

Sub total 15491.460 15491.460<br />

Centrally Sponsored <strong>Plan</strong><br />

Agriculture Work <strong>Plan</strong>-Rice Development 10.72 10.72<br />

Agriculture Work <strong>Plan</strong>-Sugarcane Development 2.59 2.59<br />

Agriculture Jute Technology Mission (MM-II) 27.51 27.51<br />

Agriculture ISOPOM (Oil Seeds) 272.96 272.96<br />

Agriculture National Horticulture Mission 193.63 193.63<br />

Agriculture Micro Irrigation Programme 45.00 45.00<br />

Agriculture ISOPOM (Oil Palm) 10.18 10.18<br />

Agriculture NWDPRA- Watershed Development 231.56 231.56<br />

F & ARD Disease Control Programme under ASCAD 81.23 81.23<br />

F & ARD Health Camp & Awareness Programme under ASCAD 0.55 0.55<br />

F & ARD<br />

Development of Inland Fisheries & Aquaculture through FFDA<br />

(Programme Component)<br />

74.40 74.40<br />

F & ARD Dev. of Brackish Water Aquacul. through FFDA 150.00 150.00<br />

F & ARD Saving-cum-Relief Scheme 14.40 14.40<br />

F & ARD Group Accident Insurance Scheme 16.50 16.50<br />

F & ARD Low Cost House 50.00 50.00<br />

F & ARD Assistance of Mechanisation Programme 28.50 28.50<br />

Panchayatiraj Swarnajayanti Gram Swarozgar Yojana ( SGSY ) <strong>12</strong>00.00 <strong>12</strong>00.00<br />

Panchayatiraj Mahatma Gandhi National Rural Employment Guarantee Scheme 4218.56 4218.56<br />

Panchayatiraj DRDA Administration 250.00 250.00<br />

DOWR Flood Management Programme 3143.13 3143.13<br />

DOWR Flood Management Programme (Major Works) 131.03 131.03<br />

Energy Rajiv Gandhi Gramin Vidyutikaran Yojana 343.04 343.04<br />

Handl. & Tex. IHDS (Cluster Approach) 8.76 8.76<br />

Handl. & Tex. IHDS (Group Approach) 11.50 11.50<br />

Handl. & Tex. IHDS (Marketing Incentive) 9.50 9.50<br />

Handl. & Tex. Health Insurance for weavers 11.73 11.73<br />

Handl. & Tex. Mahatma Gandhi Bunakar Bima Yojana 1.23 1.23<br />

S&ME Sarba Sikshya Abhiyan (SSA) 7504.21 7504.21<br />

S&ME National Programme for Education of Girls at Elementary Level 35.79 35.79<br />

S&ME Kasturiba Gandhi Balika Vidyalaya (KGBV) 44.97 44.97<br />

Sports & YA One time seed capital grant for development of Sports infrastructure 34.00 34.00<br />

Sports & YA Women Sports Competition 1.44 1.44<br />

H & FW Reproductive Child Health (RCH) 1303.62 1303.62<br />

H & FW Immunization 39.52 39.52<br />

H & FW National Rural Health Mission (NRHM) initiatives 980.59 980.59<br />

H & FW Revised National Tuberculosis Control Programme 40.92 40.92<br />

H & FW National Vector Borne Disease Control Programme 164.23 164.23<br />

Rural Dev. ARWSP-Sinking of Tube Well 209.82 209.82<br />

TSI: NABARD Consultancy Services (NABCONS) 93


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

<strong>Plan</strong><br />

Rural Dev. ARWSP-Public Water Supply Scheme 2022.00 2022.00<br />

H & UD<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT<br />

(Construction of ESR and UGR)<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP<br />

300.00 300.00<br />

H & UD (Improvement of water supply to <strong>Balasore</strong> town from river Sonoconstruction<br />

of intake well and laying of rising mains)<br />

300.00 300.00<br />

H & UD Integrated Housing & Urban Development Programme 348.63 348.63<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 66.31 66.31<br />

H & UD Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 48.36 48.36<br />

H & UD National Urban Information System (NUIS) 0.33 0.33<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 23.35 23.35<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 11.00 11.00<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 50.00 50.00<br />

Panchayatiraj Indira Awas Yojana (IAY) 8697.20 8697.20<br />

W&CD Supplementary Nutrition Programme 2394.26 2394.26<br />

W&CD Mid Day Meal Programme (Pry+UP) 1959.29 1959.29<br />

W&CD Mid Day Meal Programme (Kitchen-cum-store) 136.64 136.64<br />

W&CD Mid Day Meal Programme (Utensils) 11.60 11.60<br />

W&CD<br />

Mid Day Meal Programme (Monitoring Mechanism &<br />

Evaluation)<br />

20.50 20.50<br />

W&CD Mid Day Meal Programme (Transportation charges) 27.10 27.10<br />

W&CD Mid Day Meal Programme (Honorarium to cook & helper) 82.00 82.00<br />

W&CD Construction of AWC Building 25.00 25.00<br />

Sub total<br />

State <strong>Plan</strong><br />

37420.891 37420.891<br />

Agriculture RIDF-XIII (PLIP) 828.00 828.00<br />

Agriculture Mission Sakti Programme 4.80 4.80<br />

F & ARD Bird Flu Training 0.96 0.96<br />

F & ARD Disaster Management Preparedness 18.50 18.50<br />

F & ARD Skill up-gradation Training 3.80 3.80<br />

F & ARD Genetic up-gradation of goat & Deworing 2.00 2.00<br />

Cooperation Share capital to co-operative credit institutions under NRC-LTO fund 202.02 202.02<br />

Cooperation Revival of the short term co-operative credit institution <strong>12</strong>4.00 <strong>12</strong>4.00<br />

Cooperation Loan Support to Co-operatives 2<strong>12</strong>.16 2<strong>12</strong>.16<br />

Cooperation Modernisation of Co-op Processing Rice Mill 30.00 30.00<br />

Cooperation Share capital and Transport subsidy for PDS to Consumer Cooperatives 24.25 24.25<br />

Cooperation<br />

Infrastructure Strengthening and Managerial subsidy to<br />

Marketing Co-operatives (PACs & RCMS)<br />

131.00 131.00<br />

Cooperation<br />

Financial assistance in shape of loan/subsidy or share to other<br />

co-operatives<br />

<strong>12</strong>.20 <strong>12</strong>.20<br />

F & ARD Dev. of freshwater Aquaculture through FFDA <strong>12</strong>.50 <strong>12</strong>.50<br />

F & ARD Exhibition and Organisation of Buyer Seller meet 1.00 1.00<br />

F & ARD Assistance to Mechanisation Programme 5.00 5.00<br />

F & ARD<br />

Survey and Investigation and establishment of fishing<br />

Harbour & Fish landing Centres<br />

667.00 667.00<br />

F & ARD Safety measures for Marine Fishermen 5.00 5.00<br />

Panchayatiraj Gopabandhu Gramin Yojana (GGY) 2000.00 2000.00<br />

Panchayatiraj Construction of C.C Road (New Scheme) 287.00 287.00<br />

SC&ST Dev. Construction of Hostel for ST Girls 163.75 163.75<br />

DOWR Minor Irrigation Projects (NABARD - RIDF) 200.00 200.00<br />

DOWR Instream Reservoir (Construction of Check Dam) 300.00 300.00<br />

DOWR Installation of Lift Irrigation Projects under BKVY 581.60 581.60<br />

DOWR Minor Irrigation- Biju Krushak Vikash Yojana 261.25 261.25<br />

DOWR Bank Protection work (Flood Control) 92.71 92.71<br />

DOWR Drainage Projects (NABARD - RIDF - XII & XIV) 156.00 156.00<br />

Energy Biju Gram Jyoti Yojana 485.42 485.42<br />

Energy Biju Saharanchal Vidyutikaran Yojana 140.00 140.00<br />

Industry Promotion of Industry Sector 4.90 4.90<br />

Handl. & Tex. Promotion of Handloom Industry 15.00 15.00<br />

Handl. & Tex. Workshed-cum-Housing 17.50 17.50<br />

Handl. & Tex. Skill Upgradation Training 9.42 9.42<br />

Rural Dev. Minimum Needs Programme - Constituency Wise Allotment 80.00 80.00<br />

Rural Dev.<br />

Completion of incomplete roads and bridges and<br />

different stretches of RIDF and other schemes<br />

100.00 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 94


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

<strong>Plan</strong><br />

Rural Dev. Construction of Rural Road (Improvement/Widening/Critical Roads) 733.00 733.00<br />

Rural Dev. Flood damage repairing 300.00 300.00<br />

Rural Dev. Minimum Needs Programme - Constituency Wise Allotment 50.00 50.00<br />

Rural Dev.<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

62.00 62.00<br />

Rural Dev.<br />

Completion of incomplete road and Bridges and different<br />

Stretches of RIDF & other Schemes<br />

253.00 253.00<br />

Rural Dev.<br />

Construction of Rural Roads & Bridge under NABARD funding<br />

RIDF Project<br />

803.00 803.00<br />

Rural Dev. Minimum Needs Programme - Constituency Wise Allotment 40.00 40.00<br />

Rural Dev. Construction of Rural Road (Improvement/Widening/Critical Roads) 567.00 567.00<br />

OWD Construction of Rural Roads & Bridge under RIDF 10941.18 10941.18<br />

Forest & Env. Social and Farm Forestry <strong>12</strong>.10 <strong>12</strong>.10<br />

Forest & Env. Communication & Building - Construction of quarters for forest guards 3.63 3.63<br />

S&ME Mass Education 20.10 20.10<br />

S&ME Construction Office building boundary wall & renovation of old building 16.00 16.00<br />

S&ME Construction of staff quarters and office building<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of<br />

<strong>12</strong>5.00 <strong>12</strong>5.00<br />

Industry boundary wall, play ground, bore well, drainage system, cycle<br />

stand and repair of staff quarters<br />

99.40 99.40<br />

Sports & YA Organizing Youth Festival 0.20 0.20<br />

H & FW Rural Ayurvedic Health Services 142.47 142.47<br />

H & FW Urban Ayurvedic Health Services 35.65 35.65<br />

H & FW Primary Health Care (Rural) 179.25 179.25<br />

H & FW Primary Health Care (Urban) 14.21 14.21<br />

H & UD<br />

Improvement of Sewerage/Drainage system in different<br />

uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri ULBs<br />

Improvement of water supply and replacement of defunct bore<br />

41.00 41.00<br />

H & UD wells up-gradation of sources and laying of pipe lines in<br />

different ULBs<br />

71.00 71.00<br />

H & UD Improvement of W/S to Nilgiri town 300.00 300.00<br />

H & UD Improvement of W/S to Soro town 100.00 100.00<br />

H & UD Improvement of W/S to Jaleswar town<br />

Improvement of water supply & S/I system of different non-<br />

100.00 100.00<br />

H & UD residential office building & Govt. Institutions of <strong>Balasore</strong>, Soro,<br />

Nilgiri & Jaleswar ULBs<br />

Improvement of water supply & S/I system of different<br />

100.00 100.00<br />

H & UD residential office building & Govt. Institutions of <strong>Balasore</strong>, Soro,<br />

Nilgiri & Jaleswar ULBs<br />

100.00 100.00<br />

H & UD<br />

Infrastructure Grant towards Urban Tourism Destination<br />

Towns<br />

<strong>12</strong>.10 <strong>12</strong>.10<br />

H & UD Road Development & Maintenance 99.96 99.96<br />

H & UD Urban Greenery <strong>12</strong>.10 <strong>12</strong>.10<br />

H & UD Road Development, Maintenance Grant etc. 198.81 198.81<br />

H & UD Road Development, Maintenance Grant etc. 41.80 41.80<br />

H & UD Road Development Grant 45.00 45.00<br />

H & UD Road Maintenance Grant 20.00 20.00<br />

H & UD Protection of water bodies 25.00 25.00<br />

Panchayatiraj Mo Kudia 875.85 875.85<br />

W&CD Madhu Babu Pension Yojana 474.26 474.26<br />

W&CD Old Age Pension 87.02 87.02<br />

W&CD Orissa Disability Pension 58.13 58.13<br />

W&CD Organising Single Window Camps 8.30 8.30<br />

W&CD Bi-cycle to girl students 1.25 1.25<br />

W&CD Mission Sakti 208.75 208.75<br />

W&CD Repair & Maintenance of AWC Building 10.25 10.25<br />

W&CD Reduction of Child Malnutrition 31.16 31.16<br />

W&CD Reduction of IMR 2.20 2.20<br />

W&CD Grant in Aid to Handicapped Welfare Institution 23.00 23.00<br />

W&CD Grant in Aid to Orphanages 101.15 101.15<br />

W&CD<br />

Secretarial support to <strong>District</strong> Juvenile Justice<br />

Board/Child Welfare Committee<br />

0.35 0.35<br />

W&CD Medical Check up 0.60 0.60<br />

W&CD Sanitation 0.50 0.50<br />

W&CD Handicapped Scholarship <strong>12</strong>.47 <strong>12</strong>.47<br />

W&CD Award to AWW 0.15 0.15<br />

TSI: NABARD Consultancy Services (NABCONS) 95


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

<strong>Plan</strong><br />

W&CD Monitoring Mechanism & Evaluation 4.50 4.50<br />

W&CD Information Education Communication 3.00 3.00<br />

W&CD Medicine Kit <strong>12</strong>.20 <strong>12</strong>.20<br />

W&CD Computer 0.20 0.20<br />

W&CD Visit Programme 0.35 0.35<br />

OWD<br />

Construction of Revenue Department Buildings (Non<br />

Residential)<br />

22.30 22.30<br />

OWD Construction of Revenue Department Buildings (Residential) 13.94 13.94<br />

OWD Construction of PHC Buildings (Non Residential) 11.32 11.32<br />

OWD Construction of RD Department Buildings (Non Residential) <strong>12</strong>.65 <strong>12</strong>.65<br />

OWD Construction of Revenue Department Buildings (Non Residential) 52.90 52.90<br />

OWD Construction of PHC Buildings (Residential) 8.20 8.20<br />

OWD Construction of Revenue Department Buildings (Residential) 78.00 78.00<br />

OWD Construction of Building (Non Residential) RD Division Jaleswar 30.00 30.00<br />

OWD Construction of Health & RW Building (Residential) 21.00 21.00<br />

OWD Construction & Maintenance of Buildings (Non Residential) 13.91 13.91<br />

OWD Construction of RD Department Buildings (Residential) 32.77 32.77<br />

Sub total 25055.330 25055.330<br />

Central/State Finance Commission Grants/Untied funds from State<br />

Panchayatiraj State Finance Commission Grant 442.50 442.50<br />

Panchayatiraj 13th Finance Commisssion Award 641.25 641.25<br />

H & UD Special Problem Fund to ULBs 8.39 8.39<br />

H & UD Twelfth Finance Commission (TFC) 23.47 23.47<br />

H & UD FDR Grant to ULBs 20.00 20.00<br />

H & UD Incentive Grant to ULBs 30.00 30.00<br />

H & UD Twelfth Finance Commission (TFC) 35.00 35.00<br />

Sub total <strong>12</strong>00.610 <strong>12</strong>00.610<br />

MLA/MP LAD Fund 1000.00 1000.00<br />

Local Revenue (Receipt through taxes, cess available for local use) 245.70 245.70<br />

Total 80413.991 80413.991<br />

TSI: NABARD Consultancy Services (NABCONS) 96


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER V<br />

RESOURCE ENVELOPE FOR GRAM PANCHAYATS/<br />

BLOCKS/ULBs FOR THE ANNUAL PLAN <strong>2011</strong>-<strong>12</strong><br />

<strong>Balasore</strong> district has twelve CD blocks, three NAC (Jaleswar, Nilgiri and Soro) and one<br />

Municipality (<strong>Balasore</strong>). The twelve CD Blocks are Bahanaga, <strong>Balasore</strong>, Baliapal, Basta,<br />

Bhograi, Jaleswar, Khaira, Nilgiri, Oupada, Remuna, Simulia and Soro. Regarding, villages<br />

and Gram Panchayats under these blocks, the district has 2971 revenue villages, out of<br />

which 2586 are inhabited and 385 are uninhabited. These villages are under the<br />

jurisdiction of 289 Gram Panchayats. <strong>Balasore</strong> municipality has 31, Jaleswar NAC 17,<br />

Nilgiri NAC 13 and Soro 19 wards under jurisdiction.<br />

In the present planning exercise, an attempt was made by the TSI to identify resource<br />

envelope available to the grass root level planning units (Blocks/ULBs/GPs) from all<br />

sources for the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>.<br />

But it was observed that majority of the planned schemes are being implemented by Line<br />

Departments through their man power available either in the blocks/GP headquarter or<br />

directly from district headquarter. Some of the line departments, because of staff shortage<br />

have allotted more than one block to a single staff to implement development programmes.<br />

Further, some of the activities/programmes like construction of road (ODR/MDRs),<br />

saline/flood embankments, canals covers more than block in operational area. Segregating<br />

the financial outlay and physical targets block wise requires lot of time and resources. Due<br />

to paucity of time and other resources, TSI could not identify the total resources available in<br />

each block covering all sectors and programmes.<br />

Only resources under Rural Development programmes namely, MGNREGS, GGY, SGSY,<br />

IAY, Mo Kudia have been identified block wise with the help of officials at DRDA, Block level<br />

and GP level (only for MGNREGS & GGY). It may be mentioned here that these programmes<br />

are usually implemented only after approval is obtained at Gram Sabha, then at Panchayat<br />

Samiti level and finally at Zilla Parishad level. The planning units like Block and GPs also<br />

spent major chunk of the funds allocated under the above rural development programmes,<br />

except a part under MGNREGS, GGY and SGSY implemented by Line Department officials.<br />

5.1. Resource allocation to Blocks & GPs.<br />

MGNREGS:<br />

Under MGNREGS, the total outlay for <strong>2011</strong>-<strong>12</strong> of the district is Rs. 4218.56 lakhs. The<br />

allocation for each of the twelve blocks is presented in table 5.1 and Panchayats in table<br />

5.2. Panchayat wise detailed list of work is presented in Annexure XX.<br />

Table 5.1. Block wise allocation of funds for MGNREGS <strong>2011</strong>-<strong>12</strong><br />

Name of Block <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> (Rs. in lakhs)<br />

Bahanaga 319.90<br />

<strong>Balasore</strong> 388.25<br />

Baliapal 259.80<br />

Basta 351.65<br />

Bhograi 341.75<br />

Jaleswar 336.70<br />

Khaira 470.65<br />

Nilgiri 416.10<br />

Oupada 248.60<br />

Remuna 414.95<br />

Simulia 342.65<br />

Soro 327.56<br />

Total 4218.56<br />

TSI: NABARD Consultancy Services (NABCONS) 97


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 5.2. Panchayat wise allocation of funds for MGNREGS <strong>2011</strong>-<strong>12</strong><br />

SI.<br />

No.<br />

Block Panchayat Outlay<br />

SI.<br />

No.<br />

Block Panchayat Outlay<br />

1 Bahanaga Anji 7.80 23 Baliapal Nuagan 8.00<br />

2 Bahanaga Avana 8.80 24 Baliapal Panchupali 3.50<br />

3 Bahanaga Baripada 26.50 25 Baliapal Pratappur 4.75<br />

4 Bahanaga Chaka Jagannathpur 14.20 26 Baliapal Ratei 4.75<br />

5 Bahanaga Dandahairpur 20.80 27 Baliapal Srirampur 9.00<br />

6 Bahanaga Kochiakoili 7.30 Sub total 259.80<br />

7 Bahanaga Kasaba Jayapur 31.30 1 Basta Brahmada 16.00<br />

8 Bahanaga Kharasahapur 9.90 2 Basta Kulida 14.50<br />

9 Bahanaga Panpana 19.60 3 Basta Putura 16.00<br />

10 Bahanaga Sahaspura 10.30 4 Basta Mathani 22.00<br />

11 Bahanaga Talakurunia 10.90 5 Basta Sahada 13.75<br />

<strong>12</strong> Bahanaga Aruhabad 16.70 6 Basta Irda 16.50<br />

13 Bahanaga Bahanaga 15.80 7 Basta Purusottampur 13.00<br />

14 Bahanaga Bishnupur 8.40 8 Basta Routpada 10.00<br />

15 Bahanaga Chittol 15.00 9 Basta Chormara 1.75<br />

16 Bahanaga Kalyani 26.60 10 Basta Paunsakuli 14.50<br />

17 Bahanaga Khantapada 19.00 11 Basta Sadanandapur 22.75<br />

18 Bahanaga Kuruda 4.50 <strong>12</strong> Basta Darada 16.25<br />

19 Bahanaga Patharpentha 14.80 13 Basta Gadapada 17.50<br />

20 Bahanaga Saud 11.95 14 Basta Singla 7.00<br />

21 Bahanaga Gopalpur 19.75 15 Basta Nabara 14.75<br />

Sub total 319.90 16 Basta Naikudi 13.50<br />

1 <strong>Balasore</strong> Nagram 21.70 17 Basta Mukulisi 11.80<br />

2 <strong>Balasore</strong> Ranasahi 20.80 18 Basta Tadada 8.50<br />

3 <strong>Balasore</strong> Buanl 24.60 19 Basta Natakata 29.30<br />

4 <strong>Balasore</strong> J.Kasaba 22.20 20 Basta Raghunathpur 30.40<br />

5 <strong>Balasore</strong> Gudu 14.80 21 Basta Baharda 19.20<br />

6 <strong>Balasore</strong> Bahabalapur 21.10 22 Basta Santoshpur 22.70<br />

7 <strong>Balasore</strong> Padmapur 11.00 Sub total 351.65<br />

8 <strong>Balasore</strong> Hidigan 9.50 1 Bhograi Sankhari 9.00<br />

9 <strong>Balasore</strong> Patrapada 8.30 2 Bhograi Bajitpur 6.30<br />

10 <strong>Balasore</strong> Odangai <strong>12</strong>.50 3 Bhograi Kanthibhaunri 8.00<br />

11 <strong>Balasore</strong> Kasafal <strong>12</strong>.00 4 Bhograi Guneibasan 15.00<br />

<strong>12</strong> <strong>Balasore</strong> Chhanua 15.00 5 Bhograi Putina 11.30<br />

13 <strong>Balasore</strong> Gopinathpur 13.50 6 Bhograi Deula 14.40<br />

14 <strong>Balasore</strong> Sasanga <strong>12</strong>.00 7 Bhograi K. Kamarda 9.40<br />

15 <strong>Balasore</strong> Parikhi <strong>12</strong>.50 8 Bhograi N. M. Padia <strong>12</strong>.65<br />

16 <strong>Balasore</strong> Genguti 14.75 9 Bhograi Gunsartha 21.50<br />

17 <strong>Balasore</strong> Sartha 8.00 10 Bhograi Baunsadiha 15.60<br />

18 <strong>Balasore</strong> Kasipada 11.50 11 Bhograi Mandarsahi 14.30<br />

19 <strong>Balasore</strong> Rasalpur 26.00 <strong>12</strong> Bhograi Bhograi 14.40<br />

20 <strong>Balasore</strong> Srikona 8.50 13 Bhograi Dehurda 18.00<br />

21 <strong>Balasore</strong> Sindhia 14.20 14 Bhograi Analia <strong>12</strong>.50<br />

22 <strong>Balasore</strong> Srirampur <strong>12</strong>.15 15 Bhograi Mohagab 8.50<br />

23 <strong>Balasore</strong> Saragan 13.90 16 Bhograi Nachinda 10.10<br />

24 <strong>Balasore</strong> O.Saragan 18.25 17 Bhograi Nahara 7.10<br />

25 <strong>Balasore</strong> Haladipada 15.90 18 Bhograi Kharidpipal 8.40<br />

26 <strong>Balasore</strong> Kuradiha 13.60 19 Bhograi Balim 11.60<br />

Sub total 388.25 20 Bhograi Kakhada 8.80<br />

1 Baliapal Aladiha 4.75 21 Bhograi Gopinathpur 8.40<br />

2 Baliapal Asti 7.00 22 Bhograi Soharia 10.50<br />

3 Baliapal Balarampur 6.50 23 Bhograi Sultanpur 8.60<br />

4 Baliapal Balikuti 8.50 24 Bhograi Rasalpur 8.60<br />

5 Baliapal Baniadiha 5.00 25 Bhograi Nimatpur 9.00<br />

6 Baliapal Baliapal 5.70 26 Bhograi Dahunda 11.20<br />

7 Baliapal Betagadia 11.00 27 Bhograi Huguly 9.90<br />

8 Baliapal Bishnupur 11.00 28 Bhograi Jayrampur 7.30<br />

9 Baliapal Bodas 8.80 29 Bhograi Kusuda 10.10<br />

10 Baliapal Bolanga 8.50 30 Bhograi Sradhapur 6.30<br />

11 Baliapal Chaumukha 6.05 31 Bhograi Barbatia 7.50<br />

<strong>12</strong> Baliapal Dagara 9.70 32 Bhograi T. Hazira 7.50<br />

13 Baliapal Deula 23.10 Sub total 341.75<br />

14 Baliapal Debhog 23.40 1 Jaleswar Aruha 10.80<br />

15 Baliapal Ghantua 9.50 2 Jaleswar Baiganbadia 11.70<br />

16 Baliapal Jagatipur 24.80 3 Jaleswar Baradiha 17.00<br />

17 Baliapal Jambhirai 5.65 4 Jaleswar Bartana 21.30<br />

18 Baliapal Jamkunda 15.30 5 Jaleswar Chamargan 17.60<br />

19 Baliapal Kumbhari 10.30 6 Jaleswar D.P. Pur 17.00<br />

20 Baliapal Kunduli 13.50 7 Jaleswar G.M.Pur 21.50<br />

21 Baliapal Madhupura 3.25 8 Jaleswar Khalina 20.50<br />

TSI: NABARD Consultancy Services (NABCONS) 98


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Outlay<br />

SI.<br />

No.<br />

Block Panchayat Outlay<br />

22 Baliapal Nikhira 8.50 9 Jaleswar K.M.sahi 11.50<br />

10 Jaleswar Kalika 9.30 4 Oupada R. R. Pur 19.80<br />

11 Jaleswar Khuard <strong>12</strong>.90 5 Oupada Aghirapada 34.00<br />

<strong>12</strong> Jaleswar L.Nath 9.50 6 Oupada S. S. Pur 19.50<br />

13 Jaleswar Makidia 8.50 7 Oupada Iswarpur 19.10<br />

14 Jaleswar Nampo 10.10 8 Oupada Fatepur 19.00<br />

15 Jaleswar Netua 6.30 9 Oupada D. N. Pur 9.00<br />

16 Jaleswar Naschimpur 14.90 10 Oupada Gadasahi 19.50<br />

17 Jaleswar Olmara 7.90 11 Oupada Talakia 31.00<br />

18 Jaleswar Paikasida 10.10 Sub total 248.60<br />

19 Jaleswar Paschimbard 5.60 1 Remuna Sirijung 3.00<br />

20 Jaleswar Rajpur <strong>12</strong>.30 2 Remuna K.Mukhura 15.70<br />

21 Jaleswar R.R.Pur 11.90 3 Remuna Mangalpur 13.50<br />

22 Jaleswar Raibania 11.90 4 Remuna Kalyanpur 34.25<br />

23 Jaleswar Sardarbandh 10.80 5 Remuna Tentulida 31.20<br />

24 Jaleswar Shyamnagar 10.20 6 Remuna Haripur 8.10<br />

25 Jaleswar Sikharpur 10.50 7 Remuna Tundura 9.40<br />

26 Jaleswar Srirampur 11.50 8 Remuna Kuligan 9.35<br />

27 Jaleswar Sugo 13.60 9 Remuna Nizampur 30.95<br />

Sub total 336.70 10 Remuna Mandarpur 14.25<br />

1 Khaira Baunsagadia 16.00 11 Remuna Naraharipur 11.30<br />

2 Khaira Kaithagadia 14.20 <strong>12</strong> Remuna Inchudi 5.65<br />

3 Khaira Nandoor <strong>12</strong>.45 13 Remuna Badapal 10.15<br />

4 Khaira Achyutapur 24.50 14 Remuna Nuagan 18.50<br />

5 Khaira Shyamsudarpur 25.90 15 Remuna Kuruda 18.15<br />

6 Khaira Garasang 11.30 16 Remuna Saraswatipur 18.40<br />

7 Khaira Saradang 16.30 17 Remuna Maharajpur 11.50<br />

8 Khaira Khaira 7.30 18 Remuna Patripal 11.10<br />

9 Khaira Rapeya 8.50 19 Remuna Remuna 9.30<br />

10 Khaira Haripur 7.75 20 Remuna Chasakhand 27.90<br />

11 Khaira Gangadhuli 17.50 21 Remuna Gududa 18.25<br />

<strong>12</strong> Khaira Antara 5.75 22 Remuna Durgadevi 16.40<br />

13 Khaira Jhinkiria 18.55 23 Remuna Biruhan 6.50<br />

14 Khaira Barada 10.65 24 Remuna Barunasing 13.30<br />

15 Khaira Ratina 6.30 25 Remuna Seragarh 14.35<br />

16 Khaira Mahatipur 23.20 26 Remuna Ganipur 20.70<br />

17 Khaira Makhanpur 13.40 27 Remuna Talapada 2.00<br />

18 Khaira Dagarapada 19.65 28 Remuna Nuapadhi 11.80<br />

19 Khaira Kurunta 15.90 Sub total 414.95<br />

20 Khaira Badajaypur 16.50 1 Simulia Abjhuna 7.70<br />

21 Khaira Palasa 35.25 2 Simulia Bati 17.90<br />

22 Khaira Gadapokhari 26.00 3 Simulia Markona 40.95<br />

23 Khaira Gobindpur 14.40 4 Simulia Andarai 56.25<br />

24 Khaira Jalada 9.35 5 Simulia Jamujhadi 27.95<br />

25 Khaira Kupari 7.50 6 Simulia Khirkona 35.60<br />

26 Khaira Barttana 21.70 7 Simulia Chalunigaon 15.50<br />

27 Khaira Manitri 16.90 8 Simulia Ada 10.45<br />

28 Khaira Nayakhandi 17.10 9 Simulia Sabanga 17.20<br />

29 Khaira Dungura 30.85 10 Simulia Bauripada <strong>12</strong>.90<br />

Sub total 470.65 11 Simulia Kanchpada 9.60<br />

1 Nilgiri Ajodhya 10.80 <strong>12</strong> Simulia Purusottampur 16.10<br />

2 Nilgiri Arabandh 32.00 13 Simulia Bari 10.70<br />

3 Nilgiri Begunia 53.70 14 Simulia Maitapur 28.50<br />

4 Nilgiri Berhampur 32.90 15 Simulia Muruna 3.00<br />

5 Nilgiri Bhaunribad 21.10 16 Simulia Iswarpur 18.60<br />

6 Nilgiri Chhatrapur 23.30 17 Simulia Kanheibindha 13.75<br />

7 Nilgiri Dharampur 8.80 Sub total 342.65<br />

8 Nilgiri Dhobasila 19.30 1 Soro Anantapur 20.00<br />

9 Nilgiri Garadihi 27.50 2 Soro Jadida 26.00<br />

10 Nilgiri Jadida 20.70 3 Soro Tentei 25.42<br />

11 Nilgiri Jamudiha <strong>12</strong>.20 4 Soro Gud 15.46<br />

<strong>12</strong> Nilgiri Lakharaj 15.30 5 Soro Pakhar 46.13<br />

13 Nilgiri Kansa 6.80 6 Soro Gopinathpur 17.20<br />

14 Nilgiri Kishore Chnadrapur 10.20 7 Soro Manipur 17.00<br />

15 Nilgiri Machhua 10.20 8 Soro Natapada 6.00<br />

16 Nilgiri Mahisapata 11.10 9 Soro Madhusudanpur 8.00<br />

17 Nilgiri Matiali 5.40 10 Soro Dahisada 13.90<br />

18 Nilgiri Naranapur 13.90 11 Soro Mahumuhan 10.50<br />

19 Nilgiri Narasinghpur 19.60 <strong>12</strong> Soro Singakhunta <strong>12</strong>.65<br />

20 Nilgiri Pithahata 10.80 13 Soro Talanagar 10.00<br />

21 Nilgiri Radha Kishorepur 5.10 14 Soro Mulising <strong>12</strong>.00<br />

TSI: NABARD Consultancy Services (NABCONS) 99


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Outlay<br />

SI.<br />

No.<br />

Block Panchayat Outlay<br />

22 Nilgiri Sajanagarh <strong>12</strong>.20 15 Soro Sarasankha 10.50<br />

23 Nilgiri Siadimal 6.80 16 Soro Kedarpur 16.50<br />

24 Nilgiri Telipal 14.20 17 Soro Manatri 11.00<br />

25 Nilgiri Tentulia <strong>12</strong>.20 18 Soro Attapur 14.00<br />

Sub total 416.10 19 Soro Nadigan <strong>12</strong>.00<br />

1 Oupada Kandagaradi 13.30 20 Soro Sabira 10.07<br />

2 Oupada Baunsabania 22.30 21 Soro Sajanpur 3.50<br />

3 Oupada Badapokhari 42.10 22 Soro Nischintapur 9.73<br />

NB: Though the outlay under MGNREGS for <strong>2011</strong>-<strong>12</strong> has been finalized by DRDA, Sub total 327.56<br />

the list of work is yet to be finalized. Hence this proposed list has been prepared<br />

based on needs and priorities identified through primay survey<br />

Grand Total 4218.56<br />

Gopabandhu Gramin Yojana (GGY):<br />

Under GGY, the total outlay for <strong>2011</strong>-<strong>12</strong> of the district is Rs. 2000.00 lakhs. The allocation<br />

for each of the twelve blocks is presented in table 5.3 and Panchayats in table 5.4.<br />

Panchayat wise detailed list of work is presented in Annexure XIX.<br />

Table 5.3. Block wise allocation of funds for GGY <strong>2011</strong>-<strong>12</strong><br />

Name of Block <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> (Rs. in lakhs)<br />

Bahanaga 180.00<br />

<strong>Balasore</strong> 163.50<br />

Baliapal 168.50<br />

Basta 196.00<br />

Bhograi 188.00<br />

Jaleswar 155.00<br />

Khaira 193.50<br />

Nilgiri 234.50<br />

Oupada 113.50<br />

Remuna 166.50<br />

Simulia 100.50<br />

Soro 140.50<br />

Total 2000.00<br />

Table 5.4. Panchayat wise allocation of funds for GGY <strong>2011</strong>-<strong>12</strong><br />

(Rs. in lakhs)<br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

1 Bahanaga Anji 6.50 9 Baliapal Srirampur 4.50<br />

2 Bahanaga Baripada 11.00 10 Baliapal Aladiha 5.50<br />

3 Bahanaga Avana 8.00 11 Baliapal Bishnupur 6.50<br />

4 Bahanaga Dandaharipur 8.00 <strong>12</strong> Baliapal Baliapal 7.50<br />

5 Bahanaga C.Jagannathpur 6.00 13 Baliapal Jamkunda 3.50<br />

6 Bahanaga Kharasahapur 11.00 14 Baliapal Balikuti 7.50<br />

7 Bahanaga Saud 9.00 15 Baliapal Bolong 5.50<br />

8 Bahanaga Sahaspura 9.00 16 Baliapal Pratappur 10.50<br />

9 Bahanaga Talakurunia 10.00 17 Baliapal Baniadiha 5.50<br />

10 Bahanaga Aruhabad 11.00 18 Baliapal Kunduli 5.50<br />

11 Bahanaga Bahanaga 8.00 19 Baliapal Devog 7.50<br />

<strong>12</strong> Bahanaga Bishnupur 7.50 20 Baliapal Dagara 2.00<br />

13 Bahanaga Chittol 6.00 21 Baliapal Jagatipur 6.50<br />

14 Bahanaga Kasab Jayapur 13.00 22 Baliapal Chaumukh 4.00<br />

15 Bahanaga Kochiakoili 4.50 23 Baliapal Nuagan 6.50<br />

16 Bahanaga Khantapada 6.50 24 Baliapal Panchupali 9.00<br />

17 Bahanaga Kalyani 6.50 25 Baliapal Madhupura 7.00<br />

18 Bahanaga Kuruda 4.50 26 Baliapal Balarampur 6.50<br />

19 Bahanaga Patharpentha 13.00 Sub total 168.50<br />

20 Bahanaga Panpana 10.00 1 Basta Kulida 5.50<br />

21 Bahanaga Gopalpur 11.00 2 Basta Putura 5.50<br />

Sub total 180.00 3 Basta Sahada 5.50<br />

1 <strong>Balasore</strong> Bahabalpur 6.50 4 Basta Irda 7.50<br />

2 <strong>Balasore</strong> Buanla 5.50 5 Basta Purusottampur 11.00<br />

3 <strong>Balasore</strong> Chhanua 6.00 6 Basta Chormara 9.00<br />

4 <strong>Balasore</strong> Genguti 9.00 7 Basta Routpada 7.00<br />

TSI: NABARD Consultancy Services (NABCONS) 100


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

5 <strong>Balasore</strong> Gopinathpur 5.00 8 Basta Sadanandapur 13.00<br />

6 <strong>Balasore</strong> Gudu 7.00 9 Basta Gadapada 17.50<br />

7 <strong>Balasore</strong> Haldipada 10.00 10 Basta Darada 9.00<br />

8 <strong>Balasore</strong> Hidigan 4.00 11 Basta Naikudi 9.50<br />

9 <strong>Balasore</strong> J. Kasaba 5.50 <strong>12</strong> Basta Mukulisi 10.50<br />

10 <strong>Balasore</strong> Kasafal 7.50 13 Basta Natakata 8.50<br />

11 <strong>Balasore</strong> Kasipada 5.50 14 Basta Raghunathpur 6.50<br />

<strong>12</strong> <strong>Balasore</strong> Kuradiha 6.50 15 Basta Brahmada 8.50<br />

13 <strong>Balasore</strong> Nagram 5.00 16 Basta Paunsakuli 9.00<br />

14 <strong>Balasore</strong> O.Saragan 4.50 17 Basta Nabara 7.50<br />

15 <strong>Balasore</strong> Odangi 3.50 18 Basta Singla 8.00<br />

16 <strong>Balasore</strong> Padampur 7.50 19 Basta Tadada 11.00<br />

17 <strong>Balasore</strong> Patrapada 7.00 20 Basta Mathani 7.50<br />

18 <strong>Balasore</strong> Ranasahi 3.50 21 Basta Santoshpur 11.50<br />

19 <strong>Balasore</strong> Rasalpur 9.00 22 Basta Baharda 7.50<br />

20 <strong>Balasore</strong> Rasulpur 3.50 Sub total 196.00<br />

21 <strong>Balasore</strong> Saragan 8.50 1 Bhograi Sankhari 8.50<br />

22 <strong>Balasore</strong> Sartha 7.00 2 Bhograi Gunsartha 7.00<br />

23 <strong>Balasore</strong> Sasanga 6.50 3 Bhograi Nimatpur 8.50<br />

24 <strong>Balasore</strong> Srikona 5.00 4 Bhograi Kakhada 3.50<br />

25 <strong>Balasore</strong> Srirampur 3.50 5 Bhograi Sradhapur 5.00<br />

26 <strong>Balasore</strong> Parikhi 5.00 6 Bhograi Nachinda 8.50<br />

27 <strong>Balasore</strong> Sindhia 6.50 7 Bhograi Rasalpur 8.00<br />

Sub total 163.50 8 Bhograi T.Hazira 9.00<br />

1 Baliapal Kumbhari 10.50 9 Bhograi Bajitpur 4.00<br />

2 Baliapal Jambhirai 9.50 10 Bhograi Balim 4.00<br />

3 Baliapal Nikhira 6.50 11 Bhograi Barbatia 9.00<br />

4 Baliapal Asti 8.50 <strong>12</strong> Bhograi Bhograi 6.00<br />

5 Baliapal Ghantua 5.50 13 Bhograi Deula 6.00<br />

6 Baliapal Bodas 5.00 14 Bhograi Guneibasan 3.00<br />

7 Baliapal Betagadia 4.50 15 Bhograi Analia 6.00<br />

8 Baliapal Deula 7.50 16 Bhograi Hooguli 4.50<br />

17 Bhograi Jayrampur 4.00 18 Khaira Kupari 8.00<br />

18 Bhograi K.Bhaunri 9.00 19 Khaira Dungura 5.00<br />

19 Bhograi Mandarsahi 7.00 20 Khaira Gaganadhuli 6.00<br />

20 Bhograi Nahara 5.00 21 Khaira Haripur 4.00<br />

21 Bhograi Soharia 3.00 22 Khaira Rapeya 4.00<br />

22 Bhograi Sultanpur 6.00 23 Khaira Khaira 4.00<br />

23 Bhograi Baunsadiha 5.50 24 Khaira Sarugaon 4.00<br />

24 Bhograi Dahunda 6.00 25 Khaira Saradang 2.00<br />

25 Bhograi Gopinathpur 3.00 26 Khaira Garasang 3.50<br />

26 Bhograi K.Kamarda 6.00 27 Khaira Shyamsundarpur 6.00<br />

27 Bhograi Mohagab 5.00 28 Khaira Achyatipur 6.00<br />

28 Bhograi Khridpipal 5.00 29 Khaira Antara 4.00<br />

29 Bhograi Kusuda 8.00 30 Khaira Gadapokhari 9.50<br />

30 Bhograi NM Padia 8.00 Sub total 193.50<br />

31 Bhograi Dehurda 4.00 1 Nilgiri Ajodhya 10.00<br />

32 Bhograi Putina 3.00 2 Nilgiri Arabandh 15.00<br />

Sub total 188.00 3 Nilgiri Begunia 10.00<br />

1 Jaleswar Aruha 4.50 4 Nilgiri Berhampur 10.00<br />

2 Jaleswar Baiganbadia 10.00 5 Nilgiri Dharampur 10.00<br />

3 Jaleswar Baradiha 5.00 6 Nilgiri Chhatrapur 9.00<br />

4 Jaleswar Bartana 5.00 7 Nilgiri Garadihi 7.00<br />

5 Jaleswar Chamargan 11.00 8 Nilgiri Dhobasila 9.00<br />

6 Jaleswar D.P.Pur 5.50 9 Nilgiri Jamudiha 10.00<br />

7 Jaleswar G.M. Pur 4.50 10 Nilgiri Jadida 8.00<br />

8 Jaleswar Kaliko 5.50 11 Nilgiri Machhua 8.00<br />

9 Jaleswar Khalina 7.00 <strong>12</strong> Nilgiri K.Chandrapur 13.00<br />

10 Jaleswar Khuard 3.50 13 Nilgiri Kansa 8.00<br />

11 Jaleswar K.M. Sahi 5.00 14 Nilgiri Lakharaj 8.00<br />

<strong>12</strong> Jaleswar L.Nath 6.00 15 Nilgiri Matiali 13.00<br />

13 Jaleswar Makidia 4.00 16 Nilgiri Mahisapata 8.00<br />

14 Jaleswar Naschimpur 8.00 17 Nilgiri Naranapur 13.00<br />

TSI: NABARD Consultancy Services (NABCONS) 101


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

15 Jaleswar Nampo 3.00 18 Nilgiri Pithahata 6.00<br />

16 Jaleswar Netua 5.00 19 Nilgiri Narasinghpur 13.50<br />

17 Jaleswar Paikasida 9.00 20 Nilgiri Tentulia 8.00<br />

18 Jaleswar Paschimbard 4.50 21 Nilgiri Telipal 8.00<br />

19 Jaleswar R.R. Pur 8.00 22 Nilgiri Siadimal 8.00<br />

20 Jaleswar Raibania 5.00 23 Nilgiri Sajangarh 9.00<br />

21 Jaleswar Rajpur 5.00 24 Nilgiri R. Kishorepur 9.00<br />

22 Jaleswar Shyamnagar 4.00 25 Nilgiri Bhaunribad 4.00<br />

23 Jaleswar Sardarbandh 6.00 Sub total 234.50<br />

24 Jaleswar Sikharpur 7.00 1 Oupada Aghirapada 5.50<br />

25 Jaleswar Srirampur 5.00 2 Oupada Badapokhari 9.50<br />

26 Jaleswar Sugo 5.00 3 Oupada Baunsabania 15.50<br />

27 Jaleswar Olmara 4.00 4 Oupada D.N. Pur 7.50<br />

Sub total 155.00 5 Oupada Fatepur 16.50<br />

1 Khaira Nandoor 7.00 6 Oupada Gadasahi 6.00<br />

2 Khaira Kaithagaida 9.00 7 Oupada Iswarpur 15.00<br />

3 Khaira Baunsagadia 15.00 8 Oupada Kandagaradi 7.50<br />

4 Khaira Jhinkiria 8.00 9 Oupada R.R. Pur 6.50<br />

5 Khaira Barada 7.50 10 Oupada Talakia 14.00<br />

6 Khaira Mahatipur 5.00 11 Oupada S.S.Pur 10.00<br />

7 Khaira Ratina 10.00 Sub total 113.50<br />

8 Khaira Makhanpur 5.50 1 Remuna Mangalpur 5.00<br />

9 Khaira Dagarapada 5.00 2 Remuna Barunasing 5.00<br />

10 Khaira Kurunta 7.00 3 Remuna Chasakhanda 5.50<br />

11 Khaira Badajaypur 6.00 4 Remuna Saraswatipur 5.00<br />

<strong>12</strong> Khaira Palasa 8.50 5 Remuna Mandarpur 7.50<br />

13 Khaira Gobindpur 8.00 6 Remuna Nijampur 4.50<br />

14 Khaira Jalada 5.00 7 Remuna Kalyanpur 5.00<br />

15 Khaira Nayakhandi 8.00 8 Remuna Tentulidia 5.50<br />

16 Khaira Manitri 5.00 9 Remuna Sergarh 4.00<br />

17 Khaira Barttana 8.00 10 Remuna Remuna 6.00<br />

11 Remuna Patripal 8.00 11 Simulia Kanheibindha 6.00<br />

<strong>12</strong> Remuna Kuligan 9.50 <strong>12</strong> Simulia Kanchpada 5.00<br />

13 Remuna Durgadevi 5.00 13 Simulia Jamujhadi <strong>12</strong>.00<br />

14 Remuna K.Mukhura 7.00 14 Simulia Abjhuna 7.00<br />

15 Remuna Naraharipur 8.00 15 Simulia Bauripada 5.00<br />

16 Remuna Talapada 3.00 16 Simulia Andarai 7.00<br />

17 Remuna Kuruda 15.00 17 Simulia Purusottampur 6.00<br />

18 Remuna Nuapadhi 6.00 Sub total 100.50<br />

19 Remuna Ganipur 5.00 1 Soro Madhusudanpur 4.50<br />

20 Remuna Gududa 5.00 2 Soro Sajanpur 5.50<br />

21 Remuna Badpal 8.00 3 Soro Pakhara 7.50<br />

22 Remuna Nuagaon 6.00 4 Soro Nadigaon 4.50<br />

23 Remuna Haripur 4.00 5 Soro Dahisada 5.50<br />

24 Remuna Biruan 6.00 6 Soro Sarasankha 4.00<br />

25 Remuna Inchudi 5.00 7 Soro Attapur 4.00<br />

26 Remuna Tundara 5.00 8 Soro Natapada 4.00<br />

27 Remuna Maharajpur 6.00 9 Soro Sabira 7.00<br />

28 Remuna Srijang 2.00 10 Soro Nischintapur 4.50<br />

Sub total 166.50 11 Soro Mulisingh 8.00<br />

1 Simulia Khirkona 6.50 <strong>12</strong> Soro Anantapur 7.00<br />

2 Simulia Bari 3.50 13 Soro Jadida 9.50<br />

3 Simulia Iswarpur 5.50 14 Soro Gud 5.50<br />

4 Simulia Maitapur 4.50 15 Soro Tentei 8.00<br />

5 Simulia Markona 5.50 16 Soro Kedarpur 11.00<br />

6 Simulia Muruna 4.00 17 Soro Manatri 4.50<br />

7 Simulia Bati 8.00 18 Soro Manipur 6.50<br />

8 Simulia Sabanga 4.00 19 Soro Talanagar 7.50<br />

9 Simulia Chalunigaon 4.00 20 Soro Gopinathpur 9.00<br />

10 Simulia Ada 7.00 21 Soro Singakhunta 9.50<br />

NB: Though the outlay under GGY for <strong>2011</strong>-<strong>12</strong> has been finalized by 22 Soro Mahunuhana 3.50<br />

DRDA, the list of work is yet to be finalized. Hence this proposed list<br />

has been prepared based on needs and priorities identified through<br />

primay survey<br />

Sub total<br />

Grand total<br />

140.50<br />

2000.00<br />

TSI: NABARD Consultancy Services (NABCONS) 102


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indira Awas Yojana (IAY):<br />

Under IAY, the total outlay for <strong>2011</strong>-<strong>12</strong> of the district is Rs. 4625.24 lakhs. The allocation<br />

for each of the nine blocks is presented in table 5.5.<br />

Table 5.5. Block wise allocation of funds for IAY <strong>2011</strong>-<strong>12</strong><br />

Block <strong>Plan</strong> Outlay (Rs. In lakhs)<br />

Bahanaga 566.75<br />

<strong>Balasore</strong> Sadar 1022.32<br />

Baliapal 827.87<br />

Basta 764.02<br />

Bhograi 1187.88<br />

Jaleswar 8<strong>12</strong>.88<br />

Khaira 748.09<br />

Nilgiri 516.97<br />

Oupada 330.87<br />

Remuna 857.00<br />

Simulia 495.08<br />

Soro 567.48<br />

Total 8697.20<br />

Mo Kudia:<br />

Under Mo Kudia, the total outlay for <strong>2011</strong>-<strong>12</strong> of the district is Rs. 875.85 lakhs. The<br />

allocation for each of the nine blocks is presented in table 5.6.<br />

Table 5.6. Block wise allocation of funds for Mo Kudia <strong>2011</strong>-<strong>12</strong><br />

Block <strong>Plan</strong> Outlay (Rs. In lakhs)<br />

Bahanaga 57.07<br />

<strong>Balasore</strong> Sadar 102.95<br />

Baliapal 83.37<br />

Basta 76.94<br />

Bhograi 119.63<br />

Jaleswar 81.86<br />

Khaira 75.34<br />

Nilgiri 52.06<br />

Oupada 33.32<br />

Remuna 86.30<br />

Simulia 49.86<br />

Soro 57.15<br />

Total 875.85<br />

SGSY:<br />

Under SGSY, the total outlay for <strong>2011</strong>-<strong>12</strong> of the district is Rs.1065.00 lakhs. The allocation<br />

for each of the nine blocks is presented in table 5.7.<br />

Table 5.7. Block wise allocation of funds for SGSY <strong>2011</strong>-<strong>12</strong><br />

Block <strong>Plan</strong> Outlay (Rs. In lakhs)<br />

Bahanaga 78.20<br />

<strong>Balasore</strong> Sadar 141.06<br />

Baliapal 114.23<br />

Basta 105.42<br />

Bhograi 163.90<br />

Jaleswar 1<strong>12</strong>.16<br />

Khaira 103.22<br />

Nilgiri 71.33<br />

Oupada 45.65<br />

Remuna 118.24<br />

Simulia 68.31<br />

Soro 78.30<br />

Total <strong>12</strong>00.00<br />

TSI: NABARD Consultancy Services (NABCONS) 103


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

5.2. Resource base available at Block/Panchayat Samiti level<br />

During <strong>2011</strong>-<strong>12</strong>, in addition to rural development programmes, funds will be<br />

available from sources like 13 th Finance Commission Grants, State Finance<br />

Commission Grants, Grants from Special Relief Commissioner (OSDMA), Special<br />

Problem fund, MP/MLA LAD, Cess etc to blocks of the district. Out of these<br />

sources, final figures on fund allocated by MLA/MPs to each block from their LAD<br />

fund were not available. Hence, this source has not been included in this resource<br />

envelope.<br />

Table 5.8. Resource base available at all the Blocks (<strong>2011</strong>-<strong>12</strong>)<br />

Programme Resource available (Rs. in lakhs)<br />

MGNREGS 4218.56<br />

GGY 2000.00<br />

IAY 8697.20<br />

Mo Kudia 875.85<br />

SGSY <strong>12</strong>00.00<br />

13 th Finance Commission Grant 641.25<br />

Construction of CC Road 287.00<br />

State Finance Commission Award 442.50<br />

5.3. Own Resources of Gram Panchayats<br />

In addition to funds available under plan schemes, Panchayats also get resources from<br />

other sources to undertake development programmes and carryout day to day activities.<br />

During the planning exercise an attempt was made to collect data on own resources of<br />

Gram Panchayats from all sources and its expenditure pattern. Out of 289 Gram<br />

Panchayats in the district, data could be collected from 201 GPs (69.55%) (Table 5.9).<br />

Major source of earning of Gram Panchayat are auction of natural resources (Pond, river,<br />

sand, local hats, market complexes etc. Auction contributes 63% of the total resource<br />

generated by Panchayats (Table 5.10).<br />

Table 5.9. Own resource generation by Gram Panchayats of <strong>Balasore</strong> district<br />

(Amount in Rs.)<br />

2009-10 2010-11<br />

Name of<br />

Block<br />

No. of GPs<br />

reported<br />

Actual<br />

Resource<br />

Generation<br />

Actual<br />

Expenditure<br />

Anticipated<br />

Resource<br />

Generation<br />

Anticipated<br />

Expenditure<br />

Bahnaga<br />

17<br />

Average<br />

4.2315<br />

02489<br />

3.8651<br />

0.2274<br />

4.2350<br />

0.2491 0.0000<br />

<strong>Balasore</strong><br />

<strong>12</strong><br />

Average<br />

4.3350<br />

0.3613<br />

3.1950<br />

0.2663<br />

4.5930<br />

0.3828<br />

3.8530<br />

0.3211<br />

Baliapal<br />

16<br />

Average<br />

3.6750<br />

0.2297<br />

3.2352<br />

0.2022<br />

4.2150<br />

0.2634 0.0000<br />

Basta<br />

14<br />

Average<br />

4.0000<br />

0.2857<br />

3.265<br />

0.2332<br />

4.160<br />

0.2971<br />

3.460<br />

0.2471<br />

Bhograi<br />

15<br />

Average<br />

6.6220<br />

0.4415<br />

4.7930<br />

0.3195<br />

7.196<br />

0.4797<br />

5.2230<br />

0.3482<br />

Jaleswar<br />

18<br />

Average<br />

3.7520<br />

0.2084<br />

3.4262<br />

0.1903<br />

3.9251<br />

0.2181 0.0000<br />

Khaira<br />

20<br />

Average<br />

4.5230<br />

0.2262<br />

3.9540<br />

0.1977<br />

4.3210<br />

0.2161 0.0000<br />

Nilgiri<br />

20<br />

Average<br />

5.0390<br />

0.2520<br />

4.5400<br />

0.2270<br />

5.563<br />

0.2782<br />

0.6900<br />

0.0345<br />

Oupada<br />

11<br />

Average<br />

2.8532<br />

0.2594<br />

2.4250<br />

0.2205<br />

3.2650<br />

0.2968 0.0000<br />

Remuna 20 3.8720 3.4580 4.2050<br />

TSI: NABARD Consultancy Services (NABCONS) 104


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Name of<br />

Block<br />

No. of GPs<br />

reported<br />

Actual<br />

Resource<br />

Generation<br />

2009-10 2010-11<br />

Actual<br />

Expenditure<br />

Anticipated<br />

Resource<br />

Generation<br />

Anticipated<br />

Expenditure<br />

Average 0.1936 0.1729 0.2103 0.0000<br />

Simulia<br />

17<br />

Average<br />

4.757<br />

0.2798<br />

3.3655<br />

0.1980<br />

5.073<br />

0.2984<br />

3.558<br />

0.2093<br />

Soro<br />

21<br />

Average<br />

3.6800<br />

0.1752<br />

3.0300<br />

0.1443 0.0000 0.0000<br />

Total<br />

201<br />

Average<br />

51.3397<br />

0.2554<br />

42.5520<br />

0.2117<br />

50.7511<br />

0.2525<br />

16.7840<br />

0.0835<br />

Source: Primary survey, 2009<br />

Table 5.10. Sources of Own Resources of Gram Panchayats<br />

Sources %<br />

Auction of natural resources & properties 62.82<br />

Cess 11.28<br />

Sairat 22.01<br />

Tax on water supply 0.33<br />

Interest on deposits 1.51<br />

Royalty 0.79<br />

Cycle license 1.26<br />

Total 100.00<br />

Source: Primary survey, 2009<br />

Regarding expenditure heads of the own resources of Gram Panchayats, major amount is<br />

spent on salary of peon/watchman (28.67%) followed by office expenditure (19.02%), travel<br />

expenses for attending meeting at Block, <strong>District</strong> level (<strong>12</strong>.15%). Expenditure on<br />

development work accounts for 10.18% of total expenditure incurred in a year.<br />

Table 5.11. Heads of Expenditure of Own Resources of Gram Panchayats<br />

Sources %<br />

Maintenance of Properties/Assets* 6.96<br />

Development work 10.18<br />

Electricity/Telephone Bills 6.55<br />

Office Expenditure 19.02<br />

Salary of Peon/watch man 28.67<br />

Travel expenses <strong>12</strong>.15<br />

Observation of Festivals etc. 6.99<br />

Occasional Assistance to poor/needy (Philanthropic activity) 2.45<br />

Provision of drinking water during scarcity 6.06<br />

Miscellaneous Expenditure 0.98<br />

Total 100.00<br />

*These properties are auctioned for resource generation<br />

Source: Primary survey, 2009<br />

5.4. Resources available at ULB Level<br />

There are four ULBs in the district, one is <strong>Balasore</strong> Municipality and others are Jaleswar,<br />

Nilgiri & Soro NAC. The resource available at these four ULBs during <strong>2011</strong>-<strong>12</strong> is presented<br />

below.<br />

Programme<br />

State <strong>Plan</strong><br />

Table 5.<strong>12</strong>. Resources available to ULBs (<strong>2011</strong>-<strong>12</strong>)<br />

<strong>Balasore</strong> Municipality<br />

Amount<br />

(Rs. in lakhs)<br />

Infrastructure Grant towards Urban Tourism Destination Towns <strong>12</strong>.10<br />

Road Development & Maintenance 99.96<br />

TSI: NABARD Consultancy Services (NABCONS) 105


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programme<br />

Amount<br />

(Rs. in lakhs)<br />

Urban Greenery <strong>12</strong>.10<br />

Special Problem Fund 8.39<br />

Centrally Sponsored <strong>Plan</strong><br />

Integrated Housing & Urban Development Programme (IHSDP) 348.63<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 66.31<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 48.36<br />

National Urban Information System (NUIS) 0.33<br />

Sub total 596.18<br />

State <strong>Plan</strong><br />

Jaleswar NAC<br />

Road Development, Maintenance Grant etc. 198.81<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 23.35<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC) 23.47<br />

Sub total 245.63<br />

State <strong>Plan</strong><br />

Nilgiri NAC<br />

Road Development, Maintenance Grant etc. 41.80<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 11.00<br />

Sub total 52.80<br />

State <strong>Plan</strong><br />

Soro NAC<br />

Road Development Grant 45.00<br />

Road Maintenance Grant 20.00<br />

FDR Grant 20.00<br />

Incentive Grant 30.00<br />

Protection of water bodies 25.00<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 50.00<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC) 35.00<br />

Sub total 225.00<br />

Total 1119.61<br />

TSI: NABARD Consultancy Services (NABCONS) 106


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

6.1. CDAP<br />

6.1.1. Crop Husbandry<br />

CHAPTER VI<br />

SECTORAL DISTRICT PLANS/SCHEMES<br />

Agriculture and allied sectors are the main-stay of the district’s economy. It provides both<br />

direct and indirect employment to the majority of the workforce (67%). The share of<br />

agriculture in the district income is about 41% in the year 2001-02 which is more than the<br />

state share in NSDP. In fact agriculture is the main source of livelihood of the population<br />

supplemented by livestock rearing, fishery and horticulture. The district lack mineral and<br />

forest resources. Hence, the rural population of the district mainly depends on agriculture,<br />

fishery and other activities allied to agriculture for their livelihood.<br />

The state government has declared new Agriculture Policy in the month of August 2008<br />

with a view to transform the sector from its current status of subsistence agriculture to a<br />

commercial proposition.<br />

Major Objectives of the State Agricultural Policy 2008 are<br />

• Increase in farm mechanization<br />

• Soil testing and restoration of soil health<br />

• Increase in Seed Replacement Ratio<br />

• Increase in efficiency of irrigation<br />

• Balanced fertilization and use of bio-fertilizers<br />

• Strengthening agricultural research and education<br />

• Increase in coverage of crops under insurance schemes<br />

• Improvement in marketing<br />

In conformity with the above objectives, the district has taken concerted effort to energize<br />

the sector and make it profitable and more employable.<br />

In the district Rice is the principal crop and area coverage is almost 91.69% in Kharif<br />

season. But its productivity is much low (1.963 tons/ha) than state average (2.205<br />

tons/ha). Because of this low productivity, even if the paddy coverage is much more, the<br />

district has an annual surplus of only about 0.22 lakh tones of paddy (0.15 lakh tons of<br />

rice) (2008-09 Directorate of Agriculture, Government of Orissa). The main reasons for such<br />

a poor productivity are traditional methods of cultivation and frequent crop failure due to<br />

natural calamities.<br />

This low productivity coupled with high operational cost and frequent crop failure due to<br />

natural calamities has created a negative perception in the mind of farmers of the district<br />

towards agriculture. The youths are rarely interested to continue in this sort of nonremunerative<br />

farming and prefer to migrate to nearby industrial belts, cities to earn<br />

handsomely. Such an outward flow of potential workforce outside the district also has a<br />

serious negative impact i.e. huge shortage of labourers for farming operations during peak<br />

season. This is a major problem for the medium and large farmers who depend mostly on<br />

hired labourers to carry out the farming operations. This situation is expected to improve to<br />

some extent from this year onward because of the hike in minimum support price of food<br />

grains declared by Government of India. More return to the farmers is expected to create a<br />

positive perception in the mind of farmers towards cultivation.<br />

Keeping the above facts in mind, the strategies planned for development of this lead sector<br />

in the district are<br />

TSI: NABARD Consultancy Services (NABCONS) 107


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Objectives and Strategies of <strong>Annual</strong> <strong>Plan</strong>:<br />

• Additional land is brought under cultivation through construction of drainage channels,<br />

embankments, flood/water logging control structures and land development.<br />

• Increase in productivity of potential crops, mainly rice, jute, sugarcane;<br />

• Diversification to cash crops i.e. oilseed and pulse crops.<br />

• Promotion of organic farming through establishment of vermicompost units.<br />

• Farm mechanization – promotion of farm machineries to reduce cost of cultivation and<br />

reduce drudgery involved in farm operations. Problem due to shortage of labour can be<br />

avoided to a greater extent through farm mechanization.<br />

• Provision of irrigation through installation of Shallow Tube Wells and River Lift<br />

Irrigation Projects.<br />

List of plan schemes finalized for implementation during <strong>2011</strong>-<strong>12</strong> in this sector are<br />

presented below.<br />

State <strong>Plan</strong>:<br />

RIDF – XIII (PLIP) - The expenditure components under this head is totally State <strong>Plan</strong>. The<br />

scheme envisages undertaking activities for establishment of Shallow Tube Wells (STW) in<br />

the farmer’s field and installation of River Lift Irrigation Projects. For installation of STWs,<br />

subsidy will be provided to the farmers up to 30% of the total project cost. <strong>Annual</strong> <strong>Plan</strong><br />

Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 828.00 lakhs (SS: Rs. 828.00 lakhs)<br />

Table 6.1. Details of activities and physical targets: RIDF – XIII (PLIP)<br />

Activities <strong>Plan</strong>ned Unit <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Shallow Tube Well Nos. 3500<br />

River Lift Project Nos. 60<br />

Bore Well Nos. 6<br />

Central Sponsored <strong>Plan</strong>:<br />

Rice Development (Work <strong>Plan</strong>) – The expenditure components under this head is shared<br />

on 90:10 basis between central and state govt. This programme is in operation in the State<br />

since 2001-02. Under this scheme Farmers Field School, exposure visit of farmers (out side<br />

and inside state), training of farmers through pre-seasonal trainings, extension of improved<br />

technologies by organizing Krushak Diwas are being taken up. The main objective of the<br />

scheme is enhancement of rice production and productivity in a mission mode. Farmers’<br />

Field Schools will be organized and rice growers will be trained in various aspects of rice<br />

production. In each Farmer’s Field School 40 farmers will be trained for three times during<br />

the cropping season. Discourses on important aspects of rice production like soil testing,<br />

land preparation, variety selection, SRI method, etc. and demonstration of Integrated<br />

Nutrient Management (INM)/Integrated Pest Management/ Integrated Weed Management,<br />

Post Harvest Technology, etc will be offered. For cross learning and adoption of best<br />

practices followed elsewhere in the fields of fellow farmers, farmers will be sent to different<br />

places within the State and outside the State on exposure visits. Block level awareness<br />

campaigns i.e. Krushak Sampark Melas will be organized in each block to create awareness<br />

among the farmers about various schemes and crop practices. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong>-<br />

Rs. 10.72 lakhs (CS: Rs. 9.65 lakhs SS: Rs. 1.07 lakhs)<br />

Table 6.2. Details of activities and physical targets: Rice Development<br />

(Work <strong>Plan</strong>)<br />

Activities <strong>Plan</strong>ned Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Conduct of Farmers Field School Nos. 14<br />

Block Level awareness campaign Nos. 14<br />

Organizing Krushak Diwas Nos. 3<br />

TSI: NABARD Consultancy Services (NABCONS) 108


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Activities <strong>Plan</strong>ned Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

<strong>District</strong> Level Pre-seasonal trainings Nos. 3<br />

Exposure Visit (Inside the State) Nos. <strong>12</strong><br />

Exposure Visit (Outside the State) Nos. 9<br />

Celebration of <strong>District</strong> Mahostav Nos. 1<br />

Financial assistance to Farmers Field School Nos. 170<br />

Demonstration SRI Ha. 110<br />

Sugarcane Development (Work <strong>Plan</strong>) - The expenditure components under this head is<br />

shared on 90:10 basis between central and state govt. Under this Work <strong>Plan</strong>, activities like<br />

Farmers Field Schools, demonstration of inter cropping, ratoon management, pit method<br />

will be carried out and subsidy provided for seed cane. Ratoon Management<br />

Demonstrations of one acre each will be taken up to demonstrate better ratoon<br />

management practices for adoption. Similarly, technology demonstrations (pit Method) and<br />

inter cropping demonstrations will also be conducted during <strong>2011</strong>-<strong>12</strong>. Farmer’s field<br />

schools will be organized in sugarcane crop with participation of 25 cane growers in each<br />

school. Incentive on seed multiplication will be provided to farmers @ Rs.400/-per acre.<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 2.59 lakhs (CS: Rs. 2.33 lakhs SS: Rs. 0.26 lakhs)<br />

Table 6.3. Details of activities and physical targets: Sugarcane Development (Work<br />

<strong>Plan</strong>)<br />

Activities <strong>Plan</strong>ned Unit <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Organizing Farmers Field School Nos. 4<br />

Ratoon Management Demonstration Nos. 11<br />

Exposure Visit (Inside the State) Nos. 7<br />

Jute Technology Mission (Mini Mission - II) – The expenditure components under this<br />

head is shared on 90:10 basis between central and state govt. Under the Scheme Farmers<br />

Field School on jute crop will be taken up in selected jute-growing patches where jute area<br />

is substantial. In a field school 50 farmers will be trained for 5 days in the cropping season.<br />

Training on fertilizer management, intercultural operation, IPM, harvesting technique and<br />

retting & extraction of fiber will be imparted to the farmer trainees. New intervention like<br />

production technology demonstration, retting technology demonstration will be conducted<br />

by constructing retting tanks, both kutcha & pucca. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs.<br />

27.51 lakhs (CS: Rs. 24.76 lakhs SS: Rs. 2.75 lakhs)<br />

Table 6.4. Details of activities and physical targets: Jute Technology Mission<br />

Activities <strong>Plan</strong>ned Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Distribution of Seed (Jute) Qtls. 45<br />

Conduct of Farmers Field School Nos. 7<br />

Organizing Farmers Training Nos. 10<br />

IPM Technology Demonstration Nos. 4<br />

Distribution of Sprayer Nos. 330<br />

Production Technology Demonstration Nos. 165<br />

Foliar Spray of Urea Ha 143<br />

Distribution of Essential Nutrient Minikit Ha. 715<br />

Retting Technology Demonstration Nos. 28<br />

Retting Scheme Nos. 2<br />

Kuchha Retting Tank Nos. 66<br />

Pucca Retting Tank Nos. 11<br />

Foliar Spray of Urea distribution Ha. 143<br />

Exposure Visit (Out side the State) No. of farmers 11<br />

ISOPOM (Oilseed) - The expenditure components under this head is shared on 75:25 basis<br />

between central and state govt. The scheme envisages undertaking various activities for<br />

higher production and productivity of oilseeds in the district. For improving availability of<br />

HYV Seeds, seed mini kits provided by Govt. of India will be distributed to the farmers free<br />

of cost. Input subsidy will be provided to the farmers on use of gypsum and rhyzobium<br />

TSI: NABARD Consultancy Services (NABCONS) 109


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

culture to boost the productivity of groundnut in the district. During <strong>2011</strong>-<strong>12</strong>, it has also<br />

been programmed to conduct Farmers Field Schools and farmer’s training on integrated<br />

pest management techniques and use of micronutrients and vermicompost. To demonstrate<br />

improved methods of oilseed production, Block demonstrations will be conducted. <strong>Annual</strong><br />

<strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 272.96 lakhs (CS: Rs. 204.72 lakhs SS: Rs. 68.24 lakhs)<br />

Table 6.5. Details of activities and physical targets: ISOPOM Oilseeds<br />

Activities <strong>Plan</strong>ned Unit <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Distribution of Certified Seeds Qtls. 20280<br />

<strong>Plan</strong>t Protection Equipments Nos. <strong>12</strong>00<br />

Block level Demonstration (Sun flower) Ha 13<br />

IPM cum Farmers Field School (Mustard) Nos. 5<br />

IPM cum Farmers Field School (Groundnut) Nos. 8<br />

Micronutrient Ha 198<br />

Gypsum Ha 2750<br />

Farmers Training Nos. 15<br />

Vermi Compost units Nos. 13<br />

P.P. Chemicals Ha. 110<br />

Farm Implements (Manual) Set 6<br />

Farmers Exposure Visit Nos. 15<br />

Sprinkler Set Nos. 11<br />

Central <strong>Plan</strong><br />

Seed Village Programme: This is one of the important flagship programmes in the<br />

agriculture and allied activities sector.This is the purely central plan. <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong> - Rs. 56.68 lakhs (CS: Rs. 56.68 lakhs)<br />

Table 6.6. Details of activities and physical targets: Seed Village Programme<br />

Activities planned Unit <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Paddy Acres 3300<br />

Mung Acres 2200<br />

Biri Acres 825<br />

Groundnut Acres 3575<br />

Mustard Acres 550<br />

Farm Mechanization (Macro Management) (Work <strong>Plan</strong>) - The expenditure components<br />

under this head is Central <strong>Plan</strong>. Mechanization of agriculture operation is beneficial for<br />

reducing the cost of production and allowing the producers to compete the market. This<br />

also helps to overcome human drudgeries associated with the various agricultural<br />

operations. Under the scheme, subsidy will be provided to farmers to procure agricultural<br />

implements at the following rates. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 211.26 lakhs (CS: Rs.<br />

211.26 lakhs)<br />

Type of Implements Rate of Subsidy per implement<br />

Power tiller 50% of the cost limited to Rs.60,000/-<br />

Tractors 50% of the cost limited to Rs.90,000/-<br />

Self Propelled Paddy reaper 50% of the cost limited to Rs.80,000/-<br />

Tractor drawn Rotavator 25% of the cost limited to Rs.25,000/-<br />

Power operated implements 50%of the cost limited to Rs.20,000/-<br />

Specially Power Operated Implements 50%of the cost limited to Rs.30,000/-<br />

Manually operated/bullock drawn implements 25%of the cost limited to Rs.2000/-<br />

Hydraulic Trailer 50%of the cost limited to Rs.25,000/-<br />

Power Thresher (All types) 50%of the cost limited to Rs.24,000/-<br />

Table 6.7. Details of activities and physical targets: Farm Mechanization (Macro<br />

Management) (Work <strong>Plan</strong>)<br />

Activities <strong>Plan</strong>ned Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Subsidized sale of Tractor Nos. 132<br />

Subsidized sale of Power tiller Nos. <strong>12</strong>0<br />

TSI: NABARD Consultancy Services (NABCONS) 110


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Subsidized sale of Reaper Nos. 7<br />

Subsidized sale of Rotavator Nos. 7<br />

Subsidized sale of Hydraulic Trailer Nos. 7<br />

Subsidized sale of Power operated implements Nos. <strong>12</strong><br />

Subsidized sale of Special Power operated implements Nos. <strong>12</strong><br />

Subsidized sale of Manual & Bullock drawn<br />

implements<br />

Nos. 137<br />

National Food Security Mission – Pulses<br />

This is one of the important flagship programmes in agriculture and allied activities sector.<br />

This is a purely central plan. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 256.92 lakhs (Central <strong>Plan</strong>:<br />

Rs. 256.92 lakhs)<br />

Table 6.8. Details of activities and physical targets: NFSM<br />

Activities planned Unit<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Distribution of certified seed Qtls. 700<br />

Organization of technology demonstration (0.4 ha. Unit) Ha. 200<br />

Organization of farmers training (@ Rs.5000/1 day training) (25 farmers) Nos. 60<br />

Seed Village (@ Rs. 15000/- per Ha.) of 50 numbers of farmers for 3 days Nos. 700<br />

Storage godown at Block Head Quarter of <strong>12</strong>50 sqfts. Nos. 4<br />

Thresing Floor (30’ X 30’) with cover Nos. 4<br />

Power Tillers Nos. 25<br />

Dal Processor (Mini Dal Mill)<br />

INM<br />

Nos. 3<br />

Lime/Gypsum Ha. 1500<br />

Micro Nutrient Ha. 550<br />

Assistance for R. Culture/PSB distribution<br />

IPM<br />

Ha. 450<br />

Assistance for PP Chemicals Ha. 1100<br />

Incentive for Sprayer @ Rs.3000/- Nos. 400<br />

Distribution of Rotavators Nos. 3<br />

Distribution Sprinkler Sets @ Rs.7500/- Ha. 70<br />

Incentive for Pumpset Nos. 160<br />

Assistance for Pipe carrying water from source to field (one set 800mtr.) Meters 8000<br />

Exposure visit @ Rs.3000/- (20 persons in a groups) Nos. 5<br />

RKVY (Rashtriya Krishi Vikas Yojana):<br />

This is one of the important flagship programmes in the agriculture and allied activities<br />

sector. The scheme was introduced by Government of India in the year 2007-08 in order to<br />

provide incentives to States for increasing expenditure in Agriculture & allied sectors. The<br />

State which maintained a higher ratio of expenditures in Agriculture & allied sectors to total<br />

plan expenditure in the previous year as compared to the average ratio of expenditure<br />

incurred to total plan expenditure in 3 years before that year becomes eligible for assistance<br />

under the scheme. The entire assistance is grant to the State. In <strong>Balasore</strong> district, the<br />

scheme will be implemented in sub sectors namely Crop Husbandry, Horticulture, Animal<br />

Husbandry etc.<br />

Under crop husbandry sector, it has been planned to undertake demonstration of SRI<br />

method of rice cultivation, establishment of vermicompost hatchery & units, promote<br />

application of Bio-fertilizer in pulse and oilseed crops, supply of manual and bullock drawn<br />

implements at subsidized costs and capacity building of Krushak sathis. <strong>Annual</strong> <strong>Plan</strong><br />

Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 3700.05 lakhs (Central <strong>Plan</strong>: Rs. 3700.05 lakhs)<br />

In addition to the above schemes, the district has another potential financial resource<br />

under ATMA. Agricultural Technology Management Agency (ATMA) is a society key<br />

stakeholder involved in agricultural activities for sustainable agricultural development in<br />

TSI: NABARD Consultancy Services (NABCONS) 111


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

the district. It is focal point for integrating Research and Extension activities and<br />

decentralizing day to day management of the public Agricultural Technology System (ATS).<br />

It is a registered society responsible for technology dissemination at the district level. The<br />

ATMA at district level would be increasingly responsible for all the technology dissemination<br />

activities at the district level. It would have linkage with all the line departments, research<br />

organizations, non-governmental organizations and agencies associated with agricultural<br />

development in the district. In <strong>Balasore</strong> district, ATMA is under taking extension oriented<br />

activity at district as well at Block & village level, linkage between farmer and the Research<br />

Institutions, preparation of SREP etc.<br />

Table 6.9. Details of activities and physical targets: RKVY<br />

Activities planned<br />

RKVY Stream I<br />

Unit<br />

<strong>Annual</strong><br />

<strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Targets<br />

Profiling of secondary & micronutrient Nos. 1<br />

Supply of Paper mill sludge tons 1500<br />

Supply of Gypsum tons 800<br />

Distribution of Bio-fertilizers Qtls. 300<br />

Promotion of Organic farming Nos. 15<br />

Promotion of SRI (One unit 20 Acs.) Nos. 270<br />

Establishment of Vermicompost unit Nos. 350<br />

Distribution of Rice minikit (cost of seed + transportation) Nos. 350<br />

Exposure visit outside the state (@ Rs. 3000/person; 20 persons in one group) Nos. 10<br />

Conduct of Farmers Field School (Rice) Nos. 36<br />

Conduct of Farmers Field School (Integrated Nutrient Management) Nos. 24<br />

Conduct of Farmers Field School (Integrated Pest Management in Rice) Nos. 24<br />

Establishment of BGA Nos. 1<br />

Capacity Building training for Extension Personnel)<br />

Farm mechanization under RKVY<br />

Nos. 350<br />

Subsidy for Power Tiller Nos. 220<br />

Subsidy for Self propelled reaper Nos. <strong>12</strong><br />

Subsidy for Pump sets Nos. 900<br />

Subsidy for Rotavator Nos. 3<br />

Subsidy for Power Thresher Nos. 130<br />

Subsidy for Special power operated implements Nos. 20<br />

Subsidy for Hydraulic Trailer Nos. <strong>12</strong><br />

Subsidy for Manual & Bullock drawn implements Nos. 360<br />

Subsidy for Combined Harvester Nos. <strong>12</strong><br />

Subsidy for Transplanter Nos. 2<br />

Subsidy for Tractor<br />

RKVY Stream II<br />

Nos. <strong>12</strong><br />

Renovation of farms Nos. 1<br />

Strengthening of statistical unit Nos. 1<br />

Modernsation of training Hall with Genset. & L.C.D. Projector Nos. 1<br />

Boundary wall & Bore well & Sanitary for training hall Nos. 1<br />

Construction of FIAC building Nos. 1<br />

Construction of seed proceeding plant 5 tons capacity (Jaleswar) Nos. 1<br />

Construction of Dehumidified storage godown Nos. 1<br />

6.1.2. Horticulture<br />

Horticulture has been identified as one of the priority sector of development for <strong>Balasore</strong><br />

district. The development of horticulture has importance not only for increasing the<br />

production of fruits and vegetables, but also for improving the rural economy of the district<br />

by generating employment and income particularly for small and marginal farmers.<br />

Horticulture also provides food and nutritional security to poor men who can not afford to<br />

costly nutritional diets. <strong>Balasore</strong> district is endowed with natural resources, adequate<br />

rainfall and suitable climate for horticulture corps. Though not exploited to the extent<br />

possible, the agro-climatic condition of the district is conducive for cultivation of different<br />

TSI: NABARD Consultancy Services (NABCONS) 1<strong>12</strong>


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

fruits, flowers and vegetables. The district is covered under National Horticulture Mission<br />

(NHM), which is functioning in 19 districts of the state.<br />

At present the district accounts for only 2.67% of total area of mango in the state. Similar is<br />

the case with regard to other fruits like guava (2.26% area), citrus (2.95% area), litchi<br />

(3.05% area), banana (2.94% area), cashewnut (1.84% area) and flowers like marigold<br />

(4.98% area), rose (3.48% area), tuberose (8.00% area) and Gladioli (5.79% area).<br />

Only in case of pine apple, papaya and pomegranate the district occupies a little bit better<br />

position in the sate. The pine apple crop accounts for 5.63% of total area under pine apple<br />

in the state. Similarly, in case of papaya and pomegranate the district accounts for 4.05%<br />

and 5.00% of total area in the state. Though the district lags behind in horticultural<br />

activities, there exists lot of potential for development of this sector. Because of proximity of<br />

the district to cities like Baripada (60 kms), Cuttack (174 kms), Bhubaneswar (204 kms)<br />

and Kolkata (214 kms) and good road connectivity with these places, there lies huge scope<br />

for marketing of horticultural crops, mainly vegetables, flowers and mushrooms.<br />

Keeping the above facts in view, the objectives and strategies of <strong>Annual</strong> <strong>Plan</strong> for<br />

development of this sector are:<br />

• Development of fruit orchards at farmer’s level.<br />

• Promotion of organic farming through establishment of vermicompost units.<br />

• Popularization of floriculture through demonstrations.<br />

• Increase in plantation of fruits crops, potatoes and vegetable crops through<br />

subsidized sale of planting materials and supply of minikits.<br />

• Establishment and revival of block level nurseries to act as a resource center for<br />

farmers.<br />

• Popularization of drip and sprinkler irrigation system among farmers.<br />

List of plan schemes finalized for implementation during <strong>2011</strong>-<strong>12</strong> in this sector are<br />

presented below.<br />

State <strong>Plan</strong>:<br />

Mission Shakti: This is a state plan scheme under which it has been planned to take up<br />

plantation of fruit trees by the women SHGs. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> – Rs.4.80 lakhs<br />

(SS: Rs. 4.80 lakhs).<br />

Central Sponsored <strong>Plan</strong>:<br />

National Horticulture Mission Programme: This is a Central Sponsored <strong>Plan</strong> scheme with<br />

funding pattern of 85:15 (CS:SS). The objective of the scheme is increase production activity<br />

of horticultural plants in the district. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> – Rs.193.63 lakhs (CS:<br />

Rs. 164.58 lakhs SS: Rs. 29.05 lakhs).<br />

Micro Irrigation: This is a Central Sponsored <strong>Plan</strong> scheme with funding pattern of<br />

40:30:30 (CS:SS:Beneficiary). Under this programme, drip & sprinkler irrigation system will<br />

be set up in farmer’s field. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 64.29 lakhs (CS: Rs. 25.71<br />

lakhs SS: Rs. 19.29 lakhs Beneficiary: Rs. 19.29 lakhs)<br />

ISOPOM (Oil Palm) Development: This is a Central Sponsored <strong>Plan</strong> scheme with funding<br />

pattern of 75:25 (CS:SS). The scheme envisages providing subsidies for oil palm seedling as<br />

well as on maintenance cost on newly created plantation. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> –Rs.<br />

10.18 lakhs (CS: 7.64 lakhs SS: 2.54 lakhs).<br />

Central <strong>Plan</strong>:<br />

Demonstration on coconut: This is a Coconut Development Board Programme in which<br />

demonstrations will be conducted for new plantation of coconut trees. <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong> - Rs. 11.30 lakhs (Central <strong>Plan</strong>: Rs. 11.30 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 113


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

National Medicinal <strong>Plan</strong>ts Mission: This is a Central <strong>Plan</strong> scheme. In this scheme farmers<br />

will be provided with interventions for cultivation of medicinal and aromatic plants. <strong>Annual</strong><br />

<strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> Rs. 2.26 lakhs (Central <strong>Plan</strong>: Rs. 2.26 lakhs).<br />

RKVY: This is a Central <strong>Plan</strong> scheme. The scheme was introduced by Government of India<br />

in the year 2007-08 in order to provide incentives to States for increasing expenditure in<br />

Agriculture & allied sectors. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> Rs. 6.70 lakhs (Central <strong>Plan</strong>: Rs.<br />

6.70 lakhs)<br />

Table 6.10. Details of activities and physical targets: Horticulture<br />

Activities planned<br />

A. Mission Shakti Programme<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

<strong>Plan</strong>tation of fruit trees<br />

B. National Horticulture Mission Programme<br />

Establishment of new Garden<br />

Nos. 24000<br />

Mango <strong>Plan</strong>t Ha. 420<br />

Banana <strong>Plan</strong>t Ha. 50<br />

Costal horticulture - cashew<br />

Floriculture<br />

Ha. 200<br />

Marigold Ha. 15.00<br />

Gladioli Ha. 30.00<br />

Rose<br />

Organic Farming<br />

Ha. 20.00<br />

Vermicompost (Big)<br />

Production of <strong>Plan</strong>ting Materials<br />

Nos. 10<br />

Small Nursery (Private sector)<br />

Protected cultivation<br />

Nos. 4<br />

Greenhouse units Nos./Sqm. 60<br />

Shade net units Nos./Sqm. 400<br />

Mulching units<br />

Human Resource Development<br />

Ha. 10<br />

Training of farmers (Inside the state) Nos. 80<br />

Exposure visit (Outside the state) Nos. 30<br />

Training to gardner<br />

Subsides Sales<br />

Nos. 3<br />

Vegetable Mini kit<br />

Mission Management<br />

Nos. 14400<br />

<strong>District</strong> level show<br />

C. Micro Irrigation Programme<br />

Nos. 1<br />

Drip irrigation Ha. 50.00<br />

Sprinkler irrigation<br />

D. Coconut Development Board Programme<br />

Ha. 300.00<br />

Area expansion Ha. 80.00<br />

Laying out demonstration Ha. 20<br />

Organic Manure pit Nos. 2<br />

Raising of coconut seedling<br />

E. ISOPOM (Oil Palm)<br />

Nos. 5000<br />

Area expansion (Normal) Ha. 80.00<br />

Area expansion - State sector plan Ha. 15.00<br />

TSP Ha. 15.00<br />

Demonstration<br />

F. RKVY.<br />

Ha. 10.00<br />

Establihment of Vermicompost units Nos. 50<br />

Establihment of Vermicompost hatchery Nos. 10<br />

Establihment of Zero Energy Cool Chamber<br />

G. National Medicinal <strong>Plan</strong>t Mission<br />

Programme<br />

Nos. 10<br />

<strong>Plan</strong>tation of Anola Ha. 10.00<br />

<strong>Plan</strong>tation of Aswagandha Ha. 5.00<br />

TSI: NABARD Consultancy Services (NABCONS) 114


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Activities planned Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

<strong>Plan</strong>tation of Tulasi Ha. 7.00<br />

<strong>Plan</strong>tation of Aloevera Ha. 5.00<br />

Exposure visit (Inside the state) Nos. 5<br />

Exposure visit (Outside the state) Nos. 3<br />

6.1.3. Soil & Water Conservation<br />

In <strong>Balasore</strong> district, major problem is flood, water logging and development of salinity in the<br />

cultivated land due to lack of drainage facility. One of the major stumbling blocks in<br />

achieving crop diversification in <strong>Balasore</strong> has been predominance of low lying areas. The<br />

situation can be altered and cultivation of high value agriculture and horticulture crops can<br />

be taken up only by bringing about changes in the status of land through land development<br />

activities. Considering the problem of poor drainage/water logging in low land and salinity<br />

of soil in coastal belt, the land development sector needs greater attention in the district.<br />

Besides land leveling, on-farm development works are required to be taken up in cultivable<br />

holdings of individual farmers for deriving optimal benefits of the irrigation projects. Based<br />

on these facts, the objectives and strategies for development work in this sector are<br />

• Land leveling, on-farm development works, reclamation of saline and alkaline soil and<br />

soil improvement. All these activities are aimed to bring additional area under<br />

cultivation and increase productivity.<br />

• Watershed management.<br />

• Soil and water conservation works such as bunding, trenching, construction of nalla<br />

bunds, weirs etc.<br />

• Water management activities such as lining of field channels, laying of pipelines for<br />

distribution.<br />

• Creating water harvesting structures.<br />

In this sub sector no state plan scheme is operating in the district.<br />

Central Sponsored <strong>Plan</strong>:<br />

National Watershed Development Project for Rainfed Areas (NWDPRA): The scheme is<br />

being implemented in the district during XIth <strong>Plan</strong> as a component of Macro Management of<br />

Agriculture (MMA) under Central Sponsored <strong>Plan</strong> (CSP) Scheme. During <strong>2011</strong>-<strong>12</strong>, it has<br />

been finalized to continue the implementation of ongoing micro watersheds in the district as<br />

per common guideline for watershed development and revised treatment cost of Rs.<br />

<strong>12</strong>000.00 per Ha. The main objectives of the scheme as follows:<br />

• Natural Resource Management for enhancement of agricultural productivity and<br />

production on sustainable basis.<br />

• Restoration of ecological balance in rainfed areas.<br />

• Creation of sustainable source of income for the village community to reduce labour<br />

migration and solve employment problem through SHG mobilization.<br />

Twentyseven micro watersheds are functioning in <strong>Balasore</strong> district and 10 such microw<br />

watersheds are still under implementation covering a total area of 10421 ha during XI th<br />

plan period under the scheme. Out of this it has been finalized to cover 542.00 ha during<br />

<strong>2011</strong>-<strong>12</strong> with <strong>Annual</strong> <strong>Plan</strong> Outlay of Rs. 231.56 lakhs (CS: Rs. 208.40 lakhs SS: Rs. 23.16<br />

lakhs)<br />

Development of Farms under RKVY: This is Central <strong>Plan</strong> scheme under which soil and<br />

water conservation measures for development of farms in different blocks of the district will<br />

be taken up. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 56.00 lakhs (CS: Rs. 56.00 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 115


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 6.11. Details of activities and physical targets: Soil Conservation<br />

Programmes Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

NWDPRA Nos. 10<br />

Development of farms under RKVY Nos. <strong>12</strong><br />

6.1.4. Animal Husbandry & Dairy Development<br />

In a costal district like <strong>Balasore</strong>, animal husbandry is considered as one of the key<br />

economic activity to bring prosperity to the rural poor. It is one of the traditional sources of<br />

livelihood of almost all the rural households of the district. Animal rearing provides<br />

livestock products, dung for fuel and draught power in the household itself. Further, during<br />

natural calamities when the crop is failed, domestic animals became a boon and serve as a<br />

means of livelihood till the new crop is harvested.<br />

The district has an impressive livestock population. As per the 17 th Livestock Census<br />

(2003), the density of cattle, pig and goat in the district is higher than that of state<br />

averages. The density of cattle population in <strong>Balasore</strong> district is 335, which is almost forth<br />

times of that in Orissa state (92.31). Similarly, the density of goat is 27.03% higher than<br />

that of Orissa state.<br />

In spite of such a good livestock population, the livestock production in the district is very<br />

minimal. The per capita availability of milk is only 45 gms/day as against state figure of 94<br />

gms/day and ICMR recommendation of 250 gm of milk/day. This is because of low<br />

productivity of cows in the district. Crossbred/improved cows account for only 3.95% of the<br />

total cattle population in the district. This is low as against average percentage of 8.55% in<br />

the entire state. The indigenous cows which account for 95.81% of the total cattle and<br />

buffalo population in the district, contribute only 56.58% to the total milk production in the<br />

district.<br />

Objectives and strategies for <strong>Annual</strong> <strong>Plan</strong><br />

• Opening of new Livestock Aid Centers (LACs) in deficient areas. These LACs will<br />

have Artificial Insemination facilities for large scale up gradation of indigenous<br />

breeds of cattle.<br />

• Construction/renovation of buildings of existing veterinary dispensaries, LACs.<br />

• Promotion of dairy activities through self employment – provision of skill up<br />

gradation training of rural youths.<br />

• Strengthening of dairy organizations to promote dairy activities on a large scale.<br />

List of plan schemes finalized for implementation during <strong>2011</strong>-<strong>12</strong> in this sector are<br />

presented below.<br />

State <strong>Plan</strong><br />

Bird Flu Training: This is a state plan scheme and the objective is to control of bird flu<br />

disease through training of para vet workers. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 0.96 lakhs<br />

(Sate <strong>Plan</strong>: Rs. 0.96 lakhs).<br />

Disaster Management Preparedness: This is a State <strong>Plan</strong> scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong> – Rs. 18.50 lakhs (State <strong>Plan</strong>: Rs.18.50 lakhs).<br />

Skill Upgradation Training: This is a State <strong>Plan</strong> scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> – Rs.<br />

3.80 lakhs (State <strong>Plan</strong>: Rs.3.80 lakhs).<br />

Genetic Upgradation of Goats (Deworming): This is a State <strong>Plan</strong> scheme. <strong>Annual</strong> <strong>Plan</strong><br />

Outlay <strong>2011</strong>-<strong>12</strong> – Rs. 2.00 lakhs (State <strong>Plan</strong>: Rs.2.00 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 116


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Central Sponsored <strong>Plan</strong><br />

ASCAD (Assistance to States for Control of Animal Diseases): It is a Centrally Sponsored<br />

Scheme with funding pattern of 75:25 (CS:SS). The scheme is implemented to control<br />

livestock diseases through mass vaccination and diagnosis of diseases in the newly<br />

established DDLS in order to ensure dispensation of casualties and loss to the farmers.<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> Rs. 81.23 lakhs (CS: Rs. 60.92 lakhs SS: Rs. 20.31 lakhs)<br />

Health Camps & Awareness Programme under ASCAD: This is a Central Sponsored <strong>Plan</strong><br />

scheme and objective of the scheme is to provide awarness services on animal health care<br />

facilities in the Gram Panchayats. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 0.55 lakhs (CS: Rs. 0.41<br />

lakhs SS: Rs. 0.14 lakhs)<br />

Central <strong>Plan</strong><br />

SMILE Training (Society for Management Information Learning & Extension &<br />

Exposure Visit): This is a Central <strong>Plan</strong> scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 8.52<br />

lakhs (Central <strong>Plan</strong>: Rs. 8.52 lakhs)<br />

RKVY: This is a Central <strong>Plan</strong> scheme. The scheme was introduced by Government of India<br />

in the year 2007-08 in order to provide incentives to States for increasing expenditure in<br />

Agriculture & allied sectors. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong>–Rs. 534.94 lakhs (Central <strong>Plan</strong>: Rs.<br />

534.94 lakhs)<br />

Table 6.<strong>12</strong>. Details of activities and physical targets: Animal Husbandry<br />

Activities <strong>Plan</strong>ned<br />

ASCAD Health Camps and Awareness Programme<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Targets<br />

Health Camps Nos. of Camps 26<br />

Genetic up gradation of Goats- Deworming of Goats Nos. of Camps 300<br />

Bird Flu Training<br />

Training under SMILE<br />

Nos. of Training 15<br />

Microscopy Training to LIs Nos. of Batches 1<br />

Entrepreneurship Development Training Nos. of Batches 3<br />

Orientation Training to LIs on Development Programme Nos. of Batches 1<br />

Training of Farmers on poultry Production Nos. of Batches 42<br />

Training of lead Farmers Nos. of Batches 3<br />

Skill Upgradation Training Nos. of Batches 21<br />

Milk Production Mts. 70.00<br />

Egg Production Million 77.00<br />

Meat Production Mts. 3.50<br />

Minikits Distribution of Fodder Nos. 3000<br />

Training & Demonstration under pasture Development Nos. of Plots 500<br />

Total Fodder Production Quintals 80000<br />

Treatment of Cases Nos. of Live stocks 420000<br />

Castration<br />

Vaccination<br />

Nos. of Live stocks 37000<br />

HSV Nos. of doses 330000<br />

BQV Nos. of doses 300000<br />

FNDV Nos. of doses 300000<br />

RDV (R2B) Nos. of doses 250000<br />

PPRV Nos. of doses 100000<br />

Artificial Insemination Nos. 57000<br />

Infertility camps Nos. 650<br />

Deworming Nos. 100000<br />

Dairy units established Nos. 300<br />

Goatery units established 60<br />

Broiler Farmers established Nos. 150<br />

Back Yard Poultry Units Nos. 60000<br />

Layer farmer Units Nos. 2<br />

TSI: NABARD Consultancy Services (NABCONS) 117


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

6.1.5. Cooperative<br />

Co-operatives play a crucial role in transforming socio-economic conditions in an economy<br />

and in facilitating increased participation of people in a predominantly rural and<br />

agricultural economic, like that of Orissa. Co-operatives play a very critical role not only in<br />

the agricultural credit sector but also in many other fields.<br />

State <strong>Plan</strong><br />

Share capital to Co-operative credit institutions under NRC-LTO fund: This is a State<br />

<strong>Plan</strong> scheme. The objective of this scheme is to provid assistance in shape of share capital<br />

to the co-operative institution in order to strengthen their share capital base so as to enable<br />

them to borrow more funds from financing agencies to support their investment<br />

programmes in Agricultural Credit Programme. Under this scheme, the State Government<br />

gates funds from NABARD as negotiated soft loans. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs.<br />

202.02 lakhs (State <strong>Plan</strong>: Rs. 202.02 lakhs)<br />

Revival of the short term Cooperative Credit Institution: This is a State <strong>Plan</strong> scheme.<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. <strong>12</strong>4.00 lakhs (State <strong>Plan</strong>: Rs. <strong>12</strong>4.00 lakhs)<br />

Loan Support to Cooperatives: This is a State <strong>Plan</strong> scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> -<br />

Rs. 2<strong>12</strong>.16 lakhs (State <strong>Plan</strong>: Rs. 2<strong>12</strong>.16 lakhs)<br />

Modernization of Cooperative Processing Rice Mill: This is a State <strong>Plan</strong> scheme. <strong>Annual</strong><br />

<strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 30.00 lakhs (State <strong>Plan</strong>: Rs. 30.00 lakhs)<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives: This is a State<br />

<strong>Plan</strong> scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 24.25 lakhs (State <strong>Plan</strong>: Rs. 24.25 lakhs)<br />

Multi-State Agriculture Competitiveness Project (MACP): The project aims at creating at<br />

efficient agricultural marketing system in the state through espanding market<br />

infrastructure and improving farmer’s access to markets as well as for facilitating<br />

intensification and diversification of production system by improving the efficiency of the<br />

agricultural extension system. The project includes components such as creation and<br />

development of new market infrastructutre, strengthening of existing infrastructure,<br />

supply-chain development and linking farmers to agribusiness, strengthening of the State<br />

Marketing Board. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 131.00 lakhs (State <strong>Plan</strong>: Rs. 131.00<br />

lakhs)<br />

Women Co-operatives & Labour Co-operative: This is a State <strong>Plan</strong> scheme. Under the<br />

scheme financial assistance in shape of loan/subsidy or share to Women cooperatives,<br />

Labour cooperative is provided. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. <strong>12</strong>.20 lakhs (State <strong>Plan</strong>:<br />

Rs. <strong>12</strong>.20 lakhs)<br />

Central <strong>Plan</strong><br />

Construction of Rural Godown under RKVY: <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 1427.92<br />

lakhs (Central <strong>Plan</strong>: Rs. 1427.92 lakhs)<br />

Table 6.13. Details of activities and physical targets: Cooperation<br />

Programmes Units<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Targets<br />

Share capital to PACS/LAMPCS & C.S. Bank under NRC-LTO fund No. 67<br />

Managerial Subsidy to PACS/LAMPCS & C.S. Bank under NRC-LTO fund No. 59<br />

Modernization of Cooperative Processing Rice Mill No. 1<br />

Share Capital to Consumer Cooperatives No. 10<br />

Transport Subsidy of PDS to Consumer Cooperatives No. 23<br />

Repair of Godown of PACS & RCMS No. 14<br />

Managerial Subsidy to PACS & RCMS<br />

Financial assistance (loan/subsidy) to cooperatives<br />

No. 50<br />

Women Cooperative No. 1<br />

Labour Cooperative No. 5<br />

TSI: NABARD Consultancy Services (NABCONS) 118


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

6.1.6. Fisheries<br />

<strong>Balasore</strong> is one of the maritime districts of the state bestowed with vast freshwater,<br />

brackish water and marine fisheries resources. Rivers namely, Budhabalanga,<br />

Subarnarekha, Sono, Jalaka, Kansabansa etc are flowing in the district having rich<br />

fisheries potential for inland capture fisheries. Also 81 km long coastline of Bay of Bengal<br />

bordering the district provides enough scope for marine and brackish water fishery.<br />

In spite of such a huge potential, the production level is only 30% in fresh water fisheries,<br />

22% in brackish water fisheries and 44% in marine fisheries. The per capita availability of<br />

fresh water fish is only 5.13kg/year as against WHO recommendation of 11kg/year.<br />

Further, this sector bears potential for substantial income and opportunities in generating<br />

employment for the unemployment youths.<br />

Objectives and strategies for <strong>Annual</strong> <strong>Plan</strong><br />

• Renovation of defunct tanks owned by farmers for development of fresh water<br />

aquaculture.<br />

• Fishermen of BPL category are provided with low cost house, motorization of country<br />

crafts, rebate on HSD, coverage under insurance schemes.<br />

• Training, awareness camp & skill up gradation – Scientific training for skill up<br />

gradation of progressive farmers, entrepreneurs and interested educated youths.<br />

• Strengthening of extension services.<br />

List of plan schemes finalized for implementation during <strong>2011</strong>-<strong>12</strong> in this sector are<br />

presented below.<br />

State <strong>Plan</strong><br />

Development of Fresh water Fisheries and aquaculture through FFDA: This is a state<br />

plan scheme for development of Inland fisheries and Aquaculture through the Fish Farmer<br />

Development Agency. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. <strong>12</strong>.50 lakhs (State <strong>Plan</strong>: Rs. <strong>12</strong>.50<br />

lakhs)<br />

Exhibition and Organization of Buyer Seller meet: This is a state plan scheme. <strong>Annual</strong><br />

<strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong>- Rs. 1.00 lakhs (State <strong>Plan</strong> Rs. 1.00 lakhs)<br />

Assistance to Mechanization Programme: This is a state plan scheme. <strong>Annual</strong> <strong>Plan</strong><br />

Outlay <strong>2011</strong>-<strong>12</strong>- Rs. 5.00 lakhs (State <strong>Plan</strong> Rs. 5.00 lakhs)<br />

Survey and Investigation and establishment of Fishing Harbour & Fish landing<br />

Centers: This is a state plan scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong>- Rs. 667.00 lakhs (State<br />

<strong>Plan</strong> Rs. 667.00 lakhs)<br />

Safety measures for Marine Fishermen: This is a state plan scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong>- Rs. 5.00 lakhs (State <strong>Plan</strong> Rs. 5.00 lakhs)<br />

Central Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries and Aquaculture through FFDA (Programme<br />

Component): This is a centrally sponsored programme with funding pattern of 75:25<br />

between center and the state. <strong>Annual</strong> <strong>Plan</strong> outlay under the scheme during <strong>2011</strong>-<strong>12</strong> is Rs.<br />

74.40 lakhs (CS: Rs. 55.80 lakhs; SS: Rs. 18.60 lakhs)<br />

Develoment of Brackish Water Aquaculture through FFDA: This is a centrally sponsored<br />

programme with funding pattern of 75:25 between center and the state. <strong>Annual</strong> <strong>Plan</strong> outlay<br />

under the scheme during <strong>2011</strong>-<strong>12</strong> is Rs. 150.00 lakhs (CS: Rs.1<strong>12</strong>.50 lakhs; SS: Rs.37.50<br />

lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 119


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Saving - cum – Relief: The expenditure component under this head is shared on 50:50<br />

basis between central and state govt. The objective of the scheme is to benefit the fishermen<br />

during lean period of fishing and also to inculcate the habit of saving. <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong> - Rs. 14.40 lakhs (CS: Rs. 7.20 lakhs; SS: Rs. 7.20 lakhs)<br />

Group Accident Insurance Scheme: The expenditure component under this head is<br />

shared on 50:50 basis between central and state govt. The programme is meant for<br />

accidental insurance to active fishermen @ Rs. 50,000/- and Rs. 25,000/- in case of death<br />

and invalidity due to accident, respectively. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 16.50 lakhs<br />

(CS: Rs. 8.25 lakhs; SS: Rs. 8.25 lakhs)<br />

Low Cost Housing Scheme: The expenditure component under this head is shared on<br />

50:50 basis between central and state govt. In this scheme, model fishermen villages will be<br />

created providing low cost house, drinking water facility through tube-wells and<br />

construction of community hall. This scheme is continuing since 1987-88. <strong>Annual</strong> <strong>Plan</strong><br />

Outlay <strong>2011</strong>-<strong>12</strong> Rs. 50.00 lakhs (CS: Rs. 25.00 lakhs; SS: Rs. 25.00 lakhs)<br />

Assistance to Mechanization Programme: The expenditure component under this head is<br />

shared on 50:50 basis between central and state govt. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> Rs.<br />

28.50 lakhs (CS: Rs. 14.25 lakhs; SS: Rs. 14.25 lakhs)<br />

Central <strong>Plan</strong>:<br />

Introduction of Intermediate craft of Improved Design: This is a central plan scheme.<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 24.00 lakh (CS Rs. 24.00 lakhs)<br />

Table 6.14. Details of activities and physical targets: Fisheries<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Programmes Unit<br />

<strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Ha. 130<br />

Development of Fresh Water Aquaculture under FFDA Training to fish<br />

Farmers (Nos.)<br />

60<br />

Integrated Development of Inland Capture Resources<br />

(Reservoir/River) (Net & Boat)<br />

Net & Boats<br />

Nos.<br />

25<br />

Development of Brackish Water Aquaculture (Water Area) Ha. <strong>12</strong>0<br />

Ha. 240<br />

National Fisheries Development Board (Training)<br />

Training to fish<br />

<strong>12</strong>0<br />

Self Employment Programme (Training)<br />

6.1.7. Agricultural Credit:<br />

Farmers (Nos.)<br />

Training to fish<br />

Farmers (Nos.)<br />

For doubling the agricultural production it need to assist the farmer financially at the time<br />

cultivation and requirement. This can be streamlined with crop loan to farmer during Kharif<br />

and Rabi crop through various cooperative banks and RRBs. NABARD in association with<br />

other leading commercial Banks is working in the district to meet the financial<br />

requirements of Agricultural sectors. NABARD is also preparing Potential Linked Credit<br />

<strong>Plan</strong> (PLP) for the district since 1988-89. It aims at ensuring smooth credit flow to the<br />

district to the desired extent and in desired direction. During <strong>2011</strong>-<strong>12</strong> the potential credit<br />

linked plan has been prepared for Rs. 1397.78 crores with Rs. 768.19 crores for agriculture<br />

sector.<br />

Table 6.15. Abstract of <strong>Plan</strong> Outlays: Agriculture & Allied Activities<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Sub sectors<br />

Central <strong>Plan</strong> + Central Share of<br />

Central Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State Share of<br />

Central Sponsored <strong>Plan</strong>s<br />

Total<br />

Agriculture 4466.37 900.32 5366.69<br />

Horticulture 218.19 55.68 273.87<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>0<br />

60


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Sub sectors<br />

Central <strong>Plan</strong> + Central Share of<br />

Central Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State Share of<br />

Central Sponsored <strong>Plan</strong>s<br />

Total<br />

Soil & Water conservation 264.90 23.16 288.06<br />

Animal Husbandry 604.80 45.71 650.50<br />

Cooperation 1427.92 735.63 2163.55<br />

Fisheries 247.00 801.30 1048.30<br />

Grand Total 7229.17 2561.80 9790.97<br />

6.2. Rural Development<br />

<strong>Balasore</strong> is a densely populated district. A`s per 2001 census, population density in<br />

<strong>Balasore</strong> district is 532 persons/sq. km, which is almost double that of state figure (236<br />

persons/sq.km). Further, the percentage of rural population to total population is 89.11%<br />

as against 85.01% in Orissa state. Because of huge rural population and high population<br />

density, there is requirement of good number of civic amenities and infrastructure in rural<br />

areas of the district.<br />

In addition, 73.72% of the total families are Below Poverty Line (BPL) (1997). These BPL<br />

families requires intervention in the shape of livelihood, housing, basic amenities etc.<br />

Development of the district can’t be possible unless there is an improvement in the<br />

standard of living of this rural population, mostly people below poverty line.<br />

In this sector priority is on livelihood security for rural poor either through creation of wage<br />

employment opportunities or self employment and creation of infrastructures in deficient<br />

areas. These infrastructures not only include basic amenities but also infrastructures<br />

required for development of productive sectors, disaster management etc.<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY): Government of Orissa launched this new programme<br />

called "The Gopabandhu Gramin Yojana (GGY)" on October 9, 2006 with a view to providing<br />

additional developmental assistance to the targeted 11 (Eleven) districts which are not<br />

covered under the Backward Regions Grant Fund (BRGF). The scheme has been<br />

implemented from the year 2006-07 and will continue to be implemented during the 11th<br />

<strong>Plan</strong> period from 2007-08 to <strong>2011</strong>-<strong>12</strong>. The 11 districts covered under GGY are Angul,<br />

<strong>Balasore</strong>, Bargarh, Bhadrak, Cuttack, Jajpur, Jagatsinghpur, Kendrapara, Khurda,<br />

Nayagarh and Puri.<br />

The principal objective of the scheme is to provide additional development funds to the<br />

targeted districts to develop infrastructure in every revenue village. Some of the specific<br />

projects which could be taken under the Yojana would be in the nature of construction of<br />

concrete roads within the village, construction of black top/concrete roads to connect a<br />

village with a nearest PMGSY or ODR road, installation of street lights within the village, for<br />

which the maintenance is to be borne by the concerned Gram Panchayat (GP), provision of<br />

drinking water supply and creation of irrigation sources.<br />

The additional development funds provided in this programme would be of un-tied nature<br />

and supplement the programmes which are already available in the aforesaid sectors and<br />

provide synergy and convergence to the different development programmes.<br />

As per the intial guideline, each targeted district will be provided additional development<br />

assistance to the extent of Rs. 10 crores per annum for a period of 6 years from 2006-07 to<br />

<strong>2011</strong>-<strong>12</strong>. Panchayati Raj Department is the Nodal Department for the purpose of<br />

administration of the GGY and takes appropriate budget provisions for this purpose under<br />

separate head of account each year beginning from the year 2006-07 onwards until the<br />

expiry of the Eleventh Five Year <strong>Plan</strong>. In the year <strong>2011</strong>-<strong>12</strong>, the allocation has been doubled<br />

from Rs. 10 crores to Rs. 20 crores.<br />

During <strong>2011</strong>-<strong>12</strong> it has been planned to undertake a total of <strong>12</strong>25 works with plan outlay of<br />

Rs. 2000.00 lakhs. Panchayat wise details of work to be executed under GGY during <strong>2011</strong>-<br />

<strong>12</strong> are presented in Annexure XIX.<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>1


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

State Finance Commission Grant: This is in addition to plan funds and is received in the<br />

form of grant. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> - Rs. 442.50 lakh (SS Rs. 442.50 lakhs)<br />

Construction of CC road (New Scheme): This is a state plan scheme. <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong> - Rs. 287.00 lakh (SS Rs. 287.00 lakhs)<br />

Central Sponsored <strong>Plan</strong><br />

Swarnajayanti Gram Swarojgar Yojana (SGSY): This is a Centrally Sponsored programme.<br />

The expenditure component under this head is shared on 75:25 basis between central and<br />

state govt. The objective of SGSY is to bring the assisted poor families above the poverty line<br />

by providing them income generating assets through a mix of bank credit and government<br />

subsidy. The families below poverty line (BPL) including artisans, identified through the BPL<br />

Census are eligible for assistance under the Scheme. While selecting the new activities<br />

priority is given to those having inherent skill which is primarily constituted by the rural<br />

artisans. The roles of PRIs in the implementation of this Scheme are as under:o<br />

The Gram Sabha will approve the list of BPL families.<br />

o The list of key activities and the list of villages identified under the scheme in the Block<br />

should be approved by the Intermediate Panchayat.<br />

o The list of Swarozgaris finally selected should be made available to the Gram<br />

Panchayat for placing it before the next Gram Sabha.<br />

o The Gram Panchayat would actively monitor the performance of the Swarozgaris<br />

particularly repayment of loan.<br />

o The <strong>District</strong> Panchayat will review the performance under this scheme in its General<br />

Body Meeting.<br />

The financing under SGSY will be mainly for the Key activities identified by DRDA in the<br />

SGSY committee. Block wise key activities have been identified/finalized by the district level<br />

committee of the district.<br />

Table 6.16. Key Activities selected for SGSY in the district<br />

Block Key activity Block Key activity<br />

Bahanaga Dairy, Agro & allied activity Khaira Dairy, Pisciculture<br />

<strong>Balasore</strong><br />

Dairy, Agril. Produce &<br />

Marketing<br />

Nilgiri<br />

Dairy, Agro & allied<br />

activity.<br />

Baliapal Dairy, Farm Mechanization Oupada Dairy, Pisciculture<br />

Basta Dairy, Pisciculture Remuna Dairy, farm mechanization<br />

Bhograi Dairy, Pisciculture Simulia Dairy, Pisciculture<br />

Jalewar Dairy, Pisciculture Soro Dairy, Farm Mechanization<br />

All the programmes mentioned above exhibit a mixed trend in the performance parameter.<br />

Though the physical achievement with regard to target under SGSY is high, but the benefit<br />

to the Swarozgaris in increasing their income is not satisfactory. This is because of the low<br />

level of investment per activity, lack of entrepreneurship on the part of the beneficiaries to<br />

handle big units and partly due to reluctance of the bankers to finance more on account of<br />

a poor recovery climate. Recovery under Government sponsored programmes is very low in<br />

the whole district. This sort of dismal picture acts as a discouraging factor for the bankers<br />

to extend more and more credit. Maintenance of assets is another grey area in case of Govt.<br />

sponsored programmes. In spite of best efforts, the assets are found missing in many cases.<br />

In all the government sponsored programmes, there is provision of joint asset verification by<br />

officials of bank and Govt. But it does not work out well due to lack of coordination and<br />

gross paucity of staff in bank branches in post VRS scenario.<br />

Table 6.17. Performance of SGSY in <strong>Balasore</strong> district<br />

Indicators 2005-06 2006-07<br />

(Rs. in lakhs)<br />

2007-08<br />

Allocation 489.91 519.93 634.92<br />

Release 588.32 576.85 791.<strong>12</strong><br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>2


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicators 2005-06 2006-07 2007-08<br />

Utilization 535.68 569.33 651.26<br />

% utilization 91.00 99.00 82.00<br />

Total Expenditure on Subsidy 329.17 356.75 471.58<br />

Total Credit component 759.43 1088.36 1457.79<br />

Per Swarozgaris investment - Subsidy 8662 8634.00 8616<br />

Per Swarozgaris investment - Credit 19985 26340.00 2661.36<br />

Coverage of Swarozgaris<br />

Target 3331 3790 4732<br />

Achievement<br />

Individual 169 257 787<br />

through Group 3631 3875 4686<br />

Total 3800 4132 5473<br />

% Achievement 114.00 109.00 116.00<br />

Breakup of Swarozgaris covered<br />

SC 1327 1304 1915<br />

% to total 35.00 32.00 35.00<br />

ST 617 914 1369<br />

% to total 16.00 22.00 25.00<br />

Women 3715 4074 5144<br />

% to total 98.00 99.00 94.00<br />

Disabled 169 199 275<br />

% to total 4.00 5.00 5.00<br />

Source: DRDA, <strong>Balasore</strong><br />

During <strong>2011</strong>-<strong>12</strong>, it has been planned to provide loan to 9100 Swarozgaris under the<br />

scheme. The plan outlay under the scheme during <strong>2011</strong>-<strong>12</strong> is Rs. <strong>12</strong>00.00 lakhs (CS: Rs. 900<br />

lakhs; SS: Rs. 300 lakhs)<br />

Mahatama Gandhi National Rural Employment Guarantee Scheme (MGNREGS): It is<br />

one of the important flagship programmes of Government of India. The expenditure<br />

component under this head is shared on 90:10 basis between central and state govt. The<br />

objective is to provide livelihood security to rural households by providing at least hundred<br />

days of wage employment (unskilled manual work). Besides, durable assets will be created<br />

which will strengthen livelihood resource base in rural areas.<br />

Salient Features of the Programme:<br />

• Adult members of a rural household, willing to do unskilled manual work, may apply for<br />

registration in writing or orally to the local Gram Panchayat.<br />

• The Gram Panchayat after due verification will issue a Job Card. The Job Card will bear<br />

the photograph of all adult members of the household willing to work under NREGA and<br />

is free of cost.<br />

• The Job Card should be issued within 15 days of application.<br />

• A Job Card holder may submit a written application for employment to the Gram<br />

Panchayat, stating the time and duration for which work is sought. The minimum days<br />

of employment have to be at least fourteen.<br />

• The Gram Panchayat will issue a dated receipt of the written application for<br />

employment, against which the guarantee of providing employment within 15 days<br />

operates.<br />

• Employment will be given within 15 days of application for work, if it is not then daily<br />

unemployment allowance as per the Act, has to be paid. Liability of payment of<br />

unemployment allowance is of the States.<br />

• Work should ordinarily be provided within 5 km radius of the village. In case work is<br />

provided beyond 5 km, extra wages of 10% are payable to meet additional transportation<br />

and living expenses.<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>3


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Wages are to be paid according to the Minimum Wages Act 1948 for agricultural<br />

labourers in the State, unless the Centre notifies a wage rate which will not be less than<br />

Rs. 60/per day. Equal wages will be provided to both men and women.<br />

• Wages are to be paid according to piece rate or daily rate. Disbursement of wages has to<br />

be done on weekly basis and not beyond a fortnight in any case.<br />

• At least one-third beneficiaries shall be women who have registered and requested work<br />

under the scheme.<br />

• Work site facilities such as crèche, drinking water, shed have to be provided<br />

• The shelf of projects for a village will be recommended by the gram sabha and approved<br />

by the zilla panchayat.<br />

• At least 50% of works will be allotted to Gram Panchayats for execution.<br />

• Permissible works predominantly include water and soil conservation, afforestation and<br />

land development works.<br />

• A 60:40 wage and material ratio has to be maintained. No contractors and machinery is<br />

allowed<br />

• The Central Government bears the 100 percent wage cost of unskilled manual labour<br />

and 75 percent of the material cost including the wages of skilled and semi skilled<br />

workers.<br />

• Social Audit has to be done by the Gram Sabha.<br />

• Grievance redressal mechanisms have to be put in place for ensuring a responsive<br />

implementation process<br />

• All accounts and records relating to the Scheme should be available for public scrutiny.<br />

• Section 16 (3) (4) of the Act states that every Gram panchayat shall prepare a<br />

development plan and maintain a shelf of works and forward it to the Programme Officer<br />

for scrutiny and preliminary approval prior to the commencement of the year in which it<br />

is proposed. The Development <strong>Plan</strong> is an <strong>Annual</strong> Work <strong>Plan</strong> that should comprise a shelf<br />

of projects for each village with administrative and technical approvals so that works<br />

can be started as soon as there is a demand for work. The Development <strong>Plan</strong> will be like<br />

a rolling plan, since the approved shelf of projects may carry over from one financial<br />

year to the next.<br />

In Orissa, NREGA was started in 19 districts under Phase I. Then 5 districts were added in<br />

Phase II and 6 districts in Phase III. <strong>Balasore</strong> district was included under NREGA in the Ist<br />

phase, i.e. from 2008-09. During 2008-09, the performance of NREGA in the district is very<br />

poor. Though Job cards were issued to almost 95% of the total BPL families in the district,<br />

number of households provided employment is very less i.e., only 4.05% of the total<br />

households issued job cards. The demand for wage work was also very poor, only 4.09% of<br />

the total households issued job cards. Since, 2008-09 was the first year of programme<br />

implementation; performance is expected to be poor. But during <strong>2011</strong>-<strong>12</strong>, the performance<br />

needs to be improved with significant participation of all stake holders.<br />

During <strong>2011</strong>-<strong>12</strong>, the plan outlay under the scheme is Rs. 4218.56 lakhs (CS: Rs. 3796.70<br />

lakhs; SS: Rs. 421.86 lakhs)<br />

DRDA Administration: DRDA’s are agencies functioning at district level and responsible<br />

for implementation of all types of rural development programmes in the district. Since 1999,<br />

Government of India introduced a new scheme called “DRDA administration” which is<br />

funded on percentage basis. The expenditure component under this head is shared on<br />

75:25 basis between central and state govt. The plan outlay under the scheme during <strong>2011</strong>-<br />

<strong>12</strong> is Rs. 250.00 lakhs (CS: Rs. 187.50 lakhs; SS: Rs. 62.50 lakhs)<br />

In addition to the above plan schemes, the district will receive an amount of Rs. 641.25<br />

lakhs under 13 th Finance Commission Grant during <strong>2011</strong>-<strong>12</strong>.<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>4


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 6.18. Programme wise <strong>Plan</strong> Outlays & Grants: Rural Development<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay & Grants <strong>2011</strong>-<strong>12</strong><br />

Programmes<br />

State <strong>Plan</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Gopabandhu Gramin Yojana<br />

(GGY)<br />

0.00 100.00 0.00 2000.00 2000.00<br />

State Finance Commission<br />

Grant<br />

0.00 100.00 0.00 442.50 442.50<br />

Construction of CC road (New<br />

Scheme)<br />

Central Sponsored <strong>Plan</strong><br />

0.00 100.00 0.00 287.00 287.00<br />

Swarnajayanti Gram<br />

Swarozgar Yojana<br />

Mahatma Gandhi National<br />

75.00 25.00 900.00 300.00 <strong>12</strong>00.00<br />

Rural Employment Guarantee<br />

Scheme (MGNREGS)<br />

90.00 10.00 3796.70 421.86 4218.56<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

75.00 25.00 187.50 62.50 250.00<br />

13th Finance Commission<br />

Grant<br />

100.00 0.00 641.25 0.00 641.25<br />

Total 5525.45 3513.86 9039.31<br />

Table 6.19. Details of activities and physical targets: Rural Development<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Programmes/Activities Units<br />

<strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Gopabandhu Gramin Yojana (GGY) Nos. of Projects <strong>12</strong>25<br />

Swarnajayanti Gram Swarozgar Yojana (SGSY) No. of Swarozgaris 9100<br />

State Finance Commission Award No. of Projects 51<br />

Mahatma Gandhi National Rural Employment Guarantee<br />

Scheme<br />

Nos. of Projects 4242<br />

6.3. Special Area Programmes<br />

Special Areas Programme of the Government of India focuses on the development of Specific<br />

areas having distinguished geographical, socio-economic, and/or anthropological<br />

characteristics. In <strong>Balasore</strong> district, Hill Areas Development Programme and Border Area<br />

Development Programme is not implemented. It is not covered under BRGF. Nilgiri block in<br />

the district is a tribal block having more than 50% tribal in the total population. Hence it is<br />

a Tribal Sub <strong>Plan</strong> area and one ITDA is functioning. Similarly, in Jaleswar block, one MADA<br />

pocket is there. Special interventions have been planned to be implemented in these two<br />

pockets, details of which is presented below.<br />

Table. 6.20. Programme wise <strong>Plan</strong> Outlays: Special Area Programmes<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Programmes<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Construction of Hostel<br />

for ST girls<br />

Central <strong>Plan</strong><br />

0.00 100.0 0.00 163.75 163.75<br />

Grants under Provision<br />

to Article 275 (1)<br />

100.00 0.00 86.00 0.00 86.00<br />

Special Central<br />

Assistance to Tribal<br />

100.00 0.00 180.00 0.00 180.00<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>5


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Sub <strong>Plan</strong> areas (TSP)<br />

MADA, Jaleswar<br />

Central <strong>Plan</strong><br />

Grants under Provision<br />

to Article 275 (1)<br />

Special Central<br />

100.00 0.00 15.00 0.00 15.00<br />

Assistance to Tribal<br />

Sub <strong>Plan</strong> areas (TSP)<br />

100.00 0.00 20.00 0.00 20.00<br />

Total 301.00 163.75 464.75<br />

Table 6.21 Details of activities & physical targets: Special Area Programmes<br />

Activities<br />

ITDA, Nilgiri<br />

Grants under Provision to Article 275 (1)<br />

Units<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Construction of Boundary Wall of<br />

School/Hostel<br />

Nos. 5<br />

Construction of School/Hostel Building Nos. 2<br />

Electrification of School/Hostel Nos. 7<br />

Construction of Cross Drainage works Nos. 6<br />

Drainage work at School Nos. 3<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP)<br />

Group finance to SHGs No. of SHGs 7<br />

Bee keeping No. of families 50<br />

Lac cultivation No. of families 100<br />

Aid to tassar cultivators No. of families -<br />

Training on finishing products on lac<br />

No. of<br />

individuals<br />

-<br />

Installation of Shallow Tube Wells Nos. 150 (18)<br />

Installation of River Lift Irrigation Points Nos. 60(1)<br />

Construction of Water Harvesting<br />

Structures<br />

Nos. 7<br />

Construction of Cross Drainage works Nos. 15<br />

Training programme for tribal<br />

MADA, Jaleswar<br />

No. of trainee 50<br />

Group finance to SHGs No. of SHGs 10<br />

Construction of School/Hostel Building Nos. 3<br />

6.4. Irrigation & Flood Control<br />

<strong>Balasore</strong> district is fairly irrigated. Out of the total cultivated area 55.58% is irrigated in<br />

Kharif season and 42.02% in Rabi season. This is much higher than state figures, which is<br />

only 46.39% in kharif and 22.77% in Rabi season. In fact irrigation is required in Kharif<br />

season to save the crop only during drought. But in Rabi season irrigation is required<br />

throughout the crop growth period. Hence, irrigation facility in Rabi season is essential for<br />

the farmers. But, only 42.02% of the total cultivated area is irrigated in Rabi season. Lack<br />

of irrigation prevents the farmers in non-irrigated areas to take up a second crop, mainly<br />

cash crops during Rabi season.<br />

Regarding Lift Irrigation Projects, <strong>12</strong>09 LI Projects are there in the district. Out of <strong>12</strong>09 LI<br />

points, only 632 (52.27%) are operating and rest 577 are defunct.<br />

In <strong>Balasore</strong> district, major problem is flood, water logging and development of salinity in the<br />

cultivated land due to lack of drainage facility. Every year due to occurrence of natural<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>6


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

calamities, there is damage to river/canal embankments and drainage channels. Major<br />

emphasis under this sector is flood protection and drainage.<br />

Under this sector the following plan schemes will be implemented during <strong>2011</strong>-<strong>12</strong>.<br />

State <strong>Plan</strong>:<br />

Minor Irrigation Projects funded from NABARD (RIDF): This is a State <strong>Plan</strong> Scheme<br />

under which modernization of minor irrigation will be constructed. <strong>Annual</strong> plan outlay<br />

<strong>2011</strong>-<strong>12</strong> - Rs. 200.00 lakhs (State <strong>Plan</strong> Rs. 200.00 lakhs)<br />

Minor Irrigation (Lift) BKVY: This innovative programme has been launched for taking up<br />

improvement of MIP/LIP in a participatory mode. The salient feature of Biju Krushak Vikas<br />

Yojana (BKVY) is that there shall be an open invitation to farmers to form themselves in to<br />

registered Pani Panchayats or WUA to derive benefits of irrigation assistance from the<br />

programme. <strong>Annual</strong> plan outlay <strong>2011</strong>-<strong>12</strong> - Rs. 842.85 lakhs (State <strong>Plan</strong> Rs. 842.85 lakhs)<br />

Bank Protection Work (Flood Control): This is a State <strong>Plan</strong> Scheme under which<br />

embankment for protection will be constructed/renovated to control flood. <strong>Annual</strong> plan<br />

outlay <strong>2011</strong>-<strong>12</strong> - Rs. 92.71 lakhs (State <strong>Plan</strong> Rs. 92.71 lakhs)<br />

Instream Reservoir (Construction of Check Dams): This is a new state plan scheme.<br />

<strong>Annual</strong> plan outlay <strong>2011</strong>-<strong>12</strong> - Rs. 300.00 lakhs (State <strong>Plan</strong> Rs. 300.00 lakhs)<br />

Drainage Projects funded from NABARD (RIDF): This programme is funded by NABARD<br />

to construct structures for improvement of drainage in flood prone areas. <strong>Annual</strong> plan<br />

outlay <strong>2011</strong>-<strong>12</strong> - Rs. 156.00 lakhs (State <strong>Plan</strong> Rs. 156.00 lakhs)<br />

Central Sponsored <strong>Plan</strong>:<br />

Flood Management Programme (RiverBank protection work of River Subarnarekha &<br />

Budhabalanga): This is a Centrally Sponsored Programme with different funding pattern for<br />

different type of activities under the programme. The funding pattern is 75:25 between<br />

centre & state. <strong>Annual</strong> plan outlay <strong>2011</strong>-<strong>12</strong> is Rs. 3143.13 lakhs (CS: Rs. 2357.33 lakhs; SS:<br />

Rs. 785.80 lakhs)<br />

Flood Management Project: Government of India has launched this programme during<br />

11 th <strong>Plan</strong>. Under this scheme, central assistance is provided to State Governments for<br />

taking up flood management works. The funding pattern is 75:25 between center and the<br />

state. <strong>Annual</strong> plan outlay <strong>2011</strong>-<strong>12</strong> is Rs. 131.03 lakhs (CS: Rs. 98.27 lakhs; SS: Rs. 32.76<br />

lakhs)<br />

Installation of Lift Irrigation Projects under RKVY: This is a Central <strong>Plan</strong> scheme.<br />

<strong>Annual</strong> plan outlay <strong>2011</strong>-<strong>12</strong> is Rs. 218.40 lakhs (Central <strong>Plan</strong>: Rs. 218.40 lakhs)<br />

Table 6.22 Details of activities & physical targets: Irrigation & Flood Control<br />

Programmes/Activities Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Targets<br />

Creation of Irrigation potential (Minor Irrigation<br />

Nos. 10<br />

Projects), M.I. Division, <strong>Balasore</strong><br />

Ha. 700.00<br />

Installation of Lift Irrigation Projects under Biju<br />

Nos. 27<br />

Krushak Vikash Yojana - LI Division, Jaleswar<br />

ha 540.00<br />

Installation of Lift Irrigation Projects under Biju<br />

Nos. 50<br />

Krushak Vikash Yojana - LI Division, <strong>Balasore</strong><br />

ha 1000<br />

Installation of Lift Irrigation Projects under RKVY - LI Nos. 78<br />

Division, <strong>Balasore</strong><br />

ha 468<br />

Irrigation Division, <strong>Balasore</strong><br />

• Bank protection work on left bank of river Burhabalanga near village Patukasasan and<br />

Sahupada<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>7


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Bank protection work on right bank of river Burhabalanga including construction of 4<br />

nos. of high level spur near village Puruna <strong>Balasore</strong><br />

• Bank protection work on left bank of river Subarnarekha near village Balikbard<br />

(construction of one number of new spur and repair of 3 nos. of spur with launching and<br />

packing of 300 meters)<br />

• Bank protection work on left bank of river Burhabalanga and Gangahar near village<br />

Potukasasan, Sankarpur, Darakhuli, Gandarda, Amulkud, Banktira, Sahupada,<br />

Sardarpur, Khamanta, Dharampur, Palasia, Rabeneswar, Narayanpur, Makanda,<br />

Bhadrasia, Srirampur, Gandapura and Muturidei.<br />

• Protection of sea wall from Talasari Jetty to Udaypur Forest IB by providing Guard Wall<br />

and Dumping Armory stone from RD 0.00 to 2.80 km.<br />

Drainage Division, <strong>Balasore</strong><br />

Renovation & Structure work (Flood Management Programme)<br />

• Renovation, Extension & Improvement of Paga Nallah system<br />

• Improvement of Parvati Nallah system of Basta and Baliapal Block<br />

• Renovation, Extension & Improvement of Kaonra Nallah system<br />

• Renovation, Extension & Improvement of Baharda Nallah system<br />

• Renovation, Extension & Improvement of Aruadham Nallah system<br />

Renovation & Structure work (NABARD) (RIDF-XII & XIV)<br />

• Improvement of Nembu Nallah system<br />

• Renovation of Kochiakoli Nallah and its link drain<br />

Table 6.23. Programme wise <strong>Plan</strong> Outlays: Irrigation & Flood Control<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Programmes<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

funded from NABARD -<br />

RIDF - MI Division,<br />

<strong>Balasore</strong><br />

Instream Reservoir<br />

0.00 100.00 0.00 200.00 200.00<br />

(Construction of Check<br />

Dams) - MI Division,<br />

<strong>Balasore</strong><br />

Installation of Lift<br />

Irrigation Projects under<br />

0.00 100.00 0.00 300.00 300.00<br />

Biju Krushak Vikash<br />

Yojana - LI Division,<br />

<strong>Balasore</strong><br />

Installation of Lift<br />

Irrigation Projects under<br />

0.00 100.00 0.00 581.60 581.60<br />

Biju Krushak Vikash<br />

Yojana - LI Division<br />

Jaleswar<br />

Bank Protection Work<br />

0.00 100.00 0.00 261.25 261.25<br />

(Flood Control) -<br />

Irrigation Division,<br />

<strong>Balasore</strong><br />

Drainage Projects<br />

0.00 100.00 0.00 92.71 92.71<br />

funded from NABARD -<br />

RIDF - XIV - Drainage<br />

Division, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

0.00 100.00 0.00 156.00 156.00<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>8


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Flood Management<br />

Programme (River Bank<br />

protection work) -<br />

Irrigation Division,<br />

<strong>Balasore</strong><br />

Flood Management<br />

75.00 25.00 2357.33 785.80 3143.13<br />

Programme (Major<br />

Works) - Drainage<br />

Division, <strong>Balasore</strong><br />

Centrally <strong>Plan</strong><br />

Installation of Lift<br />

75.00 25.00 98.27 32.76 131.03<br />

Irrigation Projects under<br />

RKVY<br />

100.00 0.00 218.40 0.00 218.40<br />

Total 2674.00 2410.<strong>12</strong> 5084.<strong>12</strong><br />

6.5. Energy<br />

Energy is one of the prime inputs for economic development as well as improved quality of<br />

life of the people. In <strong>Balasore</strong> district 2460 villages (95.13%) were electrified by the end of<br />

2006. Govt. of India is also implementing Rajiv Gandhi Grameen Vidutkaran Yojana since<br />

2005 to provide electricity to all rural house hold in the district within the stipulated time<br />

frame of Five years. The programme is being implemented in the district. BGJY (Biju Gram<br />

Jyoti Yojana) is also being implemented in the district to cover villages which are not<br />

included under RGGVY.<br />

RGGVY (Rajiv Gandhi Grameen Vidyutikaran Yojana)<br />

RGGVY is a central government programme implemented through PGCIL in the district.<br />

CESU is the local agency to provide monitoring support for this programme. Following are<br />

some relevant details of the programme:<br />

• Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) was launched in April-05 by<br />

merging all ongoing schemes.<br />

• Under the programme 90% grant is provided by Govt. of India and 10% as loan by REC<br />

(Rural Electrification Corporation) to the State Governments.<br />

• REC is the nodal agency for the programme.<br />

The RGGVY aims at:<br />

• Electrifying all villages and habitations as per new definition<br />

• Providing access to electricity to all rural households<br />

• Providing electricity Connection to Below Poverty Line (BPL) families free of cost.<br />

Infrastructure under RGGVY:<br />

• Rural Electricity Distribution Backbone (REDB) with 33/11 KV (or 66/11 KV) substation<br />

of adequate capacity in blocks where these do not exist.<br />

• Village Electrification Infrastructure (VEI) with provision of distribution transformer of<br />

appropriate capacity in villages/habitations.<br />

• Decentralized Distributed Generation (DDG) Systems based on conventional & non<br />

conventional energy sources where grid supply is not feasible or cost-effective.<br />

As per the new definition, a village would be declared as electrified, if:<br />

• Basic infrastructure such as Distribution Transformer and Distribution lines are<br />

provided in the inhabited locality as well as the Dalit Basti/ hamlet where it exists.<br />

• Electricity is provided to public places like Schools, Panchayat Office, Health<br />

Centers, Dispensaries, Community centers etc.<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>9<br />

Total


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• The number of households electrified should be at least 10% of the total number of<br />

households in the village.<br />

Details of approved projects under RGGVY in <strong>Balasore</strong> district is presented below.<br />

Table 6.24. Present Status of implementation of RGGVY in <strong>Balasore</strong> district<br />

Details Status<br />

Date of Sanction 5/3/2008<br />

Sanctioned Project Cost (in Rs. Lakhs) 15922.28<br />

Name of the Implementing Agency<br />

Power Grid Corporation of India Ltd.<br />

(PGCIL)<br />

Status Target<br />

Achievement<br />

(till Dec 2009)<br />

Electrification of Un-/De-Electrified villages 174 40<br />

Achievement (%) 23.00<br />

Intensive Electrification of Electrified villages 2448 <strong>12</strong>9<br />

Achievement (%) 5.30<br />

No. of Connections to Rural Households including<br />

BPL 197749<br />

4275<br />

Achievement (%) 2.20<br />

No. of Connections to BPL Households 168238 4275<br />

Achievement (%) 2.20<br />

Table 6.25. Number of Villages Targeted for Electrification under RGGVY<br />

Type of village No. of villages<br />

Un-Electrified 83<br />

De-Electrified 91<br />

Electrified 2443<br />

Total 2617<br />

The figures presented above indicate a very poor performance of RGGVY in the district.<br />

During one year of Programme implementation, only 23.00% of the targeted Un/Deelectrified<br />

villages have been provided with electricity. Similarly, in case of household<br />

electrification, the achievement percentage is only 5.30%. This needs to be strengthened on<br />

priority basis so as to meet the targets within the stipulated period of five years.<br />

For the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>, Rs.343.04 lakhs has been proposed which includes Rs<br />

34.304 lakh towards State share and Central share Rs. 308.736 lakh.<br />

Biju Gram Jyoti Yojana (BGJY)<br />

BGJY is a State <strong>Plan</strong> programme augmenting RGGVY in areas where RGGVY is not<br />

implemented. Under this programme, each Block will share Rs.50 lakhs out of total Rs. 6<br />

crores.<br />

Biju Gram Jyoti Yojana aims to ensure supply of electricity to thousands of small villages<br />

and habitations in the State. Implemented with funds to be made available by the State<br />

Government from its own resources, this programme has the <strong>District</strong> Collector as the<br />

implementing authority for the scheme. CESU acts in the capacity of the supervising<br />

agency, as in case of RGGVY; but unlike in case of the latter, in BGJY CESU gets paid for<br />

its service.<br />

The villages that would not be covered under the Rajiv Gandhi Gram Vidyutirakan Yojana of<br />

the Centre will be given priority under the Biju Gram Jyoti Yojana. In fact, the state<br />

government decided to take up this initiative after the present Chief Minister failed to get a<br />

positive response from Union Power Minister for amendment of the rules under the RGGVY<br />

that does not provide funds for electrification of hamlets with less than 300 populations.<br />

For the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>, Rs. 485.42 lakh has been proposed from State Budget.<br />

TSI: NABARD Consultancy Services (NABCONS) 130


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Biju Saharanchal Bidyutikaran Yojana: This is a new state plan scheme. <strong>Annual</strong> plan<br />

outlay <strong>2011</strong>-<strong>12</strong> - Rs. 140.00 lakhs (State <strong>Plan</strong> Rs. 140.00 lakhs)<br />

Non-conventional Source of Energy<br />

Under Renewable Energy, the <strong>District</strong> Renewable Energy Cell basically works for promotion<br />

of different non-conventional sources of energy as per provision of different schemes &<br />

programme heads being allotted/sanctioned by the Govt. time to time.<br />

Out of different schemes, two central plan schemes namely NBMMP (National Biogas &<br />

Manure Management Programme) and SPV (Solar Photovoltaic) and one state plan scheme<br />

will be implemented in the district during <strong>2011</strong>-<strong>12</strong>. Though the potential in the district is<br />

much higher in comparison to the achievement, the progress is restricted mainly due to two<br />

major reasons, i.e. high cost involvement for one common beneficiary and secondly<br />

limitation in allocation of physical target to avail the subsidy. The programme could be<br />

more successful if some additional financial assistance can be provided under the<br />

programme.<br />

Under RVEP (Remote Village Electrification Programme) 92 villages in 7 Blocks have been<br />

identified as Remote villages to be electrified through non-conventional energy. The<br />

programme is yet to make headway in the district. Funds for Non-conventional Source of<br />

Energy are routed through OREDA as a State Sector Scheme.<br />

Programmes<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti<br />

Yojana<br />

Biju Saharanchal<br />

Bidyutikaran<br />

Yojana<br />

Table 6.26. Programme wise <strong>Plan</strong> Outlays: Energy<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

(Rs. in lakhs)<br />

Total<br />

0 100 0.00 485.42 485.42<br />

0 100 0.00 140.00 140.00<br />

Central Sponsored<br />

<strong>Plan</strong><br />

Rajiv Gandhi<br />

Grameen<br />

Vidutikaran Yojana<br />

90 10 308.736 34.304 343.04<br />

Total 308.736 659.724 968.46<br />

6.6. Industry & Minerals<br />

The district lack mineral resources. But the adjoining district of Keonjhar is rich in<br />

chromite and iron deposits. No mineral deposit of economic value beneath the soil of the<br />

district has been reported till date. Only sand sources are there because of flowing of rivers<br />

inside the district. Lack of mineral resources is the main reason behind absence of mineral<br />

based industry in the district. There are 10 major and 9 medium industries in the district.<br />

Out of 9 medium industries, 8 have been closed.<br />

A total of 232 registered SSI units are functioning in the district. The number of<br />

unregistered SSI units is approximately 300. But a large number of cottage and village<br />

industries, handicraft units exits in rural areas of the district under unorganized sector.<br />

Data on unregistered units/units under unorganized sector are not available and need to be<br />

surveyed/assessed.<br />

Rapid socio economic development and competitive atmosphere created an atmosphere for<br />

self employment in the field of unorganized sector as alternative opportunities for best<br />

utilization of young talent. The district has lot of potential in unexploited sectors.<br />

TSI: NABARD Consultancy Services (NABCONS) 131


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Agricultural products such as paddy, jute, black gram, green gram, groundnut, mustard,<br />

sugarcane etc., are harvested in selective patches all over the district. During the recent<br />

year banana plantation, sunflower cultivation has been taken up. Pisciculture has so far<br />

played a vital role in socio-economic development of the district. Agro-based industries and<br />

marine industries can be developed to a larger extent for rapid industrialization of the<br />

district.<br />

The district <strong>Balasore</strong> has a potential market for its agro-based industrial products.<br />

The adjoining districts like part of Keonjhar and Bhadrak depend on <strong>Balasore</strong>. FCI<br />

is the prime purchaser of rice produced by the millers. Huge fish harvesting also<br />

create a vast demand for ice blocks. The medium, small scale and cottage<br />

industries are able to market their products within the district. Two Industrial<br />

Estate have been established at <strong>Balasore</strong> and Baliapal and seven Industrial area in<br />

the district. The Estate is being maintained by IDCO.<br />

<strong>Balasore</strong> district has immense potential in food processing industries. Paddy and fish are<br />

the chief commodities in the district followed by vegetables, coconut and sunflower. Post<br />

harvest technology and management plays a crucial role in value additions to agriculture.<br />

With improvement in food processing, the farmers of the district will get better price for<br />

their produce and this will create additional employment opportunities. At present this<br />

district has in this sector the district has the potential in enterprises like paddy/jute<br />

processing unit, Spices unit, Oil Ghanies, Desiccated coconut, pickles, Jan, Jelly, Fish<br />

processing, Fish pickle product etc.<br />

Basically <strong>Balasore</strong> is an Agricultural based district and having thrust for development of<br />

Agro and Food based Industries. It has 81 kms of sea coast in the Bay of Bengal. The<br />

district has scope for development of marine based industries like freezing plant. Ice plant,<br />

Cold storage, prawn culture and brackish water crab farming, moderate fish canning on<br />

hygienic packed dry fish, fish oil, fish meal, fish pickles for export to gulf countries.<br />

Objectives and strategies for <strong>Annual</strong> <strong>Plan</strong><br />

• Employment generation for rural youths.<br />

• Establishment of enterprises/SSI units for self employment.<br />

• Promotion of handicrafts, rehabilitation of handicraft artisans.<br />

• Master Crafts Man (MCM) Training.<br />

• Development of craft clusters.<br />

• Promotion of handloom industries, group & cluster approach, marketing incentives.<br />

List of plan schemes finalized for implementation during <strong>2011</strong>-<strong>12</strong> in this sector are<br />

presented below.<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industries: The objective of the scheme is to popularize<br />

handloom fabrics among the consumers by organizing exhibitions, fairs, festivals, etc.<br />

within and outside the district. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 15.00 lakhs (State <strong>Plan</strong> Rs.<br />

15.00 lakhs)<br />

Workshed-cum-Housing- This is a state plan under which scheme to provided<br />

infrastructure and house to poor weavers. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong> Rs. 17.50 lakhs<br />

(State <strong>Plan</strong> Rs. 17.50 lakhs)<br />

Skill Upgradation Training: The objective of the scheme is to develop craft cluster by<br />

imparting skill training to a group of traditional artisans followed by production activity.<br />

<strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 9.42 lakhs (State <strong>Plan</strong> Rs. 9.42 lakhs)<br />

Promotion of Industry Sector: This is a State <strong>Plan</strong> scheme and the <strong>Annual</strong> <strong>Plan</strong> Outlay for<br />

<strong>2011</strong>-<strong>12</strong> is Rs. 4.90 lakhs (State <strong>Plan</strong> Rs. 4.90 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 132


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Central Sponsored <strong>Plan</strong><br />

Integrated Handloom Development Scheme - Group & Cluster Approach, Marketing<br />

Incentives: This is a central sponsored plan. Under cluster development approach focus is<br />

on formation of weavers group as a visible entity so that group becomes self sustainable.<br />

Under Group Approach, handloom weavers who are not covered by clusters will be<br />

benefited by a group approach which is implemented in a contiguous geographical area i.e.,<br />

a revenue village, block in rural area and wards in urban area, which have similar<br />

production characteristics. A group should have preferably 10 weavers or more which can<br />

be in the form of SHG/PWCS/other independent/individual weavers. <strong>Annual</strong> <strong>Plan</strong> outlay<br />

<strong>2011</strong>-<strong>12</strong>- Rs.29.76 lakhs (CS: Rs.20.51 lakhs; SS: Rs.9.25 lakhs)<br />

Health Insurance for weavers: The expenditure component under this head is shared on<br />

88:<strong>12</strong> basis between central and state govt. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 11.73 lakhs<br />

(CS: Rs. 10.32 lakhs; SS: Rs. 1.41 lakhs)<br />

Mahatma Gandhi Bunakar Bima Yojana: The expenditure component under this head is<br />

shared on 60:40 basis between central and state govt. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 1.23<br />

lakhs (CS: Rs. 0.74 lakhs; SS: Rs. 0.49 lakhs)<br />

Central <strong>Plan</strong><br />

Prime Minister's Employment Generation Programme (PMEGP): This credit linked<br />

subsidy programme called Prime Minister’s Employment Generation Programme (PMEGP)<br />

was formulated by merging the two schemes that were in operation till 31.03.2008 namely<br />

Prime Minister’s Rojgar Yojana (PMRY) and Rural Employment Generation Programme<br />

(REGP). The objective of the programme is generation of employment opportunities through<br />

establishment of micro enterprises in rural as well as urban areas. PMEGP is a central<br />

sector scheme administered by the Ministry of Micro, Small and Medium Enterprises<br />

(MOMSME). The scheme is implemented by Khadi and Village Industries Commission<br />

(KVIC), a statutory organization under the administrative control of the Ministry of MSME<br />

as the single nodal agency at the National level. At the state level, the scheme is<br />

implemented through state KCIC Directorates, State Khadi and Village Industries Boards<br />

(KVIBs) and <strong>District</strong> Industries Centers (DICs) and banks. The Government subsidy under<br />

the scheme will be routed by KVIC through the identified Banks for eventual distribution to<br />

the beneficiaries/entrepreneurs in their Bank accounts. The Implementing Agencies,<br />

namely KVIC, KVIBs and DICs will associate reputed Non Government Organization<br />

(NGOs)/reputed autonomous institution/Self Help Groups (SHGs)/National Small<br />

Industries Corporation (NSIC)/Udyami Mitras empanelled under Rajiv Gandhi Udyami<br />

Mitra Yojana (RGUMY), Panchayat Raj institutions and other relevant bodies in the<br />

implementation of the scheme, especially in the area of identification of beneficiaries, of<br />

area specific viable projects, and providing training in entrepreneurship development.<br />

<strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 300.00 lakhs (Central <strong>Plan</strong> Rs. 300.00 lakhs)<br />

10% Rebate on Handloom Products: In order to augment marketing of handloom<br />

products particularly in the wake of stiff competition of powerloom and Mill Sectors.<br />

Government of India has introduced 10% Rebate Scheme to Primary Weavers Co-operative<br />

Societies. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 10.00 lakhs (Central <strong>Plan</strong> Rs. 10.00 lakhs)<br />

<strong>District</strong> Level Exhibition: <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>- Rs. 2.00 lakhs (Central <strong>Plan</strong> Rs.<br />

2.00 lakhs)<br />

Table 6.27. Programme wise <strong>Plan</strong> Outlays: Industry & Handloom Sector<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Programmes<br />

Industry<br />

State <strong>Plan</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Promotion of 0.00 100.00 0.00 4.90 4.90<br />

TSI: NABARD Consultancy Services (NABCONS) 133


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Industry Sector<br />

Central <strong>Plan</strong><br />

PMEGP) 100.00 0.00 300.00 0.00 300.00<br />

Sub total 300.00 4.90 304.90<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of<br />

Handloom<br />

0.00 100.00 0.00 15.00 15.00<br />

Industry<br />

Workshed-cum-<br />

Housing<br />

0.00 100.00 0.00 17.50 17.50<br />

Skill Upgradation<br />

Training<br />

0.00 100.00 0.00 9.42 9.42<br />

Central Sponsored <strong>Plan</strong><br />

IHDS (Cluster<br />

Approach)<br />

70.00 20.00 6.81 1.95 8.76<br />

IHDS (Group<br />

Approach)<br />

70.00 20.00 8.95 2.55 11.50<br />

IHDS (Marketing<br />

Incentive)<br />

50.00 50.00 4.75 4.75 9.50<br />

Health Insurance<br />

for weavers<br />

Mahatma Gandhi<br />

88.00 <strong>12</strong>.00 10.32 1.41 11.73<br />

Bunakar Bima<br />

Yojana<br />

Central <strong>Plan</strong><br />

10% Rebate on<br />

60.00 40.00 0.74 0.49 1.23<br />

Handloom<br />

products<br />

100.00 0.00 10.00 0.00 10.00<br />

<strong>District</strong> Level<br />

Exhibition<br />

100.00 0.00 2.00 0.00 2.00<br />

Sub total 43.57 53.07 96.64<br />

Grand Total 343.57 57.97 401.54<br />

Table 6.28. Details of activities and physical targets: Industry & Minerals<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Programme Units<br />

<strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Small Scale Enterprises Nos. 300<br />

Cottage Industries Nos. 45<br />

PMEGP<br />

Handloom & Textiles<br />

Nos. 203<br />

Promotion of Handloom Industry No. of Weavers Coop. Societies 50<br />

Work shed-cum-Housing Nos. of Beneficiaries 50<br />

Skill Up gradation Training<br />

Central Sponsored <strong>Plan</strong><br />

No. of trainees 70<br />

IHDS (Cluster Approach) Nos. of Beneficiaries 328<br />

IHDS (Group Approach) Nos. of Beneficiaries 150<br />

IHDS (Marketing Incentive) Nos. of Beneficiaries 34<br />

Health Insurance for weavers Nos. of Beneficiaries <strong>12</strong>50<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

Nos. of Beneficiaries 820<br />

10% Rebate on Handloom products Nos. of Beneficiaries 25<br />

<strong>District</strong> Level Exhibition Nos. 1<br />

TSI: NABARD Consultancy Services (NABCONS) 134


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

6.7. Transport<br />

Transport and communication are primary infrastructural requirement of a district to<br />

achieve rapid economic development. The growth of the district and quality of life of its<br />

inhabitants depend on the adequacy of the transport facilities available.<br />

Transport is one of the important sectors in a district like <strong>Balasore</strong>. Because of its location<br />

in deltaic region, the land mass of the district is crisscrossed by a good number of rivers,<br />

rivulets, natural drainage channels, canals etc. Almost five rivers flow through the district<br />

before entering the sea. These water bodies act as physical barriers and demand huge<br />

number of bridges, culverts to make all corners of the district accessible. Further, it is a<br />

densely populated district and people are educated, politically active and socio economically<br />

developed. They require an efficient transport and communication system as an integral<br />

part of their daily needs.<br />

In addition to the above facts, natural calamities plays a destructive role in the district by<br />

damaging road network almost every. Frequent occurrence of natural calamities damages<br />

the roads every year. In fact, the elevation of rural roads in the district is very low and lack<br />

adequate culverts, bridges for discharge of flood/rain water. As a result, during flood, the<br />

roads get washed away disrupting communication. Keeping the problem in view,<br />

importance is being given on design aspect of the roads being constructed in the district for<br />

the last several years. Adequate drainage facilities with raised elevations are the major<br />

consideration in road designs.<br />

Objectives and Strategies for the <strong>Plan</strong> period:<br />

• Connecting habitations not connected by any road.<br />

• Construction of roads and bridges in deficient areas.<br />

• Bridging of missing links.<br />

• Development of roads leading to principal agricultural production areas/tourist<br />

centers/educational institutions/fishing jetties etc.<br />

The plan schemes under implementation in the district with financial outlays during <strong>2011</strong>-<br />

<strong>12</strong> are presented below.<br />

Programmes<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme -<br />

Constituency Wise Allotment<br />

(CWA)<br />

Completion of incomplete roads<br />

and bridges and different stretches<br />

of RIDF and other schemes<br />

Construction of Rural Road<br />

(Improvement/Widening/Periodical<br />

maintenance)<br />

Table 6.29. Programme wise <strong>Plan</strong> Outlays: Transport<br />

Funding Pattern (%) <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

(Rs. in lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 135<br />

Total<br />

0.00 100.00 0.00 80.00 80.00<br />

0.00 100.00 0.00 100.00 100.00<br />

0.00 100.00 0.00 733.00 733.00<br />

Flood damaged Repairing<br />

Rural Work Division -II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme -<br />

0.00 100.00 0.00 300.00 300.00<br />

Constituency Wise Allotment 0.00 100.00 0.00 50.00 50.00<br />

(CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Periodical<br />

0.00 100.00 0.00 62.00 62.00


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

maintenance)<br />

Completion of incomplete roads<br />

and bridges and different stretches<br />

of RIDF and other schemes<br />

Rural Work Division - Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funded<br />

RIDF Project<br />

Minimum Needs Programme -<br />

Constituency Wise Allotment<br />

(CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Periodical<br />

maintenance)<br />

Central <strong>Plan</strong><br />

Construction of Road under<br />

Bharat Nirman<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funding<br />

RIDF Project<br />

Funding Pattern (%) <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

TSI: NABARD Consultancy Services (NABCONS) 136<br />

Total<br />

0.00 100.00 0.00 253.00 253.00<br />

0.00 100.00 0.00 803.00 803.00<br />

0.00 100.00 0.00 40.00 40.00<br />

0.00 100.00 0.00 567.00 567.00<br />

100.00 0.00 2500.00 0.00 2500.00<br />

0.00 100.00 0.00 10941.18 10941.18<br />

Central <strong>Plan</strong><br />

Construction of Road under<br />

Central Road Fund<br />

100.00 0.00 2577.44 0.00 2577.44<br />

One time Additional Central<br />

Assistance<br />

100.00 0.00 200.00 0.00 200.00<br />

Total 5277.44 13929.18 19206.62<br />

Table 6.30. Details of activities and physical targets: Transport<br />

Programme<br />

Rural Works Division , <strong>Balasore</strong><br />

Units<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA)<br />

Black Topped Kms. 0.700<br />

Metalling Kms. 0.950<br />

Cement Concrete Road Kms. 1.500<br />

Cross drainage works Nos. 2<br />

R.T. Well Mts. 0.800<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes<br />

Black Topped Road Kms. 0.150<br />

Cement Concrete Road Kms. 0.200<br />

Cross Drainage Works Nos. 2<br />

Construction of Rural Road (Improvement/Widening/ Periodical maintenance)<br />

Black Topped Kms. 3.000<br />

Metalling Kms. 3.000<br />

Concrete Road Kms. 7.000<br />

Cross drainage works Nos. 25<br />

R.T. Well Kms. 3.000<br />

C. Drain<br />

Rural Works Division- II, <strong>Balasore</strong><br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

Kms. 0.330<br />

Cement Concrete K.M. 1.180


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programme Units<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Construction of Rural Road (Improvement/Widening/ Periodical maintenance)<br />

Cement Concrete Road Kms. 0.582<br />

Retainey Wall Mts. 308<br />

Black Topped Road Kms. 0.380<br />

Metalling Kms. 0.905<br />

Cement Concrete Road Kms. 0.316<br />

Cross drainage works Nos. 1<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes<br />

Black Topped Road Kms. 0.935<br />

Metalling Kms. 2.573<br />

Cement Concrete Road K.M. 4.781<br />

Cross drainage works<br />

Rural Works Division - Jaleswar<br />

No. <strong>12</strong><br />

Construction of road under Bharat Nirman<br />

Road<br />

28.00<br />

(Km)<br />

Construction of Rural Roads & Bridge under NABARD funding Project<br />

H.L. Bridge Nos. 1<br />

S. Bridge Nos. 3<br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

Cement Concrete Road Kms. 0.200<br />

Earth Works Kms. 2.05<br />

MSB Kms. 2.05<br />

Construction of Rural Road (Improvement/Widening/Periodical maintenance)<br />

Black Topped Kms. 15.000<br />

MSB Kms. 14.700<br />

Concrete Road Kms. 0.700<br />

Cross drainage works Nos. 40<br />

Earth Works Kms. 14.900<br />

D.R. Kms. 10.500<br />

R. Wall Mts. 150<br />

R&B Division, <strong>Balasore</strong><br />

Black Topped Road<br />

Renewal Coat Kms. 6.00<br />

Widening & Strengthening Kms. 37.<strong>12</strong>7<br />

Concrete Pavement Kms. 2.00<br />

Cross Drainage Works (Bridge/Culvert) Nos. 14<br />

Pradhan Mantri Gramya Sadak Yojana (PMGSY):<br />

This is a 100% Central funded Scheme. This Scheme seeks to provide connectivity to all<br />

unconnected habitations in the rural areas with a population of more than 500 persons<br />

through good all-weather roads by the end of the Tenth <strong>Plan</strong>. In Hill States and Desert<br />

Areas, the objective would be to connect habitations with a population of 250 persons and<br />

above. Prior to implantation of the scheme, a Draft <strong>District</strong> Rural Roads <strong>Plan</strong> will be<br />

prepared.<br />

The DRDAs shall be the competent authority to select the variable best suited for the<br />

<strong>District</strong>, categories them and accord relative weightage to them and shall communicate it to<br />

all concerned. The <strong>Plan</strong> need to be finalized by the Intermediate Panchayat. Any changes<br />

made by the Intermediate Panchayat should be separately mentioned and reasons, thereof,<br />

should be indicated. The Draft <strong>District</strong> Rural Roads <strong>Plan</strong> would be presented to the Zilla<br />

Parishad by the Chief Executive of the <strong>District</strong> <strong>Plan</strong>ning Committee. It should be discussed<br />

and adopted by the Zilla Parishad, with such changes, as may be considered appropriate,<br />

but strictly within the framework of the Manual. The rural roads constructed/upgraded<br />

under this Programme will be maintained by the concerned <strong>District</strong>/Intermediate<br />

Panchayat. Efforts will be made to involve local people in the maintenance of rural roads.<br />

TSI: NABARD Consultancy Services (NABCONS) 137


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

All the road works will be subjected to social audit by way of discussion in the Gram Sabha<br />

and the relevant information in this regard will be made available to the Gram Sabha.<br />

Table 6.31. Block wise list of unconnected habitations targeted under PMGSY<br />

Blocks No. of Unconnected habitations %<br />

Bahanaga 64 4.00<br />

<strong>Balasore</strong> 145 9.06<br />

Baliapal 97 6.06<br />

Basta 193 <strong>12</strong>.05<br />

Bhograi 201 <strong>12</strong>.55<br />

Jaleswar 133 8.31<br />

Khaira 211 13.18<br />

Nilgiri 1<strong>12</strong> 7.00<br />

Oupada 119 7.43<br />

Remuna <strong>12</strong>4 7.74<br />

Simulia 90 5.62<br />

Soro 1<strong>12</strong> 7.00<br />

Total 1601 100.00<br />

Table 6.32. Implementation performance of PMGSY in <strong>Balasore</strong> district<br />

(Physical achievement)<br />

Indicators No. of habitations<br />

Total number of Habitations 2434<br />

Total number of Connected Habitations 833<br />

Total number of Unconnected Habitations<br />

Year wise Habitations covered by PMGSY<br />

1601<br />

2000 - 2001<br />

New Connectivity<br />

Upgradation<br />

46<br />

<strong>12</strong><br />

2001 - 2002<br />

New Connectivity<br />

Upgradation<br />

52<br />

0<br />

2003 - 2004<br />

New Connectivity<br />

Upgradation<br />

89<br />

0<br />

2004 - 2005<br />

New Connectivity<br />

Upgradation<br />

68<br />

13<br />

2005 - 2006<br />

New Connectivity<br />

Upgradation<br />

77<br />

2<br />

2006 - 2007<br />

New Connectivity<br />

Upgradation<br />

78<br />

0<br />

2007 - 2008<br />

New Connectivity<br />

Upgradation<br />

201<br />

105<br />

2008 - 2009<br />

New Connectivity 58<br />

Upgradation 11<br />

Total achievement<br />

New Connectivity<br />

Upgradation<br />

669<br />

143<br />

% of achievement in new connectivity 41.79%<br />

Balance Unconnected Habitations 932<br />

It is revealed from the data presented above that the implementation performance of<br />

PMGSY is not satisfactory in the district. Even after 9 years of implementation of the<br />

project, coverage of unconnected habitation is only 41.79%. As a matter of fact the coverage<br />

should have been cent percent by the end of 2006-07, i.e. end of 10 th plan.<br />

6.8. Science Technology & Environment<br />

No plan scheme is in operation under science and technology sub sector in the district. <strong>Plan</strong><br />

schemes in forest and environment sector are under implementation in the district, details<br />

of which are presented below.<br />

TSI: NABARD Consultancy Services (NABCONS) 138


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Forest & Environment:<br />

<strong>Balasore</strong> district has a long coast line 81 kms. in the east and reserve/protected forest in<br />

the west. The forest area of district is 8.66% of total geographical area. Agro-climatic<br />

condition of the district is suitable for development of casuarinas plantation in the coastal<br />

belt and plantation of other forestry species can be taken up in three to four blocks of<br />

Nilgiri, Jaleswar, Bhograi & Remuna. Bamboo plantation also can be taken up as a part of<br />

farm forestry activities in most of the blocks. Jatropha can be grown in degraded land &<br />

fallow land. There is one wildelife sanctuary namely Kulidiha wildlife sanctuary having total<br />

area of 272.75 Sq.Km. The geographical coverage of the sanctuary covers both <strong>Balasore</strong> and<br />

Mayurbhanj district.<br />

The objectives and strategies under the plan period are<br />

• Protection and development of Kulidiha Wildlife sanctuary.<br />

• Promotion of eco-tourism and eco-development in protected areas.<br />

• Maintenance/development of mangroves in Talasari and Subarnarekha delta.<br />

• Development work/Awareness camps/motivation to stop illegal cutting of<br />

mangroves.<br />

• Distribution of fuel wood seedlings to prevent cutting of trees and destruction of<br />

forest by local villagers.<br />

The plan schemes under implementation in the district during <strong>2011</strong>-<strong>12</strong> are presented<br />

below.<br />

State <strong>Plan</strong><br />

Social & Farm Forestry: This is a State <strong>Plan</strong> scheme envisaging plantation of trees with<br />

economic value in non forest areas and its maintenance. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong>: Rs.<br />

<strong>12</strong>.10 lakhs (State <strong>Plan</strong>: Rs. <strong>12</strong>.10 lakhs)<br />

Communication & Building – Construction of quarters for forest guards: This is a State<br />

<strong>Plan</strong>. Many personnel of the department in the ranks of Forest Guards, Foresters, Forest<br />

Rangers, Asst. Conservators of Forests and others are deprived of the benefits of<br />

government quarters due to inadequacy. The frontline staff like Forest Guards, Foresters<br />

posted to remote and inaccessible areas are not able to stay at their head quarters due to<br />

absence of government accommodations and non-availability of rented accommodation in<br />

rural areas. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong>: Rs. 3.63 lakhs (State <strong>Plan</strong>: Rs. 3.63 lakhs)<br />

Central <strong>Plan</strong><br />

Development of National Parks, Sanctuaries & Nature Reserves (Forest & Wildlife<br />

<strong>Plan</strong>): This is a central plan scheme envisaging protection, maintenance and development<br />

activities in eligible protected areas of the state. The central plan scheme “Eco development<br />

around National Parks, Sanctuaries and Nature Reserves” has been merged in this scheme<br />

since 2002-03. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong>: Rs. 33.00 lakhs (Central <strong>Plan</strong>: Rs. 33.00 lakhs)<br />

Elephant Management Project-Talasari-HVBA: This Central <strong>Plan</strong> Scheme launched<br />

during 1992-93 is fully funded by Government of India under Project Elephant meant for<br />

consolidation of the programes for conservation of elephants and their habitat. <strong>Annual</strong> <strong>Plan</strong><br />

outlay <strong>2011</strong>-<strong>12</strong>: Rs. 17.70 lakhs (Central <strong>Plan</strong>: Rs. 17.70 lakhs)<br />

Table 6.33. Programme wise <strong>Plan</strong> Outlays: Science Technology & Environment<br />

(Rs. in lakhs)<br />

Programmes<br />

State <strong>Plan</strong><br />

Social and Farm<br />

forestry<br />

Funding Pattern (%) <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central Share<br />

of Central Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

TSI: NABARD Consultancy Services (NABCONS) 139<br />

Total<br />

0.00 100.00 0.00 <strong>12</strong>.10 <strong>12</strong>.10<br />

Communication & 0.00 100.00 0.00 3.63 3.63


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Building -<br />

Construction of<br />

quarters for forest<br />

guards<br />

Central <strong>Plan</strong><br />

Development of<br />

National Park,<br />

Sanctuary &<br />

Natural Reserves<br />

Maintenance of<br />

Forest (<strong>12</strong>th<br />

Finance<br />

Commission Grant)<br />

Elephant<br />

Management<br />

Project<br />

Funding Pattern (%) <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central Share<br />

of Central Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

TSI: NABARD Consultancy Services (NABCONS) 140<br />

Total<br />

100.00 0.00 33.00 0.00 33.00<br />

100.00 0.00 0.00<br />

100.00 0.00 0.60 0.00 0.60<br />

Talasari - HVBA 100.00 0.00 17.10 0.00 17.10<br />

Total 50.70 15.73 66.43<br />

6.9. General Economic Services<br />

This sector includes sub sectors like civil supply, tourism etc., but no plan scheme is under<br />

implementation in the district.<br />

6.10. Social Services<br />

6.10.1. Education<br />

In the district a total of 4169 schools are operating, out of which 177 (4.25%) are located in<br />

urban areas and 3992 (95.75%) in rural areas. Number of students in each rural school of<br />

the district has been worked out to be 146.06 as against state average of 81.35<br />

students/school. In spite of such a high student school ratio, infrastructure facilities in the<br />

schools of the district are very poor. Majority of the schools in the district lack critical<br />

infrastructure like safe drinking water, toilets, play ground, electricity etc. These<br />

infrastructures need to be immediately provided in the schools under SSA programme.<br />

Literacy level in the district (70.56%) is much higher than state average (63.08%). Even the<br />

literacy rate of SC (59.41%) & ST (31.88%) community in the district is much better than<br />

state average. The percentage of out of school children in the age group of 6 to 11 and 11 to<br />

14 is less in <strong>Balasore</strong> district than in the state. In spite of such a high overall literacy rate,<br />

the gender gap in literacy rate is still wide. The female literacy rate is 58.90% as against<br />

male literacy rate of 81.69%. This needs to be bridged through additional intervention.<br />

The school drop out rate in minority community in the age group of 11 to 14 is higher and<br />

needs to be checked. In the age group of 6 to 11, the percentage of out of school children<br />

among minority community is as low as 1.79% as against state average of 4.28%. But, in<br />

the age group of 11 to 14 years, the percentage of out of school children of minority<br />

community is 5.76% as against state average of 6.78%. Though gender wise break up of<br />

data of these out of school children is not available, yet discussion with the teachers reveals<br />

that majority of these out of school children are girls. Such a situation demands additional<br />

intervention specifically aimed at girls.<br />

Objectives and strategies for plan period<br />

• Creation of infrastructures like class rooms, toilets, drinking water sources in schools<br />

where these are in deficit.<br />

• Assistance to non government schools to maintain the quality of education.


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Supply of free text books to children.<br />

• Training of teachers to improve their teaching ability.<br />

• Promote education and reduce drop out rate among minority community, SC, ST and<br />

girls.<br />

• Specific intervention for children with special needs who are challenged with the<br />

problems such as vision, hearing, movement, learning, cerebral palsy, mental<br />

retardation etc.<br />

State <strong>Plan</strong><br />

Mass Education: This is a state plan scheme. The scheme as a part of National Literacy<br />

Mission was introduced in the state in the year 1991-92 with the objective of making all<br />

adult illiterates upto the age of 45 years literate. The programme comprises to phases (i)<br />

Total Literacy Campaign (TLC) and (ii) Post Literacy Campaign (PLC). <strong>Annual</strong> <strong>Plan</strong> outlay:<br />

Rs. 20.10 lakhs (State <strong>Plan</strong> Rs. 20.10 lakhs)<br />

In addition to the above, the district during <strong>2011</strong>-<strong>12</strong> will receive the following funds for<br />

purpose as detailed below<br />

• Construction of office building, boundary wall & renovation of old office – Rs. 16.00<br />

lakhs.<br />

• Construction of staff quarters and office building – Rs. <strong>12</strong>5.00 lakhs.<br />

• Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play<br />

ground, borewell, drainage system, cycle stand and repair of staff quarters) – Rs. 99.40<br />

lakhs.<br />

Central Sponsored <strong>Plan</strong><br />

Sarva Sikshya Abhiyan (SSA): It is one of the important flagship programmes in the<br />

education sector. The programme is designed to cover all the children in the age group of 6-<br />

14 years in the ambit of primary education. The goals of the programme are<br />

• All children of 6-14 years age group in school by 2003.<br />

• All children to complete 5 years of schooling by 2007.<br />

• All children to complete 8 years of schooling by 2010.<br />

• Universal retention by 2010.<br />

• Bridge all gender and social category gaps at primary stage by 2007 and at Upper<br />

Primary stage by 2010.<br />

• Focus on Elementary Education of satisfactory quality with focus on education for life.<br />

The programme is in operation in the district since 2001-02. Under the programme Block<br />

Resource Center (BRC) and Cluster Resource Centre (CRC) has been opened. The activity of<br />

the BRC is to design & implement all programme activities with participation & coordination<br />

of different stakeholders, under the guidance and effective involvement of block<br />

resource coordinators. CRC is the ground level institution to provide support to the BRC<br />

units for effective functioning in one hand and the schools in other to deliver quality<br />

education. Strengthening of CRCs is one of the major activities in SSA.<br />

Under SSA provision has been made to provide free N.T. Books to all SC & ST and girl<br />

students from class I to VII reading in Govt. and Govt. aided primary & upper primary<br />

school. In addition to this Govt. of Orissa will provide N.T. Books on free of cost to all the<br />

boys of general category from class I to VII of Govt. & Govt. aided schools of the district.<br />

Other innovative activities under SSA are provisions for ECCE, Girls’ education, education<br />

for SC & ST and minority groups and education of children with special needs. Education of<br />

children with special needs irrespective of category and degree of disability is one of the<br />

TSI: NABARD Consultancy Services (NABCONS) 141


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

major thrust areas of SSA. It intends to cover up the children with special needs who are<br />

challenged with the problems such as vision, hearing, movement, learning, cerebral palsy,<br />

mental retardation etc.<br />

From 11 th plan period the funding pattern of SSA is 50:50 between Center and State.<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay of SSA during <strong>2011</strong>-<strong>12</strong> for <strong>Balasore</strong> district is Rs. 7504.21 lakhs (CS: Rs.<br />

3752.105 lakhs; SS: Rs. 3752.105 lakhs).<br />

National Programme for Education of Girls at Elementary Level (NPEGEL): NPEGEL is<br />

a Central Sponsored <strong>Plan</strong> with funding pattern of 50:50 between Center and State. It is an<br />

integral part of SSA, provides a dynamic framework to accelerate girl's education i.e.<br />

universal enrollment, retention and achievement in quality education in India.<br />

Objectives of the programme:-<br />

• Reduction of gender gap in education sector.<br />

• Ensure greater participation of women and girls in the field of education.<br />

• Improve quality of education.<br />

• Stress upon the relevance and quality of girls education for their empowerment.<br />

Unique features of NPEGEL:-<br />

• Establishment of Model Cluster School exclusively to promote girls education.<br />

• Scope for all round development of girls (Enhancement of Self-esteem and Selfconfidence).<br />

• Vocational Education.<br />

• Life-Skill Education.<br />

• Gender Sensitization Training Programme for Teachers.<br />

• <strong>Comprehensive</strong> and Continuous Evaluation process.<br />

• Remedial Teaching for Low Level Learner.<br />

• Linkage between Pre-School Education and Primary Education.<br />

• Incentive for girls to attract them towards education.<br />

• Reorganization/award to potential and dedicated teachers.<br />

• Community Mobilization activities and community support for girls education.<br />

• Use of human and physical resources of the community in various programme.<br />

• Bridge Course to address the need of out of school and Adolescent girls.<br />

• Girl child friendly school at cluster level by ensuring the content and process of<br />

education is sensitive to gender issue.<br />

• Development of learning materials in regional language.<br />

• Research study on various gender issue and impact.<br />

In <strong>Balasore</strong> district, the programme is in operation since 2004-05. Under the programme<br />

Model cluster school (MCS) have been opened. A Model cluster school consists of 7 to 9<br />

schools at cluster level. Basically it acts as a resource centre for promoting girls education<br />

in the cluster with all facilities and strategy to improve the rate of retention, ensure regular<br />

attendance, enrollment and quality of education in all schools tagged under MCS.<br />

Under the programme Early Childhood Care and Education Centre (ECCE) are functioning<br />

in the district. It is a school readiness Package for preschool children in the age group of 3-<br />

5. The main objective of ECCE centre is to reduce the sibling care problem and promote<br />

pre-school education with focusing all round development of pre-school children. To meet<br />

TSI: NABARD Consultancy Services (NABCONS) 142


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

the gaps in integrated child development scheme and to relieve girls from the burden of<br />

sibling care two early childhood care and education (ECCE) Center have been opened.<br />

Library Books Distribution: Library books on different subjects have been procured and<br />

distributed among the girls of the MCS, In addition to this different inter school and intra<br />

school competition i.e., essay competition, debate competition, extempore on different<br />

issues are being conducted in MCS.<br />

Teacher training: For attitudinal transformation, gender sensitization of teachers and<br />

development of girl's friendly environment in the classroom, the gender sensitization<br />

teacher training are being conducted.<br />

Additional incentives: In order to attract the girls' students into the fold of education all the<br />

girls are being provided with uniform, as a result of which the retention of girls in the<br />

school has been increased.<br />

Remedial Teaching: To develop competence level of girls, remedial teaching centers have<br />

been opened in the Model Cluster Schools.<br />

Community Mobilization: In order to mobilize the community towards girls' education, more<br />

specifically the minority community in the district and involve them more in the process of<br />

educational management, different community mobilization activities have been undertaken<br />

in the MCS. Similarly to coordinate community mobilization activities in all MCS, MCS<br />

Coordinator have been appointed and imparted training.<br />

During 11 th plan period the funding pattern is 50:50 between Center and State. <strong>Annual</strong> <strong>Plan</strong><br />

Outlay of NPEGEL during <strong>2011</strong>-<strong>12</strong> for <strong>Balasore</strong> district is Rs. 35.79 lakhs (CS: Rs. 17.896<br />

lakhs; SS: Rs. 17.896 lakhs).<br />

Kasturaba Gandhi Balika Vidyalaya (KGBV): This is a Central Sponsored Scheme<br />

proposed to provide good education to SC/ST girls in rural areas. Under this scheme<br />

Residential school are opened for SC/STgirls students. The funding pattern is 65:35<br />

between center and state. <strong>Annual</strong> <strong>Plan</strong> Outlay during <strong>2011</strong>-<strong>12</strong> for <strong>Balasore</strong> district is Rs.<br />

44.97 lakhs (CS: Rs. 29.23 lakhs; SS: Rs. 15.74 lakhs).<br />

Programmes<br />

Table 6.34. Programme wise <strong>Plan</strong> Outlays: Education<br />

Funding<br />

Pattern (%)<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central <strong>Plan</strong><br />

+ Central<br />

Share of<br />

Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> +<br />

State Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

Total<br />

Education<br />

State <strong>Plan</strong><br />

Mass Education 0 100 0.00 20.10 20.10<br />

Construction of office building,<br />

boundary wall & renovation of old<br />

0 100 0.00 16.00 16.00<br />

office<br />

Construction of staff quarters and<br />

office building<br />

Improvement/Modernization of ITI<br />

<strong>Balasore</strong> (Construction of boundary<br />

0 100 0.00 <strong>12</strong>5.00 <strong>12</strong>5.00<br />

wall, play ground, borewell,<br />

drainage system, cycle stand and<br />

repair of staff quarters)<br />

Central Sponsored <strong>Plan</strong><br />

0 100 0.00 99.40 99.40<br />

Sarva Sikshya Abhiyan (SSA) 50 50 3752.105 3752.105 7504.21<br />

National Programme for Education<br />

of Girls at Elementary Level<br />

50 50 17.896 17.896 35.79<br />

TSI: NABARD Consultancy Services (NABCONS) 143


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

(NPEGL)<br />

Kasturiba Gandhi Balika Vidyalaya<br />

(KGBV)<br />

Funding<br />

Pattern (%)<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central <strong>Plan</strong><br />

+ Central<br />

Share of<br />

Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> +<br />

State Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

Total<br />

65 35 29.23 15.74 44.97<br />

Central <strong>Plan</strong><br />

National APP Training in ITI<br />

<strong>Balasore</strong><br />

100 0 6.00 0.00 6.00<br />

Total 3805.23 4046.24 7851.47<br />

Particulars<br />

Table 6.35. Details of activities & physical targets: Education<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Maintenance of Block Resource Center (Nos.) <strong>12</strong><br />

Maintenance of Cluster Resource Center (Nos.) 201<br />

Civil works in Primary Schools (New) (Nos.) 670<br />

Civil works in Upper Primary Schools (New) (Nos.)<br />

Girls Education (Nos.) 1<br />

SC/ST Education (Nos.) 1<br />

Computer Education(Nos.) 1<br />

Interventions for out of school children (Nos. of children) 1432<br />

Free Text Books 268902<br />

Early Child Education Care (Nos.) 1<br />

Children With Special Needs (CWSN) (Nos.) 7719<br />

Maintenance grant to Primary & Upper Primary Schools (Nos.) 2915<br />

Establishment of MIS 1<br />

Learning Enhancement Programme (LEP) 1<br />

Research & Evaluation 319<br />

School Improvement Grant (Nos.) 3199<br />

Teachers Grant (Nos.) 10037<br />

Teachers Salary (Nos.) 4545<br />

Teaching Learning Equipment (New Primary Schools) (Nos.) 31<br />

Community Mobilization 1<br />

Teachers Training (No. of teachers) 11381<br />

Community Training (No. of participants) 26572<br />

National Education Programme for Girls at Elementary Level<br />

(NPEGEL) (No. of Schools)<br />

Kasturiba Gandhi Balika Vidyalaya (KGVB) (No. of Schools) 1<br />

6.10.2. Sports & Youth Services<br />

The following schemes have been finalized to be implemented during <strong>2011</strong>-<strong>12</strong> in <strong>Balasore</strong><br />

district under Sports & Youth Services sector.<br />

State <strong>Plan</strong><br />

Organizing Youth Festival - <strong>Annual</strong> <strong>Plan</strong> outlay: Rs. 0.20 lakhs (State <strong>Plan</strong> Rs. 0.20 lakhs)<br />

Central Sponsored <strong>Plan</strong><br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA) - <strong>Annual</strong> <strong>Plan</strong> outlay: Rs. 56.16 lakhs (CS:<br />

Rs. 47.08 lakhs; SS: Rs. 9.08 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 144<br />

30


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 6.36. Programme wise <strong>Plan</strong> Outlays: Sports & Youth Services<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central <strong>Plan</strong> + State <strong>Plan</strong> +<br />

Programmes<br />

Central<br />

Share<br />

State<br />

Share<br />

Central Share<br />

of Central<br />

Sponsored<br />

State Share of<br />

Central<br />

Sponsored<br />

Total<br />

State <strong>Plan</strong><br />

<strong>Plan</strong>s<br />

<strong>Plan</strong>s<br />

Organizing Youth Festival<br />

Central Sponsored <strong>Plan</strong><br />

0 100 0.00 0.20 0.20<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

One time seed capital grant for<br />

development of Sports<br />

infrastructure<br />

75 25 25.50 8.50 34.00<br />

Women Sports Competition 60 40 0.864 0.576 1.440<br />

<strong>Annual</strong> acquisition grant 100 0 3.10 0.00 3.10<br />

<strong>Annual</strong> operation grant 100 0 3.72 0.00 3.72<br />

Rural Sports Competition 100 0 7.60 0.00 7.60<br />

Prize Money for Rural Sports 100 0 6.30 0.00 6.30<br />

Total 47.08 9.28 56.36<br />

6.10.3. Health<br />

The overall health status of the population residing in <strong>Balasore</strong> district is moderate. Though<br />

the health indicators indicates a better position of <strong>Balasore</strong> district in the state, yet<br />

considering the high literacy rate and health consciousness of the people in the district, it is<br />

not satisfactory. In spite of high literacy rate, the district is in 25 th rank in the state in<br />

Reproductive Health Index (RHI). Similarly, in case of Human Development Index (HDI) the<br />

rank of the district is also 18 in the state. Such a situation needs improvement.<br />

The existing single doctor PHCs lack adequate staff and infrastructure. Not a single PHC<br />

has ambulance facilities. There are adequate numbers of block level hospitals (CHC/UPHC).<br />

But there is shortage of specialists of different discipline, equipments, supporting staff.<br />

Even two of these hospitals do not have ambulances in running condition.<br />

The objectives and strategies under the plan period are<br />

• To provide affordable, adequate, qualitative, preventive and curative health care to the<br />

people of the district.<br />

• To improve hospital services in rural and urban areas both in terms of infrastructure,<br />

personnel and quality of care.<br />

• Impart training to doctors, nurses and other para medical staff and to upgrade their<br />

skill and knowledge to meet needs of health care.<br />

• Improve maternal and child health conditions and to reduce maternal and infant<br />

mortality and morbidity rates.<br />

The plan schemes of <strong>2011</strong>-<strong>12</strong> are presented below.<br />

State <strong>Plan</strong><br />

Primary Health Care (Rural): Under state plan, outlay available for primary health care<br />

(rural) in the district during <strong>2011</strong>-<strong>12</strong> is Rs. 179.25 lakhs.<br />

Primary Health Care (Urban): Under state plan, outlay available for primary health care<br />

(urban) in the district during <strong>2011</strong>-<strong>12</strong> is Rs. 14.21 lakhs.<br />

TSI: NABARD Consultancy Services (NABCONS) 145


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Ayurvedic Health Service (Rural): Under state plan, outlay available in the district during<br />

<strong>2011</strong>-<strong>12</strong> is Rs. 142.47 lakhs.<br />

Ayurvedic Health Service (Urban): Under state plan, outlay available in the district during<br />

<strong>2011</strong>-<strong>12</strong> is Rs. 35.65 lakhs.<br />

Central Sponsored <strong>Plan</strong><br />

Reproductive Child Health (RCH): <strong>Annual</strong> <strong>Plan</strong> outlay under this Central Sponsored <strong>Plan</strong><br />

during <strong>2011</strong>-<strong>12</strong> is Rs. 1303.62 lakhs (CS: Rs. 1108.08 lakhs; SS: Rs. 195.54 lakhs)<br />

Immunization: <strong>Annual</strong> <strong>Plan</strong> outlay under this Central Sponsored <strong>Plan</strong> during <strong>2011</strong>-<strong>12</strong> is Rs.<br />

39.52 lakhs (CS: Rs. 33.59 lakhs; SS: Rs. 5.93 lakhs)<br />

National Rural Health Mission: NRHM was launched in June 2005 with an aim to provide<br />

effective health care to rural people, especially among the disadvantaged groups including<br />

women and children by improving access, enabling community ownership and demand for<br />

services, strengthening public health system for effective service delivery, enhancing equity<br />

and accountability and promoting decentralization. NRHM seeks to integrate health with<br />

the determinants of health for which intersectoral convergence between departments like<br />

PRI, WCD, RWSS and Education is essential. The main components of NRHM are RCH-II,<br />

Immunization, National Disease Control Programme and NRHM initiatives.<br />

The Mission aims to reduce IMR and MMR, provide access to Public Health Services,<br />

promote Women health, Child Health, Sanitation and Hygiene, Immunization and Nutrition,<br />

prevention and control of communicable and non-communicable diseases. It also has as its<br />

objective access to integrate and comprehensive primary health care, population<br />

stabilization, gender and demographic balance and promotion of health lifestyle.<br />

The main activities under NRHM Initiatives are as follows:<br />

• Accredited Social Health Activist (ASHA).<br />

• Mainstreaming AYUSH.<br />

• Untied funds to Sub-Centers.<br />

• Formation of Rogi Kalyan Samities.<br />

• Mobile Medical Unit.<br />

• Strengthening PHC/CHC/UGPHC to Indian Public Health Standards<br />

NRHM is in operation in the district since 2006. Achievements under NRHM till 2008-09 are<br />

as follows.<br />

Table 6.37. Achievement in formation and strengthening of Gaon Kalyan Samities<br />

Achievement in Gaon Kalyan Samities (GKS)<br />

Block/ULBs<br />

Total<br />

target<br />

Nos. formed<br />

till Sep<br />

2010<br />

Account<br />

opened<br />

Money<br />

transferred<br />

to Account<br />

Swasthya<br />

Kantha<br />

Bahanaga 155 148 148 148 145<br />

<strong>Balasore</strong> Sadar 248 237 237 237 235<br />

Baliapal 172 166 166 165 165<br />

Basta 258 246 246 246 221<br />

Bhograi 296 294 292 290 251<br />

Jaleswar 189 185 185 185 185<br />

Khaira 320 314 313 3<strong>12</strong> 311<br />

Nilgiri 131 <strong>12</strong>9 <strong>12</strong>9 <strong>12</strong>9 <strong>12</strong>9<br />

Oupada 147 146 144 144 142<br />

Remuna 258 243 239 239 234<br />

Simulia 147 144 144 144 144<br />

Soro 157 152 152 152 146<br />

Total 2478 2404 2395 2391 2308<br />

% achievement 97.01 96.65 96.49 93.14<br />

TSI: NABARD Consultancy Services (NABCONS) 146


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 6.38. Achievement in appointment of ASHA (till September 2010)<br />

Block/ULBs Target Achievement<br />

Bahanaga <strong>12</strong>1 <strong>12</strong>0<br />

<strong>Balasore</strong> Sadar 224 208<br />

Baliapal 176 169<br />

Basta 166 157<br />

Bhograi 362 257<br />

Jaleswar 177 173<br />

Khaira 199 165<br />

Nilgiri 162 154<br />

Oupada 90 90<br />

Remuna 136 135<br />

Simulia 105 102<br />

Soro <strong>12</strong>1 117<br />

Total 2039 1847<br />

% achievement 90.58<br />

Table 6.39. Achievement in Janani Surakshya Yojana Programme during 2006-07 to<br />

2009-10<br />

Year Total Beneficiary Home Deliveries % Institutional Deliveries %<br />

2006-07 11409 952 8.34 10457 91.66<br />

2007-08 27245 963 3.53 26282 96.47<br />

2008-09 32625 296 0.91 32329 99.09<br />

2009-10 27266 175 0.64 27091 99.36<br />

The funding pattern of NRHM is 85:15 between Center and the State. <strong>Annual</strong> <strong>Plan</strong> outlay<br />

under this Central Sponsored <strong>Plan</strong> during <strong>2011</strong>-<strong>12</strong> is Rs. 980.59 lakhs (CS: Rs. 833.50 lakhs;<br />

SS: Rs. 147.09 lakhs)<br />

Revised National Tuberculosis Control Programme (RNTCP): Amongst all communicable<br />

diseases, Tuberculosis is the leading killer in the world. The disease and its associated<br />

illness, affect the human being in its most productive age group, causing immense socio<br />

economic loss. It is also a leading cause of death among women and contributes to intense<br />

stigma resulting in social discrimination. Women some times, are the worst sufferers. In<br />

early sixties (1962) National Tuberculosis Control Programme (NTCP) was launched with<br />

support from Government of India to control Tuberculosis and to minimize deaths. But it<br />

did not yield the desired output due to many determinants- such as<br />

• Irregular supply of Anti TB drugs,<br />

• Over reliance on X-Ray and<br />

• Inadequate monitoring and supervision<br />

The Revised National Tuberculosis Control Programme (RNTCP) was started in 1993 with<br />

assistance from Swedish International Development Agency (SIDA) applying the principle of<br />

DOTS - a worldwide successful phenomenon (Strategy). Subsequently the programme was<br />

rapidly expanded to other parts of the country with support from Department for<br />

International Development (DFID), Soft loan from World Bank (WB) and Danish<br />

International Development Assistance (DANIDA). DFID and DANIDA are providing support<br />

to RNTCP in Andhra Pradesh and Orissa respectively. National Tuberculosis Control<br />

Programme was implemented in Orissa from 1964. RNTCP was launched in 1997 with<br />

DANIDA support, first in 3 tribal districts then subsequently expanded to 14 districts in a<br />

phased manner from 1997 to 2003 (Phase–I). All the 30 districts were covered by 2004.<br />

In <strong>Balasore</strong> district, the programme is in operation since 2004. The funding pattern of the<br />

programme is 50:50 between Center and the State. <strong>Annual</strong> <strong>Plan</strong> outlay under this Central<br />

Sponsored <strong>Plan</strong> during <strong>2011</strong>-<strong>12</strong> is Rs. 40.92 lakhs (CS: Rs. 20.46 lakhs; SS: Rs. 20.46 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 147


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

National Vector Borne Disease Control Programme (NVBDCP): Vector borne diseases like<br />

Malaria and Filaria pose immense public health concern and continue to be major causes of<br />

significant morbidity and mortality in the state. These diseases are prevalent both in rural<br />

and urban areas mostly among lower socio-economic groups of the population, the<br />

marginalized and disadvantaged. The dynamics of these diseases are largely determined by<br />

eco-epidemiological, socio-economic and water management systems. Children, young<br />

adults, representing economically productive sections and pregnant women are the most<br />

vulnerable groups, although all age groups are affected. Government of India in its National<br />

Health Policy (2002) has pledged commitment to reduce mortality on account of malaria by<br />

50% by 2010 and efficient morbidity control and elimination of lymphatic filariasis (ELF) by<br />

2015.<br />

The Disease surveillance reports of <strong>Balasore</strong> district (2005-06) indicate that almost 0.13%<br />

of the reported diseases are due to malaria. To prevent the incidence of malaria in the<br />

district, this Central Sponsored <strong>Plan</strong> of Govt. of India is implemented in the district. <strong>Annual</strong><br />

<strong>Plan</strong> outlay under this Central Sponsored <strong>Plan</strong> during <strong>2011</strong>-<strong>12</strong> is Rs. 164.23 lakhs (CS: Rs.<br />

81.<strong>12</strong> lakhs; SS: Rs. 82.<strong>12</strong> lakhs)<br />

Central <strong>Plan</strong><br />

National Leprosy Eradication Programme: The National Leprosy Elimination Programme<br />

is under implementation in the State since 1982-83. The programme was supported by the<br />

Government of India, bilateral aid agencies and International donor agencies like Lepra<br />

India, HOINA and the German Leprosy Relief Association. The objective of the programme is<br />

to eliminate the disease by detecting all cases of leprosy from the community and treating<br />

them with “Multi Drug Therapy” (MDT). The “elimination of leprosy” means reducing the<br />

prevalence rate of leprosy to one or below one case per 10,000 populations. The State has<br />

achieved the “elimination” goal by end of December 2006. <strong>Balasore</strong> district along with 22<br />

other districts of the state have already achieved elimination. The prevalence rate of leprosy<br />

in <strong>Balasore</strong> district is only 0.48 per 10,000 populations (2008-09). The diagnosis and<br />

treatment facilities of leprosy cases have been extended to all the peripheral health<br />

institutions including Sub-Centers. Three Leprosy Eradication Units are functioning in the<br />

district. <strong>Annual</strong> <strong>Plan</strong> Outlay under the scheme during <strong>2011</strong>-<strong>12</strong> is Rs. 10.03 lakhs (Central<br />

<strong>Plan</strong>: Rs. 10.03 lakhs).<br />

National Programme for Control of Blindness (NPCB): It is a central plan scheme<br />

operating in the district for past several years. <strong>Annual</strong> <strong>Plan</strong> Outlay under the scheme during<br />

<strong>2011</strong>-<strong>12</strong> is Rs. 31.30 lakhs (Central <strong>Plan</strong>: Rs. 31.30 lakhs).<br />

Integrated Disease Surveillance Programme: The objective of this Central <strong>Plan</strong> scheme is<br />

to improve the information available to the government health services, NGO sector, medical<br />

colleges and private health care providers on a set of high-priority diseases and risk factors,<br />

with a view to improve the on-the-ground responses to such diseases and risk factors.<br />

Integrated Disease Surveillance Program (IDSP) is intended to be the backbone of public<br />

health delivery system in the country. It is expected to provide essential data to monitor<br />

progress of on going disease control programs and help in optimizing the allocation of<br />

resources. A total of 13 diseases both communicable and non-communicable have been<br />

included for the surveillance as per the decision of the IDSP committee. The programme is<br />

operating in the district for past several years. <strong>Annual</strong> <strong>Plan</strong> outlay Rs. 11.62 lakhs (Central<br />

<strong>Plan</strong> Rs. 11.62 lakhs)<br />

Programmes<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health<br />

Services<br />

Urban Ayurvedic Health<br />

Services<br />

Table 6.40. Programme wise <strong>Plan</strong> Outlays: Health<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

(Rs. in lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 148<br />

Total<br />

0 100 0.00 142.47 142.47<br />

0 100 0.00 35.65 35.65


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Primary Health Care<br />

(Rural)<br />

0 100 0.00 179.25 179.25<br />

Primary Health Care<br />

(Urban)<br />

Central Sponsored <strong>Plan</strong><br />

0 100 0.00 14.21 14.21<br />

Reproductive Child Health<br />

(RCH)<br />

85 15 1108.08 195.54 1303.62<br />

Immunization 85 15 33.59 5.93 39.52<br />

National Rural Health<br />

Mission initiatives<br />

Revised National<br />

85 15 833.50 147.09 980.59<br />

Tuberculosis Control<br />

Programme (RNTCP)<br />

National Vector Borne<br />

50 50 20.46 20.46 40.92<br />

Disease Control<br />

Programme (NVBDCP)<br />

50 50 82.<strong>12</strong> 82.<strong>12</strong> 164.23<br />

Central <strong>Plan</strong><br />

National Programme for<br />

0.00<br />

Control of Blindness<br />

(NPCB)<br />

100 0 31.30 0.00 31.30<br />

Integrated Disease<br />

Surveillance Programme<br />

100 0 11.62 0.00 11.62<br />

National Leprosy<br />

Eradication Programme<br />

100 0 10.03 0.00 10.03<br />

Total 2130.69 822.72 2953.40<br />

6.10.4. Rural Water Supply & Sanitation<br />

The Rural Water Supply and Sanitation organization’s prime duty is to provide safe drinking<br />

water to the rural people. The strategy for the plan period is to construct new pipe water<br />

projects, augment and maintain existing water supply system and the quality service as<br />

well as to promote sustainability of the sources. For implementation of RWSS, Govt. of India<br />

provides fund under ARWSP which is a centrally sponsored programme. The district is also<br />

receiving funds under State <strong>Plan</strong> scheme to supplement Rural Pipe Water Supply projects.<br />

The plan schemes under implementation in the district during <strong>2011</strong>-<strong>12</strong> are presented<br />

below.<br />

Central Sponsored <strong>Plan</strong><br />

Accelerated Rural Water Supply Programme (ARWSP): This is a centrally sponsored<br />

programme. Under ARWSP, the Central Government is to supplement the efforts of the<br />

State Governments in providing access to safe drinking water to all rural habitations of the<br />

country. Under the scheme Panchayati Raj Institutions will be involved in the<br />

implementation of schemes particularly in selecting the location of stand post, spot sources,<br />

operation and maintenance, fixing of cess/water tariff, etc. The implementation of the<br />

Sector Reform Projects in the identified pilot districts, are also to be carried out either by<br />

the <strong>District</strong> Panchayats or through the <strong>District</strong> Water and Sanitation Missions (DWSM),<br />

which are to be registered societies under the supervision, control and guidance of <strong>District</strong><br />

Panchayat. Drinking water supply assets are transferred to the appropriate level of<br />

Panchayats and such Panchayats are to be empowered to undertake operation and<br />

maintenance of drinking water systems. Under the scheme two different activities will be<br />

undertaken during <strong>2011</strong>-<strong>12</strong> with financial outlay as mentioned below.<br />

• Rural Pipe Water Supply (RPWS) - <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 2022.00 lakhs (CS: Rs.<br />

<strong>12</strong>05.00 lakhs; SS: 817.00 lakhs)<br />

TSI: NABARD Consultancy Services (NABCONS) 149<br />

Total


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Digging of tube wells, Survey & Investigation, Mitigation of drought, <strong>District</strong> Library) -<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 209.82 lakhs (CS: Rs. 104.91 lakhs; SS: 104.91 lakhs)<br />

Table 6.41. Details of activities and Physial targets: Rural Water Supply & Sanitaion<br />

Particulars Unit <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Sinking of Tube Wells Nos. 210<br />

Public Water Supply Schemes Nos. 42<br />

6.10.5. Urban Water Supply:<br />

The list of plan schemes finalized for implementation in this sub-sector during <strong>2011</strong>-<strong>12</strong> is<br />

presented below.<br />

State <strong>Plan</strong><br />

• Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>,<br />

Jaleswar, Soro & Nilgiri ULBs – <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 41.00 lakhs (State <strong>Plan</strong> Rs.<br />

41.00 lakhs)<br />

• Improvement of water supply and replacement of defunct bore wells up-gradation pf<br />

sources and laying of pipe lines in different ULBs – <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 71.00 lakhs<br />

(State <strong>Plan</strong> Rs. 71.00 lakhs)<br />

• Improvement of W/S to Nilgiri town – <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 300.00 lakhs (State <strong>Plan</strong><br />

Rs. 300.00 lakhs)<br />

• Improvement of W/S to Soro town – <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 100.00 lakhs (State <strong>Plan</strong><br />

Rs. 100.00 lakhs)<br />

• Improvement of water supply to Jaleswar town – <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 100.00 lakhs<br />

(State <strong>Plan</strong> Rs. 100.00 lakhs)<br />

• Improvement of water supply & S/I system of different non-residential office buildings<br />

& Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri and Jaleswar ULBs – <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

Rs. 100.00 lakhs (State <strong>Plan</strong> Rs. 100.00 lakhs)<br />

• Improvement of water supply & S/I system of different residential office buildings &<br />

Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri and Jaleswar ULBs – <strong>Annual</strong> <strong>Plan</strong> Outlay<br />

Rs. 100.00 lakhs (State <strong>Plan</strong> Rs. 100.00 lakhs)<br />

Central Sponsored <strong>Plan</strong><br />

• Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and<br />

UGR) – <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 300.00 lakhs (CS: Rs. 150.00 lakhs; SS: Rs. 150.00<br />

lakhs)<br />

• Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to<br />

<strong>Balasore</strong> town from river Sono – construction of intake well and laying of rising mains)<br />

– <strong>Annual</strong> <strong>Plan</strong> Outlay Rs. 300.00 lakhs (CS: Rs. 150.00 lakhs; SS: Rs. 150.00 lakhs)<br />

Table 6.42. Programme wise <strong>Plan</strong> Outlays: Urban Water Supply & Sanitation<br />

(Rs. in lakhs)<br />

Programmes<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage<br />

system in different uncovered areas of<br />

<strong>Balasore</strong>, Jaleswar, Soro & Nilgiri<br />

ULBs<br />

Improvement of water supply and<br />

replacement of defunct bore wells upgradation<br />

pf sources and laying of<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Sponsored <strong>Plan</strong>s<br />

TSI: NABARD Consultancy Services (NABCONS) 150<br />

Total<br />

0 100 0.00 41.00 41.00<br />

0 100 0.00 71.00 71.00


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Sponsored <strong>Plan</strong>s<br />

pipe lines in different ULBs<br />

Improvement of W/S to Nilgiri town 0 100 0.00 300.00 300.00<br />

Improvement of W/S to Soro town 0 100 0.00 100.00 100.00<br />

Improvement of water supply to<br />

Jaleswar town<br />

Improvement of water supply & S/I<br />

system of different non-residential<br />

0 100 0.00 100.00 100.00<br />

office buildings & Govt. Institutions of<br />

<strong>Balasore</strong>, Soro, Nilgiri and Jaleswar<br />

ULBs<br />

Improvement of water supply & S/I<br />

system of different residential office<br />

0 100 0.00 100.00 100.00<br />

buildings & Govt. Institutions of<br />

<strong>Balasore</strong>, Soro, Nilgiri and Jaleswar<br />

ULBs<br />

0 100 0.00 100.00 100.00<br />

Central Sponsored <strong>Plan</strong><br />

Augmentation of W/S to <strong>Balasore</strong><br />

0.00<br />

town under UIDSSMT (Construction<br />

of ESR and UGR)<br />

Augmentation of W/S to <strong>Balasore</strong><br />

town under EAP (Improvement of<br />

50 50 150.00 150.00 300.00<br />

water supply to <strong>Balasore</strong> town from<br />

river Sono – construction of intake<br />

well and laying of rising mains)<br />

50 50 150.00 150.00 300.00<br />

Total 300.00 11<strong>12</strong>.00 14<strong>12</strong>.00<br />

6.10.6. Urban Development:<br />

As per 2001 census, the district has an urban population of only 10.88% of the total<br />

population in the district. This is much less as compared to state average of 14.99%. The<br />

urban area in the district consists of only one municipality, i.e. <strong>Balasore</strong> and other three<br />

are Jaleswar, Nilgiri and Soro NAC. The population density in these urban areas is much<br />

high.<br />

Objectives and strategies of the plan period<br />

• Improve and develop urban infrastructure and improve delivery of services such as<br />

sanitation, drinking water, roads and lighting.<br />

• Development of flood prone areas, construction of drainage channel to avoid water<br />

logging during rainy season.<br />

• Provision of housing and basic amenities.<br />

• Implementation of self employment programme for urban poor.<br />

• Generation of wage employment for urban poor and creation of useful public assets.<br />

• Development of women and children in urban areas through assistance to urban poor<br />

women for group economic activity.<br />

During <strong>2011</strong>-<strong>12</strong>, activities to be carried out in the urban areas of the district with financial<br />

outlays are presented below.<br />

State <strong>Plan</strong>:<br />

• Infrastructure grant towards Urban Tourisium Destination towns under <strong>Balasore</strong><br />

Municipality- Rs. <strong>12</strong>.10 lakhs.<br />

• Road Development & Maintenance for <strong>Balasore</strong> Municipality – Rs.99.96 lakhs.<br />

TSI: NABARD Consultancy Services (NABCONS) 151<br />

Total


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Urban Greenery of <strong>Balasore</strong> Municipality – Rs.<strong>12</strong>.10 lakhs.<br />

• Special Problem Fund for <strong>Balasore</strong> Municipality – Rs. 8.39 lakhs.<br />

• Road Development & Maintenance for Jaleswar NAC – Rs. 198.81 lakhs.<br />

• Road Development for Nilgiri NAC – Rs. 41.80 lakhs.<br />

• Road Development for Soro NAC – Rs. 65.00 lakhs.<br />

• FDR Grant for Soro NAC – Rs. 20.00 lakhs<br />

• Incentive Grant for Soro NAC – Rs. 30.00 lakhs<br />

• Protection of water bodies for Soro NAC – Rs. 25.00 lakhs<br />

Central Sponsored <strong>Plan</strong><br />

Integrated Housing & Urban Development Programme (IHSDP): This is a centrally<br />

sponsored programme with funding pattern of 80:10:10 between center, state and the ULB<br />

respectively. Under this scheme dwelling units will be constructed with provision of basic<br />

amenities. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong> is Rs. 348.63 lakhs (CS: Rs. 306.79 lakhs; SS: Rs.<br />

41.84 lakhs)<br />

Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT):<br />

This is a centrally sponsored programme with funding pattern of 80:10:10 between center,<br />

state and the ULB respectively. Under this scheme infrastructure projects will be<br />

constructed in the ULBs of the district. <strong>Annual</strong> <strong>Plan</strong> outlay <strong>2011</strong>-<strong>12</strong> is Rs. 48.36 lakhs (CS:<br />

Rs. 42.56 lakhs; SS: Rs. 5.80 lakhs)<br />

Swarna Jayanti Sahari Rojgar Yojana (SJSRY): This is a centrally sponsored programme<br />

with funding pattern of 75:25 between center and the state. The objective of the programme<br />

are implementation of self employment programme for urban poor, generation of wage<br />

employment for urban poor and creation of useful public assets and development of women<br />

and children in urban areas through assistance to urban poor women for group economic<br />

activity. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> is Rs.150.66 lakhs (CS: Rs. 1<strong>12</strong>.995 lakhs; SS: Rs.<br />

37.665 lakhs)<br />

National Urban Information System (NUIS): This is a centrally sponsored programme with<br />

funding pattern of 90:10 between center and the state. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> is<br />

Rs.0.33 lakhs (CS: Rs. 0.30 lakhs; SS: Rs. 0.03 lakhs)<br />

In addition to above the ULBs will receive an amount of Rs. 58.47 lakhs under Finance<br />

Commission Grants.<br />

6.10.7. Rural Housing:<br />

State <strong>Plan</strong><br />

Mo Kudia: This is one of the important flagship programmes of State Government. The<br />

scheme was introduced in April 2008. Its aim is to provide dwelling houses to the needy<br />

rural poor below poverty line. The scheme will supplement resources available under IAY<br />

and increase availability of houses for the rural poor. <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> Rs.<br />

875.85 lakh (State <strong>Plan</strong>: Rs. 875.85 lakhs).<br />

Central Sponsored <strong>Plan</strong>:<br />

Indira Awas Yojana: To meet the requirement of housing for BPL families in rural areas,<br />

Government of India sponsored Indira Awas Yojana (IAY) is being implemented in the<br />

district. The IAY scheme started from the year 1985-86 to provide assistance for<br />

construction/upgradation of dwelling units to the Below Poverty Line (BPL) rural<br />

households belonging to the Scheduled Castes, Scheduled Tribe and free bonded labourer<br />

categories. From the year, 1993-94 onwards, the scope of the scheme was extended to cover<br />

the rural BPL from the non-SC and ST poor subject to the condition that the benefits to the<br />

non-SC/ST poor would not be more than 40% of the total IAY allocation. The benefits of the<br />

TSI: NABARD Consultancy Services (NABCONS) 152


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

scheme have also been extended to the families of the ex-servicemen of the armed and<br />

paramilitary forces killed in action. 3% of the houses are reserved for physically and<br />

mentally challenged persons. Apart from this as per the instructions of Ministry of Rural<br />

Development, Government of India, 15% of the total houses are reserved for the religious<br />

minority communities (i.e. Muslims, Christian, Sikhs, Buddhists & Jains) from 2006-07.<br />

Identification of eligible BPL beneficiaries is extremely crucial to the programme. In order to<br />

impart transparency to the selection process, a permanent IAY waitlist based on the results<br />

of the BPL census 1997 has already been prepared. This permanent waitlist is displayed at<br />

every Gram Panchayat. This measure will help remove arbitrariness and malpractices in the<br />

selection process of beneficiaries. The Zilla Parishad or DRDA on the basis of allocations<br />

made and targets fixed shall decide the number of houses to be constructed/upgraded<br />

panchayat wise under IAY, during a particular financial year. Zilla Parishad/DRDA shall<br />

intimate the same to the Gram Panchayat. Thereafter, the Gram Sabha will select the<br />

beneficiaries from the list of eligible households or select from the wait list, according to IAY<br />

Guidelines as per priorities fixed, restricting this number to the target allotted. The funding<br />

pattern of the programme is 75:25 between Center and the State.<br />

Table 6.43. Performance of IAY in <strong>Balasore</strong> district<br />

Indicators 2005-06 2006-07 2007-08 2008-09<br />

Allocation 1554.00 1554.00 3021.90 3021.55<br />

Release 1408.62 1554.00 3021.90 3021.55<br />

Utilization 1465.82 1528.60 730.86 1068.61<br />

% utilization 96.10 98.36 24.19 35.37<br />

Target (No. of houses) 6216 6216 <strong>12</strong>087 <strong>12</strong>086<br />

Achievement (No. of houses) 5863 6114 2639 4855<br />

% achievement 94.32 98.36 21.83 40.17<br />

Source: DRDA, <strong>Balasore</strong><br />

Table 6.44. Expenditure for vulnerable groups under IAY in <strong>Balasore</strong> district<br />

Indicators SC ST OBC Total<br />

2005-06<br />

Total Expenditure 455.86 301.97 7<strong>12</strong>.19 1470.02<br />

% to total expenditure 31.01 20.54 48.45 100.00<br />

Total number of houses constructed 2001 1416 3035 6452<br />

% to total houses constructed 31.01 21.95 47.04 100.00<br />

2006-07<br />

Total Expenditure 458.47 305.57 764.56 1528.60<br />

% to total expenditure 30.00 20.00 50.00 100.00<br />

Total number of houses constructed 1737 1154 2935 5826<br />

% to total houses constructed 29.80 19.80 50.40 100.00<br />

2007-08<br />

Total Expenditure 218.29 145.52 366.05 730.86<br />

% to total expenditure 29.87 19.91 50.22 100.00<br />

Total number of houses constructed 776 518 1345 2639<br />

% to total houses constructed 29.40 19.63 50.57 100.00<br />

Source: DRDA, <strong>Balasore</strong><br />

In <strong>Balasore</strong> district, IAY will be implemented during <strong>2011</strong>-<strong>12</strong>. The <strong>Annual</strong> <strong>Plan</strong> Outlay is Rs.<br />

8697.20 lakhs (CS: Rs. 6522.90 lakhs; SS: Rs. 2174.30 lakhs)<br />

Table 6.45. Details of activities & physical targets: Rural Housing<br />

Programmes Units <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Mo Kudia No. of Houses <strong>12</strong>00<br />

Indira Awash Yojana (IAY) No. of Houses 21705<br />

6.10.8. Welfare of SC, ST & OBC<br />

TSI: NABARD Consultancy Services (NABCONS) 153


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

For welfare of SC, ST and OBC community, the following plan programmes will be<br />

implemented in the district during <strong>2011</strong>-<strong>12</strong>. These are Central <strong>Plan</strong> schemes and the funds<br />

are released to the states in the form of Additional Central Assistance.<br />

Table 6.46. Programme wise <strong>Plan</strong> Outlays: Welfare of SC, ST & OBC<br />

Programmes<br />

Central <strong>Plan</strong> (ACA to states)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Outlay <strong>2011</strong>-<strong>12</strong><br />

Pre Matric Scholarship to SC Boys Student (Boarders) 0.75<br />

Pre Matric Scholarship to SC Girls Student (Boarders) 7.33<br />

Pre Matric Scholarship to ST Boys Student (Boarders) 72.52<br />

Pre Matric Scholarship to ST Girls Student (Boarders) 172.30<br />

Post Matric Scholarship to SC Students 97.33<br />

Post Matric Scholarship to ST Students 19.18<br />

Development of SCs (OSFDC Section) 224.13<br />

Development of STs (OSFDC Section) <strong>12</strong>9.25<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 15.66<br />

Pre Matric Scholarship to OBC Students <strong>12</strong>66.16<br />

Post Matric Scholarship to OBC Students 62.68<br />

Pre Matric Scholarship to Minorities 71.82<br />

Post Matric Scholarship to Minorities 6.26<br />

Total 2145.37<br />

6.10.9. Social Security, Social Welfare & Nutrition:<br />

This is one of the important sub sectors of Social Welfare sector. It includes social security<br />

for disadvantaged and vulnerable sections of the society, women empowerment, child<br />

development, improvement in nutrition status of children and other social welfare<br />

programmes. The plan outlays under different schemes during <strong>2011</strong>-<strong>12</strong> are presented in<br />

table 6.47. Brief discussion on some of the important programme is presented in below<br />

mentioned paragraphs.<br />

Indira Gandhi National Old Age Pension (NOAP) Scheme: This is one of the components<br />

of the National Social Assistance Programme, introduced by Government of India, Ministry<br />

of Rural Development with effect from 15.08.1995. Under this scheme, old age pension is<br />

provided to the aged, destitute persons of 65 years and above of BPL category. Till 2001-02<br />

the scheme was a central plan scheme but from 2002-03 the funds are released to the<br />

states in the form of Additional Central Assistances. The nomenclature of the scheme has<br />

been changed to Indira Gandhi National Old Age Pension Scheme. The scheme is in<br />

operation in the district.<br />

Madhubabu Pension Yojana (MBPY): Orissa Disability Pension (ODP) was a State<br />

Government initiative and was introduced in 1984 on the 2nd of October. The scheme has<br />

been restructured and renamed as MBPY. The objective of the scheme is to provide<br />

sustenance allowance for the persons with disabilities. The beneficiary receives an amount<br />

of Rs. 200/month as pension.<br />

A person shall be eligible to pension under MBPY, if he/sheo<br />

(i) is of 60 years of age and above (OAP) (ii) or is a widow (irrespective of age) (WP) (iii)<br />

or is a leprosy patient with visible signs of deformity (irrespective of age) (PLP) (iv) or is<br />

a person of 5 years of age or above and unable to do normal work due to his/her<br />

deformity or disability being totally blind or orthopaedically handicapped or mentally<br />

retarded or, with cerebral palsy. (DP) (v) or a widow of AIDS patient(irrespective of age<br />

and income (WP-AIDS) (vi) or an AIDS patient identified by the State/<strong>District</strong> AIDS<br />

Control Society (irrespective of income) (PP-AIDS:)<br />

o has family income from all sources not exceeding Rs.<strong>12</strong>,000/- per annum (Tahasildar<br />

concerned to certify)<br />

o is a permanent resident / domicile of Orissa<br />

o has not been convicted of any criminal offence involving moral turpitude.<br />

TSI: NABARD Consultancy Services (NABCONS) 154


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

National Family Benefit Scheme (NFBS): National Family Benefit Scheme is being<br />

implemented in the State with 100% Govt. of India's assistance since 15th August 1995 as<br />

the second component of National Social Assistance Programme (NSAP) of the Ministry of<br />

Rural Development, Govt. of India. The main objective of the scheme is to rehabilitate a<br />

downtrodden BPL family on the event of death of its primary bread winner. Under this<br />

Scheme, a one time lump sum financial assistance of Rs.10,000/- is given to a bereaved<br />

BPL family on the death of its primary breadwinner in the age group of 18-64 years. This<br />

amount is given to such surviving member of the ‘household’ of the deceased who, after<br />

local inquiry, is determined to be the head of the household. The household includes<br />

spouse, minor children, unmarried daughters and dependent parents. In case of the death<br />

of an unmarried adult, the term ‘household’ would include minor brothers/sisters.<br />

From 1995-96 to 2001-02, Govt. of India in the Ministry of Rural Development were<br />

releasing funds under the Scheme directly to the districts for implementation of the<br />

scheme. But, from the financial year, 2002-03 the Scheme has been transferred to the State<br />

<strong>Plan</strong> and the Govt. of India is releasing funds in the form of ACA tying up with the funds for<br />

NOAP and Annapurna Yojana for being routed through the State <strong>Plan</strong> Budget. The scheme<br />

is in operation in the district.<br />

Kishori Shakti Yojana (KSY): This is a central plan scheme and is being implemented by<br />

the Ministry of Women & Child Development using the infrastructure of ICDS. The Scheme<br />

targets adolescent girls in the age group of 11 to 18 years, for addressing their needs of self<br />

development, nutrition and health status, literacy and numerical skills, vocational skills<br />

etc. Under the scheme, adolescent girls in the age group of 11 to 18 years are being<br />

provided with iron and de-worming tablets.<br />

Supply of Bi-cycle to girls’ students: This is a State <strong>Plan</strong> scheme with the objective of<br />

supplying bicycles to the school going ST/SC girls in class-VIII to Class-XII in Scheduled<br />

Areas and ST/SC girls in Class-XI & XII in non Scheduled Areas. The scheme is in<br />

operation in the district.<br />

Mission Sakti: Mission Shakti is a Self-Help Mission for empowering women through<br />

promotion of Women’s Self-Help Groups (WSHGs) and was lanched in the State on 8 th<br />

March 2001. The Mission aims at empowering women through formation and promotion of<br />

one lakh Women’s Self-Help groups over a period of four years commencing from 2001 and<br />

strengthening the already existing ones by providing them support for capacity building and<br />

for ensuring credit linkages of the WSHGs to enable them to be engaged in economic<br />

activities for income-generation.<br />

Construction & Repair of AWC building: This is a state plan scheme. Initially the scheme<br />

was introduced in KBK districts, but later extended to non KBK districts.<br />

Reduction of IMR: Under this scheme, financial support is provided to Anganwadi<br />

Workers/ANMs for reduction of Infant Morality Rate.<br />

Supplementary Nutrition Programme: With a view to improve the health and nutritional<br />

status of children in the age group of 0-6 years, pregnant women and lactating mothers, the<br />

Supplementary Nutrition Programme has been included as one of the most important<br />

components of the ICDS programme. With a view to reducing morbidity and mortality<br />

among the vulnerable sections of the population, the Supplementary Nutrition Programme<br />

through the ICDS scheme has proved to be one of the most important food based<br />

interventions in the State. Under the scheme, Supplementary Nutrition is provided to needy<br />

children and to expectant/nursing mothers from low income families for a period of 300<br />

days a year. The aim is to supplement the daily nutritional intake by 300 Calories and 8-10<br />

gms of protein for children and 500 Calories and 20 –25 gms of protein for expectant and<br />

nursing women. Severely malnourished children, in grade III and IV as per ICDS<br />

classification are provided with an additional dose of SNP. This intervention aims only at<br />

supplementing and not substituting the family food. Through this, an important contact<br />

point is established with the pregnant women and nursing mothers to educate them about<br />

the nutritional needs and care of pregnant women, care of the newborn and young children.<br />

TSI: NABARD Consultancy Services (NABCONS) 155


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

The Supplementary Nutrition Programme in the district is being carried by 2105 AWCs<br />

functioning in the district.<br />

Mid Day Meal (MDM): The Mid-Day-Meal Programme was introduced in 1995 and the aim<br />

is to provide a cooked noon meal to primary school children of all Government and<br />

Government-aided Schools studying in Class I to V all over the State for 210 working days<br />

in a year. The scheme aims at increasing the enrolment and reducing the number of school<br />

dropouts while also improving the nutritional status of the children.<br />

Under the scheme, Government of India provides free rice @ 100 grams per beneficiary per<br />

day for 210 days in an academic year. Government of India also provides the transportation<br />

charges for transportation of the rice from the FCI Depot to the school point @ Rs.75/- per<br />

quintal which is released to the districts through the MVSN by the Ministry of HRD,<br />

Government of India upon submission of claims by the DSWOs.<br />

Government of Orissa provides funds towards purchase of the dal, vegetables, oil,<br />

condiments and transportation charges under the scheme at the rate of 64 paisa per<br />

beneficiary per day. The Govt. of India, Ministry of HRD provides cooking cost @ Rs.1.00 per<br />

beneficiary per day w.e.f. 1.9.04 and accordingly Rs.1.64 (Rs.0.64 from State Govt. fund) is<br />

being provided per beneficiary per day under the programme.<br />

Table 6.47. Programme wise <strong>Plan</strong> Outlays: Social Security, Social Welfare & Nutrition<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Programmes<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central<br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Total<br />

State <strong>Plan</strong><br />

Sponsored <strong>Plan</strong>s Sponsored <strong>Plan</strong>s<br />

Madhu Babu Pension<br />

Yojana<br />

0 100 0.00 474.26 474.26<br />

Old Age Pension 0 100 0.00 87.02 87.02<br />

Orissa Disability<br />

Pension<br />

0 100 0.00 58.13 58.13<br />

Organizing Single<br />

Window Camps<br />

0 100 0.00 8.30 8.30<br />

Bi-cycle to students 0 100 0.00 1.25 1.25<br />

Mission Sakti 0 100 0.00 208.75 208.75<br />

Repair and maintenance<br />

of AWC Building<br />

0 100 0.00 10.25 10.25<br />

Reduction of Child<br />

Malnutrition<br />

0 100 0.00 31.16 31.16<br />

Reduction of IMR<br />

Grant-in-Aid to<br />

0 100 0.00 2.20 2.20<br />

Handicapped Welfare<br />

Institution<br />

0 100 0.00 23.00 23.00<br />

Grant in Aid to<br />

Orphanages<br />

Secretarial support to<br />

0 100 0.00 101.15 101.15<br />

<strong>District</strong> JJ Board/Child<br />

Welfare Committee<br />

0 100 0.00 0.35 0.35<br />

Medical Check up 0 100 0.00 0.60 0.60<br />

Sanitation 0 100 0.00 0.50 0.50<br />

Handicapped<br />

Scholarship<br />

0 100 0.00 <strong>12</strong>.47 <strong>12</strong>.47<br />

Award to AWW 0 100 0.00 0.15 0.15<br />

Monitoring Mechanism<br />

& Evaluation<br />

0 100 0.00 4.50 4.50<br />

Information Education<br />

Communication<br />

0 100 0.00 3.00 3.00<br />

TSI: NABARD Consultancy Services (NABCONS) 156


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central<br />

Sponsored <strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Medicine Kits 0 100 0.00 <strong>12</strong>.20 <strong>12</strong>.20<br />

Computer 0 100 0.00 0.20 0.20<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

0 100 0.00 0.35 0.35<br />

Supplementary<br />

Nutrition Programme<br />

50 50 1197.13 1197.13 2394.26<br />

Mid Day Meal<br />

61 39 1195.16 764.<strong>12</strong> 1959.29<br />

Programme (Pry+UP)<br />

Mid Day Meal<br />

Programme (Kitchencum<br />

Store)<br />

Mid Day Meal<br />

Programme (Utensils)<br />

Mid Day Meal<br />

Programme (Monitoring<br />

Mechanism &<br />

Evaluation)<br />

Mid Day Meal<br />

Programme<br />

(Transportation<br />

Charges)<br />

Mid Day Meal<br />

Programme<br />

(Honorarium to cook &<br />

helper)<br />

Construction of AWC<br />

Building<br />

75 25 102.48 34.16 136.64<br />

75 25 8.70 2.90 11.60<br />

61 39 <strong>12</strong>.51 8.00 20.50<br />

75 25 20.32 6.77 27.10<br />

75 25 61.50 20.50 82.00<br />

50 50 <strong>12</strong>.50 <strong>12</strong>.50 25.00<br />

Central <strong>Plan</strong><br />

IG National Old Age<br />

Pension (ACA to States)<br />

100 0 597.14 0.00 597.14<br />

National Family Benefit<br />

Scheme (ACA to States)<br />

100 0 92.80 0.00 92.80<br />

Kishori Shakti Yojana 100 0 14.00 0.00 14.00<br />

National Disability<br />

Pension<br />

100 0 0.50 0.00 0.50<br />

National Child Labour<br />

Project<br />

100 0 105.39 0.00 105.39<br />

Total 3420.13 3085.88 6506.02<br />

6.11. General Services<br />

In this Sector, the district will receive the following funds for taking up<br />

activities/programmes during <strong>2011</strong>-<strong>12</strong>.<br />

Table 6.48. Programme wise <strong>Plan</strong> Outlays: General Services<br />

Programmes<br />

State <strong>Plan</strong><br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong><br />

Construction of Revenue Department Buildings (Non Residential) 22.30<br />

Construction of Revenue Department Buildings (Residential) 13.94<br />

Construction of PHC Buildings (Non Residential) 11.32<br />

Construction of RD Department Buildings (Non Residential) <strong>12</strong>.65<br />

Construction of Revenue Department Buildings (Non Residential) 52.90<br />

Construction of PHC Buildings (Residential) 8.20<br />

TSI: NABARD Consultancy Services (NABCONS) 157


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay<br />

<strong>2011</strong>-<strong>12</strong><br />

Construction of Revenue Department Buildings (Residential) 78.00<br />

Construction of Building (Non Residential) RD Division Jaleswar 30.00<br />

Construction of Health & RW Building (Residential) 21.00<br />

Construction & Maintenance of Buildings (Non Residential) 13.91<br />

Construction of RD Department Buildings (Residential) 32.77<br />

Total 296.99<br />

Table 6.49. Details of Activities and Physical Targets: General Services<br />

Programmes Units <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> Targets<br />

Construction of Non Residential Houses<br />

Revenue Department Building Nos. of Building 2<br />

Health Department Building Nos. of Building 2<br />

R.D. Department Building Nos. of Building 3<br />

Construction of Residential Houses<br />

Revenue Department Building Nos. of Building 2<br />

Health Department Building Nos. of Building 10<br />

R.D. Department Building Nos. of Building 4<br />

Deposit Works Nos. 1<br />

6.<strong>12</strong>. Financial Performance of the district<br />

In the present planning exercise data were collected on allocation, release and utilization of<br />

different programmes during 10 th plan in respect of schemes. The details are presented in<br />

table 6.56. The table has been split in to three sub tables as presented below.<br />

Table 6.50. Financial Performance of the district during the 10th <strong>Plan</strong> period<br />

(Rs. In lakhs)<br />

Part I<br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Promotion of SRI programme<br />

Central Sponsored <strong>Plan</strong><br />

7.65 7.65 7.65 8.75 8.75 8.75<br />

Work <strong>Plan</strong>-Rice Development<br />

Work <strong>Plan</strong>-Sugarcane Development<br />

0.95 0.95 0.95 1.20 1.20 1.20<br />

Work <strong>Plan</strong>-Farm Mechanisation 26.75 26.75 26.75 30.<strong>12</strong> 30.<strong>12</strong> 30.<strong>12</strong><br />

Jute Technology Mission (MM-II) 1.5 1.5 1.5 1.75 1.75 1.75<br />

ISOPOM (Pulses) 0.52 0.52 0.52 0.65 0.65 0.65<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

0.95 0.95 0.95 1.05 1.05 1.05<br />

Seed Village Programme 2.36 2.36 2.36 2.65 2.65 2.65<br />

RKVY 33.65 33.65 33.65 36.85 36.85 36.85<br />

Sub-Total 74.33 74.33 74.33 83.02 83.02 83.02<br />

2 Horticulture<br />

Central Sponsored <strong>Plan</strong><br />

National Horticulture Mission 84.57 84.57 84.57 95.75 95.75 95.75<br />

Micro Irrigation Programme 2.15 2.15 2.15<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

3.15 3.15 3.15 6.15 6.15 6.15<br />

Coconut Development Board<br />

Programme<br />

432.02 432.02 432.02 502.00 502.00 502.00<br />

National Medicianal <strong>Plan</strong>ts Mission<br />

Programme<br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

RKVY 0.00 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 519.74 519.74 519.74 606.05 606.05 606.05<br />

3 Soil & Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) 158<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

Central Sponsored <strong>Plan</strong><br />

IWDP 49.24 13.26 13.26 98.48 65.79 65.79<br />

NWDPRA 43.54 50.80 50.80 87.07 9.00 9.00<br />

Sub-Total 92.77 64.06 64.06 185.55 74.79 74.79<br />

4 Animal Husbandary & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training<br />

Strengthening of Livestock Service<br />

Infrastructure and Modernisation of<br />

Offices<br />

Disaster Management Preparedness<br />

Strengthening of Liquid Nitrogen<br />

Supply<br />

Strengthening of LBD farm Remuna<br />

Fodder Demonstration Programme<br />

Opening of new LI Center<br />

Backyard Poultry Development<br />

Transfer of Technology-Estension<br />

Services<br />

Organisation of Go-Sambardhana<br />

Utsav .<br />

Central Sponsored <strong>Plan</strong><br />

ASCAD (Assistance to State for<br />

Control of Livestock Diseases)<br />

Central <strong>Plan</strong><br />

SMILE Training (Society for<br />

Management Information Learning<br />

& Extension)<br />

RKVY<br />

Sub-Total 0 0 0 0 0 0<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit<br />

institutions under NRC-LTO fund<br />

Revival of the short term cooperative<br />

credit institution<br />

Loan support to co-operatives<br />

Modernisation of co-operative<br />

processing rice mill<br />

Share capital and Transport subsidy<br />

for PDS to consumer cooperatives<br />

MACP-Infrastructure Strengtheing<br />

and Managerial subsidy to<br />

Marketing Co-operatives (PACs &<br />

RCMS)<br />

Financial assistance in shape of<br />

62.27 62.27 62.27 69.27 69.27 69.27<br />

loan/subsidy or share to other cooperatives<br />

(Women co-operatives,<br />

Labour co-operative)<br />

1.00 1.00 1.00<br />

Sub-Total 63.27 63.27 63.27 69.27 69.27 69.27<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of Inland Fisheries<br />

and Aquaculture through FFDA<br />

(Establishment cost)<br />

Strengthening of Infrastructure<br />

Central Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries &<br />

Aquaculture through FFDA<br />

(Programme Component)<br />

Development of water logged areas<br />

9.47 9.47 9.47 10.58 10.58 10.58<br />

Development of Brakish Water<br />

Aquaculture through FFDA<br />

Inland Capture Fisheries<br />

(Reservoirs/Rivers)<br />

10.32 10.32 10.32 11.45 11.45 11.45<br />

Saving-cum-Relief Scheme<br />

Motorisation of traditional crafts<br />

8.25 8.25 8.25 9.75 9.75 9.75<br />

TSI: NABARD Consultancy Services (NABCONS) 159<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

Fisherman Rebate on HSD Oil 19.38 19.38 19.38 21.52 21.52 21.52<br />

Group Accident Insurance Scheme 2.1 2.1 2.1 2.65 2.65 2.65<br />

Low Cost House<br />

Central <strong>Plan</strong><br />

3.45 3.45 3.45 4.52 4.52 4.52<br />

Introduction of Intermediate craft of<br />

Improved Design<br />

0 0 0 0 0 0<br />

Sub-Total 52.97 52.97 52.97 60.47 60.47 60.47<br />

Total - I 803.08 774.37 774.37 1004.36 893.60 893.60<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY)<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Swarnajayanti Gram Swarozgary<br />

Yojana ( SGSY )<br />

National Rural Employment<br />

Guarantee Scheme (NREGS)<br />

267.71 266.51 239.16 369.84 265.16 270.47<br />

Swarnajayanti Gramin Rozgar<br />

Yojana ( SGRY )<br />

DRDA Administration<br />

1660.64 1660.64 1845.74 1813.43 1813.43. 1696.28<br />

Total - II 1928.35 1927.15 2084.9 2183.27 265.16 1966.75<br />

III SPECIAL AREAS PROGRAMMES<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article<br />

275 (1)<br />

14.67 14.67 14.67 16.85 16.85 16.85<br />

Special Central Assistance to Tribal<br />

Sub <strong>Plan</strong> areas<br />

40.05 40.05 40.05 44.55 44.55 44.55<br />

Total - III 54.72 54.72 54.72 61.4 61.4 61.4<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD -<br />

RIDF) - MI Division, <strong>Balasore</strong><br />

Minor Irrigation - Biju Krushak<br />

Vikash Yojana - LI Division,<br />

<strong>Balasore</strong><br />

Minor Irrigation- Biju Krushak<br />

Vikash Yojana - LI Division,<br />

Jaleswar<br />

Saline Embankment Improvement<br />

projects (NABARD - RIDF- XIV) -<br />

Irrigation Division, <strong>Balasore</strong><br />

Drainage Projects (NABARD - RIDF -<br />

XII) - Drainage Division, <strong>Balasore</strong><br />

Drainage Projects (NABARD - RIDF -<br />

XIV) - Drainage Division, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

Flood Management Programme<br />

(River Bank Protection Work of River<br />

Subarnarekha & Budhabalanga) -<br />

Irrigation Division, <strong>Balasore</strong><br />

Flood Management Programme<br />

(Major Works) - Drainage Division,<br />

<strong>Balasore</strong><br />

50.26 50.26 50.26 55.84 55.84 55.84<br />

Total - IV 50.26 50.26 50.26 55.84 55.84 55.84<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana<br />

Central Sponsored <strong>Plan</strong><br />

Rajiv Gandhi Gramin Vidyutikaran<br />

Yojana (RGGVY)<br />

Total - V 0.00 0.00 0.00 0.00 0.00 0.00<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

Central <strong>Plan</strong><br />

Prime Minister Rojagar Yojana<br />

(PMRY)<br />

6.53 4.09 4.65 7.32 2.83 3.32<br />

Total - VI 6.53 4.09 4.65 7.32 2.83 3.32<br />

VII TRANSPORT<br />

TSI: NABARD Consultancy Services (NABCONS) 160<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme -<br />

Constituency Wise Allotment (CWA)<br />

Construction of Rural Roads &<br />

74.50 74.50 74.50 46.02 46.02 46.02<br />

Bridge under NABARD funding<br />

RIDF Project<br />

Completion of incomplete roads and<br />

33.64 33.64 33.64 111.36 111.36 111.36<br />

bridges and different stretches of<br />

RIDF and other schemes<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana<br />

(PMGSY)<br />

10.02 10.02 10.02<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funding<br />

RIDF Project<br />

Minimum Needs Programme -<br />

Constituency Wise Allotment (CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical<br />

Roads)<br />

Central <strong>Plan</strong><br />

Construction of Rural Road (Bharat<br />

Nirman)<br />

972.56 972.56 972.56 1025.42 1025.42 1025.42<br />

3 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funding<br />

RIDF Project<br />

Roads & Bridges - State <strong>Plan</strong><br />

Central <strong>Plan</strong><br />

278.57 278.57 278.57 3<strong>12</strong>.24 3<strong>12</strong>.24 3<strong>12</strong>.24<br />

Central Road Fund 7.05 7.05 7.05 7.42 7.42 7.42<br />

4 Rural Works Division, Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funding<br />

RIDF Project<br />

Minimum Needs Programme -<br />

Constituency Wise Allotment (CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical<br />

Roads)<br />

Extension/Renovation of Road<br />

Works<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana<br />

(PMGSY)<br />

TFC Road<br />

TFC Building<br />

247.74 247.47 69.82 472.78 472.48 -<br />

Total - VII 1624.08 1623.81 1446.16 1975.24 1974.94 1502.46<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Economic <strong>Plan</strong>tations<br />

Communication & Building -<br />

Construction of quarters for forest<br />

guards<br />

Bamboo <strong>Plan</strong>tation<br />

Elephant Management <strong>Plan</strong><br />

Wildlife Protection and Conservation<br />

Measures<br />

Central <strong>Plan</strong><br />

Development of National Park,<br />

Sanctuary & Natural Reserves<br />

Elephant Management Project -<br />

Talasari - HVBA<br />

0.52 0.52 0.52<br />

TSI: NABARD Consultancy Services (NABCONS) 161<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

Total - VIII 0.52 0.52 0.52 0.00 0.00 0.00<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education<br />

Central Sponsored <strong>Plan</strong><br />

Sarba Sikshya Abhiyan (SSA)<br />

National Programme for Education<br />

of Girls at Elementary Level<br />

(NPEGEL)<br />

Kasturiba Gandhi Balika Vidyalaya<br />

(KGBV)<br />

Sub-Total 0 0 0 0 0 0<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Development of Play Field<br />

Sports Equipment to Block & GP<br />

Central Sponsored <strong>Plan</strong><br />

Sports Festival for Women<br />

One time seed capital grant (PYKKA)<br />

Central <strong>Plan</strong><br />

Inter School Games & Sports<br />

Competition<br />

Panchayat Yuba Krida Khel Abhiyan<br />

(PYKKA)<br />

<strong>Annual</strong> acquisition grant<br />

<strong>Annual</strong> operation grant<br />

Sports Competition<br />

Sub-Total 0 0 0 0 0 0<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 23.56 23.56 23.56<br />

Urban Ayurvedic Health Services<br />

Primary Health Care (Rural)<br />

Primary Health Care (Urban)<br />

Central Sponsored <strong>Plan</strong><br />

8.15 8.15 8.15<br />

Reproductive Child Health (RCH)<br />

Immunization<br />

515.45 515.45 515.45 575.95 575.95 575.95<br />

National Rural Health Mission<br />

(NRHM) initiatives<br />

Revised National Tuberculosis<br />

Control Programme (RNTCP)<br />

505.32 505.32 505.32 555.45 555.45 555.45<br />

National Vector Borne Disease<br />

Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

81.56 81.56 81.56 89.54 89.54 89.54<br />

National Programme for Control of<br />

Blindness (NPCB)<br />

Integrated Disease Surveillence<br />

Programme (IDSP)<br />

13.25 13.25 13.25<br />

National Leprosy Eradication<br />

Programme (NLEP)<br />

IMCP<br />

5.23 5.23 5.23<br />

Sub-Total 1102.33 1102.33 1102.33 <strong>12</strong>71.13 <strong>12</strong>71.13 <strong>12</strong>71.13<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP - Sinking of Tube Well 234.77 234.77 234.77 176.18 176.18 176.18<br />

ARWSP - Public Water Supply<br />

Scheme<br />

Total Sanitation Campaign (TSC)<br />

251.92 251.92 251.92 101.20 101.20 101.20<br />

Sub - Total 486.69 486.69 486.69 277.38 277.38 277.38<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Urban Pipe Water Supply 3.64 3.64 3.64 2.69 2.69 2.69<br />

Urban Sewerage<br />

Urban Water Supply Programme<br />

Provision of Over Head Tank and<br />

improvement of water supply to<br />

9.4 9.4 9.4 29 29 29<br />

TSI: NABARD Consultancy Services (NABCONS) 162<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

Jaleswar NAC<br />

Urban Water Supply Programme -<br />

Improvement of Water Supply to<br />

uncovered areas of Budhanagar<br />

under <strong>Balasore</strong> Municipality<br />

Urban Water Supply Programme<br />

Improvement of Water Supply to<br />

uncovered areas of adjacent to<br />

Barabati High School &<br />

Damodarpur under <strong>Balasore</strong><br />

Municipality<br />

Urban Water Supply Programme -<br />

Provision of water supply to Betsul<br />

and adjoining areas of ward no. 3 of<br />

Nilagiri NAC<br />

Urban Water Supply Programme-<br />

Laying of pipeline in uncovered<br />

areas of Soro NAC<br />

Urban Water Supply Programme -<br />

Laying of pipeline in uncovered<br />

areas of ward no. 5 & 13 of Jaleswar<br />

NAC<br />

Urban Sewerage and Sanitation<br />

Programme - Improvement of<br />

external sewerage disposal system<br />

to staff quarters of FM College,<br />

<strong>Balasore</strong><br />

Urban Sewerage and Sanitation<br />

Programme - Improvement of<br />

external sewerage disposal system<br />

of Police Colony near Permit Padia<br />

field, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation<br />

Programme - Improvement of<br />

external sewerage disposal system<br />

of PH staff quarters near<br />

Chandrameri Padia, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation<br />

Programme - Improvement of<br />

external sewerage disposal system<br />

of Veterinary Colony, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation<br />

Programme - Improvement of<br />

external sewerage disposal system<br />

of Revenue Colony, <strong>Balasore</strong><br />

Improvement of Water Supply to<br />

Nilagiri NAC<br />

Improvement of Water Supply to<br />

Khirda, Raipur areas of Soro NAC<br />

Central Sponsored <strong>Plan</strong><br />

AUWSP - Augmentation of Water<br />

Supply to <strong>Balasore</strong> town<br />

AUWSP - Augmentation of Water<br />

Supply to Nilagiri town<br />

Urban Infrastructure Development<br />

Scheme for Small and Medium<br />

Towns (UIDSSMT) - Augmentation<br />

of water supply to <strong>Balasore</strong> town<br />

Sub-Total 13.04 13.04 13.04 31.69 31.69 31.69<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban<br />

Tourism Destination Towns<br />

Road Development & Maintenance<br />

Urban Greenery<br />

Special Problem Fund<br />

Central Sponsored <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) 163<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

Integrated Housing & Urban<br />

Development Programme (IHSDP)<br />

Swarna Jayanti Sahari Rojagar<br />

Yojana (SJSRY)<br />

Urban Infrastructure Development<br />

7.32 7.32 7.32 8.25 8.25 8.25<br />

Scheme for Small & Medium Town<br />

(UIDSSMT)<br />

National Urban Information System<br />

(NUIS)<br />

Jaleswar NAC<br />

Central Sponsored <strong>Plan</strong><br />

70.45 70.45 70.45 78.45 78.45 78.45<br />

Swarna Jayanti Sahari Rojagar<br />

Yojana (SJSRY)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

Road Development<br />

Central Sponsored <strong>Plan</strong><br />

2.15 2.15 2.15 2.51 2.51 2.51<br />

Swarna Jayanti Sahari Rojagar<br />

Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

6.25 6.25 6.25<br />

Road Development<br />

Central Sponsored <strong>Plan</strong><br />

13.2 13.2 13.2<br />

Swarna Jayanti Sahari Rojagar<br />

Yojana (SJSRY)<br />

7.56 7.56 7.56<br />

Sub-Total 79.92 79.92 79.92 116.22 116.22 116.22<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Indra Awas Yojana (IAY) 713.68 354.84 428.80 909.26 785.62 409.17<br />

Sub-Total 713.68 354.84 428.8 909.26 785.62 409.17<br />

8 Labour & Employment<br />

State <strong>Plan</strong><br />

Craftsmen Training and Apprentice<br />

Training<br />

Sub-Total 0 0 0 0 0 0<br />

9 Social Security & Social Welfare<br />

State <strong>Plan</strong><br />

National Old Age Pension 495.85 495.85 495.85 513.24 513.24 513.24<br />

Madhubabu Pension Yojana 175.52 175.52 175.52<br />

National Family Benefit Scheme<br />

Organising Single Window Camps<br />

Bi-cycle to girl students<br />

Mission Sakti<br />

95.45 95.45 95.45<br />

Construction & Repair of AWC<br />

building<br />

Reduction of IMR<br />

39.25 39.25 39.25 41.<strong>12</strong> 41.<strong>12</strong> 41.<strong>12</strong><br />

Grant in Aid to Orphanages<br />

Secretarial support to <strong>District</strong> JJ<br />

Board/Child Welfare Committee<br />

26.45 26.45 26.45<br />

Pre and Post Matric Scholarship to<br />

SC, ST & OBC students<br />

Central Sponsored <strong>Plan</strong><br />

2253.41 2253.41 2253.41<br />

Supplementary Nutrition<br />

Programme<br />

1023.23 1023.23 1023.23<br />

Mid Day Meal Programme<br />

Central <strong>Plan</strong><br />

1052.32 1052.32 1052.32<br />

Kishori Shakti Yojana 6.<strong>12</strong> 6.<strong>12</strong> 6.<strong>12</strong><br />

Sub-Total 535.1 535.1 535.1 5186.86 5186.86 5186.86<br />

Total - IX 2930.76 2571.92 2645.88 7792.54 7668.90 7292.45<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue<br />

Department Buildings (Non<br />

Residential)<br />

Construction of building (<strong>Plan</strong>)<br />

TSI: NABARD Consultancy Services (NABCONS) 164<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Sl.<br />

No.<br />

Part II<br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2002-03 <strong>Annual</strong> <strong>Plan</strong>: 2003-04<br />

TSI: NABARD Consultancy Services (NABCONS) 165<br />

Release<br />

Jaleswar RW Division<br />

Construction of Revenue<br />

Department Buildings (Residential)<br />

Construction of PHC Buildings (Non<br />

Residential)<br />

Construction of building (Non<br />

Residential) Jaleswar RW Division<br />

Construction & Maintenance of<br />

Buildings (Non Residential)<br />

Total - X 0 0 0 0 0 0<br />

GRAND TOTAL 7398.30 7006.84 7061.46 13079.97 10922.67 11775.82<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Allocation<br />

Utilization<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2004-05 <strong>Annual</strong> <strong>Plan</strong>: 2005-06<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Promotion of SRI programme<br />

Central Sponsored <strong>Plan</strong><br />

9.45 9.45 9.45 10.25 10.25 10.25<br />

Work <strong>Plan</strong>-Rice Development<br />

Work <strong>Plan</strong>-Sugarcane Development<br />

1.65 1.65 1.65 1.78 1.78 1.78<br />

Work <strong>Plan</strong>-Farm Mechanisation 33.65 33.65 33.65 36.45 36.45 36.45<br />

Jute Technology Mission (MM-II) 1.85 1.85 1.85 2.05 2.05 2.05<br />

ISOPOM (Pulses) 0.76 0.76 0.76 0.88 0.88 0.88<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

1.25 1.25 1.25 1.45 1.45 1.45<br />

Seed Village Programme 2.85 2.85 2.85 3.15 3.15 3.15<br />

RKVY 41.25 41.25 41.25 45.25 45.25 45.25<br />

Sub-Total 92.71 92.71 92.71 101.26 101.26 101.26<br />

2 Horticulture<br />

Central Sponsored <strong>Plan</strong><br />

National Horticulture Mission 105.25 105.25 105.25 133.42 133.42 133.42<br />

Micro Irrigation Programme 2.44 2.44 2.44 2.65 2.65 2.65<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

7.25 7.25 7.25 7.95 7.95 7.95<br />

Coconut Development Board Programme 5.65 5.65 5.65 6.25 6.25 6.25<br />

National Medicianal <strong>Plan</strong>ts Mission Programme 0.00 0.00 0.00 0.00 0.00 0.00<br />

RKVY 0.00 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total <strong>12</strong>0.59 <strong>12</strong>0.59 <strong>12</strong>0.59 150.27 150.27 150.27<br />

3 Soil & Water Conservation<br />

Central Sponsored <strong>Plan</strong><br />

IWDP 98.48 40.56 40.56 49.24 49.31 49.31<br />

NWDPRA 118.85 8.40 8.40 92.29 55.73 55.73<br />

Sub-Total 217.33 48.96 48.96 141.53 105.04 105.04<br />

4 Animal Husbandary & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training<br />

Strengthening of Livestock Service Infrastructure<br />

and Modernisation of Offices<br />

Disaster Management Preparedness<br />

Strengthening of Liquid Nitrogen Supply<br />

Strengthening of LBD farm Remuna<br />

Fodder Demonstration Programme<br />

Opening of new LI Center 2.01 2.01 2.01<br />

Backyard Poultry Development<br />

Transfer of Technology-Estension Services<br />

407.42 408.42 409.42 465.23 465.23 465.23<br />

Organisation of Go-Sambardhana Utsav .<br />

Central Sponsored <strong>Plan</strong><br />

0.71 0.71 0.71 0.85 0.85 0.85<br />

ASCAD (Assistance to State for Control of Livestock<br />

Diseases)<br />

14.56 14.56 14.56<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Release<br />

Utilization<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2004-05 <strong>Annual</strong> <strong>Plan</strong>: 2005-06<br />

Central <strong>Plan</strong><br />

SMILE Training (Society for Management Information<br />

Learning & Extension)<br />

RKVY<br />

Sub-Total 408.13 409.13 410.13 482.65 482.65 482.65<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions<br />

under NRC-LTO fund<br />

Revival of the short term co-operative credit<br />

institution<br />

Loan support to co-operatives<br />

Modernisation of co-operative processing rice mill<br />

Share capital and Transport subsidy for PDS to<br />

consumer cooperatives<br />

MACP-Infrastructure Strengtheing and Managerial<br />

subsidy to Marketing Co-operatives (PACs & RCMS)<br />

Financial assistance in shape of loan/subsidy or<br />

76.97 76.97 76.97 85.82 85.82 85.82<br />

share to other co-operatives (Women co-operatives,<br />

Labour co-operative)<br />

1.00 1.00 1.00<br />

Sub-Total 77.97 77.97 77.97 85.82 85.82 85.82<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of Inland Fisheries and Aquaculture<br />

through FFDA (Establishment cost)<br />

Strengthening of Infrastructure<br />

Central Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture<br />

through FFDA (Programme Component)<br />

<strong>12</strong>.85 <strong>12</strong>.85 <strong>12</strong>.85 13.25 13.25 13.25<br />

Development of water logged areas 0.00 0.00 0.00<br />

Development of Brakish Water Aquaculture through<br />

FFDA<br />

<strong>12</strong>.75 <strong>12</strong>.75 <strong>12</strong>.75 13.26 13.26 13.26<br />

Inland Capture Fisheries (Reservoirs/Rivers) 0.00 0.00 0.00<br />

Saving-cum-Relief Scheme 10.25 10.25 10.25 11.85 11.85 11.85<br />

Motorisation of traditional crafts 0.00 0.00 0.00<br />

Fisherman Rebate on HSD Oil 23.75 23.75 23.75 25.45 25.45 25.45<br />

Group Accident Insurance Scheme 2.75 2.75 2.75 3.25 3.25 3.25<br />

Low Cost House<br />

Central <strong>Plan</strong><br />

5.2 5.2 5.2 6.85 6.85 6.85<br />

Introduction of Intermediate craft of Improved Design 0.00 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 67.55 67.55 67.55 73.91 73.91 73.91<br />

Total - I 984.28 816.91 817.91 1035.44 998.95 998.95<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY)<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Swarnajayanti Gram Swarozgary Yojana ( SGSY )<br />

National Rural Employment Guarantee Scheme<br />

(NREGS)<br />

468.88 484.83 422.14 468.88 489.91 535.65<br />

Swarnajayanti Gramin Rozgar Yojana ( SGRY )<br />

DRDA Administration<br />

1418.08 1418.08 1553.16 2105.45 2105.45 2119.74<br />

Total - II<br />

III SPECIAL AREAS PROGRAMMES<br />

Central <strong>Plan</strong><br />

1886.96 1902.91 1975.3 2574.33 2595.36 2655.39<br />

Grants under Provision to Article 275 (1) 18.10 18.10 18.10 20.15 20.15 20.15<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 48.75 48.75 48.75 55.20 55.20 55.20<br />

Total - III<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

66.85 66.85 66.85 75.35 75.35 75.35<br />

Minor Irrigation Projects (NABARD - RIDF) - MI<br />

Division, <strong>Balasore</strong><br />

Minor Irrigation - Biju Krushak Vikash Yojana - LI<br />

Division, <strong>Balasore</strong><br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI<br />

Division, Jaleswar<br />

Saline Embankment Improvement projects (NABARD<br />

- RIDF- XIV) - Irrigation Division, <strong>Balasore</strong><br />

Drainage Projects (NABARD - RIDF - XII) - Drainage<br />

62.04 62.04 62.04 68.93 68.93 68.93<br />

TSI: NABARD Consultancy Services (NABCONS) 166<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2004-05 <strong>Annual</strong> <strong>Plan</strong>: 2005-06<br />

Division, <strong>Balasore</strong><br />

Drainage Projects (NABARD - RIDF - XIV) - Drainage<br />

Division, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

Flood Management Programme (River Bank<br />

Protection Work of River Subarnarekha &<br />

Budhabalanga) - Irrigation Division, <strong>Balasore</strong><br />

Flood Management Programme (Major Works) -<br />

Drainage Division, <strong>Balasore</strong><br />

Total - IV 62.04 62.04 62.04 68.93 68.93 68.93<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana<br />

Central Sponsored <strong>Plan</strong><br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)<br />

Total - V 0.00 0.00 0.00 0.00 0.00 0.00<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

Central <strong>Plan</strong><br />

Prime Minister Rojagar Yojana (PMRY) 10.54 6.91 5.68 11.72 8.50 3.91<br />

Total - VI<br />

VII TRANSPORT<br />

10.54 6.91 5.68 11.72 8.5 3.91<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

70.00 70.00 70.00 60.00 60.00 60.00<br />

Construction of Rural Roads & Bridge under<br />

NABARD funding RIDF Project<br />

Completion of incomplete roads and bridges and<br />

different stretches of RIDF and other schemes<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

146.95 146.95 146.95 100.63 100.63 100.63<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under<br />

NABARD funding RIDF Project<br />

61.74 61.74 61.74<br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

16.33 16.33 16.33<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

34.15 34.15 34.15 38.23 38.23 38.23<br />

Construction of Rural Road (Bharat Nirman) 1132.23 1132.23 1132.23 <strong>12</strong>35.62 <strong>12</strong>35.62 <strong>12</strong>35.62<br />

3 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under<br />

NABARD funding RIDF Project<br />

Roads & Bridges - State <strong>Plan</strong><br />

Central <strong>Plan</strong><br />

342.2 342.2 342.2 385.42 385.42 385.42<br />

Central Road Fund 8.45 8.45 8.45 9.24 9.24 9.24<br />

4 Rural Works Division, Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under<br />

NABARD funding RIDF Project<br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

Extension/Renovation of Road Works<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

TFC Road<br />

TFC Building<br />

859.38 859.38 285.42 3346.42 3346.42 1810.80<br />

Total - VII<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

2593.36 2593.36 2019.40 5253.63 5253.63 3718.01<br />

Economic <strong>Plan</strong>tations 0.74 0.74 0.74 0.86 0.86 0.86<br />

Communication & Building - Construction of<br />

quarters for forest guards<br />

0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) 167<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2004-05 <strong>Annual</strong> <strong>Plan</strong>: 2005-06<br />

Bamboo <strong>Plan</strong>tation<br />

Elephant Management <strong>Plan</strong><br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

1.35 1.35 1.35<br />

Development of National Park, Sanctuary & Natural<br />

Reserves<br />

<strong>12</strong>.54 <strong>12</strong>.54 <strong>12</strong>.54 16.85 16.85 16.85<br />

Elephant Management Project - Talasari - HVBA 1.2 1.2 1.2<br />

Total - VIII<br />

IX SOCIAL SERVICES<br />

13.28 13.28 13.28 20.26 20.26 20.26<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education<br />

Central Sponsored <strong>Plan</strong><br />

4.85 4.85 4.85 5.42 5.42 5.42<br />

Sarba Sikshya Abhiyan (SSA) 2430.45 2430.45 2430.45 2711.54 2711.54 2711.54<br />

National Programme for Education of Girls at<br />

Elementary Level (NPEGEL)<br />

25.25 25.25 25.25 27.45 27.45 27.45<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) 27.85 27.85 27.85 31.85 31.85 31.85<br />

Sub-Total 2488.4 2488.4 2488.4 2776.26 2776.26 2776.26<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Development of Play Field<br />

Sports Equipment to Block & GP<br />

Central Sponsored <strong>Plan</strong><br />

Sports Festival for Women<br />

One time seed capital grant (PYKKA)<br />

Central <strong>Plan</strong><br />

Inter School Games & Sports Competition<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

<strong>Annual</strong> acquisition grant<br />

<strong>Annual</strong> operation grant<br />

0.10 0.10 0.10<br />

Sports Competition 0.15 0.15 0.15<br />

Sub-Total 0.1 0.1 0.1 0.15 0.15 0.15<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 42.23 42.23 42.23<br />

Urban Ayurvedic Health Services<br />

Primary Health Care (Rural)<br />

Primary Health Care (Urban)<br />

Central Sponsored <strong>Plan</strong><br />

10.25 10.25 10.25<br />

Reproductive Child Health (RCH)<br />

Immunization<br />

631.42 631.42 631.42 702.<strong>12</strong> 702.<strong>12</strong> 702.<strong>12</strong><br />

National Rural Health Mission (NRHM) initiatives<br />

Revised National Tuberculosis Control Programme<br />

(RNTCP)<br />

615.54 615.54 615.54 685.45 685.45 685.45<br />

National Vector Borne Disease Control Programme<br />

(NVBDCP)<br />

Central <strong>Plan</strong><br />

95.62 95.62 95.62 105.32 105.32 105.32<br />

National Programme for Control of Blindness (NPCB) 15.65 15.65 15.65<br />

Integrated Disease Surveillence Programme (IDSP)<br />

National Leprosy Eradication Programme (NLEP)<br />

6.85 6.85 6.85<br />

IMCP 8.23 8.23 8.23<br />

Sub-Total 1342.58 1342.58 1342.58 1576.1 1576.1 1576.1<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP - Sinking of Tube Well 204.48 204.48 204.48 1092.33 1092.33 1092.33<br />

ARWSP - Public Water Supply Scheme<br />

Total Sanitation Campaign (TSC)<br />

97.98 97.98 97.98 86.97 86.97 86.97<br />

Sub - Total 302.46 302.46 302.46 1179.30 1179.30 1179.30<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Urban Pipe Water Supply<br />

Urban Sewerage<br />

Urban Water Supply Programme - Laying of pipeline<br />

in uncovered areas of ward no. 5 & 13 of Jaleswar<br />

NAC<br />

Urban Sewerage and Sanitation Programme -<br />

Improvement of external sewerage disposal system to<br />

38.6 38.6 38.6 55.46 55.46 55.46<br />

TSI: NABARD Consultancy Services (NABCONS) 168<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2004-05 <strong>Annual</strong> <strong>Plan</strong>: 2005-06<br />

staff quarters of FM College, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

Improvement of external sewerage disposal system of<br />

Police Colony near Permit Padia field, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

Improvement of external sewerage disposal system of<br />

PH staff quarters near Chandrameri Padia, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

Improvement of external sewerage disposal system of<br />

Veterinary Colony, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

Improvement of external sewerage disposal system of<br />

Revenue Colony, <strong>Balasore</strong><br />

Improvement of Water Supply to Nilagiri NAC<br />

Improvement of Water Supply to Khirda, Raipur<br />

areas of Soro NAC<br />

Central Sponsored <strong>Plan</strong><br />

AUWSP - Augmentation of Water Supply to <strong>Balasore</strong><br />

town<br />

AUWSP - Augmentation of Water Supply to Nilagiri<br />

town<br />

Urban Infrastructure Development Scheme for Small<br />

and Medium Towns (UIDSSMT) - Augmentation of<br />

water supply to <strong>Balasore</strong> town<br />

35.30 35.30 35.30<br />

Sub-Total 38.6 38.6 38.6 90.76 90.76 90.76<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism<br />

Destination Towns<br />

Road Development & Maintenance<br />

Urban Greenery<br />

Special Problem Fund<br />

Central Sponsored <strong>Plan</strong><br />

Integrated Housing & Urban Development<br />

Programme (IHSDP)<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 10.23 10.23 10.23 11.23 11.23 11.23<br />

Urban Infrastructure Development Scheme for Small<br />

& Medium Town (UIDSSMT)<br />

86.52 86.52 86.52 94.65 94.65 94.65<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

Central Sponsored <strong>Plan</strong><br />

1.74 1.74 1.74<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

Road Development<br />

Central Sponsored <strong>Plan</strong><br />

2.74 2.74 2.74 2.98 2.98 2.98<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

6.85 6.85 6.85 7.02 7.02 7.02<br />

Road Development<br />

Central Sponsored <strong>Plan</strong><br />

13.84 13.84 13.84 14.95 14.95 14.95<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 8.05 8.05 8.05 8.88 8.88 8.88<br />

Sub-Total <strong>12</strong>8.23 <strong>12</strong>8.23 <strong>12</strong>8.23 141.45 141.45 141.45<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Indra Awas Yojana (IAY) 1199.00 935.49 952.68 1554.00 1408.62 1465.82<br />

Sub-Total 1199 935.49 952.68 1554 1408.62 1465.82<br />

8 Labour & Employment<br />

State <strong>Plan</strong><br />

Craftsmen Training and Apprentice Training 0.25 0.25 0.25 0.32 0.32 0.32<br />

Sub-Total 0.25 0.25 0.25 0.32 0.32 0.32<br />

9 Social Security & Social Welfare<br />

State <strong>Plan</strong><br />

National Old Age Pension 513.24 513.24 513.24 617.45 617.45 617.45<br />

Madhubabu Pension Yojana 185.65 185.65 185.65 221.13 221.13 221.13<br />

TSI: NABARD Consultancy Services (NABCONS) 169<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2004-05 <strong>Annual</strong> <strong>Plan</strong>: 2005-06<br />

National Family Benefit Scheme<br />

Organising Single Window Camps<br />

Bi-cycle to girl students<br />

Mission Sakti<br />

102.35 102.35 102.35 <strong>12</strong>2.42 <strong>12</strong>2.42 <strong>12</strong>2.42<br />

Construction & Repair of AWC building<br />

Reduction of IMR<br />

45.65 45.65 45.65 50.42 50.42 50.42<br />

Grant in Aid to Orphanages<br />

Secretarial support to <strong>District</strong> JJ Board/Child<br />

Welfare Committee<br />

28.62 28.62 28.62 32.45 32.45 32.45<br />

Pre and Post Matric Scholarship to SC, ST & OBC<br />

students<br />

Central Sponsored <strong>Plan</strong><br />

256.21 256.21 256.21 295.46 295.46 295.46<br />

Supplementary Nutrition Programme 1<strong>12</strong>4.56 1<strong>12</strong>4.56 1<strong>12</strong>4.56 <strong>12</strong>35.2 <strong>12</strong>35.2 <strong>12</strong>35.2<br />

Mid Day Meal Programme<br />

Central <strong>Plan</strong><br />

1185.54 1185.54 1185.54 <strong>12</strong>42.21 <strong>12</strong>42.21 <strong>12</strong>42.21<br />

Kishori Shakti Yojana 6.42 6.42 6.42 8.<strong>12</strong> 8.<strong>12</strong> 8.<strong>12</strong><br />

Sub-Total 3448.24 3448.24 3448.24 3824.86 3824.86 3824.86<br />

Total - IX 8947.86 8684.35 8701.54 11143.2010997.8211055.02<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non<br />

Residential)<br />

Construction of building (<strong>Plan</strong>) Jaleswar RW Division<br />

Construction of Revenue Department Buildings<br />

(Residential)<br />

Construction of PHC Buildings (Non Residential)<br />

Construction of building (Non Residential) Jaleswar<br />

RW Division<br />

Construction & Maintenance of Buildings (Non<br />

Residential)<br />

Total - X 0 0 0 0 0 0<br />

GRAND TOTAL 14565.1714146.6113662.0020182.8620018.8018595.82<br />

Sl.<br />

No.<br />

Part III<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

TSI: NABARD Consultancy Services (NABCONS) 170<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

<strong>Annual</strong> <strong>Plan</strong>: 2006-07 Total<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP) 11.57 11.57 11.57 47.67 47.67 47.67 100.00<br />

Promotion of SRI programme<br />

Central Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 2.18 2.18 2.18 7.76 7.76 7.76 100.00<br />

Work <strong>Plan</strong>-Sugarcane Development<br />

Work <strong>Plan</strong>-Farm Mechanisation 39.25 39.25 39.25 166.22 166.22 166.22 100.00<br />

Jute Technology Mission (MM-II) 2.45 2.45 2.45 9.60 9.6 9.6 100.00<br />

ISOPOM (Pulses) 0.98 0.98 0.98 3.79 3.79 3.79 100.00<br />

ISOPOM (Oil Seeds) 1.8 1.8 1.8 6.50 6.5 6.5 100.00<br />

Central <strong>Plan</strong><br />

Seed Village Programme 3.45 3.45 3.45 14.46 14.46 14.46 100.00<br />

RKVY 50.1 50.1 50.1 207.10 207.1 207.1 100.00<br />

Sub-Total 111.78 111.78 111.78 463.1 463.1 463.1 100.00<br />

2 Horticulture<br />

Central Sponsored <strong>Plan</strong><br />

National Horticulture Mission 148.58 148.58 148.58 567.57 567.57 567.57 100.00<br />

Micro Irrigation Programme 2.85 2.85 2.85 10.09 10.09 10.09 100.00<br />

ISOPOM (Oil Palm) 8.25 8.25 8.25 32.75 32.75 32.75 100.00<br />

Central <strong>Plan</strong><br />

Coconut Development Board Programme 7.05 7.05 7.05 952.97 952.97 952.97 100.00<br />

National Medicianal <strong>Plan</strong>ts Mission Programme 0.00 0.00 0.00 0.00 0 0<br />

RKVY 0.00 0.00 0.00 0.00 0 0<br />

Sub-Total 166.73 166.73 166.73 1563.38 1563.38 1563.38 100.00<br />

3 Soil & Water Conservation<br />

Central Sponsored <strong>Plan</strong><br />

IWDP 32.83 24.82 24.82 328.26 193.74 193.74 59.02<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Release<br />

Utilization<br />

Utilization<br />

% utilization to<br />

total allocation


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2006-07 Total<br />

NWDPRA 93.60 24.85 24.85 435.35 148.78 148.78 34.18<br />

Sub-Total <strong>12</strong>6.43 49.67 49.67 763.61 342.52 342.52 44.85<br />

4 Animal Husbandary & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 0.00 0.00 0.00<br />

Strengthening of Livestock Service Infrastructure and<br />

Modernisation of Offices<br />

42.25 42.25 42.25 42.25 42.25 42.25 100.00<br />

Disaster Management Preparedness 0.00 0.00 0.00<br />

Strengthening of Liquid Nitrogen Supply 0.00 0.00 0.00<br />

Strengthening of LBD farm Remuna 0.00 0.00 0.00<br />

Fodder Demonstration Programme 0.00 0.00 0.00<br />

Opening of new LI Center 2.53 2.53 2.53 4.54 4.54 4.54 100.00<br />

Backyard Poultry Development<br />

Transfer of Technology-Estension Services<br />

532.45 532.45 532.45 1405.10 1406.10 1407.10 100.14<br />

Organisation of Go-Sambardhana Utsav . 1.23 1.23 1.23 2.79 2.79 2.79 100.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

ASCAD (Assistance to State for Control of Livestock<br />

Diseases)<br />

18.23 18.23 18.23 32.79 32.79 32.79 100.00<br />

Central <strong>Plan</strong> 0.00 0.00 0.00<br />

SMILE Training (Society for Management Information<br />

Learning & Extension)<br />

0.00 0.00 0.00<br />

RKVY 0.00 0.00 0.00<br />

Sub-Total 596.69 596.69 596.69 1487.47 1488.47 1489.47 100.13<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-<br />

LTO fund<br />

95.35 95.35 95.35 389.68 389.68 389.68 100.00<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00<br />

Loan support to co-operatives 0.00 0.00 0.00<br />

Modernisation of co-operative processing rice mill 0.00 0.00 0.00<br />

Share capital and Transport subsidy for PDS to consumer<br />

cooperatives<br />

0.00 0.00 0.00<br />

MACP-Infrastructure Strengtheing and Managerial subsidy<br />

to Marketing Co-operatives (PACs & RCMS)<br />

Financial assistance in shape of loan/subsidy or share to<br />

0.00 0.00 0.00<br />

other co-operatives (Women co-operatives, Labour cooperative)<br />

2.00 2.00 2.00 100.00<br />

Sub-Total 95.35 95.35 95.35 391.68 391.68 391.68 100.00<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of Inland Fisheries and Aquaculture through<br />

FFDA (Establishment cost)<br />

0.00 0.00 0.00<br />

Strengthening of Infrastructure 0.00 0.00 0.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

Development of Inland Fisheries & Aquaculture through<br />

FFDA (Programme Component)<br />

15.25 15.25 15.25 61.40 61.40 61.40 100.00<br />

Development of water logged areas 0.00 0.00 0.00 0.00 0.00 0.00<br />

Development of Brakish Water Aquaculture through FFDA 14.52 14.52 14.52 62.30 62.30 62.30 100.00<br />

Inland Capture Fisheries (Reservoirs/Rivers) 0.00 0.00 0.00 0.00 0.00 0.00<br />

Saving-cum-Relief Scheme <strong>12</strong>.54 <strong>12</strong>.54 <strong>12</strong>.54 52.64 52.64 52.64 100.00<br />

Motorisation of traditional crafts 0.00 0.00 0.00 0.00 0.00 0.00<br />

Fisherman Rebate on HSD Oil 27.58 27.58 27.58 117.68 117.68 117.68 100.00<br />

Group Accident Insurance Scheme 3.65 3.65 3.65 14.40 14.40 14.40 100.00<br />

Low Cost House<br />

Central <strong>Plan</strong><br />

7.65 7.65 7.65 27.67 27.67 27.67 100.00<br />

Introduction of Intermediate craft of Improved Design 0.00 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 81.19 81.19 81.19 336.09 336.09 336.09 100.00<br />

Total - I 1178.17 1101.41 1101.41 5005.33 4585.24 4586.24 91.63<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY)<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Swarnajayanti Gram Swarozgary Yojana ( SGSY )<br />

National Rural Employment Guarantee Scheme (NREGS)<br />

519.93 519.93 569.93 2095.24 2026.34 2037.35 97.24<br />

Swarnajayanti Gramin Rozgar Yojana ( SGRY )<br />

DRDA Administration<br />

2075.93 2075.93 2083.44 9073.53 9073.53 9298.36 102.48<br />

Total - II 2595.86 2595.86 2653.37 11168.77 11099.87 11335.71 101.49<br />

III SPECIAL AREAS PROGRAMMES<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 22.38 22.38 22.38 92.15 92.15 92.15 100.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 61.2 61.2 61.2 249.75 249.75 249.75 100.00<br />

Total - III 83.58 83.58 83.58 341.9 341.9 341.9 100.00<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, 78.59 78.59 78.59 315.66 315.66 315.66 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 171<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization<br />

% utilization to<br />

total allocation


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2006-07 Total<br />

<strong>Balasore</strong><br />

Minor Irrigation - Biju Krushak Vikash Yojana - LI Division,<br />

<strong>Balasore</strong><br />

185.52 185.52 185.52 185.52 185.52 185.52 100.00<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division,<br />

Jaleswar<br />

285.45 285.45 285.45 285.45 285.45 285.45 100.00<br />

Saline Embankment Improvement projects (NABARD -<br />

RIDF- XIV) - Irrigation Division, <strong>Balasore</strong><br />

0 0 0 0.00 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII) - Drainage<br />

Division, <strong>Balasore</strong><br />

188.45 188.45 188.45 188.45 188.45 188.45 100.00<br />

Drainage Projects (NABARD - RIDF - XIV) - Drainage<br />

Division, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

Flood Management Programme (River Bank Protection Work<br />

0.00 0.00 0.00<br />

of River Subarnarekha & Budhabalanga) - Irrigation<br />

Division, <strong>Balasore</strong><br />

0.00 0.00 0.00<br />

Flood Management Programme (Major Works) - Drainage<br />

Division, <strong>Balasore</strong><br />

0.00 0.00 0.00<br />

Total - IV 738.01 738.01 738.01 975.08 975.08 975.08 100.00<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 185.45 185.45 185.45 185.45 185.45 185.45 100.00<br />

Total - V 185.45 185.45 185.45 185.45 185.45 185.45 100.00<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

Central <strong>Plan</strong><br />

Prime Minister Rojagar Yojana (PMRY) 9.18 2.99 4.52 45.29 25.32 22.08 48.75<br />

Total - VI<br />

VII TRANSPORT<br />

9.18 2.99 4.52 45.29 25.32 22.08 48.75<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment<br />

(CWA)<br />

50.00 50.00 50.00 300.52 300.52 300.52 100.00<br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

34.83 34.83 34.83 427.41 427.41 427.41 100.00<br />

Completion of incomplete roads and bridges and different<br />

stretches of RIDF and other schemes<br />

Central <strong>Plan</strong><br />

20.00 20.00 20.00 30.02 30.02 30.02 100.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 36.42 36.42 36.42 36.42 36.42 36.42 100.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

62.42 62.42 62.42 <strong>12</strong>4.16 <strong>12</strong>4.16 <strong>12</strong>4.16 100.00<br />

Minimum Needs Programme - Constituency Wise Allotment<br />

(CWA)<br />

18.25 18.25 18.25 34.58 34.58 34.58 100.00<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

42.56 42.56 42.56 114.94 114.94 114.94 100.00<br />

Central <strong>Plan</strong> 0.00 0.00 0.00<br />

Construction of Rural Road (Bharat Nirman) 1350.00 1350.00 1350.00 5715.83 5715.83 5715.83 100.00<br />

3 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

423.25 423.25 423.25 1741.68 1741.68 1741.68 100.00<br />

Roads & Bridges - State <strong>Plan</strong><br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00<br />

Central Road Fund 10.95 10.95 10.95 43.11 43.11 43.11 100.00<br />

4 Rural Works Division, Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

29.03 29.03 29.03 29.03 29.03 29.03 100.00<br />

Minimum Needs Programme - Constituency Wise Allotment<br />

(CWA)<br />

20.00 20.00 20.00 20.00 20.00 20.00 100.00<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

36.10 36.10 36.10 36.10 36.10 36.10 100.00<br />

Extension/Renovation of Road Works<br />

Central <strong>Plan</strong><br />

23.00 23.00 23.00 23.00 23.00 23.00 100.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 5043.26 5043.26 4352.61 10569.28 10569.28 6518.70 61.68<br />

TFC Road 232.24 232.24 232.24 232.24 232.24 232.24 100.00<br />

TFC Building 100.<strong>12</strong> 100.<strong>12</strong> 100.<strong>12</strong> 100.<strong>12</strong> 100.<strong>12</strong> 100.<strong>12</strong> 100.00<br />

Total - VII<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

7532.43 7532.43 6841.78 19578.44 19578.44 15527.86 79.31<br />

Economic <strong>Plan</strong>tations 1.02 1.02 1.02 3.14 3.14 3.14 100.00<br />

Communication & Building - Construction of quarters for 0.00 0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) 172<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization<br />

% utilization to<br />

total allocation


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2006-07 Total<br />

TSI: NABARD Consultancy Services (NABCONS) 173<br />

Allocation<br />

forest guards<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00 0.00 0.00 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00 0.00 0.00 0.00 0.00<br />

Wildlife Protection and Conservation Measures 1.55 1.55 1.55 2.90 2.90 2.90 100.00<br />

Central <strong>Plan</strong> 0.00<br />

Development of National Park, Sanctuary & Natural<br />

Reserves<br />

18.85 18.85 18.85 48.24 48.24 48.24 100.00<br />

Elephant Management Project - Talasari - HVBA 1.42 1.42 1.42 2.62 2.62 2.62 100.00<br />

Total - VIII 22.84 22.84 22.84 56.90 56.90 56.90 100.00<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education<br />

Central Sponsored <strong>Plan</strong><br />

6.45 6.45 6.45 16.72 16.72 16.72 100.00<br />

Sarba Sikshya Abhiyan (SSA) 3015.55 3015.55 3015.55 8157.54 8157.54 8157.54 100.00<br />

National Programme for Education of Girls at Elementary<br />

Level (NPEGEL)<br />

30.24 30.24 30.24 82.94 82.94 82.94 100.00<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) 34.26 34.26 34.26 93.96 93.96 93.96 100.00<br />

Sub-Total 3086.5 3086.5 3086.5 8351.16 8351.16 8351.16 100.00<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Development of Play Field<br />

Sports Equipment to Block & GP<br />

Central Sponsored <strong>Plan</strong><br />

Sports Festival for Women 0.11 0.11 0.11 0.21 0.21 0.21 100.00<br />

One time seed capital grant (PYKKA) 0.00 0.00 0.00<br />

Central <strong>Plan</strong> 0.00 0.00 0.00<br />

Inter School Games & Sports Competition 0.42 0.42 0.42 0.42 0.42 0.42 100.00<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA) 0.00 0.00 0.00<br />

<strong>Annual</strong> acquisition grant 0.00 0.00 0.00<br />

<strong>Annual</strong> operation grant 0.00 0.00 0.00<br />

Sports Competition 0.15 0.15 0.15 100.00<br />

Sub-Total 0.53 0.53 0.53 0.78 0.78 0.78 100.00<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 52.62 52.62 52.62 118.41 118.41 118.41 100.00<br />

Urban Ayurvedic Health Services<br />

Primary Health Care (Rural)<br />

Primary Health Care (Urban)<br />

Central Sponsored <strong>Plan</strong><br />

11.75 11.75 11.75 30.15 30.15 30.15 100.00<br />

Reproductive Child Health (RCH) 782.72 782.72 782.72 3207.66 3207.66 3207.66 100.00<br />

Immunization 33.50 33.50 33.50 33.50 33.50 33.50 100.00<br />

National Rural Health Mission (NRHM) initiatives 755.11 755.11 755.11 3116.87 3116.87 3116.87 100.00<br />

Revised National Tuberculosis Control Programme (RNTCP) 27.50 27.50 27.50 27.50 27.50 27.50 100.00<br />

National Vector Borne Disease Control Programme<br />

(NVBDCP)<br />

Central <strong>Plan</strong><br />

115.25 115.25 115.25 487.29 487.29 487.29 100.00<br />

National Programme for Control of Blindness (NPCB) 20.32 20.32 20.32 49.22 49.22 49.22 100.00<br />

Integrated Disease Surveillence Programme (IDSP) 8.24 8.24 8.24 15.09 15.09 15.09 100.00<br />

National Leprosy Eradication Programme (NLEP) 6.52 6.52 6.52 11.75 11.75 11.75 100.00<br />

IMCP 10.26 10.26 10.26 18.49 18.49 18.49 100.00<br />

Sub-Total 1823.79 1823.79 1823.79 7115.93 7115.93 7115.93 100.00<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP - Sinking of Tube Well 239.03 239.03 239.03 1946.79 1946.79 1946.79 100.00<br />

ARWSP - Public Water Supply Scheme<br />

Total Sanitation Campaign (TSC)<br />

115.13 115.13 115.13 653.20 653.20 653.20 100.00<br />

Sub - Total 354.16 354.16 354.16 2599.99 2599.99 2599.99 100.00<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Urban Pipe Water Supply<br />

Urban Sewerage 100.86 100.86 100.86 233.32 233.32 233.32 100.00<br />

Urban Water Supply Programme Provision of Over Head<br />

Tank and improvement of water supply to Jaleswar NAC<br />

Urban Water Supply Programme - Improvement of Water<br />

0.00 0.00 0.00<br />

Supply to uncovered areas of Budhanagar under <strong>Balasore</strong><br />

Municipality<br />

Urban Water Supply Programme Improvement of Water<br />

0.00 0.00 0.00<br />

Supply to uncovered areas of adjacent to Barabati High<br />

School & Damodarpur under <strong>Balasore</strong> Municipality<br />

0.00 0.00 0.00<br />

Urban Water Supply Programme - Provision of water supply<br />

to Betsul and adjoining areas of ward no. 3 of Nilagiri NAC<br />

0.00 0.00 0.00<br />

Urban Water Supply Programme- Laying of pipeline in<br />

uncovered areas of Soro NAC<br />

0.00 0.00 0.00<br />

Urban Water Supply Programme - Laying of pipeline in 0.00 0.00 0.00<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization<br />

% utilization to<br />

total allocation


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2006-07 Total<br />

uncovered areas of ward no. 5 & 13 of Jaleswar NAC<br />

Urban Sewerage and Sanitation Programme - Improvement<br />

of external sewerage disposal system to staff quarters of FM<br />

College, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme - Improvement<br />

0.00 0.00 0.00<br />

of external sewerage disposal system of Police Colony near<br />

Permit Padia field, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme - Improvement<br />

0.00 0.00 0.00<br />

of external sewerage disposal system of PH staff quarters<br />

near Chandrameri Padia, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme - Improvement<br />

0.00 0.00 0.00<br />

of external sewerage disposal system of Veterinary Colony,<br />

<strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme - Improvement<br />

0.00 0.00 0.00<br />

of external sewerage disposal system of Revenue Colony,<br />

<strong>Balasore</strong><br />

0.00 0.00 0.00<br />

Improvement of Water Supply to Nilagiri NAC 0.00 0.00 0.00<br />

Improvement of Water Supply to Khirda, Raipur areas of<br />

Soro NAC<br />

0.00 0.00 0.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

AUWSP - Augmentation of Water Supply to <strong>Balasore</strong> town 0.00 0.00 0.00<br />

AUWSP - Augmentation of Water Supply to Nilagiri town<br />

Urban Infrastructure Development Scheme for Small and<br />

35.30 35.30 35.30 100.00<br />

Medium Towns (UIDSSMT) - Augmentation of water supply<br />

to <strong>Balasore</strong> town<br />

0.00 0.00 0.00<br />

Sub-Total 100.86 100.86 100.86 268.62 268.62 268.62 100.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination<br />

Towns<br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Road Development & Maintenance 0.00 0.00 0.00 0.00 0.00 0.00<br />

Urban Greenery 0.00 0.00 0.00 0.00 0.00 0.00<br />

Special Problem Fund 0.00 0.00 0.00 0.00 0.00 0.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00 0.00 0.00 0.00<br />

Integrated Housing & Urban Development Programme<br />

(IHSDP)<br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) <strong>12</strong>.10 <strong>12</strong>.10 <strong>12</strong>.10 49.13 49.13 49.13 100.00<br />

Urban Infrastructure Development Scheme for Small &<br />

Medium Town (UIDSSMT)<br />

102.22 102.22 102.22 432.29 432.29 432.29 100.00<br />

National Urban Information System (NUIS) 1.95 1.95 1.95 3.69 3.69 3.69 100.00<br />

Jaleswar NAC 0.00 0.00 0.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 3.24 3.24 3.24 13.62 13.62 13.62 100.00<br />

Nilgiri NAC 0.00 0.00 0.00<br />

State <strong>Plan</strong> 0.00 0.00 0.00<br />

Road Development 0.00 0.00 0.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 7.56 7.56 7.56 27.68 27.68 27.68 100.00<br />

Soro NAC 0.00 0.00 0.00<br />

State <strong>Plan</strong> 0.00 0.00 0.00<br />

Road Development 16.35 16.35 16.35 58.34 58.34 58.34 100.00<br />

Central Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 9.45 9.45 9.45 33.94 33.94 33.94 100.00<br />

Sub-Total 152.87 152.87 152.87 618.69 618.69 618.69 100.00<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

Indra Awas Yojana (IAY) 1554.00 1554.00 1528.00 5929.94 5038.57 4784.47 80.68<br />

Sub-Total 1554 1554 1528 5929.94 5038.57 4784.47 80.68<br />

8 Labour & Employment<br />

State <strong>Plan</strong><br />

Craftsmen Training and Apprentice Training 0.57 0.57 0.57 100.00<br />

Sub-Total 0 0 0 0.57 0.57 0.57 100.00<br />

9 Social Security & Social Welfare<br />

State <strong>Plan</strong><br />

National Old Age Pension 617.45 617.45 617.45 2757.23 2757.23 2757.23 100.00<br />

Madhubabu Pension Yojana 226.73 226.73 226.73 809.03 809.03 809.03 100.00<br />

National Family Benefit Scheme 144.25 144.25 144.25 464.47 464.47 464.47 100.00<br />

Organising Single Window Camps 0.00 0.00 0.00<br />

Bi-cycle to girl students 0.00 0.00 0.00<br />

Mission Sakti 0.00 0.00 0.00<br />

Construction & Repair of AWC building 55.42 55.42 55.42 231.86 231.86 231.86 100.00<br />

Reduction of IMR 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) 174<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization<br />

% utilization to<br />

total allocation


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2006-07 Total<br />

Grant in Aid to Orphanages 45.23 45.23 45.23 132.75 132.75 132.75 100.00<br />

Secretarial support to <strong>District</strong> JJ Board/Child Welfare<br />

Committee<br />

0.23 0.23 0.23 0.23 0.23 0.23 100.00<br />

Pre and Post Matric Scholarship to SC, ST & OBC students<br />

Central Sponsored <strong>Plan</strong><br />

320.14 320.14 320.14 3<strong>12</strong>5.22 3<strong>12</strong>5.22 3<strong>12</strong>5.22 100.00<br />

Supplementary Nutrition Programme 1314.23 1314.23 1314.23 4697.22 4697.22 4697.22 100.00<br />

Mid Day Meal Programme<br />

Central <strong>Plan</strong><br />

1345.65 1345.65 1345.65 4825.72 4825.72 4825.72 100.00<br />

Kishori Shakti Yojana 10.2 10.2 10.2 30.86 30.86 30.86 100.00<br />

Sub-Total 4079.53 4079.53 4079.53 17074.59 17074.59 17074.59 100.00<br />

Total - IX 11152.24 11152.24 11<strong>12</strong>6.24 41960.27 41068.90 40814.80 97.27<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non<br />

Residential)<br />

Construction of building (<strong>Plan</strong>) Jaleswar RW Division 8.50 8.50 8.50 8.50 8.50 8.50 100.00<br />

Construction of Revenue Department Buildings<br />

(Residential)<br />

0.00 0.00 0.00<br />

Construction of PHC Buildings (Non Residential) 0.00 0.00 0.00<br />

Construction of building (Non Residential) Jaleswar RW<br />

Division<br />

24.20 24.20 24.20 24.20 24.20 24.20 100.00<br />

Construction & Maintenance of Buildings (Non Residential) 0.00 0.00 0.00<br />

Total - X 32.7 32.7 32.7 32.7 32.7 32.7 100.00<br />

GRAND TOTAL 23530.46 23447.51 22789.90 79350.13 77949.80 73878.72 93.10<br />

TSI: NABARD Consultancy Services (NABCONS) 175<br />

Allocation<br />

Release<br />

Utilization<br />

Allocation<br />

Release<br />

Utilization<br />

% utilization to<br />

total allocation


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER-VII<br />

TRIBAL SUB PLAN (TSP)<br />

Out of the total population in the district ST constitute only 11.28%. Out of the twelve CD<br />

Blocks of the district, Nilgiri is a tribal block under TSP area. Hence there is an ITDA<br />

operating in the district. Further, one of the block namely Jaleswar comes under MADA<br />

pockets. Primitive Tribal Groups do not reside in any part of the district.<br />

Important socio economic indicators of the ST population residing in the district are<br />

presented below.<br />

Table 7.1. ST population in different Blocks/ULBs of <strong>Balasore</strong> district<br />

Blocks ST Population % to total population<br />

Bahanaga 3160 2.61<br />

<strong>Balasore</strong> Sadar 26889 <strong>12</strong>.34<br />

Baliapal 9721 5.51<br />

Basta 17809 10.93<br />

Bhograi 6282 2.48<br />

Jaleswar 31625 18.25<br />

Khaira 8287 5.20<br />

Nilgiri 61902 56.16<br />

Oupada <strong>12</strong>751 18.07<br />

Remuna 25467 13.94<br />

Simulia 4867 4.61<br />

Soro 6890 5.69<br />

<strong>District</strong> (Rural) 215650 11.63<br />

<strong>Balasore</strong> (M) 6365 6.00<br />

Jaleswar (NAC) 2485 11.62<br />

Nilgiri (NAC) 3287 22.27<br />

Soro (NAC) 667 2.40<br />

<strong>District</strong> (Urban) <strong>12</strong>804 7.53<br />

<strong>District</strong> (Total) 228454 11.28<br />

Source: Census of India, 2001<br />

Table 7.2. Details of Tribal Concentrated Gram Panchayats<br />

(ST Population more than <strong>District</strong> percentage)<br />

Block<br />

No. of<br />

GPs<br />

Name of these GPs<br />

Bahanaga 2 Panpana, Patharpenth<br />

<strong>Balasore</strong> 8<br />

Jayadev Kasaba, Genguti, Nagram, Kuradiha, Sindhia, Kasafal, Parikhi,<br />

Bahabalpur<br />

Baliapal 1 Deula,<br />

Basta 6 Santoshpur, Sadanandapur, Paunshakuli, Ramanda, Mukulish, Kulida<br />

Bhograi 1 Jayarampur<br />

Jaleswar 4 Sardarbandha, Praharajpur, Chhotakalma, Chamargan<br />

Khaira 4 Gadapokhari, Nandara, Paithagali, Ratina<br />

Pithahata, Gumutia, Arabandha, Dharmapur, Siadimala, Tilipala, Narsinghpur,<br />

Nilgiri 18 Garadi, Narayanpur, Dhobasil, Matiali, Sajangarh, Chhatrapur, Bramhapur,<br />

Begunia, Kansha, Ajodhya and Bauriabad<br />

Oupada 7<br />

Aghirapada, Badapohari, Badasahi, Baunshabania, Kandagaradi, R.R.Pur and<br />

Shyamsundarpur<br />

Simulia 2 Bari, Kanthibhauni<br />

Soro 2 Mahumuana, Singhakhuta<br />

Table 7.3. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa state<br />

Parameters <strong>Balasore</strong> <strong>District</strong> Orissa State<br />

Male 81.69 73.35<br />

Literacy rate (Total)<br />

Female 58.90 50.51<br />

Total 70.56 63.08<br />

Literacy rate (Rural)<br />

Male<br />

Female<br />

81.16<br />

57.40<br />

72.93<br />

46.66<br />

TSI: NABARD Consultancy Services (NABCONS) 176


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Parameters <strong>Balasore</strong> <strong>District</strong> Orissa State<br />

Total 69.52 59.84<br />

Male 85.77 87.93<br />

Literacy rate (Urban)<br />

Female 71.20 72.87<br />

Total 78.80 80.84<br />

Literacy rate in SC Population 59.41 55.53<br />

Literacy rate in ST Population 31.88 37.37<br />

Source : <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

Table 7.4. Key Educational Indicators of <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Out of School Children (6 to 11 Age group) (% to total child population)<br />

All Community 1.31 3.28<br />

SC 1.46 2.99<br />

ST 2.95 5.43<br />

Minority 1.79 4.28<br />

Out of School Children (11 to 14 Age group) (% to total child population)<br />

All Community 3.58 5.45<br />

SC 4.32 5.06<br />

ST 7.44 9.86<br />

Minority 5.76 6.78<br />

Source: Census of India, 2001 & Information Sheet on Sarva Siksha Abhiyan, <strong>Balasore</strong> district, 2008<br />

The tribal community residing in the district is mingled with general population and face<br />

much less hardship in comparison to their counterparts in KBK districts. In the annual<br />

plan several plan schemes for development of tribal community in the district has been<br />

proposed. These specific schemes are Pre metric scholarship to ST students and supply of<br />

bicycle to ST girls. Besides of these specific schemes, allocation in proportion of percentage<br />

of population has also been made in respect of other plan schemes.<br />

In the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> the following allocations has been made for welfare of<br />

Scheduled Tribes. Out of total plan outlay of Rs. 79168.29 lakhs, Rs. 10225.68 lakhs has<br />

been allotted for TSP.<br />

Table 7.5. Scheme wise Financial Outlay for TSP during <strong>2011</strong>-<strong>12</strong><br />

(Rs. in lakhs)<br />

Sector/Sub Sector/Schemes<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

State <strong>Plan</strong><br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

828.00 93.40<br />

Work <strong>Plan</strong>-Rice Development 10.72 1.21<br />

Work <strong>Plan</strong>-Sugarcane Development 2.59 0.29<br />

Jute Technology Mission (MM-II) 27.51 3.10<br />

ISOPOM (Pulses) 0.00 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

272.96 30.79<br />

Seed Village Programme 56.68 6.39<br />

Promotion of SRI programme 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 211.26 23.83<br />

Rastriya Krishi Vikas Yojana (RKVY) 3700.05 416.97<br />

National Food Security Mission (Pulses) 256.92 28.98<br />

Sub-Total<br />

Horticulture<br />

State <strong>Plan</strong><br />

5366.69 604.96<br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.54<br />

National Horticulture Mission 193.63 21.84<br />

Micro Irrigation Programme 45.00 5.08<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

10.18 1.15<br />

Coconut Development Board Programme 11.30 1.27<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 2.26 0.25<br />

Rastriya Krishi Vikas Yojana (RKVY) 6.70 0.76<br />

Sub-Total 273.87 30.89<br />

TSI: NABARD Consultancy Services (NABCONS) 177


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development 231.56 26.<strong>12</strong><br />

Central <strong>Plan</strong><br />

Soil and water conservation measures for development of Farms under RKVY 56.50 6.37<br />

Sub-Total 288.06 32.49<br />

Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 0.96 0.11<br />

Disaster Management Preparedness 18.50 2.09<br />

Skill up-gradation Training 3.80 0.43<br />

Genetic up-gradation of goat & Deworing 2.00 0.23<br />

Centrally Sponsored <strong>Plan</strong><br />

Disease Control Programme under ASCAD 81.23 9.16<br />

Health Camp & Awareness Programme under ASCAD 0.55 0.06<br />

Central <strong>Plan</strong><br />

SMILE Training 5.00 0.56<br />

Exposure visit of farmers under SMILE 2.52 0.28<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc. 1.00 0.11<br />

RKVY<br />

a) Strengthening of Livestock Service Information & Modernisation of office 315.15 35.55<br />

b) Dairy Development <strong>12</strong>0.59 13.60<br />

c) Fodder Development 46.50 5.25<br />

d) Goat Development <strong>12</strong>.60 1.42<br />

e) Poultry Development 40.10 4.52<br />

Sub-Total 650.50 73.38<br />

Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 202.02 22.79<br />

Revival of the short term co-operative credit institution <strong>12</strong>4.00 13.99<br />

Loan Support to Co-operatives 2<strong>12</strong>.16 23.93<br />

Modernisation of Co-operative Processing Rice Mill 30.00 3.38<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 24.25 2.74<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives (PACs & RCMS) 131.00 14.78<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives (Women co-operatives, Labour co-operative) <strong>12</strong>.20 1.38<br />

Central <strong>Plan</strong><br />

Construction of Rural Godown under RKVY 1427.92 161.07<br />

Sub-Total 2163.55 244.05<br />

Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA <strong>12</strong>.50 1.41<br />

Exhibition and Organisation of Buyer Seller meet 1.00 0.11<br />

Assistance to Mechanisation Programme 5.00 0.56<br />

Survey and Investigation and establishment of FH & FLC 667.00 75.24<br />

Safety measures for Marine Fishermen 5.00 0.56<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture through FFDA (Programme Component) 74.40 55.80<br />

Development of Brackish Water Aquaculture through FFDA 150.00 16.92<br />

Saving-cum-Relief Scheme 14.40 1.62<br />

Group Accident Insurance Scheme 16.50 1.86<br />

Low Cost House 50.00 5.64<br />

Assistance of Mechanisation Programme 28.50 3.21<br />

Central <strong>Plan</strong><br />

Introduction of Intermediate craft of Improved Design 24.00 2.71<br />

Sub-Total 1048.30 165.66<br />

Total - I 9790.97 1151.43<br />

RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 2000.00 225.60<br />

Construction of C.C Road (New Scheme) 287.00 32.37<br />

State Finance Commission Grant 442.50 49.91<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) <strong>12</strong>00.00 135.36<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme 4218.56 475.85<br />

DRDA Administration 250.00 28.20<br />

Central <strong>Plan</strong><br />

<strong>12</strong>th Finance Commission Award 0.00 0.00<br />

13th Finance Commisssion Award 641.25 72.33<br />

Total - II 9039.31 1019.63<br />

SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

TSI: NABARD Consultancy Services (NABCONS) 178


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls 163.75 163.75<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 86.00 64.50<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 180.00 135.00<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 15.00 11.25<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 20.00 15.00<br />

Total - III 464.75 389.50<br />

IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 200.00 22.56<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 300.00 33.84<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 581.60 65.60<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 261.25 29.47<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 92.71 10.46<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) 156.00 17.60<br />

Centrally Sponsored <strong>Plan</strong><br />

Flood Management Programme (River Bank Protection Work ) 3143.13 354.55<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong> 131.03 14.78<br />

Central <strong>Plan</strong><br />

Installation of Lift Irrigation Projects under RKVY 218.40 24.64<br />

Total - IV 5084.<strong>12</strong> 573.49<br />

ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 485.42 54.76<br />

Biju Saharanchal Vidyutikaran Yojana 140.00 15.79<br />

Centrally Sponsored <strong>Plan</strong><br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 343.04 38.69<br />

Total - V 968.46 109.24<br />

INDUSTRY & MINERALS<br />

Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector 4.90 0.55<br />

Central <strong>Plan</strong><br />

Prime Minister's Employment Generation Programme (PMEGP) 300.00 33.84<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 15.00 1.69<br />

Workshed-cum-Housing 17.50 1.97<br />

Skill Upgradation Training 9.42 1.06<br />

Centrally Sponsored <strong>Plan</strong><br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 8.76 0.99<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 11.50 1.30<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 9.50 1.07<br />

Health Insurance for weavers 11.73 1.32<br />

Mahatma Gandhi Bunakar Bima Yojana 1.23 0.14<br />

Central <strong>Plan</strong><br />

10% Rebate on Handloom Products 10.00 1.13<br />

<strong>District</strong> Level Exhibition 2.00 0.23<br />

Total - VI 401.54 45.29<br />

TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 80.00 9.02<br />

Completion of incomplete roads and bridges of RIDF and other schemes 100.00 11.28<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 733.00 82.68<br />

Flood damage repairing 300.00 33.84<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00<br />

Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 50.00 5.64<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 62.00 6.99<br />

Completion of incomplete road and Bridges of RIDF & other Schemes 253.00 28.54<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00<br />

Rural Work Division- Jaleswar<br />

TSI: NABARD Consultancy Services (NABCONS) 179


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 803.00 90.58<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 40.00 4.51<br />

Construction of Rural Road (Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

567.00 63.96<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

2500.00 282.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project<br />

Central <strong>Plan</strong><br />

10941.18 <strong>12</strong>34.17<br />

Construction of road under Central Road Fund 2577.44 290.74<br />

One time Additional Central Assistance 200.00 22.56<br />

Total - VII<br />

SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

19206.62 2166.51<br />

Social and Farm Forestry <strong>12</strong>.10 1.36<br />

Communication & Building - Construction of quarters for forest guards 3.63 0.41<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 33.00 3.72<br />

Elephant Management Project 0.60 0.07<br />

Talsari - HVBA 17.10 1.93<br />

Total - VIII<br />

SOCIAL SERVICES<br />

General Education<br />

State <strong>Plan</strong><br />

66.43 7.49<br />

Mass Education 20.10 2.27<br />

Construction Office building boundary wall & renovation of old building 16.00 1.80<br />

Construction of staff quarters and office building <strong>12</strong>5.00 14.10<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play<br />

ground, bore well, drainage system, cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

99.40 11.21<br />

Sarba Sikshya Abhiyan (SSA) 7504.21 846.47<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 35.79 4.04<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

44.97 5.07<br />

National APP Training in ITI <strong>Balasore</strong> 6.00 0.68<br />

Sub-Total<br />

Sports & Youth Services<br />

State <strong>Plan</strong><br />

7851.47 885.65<br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.20 0.02<br />

One time seed capital grant for development of Sports infrastructure 34.00 3.84<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

1.44 0.16<br />

<strong>Annual</strong> acquisition grant 3.10 0.35<br />

<strong>Annual</strong> operation grant 3.72 0.42<br />

Rural Sports Competition 7.60 0.86<br />

Prize Money for Rural Sports 6.30 0.71<br />

Sub-Total<br />

Medical & Public Health<br />

State <strong>Plan</strong><br />

56.36 6.36<br />

Rural Ayurvedic Health Services 142.47 16.07<br />

Urban Ayurvedic Health Services 35.65 4.02<br />

Primary Health Care (Rural) 179.25 20.22<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

14.21 1.60<br />

Reproductive Child Health (RCH) 1303.62 147.05<br />

Immunization 39.52 4.46<br />

National Rural Health Mission (NRHM) initiatives 980.59 110.61<br />

Revised National Tuberculosis Control Programme (RNTCP) 40.92 4.62<br />

National Vector Borne Disease Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

164.23 18.53<br />

National Programme for Control of Blindness (NPCB) 31.30 3.53<br />

Integrated Disease Surveillance Programme (IDSP) 11.62 1.31<br />

National Leprosy Eradication Programme (NLEP) 10.03 1.13<br />

Sub-Total<br />

Rural Water Supply & Sanitation<br />

2953.41 333.14<br />

TSI: NABARD Consultancy Services (NABCONS) 180


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 209.82 23.67<br />

ARWSP-Public Water Supply Scheme 2022.00 228.08<br />

Sub - Total<br />

Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

2231.82 251.75<br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri ULBs 41.00 4.62<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of<br />

sources and laying of pipe lines in different ULBs<br />

71.00 8.01<br />

Improvement of W/S to Nilgiri town 300.00 33.84<br />

Improvement of W/S to Soro town 100.00 11.28<br />

Improvement of W/S to Jaleswar town 100.00 11.28<br />

Improvement of water supply & S/I system of different non-residential office building<br />

& Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

100.00 11.28<br />

Improvement of water supply & S/I system of different residential office building &<br />

Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

100.00 11.28<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 300.00 33.84<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to<br />

<strong>Balasore</strong> town from river Sono- construction of intake well and laying of rising mains)<br />

300.00 33.84<br />

Sub-Total<br />

Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

14<strong>12</strong>.00 159.27<br />

Infrastructure Grant towards Urban Tourism Destination Towns <strong>12</strong>.10 1.36<br />

Road Development & Maintenance 99.96 11.28<br />

Urban Greenery <strong>12</strong>.10 1.36<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

8.39 0.95<br />

Integrated Housing & Urban Development Programme (IHSDP) 348.63 39.33<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 66.31 7.48<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 48.36 5.46<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.33 0.04<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

198.81 22.43<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

23.35 2.63<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

23.47 2.65<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

41.80 4.72<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

11.00 1.24<br />

Road Development Grant 45.00 5.08<br />

Road Maintenance Grant 20.00 2.26<br />

FDR Grant 20.00 2.26<br />

Incentive Grant 30.00 3.38<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

25.00 2.82<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

50.00 5.64<br />

Twelfth Finance Commission (TFC) 35.00 3.95<br />

Sub-Total<br />

Rural Housing<br />

State <strong>Plan</strong><br />

1119.61 <strong>12</strong>6.29<br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

875.85 98.80<br />

Indira Awas Yojana (IAY) 8697.20 1739.44<br />

Sub-Total<br />

Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

9573.05 1838.24<br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.75 0.00<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 7.33 0.00<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 72.52 72.52<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 172.30 172.30<br />

Post Matric Scholarship to SC Students 97.33 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) 181


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Post Matric Scholarship to ST Students 19.18 19.18<br />

Development of SCs (OSFDC Section) 224.13 0.00<br />

Development of STs (OSFDC Section) <strong>12</strong>9.25 <strong>12</strong>9.25<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 15.66 1.77<br />

Pre Matric Scholarship to OBC Students <strong>12</strong>66.16 0.00<br />

Post Matric Scholarship to OBC Students 62.68 0.00<br />

Pre Matric Scholarship to Minorities 71.82 0.00<br />

Post Matric Scholarship to Minorities 6.26 0.00<br />

Sub-Total<br />

Social Welfare<br />

State <strong>Plan</strong><br />

2145.37 395.02<br />

Madhu Babu Pension Yojana 474.26 53.50<br />

Old Age Pension 87.02 9.82<br />

Orissa Disability Pension 58.13 6.56<br />

Organising Single Window Camps 8.30 0.94<br />

Bi-cycle to girl students 1.25 0.14<br />

Mission Sakti 208.75 23.55<br />

Repair & Maintenance of AWC Building 10.25 1.16<br />

Reduction of Child Malnutrition 31.16 3.51<br />

Reduction of IMR 2.20 0.25<br />

Grant in Aid to Handicapped Welfare Institution 23.00 2.59<br />

Grant in Aid to Orphanages 101.15 11.41<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 0.35 0.04<br />

Medical Check up 0.60 0.07<br />

Sanitation 0.50 0.06<br />

Handicapped Scholarship <strong>12</strong>.47 1.41<br />

Award to AWW 0.15 0.02<br />

Monitoring Mechanism & Evaluation 4.50 0.51<br />

Information Education Communication 3.00 0.34<br />

Medicine Kit <strong>12</strong>.20 1.38<br />

Computer 0.20 0.02<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

0.35 0.04<br />

Supplementary Nutrition Programme 2394.26 270.07<br />

Mid Day Meal Programme (Pry+UP) 1959.29 221.01<br />

Mid Day Meal Programme (Kitchen-cum-store) 136.64 15.41<br />

Mid Day Meal Programme (Utensils) 11.60 1.31<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.50 2.31<br />

Mid Day Meal Programme (Transportation charges) 27.10 3.06<br />

Mid Day Meal Programme (Honorarium to cook & helper) 82.00 9.25<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

25.00 2.82<br />

IG National Old Age Pension (ACA to States) 597.14 67.36<br />

National Family Benefit Scheme (ACA to States) 92.80 10.47<br />

Kishori Shakti Yojana 14.00 1.58<br />

National Disability Pension 0.50 0.06<br />

National Child Labour Project 105.39 11.89<br />

Sub-Total 6506.01 733.88<br />

Total - IX<br />

GENERAL SERVICES<br />

State <strong>Plan</strong><br />

33849.10 4729.59<br />

Construction of Revenue Department Buildings (Non Residential) 22.30 2.52<br />

Construction of Revenue Department Buildings (Residential) 13.94 1.57<br />

Construction of PHC Buildings (Non Residential) 11.32 1.28<br />

Construction of RD Department Buildings (Non Residential) <strong>12</strong>.65 1.43<br />

Construction of Revenue Department Buildings (Non Residential) 52.90 5.97<br />

Construction of PHC Buildings (Residential) 8.20 0.92<br />

Construction of Revenue Department Buildings (Residential) 78.00 8.80<br />

Construction of Building (Non Residential) RD Division Jaleswar 30.00 3.38<br />

Construction of Health & RW Building (Residential) 21.00 2.37<br />

Construction & Maintenance of Buildings (Non Residential) 13.91 1.57<br />

Construction of RD Department Buildings (Residential) 32.77 3.70<br />

Total - X 296.99 33.50<br />

GRAND TOTAL 79168.29 10225.68<br />

TSI: NABARD Consultancy Services (NABCONS) 182


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER-VIII<br />

SCHEDULED CASTE SUB PLAN (SCSP)<br />

Out of the total population in the district SC constitute 18.84%. Important socio economic<br />

indicators of the SC population residing in the district are presented below.<br />

Table 8.1. SC population in different Blocks/ULBs of <strong>Balasore</strong> district<br />

Blocks SC Population % to total population<br />

Bahanaga 35871 29.68<br />

<strong>Balasore</strong> 55622 25.52<br />

Baliapal 34539 19.57<br />

Basta 24507 15.04<br />

Bhograi 41466 16.37<br />

Jaleswar 25732 14.85<br />

Khaira 35593 22.31<br />

Nilgiri 10418 9.45<br />

Oupada 11934 16.92<br />

Remuna 41634 22.78<br />

Simulia 22677 21.48<br />

Soro 24443 20.20<br />

<strong>District</strong> (Rural) 364436 19.65<br />

<strong>Balasore</strong> (M) 9833 9.27<br />

Jaleswar (NAC) <strong>12</strong>81 5.99<br />

Nilgiri (NAC) 1835 <strong>12</strong>.43<br />

Soro (NAC) 4037 14.52<br />

<strong>District</strong> (Urban) 16986 9.99<br />

<strong>District</strong> (Total) 381422 18.84<br />

Source: Census of India, 2001<br />

Blocks<br />

Table 8.2. Details of Scheduled Caste Concentrated Gram Panchayats<br />

(SC Population more than <strong>District</strong> percentage)<br />

No. of<br />

GPs<br />

Name of these GPs<br />

Bahanaga 11<br />

Panpana, Kharaspur, Dandaharipur, Baripada, Chaka Jagannathpur, Kalyani,<br />

Aruabag, Patharapentha, Avana, Khanthapada, Soud<br />

<strong>Balasore</strong> 7 Chhanua, Ranasahi, Jayadev Kasaba, Rasalpur, Nagram, Sartha, Sindhia<br />

Baliapal 4 Jamkunda, Nikhira, Srirampur, Bishnupur<br />

Basta 7 Tadada, Santoshpur, Mathani, Irda, Sahada, Chormara, Kulida<br />

Bhograi 7<br />

Rasalpur, Nimatpur, Bajitpur, Sradhapur, Nachinda, Jayarampur, Narayan<br />

Mohanty Padia<br />

Jaleswar 2 Olmara, Praharajpur<br />

Garsang, Nayakhadi, Khurunta, Gadapokhari, Dungura, Baunshagadia,<br />

Khaira 16 Badajayapur, Antara, Nandar, Kainthagali, Haripur, Makhanpur, Dagarpada,<br />

Gagandhuli, Shyamsundarpur, Palash<br />

Nilgiri 2 Narsinghpur, Ajodhya<br />

Oupada 7 Badapokhari, Baunshabania, R.R.Pur, Iswarpur, Shyamsundarpur, Fatepur<br />

Remuna 3 Inchudi, Maharajpur, Barunsingh<br />

Simulia <strong>12</strong><br />

Purusottampur, Andarai, Muruna, Bati, Kanheibindha, Abjhuna, Ada, Markona,<br />

Bauripada, Maitapur, Khirkona, Bari<br />

Soro 8<br />

Manipur, Tentei, Manantri, Anantapur, Attapur, Madhusudanpur, Nadigaon,<br />

Mulsingh<br />

Table 8.3. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa state<br />

Parameters <strong>Balasore</strong> <strong>District</strong> Orissa State<br />

Male 81.69 73.35<br />

Literacy rate (Total)<br />

Female 58.90 50.51<br />

Total 70.56 63.08<br />

Male 81.16 72.93<br />

Literacy rate (Rural)<br />

Female 57.40 46.66<br />

Total 69.52 59.84<br />

Male 85.77 87.93<br />

Literacy rate (Urban)<br />

Female 71.20 72.87<br />

Total 78.80 80.84<br />

TSI: NABARD Consultancy Services (NABCONS) 183


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Parameters <strong>Balasore</strong> <strong>District</strong> Orissa State<br />

Literacy rate in SC Population 59.41 55.53<br />

Literacy rate in ST Population 31.88 37.37<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

Table 8.4. Key Educational Indicators of <strong>Balasore</strong> <strong>District</strong><br />

Indicator <strong>Balasore</strong> Orissa<br />

Out of School Children (6 to 11 Age group) (% to total child population)<br />

All Community 1.31 3.28<br />

SC 1.46 2.99<br />

ST 2.95 5.43<br />

Minority 1.79 4.28<br />

Out of School Children (11 to 14 Age group) (% to total child population)<br />

All Community 3.58 5.45<br />

SC 4.32 5.06<br />

ST 7.44 9.86<br />

Minority 5.76 6.78<br />

The SC communities residing in the district are little bit better in socio economic standard<br />

in comparison to their counterparts in KBK districts. In the annual plan several plan<br />

schemes for development of SC community in the district has been proposed. These specific<br />

schemes are Pre metric scholarship to SC students and supply of bicycle to SC girls.<br />

Besides these specific schemes, allocation in proportion of percentage of population has<br />

also been made in respect of other plan schemes.<br />

In the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> the following allocations has been made for welfare of<br />

Scheduled Tribes. Out of total plan outlay of Rs. 79168.29 lakhs, Rs. 15254.00 lakhs has<br />

been allotted for SCSP.<br />

Table 8.5. Scheme wise Financial outlay for SCSP (<strong>2011</strong>-<strong>12</strong>)<br />

Sector/Sub Sector/Scheme<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

State <strong>Plan</strong><br />

Total<br />

Outlay<br />

(Rs. in lakhs)<br />

Of which<br />

flow to SCSP<br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

828.00 156.00<br />

Work <strong>Plan</strong>-Rice Development 10.72 2.02<br />

Work <strong>Plan</strong>-Sugarcane Development 2.59 0.49<br />

Jute Technology Mission (MM-II) 27.51 5.18<br />

ISOPOM (Pulses) 0.00 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

272.96 51.43<br />

Seed Village Programme 56.68 10.68<br />

Promotion of SRI programme 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 211.26 39.80<br />

Rastriya Krishi Vikas Yojana (RKVY) 3700.05 131.89<br />

National Food Security Mission (Pulses) 256.92 48.40<br />

Sub-Total<br />

Horticulture<br />

State <strong>Plan</strong><br />

5366.69 445.88<br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.90<br />

National Horticulture Mission 193.63 36.48<br />

Micro Irrigation Programme 45.00 8.48<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

10.18 1.92<br />

Coconut Development Board Programme 11.30 2.13<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 2.26 0.43<br />

Rastriya Krishi Vikas Yojana (RKVY) 6.70 1.26<br />

Sub-Total<br />

Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

273.87 51.60<br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

231.56 43.63<br />

Soil and water conservation measures under RKVY 56.50 10.64<br />

Sub-Total 288.06 54.27<br />

TSI: NABARD Consultancy Services (NABCONS) 184


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Scheme<br />

Total<br />

Outlay<br />

Of which<br />

flow to SCSP<br />

Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 0.96 0.18<br />

Disaster Management Preparedness 18.50 3.49<br />

Skill up-gradation Training 3.80 0.72<br />

Genetic up-gradation of goat & Deworing 2.00 0.38<br />

Centrally Sponsored <strong>Plan</strong><br />

Disease Control Programme under ASCAD 81.23 15.30<br />

Health Camp & Awareness Programme under ASCAD 0.55 0.10<br />

Central <strong>Plan</strong><br />

SMILE Training (Society for Management Information Learning & Extension) 5.00 0.94<br />

Exposure visit of farmers under SMILE 2.52 0.47<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc. 1.00 0.19<br />

RKVY<br />

a) Strengthening of Livestock Service Information & Modernisation of office 315.15 59.37<br />

b) Dairy Development <strong>12</strong>0.59 22.72<br />

c) Fodder Development 46.50 8.76<br />

d) Goat Development <strong>12</strong>.60 2.37<br />

e) Poultry Development 40.10 7.55<br />

Sub-Total 650.50 <strong>12</strong>2.55<br />

Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 202.02 38.06<br />

Revival of the short term co-operative credit institution <strong>12</strong>4.00 23.36<br />

Loan Support to Co-operatives 2<strong>12</strong>.16 39.97<br />

Modernisation of Co-operative Processing Rice Mill 30.00 5.65<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 24.25 4.57<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives (PACs & RCMS) 131.00 24.68<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives (Women co-operatives, Labour cooperative)<br />

<strong>12</strong>.20 2.30<br />

Central <strong>Plan</strong><br />

onstruction of Rural Godown under RKVY 1427.92 269.02<br />

Sub-Total 2163.55 407.61<br />

Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA <strong>12</strong>.50 2.36<br />

Exhibition and Organisation of Buyer Seller meet 1.00 0.19<br />

Assistance to Mechanisation Programme 5.00 0.94<br />

Safety measures for Marine Fishermen 5.00 0.94<br />

Survey and Investigation and establishment of fishing Harbour & Fish landing Centres 667.00 <strong>12</strong>5.66<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture through FFDA (Programme Component) 74.40 18.60<br />

Development of Brackish Water Aquaculture through FFDA 150.00 28.26<br />

Saving-cum-Relief Scheme 14.40 2.71<br />

Group Accident Insurance Scheme 16.50 3.11<br />

Low Cost House 50.00 9.42<br />

Assistance of Mechanisation Programme 28.50 5.37<br />

Central <strong>Plan</strong><br />

Introduction of Intermediate craft of Improved Design 24.00 4.52<br />

Sub-Total 1048.30 202.08<br />

Total - I 9790.97 <strong>12</strong>84.00<br />

RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 2000.00 376.80<br />

Construction of C.C Road (New Scheme) 287.00 54.07<br />

State Finance Commission Grant 442.50 83.37<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) <strong>12</strong>00.00 226.08<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MNREGS) 4218.56 794.78<br />

DRDA Administration 250.00 47.10<br />

Central <strong>Plan</strong><br />

<strong>12</strong>th Finance Commission Award 0.00 0.00<br />

13th Finance Commisssion Award 641.25 <strong>12</strong>0.81<br />

Total - II 9039.31 1703.01<br />

SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls 163.75 0.00<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 86.00 21.50<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 180.00 45.00<br />

TSI: NABARD Consultancy Services (NABCONS) 185


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Scheme<br />

Total<br />

Outlay<br />

Of which<br />

flow to SCSP<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 15.00 3.75<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 20.00 5.00<br />

Total - III 464.75 75.25<br />

IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 200.00 37.68<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 300.00 56.52<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 581.60 109.57<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 261.25 49.22<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 92.71 17.47<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division, <strong>Balasore</strong> 156.00 29.39<br />

Centrally Sponsored <strong>Plan</strong> 0.00<br />

Flood Management Programme (River Bank Protection Work ) 3143.13 592.17<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong> 131.03 24.69<br />

Central <strong>Plan</strong> 0.00<br />

Installation of Lift Irrigation Projects under RKVY 218.40 41.15<br />

Total - IV 5084.<strong>12</strong> 957.85<br />

ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 485.42 91.45<br />

Biju Saharanchal Vidyutikaran Yojana 140.00 26.38<br />

Centrally Sponsored <strong>Plan</strong><br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 343.04 64.63<br />

Total - V 968.46 182.46<br />

INDUSTRY & MINERALS<br />

Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector 4.90 0.92<br />

Central <strong>Plan</strong><br />

Prime Minister's Employment Generation Programme (PMEGP) 300.00 56.52<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 15.00 2.83<br />

Workshed-cum-Housing 17.50 3.30<br />

Skill Upgradation Training 9.42 1.77<br />

Centrally Sponsored <strong>Plan</strong><br />

IHDS (Cluster Approach) 8.76 1.65<br />

IHDS (Group Approach) 11.50 2.17<br />

IHDS (Marketing Incentive) 9.50 1.79<br />

Health Insurance for weavers 11.73 2.21<br />

Mahatma Gandhi Bunakar Bima Yojana 1.23 0.23<br />

Central <strong>Plan</strong><br />

10% Rebate on Handloom Products 10.00 1.88<br />

<strong>District</strong> Level Exhibition 2.00 0.38<br />

Total - VI 401.54 75.65<br />

TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 80.00 15.07<br />

Completion of incomplete roads and bridges 100.00 18.84<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 733.00 138.10<br />

Flood damage repairing 300.00 56.52<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00<br />

Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under RIDF 0.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 50.00 9.42<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 62.00 11.68<br />

Completion of incomplete road and Bridges 253.00 47.67<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00<br />

Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under RIDF Project 803.00 151.29<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 40.00 7.54<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 567.00 106.82<br />

Central <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) 186


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Scheme<br />

Total<br />

Outlay<br />

Of which<br />

flow to SCSP<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

2500.00 471.00<br />

Construction of Rural Roads & Bridge under RIDF Project<br />

Central <strong>Plan</strong><br />

10941.18 2061.32<br />

Construction of road under Central Road Fund 2577.44 485.59<br />

One time Additional Central Assistance 200.00 37.68<br />

Total - VII<br />

SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

19206.62 3618.53<br />

Social and Farm Forestry <strong>12</strong>.10 2.28<br />

Communication & Building - Construction of quarters for forest guards 3.63 0.68<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 33.00 6.22<br />

Elephant Management Project 0.60 0.11<br />

Talsari - HVBA 17.10 3.22<br />

Total - VIII<br />

SOCIAL SERVICES<br />

General Education<br />

State <strong>Plan</strong><br />

66.43 <strong>12</strong>.52<br />

Mass Education 20.10 3.79<br />

Construction Office building boundary wall & renovation of old building 16.00 3.01<br />

Construction of staff quarters and office building <strong>12</strong>5.00 23.55<br />

Improvement/Modernization of ITI <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

99.40 18.73<br />

Sarba Sikshya Abhiyan (SSA) 7504.21 1413.79<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 35.79 6.74<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

44.97 8.47<br />

National APP Training in ITI <strong>Balasore</strong> 6.00 1.13<br />

Sub-Total<br />

Sports & Youth Services<br />

State <strong>Plan</strong><br />

7851.47 1479.22<br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.20 0.04<br />

One time seed capital grant for development of Sports infrastructure 34.00 6.41<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

1.44 0.27<br />

<strong>Annual</strong> acquisition grant 3.10 0.58<br />

<strong>Annual</strong> operation grant 3.72 0.70<br />

Rural Sports Competition 7.60 1.43<br />

Prize Money for Rural Sports 6.30 1.19<br />

Sub-Total<br />

Medical & Public Health<br />

State <strong>Plan</strong><br />

56.36 10.62<br />

Rural Ayurvedic Health Services 142.47 26.84<br />

Urban Ayurvedic Health Services 35.65 6.72<br />

Primary Health Care (Rural) 179.25 33.77<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

14.21 2.68<br />

Reproductive Child Health (RCH) 1303.62 245.60<br />

Immunization 39.52 7.45<br />

National Rural Health Mission (NRHM) initiatives 980.59 184.74<br />

Revised National Tuberculosis Control Programme (RNTCP) 40.92 7.71<br />

National Vector Borne Disease Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

164.23 30.94<br />

National Programme for Control of Blindness (NPCB) 31.30 5.90<br />

Integrated Disease Surveillance Programme (IDSP) 11.62 2.19<br />

National Leprosy Eradication Programme (NLEP) 10.03 1.89<br />

Sub-Total<br />

Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

2953.41 556.42<br />

ARWSP-Sinking of Tube Well 209.82 39.53<br />

ARWSP-Public Water Supply Scheme 2022.00 380.94<br />

Sub - Total<br />

Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

2231.82 420.47<br />

TSI: NABARD Consultancy Services (NABCONS) 187


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Scheme<br />

Total<br />

Outlay<br />

Of which<br />

flow to SCSP<br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>,<br />

Jaleswar, Soro & Nilgiri ULBs<br />

41.00 7.72<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of<br />

sources and laying of pipe lines in different ULBs<br />

71.00 13.38<br />

Improvement of W/S to Nilgiri town 300.00 56.52<br />

Improvement of W/S to Soro town 100.00 18.84<br />

Improvement of W/S to Jaleswar town 100.00 18.84<br />

Improvement of water supply & S/I system of different non-residential office<br />

building & Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

100.00 18.84<br />

Improvement of water supply & S/I system of different residential office building &<br />

Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

100.00 18.84<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT 300.00 56.52<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP 300.00 56.52<br />

Sub-Total<br />

Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

14<strong>12</strong>.00 266.02<br />

Infrastructure Grant towards Urban Tourism Destination Towns <strong>12</strong>.10 2.28<br />

Road Development & Maintenance 99.96 18.83<br />

Urban Greenery <strong>12</strong>.10 2.28<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

8.39 1.58<br />

Integrated Housing & Urban Development Programme (IHSDP) 348.63 65.68<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 66.31 <strong>12</strong>.49<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 48.36 9.11<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.33 0.06<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

198.81 37.46<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

23.35 4.40<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

23.47 4.42<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

41.80 7.88<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

11.00 2.07<br />

Road Development Grant 45.00 8.48<br />

Road Maintenance Grant 20.00 3.77<br />

FDR Grant 20.00 3.77<br />

Incentive Grant 30.00 5.65<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

25.00 4.71<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

50.00 9.42<br />

Twelfth Finance Commission (TFC) 35.00 6.59<br />

Sub-Total<br />

Rural Housing<br />

State <strong>Plan</strong><br />

1119.61 210.93<br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

875.85 165.01<br />

Indira Awas Yojana (IAY) 8697.20 2609.16<br />

Sub-Total<br />

Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

9573.05 2774.17<br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.75 0.75<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 7.33 7.33<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 72.52 0.00<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 172.30 0.00<br />

Post Matric Scholarship to SC Students 97.33 97.33<br />

Post Matric Scholarship to ST Students 19.18 0.00<br />

Development of SCs (OSFDC Section) 224.13 224.13<br />

Development of STs (OSFDC Section) <strong>12</strong>9.25 0.00<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 15.66 15.66<br />

Pre Matric Scholarship to OBC Students <strong>12</strong>66.16 0.00<br />

Post Matric Scholarship to OBC Students 62.68 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) 188


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Scheme<br />

Total<br />

Outlay<br />

Of which<br />

flow to SCSP<br />

Pre Matric Scholarship to Minorities 71.82 0.00<br />

Post Matric Scholarship to Minorities 6.26 0.00<br />

Sub-Total<br />

Social Welfare<br />

State <strong>Plan</strong><br />

2145.37 345.20<br />

Madhu Babu Pension Yojana 474.26 89.35<br />

Old Age Pension 87.02 16.39<br />

Orissa Disability Pension 58.13 10.95<br />

Organising Single Window Camps 8.30 1.56<br />

Bi-cycle to girl students 1.25 0.24<br />

Mission Sakti 208.75 39.33<br />

Repair & Maintenance of AWC Building 10.25 1.93<br />

Reduction of Child Malnutrition 31.16 5.87<br />

Reduction of IMR 2.20 0.41<br />

Grant in Aid to Handicapped Welfare Institution 23.00 4.33<br />

Grant in Aid to Orphanages 101.15 19.06<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 0.35 0.07<br />

Medical Check up 0.60 0.11<br />

Sanitation 0.50 0.09<br />

Handicapped Scholarship <strong>12</strong>.47 2.35<br />

Award to AWW 0.15 0.03<br />

Monitoring Mechanism & Evaluation 4.50 0.85<br />

Information Education Communication 3.00 0.57<br />

Medicine Kit <strong>12</strong>.20 2.30<br />

Computer 0.20 0.04<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

0.35 0.07<br />

Supplementary Nutrition Programme 2394.26 451.08<br />

Mid Day Meal Programme (Pry+UP) 1959.29 369.13<br />

Mid Day Meal Programme (Kitchen-cum-store) 136.64 25.74<br />

Mid Day Meal Programme (Utensils) 11.60 2.19<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.50 3.86<br />

Mid Day Meal Programme (Transportation charges) 27.10 5.11<br />

Mid Day Meal Programme (Honorarium to cook & helper) 82.00 15.45<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

25.00 4.71<br />

IG National Old Age Pension (ACA to States) 597.14 1<strong>12</strong>.50<br />

National Family Benefit Scheme (ACA to States) 92.80 17.48<br />

Kishori Shakti Yojana 14.00 2.64<br />

National Disability Pension 0.50 0.09<br />

National Child Labour Project 105.39 19.86<br />

Sub-Total 6506.01 <strong>12</strong>25.73<br />

Total - IX<br />

GENERAL SERVICES<br />

State <strong>Plan</strong><br />

33849.10 7288.79<br />

Construction of Revenue Department Buildings (Non Residential) 22.30 4.20<br />

Construction of Revenue Department Buildings (Residential) 13.94 2.63<br />

Construction of PHC Buildings (Non Residential) 11.32 2.13<br />

Construction of RD Department Buildings (Non Residential) <strong>12</strong>.65 2.38<br />

Construction of Revenue Department Buildings (Non Residential) 52.90 9.97<br />

Construction of PHC Buildings (Residential) 8.20 1.54<br />

Construction of Revenue Department Buildings (Residential) 78.00 14.70<br />

Construction of Building (Non Residential) RD Division Jaleswar 30.00 5.65<br />

Construction of Health & RW Building (Residential) 21.00 3.96<br />

Construction & Maintenance of Buildings (Non Residential) 13.91 2.62<br />

Construction of RD Department Buildings (Residential) 32.77 6.17<br />

Total - X 296.99 55.95<br />

GRAND TOTAL 79168.29 15254.00<br />

TSI: NABARD Consultancy Services (NABCONS) 189


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER IX<br />

GOPABANDHU GRAMIN YOJANA (GGY)<br />

Gopabandhu Gramin Yojana (GGY): Government of Orissa launched this new programme<br />

called "The Gopabandhu Gramin Yojana (GGY)" on October 9, 2006 with a view to providing<br />

additional developmental assistance to the targeted 11 (Eleven) districts which are not<br />

covered under the Backward Regions Grant Fund (BRGF). The scheme has been<br />

implemented from the year 2006-07 and will continue to be implemented during the 11th<br />

<strong>Plan</strong> period from 2007-08 to <strong>2011</strong>-<strong>12</strong>. The 11 districts covered under GGY are Angul,<br />

<strong>Balasore</strong>, Bargarh, Bhadrak, Cuttack, Jajpur, Jagatsinghpur, Kendrapara, Khurda,<br />

Nayagarh and Puri.<br />

The principal objective of the scheme is to provide additional development funds to the<br />

targeted districts to develop infrastructure in every revenue village. Some of the specific<br />

projects which could be taken under the Yojana would be in the nature of construction of<br />

concrete roads within the village, construction of black top/concrete roads to connect a<br />

village with a nearest PMGSY or ODR road, installation of street lights within the village, for<br />

which the maintenance is to be borne by the concerned Gram Panchayat (GP), provision of<br />

drinking water supply and creation of irrigation sources.<br />

The additional development funds provided in this programme would be of un-tied nature<br />

and supplement the programmes which are already available in the aforesaid sectors and<br />

provide synergy and convergence to the different development programmes.<br />

Each targeted district will be provided additional development assistance to the extent of<br />

Rs. 10 crores per annum for a period of 6 years from 2006-07 to <strong>2011</strong>-<strong>12</strong>. Panchayati Raj<br />

Department is the Nodal Department for the purpose of administration of the GGY and<br />

takes appropriate budget provisions for this purpose under separate head of account each<br />

year beginning from the year 2006-07 onwards until the expiry of the Eleventh Five Year<br />

<strong>Plan</strong>. In <strong>Balasore</strong> district, the project is in operation since 2006-07. But the work started<br />

practically in the year 2007-08. The performance in achievement of the programme is<br />

moderate, i.e about 80%. This needs to be strengthened in coming years.<br />

Table 9.1. Performance of GGY in <strong>Balasore</strong> district<br />

(Rs. in lakhs)<br />

Indicators 2006-07 2007-08 2008-09<br />

Allocation - 1000.00 1000.00<br />

Release - 1000.00 1000.00<br />

Utilization - 691.19 1194.65<br />

% utilization - 69.<strong>12</strong> 119.46<br />

Target (No. of work) - 497<br />

Achievement (No. of work) - 294 723<br />

% achievement - 59.15<br />

Mandays generated (in lakhs) - 5.92<br />

villages covered - 497<br />

Source: DRDA, <strong>Balasore</strong><br />

During <strong>2011</strong>-<strong>12</strong> it has been planned to undertake works under GGY with plan outlay of Rs.<br />

2000.00 lakhs. Though the outlay under GGY for <strong>2011</strong>-<strong>12</strong> has been finalized by DRDA, the<br />

list of work is yet to be finalized. Hence this proposed list has been prepared based on<br />

needs and priorities identified through primay survey.<br />

Table 9.2. Block wise allocation of funds for GGY <strong>2011</strong>-<strong>12</strong><br />

Name of Block <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> (Rs. in lakhs)<br />

Bahanaga 180.00<br />

<strong>Balasore</strong> 163.50<br />

Baliapal 168.50<br />

Basta 196.00<br />

Bhograi 188.00<br />

Jaleswar 155.00<br />

Khaira 193.50<br />

Nilgiri 234.50<br />

Oupada 113.50<br />

Remuna 166.50<br />

TSI: NABARD Consultancy Services (NABCONS) 190


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Name of Block <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong> (Rs. in lakhs)<br />

Simulia 100.50<br />

Soro 140.50<br />

Total 2000.00<br />

Table 9.3. Panchayat wise allocation of funds for GGY <strong>2011</strong>-<strong>12</strong><br />

Sl. No. Block Panchayat Outlay<br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

1 Bahanaga Anji 6.50 9 Baliapal Srirampur 4.50<br />

2 Bahanaga Baripada 11.00 10 Baliapal Aladiha 5.50<br />

3 Bahanaga Avana 8.00 11 Baliapal Bishnupur 6.50<br />

4 Bahanaga Dandaharipur 8.00 <strong>12</strong> Baliapal Baliapal 7.50<br />

5 Bahanaga C.Jagannathpur 6.00 13 Baliapal Jamkunda 3.50<br />

6 Bahanaga Kharasahapur 11.00 14 Baliapal Balikuti 7.50<br />

7 Bahanaga Saud 9.00 15 Baliapal Bolong 5.50<br />

8 Bahanaga Sahaspura 9.00 16 Baliapal Pratappur 10.50<br />

9 Bahanaga Talakurunia 10.00 17 Baliapal Baniadiha 5.50<br />

10 Bahanaga Aruhabad 11.00 18 Baliapal Kunduli 5.50<br />

11 Bahanaga Bahanaga 8.00 19 Baliapal Devog 7.50<br />

<strong>12</strong> Bahanaga Bishnupur 7.50 20 Baliapal Dagara 2.00<br />

13 Bahanaga Chittol 6.00 21 Baliapal Jagatipur 6.50<br />

14 Bahanaga Kasab Jayapur 13.00 22 Baliapal Chaumukh 4.00<br />

15 Bahanaga Kochiakoili 4.50 23 Baliapal Nuagan 6.50<br />

16 Bahanaga Khantapada 6.50 24 Baliapal Panchupali 9.00<br />

17 Bahanaga Kalyani 6.50 25 Baliapal Madhupura 7.00<br />

18 Bahanaga Kuruda 4.50 26 Baliapal Balarampur 6.50<br />

19 Bahanaga Patharpentha 13.00 Sub total 168.50<br />

20 Bahanaga Panpana 10.00 1 Basta Kulida 5.50<br />

21 Bahanaga Gopalpur 11.00 2 Basta Putura 5.50<br />

Sub total 180.00 3 Basta Sahada 5.50<br />

1 <strong>Balasore</strong> Bahabalpur 6.50 4 Basta Irda 7.50<br />

2 <strong>Balasore</strong> Buanla 5.50 5 Basta Purusottampur 11.00<br />

3 <strong>Balasore</strong> Chhanua 6.00 6 Basta Chormara 9.00<br />

4 <strong>Balasore</strong> Genguti 9.00 7 Basta Routpada 7.00<br />

5 <strong>Balasore</strong> Gopinathpur 5.00 8 Basta Sadanandapur 13.00<br />

6 <strong>Balasore</strong> Gudu 7.00 9 Basta Gadapada 17.50<br />

7 <strong>Balasore</strong> Haldipada 10.00 10 Basta Darada 9.00<br />

8 <strong>Balasore</strong> Hidigan 4.00 11 Basta Naikudi 9.50<br />

9 <strong>Balasore</strong> J. Kasaba 5.50 <strong>12</strong> Basta Mukulisi 10.50<br />

10 <strong>Balasore</strong> Kasafal 7.50 13 Basta Natakata 8.50<br />

11 <strong>Balasore</strong> Kasipada 5.50 14 Basta Raghunathpur 6.50<br />

<strong>12</strong> <strong>Balasore</strong> Kuradiha 6.50 15 Basta Brahmada 8.50<br />

13 <strong>Balasore</strong> Nagram 5.00 16 Basta Paunsakuli 9.00<br />

14 <strong>Balasore</strong> O.Saragan 4.50 17 Basta Nabara 7.50<br />

15 <strong>Balasore</strong> Odangi 3.50 18 Basta Singla 8.00<br />

16 <strong>Balasore</strong> Padampur 7.50 19 Basta Tadada 11.00<br />

17 <strong>Balasore</strong> Patrapada 7.00 20 Basta Mathani 7.50<br />

18 <strong>Balasore</strong> Ranasahi 3.50 21 Basta Santoshpur 11.50<br />

19 <strong>Balasore</strong> Rasalpur 9.00 22 Basta Baharda 7.50<br />

20 <strong>Balasore</strong> Rasulpur 3.50 Sub total 196.00<br />

21 <strong>Balasore</strong> Saragan 8.50 1 Bhograi Sankhari 8.50<br />

22 <strong>Balasore</strong> Sartha 7.00 2 Bhograi Gunsartha 7.00<br />

23 <strong>Balasore</strong> Sasanga 6.50 3 Bhograi Nimatpur 8.50<br />

24 <strong>Balasore</strong> Srikona 5.00 4 Bhograi Kakhada 3.50<br />

25 <strong>Balasore</strong> Srirampur 3.50 5 Bhograi Sradhapur 5.00<br />

26 <strong>Balasore</strong> Parikhi 5.00 6 Bhograi Nachinda 8.50<br />

27 <strong>Balasore</strong> Sindhia 6.50 7 Bhograi Rasalpur 8.00<br />

Sub total 163.50 8 Bhograi T.Hazira 9.00<br />

1 Baliapal Kumbhari 10.50 9 Bhograi Bajitpur 4.00<br />

2 Baliapal Jambhirai 9.50 10 Bhograi Balim 4.00<br />

3 Baliapal Nikhira 6.50 11 Bhograi Barbatia 9.00<br />

4 Baliapal Asti 8.50 <strong>12</strong> Bhograi Bhograi 6.00<br />

5 Baliapal Ghantua 5.50 13 Bhograi Deula 6.00<br />

6 Baliapal Bodas 5.00 14 Bhograi Guneibasan 3.00<br />

7 Baliapal Betagadia 4.50 15 Bhograi Analia 6.00<br />

8 Baliapal Deula 7.50 16 Bhograi Hooguli 4.50<br />

17 Bhograi Jayrampur 4.00 18 Khaira Kupari 8.00<br />

18 Bhograi K.Bhaunri 9.00 19 Khaira Dungura 5.00<br />

19 Bhograi Mandarsahi 7.00 20 Khaira Gaganadhuli 6.00<br />

20 Bhograi Nahara 5.00 21 Khaira Haripur 4.00<br />

21 Bhograi Soharia 3.00 22 Khaira Rapeya 4.00<br />

22 Bhograi Sultanpur 6.00 23 Khaira Khaira 4.00<br />

23 Bhograi Baunsadiha 5.50 24 Khaira Sarugaon 4.00<br />

24 Bhograi Dahunda 6.00 25 Khaira Saradang 2.00<br />

25 Bhograi Gopinathpur 3.00 26 Khaira Garasang 3.50<br />

26 Bhograi K.Kamarda 6.00 27 Khaira Shyamsundarpur 6.00<br />

27 Bhograi Mohagab 5.00 28 Khaira Achyatipur 6.00<br />

28 Bhograi Khridpipal 5.00 29 Khaira Antara 4.00<br />

29 Bhograi Kusuda 8.00 30 Khaira Gadapokhari 9.50<br />

30 Bhograi NM Padia 8.00 Sub total 193.50<br />

31 Bhograi Dehurda 4.00 1 Nilgiri Ajodhya 10.00<br />

TSI: NABARD Consultancy Services (NABCONS) 191


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Block Panchayat Outlay<br />

Sl.<br />

No.<br />

Block Panchayat Outlay<br />

32 Bhograi Putina 3.00 2 Nilgiri Arabandh 15.00<br />

Sub total 188.00 3 Nilgiri Begunia 10.00<br />

1 Jaleswar Aruha 4.50 4 Nilgiri Berhampur 10.00<br />

2 Jaleswar Baiganbadia 10.00 5 Nilgiri Dharampur 10.00<br />

3 Jaleswar Baradiha 5.00 6 Nilgiri Chhatrapur 9.00<br />

4 Jaleswar Bartana 5.00 7 Nilgiri Garadihi 7.00<br />

5 Jaleswar Chamargan 11.00 8 Nilgiri Dhobasila 9.00<br />

6 Jaleswar D.P.Pur 5.50 9 Nilgiri Jamudiha 10.00<br />

7 Jaleswar G.M. Pur 4.50 10 Nilgiri Jadida 8.00<br />

8 Jaleswar Kaliko 5.50 11 Nilgiri Machhua 8.00<br />

9 Jaleswar Khalina 7.00 <strong>12</strong> Nilgiri K.Chandrapur 13.00<br />

10 Jaleswar Khuard 3.50 13 Nilgiri Kansa 8.00<br />

11 Jaleswar K.M. Sahi 5.00 14 Nilgiri Lakharaj 8.00<br />

<strong>12</strong> Jaleswar L.Nath 6.00 15 Nilgiri Matiali 13.00<br />

13 Jaleswar Makidia 4.00 16 Nilgiri Mahisapata 8.00<br />

14 Jaleswar Naschimpur 8.00 17 Nilgiri Naranapur 13.00<br />

15 Jaleswar Nampo 3.00 18 Nilgiri Pithahata 6.00<br />

16 Jaleswar Netua 5.00 19 Nilgiri Narasinghpur 13.50<br />

17 Jaleswar Paikasida 9.00 20 Nilgiri Tentulia 8.00<br />

18 Jaleswar Paschimbard 4.50 21 Nilgiri Telipal 8.00<br />

19 Jaleswar R.R. Pur 8.00 22 Nilgiri Siadimal 8.00<br />

20 Jaleswar Raibania 5.00 23 Nilgiri Sajangarh 9.00<br />

21 Jaleswar Rajpur 5.00 24 Nilgiri R. Kishorepur 9.00<br />

22 Jaleswar Shyamnagar 4.00 25 Nilgiri Bhaunribad 4.00<br />

23 Jaleswar Sardarbandh 6.00 Sub total 234.50<br />

24 Jaleswar Sikharpur 7.00 1 Oupada Aghirapada 5.50<br />

25 Jaleswar Srirampur 5.00 2 Oupada Badapokhari 9.50<br />

26 Jaleswar Sugo 5.00 3 Oupada Baunsabania 15.50<br />

27 Jaleswar Olmara 4.00 4 Oupada D.N. Pur 7.50<br />

Sub total 155.00 5 Oupada Fatepur 16.50<br />

1 Khaira Nandoor 7.00 6 Oupada Gadasahi 6.00<br />

2 Khaira Kaithagaida 9.00 7 Oupada Iswarpur 15.00<br />

3 Khaira Baunsagadia 15.00 8 Oupada Kandagaradi 7.50<br />

4 Khaira Jhinkiria 8.00 9 Oupada R.R. Pur 6.50<br />

5 Khaira Barada 7.50 10 Oupada Talakia 14.00<br />

6 Khaira Mahatipur 5.00 11 Oupada S.S.Pur 10.00<br />

7 Khaira Ratina 10.00 Sub total 113.50<br />

8 Khaira Makhanpur 5.50 1 Remuna Mangalpur 5.00<br />

9 Khaira Dagarapada 5.00 2 Remuna Barunasing 5.00<br />

10 Khaira Kurunta 7.00 3 Remuna Chasakhanda 5.50<br />

11 Khaira Badajaypur 6.00 4 Remuna Saraswatipur 5.00<br />

<strong>12</strong> Khaira Palasa 8.50 5 Remuna Mandarpur 7.50<br />

13 Khaira Gobindpur 8.00 6 Remuna Nijampur 4.50<br />

14 Khaira Jalada 5.00 7 Remuna Kalyanpur 5.00<br />

15 Khaira Nayakhandi 8.00 8 Remuna Tentulidia 5.50<br />

16 Khaira Manitri 5.00 9 Remuna Sergarh 4.00<br />

17 Khaira Barttana 8.00 10 Remuna Remuna 6.00<br />

11 Remuna Patripal 8.00 11 Simulia Kanheibindha 6.00<br />

<strong>12</strong> Remuna Kuligan 9.50 <strong>12</strong> Simulia Kanchpada 5.00<br />

13 Remuna Durgadevi 5.00 13 Simulia Jamujhadi <strong>12</strong>.00<br />

14 Remuna K.Mukhura 7.00 14 Simulia Abjhuna 7.00<br />

15 Remuna Naraharipur 8.00 15 Simulia Bauripada 5.00<br />

16 Remuna Talapada 3.00 16 Simulia Andarai 7.00<br />

17 Remuna Kuruda 15.00 17 Simulia Purusottampur 6.00<br />

18 Remuna Nuapadhi 6.00 Sub total 100.50<br />

19 Remuna Ganipur 5.00 1 Soro Madhusudanpur 4.50<br />

20 Remuna Gududa 5.00 2 Soro Sajanpur 5.50<br />

21 Remuna Badpal 8.00 3 Soro Pakhara 7.50<br />

22 Remuna Nuagaon 6.00 4 Soro Nadigaon 4.50<br />

23 Remuna Haripur 4.00 5 Soro Dahisada 5.50<br />

24 Remuna Biruan 6.00 6 Soro Sarasankha 4.00<br />

25 Remuna Inchudi 5.00 7 Soro Attapur 4.00<br />

26 Remuna Tundara 5.00 8 Soro Natapada 4.00<br />

27 Remuna Maharajpur 6.00 9 Soro Sabira 7.00<br />

28 Remuna Srijang 2.00 10 Soro Nischintapur 4.50<br />

Sub total 166.50 11 Soro Mulisingh 8.00<br />

1 Simulia Khirkona 6.50 <strong>12</strong> Soro Anantapur 7.00<br />

2 Simulia Bari 3.50 13 Soro Jadida 9.50<br />

3 Simulia Iswarpur 5.50 14 Soro Gud 5.50<br />

4 Simulia Maitapur 4.50 15 Soro Tentei 8.00<br />

5 Simulia Markona 5.50 16 Soro Kedarpur 11.00<br />

6 Simulia Muruna 4.00 17 Soro Manatri 4.50<br />

7 Simulia Bati 8.00 18 Soro Manipur 6.50<br />

8 Simulia Sabanga 4.00 19 Soro Talanagar 7.50<br />

9 Simulia Chalunigaon 4.00 20 Soro Gopinathpur 9.00<br />

10 Simulia Ada 7.00 21 Soro Singakhunta 9.50<br />

NB: Though the outlay under GGY for <strong>2011</strong>-<strong>12</strong> has been finalized by DRDA, the 22 Soro Mahunuhana 3.50<br />

list of work is yet to be finalized. Hence this proposed list has been prepared<br />

Sub total 140.50<br />

based on needs and priorities identified through primay survey<br />

Grand total 2000.00<br />

TSI: NABARD Consultancy Services (NABCONS) 192


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER X<br />

GENDER SUB PLAN<br />

10.1 Gender based Stock taking/Situation Analysis:<br />

<strong>Balasore</strong> is one of the most populous districts of the state. It occupies only 2.44% of the<br />

total land mass of the state but accommodates 5.50% of total population. The population<br />

density of the district (532) is very high; almost double that of Orissa State (236). Out of <strong>12</strong><br />

CD Blocks, population density is highest in Bhograi block. Further out of <strong>12</strong> CD blocks, 7<br />

have population density more than district average. Interestingly, the growth rate of<br />

population in the district is low (19.33%) as against 16.25% for the State during 1991-<br />

2001.<br />

Table 10.1. Demographic Characteristics of <strong>Balasore</strong> district<br />

Blocks Male Female Total Sex Ratio<br />

Bahanaga 62061 58785 <strong>12</strong>0846 947<br />

<strong>Balasore</strong> Sadar 113068 104920 217988 928<br />

Baliapal 90640 85886 176526 948<br />

Basta 83759 79151 162910 945<br />

Bhograi <strong>12</strong>97<strong>12</strong> <strong>12</strong>3578 253290 953<br />

Jaleswar 88406 84923 173329 961<br />

Khaira 79845 79669 159514 998<br />

Nilgiri 55975 54257 110232 969<br />

Oupada 35190 35361 70551 1005<br />

Remuna 94352 88384 182736 937<br />

Simulia 53558 52006 105564 971<br />

Soro 61589 59413 <strong>12</strong>1002 965<br />

<strong>District</strong> (Rural) 948155 906333 1854488 956<br />

<strong>Balasore</strong> (M) 55691 50391 106082 905<br />

Jaleswar (NAC) 10905 10482 21387 961<br />

Nilgiri (NAC) 7558 7199 14757 953<br />

Soro (NAC) 14202 13592 27794 957<br />

<strong>District</strong> (Urban) 88356 81664 170020 924<br />

<strong>District</strong> (Total) 1036511 987997 2024508 953<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

As per 2001 census, the total population of the district is 2024508. Out of this 1036511 are<br />

males and 987997 are females. The district recorded sex ratio of 953 in 2001 Census. Out<br />

of <strong>12</strong> CD Blocks, sex ratio is highest in Oupada block (1005) followed by Khaira (998) and<br />

Simulia (971). Literacy rates of the district are much higher than State averages. Women<br />

literacy rate is much higher in the district. Interestingly, the literacy rates of SC & ST<br />

population in the district are better than that of state population.<br />

Table 10.2. Literacy rate of population in <strong>Balasore</strong> district vis-à-vis Orissa<br />

Parameters <strong>Balasore</strong> <strong>District</strong> Orissa State<br />

Male 81.69 73.35<br />

Literacy rate (Total)<br />

Female 58.90 50.51<br />

Total 70.56 63.08<br />

Male 81.16 72.93<br />

Literacy rate (Rural)<br />

Female 57.40 46.66<br />

Total 69.52 59.84<br />

Male 85.77 87.93<br />

Literacy rate (Urban)<br />

Female 71.20 72.87<br />

Total 78.80 80.84<br />

Literacy rate in SC Population 59.41 55.53<br />

Literacy rate in ST Population 31.88 37.37<br />

Source: <strong>District</strong> Statistical Hand book & Statistical Abstract of Orissa, 2008<br />

Table 10.3. Health Indicators of <strong>Balasore</strong> <strong>District</strong> vis-à-vis Orissa<br />

Indicators <strong>Balasore</strong> Orissa<br />

Sex ratio (2001 Census) All age group 953 972<br />

Maternal Mortality Rate (SRS 2004-06) (per 1,00,000 live births) 315 303<br />

Contraceptive Prevalence rate (Any method) (NFHS-III) 56.50 50.70<br />

TSI: NABARD Consultancy Services (NABCONS) 193


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Indicators <strong>Balasore</strong> Orissa<br />

Contraceptive Prevalence Rate (Modern Methods) (NFHS-III) 48.93 44.70<br />

Contraceptive Prevalence Rate (Female sterilization) (NFHS-III) 37.56 33.10<br />

Contraceptive Prevalence Rate (Male sterilization) (NFHS-III) 1.65 1.00<br />

Contraceptive Prevalence Rate (IUD) (NFHS-III) 0.54 0.50<br />

Contraceptive Prevalence Rate (Pill) (NFHS-III) 8.45 7.00<br />

Contraceptive Prevalence Rate (Condom) (NFHS-III) 3.65 3.00<br />

% of women who received ANC (Ante Natal Care) (NFHS-III) 88.6 87<br />

% of women who received 3 ANC visits (NFHS-III) 69 61<br />

% of women reported Institutional Delivery (CNAA 2006-07) 43.54 46<br />

Gender Development Index (GDI) value 2001 0.519 0.546<br />

GDI Rank in the State 2001 14 -<br />

10.2 Financial allocation for Women Component in total <strong>Plan</strong> outlay<br />

In the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>, out of total plan outlay of Rs. 79168.29 lakhs, Rs. 29941.02<br />

lakhs has been allotted for women component. These allocations have been made for target<br />

interventions for women and girls.<br />

Table 10.4. Scheme wise financial allocation for women component<br />

(Rs. in lakhs)<br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to WC<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP) 828.00 275.97<br />

Centrally Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 10.72 3.57<br />

Work <strong>Plan</strong>-Sugarcane Development 2.59 0.86<br />

Jute Technology Mission (MM-II) 27.51 9.17<br />

ISOPOM (Pulses) 0.00 0.00<br />

ISOPOM (Oil Seeds) 272.96 90.98<br />

Central <strong>Plan</strong><br />

Seed Village Programme 56.68 18.89<br />

Promotion of SRI programme 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 211.26 70.41<br />

Rastriya Krishi Vikas Yojana (RKVY) 3700.05 3233.33<br />

National Food Security Mission (Pulses) 256.92 85.63<br />

Sub-Total 5366.69 3788.82<br />

Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme 4.80 4.80<br />

Centrally Sponsored <strong>Plan</strong><br />

National Horticulture Mission 193.63 64.54<br />

Micro Irrigation Programme 45.00 15.00<br />

ISOPOM (Oil Palm) 10.18 3.39<br />

Central <strong>Plan</strong><br />

Coconut Development Board Programme 11.30 3.77<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 2.26 0.75<br />

Rastriya Krishi Vikas Yojana (RKVY) 6.70 2.23<br />

Sub-Total 273.87 94.48<br />

Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development 231.56 77.18<br />

Central <strong>Plan</strong><br />

Soil and water conservation measures for development of Farms under RKVY 56.50 18.83<br />

Sub-Total 288.06 96.01<br />

Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 0.96 0.32<br />

Disaster Management Preparedness 18.50 6.17<br />

Skill up-gradation Training 3.80 1.27<br />

Genetic up-gradation of goat & Deworing 2.00 0.67<br />

Centrally Sponsored <strong>Plan</strong><br />

Disease Control Programme under ASCAD 81.23 27.07<br />

Health Camp & Awareness Programme under ASCAD 0.55 0.18<br />

Central <strong>Plan</strong><br />

SMILE Training (Society for Management Information Learning & Extension) 5.00 1.67<br />

Exposure visit of farmers under SMILE 2.52 0.84<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc. 1.00 0.33<br />

RKVY<br />

a) Strengthening of Livestock Service Information & Modernisation of office 315.15 105.04<br />

b) Dairy Development <strong>12</strong>0.59 40.19<br />

c) Fodder Development 46.50 15.50<br />

d) Goat Development <strong>12</strong>.60 4.20<br />

e) Poultry Development 40.10 13.37<br />

Sub-Total 650.50 216.81<br />

TSI: NABARD Consultancy Services (NABCONS) 194


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to WC<br />

Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 202.02 67.33<br />

Revival of the short term co-operative credit institution <strong>12</strong>4.00 41.33<br />

Loan Support to Co-operatives 2<strong>12</strong>.16 70.71<br />

Modernisation of Co-operative Processing Rice Mill 30.00 10.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 24.25 8.08<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives (PACs & RCMS) 131.00 43.66<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives (Women co-operatives,<br />

Labour co-operative)<br />

Central <strong>Plan</strong><br />

<strong>12</strong>.20 4.07<br />

Construction of Rural Godown under RKVY 1427.92 475.93<br />

Sub-Total<br />

Fisheries<br />

State <strong>Plan</strong><br />

2163.55 721.11<br />

Development of freshwater Aquaculture through FFDA <strong>12</strong>.50 4.17<br />

Exhibition and Organisation of Buyer Seller meet 1.00 0.33<br />

Assistance to Mechanisation Programme 5.00 1.67<br />

Survey and Investigation and establishment of fishing Harbour & Fish landing Centres 667.00 222.31<br />

Safety measures for Marine Fishermen<br />

Centrally Sponsored <strong>Plan</strong><br />

5.00 1.67<br />

Development of Inland Fisheries & Aquaculture through FFDA 74.40 24.80<br />

Development of Brackish Water Aquaculture through FFDA 150.00 50.00<br />

Saving-cum-Relief Scheme 14.40 4.80<br />

Group Accident Insurance Scheme 16.50 5.50<br />

Low Cost House 50.00 16.67<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

28.50 9.50<br />

Introduction of Intermediate craft of Improved Design 24.00 8.00<br />

Sub-Total 1048.30 349.40<br />

Total - I<br />

RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

9790.97 5266.63<br />

Gopabandhu Gramin Yojana (GGY) 2000.00 666.60<br />

Construction of C.C Road (New Scheme) 287.00 95.66<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

442.50 147.49<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) <strong>12</strong>00.00 399.96<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme 4218.56 1406.05<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

250.00 83.33<br />

<strong>12</strong>th Finance Commission Award 0.00 0.00<br />

13th Finance Commisssion Award 641.25 213.73<br />

Total - II<br />

SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

9039.31 30<strong>12</strong>.80<br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

163.75 163.75<br />

Grants under Provision to Article 275 (1) 86.00 28.66<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

180.00 59.99<br />

Grants under Provision to Article 275 (1) 15.00 5.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 20.00 6.67<br />

Total - III<br />

IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

464.75 264.07<br />

Minor Irrigation Projects (NABARD - RIDF) 200.00 66.66<br />

Instream Reservoir (Construction of Check Dam) 300.00 99.99<br />

Installation of Lift Irrigation Projects under BKVY 581.60 193.85<br />

Minor Irrigation- Biju Krushak Vikash Yojana 261.25 87.07<br />

Bank Protection work (Flood Control) 92.71 30.90<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV)<br />

Centrally Sponsored <strong>Plan</strong><br />

156.00 51.99<br />

Flood Management Programme (River Bank Protection Work ) 3143.13 1047.61<br />

Flood Management Programme (Major Works)<br />

Central <strong>Plan</strong><br />

131.03 43.67<br />

Installation of Lift Irrigation Projects under RKVY 218.40 72.79<br />

Total - IV<br />

ENERGY<br />

State <strong>Plan</strong><br />

5084.<strong>12</strong> 1694.54<br />

Biju Gram Jyoti Yojana 485.42 161.79<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

140.00 46.66<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 343.04 114.34<br />

Total - V<br />

INDUSTRY & MINERALS<br />

Industry<br />

State <strong>Plan</strong><br />

968.46 322.79<br />

TSI: NABARD Consultancy Services (NABCONS) 195


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to WC<br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

4.90 1.63<br />

Prime Minister's Employment Generation Programme (PMEGP)<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

300.00 99.99<br />

Promotion of Handloom Industry 15.00 5.00<br />

Workshed-cum-Housing 17.50 5.83<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

9.42 3.14<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 8.76 2.92<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 11.50 3.83<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 9.50 3.17<br />

Health Insurance for weavers 11.73 3.91<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

1.23 0.41<br />

10% Rebate on Handloom Products 10.00 3.33<br />

<strong>District</strong> Level Exhibition 2.00 0.67<br />

Total - VI<br />

TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

401.54 133.83<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 80.00 26.66<br />

Completion of incomplete roads and bridges 100.00 33.33<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 733.00 244.31<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

300.00 99.99<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

0.00 0.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 50.00 16.67<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 62.00 20.66<br />

Completion of incomplete road and Bridges<br />

Central <strong>Plan</strong><br />

253.00 84.32<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

0.00 0.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 803.00 267.64<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 40.00 13.33<br />

Construction of Rural Road (Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

567.00 188.98<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

2500.00 833.25<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project<br />

Central <strong>Plan</strong><br />

10941.18 3646.70<br />

Construction of road under Central Road Fund 2577.44 859.06<br />

One time Additional Central Assistance 200.00 66.66<br />

Total - VII<br />

SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

19206.62 6401.57<br />

Social and Farm Forestry <strong>12</strong>.10 4.03<br />

Communication & Building - Construction of quarters for forest guards 3.63 1.21<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 33.00 11.00<br />

Elephant Management Project 0.60 0.20<br />

Talsari - HVBA 17.10 5.70<br />

Total - VIII<br />

SOCIAL SERVICES<br />

General Education<br />

State <strong>Plan</strong><br />

66.43 22.14<br />

Mass Education 20.10 6.70<br />

Construction Office building boundary wall & renovation of old building 16.00 5.33<br />

Construction of staff quarters and office building <strong>12</strong>5.00 41.66<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play ground, bore well,<br />

drainage system, cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

99.40 33.13<br />

Sarba Sikshya Abhiyan (SSA) 7504.21 2501.15<br />

National Programme for Education of Girls at Elementary Level 35.79 35.79<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

44.97 44.97<br />

National APP Training in ITI <strong>Balasore</strong> 6.00 2.00<br />

Sub-Total<br />

Sports & Youth Services<br />

State <strong>Plan</strong><br />

7851.47 2670.74<br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.20 0.07<br />

TSI: NABARD Consultancy Services (NABCONS) 196


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to WC<br />

One time seed capital grant for development of Sports infrastructure 34.00 11.33<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

1.44 1.44<br />

<strong>Annual</strong> acquisition grant 3.10 1.03<br />

<strong>Annual</strong> operation grant 3.72 1.24<br />

Rural Sports Competition 7.60 2.53<br />

Prize Money for Rural Sports 6.30 2.10<br />

Sub-Total<br />

Medical & Public Health<br />

State <strong>Plan</strong><br />

56.36 19.74<br />

Rural Ayurvedic Health Services 142.47 47.49<br />

Urban Ayurvedic Health Services 35.65 11.88<br />

Primary Health Care (Rural) 179.25 59.74<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

14.21 4.74<br />

Reproductive Child Health (RCH) 1303.62 434.50<br />

Immunization 39.52 13.17<br />

National Rural Health Mission (NRHM) initiatives 980.59 326.83<br />

Revised National Tuberculosis Control Programme (RNTCP) 40.92 13.64<br />

National Vector Borne Disease Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

164.23 54.74<br />

National Programme for Control of Blindness (NPCB) 31.30 10.43<br />

Integrated Disease Surveillance Programme (IDSP) 11.62 3.87<br />

National Leprosy Eradication Programme (NLEP) 10.03 3.34<br />

Sub-Total<br />

Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

2953.41 984.37<br />

ARWSP-Sinking of Tube Well 209.82 69.93<br />

ARWSP-Public Water Supply Scheme 2022.00 673.93<br />

Sub - Total<br />

Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

2231.82 743.87<br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri ULBs 41.00 13.67<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of sources and<br />

laying of pipe lines in different ULBs<br />

71.00 23.66<br />

Improvement of W/S to Nilgiri town 300.00 99.99<br />

Improvement of W/S to Soro town 100.00 33.33<br />

Improvement of W/S to Jaleswar town 100.00 33.33<br />

Improvement of water supply & S/I system of different non-residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

100.00 33.33<br />

Improvement of water supply & S/I system of different residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

100.00 33.33<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT 300.00 99.99<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to <strong>Balasore</strong> town<br />

from river Sono- construction of intake well and laying of rising mains)<br />

300.00 99.99<br />

Sub-Total<br />

Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

14<strong>12</strong>.00 470.62<br />

Infrastructure Grant towards Urban Tourism Destination Towns <strong>12</strong>.10 4.03<br />

Road Development & Maintenance 99.96 33.32<br />

Urban Greenery <strong>12</strong>.10 4.03<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

8.39 2.80<br />

Integrated Housing & Urban Development Programme (IHSDP) 348.63 116.20<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 66.31 22.10<br />

Urban Infrastructure Development Scheme for Small & Medium Town 48.36 16.<strong>12</strong><br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.33 0.11<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

198.81 66.26<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

23.35 7.78<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

23.47 7.82<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

41.80 13.93<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

11.00 3.67<br />

Road Development Grant 45.00 15.00<br />

Road Maintenance Grant 20.00 6.67<br />

FDR Grant 20.00 6.67<br />

Incentive Grant 30.00 10.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

25.00 8.33<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

50.00 16.67<br />

TSI: NABARD Consultancy Services (NABCONS) 197


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sector/Schemes<br />

Total<br />

Outlay<br />

Of which<br />

flow to WC<br />

Twelfth Finance Commission (TFC) 35.00 11.67<br />

Sub-Total<br />

Rural Housing<br />

State <strong>Plan</strong><br />

1119.61 373.17<br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

875.85 291.92<br />

Indira Awas Yojana (IAY) 8697.20 2898.78<br />

Sub-Total<br />

Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

9573.05 3190.70<br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.75 0.00<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 7.33 7.33<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 72.52 0.00<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 172.30 172.30<br />

Post Matric Scholarship to SC Students 97.33 32.44<br />

Post Matric Scholarship to ST Students 19.18 6.39<br />

Development of SCs (OSFDC Section) 224.13 74.70<br />

Development of STs (OSFDC Section) <strong>12</strong>9.25 43.08<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 15.66 5.22<br />

Pre Matric Scholarship to OBC Students <strong>12</strong>66.16 422.01<br />

Post Matric Scholarship to OBC Students 62.68 20.89<br />

Pre Matric Scholarship to Minorities 71.82 23.94<br />

Post Matric Scholarship to Minorities 6.26 2.09<br />

Sub-Total<br />

Social Welfare<br />

State <strong>Plan</strong><br />

2145.37 810.39<br />

Madhu Babu Pension Yojana 474.26 158.07<br />

Old Age Pension 87.02 29.00<br />

Orissa Disability Pension 58.13 19.37<br />

Organising Single Window Camps 8.30 8.30<br />

Bi-cycle to girl students 1.25 1.25<br />

Mission Sakti 208.75 208.75<br />

Repair & Maintenance of AWC Building 10.25 10.25<br />

Reduction of Child Malnutrition 31.16 10.39<br />

Reduction of IMR 2.20 0.73<br />

Grant in Aid to Handicapped Welfare Institution 23.00 7.67<br />

Grant in Aid to Orphanages 101.15 33.71<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 0.35 0.<strong>12</strong><br />

Medical Check up 0.60 0.20<br />

Sanitation 0.50 0.17<br />

Handicapped Scholarship <strong>12</strong>.47 4.16<br />

Award to AWW 0.15 0.15<br />

Monitoring Mechanism & Evaluation 4.50 4.50<br />

Information Education Communication 3.00 3.00<br />

Medicine Kit <strong>12</strong>.20 <strong>12</strong>.20<br />

Computer 0.20 0.07<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

0.35 0.<strong>12</strong><br />

Supplementary Nutrition Programme 2394.26 1898.01<br />

Mid Day Meal Programme (Pry+UP) 1959.29 653.03<br />

Mid Day Meal Programme (Kitchen-cum-store) 136.64 45.54<br />

Mid Day Meal Programme (Utensils) 11.60 3.87<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.50 6.83<br />

Mid Day Meal Programme (Transportation charges) 27.10 9.03<br />

Mid Day Meal Programme (Honorarium to cook & helper) 82.00 27.33<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

25.00 25.00<br />

IG National Old Age Pension (ACA to States) 597.14 199.03<br />

National Family Benefit Scheme (ACA to States) 92.80 30.93<br />

Kishori Shakti Yojana 14.00 14.00<br />

National Disability Pension 0.50 0.17<br />

National Child Labour Project 105.39 35.13<br />

Sub-Total 6506.01 3460.06<br />

Total - IX<br />

GENERAL SERVICES<br />

State <strong>Plan</strong><br />

33849.10 <strong>12</strong>723.66<br />

Construction of Revenue Department Buildings (Non Residential) 22.30 7.43<br />

Construction of Revenue Department Buildings (Residential) 13.94 4.65<br />

Construction of PHC Buildings (Non Residential) 11.32 3.77<br />

Construction of RD Department Buildings (Non Residential) <strong>12</strong>.65 4.22<br />

Construction of Revenue Department Buildings (Non Residential) 52.90 17.63<br />

Construction of PHC Buildings (Residential) 8.20 2.73<br />

Construction of Revenue Department Buildings (Residential) 78.00 26.00<br />

Construction of Building (Non Residential) RD Division Jaleswar 30.00 10.00<br />

Construction of Health & RW Building (Residential) 21.00 7.00<br />

Construction & Maintenance of Buildings (Non Residential) 13.91 4.64<br />

Construction of RD Department Buildings (Residential) 32.77 10.92<br />

Total - X 296.99 98.99<br />

GRAND TOTAL 79168.29 29941.02<br />

TSI: NABARD Consultancy Services (NABCONS) 198


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER XI<br />

REVIEW OF PLAN DOCUMENTS<br />

<strong>Plan</strong>ning and Coordination Department, Government of Orissa vide its letter no. 17961/P<br />

dated 15 th December 2010, had directed all TSIs to quickly review previous <strong>Annual</strong> <strong>Plan</strong>s<br />

(2008-09, 2009-10 & 2010-11) from the prospective of their implementation. The review<br />

report needs to be placed as a separate chapter in the <strong>Annual</strong> <strong>Plan</strong> document of <strong>2011</strong>-<strong>12</strong>.<br />

Accordingly, an attempt was made by NABCONS to compile informations for the purpose<br />

and the review report is presented below.<br />

Review exercise reveals that<br />

Year<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong> Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to allocation<br />

received<br />

2008-09 44408.56 51813.01 47402.31 91.49<br />

2009-10 61976.66 57057.63 48599.88 85.18<br />

2010-11 63476.63 72926.29 -* -*<br />

*Financial year 2010-11 is continuing<br />

Rs. in lakhs<br />

Comparison of <strong>Plan</strong> outlay with Allocations received and Expenditure<br />

44408.56<br />

51813.01<br />

47402.31<br />

61976.66<br />

57057.63<br />

2008-09 2009-10<br />

Year<br />

48599.88<br />

Outlay Proposed in <strong>Annual</strong> <strong>Plan</strong> Document Allocation Received Expenditure<br />

• In the <strong>Annual</strong> <strong>Plan</strong> of 2008-09, total outlay proposed was Rs. 44408.56 lakhs. As<br />

against this outlay an allocation of Rs. 51813.01 lakhs was received by the district,<br />

out of which Rs. 47402.31 was spent (91.49%). Sector wise and Scheme/Programme<br />

wise deviation is presented in Table 11.1 and 11.4, respectively. A total of 98<br />

schemes/programmes were included in this <strong>Annual</strong> <strong>Plan</strong> document. Out of which,<br />

allocations were not received in respect of 7 schemes/programmes. Allocations were<br />

received in respect of 4 new schemes/programmes during the year.<br />

• In the <strong>Annual</strong> <strong>Plan</strong> of 2009-10, total outlay proposed was Rs. 61976.66 lakhs. As<br />

against this outlay an allocation of Rs. 57057.63 lakhs was received by the district,<br />

out of which Rs. 48599.88 was spent (85.18%). Sector wise and Scheme/Programme<br />

wise deviation is presented in Table 11.2 and 11.5, respectively. A total of 119<br />

schemes/programmes were included in this <strong>Annual</strong> <strong>Plan</strong> document. Out of which,<br />

TSI: NABARD Consultancy Services (NABCONS) 199


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

•<br />

allocations were not received in respect of 8 schemes/programmes. Allocations were<br />

received in respect of 17 new schemes/programmes during the year.<br />

In the <strong>Annual</strong> <strong>Plan</strong> of 2010-11, total outlay proposed was Rs. 63476.63 lakhs. As<br />

against this outlay an allocation of Rs. 72926.29 lakhs was received by the district.<br />

Sector wise and Scheme/Programme wise deviation is presented in Table 11.3 and<br />

11.6, respectively. A total of <strong>12</strong>7 schemes/programmes were included in this <strong>Annual</strong><br />

<strong>Plan</strong> document. Out of which, allocations were not received in respect of 8<br />

schemes/programmes. Allocations were received in respect of 13 new<br />

schemes/programmes during the year.<br />

Table 11.1. Sector wise comparative statement of outlays proposed in plan document<br />

with allocation received and expenditure incurred FY: 2008-09<br />

(Rs. in lakhs)<br />

Sectors/Sub Sectors<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong> Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

Agriculture & Allied Activities<br />

Crop Husbandry 1333.77 1301.27 <strong>12</strong>85.82 98.81<br />

Horticulture 146.02 161.50 154.87 95.89<br />

Soil & Water<br />

Conservation<br />

99.00 108.00 99.36 92.00<br />

Animal Husbandary 2.00 5.00 2.91 58.20<br />

Co-operation 10150.00 <strong>12</strong>329.00 1<strong>12</strong>57.<strong>12</strong> 91.31<br />

Fisheries 87.10 110.60 89.05 80.51<br />

Sub total 11817.89 14015.37 <strong>12</strong>889.13 91.96<br />

Rural Development 3535.00 5178.00 4521.16 87.31<br />

Special Areas<br />

Programmes<br />

108.50 <strong>12</strong>0.00 111.88 93.23<br />

Irrigation & Flood<br />

Control<br />

3092.00 3878.00 3422.66 88.26<br />

Energy 439.00 560.00 399.72 71.38<br />

Industry & Minerals 39.00 85.85 70.34 81.93<br />

Transport 9893.00 11614.50 10472.52 90.17<br />

Science Technology &<br />

Environment<br />

Social Services<br />

43.61 43.01 40.92 95.14<br />

General Education 3467.70 3471.59 3354.<strong>12</strong> 96.62<br />

Sports & Youth Services 34.55 37.16 36.07 97.07<br />

Medical & Public Health 108.00 <strong>12</strong>0.55 115.64 95.93<br />

Rural Water Supply &<br />

Sanitation<br />

5000.20 52<strong>12</strong>.20 4942.45 94.82<br />

Urban Water Supply &<br />

Sanitation<br />

17.50 20.00 18.21 91.05<br />

Urban Development 253.00 294.44 272.08 92.41<br />

Rural Housing 1165.00 <strong>12</strong>50.30 1068.61 85.47<br />

Labour & Employment 0.75 0.89 0.79 88.76<br />

Social Security & Social<br />

Welfare<br />

5092.82 5496.45 5361.90 97.55<br />

Sub total 15139.52 15903.58 15169.87 95.39<br />

General Services 301.04 414.70 304.11 73.33<br />

Total 44408.56 51813.01 47402.31 91.49<br />

Table 11.2. Sector wise comparative statement of outlays proposed in plan document<br />

with allocation received and expenditure incurred FY: 2009-10<br />

(Rs. in lakhs)<br />

Sectors/Sub Sectors<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong> Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

Agriculture & Allied Activities<br />

Crop Husbandry 1658.30 1805.40 1396.56 77.35<br />

Horticulture <strong>12</strong>5.70 108.92 105.58 96.93<br />

Soil & Water<br />

Conservation<br />

348.50 268.50 161.93 60.31<br />

Animal Husbandary 959.74 3.26 3.18 97.55<br />

Co-Operation 433.38 0.00 0.00 0.00<br />

Fisheries 265.16 55.00 53.55 97.36<br />

Sub Total 3790.78 2241.08 1720.80 76.78<br />

Rural Development 5198.41 8794.41 6915.96 78.64<br />

Special Areas<br />

Programmes<br />

2<strong>12</strong>.29 217.29 134.83 62.05<br />

Irrigation & Flood 5939.08 3580.09 3563.45 99.54<br />

TSI: NABARD Consultancy Services (NABCONS) 200


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sectors/Sub Sectors<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong> Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

Control<br />

Energy 717.29 825.00 717.29 86.94<br />

Industry & Minerals 97.70 303.56 273.51 90.10<br />

Transport 22748.50 22385.00 14706.89 65.70<br />

Science Technology &<br />

Environment<br />

Social Services<br />

70.71 70.71 71.09 100.54<br />

General Education 6006.28 6109.53 6009.01 98.35<br />

Sports & Youth Services 77.67 48.02 47.92 99.79<br />

Medical & Public Health 2473.93 2473.93 2461.18 99.48<br />

Rural Water Supply &<br />

Sanitation<br />

3724.03 1113.03 1013.46 91.05<br />

Urban Water Supply &<br />

Sanitation<br />

88.89 69.40 66.20 95.39<br />

Urban Development 583.65 735.68 820.77 111.57<br />

Rural Housing 4881.80 2950.00 2894.00 98.10<br />

Labour & Employment 1.31 1.31 0.00 0.00<br />

Social Security, Welfare<br />

& Nutrition<br />

4992.51 4826.01 6852.03 141.98<br />

Sub Total 22830.07 18326.91 20164.57 110.03<br />

General Services 371.83 313.58 331.49 105.71<br />

Grand Total 61976.66 57057.63 48599.88 85.18<br />

Table 11.3. Sector wise comparative statement of outlays proposed in plan document<br />

with allocation received and expenditure incurred FY: 2010-11<br />

(Rs. in lakhs)<br />

Sector/Sub-Sector/Scheme<br />

Outlay Proposed<br />

In <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Agriculture & Allied Activities<br />

Crop Husbandry 4908.22 4834.63<br />

Horticulture 186.87 220.37<br />

Soil & Water Conservation 229.26 144.64<br />

Animal Husbandary 1078.09 454.54<br />

Co-Operation 735.63 941.39<br />

Fisheries 293.14 472.16<br />

Sub Total 7431.21 7067.73<br />

Rural Development 5890.93 8198.16<br />

Special Areas Programmes 262.50 371.88<br />

Irrigation & Flood Control 4579.53 5399.18<br />

Energy 789.00 789.00<br />

Industry & Minerals 99.<strong>12</strong> 336.29<br />

Transport 14498.08 20626.30<br />

Science Technology & Environment 65.22 34.33<br />

Social Services<br />

General Education 6606.86 7604.02<br />

Labour & Employment 1.50 5.00<br />

Sports & Youth Services 1<strong>12</strong>.91 55.94<br />

Medical & Public Health 2697.69 2684.24<br />

Rural Water Supply & Sanitation 4994.60 2110.85<br />

Urban Water Supply & Sanitation 4386.76 1173.80<br />

Urban Development 636.93 941.42<br />

Rural Housing 4870.60 8703.05<br />

Social Security, Welfare & Nutrition 5110.98 6558.66<br />

Sub Total 29418.83 29836.98<br />

General Services 442.20 266.44<br />

Grand Total 63476.63 72926.29<br />

*Financial year 2010-11 is continuing, hence data on expenditure was not available<br />

Table 11.4. Scheme/Programme wise comparative statement of outlays proposed in<br />

plan document with allocation received and expenditure incurred FY: 2008-09<br />

(Rs. in lakhs)<br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP) 790.00 790.00 778.35 98.53<br />

Central Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 6.00 6.00 5.95 99.17<br />

TSI: NABARD Consultancy Services (NABCONS) 201


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

Work <strong>Plan</strong>-Sugarcane Development 0.15 0.15 0.15 100.00<br />

Work <strong>Plan</strong>-Farm Mechanisation <strong>12</strong>9.00 <strong>12</strong>2.00 <strong>12</strong>1.07 99.24<br />

Jute Technology Mission (MM-II) <strong>12</strong>.00 11.00 10.77 97.91<br />

ISOPOM (Pulses) 1.62 1.62 1.62 100.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

10.00 9.50 9.22 97.05<br />

Seed Village Programme 100.00 96.00 95.21 99.18<br />

RKVY 285.00 265.00 263.48 99.43<br />

Sub-Total<br />

Horticulture<br />

Central Sponsored <strong>Plan</strong><br />

1333.77 1301.27 <strong>12</strong>85.82 98.81<br />

National Horticulture Mission 130.00 137.00 136.81 99.86<br />

Micro Irrigation Programme 9.00 14.00 10.72 76.57<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

1.50 3.00 1.82 60.67<br />

Coconut Development Board Programme 5.52 7.50 5.52 73.60<br />

Sub-Total<br />

Soil & Water Conservation<br />

Central Sponsored <strong>Plan</strong><br />

146.02 161.50 154.87 95.89<br />

IWDP 14.00 10.00 8.82 88.21<br />

NWDPRA 85.00 98.00 90.54 92.39<br />

Sub-Total<br />

Animal Husbandary & Dairy Development<br />

State <strong>Plan</strong><br />

99.00 108.00 99.36 92.00<br />

Bird Flu Training 2.00 5.00 2.91 58.20<br />

Sub-Total<br />

Co-operative<br />

State <strong>Plan</strong><br />

2.00 5.00 2.91 58.20<br />

Revival of the short term co-operative credit<br />

institution<br />

4500.00 4500.00 4428.76 98.42<br />

Loan support to co-operatives 5650.00 7829.00 6828.36 87.22<br />

Sub-Total<br />

Fisheries<br />

Central Sponsored <strong>Plan</strong><br />

10150.00 <strong>12</strong>329.00 1<strong>12</strong>57.<strong>12</strong> 91.31<br />

FFDA (Programme Component) 35.00 48.00 35.00 72.92<br />

Saving-cum-Relief Scheme 8.00 <strong>12</strong>.00 9.00 75.00<br />

Motorisation of traditional crafts 0.60 0.60 0.60 100.00<br />

Fisherman Rebate on HSD Oil 30.00 38.00 31.90 83.95<br />

Group Accident Insurance Scheme 13.50 <strong>12</strong>.00 <strong>12</strong>.55 104.57<br />

Sub-Total 87.10 110.60 89.05 80.51<br />

Total - I<br />

RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

11817.89 14015.37 <strong>12</strong>889.13 91.96<br />

Gopabandhu Gramin Yojana (GGY)<br />

Central Sponsored <strong>Plan</strong><br />

1000.00 <strong>12</strong>50.00 1194.65 95.57<br />

Swarnajayanti Gram Swarozgary Yojana 750.00 978.00 872.69 89.23<br />

MGNREGS 1700.00 2856.00 2363.27 82.75<br />

DRDA Administration 85.00 94.00 90.55 96.33<br />

Total - II<br />

SPECIAL AREAS PROGRAMMES<br />

Central <strong>Plan</strong><br />

3535.00 5178.00 4521.16 87.31<br />

Grants under Provision to Article 275 (1) 22.50 26.00 24.82 95.46<br />

Special Central Assistance to TSP areas 86.00 94.00 87.06 92.62<br />

Total - III<br />

IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

108.50 <strong>12</strong>0.00 111.88 93.23<br />

Minor Irrigation Projects (NABARD - RIDF) 55.00 58.00 54.72 94.34<br />

Minor Irrigation - BKVY 171.00 180.00 178.05 98.92<br />

Minor Irrigation- BKVY 155.00 215.00 185.54 86.30<br />

Drainage Projects (NABARD - RIDF - XII) 154.00 2<strong>12</strong>.00 157.56 74.32<br />

Drainage Projects (NABARD - RIDF - XIV)<br />

Central Sponsored <strong>Plan</strong><br />

5.00 5.00 3.08 61.60<br />

Flood Management Programme (Major Works)<br />

Central <strong>Plan</strong><br />

52.00 68.00 53.39 78.51<br />

Accelerated Irrigation Benefit Programme 2500.00 3140.00 2790.32 88.86<br />

Total - IV<br />

ENERGY<br />

State <strong>Plan</strong><br />

3092.00 3878.00 3422.66 88.26<br />

Biju Gram Jyoti Yojana<br />

Central Sponsored <strong>Plan</strong><br />

<strong>12</strong>5.00 144.00 132.42 91.96<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana 314.00 416.00 267.30 64.25<br />

Total - V<br />

INDUSTRY & MINERALS<br />

Industry<br />

Central <strong>Plan</strong><br />

439.00 560.00 399.72 71.38<br />

Prime Minister's Employment Generation<br />

Programme (PMEGP)<br />

1.00 0.85 0.85 100.00<br />

Prime Minister Rojagar Yojana (PMRY)<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

5.00 4.00 4.07 101.75<br />

TSI: NABARD Consultancy Services (NABCONS) 202


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

Promotion of Handloom Industry 14.00 11.43 81.64<br />

Skill Upgradation Training<br />

Central Sponsored <strong>Plan</strong><br />

5.00 6.00 5.80 96.67<br />

IHDS (Cluster Approach) 20.00 19.35 96.75<br />

IHDS (Group Approach) 3.00 7.00 4.44 63.43<br />

IHDS (Marketing Incentive) 5.00 3.00 2.31 77.00<br />

Health Insurance for weavers 9.00 9.00 8.23 91.44<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

5.00 2.18 43.60<br />

10% Rebate on Handloom Products 7.00 14.00 9.68 69.14<br />

<strong>District</strong> Level Exhibition 4.00 3.00 2.00 66.67<br />

Total - VI<br />

TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

39.00 85.85 70.34 81.93<br />

Minimum Needs Programme - CWA 62.00 78.00 60.00 76.92<br />

Completion of incomplete roads and bridges<br />

Central <strong>Plan</strong><br />

18.00 24.00 20.00 83.33<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

2500.00 3145.00 2914.82 92.68<br />

Construction of Rural Roads & Bridge 600.00 500.00 83.33<br />

Minimum Needs Programme - CWA 48.00 40.00 83.33<br />

Construction of Rural Road<br />

Central <strong>Plan</strong><br />

60.00 71.00 60.00 84.51<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

1850.00 1770.00 1664.70 94.05<br />

Minimum Needs Programme - CWA 52.00 48.00 40.00 83.33<br />

Construction of Rural Road 110.00 114.00 100.00 87.72<br />

Extension/Renovation of Road Works<br />

Central <strong>Plan</strong><br />

51.00 46.50 47.00 101.08<br />

Pradhan Mantri Gram Sadak Yojana<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

4200.00 4654.00 4042.00 86.85<br />

Construction of Rural Roads & Bridge<br />

Central <strong>Plan</strong><br />

845.00 845.00 823.00 97.40<br />

Central Road Fund 145.00 171.00 161.00 94.15<br />

Total - VII<br />

SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

9893.00 11614.50 10472.52 90.17<br />

Economic <strong>Plan</strong>tations 4.00 5.26 3.48 66.16<br />

Communication & Building - Construction of<br />

quarters for forest guards<br />

3.50 2.75 2.50 90.91<br />

Bamboo <strong>Plan</strong>tation 0.34 0.28 0.22 78.57<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

7.87 7.44 7.44 100.00<br />

Development of National Park, Sanctuary & Natural<br />

Reserves<br />

27.50 26.78 26.78 100.00<br />

Elephant Management Project - Talasari - HVBA 0.40 0.50 0.50 100.00<br />

Total - VIII<br />

SOCIAL SERVICES<br />

General Education<br />

State <strong>Plan</strong><br />

43.61 43.01 40.92 95.14<br />

Mass Education<br />

Central Sponsored <strong>Plan</strong><br />

<strong>12</strong>.50 13.51 13.51 100.00<br />

Sarba Sikshya Abhiyan (SSA) 3400.00 3400.00 3284.62 96.61<br />

NPEGEL 40.20 40.48 39.47 97.50<br />

Kasturiba Gandhi Balika Vidyalaya 15.00 17.60 16.52 93.86<br />

Sub-Total<br />

Sports & Youth Services<br />

State <strong>Plan</strong><br />

3467.70 3471.59 3354.<strong>12</strong> 96.62<br />

Development of Play Field 18.00 21.00 20.00 95.24<br />

Sports Equipment to Block & GP<br />

Central Sponsored <strong>Plan</strong><br />

16.00 15.36 15.36 100.00<br />

Sports Festival for Women<br />

Central <strong>Plan</strong><br />

0.20 0.25 0.16 64.00<br />

Inter School Games & Sports Competition 0.35 0.55 0.55 100.00<br />

Sub-Total<br />

Medical & Public Health<br />

State <strong>Plan</strong><br />

34.55 37.16 36.07 97.07<br />

Rural Ayurvedic Health Services 84.00 93.00 90.31 97.11<br />

Urban Ayurvedic Health Services 24.00 27.55 25.33 91.94<br />

Sub-Total<br />

Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

108.00 <strong>12</strong>0.55 115.64 95.93<br />

ARWSP - Sinking of Tube Well 230.20 230.20 220.20 95.66<br />

ARWSP - Public Water Supply Scheme 2420.00 2418.00 2372.25 98.11<br />

Total Sanitation Campaign (TSC) 2350.00 2564.00 2350.00 91.65<br />

Sub - Total 5000.20 52<strong>12</strong>.20 4942.45 94.82<br />

TSI: NABARD Consultancy Services (NABCONS) 203


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure to<br />

Allocation Received<br />

Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Urban Water Supply Programme Provision of Over Head<br />

Tank and improvement of water supply to Jaleswar<br />

NAC<br />

17.50 20.00 18.21 91.05<br />

Sub-Total<br />

Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

17.50 20.00 18.21 91.05<br />

Urban Greenery<br />

Central Sponsored <strong>Plan</strong><br />

<strong>12</strong>.00 14.50 10.00 68.97<br />

IHSDP 110.00 131.20 <strong>12</strong>0.85 92.11<br />

Swarna Jayanti Sahari Rojagar Yojana 45.30 52.50 49.89 95.03<br />

UIDSSMT<br />

Jaleswar NAC<br />

Central Sponsored <strong>Plan</strong><br />

35.00 36.40 39.97 109.81<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

Nilgiri NAC<br />

Central Sponsored <strong>Plan</strong><br />

15.40 17.50 16.07 91.83<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

Soro NAC<br />

State <strong>Plan</strong><br />

4.50 5.24 4.50 85.88<br />

Road Development<br />

Central Sponsored <strong>Plan</strong><br />

20.00 24.50 20.00 81.63<br />

Swarna Jayanti Sahari Rojagar Yojana 10.80 <strong>12</strong>.60 10.80 85.71<br />

Sub-Total<br />

Rural Housing<br />

Central Sponsored <strong>Plan</strong><br />

253.00 294.44 272.08 92.41<br />

Indra Awas Yojana (IAY) 1165.00 <strong>12</strong>50.30 1068.61 85.47<br />

Sub-Total<br />

Labour & Employment<br />

State <strong>Plan</strong><br />

1165.00 <strong>12</strong>50.30 1068.61 85.47<br />

Craftsmen Training and Apprentice Training 0.75 0.89 0.79 88.76<br />

Sub-Total<br />

Social Security & Social Welfare<br />

State <strong>Plan</strong><br />

0.75 0.89 0.79 88.76<br />

National Old Age Pension 564.50 584.60 571.05 97.68<br />

Madhubabu Pension Yojana 325.40 345.40 340.20 98.49<br />

National Family Benefit Scheme 44.10 48.75 46.40 95.18<br />

Organising Single Window Camps 8.25 8.15 7.20 88.34<br />

Bi-cycle to girl students 110.50 <strong>12</strong>0.20 117.82 98.02<br />

Mission Sakti 27.50 30.50 29.36 96.26<br />

Construction & Repair of AWC building 34.60 28.50 33.67 118.14<br />

Reduction of IMR 2.<strong>12</strong> 3.00 1.89 63.00<br />

Grant in Aid to Orphanages 102.30 110.00 104.19 94.72<br />

Secretarial support to <strong>District</strong> JJ Board/Child Welfare Committee 0.35 0.35 0.31 88.57<br />

Pre and Post Matric Scholarship to SC, ST & OBC students<br />

Central Sponsored <strong>Plan</strong><br />

545.60 555.40 550.57 99.13<br />

Supplementary Nutrition Programme 1050.00 1150.00 1048.42 91.17<br />

Mid Day Meal Programme<br />

Central <strong>Plan</strong><br />

2265.60 2499.10 2498.93 99.99<br />

Kishori Shakti Yojana <strong>12</strong>.00 <strong>12</strong>.50 11.89 95.<strong>12</strong><br />

Sub-Total 5092.82 5496.45 5361.90 97.55<br />

Total - IX<br />

GENERAL SERVICES<br />

State <strong>Plan</strong><br />

15139.52 15903.58 15169.87 95.39<br />

Construction of Revenue Department Buildings (Non<br />

Residential)<br />

34.00 62.50 30.00 48.00<br />

Construction of buildng (<strong>Plan</strong>) Jaleswar RW Division 8.54 18.00 8.00 44.44<br />

Construction of Revenue Department Buildings<br />

(Residential)<br />

27.50 34.00 26.00 76.47<br />

Construction of buildng (<strong>Plan</strong>) (Non Residential)<br />

Jaleswar RW Division<br />

75.00 85.00 74.73 87.92<br />

Construction & Maintenance of Buildings (Non<br />

Residential)<br />

156.00 215.20 165.38 76.85<br />

Total - X 301.04 414.70 304.11 73.33<br />

GRAND TOTAL 44408.56 51813.01 47402.31 91.49<br />

Table 11.5. Scheme/Programme wise comparative statement of outlays proposed in<br />

plan document with allocation received and expenditure incurred FY: 2009-10<br />

(Rs. in lakhs)<br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed<br />

in <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to Allocation<br />

Received<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP) 136.20 536.20 519 96.79<br />

Promotion of SRI programme 8.80 4.00 3.6 90.00<br />

Central Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 236.94 36.94 5.48 14.83<br />

TSI: NABARD Consultancy Services (NABCONS) 204


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed<br />

in <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to Allocation<br />

Received<br />

Work <strong>Plan</strong>-Sugarcane Development 0.35 0.35 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 94.00 134.00 <strong>12</strong>8.62 95.99<br />

Jute Technology Mission (MM-II) 10.21 14.21 11.58 81.49<br />

ISOPOM (Pulses) 11.93 11.93 7.7 64.54<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

243.93 243.93 216.84 88.89<br />

Seed Village Programme 101.93 9.83 7.29 74.16<br />

RKVY 814.01 814.01 496.45 60.99<br />

Sub-Total<br />

Horticulture<br />

State <strong>Plan</strong><br />

1658.30 1805.40 1396.56 77.35<br />

Mission Sakti Programme<br />

Central Sponsored <strong>Plan</strong><br />

1.00 0.96 96.00<br />

National Horticulture Mission 96.20 66.50 66.29 99.68<br />

Micro Irrigation Programme 15.00 24.00 21.93 91.38<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

2.20 6.60 6.36 96.36<br />

Coconut Development Board Programme 7.22 7.22 5.78 80.06<br />

National Medicianal <strong>Plan</strong>ts Mission 1.53 0.85 0.71 83.53<br />

RKVY 3.55 3.75 3.55 94.67<br />

Sub-Total<br />

Soil & Water Conservation<br />

Central Sponsored <strong>Plan</strong><br />

<strong>12</strong>5.70 108.92 105.58 96.93<br />

IWDP 95.89 95.89 0.00<br />

NWDPRA 252.61 172.61 161.93 93.81<br />

Sub-Total<br />

Animal Husbandary & Dairy Development<br />

State <strong>Plan</strong><br />

348.50 268.50 161.93 60.31<br />

Bird Flu Training 0.96 0.96 0.96 100.00<br />

Skill Upgradation Training 0.75 0.72 96.00<br />

Genetic Upgradation of Goat & Deworming 0.06 0.06 100.00<br />

Strengthening of Livestock Service Infrastructure and<br />

Modernisation of Offices<br />

68.00<br />

Strengthening of Liquid Nitrogen Supply 1.25<br />

Opening of new LI Center 3.14<br />

Backyard Poultry Development 638.00<br />

Transfer of Technology-Estension Services 1.00<br />

Organisation of Go-Sambardhana Utsav<br />

Central Sponsored <strong>Plan</strong><br />

3.00<br />

Assistance to State for Control of Livestock Diseases<br />

Central <strong>Plan</strong><br />

24.30 0.65 0.59 90.77<br />

SMILE Training 0.84 0.84 0.85 101.19<br />

RKVY 219.25<br />

Sub-Total<br />

Co-operative<br />

State <strong>Plan</strong><br />

959.74 3.26 3.18 97.55<br />

Share capital to co-operative credit institutions under<br />

NRC-LTO fund<br />

286.38<br />

MACP-Infrastructure Strengtheing and Managerial<br />

subsidy to Marketing Co-operatives (PACs & RCMS)<br />

Financial assistance in shape of loan/subsidy or share to<br />

139.00<br />

other co-operatives (Women co-operatives, Labour cooperative)<br />

8.00<br />

Sub-Total<br />

Fisheries<br />

State <strong>Plan</strong><br />

433.38 0.00 0.00 0.00<br />

FFDA (Establishment cost) 29.57 31.00 30.51 98.42<br />

Strengthening of Infrastructure<br />

Central Sponsored <strong>Plan</strong><br />

60.00<br />

FFDA (Programme Component) 66.40<br />

Development of water logged areas 4.00<br />

Development of Brakish Water Aquaculture through FFDA 8.00<br />

Inland Capture Fisheries 1.20<br />

Saving-cum-Relief Scheme 24.00 8.00 7.14 89.25<br />

Motorisation of traditional crafts 15.00<br />

Fisherman Rebate on HSD Oil 20.00<br />

Group Accident Insurance Scheme 25.99 16.00 15.90 99.38<br />

Low Cost House<br />

Central <strong>Plan</strong><br />

5.00<br />

Introduction of Intermediate craft of Improved Design 6.00<br />

Sub-Total 265.16 55.00 53.55 97.36<br />

Total - I<br />

RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

3790.78 2241.08 1720.80 76.78<br />

Gopabandhu Gramin Yojana (GGY) 1000.00 1000.00 929.63 92.96<br />

State Finance Commission Grant<br />

Central Sponsored <strong>Plan</strong><br />

650.00 616.46 94.84<br />

Swarnajayanti Gram Swarozgary Yojana 962.11 962.11 1055.61 109.72<br />

MGNREGS 3016.78 3016.78 1303.71 43.22<br />

DRDA Administration 219.52 219.52 <strong>12</strong>5.61 57.22<br />

TSI: NABARD Consultancy Services (NABCONS) 205


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed<br />

in <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to Allocation<br />

Received<br />

Central <strong>Plan</strong><br />

<strong>12</strong>th Finance Commission Grant 2946.00 2884.94 97.93<br />

Total - II<br />

SPECIAL AREAS PROGRAMMES<br />

State <strong>Plan</strong><br />

5198.41 8794.41 6915.96 78.64<br />

Construction of Hostel for ST girls<br />

Central <strong>Plan</strong><br />

5.00 4.76 95.20<br />

Grants under Provision to Article 275 (1) 70.00 70.00 39.04 55.77<br />

Special Central Assistance to TSP areas 142.29 142.29 91.03 63.97<br />

Total - III<br />

IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

2<strong>12</strong>.29 217.29 134.83 62.05<br />

Minor Irrigation Projects (NABARD - RIDF) 266.06 266.06 180 67.65<br />

Minor Irrigation - Biju Krushak Vikash Yojana 100.00 100.00 40.32 40.32<br />

Minor Irrigation- Biju Krushak Vikash Yojana 3.00 3.00 3 100.00<br />

Saline Embankment Improvement projects (NABARD -<br />

RIDF- XIV)<br />

650.00 650.00 650 100.00<br />

Drainage Projects (NABARD - RIDF - XII) 130.71 130.71 681.28 521.21<br />

Drainage Projects (NABARD - RIDF - XIV)<br />

Central Sponsored <strong>Plan</strong><br />

200.00<br />

Flood Management Programme (River Bank Protection<br />

Work of River Subarnarekha & Budhabalanga)<br />

1501.41 1501.41 1501.41 100.00<br />

Flood Management Programme (Major Works) - Drainage<br />

Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

928.91 928.91 507.44 54.63<br />

Accelerated Irrigation Benefit Programme 2158.99<br />

Total - IV<br />

ENERGY<br />

State <strong>Plan</strong><br />

5939.08 3580.09 3563.45 99.54<br />

Biju Gram Jyoti Yojana<br />

Central Sponsored <strong>Plan</strong><br />

420.29 465.00 420.29 90.38<br />

RGGVY 297.00 360.00 297 82.50<br />

Total - V<br />

INDUSTRY & MINERALS<br />

Industry<br />

State <strong>Plan</strong><br />

717.29 825.00 717.29 86.94<br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

3.50 3.27 93.43<br />

PMEGP 0.78 230.00 224 97.39<br />

Prime Minister Rojagar Yojana (PMRY)<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

3.47<br />

Promotion of Handloom Industry 18.00 18.00 7.54 41.89<br />

Workshed-cum-Housing 6.50 6.50 6.75 103.85<br />

Skill Upgradation Training<br />

Central Sponsored <strong>Plan</strong><br />

4.40<br />

IHDS (Cluster Approach) 21.99 3.00 2 66.67<br />

IHDS (Group Approach) 10.00 10.00 1.37 13.70<br />

IHDS (Marketing Incentive) 6.00 6.00 9.16 152.67<br />

Health Insurance for weavers 11.26 11.26 9.94 88.28<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

2.30 2.30 1.18 51.30<br />

10% Rebate on Handloom Products 11.00 11.00 8.3 75.45<br />

<strong>District</strong> Level Exhibition 2.00 2.00 0.00<br />

Total - VI<br />

TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

97.70 303.56 273.51 90.10<br />

Minimum Needs Programme -(CWA) 60.00 60.00 60 100.00<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

95.50 223.3 233.82<br />

Completion of incomplete roads and bridges and different<br />

stretches of RIDF and other schemes<br />

Central <strong>Plan</strong><br />

40.00 40.00 55 137.50<br />

Pradhan Mantri Gram Sadak Yojana<br />

Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

9241.00 9241.00 5198.07 56.25<br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

150.00 150.00 270 180.00<br />

Minimum Needs Programme - (CWA) 50.00 50.00 50 100.00<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

95.50 95.50 50 52.36<br />

Completion of incomplete roads and bridges and different<br />

stretches of RIDF and other schemes<br />

Central <strong>Plan</strong><br />

40.00 45.5 113.75<br />

Pradhan Mantri Gram Sadak Yojana<br />

Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

5847.00 5847.00 2638 45.<strong>12</strong><br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

160.00 160.00 113 70.63<br />

TSI: NABARD Consultancy Services (NABCONS) 206


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed<br />

in <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to Allocation<br />

Received<br />

Minimum Needs Programme - (CWA) 50.00 50.00 50 100.00<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

60.00 60.00 116.7 194.50<br />

Pradhan Mantri Gram Sadak Yojana<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

6000.00 6000.00 5321.4 88.69<br />

Construction of Rural Roads & Bridge under NABARD<br />

funding RIDF Project<br />

496.00 496.00 515.92 104.02<br />

Roads & Bridges - State <strong>Plan</strong><br />

Central <strong>Plan</strong><br />

310.00<br />

Central Road Fund 189.00<br />

Total - VII<br />

SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

22748.50 22385.00 14706.89 65.70<br />

Economic <strong>Plan</strong>tations 10.00 10.00 9.78 97.80<br />

Communication & Building - Construction of quarters for<br />

forest guards<br />

3.00 3.00 3 100.00<br />

Bamboo <strong>Plan</strong>tation 0.41 0.41 0.44 107.32<br />

Elephant Management <strong>Plan</strong> 6.95 6.95 6.76 97.27<br />

Wildlife Protection and Conser. Measures<br />

Central <strong>Plan</strong><br />

5.05 5.05 5.31 105.15<br />

Development of National Park, Sanctuary & Natural<br />

Reserves<br />

29.75 29.75 29.75 100.00<br />

Elephant Management Project - Talasari - HVBA 15.55 15.55 16.05 103.22<br />

Total - VIII<br />

SOCIAL SERVICES<br />

General Education<br />

State <strong>Plan</strong><br />

70.71 70.71 71.09 100.54<br />

Mass Education<br />

Central Sponsored <strong>Plan</strong><br />

14.23 14.23 15.85 111.38<br />

Sarba Sikshya Abhiyan (SSA) 5926.90 6014.00 5926.9 98.55<br />

NPEGEL 49.32 60.00 46.62 77.70<br />

Kasturiba Gandhi Balika Vidyalaya<br />

Central <strong>Plan</strong><br />

15.83 19.90 18.33 92.11<br />

National APP training 1.40 1.31 93.57<br />

Sub-Total<br />

Sports & Youth Services<br />

State <strong>Plan</strong><br />

6006.28 6109.53 6009.01 98.35<br />

Organising Youth Festival 0.20 0.10 50.00<br />

Development of Play Field 20.00<br />

Sports Equipment to Block & GP<br />

Central Sponsored <strong>Plan</strong><br />

15.00<br />

Sports Festival for Women<br />

Central <strong>Plan</strong><br />

0.10<br />

Inter School Games & Sports Competition<br />

Panchayat Yuba Krida Khel Abhiyan<br />

0.75<br />

One time seed capital grant (PYKKA) 34.00 34.00 34 100.00<br />

<strong>Annual</strong> acquisition grant 3.10 3.10 3.1 100.00<br />

<strong>Annual</strong> operation grant 3.72 3.72 3.72 100.00<br />

Sports Competition 1.00 7.00 7.00 100.00<br />

Sub-Total<br />

Medical & Public Health<br />

State <strong>Plan</strong><br />

77.67 48.02 47.92 99.79<br />

Rural Ayurvedic Health Services 94.80 94.80 94.8 100.00<br />

Urban Ayurvedic Health Services 28.50 28.50 28.5 100.00<br />

Primary Health Care (Rural) 145.00 145.00 145 100.00<br />

Primary Health Care (Urban)<br />

Central Sponsored <strong>Plan</strong><br />

5.45 5.45 5.45 100.00<br />

Reproductive Child Health (RCH) 977.84 977.84 977.84 100.00<br />

Immunization 41.88 41.88 41.88 100.00<br />

National Rural Health Mission (NRHM) 944.43 944.43 944.43 100.00<br />

RNTCP 35.10 35.10 35.1 100.00<br />

NVBDCP<br />

Central <strong>Plan</strong><br />

144.30 144.30 144.3 100.00<br />

NPCB 25.28 25.28 25.28 100.00<br />

IDSP 10.15 10.15 10.15 100.00<br />

NLEP 8.45 8.45 8.45 100.00<br />

IMCP <strong>12</strong>.75 <strong>12</strong>.75 0.00<br />

Sub-Total<br />

Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

2473.93 2473.93 2461.18 99.48<br />

ARWSP - Sinking of Tube Well 199.91 199.91 161.1 80.59<br />

ARWSP - Public Water Supply Scheme 913.<strong>12</strong> 913.<strong>12</strong> 852.36 93.35<br />

Total Sanitation Campaign (TSC) 2611.00<br />

Sub-Total<br />

Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

3724.03 1113.03 1013.46 91.05<br />

Urban Water Supply Programme Provision of Over Head<br />

Tank and improvement of water supply to Jaleswar NAC<br />

18.84 69.40 66.2 95.39<br />

TSI: NABARD Consultancy Services (NABCONS) 207


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed<br />

in <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to Allocation<br />

Received<br />

Urban Water Supply Programme - Improvement of Water<br />

Supply to uncovered areas of Budhanagar under <strong>Balasore</strong><br />

Municipality<br />

Urban Water Supply Programme Improvement of Water<br />

13.43<br />

Supply to uncovered areas of adjacent to Barabati High<br />

School & Damodarpur under <strong>Balasore</strong> Municipality<br />

Urban Water Supply Programme - Provision of water<br />

10.70<br />

supply to Betsul and adjoining areas of ward no. 3 of<br />

Nilagiri NAC<br />

<strong>12</strong>.85<br />

Urban Water Supply Programme- Laying of pipeline in<br />

uncovered areas of Soro NAC<br />

9.06<br />

Urban Water Supply Programme - Laying of pipeline in<br />

uncovered areas of ward no. 5 & 13 of Jaleswar NAC<br />

Urban Sewerage and Sanitation Programme -<br />

14.04<br />

Improvement of external sewerage disposal system to staff<br />

quarters of FM College, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

1.98<br />

Improvement of external sewerage disposal system of<br />

Police Colony near Permit Padia field, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

1.49<br />

Improvement of external sewerage disposal system of PH<br />

staff quarters near Chandrameri Padia, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

1.50<br />

Improvement of external sewerage disposal system of<br />

Veterinary Colony, <strong>Balasore</strong><br />

Urban Sewerage and Sanitation Programme -<br />

2.00<br />

Improvement of external sewerage disposal system of<br />

Revenue Colony, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

3.00<br />

Sub-Total<br />

Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

88.89 69.40 66.20 95.39<br />

Infrastructure Grant towards Urban Tourism Destination<br />

Towns<br />

10.00 29.31 29.31 100.00<br />

Road Development & Maintenance 82.67 82.67 82.67 100.00<br />

Urban Greenery 10.00 10.00 10.0 100.00<br />

Special Problem Fund<br />

Central Sponsored <strong>Plan</strong><br />

6.94 6.94 6.94 100.00<br />

Integrated Housing & Urban Development Programme<br />

(IHSDP)<br />

288.13 288.13 288.13 100.00<br />

Swarna Jayanti Sahari Rojagar Yojana 54.80 54.80 54.80 100.00<br />

UIDSSMT 39.97 39.97 39.97 100.00<br />

National Urban Information System<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.30 0.30 0.30 100.00<br />

Road Development & Maintenance<br />

Central Sponsored <strong>Plan</strong><br />

82.67 138.07 167.01<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

8.64 17.69 17.69 100.00<br />

Road Development & Maintenance<br />

Central Sponsored <strong>Plan</strong><br />

35.00 35.00 35.00 100.00<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

Soro NAC<br />

State <strong>Plan</strong><br />

13.00 13.00 13.00 100.00<br />

Road Development & Maintenance 22.20 22.20 51.<strong>12</strong> 230.27<br />

Incentive Grant 20.00 19.73 98.65<br />

Protection of Water Bodies<br />

Central Sponsored <strong>Plan</strong><br />

5.00 5.00 100.00<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

Central <strong>Plan</strong><br />

<strong>12</strong>.00 <strong>12</strong>.00 13.63 113.58<br />

<strong>12</strong>th Finance Commission Grant 16.00 15.41 96.31<br />

Sub-Total<br />

Rural Housing<br />

State <strong>Plan</strong><br />

583.65 735.68 820.77 111.57<br />

Mo Kudia<br />

Central Sponsored <strong>Plan</strong><br />

334.60 450.00 429.94 95.54<br />

Indra Awas Yojana (IAY) 4547.20 2500.00 2464.06 98.56<br />

Sub-Total<br />

Labour & Employment<br />

State <strong>Plan</strong><br />

4881.80 2950.00 2894.00 98.10<br />

Craftsmen Training and Apprentice Training 1.31 1.31 0.00<br />

Sub-Total<br />

Social Security & Social Welfare<br />

State <strong>Plan</strong><br />

1.31 1.31 0.00 0.00<br />

National Old Age Pension 575.00 575.00 684.16 118.98<br />

Orissa Disability Pension 60.00 58.13 96.88<br />

Madhubabu Pension Yojana 360.00 360.00 474.26 131.74<br />

National Family Benefit Scheme 92.80 40.00 38.8 97.00<br />

Organising Single Window Camps 7.75<br />

TSI: NABARD Consultancy Services (NABCONS) 208


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub Sectors/Schemes<br />

Outlay Proposed<br />

in <strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Expenditure<br />

% Expenditure<br />

to Allocation<br />

Received<br />

Bi-cycle to girl students <strong>12</strong>0.00 2.10 1.72 81.90<br />

Mission Sakti 300.00 210.00 208.75 99.40<br />

Construction & Repair of AWC building 36.20 36.20 35.25 97.38<br />

Reduction of IMR 2.06 32.06 31.16 97.19<br />

Grant in Aid to Orphanages 110.00 90.00 88.76 98.62<br />

Grant in Aid to Handicapped Welfare Institutions 23.45 22.36 95.35<br />

Handicapped Scholarship <strong>12</strong>.85 <strong>12</strong>.47 97.04<br />

Secretarial support to <strong>District</strong> JJ Board/Child Welfare<br />

Committee<br />

0.35<br />

Pre and Post Matric Scholarship to SC, ST & OBC<br />

students<br />

Central Sponsored <strong>Plan</strong><br />

322.35 322.35 557.31 172.89<br />

Supplementary Nutrition Programme 1080.00 1080.00 2394.26 221.69<br />

Mid Day Meal Programme<br />

Central <strong>Plan</strong><br />

1974.00 1974.00 2237.11 113.33<br />

Kishori Shakti Yojana <strong>12</strong>.00<br />

National Child Labour Project 8.00 7.53 94.13<br />

Sub-Total 4992.51 4826.01 6852.03 141.98<br />

Total - IX<br />

GENERAL SERVICES<br />

State <strong>Plan</strong><br />

22830.07 18326.91 20164.57 110.03<br />

Construction of Revenue Department Buildings (Non<br />

Residential)<br />

80.00 180.00 175.22 97.34<br />

Construction of buildng (<strong>Plan</strong>) Jaleswar RW Division 9.50<br />

Construction of Revenue Department Buildings<br />

(Residential)<br />

40.80 40.80 51.43 <strong>12</strong>6.05<br />

Construction of PHC Buildings (Non Residential) 29.84 29.84 51.15 171.41<br />

Construction of buildng (<strong>Plan</strong>) (Non Residential) Jaleswar<br />

RW Division<br />

27.94 27.94 21.64 77.45<br />

Construction & Maintenance of Buildings (Non<br />

Residential)<br />

183.75 35.00 32.05 91.57<br />

Total - X 371.83 313.58 331.49 105.71<br />

GRAND TOTAL 61976.66 57057.63 48599.88 85.18<br />

Table 11.6. Scheme/Programme wise comparative statement of outlays proposed in<br />

plan document with allocation received and expenditure incurred FY: 2010-11<br />

(Rs. in lakhs)<br />

Sector/Sub-Sector/Scheme<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP) 724.00 817.80<br />

Promotion of SRI programme 10.00 0.00<br />

Central Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 251.44 8.91<br />

Work <strong>Plan</strong>-Sugarcane Development 0.51 2.26<br />

Work <strong>Plan</strong>-Farm Mechanisation 165.40 182.59<br />

Jute Technology Mission (MM-II) 21.26 25.01<br />

ISOPOM (Pulses) 13.41 <strong>12</strong>.57<br />

ISOPOM (Oil Seeds) 249.55 248.14<br />

Central <strong>Plan</strong><br />

Seed Village Programme 61.61 51.53<br />

RKVY 3411.04 3411.04<br />

National Food Security Mission 74.78<br />

Sub-Total 4908.22 4834.63<br />

Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme 3.84<br />

Central Sponsored <strong>Plan</strong><br />

National Horticulture Mission 154.41 155.63<br />

Micro Irrigation Programme 18.01 35.00<br />

ISOPOM (Oil Palm) 2.80 9.20<br />

Central <strong>Plan</strong><br />

Coconut Development Board Programme 5.47 9.63<br />

National Medicianal <strong>Plan</strong>ts Mission Programme 1.90 1.<strong>12</strong><br />

RKVY 4.28 5.95<br />

Sub-Total 186.87 220.37<br />

Soil & Water Conservation<br />

Central Sponsored <strong>Plan</strong><br />

IWDP 105.48<br />

NWDPRA <strong>12</strong>3.78 144.64<br />

Sub-Total 229.26 144.64<br />

Animal Husbandary & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 0.96 0.00<br />

Skill Upgradation Training 0.72<br />

Genetic Upgradation & De-worming of goat 2.00<br />

TSI: NABARD Consultancy Services (NABCONS) 209


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub-Sector/Scheme<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Strengthening of Livestock Service Infrastructure and Modernisation of Offices 88.00<br />

Disaster Management Preparedness 18.00 0.00<br />

Strengthening of Liquid Nitrogen Supply 1.25<br />

Strengthening of LBD farm Remuna 2.00<br />

Fodder Demonstration Programme 3.00<br />

Opening of new LI Center 3.15<br />

Backyard Poultry Development 638.00<br />

Transfer of Technology-Estension Services 1.00<br />

Organisation of Go-Sambardhana Utsav .<br />

Central Sponsored <strong>Plan</strong><br />

3.00<br />

Assistance to State for Control of Livestock Diseases<br />

Central <strong>Plan</strong><br />

24.30 81.78<br />

SMILE Training 5.00 3.94<br />

RKVY 290.43 366.10<br />

Sub-Total<br />

Co-operation<br />

State <strong>Plan</strong><br />

1078.09 454.54<br />

Share capital to co-operative credit institutions under NRC-LTO fund 202.02 286.38<br />

Revival of the short term co-operative credit institution <strong>12</strong>4.00<br />

Loan support to co-operatives 2<strong>12</strong>.16<br />

Modernisation of co-operative processing rice mill 30.00<br />

Share capital and Transport subsidy for PDS to consumer cooperatives 24.25<br />

MACP-Infrastructure Strengtheing and Managerial subsidy to Marketing Co-operatives<br />

(PACs & RCMS)<br />

131.00 139.00<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives (Women cooperatives,<br />

Labour co-operative)<br />

Central <strong>Plan</strong><br />

<strong>12</strong>.20 8.00<br />

Construction of Rural Godown 508.01<br />

Sub-Total<br />

Fisheries<br />

State <strong>Plan</strong><br />

735.63 941.39<br />

Dev. of freshwater Aquaculture through FFDA 32.53 11.38<br />

Exhibition and Organisation of Buyer Seller meet 0.50<br />

Assistance to Mechanisation Programme 25.50<br />

Strengthening of Infrastructure<br />

Central Sponsored <strong>Plan</strong><br />

66.00<br />

Development of Inland Fisheries & Aquaculture through FFDA (Programme Component) 73.04 72.40<br />

Development of water logged areas 4.40<br />

Development of Brakish Water Aquaculture through FFDA 8.86 202.48<br />

Inland Capture Fisheries (Reservoirs/Rivers) 1.32<br />

Saving-cum-Relief Scheme 24.00 <strong>12</strong>.00<br />

Motorisation of traditional crafts 17.00<br />

Fisherman Rebate on HSD Oil 22.00<br />

Group Accident Insurance Scheme 25.99 15.90<br />

Low Cost House 6.00<br />

Assistance to Mechanisation Programme<br />

Central <strong>Plan</strong><br />

<strong>12</strong>0.00<br />

Introduction of Intermediate craft of Improved Design <strong>12</strong>.00 <strong>12</strong>.00<br />

Sub-Total 293.14 472.16<br />

Total - I<br />

RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

7431.21 7067.73<br />

Gopabandhu Gramin Yojana (GGY) 1000.00 1500.00<br />

Construction of C.C Road (New Scheme) 286.62<br />

State Finance Commission Grant<br />

Central Sponsored <strong>Plan</strong><br />

402.87<br />

Swarnajayanti Gram Swarozgary Yojana ( SGSY ) 1065.00 1160.50<br />

National Rural Employment Guarantee Scheme (NREGS) 3556.18 3556.18<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

269.75 200.00<br />

<strong>12</strong>th Finance Commission Award 508.71<br />

13th Finance Commisssion Award 583.28<br />

Total - II<br />

SPECIAL AREAS PROGRAMMES<br />

State <strong>Plan</strong><br />

5890.93 8198.16<br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

131.50<br />

Grants under Provision to Article 275 (1) 87.50 83.73<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 175.00 156.65<br />

Total - III<br />

IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

262.50 371.88<br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 190.64 160.00<br />

Instream Reservoir (Construction of Check Dam) 236.84<br />

Minor Irrigation - Biju Krushak Vikash Yojana - LI Division, <strong>Balasore</strong> 500.00 385.61<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 636.22 865.83<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) - Irrigation Division,<br />

<strong>Balasore</strong><br />

600.00 650.00<br />

Bank Protection work (Flood Control) 92.71<br />

Drainage Projects (NABARD - RIDF - XII) - Drainage Division, <strong>Balasore</strong> <strong>12</strong>7.70<br />

TSI: NABARD Consultancy Services (NABCONS) 210


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub-Sector/Scheme<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Drainage Projects (NABARD - RIDF - XIV) - Drainage Division, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

296.09 400.00<br />

Flood Management Programme (River Bank Protection Work of River Subarnarekha &<br />

Budhabalanga) - Irrigation Division, <strong>Balasore</strong><br />

1086.18 1086.19<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

1142.70 1522.00<br />

Accelerated Irrigation Benefit Programme (AIBP) 0.00<br />

Total - IV<br />

ENERGY<br />

State <strong>Plan</strong><br />

4579.53 5399.18<br />

Biju Gram Jyoti Yojana<br />

Central Sponsored <strong>Plan</strong><br />

462.30 462.30<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 326.70 326.70<br />

Total - V<br />

INDUSTRY & MINERALS<br />

Industry<br />

State <strong>Plan</strong><br />

789.00 789.00<br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

4.59<br />

Prime Minister's Employment Generation Programme (PMEGP) 1.00 228.00<br />

Prime Minister Rojagar Yojana (PMRY)<br />

Handloom & Textiles<br />

State <strong>Plan</strong><br />

3.82<br />

Promotion of Handloom Industry 20.00 14.55<br />

Workshed-cum-Housing 7.00 16.10<br />

Skill Upgradation Training<br />

Central Sponsored <strong>Plan</strong><br />

4.40 7.82<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 16.90 21.28<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 11.00 11.00<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 6.50 9.20<br />

Health Insurance for weavers <strong>12</strong>.00 11.55<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

2.50 1.20<br />

10% Rebate on Handloom Products <strong>12</strong>.00 9.00<br />

<strong>District</strong> Level Exhibition 2.00 2.00<br />

Total - VI<br />

TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

99.<strong>12</strong> 336.29<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 80.00 75.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 100.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 637.30<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other<br />

schemes<br />

Central <strong>Plan</strong><br />

50.00 70.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

5500.00 6007.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 165.00 30.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 55.00 45.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 105.08 57.00<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other<br />

schemes<br />

Central <strong>Plan</strong><br />

230.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

3200.00 4842.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 700.00 500.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 50.00 40.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 80.00 523.00<br />

Extension/Renovation of Road Works<br />

Central <strong>Plan</strong><br />

50.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY)<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

3200.00 5186.00<br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 545.00 1148.00<br />

Roads & Bridges - State <strong>Plan</strong><br />

Central <strong>Plan</strong><br />

398.00<br />

Central Road Fund 220.00 936.00<br />

One time Additional Central Assistance 300.00<br />

Total - VII<br />

SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

14498.08 20626.30<br />

Economic <strong>Plan</strong>tations 11.00 10.00<br />

Communication & Building - Construction of quarters for forest guards 3.30 3.00<br />

Bamboo <strong>Plan</strong>tation 0.21 0.21<br />

Elephant Management <strong>Plan</strong> 5.33<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

3.20 3.52<br />

Development of National Park, Sanctuary & Natural Reserves 30.00 <strong>12</strong>.27<br />

TSI: NABARD Consultancy Services (NABCONS) 211


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub-Sector/Scheme<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Elephant Management Project - Talasari - HVBA 17.51<br />

Total - VIII<br />

SOCIAL SERVICES<br />

General Education<br />

State <strong>Plan</strong><br />

65.22 34.33<br />

Mass Education<br />

Central Sponsored <strong>Plan</strong><br />

15.59 19.25<br />

Sarba Sikshya Abhiyan (SSA) 6519.60 7504.01<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 54.26 35.79<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) 17.41 44.97<br />

Sub-Total<br />

Labour & Employment<br />

State <strong>Plan</strong><br />

6606.86 7604.02<br />

Craftsmen Training and Apprentice Training 1.50 5.00<br />

Sub-Total<br />

Sports & Youth Services<br />

State <strong>Plan</strong><br />

1.50 5.00<br />

Organizing Youth Festival 0.18<br />

Development of Play Field 40.00<br />

Sports Equipment to Block & GP<br />

Central Sponsored <strong>Plan</strong><br />

29.64<br />

Sports Festival for Women<br />

Central <strong>Plan</strong><br />

0.10 1.04<br />

Inter School Games & Sports Competition<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

0.75<br />

One time seed capital grant (PYKKA) 34.00 34.00<br />

<strong>Annual</strong> acquisition grant 3.10 3.10<br />

<strong>Annual</strong> operation grant 3.72 3.72<br />

Sports Competition 1.60 7.60<br />

Prize money for rural sports 6.30<br />

Sub-Total<br />

Medical & Public Health<br />

State <strong>Plan</strong><br />

1<strong>12</strong>.91 55.94<br />

Rural Ayurvedic Health Services 99.54 99.54<br />

Urban Ayurvedic Health Services 29.90 29.90<br />

Primary Health Care (Rural) 154.00 154.00<br />

Primary Health Care (Urban)<br />

Central Sponsored <strong>Plan</strong><br />

5.61 5.61<br />

Reproductive Child Health (RCH) 1075.62 1075.62<br />

Immunization 46.07 46.07<br />

National Rural Health Mission (NRHM) initiatives 1038.87 1038.87<br />

Revised National Tuberculosis Control Programme (RNTCP) 37.20 37.20<br />

National Vector Borne Disease Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

149.30 149.30<br />

National Programme for Control of Blindness (NPCB) 28.45 28.45<br />

Integrated Disease Surveillence Programme (IDSP) 10.56 10.56<br />

National Leprosy Eradication Programme (NLEP) 9.<strong>12</strong> 9.<strong>12</strong><br />

IMCP 13.45<br />

Sub-Total<br />

Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

2697.69 2684.24<br />

ARWSP - Sinking of Tube Well 1<strong>12</strong>.50 238.50<br />

ARWSP - Public Water Supply Scheme 2010.00 1872.35<br />

Total Sanitation Campaign (TSC) 2872.10<br />

Sub - Total<br />

Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

4994.60 2110.85<br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>,<br />

Jaleswar, Soro & Nilgiri ULBs<br />

50.00<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of<br />

sources and laying of pipe lines in different ULBs<br />

200.00<br />

Improvement of W/S to Jaleswar town 60.00<br />

Improvement of water supply & S/I system of different non-residential office building &<br />

Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

80.80<br />

Improvement of water supply & S/I system of different residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

91.00<br />

Improvement of Water Supply to Nilagiri NAC 46.00 200.00<br />

Improvement of Water Supply to Khirda, Raipur areas of Soro NAC<br />

Central Sponsored <strong>Plan</strong><br />

71.00 92.00<br />

AUWSP - Augmentation of Water Supply to <strong>Balasore</strong> town 1564.18 200.00<br />

AUWSP - Augmentation of Water Supply to Nilagiri town 1118.00<br />

Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) -<br />

Augmentation of water supply to <strong>Balasore</strong> town<br />

1587.58 200.00<br />

Sub-Total<br />

Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

4386.76 1173.80<br />

Infrastructure Grant towards Urban Tourism Destination Towns 11.00 11.00<br />

Road Development & Maintenance 90.87 90.87<br />

Urban Greenery 11.00 11.00<br />

TSI: NABARD Consultancy Services (NABCONS) 2<strong>12</strong>


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sector/Sub-Sector/Scheme<br />

Outlay Proposed in<br />

<strong>Annual</strong> <strong>Plan</strong><br />

Document<br />

Allocation<br />

Received<br />

Special Problem Fund 7.63 7.63<br />

Central Sponsored <strong>Plan</strong><br />

Integrated Housing & Urban Development Programme (IHSDP) 316.94 316.94<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 60.28 60.28<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 43.96 43.96<br />

National Urban Information System (NUIS) 0.30 0.30<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

Road Development & Maintenance 149.45<br />

Central Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 9.50 9.49<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC) 20.24<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

Road Development & Maintenance 38.00 38.00<br />

Central Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 10.00 10.00<br />

Soro NAC<br />

State <strong>Plan</strong><br />

Road Development & Maintenance 25.45 55.26<br />

FDR Grant 20.00<br />

Incentive Grant 25.00<br />

Protection of water bodies 20.00<br />

Central Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) <strong>12</strong>.00 25.00<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC) 27.00<br />

Sub-Total 636.93 941.42<br />

Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia 245.35 795.85<br />

Central Sponsored <strong>Plan</strong><br />

Indra Awas Yojana (IAY) 4625.25 7907.20<br />

Sub-Total 4870.60 8703.05<br />

Social Security & Social Welfare<br />

State <strong>Plan</strong><br />

National Old Age Pension 575.00 575.00<br />

Madhubabu Pension Yojana 370.00 370.00<br />

National Family Benefit Scheme 92.80 92.80<br />

Organising Single Window Camps 8.90 8.30<br />

Bi-cycle to girl students <strong>12</strong>5.00 1.25<br />

Mission Sakti 350.00 3.50<br />

Construction & Repair of AWC building 39.00 11.00<br />

Reduction of IMR 2.20 14.20<br />

Grant in Aid to Handicapped Welfare Institutions 23.00<br />

Grant in Aid to Orphanages 115.00 101.15<br />

Secretarial support to <strong>District</strong> JJ Board/Child Welfare Committee 0.35 0.35<br />

Medical Check up 0.60<br />

Sanitation 0.50<br />

Handicapped Scholarship 11.60<br />

Award to AWW 0.15<br />

Monitoring Mechanism & Evaluation 4.50<br />

Information Education Communication 3.00<br />

Medicine Kit <strong>12</strong>.20<br />

Computer 0.20<br />

Visit Programme 0.50<br />

Pre and Post Matric Scholarship to SC, ST & OBC students 354.58 1950.32<br />

Central Sponsored <strong>Plan</strong><br />

Supplementary Nutrition Programme 1080.00 1080.00<br />

Mid Day Meal Programme 1984.15 2146.65<br />

Construction of AWC Building 28.00<br />

Central <strong>Plan</strong><br />

Kishori Shakti Yojana 14.00 14.00<br />

National Disability Pension 0.50<br />

National Child Labour Project 105.39<br />

Sub-Total 5110.98 6558.66<br />

Total - IX 29418.83 29836.98<br />

GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) 90.00 78.46<br />

Construction of buildng (<strong>Plan</strong>) Jaleswar RW Division <strong>12</strong>.00 27.38<br />

Construction of Revenue Department Buildings (Residential) 45.00 111.61<br />

Construction of PHC Buildings (Non Residential) 35.00 9.84<br />

Construction of PHC Buildings (Residential) 26.50<br />

Construction of buildng (<strong>Plan</strong>) (Non Residential) Jaleswar RW Division 45.00<br />

Construction & Maintenance of Buildings (Non Residential) 215.20 <strong>12</strong>.65<br />

Total - X 442.20 266.44<br />

GRAND TOTAL 63476.63 72926.29<br />

*Financial year 2010-11 is continuing, hence data on expenditure was not available<br />

TSI: NABARD Consultancy Services (NABCONS) 213


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

CHAPTER XII<br />

RECOMMENDATIONS/COMMENTS OF DPC<br />

FOR ANNUAL PLAN <strong>2011</strong>-<strong>12</strong><br />

The <strong>District</strong> <strong>Plan</strong>ning Committee meeting was held on 7 th February <strong>2011</strong> to approve this<br />

plan document. The committee unanimously approved the plan document for the year<br />

<strong>2011</strong>-<strong>12</strong> and gave following recommendations/comments to be followed in future plans.<br />

1. Need for higher credit flow to the district particularly in Agriculture sector.<br />

2. Need to allocate more funds for agriculture, irrigation and road connectivity,<br />

development of infrastructure in the district.<br />

3. Review of implementation of various programmes through conduct of separate DPC<br />

meetings.<br />

The Proceedings of the <strong>District</strong> <strong>Plan</strong>ning Committee meeting is attached with this <strong>Plan</strong><br />

document.<br />

TSI: NABARD Consultancy Services (NABCONS) 214


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SECTION - II<br />

TSI: NABARD Consultancy Services (NABCONS)


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

GN Statement A: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PROPOSED OUTLAYS<br />

Annexure - I<br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

528.96 519.00 817.80 817.80 828.00<br />

Work <strong>Plan</strong>-Rice Development 69.02 5.48 8.91 8.91 10.72<br />

Work <strong>Plan</strong>-Sugarcane Development 1.44 0.00 2.26 2.26 2.59<br />

Jute Technology Mission (MM-II) 93.99 11.58 25.01 25.01 27.51<br />

ISOPOM (Pulses) 26.84 7.70 <strong>12</strong>.57 <strong>12</strong>.57 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

583.45 216.84 248.14 248.14 272.96<br />

Seed Village Programme 133.15 7.29 51.53 51.53 56.68<br />

Promotion of SRI programme 0.00 3.60 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 592.25 <strong>12</strong>8.62 182.59 182.59 211.26<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 496.45 3411.04 3411.04 3700.05<br />

National Food Security Mission (Pulses) 0.00 0.00 74.78 74.78 256.92<br />

Sub-Total 2029.11 1396.56 4834.63 4834.63 5366.69<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.96 3.84 3.84 4.80<br />

National Horticulture Mission 617.62 66.29 155.63 155.63 193.63<br />

Micro Irrigation Programme 56.00 21.93 35.00 35.00 45.00<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

9.25 6.36 9.20 9.20 10.18<br />

Coconut Development Board Programme 60.54 5.78 9.63 9.63 11.30<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 5.81 0.71 1.<strong>12</strong> 1.<strong>12</strong> 2.26<br />

Rastriya Krishi Vikas Yojana (RKVY) <strong>12</strong>.68 3.55 5.95 5.95 6.70<br />

Sub-Total 766.70 105.58 220.37 220.37 273.87<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

538.13 161.93 144.64 144.64 231.56<br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00 56.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Sub-Total 538.13 161.93 144.64 144.64 288.06<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 0.96 0.00 0.00 0.96<br />

Disaster Management Preparedness 18.50 0.00 0.00 0.00 18.50<br />

Skill up-gradation Training 9.05 0.72 0.72 0.72 3.80<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

4.<strong>12</strong> 0.06 2.00 2.00 2.00<br />

Disease Control Programme under ASCAD 162.46 0.00 81.23 81.23 81.23<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

6.<strong>12</strong> 0.59 0.55 0.82 0.55<br />

SMILE Training (Society for Management Information Learning & Extension) 11.43 0.85 0.69 0.84 5.00<br />

Exposure visit of farmers under SMILE 5.04 0.00 2.25 2.25 2.52<br />

Extension Services (Posters, ( , Leaf lefts, , Charts, , TV ads.etc.<br />

RKVY<br />

2.00 0.00 1.00 1.00 1.00<br />

a) Strengthening of Livestock Service Information & Modernisation of office 506.08 0.00 190.79 190.79 315.15<br />

b) Dairy Development 226.80 0.00 106.21 106.21 <strong>12</strong>0.59<br />

c) Fodder Development 86.30 0.00 40.20 40.20 46.50<br />

d) Goat Development 25.20 0.00 <strong>12</strong>.60 <strong>12</strong>.60 <strong>12</strong>.60<br />

e) Poultry Development 56.40 0.00 16.30 16.30 40.10<br />

Sub-Total 1<strong>12</strong>5.28 3.17 454.54 454.96 650.50<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 0.00 286.38 286.38 202.02<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 <strong>12</strong>4.00<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 2<strong>12</strong>.16<br />

Modernisation of Co-operative Processing Rice Mill 10.00 0.00 0.00 0.00 30.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 0.00 0.00 0.00 24.25<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives (PACs &<br />

RCMS)<br />

345.00 0.00 139.00 139.00 131.00<br />

Financial assistance (loan/subsidy or share to other co-operatives)<br />

Central <strong>Plan</strong><br />

25.00 0.00 8.00 8.00 <strong>12</strong>.20<br />

Construction of Rural Godown under RKVY 0.00 0.00 508.01 508.01 1427.92<br />

Sub-Total 1132.15 0.00 941.39 941.39 2163.55<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 11.38 11.38 <strong>12</strong>.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.00 0.50 0.50 1.00<br />

Assistance to Mechanisation Programme 19.00 0.00 25.50 25.50 5.00<br />

Survey and Investigation and establishment of FH & FLC 1319.00 0.00 0.00 0.00 667.00<br />

Safety measures for Marine Fishermen<br />

Centrally Sponsored <strong>Plan</strong><br />

20.00 0.00 0.00 0.00 5.00<br />

Development of Inland Fisheries & Aquaculture through FFDA 242.00 30.51 72.40 72.40 74.40<br />

Development of Brackish Water Aquaculture through FFDA 262.20 0.00 202.48 202.48 150.00<br />

Saving-cum-Relief Scheme 56.34 7.14 <strong>12</strong>.00 <strong>12</strong>.00 14.40<br />

Group Accident Insurance Scheme 64.71 15.90 15.90 15.90 16.50<br />

Low Cost House 50.00 0.00 0.00 0.00 50.00<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

54.00 0.00 <strong>12</strong>0.00 <strong>12</strong>0.00 28.50<br />

Introduction of Intermediate craft of Improved Design 60.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 24.00<br />

Sub-Total Sub Total 2148.75 53.55 472.16 472.16 1048.30<br />

Total - I 7740.11 1720.79 7067.73 7068.15 9790.97<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 929.63 1500.00 1500.00 2000.00<br />

Construction of C.C Road (New Scheme) 1435.00 0.00 286.62 286.62 287.00<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

1019.33 616.46 402.87 402.87 442.50<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 4749.74 1055.61 1160.50 1160.50 <strong>12</strong>00.00<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MNREGS) 14372.15 1303.71 3556.18 3556.18 4218.56<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

976.18 <strong>12</strong>5.61 200.00 200.00 250.00<br />

<strong>12</strong>th Finance Commission Award 3393.65 2884.94 508.71 508.71 0.00<br />

13th Finance Commisssion Award 0.00 0.00 583.28 583.28 641.25<br />

Total - II 32446.05 6915.96 8198.16 8198.16 9039.31<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

300.10 4.76 131.50 131.50 163.75<br />

Grants under Provision to Article 275 (1) 233.64 39.04 70.00 70.00 86.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

549.82 79.53 135.00 135.00 180.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Grants under Provision to Article 275 (1) 0.00 0.00 13.73 13.73 15.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 11.50 21.65 21.65 20.00<br />

Total - III 1083.56 134.83 371.88 371.88 464.75<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 734.81 180.00 160.00 160.00 200.00<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 500.00 0.00 236.84 236.84 300.00<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 40.32 865.83 865.83 581.60<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 1634.06 3.00 385.61 385.61 261.25<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 92.71 92.71 92.71<br />

Saline Embankment Improv. projects (NABARD - RIDF- XIV) - Irri. Div., <strong>Balasore</strong> 0.00 650.00 650.00 650.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division, <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

<strong>12</strong>73.72 681.28 400.00 400.00 156.00<br />

Flood Management Programme Irrigation Division, <strong>Balasore</strong> 0.00 1501.41 1086.19 1086.19 3143.13<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

2114.00 507.44 1522.00 1522.00 131.03<br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 218.40<br />

Total - IV 6256.59 3563.45 5399.18 5399.18 5084.<strong>12</strong><br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 420.29 462.30 462.30 485.42<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 140.00<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 297.00 326.70 326.70 343.04<br />

Total - V 0.00 717.29 789.00 789.00 968.46<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

20.49 3.27 4.59 4.59 4.90<br />

Prime Minister's Employment Generation Programme (PMEGP) 863.00 224.00 228.00 228.00 300.00<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 7.54 14.55 14.55 15.00<br />

Workshed-cum-Housing 22.50 6.75 16.10 16.10 17.50<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

18.40 0.00 7.82 7.82 9.42<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 62.33 2.00 21.28 21.28 8.76<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 76.10 1.37 11.00 11.00 11.50<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 60.64 9.16 9.20 9.20 9.50<br />

Health Insurance for weavers 41.00 9.94 11.55 11.55 11.73<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

9.06 1.18 1.20 1.20 1.23<br />

10% Rebate on Handloom Products 75.00 8.30 9.00 9.00 10.00<br />

<strong>District</strong> Level Exhibition 20.00 0.00 2.00 2.00 2.00<br />

Total - VI 1335.11 273.51 336.29 336.29 401.54<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 305.00 60.00 75.00 75.00 80.00<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes 195.00 55.00 70.00 70.00 100.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 223.30 637.30 637.30 733.00<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

616.92 0.00 0.00 0.00 300.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 20359.56 5198.07 6007.00 6007.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1059.50 270.00 30.00 30.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 145.00 50.00 45.00 45.00 50.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 169.00 50.00 57.00 57.00 62.00<br />

Completion of incomplete road and Bridges and different Stretches of RIDF & other Schemes<br />

Central <strong>Plan</strong><br />

528.50 45.50 230.00 230.00 253.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 10480.00 2638.00 4842.00 4842.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1950.34 113.00 500.00 500.00 803.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 180.00 50.00 40.00 40.00 40.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 464.44 116.70 523.00 523.00 567.00<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 152<strong>12</strong>.00 5321.40 5186.00 5186.00 2500.00<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 515.92 1148.00 1148.00 10941.18<br />

Central <strong>Plan</strong><br />

Construction of road under Central Road Fund 0.00 0.00 936.00 936.00 2577.44<br />

One time Additional Central Assistance 0.00 0.00 300.00 300.00 200.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Total - VII 53852.18 14706.89 20626.30 20626.30 19206.62<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 18.00 9.78 10.00 10.00 <strong>12</strong>.10<br />

Communication & Building - Construction of quarters for forest guards 15.00 3.00 3.00 3.00 3.63<br />

Bamboo <strong>Plan</strong>tation 0.00 0.44 0.21 0.21 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 6.76 5.33 5.33 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 5.31 3.52 3.52 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 0.00 29.75 <strong>12</strong>.27 <strong>12</strong>.27 33.00<br />

Elephant Management Project 0.00 0.50 0.00 0.00 0.60<br />

Talsari - HVBA 0.00 15.55 0.00 0.00 17.10<br />

Total - VIII 33.00 71.08 34.33 34.33 66.43<br />

IX SOCIAL SERVICES<br />

11 General Education<br />

State <strong>Plan</strong><br />

Mass Education 7.79 15.85 19.25 19.25 20.10<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 16.00<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 <strong>12</strong>5.00<br />

Improvement/Modernization of ITI <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 99.40<br />

Sarba Sikshya Abhiyan (SSA) 0.00 5926.90 7504.01 7504.01 7504.21<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 0.00 46.62 35.79 35.79 35.79<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

0.00 18.33 44.97 44.97 44.97<br />

National APP Training in ITI <strong>Balasore</strong> 43.00 1.31 5.00 5.00 6.00<br />

Sub-Total 50.79 6009.01 7609.02 7609.02 7851.47<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.10 0.18 0.18 0.20<br />

One time seed capital grant for development of Sports infrastructure 0.00 34.00 34.00 34.00 34.00<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 1.04 1.04 1.44<br />

<strong>Annual</strong> acquisition grant 0.00 3.10 3.10 3.10 3.10<br />

<strong>Annual</strong> operation grant 0.00 3.72 3.72 3.72 3.72<br />

Rural Sports Competition 0.00 7.00 7.60 7.60 7.60<br />

Prize Money for Rural Sports 0.00 0.00 6.30 6.30 6.30<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Sub-Total 0.00 47.92 55.94 55.94 56.36<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 94.80 99.54 99.54 142.47<br />

Urban Ayurvedic Health Services 91.28 28.50 29.90 29.90 35.65<br />

Primary Health Care (Rural) 603.00 145.00 154.00 154.00 179.25<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

28.00 5.45 5.61 5.61 14.21<br />

Reproductive Child Health (RCH) 0.00 977.84 1075.62 1075.62 1303.62<br />

Immunization 0.00 41.88 46.07 46.07 39.52<br />

National Rural Health Mission (NRHM) initiatives 0.00 944.43 1038.87 1038.87 980.59<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 35.10 37.20 37.20 40.92<br />

National Vector Borne Disease Control Programme (NVBDCP) 0.00 144.30 149.30 149.30 164.23<br />

Central <strong>Plan</strong><br />

National Programme for Control of Blindness (NPCB) 0.00 25.28 28.45 28.45 31.30<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 10.15 10.56 10.56 11.62<br />

National Leprosy Eradication Programme (NLEP) 0.00 8.45 9.<strong>12</strong> 9.<strong>12</strong> 10.03<br />

Sub-Total 1142.37 2461.18 2684.24 2684.24 2953.41<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 844.44 161.10 238.50 238.50 209.82<br />

ARWSP-Public Water Supply Scheme 7931.49 852.36 1872.35 1872.35 2022.00<br />

Sub - Total 8775.93 1013.46 2110.85 2110.85 2231.82<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>,<br />

Jaleswar, Soro & Nilgiri ULBs<br />

100.00 9.00 50.00 50.00 41.00<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of<br />

sources and laying of pipe lines in different ULBs<br />

300.00 29.00 200.00 200.00 71.00<br />

Improvement of W/S to Nilgiri town 1118.42 0.00 200.00 200.00 300.00<br />

Improvement of W/S to Soro town 192.00 0.00 92.00 92.00 100.00<br />

Improvement of W/S to Jaleswar town 160.00 0.00 60.00 60.00 100.00<br />

Improvement of water supply & S/I system of different non-residential office building &<br />

Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

200.00 19.20 80.80 80.80 100.00<br />

Improvement of water supply & S/I system of different residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

200.00 9.00 91.00 91.00 100.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 1587.58 0.00 200.00 200.00 300.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP 5442.39 0.00 200.00 200.00 300.00<br />

Sub-Total 9300.39 66.20 1173.80 1173.80 14<strong>12</strong>.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 29.31 11.00 11.00 <strong>12</strong>.10<br />

Road Development & Maintenance 0.00 82.67 90.87 90.87 99.96<br />

Urban Greenery 0.00 10.00 11.00 11.00 <strong>12</strong>.10<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 6.94 7.63 7.63 8.39<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 288.13 316.94 316.94 348.63<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 54.80 60.28 60.28 66.31<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 39.97 43.96 43.96 48.36<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.00 0.30 0.30 0.30 0.33<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 138.07 149.45 165.68 198.81<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 17.69 9.49 19.46 23.35<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 20.24 20.24 23.47<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 35.00 38.00 38.00 41.80<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 13.00 10.00 10.00 11.00<br />

Road Development Grant 0.00 36.65 37.59 37.59 45.00<br />

Road Maintenance Grant 0.00 14.47 17.67 17.67 20.00<br />

FDR Grant 0.00 0.00 20.00 20.00 20.00<br />

Incentive Grant 0.00 19.73 25.00 25.00 30.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 5.00 20.00 20.00 25.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 13.63 25.00 25.00 50.00<br />

Twelfth Finance Commission (TFC) 0.00 15.41 27.00 27.00 35.00<br />

Sub-Total 0.00 820.77 941.42 967.62 1119.61<br />

7 Rural Housing<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

1429.75 429.94 795.85 795.85 875.85<br />

Indira Awas Yojana (IAY) 19841.50 2464.06 7907.20 7907.20 8697.20<br />

Sub-Total 2<strong>12</strong>71.25 2894.00 8703.05 8703.05 9573.05<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.68 0.68 0.68 0.75<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 6.49 6.66 6.66 7.33<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 65.21 65.92 65.92 72.52<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 143.38 156.64 156.64 172.30<br />

Post Matric Scholarship to SC Students 0.00 47.06 88.48 88.48 97.33<br />

Post Matric Scholarship to ST Students 0.00 15.84 17.44 17.44 19.18<br />

DDevelopment l t of f SC SCs (OSFDC Section) S ti ) 000 0.00 175 175.70 70 203 203.75 75 203 203.75 75 224 224.13 13<br />

Development of STs (OSFDC Section) 0.00 83.10 117.50 117.50 <strong>12</strong>9.25<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 0.00 3.92 14.24 14.24 15.66<br />

Pre Matric Scholarship to OBC Students 0.00 6.39 1151.05 1151.05 <strong>12</strong>66.16<br />

Post Matric Scholarship to OBC Students 0.00 0.00 56.98 56.98 62.68<br />

Pre Matric Scholarship to Minorities 0.00 9.54 65.29 65.29 71.82<br />

Post Matric Scholarship to Minorities 0.00 0.00 5.69 5.69 6.26<br />

Sub-Total 0.00 557.31 1950.32 1950.32 2145.37<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 1323.38 474.26 370.00 370.00 474.26<br />

Old Age Pension 155.09 87.02 0.00 0.00 87.02<br />

Orissa Disability Pension 13.70 58.13 0.00 0.00 58.13<br />

Organising Single Window Camps 23.45 0.00 8.30 8.30 8.30<br />

Bi-cycle to girl students 362.82 1.72 1.25 1.25 1.25<br />

Mission Sakti 943.60 208.75 3.50 3.50 208.75<br />

Repair & Maintenance of AWC Building 75.22 10.25 11.00 11.00 10.25<br />

Reduction of Child Malnutrition 49.23 31.16 <strong>12</strong>.00 <strong>12</strong>.00 31.16<br />

Reduction of IMR 7.99 0.00 2.20 2.20 2.20<br />

Grant in Aid to Handicapped Welfare Institution 54.99 22.36 23.00 23.00 23.00<br />

Grant in Aid to Orphanages 379.38 88.76 101.15 101.15 101.15<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.35 0.00 0.35 0.35 0.35<br />

Medical Check up 1.60 0.00 0.60 0.60 0.60<br />

Sanitation 1.29 0.00 0.50 0.50 0.50<br />

Handicapped Scholarship 45.06 <strong>12</strong>.47 11.60 11.60 <strong>12</strong>.47<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Award to AWW 0.60 0.00 0.15 0.15 0.15<br />

Monitoring Mechanism & Evaluation 17.61 0.00 4.50 4.50 4.50<br />

Information Education Communication 10.72 0.00 3.00 3.00 3.00<br />

Medicine Kit 34.30 0.00 <strong>12</strong>.20 <strong>12</strong>.20 <strong>12</strong>.20<br />

Computer 0.56 0.00 0.20 0.20 0.20<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

1.50 0.00 0.50 0.50 0.35<br />

Supplementary Nutrition Programme 4653.02 2394.26 1080.00 1080.00 2394.26<br />

Mid Day Meal Programme (Pry+UP) 3819.83 1959.29 900.00 900.00 1959.29<br />

Mid Day Meal Programme (Kitchen-cum-store) 3826.40 136.64 1000.00 1000.00 136.64<br />

Mid Day Meal Programme (Utensils) 290.27 11.60 84.15 84.15 11.60<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.57 20.50 5.00 5.00 20.50<br />

Mid Day Meal Programme (Transportation charges) 285.<strong>12</strong> 27.10 75.50 75.50 27.10<br />

Mid Day Meal Programme (Honorarium to cook & helper) 409.92 81.98 82.00 82.00 82.00<br />

CConstruction t ti of f AWC Building B ildi<br />

Central <strong>Plan</strong><br />

97 97.00 00 25 25.00 00 28 28.00 00 28 28.00 00 25 25.00 00<br />

IG National Old Age Pension (ACA to States) 2408.78 597.14 575.00 575.00 597.14<br />

National Family Benefit Scheme (ACA to States) 392.20 38.80 92.80 92.80 92.80<br />

Kishori Shakti Yojana 50.05 0.00 14.00 14.00 14.00<br />

National Disability Pension 20.00 0.00 0.50 0.50 0.50<br />

National Child Labour Project 0.00 7.53 105.39 105.39 105.39<br />

Sub-Total 19776.60 6294.72 4608.34 4608.34 6506.01<br />

Total - IX 60317.33 20164.57 29836.98 29863.18 33849.10<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) 161.66 90.00 19.36 19.36 22.30<br />

Construction of Revenue Department Buildings (Residential) 74.44 22.33 <strong>12</strong>.<strong>12</strong> <strong>12</strong>.<strong>12</strong> 13.94<br />

Construction of PHC Buildings (Non Residential) 21.16 0.00 9.84 9.84 11.32<br />

Construction of RD Department Buildings (Non Residential) 64.15 8.00 11.00 11.00 <strong>12</strong>.65<br />

Construction of Revenue Department Buildings (Non Residential) 178.22 77.22 48.10 48.10 52.90<br />

Construction of PHC Buildings (Residential) 32.55 16.85 7.50 7.50 8.20<br />

Construction of Revenue Department Buildings (Residential) 178.10 29.10 71.00 71.00 78.00<br />

Construction of Building (Non Residential) RD Division Jaleswar 60.00 21.64 27.38 27.38 30.00<br />

Construction of Health & RW Building (Residential) 100.55 34.30 19.00 19.00 21.00<br />

Construction & Maintenance of Buildings (Non Residential) 58.61 32.05 <strong>12</strong>.65 <strong>12</strong>.65 13.91<br />

Construction of RD Department Buildings (Residential) 61.26 0.00 28.49 28.49 32.77<br />

Total - X 990.70 331.49 266.44 266.44 296.99<br />

GRAND TOTAL 164054.63 48599.87 72926.29 72952.91 79168.29<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - I


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

GN Statement B: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong> : PROPOSED OUTLAYS (From State Budget)<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

0 1 2 3 4 5 6<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

528.96 519.00 817.80 817.80 828.00<br />

Work <strong>Plan</strong>-Rice Development 6.90 0.55 0.89 0.89 1.07<br />

Work <strong>Plan</strong>-Sugarcane Development 0.14 0.00 0.23 0.23 0.26<br />

Jute Technology Mission (MM-II) 9.40 1.16 2.50 2.50 2.75<br />

ISOPOM (Pulses) 6.71 1.93 3.14 3.14 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

145.86 54.21 62.04 62.04 68.24<br />

Annexure - II<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Seed Village Programme 0.00 0.00 0.00 0.00 0.00<br />

Promotion of SRI programme 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 0.00 0.00 0.00 0.00 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 0.00 0.00 0.00<br />

National Food Security Mission (Pulses) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 697.98 576.84 886.60 886.60 900.32<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.96 3.84 3.84 4.80<br />

National Horticulture Mission 92.64 9.94 23.34 23.34 29.04<br />

Micro Irrigation Programme 24.00 9.40 15.00 15.00 19.29<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

2.31 1.59 2.30 2.30 2.55<br />

Coconut Development Board Programme 0.00 0.00 0.00 0.00 0.00<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 0.00 0.00 0.00 0.00 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total <strong>12</strong>3.76 21.89 44.48 44.48 55.68<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

53.81 16.19 14.46 14.46 23.16<br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00<br />

Sub-Total 53.81 16.19 14.46 14.46 23.16<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 0.96 0.00 0.00 0.96<br />

Disaster Management Preparedness 18.50 0.00 0.00 0.00 18.50<br />

Skill up-gradation Training 9.05 0.72 0.72 0.72 3.80<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

4.<strong>12</strong> 0.06 2.00 2.00 2.00<br />

Disease Control Programme under ASCAD (Assistance to State for Control of Livestock<br />

Diseases)<br />

40.62 0.00 20.31 20.31 20.31<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

1.53 0.15 0.14 0.21 0.14<br />

SMILE Training (Society for Management Information Learning & Extension) 0.00 0.00 0.00 0.00 0.00<br />

Exposure visit of farmers under SMILE 0.00 0.00 0.00 0.00 0.00<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc.<br />

RKVY<br />

0.00 0.00 0.00 0.00 0.00<br />

a) Strengthening of Livestock Service Information & Modernisation of office 0.00 0.00 0.00 0.00 0.00<br />

b) Dairy Development 0.00 0.00 0.00 0.00 0.00<br />

c) Fodder Development 0.00 0.00 0.00 0.00 0.00<br />

d) Goat Development 0.00 0.00 0.00 0.00 0.00<br />

e) Poultry Development 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 79.59 1.89 23.17 23.23 45.71<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 0.00 286.38 286.38 202.02<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 <strong>12</strong>4.00<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 2<strong>12</strong>.16<br />

Modernisation of Co-operative Processing Rice Mill 10.00 0.00 0.00 0.00 30.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 0.00 0.00 0.00 24.25<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives (PACs &<br />

RCMS)<br />

345.00 0.00 139.00 139.00 131.00<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives<br />

Central <strong>Plan</strong><br />

25.00 0.00 8.00 8.00 <strong>12</strong>.20<br />

Construction of Rural Godown under RKVY 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 1132.15 0.00 433.38 433.38 735.63<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 11.38 11.38 <strong>12</strong>.50<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.00 0.50 0.50 1.00<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Assistance to Mechanisation Programme 19.00 0.00 25.50 25.50 5.00<br />

Survey and Investigation and establishment of FH & FLC 1319.00 0.00 0.00 0.00 667.00<br />

Safety measures for Marine Fishermen 20.00 0.00 0.00 0.00 5.00<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture through FFDA 60.50 7.63 18.10 18.10 18.60<br />

Development of Brackish Water Aquaculture through FFDA 65.55 0.00 50.62 50.62 37.50<br />

Saving-cum-Relief Scheme 28.17 3.57 6.00 6.00 7.20<br />

Group Accident Insurance Scheme 32.35 7.95 7.95 7.95 8.25<br />

Low Cost House 25.00 0.00 0.00 0.00 25.00<br />

Assistance of Mechanisation Programme 27.00 0.00 60.00 60.00 14.25<br />

Central <strong>Plan</strong> 0.00 0.00 0.00 0.00 0.00<br />

Introduction of Intermediate craft of Improved Design 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 1598.07 19.15 180.05 180.05 801.30<br />

Total - I 3685.36 635.96 1582.14 1582.20 2561.80<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 929.63 1500.00 1500.00 2000.00<br />

Construction of C.C Road (New Scheme) 1435.00 0.00 286.62 286.62 287.00<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

1019.33 616.46 402.87 402.87 442.50<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 1187.44 263.90 290.13 290.13 300.00<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MNREGS) 1437.22 130.37 355.62 355.62 421.86<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

244.05 31.40 50.00 50.00 62.50<br />

<strong>12</strong>th Finance Commission Award 0.00 0.00 0.00 0.00 0.00<br />

13th Finance Commisssion Award 0.00 0.00 0.00 0.00 0.00<br />

Total - II 11823.03 1971.77 2885.23 2885.23 3513.86<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

300.10 4.76 131.50 131.50 163.75<br />

Grants under Provision to Article 275 (1) 0.00 0.00 0.00 0.00 0.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Grants under Provision to Article 275 (1) 0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 0.00 0.00 0.00 0.00<br />

Total - III 300.10 4.76 131.50 131.50 163.75<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 734.81 180.00 160.00 160.00 200.00<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 500.00 0.00 236.84 236.84 300.00<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 40.32 865.83 865.83 581.60<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 1634.06 3.00 385.61 385.61 261.25<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 92.71 92.71 92.71<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) - Irrigation Division, <strong>Balasore</strong> 0.00 650.00 650.00 650.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division, <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

<strong>12</strong>73.72 681.28 400.00 400.00 156.00<br />

Flood Management Programme (River Bank Protection Work ) Irrigation Division, <strong>Balasore</strong> 0.00 375.35 271.55 271.55 785.80<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

525.50 <strong>12</strong>6.86 380.50 380.50 32.76<br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 0.00<br />

Total - IV 4668.09 2056.81 3443.04 3443.04 2410.<strong>12</strong><br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 420.29 462.30 462.30 485.42<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 140.00<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 29.70 32.67 32.67 34.30<br />

Total - V 0.00 449.99 494.97 494.97 659.72<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

20.49 3.27 4.59 4.59 4.90<br />

Prime Minister's Employment Generation Programme (PMEGP) 0.00 0.00 0.00 0.00 0.00<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 7.54 14.55 14.55 15.00<br />

Workshed-cum-Housing 22.50 6.75 16.10 16.10 17.50<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

18.40 0.00 7.82 7.82 9.42<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 13.85 0.44 4.73 4.73 1.95<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 16.91 0.30 2.44 2.44 2.55<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 30.32 4.58 4.60 4.60 4.75<br />

Health Insurance for weavers 4.92 1.19 1.39 1.39 1.41<br />

Mahatma Gandhi Bunakar Bima Yojana 3.62 0.47 0.48 0.48 0.49<br />

Central <strong>Plan</strong><br />

10% Rebate on Handloom Products 0.00 0.00 0.00 0.00 0.00<br />

<strong>District</strong> Level Exhibition 0.00 0.00 0.00 0.00 0.00<br />

Total - VI 197.60 24.55 56.69 56.69 57.97<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 305.00 60.00 75.00 75.00 80.00<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes 195.00 55.00 70.00 70.00 100.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 223.30 637.30 637.30 733.00<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

616.92 0.00 0.00 0.00 300.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00 0.00 0.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1059.50 270.00 30.00 30.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 145.00 50.00 45.00 45.00 50.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 169.00 50.00 57.00 57.00 62.00<br />

Completion of incomplete road and Bridges and different Stretches of RIDF & other Schemes<br />

Central <strong>Plan</strong><br />

528.50 45.50 230.00 230.00 253.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00 0.00 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1950.34 113.00 500.00 500.00 803.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 180.00 50.00 40.00 40.00 40.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 464.44 116.70 523.00 523.00 567.00<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00 0.00 0.00 0.00<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 515.92 1148.00 1148.00 10941.18<br />

Central <strong>Plan</strong><br />

Construction of road under Central Road Fund 0.00 0.00 0.00 0.00 0.00<br />

One time Additional Central Assistance 0.00 0.00 0.00 0.00 0.00<br />

Total - VII 7800.62 1549.42 3355.30 3355.30 13929.18<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 18.00 9.78 10.00 10.00 <strong>12</strong>.10<br />

Communication & Building - Construction of quarters for forest guards 15.00 3.00 3.00 3.00 3.63<br />

Bamboo <strong>Plan</strong>tation 0.00 0.44 0.21 0.21 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 6.76 5.33 5.33 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 5.31 3.52 3.52 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 0.00 0.00 0.00 0.00 0.00<br />

Elephant Management Project 0.00 0.00 0.00 0.00 0.00<br />

Talsari - HVBA 0.00 0.00 0.00 0.00 0.00<br />

Total - VIII 33.00 25.28 22.07 22.06 15.73<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education 7.79 15.85 19.25 19.25 20.10<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 16.00<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 <strong>12</strong>5.00<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play ground, bore well,<br />

drainage system, cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 99.40<br />

Sarba Sikshya Abhiyan (SSA) 0.00 2963.45 3752.01 3752.01 3752.11<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 0.00 23.31 17.90 17.90 17.90<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) 0.00 6.42 15.74 15.74 15.74<br />

Central <strong>Plan</strong> 0.00 0.00 0.00 0.00<br />

National APP Training in ITI <strong>Balasore</strong> 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 7.79 3009.03 3804.89 3804.89 4046.24<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.10 0.18 0.18 0.20<br />

One time seed capital grant for development of Sports infrastructure 0.00 8.50 8.50 8.50 8.50<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.42 0.42 0.58<br />

<strong>Annual</strong> acquisition grant 0.00 0.00 0.00 0.00 0.00<br />

<strong>Annual</strong> operation grant 0.00 0.00 0.00 0.00 0.00<br />

Rural Sports Competition 0.00 0.00 0.00 0.00 0.00<br />

Prize Money for Rural Sports 0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Sub-Total 0.00 8.60 9.10 9.10 9.28<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 94.80 99.54 99.54 142.47<br />

Urban Ayurvedic Health Services 91.28 28.50 29.90 29.90 35.65<br />

Primary Health Care (Rural) 603.00 145.00 154.00 154.00 179.25<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

28.00 5.45 5.61 5.61 14.21<br />

Reproductive Child Health (RCH) 0.00 146.68 161.34 161.34 195.54<br />

Immunization 0.00 6.28 6.91 6.91 5.93<br />

National Rural Health Mission (NRHM) initiatives 0.00 141.66 155.83 155.83 147.09<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 17.55 18.60 18.60 20.46<br />

National Vector Borne Disease Control Programme (NVBDCP) 0.00 72.15 74.65 74.65 82.<strong>12</strong><br />

Central <strong>Plan</strong><br />

National Programme g for Control of Blindness (NPCB) ( )<br />

0.00 0.00 0.00 0.00 0.00<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 0.00 0.00 0.00 0.00<br />

National Leprosy Eradication Programme (NLEP) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 1142.37 658.07 706.38 706.38 822.72<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 422.22 80.55 119.25 119.25 104.91<br />

ARWSP-Public Water Supply Scheme 3172.60 340.94 748.94 748.94 817.00<br />

Sub - Total 3594.82 421.49 868.19 868.19 921.91<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro &<br />

Nilgiri ULBs<br />

100.00 9.00 50.00 50.00 41.00<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of sources and<br />

laying of pipe lines in different ULBs<br />

300.00 29.00 200.00 200.00 71.00<br />

Improvement of W/S to Nilgiri town 1118.42 0.00 200.00 200.00 300.00<br />

Improvement of W/S to Soro town 192.00 0.00 92.00 92.00 100.00<br />

Improvement of W/S to Jaleswar town 160.00 0.00 60.00 60.00 100.00<br />

Improvement of water supply & S/I system of different non-residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

200.00 19.20 80.80 80.80 100.00<br />

Improvement of water supply & S/I system of different residential office building & Govt. Institutions<br />

of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

200.00 9.00 91.00 91.00 100.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 796.79 0.00 100.00 100.00 150.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to <strong>Balasore</strong> town<br />

from river Sono- construction of intake well and laying of rising mains)<br />

2721.20 0.00 100.00 100.00 150.00<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Sub-Total 5788.41 66.20 973.80 973.80 11<strong>12</strong>.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 29.31 11.00 11.00 <strong>12</strong>.10<br />

Road Development & Maintenance 0.00 82.67 90.87 90.87 99.96<br />

Urban Greenery 0.00 10.00 11.00 11.00 <strong>12</strong>.10<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 6.94 7.63 7.63 8.39<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 32.01 35.22 35.22 41.84<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 13.70 15.07 15.07 16.58<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 4.44 4.88 4.88 5.80<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.00 0.03 0.03 0.03 0.03<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 138.07 149.45 165.68 198.81<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 4.42 2.37 4.87 5.84<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 35.00 38.00 38.00 41.80<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 3.25 2.50 2.50 2.75<br />

Road Development Grant 0.00 36.65 37.59 37.59 45.00<br />

Road Maintenance Grant 0.00 14.47 17.67 17.67 20.00<br />

FDR Grant 0.00 0.00 20.00 20.00 20.00<br />

Incentive Grant 0.00 19.73 25.00 25.00 30.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 5.00 20.00 20.00 25.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 3.41 6.25 6.25 <strong>12</strong>.50<br />

Twelfth Finance Commission (TFC) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 439.10 494.53 513.26 598.50<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Mo Kudia 1429.75 429.94 795.85 795.85 875.85<br />

Centrally Sponsored <strong>Plan</strong><br />

Indira Awas Yojana (IAY) 4960.38 616.02 1976.80 1976.80 2174.30<br />

Sub-Total 6390.13 1045.96 2772.65 2772.65 3050.15<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.00 0.00 0.00 0.00<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 0.00 0.00 0.00 0.00<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 0.00 0.00 0.00 0.00<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 0.00 0.00 0.00 0.00<br />

Post Matric Scholarship to SC Students 0.00 0.00 0.00 0.00 0.00<br />

Post Matric Scholarship to ST Students 0.00 0.00 0.00 0.00 0.00<br />

Development of SCs (OSFDC Section) 0.00 0.00 0.00 0.00 0.00<br />

Development of STs (OSFDC Section) 0.00 0.00 0.00 0.00 0.00<br />

Pre Matric i SScholarship h l hi to the h students d whose h parents engaged d unclean l occupation i 0.00 000 0.00 000 0.00 000 0.00 000 0.00 000<br />

Pre Matric Scholarship to OBC Students 0.00 0.00 0.00 0.00 0.00<br />

Post Matric Scholarship to OBC Students 0.00 0.00 0.00 0.00 0.00<br />

Pre Matric Scholarship to Minorities 0.00 0.00 0.00 0.00 0.00<br />

Post Matric Scholarship to Minorities 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 1323.38 474.26 370.00 370.00 474.26<br />

Old Age Pension 155.09 87.02 0.00 0.00 87.02<br />

Orissa Disability Pension 13.70 58.13 0.00 0.00 58.13<br />

Organising Single Window Camps 23.45 0.00 8.30 8.30 8.30<br />

Bi-cycle to girl students 362.82 1.72 1.25 1.25 1.25<br />

Mission Sakti 943.60 208.75 3.50 3.50 208.75<br />

Repair & Maintenance of AWC Building 75.22 10.25 11.00 11.00 10.25<br />

Reduction of Child Malnutrition 49.23 31.16 <strong>12</strong>.00 <strong>12</strong>.00 31.16<br />

Reduction of IMR 7.99 0.00 2.20 2.20 2.20<br />

Grant in Aid to Handicapped Welfare Institution 54.99 22.36 23.00 23.00 23.00<br />

Grant in Aid to Orphanages 379.38 88.76 101.15 101.15 101.15<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.35 0.00 0.35 0.35 0.35<br />

Medical Check up 1.60 0.00 0.60 0.60 0.60<br />

Sanitation 1.29 0.00 0.50 0.50 0.50<br />

Handicapped Scholarship 45.06 <strong>12</strong>.47 11.60 11.60 <strong>12</strong>.47<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>- <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay (at 2006-<br />

Actual Expenditure<br />

07 Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Award to AWW 0.60 0.00 0.15 0.15 0.15<br />

Monitoring Mechanism & Evaluation 17.61 0.00 4.50 4.50 4.50<br />

Information Education Communication 10.72 0.00 3.00 3.00 3.00<br />

Medicine Kit 34.30 0.00 <strong>12</strong>.20 <strong>12</strong>.20 <strong>12</strong>.20<br />

Computer 0.56 0.00 0.20 0.20 0.20<br />

Visit Programme 1.50 0.00 0.50 0.50 0.35<br />

Central Sponsored <strong>Plan</strong><br />

Supplementary Nutrition Programme 2326.51 1197.13 540.00 540.00 1197.13<br />

Mid Day Meal Programme (Pry+UP) 1489.73 764.<strong>12</strong> 351.00 351.00 764.<strong>12</strong><br />

Mid Day Meal Programme (Kitchen-cum-store) 956.60 34.16 250.00 250.00 34.16<br />

Mid Day Meal Programme (Utensils) 72.57 2.90 21.04 21.04 2.90<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 8.02 8.00 1.95 1.95 8.00<br />

Mid Day Meal Programme (Transportation charges) 71.28 6.78 18.88 18.88 6.78<br />

Mid Day Meal Programme (Honorarium to cook & helper) 102.48 20.50 20.50 20.50 20.50<br />

Construction of AWC Buildingg Central <strong>Plan</strong><br />

48.50 <strong>12</strong>.50 14.00 14.00 <strong>12</strong>.50<br />

IG National Old Age Pension (ACA to States) 0.00 0.00 0.00 0.00 0.00<br />

National Family Benefit Scheme (ACA to States) 0.00 0.00 0.00 0.00 0.00<br />

Kishori Shakti Yojana 0.00 0.00 0.00 0.00 0.00<br />

National Disability Pension 0.00 0.00 0.00 0.00 0.00<br />

National Child Labour Project 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 8579.13 3040.96 1783.36 1783.36 3085.88<br />

Total - IX 25502.64 8689.41 114<strong>12</strong>.90 11431.63 13646.67<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) 161.66 90.00 19.36 19.36 22.30<br />

Construction of Revenue Department Buildings (Residential) 74.44 22.33 <strong>12</strong>.<strong>12</strong> <strong>12</strong>.<strong>12</strong> 13.94<br />

Construction of PHC Buildings (Non Residential) 21.16 0.00 9.84 9.84 11.32<br />

Construction of RD Department Buildings (Non Residential) 64.15 8.00 11.00 11.00 <strong>12</strong>.65<br />

Construction of Revenue Department Buildings (Non Residential) 178.22 77.22 48.10 48.10 52.90<br />

Construction of PHC Buildings (Residential) 32.55 16.85 7.50 7.50 8.20<br />

Construction of Revenue Department Buildings (Residential) 178.10 29.10 71.00 71.00 78.00<br />

Construction of Building (Non Residential) RD Division Jaleswar 60.00 21.64 27.38 27.38 30.00<br />

Construction of Health & RW Building (Residential) 100.55 34.30 19.00 19.00 21.00<br />

Construction & Maintenance of Buildings (Non Residential) 58.61 32.05 <strong>12</strong>.65 <strong>12</strong>.65 13.91<br />

Construction of RD Department Buildings (Residential) 61.26 0.00 28.49 28.49 32.77<br />

Total - X 990.70 331.49 266.44 266.44 296.99<br />

GRAND TOTAL 55001.14 15739.43 23650.28 23669.07 37255.79<br />

TSI: NABARD Consultancy Services (NABCON) Annexure -II


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

GN Statement C (Part I): ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PROPOSED OUTLAYS (Rural)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Annexure - III<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

528.96 519.00 817.80 817.80 828.00<br />

Work <strong>Plan</strong>-Rice Development 69.02 5.48 8.91 8.91 10.72<br />

Work <strong>Plan</strong>-Sugarcane Development 1.44 0.00 2.26 2.26 2.59<br />

Jute Technology Mission (MM-II) 93.99 11.58 25.01 25.01 27.51<br />

ISOPOM (Pulses) 26.84 7.70 <strong>12</strong>.57 <strong>12</strong>.57 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

583.45 216.84 248.14 248.14 272.96<br />

Seed Village Programme 133.15 7.29 51.53 51.53 56.68<br />

Promotion of SRI programme 0.00 3.60 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 592.25 <strong>12</strong>8.62 182.59 182.59 211.26<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 496.45 3411.04 3411.04 3700.05<br />

National Food Security Mission (Pulses) 0.00 0.00 74.78 74.78 256.92<br />

Sub-Total 2029.11 1396.56 4834.63 4834.63 5366.69<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.96 3.84 3.84 4.80<br />

National Horticulture Mission 617.62 66.29 155.63 155.63 193.63<br />

Micro Irrigation Programme 56.00 21.93 35.00 35.00 45.00<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

9.25 6.36 9.20 9.20 10.18<br />

Coconut Development Board Programme 60.54 5.78 9.63 9.63 11.30<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 5.81 0.71 1.<strong>12</strong> 1.<strong>12</strong> 2.26<br />

Rastriya Krishi Vikas Yojana (RKVY) <strong>12</strong>.68 3.55 5.95 5.95 6.70<br />

Sub-Total 766.70 105.58 220.37 220.37 273.87<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

538.13 161.93 144.64 144.64 231.56<br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00 56.50<br />

Sub-Total 538.13 161.93 144.64 144.64 288.06<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 0.96 0.00 0.00 0.96<br />

Disaster Management Preparedness 18.50 0.00 0.00 0.00 18.50<br />

Skill up-gradation Training 9.05 0.72 0.72 0.72 3.80<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

4.<strong>12</strong> 0.06 2.00 2.00 2.00<br />

Disease Control Programme under ASCAD 162.46 0.00 81.23 81.23 81.23<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

6.<strong>12</strong> 0.59 0.55 0.82 0.55<br />

SMILE Training (Society for Management Information Learning & Extension) 11.43 0.85 0.69 0.84 5.00<br />

Exposure visit of farmers under SMILE 5.04 0.00 2.25 2.25 2.52<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc.<br />

RKVY<br />

2.00 0.00 1.00 1.00 1.00<br />

a) Strengthening of Livestock Service Information & Modernisation of office 506.08 0.00 190.79 90. 9 190.79 90. 9 315.15 3 5. 5<br />

b) Dairy Development 226.80 0.00 106.21 106.21 <strong>12</strong>0.59<br />

c) Fodder Development 86.30 0.00 40.20 40.20 46.50<br />

d) Goat Development 25.20 0.00 <strong>12</strong>.60 <strong>12</strong>.60 <strong>12</strong>.60<br />

e) Poultry Development 56.40 0.00 16.30 16.30 40.10<br />

Sub-Total 1<strong>12</strong>5.28 3.17 454.54 454.96 650.50<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 0.00 286.38 286.38 202.02<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 <strong>12</strong>4.00<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 2<strong>12</strong>.16<br />

Modernisation of Co-operative Processing Rice Mill 10.00 0.00 0.00 0.00 30.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 0.00 0.00 0.00 24.25<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives 345.00 0.00 139.00 139.00 131.00<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives<br />

Central <strong>Plan</strong><br />

25.00 0.00 8.00 8.00 <strong>12</strong>.20<br />

Construction of Rural Godown under RKVY 0.00 0.00 508.01 508.01 1427.92<br />

Sub-Total 1132.15 0.00 941.39 941.39 2163.55<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 11.38 11.38 <strong>12</strong>.50<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.00 0.50 0.50 1.00<br />

Assistance to Mechanisation Programme 19.00 0.00 25.50 25.50 5.00<br />

Survey and Investigation and establishment of FH & FLC 1319.00 0.00 0.00 0.00 667.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Safety measures for Marine Fishermen<br />

Centrally Sponsored <strong>Plan</strong><br />

20.00 0.00 0.00 0.00 5.00<br />

Development of Inland Fisheries & Aquaculture through FFDA 242.00 30.51 72.40 72.40 74.40<br />

Development of Brackish Water Aquaculture through FFDA 262.20 0.00 202.48 202.48 150.00<br />

Saving-cum-Relief Scheme 56.34 7.14 <strong>12</strong>.00 <strong>12</strong>.00 14.40<br />

Group Accident Insurance Scheme 64.71 15.90 15.90 15.90 16.50<br />

Low Cost House 50.00 0.00 0.00 0.00 50.00<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

54.00 0.00 <strong>12</strong>0.00 <strong>12</strong>0.00 28.50<br />

Introduction of Intermediate craft of Improved Design 60.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 24.00<br />

Sub-Total 2148.75 53.55 472.16 472.16 1048.30<br />

Total - I 7740.11 1720.79 7067.73 7068.15 9790.97<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 929.63 1500.00 1500.00 2000.00<br />

Construction of C.C Road (New Scheme) 1435.00 0.00 286.62 286.62 287.00<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

1019.33 616.46 402.87 402.87 442.50<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 4749.74 1055.61 1160.50 1160.50 <strong>12</strong>00.00<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MNREGS) 14372.15 1303.71 3556.18 3556.18 4218.56<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

976.18 <strong>12</strong>5.61 200.00 200.00 250.00<br />

<strong>12</strong>th Finance Commission Award 3393.65 2884.94 508.71 508.71 0.00<br />

13th Finance Commisssion Award 0.00 0.00 583.28 583.28 641.25<br />

Total - II 32446.05 6915.96 8198.16 8198.16 9039.31<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

300.10 4.76 131.50 131.50 163.75<br />

Grants under Provision to Article 275 (1) 233.64 39.04 70.00 70.00 86.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

549.82 79.53 135.00 135.00 180.00<br />

Grants under Provision to Article 275 (1) 0.00 0.00 13.73 13.73 15.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 11.50 21.65 21.65 20.00<br />

Total - III 1083.56 134.83 371.88 371.88 464.75<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 734.81 180.00 160.00 160.00 200.00<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 500.00 0.00 236.84 236.84 300.00<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 40.32 865.83 865.83 581.60<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 1634.06 3.00 385.61 385.61 261.25<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 92.71 92.71 92.71<br />

Saline Embankment Impro. projects (NABARD/RIDF- XIV) - Irri. Div. <strong>Balasore</strong> 0.00 650.00 650.00 650.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division, <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

<strong>12</strong>73.72 681.28 400.00 400.00 156.00<br />

Flood Management Programme (River Bank Protection Work ) Irri. Div. <strong>Balasore</strong> 0.00 1501.41 1086.19 1086.19 3143.13<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

2114.00 507.44 1522.00 1522.00 131.03<br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 218.40<br />

Total - IV 6256.59 3563.45 5399.18 5399.18 5084.<strong>12</strong><br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 420.29 462.30 462.30 485.42<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 297.00 326.70 326.70 343.04<br />

Total - V 0.00 717.29 789.00 789.00 828.46<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

20.49 3.27 4.59 4.59 4.90<br />

Prime Minister's Employment Generation Programme (PMEGP) 863.00 224.00 228.00 228.00 300.00<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 7.54 14.55 14.55 15.00<br />

Workshed-cum-Housing 22.50 6.75 16.10 16.10 17.50<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

18.40 0.00 7.82 7.82 9.42<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 62.33 2.00 21.28 21.28 8.76<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 76.10 1.37 11.00 11.00 11.50<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 60.64 9.16 9.20 9.20 9.50<br />

Health Insurance for weavers 41.00 9.94 11.55 11.55 11.73<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

9.06 1.18 1.20 1.20 1.23<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

10% Rebate on Handloom Products 75.00 8.30 9.00 9.00 10.00<br />

<strong>District</strong> Level Exhibition 20.00 0.00 2.00 2.00 2.00<br />

Total - VI 1335.11 273.51 336.29 336.29 401.54<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 228.75 45.00 56.25 56.25 60.00<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes 195.00 55.00 70.00 70.00 100.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 223.30 637.30 637.30 733.00<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

462.69 0.00 0.00 0.00 225.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 20359.56 5198.07 6007.00 6007.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

CConstruction t ti of f RRural l RRoads d & Bridge B id under d NABARD funding f di RIDF Project P j t 1059 1059.50 50 270 270.00 00 30 30.00 00 30 30.00 00 000 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 108.75 37.50 33.75 33.75 37.50<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 169.00 50.00 57.00 57.00 62.00<br />

Completion of incomplete road and Bridges and different Stretches of RIDF & other Schemes<br />

Central <strong>Plan</strong><br />

528.50 45.50 230.00 230.00 253.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 10480.00 2638.00 4842.00 4842.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1950.34 113.00 500.00 500.00 803.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 135.00 37.50 30.00 30.00 30.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 464.44 116.70 523.00 523.00 567.00<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 152<strong>12</strong>.00 5321.40 5186.00 5186.00 2500.00<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 515.92 1148.00 1148.00 10941.18<br />

Central <strong>Plan</strong><br />

Construction of road under Central Road Fund 0.00 0.00 702.00 702.00 1933.08<br />

One time Additional Central Assistance 0.00 0.00 225.00 225.00 150.00<br />

Total - VII 53540.45 14666.89 20277.30 20277.30 18394.76<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 18.00 9.78 10.00 10.00 <strong>12</strong>.10<br />

Communication & Building - Construction of quarters for forest guards 15.00 3.00 3.00 3.00 3.63<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Bamboo <strong>Plan</strong>tation 0.00 0.44 0.21 0.21 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 6.76 5.33 5.33 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 5.31 3.52 3.52 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 0.00 29.75 <strong>12</strong>.27 <strong>12</strong>.27 33.00<br />

Elephant Management Project 0.00 0.50 0.00 0.00 0.60<br />

Talsari - HVBA 0.00 15.55 0.00 0.00 17.10<br />

Total - VIII 33.00 71.08 34.33 34.33 66.43<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education 5.84 11.89 14.44 14.44 15.08<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 <strong>12</strong>.00<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 93.75<br />

Improvement/Modernization p / of ITI <strong>Balasore</strong> ( (Construction of boundary y wall, play p y gground,<br />

bore well,<br />

drainage system, cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

000 0.00 000 0.00 000 0.00 000 0.00 74 74.55 55<br />

Sarba Sikshya Abhiyan (SSA) 0.00 4445.18 5628.01 5628.01 5628.16<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 0.00 34.97 26.84 26.84 26.84<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

0.00 13.75 33.73 33.73 33.72<br />

National APP Training in ITI <strong>Balasore</strong> 32.25 0.98 3.75 3.75 4.50<br />

Sub-Total 38.09 4506.76 5706.77 5706.77 5888.60<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.10 0.18 0.18 0.20<br />

One time seed capital grant for development of Sports infrastructure 0.00 34.00 34.00 34.00 34.00<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 1.04 1.04 1.44<br />

<strong>Annual</strong> acquisition grant 0.00 3.10 3.10 3.10 3.10<br />

<strong>Annual</strong> operation grant 0.00 3.72 3.72 3.72 3.72<br />

Rural Sports Competition 0.00 7.00 7.60 7.60 7.60<br />

Prize Money for Rural Sports 0.00 0.00 6.30 6.30 6.30<br />

Sub-Total 0.00 47.92 55.94 55.94 56.36<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 94.80 99.54 99.54 142.47<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Urban Ayurvedic Health Services 0.00 0.00 0.00 0.00 0.00<br />

Primary Health Care (Rural) 603.00 145.00 154.00 154.00 179.25<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Reproductive Child Health (RCH) 0.00 733.38 806.72 806.72 977.72<br />

Immunization 0.00 31.41 34.55 34.55 29.64<br />

National Rural Health Mission (NRHM) initiatives 0.00 944.43 1038.87 1038.87 980.59<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 26.33 27.90 27.90 30.69<br />

National Vector Borne Disease Control Programme (NVBDCP) 0.00 108.23 111.98 111.98 <strong>12</strong>3.17<br />

Central <strong>Plan</strong><br />

National Programme for Control of Blindness (NPCB) 0.00 18.96 21.34 21.34 23.48<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 7.61 7.92 7.92 8.72<br />

National Leprosy Eradication Programme (NLEP) 0.00 6.34 6.84 6.84 7.52<br />

Sub-Total 1023.09 2116.48 2309.65 2309.65 2503.24<br />

4 RRural l Water W t Supply S l & Sanitation<br />

S it ti<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 844.44 161.10 238.50 238.50 209.82<br />

ARWSP-Public Water Supply Scheme 7931.49 852.36 1872.35 1872.35 2022.00<br />

Sub - Total 8775.93 1013.46 2110.85 2110.85 2231.82<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri 0.00 0.00 0.00 0.00 0.00<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of sources and laying of pipe 0.00 0.00 0.00 0.00 0.00<br />

Improvement of W/S to Nilgiri town 0.00 0.00 0.00 0.00 0.00<br />

Improvement of W/S to Soro town 0.00 0.00 0.00 0.00 0.00<br />

Improvement of W/S to Jaleswar town 0.00 0.00 0.00 0.00 0.00<br />

Improvement of water supply & S/I system of different non-residential office building & Govt. Institutions of 0.00 0.00 0.00 0.00 0.00<br />

Improvement of water supply & S/I system of different residential office building & Govt. Institutions of <strong>Balasore</strong>, 0.00 0.00 0.00 0.00 0.00<br />

Centrally Sponsored <strong>Plan</strong><br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 0.00 0.00 0.00 0.00 0.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to <strong>Balasore</strong> town from river 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 0.00 0.00 0.00 0.00<br />

Road Development & Maintenance 0.00 0.00 0.00 0.00 0.00<br />

Urban Greenery 0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 0.00 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 0.00 0.00 0.00<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 0.00 0.00 0.00 0.00<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Road Development Grant 0.00 0.00 0.00 0.00 0.00<br />

Road Maintenance Grant 0.00 0.00 0.00 0.00 0.00<br />

FDR Grant 0.00 0.00 0.00 0.00 0.00<br />

Incentive Grant 0.00 0.00 0.00 0.00 0.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Twelfth Finance Commission (TFC) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

1429.75 429.94 795.85 795.85 875.85<br />

Indira Awas Yojana (IAY) 19841.50 2464.06 7907.20 7907.20 8697.20<br />

Sub-Total 2<strong>12</strong>71.25 2894.00 8703.05 8703.05 9573.05<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.51 0.51 0.51 0.56<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 4.87 5.00 5.00 5.50<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 48.91 49.44 49.44 54.39<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 107.54 117.48 117.48 <strong>12</strong>9.23<br />

Post Matric Scholarship to SC Students 0.00 35.30 66.36 66.36 73.00<br />

Post Matric Scholarship to ST Students 0.00 11.88 13.08 13.08 14.39<br />

Development of SCs (OSFDC Section) 0.00 131.78 152.81 152.81 168.10<br />

Development of STs (OSFDC Section) 0.00 62.33 88.13 88.13 96.94<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 0.00 2.94 10.68 10.68 11.75<br />

Pre Matric Scholarship to OBC Students 0.00 4.79 863.29 863.29 949.62<br />

Post Matric Scholarship to OBC Students 0.00 0.00 42.74 42.74 47.01<br />

Pre Matric Scholarship to Minorities 0.00 7.16 48.97 48.97 53.87<br />

Post Matric Scholarship to Minorities 0.00 0.00 4.27 4.27 4.70<br />

Sub-Total 0.00 417.98 1462.74 1462.74 1609.03<br />

9 Social Welfare Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 992.54 355.70 277.50 277.50 355.70<br />

Old Age Pension 116.32 65.27 0.00 0.00 65.27<br />

Orissa Disability Pension 10.28 43.60 0.00 0.00 43.60<br />

Organising Single Window Camps 17.59 0.00 6.23 6.23 6.23<br />

Bi-cycle to girl students 272.<strong>12</strong> 1.29 0.94 0.94 0.94<br />

Mission Sakti 707.70 156.56 2.63 2.63 156.56<br />

Repair & Maintenance of AWC Building 56.42 7.69 8.25 8.25 7.69<br />

Reduction of Child Malnutrition 36.92 23.37 9.00 9.00 23.37<br />

Reduction of IMR 5.99 0.00 1.65 1.65 1.65<br />

Grant in Aid to Handicapped Welfare Institution 41.24 16.77 17.25 17.25 17.25<br />

Grant in Aid to Orphanages 284.54 66.57 75.86 75.86 75.86<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.01 0.00 0.26 0.26 0.26<br />

Medical Check up 1.20 0.00 0.45 0.45 0.45<br />

Sanitation 0.97 0.00 0.38 0.38 0.38<br />

Handicapped Scholarship 33.80 9.35 8.70 8.70 9.35<br />

Award to AWW 0.45 0.00 0.11 0.11 0.11<br />

Monitoring Mechanism & Evaluation 13.21 0.00 3.38 3.38 3.38<br />

Information Education Communication 8.04 0.00 2.25 2.25 2.25<br />

Medicine Kit 25.73 0.00 9.15 9.15 9.15<br />

Computer 0.42 0.00 0.15 0.15 0.15<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

1.13 0.00 0.38 0.38 0.26<br />

Supplementary Nutrition Programme 3489.77 1795.70 810.00 810.00 1795.70<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Anticipated<br />

Outlay Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Mid Day Meal Programme (Pry+UP) 2864.87 1469.47 675.00 675.00 1469.47<br />

Mid Day Meal Programme (Kitchen-cum-store) 2869.80 102.48 750.00 750.00 102.48<br />

Mid Day Meal Programme (Utensils) 217.70 8.70 63.11 63.11 8.70<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 15.43 15.38 3.75 3.75 15.38<br />

Mid Day Meal Programme (Transportation charges) 213.84 20.33 56.63 56.63 20.33<br />

Mid Day Meal Programme (Honorarium to cook & helper) 307.44 61.49 61.50 61.50 61.50<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

72.75 18.75 21.00 21.00 18.75<br />

IG National Old Age Pension (ACA to States) 1806.59 447.86 431.25 431.25 447.86<br />

National Family Benefit Scheme (ACA to States) 294.15 29.10 69.60 69.60 69.60<br />

Kishori Shakti Yojana 37.54 0.00 10.50 10.50 10.50<br />

National Disability Pension 15.00 0.00 0.38 0.38 0.38<br />

National Child Labour Project 0.00 5.65 79.04 79.04 79.04<br />

Sub-Total 14832.45 4721.04 3456.25 3456.25 4879.51<br />

Total - IX 45940 45940.81 81 15717 15717.65 65 23805 23805.25 25 23805 23805.25 25 26741 26741.60 60<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) <strong>12</strong>1.25 67.50 14.52 14.52 16.73<br />

Construction of Revenue Department Buildings (Residential) 55.83 16.75 9.09 9.09 10.46<br />

Construction of PHC Buildings (Non Residential) 15.87 0.00 7.38 7.38 8.49<br />

Construction of RD Department Buildings (Non Residential) 48.11 6.00 8.25 8.25 9.49<br />

Construction of Revenue Department Buildings (Non Residential) 133.67 57.92 36.08 36.08 39.68<br />

Construction of PHC Buildings (Residential) 24.41 <strong>12</strong>.64 5.63 5.63 6.15<br />

Construction of Revenue Department Buildings (Residential) 133.58 21.83 53.25 53.25 58.50<br />

Construction of Building (Non Residential) RD Division Jaleswar 45.00 16.23 20.54 20.54 22.50<br />

Construction of Health & RW Building (Residential) 75.41 25.73 14.25 14.25 15.75<br />

Construction & Maintenance of Buildings (Non Residential) 43.96 24.04 9.49 9.49 10.43<br />

Construction of RD Department Buildings (Residential) 45.95 0.00 21.37 21.37 24.58<br />

Total - X 743.03 248.62 199.83 199.83 222.74<br />

GRAND TOTAL 149118.70 44030.07 66478.95 66479.37 71034.68<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - III


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

GN Statement C (Part -II) ANNUAL PLAN <strong>2011</strong>-<strong>12</strong>: PROPOSED OUTLAYS (Urban)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at<br />

2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

Annexure - IV<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Rice Development 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Sugarcane Development 0.00 0.00 0.00 0.00 0.00<br />

Jute Technology Mission (MM-II) 0.00 0.00 0.00 0.00 0.00<br />

ISOPOM (Pulses) 0.00 0.00 0.00 0.00 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

SSeed d Vill Village Programme P 000 0.00 000 0.00 000 0.00 000 0.00 000 0.00<br />

Promotion of SRI programme 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 0.00 0.00 0.00 0.00 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 0.00 0.00 0.00<br />

National Food Security Mission (Pulses) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

National Horticulture Mission 0.00 0.00 0.00 0.00 0.00<br />

Micro Irrigation Programme 0.00 0.00 0.00 0.00 0.00<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Coconut Development Board Programme 0.00 0.00 0.00 0.00 0.00<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 0.00 0.00 0.00 0.00 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

4 Animal Husbandry & Dairy Development<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

State <strong>Plan</strong><br />

Bird Flu Training 0.00 0.00 0.00 0.00 0.00<br />

Disaster Management Preparedness 0.00 0.00 0.00 0.00 0.00<br />

Skill up-gradation Training 0.00 0.00 0.00 0.00 0.00<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Disease Control Programme under ASCAD 0.00 0.00 0.00 0.00 0.00<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

SMILE Training (Society for Management Information Learning & Extension) 0.00 0.00 0.00 0.00 0.00<br />

Exposure visit of farmers under SMILE 0.00 0.00 0.00 0.00 0.00<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc.<br />

RKVY<br />

0.00 0.00 0.00 0.00 0.00<br />

a) Strengthening of Livestock Service Information & Modernisation of office 0.00 0.00 0.00 0.00 0.00<br />

b) Dairy Development 0.00 0.00 0.00 0.00 0.00<br />

c) Fodder Development 0.00 0.00 0.00 0.00 0.00<br />

d) Goat Development 0.00 0.00 0.00 0.00 0.00<br />

e) Poultry Development 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 0.00 0.00 0.00 0.00 0.00<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 0.00<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 0.00<br />

Modernisation of Co-operative Processing Rice Mill 0.00 0.00 0.00 0.00 0.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 0.00 0.00 0.00 0.00 0.00<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives (PACs & RCMS) 0.00 0.00 0.00 0.00 0.00<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Construction of Rural Godown under RKVY 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 0.00 0.00 0.00<br />

Exhibition and Organisation of Buyer Seller meet 0.00 0.00 0.00 0.00 0.00<br />

Assistance to Mechanisation Programme 0.00 0.00 0.00 0.00 0.00<br />

Survey and Investigation and establishment of FH & FLC 0.00 0.00 0.00 0.00 0.00<br />

Safety measures for Marine Fishermen<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Development of Inland Fisheries & Aquaculture through FFDA 0.00 0.00 0.00 0.00 0.00<br />

Development of Brackish Water Aquaculture through FFDA 0.00 0.00 0.00 0.00 0.00<br />

Saving-cum-Relief Scheme 0.00 0.00 0.00 0.00 0.00<br />

Group Accident Insurance Scheme 0.00 0.00 0.00 0.00 0.00<br />

Low Cost House 0.00 0.00 0.00 0.00 0.00<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Introduction of Intermediate craft of Improved Design 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

Total - I 0.00 0.00 0.00 0.00 0.00<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 0.00 0.00 0.00 0.00 0.00<br />

Construction of C.C Road (New Scheme) 0.00 0.00 0.00 0.00 0.00<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 0.00 0.00 0.00 0.00 0.00<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MNREGS) 0.00 0.00 0.00 0.00 0.00<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

<strong>12</strong>th Finance Commission Award 0.00 0.00 0.00 0.00 0.00<br />

13th Finance Commisssion Award 0.00 0.00 0.00 0.00 0.00<br />

Total - II 0.00 0.00 0.00 0.00 0.00<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Grants under Provision to Article 275 (1) 0.00 0.00 0.00 0.00 0.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Grants under Provision to Article 275 (1) 0.00 0.00 0.00 0.00 0.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 0.00 0.00 0.00 0.00<br />

Total - III 0.00 0.00 0.00 0.00 0.00<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 0.00 0.00 0.00 0.00 0.00<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 0.00 0.00 0.00 0.00<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 0.00 0.00 0.00 0.00 0.00<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 0.00 0.00 0.00<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 0.00 0.00 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Flood Management Programme (River Bank Protection Work ) 0.00 0.00 0.00 0.00 0.00<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 0.00<br />

Total - IV 0.00 0.00 0.00 0.00 0.00<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 0.00 0.00 0.00 0.00<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 140.00<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 0.00 0.00 0.00 0.00<br />

Total - V 0.00 0.00 0.00 0.00 140.00<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Prime Minister's Employment Generation Programme (PMEGP) 0.00 0.00 0.00 0.00 0.00<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 0.00 0.00 0.00 0.00 0.00<br />

Workshed-cum-Housing 0.00 0.00 0.00 0.00 0.00<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 0.00 0.00 0.00 0.00 0.00<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 0.00 0.00 0.00 0.00 0.00<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 0.00 0.00 0.00 0.00 0.00<br />

Health Insurance for weavers 0.00 0.00 0.00 0.00 0.00<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

10% Rebate on Handloom Products 0.00 0.00 0.00 0.00 0.00<br />

<strong>District</strong> Level Exhibition 0.00 0.00 0.00 0.00 0.00<br />

Total - VI 0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 76.25 15.00 18.75 18.75 20.00<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes 0.00 0.00 0.00 0.00 0.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 0.00 0.00 0.00 0.00 0.00<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

154.23 0.00 0.00 0.00 75.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00 0.00 0.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 0.00 0.00 0.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 36.25 <strong>12</strong>.50 11.25 11.25 <strong>12</strong>.50<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 0.00 0.00 0.00 0.00 0.00<br />

Completion of incomplete road and Bridges and different Stretches of RIDF & other Schemes 0.00 0.00 0.00 0.00 0.00<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00 0.00 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 0.00 0.00 0.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 45.00 <strong>12</strong>.50 10.00 10.00 10.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 0.00 0.00 0.00 0.00 0.00<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Construction of road under Central Road Fund 0.00 0.00 234.00 234.00 644.36<br />

One time Additional Central Assistance 0.00 0.00 75.00 75.00 50.00<br />

Total - VII 311.73 40.00 349.00 349.00 811.86<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 0.00 0.00 0.00 0.00 0.00<br />

Communication & Building - Construction of quarters for forest guards 0.00 0.00 0.00 0.00 0.00<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00 0.00 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00 0.00 0.00 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Development of National Park, Sanctuary & Natural Reserves 0.00 0.00 0.00 0.00 0.00<br />

Elephant Management Project 0.00 0.00 0.00 0.00 0.00<br />

Talsari - HVBA 0.00 0.00 0.00 0.00 0.00<br />

Total - VIII 0.00 0.00 0.00 0.00 0.00<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education 1.95 3.96 4.81 4.81 5.03<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 4.00<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 31.25<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play ground, bore 0.00 0.00 0.00 0.00 24.85<br />

Centrally Sponsored <strong>Plan</strong><br />

Sarba Sikshya Abhiyan (SSA) 0.00 1481.73 1876.00 1876.00 1876.05<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 0.00 11.66 8.95 8.95 8.95<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

0.00 4.58 11.24 11.24 11.24<br />

National APP Training in ITI <strong>Balasore</strong> 10.75 0.33 1.25 1.25 1.50<br />

Sub-Total <strong>12</strong>.70 1502.25 1902.25 1902.25 1962.87<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

One time seed capital grant for development of Sports infrastructure 0.00 0.00 0.00 0.00 0.00<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

<strong>Annual</strong> acquisition grant 0.00 0.00 0.00 0.00 0.00<br />

<strong>Annual</strong> operation grant 0.00 0.00 0.00 0.00 0.00<br />

Rural Sports Competition 0.00 0.00 0.00 0.00 0.00<br />

Prize Money for Rural Sports 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 0.00 0.00 0.00 0.00 0.00<br />

Urban Ayurvedic Health Services 91.28 28.50 29.90 29.90 35.65<br />

Primary Health Care (Rural) 0.00 0.00 0.00 0.00 0.00<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

28.00 5.45 5.61 5.61 14.21<br />

Reproductive Child Health (RCH) 0.00 244.46 268.91 268.91 325.91<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Immunization 0.00 10.47 11.52 11.52 9.88<br />

National Rural Health Mission (NRHM) initiatives 0.00 0.00 0.00 0.00 0.00<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 8.78 9.30 9.30 10.23<br />

National Vector Borne Disease Control Programme (NVBDCP) 0.00 36.08 37.33 37.33 41.06<br />

Central <strong>Plan</strong><br />

National Programme for Control of Blindness (NPCB) 0.00 6.32 7.11 7.11 7.83<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 2.54 2.64 2.64 2.91<br />

National Leprosy Eradication Programme (NLEP) 0.00 2.11 2.28 2.28 2.51<br />

Sub-Total 119.28 344.70 374.59 374.59 450.17<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 0.00 0.00 0.00 0.00 0.00<br />

ARWSP-Public Water Supply Scheme 0.00 0.00 0.00 0.00 0.00<br />

Sub - Total 0.00 0.00 0.00 0.00 0.00<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar, 100.00 9.00 50.00 50.00 41.00<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of sources and 300.00 29.00 200.00 200.00 71.00<br />

Improvement of W/S to Nilgiri town 1118.42 0.00 200.00 200.00 300.00<br />

Improvement of W/S to Soro town 192.00 0.00 92.00 92.00 100.00<br />

Improvement of W/S to Jaleswar town 160.00 0.00 60.00 60.00 100.00<br />

Improvement of water supply & S/I system of different non-residential office building & Govt. 200.00 19.20 80.80 80.80 100.00<br />

Improvement of water supply & S/I system of different residential office building & Govt. 200.00 9.00 91.00 91.00 100.00<br />

Centrally Sponsored <strong>Plan</strong><br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 1587.58 0.00 200.00 200.00 300.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to <strong>Balasore</strong> town 5442.39 0.00 200.00 200.00 300.00<br />

Sub-Total 9300.39 66.20 1173.80 1173.80 14<strong>12</strong>.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 29.31 11.00 11.00 <strong>12</strong>.10<br />

Road Development & Maintenance 0.00 82.67 90.87 90.87 99.96<br />

Urban Greenery 0.00 10.00 11.00 11.00 <strong>12</strong>.10<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 6.94 7.63 7.63 8.39<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 288.13 316.94 316.94 348.63<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 54.80 60.28 60.28 66.31<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 39.97 43.96 43.96 48.36<br />

National Urban Information System (NUIS) 0.00 0.30 0.30 0.30 0.33<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 138.07 149.45 165.68 198.81<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 17.69 9.49 19.46 23.35<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 20.24 20.24 23.47<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 35.00 38.00 38.00 41.80<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 13.00 10.00 10.00 11.00<br />

Road Development Grant 0.00 36.65 37.59 37.59 45.00<br />

Road Maintenance Grant 0.00 14.47 17.67 17.67 20.00<br />

FDR Grant 0.00 0.00 20.00 20.00 20.00<br />

Incentive Grant 0.00 19.73 25.00 25.00 30.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 5.00 20.00 20.00 25.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 13.63 25.00 25.00 50.00<br />

Twelfth Finance Commission (TFC) 0.00 15.41 27.00 27.00 35.00<br />

Sub-Total 0.00 820.77 941.42 967.62 1119.61<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00<br />

Indira Awas Yojana (IAY) 0.00 0.00 0.00 0.00 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 0.00<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.17 0.17 0.17 0.19<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 1.62 1.67 1.67 1.83<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 16.30 16.48 16.48 18.13<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 35.85 39.16 39.16 43.08<br />

Post Matric Scholarship to SC Students 0.00 11.77 22.<strong>12</strong> 22.<strong>12</strong> 24.33<br />

Post Matric Scholarship to ST Students 0.00 3.96 4.36 4.36 4.80<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Development of SCs (OSFDC Section) 0.00 43.93 50.94 50.94 56.03<br />

Development of STs (OSFDC Section) 0.00 20.78 29.38 29.38 32.31<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 0.00 0.98 3.56 3.56 3.92<br />

Pre Matric Scholarship to OBC Students 0.00 1.60 287.76 287.76 316.54<br />

Post Matric Scholarship to OBC Students 0.00 0.00 14.25 14.25 15.67<br />

Pre Matric Scholarship to Minorities 0.00 2.39 16.32 16.32 17.96<br />

Post Matric Scholarship to Minorities 0.00 0.00 1.42 1.42 1.57<br />

Sub-Total 0.00 139.33 487.58 487.58 536.34<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 330.85 118.57 92.50 92.50 118.57<br />

Old Age Pension 38.77 21.76 0.00 0.00 21.76<br />

Orissa Disability Pension 3.43 14.53 0.00 0.00 14.53<br />

Organising Single Window Camps 5.86 0.00 2.08 2.08 2.08<br />

Bi-cycle to girl students 90.71 0.43 0.31 0.31 0.31<br />

Mission Sakti 235.90 52.19 0.88 0.88 52.19<br />

Repair & Maintenance of AWC Building 18.81 2.56 2.75 2.75 2.56<br />

Reduction of Child Malnutrition <strong>12</strong>.31 7.79 3.00 3.00 7.79<br />

Reduction of IMR 2.00 0.00 0.55 0.55 0.55<br />

Grant in Aid to Handicapped Welfare Institution 13.75 5.59 5.75 5.75 5.75<br />

Grant in Aid to Orphanages 94.85 22.19 25.29 25.29 25.29<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 0.34 0.00 0.09 0.09 0.09<br />

Medical Check up 0.40 0.00 0.15 0.15 0.15<br />

Sanitation 0.32 0.00 0.13 0.13 0.13<br />

Handicapped Scholarship 11.27 3.<strong>12</strong> 2.90 2.90 3.<strong>12</strong><br />

Award to AWW 0.15 0.00 0.04 0.04 0.04<br />

Monitoring Mechanism & Evaluation 4.40 0.00 1.13 1.13 1.13<br />

Information Education Communication 2.68 0.00 0.75 0.75 0.75<br />

Medicine Kit 8.58 0.00 3.05 3.05 3.05<br />

Computer 0.14 0.00 0.05 0.05 0.05<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

0.38 0.00 0.13 0.13 0.09<br />

Supplementary Nutrition Programme 1163.26 598.57 270.00 270.00 598.57<br />

Mid Day Meal Programme (Pry+UP) 954.96 489.82 225.00 225.00 489.82<br />

Mid Day Meal Programme (Kitchen-cum-store) 956.60 34.16 250.00 250.00 34.16<br />

Mid Day Meal Programme (Utensils) 72.57 2.90 21.04 21.04 2.90<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 5.14 5.13 1.25 1.25 5.13<br />

Mid Day Meal Programme (Transportation charges) 71.28 6.78 18.88 18.88 6.78<br />

Mid Day Meal Programme (Honorarium to cook & helper) 102.48 20.50 20.50 20.50 20.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>) <strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Projected Outlay (at 10 Actual<br />

2006-07 prices) Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 4 5 6 7<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

24.25 6.25 7.00 7.00 6.25<br />

IG National Old Age Pension (ACA to States) 602.20 149.29 143.75 143.75 149.29<br />

National Family Benefit Scheme (ACA to States) 98.05 9.70 23.20 23.20 23.20<br />

Kishori Shakti Yojana <strong>12</strong>.51 0.00 3.50 3.50 3.50<br />

National Disability Pension 5.00 0.00 0.13 0.13 0.13<br />

National Child Labour Project 0.00 1.88 26.35 26.35 26.35<br />

Sub-Total 4944.15 1573.68 1152.09 1152.09 1626.50<br />

Total - IX 14376.52 4446.93 6031.73 6057.93 7107.50<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) 40.42 22.50 4.84 4.84 5.58<br />

Construction of Revenue Department Buildings (Residential) 18.61 5.58 3.03 3.03 3.49<br />

Construction of PHC Buildings (Non Residential) 5.29 0.00 2.46 2.46 2.83<br />

Construction of RD Department Buildings (Non Residential) 16.04 2.00 2.75 2.75 3.16<br />

Construction of Revenue Department Buildings (Non Residential) 44.56 19.31 <strong>12</strong>.03 <strong>12</strong>.03 13.23<br />

Construction of PHC Buildings (Residential) 8.14 4.21 1.88 1.88 2.05<br />

Construction of Revenue Department Buildings (Residential) 44.53 7.28 17.75 17.75 19.50<br />

Construction of Building (Non Residential) RD Division Jaleswar 15.00 5.41 6.85 6.85 7.50<br />

Construction of Health & RW Building (Residential) 25.14 8.58 4.75 4.75 5.25<br />

Construction & Maintenance of Buildings (Non Residential) 14.65 8.01 3.16 3.16 3.48<br />

Construction of RD Department Buildings (Residential) 15.32 0.00 7.<strong>12</strong> 7.<strong>12</strong> 8.19<br />

Total - X 247.68 82.87 66.61 66.61 74.25<br />

GRAND TOTAL 14935.93 4569.80 6447.34 6473.54 8133.61<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IV


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

GN Statement C (Part- III) ANNUAL PLAN <strong>2011</strong>-<strong>12</strong>: PROPOSED OUTLAYS (Rural+Urban)<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

Annexure - V<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

528.96 519.00 817.80 817.80 828.00<br />

Work <strong>Plan</strong>-Rice Development 69.02 5.48 8.91 8.91 10.72<br />

Work <strong>Plan</strong>-Sugarcane Development 1.44 0.00 2.26 2.26 2.59<br />

Jute Technology Mission (MM-II) 93.99 11.58 25.01 25.01 27.51<br />

ISOPOM (Pulses) 26.84 7.70 <strong>12</strong>.57 <strong>12</strong>.57 0.00<br />

ISOPOM (Oil Seeds) 583.45 216.84 248.14 248.14 272.96<br />

Central <strong>Plan</strong> ffff<br />

Seed Village Programme 133.15 7.29 51.53 51.53 56.68<br />

Promotion of SRI programme 0.00 3.60 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 592.25 <strong>12</strong>8.62 182.59 182.59 211.26<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 496.45 3411.04 3411.04 3700.05<br />

National Food Security Mission (Pulses) 0.00 0.00 74.78 74.78 256.92<br />

Sub-Total 2029.11 1396.56 4834.63 4834.63 5366.69<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.96 3.84 3.84 4.80<br />

National Horticulture Mission 617.62 66.29 155.63 155.63 193.63<br />

Micro Irrigation Programme 56.00 21.93 35.00 35.00 45.00<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

9.25 6.36 9.20 9.20 10.18<br />

Coconut Development Board Programme 60.54 5.78 9.63 9.63 11.30<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 5.81 0.71 1.<strong>12</strong> 1.<strong>12</strong> 2.26<br />

Rastriya Krishi Vikas Yojana (RKVY) <strong>12</strong>.68 3.55 5.95 5.95 6.70<br />

Sub-Total 766.70 105.58 220.37 220.37 273.87<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

538.13 161.93 144.64 144.64 231.56<br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00 56.50<br />

Sub-Total 538.13 161.93 144.64 144.64 288.06<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 0.96 0.00 0.00 0.96<br />

Disaster Management Preparedness 18.50 0.00 0.00 0.00 18.50<br />

Skill up-gradation Training 9.05 0.72 0.72 0.72 3.80<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

4.<strong>12</strong> 0.06 2.00 2.00 2.00<br />

Disease Control Programme under ASCAD 162.46 0.00 81.23 81.23 81.23<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

6.<strong>12</strong> 0.59 0.55 0.82 0.55<br />

SMILE Training (Society for Management Information Learning & Extension) 11.43 0.85 0.69 0.84 5.00<br />

Exposure visit of farmers under SMILE 5.04 0.00 2.25 2.25 2.52<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc.<br />

RKVY<br />

2.00 0.00 1.00 1.00 1.00<br />

a) ) Strengthening g g of Livestock Service Information & Modernisation of office 506.08 0.00 190.79 190.79 315.15<br />

b) Dairy Development 226.80 0.00 106.21 106.21 <strong>12</strong>0.59<br />

c) Fodder Development 86.30 0.00 40.20 40.20 46.50<br />

d) Goat Development 25.20 0.00 <strong>12</strong>.60 <strong>12</strong>.60 <strong>12</strong>.60<br />

e) Poultry Development 56.40 0.00 16.30 16.30 40.10<br />

Sub-Total 1<strong>12</strong>5.28 3.17 454.54 454.96 650.50<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 0.00 286.38 286.38 202.02<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 <strong>12</strong>4.00<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 2<strong>12</strong>.16<br />

Modernisation of Co-operative Processing Rice Mill 10.00 0.00 0.00 0.00 30.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 0.00 0.00 0.00 24.25<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives 345.00 0.00 139.00 139.00 131.00<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives<br />

Central <strong>Plan</strong><br />

25.00 0.00 8.00 8.00 <strong>12</strong>.20<br />

Construction of Rural Godown under RKVY 0.00 0.00 508.01 508.01 1427.92<br />

Sub-Total 1132.15 0.00 941.39 941.39 2163.55<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 11.38 11.38 <strong>12</strong>.50<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.00 0.50 0.50 1.00<br />

Assistance to Mechanisation Programme 19.00 0.00 25.50 25.50 5.00<br />

Survey and Investigation and establishment of fishing Harbour & Fish landing Centres 1319.00 0.00 0.00 0.00 667.00<br />

Safety measures for Marine Fishermen 20.00 0.00 0.00 0.00 5.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture through FFDA (Programme Component) 242.00 30.51 72.40 72.40 74.40<br />

Development of Brackish Water Aquaculture through FFDA 262.20 0.00 202.48 202.48 150.00<br />

Saving-cum-Relief Scheme 56.34 7.14 <strong>12</strong>.00 <strong>12</strong>.00 14.40<br />

Group Accident Insurance Scheme 64.71 15.90 15.90 15.90 16.50<br />

Low Cost House 50.00 0.00 0.00 0.00 50.00<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

54.00 0.00 <strong>12</strong>0.00 <strong>12</strong>0.00 28.50<br />

Introduction of Intermediate craft of Improved Design 60.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 24.00<br />

Sub-Total 2148.75 53.55 472.16 472.16 1048.30<br />

Total - I 7740.11 1720.79 7067.73 7068.15 9790.97<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 929.63 1500.00 1500.00 2000.00<br />

Construction of C.C Road (New ( Scheme) )<br />

1435.00 0.00 286.62 286.62 287.00<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

1019.33 616.46 402.87 402.87 442.50<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 4749.74 1055.61 1160.50 1160.50 <strong>12</strong>00.00<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MNREGS) 14372.15 1303.71 3556.18 3556.18 4218.56<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

976.18 <strong>12</strong>5.61 200.00 200.00 250.00<br />

<strong>12</strong>th Finance Commission Award 3393.65 2884.94 508.71 508.71 0.00<br />

13th Finance Commisssion Award 0.00 0.00 583.28 583.28 641.25<br />

Total - II 32446.05 6915.96 8198.16 8198.16 9039.31<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

300.10 4.76 131.50 131.50 163.75<br />

Grants under Provision to Article 275 (1) 233.64 39.04 70.00 70.00 86.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

549.82 79.53 135.00 135.00 180.00<br />

Grants under Provision to Article 275 (1) 0.00 0.00 13.73 13.73 15.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 11.50 21.65 21.65 20.00<br />

Total - III 1083.56 134.83 371.88 371.88 464.75<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 734.81 180.00 160.00 160.00 200.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 500.00 0.00 236.84 236.84 300.00<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 40.32 865.83 865.83 581.60<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 1634.06 3.00 385.61 385.61 261.25<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 92.71 92.71 92.71<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 650.00 650.00 650.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division, <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

<strong>12</strong>73.72 681.28 400.00 400.00 156.00<br />

Flood Management Programme (River Bank Protection Work ) Irrigation Division, <strong>Balasore</strong> 0.00 1501.41 1086.19 1086.19 3143.13<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

2114.00 507.44 1522.00 1522.00 131.03<br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 218.40<br />

Total - IV 6256.59 3563.45 5399.18 5399.18 5084.<strong>12</strong><br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju j Gram Jyoti y Yojana j<br />

0.00 420.29 462.30 462.30 485.42<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 140.00<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 297.00 326.70 326.70 343.04<br />

Total - V 0.00 717.29 789.00 789.00 968.46<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

20.49 3.27 4.59 4.59 4.90<br />

Prime Minister's Employment Generation Programme (PMEGP) 863.00 224.00 228.00 228.00 300.00<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 7.54 14.55 14.55 15.00<br />

Workshed-cum-Housing 22.50 6.75 16.10 16.10 17.50<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

18.40 0.00 7.82 7.82 9.42<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 62.33 2.00 21.28 21.28 8.76<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 76.10 1.37 11.00 11.00 11.50<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 60.64 9.16 9.20 9.20 9.50<br />

Health Insurance for weavers 41.00 9.94 11.55 11.55 11.73<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

9.06 1.18 1.20 1.20 1.23<br />

10% Rebate on Handloom Products 75.00 8.30 9.00 9.00 10.00<br />

<strong>District</strong> Level Exhibition 20.00 0.00 2.00 2.00 2.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Total - VI 1335.11 273.51 336.29 336.29 401.54<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 305.00 60.00 75.00 75.00 80.00<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes 195.00 55.00 70.00 70.00 100.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 223.30 637.30 637.30 733.00<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

616.92 0.00 0.00 0.00 300.00<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 20359.56 5198.07 6007.00 6007.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1059.50 270.00 30.00 30.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 145.00 50.00 45.00 45.00 50.00<br />

Construction of Rural Road (Improvement/Widening/Critical ( p / g/ Roads) )<br />

169.00 50.00 57.00 57.00 62.00<br />

Completion of incomplete road and Bridges and different Stretches of RIDF & other Schemes 528.50 45.50 230.00 230.00 253.00<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 10480.00 2638.00 4842.00 4842.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1950.34 113.00 500.00 500.00 803.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 180.00 50.00 40.00 40.00 40.00<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 464.44 116.70 523.00 523.00 567.00<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 152<strong>12</strong>.00 5321.40 5186.00 5186.00 2500.00<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 515.92 1148.00 1148.00 10941.18<br />

Central <strong>Plan</strong><br />

Construction of road under Central Road Fund 0.00 0.00 936.00 936.00 2577.44<br />

One time Additional Central Assistance 0.00 0.00 300.00 300.00 200.00<br />

Total - VII 53852.18 14706.89 20626.30 20626.30 19206.62<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 18.00 9.78 10.00 10.00 <strong>12</strong>.10<br />

Communication & Building - Construction of quarters for forest guards 15.00 3.00 3.00 3.00 3.63<br />

Bamboo <strong>Plan</strong>tation 0.00 0.44 0.21 0.21 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 6.76 5.33 5.33 0.00<br />

Wildlife Protection and Conservation Measures 0.00 5.31 3.52 3.52 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Central <strong>Plan</strong><br />

Development of National Park, Sanctuary & Natural Reserves 0.00 29.75 <strong>12</strong>.27 <strong>12</strong>.27 33.00<br />

Elephant Management Project 0.00 0.50 0.00 0.00 0.60<br />

Talsari - HVBA 0.00 15.55 0.00 0.00 17.10<br />

Total - VIII 33.00 71.08 34.33 34.33 66.43<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education 7.79 15.85 19.25 19.25 20.10<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 16.00<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 <strong>12</strong>5.00<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play ground, bore well, drainage system,<br />

cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 99.40<br />

Sarba Sikshya Abhiyan (SSA) 0.00 5926.90 7504.01 7504.01 7504.21<br />

National i l Programme for f Education d i of f Gi Girls l at Elementary l Level l (NPEGEL) ( G )<br />

0.00 46.62 35.79 35.79 35.79<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

0.00 18.33 44.97 44.97 44.97<br />

National APP Training in ITI <strong>Balasore</strong> 43.00 1.31 5.00 5.00 6.00<br />

Sub-Total 50.79 6009.01 7609.02 7609.02 7851.47<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.10 0.18 0.18 0.20<br />

One time seed capital grant for development of Sports infrastructure 0.00 34.00 34.00 34.00 34.00<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 1.04 1.04 1.44<br />

<strong>Annual</strong> acquisition grant 0.00 3.10 3.10 3.10 3.10<br />

<strong>Annual</strong> operation grant 0.00 3.72 3.72 3.72 3.72<br />

Rural Sports Competition 0.00 7.00 7.60 7.60 7.60<br />

Prize Money for Rural Sports 0.00 0.00 6.30 6.30 6.30<br />

Sub-Total 0.00 47.92 55.94 55.94 56.36<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 94.80 99.54 99.54 142.47<br />

Urban Ayurvedic Health Services 91.28 28.50 29.90 29.90 35.65<br />

Primary Health Care (Rural) 603.00 145.00 154.00 154.00 179.25<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

28.00 5.45 5.61 5.61 14.21<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Reproductive Child Health (RCH) 0.00 977.84 1075.62 1075.62 1303.62<br />

Immunization 0.00 41.88 46.07 46.07 39.52<br />

National Rural Health Mission (NRHM) initiatives 0.00 944.43 1038.87 1038.87 980.59<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 35.10 37.20 37.20 40.92<br />

National Vector Borne Disease Control Programme (NVBDCP) 0.00 144.30 149.30 149.30 164.23<br />

Central <strong>Plan</strong><br />

National Programme for Control of Blindness (NPCB) 0.00 25.28 28.45 28.45 31.30<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 10.15 10.56 10.56 11.62<br />

National Leprosy Eradication Programme (NLEP) 0.00 8.45 9.<strong>12</strong> 9.<strong>12</strong> 10.03<br />

Sub-Total 1142.37 2461.18 2684.24 2684.24 2953.41<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 844.44 161.10 238.50 238.50 209.82<br />

ARWSP-Public Water Supply Scheme 7931.49 852.36 1872.35 1872.35 2022.00<br />

Sub - Total 8775.93 1013.46 2110.85 2110.85 2231.82<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri ULBs 100.00 9.00 50.00 50.00 41.00<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of sources and laying of pipe lines in<br />

different ULBs<br />

300.00 29.00 200.00 200.00 71.00<br />

Improvement of W/S to Nilgiri town 1118.42 0.00 200.00 200.00 300.00<br />

Improvement of W/S to Soro town 192.00 0.00 92.00 92.00 100.00<br />

Improvement of W/S to Jaleswar town 160.00 0.00 60.00 60.00 100.00<br />

Improvement of water supply & S/I system of different non-residential office building & Govt. Institutions of <strong>Balasore</strong>,<br />

Soro, Nilgiri & Jaleswar ULBs<br />

200.00 19.20 80.80 80.80 100.00<br />

Improvement of water supply & S/I system of different residential office building & Govt. Institutions of <strong>Balasore</strong>, Soro,<br />

Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

200.00 9.00 91.00 91.00 100.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 1587.58 0.00 200.00 200.00 300.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP 5442.39 0.00 200.00 200.00 300.00<br />

Sub-Total 9300.39 66.20 1173.80 1173.80 14<strong>12</strong>.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 29.31 11.00 11.00 <strong>12</strong>.10<br />

Road Development & Maintenance 0.00 82.67 90.87 90.87 99.96<br />

Urban Greenery 0.00 10.00 11.00 11.00 <strong>12</strong>.10<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 6.94 7.63 7.63 8.39<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 288.13 316.94 316.94 348.63<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 54.80 60.28 60.28 66.31<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 39.97 43.96 43.96 48.36<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.00 0.30 0.30 0.30 0.33<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 138.07 149.45 165.68 198.81<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 17.69 9.49 19.46 23.35<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 20.24 20.24 23.47<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 35.00 38.00 38.00 41.80<br />

Swarna Jayanti y Sahari Rojagar j g Yojana j (SJSRY) ( )<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 13.00 10.00 10.00 11.00<br />

Road Development Grant 0.00 36.65 37.59 37.59 45.00<br />

Road Maintenance Grant 0.00 14.47 17.67 17.67 20.00<br />

FDR Grant 0.00 0.00 20.00 20.00 20.00<br />

Incentive Grant 0.00 19.73 25.00 25.00 30.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 5.00 20.00 20.00 25.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 13.63 25.00 25.00 50.00<br />

Twelfth Finance Commission (TFC) 0.00 15.41 27.00 27.00 35.00<br />

Sub-Total 0.00 820.77 941.42 967.62 1119.61<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

1429.75 429.94 795.85 795.85 875.85<br />

Indira Awas Yojana (IAY) 19841.50 2464.06 7907.20 7907.20 8697.20<br />

Sub-Total 2<strong>12</strong>71.25 2894.00 8703.05 8703.05 9573.05<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.68 0.68 0.68 0.75<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 6.49 6.66 6.66 7.33<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 65.21 65.92 65.92 72.52<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 143.38 156.64 156.64 172.30<br />

Post Matric Scholarship to SC Students 0.00 47.06 88.48 88.48 97.33<br />

Post Matric Scholarship to ST Students 0.00 15.84 17.44 17.44 19.18<br />

Development of SCs (OSFDC Section) 0.00 175.70 203.75 203.75 224.13<br />

Development of STs (OSFDC Section) 0.00 83.10 117.50 117.50 <strong>12</strong>9.25<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 0.00 3.92 14.24 14.24 15.66<br />

Pre Matric Scholarship to OBC Students 0.00 6.39 1151.05 1151.05 <strong>12</strong>66.16<br />

Post Matric Scholarship to OBC Students 0.00 0.00 56.98 56.98 62.68<br />

Pre Matric Scholarship to Minorities 0.00 9.54 65.29 65.29 71.82<br />

Post Matric Scholarship to Minorities 0.00 0.00 5.69 5.69 6.26<br />

Sub-Total 0.00 557.31 1950.32 1950.32 2145.37<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 1323.38 474.26 370.00 370.00 474.26<br />

Old Age g Pension 155.09 87.02 0.00 0.00 87.02<br />

Orissa Disability Pension 13.70 58.13 0.00 0.00 58.13<br />

Organising Single Window Camps 23.45 0.00 8.30 8.30 8.30<br />

Bi-cycle to girl students 362.82 1.72 1.25 1.25 1.25<br />

Mission Sakti 943.60 208.75 3.50 3.50 208.75<br />

Repair & Maintenance of AWC Building 75.22 10.25 11.00 11.00 10.25<br />

Reduction of Child Malnutrition 49.23 31.16 <strong>12</strong>.00 <strong>12</strong>.00 31.16<br />

Reduction of IMR 7.99 0.00 2.20 2.20 2.20<br />

Grant in Aid to Handicapped Welfare Institution 54.99 22.36 23.00 23.00 23.00<br />

Grant in Aid to Orphanages 379.38 88.76 101.15 101.15 101.15<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.35 0.00 0.35 0.35 0.35<br />

Medical Check up 1.60 0.00 0.60 0.60 0.60<br />

Sanitation 1.29 0.00 0.50 0.50 0.50<br />

Handicapped Scholarship 45.06 <strong>12</strong>.47 11.60 11.60 <strong>12</strong>.47<br />

Award to AWW 0.60 0.00 0.15 0.15 0.15<br />

Monitoring Mechanism & Evaluation 17.61 0.00 4.50 4.50 4.50<br />

Information Education Communication 10.72 0.00 3.00 3.00 3.00<br />

Medicine Kit 34.30 0.00 <strong>12</strong>.20 <strong>12</strong>.20 <strong>12</strong>.20<br />

Computer 0.56 0.00 0.20 0.20 0.20<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

1.50 0.00 0.50 0.50 0.35<br />

Supplementary Nutrition Programme 4653.02 2394.26 1080.00 1080.00 2394.26<br />

Mid Day Meal Programme (Pry+UP) 3819.83 1959.29 900.00 900.00 1959.29<br />

Mid Day Meal Programme (Kitchen-cum-store) 3826.40 136.64 1000.00 1000.00 136.64<br />

Mid Day Meal Programme (Utensils) 290.27 11.60 84.15 84.15 11.60<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed Outlay<br />

0 1 2 3 4 5 6<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.57 20.50 5.00 5.00 20.50<br />

Mid Day Meal Programme (Transportation charges) 285.<strong>12</strong> 27.10 75.50 75.50 27.10<br />

Mid Day Meal Programme (Honorarium to cook & helper) 409.92 81.98 82.00 82.00 82.00<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

97.00 25.00 28.00 28.00 25.00<br />

IG National Old Age Pension (ACA to States) 2408.78 597.14 575.00 575.00 597.14<br />

National Family Benefit Scheme (ACA to States) 392.20 38.80 92.80 92.80 92.80<br />

Kishori Shakti Yojana 50.05 0.00 14.00 14.00 14.00<br />

National Disability Pension 20.00 0.00 0.50 0.50 0.50<br />

National Child Labour Project 0.00 7.53 105.39 105.39 105.39<br />

Sub-Total 19776.60 6294.72 4608.34 4608.34 6506.01<br />

Total - IX 60317.33 20164.57 29836.98 29863.18 33849.10<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department p Buildings g ( (Non Residential) )<br />

161.66 90.00 19.36 19.36 22.30<br />

Construction of Revenue Department Buildings (Residential) 74.44 22.33 <strong>12</strong>.<strong>12</strong> <strong>12</strong>.<strong>12</strong> 13.94<br />

Construction of PHC Buildings (Non Residential) 21.16 0.00 9.84 9.84 11.32<br />

Construction of RD Department Buildings (Non Residential) 64.15 8.00 11.00 11.00 <strong>12</strong>.65<br />

Construction of Revenue Department Buildings (Non Residential) 178.22 77.22 48.10 48.10 52.90<br />

Construction of PHC Buildings (Residential) 32.55 16.85 7.50 7.50 8.20<br />

Construction of Revenue Department Buildings (Residential) 178.10 29.10 71.00 71.00 78.00<br />

Construction of Building (Non Residential) RD Division Jaleswar 60.00 21.64 27.38 27.38 30.00<br />

Construction of Health & RW Building (Residential) 100.55 34.30 19.00 19.00 21.00<br />

Construction & Maintenance of Buildings (Non Residential) 58.61 32.05 <strong>12</strong>.65 <strong>12</strong>.65 13.91<br />

Construction of RD Department Buildings (Residential) 61.26 0.00 28.49 28.49 32.77<br />

Total - X 990.70 331.49 266.44 266.44 296.99<br />

GRAND TOTAL 164054.63 48599.87 72926.29 72952.91 79168.29<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - V


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Annexure-I: ANNUAL PLAN 20011-<strong>12</strong>: PROPOSED OUTLAYS (SCHEME WISE)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

DDA 528.96 528.96 0.00 519.00 519.00 0.00 817.80 817.80 0.00 817.80 817.80 0.00 828.00 828.00 0.00<br />

Work <strong>Plan</strong>-Rice Development DDA 69.02 69.02 0.00 5.48 5.48 0.00 8.91 8.91 0.00 8.91 8.91 0.00 10.72 10.72 0.00<br />

Work <strong>Plan</strong>-Sugarcane Development DDA 1.44 1.44 0.00 0.00 0.00 0.00 2.26 2.26 0.00 2.26 2.26 0.00 2.59 2.59 0.00<br />

Jute Technology Mission (MM-II) DDA 93.99 93.99 0.00 11.58 11.58 0.00 25.01 25.01 0.00 25.01 25.01 0.00 27.51 27.51 0.00<br />

ISOPOM (Pulses) DDA 26.84 26.84 0.00 7.70 7.70 0.00 <strong>12</strong>.57 <strong>12</strong>.57 0.00 <strong>12</strong>.57 <strong>12</strong>.57 0.00 0.00 0.00 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

DDA 583.45 583.45 0.00 216.84 216.84 0.00 248.14 248.14 0.00 248.14 248.14 0.00 272.96 272.96 0.00<br />

Seed Village Programme DDA 133.15 133.15 0.00 7.29 7.29 0.00 51.53 51.53 0.00 51.53 51.53 0.00 56.68 56.68 0.00<br />

Promotion of SRI programme DDA 0.00 0.00 0.00 3.60 3.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation DDA 592.25 592.25 0.00 <strong>12</strong>8.62 <strong>12</strong>8.62 0.00 182.59 182.59 0.00 182.59 182.59 0.00 211.26 211.26 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) DDA 0.00 0.00 0.00 496.45 496.45 0.00 3411.04 3411.04 0.00 3411.04 3411.04 0.00 3700.05 3700.05 0.00<br />

National Food Security Mission (Pulses) DDA 0.00 0.00 0.00 0.00 0.00 0.00 74.78 74.78 0.00 74.78 74.78 0.00 256.92 256.92 0.00<br />

Sub-Total 2029.11 2029.11 0.00 1396.56 1396.56 0.00 4834.63 4834.63 0.00 4834.63 4834.63 0.00 5366.69 5366.69 0.00<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

DDH 4.80 4.80 0.00 0.96 0.96 0.00 3.84 3.84 0.00 3.84 3.84 0.00 4.80 4.80 0.00<br />

National Horticulture Mission DDH 617.62 617.62 0.00 66.29 66.29 0.00 155.63 155.63 0.00 155.63 155.63 0.00 193.63 193.63 0.00<br />

Micro Irrigation Programme DDH 56.00 56.00 0.00 21.93 21.93 0.00 35.00 35.00 0.00 35.00 35.00 0.00 45.00 45.00 0.00<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

DDH 9.25 9.25 0.00 6.36 6.36 0.00 9.20 9.20 0.00 9.20 9.20 0.00 10.18 10.18 0.00<br />

Coconut Development Board Programme DDH 60.54 60.54 0.00 5.78 5.78 0.00 9.63 9.63 0.00 9.63 9.63 0.00 11.30 11.30 0.00<br />

National Medicinal <strong>Plan</strong>ts Mission<br />

Programme<br />

DDH 5.81 5.81 0.00 0.71 0.71 0.00 1.<strong>12</strong> 1.<strong>12</strong> 0.00 1.<strong>12</strong> 1.<strong>12</strong> 0.00 2.26 2.26 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) DDH <strong>12</strong>.68 <strong>12</strong>.68 0.00 3.55 3.55 0.00 5.95 5.95 0.00 5.95 5.95 0.00 6.70 6.70 0.00<br />

Sub-Total 766.70 766.70 0.00 105.58 105.58 0.00 220.37 220.37 0.00 220.37 220.37 0.00 273.87 273.87 0.00<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

ASCO 538.13 538.13 0.00 161.93 161.93 0.00 144.64 144.64 0.00 144.64 144.64 0.00 231.56 231.56 0.00<br />

Soil and water conservation measures for<br />

development of Farms under RKVY<br />

ASCO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.50 56.50 0.00<br />

Sub-Total 538.13 538.13 0.00 161.93 161.93 0.00 144.64 144.64 0.00 144.64 144.64 0.00 288.06 288.06 0.00<br />

4<br />

Animal Husbandry & Dairy<br />

Development<br />

State <strong>Plan</strong><br />

Bird Flu Training CDVO 5.79 5.79 0.00 0.96 0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 0.96 0.00<br />

Disaster Management Preparedness CDVO 18.50 18.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.50 18.50 0.00<br />

Skill up-gradation Training CDVO 9.05 9.05 0.00 0.72 0.72 0.00 0.72 0.72 0.00 0.72 0.72 0.00 3.80 3.80 0.00<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

Annexure- VI<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

CDVO 4.<strong>12</strong> 4.<strong>12</strong> 0.00 0.06 0.06 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00<br />

Disease Control Programme under<br />

ASCAD<br />

CDVO 162.46 162.46 0.00 0.00 0.00 0.00 81.23 81.23 0.00 81.23 81.23 0.00 81.23 81.23 0.00<br />

Health Camp & Awareness Programme<br />

under ASCAD<br />

Central <strong>Plan</strong><br />

CDVO 6.<strong>12</strong> 6.<strong>12</strong> 0.00 0.59 0.59 0.00 0.55 0.55 0.00 0.82 0.82 0.00 0.55 0.55 0.00<br />

SMILE Training CDVO 11.43 11.43 0.00 0.85 0.85 0.00 0.69 0.69 0.00 0.84 0.84 0.00 5.00 5.00 0.00<br />

Exposure visit of farmers under SMILE CDVO 5.04 5.04 0.00 0.00 0.00 0.00 2.25 2.25 0.00 2.25 2.25 0.00 2.52 2.52 0.00<br />

Extension Services<br />

RKVY<br />

CDVO 2.00 2.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00<br />

a) Strengthening of Livestock Service<br />

Information & Modernisation of office<br />

CDVO 506.08 506.08 0.00 0.00 0.00 0.00 190.79 190.79 0.00 190.79 190.79 0.00 315.15 315.15 0.00<br />

b) Dairy Development CDVO 226.80 226.80 0.00 0.00 0.00 0.00 106.21 106.21 0.00 106.21 106.21 0.00 <strong>12</strong>0.59 <strong>12</strong>0.59 0.00<br />

c) Fodder Development CDVO 86.30 86.30 0.00 0.00 0.00 0.00 40.20 40.20 0.00 40.20 40.20 0.00 46.50 46.50 0.00<br />

d) Goat Development CDVO 25.20 25.20 0.00 0.00 0.00 0.00 <strong>12</strong>.60 <strong>12</strong>.60 0.00 <strong>12</strong>.60 <strong>12</strong>.60 0.00 <strong>12</strong>.60 <strong>12</strong>.60 0.00<br />

e) Poultry Development CDVO 56.40 56.40 0.00 0.00 0.00 0.00 16.30 16.30 0.00 16.30 16.30 0.00 40.10 40.10 0.00<br />

Sub-Total 1<strong>12</strong>5.28 1<strong>12</strong>5.28 0.00 3.17 3.17 0.00 454.54 454.54 0.00 454.96 454.96 0.00 650.50 650.50 0.00<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit<br />

institutions under NRC-LTO fund<br />

DRCS 713.40 713.40 0.00 0.00 0.00 0.00 286.38 286.38 0.00 286.38 286.38 0.00 202.02 202.02 0.00<br />

Revival of the short term co-operative<br />

credit institution<br />

DRCS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>4.00 <strong>12</strong>4.00 0.00<br />

Loan Support to Co-operatives DRCS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2<strong>12</strong>.16 2<strong>12</strong>.16 0.00<br />

Modernisation of Co-op Processing Rice<br />

Mill<br />

DRCS 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 30.00 0.00<br />

Share capital and Transport subsidy for<br />

PDS to Consumer Cooperatives<br />

Infrastructure Strengthening and<br />

DRCS 38.75 38.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.25 24.25 0.00<br />

Managerial subsidy to Marketing Cooperatives<br />

(PACs & RCMS)<br />

Financial assistance in shape of<br />

DRCS 345.00 345.00 0.00 0.00 0.00 0.00 139.00 139.00 0.00 139.00 139.00 0.00 131.00 131.00 0.00<br />

loan/subsidy or share to other cooperatives<br />

Central <strong>Plan</strong><br />

DRCS 25.00 25.00 0.00 0.00 0.00 0.00 8.00 8.00 0.00 8.00 8.00 0.00 <strong>12</strong>.20 <strong>12</strong>.20 0.00<br />

Construction of Rural Godown under<br />

RKVY<br />

DRCS 0.00 0.00 0.00 0.00 0.00 0.00 508.01 508.01 0.00 508.01 508.01 0.00 1427.92 1427.92 0.00<br />

Sub-Total 1132.15 1132.15 0.00 0.00 0.00 0.00 941.39 941.39 0.00 941.39 941.39 0.00 2163.55 2163.55 0.00<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Dev. of freshwater Aquaculture through<br />

FFDA<br />

FFDA &<br />

BFDA<br />

0.00 0.00 0.00 0.00 0.00 0.00 11.38 11.38 0.00 11.38 11.38 0.00 <strong>12</strong>.50 <strong>12</strong>.50 0.00<br />

Exhibition and Organisation of Buyer<br />

Seller meet<br />

FFDA &<br />

BFDA<br />

1.50 1.50 0.00 0.00 0.00 0.00 0.50 0.50 0.00 0.50 0.50 0.00 1.00 1.00 0.00<br />

Assistance to Mechanisation Programme MFDA 19.00 19.00 0.00 0.00 0.00 0.00 25.50 25.50 0.00 25.50 25.50 0.00 5.00 5.00 0.00<br />

Survey and Investigation and<br />

establishment of fishing Harbour & Fish<br />

MFDA 1319.00 1319.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 667.00 667.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Safety measures for Marine Fishermen MFDA 20.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 0.00<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries &<br />

Aquaculture through FFDA (Programme<br />

Component)<br />

Dev. of Brackish Water Aquacul. through<br />

FFDA &<br />

BFDA<br />

FFDA &<br />

242.00 242.00 0.00 30.51 30.51 0.00 72.40 72.40 0.00 72.40 72.40 0.00 74.40 74.40 0.00<br />

FFDA<br />

BFDA<br />

262.20 262.20 0.00 0.00 0.00 0.00 202.48 202.48 0.00 202.48 202.48 0.00 150.00 150.00 0.00<br />

Saving-cum-Relief Scheme MFDA 56.34 56.34 0.00 7.14 7.14 0.00 <strong>12</strong>.00 <strong>12</strong>.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 0.00 14.40 14.40 0.00<br />

Group Accident Insurance Scheme MFDA 64.71 64.71 0.00 15.90 15.90 0.00 15.90 15.90 0.00 15.90 15.90 0.00 16.50 16.50 0.00<br />

Low Cost House MFDA 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 50.00 0.00<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

MFDA 54.00 54.00 0.00 0.00 0.00 0.00 <strong>12</strong>0.00 <strong>12</strong>0.00 0.00 <strong>12</strong>0.00 <strong>12</strong>0.00 0.00 28.50 28.50 0.00<br />

Intro. of Intermediate craft of Improved<br />

Design<br />

MFDA 60.00 60.00 0.00 0.00 0.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 0.00 24.00 24.00 0.00<br />

Sub-Total 2148.75 2148.75 0.00 53.55 53.55 0.00 472.16 472.16 0.00 472.16 472.16 0.00 1048.30 1048.30 0.00<br />

Total - I 7740.11 7740.11 0.00 1720.79 1720.79 0.00 7067.73 7067.73 0.00 7068.15 7068.15 0.00 9790.97 9790.97 0.00<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) DRDA 6500.00 6500.00 0.00 929.63 929.63 0.00 1500.00 1500.00 0.00 1500.00 1500.00 0.00 2000.00 2000.00 0.00<br />

Construction of C.C Road (New Scheme) DRDA 1435.00 1435.00 0.00 0.00 0.00 0.00 286.62 286.62 0.00 286.62 286.62 0.00 287.00 287.00 0.00<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

DRDA 1019.33 1019.33 0.00 616.46 616.46 0.00 402.87 402.87 0.00 402.87 402.87 0.00 442.50 442.50 0.00<br />

Swarnajayanti Gram Swarozgar Yojana (<br />

SGSY )<br />

Mahatma Gandhi National Rural<br />

DRDA 4749.74 4749.74 0.00 1055.61 1055.61 0.00 1160.50 1160.50 0.00 1160.50 1160.50 0.00 <strong>12</strong>00.00 <strong>12</strong>00.00 0.00<br />

Employment Guarantee Scheme<br />

DRDA 14372.15 14372.15 0.00 1303.71 1303.71 0.00 3556.18 3556.18 0.00 3556.18 3556.18 0.00 4218.56 4218.56 0.00<br />

(MNREGS)<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

DRDA 976.18 976.18 0.00 <strong>12</strong>5.61 <strong>12</strong>5.61 0.00 200.00 200.00 0.00 200.00 200.00 0.00 250.00 250.00 0.00<br />

<strong>12</strong>th Finance Commission Award DRDA 3393.65 3393.65 0.00 2884.94 2884.94 0.00 508.71 508.71 0.00 508.71 508.71 0.00 0.00 0.00 0.00<br />

13th Finance Commisssion Award DRDA 0.00 0.00 0.00 0.00 0.00 0.00 583.28 583.28 0.00 583.28 583.28 0.00 641.25 641.25 0.00<br />

Total - II 32446.05 32446.05 0.00 6915.96 6915.96 0.00 8198.16 8198.16 0.00 8198.16 8198.16 0.00 9039.31 9039.31 0.00<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

ITDA,<br />

Nilgiri<br />

300.10 300.10 0.00 4.76 4.76 0.00 131.50 131.50 0.00 131.50 131.50 0.00 163.75 163.75 0.00<br />

Grants under Provision to Article 275 (1)<br />

ITDA,<br />

Nilgiri<br />

233.64 233.64 0.00 39.04 39.04 0.00 70.00 70.00 0.00 70.00 70.00 0.00 86.00 86.00 0.00<br />

Special Central Assistance to TSP areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

ITDA,<br />

Nilgiri<br />

549.82 549.82 0.00 79.53 79.53 0.00 135.00 135.00 0.00 135.00 135.00 0.00 180.00 180.00 0.00<br />

Grants under Provision to Article 275 (1) MADA 0.00 0.00 0.00 0.00 0.00 0.00 13.73 13.73 0.00 13.73 13.73 0.00 15.00 15.00 0.00<br />

Special Central Assistance to TSP areas MADA 0.00 0.00 0.00 11.50 11.50 0.00 21.65 21.65 0.00 21.65 21.65 0.00 20.00 20.00 0.00<br />

Total - III 1083.56 1083.56 0.00 134.83 134.83 0.00 371.88 371.88 0.00 371.88 371.88 0.00 464.75 464.75 0.00<br />

IV IRRIGATION & FLOOD CONTROL<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD -<br />

RIDF)<br />

M.I<br />

Division<br />

734.81 734.81 0.00 180.00 180.00 0.00 160.00 160.00 0.00 160.00 160.00 0.00 200.00 200.00 0.00<br />

Instream Reservoir (Construction of<br />

Check Dam)<br />

M.I<br />

Division<br />

500.00 500.00 0.00 0.00 0.00 0.00 236.84 236.84 0.00 236.84 236.84 0.00 300.00 300.00 0.00<br />

Installation of Lift Irrigation Projects<br />

under BKVY<br />

L.I<br />

Division<br />

0.00 0.00 0.00 40.32 40.32 0.00 865.83 865.83 0.00 865.83 865.83 0.00 581.60 581.60 0.00<br />

Minor Irrigation- Biju Krushak Vikash<br />

Yojana<br />

L.I<br />

Division<br />

1634.06 1634.06 0.00 3.00 3.00 0.00 385.61 385.61 0.00 385.61 385.61 0.00 261.25 261.25 0.00<br />

Bank Protection work (Flood Control) Irri. Div. 0.00 0.00 0.00 0.00 0.00 0.00 92.71 0.00 92.71 92.71 0.00 92.71 92.71 0.00 92.71<br />

Saline Embankment Improvement<br />

projects (NABARD - RIDF- XIV)<br />

Irri. Div. 0.00 0.00 0.00 650.00 650.00 0.00 650.00 650.00 0.00 650.00 650.00 0.00 0.00 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII<br />

& XIV)<br />

Centrally Sponsored <strong>Plan</strong><br />

Drain.<br />

Div.<br />

<strong>12</strong>73.72 <strong>12</strong>73.72 0.00 681.28 681.28 0.00 400.00 400.00 0.00 400.00 400.00 0.00 156.00 156.00 0.00<br />

Flood Management Programme Irri. Div. 0.00 0.00 0.00 1501.41 1501.41 0.00 1086.19 1086.19 0.00 1086.19 1086.19 0.00 3143.13 3143.13 0.00<br />

Flood Management Programme (Major<br />

Works) - Drainage Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

Drain.<br />

Div.<br />

2114.00 2114.00 0.00 507.44 507.44 0.00 1522.00 1522.00 0.00 1522.00 1522.00 0.00 131.03 131.03 0.00<br />

Installation of Lift Irrigation Projects<br />

under RKVY<br />

L.I<br />

Division<br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 218.40 218.40 0.00<br />

Total - IV 6256.59 6256.59 0.00 3563.45 3563.45 0.00 5399.18 5306.47 92.71 5399.18 5306.47 92.71 5084.<strong>12</strong> 4991.41 92.71<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana NESCO 0.00 0.00 0.00 420.29 420.29 0.00 462.30 462.30 0.00 462.30 462.30 0.00 485.42 485.42 0.00<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

NESCO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.00 140.00 0.00<br />

Rajiv Gandhi Gramin Vidyutikaran PGCIL 0.00 0.00 0.00 297.00 297.00 0.00 326.70 326.70 0.00 326.70 326.70 0.00 343.04 343.04 0.00<br />

Total - V 0.00 0.00 0.00 717.29 717.29 0.00 789.00 789.00 0.00 789.00 789.00 0.00 968.46 968.46 0.00<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

DIC 20.49 20.49 0.00 3.27 3.27 0.00 4.59 4.59 0.00 4.59 4.59 0.00 4.90 4.90 0.00<br />

Prime Minister's Emp.Gen. Prog. (PMEGP) DIC 863.00 863.00 0.00 224.00 224.00 0.00 228.00 228.00 0.00 228.00 228.00 0.00 300.00 300.00 0.00<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry ADT 66.59 66.59 0.00 7.54 7.54 0.00 14.55 14.55 0.00 14.55 14.55 0.00 15.00 15.00 0.00<br />

Workshed-cum-Housing ADT 22.50 22.50 0.00 6.75 6.75 0.00 16.10 16.10 0.00 16.10 16.10 0.00 17.50 17.50 0.00<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

ADT 18.40 18.40 0.00 0.00 0.00 0.00 7.82 7.82 0.00 7.82 7.82 0.00 9.42 9.42 0.00<br />

IHDS (Cluster Approach) ADT 62.33 62.33 0.00 2.00 2.00 0.00 21.28 21.28 0.00 21.28 21.28 0.00 8.76 8.76 0.00<br />

IHDS (Group Approach) ADT 76.10 76.10 0.00 1.37 1.37 0.00 11.00 11.00 0.00 11.00 11.00 0.00 11.50 11.50 0.00<br />

IHDS (Marketing Incentive) ADT 60.64 60.64 0.00 9.16 9.16 0.00 9.20 9.20 0.00 9.20 9.20 0.00 9.50 9.50 0.00<br />

Health Insurance for weavers ADT 41.00 41.00 0.00 9.94 9.94 0.00 11.55 11.55 0.00 11.55 11.55 0.00 11.73 11.73 0.00<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

ADT 9.06 9.06 0.00 1.18 1.18 0.00 1.20 1.20 0.00 1.20 1.20 0.00 1.23 1.23 0.00<br />

10% Rebate on Handloom Products ADT 75.00 75.00 0.00 8.30 8.30 0.00 9.00 9.00 0.00 9.00 9.00 0.00 10.00 10.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

<strong>District</strong> Level Exhibition ADT 20.00 20.00 0.00 0.00 0.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00<br />

Total - VI 1335.11 1335.11 0.00 273.51 273.51 0.00 336.29 336.29 0.00 336.29 336.29 0.00 401.54 401.54 0.00<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme -<br />

Constituency Wise Allotment (CWA)<br />

RW<br />

Division<br />

305.00 305.00 0.00 60.00 60.00 0.00 75.00 75.00 0.00 75.00 75.00 0.00 80.00 80.00 0.00<br />

Completion of incomplete roads and<br />

bridges and different stretches of RIDF<br />

and other schemes<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

RW<br />

Division<br />

RW<br />

Division<br />

195.00<br />

2186.92<br />

195.00<br />

2186.92<br />

0.00<br />

0.00<br />

55.00<br />

223.30<br />

55.00<br />

223.30<br />

0.00<br />

0.00<br />

70.00<br />

637.30<br />

70.00<br />

637.30<br />

0.00<br />

0.00<br />

70.00<br />

637.30<br />

70.00<br />

637.30<br />

0.00<br />

0.00<br />

100.00<br />

733.00<br />

100.00<br />

733.00<br />

0.00<br />

0.00<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

RW<br />

Division<br />

616.92 616.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 300.00 0.00<br />

Pradhan Mantri Gram Sadak Yojana<br />

(PMGSY)<br />

RW<br />

Division<br />

20359.56 20359.56 0.00 5198.07 5198.07 0.00 6007.00 6007.00 0.00 6007.00 6007.00 0.00 0.00 0.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge<br />

under NABARD funding RIDF Project<br />

RW<br />

Division-II<br />

1059.50 1059.50 0.00 270.00 270.00 0.00 30.00 30.00 0.00 30.00 30.00 0.00<br />

Minimum Needs Programme -<br />

Constituency Wise Allotment (CWA)<br />

RW<br />

Division-II<br />

145.00 145.00 0.00 50.00 50.00 0.00 45.00 45.00 0.00 45.00 45.00 0.00 50.00 50.00 0.00<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

RW<br />

Division-II<br />

169.00 169.00 0.00 50.00 50.00 0.00 57.00 57.00 0.00 57.00 57.00 0.00 62.00 62.00 0.00<br />

Completion of incomplete road and<br />

RW<br />

Bridges and different Stretches of RIDF &<br />

Division-II<br />

other Schemes<br />

Central <strong>Plan</strong><br />

528.50 528.50 0.00 45.50 45.50 0.00 230.00 230.00 0.00 230.00 230.00 0.00 253.00 253.00 0.00<br />

Pradhan Mantri Gram Sadak Yojana<br />

(PMGSY)<br />

RW<br />

Division-II<br />

10480.00 10480.00 0.00 2638.00 2638.00 0.00 4842.00 4842.00 0.00 4842.00 4842.00 0.00 0.00 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge<br />

under NABARD funding RIDF Project<br />

Minimum Needs Programme -<br />

Constituency Wise Allotment (CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

RW<br />

Division-<br />

Jaleswar<br />

RW<br />

Division-<br />

Jaleswar<br />

RW<br />

Division-<br />

Jaleswar<br />

1950.34<br />

180.00<br />

464.44<br />

1950.34<br />

180.00<br />

464.44<br />

0.00<br />

0.00<br />

0.00<br />

113.00<br />

50.00<br />

116.70<br />

113.00<br />

50.00<br />

116.70<br />

0.00<br />

0.00<br />

0.00<br />

500.00<br />

40.00<br />

523.00<br />

500.00<br />

40.00<br />

523.00<br />

0.00<br />

0.00<br />

0.00<br />

500.00<br />

40.00<br />

523.00<br />

500.00<br />

40.00<br />

523.00<br />

0.00<br />

0.00<br />

0.00<br />

803.00<br />

40.00<br />

567.00<br />

803.00<br />

40.00<br />

567.00<br />

0.00<br />

0.00<br />

0.00<br />

4<br />

Pradhan Mantri Gram Sadak Yojana<br />

(PMGSY)<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

RW<br />

Division-<br />

Jaleswar<br />

152<strong>12</strong>.00 152<strong>12</strong>.00 0.00 5321.40 5321.40 0.00 5186.00 5186.00 0.00 5186.00 5186.00 0.00 2500.00 2500.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Construction of Rural Roads & Bridge<br />

under NABARD funding RIDF Project<br />

Central <strong>Plan</strong><br />

R & B<br />

Division<br />

0.00 0.00 0.00 515.92 515.92 0.00 1148.00 1148.00 0.00 1148.00 1148.00 0.00 10941.18 10941.18 0.00<br />

Construction of road under Central Road<br />

Fund<br />

R & B<br />

Division<br />

0.00 0.00 0.00 0.00 0.00 0.00 936.00 936.00 0.00 936.00 936.00 0.00 2577.44 2577.44 0.00<br />

One time Additional Central Assistance<br />

R & B<br />

Division<br />

0.00 0.00 0.00 0.00 0.00 0.00 300.00 300.00 0.00 300.00 300.00 0.00 200.00 200.00 0.00<br />

Total - VII 53852.18 53852.18 0.00 14706.89 14706.89 0.00 20626.30 20626.30 0.00 20626.30 20626.30 0.00 19206.62 19206.62 0.00<br />

VIII<br />

SCIENCE TECHNOLOGY &<br />

ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry DFO 18.00 18.00 0.00 9.78 9.78 0.00 10.00 10.00 0.00 10.00 10.00 0.00 <strong>12</strong>.10 <strong>12</strong>.10 0.00<br />

Communication & Building -<br />

Construction of quarters for forest guards<br />

DFO 15.00 15.00 0.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 0.00 3.63 3.63 0.00<br />

Bamboo <strong>Plan</strong>tation DFO 0.00 0.00 0.00 0.44 0.44 0.00 0.21 0.21 0.00 0.21 0.21 0.00 0.00 0.00 0.00<br />

Elephant Management <strong>Plan</strong> DFO 0.00 0.00 0.00 6.76 6.76 0.00 5.33 5.33 0.00 5.33 5.33 0.00 0.00 0.00 0.00<br />

Wildlife Protection and Conservation<br />

Measures<br />

Central <strong>Plan</strong><br />

DFO 0.00 0.00 0.00 5.31 5.31 0.00 3.52 3.52 0.00 3.52 3.52 0.00 0.00 0.00 0.00<br />

Development of National Park, Sanctuary<br />

& Natural Reserves<br />

DFO 0.00 0.00 0.00 29.75 29.75 0.00 <strong>12</strong>.27 <strong>12</strong>.27 0.00 <strong>12</strong>.27 <strong>12</strong>.27 0.00 33.00 33.00 0.00<br />

Elephant Management Project DFO 0.00 0.00 0.00 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 0.60 0.00<br />

Talsari - HVBA DFO 0.00 0.00 0.00 15.55 15.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.10 17.10 0.00<br />

Total - VIII 33.00 33.00 0.00 71.08 71.08 0.00 34.33 34.33 0.00 34.33 34.33 0.00 66.43 66.43 0.00<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education DI Schools 7.79 7.79 0.00 15.85 15.85 0.00 19.25 19.25 0.00 19.25 19.25 0.00 20.10 20.10 0.00<br />

Construction Office building boundary<br />

wall & renovation of old building<br />

CI ,<br />

Schools<br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 16.00 0.00<br />

Construction of staff quarters and office<br />

building<br />

Improvement/Modernization of ITI<br />

CI ,<br />

Schools<br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>5.00 <strong>12</strong>5.00 0.00<br />

<strong>Balasore</strong> (Construction of boundary wall,<br />

play ground, bore well, drainage system,<br />

cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

Prinicipal,<br />

ITI<br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.40 99.40 0.00<br />

Sarba Sikshya Abhiyan (SSA) SSA 0.00 0.00 0.00 5926.90 5926.90 0.00 7504.01 7504.01 0.00 7504.01 7504.01 0.00 7504.21 7504.21 0.00<br />

National Programme for Education of<br />

Girls at Elementary Level (NPEGEL)<br />

SSA 0.00 0.00 0.00 46.62 46.62 0.00 35.79 35.79 0.00 35.79 35.79 0.00 35.79 35.79 0.00<br />

Kasturiba Gandhi Balika Vidyalaya<br />

Central <strong>Plan</strong><br />

SSA 0.00 0.00 0.00 18.33 18.33 0.00 44.97 44.97 0.00 44.97 44.97 0.00 44.97 44.97 0.00<br />

National APP Training in ITI <strong>Balasore</strong><br />

Prinicipal,<br />

ITI<br />

43.00 43.00 0.00 1.31 1.31 0.00 5.00 5.00 0.00 5.00 5.00 0.00 6.00 6.00 0.00<br />

Sub-Total 50.79 50.79 0.00 6009.01 6009.01 0.00 7609.02 7609.02 0.00 7609.02 7609.02 0.00 7851.47 7851.47 0.00<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan<br />

(PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

DSO 0.00 0.00 0.00 0.10 0.10 0.00 0.18 0.18 0.00 0.18 0.18 0.00 0.20 0.20 0.00<br />

One time seed capital grant for<br />

development of Sports infrastructure<br />

DSO 0.00 0.00 0.00 34.00 34.00 0.00 34.00 34.00 0.00 34.00 34.00 0.00 34.00 34.00 0.00<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

DSO 0.00 0.00 0.00 0.00 0.00 0.00 1.04 1.04 0.00 1.04 1.04 0.00 1.44 1.44 0.00<br />

<strong>Annual</strong> acquisition grant DSO 0.00 0.00 0.00 3.10 3.10 0.00 3.10 3.10 0.00 3.10 3.10 0.00 3.10 3.10 0.00<br />

<strong>Annual</strong> operation grant DSO 0.00 0.00 0.00 3.72 3.72 0.00 3.72 3.72 0.00 3.72 3.72 0.00 3.72 3.72 0.00<br />

Rural Sports Competition DSO 0.00 0.00 0.00 7.00 7.00 0.00 7.60 7.60 0.00 7.60 7.60 0.00 7.60 7.60 0.00<br />

Prize Money for Rural Sports DSO 0.00 0.00 0.00 0.00 0.00 0.00 6.30 6.30 0.00 6.30 6.30 0.00 6.30 6.30 0.00<br />

Sub-Total 0.00 0.00 0.00 47.92 47.92 0.00 55.94 55.94 0.00 55.94 55.94 0.00 56.36 56.36 0.00<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services<br />

Inspector,<br />

Ayurvedic<br />

420.09 420.09 0.00 94.80 94.80 0.00 99.54 99.54 0.00 99.54 99.54 0.00 142.47 142.47 0.00<br />

Urban Ayurvedic Health Services<br />

Inspector,<br />

Ayurvedic<br />

91.28 91.28 0.00 28.50 28.50 0.00 29.90 29.90 0.00 29.90 29.90 0.00 35.65 35.65 0.00<br />

Primary Health Care (Rural) CDMO 603.00 603.00 0.00 145.00 145.00 0.00 154.00 154.00 0.00 154.00 154.00 0.00 179.25 179.25 0.00<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

CDMO 28.00 28.00 0.00 5.45 5.45 0.00 5.61 5.61 0.00 5.61 5.61 0.00 14.21 14.21 0.00<br />

Reproductive Child Health (RCH) CDMO 0.00 0.00 0.00 977.84 977.84 0.00 1075.62 1075.62 0.00 1075.62 1075.62 0.00 1303.62 1303.62 0.00<br />

Immunization CDMO 0.00 0.00 0.00 41.88 41.88 0.00 46.07 46.07 0.00 46.07 46.07 0.00 39.52 39.52 0.00<br />

National Rural Health Mission (NRHM)<br />

initiatives<br />

CDMO 0.00 0.00 0.00 944.43 944.43 0.00 1038.87 1038.87 0.00 1038.87 1038.87 0.00 980.59 980.59 0.00<br />

Revised National Tuberculosis Control<br />

Programme (RNTCP)<br />

CDMO 0.00 0.00 0.00 35.10 35.10 0.00 37.20 37.20 0.00 37.20 37.20 0.00 40.92 40.92 0.00<br />

National Vector Borne Disease Control<br />

Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

CDMO 0.00 0.00 0.00 144.30 144.30 0.00 149.30 149.30 0.00 149.30 149.30 0.00 164.23 164.23 0.00<br />

National Programme for Control of<br />

Blindness (NPCB)<br />

CDMO 0.00 0.00 0.00 25.28 25.28 0.00 28.45 28.45 0.00 28.45 28.45 0.00 31.30 31.30 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Integrated Disease Surveillance<br />

Programme (IDSP)<br />

CDMO 0.00 0.00 0.00 10.15 10.15 0.00 10.56 10.56 0.00 10.56 10.56 0.00 11.62 11.62 0.00<br />

National Leprosy Eradication Programme<br />

(NLEP)<br />

CDMO 0.00 0.00 0.00 8.45 8.45 0.00 9.<strong>12</strong> 9.<strong>12</strong> 0.00 9.<strong>12</strong> 9.<strong>12</strong> 0.00 10.03 10.03 0.00<br />

Sub-Total 1142.37 1142.37 0.00 2461.18 2461.18 0.00 2684.24 2684.24 0.00 2684.24 2684.24 0.00 2953.41 2953.41 0.00<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well RWSS 844.44 844.44 0.00 161.10 161.10 0.00 238.50 238.50 0.00 238.50 238.50 0.00 209.82 209.82 0.00<br />

ARWSP-Public Water Supply Scheme RWSS 7931.49 7931.49 0.00 852.36 852.36 0.00 1872.35 1872.35 0.00 1872.35 1872.35 0.00 2022.00 2022.00 0.00<br />

Sub - Total 8775.93 8775.93 0.00 1013.46 1013.46 0.00 2110.85 2110.85 0.00 2110.85 2110.85 0.00 2231.82 2231.82 0.00<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage<br />

system in different uncovered areas of<br />

<strong>Balasore</strong> Jaleswar Soro & Nilgiri ULBs<br />

Improvement of water supply and<br />

PHED 100.00 100.00 0.00 9.00 9.00 0.00 50.00 50.00 0.00 50.00 50.00 0.00 41.00 41.00 0.00<br />

replacement of defunct bore wells upgradation<br />

of sources and laying of pipe<br />

PHED 300.00 300.00 0.00 29.00 29.00 0.00 200.00 200.00 0.00 200.00 200.00 0.00 71.00 71.00 0.00<br />

lines in different ULBs<br />

Improvement of W/S to Nilgiri town PHED 1118.42 1118.42 0.00 0.00 0.00 0.00 200.00 200.00 0.00 200.00 200.00 0.00 300.00 300.00 0.00<br />

Improvement of W/S to Soro town PHED 192.00 192.00 0.00 0.00 0.00 0.00 92.00 92.00 0.00 92.00 92.00 0.00 100.00 100.00 0.00<br />

Improvement of W/S to Jaleswar town<br />

Improvement of water supply & S/I<br />

PHED 160.00 160.00 0.00 0.00 0.00 0.00 60.00 60.00 0.00 60.00 60.00 0.00 100.00 100.00 0.00<br />

system of different non-residential office<br />

building & Govt. Institutions of <strong>Balasore</strong>,<br />

Soro Nilgiri & Jaleswar ULBs<br />

Improvement of water supply & S/I<br />

PHED 200.00 200.00 0.00 19.20 19.20 0.00 80.80 80.80 0.00 80.80 80.80 0.00 100.00 100.00 0.00<br />

system of different residential office<br />

building & Govt. Institutions of <strong>Balasore</strong>,<br />

Soro Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

PHED 200.00 200.00 0.00 9.00 9.00 0.00 91.00 91.00 0.00 91.00 91.00 0.00 100.00 100.00 0.00<br />

Augmentation of W/S to <strong>Balasore</strong> town<br />

under UIDSSMT (Construction of ESR<br />

and UGR)<br />

Augmentation of W/S to <strong>Balasore</strong> town<br />

PH<br />

Division<br />

1587.58 1587.58 0.00 0.00 0.00 0.00 200.00 200.00 0.00 200.00 200.00 0.00 300.00 300.00 0.00<br />

under EAP (Improvement of water supply<br />

to <strong>Balasore</strong> town from river Sonoconstruction<br />

of intake well and laying of<br />

PH<br />

Division<br />

5442.39 5442.39 0.00 0.00 0.00 0.00 200.00 200.00 0.00 200.00 200.00 0.00 300.00 300.00 0.00<br />

rising mains)<br />

Sub-Total 9300.39 9300.39 0.00 66.20 66.20 0.00 1173.80 1173.80 0.00 1173.80 1173.80 0.00 14<strong>12</strong>.00 14<strong>12</strong>.00 0.00<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban<br />

Tourism Destination Towns<br />

EO, ULB 0.00 0.00 0.00 29.31 29.31 0.00 11.00 11.00 0.00 11.00 11.00 0.00 <strong>12</strong>.10 <strong>12</strong>.10 0.00<br />

Road Development & Maintenance EO, ULB 0.00 0.00 0.00 82.67 82.67 0.00 90.87 90.87 0.00 90.87 90.87 0.00 99.96 99.96 0.00<br />

Urban Greenery EO, ULB 0.00 0.00 0.00 10.00 10.00 0.00 11.00 11.00 0.00 11.00 11.00 0.00 <strong>12</strong>.10 <strong>12</strong>.10 0.00<br />

Special Problem Fund EO, ULB 0.00 0.00 0.00 6.94 6.94 0.00 7.63 7.63 0.00 7.63 7.63 0.00 8.39 8.39 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Centrally Sponsored <strong>Plan</strong><br />

Integrated Housing & Urban Development<br />

Programme (IHSDP)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

EO, ULB 0.00 0.00 0.00 288.13 288.13 0.00 316.94 316.94 0.00 316.94 316.94 0.00 348.63 348.63 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

(SJSRY)<br />

EO, ULB 0.00 0.00 0.00 54.80 54.80 0.00 60.28 60.28 0.00 60.28 60.28 0.00 66.31 66.31 0.00<br />

Urban Infrastructure Development<br />

Scheme for Small & Medium Town<br />

EO, ULB 0.00 0.00 0.00 39.97 39.97 0.00 43.96 43.96 0.00 43.96 43.96 0.00 48.36 48.36 0.00<br />

National Urban Information System<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 0.30 0.30 0.00 0.30 0.30 0.00 0.30 0.30 0.00 0.33 0.33 0.00<br />

Road Development, Maintenance Grant<br />

etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 138.07 138.07 0.00 149.45 149.45 0.00 165.68 165.68 0.00 198.81 198.81 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

(SJSRY)<br />

Central <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 17.69 17.69 0.00 9.49 9.49 0.00 19.46 19.46 0.00 23.35 23.35 0.00<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 0.00 0.00 0.00 20.24 20.24 0.00 20.24 20.24 0.00 23.47 23.47 0.00<br />

Road Development, Maintenance Grant<br />

etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 35.00 35.00 0.00 38.00 38.00 0.00 38.00 38.00 0.00 41.80 41.80 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

(SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 13.00 13.00 0.00 10.00 10.00 0.00 10.00 10.00 0.00 11.00 11.00 0.00<br />

Road Development Grant EO, ULB 0.00 0.00 0.00 36.65 36.65 0.00 37.59 37.59 0.00 37.59 37.59 0.00 45.00 45.00 0.00<br />

Road Maintenance Grant EO, ULB 0.00 0.00 0.00 14.47 14.47 0.00 17.67 17.67 0.00 17.67 17.67 0.00 20.00 20.00 0.00<br />

FDR Grant EO, ULB 0.00 0.00 0.00 0.00 0.00 0.00 20.00 20.00 0.00 20.00 20.00 0.00 20.00 20.00 0.00<br />

Incentive Grant EO, ULB 0.00 0.00 0.00 19.73 19.73 0.00 25.00 25.00 0.00 25.00 25.00 0.00 30.00 30.00 0.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 5.00 5.00 0.00 20.00 20.00 0.00 20.00 20.00 0.00 25.00 25.00 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana<br />

(SJSRY)<br />

Central <strong>Plan</strong><br />

EO, ULB 0.00 0.00 0.00 13.63 13.63 0.00 25.00 25.00 0.00 25.00 25.00 0.00 50.00 50.00 0.00<br />

Twelfth Finance Commission (TFC) EO, ULB 0.00 0.00 0.00 15.41 15.41 0.00 27.00 27.00 0.00 27.00 27.00 0.00 35.00 35.00 0.00<br />

Sub-Total 0.00 0.00 0.00 820.77 820.77 0.00 941.42 941.42 0.00 967.62 967.62 0.00 1119.61 1119.61 0.00<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

DRDA 1429.75 1429.75 0.00 429.94 429.94 0.00 795.85 795.85 0.00 795.85 795.85 0.00 875.85 875.85 0.00<br />

Indira Awas Yojana (IAY) DRDA 19841.50 19841.50 0.00 2464.06 2464.06 0.00 7907.20 7907.20 0.00 7907.20 7907.20 0.00 8697.20 8697.20 0.00<br />

Sub-Total 2<strong>12</strong>71.25 2<strong>12</strong>71.25 0.00 2894.00 2894.00 0.00 8703.05 8703.05 0.00 8703.05 8703.05 0.00 9573.05 9573.05 0.00<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys<br />

Students (Boarders)<br />

DWO 0.00 0.00 0.00 0.68 0.68 0.00 0.68 0.68 0.00 0.68 0.68 0.00 0.75 0.75 0.00<br />

Pre Matric Scholarship to SC Girls<br />

Students (Boarders)<br />

DWO 0.00 0.00 0.00 6.49 6.49 0.00 6.66 6.66 0.00 6.66 6.66 0.00 7.33 7.33 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Pre Matric Scholarship to ST Boys<br />

Students (Boarders)<br />

DWO 0.00 0.00 0.00 65.21 65.21 0.00 65.92 65.92 0.00 65.92 65.92 0.00 72.52 72.52 0.00<br />

Pre Matric Scholarship to ST Girls<br />

Students (Boarders)<br />

DWO 0.00 0.00 0.00 143.38 143.38 0.00 156.64 156.64 0.00 156.64 156.64 0.00 172.30 172.30 0.00<br />

Post Matric Scholarship to SC Students DWO 0.00 0.00 0.00 47.06 47.06 0.00 88.48 88.48 0.00 88.48 88.48 0.00 97.33 97.33 0.00<br />

Post Matric Scholarship to ST Students DWO 0.00 0.00 0.00 15.84 15.84 0.00 17.44 17.44 0.00 17.44 17.44 0.00 19.18 19.18 0.00<br />

Development of SCs (OSFDC Section) DWO 0.00 0.00 0.00 175.70 175.70 0.00 203.75 203.75 0.00 203.75 203.75 0.00 224.13 224.13 0.00<br />

Development of STs (OSFDC Section) DWO 0.00 0.00 0.00 83.10 83.10 0.00 117.50 117.50 0.00 117.50 117.50 0.00 <strong>12</strong>9.25 <strong>12</strong>9.25 0.00<br />

Pre Matric Scholarship to the students<br />

whose parents engaged unclean<br />

DWO 0.00 0.00 0.00 3.92 3.92 0.00 14.24 14.24 0.00 14.24 14.24 0.00 15.66 15.66 0.00<br />

Pre Matric Scholarship to OBC Students DWO 0.00 0.00 0.00 6.39 6.39 0.00 1151.05 1151.05 0.00 1151.05 1151.05 0.00 <strong>12</strong>66.16 <strong>12</strong>66.16 0.00<br />

Post Matric Scholarship to OBC Students DWO 0.00 0.00 0.00 0.00 0.00 0.00 56.98 56.98 0.00 56.98 56.98 0.00 62.68 62.68 0.00<br />

Pre Matric Scholarship to Minorities DWO 0.00 0.00 0.00 9.54 9.54 0.00 65.29 65.29 0.00 65.29 65.29 0.00 71.82 71.82 0.00<br />

Post Matric Scholarship to Minorities DWO 0.00 0.00 0.00 0.00 0.00 0.00 5.69 5.69 0.00 5.69 5.69 0.00 6.26 6.26 0.00<br />

Sub-Total 0.00 0.00 0.00 557.31 557.31 0.00 1950.32 1950.32 0.00 1950.32 1950.32 0.00 2145.37 2145.37 0.00<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana DSWO 1323.38 1323.38 0.00 474.26 474.26 0.00 370.00 370.00 0.00 370.00 370.00 0.00 474.26 474.26 0.00<br />

Old Age Pension DSWO 155.09 155.09 0.00 87.02 87.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87.02 87.02 0.00<br />

Orissa Disability Pension DSWO 13.70 13.70 0.00 58.13 58.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.13 58.13 0.00<br />

Organising Single Window Camps DSWO 23.45 23.45 0.00 0.00 0.00 0.00 8.30 8.30 0.00 8.30 8.30 0.00 8.30 8.30 0.00<br />

Bi-cycle to girl students DSWO 362.82 362.82 0.00 1.72 1.72 0.00 1.25 1.25 0.00 1.25 1.25 0.00 1.25 1.25 0.00<br />

Mission Sakti DSWO 943.60 943.60 0.00 208.75 208.75 0.00 3.50 3.50 0.00 3.50 3.50 0.00 208.75 208.75 0.00<br />

Repair & Maintenance of AWC Building DSWO 75.22 75.22 0.00 10.25 10.25 0.00 11.00 11.00 0.00 11.00 11.00 0.00 10.25 10.25 0.00<br />

Reduction of Child Malnutrition DSWO 49.23 49.23 0.00 31.16 31.16 0.00 <strong>12</strong>.00 <strong>12</strong>.00 0.00 <strong>12</strong>.00 <strong>12</strong>.00 0.00 31.16 31.16 0.00<br />

Reduction of IMR DSWO 7.99 7.99 0.00 0.00 0.00 0.00 2.20 2.20 0.00 2.20 2.20 0.00 2.20 2.20 0.00<br />

Grant in Aid to Handicapped Welfare<br />

Institution<br />

DSWO 54.99 54.99 0.00 22.36 22.36 0.00 23.00 23.00 0.00 23.00 23.00 0.00 23.00 23.00 0.00<br />

Grant in Aid to Orphanages DSWO 379.38 379.38 0.00 88.76 88.76 0.00 101.15 101.15 0.00 101.15 101.15 0.00 101.15 101.15 0.00<br />

Secretarial support to <strong>District</strong> Juvenile<br />

Justice Board/Child Welfare Committee<br />

DSWO 1.35 1.35 0.00 0.00 0.00 0.00 0.35 0.35 0.00 0.35 0.35 0.00 0.35 0.35 0.00<br />

Medical Check up DSWO 1.60 1.60 0.00 0.00 0.00 0.00 0.60 0.60 0.00 0.60 0.60 0.00 0.60 0.60 0.00<br />

Sanitation DSWO 1.29 1.29 0.00 0.00 0.00 0.00 0.50 0.50 0.00 0.50 0.50 0.00 0.50 0.50 0.00<br />

Handicapped Scholarship DSWO 45.06 45.06 0.00 <strong>12</strong>.47 <strong>12</strong>.47 0.00 11.60 11.60 0.00 11.60 11.60 0.00 <strong>12</strong>.47 <strong>12</strong>.47 0.00<br />

Award to AWW DSWO 0.60 0.60 0.00 0.00 0.00 0.00 0.15 0.15 0.00 0.15 0.15 0.00 0.15 0.15 0.00<br />

Monitoring Mechanism & Evaluation DSWO 17.61 17.61 0.00 0.00 0.00 0.00 4.50 4.50 0.00 4.50 4.50 0.00 4.50 4.50 0.00<br />

Information Education Communication DSWO 10.72 10.72 0.00 0.00 0.00 0.00 3.00 3.00 0.00 3.00 3.00 0.00 3.00 3.00 0.00<br />

Medicine Kit DSWO 34.30 34.30 0.00 0.00 0.00 0.00 <strong>12</strong>.20 <strong>12</strong>.20 0.00 <strong>12</strong>.20 <strong>12</strong>.20 0.00 <strong>12</strong>.20 <strong>12</strong>.20 0.00<br />

Computer DSWO 0.56 0.56 0.00 0.00 0.00 0.00 0.20 0.20 0.00 0.20 0.20 0.00 0.20 0.20 0.00<br />

Visit Programme DSWO 1.50 1.50 0.00 0.00 0.00 0.00 0.50 0.50 0.00 0.50 0.50 0.00 0.35 0.35 0.00<br />

Central Sponsored <strong>Plan</strong> DSWO<br />

Supplementary Nutrition Programme DSWO 4653.02 4653.02 0.00 2394.26 2394.26 0.00 1080.00 1080.00 0.00 1080.00 1080.00 0.00 2394.26 2394.26 0.00<br />

Mid Day Meal Programme (Pry+UP) DSWO 3819.83 3819.83 0.00 1959.29 1959.29 0.00 900.00 900.00 0.00 900.00 900.00 0.00 1959.29 1959.29 0.00<br />

Mid Day Meal Programme (Kitchen-cumstore)<br />

DSWO 3826.40 3826.40 0.00 136.64 136.64 0.00 1000.00 1000.00 0.00 1000.00 1000.00 0.00 136.64 136.64 0.00<br />

Mid Day Meal Programme (Utensils) DSWO 290.27 290.27 0.00 11.60 11.60 0.00 84.15 84.15 0.00 84.15 84.15 0.00 11.60 11.60 0.00<br />

Mid Day Meal Programme (Monitoring<br />

Mechanism & Evaluation)<br />

DSWO 20.57 20.57 0.00 20.50 20.50 0.00 5.00 5.00 0.00 5.00 5.00 0.00 20.50 20.50 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of<br />

Development (Scheme-wise)<br />

Implementing<br />

Agency<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

Prices)<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10 Actual<br />

Expenditure<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13 14 15 16 17<br />

Mid Day Meal Programme (Transportation<br />

charges)<br />

DSWO 285.<strong>12</strong> 285.<strong>12</strong> 0.00 27.10 27.10 0.00 75.50 75.50 0.00 75.50 75.50 0.00 27.10 27.10 0.00<br />

Mid Day Meal Programme (Honorarium to<br />

cook & helper)<br />

DSWO 409.92 409.92 0.00 81.98 81.98 0.00 82.00 82.00 0.00 82.00 82.00 0.00 82.00 82.00 0.00<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

DSWO 97.00 97.00 0.00 25.00 25.00 0.00 28.00 28.00 0.00 28.00 28.00 0.00 25.00 25.00 0.00<br />

IG National Old Age Pension (ACA to<br />

States)<br />

DSWO 2408.78 2408.78 0.00 597.14 597.14 0.00 575.00 575.00 0.00 575.00 575.00 0.00 597.14 597.14 0.00<br />

National Family Benefit Scheme (ACA to<br />

States)<br />

DSWO 392.20 392.20 0.00 38.80 38.80 0.00 92.80 92.80 0.00 92.80 92.80 0.00 92.80 92.80 0.00<br />

Kishori Shakti Yojana DSWO 50.05 50.05 0.00 0.00 0.00 0.00 14.00 14.00 0.00 14.00 14.00 0.00 14.00 14.00 0.00<br />

National Disability Pension DSWO 20.00 20.00 0.00 0.00 0.00 0.00 0.50 0.50 0.00 0.50 0.50 0.00 0.50 0.50 0.00<br />

National Child Labour Project DSWO 0.00 0.00 0.00 7.53 7.53 0.00 105.39 105.39 0.00 105.39 105.39 0.00 105.39 105.39 0.00<br />

Sub-Total 19776.60 19776.60 0.00 6294.72 6294.72 0.00 4608.34 4608.34 0.00 4608.34 4608.34 0.00 6506.01 6506.01 0.00<br />

Total - IX 60317.33 60317.33 0.00 20164.57 20164.57 0.00 29836.98 29836.98 0.00 29863.18 29863.18 0.00 33849.10 33849.10 0.00<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department<br />

Buildings (Non Residential)<br />

RW<br />

Division<br />

161.66 161.66 0.00 90.00 90.00 0.00 19.36 19.36 0.00 19.36 19.36 0.00 22.30 22.30 0.00<br />

Construction of Revenue Department<br />

Buildings (Residential)<br />

RW<br />

Division<br />

74.44 74.44 0.00 22.33 22.33 0.00 <strong>12</strong>.<strong>12</strong> <strong>12</strong>.<strong>12</strong> 0.00 <strong>12</strong>.<strong>12</strong> <strong>12</strong>.<strong>12</strong> 0.00 13.94 13.94 0.00<br />

Construction of PHC Buildings (Non<br />

Residential)<br />

RW<br />

Division<br />

21.16 21.16 0.00 0.00 0.00 0.00 9.84 9.84 0.00 9.84 9.84 0.00 11.32 11.32 0.00<br />

Construction of RD Department Buildings<br />

(Non Residential)<br />

RW<br />

Division<br />

64.15 64.15 0.00 8.00 8.00 0.00 11.00 11.00 0.00 11.00 11.00 0.00 <strong>12</strong>.65 <strong>12</strong>.65 0.00<br />

Construction of Revenue Department<br />

Buildings (Non Residential)<br />

RW<br />

Division<br />

178.22 178.22 0.00 77.22 77.22 0.00 48.10 48.10 0.00 48.10 48.10 0.00 52.90 52.90 0.00<br />

Construction of PHC Buildings<br />

(Residential)<br />

RW<br />

Division<br />

32.55 32.55 0.00 16.85 16.85 0.00 7.50 7.50 0.00 7.50 7.50 0.00 8.20 8.20 0.00<br />

Construction of Revenue Department<br />

Buildings (Residential)<br />

RW<br />

Division<br />

178.10 178.10 0.00 29.10 29.10 0.00 71.00 71.00 0.00 71.00 71.00 0.00 78.00 78.00 0.00<br />

Construction of Building (Non Residential)<br />

RD Division Jaleswar<br />

RW<br />

Division<br />

60.00 60.00 0.00 21.64 21.64 0.00 27.38 27.38 0.00 27.38 27.38 0.00 30.00 30.00 0.00<br />

Construction of Health & RW Building<br />

(Residential)<br />

RW<br />

Division<br />

100.55 100.55 0.00 34.30 34.30 0.00 19.00 19.00 0.00 19.00 19.00 0.00 21.00 21.00 0.00<br />

Construction & Maintenance of Buildings<br />

(Non Residential)<br />

RW<br />

Division<br />

58.61 58.61 0.00 32.05 32.05 0.00 <strong>12</strong>.65 <strong>12</strong>.65 0.00 <strong>12</strong>.65 <strong>12</strong>.65 0.00 13.91 13.91 0.00<br />

Construction of RD Department Buildings<br />

(Residential)<br />

RW<br />

Division<br />

61.26 61.26 0.00 0.00 0.00 0.00 28.49 28.49 0.00 28.49 28.49 0.00 32.77 32.77 0.00<br />

Total - X 990.70 990.70 0.00 331.49 331.49 0.00 266.44 266.44 0.00 266.44 266.44 0.00 296.99 296.99 0.00<br />

GRAND TOTAL 164054.63 164054.63 0.00 48599.87 48599.87 0.00 72926.29 72833.58 92.71 72952.91 72860.20 92.71 79168.29 79075.58 92.71<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VI<br />

Total<br />

Continuing<br />

Schemes<br />

New<br />

Schemes


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item<br />

Annexure-II: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PHYSICAL TARGETS AND ACHIEVEMENTS<br />

Eleventh <strong>Plan</strong> (2007-<br />

<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

Annexure-VII<br />

0 1 2 3 4 5 6 7<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

Work <strong>Plan</strong>-Rice Development<br />

Farmers Field School Nos. 172 <strong>12</strong> <strong>12</strong> 13 14<br />

Block level awareness campaign Nos. 60 <strong>12</strong> <strong>12</strong> 13 14<br />

Krushak Diwas Nos. 5 1 1 2 3<br />

Pre-seasonal training Nos. 5 1 1 2 3<br />

HYV. Rice production Ha. 60 0<br />

Asst. to Krushak Sathi Nos. 1445 0<br />

SRI method of Rice cultivation Ha. 72 0 96 96 110<br />

Exposure visit (Outside the state) Nos. 50 6 8 8 9<br />

Exposure visit (Inside the state) Nos. 100 11 0 11 <strong>12</strong><br />

Celebration of <strong>District</strong> Mahostav Nos. 5 0 1 1 1<br />

Financial assistance to FFS<br />

Work <strong>Plan</strong>-Sugarcane Development<br />

Nos. 0 0 160 160 170<br />

Ratoon Management Acre. 0 0 10 10 11<br />

Exposure visit (Inside the state) Nos. 36 0 6 6 7<br />

Farmers Field School<br />

Work <strong>Plan</strong>-Farm Mechanization<br />

Nos. 0 0 3 3 4<br />

Subsidy for Tractor Nos. 155 110 110 <strong>12</strong>0 132<br />

Subsidy for Power Tiller Nos. 1610 36 110 110 <strong>12</strong>0<br />

Subsidy for Self Propelled Reaper Nos. 10 1 6 6 7<br />

Subsidy for Self Propelled transplantor Nos. 5 0 0 0 0<br />

Subsidy for Rotavator Nos. 20 1 6 6 7<br />

Subsidy for Power operated implements Nos. 40 3 11 11 <strong>12</strong><br />

Subsidy for Special power operated implements Nos. 84 2 11 11 <strong>12</strong><br />

Subsidy for Hydraulic Trailer Nos. 21 3 6 6 7<br />

Subsidy for Manual & Bullock drawn implements Sets 520 <strong>12</strong>5 110 <strong>12</strong>5 137<br />

P.H.M Training<br />

Jute Technology Mission (MM-II)<br />

Nos. 8 0<br />

Seed Distribution (Jute) Qtl. 400 17 40 40 45<br />

Seed Minikit Qtl. <strong>12</strong>00 0 0 0 0<br />

Distribution of Sprayer Nos. 852 150 300 300 300<br />

Production Technology Demonstration Ha. 0 140 150 150 165<br />

Production Technology Minikit Nos. 430 0 0 0 0<br />

Retting Technology Demonstration Nos. 85 20 25 25 28<br />

Essential Nutrients Mini kits Ha. 2500 600 650 650 715<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Foliar Spray Demonstration Ha. 600 <strong>12</strong>0 130 130 143<br />

Retting Scheme Nos. 4 0 1 1 2<br />

Kuchha Retting Tank Nos. 162 60 60 60 66<br />

Pucca Retting Tank Nos. 32 0 10 10 11<br />

Integrated Pest Management Demonstration Nos. <strong>12</strong> 2 3 3 4<br />

Farmer's training Nos. 25 8 9 9 10<br />

Exposure visit (Outside the state ) Nos. 35 10 10 10 11<br />

Farmers Field School<br />

ISOPOM Pulses<br />

Nos. 30 6 6 6 7<br />

Block Demonstration Ha. 70 10 <strong>12</strong><br />

Farmer's training Nos. 50 <strong>12</strong> <strong>12</strong><br />

R. Culture/PBS Ha. 215 0<br />

<strong>Plan</strong>t Protection Equipments Nos. 1300 300 250<br />

Micronutrient Ha. 260 100<br />

Storage Bins Nos. 450<br />

Vermicompost units Nos. 60 0 24<br />

Sprinkler Nos. 0 7 11<br />

<strong>Plan</strong>t Protection Chemicals Ha. 0 150 65<br />

Distribution of Certified Seeds<br />

ISOPOM Oilseeds<br />

Qtl. 0 227 720<br />

Distribution of Certified Seeds Qtl. 47300 15508 18390 18390 20280<br />

Block Demonstration (Sunflower) Ha. 150 0 <strong>12</strong> <strong>12</strong> 13<br />

Gypsum Ha. 7510 832 2500 2500 2750<br />

R.Culture/PBS Ha. 5800 0 0<br />

Farmers Field School cum IPM (Mustard) Nos. 0 0 4 4 5<br />

Farmers Field School cum IPM (Groundnut) Nos. 24 0 7 7 8<br />

Sprinkler's set Nos. 25 10 6 10 11<br />

<strong>Plan</strong>t Protection Equipments Nos. 860 1000 350 1100 <strong>12</strong>00<br />

Micronutrient Ha. 300 20 180 180 198<br />

Farm Implements (Manual) Sets 20 4 5 6<br />

Weedicides Ha. <strong>12</strong>0 0 0<br />

<strong>Plan</strong>t Protection Chemicals Ha. 200 0 100 100 110<br />

Vermicompost units Nos. 72 0 <strong>12</strong> <strong>12</strong> 13<br />

Farmer's training Nos. 60 <strong>12</strong> 14 14 15<br />

Exposure visit<br />

Seed Village Scheme<br />

Nos. 50 11 14 14 15<br />

Paddy Ac. 750 24750 3000 3000 3300<br />

Mung Ac. 150 116 2000 2000 2200<br />

Biri Ac. 150 648 750 750 825<br />

Groundnut Ac. 150 1578 3250 3250 3575<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Mustard Ac. 0 500 500 550<br />

Training (Rs.1500/- per Training.) Nos. 48 0 0 0 0<br />

Storage Bins (20 Qtl. Capacity) Nos. 175 0 0 0 0<br />

Storage Bins (10 Qtl. Capacity)<br />

RIDF-JALANIDHI<br />

Nos. 275 0 0 0 0<br />

Shallow Tube Well Nos. 4520 2849 3500 3500 3500<br />

River Lift Project<br />

RKVY<br />

Nos. 250 0 60 60 60<br />

Profiling of secondary & Micronutrient Nos. 0 1 0 0 1<br />

Supply of paper mill sludge Mts. 0 <strong>12</strong>00 0 0 1500<br />

Supply of Gypsum Mts. 0 721 0 0 800<br />

Bio-fertilizer Qtl. 0 0 226 226 300<br />

Promotion of organic farming Nos. 0 0 11 11 15<br />

Promotion of SRI (One unit - 20Ac.) Nos. 0 0 240 240 270<br />

Establishment of Vermi Compost Nos. 0 0 300 300 350<br />

Management of acid soil Mts. 0 0 <strong>12</strong>00 <strong>12</strong>00 0<br />

Rice Minikit (Seed cost and transportation unit) Nos. 0 0 300 300 350<br />

Exposure visit outside state (20 persons in one group) Nos. 0 0 0 0 10<br />

Farmers Field School (Rice) Nos. 0 0 0 0 36<br />

INM-FFS Nos. 0 0 0 0 24<br />

IPM-FFS (Rice) Nos. 0 0 0 0 24<br />

Establishment of BGA Nos. 0 0 0 0 1<br />

Capacity building of Extension personnel's<br />

Farm Mechanization under RKVY<br />

Nos. 0 0 0 0 350<br />

Subsidy for Power Tiller Nos. 0 542 100 197 220<br />

Subsidy for Self Propelled Reaper Nos. 0 4 1 10 <strong>12</strong><br />

Subsidy for Pump sets Nos. 0 0 90 800 900<br />

Subsidy for Rotavator Nos. 0 0 0 2 3<br />

Subsidy for Power operated Thresher Nos. 0 25 5 <strong>12</strong>0 130<br />

Subsidy for Special power operated implements Nos. 0 8 1 18 20<br />

Subsidy for Hydraulic Trailer Nos. 0 2 8 10 <strong>12</strong><br />

Subsidy for Manual & Bullock drawn implements Nos. 0 195 1 331 360<br />

Subsidy for Combine Harvester Nos. 0 2 0 10 <strong>12</strong><br />

Subsidy for Transplanter Nos. 0 0 0 1 2<br />

Subsidy for Tractor<br />

RKVY-STREAM-II<br />

Nos. 0 0 0 10 <strong>12</strong><br />

Renovation of farms Nos. 2 1 0 0 1<br />

Strengthening of statistical unit Nos. 2 1 0 0 1<br />

Modernization of train. hall with Gen. Set. & LCD Projec. Nos. 1 0 0 0 1<br />

Boundary wall /Bore well & Sanitary for training hall Nos. 1 0 0 0 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Construction of FIAC building Nos. 8 0 6 6 2<br />

Construction of seed proceeding plant 5tons capacity (Jaleswar) Nos. 1 0 0 0 1<br />

Construction of Dehumidified storage go-down for g/t<br />

National Food Security Mission (Pulse)<br />

Nos. 1 0 0 0 1<br />

Distribution of Certified Seeds Qtl. 0 0 650 650 700<br />

Organization of technology Demonstration (0.4ha-unit) Ha. 0 0 140 140 200<br />

Organization of farmers Training (25 nos of farmers) Nos. 0 0 0 0 60<br />

Seed Village (@ Rs. 15000/-per Ha.) of 50 nos farmers of 3 days Ha. 0 0 0 0 700<br />

Storage go-down at Block Head Quarter of <strong>12</strong>50 sqft.. Nos. 0 0 0 0 4<br />

Threshing Floor (30'X30') with cover Nos. 0 0 0 0 4<br />

Power Tillers Nos. 0 0 0 0 25<br />

Dal Processor (Mini Dal Mill)<br />

INM (Integrated Nutrient Management)<br />

Nos. 0 0 0 0 3<br />

Lime/Gypsum Ha. 0 0 <strong>12</strong>00 <strong>12</strong>00 1500<br />

Micronutrient Ha. 0 0 480 480 550<br />

Assistance for R.Culture/PSB distribution<br />

IPM (Integrated Post Management)<br />

Ha. 0 0 400 400 450<br />

Assistance for PP Chemicals Ha. 0 0 1000 1000 1100<br />

Incentive for sprayer @ Rs.3000/- Nos. 0 0 350 350 400<br />

Distribution of Rotavactors Nos. 0 0 2 2 3<br />

Distribution sprinkler set @ Rs.7500/- Ha. 0 0 60 60 70<br />

Incentives for pump sets Nos. 0 0 140 140 160<br />

Assistance for pipe (one set 800mtr) Mts. 0 0 6400 6400 8000<br />

Exposure visit @ Rs.3000/- (20 persons in a group) Nos. 0 0 0 0 5<br />

2 Horticulture<br />

A. National Horticulture Mission Programme<br />

Establishment of new Garden<br />

Mango Ha. 1318 250 400 400 420<br />

Banana Ha. 240 70 20 20 50<br />

Costal horticulture -cashew<br />

Floriculture<br />

Ha. 670 150 150 150 200<br />

Marigold Ha. 207 25 10 10 15<br />

Gladioli Ha. 265 50 25 25 30<br />

Rose Ha. 162 171 15 15 20<br />

Tube Rose<br />

Organic Farming<br />

Ha. 108 0 0 0 0<br />

Vermicompost (Big) Nos. 20 2 8 8 10<br />

Vermicompost (Small)<br />

Production of <strong>Plan</strong>ting Materials<br />

Nos. 158 30 0 0 0<br />

Small Nursery (Public Sector) Nos. 3 1 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Small Nursery (Private Sector) Nos. <strong>12</strong> 3 0 0 4<br />

Model Nursery in private sector<br />

Protected cultivation<br />

Nos. 2 0 0 0 0<br />

Greenhouse units Nos. 22 0 60 60 60<br />

Shade net units Nos. 25 0 400 400 400<br />

Mulching units Nos. 35 0 10 10 10<br />

Plastic Tunnel units<br />

Human Resource Development<br />

Nos. 62 0 0 0 0<br />

Training of farmers (Inside the state) Nos. 683 70 80 80 80<br />

Exposure visit (Outside the state) Nos. 80 20 30 30 30<br />

Training to Gardener Nos. 20 8 3 3 3<br />

Training to entrepreneur Nos. 34 3 0 0 0<br />

Training to supervisor<br />

Subsides Sales<br />

Nos. 7 0 0 0 0<br />

Vegetable Mini kit<br />

Mission Management<br />

Nos. 46510 11460 <strong>12</strong>000 <strong>12</strong>000 14400<br />

<strong>District</strong> level show<br />

B. Micro Irrigation Programme<br />

Nos. 5 1 1 1 1<br />

Drip irrigation Ha. 27 5 50 50 50<br />

Sprinkler irrigation<br />

C. Coconut Development Board Programme<br />

Ha. 551 205 200 200 300<br />

Area expansion Ha. 205 0 75 75 80<br />

Laying out demonstration Ha. 62 25 15 15 20<br />

Organic manure pit Nos. 8 2 2 2 2<br />

Raising of coconut seedling<br />

D. ISOPOM (Oil Palm)<br />

Nos. 55000 5000 5000 5000 5000<br />

Normal Ha. 68 64 70 70 80<br />

S.C.P Ha. 20 10 <strong>12</strong> <strong>12</strong> 15<br />

T.A.S.P Ha. 20 <strong>12</strong> 15 15 15<br />

Demonstration<br />

E. R.K.V.Y.<br />

Ha. 6 6 10 10 10<br />

Vermicompost units Nos. 136 40 40 40 50<br />

Vermicompost hatchery Nos. 9 2 10 10 10<br />

Zero Energy Cool Chamber<br />

F. National Medicinal <strong>Plan</strong>t Mission Programme<br />

Nos. 10 0 10 10 10<br />

Anola Ha. 45 7 7 7 10<br />

Aswagandha Ha. 15 5 2 2 5<br />

Tulasi Ha. 15 0 5 5 7<br />

Aloevera Ha. 0 0 5 5 5<br />

Exposure visit (Inside the state) Nos. 56 0 5 5 5<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Exposure visit (Outside the state) Nos. 13 0 2 2 3<br />

3 Soil and Water Conservation<br />

Watershed Development Nos. 0 8 10 10 10<br />

4 Animal Husbandry & Dairy Development<br />

ASCAD Health Camp & Awareness Programme Nos. 0 26 26 26 26<br />

Bird Flu Training Programme Nos. 0 <strong>12</strong> <strong>12</strong> <strong>12</strong> 15<br />

Genetic up gradation of Goats Deworming of goats<br />

SIMILE Training<br />

Nos. 0 115 0 160 300<br />

Microscopy Training to LIs Nos. 0 1 1 1 1<br />

Entrepreneurship Development Training Nos. 0 1 1 1 3<br />

Orientation training to LIs on development programme of Deptt. Nos. 0 1 1 1 1<br />

Training to farmers on poultry production Nos. 0 0 0 0 42<br />

Training of lead farmers Nos. 0 1 1 1 3<br />

Skill up gradation training Nos. 0 4 4 4 21<br />

Milk Production MT. 0 63.90 72.00 65.00 70.00<br />

Egg Production Million 0 76.72 90.00 80.00 77.00<br />

Meat Production MT. 0 3.04 0.00 3.25 3.50<br />

Fodder Minikit distribution Nos. 2472 100 100 3000<br />

Training & Demonstration under pasture development Nos.of Demon. 2472 100 100 500<br />

Fodder Production Qtl. 53517 0 0 80000<br />

Treatment of Cases Nos. 351860 461000 380000 420000<br />

Castration<br />

Vaccination<br />

Nos. 32656 45000 34000 37000<br />

HSV Nos. 294900 778350 330000 330000<br />

BQV Nos. 277950 436200 300000 300000<br />

FMDV Nos. 161800 207000 180000 300000<br />

RDV.(R2B) Nos. 186300 332200 220000 250000<br />

PPRV Nos. 111100 100000 100000 100000<br />

Artificial Insemination Nos. 64132 86100 70000 57000<br />

Infertility camps Nos. 731 1198 800 650<br />

Deworming Nos. 107997 267610 <strong>12</strong>0000 100000<br />

Establishment of Dairy units Nos. 60 0 160 300<br />

Establishment of Goatery units Nos. 32 0 40 60<br />

Establishment of Broilers farmer units Nos. 92 0 10 150<br />

Back yard poultry units Nos. 42441 0 50000 60000<br />

Layers farmers Nos. 0 2 1 2<br />

6 Fisheries<br />

Development of Fresh Water Aquaculture under FFDA (Water Area) Ha. 550.00 114.53 <strong>12</strong>0.00 <strong>12</strong>0.00 130.00<br />

Development of Fresh Water Aquaculture under FFDA (Training) Nos. 500 30 50 50 60<br />

Development of Water Logged Areas (Water Area) Ha. 50.00 10.26 0.00 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Development of Water Logged Areas (Training) Nos. 150.00 0.00 0.00 0.00 0.00<br />

Development of Brackish Water Aquaculture (Water Area) Ha. 2360.00 0.00 250.00 100.00 <strong>12</strong>0.00<br />

Integrated Development of Inland Capture Resources (Net & Boat) Nos. 300 62 0 20 25<br />

Integrated Development of Inland Capture Resources (Training) Nos. 300 0 0 0 0<br />

Development of Fresh Water Aquaculture under NFDB (Water Area) Ha. 0 0 240 240 240<br />

Development of Fresh Water Aquaculture under NFDB (Training) Nos. 500 70 <strong>12</strong>0 <strong>12</strong>0 <strong>12</strong>0<br />

Self Employment Programme (Training) Nos. 500 60 30 30 60<br />

7 Cooperation<br />

Share capital to Cooperative credit institutions under NRC-LTO fund<br />

PACS/LAMPCS & C.S. Bank Nos. 143 0 65 65 67<br />

Weak CARD Bank Nos. 1 0 1 1 0<br />

Managerial Subsidy<br />

Modernation of Co-operative Processing<br />

Nos. <strong>12</strong>1 0 62 62 59<br />

Rice Mill<br />

Consumer Co-operative<br />

Nos. 1 0 0 0 1<br />

Share Capital Nos. 22 0 8 8 10<br />

Transporting Subsidy of PDS<br />

MACP-Infrastructure Strengthening and Managerial subsidy to Marketing<br />

Nos. 49 0 20 20 23<br />

Repair of Godown of PACS & RCMS Nos. 33 0 10 10 14<br />

Managerial Subsidy to PACS & RCMS for procurement<br />

Financial assistance (loan/subsidy or share) to other cooperative<br />

Nos. 100 0 40 40 50<br />

Women Cooperative Nos. 4 0 1 1 1<br />

Labour Cooperative Nos. 9 0 2 2 5<br />

II. RURAL DEVELOPMENT<br />

1 DRDA Administration<br />

Gopabandhu Gramin Yojana (GGY) Nos. of Projects 2095 333 836 836 <strong>12</strong>25<br />

State Finance Commission Grant Nos. of Projects 434 393 41 41 51<br />

Twelfth Finance Commission (TFC) Nos. of Projects 8637 7784 853 853 0<br />

13th FCA Nos. of Projects 0 0 0 0 0<br />

2 Rural Employment<br />

(a) Swarnajayanti Gram Swarozgar Yojana (SGSY) Nos. of Benf. 34607 9257 8300 10223 9100<br />

(c) Mahatma Gandhi National Rural Employment Guarantee Scheme Nos. of Projects 6915 364 3924 3924 4242<br />

III. SPECIAL AREAS PROGRAMMES<br />

Nilgiri ITDA<br />

1 Grants under provision to article 275(1)<br />

Construction of Boundary Wall of School/Hostel Nos. 18 4 0 3 5<br />

Construction of School/Hostel Building Nos. 20 20 3 0 2<br />

Electrification of School/Hostel Nos. 26 4 0 6 7<br />

CD work Nos. 28 3 0 4 6<br />

Drainage works at school Nos. 6 1 0 2 3<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

2 Special Central Assistance to Tribal Sub-<strong>Plan</strong><br />

Group finance to SHGs Nos. of families 9 16 6 6 7<br />

Bee keeping Nos. of families 325 100 50 50 50<br />

Lac cultivation Nos. of families 650 150 100 100 100<br />

Land Development Nos. of families 53 53 0 0 0<br />

Cello Tube well Nos. 76 16 16 16 18<br />

River Lift Point Nos. 10 2 3 3 1<br />

Training Programme Nos. <strong>12</strong>0 10 60 60 50<br />

CD work Nos. 64 15 <strong>12</strong> <strong>12</strong> 15<br />

WHS Nos. 20 0 6 6 7<br />

IV. IRRIGATION & FLOOD CONTROL<br />

<strong>12</strong>th F.C. road Nos. 0 3 0 0 0<br />

<strong>12</strong>th F.C. building Nos. 0 2 0 0 0<br />

RIDF (NABARD) Nos. 0 0 1 1 0<br />

Bank protection work (Flood Control) Nos. 0 0 3 3 0<br />

State <strong>Plan</strong> (LUMP) Nos. 0 0 31 31 0<br />

Bank protection work (Flood Control) Nos. 0 0 0 0 2<br />

1 Minor Irrigation<br />

Creation of Irrigation potential Ha. 0.00 336.00 604.00 0.00 700.00<br />

Biju Krushak Vikash Yojana - LI Division, Jaleswar Ha. 4294.00 48.00 780.00 780.00 540.00<br />

V. ENERGY<br />

Rajib Gandhi Gramin Vidyutikaran Yojana Nos. 4275 <strong>12</strong>5250 <strong>12</strong>5250 18250<br />

Electrification of Un-electrified Villages Nos. 40 60 60 55<br />

Biju Gram Jyoti Yojana No. of village 6 10 10 <strong>12</strong><br />

VI. INDUSTRY & MINERALS<br />

1 Small Scale Enterprises Nos. 1784 293 290 0 300<br />

PMEGP Nos. 1472 166 163 0 203<br />

Cottage Industries Nos. 243 49 42 0 45<br />

2 Handloom & Textile<br />

Promotion of Handloom Industry Nos. of Wvrs 190 80 80 0 50<br />

Workshed-cum-Housing Nos. 170 26 46 0 50<br />

Skill up gradation training Nos. 220 0 50 0 70<br />

IHDS (Cluster Approach) Nos. of Wvrs 328 216 328 0 328<br />

IHDS (Group Approach) Nos. of Wvrs 628 140 <strong>12</strong>0 0 150<br />

IHDS (Marketing Incentive) Nos. of Wvrs 34 10 30 0 34<br />

ICICI (Lombard) Nos. of Wvrs 1800 <strong>12</strong>29 <strong>12</strong>30 0 <strong>12</strong>50<br />

MGBBY Nos. of Wvrs 1<strong>12</strong>0 788 800 0 820<br />

10% Rebate on Handloom Product Nos. of WCS 25 21 25 0 25<br />

<strong>District</strong> level Exhibition Nos 5 0 1 0 1<br />

VII. TRANSPORT<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

1 Rural Work Division, <strong>Balasore</strong> (I)<br />

A C.W.A<br />

Black Topped K.M. 3.242 0.696 0.690 0.690 0.700<br />

Metalling K.M. 3.762 0.696 0.946 0.946 0.950<br />

R. T. Wall Mtr. 1.392 0.011 0.581 0.581 0.800<br />

Cement Concrete Road K.M. 6.427 1.038 1.251 1.251 1.500<br />

Cross Drainage works Nos. 4 1 0 0 2<br />

B <strong>12</strong>th Finance Commission Award<br />

Black Topped K.M. 7.400 0.696 0.000 0.000 0.000<br />

Metalling K.M. 9.035 0.696 0.000 0.000 0.000<br />

R. T. Wall Mtr. 0.011 0.011 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 4.514 1.038 0.000 0.000 0.000<br />

Cross Drainage works Nos. 31 1 0.000 0.000 0<br />

C Special Repair to Road<br />

Black Topped K.M. 7.510 0.000 2.883 2.883 3.000<br />

Metalling K.M. 6.997 0.260 2.383 2.383 3.000<br />

R. T. Wall Mtr. 6.727 0.234 2.685 2.685 3.000<br />

Cement Concrete Road K.M. 21.056 2.277 6.0<strong>12</strong> 6.0<strong>12</strong> 7.000<br />

Cross Drainage works Nos. 69 8 20 20 25<br />

C. Drain K.M. 0.768 0.140 0.298 0.298 0.330<br />

DR K.M. 59.359 0.000 23.606 23.606 0.000<br />

D PMGSY<br />

Black Topped K.M. 14.91 0.00 0.00 14.91 0.00<br />

2 Rural Work Division, <strong>Balasore</strong> (II)<br />

A C.W.A<br />

Black Topped K.M. 0.000 0.330 0.000 0.000 0.000<br />

Metalling K.M. 0.000 1.340 0.000 0.000 0.000<br />

R. T. Wall Mtr. 0.000 96.000 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 1.050 1.073 1.073 1.180<br />

Cross Drainage works Nos. 0 0 1.000 1.000 0<br />

B NABARD Road<br />

Black Topped K.M. 0.000 15.410 0.000 0.000 0.000<br />

Metalling K.M. 0.000 15.410 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 13.190 0.000 0.000 0.000<br />

Cross Drainage works Nos. 0 52 0.000 0.000 0.000<br />

C <strong>12</strong>th Finance Commission<br />

Black Topped K.M.<br />

Metalling K.M. 0.000 1.827 0.000 0.000 0.000<br />

R. T. Wall Mtr. 0.000 144.000 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 2.618 0.000 0.000 0.000<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Cross Drainage works Nos. 0 4 0.000 0.000 0.000<br />

D Critical Road<br />

Black Topped K.M. 0.000 0.000 0.345 0.345 0.380<br />

Metalling K.M. 0.000 0.000 0.823 0.823 0.905<br />

R. T. Wall Mtr. 0.000 251.000 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 0.432 0.287 0.287 0.316<br />

Cross Drainage works Nos. 0 0 1 1 1<br />

E Improvement & Widening Road<br />

Cement Concrete Road K.M. 0.000 0.373 0.529 0.529 0.582<br />

R. T. Wall Mtr. 0.000 255.000 280.000 280.000 308.000<br />

Cross Drainage works Nos. 0 1 0 0 0<br />

F <strong>Plan</strong> Scheme Road<br />

Black Topped K.M. 0.000 0.600 0.850 0.850 0.935<br />

Metalling K.M. 0.600 2.339 2.339 2.339 2.573<br />

R. T. Wall Mtr.<br />

Cement Concrete Road K.M. 0.000 0.774 4.346 4.346 4.781<br />

Cross Drainage works Nos. 0 3 11 11 <strong>12</strong><br />

G Bharat Nirman<br />

Black Topped K.M. 0.000 18.100 15.200 15.200 0.000<br />

Metalling K.M. 0.000 1.100 15.200 15.200 0.000<br />

R. T. Wall Mtr.<br />

Cement Concrete Road K.M. 0.000 27.000 28.000 28.000 0.000<br />

Cross Drainage works Nos. 0 390 1025 1025 0<br />

3 R & B Division<br />

Black Topped K.M. 0.000 7.100 29.990 29.990 43.<strong>12</strong>7<br />

Metalling K.M. 0.000 0.744 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 2.588 1.978 1.978 2.000<br />

Cross Drainage works Nos. 0 18 10 10 14<br />

4 Rural Work Division, Jaleswar<br />

A C.W.A.<br />

Black Topped K.M. 0.000 0.540 0.000 0.000 0.000<br />

Metalling K.M. 0.000 0.675 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 1.649 0.687 0.195 0.195 0.200<br />

GSB K.M. 0.000 0.285 0.000 0.000 0.000<br />

MSB K.M. 0.000 0.000 2.053 2.053 2.050<br />

EW K.M. 0.000 0.000 2.053 2.053 2.050<br />

B NABARD<br />

Black Topped K.M. 4.955<br />

WBM K.M. 4.955<br />

Cement Concrete Road K.M. 0.700<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Cross Drainage works Nos. 17<br />

R. T. Wall Mrt. 0.650<br />

GSB K.M. 2.555<br />

HL Bridge Nos. 1 1 1 1 1<br />

S. Bridge Nos. 5 3<br />

C <strong>12</strong>th Finance Commission<br />

Black Topped K.M. 1.700<br />

Metalling K.M. 4.605<br />

Cement Concrete Road K.M. 7.193 2.622<br />

GSB K.M. 5.355<br />

EW K.M. 3.637<br />

Cross Drainage works Nos. 23 10<br />

R. T. Wall Mrt. 0.000 0.497<br />

Drain Nos. 0 1<br />

Building works Nos. 85 9<br />

D Important Critical Road<br />

Black Topped K.M. 77.709 0.991 15.200 15.200 15.000<br />

Metalling K.M. 0.400 0.991 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 28.833 0.631 0.609 0.609 0.700<br />

GSB K.M. 0.000 1.500 0.000 0.000 0.000<br />

EW K.M. 0.000 0.000 14.574 14.574 14.900<br />

MSB K.M. 0.000 0.000 14.574 14.574 14.700<br />

Cross Drainage works Nos. 0 2 38 38 40<br />

DR K.M. 0.000 0.000 9.169 9.169 10.500<br />

R. T. Wall Mrt. 0.000 0.000 <strong>12</strong>0.000 <strong>12</strong>0.000 150.000<br />

Bharat Nirman K.M. 217.700 98.390 78.220 78.220 28.000<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

1 Eco-<strong>Plan</strong>tation Ha. 0 50 15 15 0<br />

2 Construction of Building Nos. 0 1 1 1 0<br />

IX SOCIAL SERVICES<br />

Education<br />

S.S.A<br />

Block Resource Center Nos. 0 <strong>12</strong> <strong>12</strong> <strong>12</strong> <strong>12</strong><br />

Cluster Resource Center Nos. 0 204 201 201 201<br />

Civil work Nos. 0 0 670 670 670<br />

Interventions for out of School Children Nos. 0 0 1432 1432 1432<br />

Free Text Book Nos. 0 0 268902 268902 268902<br />

Innovative Activities Nos.<br />

i.) ECCE Nos. 0 0 1 1 1<br />

ii.) Girl Education Nos. 0 0 1 1 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

iii.) SC/ST Education Nos. 0 0 1 1 1<br />

iv.) Computer Education Nos. 0 0 1 1 1<br />

v.) Others Nos. 0 0 1 1 1<br />

CWSN (IED) Nos. 0 0 7719 7719 7719<br />

Maintenance Grants (PS & UPS) Nos. 0 2671 2915 2915 2915<br />

Management & MIS Nos. 0 0 1 1 1<br />

i.) Learning Enhancement Prog(LEP) Nos. 0 0 1 1 1<br />

Research & Evaluation Nos. 0 0 319 319 319<br />

School Improvement Grant Nos. 0 3080 3199 3199 3199<br />

Teachers Grant Nos. 0 8962 10937 10937 10937<br />

Teachers Grant Salary (Recurring) Nos. 0 3294 4545 4545 4545<br />

Teaching Learning Equipment (PS) Nos. 0 83<strong>12</strong>5 31 31 31<br />

Teacher Training Nos. 0 7292 11381 11381 11381<br />

Community Training Nos. 0 0 26572 26572 26572<br />

Community Mobilization Nos. 0 0 1 1 1<br />

National Education Programme for Girls at Elementary Level (NPEGEL) Nos. 0 30 30 30 30<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) Nos. 0 1 1 1 1<br />

6 Medical & Public Health<br />

Sterilization Nos. 8819 9701 9701 10671<br />

Intra Uterine Devices Nos. 45000 49500 49500 54450<br />

Oral Pills Nos. 20000 22000 22000 24200<br />

Contraceptive Condoms users Nos. 20000 22000 22000 24200<br />

MTP<br />

Immunization<br />

Nos. 3400 3740 3740 4114<br />

TT (Preg) Nos. 51672 56839 56839 62523<br />

DPT Nos. 46975 51673 51673 56840<br />

Polio Nos. 46975 51673 51673 56840<br />

BCG Nos. 46975 51673 51673 56840<br />

Measles Nos. 46975 51673 51673 56840<br />

Vit-A Nos. 46975 51673 51673 56840<br />

DT Nos. 51800 51800 51800 56980<br />

TT (10 years) Nos. 52000 57200 57200 62920<br />

TT (16 years) Nos. 45000 49500 49500 54450<br />

Large Follifor Nos. 51672 56839 56839 62523<br />

7 Water Supply & Sanitation<br />

(i) Rural Water Supply<br />

ARWSP Sinking of Tube Wells Nos. 959 240 239 239 210<br />

MNP Sinking of Tube Wells Nos. 1135 117 238 238 210<br />

Public Water Supply Schemes Nos. 314 32 93 93 42<br />

(ii) Rural Sanitation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Item<br />

Unit<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

Eleventh <strong>Plan</strong> (2007-<br />

10 Actual<br />

<strong>12</strong>) Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Anticipated<br />

Target<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

Sanitation coverage of Households Nos. 42391 55000 55000 6<strong>12</strong>50<br />

Sanitation coverage of Schools (Toilets) Nos. 764 0 0 800<br />

Sanitation coverage of Anganwadis (Toilets) Nos. 964 0 0 750<br />

(iii) Urban Water Supply<br />

Urban Water Supply Projects Nos. 6 5 5 6<br />

(iv) Urban Sanitation<br />

Urban Sanitation Projects Nos. - 5 5 6<br />

8 Rural Housing<br />

Indira Awas Yojana Nos. of Benf. 56690 4634 16604 16604 21705<br />

Mo Kudia Nos. of Benf. 4085 776 996 996 <strong>12</strong>00<br />

9 Social Security & Social Welfare<br />

IGNOAP Nos. of Benf. 23794 23794 23794 23794 23794<br />

ODP Nos. of Benf. 6647 9369 750 750 750<br />

MBPY Nos. of Benf. 31055 48094 8500 8500 49158<br />

X GENERAL SERVICES<br />

Non Residential<br />

Construction of Revenue Department Buildings Nos. 4 2 0 0 2<br />

Construction of PHC Buildings Nos. 4 0 1 1 2<br />

Construction & Maintenance of Buildings<br />

Residential<br />

Nos. 7 0 2 2 3<br />

Construction of Revenue Department Buildings Nos. 8 6 0 0 2<br />

Construction of PHC Buildings Nos. 17 7 0 0 10<br />

Construction & Maintenance of Buildings Nos. 8 0 2 2 4<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-VII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>)<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Projected Outlay Actual Expenditure Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

Annexure - VIII<br />

Annexure - III: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: BHARAT NIRMAN PROGRAMMES: PROPOSED OUTLAYS<br />

(Rs. In lakh)<br />

Name of Items/Programmes<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<br />

<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6<br />

1 Irrigation 6256.59 3563.45 5399.18 5399.18 5084.<strong>12</strong><br />

2 Rural Drinking Water Supply 8775.93 1013.46 2110.85 2110.85 2231.82<br />

3 Rural Roads 53852.18 14706.89 20626.30 20626.30 19206.62<br />

4 Rural Housing 2<strong>12</strong>71.25 2894.00 8703.05 8703.05 9573.05<br />

5 Rural Electrification 0.00 717.29 789.00 789.00 968.46<br />

6 Rural Telephone Connectivity<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Total (1 to 6) 90155.95 22895.09 37628.38 37628.38 37064.07<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - VIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Annexure-IV: ANNUAL PLAN: <strong>2011</strong>-<strong>12</strong>: PROPOSED OUTLAYS (CENTRALLY SPONSORED & CENTRAL PLAN SCHEMES)<br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

Centrally Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 90.00 10.00 62.<strong>12</strong> 6.90 4.93 0.55 8.02 0.89 8.02 0.89 9.65 1.07<br />

Work <strong>Plan</strong>-Sugarcane Development 90.00 10.00 1.30 0.14 0.00 0.00 2.03 0.23 2.03 0.23 2.33 0.26<br />

Jute Technology Mission (MM-II) 90.00 10.00 84.59 9.40 10.42 1.16 22.51 2.50 22.51 2.50 24.76 2.75<br />

ISOPOM (Pulses) 75.00 25.00 20.13 6.71 5.78 1.93 9.43 3.14 9.43 3.14 0.00 0.00<br />

ISOPOM (Oil Seeds)<br />

Central <strong>Plan</strong><br />

75.00 25.00 437.59 145.86 162.63 54.21 186.11 62.04 186.11 62.04 204.72 68.24<br />

Seed Village Programme 100 100.00 00 000 0.00 133 133.15 15 000 0.00 729 7.29 000 0.00 51 51.53 53 000 0.00 51 51.53 53 000 0.00 56 56.68 68 000 0.00<br />

Promotion of SRI programme 100.00 0.00 0.00 0.00 3.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 100.00 0.00 592.25 0.00 <strong>12</strong>8.62 0.00 182.59 0.00 182.59 0.00 211.26 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) 100.00 0.00 0.00 0.00 496.45 0.00 3411.04 0.00 3411.04 0.00 3700.05 0.00<br />

National Food Security Mission (Pulses) 100.00 0.00 0.00 0.00 0.00 0.00 74.78 0.00 74.78 0.00 256.92 0.00<br />

Sub-Total 1331.13 169.02 819.72 57.84 3948.03 68.80 3948.03 68.80 4466.37 72.32<br />

2 Horticulture<br />

Centrally Sponsored <strong>Plan</strong><br />

National Horticulture Mission 85.00 15.00 524.98 92.64 56.35 9.94 132.29 23.34 132.29 23.34 164.59 29.04<br />

Micro Irrigation Programme 40.00 30.00 32.00 24.00 <strong>12</strong>.53 9.40 20.00 15.00 20.00 15.00 25.71 19.29<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

75.00 25.00 6.94 2.31 4.77 1.59 6.90 2.30 6.90 2.30 7.64 2.55<br />

Coconut Development Board Programme 100.00 0.00 60.54 0.00 5.78 0.00 9.63 0.00 9.63 0.00 11.30 0.00<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 100.00 0.00 5.81 0.00 0.71 0.00 1.<strong>12</strong> 0.00 1.<strong>12</strong> 0.00 2.26 0.00<br />

Rastriya Krishi Vikas Yojana (RKVY) 100.00 0.00 <strong>12</strong>.68 0.00 3.55 0.00 5.95 0.00 5.95 0.00 6.70 0.00<br />

Sub-Total 642.94 118.96 83.69 20.93 175.89 40.64 175.89 40.64 218.19 50.88<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

90.00 10.00 484.32 53.81 145.74 16.19 130.18 14.46 130.18 14.46 208.40 23.16<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

Annexure - IX<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Soil and water conservation measures under RKVY 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.50 0.00<br />

Sub-Total 484.32 53.81 145.74 16.19 130.18 14.46 130.18 14.46 264.90 23.16<br />

4 Animal Husbandry & Dairy Development<br />

Centrally Sponsored <strong>Plan</strong><br />

Disease Control Programme under ASCAD 75.00 25.00 <strong>12</strong>1.85 40.62 0.00 0.00 60.92 20.31 60.92 20.31 60.92 20.31<br />

Health Camp & Awareness under ASCAD<br />

Central <strong>Plan</strong><br />

75.00 25.00 4.59 1.53 0.44 0.15 0.41 0.14 0.62 0.21 0.41 0.14<br />

SMILE Training 100.00 0.00 11.43 0.00 0.85 0.00 0.69 0.00 0.84 0.00 5.00 0.00<br />

Exposure visit of farmers under SMILE 100.00 0.00 5.04 0.00 0.00 0.00 2.25 0.00 2.25 0.00 2.52 0.00<br />

Extension Services<br />

RKVY<br />

100.00 0.00 2.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00<br />

a) Strengthening of Livestock Service Service Information &<br />

Modernisation of office<br />

100 100.00 00 000 0.00 506 506.08 08 000 0.00 000 0.00 000 0.00 190 190.79 79 000 0.00 190 190.79 79 000 0.00 315 315.15 15 000 0.00<br />

b) Dairy Development 100.00 0.00 226.80 0.00 0.00 0.00 106.21 0.00 106.21 0.00 <strong>12</strong>0.59 0.00<br />

c) Fodder Development 100.00 0.00 86.30 0.00 0.00 0.00 40.20 0.00 40.20 0.00 46.50 0.00<br />

d) Goat Development 100.00 0.00 25.20 0.00 0.00 0.00 <strong>12</strong>.60 0.00 <strong>12</strong>.60 0.00 <strong>12</strong>.60 0.00<br />

e) Poultry Development 100.00 0.00 56.40 0.00 0.00 0.00 16.30 0.00 16.30 0.00 40.10 0.00<br />

Sub-Total 1045.68 42.14 1.29 0.15 431.37 20.44 431.73 20.51 604.79 20.44<br />

5 Co-operative<br />

Central <strong>Plan</strong><br />

Construction of Rural Godown under RKVY 100.00 0.00 0.00 0.00 0.00 0.00 508.01 0.00 508.01 0.00 1427.92 0.00<br />

Sub-Total 0.00 0.00 0.00 0.00 508.01 0.00 508.01 0.00 1427.92 0.00<br />

6 Fisheries<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture<br />

through FFDA<br />

75.00 25.00 181.50 60.50 22.88 7.63 54.30 18.10 54.30 18.10 55.80 18.60<br />

Development of Brackish Water Aquaculture through<br />

FFDA<br />

75.00 25.00 196.65 65.55 0.00 0.00 151.86 50.62 151.86 50.62 1<strong>12</strong>.50 37.50<br />

Saving-cum-Relief Scheme 50.00 50.00 28.17 28.17 3.57 3.57 6.00 6.00 6.00 6.00 7.20 7.20<br />

Group Accident Insurance Scheme 50.00 50.00 32.35 32.35 7.95 7.95 7.95 7.95 7.95 7.95 8.25 8.25<br />

Low Cost House 50.00 50.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00<br />

Assistance of Mechanisation Programme 50.00 50.00 27.00 27.00 0.00 0.00 60.00 60.00 60.00 60.00 14.25 14.25<br />

Central <strong>Plan</strong> 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Introduction of Intermediate craft of Improved Design 100.00 0.00 60.00 0.00 0.00 0.00 <strong>12</strong>.00 0.00 <strong>12</strong>.00 0.00 24.00 0.00<br />

Sub-Total 550.67 238.57 34.40 19.15 292.11 142.67 292.11 142.67 247.00 110.80<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Total - I 4054.74 622.50 1084.83 114.26 5485.59 287.02 5485.94 287.09 7229.17 277.60<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

II RURAL DEVELOPMENT<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarnajayanti Gram Swarozgar Yojana 75.00 25.00 3562.31 1187.44 791.71 263.90 870.38 290.13 870.38 290.13 900.00 300.00<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme 90.00 10.00 <strong>12</strong>934.94 1437.22 1173.34 130.37 3200.56 355.62 3200.56 355.62 3796.70 421.86<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

75.00 25.00 732.14 244.05 94.21 31.40 150.00 50.00 150.00 50.00 187.50 62.50<br />

<strong>12</strong>th Finance Commission Award 100.00 0.00 3393.65 0.00 2884.94 0.00 508.71 0.00 508.71 0.00 0.00 0.00<br />

13th Finance Commisssion Award 100.00 0.00 0.00 0.00 0.00 0.00 583.28 0.00 583.28 0.00 641.25 0.00<br />

Total - II 20623.03 2868.70 4944.19 425.68 53<strong>12</strong>.93 695.74 53<strong>12</strong>.93 695.74 5525.45 784.36<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 100.00 0.00 233.64 0.00 39.04 0.00 70.00 0.00 70.00 0.00 86.00 0.00<br />

Special Central Assistance to TSP areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

100.00 0.00 549.82 0.00 79.53 0.00 135.00 0.00 135.00 0.00 180.00 0.00<br />

Grants under Provision to Article 275 (1) 100.00 0.00 0.00 0.00 0.00 0.00 13.73 0.00 13.73 0.00 15.00 0.00<br />

Special Central Assistance to TSP areas 100.00 0.00 0.00 0.00 11.50 0.00 21.65 0.00 21.65 0.00 20.00 0.00<br />

Total - III 783.46 0.00 130.07 0.00 240.38 0.00 240.38 0.00 301.00 0.00<br />

IV IRRIGATION & FLOOD CONTROL<br />

Centrally Sponsored <strong>Plan</strong><br />

Flood Mang. Prog. (River Bank Protec. Work) 75.00 25.00 0.00 0.00 1<strong>12</strong>6.06 375.35 814.64 271.55 814.64 271.55 2357.33 785.80<br />

Flood Management Programme (Major Works)<br />

Central <strong>Plan</strong><br />

75.00 25.00 1585.50 528.50 380.58 <strong>12</strong>6.86 1141.50 380.50 1141.50 380.50 98.27 32.76<br />

Installation of LI Projects under RKVY 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 218.40 0.00<br />

Total - IV 1585.50 528.50 1506.64 502.21 1956.14 652.05 1956.14 652.05 2674.00 818.56<br />

V. ENERGY<br />

Centrally Sponsored <strong>Plan</strong><br />

Rajiv Gandhi Gramin Vidyutikaran Yojana 90.00 10.00 0.00 0.00 267.30 29.70 294.03 32.67 294.03 32.67 308.74 34.30<br />

Total - V 0.00 0.00 267.30 29.70 294.03 32.67 294.03 32.67 308.74 34.30<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

Central <strong>Plan</strong><br />

Prime Minister's Employment Generation Programme (PMEGP) 100.00 0.00 863.00 0.00 224.00 0.00 228.00 0.00 228.00 0.00 300.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

2 Handloom & Textiles<br />

Centrally Sponsored <strong>Plan</strong><br />

IHDS (Cluster Approach) 70.00 20.00 48.48 13.85 1.56 0.44 16.55 4.73 16.55 4.73 6.81 1.95<br />

IHDS (Group Approach) 70.00 20.00 59.19 16.91 1.07 0.30 8.56 2.44 8.56 2.44 8.95 2.55<br />

IHDS (Marketing Incentive) 50.00 50.00 30.32 30.32 4.58 4.58 4.60 4.60 4.60 4.60 4.75 4.75<br />

Health Insurance for weavers 88.00 <strong>12</strong>.00 36.08 4.92 8.75 1.19 10.16 1.39 10.16 1.39 10.32 1.41<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

60.00 40.00 5.44 3.62 0.71 0.47 0.72 0.48 0.72 0.48 0.74 0.49<br />

10% Rebate on Handloom Products 100.00 0.00 75.00 0.00 8.30 0.00 9.00 0.00 9.00 0.00 10.00 0.00<br />

<strong>District</strong> Level Exhibition 100.00 0.00 20.00 0.00 0.00 0.00 2.00 0.00 2.00 0.00 2.00 0.00<br />

Total - VI 1137.51 69.62 248.97 6.98 279.59 13.64 279.59 13.64 343.57 11.15<br />

VII TRANSPORT<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

1 Rural Work Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 100.00 0.00 20359.56 0.00 5198.07 0.00 6007.00 0.00 6007.00 0.00 0.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 100.00 0.00 10480.00 0.00 2638.00 0.00 4842.00 0.00 4842.00 0.00 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 100.00 0.00 152<strong>12</strong>.00 0.00 5321.40 0.00 5186.00 0.00 5186.00 0.00 2500.00 0.00<br />

4 R & B Division, <strong>Balasore</strong><br />

Central <strong>Plan</strong><br />

Construction of road under Central Road Fund 100.00 0.00 0.00 0.00 0.00 0.00 936.00 0.00 936.00 0.00 2577.44 0.00<br />

One time Additional Central Assistance 100.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 300.00 0.00 200.00 0.00<br />

Total - VII 46051.56 0.00 13157.47 0.00 17271.00 0.00 17271.00 0.00 5277.44 0.00<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

Central <strong>Plan</strong><br />

Development of National Park, Sanctuary & Natural Reserves 100.00 0.00 0.00 0.00 29.75 0.00 <strong>12</strong>.27 0.00 <strong>12</strong>.27 0.00 33.00 0.00<br />

Elephant Management Project 100.00 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.60 0.00<br />

Talsari - HVBA 100.00 0.00 0.00 0.00 15.55 0.00 0.00 0.00 0.00 0.00 17.10 0.00<br />

Total - VIII 0.00 0.00 45.80 0.00 <strong>12</strong>.27 0.00 <strong>12</strong>.27 0.00 50.70 0.00<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

Centrally Sponsored <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Sarba Sikshya Abhiyan (SSA) 50.00 50.00 0.00 0.00 2963.45 2963.45 3752.01 3752.01 3752.01 3752.01 3752.11 3752.11<br />

National Programme for Education of Girls at Elementary Level 50.00 50.00 0.00 0.00 23.31 23.31 17.90 17.90 17.90 17.90 17.90 17.90<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) 65.00 35.00 0.00 0.00 11.91 6.42 29.23 15.74 29.23 15.74 29.23 15.74<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Central <strong>Plan</strong><br />

National APP Training in ITI <strong>Balasore</strong> 100.00 0.00 43.00 0.00 1.31 0.00 5.00 0.00 5.00 0.00 6.00 0.00<br />

Sub-Total 43.00 0.00 2999.98 2993.18 3804.13 3785.64 3804.13 3785.64 3805.23 3785.74<br />

2 Sports & Youth Services<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

One time seed capital grant for dev. of Sports infra. 75.00 25.00 0.00 0.00 25.50 8.50 25.50 8.50 25.50 8.50 25.50 8.50<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

60.00 40.00 0.00 0.00 0.00 0.00 0.62 0.42 0.62 0.42 0.86 0.58<br />

<strong>Annual</strong> acquisition grant 100.00 0.00 0.00 0.00 3.10 0.00 3.10 0.00 3.10 0.00 3.10 0.00<br />

<strong>Annual</strong> operation grant 100.00 0.00 0.00 0.00 3.72 0.00 3.72 0.00 3.72 0.00 3.72 0.00<br />

Rural Rural Sports Sports Competition 100.00 0.00 0.00 0.00 7.00 0.00 7.60 0.00 7.60 0.00 7.60 0.00<br />

Prize Money for Rural Sports 100.00 0.00 0.00 0.00 0.00 0.00 6.30 0.00 6.30 0.00 6.30 0.00<br />

Sub-Total 0.00 0.00 39.32 8.50 46.84 8.92 46.84 8.92 47.08 9.08<br />

3 Medical & Public Health<br />

Centrally Sponsored <strong>Plan</strong><br />

Reproductive Child Health (RCH) 85.00 15.00 0.00 0.00 831.16 146.68 914.28 161.34 914.28 161.34 1108.08 195.54<br />

Immunization 85.00 15.00 0.00 0.00 35.60 6.28 39.16 6.91 39.16 6.91 33.59 5.93<br />

National Rural Health Mission 85.00 15.00 0.00 0.00 802.77 141.66 883.04 155.83 883.04 155.83 833.50 147.09<br />

Revised National Tuberculosis Control Programme 50.00 50.00 0.00 0.00 17.55 17.55 18.60 18.60 18.60 18.60 20.46 20.46<br />

National Vector Borne Disease Control Programme<br />

Central <strong>Plan</strong><br />

50.00 50.00 0.00 0.00 72.15 72.15 74.65 74.65 74.65 74.65 82.11 82.<strong>12</strong><br />

National Programme for Control of Blindness 100.00 0.00 0.00 0.00 25.28 0.00 28.45 0.00 28.45 0.00 31.30 0.00<br />

Integrated Disease Surveillance Programme 100.00 0.00 0.00 0.00 10.15 0.00 10.56 0.00 10.56 0.00 11.62 0.00<br />

National Leprosy Eradication Programme 100.00 0.00 0.00 0.00 8.45 0.00 9.<strong>12</strong> 0.00 9.<strong>12</strong> 0.00 10.03 0.00<br />

Sub-Total 0.00 0.00 1803.11 384.32 1977.86 417.33 1977.86 417.33 2130.69 451.13<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 50.00 50.00 422.22 422.22 80.55 80.55 119.25 119.25 119.25 119.25 104.91 104.91<br />

ARWSP-Public Water Supply Scheme 60.00 40.00 4758.89 3172.60 511.42 340.94 1<strong>12</strong>3.41 748.94 1<strong>12</strong>3.41 748.94 <strong>12</strong>05.00 817.00<br />

Sub - Total 5181.11 3594.82 591.97 421.49 <strong>12</strong>42.66 868.19 <strong>12</strong>42.66 868.19 1309.91 921.91<br />

5 Urban Water Supply & Sanitation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Centrally Sponsored <strong>Plan</strong> 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT<br />

(Construction of ESR and UGR)<br />

50.00 50.00 793.79 793.79 0.00 0.00 100.00 100.00 100.00 100.00 150.00 150.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP<br />

(Improvement of water supply to <strong>Balasore</strong> town from river Sonoconstruction<br />

of intake well and laying of rising mains)<br />

50.00 50.00 2721.20 2721.20 0.00 0.00 100.00 100.00 100.00 100.00 150.00 150.00<br />

Sub-Total 3514.99 3514.99 0.00 0.00 200.00 200.00 200.00 200.00 300.00 300.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

Centrally Sponsored <strong>Plan</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Integrated Housing & Urban Development Programme 80.00 10.00 0.00 0.00 256.<strong>12</strong> 32.01 281.72 35.22 281.72 35.22 306.79 41.84<br />

Swarna Jayanti Sahari Rojagar Yojana 75.00 25.00 0.00 0.00 41.10 13.70 45.21 15.07 45.21 15.07 49.73 16.58<br />

Urban Infrastructure Development Scheme for Small &<br />

Medium Town<br />

80.00 10.00 0.00 0.00 35.53 4.44 39.08 4.88 39.08 4.88 42.56 5.80<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

Centrally Sponsored <strong>Plan</strong><br />

90.00 10.00 0.00 0.00 0.27 0.03 0.27 0.03 0.27 0.03 0.30 0.03<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

75.00 25.00 0.00 0.00 13.27 13.27 4.42 7.<strong>12</strong> 2.37 14.60 4.87 17.51 5.84<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

Centrally Sponsored <strong>Plan</strong><br />

100.00 0.00 0.00 0.00 0.00 0.00 20.24 0.00 20.24 0.00 23.47 0.00<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

Centrally Sponsored <strong>Plan</strong><br />

75.00 25.00 0.00 0.00 9.75 3.25 7.50 2.50 7.50 2.50 8.25 2.75<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

75.00 25.00 0.00 0.00 10.22 3.41 18.75 6.25 18.75 6.25 37.50 <strong>12</strong>.50<br />

Twelfth Finance Commission (TFC) 100.00 0.00 0.00 0.00 15.41 0.00 27.00 0.00 27.00 0.00 35.00 0.00<br />

Sub-Total 0.00 0.00 381.67 61.26 446.89 66.32 454.37 68.82 521.11 85.34<br />

7 Rural Housing<br />

Centrally Sponsored <strong>Plan</strong><br />

Indira Awas Yojana (IAY) 75.00 25.00 14881.13 4960.38 1848.05 616.02 5930.40 1976.80 5930.40 1976.80 6522.90 2174.30<br />

Sub-Total 14881.13 4960.38 1848.05 616.02 5930.40 1976.80 5930.40 1976.80 6522.90 2174.30<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 100.00 0.00 0.00 0.00 0.68 0.00 0.68 0.00 0.68 0.00 0.75 0.00<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 100.00 0.00 0.00 0.00 6.49 0.00 6.66 0.00 6.66 0.00 7.33 0.00<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 100.00 0.00 0.00 0.00 65.21 0.00 65.92 0.00 65.92 0.00 72.52 0.00<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 100.00 0.00 0.00 0.00 143.38 0.00 156.64 0.00 156.64 0.00 172.30 0.00<br />

Post Matric Scholarship to SC Students 100.00 0.00 0.00 0.00 47.06 0.00 88.48 0.00 88.48 0.00 97.33 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Post Matric Scholarship to ST Students 100.00 0.00 0.00 0.00 15.84 0.00 17.44 0.00 17.44 0.00 19.18 0.00<br />

Development of SCs (OSFDC Section) 100.00 0.00 0.00 0.00 175.70 0.00 203.75 0.00 203.75 0.00 224.13 0.00<br />

Development of STs (OSFDC Section) 100.00 0.00 0.00 0.00 83.10 0.00 117.50 0.00 117.50 0.00 <strong>12</strong>9.25 0.00<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development (Scheme-wise)<br />

Pattern of<br />

funding (% basis)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2009-10<br />

Actual Expenditure<br />

0 1 2 3 4 5 6 7 8 9 10 11 <strong>12</strong> 13<br />

Central<br />

Share<br />

State<br />

Share<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

(Rs.in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong>: <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Pre Matric Scholarship to the students whose parents<br />

engaged unclean occupation<br />

100.00 0.00 0.00 0.00 3.92 0.00 14.24 0.00 14.24 0.00 15.66 0.00<br />

Pre Matric Scholarship to OBC Students 100.00 0.00 0.00 0.00 6.39 0.00 1151.05 0.00 1151.05 0.00 <strong>12</strong>66.16 0.00<br />

Post Matric Scholarship to OBC Students 100.00 0.00 0.00 0.00 0.00 0.00 56.98 0.00 56.98 0.00 62.68 0.00<br />

Pre Matric Scholarship to Minorities 100.00 0.00 0.00 0.00 9.54 0.00 65.29 0.00 65.29 0.00 71.82 0.00<br />

Post Matric Scholarship to Minorities 100.00 0.00 0.00 0.00 0.00 0.00 5.69 0.00 5.69 0.00 6.26 0.00<br />

Sub-Total<br />

Social Welfare<br />

Central Sponsored <strong>Plan</strong><br />

0.00 0.00 557.31 0.00 1950.32 0.00 1950.32 0.00 2145.37 0.00<br />

Supplementary Nutrition Programme 50.00 50.00 2326.51 2326.51 1197.13 1197.13 540.00 540.00 540.00 540.00 1197.13 1197.13<br />

Mid Day Meal Programme (Pry+UP) 61.00 39.00 2330.10 1489.73 1195.17 764.<strong>12</strong> 549.00 351.00 549.00 351.00 1195.17 764.<strong>12</strong><br />

Mid Day Meal Programme (Kitchen-cum-store) (Kitchen cum store) 75.00 25.00 2869.80 956.60 956.60 102.48 102.48 34.16 750.00 250.00 250.00 750.00 750.00 250.00 250.00 102.48 102.48 34.16<br />

Mid Day Meal Programme (Utensils) 75.00 25.00 217.70 72.57 8.70 2.90 63.11 21.04 63.11 21.04 8.70 2.90<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 61.00 39.00 <strong>12</strong>.55 8.02 <strong>12</strong>.51 8.00 3.05 1.95 3.05 1.95 <strong>12</strong>.51 8.00<br />

Mid Day Meal Programme (Transportation charges) 75.00 25.00 213.84 71.28 20.33 6.78 56.63 18.88 56.63 18.88 20.32 6.78<br />

Mid Day Meal Programme (Honorarium to cook & helper) 75.00 25.00 307.44 102.48 61.49 20.50 61.50 20.50 61.50 20.50 61.50 20.50<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

50.00 50.00 48.50 48.50 <strong>12</strong>.50 <strong>12</strong>.50 14.00 14.00 14.00 14.00 <strong>12</strong>.50 <strong>12</strong>.50<br />

IG National Old Age Pension (ACA to States) 100.00 0.00 2408.78 0.00 597.14 0.00 575.00 0.00 575.00 0.00 597.14 0.00<br />

National Family Benefit Scheme (ACA to States) 100.00 0.00 392.20 0.00 38.80 0.00 92.80 0.00 92.80 0.00 92.80 0.00<br />

Kishori Shakti Yojana 100.00 0.00 50.05 0.00 0.00 0.00 14.00 0.00 14.00 0.00 14.00 0.00<br />

National Disability Pension 100.00 0.00 20.00 0.00 0.00 0.00 0.50 0.00 0.50 0.00 0.50 0.00<br />

National Child Labour Project 100.00 0.00 0.00 0.00 7.53 0.00 105.39 0.00 105.39 0.00 105.39 0.00<br />

Sub-Total 11197.47 5075.69 3253.76 2046.08 2824.98 <strong>12</strong>17.36 2824.98 <strong>12</strong>17.36 3420.13 2046.08<br />

Total - IX 34817.69 17145.87 11475.16 6530.85 18424.08 8540.57 18431.55 8543.06 20202.43 9773.58<br />

GRAND TOTAL 109053.49 2<strong>12</strong>35.19 32860.43 7609.68 49276.01 10221.68 49283.84 10224.24 419<strong>12</strong>.51 11699.55<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - IX<br />

Central<br />

Share<br />

State<br />

Share


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Annexure - VA: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: FINANCIAL OUTLAYS: (Proposal for TSP)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP) 528.96 59.67 58.54 817.80 92.25 817.80 92.25 828.00 93.40<br />

Centrally Sponsored <strong>Plan</strong><br />

Work <strong>Plan</strong>-Rice Development 69.02 7.79 0.62 8.91 1.01 8.91 1.01 10.72 1.21<br />

Work <strong>Plan</strong>-Sugarcane Development 1.44 0.16 0.00 2.26 0.25 2.26 0.25 2.59 0.29<br />

Jute Technology Mission (MM-II) 93.99 10.60 1.31 25.01 2.82 25.01 2.82 27.51 3.10<br />

ISOPOM (Pulses) 26.84 3.03 0.87 <strong>12</strong>.57 1.42 <strong>12</strong>.57 1.42 0.00 0.00<br />

Total<br />

Outlay<br />

Annexure - X<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

ISOPOM (Oil Seeds) 583.45 65.81 24.46 248.14 27.99 248.14 27.99 272.96 30.79<br />

Central <strong>Plan</strong><br />

Seed Village Programme 133.15 15.02 0.82 51.53 5.81 51.53 5.81 56.68 6.39<br />

Promotion of SRI programme 0.00 0.00 0.41 0.00 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 592.25 66.81 14.51 182.59 20.60 182.59 20.60 211.26 23.83<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 56.00 3411.04 384.77 3411.04 384.77 3700.05 416.97<br />

National Food Security Mission (Pulses) 0.00 0.00 0.00 74.78 8.44 74.78 8.44 256.92 28.98<br />

Sub-Total 2029.11 228.88 157.53 4834.63 545.35 4834.63 545.35 5366.69 604.96<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme 4.80 0.54 0.11 3.84 0.43 3.84 0.43 4.80 0.54<br />

Centrally Sponsored <strong>Plan</strong><br />

National Horticulture Mission 617.62 69.67 7.48 155.63 17.56 155.63 17.56 193.63 21.84<br />

Micro Irrigation Programme 56.00 6.32 2.47 35.00 3.95 35.00 3.95 45.00 5.08<br />

ISOPOM (Oil Palm) 9.25 1.04 0.72 9.20 1.04 9.20 1.04 10.18 1.15<br />

Central <strong>Plan</strong><br />

Coconut Development Board Programme 60.54 6.83 0.65 9.63 1.09 9.63 1.09 11.30 1.27<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 5.81 0.66 0.08 1.<strong>12</strong> 0.13 1.<strong>12</strong> 0.13 2.26 0.25<br />

Rastriya Krishi Vikas Yojana (RKVY) <strong>12</strong>.68 1.43 0.40 5.95 0.67 5.95 0.67 6.70 0.76<br />

Sub-Total 766.70 86.48 11.91 220.37 24.86 220.37 24.86 273.87 30.89<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X<br />

Of which<br />

flow to TSP


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

NWDPRA- Watershed Development 538.13 60.70 18.27 144.64 16.32 144.64 16.32 231.56 26.<strong>12</strong><br />

Central <strong>Plan</strong><br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.50 6.37<br />

Sub-Total 538.13 60.70 18.27 144.64 16.32 144.64 16.32 288.06 32.49<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 0.65 0.11 0.00 0.00 0.00 0.00 0.96 0.11<br />

Disaster Management Preparedness 18.50 2.09 0.00 0.00 0.00 0.00 0.00 18.50 2.09<br />

Skill up-gradation Training 9.05 1.02 0.08 0.72 0.08 0.72 0.08 3.80 0.43<br />

Genetic up-gradation of goat & Deworing 4.<strong>12</strong> 0.46 0.01 2.00 0.23 2.00 0.23 2.00 0.23<br />

Centrally Sponsored <strong>Plan</strong><br />

Disease Control Programme under ASCAD 162.46 18.33 0.00 81.23 9.16 81.23 9.16 81.23 9.16<br />

Health Camp & Awareness Programme under ASCAD 6.<strong>12</strong> 0.69 0.07 0.55 0.06 0.82 0.09 0.55 0.06<br />

Central <strong>Plan</strong><br />

SMILE Training 11.43 1.29 0.10 0.69 0.08 0.84 0.09 5.00 0.56<br />

Exposure visit of farmers under SMILE 5.04 0.57 0.00 2.25 0.25 2.25 0.25 2.52 0.28<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc. 2.00 0.23 0.00 1.00 0.11 1.00 0.11 1.00 0.11<br />

RKVY<br />

a) Strengthening of Livestock Service Information & Modernisation of office 506.08 57.09 0.00 190.79 21.52 190.79 21.52 315.15 35.55<br />

b) Dairy Development 226.80 25.58 0.00 106.21 11.98 106.21 11.98 <strong>12</strong>0.59 13.60<br />

c) Fodder Development 86.30 9.73 0.00 40.20 4.53 40.20 4.53 46.50 5.25<br />

d) Goat Development 25.20 2.84 0.00 <strong>12</strong>.60 1.42 <strong>12</strong>.60 1.42 <strong>12</strong>.60 1.42<br />

e) Poultry Development 56.40 6.36 0.00 16.30 1.84 16.30 1.84 40.10 4.52<br />

Sub-Total 1<strong>12</strong>5.28 <strong>12</strong>6.93 0.36 454.54 51.27 454.96 51.32 650.50 73.38<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 80.47 0.00 286.38 32.30 286.38 32.30 202.02 22.79<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>4.00 13.99<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2<strong>12</strong>.16 23.93<br />

Modernisation of Co-operative Processing Rice Mill 10.00 1.13 0.00 0.00 0.00 0.00 0.00 30.00 3.38<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 4.37 0.00 0.00 0.00 0.00 0.00 24.25 2.74<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co-operatives<br />

(PACs & RCMS)<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

345.00 38.92 0.00 139.00 15.68 139.00 15.68 131.00 14.78<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives (Women<br />

co-operatives, Labour co-operative)<br />

25.00 2.82 0.00 8.00 0.90 8.00 0.90 <strong>12</strong>.20 1.38<br />

Central <strong>Plan</strong><br />

Construction of Rural Godown under RKVY 0.00 0.00 0.00 508.01 57.30 508.01 57.30 1427.92 161.07<br />

Sub-Total 1132.15 <strong>12</strong>7.71 0.00 941.39 106.19 941.39 106.19 2163.55 244.05<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 0.00 11.38 1.28 11.38 1.28 <strong>12</strong>.50 1.41<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.17 0.00 0.50 0.06 0.50 0.06 1.00 0.11<br />

Assistance to Mechanisation Programme 19.00 2.14 0.00 25.50 2.88 25.50 2.88 5.00 0.56<br />

Survey and Investigation and establishment of FH & FLC 1319.00 148.78 0.00 0.00 0.00 0.00 0.00 667.00 75.24<br />

Safety measures for Marine Fishermen 20.00 2.26 0.00 0.00 0.00 0.00 0.00 5.00 0.56<br />

Centrally Sponsored <strong>Plan</strong><br />

Development of Inland Fisheries & Aquaculture through FFDA (Programme Component) 242.00 181.50 22.88 72.40 54.30 72.40 54.30 74.40 55.80<br />

Development of Brackish Water Aquaculture through FFDA 262.20 29.58 0.00 202.48 22.84 202.48 22.84 150.00 16.92<br />

Saving-cum-Relief Scheme 56.34 6.36 0.81 <strong>12</strong>.00 1.35 <strong>12</strong>.00 1.35 14.40 1.62<br />

Group Accident Insurance Scheme 64.71 7.30 1.79 15.90 1.79 15.90 1.79 16.50 1.86<br />

Low Cost House 50.00 5.64 0.00 0.00 0.00 0.00 0.00 50.00 5.64<br />

Assistance of Mechanisation Programme 54.00 6.09 0.00 <strong>12</strong>0.00 13.54 <strong>12</strong>0.00 13.54 28.50 3.21<br />

Central <strong>Plan</strong><br />

Introduction of Intermediate craft of Improved Design 60.00 6.77 0.00 <strong>12</strong>.00 1.35 <strong>12</strong>.00 1.35 24.00 2.71<br />

Sub-Total 2148.75 396.58 25.48 472.16 99.39 472.16 99.39 1048.30 165.66<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Total - I 7740.11 1027.29 213.54 7067.73 843.37 7068.15 843.42 9790.97 1151.43<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 733.20 104.86 1500.00 169.20 1500.00 169.20 2000.00 225.60<br />

Construction of C.C Road (New Scheme) 1435.00 161.87 0.00 286.62 32.33 286.62 32.33 287.00 32.37<br />

State Finance Commission Grant 1019.33 114.98 69.54 402.87 45.44 402.87 45.44 442.50 49.91<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 4749.74 535.77 119.07 1160.50 130.90 1160.50 130.90 <strong>12</strong>00.00 135.36<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme 14372.15 1621.18 147.06 3556.18 401.14 3556.18 401.14 4218.56 475.85<br />

DRDA Administration 976.18 110.11 14.17 200.00 22.56 200.00 22.56 250.00 28.20<br />

Central <strong>Plan</strong><br />

<strong>12</strong>th Finance Commission Award 3393.65 382.80 325.42 508.71 57.38 508.71 57.38 0.00 0.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

13th Finance Commisssion Award 0.00 0.00 0.00 583.28 65.79 583.28 65.79 641.25 72.33<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Total - II 32446.05 3659.91 780.<strong>12</strong> 8198.16 924.75 8198.16 924.75 9039.31 1019.63<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls 300.10 300.10 4.76 131.50 131.50 131.50 131.50 163.75 163.75<br />

Central <strong>Plan</strong><br />

Grants under Provision to Article 275 (1) 233.64 175.23 29.28 70.00 52.50 70.00 52.50 86.00 64.50<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas 549.82 4<strong>12</strong>.37 59.65 135.00 101.25 135.00 101.25 180.00 135.00<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

G Grants under d Provision P i i to Article A i l 275 (1) 0.00 0.00 0.00 13.73 10.30 13.73 10.30 15.00 11.25<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 0.00 8.62 21.65 16.24 21.65 14.24 20.00 15.00<br />

Total - III 1083.56 887.70 102.31 371.88 311.79 371.88 309.79 464.75 389.50<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 734.81 82.89 20.30 160.00 18.05 160.00 18.05 200.00 22.56<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 500.00 56.40 0.00 236.84 26.72 236.84 26.72 300.00 33.84<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 0.00 4.55 865.83 97.67 865.83 97.67 581.60 65.60<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 1634.06 184.32 0.34 385.61 43.50 385.61 43.50 261.25 29.47<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 0.00 92.71 10.46 92.71 10.46 92.71 10.46<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 0.00 73.32 650.00 73.32 650.00 73.32 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) <strong>12</strong>73.72 143.68 76.85 400.00 45.<strong>12</strong> 400.00 45.<strong>12</strong> 156.00 17.60<br />

Centrally Sponsored <strong>Plan</strong><br />

Flood Management Programme (River Bank Protection Work ) 0.00 0.00 169.36 1086.19 <strong>12</strong>2.52 1086.19 <strong>12</strong>2.52 3143.13 354.55<br />

Flood Management Programme (Major Works) - Drainage Division, <strong>Balasore</strong> 2114.00 238.46 57.24 1522.00 171.68 1522.00 171.68 131.03 14.78<br />

Central <strong>Plan</strong><br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 218.40 24.64<br />

Total - IV 6256.59 705.74 401.96 5399.18 609.03 5399.18 609.03 5084.<strong>12</strong> 573.49<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 0.00 47.41 462.30 52.15 462.30 52.15 485.42 54.76<br />

Biju Saharanchal Vidyutikaran Yojana 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.00 15.79<br />

Centrally Sponsored <strong>Plan</strong><br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 0.00 33.50 326.70 36.85 326.70 36.85 343.04 38.69<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Total - V 0.00 0.00 80.91 789.00 89.00 789.00 89.00 968.46 109.24<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector 20.49 2.31 0.37 4.59 0.52 4.59 0.52 4.90 0.55<br />

Central <strong>Plan</strong><br />

Prime Minister's Employment Generation Programme (PMEGP) 863.00 97.35 25.27 228.00 25.72 228.00 25.72 300.00 33.84<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 7.51 0.85 14.55 1.64 14.55 1.64 15.00 1.69<br />

Workshed-cum-Housing 22.50 2.54 0.76 16.10 1.82 16.10 1.82 17.50 1.97<br />

Skill UUpgradation d i Training T i i<br />

18.40 2.08 0.00 7.82 0.88 7.82 0.88 9.42 1.06<br />

Centrally Sponsored <strong>Plan</strong><br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 62.33 7.03 0.23 21.28 2.40 21.28 2.40 8.76 0.99<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 76.10 8.58 0.15 11.00 1.24 11.00 1.24 11.50 1.30<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 60.64 6.84 1.03 9.20 1.04 9.20 1.04 9.50 1.07<br />

Health Insurance for weavers 41.00 4.62 1.<strong>12</strong> 11.55 1.30 11.55 1.30 11.73 1.32<br />

Mahatma Gandhi Bunakar Bima Yojana 9.06 1.02 0.13 1.20 0.14 1.20 0.14 1.23 0.14<br />

Central <strong>Plan</strong><br />

10% Rebate on Handloom Products 75.00 8.46 0.94 9.00 1.02 9.00 1.02 10.00 1.13<br />

<strong>District</strong> Level Exhibition 20.00 2.26 0.00 2.00 0.23 2.00 0.23 2.00 0.23<br />

Total - VI 1335.11 150.60 30.85 336.29 37.93 336.29 37.93 401.54 45.29<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 305.00 34.40 6.77 75.00 8.46 75.00 8.46 80.00 9.02<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes 195.00 22.00 6.20 70.00 7.90 70.00 7.90 100.00 11.28<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 246.68 25.19 637.30 71.89 637.30 71.89 733.00 82.68<br />

Flood damage repairing 616.92 69.59 0.00 0.00 0.00 0.00 0.00 300.00 33.84<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 20359.56 2296.56 586.34 6007.00 677.59 6007.00 677.59 0.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1059.50 119.51 30.46 30.00 3.38 30.00 3.38 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 145.00 16.36 5.64 45.00 5.08 45.00 5.08 50.00 5.64<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 169.00 19.06 5.64 57.00 6.43 57.00 6.43 62.00 6.99<br />

Completion of incomplete road and Bridges and different Stretches of RIDF & other Schemes 528.50 59.61 5.13 230.00 25.94 230.00 25.94 253.00 28.54<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 10480.00 1182.14 297.57 4842.00 546.18 4842.00 546.18 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1950.34 220.00 <strong>12</strong>.75 500.00 56.40 500.00 56.40 803.00 90.58<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 180.00 20.30 5.64 40.00 4.51 40.00 4.51 40.00 4.51<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 464.44 52.39 13.16 523.00 58.99 523.00 58.99 567.00 63.96<br />

Central <strong>Plan</strong><br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 152<strong>12</strong>.00 1715.91 600.25 5186.00 584.98 5186.00 584.98 2500.00 282.00<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

4 R & B Division, i i i <strong>Balasore</strong> l<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 0.00 0.00 58.20 1148.00 <strong>12</strong>9.49 1148.00 <strong>12</strong>9.49 10941.18 <strong>12</strong>34.17<br />

Central <strong>Plan</strong><br />

Construction of road under Central Road Fund 0.00 0.00 0.00 936.00 105.58 936.00 105.58 2577.44 290.74<br />

One time Additional Central Assistance 0.00 0.00 0.00 300.00 33.84 300.00 33.84 200.00 22.56<br />

Total - VII 53852.18 6074.53 1658.94 20626.30 2326.65 20626.30 2326.65 19206.62 2166.51<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 18.00 2.03 1.10 10.00 1.13 10.00 1.13 <strong>12</strong>.10 1.36<br />

Communication & Building - Construction of quarters for forest guards 15.00 1.69 0.34 3.00 0.34 3.00 0.34 3.63 0.41<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00 0.05 0.21 0.02 0.21 0.02 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00 0.76 5.33 0.60 5.33 0.60 0.00 0.00<br />

Wildlife Protection and Conservation Measures 0.00 0.00 0.60 3.52 0.40 3.52 0.40 0.00 0.00<br />

Central <strong>Plan</strong><br />

Development of National Park, Sanctuary & Natural Reserves 0.00 0.00 3.36 <strong>12</strong>.27 1.38 <strong>12</strong>.27 1.38 33.00 3.72<br />

Elephant Management Project 0.00 0.00 0.06 0.00 0.00 0.00 0.00 0.60 0.07<br />

Talsari - HVBA 0.00 0.00 1.75 0.00 0.00 0.00 0.00 17.10 1.93<br />

Total - VIII 33.00 3.72 8.02 34.33 3.87 34.33 3.87 66.43 7.49<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education 7.79 0.88 1.79 19.25 2.17 19.25 2.17 20.10 2.27<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1.80<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>5.00 14.10<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall, play ground, bore<br />

well, drainage system, cycle stand and repair of staff quarters<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.40 11.21<br />

Sarba Sikshya Abhiyan (SSA) 0.00 0.00 668.55 7504.01 846.45 7504.01 846.45 7504.21 846.47<br />

National Programme for Education of Girls at Elementary Level (NPEGEL) 0.00 0.00 5.26 35.79 4.04 35.79 4.04 35.79 4.04<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) 0.00 0.00 2.07 44.97 5.07 44.97 5.07 44.97 5.07<br />

Central <strong>Plan</strong><br />

National APP Training in ITI <strong>Balasore</strong> 43.00 4.85 0.15 5.00 0.56 5.00 0.56 6.00 0.68<br />

Sub-Total 50.79 5.73 677.82 7609.02 858.30 7609.02 858.30 7851.47 885.65<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival 0.00 0.00 0.01 0.18 0.02 0.18 0.02 0.20 0.02<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

One time seed capital grant for development of Sports infrastructure 0.00 0.00 3.84 34.00 3.84 34.00 3.84 34.00 3.84<br />

Women Sports Competition 0.00 0.00 0.00 1.04 0.<strong>12</strong> 1.04 0.<strong>12</strong> 1.44 0.16<br />

Central <strong>Plan</strong><br />

<strong>Annual</strong> acquisition grant 0.00 0.00 0.35 3.10 0.35 3.10 0.35 3.10 0.35<br />

<strong>Annual</strong> operation grant 0.00 0.00 0.42 3.72 0.42 3.72 0.42 3.72 0.42<br />

Rural Sports Competition 0.00 0.00 0.79 7.60 0.86 7.60 0.86 7.60 0.86<br />

Prize Money for Rural Sports 0.00 0.00 0.00 6.30 0.71 6.30 0.71 6.30 0.71<br />

Sub-Total 0.00 0.00 5.41 55.94 6.31 55.94 6.31 56.36 6.36<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 47.39 10.69 99.54 11.23 99.54 11.23 142.47 16.07<br />

Urban Ayurvedic Health Services 91.28 10.30 3.21 29.90 3.37 29.90 3.37 35.65 4.02<br />

Primary Health Care (Rural) 603.00 68.02 16.36 154.00 17.37 154.00 17.37 179.25 20.22<br />

Primary Health Care (Urban) 28.00 3.16 0.61 5.61 0.63 5.61 0.63 14.21 1.60<br />

Centrally Sponsored <strong>Plan</strong><br />

Reproductive Child Health (RCH) 0.00 0.00 110.30 1075.62 <strong>12</strong>1.33 1075.62 <strong>12</strong>1.33 1303.62 147.05<br />

Immunization 0.00 0.00 4.72 46.07 5.20 46.07 5.20 39.52 4.46<br />

National Rural Health Mission (NRHM) initiatives 0.00 0.00 106.53 1038.87 117.18 1038.87 117.18 980.59 110.61<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 0.00 3.96 37.20 4.20 37.20 4.20 40.92 4.62<br />

National Vector Borne Disease Control Programme (NVBDCP) 0.00 0.00 16.28 149.30 16.84 149.30 16.84 164.23 18.53<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Central <strong>Plan</strong><br />

National Programme for Control of Blindness (NPCB) 0.00 0.00 2.85 28.45 3.21 28.45 3.21 31.30 3.53<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 0.00 1.14 10.56 1.19 10.56 1.19 11.62 1.31<br />

National Leprosy Eradication Programme (NLEP) 0.00 0.00 0.95 9.<strong>12</strong> 1.03 9.<strong>12</strong> 1.03 10.03 1.13<br />

Sub-Total 1142.37 <strong>12</strong>8.86 277.62 2684.24 302.78 2684.24 302.78 2953.41 333.14<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 844.44 95.25 18.17 238.50 26.90 238.50 26.90 209.82 23.67<br />

ARWSP-Public Water Supply Scheme 7931.49 894.67 96.15 1872.35 211.20 1872.35 211.20 2022.00 228.08<br />

Sub - Total 8775.93 989.92 114.32 2110.85 238.10 2110.85 238.10 2231.82 251.75<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of <strong>Balasore</strong>, Jaleswar,<br />

Soro & Nilgiri ULBs<br />

100.00 11.28 1.02 50.00 5.64 50.00 5.64 41.00 4.62<br />

Improvement of water supply and replacement of defunct bore wells up-gradation of sources and<br />

laying of pipe lines in different ULBs<br />

300.00 33.84 3.27 200.00 22.56 200.00 22.56 71.00 8.01<br />

Improvement of W/S to Nilgiri town 1118.42 <strong>12</strong>6.16 0.00 200.00 22.56 200.00 22.56 300.00 33.84<br />

Improvement of W/S to Soro town 192.00 21.66 0.00 92.00 10.38 92.00 10.38 100.00 11.28<br />

Improvement of W/S to Jaleswar town 160.00 18.05 0.00 60.00 6.77 60.00 6.77 100.00 11.28<br />

Improvement of water supply & S/I system of different non-residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

200.00 22.56 2.17 80.80 9.11 80.80 9.11 100.00 11.28<br />

Improvement of water supply & S/I system of different residential office building & Govt.<br />

Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Centrally Sponsored <strong>Plan</strong><br />

200.00 22.56 1.02 91.00 10.26 91.00 10.26 100.00 11.28<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT (Construction of ESR and UGR) 1587.58 179.08 0.00 200.00 22.56 200.00 22.56 300.00 33.84<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water supply to <strong>Balasore</strong><br />

town from river Sono- construction of intake well and laying of rising mains)<br />

5442.39 613.90 0.00 200.00 22.56 200.00 22.56 300.00 33.84<br />

Sub-Total 9300.39 1049.08 7.47 1173.80 132.40 1173.80 132.40 14<strong>12</strong>.00 159.27<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 0.00 3.31 11.00 1.24 11.00 1.24 <strong>12</strong>.10 1.36<br />

Road Development & Maintenance 0.00 0.00 9.33 90.87 10.25 90.87 10.25 99.96 11.28<br />

Urban Greenery 0.00 0.00 1.13 11.00 1.24 11.00 1.24 <strong>12</strong>.10 1.36<br />

Special Problem Fund 0.00 0.00 0.78 7.63 0.86 7.63 0.86 8.39 0.95<br />

Centrally Sponsored <strong>Plan</strong><br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 0.00 32.50 316.94 35.75 316.94 35.75 348.63 39.33<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 6.18 60.28 6.80 60.28 6.80 66.31 7.48<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 0.00 4.51 43.96 4.96 43.96 4.96 48.36 5.46<br />

National Urban Information System (NUIS) 0.00 0.00 0.03 0.30 0.03 0.30 0.03 0.33 0.04<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

Road Development, Maintenance Grant etc. 0.00 0.00 15.57 149.45 16.86 165.68 18.69 198.81 22.43<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 2.00 9.49 1.07 19.46 2.20 23.35 2.63<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC) 0.00 0.00 0.00 20.24 2.28 20.24 2.28 23.47 2.65<br />

Nilgiri NAC<br />

S State <strong>Plan</strong> l<br />

Road Development, Maintenance Grant etc. 0.00 0.00 3.95 38.00 4.29 38.00 4.29 41.80 4.72<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 1.47 10.00 1.13 10.00 1.13 11.00 1.24<br />

Soro NAC<br />

State <strong>Plan</strong><br />

Road Development Grant 0.00 0.00 4.13 37.59 4.24 37.59 4.24 45.00 5.08<br />

Road Maintenance Grant 0.00 0.00 1.63 17.67 1.99 17.67 1.99 20.00 2.26<br />

FDR Grant 0.00 0.00 0.00 20.00 2.26 20.00 2.26 20.00 2.26<br />

Incentive Grant 0.00 0.00 2.23 25.00 2.82 25.00 2.82 30.00 3.38<br />

Protection of water bodies 0.00 0.00 0.56 20.00 2.26 20.00 2.26 25.00 2.82<br />

Centrally Sponsored <strong>Plan</strong><br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 1.54 25.00 2.82 25.00 2.82 50.00 5.64<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC) 0.00 0.00 1.74 27.00 3.05 27.00 3.05 35.00 3.95<br />

Sub-Total 0.00 0.00 92.58 941.42 106.19 967.62 109.15 1119.61 <strong>12</strong>6.29<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia 1429.75 161.28 48.50 795.85 89.77 795.85 89.77 875.85 98.80<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Centrally Sponsored <strong>Plan</strong><br />

Indira Awas Yojana (IAY) 19841.50 3968.30 492.81 7907.20 1581.44 7907.20 1581.44 8697.20 1739.44<br />

Sub-Total 2<strong>12</strong>71.25 4<strong>12</strong>9.58 541.31 8703.05 1671.21 8703.05 1671.21 9573.05 1838.24<br />

8 Social Security & Social Welfare<br />

Welfare<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.00 0.00 0.68 0.00 0.68 0.00 0.75 0.00<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 0.00 0.00 6.66 0.00 6.66 0.00 7.33 0.00<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 0.00 65.21 65.92 65.92 65.92 65.92 72.52 72.52<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 0.00 143.38 156.64 156.64 156.64 156.64 172.30 172.30<br />

Post Matric Scholarship to SC Students 0.00 0.00 0.00 88.48 0.00 88.48 0.00 97.33 0.00<br />

Post Matric Scholarship to ST Students 0.00 0.00 15.84 17.44 17.44 17.44 17.44 19.18 19.18<br />

Development of SCs (OSFDC Section) 0.00 0.00 0.00 203.75 0.00 203.75 0.00 224.13 0.00<br />

Development of STs (OSFDC Section) 0.00 0.00 83.10 117.50 117.50 117.50 117.50 <strong>12</strong>9.25 <strong>12</strong>9.25<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 0.00 0.00 0.44 14.24 1.61 14.24 1.61 15.66 1.77<br />

Pre Matric Scholarship to OBC Students 0.00 0.00 0.00 1151.05 0.00 1151.05 0.00 <strong>12</strong>66.16 0.00<br />

Post Matric Scholarship to OBC Students 0.00 0.00 0.00 0.00 56.98 0.00 56.98 0.00 62.68 0.00<br />

Pre Matric Scholarship to Minorities 0.00 0.00 1.08 65.29 7.36 65.29 7.36 71.82 0.00<br />

Post Matric Scholarship to Minorities 0.00 0.00 0.00 5.69 0.64 5.69 0.64 6.26 0.00<br />

Sub-Total 0.00 0.00 309.05 1950.32 367.11 1950.32 367.11 2145.37 395.02<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 1323.38 149.28 53.50 370.00 41.74 370.00 41.74 474.26 53.50<br />

Old Age Pension 155.09 17.49 9.82 0.00 0.00 0.00 0.00 87.02 9.82<br />

Orissa Disability Pension 13.70 1.55 6.56 0.00 0.00 0.00 0.00 58.13 6.56<br />

Organising Single Window Camps 23.45 2.65 0.00 8.30 0.94 8.30 0.94 8.30 0.94<br />

Bi-cycle to girl students 362.82 40.93 0.19 1.25 0.14 1.25 0.14 1.25 0.14<br />

Mission Sakti 943.60 106.44 23.55 3.50 0.39 3.50 0.39 208.75 23.55<br />

Repair & Maintenance of AWC Building 75.22 8.48 1.16 11.00 1.24 11.00 1.24 10.25 1.16<br />

Reduction of Child Malnutrition 49.23 5.55 3.51 <strong>12</strong>.00 1.35 <strong>12</strong>.00 1.35 31.16 3.51<br />

Reduction of IMR 7.99 0.90 0.00 2.20 0.25 2.20 0.25 2.20 0.25<br />

Grant in Aid to Handicapped Welfare Institution 54.99 6.20 2.52 23.00 2.59 23.00 2.59 23.00 2.59<br />

Grant in Aid to Orphanages 379.38 42.79 10.01 101.15 11.41 101.15 11.41 101.15 11.41<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.35 0.15 0.00 0.35 0.04 0.35 0.04 0.35 0.04<br />

Medical Check up 1.60 0.18 0.00 0.60 0.07 0.60 0.07 0.60 0.07<br />

Sanitation 1.29 0.15 0.00 0.50 0.06 0.50 0.06 0.50 0.06<br />

Handicapped Scholarship 45.06 5.08 1.41 11.60 1.31 11.60 1.31 <strong>12</strong>.47 1.41<br />

Award to AWW 0.60 0.07 0.00 0.15 0.02 0.15 0.02 0.15 0.02<br />

Monitoring Mechanism & Evaluation 17.61 1.99 0.00 4.50 0.51 4.50 0.51 4.50 0.51<br />

Information Education Communication 10.72 1.21 0.00 3.00 0.34 3.00 0.34 3.00 0.34<br />

Medicine Kit 34.30 3.87 0.00 <strong>12</strong>.20 1.38 <strong>12</strong>.20 1.38 <strong>12</strong>.20 1.38<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-<br />

07 prices)<br />

Total Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

Under TSP<br />

Agreed Outlay<br />

Total<br />

Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which<br />

flow to TSP<br />

Anticipated<br />

Expenditure<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Computer 0.56 0.06 0.00 0.20 0.02 0.20 0.02 0.20 0.02<br />

Visit Programme 1.50 0.17 0.00 0.50 0.06 0.50 0.06 0.35 0.04<br />

Central Sponsored <strong>Plan</strong><br />

Supplementary Nutrition Programme 4653.02 524.86 270.07 1080.00 <strong>12</strong>1.82 1080.00 <strong>12</strong>1.82 2394.26 270.07<br />

Mid Day Meal Programme (Pry+UP) 3819.83 430.88 221.01 900.00 101.52 900.00 101.52 1959.29 221.01<br />

Mid Day Meal Programme (Kitchen-cum-store) 3826.40 431.62 15.41 1000.00 1<strong>12</strong>.80 1000.00 1<strong>12</strong>.80 136.64 15.41<br />

Mid Day Meal Programme (Utensils) 290.27 32.74 1.31 84.15 9.49 84.15 9.49 11.60 1.31<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.57 2.32 2.31 5.00 0.56 5.00 0.56 20.50 2.31<br />

Mid Day Meal Programme (Transportation charges) 285.<strong>12</strong> 32.16 3.06 75.50 8.52 75.50 8.52 27.10 3.06<br />

Mid Day Meal Programme (Honorarium to cook & helper) 409.92 46.24 9.25 82.00 9.25 82.00 9.25 82.00 9.25<br />

Construction of AWC Building 97.00 10.94 2.82 28.00 3.16 28.00 3.16 25.00 2.82<br />

Central Central <strong>Plan</strong><br />

IG National Old Age Pension (ACA to States) 2408.78 271.71 67.36 575.00 64.86 575.00 64.86 597.14 67.36<br />

National Family Benefit Scheme (ACA to States) 392.20 44.24 4.38 92.80 10.47 92.80 10.47 92.80 10.47<br />

Kishori Shakti Yojana 50.05 5.65 0.00 14.00 1.58 14.00 1.58 14.00 1.58<br />

National Disability Pension 20.00 2.26 0.00 0.50 0.06 0.50 0.06 0.50 0.06<br />

National Child Labour Project 0.00 0.00 0.85 105.39 11.89 105.39 11.89 105.39 11.89<br />

Sub-Total 19776.60 2230.80 710.05 4608.34 519.82 4608.34 519.82 6506.01 733.88<br />

Total<br />

Outlay<br />

Of which<br />

flow to TSP<br />

Total - IX 60317.33 8533.97 2735.61 29836.98 4202.24 29863.18 4205.19 33849.10 4729.59<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) 161.66 18.24 10.15 19.36 2.18 19.36 2.18 22.30 2.52<br />

Construction of Revenue Department Buildings (Residential) 74.44 8.40 2.52 <strong>12</strong>.<strong>12</strong> 1.37 <strong>12</strong>.<strong>12</strong> 1.37 13.94 1.57<br />

Construction of PHC Buildings (Non Residential) 21.16 2.39 0.00 9.84 1.11 9.84 1.11 11.32 1.28<br />

Construction of RD Department Buildings (Non Residential) 64.15 7.24 0.90 11.00 1.24 11.00 1.24 <strong>12</strong>.65 1.43<br />

Construction of Revenue Department Buildings (Non Residential) 178.22 20.10 8.71 48.10 5.43 48.10 5.43 52.90 5.97<br />

Construction of PHC Buildings (Residential) 32.55 3.67 1.90 7.50 0.85 7.50 0.85 8.20 0.92<br />

Construction of Revenue Department Buildings (Residential) 178.10 20.09 3.28 71.00 8.01 71.00 8.01 78.00 8.80<br />

Construction of Building (Non Residential) RD Division Jaleswar 60.00 6.77 2.44 27.38 3.09 27.38 3.09 30.00 3.38<br />

Construction of Health & RW Building (Residential) 100.55 11.34 3.87 19.00 2.14 19.00 2.14 21.00 2.37<br />

Construction & Maintenance of Buildings (Non Residential) 58.61 6.61 3.62 <strong>12</strong>.65 1.43 <strong>12</strong>.65 1.43 13.91 1.57<br />

Construction of RD Department Buildings (Residential) 61.26 6.91 0.00 28.49 3.21 28.49 3.21 32.77 3.70<br />

Total - X 990.70 111.75 37.39 266.44 30.05 266.44 30.05 296.99 33.50<br />

GRAND TOTAL 164054.63 21155.22 6049.65 72926.29 9378.69 72952.91 9379.69 79168.29 10225.68<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - X


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Annexure V-B: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PHYSICAL TARGETS AND ACHIEVEMENTS (Proposal for TSP)<br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

Annexure - XI<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

Crop Husbandry<br />

Work <strong>Plan</strong>-Rice Development<br />

Farmers Field School Nos. 19 1 1 1 2<br />

Block level awareness campaign Nos. 7 1 1 1 2<br />

Krushak Diwas Nos. 1 0 0 0 0<br />

Pre-seasonal training Nos. 1 0 0 0 0<br />

HYV. Rice production Ha. 7 0 0 0 0<br />

Asst. to Krushak Sathi Nos. 163 0 0 0 0<br />

SRI method of Rice cultivation Ha. 8.<strong>12</strong> 0 10.83 10.83 <strong>12</strong>.41<br />

Exposure visit (Outside the state) Nos. 6 1 1 1 1<br />

Exposure visit (Inside the state) Nos. 11 1 0 1 1<br />

Celebration of <strong>District</strong> Mahostav Nos. 1 0 0 0 0<br />

Financial assistance to FFS Nos. 0 0 18 18 19<br />

Work <strong>Plan</strong>-Sugarcane Development 0 0 0 0 0<br />

Ratoon Management Acre. 0 0 1.13 1.13 1.24<br />

Exposure visit (Inside the state) Nos. 4 0 1 1 1<br />

Work <strong>Plan</strong>-Farm Mechanization 0 0 0 0 0<br />

Subsidy for Tractor Nos. 17 <strong>12</strong> <strong>12</strong> 14 15<br />

Subsidy for Power Tiller Nos. 182 4 <strong>12</strong> <strong>12</strong> 14<br />

Subsidy for Self Propelled Reaper Nos. 1 0 1 1 1<br />

Subsidy for Self Propelled transplantor Nos. 1 0 0 0 0<br />

Subsidy for Rotavator Nos. 2 0 1 1 1<br />

Subsidy for Power operated implements Nos. 5 0 1 1 1<br />

Subsidy for Special power operated implements Nos. 9 0 1 1 1<br />

Subsidy for Hydraulic Trailer Nos. 2 0 1 1 1<br />

Subsidy for Manual & Bullock drawn implements Sets 59 14 <strong>12</strong> 14 15<br />

P.H.M Training Nos. 1 0 0 0 0<br />

Jute Technology Mission (MM-II)<br />

Seed Distribution (Jute) Qtl. 45 2 5 5 5<br />

Seed Minikit Qtl. 135 0 0 0 0<br />

Distribution of Sprayer Nos. 96 17 34 34 34<br />

Production Technology Demonstration Ha. 0 15.79 16.92 16.92 18.61<br />

Production Technology Minikit Nos. 49 0 0 0 0<br />

Retting Technology Demonstration Nos. 10 2 3 3 3<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

Essential Nutrients Mini kits Ha. 282.00 67.68 73.32 73.32 80.65<br />

Foliar Spray Demonstration Ha. 67.68 13.54 14.66 14.66 16.13<br />

Kuchha Retting Tank Nos. 18 7 7 7 7<br />

Pucca Retting Tank Nos. 4 0 1 1 1<br />

Integrated Pest Management Demonstration Nos. 1 0 0 0 0<br />

Farmer's training Nos. 3 1 1 1 1<br />

Exposure visit (Outside the state ) Nos. 4 1 1 1 1<br />

Farmers Field School Nos. 3 1 1 1 1<br />

ISOPOM Pulses 0 0 0 0 0<br />

Block Demonstration Ha. 7.90 1.13 1.35 0 0<br />

Farmer's training Nos. 6 1 1 0 0<br />

R. Culture/PBS Ha. 24 0 0 0 0<br />

<strong>Plan</strong>t Protection Equipments Nos. 147 34 28 0 0<br />

Micronutrient Ha. 29 11 0 0 0<br />

Storage Bins Nos. 51 0 0 0 0<br />

Vermicompost units Nos. 7 0 3 0 0<br />

Sprinkler Nos. 0 1 1 0 0<br />

<strong>Plan</strong>t Protection Chemicals Ha. 0 17 7 0 0<br />

Distribution of Certified Seeds Qtl. 0 26 81 0 0<br />

ISOPOM Oilseeds<br />

Distribution of Certified Seeds Qtl. 5335 1749 2074 2074 2288<br />

Block Demonstration (Sunflower) Ha. 16.92 0.00 1.35 1.35 1.47<br />

Gypsum Ha. 847.13 93.85 282.00 282.00 310.20<br />

R.Culture/PBS Ha. 654 0 0 0 0<br />

Farmers Field School cum IPM (Mustard) Nos. 0 0 0 0 1<br />

Farmers Field School cum IPM (Groundnut) Nos. 3 0 1 1 1<br />

Sprinkler's set Nos. 3 1 1 1 1<br />

<strong>Plan</strong>t Protection Equipments Nos. 97 113 39 <strong>12</strong>4 135<br />

Micronutrient Ha. 33.84 2.26 20.30 20.30 22.33<br />

Farm Implements (Manual) Sets 2 0 0 1 1<br />

Weedicides Ha. 14 0 0 0 0<br />

<strong>Plan</strong>t Protection Chemicals Ha. 22.56 0.00 11.28 11.28 <strong>12</strong>.41<br />

Vermicompost units Nos. 8 0 1 1 1<br />

Farmer's training Nos. 7 1 2 2 2<br />

Exposure visit Nos. 6 1 2 2 2<br />

Seed Village Scheme 0 0 0 0 0<br />

Paddy Ac. 85 2792 338 338 372<br />

Mung Ac. 17 13 226 226 248<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

Biri Ac. 17 73 85 85 93<br />

Groundnut Ac. 17 178 367 367 403<br />

Mustard Ac. 0 0 56 56 62<br />

Training (Rs.1500/- per Training.) Nos. 5 0 0 0 0<br />

Storage Bins (20 Qtl. Capacity) Nos. 20 0 0 0 0<br />

Storage Bins (10 Qtl. Capacity) Nos. 31 0 0 0 0<br />

RIDF-JALANIDHI 0 0 0 0 0<br />

Shallow Tube Well Nos. 510 321 395 395 395<br />

River Lift Project Nos. 28 0 7 7 7<br />

RKVY 0 0 0 0 0<br />

Supply of paper mill sludge Mts. 0 135 0 0 169<br />

Supply of Gypsum Mts. 0 81 0 0 90<br />

Bio-fertilizer Qtl. 0 0 25 25 34<br />

Promotion of organic farming Nos. 0 0 1 1 2<br />

Promotion of SRI (One unit - 20Ac.) Nos. 0 0 27 27 30<br />

Establishment of Vermi Compost Nos. 0 0 34 34 39<br />

Management of acid soil Mts. 0 0 135 135 0<br />

Rice Minikit (Seed cost and transportation unit) Nos. 0 0 34 34 39<br />

Exposure visit outside state (20 persons in one group) Nos. 0 0 0 0 1<br />

Farmers Field School (Rice) Nos. 0 0 0 0 4<br />

INM-FFS Nos. 0 0 0 0 3<br />

IPM-FFS (Rice) Nos. 0 0 0 0 3<br />

Capacity building of Extension personnel's Nos. 0 0 0 0 39<br />

Farm Mechanization under RKVY 0 0 0 0 0<br />

Subsidy for Power Tiller Nos. 0 61 11 22 25<br />

Subsidy for Self Propelled Reaper Nos. 0 0 0 1 1<br />

Subsidy for Pump sets Nos. 0 0 10 90 102<br />

Subsidy for Power operated Thresher Nos. 0 3 1 14 15<br />

Subsidy for Special power operated implements Nos. 0 1 0 2 2<br />

Subsidy for Hydraulic Trailer Nos. 0 0 1 1 1<br />

Subsidy for Manual & Bullock drawn implements Nos. 0 22 0 37 41<br />

Subsidy for Combine Harvester Nos. 0 0 0 1 1<br />

Subsidy for Tractor Nos. 0 0 0 1 1<br />

RKVY-STREAM-II 0 0 0 0 0<br />

Strengthening of statistical unit Nos. 0 0 0 0 0<br />

Boundary wall /Bore well & Sanitary for training hall Nos. 0 0 0 0 0<br />

Construction of FIAC building Nos. 1 0 1 1 0<br />

Construction of Dehumidified storage go-down for g/t Nos. 0 0 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

National Food Security Mission (Pulse)<br />

Distribution of Certified Seeds Qtl. 0 0 73 73 79<br />

Organization of technology Demonstration (0.4ha-unit) Ha. 0 0 15.79 15.79 22.56<br />

Organization of farmers Training (25 nos of farmers) Nos. 0 0 0 0 7<br />

Seed Village (@ Rs. 15000/-per Ha.) of 50 nos farmers of 3 days Ha. 0 0 0 0 78.96<br />

Power Tillers Nos. 0 0 0 0 3<br />

INM (Integrated Nutrient Management)<br />

Lime/Gypsum Ha. 0 0 135.36 135.36 169.20<br />

Micronutrient Ha. 0 0 54.14 54.14 62.04<br />

Assistance for R.Culture/PSB distribution Ha. 0 0 45.<strong>12</strong> 45.<strong>12</strong> 50.76<br />

IPM (Integrated Post Management)<br />

Assistance for PP Chemicals Ha. 0 0 1<strong>12</strong>.80 1<strong>12</strong>.80 <strong>12</strong>4.08<br />

Incentive for sprayer @ Rs.3000/- Nos. 0 0 39 39 45<br />

Distribution sprinkler set @ Rs.7500/- Ha. 0 0 6.77 6.77 7.90<br />

Incentives for pump sets Nos. 0 0 16 16 18<br />

Assistance for pipe (one set 800mtr) Mts. 0 0 722 722 902<br />

Exposure visit @ Rs.3000/- (20 persons in a group) Nos. 0 0 0 0 1<br />

Horticulture<br />

A. National Horticulture Mission Programme<br />

Mango Ha. 148.67 28.20 45.<strong>12</strong> 45.<strong>12</strong> 47.38<br />

Banana Ha. 27.07 7.90 2.26 2.26 5.64<br />

Costal horticulture -cashew Ha. 75.58 16.92 16.92 16.92 22.56<br />

Marigold Ha. 23.35 2.82 1.13 1.13 1.69<br />

Gladioli Ha. 29.89 5.64 2.82 2.82 3.38<br />

Rose Ha. 18.32 19.29 1.69 1.69 2.26<br />

Tube Rose Ha. <strong>12</strong>.18 0.00 0.00 0.00 0.00<br />

Vermicompost (Big) Nos. 2 0 1 1 1<br />

Vermicompost (Small) Nos. 18 3 0 0 0<br />

Small Nursery (Private Sector) Nos. 1 0 0 0 0<br />

Greenhouse units Nos. 2 0 7 7 7<br />

Shade net units Nos. 3 0 45 45 45<br />

Mulching units Nos. 4 0 1 1 1<br />

Plastic Tunnel units Nos. 7 0 0 0 0<br />

Human Resource Development<br />

Training of farmers (Inside the state) Nos. 77 8 9 9 9<br />

Exposure visit (Outside the state) Nos. 9 2 3 3 3<br />

Training to Gardener Nos. 2 1 0 0 0<br />

Training to entrepreneur Nos. 4 0 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

Training to supervisor Nos. 1 0 0 0 0<br />

Vegetable Mini kit Nos. 5246 <strong>12</strong>93 1354 1354 1624<br />

<strong>District</strong> level show Nos. 1 0 0 0 0<br />

B. Micro Irrigation Programme<br />

Drip irrigation Ha. 3.05 0.56 5.64 5.64 5.64<br />

Sprinkler irrigation Ha. 62.15 23.<strong>12</strong> 22.56 22.56 33.84<br />

C. Coconut Development Board Programme<br />

Area expansion Ha. 23.10 0.00 8.46 8.46 9.02<br />

Laying out demonstration Ha. 6.99 2.82 1.69 1.69 2.26<br />

Organic manure pit Nos. 1 0 0 0 0<br />

Raising of coconut seedling Nos. 6204 564 564 564 564<br />

D. ISOPOM (Oil Palm)<br />

Normal Ha. 7.67 7.22 7.90 7.90 9.02<br />

S.C.P Ha. 2.26 1.13 1.35 1.35 1.69<br />

T.A.S.P Ha. 2.26 1.35 1.69 1.69 1.69<br />

Demonstration Ha. 0.68 0.68 1.13 1.13 1.13<br />

E. R.K.V.Y.<br />

Vermicompost units Nos. 15 5 5 5 6<br />

Vermicompost hatchery Nos. 1 0 1 1 1<br />

Zero Energy Cool Chamber Nos. 1 0 1 1 1<br />

F. National Medicinal <strong>Plan</strong>t Mission Programme<br />

Anola Ha. 5.08 0.79 0.79 0.79 1.13<br />

Aswagandha Ha. 1.69 0.56 0.23 0.23 0.56<br />

Tulasi Ha. 1.69 0.00 0.56 0.56 0.79<br />

Aloevera Ha. 0.00 0.00 0.56 0.56 0.56<br />

Exposure visit (Inside the state) Nos. 6 0 1 1 1<br />

Exposure visit (Outside the state) Nos. 1 0 0 0 0<br />

Soil and Water Conservation<br />

Watershed Development Nos. 0 1 1 1 1<br />

Animal Husbandry & Dairy Development<br />

ASCAD Health Camp & Awareness Programme Nos. 0 3 3 3 3<br />

Bird Flu Training Programme Nos. 0 1 1 1 2<br />

Genetic up gradation of Goats Deworming of goats Nos. 0 13 0 18 34<br />

SIMILE Training<br />

Training to farmers on poultry production Nos. 0 0 0 0 5<br />

Skill up gradation training Nos. 0 0 0 0 2<br />

Milk Production MT. 0 7 8 7 8<br />

Egg Production Million 0 9 10 9 9<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

Fodder Minikit distribution Nos. 0 279 11 11 338<br />

Training & Demonstration under pasture development<br />

Nos.of<br />

Demonstration<br />

0 279 11 11 56<br />

Fodder Production Qtl. 0 6037 0 0 9024<br />

Treatment of Cases Nos. 0 39690 52001 42864 47376<br />

Castration Nos. 0 3684 5076 3835 4174<br />

Vaccination 0 0 0 0 0<br />

HSV Nos. 0 33265 87798 37224 37224<br />

BQV Nos. 0 31353 49203 33840 33840<br />

FMDV Nos. 0 18251 23350 20304 33840<br />

RDV.(R2B) Nos. 0 21015 37472 24816 28200<br />

PPRV Nos. 0 <strong>12</strong>532 1<strong>12</strong>80 1<strong>12</strong>80 1<strong>12</strong>80<br />

Artificial Insemination Nos. 0 7234 97<strong>12</strong> 7896 6430<br />

Infertility camps Nos. 0 82 135 90 73<br />

Deworming Nos. 0 <strong>12</strong>182 30186 13536 1<strong>12</strong>80<br />

Establishment of Dairy units Nos. 0 7 0 18 34<br />

Establishment of Goatery units Nos. 0 4 0 5 7<br />

Establishment of Broilers farmer units Nos. 0 10 0 1 17<br />

Back yard poultry units Nos. 0 4787 0 5640 6768<br />

Fisheries<br />

Development of Fresh Water Aquaculture under FFDA (Water Area) Ha. 4<strong>12</strong>.50 85.90 90.00 90.00 97.50<br />

Development of Fresh Water Aquaculture under FFDA (Training) Nos. 375 23 38 38 45<br />

Development of Water Logged Areas (Water Area) Ha. 6 1 0 0 0<br />

Development of Water Logged Areas (Training) Nos. 17 0 0 0 0<br />

Development of Brackish Water Aquaculture (Water Area) Ha. 266.21 0.00 28.20 11.28 13.54<br />

Integrated Development of Inland Capture Resources (Net & Boat) Nos. 34 7 0 2 3<br />

Integrated Development of Inland Capture Resources (Training) Nos. 34 0 0 0 0<br />

Development of Fresh Water Aquaculture under NFDB (Water Area) Ha. 0 0 27.07 27.07 27.07<br />

Development of Fresh Water Aquaculture under NFDB (Training) Nos. 56 8 14 14 14<br />

Self Employment Programme (Training)<br />

Cooperation<br />

Nos. 56 7 3 3 7<br />

Share capital to Cooperative credit institutions under NRC-LTO fund<br />

PACS/LAMPCS & C.S. Bank Nos. 16 0 7 7 8<br />

Managerial Subsidy Nos. 14 0 7 7 7<br />

Modernation of Co-operative Processing<br />

Consumer Co-operative<br />

Share Capital Nos. 2 0 1 1 1<br />

Transporting Subsidy of PDS Nos. 6 0 2 2 3<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

MACP-Infrastructure Strengthening and Managerial subsidy to Marketing<br />

Cooperatives (PACs & RCMS)<br />

Repair of Godown of PACS & RCMS Nos. 4 0 1 1 2<br />

Managerial Subsidy to PACS & RCMS for procurement<br />

Financial assistance in shape of loan/subsidy or share to other cooperative<br />

Nos. 11 0 5 5 6<br />

Labour Cooperative Nos. 1 0 0 0 1<br />

II. RURAL DEVELOPMENT<br />

DRDA Administration<br />

Gopabandhu Gramin Yojana (GGY) Nos. of Projects 236 38 94 94 138<br />

State Finance Commission Grant Nos. of Projects 49 44 5 5 6<br />

Twelfth Finance Commission (TFC)<br />

Rural Employment<br />

Nos. of Projects 974 878 96 96 0<br />

Swarnajayanti Gram Swarozgar Yojana (SGSY) Nos. of Beneficiaries 3904 1044 936 1153 1026<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme Nos. of Projects 780 41 443 443 478<br />

III. SPECIAL AREAS PROGRAMMES<br />

Nilgiri ITDA<br />

Grants under provision to article 275(1)<br />

Construction of Boundary Wall of School/Hostel Nos. 14 3 0 2 4<br />

Construction of School/Hostel Building Nos. 15 15 2 0 2<br />

Electrification of School/Hostel Nos. 20 3 0 5 5<br />

CD work Nos. 21 2 0 3 5<br />

Drainage works at school Nos. 5 1 0 2 2<br />

Special Central Assistance to Tribal Sub-<strong>Plan</strong><br />

Group finance to SHGs Nos. of families 7 <strong>12</strong> 5 5 5<br />

Bee keeping Nos. of families 244 75 38 38 38<br />

Lac cultivation Nos. of families 488 113 75 75 75<br />

Land Development Nos. of families 40 40 0 0 0<br />

Cello Tube well Nos. 57 <strong>12</strong> <strong>12</strong> <strong>12</strong> 14<br />

River Lift Point Nos. 8 2 2 2 1<br />

Training Programme Nos. 90 8 45 45 38<br />

CD work Nos. 48 11 9 9 11<br />

WHS Nos. 15 0 5 5 5<br />

IV. IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong> (LUMP) Nos. 0 0 3 3 0<br />

Bank protection work (Flood Control) Nos. 0 0 0 0 0<br />

Minor Irrigation<br />

Creation of Irrigation potential Ha. 0.00 37.90 68.13 0.00 78.96<br />

Biju Krushak Vikash Yojana - LI Division, Jaleswar Ha. 484.36 5.41 87.98 87.98 60.91<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

V. ENERGY<br />

Rajib Gandhi Gramin Vidyutikaran Yojana Nos. 0 482 14<strong>12</strong>8 14<strong>12</strong>8 2059<br />

Electrification of Un-electrified Villages Nos. 0 5 7 7 6<br />

Biju Gram Jyoti Yojana No. of village 0 1 1 1 1<br />

VI. INDUSTRY & MINERALS<br />

Small Scale Enterprises Nos. 201 33 33 0 34<br />

PMEGP Nos. 166 19 18 0 23<br />

Cottage Industries Nos. 27 6 5 0 5<br />

Handloom & Textile<br />

Promotion of Handloom Industry Nos. of Wvrs 21 9 9 0 6<br />

Workshed-cum-Housing Nos. 19 3 5 0 6<br />

Skill up gradation training Nos. 25 0 6 0 8<br />

IHDS (Cluster Approach) Nos. of Wvrs 37 24 37 0 37<br />

IHDS (Group Approach) Nos. of Wvrs 71 16 14 0 17<br />

IHDS (Marketing Incentive) Nos. of Wvrs 4 1 3 0 4<br />

ICICI (Lombard) Nos. of Wvrs 203 139 139 0 141<br />

MGBBY Nos. of Wvrs <strong>12</strong>6 89 90 0 92<br />

10% Rebate on Handloom Product Nos. of WCS 3 2 3 0 3<br />

<strong>District</strong> level Exhibition Nos 1 0 0 0 0<br />

VII. TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong> (I)<br />

C.W.A<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

<strong>12</strong>th Finance Commission Award<br />

Black Topped K.M. 1 0 0 0 0<br />

Metalling K.M. 1 0 0 0 0<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 3 0 0 0 0<br />

Special Repair to Road<br />

Black Topped K.M. 1 0 0 0 0<br />

Metalling K.M. 1 0 0 0 0<br />

R. T. Wall Mtr. 1 0 0 0 0<br />

Cement Concrete Road K.M. 2.375 0.257 0.678 0.678 0.790<br />

Cross Drainage works Nos. 7.783 0.902 2.256 2.256 2.820<br />

DR K.M. 7 0 2.663 2.663 0<br />

PMGSY<br />

Black Topped K.M. 2 0 0 1.682 0<br />

Rural Work Division, <strong>Balasore</strong> (II)<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

C.W.A<br />

R. T. Wall Mtr. 0 11 0 0 0<br />

NABARD Road<br />

Black Topped K.M. 0.000 1.738 0.000 0.000 0.000<br />

Metalling K.M. 0.000 1.738 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 1.488 0.000 0.000 0.000<br />

Cross Drainage works Nos. 0 6 0 0 0<br />

<strong>12</strong>th Finance Commission<br />

R. T. Wall Mtr. 0 16 0 0 0<br />

R. T. Wall Mtr. 0 28 0 0 0<br />

R. T. Wall Mtr. 0 29 32 32 35<br />

Cement Concrete Road K.M. 0 0 0 0 1<br />

Cross Drainage works Nos. 0 0 1 1 1<br />

Bharat Nirman<br />

Black Topped K.M. 0.000 2.042 1.715 1.715 0.000<br />

Metalling K.M. 0.000 0.<strong>12</strong>4 1.715 1.715 0.000<br />

Cement Concrete Road K.M. 0.000 3.046 3.158 3.158 0.000<br />

Cross Drainage works Nos. 0 44 116 116 0<br />

R & B Division<br />

Black Topped K.M. 0.000 0.801 3.383 3.383 4.865<br />

Metalling K.M. 0.000 0.084 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 0.292 0.223 0.223 0.226<br />

Cross Drainage works Nos. 0 2 1 1 2<br />

Rural Work Division, Jaleswar<br />

C.W.A.<br />

NABARD<br />

Black Topped K.M. 1 0 0 0 0<br />

WBM K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 2 0 0 0 0<br />

S. Bridge Nos. 1 0 0 0 0<br />

<strong>12</strong>th Finance Commission<br />

Black Topped K.M. 0 0 0 0 0<br />

Metalling K.M. 1 0 0 0 0<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

GSB K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 3 1 0 0 0<br />

Building works Nos. 10 1 0 0 0<br />

Important Critical Road<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

Black Topped K.M. 8.766 0.1<strong>12</strong> 1.715 1.715 1.692<br />

Metalling K.M. 0.045 0.1<strong>12</strong> 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 3.252 0.071 0.069 0.069 0.079<br />

GSB K.M. 0.000 0.169 0.000 0.000 0.000<br />

EW K.M. 0.000 0.000 1.644 1.644 1.681<br />

MSB K.M. 0.000 0.000 1.644 1.644 1.658<br />

Cross Drainage works Nos. 0 0 4 4 5<br />

DR K.M. 0.000 0.000 1.034 1.034 1.184<br />

R. T. Wall Mrt. 0.00 0.00 13.54 13.54 16.92<br />

Bharat Nirman K.M. 24.557 11.098 8.823 8.823 3.158<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

Eco-<strong>Plan</strong>tation Ha. 0.00 5.64 1.69 1.69 0.00<br />

IX SOCIAL SERVICES<br />

Education<br />

S.S.A<br />

Block Resource Center Nos. 0 1 1 1 1<br />

Cluster Resource Center Nos. 0 23 23 23 23<br />

Civil work Nos. 0 0 76 76 76<br />

Interventions for out of School Children Nos. 0 0 162 162 162<br />

Free Text Book Nos. 0 0 30332 30332 30332<br />

iii.) SC/ST Education Nos. 0 0 1 1 1<br />

CWSN (IED) Nos. 0 0 871 871 871<br />

Maintenance Grants (PS & UPS) Nos. 0 301 329 329 329<br />

Research & Evaluation Nos. 0 0 36 36 36<br />

School Improvement Grant Nos. 0 347 361 361 361<br />

Teachers Grant Nos. 0 1011 <strong>12</strong>34 <strong>12</strong>34 <strong>12</strong>34<br />

Teachers Grant Salary (Recurring) Nos. 0 372 513 513 513<br />

Teaching Learning Equipment (PS) Nos. 0 9377 3 3 3<br />

Teacher Training Nos. 0 823 <strong>12</strong>84 <strong>12</strong>84 <strong>12</strong>84<br />

Community Training Nos. 0 0 2997 2997 2997<br />

National Education Programme for Girls at Elementary Level (NPEGEL) Nos. 0 3 3 3 3<br />

Medical & Public Health<br />

Sterilization Nos. 0 995 1094 1094 <strong>12</strong>04<br />

Intra Uterine Devices Nos. 0 5076 5584 5584 6142<br />

Oral Pills Nos. 0 2256 2482 2482 2730<br />

Contraceptive Condoms users Nos. 0 2256 2482 2482 2730<br />

MTP Nos. 0 384 422 422 464<br />

Immunization<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong> (2007- <strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

<strong>12</strong>) Target Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

TT (Preg) Nos. 0 5829 6411 6411 7053<br />

DPT Nos. 0 5299 5829 5829 64<strong>12</strong><br />

Polio Nos. 0 5299 5829 5829 64<strong>12</strong><br />

BCG Nos. 0 5299 5829 5829 64<strong>12</strong><br />

Measles Nos. 0 5299 5829 5829 64<strong>12</strong><br />

Vit-A Nos. 0 5299 5829 5829 64<strong>12</strong><br />

DT Nos. 0 5843 5843 5843 6427<br />

TT (10 years) Nos. 0 5866 6452 6452 7097<br />

TT (16 years) Nos. 0 5076 5584 5584 6142<br />

Large Follifor Nos. 0 5829 6411 6411 7053<br />

Water Supply & Sanitation<br />

Rural Water Supply<br />

ARWSP Sinking of Tube Wells Nos. 108 27 27 27 24<br />

MNP Sinking of Tube Wells Nos. <strong>12</strong>8 13 27 27 24<br />

Public Water Supply Schemes Nos. 35 4 10 10 5<br />

Rural Sanitation<br />

Sanitation coverage of Households Nos. 0 4782 6204 6204 6909<br />

Sanitation coverage of Schools (Toilets) Nos. 0 86 0 0 90<br />

Sanitation coverage of Anganwadis (Toilets)<br />

Urban Water Supply<br />

Nos. 0 109 0 0 85<br />

Urban Water Supply Projects Nos. 0 1 1 1 1<br />

Urban Sanitation<br />

Urban Sanitation Projects Nos. 0 0 1 1 1<br />

Rural Housing<br />

Indira Awas Yojana Nos. of Beneficiaries 11338 927 3320 3320 4341<br />

Mo Kudia<br />

Social Security & Social Welfare<br />

Nos. of Beneficiaries 461 88 1<strong>12</strong> 1<strong>12</strong> 135<br />

IGNOAP Nos. of Beneficiaries 2684 2684 2684 2684 2684<br />

ODP Nos. of Beneficiaries 750 1057 85 85 85<br />

MBPY Nos. of Beneficiaries 3503 5425 959 959 5545<br />

X GENERAL SERVICES<br />

Non Residential<br />

Construction & Maintenance of Buildings<br />

Residential<br />

Nos. 1 0 0 0 0<br />

Construction of Revenue Department Buildings Nos. 1 1 0 0 0<br />

Construction of PHC Buildings Nos. 2 1 0 0 1<br />

Construction & Maintenance of Buildings Nos. 1 0 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XI


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Annexure - VIA: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: FINANCIAL OUTLAYS (Proposal for SCSP)<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

Expenditure<br />

Under SCSP<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Total Outlay<br />

Annexure - XII<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

528.96 99.66 97.78 817.80 154.07 817.80 154.07 828.00 156.00<br />

Work <strong>Plan</strong>-Rice Development 69.02 13.00 1.03 8.91 1.68 8.91 1.68 10.72 2.02<br />

Work <strong>Plan</strong>-Sugarcane Development 1.44 0.27 0.00 2.26 0.43 2.26 0.43 2.59 0.49<br />

Jute Technology Mission (MM-II) 93.99 17.71 2.18 25.01 4.71 25.01 4.71 27.51 5.18<br />

ISOPOM (Pulses) 26.84 5.06 1.45 <strong>12</strong>.57 2.37 <strong>12</strong>.57 2.37 0.00 0.00<br />

ISOPOM (Oil Seeds) Seeds)<br />

Central <strong>Plan</strong><br />

583 583.45 45 109 109.92 92 40 40.85 85 248 248.14 14 46 46.75 75 248 248.14 14 46 46.75 75 272 272.96 96 51 51.43 43<br />

Seed Village Programme 133.15 25.09 1.37 51.53 9.71 51.53 9.71 56.68 10.68<br />

Promotion of SRI programme 0.00 0.00 0.68 0.00 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 592.25 111.58 24.23 182.59 34.40 182.59 34.40 211.26 39.80<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 93.53 3411.04 642.64 3411.04 642.64 3700.05 131.89<br />

National Food Security Mission (Pulses) 0.00 0.00 0.00 74.78 14.09 74.78 14.09 256.92 48.40<br />

Sub-Total 2029.11 382.28 263.11 4834.63 910.84 4834.63 910.84 5366.69 445.88<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 0.90 0.18 3.84 0.72 3.84 0.72 4.80 0.90<br />

National Horticulture Mission 617.62 116.36 <strong>12</strong>.49 155.63 29.32 155.63 29.32 193.63 36.48<br />

Micro Irrigation Programme 56.00 10.55 4.13 35.00 6.59 35.00 6.59 45.00 8.48<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

9.25 1.74 1.20 9.20 1.73 9.20 1.73 10.18 1.92<br />

Coconut Development Board Programme 60.54 11.41 1.09 9.63 1.81 9.63 1.81 11.30 2.13<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 5.81 1.09 0.13 1.<strong>12</strong> 0.21 1.<strong>12</strong> 0.21 2.26 0.43<br />

Rastriya Krishi Vikas Yojana (RKVY) <strong>12</strong>.68 2.39 0.67 5.95 1.<strong>12</strong> 5.95 1.<strong>12</strong> 6.70 1.26<br />

Sub-Total 766.70 144.45 19.89 220.37 41.52 220.37 41.52 273.87 51.60<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

538.13 101.38 30.51 144.64 27.25 144.64 27.25 231.56 43.63<br />

Soil and water conservation measures under RKVY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.50 10.64<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Sub-Total 538.13 101.38 30.51 144.64 27.25 144.64 27.25 288.06 54.27<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 1.09 0.18 0.00 0.00 0.00 0.00 0.96 0.18<br />

Disaster Management Preparedness 18.50 3.49 0.00 0.00 0.00 0.00 0.00 18.50 3.49<br />

Skill up-gradation Training 9.05 1.70 0.14 0.72 0.14 0.72 0.14 3.80 0.72<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

4.<strong>12</strong> 0.78 0.01 2.00 0.38 2.00 0.38 2.00 0.38<br />

Disease Control Programme under ASCAD 162.46 30.61 0.00 81.23 15.30 81.23 15.30 81.23 15.30<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

6.<strong>12</strong> 1.15 0.11 0.55 0.10 0.82 0.15 0.55 0.10<br />

SMILE Training (Society for Management Information Learning & 11.43 2.15 0.16 0.69 0.13 0.84 0.16 5.00 0.94<br />

Exposure visit of farmers under SMILE 5.04 0.95 0.00 2.25 0.42 2.25 0.42 2.52 0.47<br />

Extension Services (Posters, Leaf lefts, Charts, TV ads.etc.<br />

RKVY<br />

2.00 0.38 0.00 1.00 0.19 1.00 0.19 1.00 0.19<br />

a) Strengthening of Livestock Service Information & Modernisation of 506.08 95.35 0.00 190.79 35.94 190.79 35.94 315.15 59.37<br />

b) Dairy Development 226.80 42.73 0.00 106.21 20.01 106.21 20.01 <strong>12</strong>0.59 22.72<br />

c) Fodder Development 86.30 16.26 0.00 40.20 7.57 40.20 7.57 46.50 8.76<br />

d) Goat Development 25.20 4.75 0.00 <strong>12</strong>.60 2.37 <strong>12</strong>.60 2.37 <strong>12</strong>.60 2.37<br />

e) Poultry Development 56.40 10.63 0.00 16.30 3.07 16.30 3.07 40.10 7.55<br />

Sub-Total 1<strong>12</strong>5.28 2<strong>12</strong>.00 0.60 454.54 85.64 454.96 85.71 650.50 <strong>12</strong>2.55<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 134.40 0.00 286.38 53.95 286.38 53.95 202.02 38.06<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>4.00 23.36<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2<strong>12</strong>.16 39.97<br />

Modernisation of Co-operative Processing Rice Mill 10.00 1.88 0.00 0.00 0.00 0.00 0.00 30.00 5.65<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 7.30 0.00 0.00 0.00 0.00 0.00 24.25 4.57<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co- 345.00 65.00 0.00 139.00 26.19 139.00 26.19 131.00 24.68<br />

Financial assistance in shape of loan/subsidy or share to other co-<br />

Central <strong>Plan</strong><br />

25.00 4.71 0.00 8.00 1.51 8.00 1.51 <strong>12</strong>.20 2.30<br />

Construction of Rural Godown under RKVY 0.00 0.00 0.00 508.01 95.71 508.01 95.71 1427.92 269.02<br />

Sub-Total 1132.15 213.30 0.00 941.39 177.36 941.39 177.36 2163.55 407.61<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 0.00 11.38 2.14 11.38 2.14 <strong>12</strong>.50 2.36<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.28 0.00 0.50 0.09 0.50 0.09 1.00 0.19<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Assistance to Mechanisation Programme 19.00 3.58 0.00 25.50 4.80 25.50 4.80 5.00 0.94<br />

Survey and Investigation and establishment of fishing Harbour & Fish 1319.00 248.50 0.00 0.00 0.00 0.00 0.00 667.00 <strong>12</strong>5.66<br />

Safety measures for Marine Fishermen<br />

Centrally Sponsored <strong>Plan</strong><br />

20.00 3.77 0.00 0.00 0.00 0.00 0.00 5.00 0.94<br />

Development of Inland Fisheries & Aquaculture through FFDA 242.00 60.50 7.63 72.40 18.10 72.40 18.10 74.40 18.60<br />

Development of Brackish Water Aquaculture through FFDA 262.20 49.40 0.00 202.48 38.15 202.48 38.15 150.00 28.26<br />

Saving-cum-Relief Scheme 56.34 10.61 1.35 <strong>12</strong>.00 2.26 <strong>12</strong>.00 2.26 14.40 2.71<br />

Group Accident Insurance Scheme 64.71 <strong>12</strong>.19 3.00 15.90 3.00 15.90 3.00 16.50 3.11<br />

Low Cost House 50.00 9.42 0.00 0.00 0.00 0.00 0.00 50.00 9.42<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

54.00 10.17 0.00 <strong>12</strong>0.00 22.61 <strong>12</strong>0.00 22.61 28.50 5.37<br />

Introduction of Intermediate craft of Improved Design 60.00 11.30 0.00 <strong>12</strong>.00 2.26 <strong>12</strong>.00 2.26 24.00 4.52<br />

Sub-Total 2148.75 419.73 11.97 472.16 93.41 472.16 93.41 1048.30 202.08<br />

Total - I 7740.11 1473.14 326.08 7067.73 1336.02 7068.15 1336.10 9790.97 <strong>12</strong>84.00<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 <strong>12</strong>24.60 175.14 1500.00 282.60 1500.00 282.60 2000.00 376.80<br />

Construction of C.C Road (New Scheme) 1435.00 270.35 0.00 286.62 54.00 286.62 54.00 287.00 54.07<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

1019.33 192.04 116.14 402.87 75.90 402.87 75.90 442.50 83.37<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 4749.74 894.85 198.88 1160.50 218.64 1160.50 218.64 <strong>12</strong>00.00 226.08<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme 14372.15 2707.71 245.62 3556.18 669.98 3556.18 669.98 4218.56 794.78<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

976.18 183.91 23.66 200.00 37.68 200.00 37.68 250.00 47.10<br />

<strong>12</strong>th Finance Commission Award 3393.65 639.36 543.52 508.71 95.84 508.71 95.84 0.00 0.00<br />

13th Finance Commisssion Award 0.00 0.00 0.00 583.28 109.89 583.28 109.89 641.25 <strong>12</strong>0.81<br />

Total - II 32446.05 61<strong>12</strong>.84 1302.97 8198.16 1544.53 8198.16 1544.53 9039.31 1703.01<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

300.10 0.00 131.50 131.50 0.00 131.50 0.00 163.75 0.00<br />

Grants under Provision to Article 275 (1) 233.64 58.41 9.76 70.00 17.50 70.00 17.50 86.00 21.50<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

549.82 137.46 19.88 135.00 33.75 135.00 33.75 180.00 45.00<br />

Grants under Provision to Article 275 (1) 0.00 0.00 0.00 13.73 3.43 13.73 3.43 15.00 3.75<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 0.00 2.88 21.65 5.41 21.65 5.41 20.00 5.00<br />

Total - III 1083.56 195.87 164.02 371.88 60.09 371.88 60.09 464.75 75.25<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) - MI Division, <strong>Balasore</strong> 734.81 138.44 33.91 160.00 30.14 160.00 30.14 200.00 37.68<br />

Instream Reservoir (Construction of Check Dam) MI Division <strong>Balasore</strong> 500.00 94.20 0.00 236.84 44.62 236.84 44.62 300.00 56.52<br />

Installation of Lift Irrigation Projects under BKVY, LI Division <strong>Balasore</strong> 0.00 0.00 7.60 865.83 163.<strong>12</strong> 865.83 163.<strong>12</strong> 581.60 109.57<br />

Minor Irrigation- Biju Krushak Vikash Yojana - LI Division, Jaleswar 1634.06 307.86 0.57 385.61 72.65 385.61 72.65 261.25 49.22<br />

Bank Protection work (Flood Control) Irrigation Division <strong>Balasore</strong> 0.00 0.00 0.00 92.71 17.47 92.71 17.47 92.71 17.47<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) - 0.00 0.00 <strong>12</strong>2.46 650.00 <strong>12</strong>2.46 650.00 <strong>12</strong>2.46 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV) - Drainage Division, <strong>12</strong>73.72 239.97 <strong>12</strong>8.35 400.00 75.36 400.00 75.36 156.00 29.39<br />

Centrally Sponsored <strong>Plan</strong> 0.00 0.00 0.00<br />

Flood Management Programme (River Bank Protection Work ) Irrigation 0.00 0.00 282.87 1086.19 204.64 1086.19 204.64 3143.13 592.17<br />

Fl Flood d M Management P Programme (M (Major j WWorks) k ) - Drainage D i Division, Di i i<br />

2114.00 398.28 95.60 1522.00 286.74 1522.00 286.74 131.03 24.69<br />

Central <strong>Plan</strong> 0.00 0.00 0.00<br />

Installation of Lift Irrigation Projects under RKVY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 218.40 41.15<br />

Total - IV 6256.59 1178.74 671.35 5399.18 1017.21 5399.18 1017.21 5084.<strong>12</strong> 957.85<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 0.00 79.18 462.30 87.10 462.30 87.10 485.42 91.45<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.00 26.38<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 0.00 55.95 326.70 61.55 326.70 61.55 343.04 64.63<br />

Total - V 0.00 0.00 135.14 789.00 148.65 789.00 148.65 968.46 182.46<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

20.49 3.86 0.62 4.59 0.86 4.59 0.86 4.90 0.92<br />

Prime Minister's Employment Generation Programme (PMEGP) 863.00 162.59 42.20 228.00 42.96 228.00 42.96 300.00 56.52<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 <strong>12</strong>.55 1.42 14.55 2.74 14.55 2.74 15.00 2.83<br />

Workshed-cum-Housing 22.50 4.24 1.27 16.10 3.03 16.10 3.03 17.50 3.30<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

18.40 3.47 0.00 7.82 1.47 7.82 1.47 9.42 1.77<br />

IHDS (Cluster Approach) 62.33 11.74 0.38 21.28 4.01 21.28 4.01 8.76 1.65<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

IHDS (Group Approach) 76.10 14.34 0.26 11.00 2.07 11.00 2.07 11.50 2.17<br />

IHDS (Marketing Incentive) 60.64 11.42 1.73 9.20 1.73 9.20 1.73 9.50 1.79<br />

Health Insurance for weavers 41.00 7.72 1.87 11.55 2.18 11.55 2.18 11.73 2.21<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

9.06 1.71 0.22 1.20 0.23 1.20 0.23 1.23 0.23<br />

10% Rebate on Handloom Products 75.00 14.13 1.56 9.00 1.70 9.00 1.70 10.00 1.88<br />

<strong>District</strong> Level Exhibition 20.00 3.77 0.00 2.00 0.38 2.00 0.38 2.00 0.38<br />

Total - VI 1335.11 251.53 51.53 336.29 63.36 336.29 63.36 401.54 75.65<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 305.00 57.46 11.30 75.00 14.13 75.00 14.13 80.00 15.07<br />

Completion of incomplete roads and bridges 195.00 36.74 10.36 70.00 13.19 70.00 13.19 100.00 18.84<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 4<strong>12</strong>.02 42.07 637.30 <strong>12</strong>0.07 637.30 <strong>12</strong>0.07 733.00 138.10<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

616.92 116.23 0.00 0.00 0.00 0.00 0.00 300.00 56.52<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 20359.56 3835.74 979.32 6007.00 1131.72 6007.00 1131.72 0.00 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under RIDF 1059.50 199.61 50.87 30.00 5.65 30.00 5.65 0.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 145.00 27.32 9.42 45.00 8.48 45.00 8.48 50.00 9.42<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 169.00 31.84 9.42 57.00 10.74 57.00 10.74 62.00 11.68<br />

Completion of incomplete road and Bridges<br />

Central <strong>Plan</strong><br />

528.50 99.57 8.57 230.00 43.33 230.00 43.33 253.00 47.67<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 10480.00 1974.43 497.00 4842.00 9<strong>12</strong>.23 4842.00 9<strong>12</strong>.23 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under RIDF Project 1950.34 367.44 21.29 500.00 94.20 500.00 94.20 803.00 151.29<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 180.00 33.91 9.42 40.00 7.54 40.00 7.54 40.00 7.54<br />

Construction of Rural Road (Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

464.44 87.50 21.99 523.00 98.53 523.00 98.53 567.00 106.82<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 152<strong>12</strong>.00 2865.94 1002.55 5186.00 977.04 5186.00 977.04 2500.00 471.00<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under RIDF Project<br />

Central <strong>Plan</strong><br />

0.00 0.00 97.20 1148.00 216.28 1148.00 216.28 10941.18 2061.32<br />

Construction of road under Central Road Fund 0.00 0.00 0.00 936.00 176.34 936.00 176.34 2577.44 485.59<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

One time Additional Central Assistance 0.00 0.00 0.00 300.00 56.52 300.00 56.52 200.00 37.68<br />

Total - VII 53852.18 10145.75 2770.78 20626.30 3885.99 20626.30 3885.99 19206.62 3618.53<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

Social and Farm Forestry 18.00 3.39 1.84 10.00 1.88 10.00 1.88 <strong>12</strong>.10 2.28<br />

Communication & Building - Construction of quarters for forest guards 15.00 2.83 0.57 3.00 0.57 3.00 0.57 3.63 0.68<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00 0.08 0.21 0.04 0.21 0.04 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00 1.27 5.33 1.00 5.33 1.00 0.00 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 0.00 1.00 3.52 0.66 3.52 0.66 0.00 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 0.00 0.00 5.60 <strong>12</strong>.27 2.31 <strong>12</strong>.27 2.31 33.00 6.22<br />

Elephant Management Project 0.00 0.00 0.09 0.00 0.00 0.00 0.00 0.60 0.11<br />

Talsari - HVBA 0.00 0.00 2.93 0.00 0.00 0.00 0.00 17.10 3.22<br />

Total - VIII 33.00 6.22 13.39 34.33 6.47 34.33 6.47 66.43 <strong>12</strong>.52<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education 7.79 1.47 2.99 19.25 3.63 19.25 3.63 20.10 3.79<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 3.01<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>5.00 23.55<br />

Improvement/Modernization of ITI <strong>Balasore</strong><br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.40 18.73<br />

Sarba Sikshya Abhiyan (SSA) 0.00 0.00 1116.63 7504.01 1413.76 7504.01 1413.76 7504.21 1413.79<br />

National Programme for Education of Girls at Elementary Level 0.00 0.00 8.78 35.79 6.74 35.79 6.74 35.79 6.74<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

0.00 0.00 3.45 44.97 8.47 44.97 8.47 44.97 8.47<br />

National APP Training in ITI <strong>Balasore</strong> 43.00 8.10 0.25 5.00 0.94 5.00 0.94 6.00 1.13<br />

Sub-Total 50.79 9.57 1132.10 7609.02 1433.54 7609.02 1433.54 7851.47 1479.22<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.02 0.18 0.03 0.18 0.03 0.20 0.04<br />

One time seed capital grant for development of Sports infrastructure 0.00 0.00 6.41 34.00 6.41 34.00 6.41 34.00 6.41<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 1.04 0.20 1.04 0.20 1.44 0.27<br />

<strong>Annual</strong> acquisition grant 0.00 0.00 0.58 3.10 0.58 3.10 0.58 3.10 0.58<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

<strong>Annual</strong> operation grant 0.00 0.00 0.70 3.72 0.70 3.72 0.70 3.72 0.70<br />

Rural Sports Competition 0.00 0.00 1.32 7.60 1.43 7.60 1.43 7.60 1.43<br />

Prize Money for Rural Sports 0.00 0.00 0.00 6.30 1.19 6.30 1.19 6.30 1.19<br />

Sub-Total 0.00 0.00 9.03 55.94 10.54 55.94 10.54 56.36 10.62<br />

3 Medical & Public Health<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 79.14 17.86 99.54 18.75 99.54 18.75 142.47 26.84<br />

Urban Ayurvedic Health Services 91.28 17.20 5.37 29.90 5.63 29.90 5.63 35.65 6.72<br />

Primary Health Care (Rural) 603.00 113.61 27.32 154.00 29.01 154.00 29.01 179.25 33.77<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

28.00 5.28 1.03 5.61 1.06 5.61 1.06 14.21 2.68<br />

Reproductive Child Health (RCH) 0.00 0.00 184.23 1075.62 202.65 1075.62 202.65 1303.62 245.60<br />

Immunization 0.00 0.00 7.89 46.07 8.68 46.07 8.68 39.52 7.45<br />

National Rural Health Mission (NRHM) initiatives 0.00 0.00 177.93 1038.87 195.72 1038.87 195.72 980.59 184.74<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 0.00 6.61 37.20 7.01 37.20 7.01 40.92 7.71<br />

National Vector Borne Disease Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

0.00 0.00 27.19 149.30 28.13 149.30 28.13 164.23 30.94<br />

National Programme for Control of Blindness (NPCB) 0.00 0.00 4.76 28.45 5.36 28.45 5.36 31.30 5.90<br />

Integrated Disease Surveillance Programme (IDSP) 0.00 0.00 1.91 10.56 1.99 10.56 1.99 11.62 2.19<br />

National Leprosy Eradication Programme (NLEP) 0.00 0.00 1.59 9.<strong>12</strong> 1.72 9.<strong>12</strong> 1.72 10.03 1.89<br />

Sub-Total 1142.37 215.22 463.69 2684.24 505.71 2684.24 505.71 2953.41 556.42<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 844.44 159.09 30.35 238.50 44.93 238.50 44.93 209.82 39.53<br />

ARWSP-Public Water Supply Scheme 7931.49 1494.29 160.58 1872.35 352.75 1872.35 352.75 2022.00 380.94<br />

Sub - Total 8775.93 1653.39 190.94 2110.85 397.68 2110.85 397.68 2231.82 420.47<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered<br />

areas of <strong>Balasore</strong>, Jaleswar, Soro & Nilgiri ULBs<br />

100.00 18.84 1.70 50.00 9.42 50.00 9.42 41.00 7.72<br />

Improvement of water supply and replacement of defunct bore wells upgradation<br />

of sources and laying of pipe lines in different ULBs<br />

300.00 56.52 5.46 200.00 37.68 200.00 37.68 71.00 13.38<br />

Improvement of W/S to Nilgiri town 1118.42 210.71 0.00 200.00 37.68 200.00 37.68 300.00 56.52<br />

Improvement of W/S to Soro town 192.00 36.17 0.00 92.00 17.33 92.00 17.33 100.00 18.84<br />

Improvement of W/S to Jaleswar town 160.00 30.14 0.00 60.00 11.30 60.00 11.30 100.00 18.84<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Agreed Outlay<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Of which flow<br />

to SCSP<br />

Anticipated Expenditure<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

0 1<br />

Improvement of water supply & S/I system of different non-residential<br />

2 3 4 5 6 7 8 9 10<br />

office building & Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar<br />

ULBs<br />

200.00 37.68 3.62 80.80 15.22 80.80 15.22 100.00 18.84<br />

Improvement of water supply & S/I system of different residential office<br />

building & Govt. Institutions of <strong>Balasore</strong>, Soro, Nilgiri & Jaleswar ULBs<br />

Of which flow<br />

to SCSP<br />

200.00 37.68 1.70 91.00 17.14 91.00 17.14 100.00 18.84<br />

Centrally Sponsored <strong>Plan</strong><br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT 1587.58 299.10 0.00 200.00 37.68 200.00 37.68 300.00 56.52<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP 5442.39 1025.35 0.00 200.00 37.68 200.00 37.68 300.00 56.52<br />

Sub-Total 9300.39 1752.19 <strong>12</strong>.47 1173.80 221.14 1173.80 221.14 14<strong>12</strong>.00 266.02<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 0.00 5.52 11.00 2.07 11.00 2.07 <strong>12</strong>.10 2.28<br />

Road Development & Maintenance 0.00 0.00 15.58 90.87 17.<strong>12</strong> 90.87 17.<strong>12</strong> 99.96 18.83<br />

Urban Greenery 0.00 0.00 1.88 11.00 2.07 11.00 2.07 <strong>12</strong>.10 2.28<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 1.31 7.63 1.44 7.63 1.44 8.39 1.58<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 0.00 54.28 316.94 59.71 316.94 59.71 348.63 65.68<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 10.32 60.28 11.36 60.28 11.36 66.31 <strong>12</strong>.49<br />

Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 0.00 0.00 7.53 43.96 8.28 43.96 8.28 48.36 9.11<br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.06 0.30 0.06 0.30 0.06 0.33 0.06<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 26.01 149.45 28.16 165.68 31.21 198.81 37.46<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 0.00 3.33 9.49 1.79 19.46 3.67 23.35 4.40<br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.00 20.24 3.81 20.24 3.81 23.47 4.42<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 6.59 38.00 7.16 38.00 7.16 41.80 7.88<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 2.45 10.00 1.88 10.00 1.88 11.00 2.07<br />

Road Development Grant 0.00 0.00 6.90 37.59 7.08 37.59 7.08 45.00 8.48<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Road Maintenance Grant 0.00 0.00 2.73 17.67 3.33 17.67 3.33 20.00 3.77<br />

FDR Grant 0.00 0.00 0.00 20.00 3.77 20.00 3.77 20.00 3.77<br />

Incentive Grant 0.00 0.00 3.72 25.00 4.71 25.00 4.71 30.00 5.65<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.94 20.00 3.77 20.00 3.77 25.00 4.71<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 0.00 2.57 25.00 4.71 25.00 4.71 50.00 9.42<br />

Twelfth Finance Commission (TFC) 0.00 0.00 2.90 27.00 5.09 27.00 5.09 35.00 6.59<br />

Sub-Total 0.00 0.00 154.63 941.42 177.36 967.62 182.30 1119.61 210.93<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

1429.75 269.36 81.00 795.85 149.94 795.85 149.94 875.85 165.01<br />

Indira Awas Yojana (IAY) 19841.50 5952.45 739.22 7907.20 2372.16 7907.20 2372.16 8697.20 2609.16<br />

Sub-Total 2<strong>12</strong>71.25 6221.81 820.22 8703.05 2522.10 8703.05 2522.10 9573.05 2774.17<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.00 0.68 0.68 0.68 0.68 0.68 0.75 0.75<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 0.00 6.49 6.66 6.66 6.66 6.66 7.33 7.33<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 0.00 0.00 65.92 0.00 65.92 0.00 72.52 0.00<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 0.00 0.00 156.64 0.00 156.64 0.00 172.30 0.00<br />

Post Matric Scholarship to SC Students 0.00 0.00 47.06 88.48 88.48 88.48 88.48 97.33 97.33<br />

Post Matric Scholarship to ST Students 0.00 0.00 0.00 17.44 0.00 17.44 0.00 19.18 0.00<br />

Development of SCs (OSFDC Section) 0.00 0.00 175.70 203.75 203.75 203.75 203.75 224.13 224.13<br />

Development of STs (OSFDC Section) 0.00 0.00 0.00 117.50 0.00 117.50 0.00 <strong>12</strong>9.25 0.00<br />

Pre Matric Scholarship to the students whose parents engaged unclean 0.00 0.00 0.74 14.24 2.68 14.24 2.68 15.66 15.66<br />

Pre Matric Scholarship to OBC Students 0.00 0.00 6.39 1151.05 0.00 1151.05 0.00 <strong>12</strong>66.16 0.00<br />

Post Matric Scholarship to OBC Students 0.00 0.00 0.00 56.98 0.00 56.98 0.00 62.68 0.00<br />

Pre Matric Scholarship to Minorities 0.00 0.00 1.80 65.29 <strong>12</strong>.30 65.29 <strong>12</strong>.30 71.82 0.00<br />

Post Matric Scholarship to Minorities 0.00 0.00 0.00 5.69 1.07 5.69 1.07 6.26 0.00<br />

Sub-Total 0.00 0.00 238.86 1950.32 315.63 1950.32 315.63 2145.37 345.20<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 1323.38 249.32 89.35 370.00 69.71 370.00 69.71 474.26 89.35<br />

Old Age Pension 155.09 29.22 16.39 0.00 0.00 0.00 0.00 87.02 16.39<br />

Orissa Disability Pension 13.70 2.58 10.95 0.00 0.00 0.00 0.00 58.13 10.95<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Organising Single Window Camps 23.45 4.42 0.00 8.30 1.56 8.30 1.56 8.30 1.56<br />

Bi-cycle to girl students 362.82 68.36 0.32 1.25 0.24 1.25 0.24 1.25 0.24<br />

Mission Sakti 943.60 177.77 39.33 3.50 0.66 3.50 0.66 208.75 39.33<br />

Repair & Maintenance of AWC Building 75.22 14.17 1.93 11.00 2.07 11.00 2.07 10.25 1.93<br />

Reduction of Child Malnutrition 49.23 9.27 5.87 <strong>12</strong>.00 2.26 <strong>12</strong>.00 2.26 31.16 5.87<br />

Reduction of IMR 7.99 1.51 0.00 2.20 0.41 2.20 0.41 2.20 0.41<br />

Grant in Aid to Handicapped Welfare Institution 54.99 10.36 4.21 23.00 4.33 23.00 4.33 23.00 4.33<br />

Grant in Aid to Orphanages 379.38 71.48 16.72 101.15 19.06 101.15 19.06 101.15 19.06<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.35 0.25 0.00 0.35 0.07 0.35 0.07 0.35 0.07<br />

Medical Check up 1.60 0.30 0.00 0.60 0.11 0.60 0.11 0.60 0.11<br />

Sanitation 1.29 0.24 0.00 0.50 0.09 0.50 0.09 0.50 0.09<br />

Handicapped Scholarship 45.06 8.49 2.35 11.60 2.19 11.60 2.19 <strong>12</strong>.47 2.35<br />

Award to AWW 0.60 0.11 0.00 0.15 0.03 0.15 0.03 0.15 0.03<br />

Monitoring Mechanism & Evaluation 17.61 3.32 0.00 4.50 0.85 4.50 0.85 4.50 0.85<br />

Information Education Communication 10.72 2.02 0.00 3.00 0.57 3.00 0.57 3.00 0.57<br />

Medicine Kit 34.30 6.46 0.00 <strong>12</strong>.20 2.30 <strong>12</strong>.20 2.30 <strong>12</strong>.20 2.30<br />

Computer 0.56 0.11 0.00 0.20 0.04 0.20 0.04 0.20 0.04<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

1.50 0.28 0.00 0.50 0.09 0.50 0.09 0.35 0.07<br />

Supplementary Nutrition Programme 4653.02 876.63 451.08 1080.00 203.47 1080.00 203.47 2394.26 451.08<br />

Mid Day Meal Programme (Pry+UP) 3819.83 719.66 369.13 900.00 169.56 900.00 169.56 1959.29 369.13<br />

Mid Day Meal Programme (Kitchen-cum-store) 3826.40 720.89 25.74 1000.00 188.40 1000.00 188.40 136.64 25.74<br />

Mid Day Meal Programme (Utensils) 290.27 54.69 2.19 84.15 15.85 84.15 15.85 11.60 2.19<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.57 3.88 3.86 5.00 0.94 5.00 0.94 20.50 3.86<br />

Mid Day Meal Programme (Transportation charges) 285.<strong>12</strong> 53.72 5.11 75.50 14.22 75.50 14.22 27.10 5.11<br />

Mid Day Meal Programme (Honorarium to cook & helper) 409.92 77.23 15.45 82.00 15.45 82.00 15.45 82.00 15.45<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

97.00 18.27 4.71 28.00 5.28 28.00 5.28 25.00 4.71<br />

IG National Old Age Pension (ACA to States) 2408.78 453.81 1<strong>12</strong>.50 575.00 108.33 575.00 108.33 597.14 1<strong>12</strong>.50<br />

National Family Benefit Scheme (ACA to States) 392.20 73.89 7.31 92.80 17.48 92.80 17.48 92.80 17.48<br />

Kishori Shakti Yojana 50.05 9.43 0.00 14.00 2.64 14.00 2.64 14.00 2.64<br />

National Disability Pension 20.00 3.77 0.00 0.50 0.09 0.50 0.09 0.50 0.09<br />

National Child Labour Project 0.00 0.00 1.42 105.39 19.86 105.39 19.86 105.39 19.86<br />

Sub-Total 19776.60 3725.91 1185.93 4608.34 868.22 4608.34 868.22 6506.01 <strong>12</strong>25.73<br />

Total - IX 60317.33 13578.10 4207.86 29836.98 6451.92 29863.18 6456.86 33849.10 7288.79<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl. No. Major Head/Minor heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10<br />

Actual<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to SCSP<br />

Expenditure<br />

Under SCSP<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

Total Outlay<br />

to SCSP<br />

Of which flow<br />

to SCSP<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Construction of Revenue Department Buildings (Non Residential) 161.66 30.46 16.96 19.36 3.65 19.36 3.65 22.30 4.20<br />

Construction of Revenue Department Buildings (Residential) 74.44 14.02 4.21 <strong>12</strong>.<strong>12</strong> 2.28 <strong>12</strong>.<strong>12</strong> 2.28 13.94 2.63<br />

Construction of PHC Buildings (Non Residential) 21.16 3.99 0.00 9.84 1.85 9.84 1.85 11.32 2.13<br />

Construction of RD Department Buildings (Non Residential) 64.15 <strong>12</strong>.09 1.51 11.00 2.07 11.00 2.07 <strong>12</strong>.65 2.38<br />

Construction of Revenue Department Buildings (Non Residential) 178.22 33.58 14.55 48.10 9.06 48.10 9.06 52.90 9.97<br />

Construction of PHC Buildings (Residential) 32.55 6.13 3.17 7.50 1.41 7.50 1.41 8.20 1.54<br />

Construction of Revenue Department Buildings (Residential) 178.10 33.55 5.48 71.00 13.38 71.00 13.38 78.00 14.70<br />

Construction of Building (Non Residential) RD Division Jaleswar 60.00 11.30 4.08 27.38 5.16 27.38 5.16 30.00 5.65<br />

Construction of Health & RW Building (Residential) 100.55 18.94 6.46 19.00 3.58 19.00 3.58 21.00 3.96<br />

Construction & Maintenance of Buildings (Non Residential) 58.61 11.04 6.04 <strong>12</strong>.65 2.38 <strong>12</strong>.65 2.38 13.91 2.62<br />

Construction of RD Department Buildings (Residential) 61.26 11.54 0.00 28.49 5.37 28.49 5.37 32.77 6.17<br />

Total - X 990.70 186.65 62.45 266.44 50.20 266.44 50.20 296.99 55.95<br />

GRAND TOTAL 164054.63 33<strong>12</strong>8.84 9705.57 72926.29 14564.43 72952.91 14569.45 79168.29 15254.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Annexure VI-B: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PHYSICAL TARGETS AND ACHIEVEMENTS (Proposal for SCSP)<br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

Annexure - XIII<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

Work <strong>Plan</strong>-Rice Development<br />

Farmers Field School Nos. 32 2 2 2 3<br />

Block level awareness campaign Nos. 11 2 2 2 3<br />

Krushak Diwas Nos. 1 0 0 0 1<br />

Pre-seasonal training Nos. 1 0 0 0 1<br />

HYV. Rice production Ha. 11 0 0 0 0<br />

Asst. to Krushak Sathi Nos. 272 0 0 0 0<br />

SRI method of Rice cultivation Ha. 13.56 0.00 18.09 18.09 20.72<br />

Exposure visit (Outside the state) Nos. 9 1 2 2 2<br />

Exposure visit (Inside the state) Nos. 19 2 0 2 2<br />

Celebration of <strong>District</strong> Mahostav Nos. 1 0 0 0 0<br />

Financial assistance to FFS<br />

Work <strong>Plan</strong>-Sugarcane Development<br />

Nos. 0 0 30 30 32<br />

Ratoon Management Acre. 0.00 0.00 1.88 1.88 2.07<br />

Exposure visit (Inside the state) Nos. 7 0 1 1 1<br />

Farmers Field School<br />

Work <strong>Plan</strong>-Farm Mechanization<br />

Nos. 0 0 1 1 1<br />

Subsidy for Tractor Nos. 29 21 21 23 25<br />

Subsidy for Power Tiller Nos. 303 7 21 21 23<br />

Subsidy for Self Propelled Reaper Nos. 2 0 1 1 1<br />

Subsidy for Self Propelled transplantor Nos. 1 0 0 0 0<br />

Subsidy for Rotavator Nos. 4 0 1 1 1<br />

Subsidy for Power operated implements Nos. 8 1 2 2 2<br />

Subsidy for Special power operated implements Nos. 16 0 2 2 2<br />

Subsidy for Hydraulic Trailer Nos. 4 1 1 1 1<br />

Subsidy for Manual & Bullock drawn implements Sets 98 24 21 24 26<br />

P.H.M Training<br />

Jute Technology Mission (MM-II)<br />

Nos. 2 0 0 0 0<br />

Seed Distribution (Jute) Qtl. 75 3 8 8 8<br />

Seed Minikit Qtl. 226 0 0 0 0<br />

Distribution of Sprayer Nos. 161 28 57 57 57<br />

Production Technology Demonstration Ha. 0.00 26.38 28.26 28.26 31.09<br />

Production Technology Minikit Nos. 81 0 0 0 0<br />

Retting Technology Demonstration Nos. 16 4 5 5 5<br />

Essential Nutrients Mini kits Ha. 471.00 113.04 <strong>12</strong>2.46 <strong>12</strong>2.46 134.71<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Foliar Spray Demonstration Ha. 113.04 22.61 24.49 24.49 26.94<br />

Retting Scheme Nos. 1 0 0 0 0<br />

Kuchha Retting Tank Nos. 31 11 11 11 <strong>12</strong><br />

Pucca Retting Tank Nos. 6 0 2 2 2<br />

Integrated Pest Management Demonstration Nos. 2 0 1 1 1<br />

Farmer's training Nos. 5 2 2 2 2<br />

Exposure visit (Outside the state ) Nos. 7 2 2 2 2<br />

Farmers Field School<br />

ISOPOM Pulses<br />

Nos. 6 1 1 1 1<br />

Block Demonstration Ha. 13 2 2 0 0<br />

Farmer's training Nos. 9 2 2 0 0<br />

R. Culture/PBS Ha. 41 0 0 0 0<br />

<strong>Plan</strong>t Protection Equipments Nos. 245 57 47 0 0<br />

Micronutrient Ha. 49 19 0 0 0<br />

Storage Bins Nos. 85 0 0 0 0<br />

Vermicompost units Nos. 11 0 5 0 0<br />

Sprinkler Nos. 0 1 2 0 0<br />

<strong>Plan</strong>t Protection Chemicals Ha. 0 28 <strong>12</strong> 0 0<br />

Distribution of Certified Seeds<br />

ISOPOM Oilseeds<br />

Qtl. 0 43 136 0 0<br />

Distribution of Certified Seeds Qtl. 8911 2922 3465 3465 3821<br />

Block Demonstration (Sunflower) Ha. 28.26 0.00 2.26 2.26 2.45<br />

Gypsum Ha. 1414.88 156.75 471.00 471.00 518.10<br />

R.Culture/PBS Ha. 1092.72 0.00 0.00 0.00 0.00<br />

Farmers Field School cum IPM (Mustard) Nos. 0 0 1 1 1<br />

Farmers Field School cum IPM (Groundnut) Nos. 5 0 1 1 2<br />

Sprinkler's set Nos. 5 2 1 2 2<br />

<strong>Plan</strong>t Protection Equipments Nos. 162 188 66 207 226<br />

Micronutrient Ha. 56.52 3.77 33.91 33.91 37.30<br />

Farm Implements (Manual) Sets 4 1 0 1 1<br />

Weedicides Ha. 22.61 0.00 0.00 0.00 0.00<br />

<strong>Plan</strong>t Protection Chemicals Ha. 37.68 0.00 18.84 18.84 20.72<br />

Vermicompost units Nos. 14 0 2 2 2<br />

Farmer's training Nos. 11 2 3 3 3<br />

Exposure visit<br />

Seed Village Scheme<br />

Nos. 9 2 3 3 3<br />

Paddy Ac. 141 4663 565 565 622<br />

Mung Ac. 28 22 377 377 414<br />

Biri Ac. 28 <strong>12</strong>2 141 141 155<br />

Groundnut Ac. 28 297 6<strong>12</strong> 6<strong>12</strong> 674<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Mustard Ac. 0 0 94 94 104<br />

Training (Rs.1500/- per Training.) Nos. 9 0 0 0 0<br />

Storage Bins (20 Qtl. Capacity) Nos. 33 0 0 0 0<br />

Storage Bins (10 Qtl. Capacity)<br />

RIDF-JALANIDHI<br />

Nos. 52 0 0 0 0<br />

Shallow Tube Well Nos. 852 537 659 659 659<br />

River Lift Project<br />

RKVY<br />

Nos. 47 0 11 11 11<br />

Supply of paper mill sludge Mts. 0 226 0 0 283<br />

Supply of Gypsum Mts. 0 136 0 0 151<br />

Bio-fertilizer Qtl. 0 0 43 43 57<br />

Promotion of organic farming Nos. 0 0 2 2 3<br />

Promotion of SRI (One unit - 20Ac.) Nos. 0 0 45 45 51<br />

Establishment of Vermi Compost Nos. 0 0 57 57 66<br />

Management of acid soil Mts. 0 0 226 226 0<br />

Rice Minikit (Seed cost and transportation unit) Nos. 0 0 57 57 66<br />

Exposure visit outside state (20 persons in one group) Nos. 0 0 0 0 2<br />

Farmers Field School (Rice) Nos. 0 0 0 0 7<br />

INM-FFS Nos. 0 0 0 0 5<br />

IPM-FFS (Rice) Nos. 0 0 0 0 5<br />

Capacity building of Extension personnel's<br />

Farm Mechanization under RKVY<br />

Nos. 0 0 0 0 66<br />

Subsidy for Power Tiller Nos. 0 102 19 37 41<br />

Subsidy for Self Propelled Reaper Nos. 0 1 0 2 2<br />

Subsidy for Pump sets Nos. 0 0 17 151 170<br />

Subsidy for Rotavator Nos. 0 0 0 0 1<br />

Subsidy for Power operated Thresher Nos. 0 5 1 23 24<br />

Subsidy for Special power operated implements Nos. 0 2 0 3 4<br />

Subsidy for Hydraulic Trailer Nos. 0 0 2 2 2<br />

Subsidy for Manual & Bullock drawn implements Nos. 0 37 0 62 68<br />

Subsidy for Combine Harvester Nos. 0 0 0 2 2<br />

Subsidy for Tractor<br />

RKVY-STREAM-II<br />

Nos. 0 0 0 2 2<br />

Construction of FIAC building<br />

National Food Security Mission (Pulse)<br />

Nos. 2 0 1 1 0<br />

Distribution of Certified Seeds Qtl. 0 0 <strong>12</strong>2 <strong>12</strong>2 132<br />

Organization of technology Demonstration (0.4ha-unit) Ha. 0.00 0.00 26.38 26.38 37.68<br />

Organization of farmers Training @ Rs.5000/-per training for one day) (25 nos of Nos. 0 0 0 0 11<br />

Seed Village (@ Rs. 15000/-per Ha.) of 50 nos farmers of 3 days Ha. 0.00 0.00 0.00 0.00 131.88<br />

Storage go-down at Block Head Quarter of <strong>12</strong>50 sqft.. Nos. 0 0 0 0 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Threshing Floor (30'X30') with cover Nos. 0 0 0 0 1<br />

Power Tillers Nos. 0 0 0 0 5<br />

Dal Processor (Mini Dal Mill)<br />

INM (Integrated Nutrient Management)<br />

Nos. 0 0 0 0 1<br />

Lime/Gypsum Ha. 0.00 0.00 226.08 226.08 282.60<br />

Micronutrient Ha. 0.00 0.00 90.43 90.43 103.62<br />

Assistance for R.Culture/PSB distribution<br />

IPM (Integrated Post Management)<br />

Ha. 0.00 0.00 75.36 75.36 84.78<br />

Assistance for PP Chemicals Ha. 0.00 0.00 188.40 188.40 207.24<br />

Incentive for sprayer @ Rs.3000/- Nos. 0 0 66 66 75<br />

Distribution of Rotavactors Nos. 0 0 0 0 1<br />

Distribution sprinkler set @ Rs.7500/- Ha. 0.00 0.00 11.30 11.30 13.19<br />

Incentives for pump sets Nos. 0 0 26 26 30<br />

Assistance for pipe (one set 800mtr) Mts. 0 0 <strong>12</strong>06 <strong>12</strong>06 1507<br />

Exposure visit @ Rs.3000/- (20 persons in a group) Nos. 0 0 0 0 1<br />

2 Horticulture<br />

A. National Horticulture Mission Programme<br />

Establishment of new Garden<br />

Mango Ha. 248.31 47.10 75.36 75.36 79.13<br />

Banana Ha. 45.22 13.19 3.77 3.77 9.42<br />

Costal horticulture -cashew<br />

Floriculture<br />

Ha. <strong>12</strong>6.23 28.26 28.26 28.26 37.68<br />

Marigold Ha. 39.00 4.71 1.88 1.88 2.83<br />

Gladioli Ha. 49.93 9.42 4.71 4.71 5.65<br />

Rose Ha. 30.60 32.22 2.83 2.83 3.77<br />

Tube Rose<br />

Organic Farming<br />

Ha. 20.35 0.00 0.00 0.00 0.00<br />

Vermicompost (Big) Nos. 4 0 2 2 2<br />

Vermicompost (Small)<br />

Production of <strong>Plan</strong>ting Materials<br />

Nos. 30 6 0 0 0<br />

Small Nursery (Public Sector) Nos. 1 0 0 0 0<br />

Small Nursery (Private Sector)<br />

Protected cultivation<br />

Nos. 2 1 0 0 1<br />

Greenhouse units Nos. 4 0 11 11 11<br />

Shade net units Nos. 5 0 75 75 75<br />

Mulching units Nos. 6 0 2 2 2<br />

Plastic Tunnel units<br />

Human Resource Development<br />

Nos. <strong>12</strong> 0 0 0 0<br />

Training of farmers (Inside the state) Nos. <strong>12</strong>9 13 15 15 15<br />

Exposure visit (Outside the state) Nos. 15 4 6 6 6<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Training to Gardener Nos. 4 2 1 1 1<br />

Training to entrepreneur Nos. 6 1 0 0 0<br />

Training to supervisor<br />

Subsides Sales<br />

Nos. 1 0 0 0 0<br />

Vegetable Mini kit<br />

Mission Management<br />

Nos. 8762 2159 2261 2261 2713<br />

<strong>District</strong> level show<br />

B. Micro Irrigation Programme<br />

Nos. 1 0 0 0 0<br />

Drip irrigation Ha. 5.09 0.94 9.42 9.42 9.42<br />

Sprinkler irrigation<br />

C. Coconut Development Board Programme<br />

Ha. 103.81 38.62 37.68 37.68 56.52<br />

Area expansion Ha. 38.59 0.00 14.13 14.13 15.07<br />

Laying out demonstration Ha. 11.68 4.71 2.83 2.83 3.77<br />

Organic manure pit Nos. 2 0 0 0 0<br />

Raising of coconut seedling<br />

D. ISOPOM (Oil Palm)<br />

Nos. 10362 942 942 942 942<br />

Normal Ha. <strong>12</strong>.81 <strong>12</strong>.06 13.19 13.19 15.07<br />

S.C.P Ha. 3.77 1.88 2.26 2.26 2.83<br />

T.A.S.P Ha. 3.77 2.26 2.83 2.83 2.83<br />

Demonstration<br />

E. R.K.V.Y.<br />

Ha. 1.13 1.13 1.88 1.88 1.88<br />

Vermicompost units Nos. 26 8 8 8 9<br />

Vermicompost hatchery Nos. 2 0 2 2 2<br />

Zero Energy Cool Chamber<br />

F. National Medicinal <strong>Plan</strong>t Mission Programme<br />

Nos. 2 0 2 2 2<br />

Anola Ha. 8.48 1.32 1.32 1.32 1.88<br />

Aswagandha Ha. 2.83 0.94 0.38 0.38 0.94<br />

Tulasi Ha. 2.83 0.00 0.94 0.94 1.32<br />

Aloevera Ha. 0.00 0.00 0.94 0.94 0.94<br />

Exposure visit (Inside the state) Nos. 11 0 1 1 1<br />

Exposure visit (Outside the state) Nos. 2 0 0 0 1<br />

3 Soil and Water Conservation<br />

Watershed Development Nos. 0 2 2 2 2<br />

4 Animal Husbandry & Dairy Development<br />

ASCAD Health Camp & Awareness Programme Nos. 0 5 5 5 5<br />

Bird Flu Training Programme Nos. 0 2 2 2 3<br />

Genetic up gradation of Goats Deworming of goats<br />

SIMILE Training<br />

Nos. 0 22 0 30 57<br />

Entrepreneurship Development Training Nos. 0 0 0 0 1<br />

Training to farmers on poultry production Nos. 0 0 0 0 8<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Training of lead farmers Nos. 0 0 0 0 1<br />

Skill up gradation training Nos. 0 1 1 1 4<br />

Milk Production MT. 0 <strong>12</strong> 14 <strong>12</strong> 13<br />

Egg Production Million 0 14 17 15 15<br />

Meat Production MT. 0 1 0 1 1<br />

Fodder Minikit distribution Nos. 0 466 19 19 565<br />

Training & Demonstration under pasture development Nos.of Demon. 0 466 19 19 94<br />

Fodder Production Qtl. 0 10083 0 0 15072<br />

Treatment of Cases Nos. 0 66290 86852 71592 79<strong>12</strong>8<br />

Castration<br />

Vaccination<br />

Nos. 0 6152 8478 6406 6971<br />

HSV Nos. 0 55559 146641 62172 62172<br />

BQV Nos. 0 52366 82180 56520 56520<br />

FMDV Nos. 0 30483 38999 339<strong>12</strong> 56520<br />

RDV.(R2B) Nos. 0 35099 62586 41448 47100<br />

PPRV Nos. 0 20931 18840 18840 18840<br />

Artificial Insemination Nos. 0 <strong>12</strong>082 16221 13188 10739<br />

Infertility camps Nos. 0 138 226 151 <strong>12</strong>2<br />

Deworming Nos. 0 20347 50418 22608 18840<br />

Establishment of Dairy units Nos. 0 11 0 30 57<br />

Establishment of Goatery units Nos. 0 6 0 8 11<br />

Establishment of Broilers farmer units Nos. 0 17 0 2 28<br />

Back yard poultry units Nos. 0 7996 0 9420 11304<br />

5 Fisheries<br />

Development of Fresh Water Aquaculture under FFDA (Water Area) Ha. 137.50 28.63 30 30.00 33.00<br />

Development of Fresh Water Aquaculture under FFDA (Training) Nos. <strong>12</strong>5 8 13 13 15<br />

Development of Water Logged Areas (Water Area) Ha. 9.42 1.93 0.00 0.00 0.00<br />

Development of Water Logged Areas (Training) Nos. 28 0 0 0 0<br />

Development of Brackish Water Aquaculture (Water Area) Ha. 444.62 0.00 47.10 18.84 22.61<br />

Integrated Development of Inland Capture Resources (Net & Boat) Nos. 57 <strong>12</strong> 0 4 5<br />

Integrated Development of Inland Capture Resources (Training) Nos. 57 0 0 0 0<br />

Development of Fresh Water Aquaculture under NFDB (Water Area) Ha. 0.00 0.00 45.22 45.22 45.22<br />

Development of Fresh Water Aquaculture under NFDB (Training) Nos. 94 13 23 23 23<br />

Self Employment Programme (Training) Nos. 94 11 6 6 11<br />

6 Cooperation<br />

Share capital to Cooperative credit institutions under NRC-LTO fund<br />

PACS/LAMPCS & C.S. Bank Nos. 27 0 <strong>12</strong> <strong>12</strong> 13<br />

Managerial Subsidy<br />

Modernation of Co-operative Processing<br />

Consumer Co-operative<br />

Nos. 23 0 <strong>12</strong> <strong>12</strong> 11<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Share Capital Nos. 4 0 2 2 2<br />

Transporting Subsidy of PDS<br />

MACP-Infrastructure Strengthening and Managerial subsidy to Marketing<br />

Nos. 9 0 4 4 4<br />

Repair of Godown of PACS & RCMS Nos. 6 0 2 2 3<br />

Managerial Subsidy to PACS & RCMS for procurement<br />

Financial assistance in shape of loan/subsidy or share to other cooperative<br />

Nos. 19 0 8 8 9<br />

Women Cooperative Nos. 1 0 0 0 0<br />

Labour Cooperative Nos. 2 0 0 0 1<br />

II. RURAL DEVELOPMENT<br />

1 DRDA Administration<br />

Gopabandhu Gramin Yojana (GGY) Nos. of Projects 395 63 158 158 231<br />

State Finance Commission Grant Nos. of Projects 82 74 8 8 10<br />

Twelfth Finance Commission (TFC) Nos. of Projects 1627 1467 161 161 0<br />

2 Rural Employment<br />

Swarnajayanti Gram Swarozgar Yojana (SGSY) No. of Benf. 6520 1744 1564 1926 1714<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme Nos. of Projects 1303 69 739 739 799<br />

III. SPECIAL AREAS PROGRAMMES<br />

Nilgiri ITDA<br />

1 Grants under provision to article 275(1)<br />

Construction of Boundary Wall of School/Hostel Nos. 5 1 0 1 1<br />

Construction of School/Hostel Building Nos. 5 5 1 0 1<br />

Electrification of School/Hostel Nos. 7 1 0 2 2<br />

CD work Nos. 7 1 0 1 2<br />

Drainage works at school Nos. 2 0 0 1 1<br />

2 Special Central Assistance to Tribal Sub-<strong>Plan</strong><br />

Group finance to SHGs Nos. of families 2 4 2 2 2<br />

Bee keeping Nos. of families 81 25 13 13 13<br />

Lac cultivation Nos. of families 163 38 25 25 25<br />

Land Development Nos. of families 13 13 0 0 0<br />

Cello Tube well Nos. 19 4 4 4 5<br />

River Lift Point Nos. 3 1 1 1 0<br />

Training Programme Nos. 30 3 15 15 13<br />

CD work Nos. 16 4 3 3 4<br />

WHS Nos. 5 0 2 2 2<br />

IV. IRRIGATION & FLOOD CONTROL<br />

<strong>12</strong>th F.C. road Nos. 0 1 0 0 0<br />

Bank protection work (Flood Control) Nos. 0 0 1 1 0<br />

State <strong>Plan</strong> (LUMP)<br />

Minor Irrigation<br />

Nos. 0 0 6 6 0<br />

Creation of Irrigation potential Ha. 0.00 63.30 113.79 0.00 131.88<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Biju Krushak Vikash Yojana - LI Division, Jaleswar Ha. 808.99 9.04 146.95 146.95 101.74<br />

V. ENERGY<br />

Rajib Gandhi Gramin Vidyutikaran Yojana Nos. 0 805 23597 23597 3438<br />

Electrification of Un-electrified Villages Nos. 0 8 11 11 10<br />

Biju Gram Jyoti Yojana No. of village 0 1 2 2 2<br />

VI. INDUSTRY & MINERALS<br />

1 Small Scale Enterprises Nos. 336 55 55 0 57<br />

PMEGP Nos. 277 31 31 0 38<br />

Cottage Industries Nos. 46 9 8 0 8<br />

2 Handloom & Textile<br />

Promotion of Handloom Industry Nos. of Wvrs 36 15 15 0 9<br />

Workshed-cum-Housing Nos. 32 5 9 0 9<br />

Skill up gradation training Nos. 41 0 9 0 13<br />

IHDS (Cluster Approach) Nos. of Wvrs 62 41 62 0 62<br />

IHDS (Group Approach) Nos. of Wvrs 118 26 23 0 28<br />

IHDS (Marketing Incentive) Nos. of Wvrs 6 2 6 0 6<br />

ICICI (Lombard) Nos. of Wvrs 339 232 232 0 236<br />

MGBBY Nos. of Wvrs 211 148 151 0 154<br />

10% Rebate on Handloom Product Nos. of WCS 5 4 5 0 5<br />

<strong>District</strong> level Exhibition Nos 1 0 0 0 0<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong> (I)<br />

A C.W.A<br />

Black Topped K.M. 1 0 0 0 0<br />

Metalling K.M. 1 0 0 0 0<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 1 0 0 0 0<br />

B <strong>12</strong>th Finance Commission Award<br />

Black Topped K.M. 1 0 0 0 0<br />

Metalling K.M. 2 0 0 0 0<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 6 0 0 0 0<br />

C Special Repair to Road<br />

Black Topped K.M. 1.415 0.000 0.543 0.543 0.565<br />

Metalling K.M. 1.318 0.049 0.449 0.449 0.565<br />

R. T. Wall Mtr. 1.267 0.044 0.506 0.506 0.565<br />

Cement Concrete Road K.M. 3.967 0.429 1.133 1.133 1.319<br />

Cross Drainage works Nos. 13 2 4 4 5<br />

C. Drain K.M. 0.145 0.026 0.056 0.056 0.062<br />

DR K.M. 11.183 0.000 4.447 4.447 0.000<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

D PMGSY<br />

Black Topped K.M. 2.810 0.000 0.000 2.810 0.000<br />

2 Rural Work Division, <strong>Balasore</strong> (II)<br />

A C.W.A<br />

R. T. Wall Mtr. 0 18 0 0 0<br />

B NABARD Road<br />

Black Topped K.M. 0.000 2.903 0.000 0.000 0.000<br />

Metalling K.M. 0.000 2.903 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 2.485 0.000 0.000 0.000<br />

Cross Drainage works Nos. 0 10 0 0 0<br />

C <strong>12</strong>th Finance Commission<br />

R. T. Wall Mtr. 0 27 0 0 0<br />

Cross Drainage works Nos. 0 1 0 0 0<br />

D Critical Road<br />

R. T. Wall Mtr. 0 47 0 0 0<br />

E Improvement & Widening Road<br />

R. T. Wall Mtr. 0 48 53 53 58<br />

F <strong>Plan</strong> Scheme Road<br />

Cement Concrete Road K.M. 0.000 0.146 0.819 0.819 0.901<br />

Cross Drainage works Nos. 0 1 2 2 2<br />

G Bharat Nirman<br />

Black Topped K.M. 0.000 3.410 2.864 2.864 0.000<br />

Metalling K.M. 0.000 0.207 2.864 2.864 0.000<br />

Cement Concrete Road K.M. 0.000 5.087 5.275 5.275 0.000<br />

3 R & B Division<br />

Black Topped K.M. 0.000 1.338 5.650 5.650 8.<strong>12</strong>5<br />

Metalling K.M. 0.000 0.140 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 0.488 0.373 0.373 0.377<br />

Cross Drainage works Nos. 0 3 2 2 3<br />

4 Rural Work Division, Jaleswar<br />

A C.W.A.<br />

B NABARD<br />

Black Topped K.M. 1 0 0 0 0<br />

WBM K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 3 0 0 0 0<br />

S. Bridge Nos. 1 0 0 0 1<br />

C <strong>12</strong>th Finance Commission<br />

Metalling K.M. 1 0 0 0 0<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

GSB K.M. 1 0 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

EW K.M. 1 0 0 0 0<br />

Cross Drainage works Nos. 4 2 0 0 0<br />

Building works Nos. 16 2 0 0 0<br />

D Important Critical Road<br />

Black Topped K.M. 14.640 0.187 2.864 2.864 2.826<br />

Metalling K.M. 0.075 0.187 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 5.432 0.119 0.115 0.115 0.132<br />

GSB K.M. 0.000 0.283 0.000 0.000 0.000<br />

EW K.M. 0.000 0.000 2.746 2.746 2.807<br />

MSB K.M. 0.000 0.000 2.746 2.746 2.769<br />

Cross Drainage works Nos. 0 0 7 7 8<br />

DR K.M. 0.000 0.000 1.727 1.727 1.978<br />

R. T. Wall Mrt. 0 0 23 23 28<br />

Bharat Nirman<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

K.M. 41.015 18.537 14.737 14.737 5.275<br />

1 Eco-<strong>Plan</strong>tation Ha. 0.00 9.42 2.83 2.83 0.00<br />

IX SOCIAL SERVICES<br />

Education<br />

S.S.A<br />

Block Resource Center Nos. 0 2 2 2 2<br />

Cluster Resource Center Nos. 0 38 38 38 38<br />

Civil work Nos. 0 0 <strong>12</strong>6 <strong>12</strong>6 <strong>12</strong>6<br />

Interventions for out of School Children Nos. 0 0 270 270 270<br />

Free Text Book Nos. 0 0 50661 50661 50661<br />

CWSN (IED) Nos. 0 0 1454 1454 1454<br />

Maintenance Grants (PS & UPS) Nos. 0 503 549 549 549<br />

Research & Evaluation Nos. 0 0 60 60 60<br />

School Improvement Grant Nos. 0 580 603 603 603<br />

Teachers Grant Nos. 0 1688 2061 2061 2061<br />

Teachers Grant Salary (Recurring) Nos. 0 621 856 856 856<br />

Teaching Learning Equipment (PS) Nos. 0 15661 6 6 6<br />

Teacher Training Nos. 0 1374 2144 2144 2144<br />

Community Training Nos. 0 0 5006 5006 5006<br />

National Education Programme for Girls at Elementary Level (NPEGEL)<br />

Medical & Public Health<br />

Nos. 0 6 6 6 6<br />

Sterilization Nos. 0 1661 1828 1828 2010<br />

Intra Uterine Devices Nos. 0 8478 9326 9326 10258<br />

Oral Pills Nos. 0 3768 4145 4145 4559<br />

Contraceptive Condoms users Nos. 0 3768 4145 4145 4559<br />

MTP Nos. 0 641 705 705 775<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Target<br />

0 1 2 3 4 5 6<br />

Immunization<br />

TT (Preg) Nos. 0 9735 10708 10708 11779<br />

DPT Nos. 0 8850 9735 9735 10709<br />

Polio Nos. 0 8850 9735 9735 10709<br />

BCG Nos. 0 8850 9735 9735 10709<br />

Measles Nos. 0 8850 9735 9735 10709<br />

Vit-A Nos. 0 8850 9735 9735 10709<br />

DT Nos. 0 9759 9759 9759 10735<br />

TT (10 years) Nos. 0 9797 10776 10776 11854<br />

TT (16 years) Nos. 0 8478 9326 9326 10258<br />

Large Follifor<br />

Water Supply & Sanitation<br />

Rural Water Supply<br />

Nos. 0 9735 10708 10708 11779<br />

ARWSP Sinking of Tube Wells Nos. 181 45 45 45 40<br />

MNP Sinking of Tube Wells Nos. 214 22 45 45 40<br />

Public Water Supply Schemes<br />

Rural Sanitation<br />

Nos. 59 6 18 18 8<br />

Sanitation coverage of Households Nos. 0 7986 10362 10362 11540<br />

Sanitation coverage of Schools (Toilets) Nos. 0 144 0 0 151<br />

Sanitation coverage of Anganwadis (Toilets)<br />

Urban Water Supply<br />

Nos. 0 182 0 0 141<br />

Urban Water Supply Projects<br />

Urban Sanitation<br />

Nos. 0 1 1 1 1<br />

Urban Sanitation Projects<br />

Rural Housing<br />

Nos. 0 0 1 1 1<br />

Indira Awas Yojana No. of Benf. 17007 1390 4981 4981 65<strong>12</strong><br />

Mo Kudia<br />

Social Security & Social Welfare<br />

No. of Benf. 770 146 188 188 226<br />

IGNOAP No. of Benf. 4483 4483 4483 4483 4483<br />

ODP No. of Benf. <strong>12</strong>52 1765 141 141 141<br />

MBPY No. of Benf. 5851 9061 1601 1601 9261<br />

X GENERAL SERVICES<br />

Non Residential<br />

Construction of Revenue Department Buildings Nos. 1 0 0 0 0<br />

Construction of PHC Buildings Nos. 1 0 0 0 0<br />

Construction & Maintenance of Buildings<br />

Residential<br />

Nos. 1 0 0 0 1<br />

Construction of Revenue Department Buildings Nos. 2 1 0 0 0<br />

Construction of PHC Buildings Nos. 3 1 0 0 2<br />

Construction & Maintenance of Buildings Nos. 2 0 0 0 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XIII


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Sl.<br />

No.<br />

Annexure VII: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PROPOSED OUTLAYS/EXPENDITURE FOR VOLUNTARY SECTOR<br />

Schemes<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>)<br />

Projected Outlay<br />

(at 2006-07 prices)<br />

<strong>Annual</strong> <strong>Plan</strong><br />

2009-10 Actual<br />

Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed<br />

Outlay<br />

Anticipated<br />

Expenditure<br />

<strong>Balasore</strong> Distric t<br />

0 1 2 3 4 5 6<br />

1 Old Age Home 20.25 22.28 22.28 24.50<br />

2 Day care Center 14.58 16.04 16.04 17.60<br />

3 Swadhar 10.25 11.28 11.28 <strong>12</strong>.30<br />

4 Help line 5.45 6.00 6.00 6.60<br />

5 Drug De-addiction 19.24 21.16 21.16 23.26<br />

6 Vocational Training for women 2.45 2.70 2.70 3.00<br />

7 Sishu Gruha 6.21 6.83 6.83 7.50<br />

GRAND TOTAL 78.43 86.29 86.29 94.76<br />

Annexure-XIV<br />

(Rs. in lakhs)<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<br />

<strong>12</strong> Proposed<br />

Outlay<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-XIV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Annexure VIII-A: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: FINANCIAL OUTLAYS (Proposal for Women Component)<br />

Annexure - XV<br />

(Rs. in lakhs)<br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay<br />

Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

I AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

State <strong>Plan</strong><br />

RIDF-XIII (PLIP)<br />

Centrally Sponsored <strong>Plan</strong><br />

528.96 176.30 172.98 817.80 272.57 817.80 272.57 828.00 275.97<br />

Work <strong>Plan</strong>-Rice Development 69.02 23.01 1.83 8.91 2.97 8.91 2.97 10.72 3.57<br />

Work <strong>Plan</strong>-Sugarcane Development 1.44 0.48 0.00 2.26 0.75 2.26 0.75 2.59 0.86<br />

Jute Technology Mission (MM-II) 93.99 31.33 3.86 25.01 8.34 25.01 8.34 27.51 9.17<br />

ISOPOM (Pulses) 26.84 8.95 2.57 <strong>12</strong>.57 4.19 <strong>12</strong>.57 4.19 0.00 0.00<br />

ISOPOM (Oil Seeds) 583.45 194.46 72.27 248.14 82.71 248.14 82.71 272.96 90.98<br />

Central <strong>Plan</strong><br />

Seed Village Programme 133.15 44.38 2.43 51.53 17.17 51.53 17.17 56.68 18.89<br />

Promotion of SRI programme 0.00 0.00 1.20 0.00 0.00 0.00 0.00 0.00 0.00<br />

Work <strong>Plan</strong>-Farm Mechanisation 592.25 197.40 42.87 182.59 60.86 182.59 60.86 211.26 70.41<br />

Rastriya Krishi Vikas Yojana (RKVY) 0.00 0.00 165.47 3411.04 1136.90 3411.04 1136.90 3700.05 3233.33<br />

National Food Security Mission (Pulses) 0.00 0.00 0.00 74.78 24.92 74.78 24.92 256.92 85.63<br />

Sub-Total 2029.11 676.30 465.47 4834.63 1611.38 4834.63 1611.38 5366.69 3788.82<br />

2 Horticulture<br />

State <strong>Plan</strong><br />

Mission Sakti Programme<br />

Centrally Sponsored <strong>Plan</strong><br />

4.80 4.80 0.96 3.84 3.84 3.84 3.84 4.80 4.80<br />

National Horticulture Mission 617.62 205.85 22.09 155.63 51.87 155.63 51.87 193.63 64.54<br />

Micro Irrigation Programme 56.00 18.66 7.31 35.00 11.67 35.00 11.67 45.00 15.00<br />

ISOPOM (Oil Palm)<br />

Central <strong>Plan</strong><br />

9.25 3.08 2.<strong>12</strong> 9.20 3.07 9.20 3.07 10.18 3.39<br />

Coconut Development Board Programme 60.54 20.18 1.93 9.63 3.21 9.63 3.21 11.30 3.77<br />

National Medicinal <strong>Plan</strong>ts Mission Programme 5.81 1.94 0.24 1.<strong>12</strong> 0.37 1.<strong>12</strong> 0.37 2.26 0.75<br />

Rastriya Krishi Vikas Yojana (RKVY) <strong>12</strong>.68 4.23 1.18 5.95 1.98 5.95 1.98 6.70 2.23<br />

Sub-Total 766.70 258.74 35.83 220.37 76.01 220.37 76.01 273.87 94.48<br />

3 Soil & Water Conservation<br />

Centrally Sponsored <strong>Plan</strong><br />

NWDPRA- Watershed Development<br />

Central <strong>Plan</strong><br />

538.13 179.36 53.97 144.64 48.21 144.64 48.21 231.56 77.18<br />

Soil and water conservation measures for development of Farms under RKVY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.50 18.83<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Sub-Total 538.13 179.36 53.97 144.64 48.21 144.64 48.21 288.06 96.01<br />

4 Animal Husbandry & Dairy Development<br />

State <strong>Plan</strong><br />

Bird Flu Training 5.79 1.93 0.32 0.00 0.00 0.00 0.00 0.96 0.32<br />

Disaster Management Preparedness 18.50 6.17 0.00 0.00 0.00 0.00 0.00 18.50 6.17<br />

Skill up-gradation Training 9.05 3.01 0.24 0.72 0.24 0.72 0.24 3.80 1.27<br />

Genetic up-gradation of goat & Deworing<br />

Centrally Sponsored <strong>Plan</strong><br />

4.<strong>12</strong> 1.37 0.02 2.00 0.67 2.00 0.67 2.00 0.67<br />

Disease Control Programme under ASCAD 162.46 54.15 0.00 81.23 27.07 81.23 27.07 81.23 27.07<br />

Health Camp & Awareness Programme under ASCAD<br />

Central <strong>Plan</strong><br />

6.<strong>12</strong> 2.04 0.19 0.55 0.18 0.82 0.27 0.55 0.18<br />

SMILE Training (Society for Management Information Learning & Extension) 11.43 3.81 0.28 0.69 0.23 0.84 0.28 5.00 1.67<br />

Exposure visit of farmers under SMILE 5.04 1.68 0.00 2.25 0.75 2.25 0.75 2.52 0.84<br />

Extension Services (Posters (Posters, Leaf lefts lefts, Charts Charts, TV ads ads.etc. etc<br />

RKVY<br />

200 2.00 067 0.67 000 0.00 100 1.00 033 0.33 100 1.00 033 0.33 100 1.00 033 0.33<br />

a) Strengthening of Livestock Service Information & Modernisation of 506.08 168.68 0.00 190.79 63.59 190.79 63.59 315.15 105.04<br />

b) Dairy Development 226.80 75.59 0.00 106.21 35.40 106.21 35.40 <strong>12</strong>0.59 40.19<br />

c) Fodder Development 86.30 28.76 0.00 40.20 13.40 40.20 13.40 46.50 15.50<br />

d) Goat Development 25.20 8.40 0.00 <strong>12</strong>.60 4.20 <strong>12</strong>.60 4.20 <strong>12</strong>.60 4.20<br />

e) Poultry Development 56.40 18.80 0.00 16.30 5.43 16.30 5.43 40.10 13.37<br />

Sub-Total 1<strong>12</strong>5.28 375.05 1.06 454.54 151.50 454.96 151.64 650.50 216.81<br />

5 Co-operative<br />

State <strong>Plan</strong><br />

Share capital to co-operative credit institutions under NRC-LTO fund 713.40 237.78 0.00 286.38 95.45 286.38 95.45 202.02 67.33<br />

Revival of the short term co-operative credit institution 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>4.00 41.33<br />

Loan Support to Co-operatives 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2<strong>12</strong>.16 70.71<br />

Modernisation of Co-operative Processing Rice Mill 10.00 3.33 0.00 0.00 0.00 0.00 0.00 30.00 10.00<br />

Share capital and Transport subsidy for PDS to Consumer Cooperatives 38.75 <strong>12</strong>.92 0.00 0.00 0.00 0.00 0.00 24.25 8.08<br />

Infrastructure Strengthening and Managerial subsidy to Marketing Co- 345.00 114.99 0.00 139.00 46.33 139.00 46.33 131.00 43.66<br />

Financial assistance in shape of loan/subsidy or share to other co-operatives<br />

Central <strong>Plan</strong><br />

25.00 8.33 0.00 8.00 2.67 8.00 2.67 <strong>12</strong>.20 4.07<br />

Construction of Rural Godown under RKVY 0.00 0.00 0.00 508.01 169.32 508.01 169.32 1427.92 475.93<br />

Sub-Total 1132.15 377.35 0.00 941.39 313.77 941.39 313.77 2163.55 721.11<br />

6 Fisheries<br />

State <strong>Plan</strong><br />

Development of freshwater Aquaculture through FFDA 0.00 0.00 0.00 11.38 3.79 11.38 3.79 <strong>12</strong>.50 4.17<br />

Exhibition and Organisation of Buyer Seller meet 1.50 0.50 0.00 0.50 0.17 0.50 0.17 1.00 0.33<br />

Assistance to Mechanisation Programme 19.00 6.33 0.00 25.50 8.50 25.50 8.50 5.00 1.67<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Survey and Investigation and establishment of fishing Harbour & Fish 1319.00 439.62 0.00 0.00 0.00 0.00 0.00 667.00 222.31<br />

Safety measures for Marine Fishermen<br />

Centrally Sponsored <strong>Plan</strong><br />

20.00 6.67 0.00 0.00 0.00 0.00 0.00 5.00 1.67<br />

Development of Inland Fisheries & Aquaculture through FFDA 242.00 80.66 10.17 72.40 24.13 72.40 24.13 74.40 24.80<br />

Development of Brackish Water Aquaculture through FFDA 262.20 87.39 0.00 202.48 67.49 202.48 67.49 150.00 50.00<br />

Saving-cum-Relief Scheme 56.34 18.78 2.38 <strong>12</strong>.00 4.00 <strong>12</strong>.00 4.00 14.40 4.80<br />

Group Accident Insurance Scheme 64.71 21.57 5.30 15.90 5.30 15.90 5.30 16.50 5.50<br />

Low Cost House 50.00 16.67 0.00 0.00 0.00 0.00 0.00 50.00 16.67<br />

Assistance of Mechanisation Programme<br />

Central <strong>Plan</strong><br />

54.00 18.00 0.00 <strong>12</strong>0.00 40.00 <strong>12</strong>0.00 40.00 28.50 9.50<br />

Introduction of Intermediate craft of Improved Design 60.00 20.00 0.00 <strong>12</strong>.00 4.00 <strong>12</strong>.00 4.00 24.00 8.00<br />

Sub-Total 2148.75 716.18 17.85 472.16 157.37 472.16 157.37 1048.30 349.40<br />

Total - I 7740.11 2582.98 574.18 7067.73 2358.23 7068.15 2358.37 9790.97 5266.63<br />

II RURAL DEVELOPMENT<br />

State <strong>Plan</strong><br />

Gopabandhu Gramin Yojana (GGY) 6500.00 2166.45 309.85 1500.00 499.95 1500.00 499.95 2000.00 666.60<br />

Construction of C.C Road (New Scheme) 1435.00 478.29 0.00 286.62 95.53 286.62 95.53 287.00 95.66<br />

State Finance Commission Grant<br />

Centrally Sponsored <strong>Plan</strong><br />

1019.33 339.74 205.47 402.87 134.28 402.87 134.28 442.50 147.49<br />

Swarnajayanti Gram Swarozgar Yojana ( SGSY ) 4749.74 1583.09 351.83 1160.50 386.79 1160.50 386.79 <strong>12</strong>00.00 399.96<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme 14372.15 4790.24 434.53 3556.18 1185.27 3556.18 1185.27 4218.56 1406.05<br />

DRDA Administration<br />

Central <strong>Plan</strong><br />

976.18 325.36 41.87 200.00 66.66 200.00 66.66 250.00 83.33<br />

<strong>12</strong>th Finance Commission Award 3393.65 1131.10 961.55 508.71 169.55 508.71 169.55 0.00 0.00<br />

13th Finance Commisssion Award 0.00 0.00 0.00 583.28 194.41 583.28 194.41 641.25 213.73<br />

Total - II 32446.05 10814.27 2305.09 8198.16 2732.45 8198.16 2732.45 9039.31 30<strong>12</strong>.80<br />

III SPECIAL AREAS PROGRAMMES<br />

ITDA, Nilgiri<br />

State <strong>Plan</strong><br />

Construction of Hostel for ST Girls<br />

Central <strong>Plan</strong><br />

300.10 300.10 4.76 131.50 131.50 131.50 131.50 163.75 163.75<br />

Grants under Provision to Article 275 (1) 233.64 77.87 13.01 70.00 23.33 70.00 23.33 86.00 28.66<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas<br />

MADA Programme, Jaleswar<br />

Central <strong>Plan</strong><br />

549.82 183.26 26.51 135.00 45.00 135.00 45.00 180.00 59.99<br />

Grants under Provision to Article 275 (1) 0.00 0.00 0.00 13.73 4.58 13.73 4.58 15.00 5.00<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP) 0.00 0.00 3.83 21.65 7.22 21.65 7.22 20.00 6.67<br />

Total - III 1083.56 561.23 48.11 371.88 211.62 371.88 211.62 464.75 264.07<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

IV IRRIGATION & FLOOD CONTROL<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects (NABARD - RIDF) 734.81 244.91 59.99 160.00 53.33 160.00 53.33 200.00 66.66<br />

Instream Reservoir (Construction of Check Dam) 500.00 166.65 0.00 236.84 78.94 236.84 78.94 300.00 99.99<br />

Installation of Lift Irrigation Projects under BKVY 0.00 0.00 13.44 865.83 288.58 865.83 288.58 581.60 193.85<br />

Minor Irrigation- Biju Krushak Vikash Yojana 1634.06 544.63 1.00 385.61 <strong>12</strong>8.52 385.61 <strong>12</strong>8.52 261.25 87.07<br />

Bank Protection work (Flood Control) 0.00 0.00 0.00 92.71 30.90 92.71 30.90 92.71 30.90<br />

Saline Embankment Improvement projects (NABARD - RIDF- XIV) 0.00 0.00 216.65 650.00 216.65 650.00 216.65 0.00 0.00<br />

Drainage Projects (NABARD - RIDF - XII & XIV)<br />

Centrally Sponsored <strong>Plan</strong><br />

<strong>12</strong>73.72 424.53 227.07 400.00 133.32 400.00 133.32 156.00 51.99<br />

Flood Management Programme (River Bank Protection Work ) 0.00 0.00 500.42 1086.19 362.03 1086.19 362.03 3143.13 1047.61<br />

Flood Management Programme (Major Works)<br />

Central <strong>Plan</strong><br />

2114.00 704.60 169.13 1522.00 507.28 1522.00 507.28 131.03 43.67<br />

Installation of Lift Lift Irrigation Projects under RKVY 000 0.00 000 0.00 000 0.00 000 0.00 000 0.00 000 0.00 000 0.00 218 218.40 40 72 72.79 79<br />

Total - IV 6256.59 2085.32 1187.70 5399.18 1799.55 5399.18 1799.55 5084.<strong>12</strong> 1694.54<br />

V. ENERGY<br />

State <strong>Plan</strong><br />

Biju Gram Jyoti Yojana 0.00 0.00 140.08 462.30 154.08 462.30 154.08 485.42 161.79<br />

Biju Saharanchal Vidyutikaran Yojana<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.00 46.66<br />

Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) 0.00 0.00 98.99 326.70 108.89 326.70 108.89 343.04 114.34<br />

Total - V 0.00 0.00 239.07 789.00 262.97 789.00 262.97 968.46 322.79<br />

VI INDUSTRY & MINERALS<br />

1 Industry<br />

State <strong>Plan</strong><br />

Promotion of Industry Sector<br />

Central <strong>Plan</strong><br />

20.49 6.83 1.09 4.59 1.53 4.59 1.53 4.90 1.63<br />

Prime Minister's Employment Generation Programme (PMEGP) 863.00 287.64 74.66 228.00 75.99 228.00 75.99 300.00 99.99<br />

2 Handloom & Textiles<br />

State <strong>Plan</strong><br />

Promotion of Handloom Industry 66.59 22.19 2.51 14.55 4.85 14.55 4.85 15.00 5.00<br />

Workshed-cum-Housing 22.50 7.50 2.25 16.10 5.37 16.10 5.37 17.50 5.83<br />

Skill Upgradation Training<br />

Centrally Sponsored <strong>Plan</strong><br />

18.40 6.13 0.00 7.82 2.61 7.82 2.61 9.42 3.14<br />

Integrated Handloom Development Scheme (IHDS) (Cluster Approach) 62.33 20.77 0.67 21.28 7.09 21.28 7.09 8.76 2.92<br />

Integrated Handloom Development Scheme (IHDS) (Group Approach) 76.10 25.36 0.46 11.00 3.67 11.00 3.67 11.50 3.83<br />

Integrated Handloom Development Scheme (IHDS) (Marketing Incentive) 60.64 20.21 3.05 9.20 3.07 9.20 3.07 9.50 3.17<br />

Health Insurance for weavers 41.00 13.67 3.31 11.55 3.85 11.55 3.85 11.73 3.91<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Mahatma Gandhi Bunakar Bima Yojana<br />

Central <strong>Plan</strong><br />

9.06 3.02 0.39 1.20 0.40 1.20 0.40 1.23 0.41<br />

10% Rebate on Handloom Products 75.00 25.00 2.77 9.00 3.00 9.00 3.00 10.00 3.33<br />

<strong>District</strong> Level Exhibition 20.00 6.67 0.00 2.00 0.67 2.00 0.67 2.00 0.67<br />

Total - VI 1335.11 444.99 91.16 336.29 1<strong>12</strong>.08 336.29 1<strong>12</strong>.08 401.54 133.83<br />

VII TRANSPORT<br />

1 Rural Work Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 305.00 101.66 20.00 75.00 25.00 75.00 25.00 80.00 26.66<br />

Completion of incomplete roads and bridges 195.00 64.99 18.33 70.00 23.33 70.00 23.33 100.00 33.33<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 2186.92 728.90 74.43 637.30 2<strong>12</strong>.41 637.30 2<strong>12</strong>.41 733.00 244.31<br />

Flood damage repairing<br />

Central <strong>Plan</strong><br />

616.92 205.62 0.00 0.00 0.00 0.00 0.00 300.00 99.99<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 20359 20359.56 56 6785 6785.84 84 1732 1732.52 52 6007 6007.00 00 2002 2002.13 13 6007 6007.00 00 2002 2002.13 13 000 0.00 000 0.00<br />

2 Rural Work Division- II, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1059.50 353.13 89.99 30.00 10.00 30.00 10.00 0.00<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 145.00 48.33 16.67 45.00 15.00 45.00 15.00 50.00 16.67<br />

Construction of Rural Road (Improvement/Widening/Critical Roads) 169.00 56.33 16.67 57.00 19.00 57.00 19.00 62.00 20.66<br />

Completion of incomplete road and Bridges<br />

Central <strong>Plan</strong><br />

528.50 176.15 15.17 230.00 76.66 230.00 76.66 253.00 84.32<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 10480.00 3492.98 879.25 4842.00 1613.84 4842.00 1613.84 0.00 0.00<br />

3 Rural Work Division- Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project 1950.34 650.05 37.66 500.00 166.65 500.00 166.65 803.00 267.64<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA) 180.00 59.99 16.67 40.00 13.33 40.00 13.33 40.00 13.33<br />

Construction of Rural Road (Improvement/Widening/Critical Roads)<br />

Central <strong>Plan</strong><br />

464.44 154.80 38.90 523.00 174.32 523.00 174.32 567.00 188.98<br />

Pradhan Mantri Gram Sadak Yojana (PMGSY) 152<strong>12</strong>.00 5070.16 1773.62 5186.00 1728.49 5186.00 1728.49 2500.00 833.25<br />

4 R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads & Bridge under NABARD funding RIDF Project<br />

Central <strong>Plan</strong><br />

0.00 0.00 171.96 1148.00 382.63 1148.00 382.63 10941.18 3646.70<br />

Construction of road under Central Road Fund 0.00 0.00 0.00 936.00 311.97 936.00 311.97 2577.44 859.06<br />

One time Additional Central Assistance 0.00 0.00 0.00 300.00 99.99 300.00 99.99 200.00 66.66<br />

Total - VII 53852.18 17948.93 4901.81 20626.30 6874.75 20626.30 6874.75 19206.62 6401.57<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

State <strong>Plan</strong><br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Social and Farm Forestry 18.00 6.00 3.26 10.00 3.33 10.00 3.33 <strong>12</strong>.10 4.03<br />

Communication & Building - Construction of quarters for forest guards 15.00 5.00 1.00 3.00 1.00 3.00 1.00 3.63 1.21<br />

Bamboo <strong>Plan</strong>tation 0.00 0.00 0.15 0.21 0.07 0.21 0.07 0.00 0.00<br />

Elephant Management <strong>Plan</strong> 0.00 0.00 2.25 5.33 1.78 5.33 1.78 0.00 0.00<br />

Wildlife Protection and Conservation Measures<br />

Central <strong>Plan</strong><br />

0.00 0.00 1.77 3.52 1.17 3.52 1.17 0.00 0.00<br />

Development of National Park, Sanctuary & Natural Reserves 0.00 0.00 9.92 <strong>12</strong>.27 4.09 <strong>12</strong>.27 4.09 33.00 11.00<br />

Elephant Management Project 0.00 0.00 0.17 0.00 0.00 0.00 0.00 0.60 0.20<br />

Talsari - HVBA 0.00 0.00 5.18 0.00 0.00 0.00 0.00 17.10 5.70<br />

Total - VIII 33.00 11.00 23.69 34.33 11.44 34.33 11.44 66.43 22.14<br />

IX SOCIAL SERVICES<br />

1 General Education<br />

State <strong>Plan</strong><br />

Mass Education Education 779 7.79 260 2.60 528 5.28 19 19.25 25 642 6.42 19 19.25 25 642 6.42 20 20.10 10 670 6.70<br />

Construction Office building boundary wall & renovation of old building 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 5.33<br />

Construction of staff quarters and office building 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <strong>12</strong>5.00 41.66<br />

Improvement/Modernization of ITI <strong>Balasore</strong> (Construction of boundary wall,<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.40 33.13<br />

Sarba Sikshya Abhiyan (SSA) 0.00 0.00 1975.44 7504.01 2501.09 7504.01 2501.09 7504.21 2501.15<br />

National Programme for Education of Girls at Elementary Level 0.00 0.00 46.62 35.79 35.79 35.79 35.79 35.79 35.79<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV)<br />

Central <strong>Plan</strong><br />

0.00 0.00 18.33 44.97 44.97 44.97 44.97 44.97 44.97<br />

National APP Training in ITI <strong>Balasore</strong> 43.00 14.33 0.44 5.00 1.67 5.00 1.67 6.00 2.00<br />

Sub-Total 50.79 16.93 2046.11 7609.02 2589.93 7609.02 2589.93 7851.47 2670.74<br />

2 Sports & Youth Services<br />

State <strong>Plan</strong><br />

Organizing Youth Festival<br />

Panchayat Yuba Krida Khel Abhiyan (PYKKA)<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 0.03 0.18 0.06 0.18 0.06 0.20 0.07<br />

One time seed capital grant for development of Sports infrastructure 0.00 0.00 11.33 34.00 11.33 34.00 11.33 34.00 11.33<br />

Women Sports Competition<br />

Central <strong>Plan</strong><br />

0.00 0.00 0.00 1.04 1.04 1.04 1.04 1.44 1.44<br />

<strong>Annual</strong> acquisition grant 0.00 0.00 1.03 3.10 1.03 3.10 1.03 3.10 1.03<br />

<strong>Annual</strong> operation grant 0.00 0.00 1.24 3.72 1.24 3.72 1.24 3.72 1.24<br />

Rural Sports Competition 0.00 0.00 2.33 7.60 2.53 7.60 2.53 7.60 2.53<br />

Prize Money for Rural Sports 0.00 0.00 0.00 6.30 2.10 6.30 2.10 6.30 2.10<br />

Sub-Total 0.00 0.00 15.97 55.94 19.34 55.94 19.34 56.36 19.74<br />

3 Medical & Public Health<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

WC<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

State <strong>Plan</strong><br />

Rural Ayurvedic Health Services 420.09 140.02 31.60 99.54 33.18 99.54 33.18 142.47 47.49<br />

Urban Ayurvedic Health Services 91.28 30.42 9.50 29.90 9.97 29.90 9.97 35.65 11.88<br />

Primary Health Care (Rural) 603.00 200.98 48.33 154.00 51.33 154.00 51.33 179.25 59.74<br />

Primary Health Care (Urban)<br />

Centrally Sponsored <strong>Plan</strong><br />

28.00 9.33 1.82 5.61 1.87 5.61 1.87 14.21 4.74<br />

Reproductive Child Health (RCH) 0.00 0.00 325.91 1075.62 358.50 1075.62 358.50 1303.62 434.50<br />

Immunization 0.00 0.00 13.96 46.07 15.36 46.07 15.36 39.52 13.17<br />

National Rural Health Mission (NRHM) initiatives 0.00 0.00 314.78 1038.87 346.26 1038.87 346.26 980.59 326.83<br />

Revised National Tuberculosis Control Programme (RNTCP) 0.00 0.00 11.70 37.20 <strong>12</strong>.40 37.20 <strong>12</strong>.40 40.92 13.64<br />

National Vector Borne Disease Control Programme (NVBDCP)<br />

Central <strong>Plan</strong><br />

0.00 0.00 48.10 149.30 49.76 149.30 49.76 164.23 54.74<br />

National Programme for Control of Blindness (NPCB) 0.00 0.00 8.43 28.45 9.48 28.45 9.48 31.30 10.43<br />

Integrated Disease Surveillance Programme (IDSP) 000 0.00 000 0.00 338 3.38 10 10.56 56 352 3.52 10 10.56 56 352 3.52 11 11.62 62 387 3.87<br />

National Leprosy Eradication Programme (NLEP) 0.00 0.00 2.82 9.<strong>12</strong> 3.04 9.<strong>12</strong> 3.04 10.03 3.34<br />

Sub-Total 1142.37 380.75 820.31 2684.24 894.66 2684.24 894.66 2953.41 984.37<br />

4 Rural Water Supply & Sanitation<br />

Central Sponsored <strong>Plan</strong><br />

ARWSP-Sinking of Tube Well 844.44 281.45 53.69 238.50 79.49 238.50 79.49 209.82 69.93<br />

ARWSP-Public Water Supply Scheme 7931.49 2643.57 284.09 1872.35 624.05 1872.35 624.05 2022.00 673.93<br />

Sub - Total 8775.93 2925.02 337.79 2110.85 703.55 2110.85 703.55 2231.82 743.87<br />

5 Urban Water Supply & Sanitation<br />

State <strong>Plan</strong><br />

Improvement of Sewerage/Drainage system in different uncovered areas of 100.00 33.33 3.00 50.00 16.67 50.00 16.67 41.00 13.67<br />

Improvement of water supply and replacement of defunct bore wells up- 300.00 99.99 9.67 200.00 66.66 200.00 66.66 71.00 23.66<br />

Improvement of W/S to Nilgiri town 1118.42 372.77 0.00 200.00 66.66 200.00 66.66 300.00 99.99<br />

Improvement of W/S to Soro town 192.00 63.99 0.00 92.00 30.66 92.00 30.66 100.00 33.33<br />

Improvement of W/S to Jaleswar town 160.00 53.33 0.00 60.00 20.00 60.00 20.00 100.00 33.33<br />

Improvement of water supply & S/I system of different non-residential office 200.00 66.66 6.40 80.80 26.93 80.80 26.93 100.00 33.33<br />

Improvement of water supply & S/I system of different residential office building<br />

Centrally Sponsored <strong>Plan</strong><br />

200.00 66.66 3.00 91.00 30.33 91.00 30.33 100.00 33.33<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT 1587.58 529.14 0.00 200.00 66.66 200.00 66.66 300.00 99.99<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP (Improvement of water 5442.39 1813.95 0.00 200.00 66.66 200.00 66.66 300.00 99.99<br />

Sub-Total 9300.39 3099.82 22.06 1173.80 391.23 1173.80 391.23 14<strong>12</strong>.00 470.62<br />

6 Urban Development<br />

<strong>Balasore</strong> Municipality<br />

State <strong>Plan</strong><br />

Infrastructure Grant towards Urban Tourism Destination Towns 0.00 0.00 9.77 11.00 3.67 11.00 3.67 <strong>12</strong>.10 4.03<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

WC<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Road Development & Maintenance 0.00 0.00 27.55 90.87 30.29 90.87 30.29 99.96 33.32<br />

Urban Greenery 0.00 0.00 3.33 11.00 3.67 11.00 3.67 <strong>12</strong>.10 4.03<br />

Special Problem Fund<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 2.31 7.63 2.54 7.63 2.54 8.39 2.80<br />

Integrated Housing & Urban Development Programme (IHSDP) 0.00 0.00 96.03 316.94 105.64 316.94 105.64 348.63 116.20<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 18.26 60.28 20.09 60.28 20.09 66.31 22.10<br />

Urban Infrastructure Development Scheme for Small & Medium Town 0.00 0.00 13.32 43.96 14.65 43.96 14.65 48.36 16.<strong>12</strong><br />

National Urban Information System (NUIS)<br />

Jaleswar NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.10 0.30 0.10 0.30 0.10 0.33 0.11<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 46.02 149.45 49.81 165.68 55.22 198.81 66.26<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 0.00 0.00 5.90 9.49 3.16 19.46 6.49 23.35 7.78<br />

Central <strong>Plan</strong><br />

Twelfth Finance Commission (TFC)<br />

Nilgiri NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 0.00 20.24 6.75 20.24 6.75 23.47 7.82<br />

Road Development, Maintenance Grant etc.<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 11.67 38.00 <strong>12</strong>.67 38.00 <strong>12</strong>.67 41.80 13.93<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Soro NAC<br />

State <strong>Plan</strong><br />

0.00 0.00 4.33 10.00 3.33 10.00 3.33 11.00 3.67<br />

Road Development Grant 0.00 0.00 <strong>12</strong>.22 37.59 <strong>12</strong>.53 37.59 <strong>12</strong>.53 45.00 15.00<br />

Road Maintenance Grant 0.00 0.00 4.82 17.67 5.89 17.67 5.89 20.00 6.67<br />

FDR Grant 0.00 0.00 0.00 20.00 6.67 20.00 6.67 20.00 6.67<br />

Incentive Grant 0.00 0.00 6.58 25.00 8.33 25.00 8.33 30.00 10.00<br />

Protection of water bodies<br />

Centrally Sponsored <strong>Plan</strong><br />

0.00 0.00 1.67 20.00 6.67 20.00 6.67 25.00 8.33<br />

Swarna Jayanti Sahari Rojagar Yojana (SJSRY)<br />

Central <strong>Plan</strong><br />

0.00 0.00 4.54 25.00 8.33 25.00 8.33 50.00 16.67<br />

Twelfth Finance Commission (TFC) 0.00 0.00 5.14 27.00 9.00 27.00 9.00 35.00 11.67<br />

Sub-Total 0.00 0.00 273.56 941.42 313.78 967.62 322.51 1119.61 373.17<br />

7 Rural Housing<br />

State <strong>Plan</strong><br />

Mo Kudia<br />

Centrally Sponsored <strong>Plan</strong><br />

1429.75 476.54 143.30 795.85 265.26 795.85 265.26 875.85 291.92<br />

Indira Awas Yojana (IAY) 19841.50 6613.17 821.27 7907.20 2635.47 7907.20 2635.47 8697.20 2898.78<br />

Sub-Total 2<strong>12</strong>71.25 7089.71 964.57 8703.05 2900.73 8703.05 2900.73 9573.05 3190.70<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

WC<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

8 Social Security & Social Welfare<br />

Welfare<br />

Central <strong>Plan</strong><br />

Pre Matric Scholarship to SC Boys Students (Boarders) 0.00 0.00 0.00 0.68 0.00 0.68 0.00 0.75 0.00<br />

Pre Matric Scholarship to SC Girls Students (Boarders) 0.00 0.00 6.47 6.66 6.66 6.66 6.66 7.33 7.33<br />

Pre Matric Scholarship to ST Boys Students (Boarders) 0.00 0.00 0.00 65.92 0.00 65.92 0.00 72.52 0.00<br />

Pre Matric Scholarship to ST Girls Students (Boarders) 0.00 0.00 143.38 156.64 156.64 156.64 156.64 172.30 172.30<br />

Post Matric Scholarship to SC Students 0.00 0.00 15.69 88.48 29.49 88.48 29.49 97.33 32.44<br />

Post Matric Scholarship to ST Students 0.00 0.00 5.28 17.44 5.81 17.44 5.81 19.18 6.39<br />

Development of SCs (OSFDC Section) 0.00 0.00 58.56 203.75 67.91 203.75 67.91 224.13 74.70<br />

Development of STs (OSFDC Section) 0.00 0.00 27.70 117.50 39.16 117.50 39.16 <strong>12</strong>9.25 43.08<br />

Pre Matric Scholarship to the students whose parents engaged unclean occupation 0.00 0.00 1.31 14.24 4.75 14.24 4.75 15.66 5.22<br />

Pre Matric Scholarship to OBC Students 0.00 0.00 2.13 1151.05 383.64 1151.05 383.64 <strong>12</strong>66.16 422.01<br />

Post Matric Scholarship to OBC Students 000 0.00 000 0.00 000 0.00 56 56.98 98 18 18.99 99 56 56.98 98 18 18.99 99 62 62.68 68 20 20.89 89<br />

Pre Matric Scholarship to Minorities 0.00 0.00 3.18 65.29 21.76 65.29 21.76 71.82 23.94<br />

Post Matric Scholarship to Minorities 0.00 0.00 0.00 5.69 1.90 5.69 1.90 6.26 2.09<br />

Sub-Total 0.00 0.00 263.69 1950.32 736.72 1950.32 736.72 2145.37 810.39<br />

9 Social Welfare<br />

State <strong>Plan</strong><br />

Madhu Babu Pension Yojana 1323.38 441.08 158.07 370.00 <strong>12</strong>3.32 370.00 <strong>12</strong>3.32 474.26 158.07<br />

Old Age Pension 155.09 51.69 29.00 0.00 0.00 0.00 0.00 87.02 29.00<br />

Orissa Disability Pension 13.70 4.57 19.37 0.00 0.00 0.00 0.00 58.13 19.37<br />

Organising Single Window Camps 23.45 7.82 0.00 8.30 2.77 8.30 2.77 8.30 8.30<br />

Bi-cycle to girl students 362.82 362.82 1.72 1.25 1.25 1.25 1.25 1.25 1.25<br />

Mission Sakti 943.60 943.60 208.75 3.50 3.50 3.50 3.50 208.75 208.75<br />

Repair & Maintenance of AWC Building 75.22 25.07 3.42 11.00 3.67 11.00 3.67 10.25 10.25<br />

Reduction of Child Malnutrition 49.23 16.41 10.39 <strong>12</strong>.00 4.00 <strong>12</strong>.00 4.00 31.16 10.39<br />

Reduction of IMR 7.99 2.66 0.00 2.20 0.73 2.20 0.73 2.20 0.73<br />

Grant in Aid to Handicapped Welfare Institution 54.99 18.33 7.45 23.00 7.67 23.00 7.67 23.00 7.67<br />

Grant in Aid to Orphanages 379.38 <strong>12</strong>6.45 29.58 101.15 33.71 101.15 33.71 101.15 33.71<br />

Secretarial support to <strong>District</strong> Juvenile Justice Board/Child Welfare Committee 1.35 0.45 0.00 0.35 0.<strong>12</strong> 0.35 0.<strong>12</strong> 0.35 0.<strong>12</strong><br />

Medical Check up 1.60 0.53 0.00 0.60 0.20 0.60 0.20 0.60 0.20<br />

Sanitation 1.29 0.43 0.00 0.50 0.17 0.50 0.17 0.50 0.17<br />

Handicapped Scholarship 45.06 15.02 4.16 11.60 3.87 11.60 3.87 <strong>12</strong>.47 4.16<br />

Award to AWW 0.60 0.20 0.00 0.15 0.05 0.15 0.05 0.15 0.15<br />

Monitoring Mechanism & Evaluation 17.61 5.87 0.00 4.50 1.50 4.50 1.50 4.50 4.50<br />

Information Education Communication 10.72 3.57 0.00 3.00 1.00 3.00 1.00 3.00 3.00<br />

Medicine Kit 34.30 11.43 0.00 <strong>12</strong>.20 4.07 <strong>12</strong>.20 4.07 <strong>12</strong>.20 <strong>12</strong>.20<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Major Heads/Minor Heads of Development<br />

Eleventh <strong>Plan</strong> (2007-<strong>12</strong>)<br />

Projected Outlay (at 2006-07<br />

prices)<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-<br />

10 Actual<br />

Expenditure Under<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Agreed Outlay Anticipated Expenditure<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Proposed Outlay<br />

Total Outlay<br />

Of which flow<br />

to WC<br />

WC<br />

Total Outlay<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

Total Outlay<br />

to WC<br />

Of which flow<br />

to WC<br />

0 1 2 3 4 5 6 7 8 9 10<br />

Computer 0.56 0.19 0.00 0.20 0.07 0.20 0.07 0.20 0.07<br />

Visit Programme<br />

Central Sponsored <strong>Plan</strong><br />

1.50 0.50 0.00 0.50 0.17 0.50 0.17 0.35 0.<strong>12</strong><br />

Supplementary Nutrition Programme 4653.02 1550.85 798.01 1080.00 359.96 1080.00 359.96 2394.26 1898.01<br />

Mid Day Meal Programme (Pry+UP) 3819.83 <strong>12</strong>73.15 653.03 900.00 299.97 900.00 299.97 1959.29 653.03<br />

Mid Day Meal Programme (Kitchen-cum-store) 3826.40 <strong>12</strong>75.34 45.54 1000.00 333.30 1000.00 333.30 136.64 45.54<br />

Mid Day Meal Programme (Utensils) 290.27 96.75 3.87 84.15 28.05 84.15 28.05 11.60 3.87<br />

Mid Day Meal Programme (Monitoring Mechanism & Evaluation) 20.57 6.86 6.83 5.00 1.67 5.00 1.67 20.50 6.83<br />

Mid Day Meal Programme (Transportation charges) 285.<strong>12</strong> 95.03 9.03 75.50 25.16 75.50 25.16 27.10 9.03<br />

Mid Day Meal Programme (Honorarium to cook & helper) 409.92 136.63 27.32 82.00 27.33 82.00 27.33 82.00 27.33<br />

Construction of AWC Building<br />

Central <strong>Plan</strong><br />

97.00 32.33 8.33 28.00 9.33 28.00 9.33 25.00 25.00<br />

IG National Old Age Pension (ACA to States) 2408.78 802.85 199.03 575.00 191.65 575.00 191.65 597.14 199.03<br />

National Family Benefit Benefit Scheme (ACA to States) 392 392.20 20 130 130.72 72 <strong>12</strong> <strong>12</strong>.93 93 92 92.80 80 30 30.93 93 92 92.80 80 30 30.93 93 92 92.80 80 30 30.93 93<br />

Kishori Shakti Yojana 50.05 50.05 0.00 14.00 14.00 14.00 14.00 14.00 14.00<br />

National Disability Pension 20.00 6.67 0.00 0.50 0.17 0.50 0.17 0.50 0.17<br />

National Child Labour Project 0.00 0.00 2.51 105.39 35.13 105.39 35.13 105.39 35.13<br />

Sub-Total 19776.60 7495.90 2238.35 4608.34 1548.46 4608.34 1548.46 6506.01 3460.06<br />

Total - IX 60317.33 21008.<strong>12</strong> 6982.41 29836.98 10098.38 29863.18 10107.11 33849.10 <strong>12</strong>723.66<br />

X GENERAL SERVICES<br />

State <strong>Plan</strong><br />

Construction of Revenue Department Buildings (Non Residential) 161.66 53.88 30.00 19.36 6.45 19.36 6.45 22.30 7.43<br />

Construction of Revenue Department Buildings (Residential) 74.44 24.81 7.44 <strong>12</strong>.<strong>12</strong> 4.04 <strong>12</strong>.<strong>12</strong> 4.04 13.94 4.65<br />

Construction of PHC Buildings (Non Residential) 21.16 7.05 0.00 9.84 3.28 9.84 3.28 11.32 3.77<br />

Construction of RD Department Buildings (Non Residential) 64.15 21.38 2.67 11.00 3.67 11.00 3.67 <strong>12</strong>.65 4.22<br />

Construction of Revenue Department Buildings (Non Residential) 178.22 59.40 25.74 48.10 16.03 48.10 16.03 52.90 17.63<br />

Construction of PHC Buildings (Residential) 32.55 10.85 5.62 7.50 2.50 7.50 2.50 8.20 2.73<br />

Construction of Revenue Department Buildings (Residential) 178.10 59.36 9.70 71.00 23.66 71.00 23.66 78.00 26.00<br />

Construction of Building (Non Residential) RD Division Jaleswar 60.00 20.00 7.21 27.38 9.13 27.38 9.13 30.00 10.00<br />

Construction of Health & RW Building (Residential) 100.55 33.51 11.43 19.00 6.33 19.00 6.33 21.00 7.00<br />

Construction & Maintenance of Buildings (Non Residential) 58.61 19.53 10.68 <strong>12</strong>.65 4.22 <strong>12</strong>.65 4.22 13.91 4.64<br />

Construction of RD Department Buildings (Residential) 61.26 20.42 0.00 28.49 9.50 28.49 9.50 32.77 10.92<br />

Total - X 990.70 330.20 110.49 266.44 88.80 266.44 88.80 296.99 98.99<br />

GRAND TOTAL 164054.63 55787.04 16463.71 72926.29 24550.28 72952.91 24559.15 79168.29 29941.02<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XV


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Annexure VIII-B: ANNUAL PLAN - <strong>2011</strong>-<strong>12</strong>: PHYSICAL TARGETS AND ACHIEVEMENTS (Proposal for Women Component)<br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

Annexure - XVI<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

0 1 2 3 4 5 6 7<br />

I. AGRICULTURE & ALLIED ACTIVITIES<br />

1 Crop Husbandry<br />

Work <strong>Plan</strong>-Rice Development<br />

Farmers Field School Nos. 57 4 4 4 5<br />

Block level awareness campaign Nos. 20 4 4 4 5<br />

Krushak Diwas Nos. 2 0 0 1 1<br />

Pre-seasonal training Nos. 2 0 0 1 1<br />

HYV. Rice production Ha. 20.00 0.00 0.00 0.00 0.00<br />

Asst. to Krushak Sathi Nos. 482 0 0 0 0<br />

SRI method of Rice cultivation Ha. 24 0 32 32 37<br />

Exposure visit (Outside the state) Nos. 17 2 3 3 3<br />

Exposure visit (Inside the state) Nos. 33 4 0 4 4<br />

Celebration of <strong>District</strong> Mahostav Nos. 2 0 0 0 0<br />

Financial assistance to FFS Nos. 0 0 53 53 57<br />

Work <strong>Plan</strong>-Sugarcane Development<br />

Ratoon Management Acre. 0.00 0.00 3.33 3.33 3.67<br />

Exposure visit (Inside the state) Nos. <strong>12</strong> 0 2 2 2<br />

Farmers Field School Nos. 0 0 1 1 1<br />

Work <strong>Plan</strong>-Farm Mechanization<br />

Subsidy for Tractor Nos. 52 37 37 40 44<br />

Subsidy for Power Tiller Nos. 537 <strong>12</strong> 37 37 40<br />

Subsidy for Self Propelled Reaper Nos. 3 0 2 2 2<br />

Subsidy for Self Propelled transplantor Nos. 2 0 0 0 0<br />

Subsidy for Rotavator Nos. 7 0 2 2 2<br />

Subsidy for Power operated implements Nos. 13 1 4 4 4<br />

Subsidy for Special power operated implements Nos. 28 1 4 4 4<br />

Subsidy for Hydraulic Trailer Nos. 7 1 2 2 2<br />

Subsidy for Manual & Bullock drawn implements Sets 173 42 37 42 46<br />

P.H.M Training Nos. 3 0 0 0 0<br />

Jute Technology Mission (MM-II)<br />

Seed Distribution (Jute) Qtl. 133 6 13 13 15<br />

Seed Minikit Qtl. 400 0 0 0 0<br />

Distribution of Sprayer Nos. 284 50 100 100 100<br />

Production Technology Demonstration Ha. 0.00 46.66 50.00 50.00 54.99<br />

Production Technology Minikit Nos. 143 0 0 0 0<br />

Retting Technology Demonstration Nos. 28 7 8 8 9<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Essential Nutrients Mini kits Ha. 833.25 199.98 216.65 216.65 238.31<br />

Foliar Spray Demonstration Ha. 199.98 40.00 43.33 43.33 47.66<br />

Retting Scheme Nos. 1 0 0 0 1<br />

Kuchha Retting Tank Nos. 54 20 20 20 22<br />

Pucca Retting Tank Nos. 11 0 3 3 4<br />

Integrated Pest Management Demonstration Nos. 4 1 1 1 1<br />

Farmer's training Nos. 8 3 3 3 3<br />

Exposure visit (Outside the state ) Nos. <strong>12</strong> 3 3 3 4<br />

Farmers Field School<br />

ISOPOM Pulses<br />

Nos. 10 2 2 2 2<br />

Block Demonstration Ha. 23.33 3.33 4.00 0.00 0.00<br />

Farmer's training Nos. 17 4 4 0 0<br />

R. Culture/PBS Ha. 71.66 0.00 0.00 0.00 0.00<br />

<strong>Plan</strong>t Protection Equipments Nos. 433 100 83 0 0<br />

Micronutrient Ha. 86.66 33.33 0.00 0.00 0.00<br />

Storage Bins Nos. 150 0 0 0 0<br />

Vermicompost units Nos. 20 0 8 0 0<br />

Sprinkler Nos. 0 2 4 0 0<br />

<strong>Plan</strong>t Protection Chemicals Ha. 0.00 50.00 21.66 0.00 0.00<br />

Distribution of Certified Seeds<br />

ISOPOM Oilseeds<br />

Qtl. 0 76 240 0 0<br />

Distribution of Certified Seeds Qtl. 15765 5169 6<strong>12</strong>9 6<strong>12</strong>9 6759<br />

Block Demonstration (Sunflower) Ha. 50.00 0.00 4.00 4.00 4.33<br />

Gypsum Ha. 2503.08 277.31 833.25 833.25 916.58<br />

R.Culture/PBS Ha. 1933.14 0.00 0.00 0.00 0.00<br />

Farmers Field School cum IPM (Mustard) Nos. 0 0 1 1 2<br />

Farmers Field School cum IPM (Groundnut) Nos. 8 0 2 2 3<br />

Sprinkler's set Nos. 8 3 2 3 4<br />

<strong>Plan</strong>t Protection Equipments Nos. 287 333 117 367 400<br />

Micronutrient Ha. 99.99 6.67 59.99 59.99 65.99<br />

Farm Implements (Manual) Sets 7 1 0 2 2<br />

Weedicides Ha. 40.00 0.00 0.00 0.00 0.00<br />

<strong>Plan</strong>t Protection Chemicals Ha. 66.66 0.00 33.33 33.33 36.66<br />

Vermicompost units Nos. 24 0 4 4 4<br />

Farmer's training Nos. 20 4 5 5 5<br />

Exposure visit<br />

Seed Village Scheme<br />

Nos. 17 4 5 5 5<br />

Paddy Ac. 250 8249 1000 1000 1100<br />

Mung Ac. 50 39 667 667 733<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Biri Ac. 50 216 250 250 275<br />

Groundnut Ac. 50 526 1083 1083 1192<br />

Mustard Ac. 0 0 167 167 183<br />

Training (Rs.1500/- per Training.) Nos. 16 0 0 0 0<br />

Storage Bins (20 Qtl. Capacity) Nos. 58 0 0 0 0<br />

Storage Bins (10 Qtl. Capacity)<br />

RIDF-JALANIDHI<br />

Nos. 92 0 0 0 0<br />

Shallow Tube Well Nos. 1507 950 1167 1167 1167<br />

River Lift Project<br />

RKVY<br />

Nos. 83 0 20 20 20<br />

Supply of paper mill sludge Mts. 0 400 0 0 500<br />

Supply of Gypsum Mts. 0 240 0 0 267<br />

Bio-fertilizer Qtl. 0 0 75 75 100<br />

Promotion of organic farming Nos. 0 0 4 4 5<br />

Promotion of SRI (One unit - 20Ac.) Nos. 0 0 80 80 90<br />

Establishment of Vermi Compost Nos. 0 0 100 100 117<br />

Management of acid soil Mts. 0 0 400 400 0<br />

Rice Minikit (Seed cost and transportation unit) Nos. 0 0 100 100 117<br />

Exposure visit outside state @ Rs. 3000/- per person (20 persons in one group) Nos. 0 0 0 0 3<br />

Farmers Field School (Rice) Nos. 0 0 0 0 <strong>12</strong><br />

INM-FFS Nos. 0 0 0 0 8<br />

IPM-FFS (Rice) Nos. 0 0 0 0 8<br />

Capacity building of Extension personnel's<br />

Farm Mechanization under RKVY<br />

Nos. 0 0 0 0 117<br />

Subsidy for Power Tiller Nos. 0 181 33 66 73<br />

Subsidy for Self Propelled Reaper Nos. 0 1 0 3 4<br />

Subsidy for Pump sets Nos. 0 0 30 267 300<br />

Subsidy for Rotavator Nos. 0 0 0 1 1<br />

Subsidy for Power operated Thresher Nos. 0 8 2 40 43<br />

Subsidy for Special power operated implements Nos. 0 3 0 6 7<br />

Subsidy for Hydraulic Trailer Nos. 0 1 3 3 4<br />

Subsidy for Manual & Bullock drawn implements Nos. 0 65 0 110 <strong>12</strong>0<br />

Subsidy for Combine Harvester Nos. 0 1 0 3 4<br />

Subsidy for Transplanter Nos. 0 0 0 0 1<br />

Subsidy for Tractor<br />

RKVY-STREAM-II<br />

Nos. 0 0 0 3 4<br />

Renovation of farms Nos. 1 0 0 0 0<br />

Strengthening of statistical unit Nos. 1 0 0 0 0<br />

Construction of FIAC building Nos. 3 0 2 2 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

National Food Security Mission (Pulse)<br />

Distribution of Certified Seeds Qtl. 0 0 217 217 233<br />

Organization of technology Demonstration (0.4ha-unit) Ha. 0.00 0.00 46.66 46.66 66.66<br />

Organization of farmers Training (25 nos of farmers) Nos. 0 0 0 0 20<br />

Seed Village (@ Rs. 15000/-per Ha.) of 50 nos farmers of 3 days Ha. 0 0 0 0 233.31<br />

Storage go-down at Block Head Quarter of <strong>12</strong>50 sqft.. Nos. 0 0 0 0 1<br />

Threshing Floor (30'X30') with cover Nos. 0 0 0 0 1<br />

Power Tillers Nos. 0 0 0 0 8<br />

Dal Processor (Mini Dal Mill)<br />

INM (Integrated Nutrient Management)<br />

Nos. 0 0 0 0 1<br />

Lime/Gypsum Ha. 0.00 0.00 399.96 399.96 499.95<br />

Micronutrient Ha. 0.00 0.00 159.98 159.98 183.32<br />

Assistance for R.Culture/PSB distribution<br />

IPM (Integrated Post Management)<br />

Ha. 0.00 0.00 133.32 133.32 149.99<br />

Assistance for PP Chemicals Ha. 0.00 0.00 333.30 333.30 366.63<br />

Incentive for sprayer @ Rs.3000/- Nos. 0 0 117 117 133<br />

Distribution of Rotavactors Nos. 0 0 1 1 1<br />

Distribution sprinkler set @ Rs.7500/- Ha. 0.00 0.00 20.00 20.00 23.33<br />

Incentives for pump sets Nos. 0 0 47 47 53<br />

Assistance for pipe for carrying water from source to field (one set 800mtr) Mts. 0 0 2133 2133 2666<br />

Exposure visit @ Rs.3000/- (20 persons in a group) Nos. 0 0 0 0 2<br />

2 Horticulture<br />

A. National Horticulture Mission Programme<br />

Mango Ha. 439.29 83.33 133.32 133.32 139.99<br />

Banana Ha. 79.99 23.33 6.67 6.67 16.67<br />

Costal horticulture -cashew Ha. 223.31 50.00 50.00 50.00 66.66<br />

Marigold Ha. 68.99 8.33 3.33 3.33 5.00<br />

Gladioli Ha. 88.32 16.67 8.33 8.33 10.00<br />

Rose Ha. 54.13 56.99 5.00 5.00 6.67<br />

Tube Rose Ha. 36.00 0.00 0.00 0.00 0.00<br />

Vermicompost (Big) Nos. 7 1 3 3 3<br />

Vermicompost (Small) Nos. 53 10 0 0 0<br />

Small Nursery (Public Sector) Nos. 1 0 0 0 0<br />

Small Nursery (Private Sector) Nos. 4 1 0 0 1<br />

Model Nursery in private sector Nos. 1 0 0 0 0<br />

Greenhouse units Nos. 7 0 20 20 20<br />

Shade net units Nos. 8 0 133 133 133<br />

Mulching units Nos. 11 0 3 3 3<br />

Plastic Tunnel units Nos. 21 0 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Human Resource Development<br />

Training of farmers (Inside the state) Nos. 228 23 27 27 27<br />

Exposure visit (Outside the state) Nos. 27 7 10 10 10<br />

Training to Gardener Nos. 7 3 1 1 1<br />

Training to entrepreneur Nos. 11 1 0 0 0<br />

Training to supervisor Nos. 2 0 0 0 0<br />

Vegetable Mini kit Nos. 15502 3820 4000 4000 4800<br />

<strong>District</strong> level show<br />

B. Micro Irrigation Programme<br />

Nos. 2 0 0 0 0<br />

Drip irrigation Ha. 9.00 1.67 16.67 16.67 16.67<br />

Sprinkler irrigation<br />

C. Coconut Development Board Programme<br />

Ha. 183.65 68.33 66.66 66.66 99.99<br />

Area expansion Ha. 68.27 0.00 25.00 25.00 26.66<br />

Laying out demonstration Ha. 20.66 8.33 5.00 5.00 6.67<br />

Organic manure pit Nos. 3 1 1 1 1<br />

Raising of coconut seedling<br />

D. ISOPOM (Oil Palm)<br />

Nos. 18332 1667 1667 1667 1667<br />

Normal Ha. 22.66 21.33 23.33 23.33 26.66<br />

S.C.P Ha. 6.67 3.33 4.00 4.00 5.00<br />

T.A.S.P Ha. 6.67 4.00 5.00 5.00 5.00<br />

Demonstration<br />

E. R.K.V.Y.<br />

Ha. 2.00 2.00 3.33 3.33 3.33<br />

Vermicompost units Nos. 45 13 13 13 17<br />

Vermicompost hatchery Nos. 3 1 3 3 3<br />

Zero Energy Cool Chamber<br />

F. National Medicinal <strong>Plan</strong>t Mission Programme<br />

Nos. 3 0 3 3 3<br />

Anola Ha. 15.00 2.33 2.33 2.33 3.33<br />

Aswagandha Ha. 5.00 1.67 0.67 0.67 1.67<br />

Tulasi Ha. 5.00 0.00 1.67 1.67 2.33<br />

Aloevera Ha. 0.00 0.00 1.67 1.67 1.67<br />

Exposure visit (Inside the state) Nos. 19 0 2 2 2<br />

Exposure visit (Outside the state) Nos. 4 0 1 1 1<br />

3 Soil and Water Conservation<br />

Watershed Development Nos. 0 3 3 3 3<br />

4 Animal Husbandry & Dairy Development<br />

ASCAD Health Camp & Awareness Programme Nos. 0 9 9 9 9<br />

Bird Flu Training Programme Nos. 0 4 4 4 5<br />

Genetic up gradation of Goats Deworming of goats Nos. 0 38 0 53 100<br />

Entrepreneurship Development Training Nos. 0 0 0 0 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Training to farmers on poultry production Nos. 0 0 0 0 14<br />

Training of lead farmers Nos. 0 0 0 0 1<br />

Skill up gradation training Nos. 0 1 1 1 7<br />

Milk Production MT. 0 21 24 22 23<br />

Egg Production Million 0 26 30 27 26<br />

Meat Production MT. 0 1 0 1 1<br />

Fodder Minikit distribution Nos. 0 824 33 33 1000<br />

Training & Demonstration under pasture development Nos.of Demon. 0 824 33 33 167<br />

Fodder Production Qtl. 0 17837 0 0 26664<br />

Treatment of Cases Nos. 0 117275 153651 <strong>12</strong>6654 139986<br />

Castration<br />

Vaccination<br />

Nos. 0 10884 14999 11332 <strong>12</strong>332<br />

HSV Nos. 0 98290 259424 109989 109989<br />

BQV Nos. 0 92641 145385 99990 99990<br />

FMDV Nos. 0 53928 68993 59994 99990<br />

RDV.(R2B) Nos. 0 62094 110722 73326 83325<br />

PPRV Nos. 0 37030 33330 33330 33330<br />

Artificial Insemination Nos. 0 21375 28697 23331 18998<br />

Infertility camps Nos. 0 244 399 267 217<br />

Deworming Nos. 0 35995 89194 39996 33330<br />

Establishment of Dairy units Nos. 0 20 0 53 100<br />

Establishment of Goatery units Nos. 0 11 0 13 20<br />

Establishment of Broilers farmer units Nos. 0 31 0 3 50<br />

Back yard poultry units Nos. 0 14146 0 16665 19998<br />

Layers farmers Nos. 0 0 1 0 1<br />

5 Fisheries<br />

Development of Fresh Water Aquaculture under FFDA (Water Area) Ha. 183.32 38.17 40.00 40.00 43.33<br />

Development of Fresh Water Aquaculture under FFDA (Training) Nos. 167 10 17 17 20<br />

Development of Water Logged Areas (Water Area) Ha. 16.67 3.42 0.00 0.00 0.00<br />

Development of Water Logged Areas (Training) Nos. 50 0 0 0 0<br />

Development of Brackish Water Aquaculture (Water Area) Ha. 786.59 0.00 83.33 33.33 40.00<br />

Integrated Development of Inland Capture Resources (Reservoir/River) (Net & Boat) Nos. 100 21 0 7 8<br />

Integrated Development of Inland Capture Resources (Reservoir/River) (Training) Nos. 100 0 0 0 0<br />

Development of Fresh Water Aquaculture under NFDB (Water Area) Ha. 0.00 0.00 79.99 79.99 79.99<br />

Development of Fresh Water Aquaculture under NFDB (Training) Nos. 167 23 40 40 40<br />

Self Employment Programme (Training) Nos. 167 20 10 10 20<br />

6 Cooperation<br />

Share capital to Cooperative credit institutions under NRC-LTO fund<br />

0 0 0 0 0<br />

PACS/LAMPCS & C.S. Bank Nos. 48 0 22 22 22<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Managerial Subsidy Nos. 40 0 21 21 20<br />

Consumer Co-operative<br />

0 0 0 0 0<br />

Share Capital Nos. 7 0 3 3 3<br />

Transporting Subsidy of PDS Nos. 16 0 7 7 8<br />

MACP-Infrastructure Strengthening and Managerial subsidy to Marketing Cooperatives (PACs & RCMS)<br />

Repair of Godown of PACS & RCMS Nos. 11 0 3 3 5<br />

Managerial Subsidy to PACS & RCMS for procurement Nos. 33 0 13 13 17<br />

Financial assistance in shape of loan/subsidy or share to other cooperative<br />

0 0 0 0 0<br />

Women Cooperative Nos. 4 0 1 1 1<br />

Labour Cooperative Nos. 3 0 1 1 2<br />

II. RURAL DEVELOPMENT<br />

DRDA Administration<br />

0 0 0 0 0<br />

Gopabandhu Gramin Yojana (GGY) No. of Proj. 698 111 279 279 408<br />

State Finance Commission Grant No. of Proj. 145 131 14 14 17<br />

Twelfth Finance Commission (TFC)<br />

Rural Employment<br />

No. of Proj. 2879 2594 284 284 0<br />

Swarnajayanti Gram Swarozgar Yojana (SGSY) No. of Benf. 11535 3085 2766 3407 3033<br />

Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) No. of Proj. 2305 <strong>12</strong>1 1308 1308 1414<br />

III. SPECIAL AREAS PROGRAMMES 0 0 0 0 0<br />

Nilgiri ITDA 0 0 0 0 0<br />

Grants under provision to article 275(1) 0 0 0 0 0<br />

Construction of Boundary Wall of School/Hostel Nos. 6 1 0 1 2<br />

Construction of School/Hostel Building Nos. 7 7 1 0 1<br />

Electrification of School/Hostel Nos. 9 1 0 2 2<br />

CD work Nos. 9 1 0 1 2<br />

Drainage works at school<br />

Special Central Assistance to Tribal Sub-<strong>Plan</strong><br />

Nos. 2 0 0 1 1<br />

Group finance to SHGs No. of fam. 9 16 6 6 7<br />

Bee keeping No. of fam. 108 33 17 17 17<br />

Lac cultivation No. of fam. 217 50 33 33 33<br />

Land Development No. of fam. 18 18 0 0 0<br />

Cello Tube well Nos. 25 5 5 5 6<br />

River Lift Point Nos. 3 1 1 1 0<br />

Training Programme Nos. 40 3 20 20 17<br />

CD work Nos. 21 5 4 4 5<br />

WHS Nos. 7 0 2 2 2<br />

IV. IRRIGATION & FLOOD CONTROL<br />

<strong>12</strong>th F.C. road Nos. 0 1 0 0 0<br />

<strong>12</strong>th F.C. building Nos. 0 1 0 0 0<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Bank protection work (Flood Control) Nos. 0 0 1 1 0<br />

State <strong>Plan</strong> (LUMP) Nos. 0 0 10 10 0<br />

Bank protection work (Flood Control)<br />

Minor Irrigation<br />

Nos. 0 0 0 0 1<br />

Creation of Irrigation potential Ha. 0 1<strong>12</strong> 201 0 233<br />

Biju Krushak Vikash Yojana - LI Division, Jaleswar Ha. 1431 16 260 260 180<br />

V. ENERGY<br />

Rajib Gandhi Gramin Vidyutikaran Yojana Nos. 0 1425 41746 41746 6083<br />

Electrification of Un-electrified Villages Nos. 0 13 20 20 18<br />

Biju Gram Jyoti Yojana No. of vill. 0 2 3 3 4<br />

VI. INDUSTRY & MINERALS<br />

Small Scale Enterprises Nos. 595 98 97 0 100<br />

PMEGP Nos. 491 55 54 0 68<br />

Cottage Industries<br />

Handloom & Textile<br />

Nos. 81 16 14 0 15<br />

Promotion of Handloom Industry Nos. of Wvrs 63 27 27 0 17<br />

Workshed-cum-Housing Nos. 57 9 15 0 17<br />

Skill up gradation training Nos. 73 0 17 0 23<br />

IHDS (Cluster Approach) Nos. of Wvrs 109 72 109 0 109<br />

IHDS (Group Approach) Nos. of Wvrs 209 47 40 0 50<br />

IHDS (Marketing Incentive) Nos. of Wvrs 11 3 10 0 11<br />

ICICI (Lombard) Nos. of Wvrs 600 410 410 0 417<br />

MGBBY Nos. of Wvrs 373 263 267 0 273<br />

10% Rebate on Handloom Product Nos. of WCS 25 21 25 0 25<br />

<strong>District</strong> level Exhibition Nos 2 0 0 0 0<br />

VII. TRANSPORT<br />

Rural Work Division, <strong>Balasore</strong> (I)<br />

C.W.A<br />

Black Topped K.M. 1 0 0 0 0<br />

Metalling K.M. 1 0 0 0 0<br />

Cement Concrete Road K.M. 2 0 0 0 0<br />

Cross Drainage works<br />

<strong>12</strong>th Finance Commission Award<br />

Nos. 1 0 0 0 1<br />

Black Topped K.M. 2 0 0 0 0<br />

Metalling K.M. 3 0 0 0 0<br />

Cement Concrete Road K.M. 2 0 0 0 0<br />

Cross Drainage works<br />

Special Repair to Road<br />

Nos. 10 0 0 0 0<br />

Black Topped K.M. 2.503 0.000 0.961 0.961 1.000<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Metalling K.M. 2.332 0.087 0.794 0.794 1.000<br />

R. T. Wall Mtr. 2 0 1 1 1<br />

Cement Concrete Road K.M. 7.018 0.759 2.004 2.004 2.333<br />

Cross Drainage works Nos. 23 3 7 7 8<br />

DR<br />

PMGSY<br />

K.M. 19.784 0.000 7.868 7.868 0.000<br />

Black Topped<br />

Rural Work Division, <strong>Balasore</strong> (II)<br />

C.W.A<br />

K.M. 5 0 0 5 0<br />

R. T. Wall<br />

NABARD Road<br />

Mtr. 0 32 0 0 0<br />

Black Topped K.M. 0 5 0 0 0<br />

Metalling K.M. 0 5 0 0 0<br />

Cement Concrete Road K.M. 0 4 0 0 0<br />

Cross Drainage works<br />

<strong>12</strong>th Finance Commission<br />

Nos. 0 17 0 0 0<br />

Metalling K.M. 0 1 0 0 0<br />

R. T. Wall Mtr. 0 48 0 0 0<br />

Cement Concrete Road K.M. 0 1 0 0 0<br />

Cross Drainage works<br />

Critical Road<br />

Nos. 0 1 0 0 0<br />

R. T. Wall<br />

Improvement & Widening Road<br />

Mtr. 0 84 0 0 0<br />

R. T. Wall<br />

<strong>Plan</strong> Scheme Road<br />

Mtr. 0 85 93 93 103<br />

Black Topped K.M. 0.000 0.200 0.283 0.283 0.3<strong>12</strong><br />

Metalling K.M. 0.200 0.780 0.780 0.780 0.858<br />

Cement Concrete Road K.M. 0.000 0.258 1.449 1.449 1.594<br />

Cross Drainage works<br />

Bharat Nirman<br />

Nos. 0 1 4 4 4<br />

Black Topped K.M. 0.000 6.033 5.066 5.066 0.000<br />

Metalling K.M. 0.000 0.367 5.066 5.066 0.000<br />

Cement Concrete Road K.M. 0.000 8.999 9.332 9.332 0.000<br />

Cross Drainage works<br />

R & B Division<br />

Nos. 0 130 342 342 0<br />

Black Topped K.M. 0.000 2.366 9.996 9.996 14.374<br />

Metalling K.M. 0.000 0.248 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 0.000 0.863 0.659 0.659 0.667<br />

Cross Drainage works Nos. 0 6 3 3 5<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Rural Work Division, Jaleswar<br />

C.W.A.<br />

Cement Concrete Road K.M. 1 0 0 0 0<br />

MSB K.M. 0.000 0.000 0.684 0.684 0.683<br />

EW<br />

NABARD<br />

K.M. 0.000 0.000 0.684 0.684 0.683<br />

Black Topped K.M. 2 0 0 0 0<br />

WBM K.M. 2 0 0 0 0<br />

Cross Drainage works Nos. 6 0 0 0 0<br />

GSB K.M. 1 0 0 0 0<br />

S. Bridge<br />

<strong>12</strong>th Finance Commission<br />

Nos. 2 0 0 0 1<br />

Black Topped K.M. 0.567 0.000 0.000 0.000 0.000<br />

Metalling K.M. 1.535 0.000 0.000 0.000 0.000<br />

Cement Concrete Road K.M. 2.397 0.874 0.000 0.000 0.000<br />

GSB K.M. 1.785 0.000 0.000 0.000 0.000<br />

EW K.M. 1.2<strong>12</strong> 0.000 0.000 0.000 0.000<br />

Cross Drainage works Nos. 8 3 0 0 0<br />

Building works<br />

Important Critical Road<br />

Nos. 28 3 0 0 0<br />

Black Topped K.M. 25.900 0.330 5.066 5.066 5.000<br />

Cement Concrete Road K.M. 10 0 0 0 0<br />

EW K.M. 0 0 5 5 5<br />

MSB K.M. 0 0 5 5 5<br />

Cross Drainage works Nos. 0 1 13 13 13<br />

DR K.M. 0.000 0.000 3.056 3.056 3.500<br />

R. T. Wall Mrt. 0 0 40 40 50<br />

Bharat Nirman K.M. 72.559 32.793 26.071 26.071 9.332<br />

VIII SCIENCE TECHNOLOGY & ENVIRONMENT<br />

Eco-<strong>Plan</strong>tation Ha. 0.00 16.67 5.00 5.00 0.00<br />

IX SOCIAL SERVICES<br />

Education<br />

S.S.A<br />

Block Resource Center Nos. 0 4 4 4 4<br />

Cluster Resource Center Nos. 0 68 67 67 67<br />

Civil work Nos. 0 0 223 223 223<br />

Interventions for out of School Children Nos. 0 0 477 477 477<br />

Free Text Book Nos. 0 0 89625 89625 89625<br />

ii.) Girl Education Nos. 0 0 1 1 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

CWSN (IED) Nos. 0 0 2573 2573 2573<br />

Maintenance Grants (PS & UPS) Nos. 0 890 972 972 972<br />

Research & Evaluation Nos. 0 0 106 106 106<br />

School Improvement Grant Nos. 0 1027 1066 1066 1066<br />

Teachers Grant Nos. 0 2987 3645 3645 3645<br />

Teachers Grant Salary (Recurring) Nos. 0 1098 1515 1515 1515<br />

Teaching Learning Equipment (PS) Nos. 0 27706 10 10 10<br />

Teacher Training Nos. 0 2430 3793 3793 3793<br />

Community Training Nos. 0 0 8856 8856 8856<br />

National Education Programme for Girls at Elementary Level (NPEGEL) Nos. 0 30 30 30 30<br />

Kasturiba Gandhi Balika Vidyalaya (KGBV) Nos. 0 1 1 1 1<br />

Medical & Public Health 0 0 0 0 0<br />

Sterilization Nos. 0 2939 3233 3233 3557<br />

Intra Uterine Devices Nos. 0 14999 16498 16498 18148<br />

Oral Pills Nos. 0 6666 7333 7333 8066<br />

Contraceptive Condoms users Nos. 0 6666 7333 7333 8066<br />

MTP<br />

Immunization<br />

Nos. 0 1133 <strong>12</strong>47 <strong>12</strong>47 1371<br />

TT (Preg) Nos. 0 17222 18944 18944 20839<br />

DPT Nos. 0 15657 17223 17223 18945<br />

Polio Nos. 0 15657 17223 17223 18945<br />

BCG Nos. 0 15657 17223 17223 18945<br />

Measles Nos. 0 15657 17223 17223 18945<br />

Vit-A Nos. 0 15657 17223 17223 18945<br />

DT Nos. 0 17265 17265 17265 18991<br />

TT (10 years) Nos. 0 17332 19065 19065 20971<br />

TT (16 years) Nos. 0 14999 16498 16498 18148<br />

Large Follifor<br />

Water Supply & Sanitation<br />

Rural Water Supply<br />

Nos. 0 17222 18944 18944 20839<br />

ARWSP Sinking of Tube Wells Nos. 320 80 80 80 70<br />

MNP Sinking of Tube Wells Nos. 378 39 79 79 70<br />

Public Water Supply Schemes<br />

Rural Sanitation<br />

Nos. 105 11 31 31 14<br />

Sanitation coverage of Households Nos. 0 14<strong>12</strong>9 18332 18332 20415<br />

Sanitation coverage of Schools (Toilets) Nos. 0 255 0 0 267<br />

Sanitation coverage of Anganwadis (Toilets)<br />

Urban Water Supply<br />

Nos. 0 321 0 0 250<br />

Urban Water Supply Projects Nos. 0 2 2 2 2<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Item Unit<br />

Eleventh <strong>Plan</strong><br />

(2007-<strong>12</strong>) Target<br />

<strong>Annual</strong> <strong>Plan</strong> 2009-10<br />

Actual Achievement<br />

<strong>Annual</strong> <strong>Plan</strong>: 2010-11<br />

Target<br />

Anticipated<br />

Achievement<br />

<strong>Annual</strong> <strong>Plan</strong><br />

<strong>2011</strong>-<strong>12</strong> Target<br />

Urban Sanitation<br />

Urban Sanitation Projects<br />

Rural Housing<br />

Nos. 0 0 2 2 2<br />

Indira Awas Yojana No. of Benf. 18895 1545 5534 5534 7234<br />

Mo Kudia<br />

Social Security & Social Welfare<br />

No. of Benf. 1362 259 332 332 400<br />

IGNOAP No. of Benf. 7931 7931 7931 7931 7931<br />

ODP No. of Benf. 2215 3<strong>12</strong>3 250 250 250<br />

MBPY No. of Benf. 10351 16030 2833 2833 16384<br />

X GENERAL SERVICES<br />

Non Residential<br />

Construction of Revenue Department Buildings Nos. 1 1 0 0 1<br />

Construction of PHC Buildings Nos. 1 0 0 0 1<br />

Construction & Maintenance of Buildings<br />

Residential<br />

Nos. 2 0 1 1 1<br />

Construction of Revenue Department Buildings Nos. 3 2 0 0 1<br />

Construction of PHC Buildings Nos. 6 2 0 0 3<br />

Construction & Maintenance of Buildings Nos. 3 0 1 1 1<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure - XVI


Annexure XVII<br />

Photographs of <strong>District</strong>, Block & ULB Level <strong>Plan</strong>ning Workshops<br />

<strong>District</strong> level workshop<br />

Bahanaga g Block Simulia Block<br />

Khaira Block<br />

Basta Block<br />

Bhograi Block<br />

Soro Block


Jaleswar Block Jaleswar NAC<br />

Nilgiri NAC<br />

Sadar Block<br />

Oupada Block<br />

Soro NAC<br />

Baliapal Block<br />

Nilgiri Block


Remuna Block<br />

<strong>Balasore</strong> Municipality<br />

Remuna Block<br />

<strong>Balasore</strong> Municipality p y


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block and GP Level Information<br />

Annexure – XVIII<br />

A. SC and ST population in different Blocks/ULBs of <strong>Balasore</strong> <strong>District</strong><br />

Block SC Population<br />

% to total<br />

population<br />

ST Population<br />

% to total<br />

population<br />

Bahanaga 35871 29.68 3160 2.61<br />

<strong>Balasore</strong> 55622 25.52 26889 <strong>12</strong>.34<br />

Baliapal 34539 19.57 9721 5.51<br />

Basta 24507 15.04 17809 10.93<br />

Bhograi 41466 16.37 6282 2.48<br />

Jaleswar 25732 14.85 31625 18.25<br />

Khaira 35593 22.31 8287 5.20<br />

Nilgiri 10418 9.45 61902 56.16<br />

Oupada 11934 16.92 <strong>12</strong>751 18.07<br />

Remuna 41634 22.78 25467 13.94<br />

Simulia 22677 21.48 4867 4.61<br />

Soro 24443 20.20 6890 5.69<br />

<strong>District</strong> (Rural) 364436 19.65 215650 11.63<br />

<strong>Balasore</strong> (M) 9833 9.27 6365 6.00<br />

Jaleswar (NAC) <strong>12</strong>81 5.99 2485 11.62<br />

Nilgiri (NAC) 1835 <strong>12</strong>.43 3287 22.27<br />

Soro (NAC) 4037 14.52 667 2.40<br />

<strong>District</strong> (Urban) 16986 9.99 <strong>12</strong>804 7.53<br />

<strong>District</strong> (Total)<br />

Source: Census of India, 2001<br />

381422 18.84 228454 11.28<br />

B: Literacy rate in different Block/ULBs of the district<br />

Block/ULBs Male Female Total<br />

Bahanaga 84.37 62.07 73.53<br />

<strong>Balasore</strong> 78.52 54.78 67.11<br />

Baliapal 84.64 58.87 51.9<br />

Basta 80.31 56.00 68.49<br />

Bhograi 46.72 64.55 76.75<br />

Jaleswar 79.32 52.67 66.21<br />

Khaira 84.34 61.63 72.96<br />

Nilgiri 62.08 38.77 50.59<br />

Oupada 75.77 53.50 64.56<br />

Remuna 77.91 57.53 68.06<br />

Simulia 83.48 59.11 71.45<br />

Soro 84.45 62.10 73.45<br />

<strong>Balasore</strong> (M) 89.77 78.13 84.25<br />

Jaleswar (NAC) 84.30 66.22 74.99<br />

Nilgiri (NAC) 76.05 60.87 68.63<br />

Soro (NAC) 85.79 68.28 77.04<br />

<strong>District</strong> (Total) 81.89 58.90 70.56<br />

Source: Census of India, 2001<br />

C: Occupational pattern of population in different Blocks/ULBs of <strong>Balasore</strong> district<br />

Block/ULBs<br />

% of workers to total<br />

population<br />

% of main workers to total<br />

population<br />

% of marginal workers to total<br />

population<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure – XVIII<br />

% of non workers to total<br />

population<br />

% of workers (main & marginal)<br />

engaged in cultivation<br />

% of workers (main & marginal)<br />

engaged as Agricultural<br />

Labourers<br />

Bahanaga 35.54 25.1 10.44 64.46 37.34 31.26 2.14 25.61<br />

<strong>Balasore</strong> 25.6 16.38 9.22 74.4 16.65 25.69 2.5 55.16<br />

Baliapal 31.74 20.67 11.64 68.26 47.88 30.53 1.3 20.29<br />

Basta 47.36 29.78 17.68 52.64 39.31 34.35 3.1 23.24<br />

Bhograi 31.72 20.24 11.48 68.28 39.26 35.24 3.96 19.45<br />

Jaleswar 42.15 24.55 17.6 57.85 40.72 34.9 3.96 20.42<br />

Khaira 34.13 20.45 13.68 65.87 21.23 41.2 8.21 27.51<br />

Nilgiri 36.92 23.28 13.64 63.08 21.<strong>12</strong> 40.43 9.94 28.51<br />

Oupada 43.36 30.62 <strong>12</strong>.74 56.64 22.26 38.26 7.56 26.5<br />

Remuna 26.69 16.85 8.87 73.31 20.23 26.35 2.15 53.25<br />

Simulia 41.75 31.05 10.7 58.25 44.14 37.32 1.86 16.68<br />

% of workers (main & marginal)<br />

engaged in Household Industry<br />

% of workers (main & marginal)<br />

engaged in other works


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULBs<br />

% of workers to total<br />

population<br />

% of main workers to total<br />

population<br />

% of marginal workers to total<br />

population<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure – XVIII<br />

% of non workers to total<br />

population<br />

% of workers (main & marginal)<br />

engaged in cultivation<br />

% of workers (main & marginal)<br />

engaged as Agricultural<br />

Labourers<br />

Soro 37.85 24.49 13.36 62.15 38.32 32.64 2.15 26.89<br />

<strong>Balasore</strong> (M) 40.38 35.93 3.98 58.96 0.58 1.48 1.74 96.2<br />

Jaleswar (NAC) 23.29 19.47 3.82 50.5 19.38 18.08 1.97 6057<br />

Nilgiri (NAC) 33.07 26.25 6.82. 66.85 14.24 31.11 4.75 49.9<br />

Soro (NAC) 27.58 23.76 3.82 72.41 9.87 21.88 3.17 65.08<br />

<strong>District</strong> (Total) 35.<strong>12</strong> 22.59 <strong>12</strong>.58 64.88 34.03 32.98 3.52 29.47<br />

Source: Census of India, 2001<br />

D: Distance and type of road to infrastructure and service facilities<br />

Type of Administrative<br />

Units/Service Facilities<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

% of workers (main & marginal)<br />

engaged in Household Industry<br />

Fair<br />

weather<br />

Road<br />

% of workers (main & marginal)<br />

engaged in other works<br />

Total No.<br />

of GPs<br />

Block 1: Bahanaga<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

0.00 0.00 0.00 21 17 2 1 1 21<br />

% 0.00 0.00 0.00 100.00 80.95 9.52 4.76 4.76 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

1 2 3 15 16 2 2 1 21<br />

% 4.76 9.52 14.29 71.43 76.19 9.52 9.52 4.76 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

2 19 14 3 2 2 21<br />

% 0.00 0.00 9.52 90.48 66.67 14.29 9.52 9.52 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

3 4 14 16 4 1 21<br />

% 0.00 14.29 19.05 66.67 76.19 19.05 0.00 4.76 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

6 7 8 17 3 1 21<br />

% 0.00 28.57 33.33 38.10 80.95 14.29 0.00 4.76 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

1 7 9 4 17 2 1 1 21<br />

% 4.76 33.33 42.86 19.05 80.95 9.52 4.76 4.76 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

1 10 7 3 15 3 2 1 21<br />

% 4.76 47.62 33.33 14.29 71.43 14.29 9.52 4.76 100.00<br />

LI Center<br />

No. of<br />

GPs<br />

9 11 1 14 5 1 1 21<br />

% 42.86 52.38 4.76 0.00 66.67 23.81 4.76 4.76 100.00<br />

Milk Collection center<br />

No. of<br />

GPs<br />

7 11 1 2 13 5 1 2 21<br />

% 33.33 52.38 4.76 9.52 61.90 23.81 4.76 9.52 100.00<br />

Agril. Input shops<br />

No. of<br />

GPs<br />

3 10 2 6 13 4 3 1 21<br />

% 14.29 47.62 9.52 28.57 61.90 19.05 14.29 4.76 100.00<br />

Municipality/NAC (nearest)<br />

(specify)<br />

No. of<br />

GPs<br />

% 0.00<br />

5<br />

23.81<br />

2<br />

9.52<br />

14<br />

66.67<br />

17<br />

80.95<br />

2<br />

9.52<br />

1<br />

4.76<br />

1<br />

4.76<br />

21<br />

100.00<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

6 10 1 4 15 3 2 1 21<br />

% 28.57 47.62 4.76 19.05 71.43 14.29 9.52 4.76 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

7 3 11 19 2 21<br />

% 0.00 33.33 14.29 52.38 90.48 9.52 0.00 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

8 9 3 1 15 4 1 1 21<br />

% 38.10 42.86 14.29 4.76 71.43 19.05 4.76 4.76 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

9 <strong>12</strong> 16 4 1 21<br />

% 42.86 57.14 0.00 0.00 76.19 19.05 4.76 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

9 <strong>12</strong> 15 3 1 2 21<br />

Block 2: <strong>Balasore</strong> Sadar<br />

% 42.86 57.14 0.00 0.00 71.43 14.29 4.76 9.52 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

9 7 11 22 5 27<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

Block HQ No. of 9 7 11 22 5 27


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Tahasil HQ<br />

Police Station<br />

Hospital (Indoor)<br />

Hospital (only outdoor)<br />

Veterinary Dispensary<br />

LI Center<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Bus Stop (nearest) (specify)<br />

Railway Station (nearest) (specify)<br />

Hats/Markets<br />

Post Office<br />

Public Telephone Booth<br />

Block 3: Baliapal<br />

<strong>District</strong> HQ<br />

Block HQ<br />

Tahasil HQ<br />

Police Station<br />

Hospital (Indoor)<br />

Hospital (only outdoor)<br />

Veterinary Dispensary<br />

LI Center<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

GPs<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

9 7 11 22 5 27<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

9 7 11 22 5 27<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 5 6 14 18 9 27<br />

% 7.41 18.52 22.22 51.85 66.67 33.33 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

3 9 6 9 <strong>12</strong> 15 27<br />

% 11.11 33.33 22.22 33.33 44.44 55.56 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

3 9 6 9 <strong>12</strong> 15 27<br />

% 11.11 33.33 22.22 33.33 44.44 55.56 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

3 22 2 11 13 2 1 27<br />

% 11.11 81.48 7.41 0.00 40.74 48.15 7.41 3.70 100.00<br />

No. of<br />

GPs<br />

2 3 7 15 <strong>12</strong> 14 1 27<br />

% 7.41 11.11 25.93 55.56 44.44 51.85 3.70 0.00 100.00<br />

No. of<br />

GPs<br />

9 7 11 22 5 27<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

9 7 11 22 5 27<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

5 8 9 5 14 11 2 27<br />

% 18.52 29.63 33.33 18.52 51.85 40.74 0.00 7.41 100.00<br />

No. of<br />

GPs<br />

9 7 11 22 5 27<br />

% 0.00 33.33 25.93 40.74 81.48 18.52 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 15 8 18 7 2 27<br />

% 14.81 55.56 29.63 0.00 66.67 25.93 0.00 7.41 100.00<br />

No. of<br />

GPs<br />

6 21 10 17 27<br />

% 22.22 77.78 0.00 0.00 37.04 62.96 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

6 19 2 11 14 2 27<br />

% 22.22 70.37 7.41 0.00 40.74 51.85 0.00 7.41 100.00<br />

No. of<br />

GPs<br />

27 27 27<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 14 11 24 3 27<br />

% 0.00 7.41 51.85 40.74 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 14 11 24 3 27<br />

% 0.00 7.41 51.85 40.74 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 14 11 24 3 27<br />

% 0.00 7.41 51.85 40.74 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 9 16 24 3 27<br />

% 0.00 7.41 33.33 59.26 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

1 <strong>12</strong> 9 5 22 4 1 27<br />

% 3.70 44.44 33.33 18.52 81.48 14.81 0.00 3.70 100.00<br />

No. of<br />

GPs<br />

2 14 11 24 3 27<br />

% 0.00 7.41 51.85 40.74 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

3 20 4 25 2 27<br />

% 11.11 74.07 14.81 0.00 92.59 7.41 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 9 16 24 3 27<br />

% 0.00 7.41 33.33 59.26 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 9 16 24 3 27<br />

% 0.00 7.41 33.33 59.26 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 25 27 27<br />

% 0.00 0.00 7.41 92.59 100.00 0.00 0.00 0.00 100.00


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

2 22 3 23 3 1 27<br />

% 7.41 81.48 11.11 0.00 85.19 11.11 0.00 3.70 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

2 25 27 27<br />

% 0.00 0.00 7.41 92.59 100.00 0.00 0.00 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

2 25 24 2 1 27<br />

% 7.41 92.59 0.00 0.00 88.89 7.41 0.00 3.70 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

8 19 24 2 1 27<br />

% 29.63 70.37 0.00 0.00 88.89 7.41 0.00 3.70 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

8 19 24 2 1 27<br />

Block 4: Basta<br />

% 29.63 70.37 0.00 0.00 88.89 7.41 0.00 3.70 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

22 21 1 22<br />

% 0.00 0.00 0.00 100.00 95.45 4.55 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

1 3 18 20 2 22<br />

% 0.00 4.55 13.64 81.82 90.91 9.09 0.00 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

1 2 3 16 20 2 22<br />

% 4.55 9.09 13.64 72.73 90.91 9.09 0.00 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

1 6 7 8 20 1 1 22<br />

% 4.55 27.27 31.82 36.36 90.91 4.55 4.55 0.00 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

1 7 3 11 19 2 1 22<br />

% 4.55 31.82 13.64 50.00 86.36 9.09 4.55 0.00 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

2 7 5 8 20 1 1 22<br />

% 9.09 31.82 22.73 36.36 90.91 4.55 4.55 0.00 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

1 4 6 11 19 2 1 22<br />

% 4.55 18.18 27.27 50.00 86.36 9.09 4.55 0.00 100.00<br />

LI Center<br />

No. of<br />

GPs<br />

5 <strong>12</strong> 2 3 16 3 3 22<br />

% 22.73 54.55 9.09 13.64 72.73 13.64 13.64 0.00 100.00<br />

Milk Collection center<br />

No. of<br />

GPs<br />

2 8 4 8 17 2 3 22<br />

% 9.09 36.36 18.18 36.36 77.27 9.09 13.64 0.00 100.00<br />

Agril. Input shops<br />

No. of<br />

GPs<br />

1 1 3 17 20 1 1 22<br />

% 4.55 4.55 13.64 77.27 90.91 4.55 4.55 0.00 100.00<br />

Municipality/NAC (nearest)<br />

(specify)<br />

No. of<br />

GPs<br />

%<br />

1<br />

4.55<br />

1<br />

4.55<br />

2<br />

9.09<br />

18<br />

81.82<br />

21<br />

95.45<br />

1<br />

4.55 0.00 0.00<br />

22<br />

100.00<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

3 15 4 19 2 1 22<br />

% 13.64 68.18 18.18 0.00 86.36 9.09 4.55 0.00 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

7 5 10 21 1 22<br />

% 0.00 31.82 22.73 45.45 95.45 0.00 4.55 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

9 11 1 1 18 2 2 22<br />

% 40.91 50.00 4.55 4.55 81.82 9.09 9.09 0.00 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

11 11 16 4 2 22<br />

% 50.00 50.00 0.00 0.00 72.73 18.18 9.09 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

11 10 1 18 2 2 22<br />

Block 5: Bhogarai<br />

% 50.00 45.45 4.55 0.00 81.82 9.09 9.09 0.00 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

32 29 3 32<br />

% 0.00 0.00 0.00 100.00 90.63 9.38 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

4 6 22 28 4 2 32<br />

% 0.00 <strong>12</strong>.50 18.75 68.75 87.50 <strong>12</strong>.50 6.25 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

4 6 22 28 4 32<br />

% 0.00 <strong>12</strong>.50 18.75 68.75 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

4 10 18 28 4 32<br />

% 0.00 <strong>12</strong>.50 31.25 56.25 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

Hospital (Indoor) No. of 8 6 18 28 4 32


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Hospital (only outdoor)<br />

Veterinary Dispensary<br />

LI Center<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Bus Stop (nearest) (specify)<br />

Railway Station (nearest) (specify)<br />

Hats/Markets<br />

Post Office<br />

Public Telephone Booth<br />

Block 6: Jaleswar<br />

<strong>District</strong> HQ<br />

Block HQ<br />

Tahasil HQ<br />

Police Station<br />

Hospital (Indoor)<br />

Hospital (only outdoor)<br />

Veterinary Dispensary<br />

LI Center<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Bus Stop (nearest) (specify)<br />

Railway Station (nearest) (specify)<br />

Hats/Markets<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

GPs<br />

% 0.00 25.00 18.75 56.25 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

5 11 9 7 28 4 32<br />

% 15.63 34.38 28.13 21.88 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 7 <strong>12</strong> 9 28 4 32<br />

% <strong>12</strong>.50 21.88 37.50 28.13 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

7 11 9 5 25 3 4 32<br />

% 21.88 34.38 28.13 15.63 78.13 9.38 <strong>12</strong>.50 0.00 100.00<br />

No. of<br />

GPs<br />

13 11 8 26 3 3 32<br />

% 0.00 40.63 34.38 25.00 81.25 9.38 9.38 0.00 100.00<br />

No. of<br />

GPs<br />

7 9 16 18 2 32<br />

% 0.00 21.88 28.13 50.00 56.25 6.25 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

32 28 4 32<br />

% 0.00 0.00 0.00 100.00 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 15 11 2 27 4 1 32<br />

% <strong>12</strong>.50 46.88 34.38 6.25 84.38 <strong>12</strong>.50 3.13 0.00 100.00<br />

No. of<br />

GPs<br />

1 31 28 4 32<br />

% 0.00 0.00 3.13 96.88 87.50 <strong>12</strong>.50 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

9 19 4 18 5 9 32<br />

% 28.13 59.38 <strong>12</strong>.50 0.00 56.25 15.63 28.13 0.00 100.00<br />

No. of<br />

GPs<br />

4 22 6 23 3 6 32<br />

% <strong>12</strong>.50 68.75 18.75 0.00 71.88 9.38 18.75 0.00 100.00<br />

No. of<br />

GPs<br />

9 19 4 25 5 2 32<br />

% 28.13 59.38 <strong>12</strong>.50 0.00 78.13 15.63 6.25 0.00 100.00<br />

No. of<br />

GPs<br />

27 27 27<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 15 8 24 3 27<br />

% 0.00 14.81 55.56 29.63 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

6 14 7 24 3 27<br />

% 0.00 22.22 51.85 25.93 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 <strong>12</strong> 11 24 3 27<br />

% 0.00 14.81 44.44 40.74 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 18 7 24 3 27<br />

% 0.00 7.41 66.67 25.93 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 9 <strong>12</strong> 4 23 3 1 27<br />

% 7.41 33.33 44.44 14.81 85.19 11.11 3.70 0.00 100.00<br />

No. of<br />

GPs<br />

6 17 4 24 3 27<br />

% 0.00 22.22 62.96 14.81 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 14 9 23 3 1 27<br />

% 14.81 51.85 33.33 0.00 85.19 11.11 3.70 0.00 100.00<br />

No. of<br />

GPs<br />

3 20 4 23 3 1 27<br />

% 0.00 11.11 74.07 14.81 85.19 11.11 3.70 0.00 100.00<br />

No. of<br />

GPs<br />

5 14 8 24 3 27<br />

% 0.00 18.52 51.85 29.63 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 15 8 24 3 27<br />

% 0.00 14.81 55.56 29.63 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

6 18 3 21 3 1 2 27<br />

% 22.22 66.67 11.11 0.00 77.78 11.11 3.70 7.41 100.00<br />

No. of<br />

GPs<br />

4 15 8 24 3 27<br />

% 0.00 14.81 55.56 29.63 88.89 11.11 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

5 18 4 20 3 2 2 27<br />

% 18.52 66.67 14.81 0.00 74.07 11.11 7.41 7.41 100.00


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

Post Office<br />

No. of<br />

GPs<br />

6 19 2 22 3 2 27<br />

% 22.22 70.37 7.41 0.00 81.48 11.11 7.41 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

6 19 2 22 3 2 27<br />

Block 7: Khaira<br />

% 22.22 70.37 7.41 0.00 81.48 11.11 7.41 0.00 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

30 28 2 30<br />

% 0.00 0.00 0.00 100.00 93.33 6.67 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

1 3 7 19 24 5 1 30<br />

% 3.33 10.00 23.33 63.33 80.00 16.67 3.33 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

1 3 7 19 24 5 1 30<br />

% 3.33 10.00 23.33 63.33 80.00 16.67 3.33 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

3 6 21 25 4 1 30<br />

% 0.00 10.00 20.00 70.00 83.33 13.33 3.33 0.00 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

6 7 17 24 4 2 30<br />

% 0.00 20.00 23.33 56.67 80.00 13.33 6.67 0.00 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

8 5 17 24 4 2 30<br />

% 0.00 26.67 16.67 56.67 80.00 13.33 6.67 0.00 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

1 2 6 21 23 5 2 30<br />

% 3.33 6.67 20.00 70.00 76.67 16.67 6.67 0.00 100.00<br />

LI Center<br />

No. of<br />

GPs<br />

4 19 7 23 5 2 30<br />

% 13.33 63.33 23.33 0.00 76.67 16.67 6.67 0.00 100.00<br />

Milk Collection center<br />

No. of<br />

GPs<br />

1 9 6 14 23 5 2 30<br />

% 3.33 30.00 20.00 46.67 76.67 16.67 6.67 0.00 100.00<br />

Agril. Input shops<br />

No. of<br />

GPs<br />

1 4 8 17 23 5 2 30<br />

% 3.33 13.33 26.67 56.67 76.67 16.67 6.67 0.00 100.00<br />

Municipality/NAC (nearest)<br />

(specify)<br />

No. of<br />

GPs<br />

% 0.00 0.00<br />

1<br />

3.33<br />

29<br />

96.67<br />

23<br />

76.67<br />

5<br />

16.67<br />

2<br />

6.67 0.00<br />

30<br />

100.00<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

2 17 7 4 23 5 2 30<br />

% 6.67 56.67 23.33 13.33 76.67 16.67 6.67 0.00 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

1 29 23 5 2 30<br />

% 0.00 0.00 3.33 96.67 76.67 16.67 6.67 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

19 9 2 23 5 2 30<br />

% 0.00 63.33 30.00 6.67 76.67 16.67 6.67 0.00 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

6 23 1 23 5 2 30<br />

% 20.00 76.67 0.00 3.33 76.67 16.67 6.67 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

6 23 1 23 5 2 30<br />

Block 8: Nilgiri<br />

% 20.00 76.67 3.33 0.00 76.67 16.67 6.67 0.00 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

25 24 1 25<br />

% 0.00 0.00 0.00 100.00 96.00 4.00 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

2 5 18 24 1 25<br />

% 0.00 8.00 20.00 72.00 96.00 4.00 0.00 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

2 5 18 24 1 25<br />

% 0.00 8.00 20.00 72.00 96.00 4.00 0.00 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

1 4 10 10 24 1 25<br />

% 4.00 16.00 40.00 40.00 96.00 4.00 0.00 0.00 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

2 5 10 8 24 1 25<br />

% 8.00 20.00 40.00 32.00 96.00 4.00 0.00 0.00 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

3 5 7 10 23 2 25<br />

% <strong>12</strong>.00 20.00 28.00 40.00 92.00 8.00 0.00 0.00 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

2 9 6 8 23 1 1 25<br />

% 8.00 36.00 24.00 32.00 92.00 4.00 4.00 0.00 100.00<br />

LI Center No. of 8 <strong>12</strong> 4 1 23 1 1 25


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Bus Stop (nearest) (specify)<br />

Railway Station (nearest) (specify)<br />

Hats/Markets<br />

Post Office<br />

Public Telephone Booth<br />

Block 9: Oupada<br />

<strong>District</strong> HQ<br />

Block HQ<br />

Tahasil HQ<br />

Police Station<br />

Hospital (Indoor)<br />

Hospital (only outdoor)<br />

Veterinary Dispensary<br />

LI Center<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Bus Stop (nearest) (specify)<br />

Railway Station (nearest) (specify)<br />

Hats/Markets<br />

Post Office<br />

Public Telephone Booth<br />

Block 10: Remuna<br />

<strong>District</strong> HQ<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

GPs<br />

% 32.00 48.00 16.00 4.00 92.00 4.00 4.00 0.00 100.00<br />

No. of<br />

GPs<br />

1 5 3 16 24 1 25<br />

% 4.00 20.00 <strong>12</strong>.00 64.00 96.00 4.00 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

4 4 7 10 23 1 1 25<br />

% 16.00 16.00 28.00 40.00 92.00 4.00 4.00 0.00 100.00<br />

No. of<br />

GPs<br />

2 6 17 23 1 1 25<br />

% 0.00 8.00 24.00 68.00 92.00 4.00 4.00 0.00 100.00<br />

No. of<br />

GPs<br />

8 13 3 1 23 1 1 25<br />

% 32.00 52.00 <strong>12</strong>.00 4.00 92.00 4.00 4.00 0.00 100.00<br />

No. of<br />

GPs<br />

25 25 25<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

6 14 2 3 21 2 2 25<br />

% 24.00 56.00 8.00 <strong>12</strong>.00 84.00 8.00 8.00 0.00 100.00<br />

No. of<br />

GPs<br />

8 15 2 21 1 3 25<br />

% 32.00 60.00 8.00 0.00 84.00 4.00 <strong>12</strong>.00 0.00 100.00<br />

No. of<br />

GPs<br />

8 15 1 1 21 2 2 25<br />

% 32.00 60.00 4.00 4.00 84.00 8.00 8.00 0.00 100.00<br />

No. of<br />

GPs<br />

11 9 2 11<br />

% 0.00 0.00 0.00 100.00 81.82 18.18 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

1 3 7 9 1 1 11<br />

% 0.00 9.09 27.27 63.64 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

3 3 5 9 1 1 11<br />

% 0.00 27.27 27.27 45.45 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

3 3 5 9 1 1 11<br />

% 0.00 27.27 27.27 45.45 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

5 6 9 1 1 11<br />

% 0.00 45.45 54.55 0.00 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

6 3 2 9 1 1 11<br />

% 0.00 54.55 27.27 18.18 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

7 3 1 9 1 1 11<br />

% 0.00 63.64 27.27 9.09 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

4 6 1 7 1 3 11<br />

% 36.36 54.55 9.09 0.00 63.64 9.09 27.27 0.00 100.00<br />

No. of<br />

GPs<br />

1 4 6 7 1 3 11<br />

% 0.00 9.09 36.36 54.55 63.64 9.09 27.27 0.00 100.00<br />

No. of<br />

GPs<br />

3 5 3 9 1 1 11<br />

% 0.00 27.27 45.45 27.27 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

2 1 8 9 2 11<br />

% 0.00 18.18 9.09 72.73 81.82 18.18 0.00 0.00 100.00<br />

No. of<br />

GPs<br />

7 4 8 1 2 11<br />

% 0.00 63.64 36.36 0.00 72.73 9.09 18.18 0.00 100.00<br />

No. of<br />

GPs<br />

4 7 9 1 1 11<br />

% 0.00 0.00 36.36 63.64 81.82 9.09 9.09 0.00 100.00<br />

No. of<br />

GPs<br />

4 6 1 7 1 3 11<br />

% 36.36 54.55 9.09 0.00 63.64 9.09 27.27 0.00 100.00<br />

No. of<br />

GPs<br />

5 6 7 1 3 11<br />

% 45.45 54.55 0.00 0.00 63.64 9.09 27.27 0.00 100.00<br />

No. of<br />

GPs<br />

4 7 7 1 3 11<br />

% 36.36 63.64 0.00 0.00 63.64 9.09 27.27 0.00 100.00<br />

No. of<br />

GPs<br />

28 28 28


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

1 5 <strong>12</strong> 10 25 3 28<br />

% 3.57 17.86 42.86 35.71 89.29 10.71 0.00 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

1 5 <strong>12</strong> 10 25 3 28<br />

% 3.57 17.86 42.86 35.71 89.29 10.71 0.00 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

1 5 9 13 25 3 28<br />

% 3.57 17.86 32.14 46.43 89.29 10.71 0.00 0.00 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

1 6 14 7 25 3 28<br />

% 3.57 21.43 50.00 25.00 89.29 10.71 0.00 0.00 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

1 <strong>12</strong> 11 4 25 3 28<br />

% 3.57 42.86 39.29 14.29 89.29 10.71 0.00 0.00 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

1 <strong>12</strong> 10 5 25 3 28<br />

% 3.57 42.86 35.71 17.86 89.29 10.71 0.00 0.00 100.00<br />

LI Center<br />

No. of<br />

GPs<br />

3 18 7 25 3 28<br />

% 10.71 64.29 25.00 0.00 89.29 10.71 0.00 0.00 100.00<br />

Milk Collection center<br />

No. of<br />

GPs<br />

1 6 15 6 25 3 28<br />

% 3.57 21.43 53.57 21.43 89.29 10.71 0.00 0.00 100.00<br />

Agril. Input shops<br />

No. of<br />

GPs<br />

1 2 <strong>12</strong> 13 25 3 28<br />

% 3.57 7.14 42.86 46.43 89.29 10.71 0.00 0.00 100.00<br />

Municipality/NAC (nearest)<br />

(specify)<br />

No. of<br />

GPs<br />

% 0.00 0.00 0.00<br />

28<br />

100.00<br />

28<br />

100.00 0.00 0.00 0.00<br />

28<br />

100.00<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

3 19 6 25 3 28<br />

% 10.71 67.86 21.43 0.00 89.29 10.71 0.00 0.00 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

28 28 28<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

6 18 4 25 3 28<br />

% 21.43 64.29 14.29 0.00 89.29 10.71 0.00 0.00 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

7 19 2 25 3 28<br />

% 25.00 67.86 7.14 0.00 89.29 10.71 0.00 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

9 19 25 3 28<br />

Block 11: Simulia<br />

% 32.14 67.86 0.00 0.00 89.29 10.71 0.00 0.00 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

17 17 17<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

1 3 5 8 17 17<br />

% 5.88 17.65 29.41 47.06 100.00 0.00 0.00 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

1 3 5 8 17 17<br />

% 5.88 17.65 29.41 47.06 100.00 0.00 0.00 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

1 3 5 8 17 17<br />

% 5.88 17.65 29.41 47.06 100.00 0.00 0.00 0.00 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

2 3 7 5 17 17<br />

% 11.76 17.65 41.18 29.41 100.00 0.00 0.00 0.00 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

1 6 6 4 17 17<br />

% 5.88 35.29 35.29 23.53 100.00 0.00 0.00 0.00 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

2 3 7 5 17 17<br />

% 11.76 17.65 41.18 29.41 100.00 0.00 0.00 0.00 100.00<br />

LI Center<br />

No. of<br />

GPs<br />

2 10 4 1 15 2 17<br />

% 11.76 58.82 23.53 5.88 88.24 0.00 11.76 0.00 100.00<br />

Milk Collection center<br />

No. of<br />

GPs<br />

10 6 1 15 2 17<br />

% 0.00 58.82 35.29 5.88 88.24 0.00 11.76 0.00 100.00<br />

Agril. Input shops<br />

No. of<br />

GPs<br />

1 4 7 5 17 17<br />

% 5.88 23.53 41.18 29.41 100.00 0.00 0.00 0.00 100.00<br />

Municipality/NAC (nearest) No. of 17 17 17


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

(specify) GPs<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

2 8 6 1 17 17<br />

% 11.76 47.06 35.29 5.88 100.00 0.00 0.00 0.00 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

3 6 8 16 1 17<br />

% 0.00 17.65 35.29 47.06 94.<strong>12</strong> 5.88 0.00 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

2 <strong>12</strong> 3 16 1 17<br />

% 11.76 70.59 17.65 0.00 94.<strong>12</strong> 0.00 5.88 0.00 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

2 14 1 15 2 17<br />

% 11.76 82.35 5.88 0.00 88.24 0.00 11.76 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

2 <strong>12</strong> 2 1 15 2 17<br />

Block <strong>12</strong>: Soro<br />

% 11.76 70.59 11.76 5.88 88.24 0.00 11.76 0.00 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

22 22 22<br />

% 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

1 10 11 22 22<br />

% 0.00 4.55 45.45 50.00 100.00 0.00 0.00 0.00 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

3 10 9 22 22<br />

% 0.00 13.64 45.45 40.91 100.00 0.00 0.00 0.00 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

3 10 9 22 22<br />

% 0.00 13.64 45.45 40.91 100.00 0.00 0.00 0.00 100.00<br />

Hospital (Indoor)<br />

No. of<br />

GPs<br />

2 2 7 11 22 22<br />

% 9.09 9.09 31.82 50.00 100.00 0.00 0.00 0.00 100.00<br />

Hospital (only outdoor)<br />

No. of<br />

GPs<br />

1 <strong>12</strong> 9 22 22<br />

% 0.00 4.55 54.55 40.91 100.00 0.00 0.00 0.00 100.00<br />

Veterinary Dispensary<br />

No. of<br />

GPs<br />

2 13 7 22 22<br />

% 0.00 9.09 59.09 31.82 100.00 0.00 0.00 0.00 100.00<br />

LI Center<br />

No. of<br />

GPs<br />

8 9 5 19 1 2 22<br />

% 36.36 40.91 22.73 0.00 86.36 4.55 9.09 0.00 100.00<br />

Milk Collection center<br />

No. of<br />

GPs<br />

5 10 7 19 1 2 22<br />

% 0.00 22.73 45.45 31.82 86.36 4.55 9.09 0.00 100.00<br />

Agril. Input shops<br />

No. of<br />

GPs<br />

2 3 9 8 22 22<br />

% 9.09 13.64 40.91 36.36 100.00 0.00 0.00 0.00 100.00<br />

Municipality/NAC (nearest)<br />

(specify)<br />

No. of<br />

GPs<br />

% 0.00<br />

3<br />

13.64<br />

10<br />

45.45<br />

9<br />

40.91<br />

22<br />

100.00 0.00 0.00 0.00<br />

22<br />

100.00<br />

Bus Stop (nearest) (specify)<br />

No. of<br />

GPs<br />

1 11 8 2 22 22<br />

% 4.55 50.00 36.36 9.09 100.00 0.00 0.00 0.00 100.00<br />

Railway Station (nearest) (specify)<br />

No. of<br />

GPs<br />

4 10 8 21 1 22<br />

% 0.00 18.18 45.45 36.36 95.45 4.55 0.00 0.00 100.00<br />

Hats/Markets<br />

No. of<br />

GPs<br />

8 6 8 21 1 22<br />

% 36.36 27.27 36.36 0.00 95.45 4.55 0.00 0.00 100.00<br />

Post Office<br />

No. of<br />

GPs<br />

15 5 2 18 1 3 22<br />

% 68.18 22.73 9.09 0.00 81.82 4.55 13.64 0.00 100.00<br />

Public Telephone Booth<br />

No. of<br />

GPs<br />

14 6 2 18 1 3 22<br />

<strong>District</strong> Total<br />

% 63.64 27.27 9.09 0.00 81.82 4.55 13.64 0.00 100.00<br />

<strong>District</strong> HQ<br />

No. of<br />

GPs<br />

0 9 7 273 271 16 1 1 289<br />

% 0.00 3.11 2.42 94.46 93.77 5.54 0.35 0.35 100.00<br />

Block HQ<br />

No. of<br />

GPs<br />

4 37 90 158 255 29 6 1 289<br />

% 1.38 <strong>12</strong>.80 31.14 54.67 88.24 10.03 2.08 0.35 100.00<br />

Tahasil HQ<br />

No. of<br />

GPs<br />

4 42 88 155 253 30 4 2 289<br />

% 1.38 14.53 30.45 53.63 87.54 10.38 1.38 0.69 100.00<br />

Police Station<br />

No. of<br />

GPs<br />

4 49 97 139 256 29 3 1 289


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Type of Administrative<br />

Units/Service Facilities<br />

Hospital (Indoor)<br />

Hospital (only outdoor)<br />

Veterinary Dispensary<br />

LI Center<br />

Milk Collection center<br />

Agril. Input shops<br />

Municipality/NAC (nearest)<br />

(specify)<br />

Bus Stop (nearest) (specify)<br />

Railway Station (nearest) (specify)<br />

Hats/Markets<br />

Post Office<br />

Public Telephone Booth<br />

Source: Primary Survey, 2010<br />

Details<br />

0 km<br />

Distance from Panchayats Type of Road<br />

10 km<br />

Pucca Road<br />

Semi Pucca<br />

Kutcha<br />

Fair<br />

weather<br />

Road<br />

% 1.38 16.96 33.56 48.10 88.58 10.03 1.04 0.35 100.00<br />

No. of<br />

GPs<br />

10 57 100 <strong>12</strong>2 251 33 4 1 289<br />

% 3.46 19.72 34.60 42.21 86.85 11.42 1.38 0.35 100.00<br />

No. of<br />

GPs<br />

19 93 94 83 242 39 6 2 289<br />

% 6.57 32.18 32.53 28.72 83.74 13.49 2.08 0.69 100.00<br />

No. of<br />

GPs<br />

15 73 107 94 241 40 7 1 289<br />

% 5.19 25.26 37.02 32.53 83.39 13.84 2.42 0.35 100.00<br />

No. of<br />

GPs<br />

60 164 55 10 226 40 21 2 289<br />

% 20.76 56.75 19.03 3.46 78.20 13.84 7.27 0.69 100.00<br />

No. of<br />

GPs<br />

14 76 96 103 228 41 18 2 289<br />

% 4.84 26.30 33.22 35.64 78.89 14.19 6.23 0.69 100.00<br />

No. of<br />

GPs<br />

13 54 92 130 240 28 8 1 289<br />

% 4.50 18.69 31.83 44.98 83.04 9.69 2.77 0.35 100.00<br />

No. of<br />

GPs<br />

1 26 46 216 261 23 4 1 289<br />

% 0.35 9.00 15.92 74.74 90.31 7.96 1.38 0.35 100.00<br />

No. of<br />

GPs<br />

42 163 65 19 237 36 10 6 289<br />

% 14.53 56.40 22.49 6.57 82.01 <strong>12</strong>.46 3.46 2.08 100.00<br />

No. of<br />

GPs<br />

0 34 54 201 263 22 4 0 289<br />

% 0.00 11.76 18.69 69.55 91.00 7.61 1.38 0.00 100.00<br />

No. of<br />

GPs<br />

63 172 47 7 226 35 22 6 289<br />

% 21.80 59.52 16.26 2.42 78.20 <strong>12</strong>.11 7.61 2.08 100.00<br />

No. of<br />

GPs<br />

87 186 15 1 220 44 24 1 289<br />

% 30.10 64.36 5.19 0.35 76.<strong>12</strong> 15.22 8.30 0.35 100.00<br />

No. of<br />

GPs<br />

92 180 15 2 224 41 19 5 289<br />

% 31.83 62.28 5.19 0.69 77.51 14.19 6.57 1.73 100.00<br />

E: Block wise no. of Gram Panchayat prone to natural calamities<br />

Block Details<br />

Flood Tsunami<br />

Prone to<br />

Cyclone<br />

Sea<br />

Aggressions<br />

Drought<br />

Total No.<br />

of GPs<br />

Bahanaga<br />

No. of GPs<br />

%<br />

8<br />

38.10<br />

6<br />

28.57<br />

21<br />

100.00<br />

6<br />

28.57<br />

0.00<br />

0.00<br />

21<br />

100.00<br />

<strong>Balasore</strong> No. of GPs 10 9 27 8 27<br />

Sadar % 37.04 33.33 100.00 29.63 0.00 100.00<br />

Baliapal<br />

No. of GPs<br />

%<br />

14<br />

51.85<br />

27<br />

100.00<br />

27<br />

100.00<br />

6<br />

22.22 0.00<br />

27<br />

100.00<br />

Basta<br />

No. of GPs<br />

%<br />

11<br />

50.00<br />

2<br />

9.09<br />

18<br />

81.82<br />

0<br />

0.00<br />

5<br />

22.73<br />

22<br />

100.00<br />

Bhogarai<br />

No. of GPs<br />

%<br />

14<br />

43.75<br />

6<br />

18.75<br />

32<br />

100.00<br />

8<br />

25.00 0.00<br />

32<br />

100.00<br />

Jaleswar<br />

No. of GPs<br />

%<br />

13<br />

48.15<br />

1<br />

3.70 0.00<br />

0<br />

0.00 0.00<br />

27<br />

100.00<br />

Khaira<br />

No. of GPs<br />

%<br />

5<br />

16.67 0.00<br />

17<br />

56.67<br />

0<br />

0.00<br />

19<br />

63.33<br />

30<br />

100.00<br />

Nilagiri<br />

No. of GPs<br />

%<br />

8<br />

32.00 0.00<br />

<strong>12</strong><br />

48.00<br />

0<br />

0.00<br />

16<br />

64.00<br />

25<br />

100.00<br />

Oupada<br />

No. of GPs<br />

%<br />

0<br />

0.00<br />

0<br />

0.00<br />

7<br />

63.64<br />

0<br />

0.00<br />

5<br />

45.45<br />

11<br />

100.00<br />

Remuna<br />

No. of GPs<br />

%<br />

<strong>12</strong><br />

42.86<br />

4<br />

14.29 0.00<br />

4<br />

14.29<br />

28<br />

100.00<br />

28<br />

100.00<br />

Simulia<br />

No. of GPs<br />

%<br />

6<br />

35.29<br />

0<br />

0.00<br />

0<br />

0.00<br />

0<br />

0.00<br />

0<br />

0.00<br />

17<br />

100.00<br />

Soro<br />

No. of GPs<br />

%<br />

8<br />

36.36 0.00<br />

16<br />

72.73 0.00<br />

16<br />

72.73<br />

22<br />

100.00<br />

<strong>District</strong> No. of GPs 74 38 100 16 84 289<br />

Total<br />

% 25.61 13.15 34.60 5.54 29.07 100.00<br />

Source: Primary Survey, 2010


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

F: Details of Cyclone Shelter established in <strong>Balasore</strong> district<br />

Block<br />

OSDMA<br />

Scheme/Programme<br />

Red Cross Society PMNRF CMRF<br />

Total<br />

Bahanaga 2 3 11 14 30<br />

<strong>Balasore</strong> 3 <strong>12</strong> 39 54<br />

Baliapal 7 5 13 1 26<br />

Basta 0 0 0 0 0<br />

Bhograi 4 4 14 1 23<br />

Jaleswar 0 0 0 1 1<br />

Khaira 0 0 6 2 8<br />

Nilgiri 0 0 5 1 6<br />

Oupada 0 0 2 0 2<br />

Remuna 4 0 6 9 19<br />

Simulia 0 0 7 1 8<br />

Soro 1 0 20 14 35<br />

Total 21 <strong>12</strong> 96 83 2<strong>12</strong><br />

Indicators<br />

G: Land use pattern in different Blocks (% to total geographical area)<br />

Bahanaga<br />

<strong>Balasore</strong><br />

Baliapal<br />

Basta<br />

Bhogarai<br />

Jaleswar<br />

Forest<br />

58<br />

(0.23)<br />

293<br />

(0.67)<br />

0<br />

(0.00)<br />

0<br />

(0.00)<br />

88<br />

(0.26)<br />

0 (0.00)<br />

260<br />

(0.80)<br />

1925<br />

(7.81)<br />

827<br />

(4.86)<br />

54<br />

(0.18)<br />

116<br />

(0.56)<br />

28<br />

(0.<strong>12</strong>)<br />

3649<br />

(1.07)<br />

Miscellaneous<br />

tree crops<br />

and grooves<br />

538<br />

(2.16)<br />

317<br />

(0.73)<br />

1021<br />

(3.73)<br />

546<br />

(2.06)<br />

2964<br />

(8.61)<br />

580<br />

(1.62)<br />

497<br />

(1.52)<br />

235<br />

(0.95)<br />

118<br />

(0.69)<br />

490<br />

(1.62)<br />

344<br />

(1.66)<br />

264<br />

(1.15)<br />

7914<br />

(2.32)<br />

Permanent 750 2930 500 820 918 690 1543 3088 562 1437 765 1019 15022<br />

pastures<br />

(3.02) (6.74) (1.83) (3.11) (2.67) (1.93) (4.73) (<strong>12</strong>.52) (3.30) (4.76) (3.69) (4.44) (4.41)<br />

Cultivable 942 2210 2999 836 1755 1832 1329 2206 191 1978 628 1699 18605<br />

waste<br />

(3.79) (5.08) (10.96) (3.17) (5.10) (5.11) (4.08) (8.94) (1.<strong>12</strong>) (6.55) (3.03) (7.40) (5.46)<br />

Land under<br />

Non-agril.<br />

uses<br />

2450<br />

(9.85)<br />

3937<br />

(9.06)<br />

3532<br />

(<strong>12</strong>.91)<br />

3268<br />

(<strong>12</strong>.39)<br />

3861<br />

(11.21)<br />

5194<br />

(14.49)<br />

2996<br />

(9.19)<br />

2186<br />

(8.86)<br />

460<br />

(2.71)<br />

4586<br />

(15.18)<br />

2733<br />

(13.19)<br />

2332<br />

(10.15)<br />

37535<br />

(11.02)<br />

Barren &<br />

uncultivable<br />

land<br />

1890<br />

(7.60)<br />

637<br />

(1.46)<br />

1384<br />

(5.06)<br />

<strong>12</strong>8<br />

(0.49)<br />

1445<br />

(4.20)<br />

336<br />

(0.94)<br />

1948<br />

(5.98)<br />

2055<br />

(8.33)<br />

10108<br />

(59.44)<br />

77<br />

(0.25)<br />

0 (0.00)<br />

79<br />

(0.34)<br />

20087<br />

(5.90)<br />

Current<br />

1139 2004 1034 721 1803 2<strong>12</strong>2 627 565 <strong>12</strong>2 1167 900 849 13053<br />

Fallows<br />

(4.58) (4.61) (3.78) (2.73) (5.23) (5.92) (1.92) (2.29) (.72) (3.86) (4.34) (3.70) (3.83)<br />

Other Fallows<br />

581<br />

(2.33)<br />

<strong>12</strong>25<br />

(2.82)<br />

269<br />

(0.98)<br />

383<br />

(1.45)<br />

1165<br />

(3.38)<br />

489<br />

(1.36)<br />

340<br />

(1.04)<br />

391<br />

(1.59)<br />

38<br />

(0.22)<br />

199<br />

(0.66)<br />

503<br />

(2.43)<br />

166<br />

(0.72)<br />

5749<br />

(1.69<br />

Net sown 16524 29920 16628 19677 20446 24597 23062 <strong>12</strong>0<strong>12</strong> 4579 20227 14727 16532 218931<br />

area<br />

(66.44) (68.83) (60.76) (74.59) (59.36) (68.63) ( 70.74) (48.70) (26.93) (66.94) (71.09) (71.98) (64.29)<br />

Geographical 24872 43473 27367 26379 34445 35840 32602 24663 17005 30215 20716 22968 340545<br />

area<br />

(100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00) (100.00)<br />

Source: <strong>District</strong> Statistical Handbook<br />

H: Topography in different Blocks of the district<br />

Type of Topography<br />

Block<br />

Bahanaga<br />

<strong>Balasore</strong><br />

Baliapal<br />

Basta<br />

Bhogarai<br />

Jaleswar<br />

Khaira<br />

Nilagiri<br />

Oupada<br />

Remuna<br />

Simulia<br />

Details<br />

Hilly area<br />

Undulated<br />

Close to<br />

sea<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure – XVIII<br />

Khaira<br />

Waterlogge<br />

d<br />

Nilgiri<br />

Forest<br />

village<br />

Oupada<br />

Any other<br />

Remuna<br />

Simulia<br />

Soro<br />

Total No. of GPs<br />

No. of GPs 1 2 7 6 0 0 21<br />

% 4.76 9.52 33.33 28.57 0.00 0.00 100.00<br />

No. of GPs 1 8 2 27<br />

% 0.00 3.70 29.63 7.41 0.00 0.00 100.00<br />

No. of GPs 2 5 2 27<br />

% 0.00 7.41 18.52 7.41 0.00 0.00 100.00<br />

No. of GPs 1 4 2 22<br />

% 0.00 4.55 0.00 18.18 9.09 0.00 100.00<br />

No. of GPs 1 9 10 6 32<br />

% 0.00 3.13 28.13 31.25 18.75 0.00 100.00<br />

No. of GPs 6 3 27<br />

% 0.00 0.00 22.22 11.11 0.00 0.00 100.00<br />

No. of GPs 6 1 1 6 30<br />

% 20.00 3.33 0.00 3.33 20.00 0.00 100.00<br />

No. of GPs 11 4 10 25<br />

% 44.00 0.00 0.00 16.00 40.00 0.00 100.00<br />

No. of GPs 10 1 7 11<br />

% 90.91 0.00 0.00 9.09 63.64 0.00 100.00<br />

No. of GPs 2 2 28<br />

% 7.14 0.00 0.00 0.00 7.14 0.00 100.00<br />

No. of GPs 7 2 17<br />

% 0.00 0.00 0.00 41.18 11.76 0.00 100.00<br />

<strong>District</strong><br />

(Total)


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block<br />

Details<br />

Hilly area<br />

Undulated<br />

Type of Topography<br />

Close to<br />

sea<br />

Total No. of GPs<br />

Soro<br />

No. of GPs<br />

%<br />

3<br />

13.64 0.00 0.00<br />

4<br />

18.18<br />

4<br />

18.18 0.00<br />

22<br />

100.00<br />

<strong>District</strong> Total<br />

No. of GPs<br />

%<br />

27<br />

9.34<br />

6<br />

2.08<br />

20<br />

6.92<br />

30<br />

10.38<br />

27<br />

9.34<br />

0<br />

0.00<br />

289<br />

100.00<br />

Source: Primary Survey, 2010<br />

I: Different category of land in <strong>Balasore</strong> district<br />

Blocks<br />

High Land<br />

Area %<br />

Medium Land<br />

Area %<br />

Low Land<br />

Area %<br />

Total<br />

Area %<br />

Bahanaga 1037 2.86 9213 9.36 8560 7.49 19810 7.91<br />

<strong>Balasore</strong> 3526 9.74 <strong>12</strong>030 <strong>12</strong>.22 11944 10.45 29050 11.59<br />

Baliapal 3591 9.92 7253 7.37 9566 8.37 20410 8.15<br />

Basta 3313 9.15 7073 7.19 11444 10.01 21830 8.71<br />

Bhograi 2536 7.00 9432 9.58 9532 8.34 21500 8.58<br />

Jaleswar 5194 14.35 8017 8.15 14609 <strong>12</strong>.78 27820 11.10<br />

Khaira 2805 7.75 3755 3.82 16350 14.30 21910 8.74<br />

Nilgiri 3372 9.31 7191 7.31 6737 5.89 17300 6.90<br />

Oupada 3929 10.85 6025 6.<strong>12</strong> 2366 2.07 <strong>12</strong>320 4.92<br />

Remuna 5904 16.31 9130 9.28 7816 6.84 22850 9.<strong>12</strong><br />

Simulia 540 1.49 9710 9.87 6440 5.63 16710 6.67<br />

Soro 457 1.26 9597 9.75 8986 7.86 19040 7.60<br />

<strong>District</strong><br />

(Total)<br />

36204 100 98426 100 114350 100 250550 100<br />

J: Soil test data for CD Blocks of <strong>Balasore</strong> district<br />

Block No. of sample Analyzed<br />

Acid tral<br />

pH (%)<br />

Neualine Alk (N)<br />

Av Nutrient Index<br />

Org. C Av. p Av. k<br />

Bahanaga 2199 45 52 3 1.75 1.10 2.10<br />

<strong>Balasore</strong> 3818 37 57 6 1.76 1.16 1.69<br />

Baliapal 2573 55 40 5 1.67 1.76 1.68<br />

Basta 2863 55 40 5 1.71 1.60 1.58<br />

Bhograi 1906 37 60 3 1.80 1.19 2.07<br />

Jaleswar 3319 37 58 5 1.81 1.<strong>12</strong> 1.84<br />

Khaira 2951 49 47 4 1.85 1.05 1.96<br />

Nilgiri 1991 47 51 2 1.73 1.04 1.93<br />

Oupada 1566 47 50 3 1.97 1.52 1.99<br />

Remuna 3137 39 56 5 1.34 1.14 1.91<br />

Simulia 1843 42 52 6 1.63 1.37 1.75<br />

Soro 2391 46 51 3 1.68 1.14 1.93<br />

<strong>District</strong> (Total) 30557 44 51 5 1.76 1.25 1.97<br />

K. Operational Land Holding Size (% of farmer in different categories)<br />

Operational Land Holding Size<br />

Block Marginal Small<br />

Semi-medium<br />

Medium Large Farmers<br />

(10.00 ha)<br />

Bahanaga<br />

<strong>12</strong>765<br />

(67.43)<br />

6062<br />

(32.02)<br />

-<br />

105<br />

(0.55)<br />

-<br />

<strong>Balasore</strong><br />

19650<br />

(55.79)<br />

11348<br />

(32.22)<br />

3865<br />

(10.97)<br />

356<br />

(1.01)<br />

-<br />

Baiiapal<br />

<strong>12</strong>358<br />

(48.20)<br />

<strong>12</strong>210<br />

(47.62)<br />

1072<br />

(4.18)<br />

- -<br />

Basta<br />

8302<br />

(39.00)<br />

<strong>12</strong><strong>12</strong>6<br />

(56.96)<br />

7<strong>12</strong><br />

(3.34)<br />

143<br />

(0.67)<br />

5<br />

(0.02)<br />

Bhograi<br />

19424<br />

(53.14)<br />

15253<br />

(41.73)<br />

1536<br />

(4.20)<br />

325<br />

(0.89)<br />

15<br />

(0.04)<br />

Jaleswar<br />

14708<br />

(52.14)<br />

<strong>12</strong>456<br />

(44.15)<br />

-<br />

1046<br />

(3.71)<br />

-<br />

Khaira<br />

11665<br />

(48.30)<br />

8149<br />

(33.75)<br />

-<br />

4335<br />

(17.95)<br />

-<br />

Nilgiri<br />

3654<br />

(24.53)<br />

10308<br />

(69.20)<br />

465<br />

(3.<strong>12</strong>)<br />

373<br />

(2.51)<br />

95<br />

(0.64)<br />

Oupada<br />

15357<br />

(68.98)<br />

6834<br />

(30.69)<br />

53<br />

(0.24)<br />

20<br />

(0.09)<br />

-<br />

Remuna<br />

<strong>12</strong>424<br />

(60.81)<br />

6836<br />

(33.46)<br />

978<br />

(4.79)<br />

180<br />

(0.88)<br />

<strong>12</strong><br />

(0.06)<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure – XVIII<br />

Waterlogge<br />

d<br />

Forest<br />

village<br />

Any other<br />

Total<br />

18932<br />

(100.00)<br />

35219<br />

(100.00)<br />

25640<br />

(100.00)<br />

2<strong>12</strong>88<br />

(100.00)<br />

36553<br />

(100.00)<br />

28210<br />

(100.00)<br />

24149<br />

(100.00)<br />

14895<br />

(100.00)<br />

22264<br />

(100.00)<br />

20430<br />

(100.00)


Simulia<br />

Soro<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block<br />

<strong>District</strong> (Total)<br />

Marginal<br />

(10.00 ha)<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure – XVIII<br />

-<br />

107<br />

(0.60)<br />

234<br />

(0.08)<br />

Total<br />

17050<br />

(100.00)<br />

17850<br />

(100.00)<br />

282480<br />

(100.00)


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

PROPOSED LIST OF WORK TO BE UNDERTAKEN UNDER GGY DURING <strong>2011</strong>-<strong>12</strong><br />

Annexure - XIX<br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

1 Bahanaga Anji Anji Construction of pucca ghat and excavation of Baishnab sahi pokhari 3.50<br />

2 Bahanaga Baripada Balarampur Improvement of road from Balarampur defence road to Mati Godia road 4.00<br />

3 Bahanaga Avana Alada Improvement of road from Barajduli defence road to Biswal sahi 5.00<br />

4 Bahanaga Dandaharipur Keshpur Renovation of Keshpur Harekrushna Das pokhari 4.00<br />

5 Bahanaga Chaka Jagannathpur Talapatana Improvement of road from CC road to Nachinta PS road via Mandal Sashan 4.00<br />

6 Bahanaga Kharasahapur Ramdha Construction of road from Ramdha Sudarsan Sahu chhak to Mahalik sahi 5.00<br />

7 Bahanaga Saud Talasada Construction of CC road from Talasada digi pokhari to Jamuna pokhari 4.00<br />

8 Bahanaga Sahaspura Sahaspura Improvement of road from Hatapada to Harihata pada 4.00<br />

9 Bahanaga Talakurunia Rahaniaganj Improvement of road from ITR mechine chhak to Rahaniaganj Badhi sahi via Mangala sahi 5.00<br />

10 Bahanaga Aruhabad Aruhabad Improvement of road from Baishna Majhi house to Surendra Sahu house road 4.00<br />

11 Bahanaga Bahanaga Daradia Improvement of road from Daradia Mohanty sahi Naba tank to Sathi Mangala temple 5.00<br />

<strong>12</strong> Bahanaga Bishnupur Bishnupur Improvement of road from Acharya sahi chhak to Baunsa padia via Biswal sahi 3.50<br />

13 Bahanaga Chittol Podadhiha Improvement of road from Podadiha ITR road to Ramachandra Sial house 2.50<br />

14 Bahanaga Kasab Jayapur Jirtal Improvement of road from NH-5 to Jugal sasan 4.00<br />

15 Bahanaga Kochiakoili Kochiakoili Construction of road from Barik sahi to Mahalik sahi 2.50<br />

16 Bahanaga Khantapada Suthanga Improvement of road from Mohanty sahi 2.50<br />

17 Bahanaga Kalyani Gilida Earth & morum work from Mahadev mandir to Purna Patra house 2.50<br />

18 Bahanaga Kuruda Kuruda Improvement of road from Manguli Diha to Purna Chandrapur road 2.50<br />

19 Bahanaga Patharpentha Patharpetha Earth & morum work of Badamba sahi road 5.00<br />

20 Bahanaga Panpana Sarastia Earth, morum & culvert work from Kuber sahi CC road to Mahadev mandir, via Rama Pati house 5.00<br />

21 Bahanaga Gopalpur Fatepur Improvement of road from Junia to Fatepur Dola padia via Patra sahi 4.00<br />

22 Bahanaga Anji Kharida Construction of pucca ghat and renovation of Kharida Sanrua pokhari 3.00<br />

23 Bahanaga Baripada Maharudrapur Improvement of road from Maharudrapur hata chhak to Mahisa sahi road 4.00<br />

24 Bahanaga Baripada Karanjabinda Improvement of road from Karanjabinda Bishnu house to main chhak 3.00<br />

25 Bahanaga Avana Barajadeuli Excavation of Sai Sagar pokhari 3.00<br />

26 Bahanaga Dandaharipur Aruha Earth & morum work from Chhatrali RD road to Rout sahi 4.00<br />

27 Bahanaga Chaka Jagannathpur Attapur Improvement of road from Dasarathi house to Giridhari Jena house 2.00<br />

28 Bahanaga Kharasahapur Baramhapur Construction of road from Keshpur Gunthuna chhak to Patra sahi 5.00<br />

29 Bahanaga Kharasahapur Kharasahapur Construction of Sahada bridge 1.00<br />

30 Bahanaga Saud Pakhara Construction of pucca ghat and excavation of pokhari 5.00<br />

31 Bahanaga Sahaspura Sahaspura Construction of new tank at Machhantapada 5.00<br />

32 Bahanaga Talakurunia Rahaniaganj Improvement of road from imcomplete Redhua astha pada to Gobind Sahu house 5.00<br />

33 Bahanaga Aruhabad Rupkhand Improvement of road from Susil Pradhan house to Kartik Mahalik house via Bangala sahi 2.00<br />

34 Bahanaga Aruhabad Dolpur Improvement of road from Mangala mandir to Mathei pokhari road 5.00<br />

35 Bahanaga Bahanaga Sathi Improvement of road from Talapada road to Sathi Primary School 3.00<br />

36 Bahanaga Bishnupur Debendrapur Construction of drain from Baudev mandir to Bainga 2.00<br />

37 Bahanaga Bishnupur Debendrapur Improvement of road from Bali Padhi chhaka to Basudev mandir via Padhi sahi and Panigrahi sahi 2.00<br />

38 Bahanaga Chittol Podadhiha Improvement of road from Podadiha PMGSY road to PMGSY road via Narasingha Barik house 3.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

39 Bahanaga Kasab Jayapur Alasuan Stone packing & Construction of pucca ghat of Barika pokhari 4.00<br />

40 Bahanaga Kasab Jayapur Kasab Jayapur Stone packing near of GP pokhari 5.00<br />

41 Bahanaga Kochiakoili Kochiakoili Construction of PS road to Sankhua sahi road via Baina Panda house 2.00<br />

42 Bahanaga Khantapada Naichhanapur Improvement of road from Naichhanapur road to Rama Nagar road 2.00<br />

43 Bahanaga Khantapada Mulakudhai Improvement of road from RD road to Adibasi sahi 2.00<br />

44 Bahanaga Kalyani Villa Construction of drain from Padhi pokhari to Sethi sahi 2.00<br />

45 Bahanaga Kalyani Kalyani Construction of drain at Samuka gohiri 2.00<br />

46 Bahanaga Kuruda Kuruda Improvement of road from PMGSY road to Tudi pokhari via Baranei 2.00<br />

47 Bahanaga Patharpentha Patana Earth & morum work from Bhavani Malik sahi to RD road and Bihari sahi road 3.00<br />

48 Bahanaga Patharpentha Patharpetha Earth & morum work from Raimahal School to RD road via Ratha padia 5.00<br />

49 Bahanaga Panpana Begunia Excavation of Barunei Thakurani pokhari 5.00<br />

50 Bahanaga Gopalpur Nadigira Excavation of Nadigira gohira tank 2.00<br />

51 Bahanaga Gopalpur Gopalpur Improvement of road from Antariyami Panda house to Sethi sahi 5.00<br />

Sub Total 180.00<br />

1 <strong>Balasore</strong> Bahabalpur Bahabalpur Construction.of C.C road from Sasanka Sekhar Das house to Amulya Mali house 4.00<br />

2 <strong>Balasore</strong> Buanla Kudia Construction. of CC road from Chhatrapur Bhikari Jena's house to Kudia Balabhadra Pati's house 4.00<br />

3 <strong>Balasore</strong> Chhanua Silda Construction of CC road at Silda, via-Upendra Malik house 4.00<br />

4 <strong>Balasore</strong> Genguti Khannagar Improvement of road from khannagar RD road to Raul sahi road via Majhi dalei sahi 4.00<br />

5 <strong>Balasore</strong> Gopinathpur Jaganathpur Construction.of CC road from Dasa Sahi to Mohanty Sahi 4.00<br />

6 <strong>Balasore</strong> Gudu Gudu Construction.of CC road from Rout Sahi chhak to Andhari Mangala chhak 4.00<br />

7 <strong>Balasore</strong> Haldipada Rainsuan Construction.of CC road from Maheswar Sahu house to Jaladhar Mohalik house 5.00<br />

8 <strong>Balasore</strong> Hidigan Salapada Construction. of CC road from Salapada School to Rabindra Malik house 4.00<br />

9 <strong>Balasore</strong> J. Kasaba Jayadebkasaba Construction.of CC road from ITR road to Mangala chhak via-Raghunath Behera house 2.50<br />

10 <strong>Balasore</strong> Kasafal Sarthabindha Construction.of CC road from Sartha Bindha culvert to Babu chhak 3.50<br />

11 <strong>Balasore</strong> Kasipada Rupasasamil Hasanpur Construction.of CC road from Jalia sahi chhak to Podadiha railway station chhak 3.50<br />

<strong>12</strong> <strong>Balasore</strong> Kuradiha Sanadhanadi Construction.of CC road from Sitaram Behera house to Santosh Dhal house via-Sandhanadi School 3.50<br />

13 <strong>Balasore</strong> Nagram Nagram Construction.of CC road from Nagram PMGSY road Babu Dalei house to Naba Das house 3.50<br />

14 <strong>Balasore</strong> O.Saragan Oupal Construction.of CC road from RD road to Oupal 3.50<br />

15 <strong>Balasore</strong> Odangi Silod Construction.of CC road from Silad Mahadev mandir to Purusottam Tapsi house 2.50<br />

16 <strong>Balasore</strong> Padampur Majhikia Construction.of CC road from Srinibas Tubewell chhak to Dula chhak via-Abhirapada 2.50<br />

17 <strong>Balasore</strong> Patrapada Chak Simulia Construction of CC road from Chaka-Simulia Antaryami Bhuyan house to ITR road 5.00<br />

18 <strong>Balasore</strong> Ranasahi Jhagadapadhi Construction. of CC road and drain from RD road to Ranjan Bhuyan house, Jhagadpahi 2.50<br />

19 <strong>Balasore</strong> Rasalpur Bhimpur Construction of CC road from Bhimpur Madhu Das house to Nakula Mohanty house 4.00<br />

20 <strong>Balasore</strong> Rasulpur Rasulpur Construction of CC road from Sankarnath road to Mohalik Sahi via Pati sahi 3.50<br />

21 <strong>Balasore</strong> Saragan Dalsusa Construction.of CC road from Ratikanta Behera chhak to Gendua Dalei house via Behera sahi road 3.50<br />

22 <strong>Balasore</strong> Sartha Sartha Construction. of CC road from Sartha Barendra house to Surendra Pradhan house chhak 3.50<br />

23 <strong>Balasore</strong> Sasanga Saraswatipur Construction. of CC road from Saraswatipur Dayanidhi Das house to Hrushi Das house (Tubewell chhak) 3.50<br />

24 <strong>Balasore</strong> Srikona Chandipur Construction. of CC road from Chandipur chhak gate to Bhiguram Das house 5.00<br />

25 <strong>Balasore</strong> Srirampur Gunduripada Construction.of CC road from Uttarsahi CC road to Dakhina sahi via Abani Gochhayat house 2.50<br />

26 <strong>Balasore</strong> Bahabalpur DubulaGadi Construction of CC road from Abhimanyu Pradhan house to Nani Gopal Maity house 2.50<br />

27 <strong>Balasore</strong> Buanla Parikul Construction of CC road from Shiva Narayan Mohapatra house to Samiti road 1.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

28 <strong>Balasore</strong> Chhanua Bhadrasia Construction of CC road on Bhadrasia pokhari adi with drain 2.00<br />

29 <strong>Balasore</strong> Genguti Pachhudia Construction of CC road from Pal Master chhak to Goura Sahu chhak 5.00<br />

30 <strong>Balasore</strong> Gopinathpur Jagganathpur Construction of CC road from Jagannathpur club to Prasanna Khatua house 1.00<br />

31 <strong>Balasore</strong> Gudu Sahada Construction of CC road in Sahada Kajipatana sahi 3.00<br />

32 <strong>Balasore</strong> Haldipada Nayapada Construction of CC road from railway line to old. NH-60 via-Lenka sahi Hema river 5.00<br />

33 <strong>Balasore</strong> J. Kasaba Jayadebkasaba Construction of CC road from Netaji Sporting Club to Hudapada, Jayadev Kasaba Pahi 3.00<br />

34 <strong>Balasore</strong> Kasafal Kasafal Construction of CC road from Kasafal GP Office chhak to Tarada Bodhia via-B.C High School 4.00<br />

35 <strong>Balasore</strong> Kasipada Rupasasamil Hasanpur Construction of CC road from Kendudangiri boarder to Bhagabati mandap 2.00<br />

36 <strong>Balasore</strong> Kuradiha Paramanandapur Construction of CC road from Paramanandapur (ward No.11) Kotha house to Pada main road via-Raghunath Mohalik house 3.00<br />

37 <strong>Balasore</strong> Nagram Kahanrakul Construction of CC road from Maa Mangala Thakurani to Maheswar Mohanty house Kaharakul"A" 1.50<br />

38 <strong>Balasore</strong> O.Saragan Potagaon Construction of CC road in village Potagaon 1.00<br />

39 <strong>Balasore</strong> Odangi Narsingpur Completion of CC road from Narasinghpur main road to Mohapatra sahi 1.00<br />

40 <strong>Balasore</strong> Padampur Bankeswar Construction of CC road & drain from Bankeswar School to Hari Sahoo house via Niranjan Das house 5.00<br />

41 <strong>Balasore</strong> Parikhi Kayakadala Construction of CC road from Adivasi sahi chhak to Masjid 5.00<br />

42 <strong>Balasore</strong> Patrapada Ghisuan Construction of CC road from Mohan Das house to Sridhar Das house 2.00<br />

43 <strong>Balasore</strong> Ranasahi Dasigaon Construction of CC road from RD road to Chunia Mallik house via Laxminarayan mandap chhak 1.00<br />

44 <strong>Balasore</strong> Rasalapur Kusumuli Construction of CC road from ITR road to ITR road via-Natha house and Subal Jena house 3.00<br />

45 <strong>Balasore</strong> Rasulpur Kusadiha Construction of CC road at Kusadiha Uttar Pradhan sahi via-Sudhir Pradhan sahi 2.00<br />

46 <strong>Balasore</strong> Saragan Sunduri Constructionof W.H.S at Sundari village 5.00<br />

47 <strong>Balasore</strong> Sartha Sartha Construction of CC road from Sartha RD road to Kunja Bihari Ghosh house 3.50<br />

48 <strong>Balasore</strong> Sasanga Nuapur Construction of CC road from Nuapur chhatara chhak to Basanti mandap 3.00<br />

49 <strong>Balasore</strong> Sindhia Pakhrabad Construction of CC road from Kartik Majhi house to Benapadia barghachha 1.50<br />

50 <strong>Balasore</strong> Sindhia Madhusudanpur Construction of CC road from Muruda Brahmana sahi chhak to Harihat mandap CC road 5.00<br />

51 <strong>Balasore</strong> Srirampur Binjha Construction of CC road from incomplete CC road to incomplete CC road 1.00<br />

Sub Total 163.50<br />

1 Baliapal Kumbhari Guapada Construction. of CC road from Guapada Sub-station to Subarnarekha nadi ghat. 3.50<br />

2 Baliapal Jambhirai Jambhirai Construction. of CC road from Jambhirai Rali chhak to Senapati chhak via Dakhin Jambhirai U.P School 3.50<br />

3 Baliapal Jambhirai Jambhirai Construction. of CC road from Jambhari 11 No Ward Debanath chhak to Nuagan Fish market. 3.50<br />

4 Baliapal Nikhira Nikhira Construction. of CC road from Nikhira R.D road Sambhunath Giri house to Balikhana 3.50<br />

5 Baliapal Asti Pardipa Construction. of CC road from padia Sub-station to Bhagabat Giri house 3.50<br />

6 Baliapal Ghantua Ghantua Construction. of CC road from Ghantua Ganachakra to Bansidhara Pradhan house 3.50<br />

7 Baliapal Betagadia Kasipur Construction. of CC road from Kasipur main road to Narayana pur Pareshazira chhak via Betagadia 2.50<br />

8 Baliapal Deula Kaupada Construction of CC road from Kaupada Arun Giri house to Basudvpur end 2.50<br />

9 Baliapal Srirampur Gokulanandapur Construction. of CC road from Gokulanandapur Sambhunath Jena house to R.D. road via- N. Dey. 2.50<br />

10 Baliapal Aladiha Badanpur Construction. of CC road from Badanpur CC road to Kulhabag. 2.50<br />

11 Baliapal Bishnupur Ikadapal Construction. of CC road from Ikardapal Rahasa mandap to High School, via Chhatigohiri 2.50<br />

<strong>12</strong> Baliapal Baliapal Kachuapada Construction. of CC road from Kachuapada Telephone Exchange to P. Jena 2.50<br />

13 Baliapal Jamkunda Kalaruhi Construction of CC road from Kalaruhi irrigation bandha to Jhadeswar Mandal house 2.50<br />

14 Baliapal Balikuti Mahabala Construction of CC road from Dakhin Mahabalabhanu Samanta house to gochar pada 2.50<br />

15 Baliapal Bolong Teluni Construction of CC road from Teluni Prasad Dalei house to Krupasindhu Nayak house 3.50<br />

16 Baliapal Pratappur Pratappur Construction of CC road from Pratappur Das chhak to Arta Biswal pokhari 3.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

17 Baliapal Baniadiha Banidiha Construction of CC road from Baniadiha Brundaban Sahu house to Sub-station 3.50<br />

18 Baliapal Kunduli Talanendua Construction of CC road from Talanendua Janmejay Sahoo house to Siva mandir 3.50<br />

19 Baliapal Devog Devog Construction of CC road from Devog SCS to Basanta Mohanty house 3.50<br />

20 Baliapal Dagara Jugadiha Construction of CC road from Jugadiha Jadupatra house to Nadi Pakha 2.00<br />

21 Baliapal Jagatipur Karanj Construction of CC road from Karanja Pagal chhak to Daitari Mohanty chhak 3.50<br />

22 Baliapal Chaumukh Chaumukh Construction of CC road from Kankadapal Santoshi puja chhak to Pipilli School 2.00<br />

23 Baliapal Nuagan Kataramahal Construction of CC road from Arjun Giri chhak to Krushna Barik chhak 3.50<br />

24 Baliapal Panchupali Kalasimuli Construction of CC road from Kalasimuli Ajay Halar chhak to main road 3.50<br />

25 Baliapal Madhupura Badasimulia Construction. of CC road from Madhupura GP Office Badasimulia to Basta Baliapal PWD road 4.00<br />

26 Baliapal Balarampur Balarampur Construction of CC road from Balarampur Girija Shankar house to Bhasakr Sahu house 3.50<br />

27 Baliapal Kumbhari Kumbhari Construction of CC road from Kumbhari Adhikari sahi chhak to R.D road via Bikash Mohapatra house 5.00<br />

28 Baliapal Kumbhari Sunakania Construction of CC road from Sunakania Primary School to Narendra Sahu house. 2.00<br />

29 Baliapal Jambhirai Jambhirai Construction of CC road from Jambhirai Kulhari chhak to Makaramela via Kali mandir 2.50<br />

30 Baliapal Nikhira Taladhanda(1) Construction of CC road from Taladhanda Harijan sahi irrigation to Amulya Badu house. 3.00<br />

31 Baliapal Asti Parulia Construction of CC road from Parulia Harekrushna Pradhan house to Mangala 5.00<br />

32 Baliapal Ghantua Dharmadura Construction of CC road from Dharmadura Saohurasanta house to Manpur end 2.00<br />

33 Baliapal Bodas Kathasagada Construction of CC road from Kathasagada main road Bansikaran chhak to Pakamundi Nodal School 5.00<br />

34 Baliapal Betagadia Kasipur Construction of CC road from Kasipur Deeptabewell to Betagadia road 2.00<br />

35 Baliapal Deula Kalajathia Construction of CC road from Kalajathia Behera chhak to U.P. School. 2.00<br />

36 Baliapal Deula Basudevpur Construction of CC road from Basudevpur School to Kushadiha 3.00<br />

37 Baliapal Srirampur Dhanda Construction of CC road from Dhanda Kinaram Jena house to Ratna Kar gula pokhari. 2.00<br />

38 Baliapal Aladiha Chandamani Construction of CC road from Chandamani High School to Ramanath Pradhan house 3.00<br />

39 Baliapal Bishnupur Bishnupur Construction of CC road from Mukha pokhari to chada sahi ,via Bijay Sahoo 4.00<br />

40 Baliapal Baliapal Kudmansingh Construction of CC. road from Kudmansingh Rahasa mandap to chada Mangala mandap. 5.00<br />

41 Baliapal Jamkunda Kalaruhi Construction of CC road from Kalaruhi irrigation bandha to west Mandal sahi 1.00<br />

42 Baliapal Balikuti Mahabala Construction of CC road from Mahabala irrigation bandha to Barik sahi via Natha sahi 3.00<br />

43 Baliapal Balikuti Demuria Construction of CC road from Demuria Chiittabinodan Kendra to Kantabani Adibasi sahi 2.00<br />

44 Baliapal Bolong Budhirani Construction of CC road from Budhirani to Saudi road 2.00<br />

45 Baliapal Pratappur Routarapur Construction of CC road from Routarapur Netai Club to Gautam Patra 4.00<br />

46 Baliapal Pratappur Naighati Construction of CC road from Naighati Kamila house to Siva mandir 3.00<br />

47 Baliapal Baniadiha Jhinkiria Construction of CC road from Jhinkiria Sadhu Dhal house to Bhanupur CC 2.00<br />

48 Baliapal Kunduli Tailokya Construction of CC road from Tailokya Siba mandir to Pry School 2.00<br />

49 Baliapal Devog Khalamuhani Construction of CC road from Khalamuhani LI Point to Kupa 4.00<br />

50 Baliapal Jagatipur Karanj Construction of CC road from Karanja Baligudia to Kishore Das chhak 3.00<br />

51 Baliapal Chaumukh Chaumukh Construction of CC road from Chuamukh Kanakadapal UGME School chhak to Sea shore 2.00<br />

52 Baliapal Nuagan Kataramahal Construction of CC road from Kataramahal Gajendra Chakrabarty chhak to Jhadeswar Nayak chhak 3.00<br />

53 Baliapal Panchupali Panchupali Construction of CC road from Panchupali GP Office to main road 2.50<br />

54 Baliapal Panchupali Kalasimuli Construction of CC road from Laxmikanta Das chhak to Chitta Das chhak 3.00<br />

55 Baliapal Madhupura Panchakhurukhi Construction of CC road from Panchukhurukhi to Jamkunda irrigation bandha 3.00<br />

56 Baliapal Balarampur Balarampur Construction of CC road from Balarampur Sasti mandap to Sankarnatha Mahadev mandap 3.00<br />

Sub Total 168.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

1 Basta Kulida Tentulia Improvement of embankment from Tentulia village Hadibandhu Dhal's house to Kulida pucca bridge 2.50<br />

2 Basta Putura Dandakut Construction of drain from Paramananda Das house Sudhir Parida house to main road 2.50<br />

3 Basta Sahada Kainagari Improvement of road from Kainagari Michua Bazar to Nodal School 2.50<br />

4 Basta Irda Machada Construction of CC road from Machada Club to Sankrshan Prusti house 2.50<br />

5 Basta Purusottampur Sundarkuli Improvement of road from Sundarkuli Shiva mandir to mandir chhak with drain 3.50<br />

6 Basta Purusottampur Biripada Improvement of CC road from Biripada Gadadhara Sahoo to Chandra Sekhar Shiva mandir 2.50<br />

7 Basta Chormara Chormara Construction of CC road from Adlmapur Susanta Parida house to Post Office 4.00<br />

8 Basta Routpada Batirangi Improvement of CC road from Batirangi CC road to Routpada sima via railway gate 4.00<br />

9 Basta Sadanandapur Machia Improvement of road from Kartik Kundu house to Kendupada 4.00<br />

10 Basta Gadapada Gadapada Improvement of CC road from Baburam Sing house to Sisira Sing house 5.00<br />

11 Basta Gadapada Jahata Improvement of CC road from Kalki Narayan to Apartikoi 3.50<br />

<strong>12</strong> Basta Darada Chakarda Improvement of road from UP school to Bhandari wadi via Mandal sahi CC road 5.00<br />

13 Basta Naikudi Agatamala Improvement of CC road from Sidheswar Parida house to Rabindra Das house 4.00<br />

14 Basta Naikudi Bagsahi Improvement of CC road from PWD road to Pitambar Mishra house 2.50<br />

15 Basta Mukulisi Sitapur Improvement of CC road from Mukulishi Barada road to Sitapur Paschim sahi 4.00<br />

16 Basta Mukulisi Chhachina Improvement of road from Chhachina Pradhan sahi to OT road 2.50<br />

17 Basta Natakata Panchabatia Improvement of road from Panchabatia Mahadev to Bhagabati mandir 3.50<br />

18 Basta Raghunathpur Ambakudichi Improvement of CC road from Khilar house chhak to Atul Senapati house 3.50<br />

19 Basta Brahmada Sadanadapur Construction of drain from Sadanandapur village mandir to Pichu road via Srusti Behera house 3.50<br />

20 Basta Paunsakuli Nabda Imp of CC road from Nabda Gouri Patra house to Begunia Sima 2.50<br />

21 Basta Paunsakuli Masada Imp of CC road from Masada PMGSY road to Mahadev mandir 2.50<br />

22 Basta Nabara Nabara Improvement of road from Kara Pola to Nabara High School road 2.50<br />

23 Basta Singla Jamusil Improvement of CC road from Jamosala RD road to Sanjeeb Nayak house 4.00<br />

24 Basta Tadada Tadada Improvement of CC road from Gopal Mohapatra house to Bentapur pond 3.50<br />

25 Basta Tadada Simulia Improvement of CC road from Simulia bazar to Simulia Mahadev temple 3.50<br />

26 Basta Mathani Sankhudi Improvement of CC road from Sanakhudi Krushna house to Gadadhar house 3.50<br />

27 Basta Santoshpur Dhitpura Improvement of CC road of Dhitpura main road 3.50<br />

28 Basta Santoshpur Santoshpur Improvement of CC road Satoshpur Kartikeswar mandap to main road via Mohanty sahi ana Pada sahi 4.00<br />

29 Basta Baharda Machhia Improvement of C.C. road from Machhia polo to EGS School and Pipe to Thampu Murmu house. 2.50<br />

30 Basta Kulida Tentulia Improvement of CC road from Tentulia Prasanna Behera's house to Banshidhara Hati's house 3.00<br />

31 Basta Putura Tentula Improvement of road from Tentula School to Nabara sima 3.00<br />

32 Basta Sahada Kainagari Improvement of road from Kainagari tubewell to Dhala sahi with culvert 3.00<br />

33 Basta Irda Gambalundi Construction of CC road Gambhalundi village road 5.00<br />

34 Basta Purusottampur Sarisa Improvement of CC road from Mandei chhak to Purusottampur via Tribrikrama Panda with drain 5.00<br />

35 Basta Chormara Chormara Construction of CC road from Chormara Pradhan sahi chhak to Samaj Padia 5.00<br />

36 Basta Routpada Nuagaon Improvement of CC road from Sub-station chhak to Bhagbat Das house via Bishnu Charan Rout 3.00<br />

37 Basta Gadapada Haripur Improvement of CC road from Haripur Bidyadhara Biswal house to Bhuyan sadak 5.00<br />

38 Basta Sadanandapur Badabazar Construction of embankment & pucca ghat at Mahentar pokhari 4.00<br />

39 Basta Gadapada Lachhamankhunta Improvement of CC road from Nabid Das house to Manu Sing house 4.00<br />

40 Basta Sadanandapur Kusudiha Improvement of road from A.Behera house to Tala sahi of Bhagabat Behera house with drain. 5.00<br />

41 Basta Darada Palasia Improvement of road from Raghunath Sur house to School 4.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

42 Basta Naikudi Baya Improvement of CC road from Adibasi sahi to Baya School 3.00<br />

43 Basta Mukulisi Renuapada Improvement of CC road from Renuapada Rout sahi chhak to Dakhin sahi CC road 4.00<br />

44 Basta Natakata Bela Improvement of road from Bela School to Pathuria CC road 5.00<br />

45 Basta Raghunathpur Beli Improvement of CC road from R.D. road to Rana sahi end 3.00<br />

46 Basta Brahmada Dubulia Improvement of road from Dubulia village School to Purna Nayak house 5.00<br />

47 Basta Paunsakuli Sonepur Improvement of CC road from Sonepur Sena house to Nabda Sima 4.00<br />

48 Basta Nabara Jamalpur Improvement of CC road from Jamalpur Pradeep Mishra chhak to Anama Panda house 5.00<br />

49 Basta Singla Singla Construction of CC road from RD road to Jena sahi east adi bandha 4.00<br />

50 Basta Tadada Shyamraipur Improvement of CC road from Shyamraipur Mahadev temple to Hadibandhu Das house 4.00<br />

51 Basta Mathani Paikapada Improvement of CC road of Paikapada Mahata sahi road 4.00<br />

52 Basta Santoshpur Benuapara Improvement of CC road from Baruni padia to Bharat Mahalik house 4.00<br />

53 Basta Baharda Punisita Improvement of road from Punisita Sudarshan Das house to Pegarpada M.E. School. 5.00<br />

Sub Total 196.00<br />

1 Bhograi Sankhari Nashkarpur Improvement of road from Balabhadra Sahu to Umakanta Pradhan house. 3.50<br />

2 Bhograi Gunsartha Kalyanpur Improvement of road from Naba Pradhan house to Srihari Mohanty house via Umakanta Singh 5.00<br />

3 Bhograi Nimatpur Kuchiladangar Pipe water supply infront of Tarapur School at Kuchiladangar 3.50<br />

4 Bhograi Kakhada Mandari Water supply in village Mandari 3.50<br />

5 Bhograi Sradhapur Palasia Construction of CC road from Purna Jena chhak to Chaksarbani CC road village Palasia 2.00<br />

6 Bhograi Nachinda Kharidchak Construction of CC road from Kharidchak Basuli Thakurani to Ramesh Dey hosue 3.50<br />

7 Bhograi Rasalpur Kumbhirgadi Construction of CC road from Kumbhirgadi Pranakrushna Sahu house to Subarnarekha river via Bishnupada Pradhan 3.00<br />

8 Bhograi T.Hazira Sanausa Water supply in village Sanausa 5.00<br />

9 Bhograi Bajitpur Sandova Construction of CC road from Sandova Rajani Jena house front to Bajitpur boarder 2.00<br />

10 Bhograi Balim Budhakusumi Construction of CC road from Budhakusumi Harisamaj CC road to Ranjan Rasmi Chand house 2.00<br />

11 Bhograi Barbatia Kukudia Construction of CC road from Purna Kar shop to Kukudia Bankim Sahu chhak 2.00<br />

<strong>12</strong> Bhograi Barbatia Bahabalpur Construction of CC road from Bahabalpur Baneswar Pattanaik house PMGSY road to Debasis Panda house 2.00<br />

13 Bhograi Bhograi Polasia Construction of CC road from RD road to Narayan Jena house 3.00<br />

14 Bhograi Deula Saraswatipur Construction of CC road from Saraswatipur Arun Das house to Saraswatipur H. School Via Narayan Jena 3.00<br />

15 Bhograi Guneibasan Naiduli Water supply near Naiduli School 3.00<br />

16 Bhograi Analia Nasirabad Construction of CC road from Haripada Mohanty chhak to Satish Mohanty chhak 3.00<br />

17 Bhograi Hooguli Gazipur Construction of CC road from Gajipur Usman Khan house to Naichhanpur boarder 2.50<br />

18 Bhograi Jayrampur Kathakata Construction of CC road from UP school to Basanta Dalai house 2.00<br />

19 Bhograi K.Bhaunri Bichitrapur Construction of CC road from Sunil Das house to Kartik ch.Patra house via Bichitrapur Pry School 4.00<br />

20 Bhograi Mandarsahi Bhanjabasan Construction of CC road from Bhanjabasan to Ganeswarpur U.P School via Barajamahal rasta. 2.00<br />

21 Bhograi Nahara Saintapata Water supply near the land of Biswajit Khatua south-west boarder. 2.00<br />

22 Bhograi Soharia Raipur Water supply 3.00<br />

23 Bhograi Sultanpur Bagrukhi Construction of CC road Masina adi R.D road to via Benudhar Jena Girija Shankar Tripathy house. 3.00<br />

24 Bhograi Baunsadiha Chakeisab Construction of CC road from Suresh Das house to Udayhari Mohanty via Santoshi mandap 3.50<br />

25 Bhograi Dahunda Dahunda Construction of CC road from Raghunath Das CC road to Sibasahi sarat boarder via Dahunda School chhak 3.00<br />

26 Bhograi Gopinathpur Basudevpur Construction of CC road from Chaturbhuja Mohanty hosue to Surendra Sahu hosue culvert 3.00<br />

27 Bhograi K.Kamarda Barbatia Construction of CC road from Barbatia CC road end point to Kusuda RD road 3.00<br />

28 Bhograi Mohagab Chandakusumi Construction of CC road from Abanti Behera house to Srihari Dey chhak via Amulya Behera house 5.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

29 Bhograi Kusuda Nilpura Construction of CC road from Nilpura Anjan Pal house to Pradip Dutta house via Nateswari mandap 3.00<br />

30 Bhograi NM Padia NM Padia Construction of CC road from NM Padia School chhak to Khetramohan Giri house 5.00<br />

31 Bhograi Dehurda Santeghari Construction of CC road from Narayan Sahu bettle farm to coast canal 3.00<br />

32 Bhograi Sankhari Jagannathpur Water supply in village Jagannathpur 5.00<br />

33 Bhograi Gunsartha Uplahat Construction of road from Bipin Majhi matha to Jayanta Bhuyan chhak via Balabhadra Dinda shop 2.00<br />

34 Bhograi Nimatpur Nimatpur Construction of CC road road from Nimatpur hat to Nimatpur boarder via Ananta Sahu house 5.00<br />

35 Bhograi Sradhapur Khadibil Construction of CC road from Forest Office Binod Jena house to Haripada Bej chhaka 3.00<br />

36 Bhograi Nachinda Jaladha Construction of CC road from Jaladha Ramesh Dhal culvert to Hedapoada(Mulari Dhal) 5.00<br />

37 Bhograi Rasalpur Adangapantei Construction of CC road from Abaniti Majhi hosue CC road to Pheri ghat 5.00<br />

38 Bhograi T.Hazira Fulbanikhas Construction of CC road from Fulbanikhas Khagendra Jena house to Shanti Nagar boarder 4.00<br />

39 Bhograi Bajitpur Sahapur Construction of CC road from Sahapur Gambhari boarder to Hemanta Senapati house 2.00<br />

40 Bhograi Balim Balikida Construction of CC road from Amidhangadia to Balikida Bhima Kamila house 2.00<br />

41 Bhograi Barbatia Bagard Construction of road from Bagard Barendra Panda house to Mohanal. 3.00<br />

42 Bhograi Barbatia Debdha Construction of CC road from Debdha PMGSY road to Basuli mandir with guard wall and pola 2.00<br />

43 Bhograi Bhograi Polasia Construction of CC road from Bipin Sahu house to Ma Manasa mandir 3.00<br />

44 Bhograi Deula Suasuni Construction of CC road from Suasuni Purna chandra Patra house to Daxin Nidhubani 3.00<br />

45 Bhograi Analia Nisanpur Construction of CC road from Nisanpur Subodh Jena house to Kalika mandir 3.00<br />

46 Bhograi Hooguli Naichhanpur Construction of road from Sailesh Pradhan house to Ramapada Das. 2.00<br />

47 Bhograi Jayrampur Kathakata Construction of CC road from Khadikabadi boarder hume pipe to Tube well in village Kathakata 2.00<br />

48 Bhograi K.Bhaunri Ransinghpur-II Construction of CC road from Purna Pattayat house to Bhenda pokhari via Amulya Pattayat 5.00<br />

49 Bhograi Mandarsahi Haripur Construction of CC road from Haripur Sadananda Patra house Mandarsahi Patna Sitala temple 2.00<br />

50 Bhograi Mandarsahi Ganeswarpur Construction of road from Sub-station to Ganeswarpur hat via Pattanayak sahi. 3.00<br />

51 Bhograi Nahara Kanpur Water supply near Mahadev temple. 3.00<br />

52 Bhograi Putina Uladi Construction of CC road from Uladi CC road to Kukudabhadi 3.00<br />

53 Bhograi Sultanpur Bagrukhi Construction of CC road from Sadasiv Behera chhak to Bagrukhi pola via UP School 3.00<br />

54 Bhograi Baunsadiha Mukulis pur Construction of CC road from PWD road to Talapokhari via Banshidhar Pradhan 2.00<br />

55 Bhograi Dahunda Dahunda Construction of CC road from Dahunda School chhak to Chatra bata via Bhaskar Sahu CC road 3.00<br />

56 Bhograi K.Kamarda Barbatia Construction of CC road from M Singh house to Suresh Ch Singh house via huller machine 3.00<br />

57 Bhograi Khridpipal Barbatia Construction of CC road from Barbatia Radhamohan Deo house to Narendra Nath Jena 5.00<br />

58 Bhograi Kusuda Purusottampur Construction of CC road from Purusottampur ADB road to Raspada via Jhagadeswar temple 3.00<br />

59 Bhograi Kusuda Gujadiha Construction of CC road from Gujadiha Harishankar Panda house to Samaj badi 2.00<br />

60 Bhograi NM Padia Chandrabali Construction of CC road from Chandrabali UP School to Balagobinda chhak 3.00<br />

61 Bhograi Dehurda Banabasan Construction of CC road from west Banabasan Girish Jena house to village boarder 1.00<br />

Sub Total 188.00<br />

1 Jaleswar Aruha Salikotha Construction. of CC road from Siba Giri gate to Madan gadia via Banabasuli 2.50<br />

2 Jaleswar Baiganbadia Kantapal Construction.of CC road from Irrigatrion bandha Kantapal CC.road via Sanskrit Tool. 5.00<br />

3 Jaleswar Baradiha Baradiha Construction.of CC road from Nuhapada School to Gopal Baske house. 2.50<br />

4 Jaleswar Chamargan Bhandarkulli Construction. of CC road from Santipur road to Aparti Ghosh bila 5.00<br />

5 Jaleswar Chamargan Taradighi Construction of CC road from Shantipur road to UP School 3.00<br />

6 Jaleswar D.P.Pur Praharajpur Construction of CC road from Kashaphala chhak to Ram Patra chhak(Praharajpur) with drain 3.00<br />

7 Jaleswar G.M. Pur GMPur Construction of CC road from Krupasindhu Das house to Sankha Muha 1.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

8 Jaleswar Kaliko Kaliko Pipe water supply at Dudhiakhali village 2.50<br />

9 Jaleswar Khalina Khalina Construction of CC road from Guthuna to Mahadev mandir via Naba Sit 2.50<br />

10 Jaleswar Khuard Khuard Construction of CC road from Mahuduma Satyaban Das house to Mahadev mandir 2.50<br />

11 Jaleswar K.M. Sahi Beherasahi Construction.of CC road of Gopal Dandapat house to Nakachana via Bhalukabasa. 2.50<br />

<strong>12</strong> Jaleswar L.Nath Gobarghata Construction of CC road from Bhagban Ghosh chhak to Singa house 3.00<br />

13 Jaleswar Makidia Kaunarpur Construction of CC road from Kaunarpur School chhak to Pada 2.00<br />

14 Jaleswar Naschimpur Ambaliatha Construction of CC road from Tanuja Nandy house to RD road Markanda Patra 2.50<br />

15 Jaleswar Nampo Tilopata Construction.of CC road from Chandi Bhuyan house to R.D.road via Umakant Mohanty. 2.00<br />

16 Jaleswar Netua Netua Construction of CC road from Sugo Kamarsalia RD road to Netua Nishi Kanta house via Banshidhar Jena 3.00<br />

17 Jaleswar Paikasida Chitamishra Construction.of CC road from M.E.School to Benga Das. 2.00<br />

18 Jaleswar Paschimbard Devkumar Construction of CC road from Bhuyan pokhari to Manicha chhak and Gourideipatna Srinibash Jena house 2.50<br />

19 Jaleswar R.R. Pur Gobardhanpur Construction of CC road from Siva Mandir to Nadighata via Abhilash Jena 3.00<br />

20 Jaleswar Raibania Raibania Construction of CC road from RD road to Brahman pokhari 2.50<br />

21 Jaleswar Rajpur Rajpur Construction of CC road from Shankar Biswal house to Nagendra Nayak 3.00<br />

22 Jaleswar Shyamnagar Kanpur Construction of CC road from Kanpur to Demburbani 2.00<br />

23 Jaleswar Sardarbandh Palasabani Construction.of CC road from Palasabani to Patharchatia. 2.00<br />

24 Jaleswar Sikharpur Sikharpur Construction of CC road from Bhanu Mohanty house to PMGSY road 5.00<br />

25 Jaleswar Srirampur Srikanthapur Construction.of CC road from Madhusudan Behera house to Narasingha 2.00<br />

26 Jaleswar Sugo Banidia Construction of CC road from Gobardhan Pada to Kamal Lochan house via Galibandha road 2.50<br />

27 Jaleswar Olmara Rajnagar Construction of CC road of School road 2.00<br />

28 Jaleswar Aruha Chakbaban Construction of CC road from Bhanucharan Mohanty land to Basanta Paital 2.00<br />

29 Jaleswar Baiganbadia JhadapImprovemental Construction of CC.road from Sitarani Jena house to R.D.road via Harendra Nath Jena 5.00<br />

30 Jaleswar Baradiha Kalama Construction of CC.road from Gundurisole Kartik Das house to School. 2.50<br />

31 Jaleswar Bartana Khuluda Construction of CC road from Mahadev mandir to Dillip chhak 5.00<br />

32 Jaleswar Chamargan Chafla Construction of CC road from OT road to Rout sahi 3.00<br />

33 Jaleswar D.P.Pur D.P.Pur Construction of CC road from D.P Pur CC road to Mahala sahi 2.50<br />

34 Jaleswar G.M. Pur Sarsida Construction of CC road from Benudhar Barik house to Ananda Bazar via Parida sahi 3.00<br />

35 Jaleswar Kaliko Bhadua Construction of CC road from Bhadua Mahadev mandir to Upendra Mohanty house 3.00<br />

36 Jaleswar Khalina Sarisa Construction of CC road from Baunsamula to Rajkishore Panda via Badapada 2.00<br />

37 Jaleswar Khalina Ekada Construction of CC road from Ekada School to Mahadev mandir 2.50<br />

38 Jaleswar Khuard Purunapani Construction of CC road from Mita Barik house to Pravakar Gandhi 1.00<br />

39 Jaleswar K.M. Sahi Beherasahi Construction of CC.road of Malu Behera house to Pramila Behera house 2.50<br />

40 Jaleswar L.Nath Gobarghata Construction of CC road from Surendra Behera chhak to Nadibandha road 2.00<br />

41 Jaleswar L.Nath Gopa Street Light at Gopa Mahajania 1.00<br />

42 Jaleswar Makidia Gopalprasad Construction of CC road from Gopal Prasad main road to Bigyan Pati house 2.00<br />

43 Jaleswar NaschImprovementur Ambaliatha Construction of CC road from PWD road to Keuta pada via Brundaban Senapati 2.50<br />

44 Jaleswar NaschImprovementur Deula Construction of CC road from Shankar Jena house to Banshidhar Sahu via Jhadeswar Rout 3.00<br />

45 Jaleswar Nampo Demuria Construction of CC.road from P.W.D. road to Nilakantha Jena via Jayanta Hui. 1.00<br />

46 Jaleswar Netua Netua Construction of CC road from Sugo Kamrasalia RD road to Banshidhar Behera house 2.00<br />

47 Jaleswar Paikasida G.Baliapal. Construction of CC.road from Bhupati Giri house to Raidhenka khala . 2.00<br />

48 Jaleswar Paikasida Keshpura Electrification at Brajendra Behera chhak 2.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

49 Jaleswar Paikasida Keshpura Construction of CC.road from Dhal house bridge tota 3.00<br />

50 Jaleswar Paschimbard Paschimbard Pipe water supply at Hedapada 2.00<br />

51 Jaleswar R.R. Pur RRPur Construction of CC road from Malgadia Post Office PMGSY road to irrigation bandha road 5.00<br />

52 Jaleswar Raibania Raibania Construction of CC road from VAS centre to Kedar Nath Das house 2.50<br />

53 Jaleswar Rajpur Rajpur Construction of CC road from Durga Shankar Bhuyan house to Bidyadhar Patra 2.00<br />

54 Jaleswar Shyamnagar Chandrapur Construction of of CC road from Brajendra Mahanta house to Chandrapur Budhbadam 2.00<br />

55 Jaleswar Sardarbandh Chudamanipur Construction of CC.road from Chudamanipur chhak to Bengal road via Nagen house. 3.00<br />

56 Jaleswar Sardarbandh Sardarbandha Construction of CC.road of Dobakasahi to Kitajhori via.Bodam road. 1.00<br />

57 Jaleswar Sikharpur Mahulia Construction of CC road from Mahulia sahi chhak to Biswanath Behera house 2.00<br />

58 Jaleswar Srirampur Malipal Construction of CC.road from main road to Kumuda house. 2.00<br />

59 Jaleswar Srirampur Gurudaspur Construction of CC.road from Radhakrushna house via Narayan boarder. 1.00<br />

60 Jaleswar Sugo Banidia Construction of CC road from JBC road to School Adibasi sahi 2.50<br />

61 Jaleswar Olmara Rajnagar Construction of CC road of Rajnagar sadar ghat 2.00<br />

Sub Total 155.00<br />

1 Khaira Nandoor Nandoor Construction of Kacheri bandha 3.00<br />

2 Khaira Kaithagaida Sananuagan Development of road from Sananuagan CC road to Gadapokhari road 5.00<br />

3 Khaira Baunsagadia Baunsagadia Construction of road from Ramada Tantisahi to Ramada sahi with ghat 5.00<br />

4 Khaira Jhinkiria Jhinkiria Construction. of road from Jhinkiria Routsahi to Begunia Sub-minor canal with culvert 3.00<br />

5 Khaira Barada Rasuna Construction. of road from Rasuna CC road to Harijansahi 2.50<br />

6 Khaira Mahatipur Gopalabedha Construction of Gopalabedha Kasi Ambila bandha 5.00<br />

7 Khaira Ratina Ratina Construction. of road from Tumbhapadia road Ratina subminor cross bandha via Sanabandha with culvert 5.00<br />

8 Khaira Dagarapada Ogalpur Improvement of road from Raikula to Aradi road via: - Pandasahi 1.50<br />

9 Khaira Kurunta Kurunta Construction of road from Kurunta Adibasi sahi 2.00<br />

10 Khaira Badajaypur Badajaypur Construction of road from Behera sahi to Krushnapur canal 3.00<br />

11 Khaira Palasa Arjunpur Construction. of road from Arjunpur to Talamahuri patana sahi 3.00<br />

<strong>12</strong> Khaira Gobindpur Sahapur Improvement of incomplete CC road to Thakurani 5.00<br />

13 Khaira Gadapokhari Gagua Construction. of road from Gopi Biswal house to Matha 3.00<br />

14 Khaira Jalada Sadikpur Improvement of road from transformer chhak to Das sahi 2.00<br />

15 Khaira Nayakhandi Bachakhunta Construction of road from Majhi Sahi to Upper Sahi 5.00<br />

16 Khaira Manitri Tentulia Construction of road from Tentulia School tank to ghat 3.00<br />

17 Khaira Barttana Sain Construction of CC road from Sain Durga mandap to chhak 5.00<br />

18 Khaira Kupari Kupari Construction of CC road from Baghua sahi to Main canal 3.00<br />

19 Khaira Dungura Barunapadi Construction. of road from Behera sahi to Aliha 2.50<br />

20 Khaira Baunsagadia Baunsagadia Construction of road from Baunsagadia UGME School to Baunsagadia Kolha sahi with ghat 2.00<br />

21 Khaira Gaganadhuli Malikapur Construction of Kiagadia bandha 3.00<br />

22 Khaira Haripur Haripur Construction of Bmajana to Patagadia road with culvert 2.00<br />

23 Khaira Rapeya Rapeya Improvement of road from Antara Dhauli to Pathi road 2.00<br />

24 Khaira Khaira Natapada Construction of road from Harihata to Bidanta sahi 2.00<br />

25 Khaira Sarugaon Dahipur Construction of road from Jagannath mandir to Sanskrit School 2.00<br />

26 Khaira Garasang Garasang Construction of road from Harijansahi to Kumbhuka road 1.50<br />

27 Khaira Shyamsundarpur Jhatia Construction of Bahalibandha 3.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

28 Khaira Achyatipur Mundia Construction of new road from Upra Samal sahi to Thakurani 2.00<br />

29 Khaira Antara Nua Construction of road from Nua Harihat to Fendragadia 2.00<br />

30 Khaira Jhinkiria Gagandhuli Construction. of road from Gagandhuli Thakurani to Karandia pokhari with culvert 1.00<br />

31 Khaira Makhanpur Durgapur Construction. of road from Taranga Palasa road chhak to Rafayatpur Sasan via Durgapur 1.00<br />

32 Khaira Kurunta Kurunta Construction. of road from Kurunta sasan to Anantabada 2.00<br />

33 Khaira Gadapokhari Dahi Construction. of road from Dahi to Analjhuri via Sapagadia 2.50<br />

34 Khaira Jalada Tuto Improvement of road from Tuta Thakurani to Budha nala via Panigrahi sahi 1.00<br />

35 Khaira Kupari Kupari Construction of Mukhia sahi road and drain 2.00<br />

36 Khaira Nandoor Nandoor Development of road from Baitangi 4.00<br />

37 Khaira Kaithagaida Mundahata Construction of Singha sahi Panimahara adi bandha 4.00<br />

38 Khaira Baunsagadia Kalamachhua Construction of road from Ranapur to Baunsagadia U.G.M.E. School with ghat 5.00<br />

39 Khaira Jhinkiria Paikalpur Construction of road from Paikalpur P.S. road to Jhinkiria chhak road with culvert 4.00<br />

40 Khaira Barada Garadi Construction of road from Garadi RD to canal bandha 5.00<br />

41 Khaira Ratina Ratina Construction of road from Kaliagadia to Sananda PWD road via Panisahigadia 5.00<br />

42 Khaira Makhanpur Makhanpur Construction of road from Makhanpur Dalei sahi to Malika sahi 2.50<br />

43 Khaira Dagarapada Dagarpada Improvement of road from Dagarpada CC road to Ranigadia via Jena sahi Puriapada 2.50<br />

44 Khaira Kurunta Baringia Construction of Baringia village road 3.00<br />

45 Khaira Badajaypur Oliha Improvement of road from Mohanty sahi to Belkula 3.00<br />

46 Khaira Palasa Nachhipur Construction of road from Charighiria Sasan to School 3.00<br />

47 Khaira Palasa Maliha Construction of road from incomplete CC road Charighiria Sasan 2.50<br />

48 Khaira Gobindpur Palaspur Improvement of road from RD road to Baratikari incomplete CC road with protection wall 3.00<br />

49 Khaira Gadapokhari Parikhama Construction of road from Parikhama to Kanalkhunta 3.00<br />

50 Khaira Jalada Sampei Improvement of road from Post Office chhak to Jena sahi 2.00<br />

51 Khaira Nayakhandi Jhinkiria Construction of road from Bisal sahi to Sutal sahi 3.00<br />

52 Khaira Manitri Chandanpur Construction of road from Ranital Kupari road to Adadigochhia road via Patana sahi 2.00<br />

53 Khaira Barttana Andola Construction of CC road from RD road to Andola Harijansahi 3.00<br />

54 Khaira Kupari Kupari Construction of CC road at Paikasahi School road with culvert 2.00<br />

55 Khaira Dungura Mahanchua Construction of road from Sethi sahi to Dungura Ranital 2.50<br />

56 Khaira Baunsagadia Salagadia Construction of road from Paikasahi to Sahoo sahi road 3.00<br />

57 Khaira Gaganadhuli Khairadihi Construction of Hanuman gohiri road 3.00<br />

58 Khaira Haripur Sanada Construction of incomplete CC road of Sananda 2.00<br />

59 Khaira Rapeya Chaupohari Improvement of road from Gouripokhari to Kanabha road 2.00<br />

60 Khaira Khaira Alada Construction of road from Totasahi road 2.00<br />

61 Khaira Sarugaon Tilada Construction of road from CC road to Sethi sahi 2.00<br />

62 Khaira Saradang Alipur Construction fo road from Alipur RD chhak to Damodarpur culvert with HP & CD work 2.00<br />

63 Khaira Garasang Krushnapur Construction of road from Krushnapur Harijan sahi to canal bandha 2.00<br />

64 Khaira Shyamsundarpur Chakapada Construction of road from Chakapada Giri sahi to Jhatia 3.00<br />

65 Khaira Achyatipur Mirjapur Construction of Mirjapur Barahampur road 2.00<br />

66 Khaira Achyatipur Deauli Construction of new road from Club to Ratanakar Panigrahi house 2.00<br />

67 Khaira Antara Antara Construction of road from Antara chhak to Patimangala chhak 2.00<br />

68 Khaira Makhanpur Bhatapada Construction of road from Siala sahi to Barik sahi 2.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

69 Khaira Dagarapada Naranpur Renovation of Kamalasagar pokhari with construction of ghat 1.00<br />

70 Khaira Gadapokhari Gadapokhri Construction of Harijan Sankana pokhari adi bandha 1.00<br />

71 Khaira Kupari Kupari Construction of Patagadia sahi CC road 1.00<br />

Sub Total 193.50<br />

1 Nilgiri Ajodhya Balipal Improvement of road from Balipal AWC to Mahabali Thakurani 5.00<br />

2 Nilgiri Arabandh Arabandh Improvement of road from Chirkuni chua to R.D. road 5.00<br />

3 Nilgiri Begunia Begunia Improvement of road from Holipada chhak to Adibasi pokhari 5.00<br />

4 Nilgiri Berhampur Berhampur Improvement of road from Berhampur Debatatala chhak to Mahima pokhari 5.00<br />

5 Nilgiri Dharampur Isanendi Improvement of road from Paramananda house to Kamalanadi bridge 5.00<br />

6 Nilgiri Chhatrapur Khuntadiha Improvement of CC road from Kuanarsahi Mahendra Kuanr house to Giri sahi 4.00<br />

7 Nilgiri Garadihi Garadihi Improvement of road from Badasahi chhak to Bhagirathi house 4.00<br />

8 Nilgiri Dhobasila Dhobasila Improvement of CC road at Dhobasila Malika sahi 4.00<br />

9 Nilgiri Jamudiha Babil Construction of Ghagara Badabil canal Adibandha at Babil 5.00<br />

10 Nilgiri Jadida Jagannathpur Improvement & renovation of Jagannathpur Mangala tank 3.00<br />

11 Nilgiri Machhua Machhua Improvement of road from Thumpu Sing house to Raghu Sing house 3.00<br />

<strong>12</strong> Nilgiri Kishore Chandrapur Chandigarh Improvement of road from canal bridge to tank 3.00<br />

13 Nilgiri Kansa Kansa Improvement of road from Mantu house to Khaga Mohanty house 3.00<br />

14 Nilgiri Lakharaj Chandipur Construction of Chandipur Sandhamara bandha 3.00<br />

15 Nilgiri Matiali Mitiali Improvement of road from Barapada pond to Santala sahi road 3.00<br />

16 Nilgiri Mahisapata Patana Improvement of road from Patanabauladanda to Kapilendra Prusti house 3.00<br />

17 Nilgiri Naranapur Badatokipada Construction of dam at Sukhia 3.00<br />

18 Nilgiri Pithahata Sana Nuagar Improvement of road from Mahulabani pokhari to Tangana nadi 3.00<br />

19 Nilgiri Narasinghpur Durgapur Construction of vedibandha at Durgapur river 3.50<br />

20 Nilgiri Tentulia Bauriora Construction of porject from Ambanala to Balidhipa 3.00<br />

21 Nilgiri Telipal Gohira Improvement of road from Gohira bus stand to Sitaram sahi 3.00<br />

22 Nilgiri Siadimal Gokulapani Construction of drain both side of Gokulapani CC road 3.00<br />

23 Nilgiri Sajangarh Banthiapada Improvement of road from Gurucharan Singh house to Kanyashram 5.00<br />

24 Nilgiri Radha Kishorepur Pundala Improvement of road from Pundala Nalaghat Pichal to Post Office 4.00<br />

25 Nilgiri Ajodhya Gopalpur Improvement of road from Gopalpur hata chhak to Jungle. 5.00<br />

26 Nilgiri Arabandh Badapalasa Improvement of road from Barabasi to Athalagadi nadighat 5.00<br />

27 Nilgiri Arabandh Saldhar Improvement of road from Mahadev mandir to Sudha Patra house 5.00<br />

28 Nilgiri Begunia Dobati Improvement of road from Mandir chhak to nadighat 5.00<br />

29 Nilgiri Berhampur Bhogdia Improvement of road from Bhogadia AWC to Bila Thakurani tala 5.00<br />

30 Nilgiri Bhaunribad Bhaunribad Improvement of CC road from Jhuna house to Bharada chhak Bayar sahi 4.00<br />

31 Nilgiri Dharampur Isanendi Improvement of road from Godi pokhari to Parsa gadia 5.00<br />

32 Nilgiri Chhatrapur Chhatrapur Improvement of CC.road from Budhia Tudu house to Laxman Kisku house 5.00<br />

33 Nilgiri Garadihi Ambajhar Construction of Manigarh dam 3.00<br />

34 Nilgiri Dhobasila Kendukhunta Improvement of road from Kendukhunta Niranjan Mohapatra house to PWD road 5.00<br />

35 Nilgiri Jamudiha Babil Construction of Dahanipada bandha 5.00<br />

36 Nilgiri Jadida Jagannathpur Improvement of Jagannathpur Kapudia Mahara bund canal 5.00<br />

37 Nilgiri Machhua Kalyani Improvement of road from Santosh Behera house to Krushna Chandra Samanta house 5.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

38 Nilgiri Kishore Chandrapur Betakata Improvement of road from end of the RD road to line chhak 5.00<br />

39 Nilgiri Kishore Chandrapur Rasia Improvement of road from Babaji matha to Kelamara 5.00<br />

40 Nilgiri Kansa Sangarampur Improvement of road from Sudarshan Mahalik house to RD road 5.00<br />

41 Nilgiri Lakharaj Kathagochhi Construction of canal from Kalikula to Gujidhari 5.00<br />

42 Nilgiri Matiali Matiali Construction of Matiali Nijarabandha 5.00<br />

43 Nilgiri Matiali Mitiali Improvement of road from Muni Samaj chhak to Nalasahi road 5.00<br />

44 Nilgiri Mahisapata Mahisapata Improvement of road from Kalashyam chhak to dug well 5.00<br />

45 Nilgiri Naranapur DalImprovemental Construction of dam at Dal Improvemental Dakshinsul 5.00<br />

46 Nilgiri Naranapur Naranpur Improvement of road from Naranpur Uda chhak to Saharadihi chhak 5.00<br />

47 Nilgiri Pithahata Pithahata Construction of adi bandha from Sanamata to Behera sahi 3.00<br />

48 Nilgiri Narasinghpur Purunagan Improvement of road from PWD road to Bamphi chhak 5.00<br />

49 Nilgiri Narasinghpur Narasinghpur Improvement of Hadanali road 5.00<br />

50 Nilgiri Tentulia Charbadi Improvement of road from Charbadi Nayak sahi to Dahi sahi 5.00<br />

51 Nilgiri Telipal Bhagabandh Construction of Indraduba Antadahi canal 5.00<br />

52 Nilgiri Siadimal Chatar Improvement of road from Uma Arjun School to Jharan pokhari 5.00<br />

53 Nilgiri Sajangarh Kusumian Construction of vedi bandha at Deuncha Thakurani 4.00<br />

54 Nilgiri Radha Kishorepur Radha Kishorepur Improvement of road from RD road to Barapada 5.00<br />

Sub Total 234.50<br />

1 Oupada Aghirapada Aghirapada Improvement of road from Jenasahi Patrasahi road to PWD road 3.50<br />

2 Oupada Badapokhari Aghasol Improvement of road from Aghasoll R.D. road to Barapada 3.00<br />

3 Oupada Badapokhari Badapokhari Improvement of road from Badapokhari RD to Jayaram sahi road 2.50<br />

4 Oupada Badapokhari Jokagadia Improvement of road from Jokagadia RD road to Jharasula road 3.00<br />

5 Oupada Baunsabania Baliora Improvement of road from Baliora to Raipur Dumapur 3.50<br />

6 Oupada Baunsabania Guhalia Construction of road from Guhalia Harish Ch. Behera house to Bilasin bandha 3.50<br />

7 Oupada Baunsabania Baliora Improvement of road from Baliora chhak to Dholpur Adibasi sahi via Nayak sahi 2.00<br />

8 Oupada D.N. Pur Chasakhand Improvement of road from Chasakhanda Mangala Thakurani to Bhanja Pradhan house 1.50<br />

9 Oupada D.N. Pur Pratappada Improvement of road from Pratapada village boundary to Women's college drain & culvert 5.00<br />

10 Oupada Fatepur Fatepur Improvement of road from Khaira-Fatepur RD road To Jianipada via Mohanty sahi 4.00<br />

11 Oupada Fatepur Basudeipur Improvement of road from Basudeipur Barik sahi chhak to Mituani road via Ojha sahi 4.00<br />

<strong>12</strong> Oupada Fatepur Lunipada Improvement of road from Lunipada to Jena sahi road 2.50<br />

13 Oupada Fatepur Paikapada Improvement of road from Paikapada Gaya Nayak chhak to Majhi sahi via- Solavaunri 2.00<br />

14 Oupada Gadasahi Janikapal Improvement of road from Janikapal RD road to GGY road 2.00<br />

15 Oupada Gadasahi Kusumdaspur Improvement of road from Kusumdaspur School to Lenkasahi 1.00<br />

16 Oupada Iswarpur Andra Improvement of road from Andra CC road to Harijansahi & Anantaswar tank 4.00<br />

17 Oupada Iswarpur Bahabalpur Improvement of road from Bahabalpur Das sahi to Samula sahi via- Mohapatra sahi 1.50<br />

18 Oupada Iswarpur Iswarpur Improvement of road from Iswarpur Biswal house to Bhol house 5.00<br />

19 Oupada Iswarpur Mardarajpur Improvement of road from Mardarajpur Jenasahi to Durga mandap via- Jenasahi south 2.50<br />

20 Oupada Kandagaradi Baulagadia Improvement of road from Baulagadia Budhidei house to CC road 1.50<br />

21 Oupada Kandagaradi Baulagadia Improvement of road from Baulagadia Shankar Sethi house to Ranasahi via Bhaga Pradhan road 1.50<br />

22 Oupada Kandagaradi Sikidia Improvement of road from Sikidia PWD road to Mankadagadia via Babu sahi 2.00<br />

23 Oupada R.R. Pur Janihapada Improvement of road from Pradhandiha to Talasahi road via Patada chhak 2.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

24 Oupada R.R. Pur R.R.pur Improvement of road from RR pur Pry. School to Rangamatia 2.00<br />

25 Oupada Talakia Chanpur Improvement of road from Chanpur Sasan to Oupada via- Matiasahi 2.00<br />

26 Oupada Talakia Dhimpura Improvement of road from Dhimpura C.C. road to Mukhi sahi & Rout sahi 5.00<br />

27 Oupada Talakia Jagannathpur Improvement of road from Jaganathpur Swainsahi to CC road 1.50<br />

28 Oupada Talakia Jodagadia Improvement of road from Jodagadia Village to Station sahi RD road 1.00<br />

29 Oupada S.S.Pur S.S. Pur Improvement of road from Mohanty Sahi to Library chhak 5.00<br />

30 Oupada Aghirapada Aghirapada Renovation of tank at Aguan sahi (Badasahi) 2.00<br />

31 Oupada Badapokhari Badapokhari Improvement of road from Badapokhari Sub-station chhak to Gajamba School 1.00<br />

32 Oupada Baunsabania Baliora Improvement of road from Baliora Arjun Behera house to Baliora Brahmana badi 2.00<br />

33 Oupada Baunsabania Baliora Improvement of road from Baliora Giridhari Pradhan house to Balabhadra Pradhan house 2.00<br />

34 Oupada Baunsabania Dholpur Renovation of Dholpur tank 2.50<br />

35 Oupada D.N. Pur D.N.Pur Improvement of road from D.N.Pur Manicharan Panigrahi house to P.W.D. road 1.00<br />

36 Oupada Fatepur Fatepur Improvement of road from Fatepur Bhunya sahi pokhari and guard wall 3.00<br />

37 Oupada Fatepur Naranpur Improvement of road from Naranpur Jatima house to Sudarsan Das CC. road 1.00<br />

38 Oupada Gadasahi Gadasahi Improvement of road from Gada sahi CC road to Langudasuni Bijasthali via Uparsahi 1.00<br />

39 Oupada Gadasahi Kabisol Improvement of road from Chanpur RD road to Kabisol Pry. School road 2.00<br />

40 Oupada Iswarpur Iswarpur Improvement of road from Andira Mohanty sahi to Biswal sahi 1.00<br />

41 Oupada Iswarpur Bahabalpur Improvement of road from Pitam sahi to Bahabalpur Das sahi 1.00<br />

42 Oupada Kandagaradi Baulagadia Improvement of road from Baulagadia Mahakuda sahi chhak to Patra sahi chhak with CD works 1.00<br />

43 Oupada Kandagaradi Sikidia Improvement of road from Sikidia CC road to Bisweswara Mahadev Temple 1.50<br />

44 Oupada R.R. Pur Mahinsadali Improvement of road from Mahisadali to Fatepur road 2.50<br />

45 Oupada Talakia DhImprovementura Renovation of Dhimprovementura Badhi tank 2.50<br />

46 Oupada Talakia Jalapanka Improvement of road from Jalapanka RD to Biriha 2.00<br />

47 Oupada S.S.Pur S.S. Pur Renovation of Radhu Sagar tank with guard wall 5.00<br />

Sub Total 113.50<br />

1 Remuna Mangalpur Ghagarpada Construction of road from Ghagarapada Balabhadra house chhak to Ananta Pradhan house chhak 2.00<br />

2 Remuna Barunasing Antapani Construction of road from Babuli shop chhak to Patra sahi via Uma Dalei house 3.00<br />

3 Remuna Chasakhanda Medinipur Construction of CC road from Medinipur Khaparapada to Shiva mandir 2.50<br />

4 Remuna Saraswatipur Shyamdeipur Construction of CC road from Basuli Thakurani to Dahanagadia chhak 2.50<br />

5 Remuna Mandarpur Niabag Improvement of road from Lambodara Das house to Sahadasundari Thakurani 2.50<br />

6 Remuna Nijampur Dhopal Construction of CC road from Lakshaman Parida house to Chaitanya Jena house via-pokhariadi 2.50<br />

7 Remuna Kalyanpur Panchharukha Construction of CC road from Malaghar chhak to Samit road from via-Haraprasad Das 3.00<br />

8 Remuna Tentulidia Purukhi Construction of CC road from Parikhita Patra house to Umakanta Mahapatra house 2.50<br />

9 Remuna Sergarh Oukhunta Construction of road from Maheswar Panda house to Gagan Mallick house 2.00<br />

10 Remuna Remuna Ganeswarpur Construction of CC road from Padma pokhari adi to PWD road 2.00<br />

11 Remuna Patripal Tantarda Improvement of road from Tantarda Sundar Mohan Pradhan house to Das sahi 4.00<br />

<strong>12</strong> Remuna Kuligan Ganjia Improvement of road from Ganjia Shyamdharanipur Radha Mallick house toKaruna Godia chhak 2.50<br />

13 Remuna Durgadevi Kudia Improvement of road and drain from Kudia badi to Udapada via Kudia sahi 3.00<br />

14 Remuna K.Mukhura Jenabarai Imprvement of road from Jenabarai Raghunath Barik house to (baramanshipada) Kamalananda kupa 2.00<br />

15 Remuna Naraharipur Naraharipur Improvement of road from Naraharipur Sumanta Behera house to Mahadev via Ganesh Behera house 5.00<br />

16 Remuna Kuruda Mahasayapatna Construction of road from Chakreswar Mandir to Gangadhar Parida house 2.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

17 Remuna Kuruda Notipatana Construction of road from Jitendra Panda house to Mahadev mandir 2.00<br />

18 Remuna Nuapadhi Balgopalpur Construction of CC road from Balgopalpur Sanyashi Das house to Nilagiri Siramika chhak and drain 3.00<br />

19 Remuna Ganipur Kurunia Improvement of road from Kurunia Banthua Mishra house to puruna R.I.Office 2.00<br />

20 Remuna Gududa Mahada Construction of road from Mahada (Sialapada) nala to Shyama Santara house 5.00<br />

21 Remuna Badpal Badpal Construction of road from Badpal Gajendra Rout house to Bhutapur Adibasi sahi via Madhu Chand house 3.00<br />

22 Remuna Nuagaon Bahala Construction of road from Bahala Bhagabat tungi to Hentasura RD road via Karunakar Rout house 3.00<br />

23 Remuna Haripur Dahapada Improvement of road from Pagal Jena house to Thakurani ghara 2.00<br />

24 Remuna Biruan Biruan Improvement of road from Sukru Pradhan house to Kasipur with drain 3.00<br />

25 Remuna Inchudi Inchudi Improvement of road from Mangala chhak to Bamphia sahi 2.00<br />

26 Remuna Tundara Dehlabad Construction of road from I.T.R. road to Dehlabad Adivasi sahi 3.00<br />

27 Remuna Maharajpur Maharajpur Improvement of road from Maharajpur School to Mohapatra sahi via Grengola 3.00<br />

28 Remuna Mangalpur Shasanbad Construction of road from Shasanbad Jayanta Das house to Kartikeswar mandap 3.00<br />

29 Remuna Barunasing Antapani Construction of road from RD road to Patra Brahmana sasan 2.00<br />

30 Remuna Chasakhanda Bhandeswar Construction of CC road from Bhandeswar Guthunagadia to Partha Mohanty house 3.00<br />

31 Remuna Saraswatipur Jugala patana Construction of CC road from Sundari pokhari to Paschimani Thakurani 2.50<br />

32 Remuna Mandarpur Mendra Improvement of road from Laxminarayan mandap chhak to Narendra Panda house 3.00<br />

33 Remuna Mandarpur Dolagohira Improvement of road from Pitambar Mohanty house to Tribeni club 2.00<br />

34 Remuna Nijampur Nijampur Construction of CC road from N.H-5 to Hari Sethi house 2.00<br />

35 Remuna Kalyanpur Chadheipur Construction of CC road from Chantamani house to Basuli Thakurani 2.00<br />

36 Remuna Tentulidia Dharaganja Construction of CC road from Karuna Barik house to Satrughna Jena house 3.00<br />

37 Remuna Sergarh Sergarh Construction of road from Sergarh main road Ashapurna pucca road to kila R.D road 2.00<br />

38 Remuna Remuna Purosttampur Construction of CC road from Rabindra house to Adibasi via Harijan sahi 2.00<br />

39 Remuna Remuna Goudadanda Construction of CC road from Bangali sahi chhak to Samanatha gudia house 2.00<br />

40 Remuna Patripal Tantarda Improvement of road from Kantabania Mukhya road to Akhya Behera house 2.00<br />

41 Remuna Patripal Patripal Improvement of road from Patripal Narahari Das house to Ghania Das house 2.00<br />

42 Remuna Kuligan Gambharia Improvement of road from Sasta Nanda chhak to Jena sahi via Rout sahi 2.00<br />

43 Remuna Kuligan Kuligan Improvement of road from Kuligan Jagannath mandir to Kuhabuha road 5.00<br />

44 Remuna Durgadevi Dharpaikali Improvement of road and drain from Dharpaikali baula chhak to Jagannath mandir 2.00<br />

45 Remuna K.Mukhura Agalpur Improvement of road from Agalpur tota pola to Marichei Thakurani 2.00<br />

46 Remuna K.Mukhura K.Mukhura Improvement of road from Kharidmukhura Itali Rout house to Sanatan Patra house 3.00<br />

47 Remuna Naraharipur Begampur Improvement of road from Begampur Ghosh house to Niranjan Singh house 3.00<br />

48 Remuna Talapada Talapada Improvement of road from Babaji Mahallik house to Saraji pada 3.00<br />

49 Remuna Kuruda Kuruda Construction of road from Alekh Mohapatra house to NH-5 3.00<br />

50 Remuna Kuruda Bilaparia Construction of road from Gangadhar Parida house to Village end 2.00<br />

51 Remuna Kuruda Banaparia Construction of road from melana chhak to Abhimanyu Swain house 3.00<br />

52 Remuna Kuruda Karanjia Construction of road from Kailash Panda house to Dhalei road via Mahishasuri Thakurani 3.00<br />

53 Remuna Nuapadhi Sireipur Construction of CC road from Sireipur Kutisamadhara house to Vivekananda Sikhya Kendra 3.00<br />

54 Remuna Ganipur Kanarali Improvement of road from Karanali School to Siva Sahu house via Sethy sahi 3.00<br />

55 Remuna Badpal Gopalpur Improvement of road from RD road to Gopalpur pucca sadak 3.00<br />

56 Remuna Badpal Kankali Improvement of Kankali village road 2.00<br />

57 Remuna Nuagaon Nuagaon Improvement of road from Nuagaon EGS School to Bhagabat tungi with drain 3.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

58 Remuna Haripur Balia Improvement of road from Adivasi sahi to Kartik Singh house 2.00<br />

59 Remuna Srijang Srijang Improvement of road from Sarat Parida chhak to Uma dokan chhak via Satya dokan 2.00<br />

60 Remuna Biruan Somonathpur Improvement of road from Dhai centre chhak to Koili Behera house 3.00<br />

61 Remuna Inchudi Salapadhi Construction of road from Barendra chhak to Somanath pokhari 3.00<br />

62 Remuna Tundara Tundura Construction of road from Musina Dalei house to Kanarpur 2.00<br />

63 Remuna Maharajpur Maharajpur Improvement of road from RD road Ambagadia chhak to Das sahi via Baula tota 3.00<br />

Sub Total 166.50<br />

1 Simulia Khirkona Khirkona Construction of Padhisahi CC road 2.00<br />

2 Simulia Khirkona Rasidpur Construction of road from Baulagachha to Beherasahi road. 2.50<br />

3 Simulia Bari Bari-1 Construction of road from Bari club road to Bari puruna Harihat CC road 2.50<br />

4 Simulia Iswarpur Kalasuni Construction of CC road from Kalasuni Hatuari road to Barik sahi via Panigrahi sahi. 2.50<br />

5 Simulia Maitapur Maitapur Construction. of CC road from Munipada to Mohanty sahi via Mahadev sahi (incomplete) 2.50<br />

6 Simulia Markona Markona Construction of CC road from Markona Sadanandapur RD road to Markona Brahmansahi, Jenasahi and 2.50<br />

7 Simulia Markona Ria Construction of CC road from Ria canal to Ria Bahadalpur 2.00<br />

8 Simulia Muruna Gobindapur Construction of Gobindpur Chamar sahi CC road 3.00<br />

9 Simulia Bati Bati Construction of Bati Amania Dolamandap to Paridasahi road. 3.00<br />

10 Simulia Bati Rudhunga Construction of CC road from Rudhunga PMGSY road to Mohapatra sahi road. 3.00<br />

11 Simulia Sabanga Sabanga Construction of CC road from RD road to Pandasahi road. 3.00<br />

<strong>12</strong> Simulia Chalunigaon Chalunigaon Construction of road from Chalunigaon Baistima sahi to Badapada. 3.00<br />

13 Simulia Ada Ada Construction of Ada Sasan CC road 3.00<br />

14 Simulia Ada Chatrapur Construction of Chatrapur Jena sahi road 3.00<br />

15 Simulia Kanheibindha Dadhibamanpur Construction of Dadhibamanpur Jena sahi CC road 3.00<br />

16 Simulia Kanchpada Kanchpada Kanchapada RD road to Kalandi Nayak sahi road. 3.00<br />

17 Simulia Jamujhadi Kupura Construction of CC road from Kupura Ghadia sahi to Barik sahi 3.00<br />

18 Simulia Jamujhadi Kupura Construction of CC road from Hari Mukhi to Gayadhar Jena house. 3.00<br />

19 Simulia Jamujhadi Radhaballvpur Construction of CC road from NH-5 to Jamujhadi via Mangala sahi 3.00<br />

20 Simulia Abjhuna Somanathpur Construction of CC road from Playground through Padhi sahi via Charu Barik 3.00<br />

21 Simulia Abjhuna Ramakrushnapur Construction of Pila Gadia Patra sahi CC road 1.00<br />

22 Simulia Bauripada Bauripada Construction of CC road from Gandibed road to Gopalpur minor. 2.00<br />

23 Simulia Andarai Andarai Construction of road from Andarai RD road to Barik sahi CC road. 1.50<br />

24 Simulia Andarai Serpur Construction of road from Serpur Bhairabnath sahi to Saptaghar CC road. 3.00<br />

25 Simulia Purusottampur Bomtia Construction.of CC road from Brahman sahi to Panda sahi 2.00<br />

26 Simulia Khirkona Khirkona Construction of Khirkona Malik sahi road 2.00<br />

27 Simulia Bari Syamsundarpur Construction of Hari Nayak sahi Sanpei CC road 1.00<br />

28 Simulia Iswarpur Chandrapada Construction of CC road from Kalasuni Hatuary road to Kalandikhadi 3.00<br />

29 Simulia Maitapur Maitapur Construction of Maitapur Chamar sahi village CC road 2.00<br />

30 Simulia Markona Bangarkhadigadia Construction of CC road from Bana Saradanga RD road to Belagadia Sasan road 1.00<br />

31 Simulia Muruna Balikana Construction of CC road from Balikana canal to Puhan sahi and Jena sahi 1.00<br />

32 Simulia Bati Bati Construction of Bati Nayak sahi CC road to Sial sahi CC road 2.00<br />

33 Simulia Sabanga Anandapur Construction of Anandpur Samal sahi and Behera sahi CC road. 1.00<br />

34 Simulia Chalunigaon Chalunigaon Construction of Chalunigaon Kumbhar sahi CC road via Anta Sahu house. 1.00<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

35 Simulia Ada Chatrapur Construction of Mirpatna village road. 1.00<br />

36 Simulia Kanheibindha Baduli Construction of road from Baduli Malik sahi to Khajirapada 3.00<br />

37 Simulia Kanchpada Kanchpada Constructionr. of Kanchapada RD road to Madhu Nayak sahi road. 2.00<br />

38 Simulia Jamujhadi Kupura Construction of CC road from Kupura village road to Babu sahi 2.00<br />

39 Simulia Jamujhadi Radhaballvpur Construction of CC road from NH-5 to Bhalu pokhari 1.00<br />

40 Simulia Abjhuna Somanathpur Construction of CC road from Budira to Rama Mohapatra house via Mangala temple 1.50<br />

41 Simulia Abjhuna Somanathpur Construction of Ragitia sahi CC road. 1.50<br />

42 Simulia Bauripada Bauripada Construction of CC road from PMGSY road to Bauripada Panchayat pokhari via Nayak sahi 2.00<br />

43 Simulia Bauripada Pandu Construction of road from Pandu Thakurani to Gandibed CC road 1.00<br />

44 Simulia Andarai Andarai Construction of road from Andarai Digi Kuladhar Bindha UP School to Biswal sahi CC road. 1.50<br />

45 Simulia Andarai Serpur Construction of Serpur Nayak sahi CC road 1.00<br />

46 Simulia Purusottampur Purusottampur Construction of CC road from Niranjan Mohanty house chhak to Golak Mohanty house chhak. 2.00<br />

47 Simulia Purusottampur Bomtia Construction of CC road from Haladhar Sahu house chhak to Baidhar Sahu house chhak 2.00<br />

Sub Total 100.50<br />

1 Soro Madhusudanpur Raghunathapur Improvement of road from PMGSY road to Prusty sahi village road 2.50<br />

2 Soro Sajanpur Sajanpur Improvement of road from Library houae to Radhakanta Lenka house 3.00<br />

3 Soro Pakhara Reoda Improvement of road from CC road end to Panigrahi sahi road 3.00<br />

4 Soro Nadigaon Nadigaon Improvement of road from Kanhapur Primary School to PWD road via Mandal sahi 2.50<br />

5 Soro Dahisada Dahisada Improvement of road from RD road to Sahu sahi via Dayanidhi Behera house 3.00<br />

6 Soro Sarasankha Basudeipur Improvement of road from PS road to Baladia chhak 1.50<br />

7 Soro Attapur Attapur Improvement of road from RD road to Nayak sahi 2.00<br />

8 Soro Natapada Binagadia Improvement of Binagadia main road 2.00<br />

9 Soro Sabira Chilisimadha Improvement of Dalia sahi road 3.00<br />

10 Soro Nischintapur Kudei Improvement of road from Hata sahi to Kudei via Sethy sahi 2.00<br />

11 Soro Mulisingh Mulisingh Improvement of road from Sada sahi to RD road 3.00<br />

<strong>12</strong> Soro Mulisingh Bartana Improvement of road from Bartana chhak to Naga house via Jena Harijan sahi 2.50<br />

13 Soro Anantapur Kanpur Improvement of road from Kanpur CC road to RD road chhak via Thakurani danda 3.00<br />

14 Soro Jadida Narasinghnagar Improvement of road from Raghunathpur CC road to Kalia project 3.00<br />

15 Soro Jadida Patanarusa Improvement of road from Rusa School to Samiti road 2.50<br />

16 Soro Gud Gud Improvement of road from Patana sahi to Balabhadra U.P. School via Nayak sahi 2.50<br />

17 Soro Tentei Tentulia Improvement of road from Tentulia CC road to Niriparadhan road via Mohanty sahi CC road 4.00<br />

18 Soro Kedarpur Kedarpur Improvement of road from RD road to Barik sahi 3.50<br />

19 Soro Kedarpur Kedarpur Improvement of road from U.P. School to Nayak sahi 3.50<br />

20 Soro Manipur Kanpur Completion of CC road 3.50<br />

21 Soro Talanagar Talanagar Improvement of road from NH-5 to Nayak sahi via Jagulia mandir road 2.50<br />

22 Soro Talanagar Chauli Sabira Improvement of road from PS road to Naba Barik house 3.00<br />

23 Soro Gopinathpur Gopinathpur Improvement of Nuapatana village road via Muduli sahi 2.50<br />

24 Soro Gopinathpur Joka Improvement of road from PWD road to Sankarda Nuauasa via Panda sahi 2.50<br />

25 Soro Singakhunta Gujadehia Improvement of road from Uddhav Nayak chhak to village end 3.00<br />

26 Soro Singakhunta Kumbhi Improvement of road from Sahu house chhak to Rout house 1.50<br />

27 Soro Mahunuhana Mahunuhan Improvement of road from Bagudi PWD road to Giri sahi CC road 3.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Sl.<br />

No.<br />

Block Panchayat Village Name of the Porject Outlay<br />

28 Soro Madhusudanpur Kurunia Improvement of road from Kurunia CC road to Banabishnupur 2.00<br />

29 Soro Sajanpur Barahampur Improvement of road from Chaparapada Majhi sahi to N.H-5 P.Panda road 2.50<br />

30 Soro Pakhara Pakhara Improvement of road from Durgapur Gopal sahi chhak to Tentei PMGSY road 2.00<br />

31 Soro Pakhara Janhia Improvement of road from EGS School to Chadhua sahi 2.50<br />

32 Soro Nadigaon Guhaldihi Improvement of road from Talaguhaldihi to Dolamandap road 2.00<br />

33 Soro Dahisada Sultanpur Improvement of road from RD road to Pradhan sahi road 2.50<br />

34 Soro Sarasankha Sarasankha B. sahi Improvement of Jogeswari bandha 1.00<br />

35 Soro Sarasankha Baladia Improvement of road from PS road to CC road 1.50<br />

36 Soro Attapur Hansipatna Improvement of road from RD road to Adivasi sahi 2.00<br />

37 Soro Natapada Chahalima Construction of CC road from Balipur to Khatua sahi 2.00<br />

38 Soro Sabira Sabira Improvement of Sabira Mohanty sahi road 2.00<br />

39 Soro Sabira Banaparia Improvement of Banaparia sasan road 2.00<br />

40 Soro Nischintapur Kudei Improvement of road from Kudei Mahadev to Baida sahi via Jena sahi 2.50<br />

41 Soro Mulisingh Mulisingh Improvement of road from Mulisingh Mata sahi to Talapadhi road 2.50<br />

42 Soro Anantapur Belpur Improvement of road from Belpur Madrasa to Kanthigadia 2.00<br />

43 Soro Anantapur Aharapur Improvement of road from Aharapur CC road to Upa Sahu house 2.00<br />

44 Soro Jadida Rusa Improvement of road from Samiti road to Biswal sahi 2.00<br />

45 Soro Jadida Gangi Improvement of road from Ram Behera house to Dama Sahu house 2.00<br />

46 Soro Gud Gud Improvement of road from defance road to U.P. School via Sethy sahi 1.50<br />

47 Soro Gud Gud Improvement of road from Panchayat road to Das sahi 1.50<br />

48 Soro Tentei Tentei Improvement of road from RD road to RD road via Tentei Office CC road 2.00<br />

49 Soro Tentei Biripada Improvement of road from Baburihata to Biripada CC road 2.00<br />

50 Soro Kedarpur Kedarpur Improvement of road from Samiti road to Bhaja Jena house 2.00<br />

51 Soro Kedarpur Banisiha Improvement of road from Banisiha Thakurani chhak to Mahadev temple 2.00<br />

52 Soro Manatri Gopalpur Improvement of road from Dahipur chhak to Madhu Padhi 2.50<br />

53 Soro Manatri Dahipur Improvement of road from CC road to Jena sahi 2.00<br />

54 Soro Manipur Chhatara Improvement of road from GP road Ghuda sahi to Nihari sahi 1.00<br />

55 Soro Manipur Ranapur Improvement of road from Das sahi road to Jena sahi 2.00<br />

56 Soro Talanagar Habalei gandatara Improvement of road from Fakira Rout's huller to Jena sahi via Mahakuda sahi road 2.00<br />

57 Soro Gopinathpur Digibhara Improvement of Baunsapala village road 2.00<br />

58 Soro Gopinathpur Raipitambar Improvement of road from PWD road to Samal sahi road 2.00<br />

59 Soro Singakhunta Gujadehia Improvement of road from Mandir chhak to Harijan sahi (Panchua house) 2.00<br />

60 Soro Singakhunta Saralia Improvement of road from Sethy sahi to Behera sahi 2.00<br />

61 Soro Singakhunta Singakhunta Improvement of road from Rout sahi to Moharana sahi 1.00<br />

Sub Total 140.50<br />

Total 2000.00<br />

NB: Though the outlay under GGY for <strong>2011</strong>-<strong>12</strong> has been finalized by DRDA, the list of work is yet to be finalized. Hence this proposed list has been prepared based on needs and priorities identified through primay<br />

survey<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XIX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Proposed list of work to be undertaken under MGNREGS during <strong>2011</strong>-<strong>12</strong><br />

Annexure-XX<br />

(Rs. in lakhs)<br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

1 Bahanaga Anji Anji Improvement of road from R.D. road Panda sahi chhaka to Rama Nayak chhaka via Jena sahi road. 1.70 Rural Connectivity<br />

2 Bahanaga AnjiKharida Construction of pucca Ghat and renovation of Deuli Pokhari 2.20 Water Conservation<br />

3 Bahanaga AnjiKharida Construction of pucca Ghat and renovation of Nua Pokhari at Kharida 2.20 Water Conservation<br />

4 Bahanaga AnjiJayanagar Improvement of road from Jayangar Safiri Pokhari to Nahana Pada road 1.70 Rural Connectivity<br />

5 Bahanaga Avana Barajadeuli Improvement of road at Alada Kia Gohiri and Chhuapada Gohiri 1.70 Rural Connectivity<br />

6 Bahanaga Avana Avana Improvement of road from Avana Toll R.D. road to Budhi Mangala road 1.70 Rural Connectivity<br />

7 Bahanaga Avana Avana Levelling of Avana High School boundary 2.20 Land Development<br />

8 Bahanaga Avana Alada Improvement of road from Alada Mana Patra Chhaka to Bagada road 1.70 Rural Connectivity<br />

9 Bahanaga Baripada Jagannathpur Improvement of road from Jagannathpur defence road to Baincha Pokhari 1.70 Rural Connectivity<br />

10 Bahanaga Baripada Maharudrapur Improvement of road from Maharudrapur Rama Rout house chhaka to Tini chhaki road 2.20 Rural Connectivity<br />

11 Bahanaga Baripada Balarampur Improvement of road from Balarampur defence road to Kailash Mallick house chhaka via Lachhaman Behera house 1.70 Rural Connectivity<br />

<strong>12</strong> Bahanaga Baripada Baripada Improvement of road from Baripada Giligadia C.C. road to Nai Adi 1.70 Rural Connectivity<br />

13 Bahanaga Baripada L.N.Patana Improvement of road from Panigrahi Chhaka to Patana Pokhari 1.70 Rural Connectivity<br />

14 Bahanaga Baripada Madanapur Improvement of road from Madanapur defence road to Maguni Mallik sahi road 1.50 Rural Connectivity<br />

15 Bahanaga Baripada Attaspur Improvement of road from Attaspur chhaka to Baula Pokhari road 2.20 Rural Connectivity<br />

16 Bahanaga Baripada Karanjabindha Improvement of road from Karanjabindha Sindura Goura chhaka to Das sahi road 1.70 Rural Connectivity<br />

17 Bahanaga Chaka Jagannathpur Chaka Jagannathpur Improvement of road from Durga Mandap to Kunda Khai Bazar 2.20 Rural Connectivity<br />

18 Bahanaga Chaka Jagannathpur Chaka Jagannathpur Improvement of road from School Chhaka to Nalu Panda house 2.20 Rural Connectivity<br />

19 Bahanaga Chaka Jagannathpur Chandinipur Improvement of road from Chandanpur Behera sahi road 1.00 Rural Connectivity<br />

20 Bahanaga Chaka Jagannathpur Attapur Construction of road from Futi Gadia to Kartik Behera house 1.00 Rural Connectivity<br />

21 Bahanaga Chaka Jagannathpur Kamalapatana Sasan Construction of road from Musika Behera house to Attapur 1.70 Rural Connectivity<br />

22 Bahanaga Dandahairpur Mugunipur Earth, morum work from Majhi sahi chhak to Daxina side road 1.70 Land Development<br />

23 Bahanaga Dandahairpur Pitalapada Improvement of road from Sukra Mallik house to R.D. road 1.70 Rural Connectivity<br />

24 Bahanaga Dandahairpur Aruha Renovation of Puntakala Pokhari Aruha 1.70 Water Conservation<br />

25 Bahanaga Dandahairpur Asimila Earth, morum work from Asimila Jaga Mallik house to Thakura Chhaka via Lochan Biswal house 1.70 Land Development<br />

26 Bahanaga Dandahairpur Dandaharipur Earth, morum work from R.D. road to railway line via Kinu Mallik & Gouranga Mallik houe 1.70 Land Development<br />

27 Bahanaga Dandahairpur Keshpur Construction of road from Keshpur NH-5 to Arhua Chhaka via Keshpur 1.70 Rural Connectivity<br />

28 Bahanaga Dandahairpur Gandasthapur Improvement of road from Patali Mangala to Sethi sahi via Kamara sahi, Gandasthapur 1.50 Rural Connectivity<br />

29 Bahanaga Kochiakoili Kanthigadia Excavation of Chandrama Pokhari 1.50 Water Conservation<br />

30 Bahanaga Kochiakoili Kochiakoili Improvement of road from ADV road to Bhagaban Samal house 2.20 Rural Connectivity<br />

31 Bahanaga Kasaba Jayapur Alasuan Earth, morum work from Alasuan Harihata house to Gouranga pokhari via Narendra Pallai house 1.70 Land Development<br />

32 Bahanaga Kasaba Jayapur Jirtal Excavation and earth work of Kalia Sandha Pokhari 1.70 Water Conservation<br />

33 Bahanaga Kasaba Jayapur K. Jayapur Excavation of Mahadev Pokhari, Kunda sahi 1.70 Water Conservation<br />

34 Bahanaga Kasaba Jayapur Routmanakahani Excavation and stone packing of Abhiram Pokhari 1.70 Water Conservation<br />

35 Bahanaga Kasaba Jayapur Dalingia Improvement of road from Dalingia Kantia Tikiri Chhaka to Patana sahi road 1.70 Rural Connectivity<br />

36 Bahanaga Kasaba Jayapur Jugala Excavation of Gothana Adibasi sahi Pokhari 1.70 Water Conservation<br />

37 Bahanaga Kasaba Jayapur Oliapatan Improvement of road from NH-5 to Olia Patana road 1.70 Rural Connectivity<br />

38 Bahanaga Kasaba Jayapur Manakahani Improvement of road from Beta Godia to Parida sahi via E.G.S. School 1.70 Rural Connectivity<br />

39 Bahanaga Kasaba Jayapur Rasalpur Improvement of road and drain from PMGSY Jirital to Rasalpur Chhaka and Manakahani Parida sahi 1.70 Rural Connectivity<br />

40 Bahanaga Kasaba Jayapur Abadulanagar Improvement of road from Matha Pada R.D. road to via Teli sahi Jirtali village road 1.70 Rural Connectivity<br />

41 Bahanaga Kharasahapur Kharasahapur Construction of Barabatia bridge 1.00 Rural Connectivity<br />

42 Bahanaga Kharasahapur Kharasahapur Digging of Kharasahapur Brahman tank 1.50 Water Conservation<br />

43 Bahanaga Kharasahapur Ramdha Improvement of road from Ramdha Primary School to Mohanty sahi, via Baishnab sahi 2.20 Rural Connectivity<br />

44 Bahanaga Kharasahapur Bramhapur Improvement of road from Keshpur Guthuna chhaka to Patra sahi 1.70 Rural Connectivity<br />

45 Bahanaga Panpana Kahanragohiri Excavation of Tentula Pokhari 2.20 Water Conservation<br />

46 Bahanaga Panpana Begunia Earth & morum work from NH-5 to Behera sahi via Mahadev Mandir 2.20 Land Development<br />

47 Bahanaga Panpana Betagadia Renovation & construction of Ghat at Mohadrv tank 2.20 Water Conservation<br />

48 Bahanaga Panpana Panpana Earth & morum work from Muni Pokhari to CC road via Babu Jena house 1.70 Land Development<br />

49 Bahanaga Panpana Raghunathpru Patana Earth & morum work from railway line to Kalika Mandir, via Harihat chhak 2.20 Land Development<br />

50 Bahanaga Panpana Gunuda Excavation of Suan tank 2.00 Water Conservation<br />

51 Bahanaga Panpana Nachinda Improvement of road from Nachinda Das sahi chhak to Kaharagohiri 1.70 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

52 Bahanaga Panpana Nuapada Earth & morum work from main road to Khanda sahi 1.70 Land Development<br />

53 Bahanaga Panpana Bishnu Chhak Renovation of Maitrapur Khajira tank 1.70 Water Conservation<br />

54 Bahanaga Panpana Malada Pada Earth & morum work from PMG road to Mohanty sahi 2.00 Land Development<br />

55 Bahanaga Sahaspura Sahaspura Improvement of road from CC road to Patana sahi via Gudia Pada 1.70 Rural Connectivity<br />

56 Bahanaga Sahaspura Sahaspura Improvement of road from Jena sahi chhaka to Baula Dalei house 1.70 Rural Connectivity<br />

57 Bahanaga Sahaspura Kanhei Ogalpur Renovation of Aratapti tank 2.00 Water Conservation<br />

58 Bahanaga Sahaspura Jhadta Renovation of Padu Panda tank 1.70 Water Conservation<br />

59 Bahanaga Sahaspura Ranabhanjapur Renovation of Mahisasuri Thakurani tank 1.50 Water Conservation<br />

60 Bahanaga Sahaspura Bagada Construction of chua tank 1.70 Water Conservation<br />

61 Bahanaga Talakurunia Rahaniaganj Improvement of road from Jhadata CC road to Gadadhar Ojha & Surendra Nayak house 2.50 Rural Connectivity<br />

62 Bahanaga Talakurunia Talakurunia Improvement of Talakurunia Ratha Padia 2.50 Land Development<br />

63 Bahanaga Talakurunia Talakurunia Improvement of road from UP school to Telisahi 1.70 Rural Connectivity<br />

64 Bahanaga Talakurunia N.P. Magura Improvement of road from Magura Basti tanki Pokhari toChalana Badi road 2.50 Rural Connectivity<br />

65 Bahanaga Talakurunia Haripur Improvement of road from imcomplete Haripur ITR road to Mahadev Mandir via Jalasaranga 1.70 Rural Connectivity<br />

66 Bahanaga Aruhabad Patripur Improvement of road from Patripur Thakurani field to Khela Padia road via Bada Tripathy sahi 2.50 Rural Connectivity<br />

67 Bahanaga Aruhabad Patripur Improvement of road from Patripur sub-station to Apuja Mahadev road 1.70 Rural Connectivity<br />

68 Bahanaga Aruhabad Aruhabad Improvement of road from Aruhabad UP school to Sethi sahi road 2.50 Rural Connectivity<br />

69 Bahanaga Aruhabad Rupkhand Improvement of road from Lochan Mahalik house to Kamitri Pokhari road 2.50 Rural Connectivity<br />

70 Bahanaga Aruhabad Rupkhand Renovation of Astia Pokhari 2.50 Water Conservation<br />

71 Bahanaga Aruhabad Dolpur Improvement of road from Dolpur Sanskrit toll to Kunda Pokhari 2.50 Rural Connectivity<br />

72 Bahanaga Aruhabad Dolpur Renovation of Ghanagutia Pokhari 2.50 Water Conservation<br />

73 Bahanaga Bahanaga Sathi Improvement of road from Sathi Mahadev temple road to Barik sahi 2.50 Rural Connectivity<br />

74 Bahanaga Bahanaga Sathi Construction of road from Jadu Ghadei house CC road to Sasan via Dalei sahi 1.70 Water Conservation<br />

75 Bahanaga Bahanaga Gandhina Renovation & Construction of Garh at Gandhina Baya Pokhari 1.50 Flood Control<br />

76 Bahanaga Bahanaga Bahanaga Improvement of road from NH-5 to Bhanaga village CC road 1.70 Rural Connectivity<br />

77 Bahanaga Bahanaga Bahanaga Improvement of road from Shiva Sahoo house to Sarat Barik house 1.70 Rural Connectivity<br />

78 Bahanaga Bahanaga Daradia Improvement of road from Daradia C.C. road to Railway line via Kata Muduli 1.70 Rural Connectivity<br />

79 Bahanaga Bahanaga Barikpur Improvement of road from Barikpur Panigrahi sahi to Jena sahi 2.50 Rural Connectivity<br />

80 Bahanaga Bahanaga Ichhapur Renovation & Construction of Ghat at Ichhapur Jagada tank 2.50 Water Conservation<br />

81 Bahanaga Bishnupur Bishnupur Renovation of Tara Pokhari 1.70 Water Conservation<br />

82 Bahanaga Bishnupur Bishnupur Improvement of road from Mallika Pokhari Kalia Gohiri road 2.50 Rural Connectivity<br />

83 Bahanaga Bishnupur Bishnupur Construction of drain near Basuli 2.50 Irrigation<br />

84 Bahanaga Bishnupur Debendrapur Renovation of Bainga Pokhari 1.70 Water Conservation<br />

85 Bahanaga Chittol Chittol Improvement of road from Chittol Danda Khedei Thakurani to Malamundia road via Pravakar Nayak sahi 2.50 Rural Connectivity<br />

86 Bahanaga Chittol Chittol Improvement of road from Chittol Banamli Barik house to Biswal sahi 2.00 Rural Connectivity<br />

87 Bahanaga Chittol Podadhiha Renovation of Bana tank & Construction of of Ghat 1.70 Water Conservation<br />

88 Bahanaga Chittol Patimunda Conastruction of boundary wall & filling of Patimunda Shir Jagannatha Sanskrit Maha Vidyalaya field 1.70 Land Development<br />

89 Bahanaga Chittol Baliktiran Improvement of road from Balikitiran sub-satation to Nagara Gohiri via Cahalapada 1.70 Rural Connectivity<br />

90 Bahanaga Chittol Fatepur Improvement of road from Fatepur main road to Samal sahi 2.00 Rural Connectivity<br />

91 Bahanaga Chittol Bankeswarpur Improvement of road from Bankeswarpur Behera sahi chhak to Mana Behera house 1.70 Rural Connectivity<br />

92 Bahanaga Chittol Dianpahi Renovation & construction of Ghat of Dianpahi Thakurani tank 1.70 Water Conservation<br />

93 Bahanaga Kalyani Villa Renovation of Baula tank 2.00 Water Conservation<br />

94 Bahanaga Kalyani Villa Stone patching of Gola Badhi Pokhari 1.00 Water Conservation<br />

95 Bahanaga Kalyani Dyarika Earth & morum work form Behera chhaka to Panchumukhi via Bania pada 1.70 Land Development<br />

96 Bahanaga Kalyani Kalyani Earth & morum work from Arala PWD to Purtta road via Patana Mangala & Kalyani Sasan 1.70 Rural Connectivity<br />

97 Bahanaga Kalyani Arala Earth & morum work from Purtta road to Adhok Das house via Panigrahi sahi 2.00 Rural Connectivity<br />

98 Bahanaga Kalyani Salagan Earth & morum work from PMG road to Hrushikesh Mahapatra house via Jagnnath Mahapatra house 2.75 Rural Connectivity<br />

99 Bahanaga Kalyani Kuapada Earth & morum work from Kuapada school to Bhalu Mahalik house via Ratha Mahalik 2.75 Rural Connectivity<br />

100 Bahanaga Kalyani Odasal Renovation of Kunda tank 2.75 Water Conservation<br />

101 Bahanaga Kalyani Bagalpur Renovation of Kunda tank 2.75 Water Conservation<br />

102 Bahanaga Kalyani Jahnipur Renovation of Gauda tank 2.75 Water Conservation<br />

103 Bahanaga Kalyani Nuapur Renovation of Santani tank 1.70 Water Conservation<br />

104 Bahanaga Kalyani Gilida Levelling of Gilida High School boundary 2.75 Land Development<br />

105 Bahanaga Khantapada Bhagabatpur Earth & morum work from Sukurima Baragachha to Tangara road via School Patra sahi 1.50 Rural Connectivity<br />

106 Bahanaga Khantapada Gobindapur Earth & morum work from middle of village school Naichhanapur road 2.50 Land Development<br />

107 Bahanaga Khantapada Khantapada Earth & morum work from Khantapada road Bhagabata Gosai house to Girls High School road 2.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

108 Bahanaga Khantapada Suthanga Improvement of road at Mohanty sahi 2.50 Rural Connectivity<br />

109 Bahanaga Khantapada Haripalpur Improvement of road from Haripalpur to Telipada 2.50 Rural Connectivity<br />

110 Bahanaga Khantapada Mulakudhai Excavation of Dandatali Pokhari 2.50 Water Conservation<br />

111 Bahanaga Khantapada Sankhua Excavation of Meki Pokhari 2.50 Water Conservation<br />

1<strong>12</strong> Bahanaga Khantapada Naichhanpur Earth & morum work from incomplete Naichhanpur Pucca road to RD road via Mahadev temple 2.50 Rural Connectivity<br />

113 Bahanaga Kuruda Kuruda Improvement of road from soil road to transfermer via Balimunda 2.50 Rural Connectivity<br />

114 Bahanaga Kuruda Kuruda Renovation of Vatpada tank 2.00 Water Conservation<br />

115 Bahanaga Patharpentha Taharpur Earth & morum work from RD road to Tinigharia sahir road 1.70 Rural Connectivity<br />

116 Bahanaga Patharpentha Taharpur Earth & morum work from R.D. road to Pradhan sahi 2.00 Rural Connectivity<br />

117 Bahanaga Patharpentha Patana Earth & morum work from Patana School to Bagalpur road 2.00 Rural Connectivity<br />

118 Bahanaga Patharpentha Patana Renovation of Bairatota Pokhari 2.00 Water Conservation<br />

119 Bahanaga Patharpentha Patharpetha Earth & morum work of Kamarakhala sahi road 1.70 Rural Connectivity<br />

<strong>12</strong>0 Bahanaga Patharpentha Basulipur Renovation of Adibasi sahi Pokhari 2.00 Water Conservation<br />

<strong>12</strong>1 Bahanaga Patharpentha Bagalpur Earth & morum work from Sahu sahi & Pandia sahi road 1.70 Rural Connectivity<br />

<strong>12</strong>2 Bahanaga Patharpentha Sibapura Renovation of Sibapura Kalara Pokhari 1.70 Water Conservation<br />

<strong>12</strong>3 Bahanaga Saud Pakhara Construction of pucca ghat and excavation of Pakhara Bela Pokhari 2.00 Water Conservation<br />

<strong>12</strong>4 Bahanaga Saud Benapada Excavation of new pokhari at infort of Benapada M.E. School 1.70 Water Conservation<br />

<strong>12</strong>5 Bahanaga Saud Saud Renovation of Hata tank at Saud 2.75 Water Conservation<br />

<strong>12</strong>6 Bahanaga Saud Bajana Excavation of Bajana Talapada Pokhari 2.75 Water Conservation<br />

<strong>12</strong>7 Bahanaga Saud Talasada Construction of Pucca ghat and excavation of Talasada pokhari 2.75 Water Conservation<br />

<strong>12</strong>8 Bahanaga Gopalpur Pandasuni Improvement of road from Pandasuni sub-station chhak to Moda Gachha 1.70 Rural Connectivity<br />

<strong>12</strong>9 Bahanaga Gopalpur Malanga Construction of road from Malanga Avira chhak to Das sahi chhak via Mohanty sahi chhak 1.70 Rural Connectivity<br />

130 Bahanaga Gopalpur Nadigira Construction of road from Tarini Chhak to Transformer via UP school & club chhak 1.70 Rural Connectivity<br />

131 Bahanaga Gopalpur Paikasta Improvement of road from Hanuman Mandir to Patana Rout sahi road 1.70 Rural Connectivity<br />

132 Bahanaga Gopalpur Sarangapur Improvement of road from Junia to Sarangasuni via Chamara sahi 1.70 Rural Connectivity<br />

133 Bahanaga Gopalpur Gopalpur Improvement of road from Gopalpur Talapada road to Nayak sahi 1.70 Rural Connectivity<br />

134 Bahanaga Gopalpur Gopalpur Improvement of road from Luni road to Gopalpur village road 1.70 Rural Connectivity<br />

135 Bahanaga Gopalpur Uttarkuanra Construction of Uttarkuanra village road 1.70 Rural Connectivity<br />

136 Bahanaga Gopalpur Jalakhatua Excavation of Jala Khatua Uttar sahi tank 2.75 Water Conservation<br />

137 Bahanaga Gopalpur Mainsapata Construction of of Mainsapata villagae road 1.70 Rural Connectivity<br />

138 Bahanaga Gopalpur Nilakanthapur Improvement of road from Nilakanthapur school to Thakurani 1.70 Rural Connectivity<br />

139 Bahanaga Avana Alada Improvement of road from Alada Mahapatra road to Kharasahapur road 1.50 Rural Connectivity<br />

140 Bahanaga Baripada Jagannathpur Levelling of Jagannathpur Jatra Padia 1.50 Land Development<br />

141 Bahanaga Baripada Osanga Improvement of road from Osangapurdefence road to Resua Pokhari road 1.20 Rural Connectivity<br />

142 Bahanaga Baripada Maharudrapur Improvement of road from Maharudrapur defence road to Sahu sahi 1.30 Rural Connectivity<br />

143 Bahanaga Baripada Baripada Improvement of road from Baripada road to Chhachi Mallik sahi road 2.20 Rural Connectivity<br />

144 Bahanaga Baripada L.N.Patana Renovation of R.N.Pur Patana Kerua Pokhari 1.30 Water Conservation<br />

145 Bahanaga Baripada Madanapur Improvement of road from Madnapaur defence road to Mati Godia road 1.20 Rural Connectivity<br />

146 Bahanaga Baripada Attaspur Improvement of road from Ataspur defence road to Chakradhar Tripathy house road 2.20 Rural Connectivity<br />

147 Bahanaga Baripada Karanjabindha Improvement of road from Karanjabindha Harihata chhaka to Nigamanand Mandir road 1.20 Rural Connectivity<br />

148 Bahanaga Chaka Jagannathpur Chaka Jagannathpur Improvement of road from Sudarsan Jena house to Gopal Singh house 1.30 Rural Connectivity<br />

149 Bahanaga Chaka Jagannathpur Chandinipur Improvement of road from R.D. road to Keshab Bila 1.30 Rural Connectivity<br />

150 Bahanaga Chaka Jagannathpur Attapur Construction of road from Sachindra Jena house to Uppar Patna road 1.30 Rural Connectivity<br />

151 Bahanaga Chaka Jagannathpur Kamalapatana Sasan Improvement of road from Kamala Kanta Pur Tela Shi Chhaka to Nachinta P.S. road 2.20 Rural Connectivity<br />

152 Bahanaga Dandahairpur Mugunipur Earth, morum work from Basulidhia road to Rout Ghar chhaka 1.30 Rural Connectivity<br />

153 Bahanaga Dandahairpur Nayakbandha Renovation of Nayakbandha Pokhari 1.30 Water Conservation<br />

154 Bahanaga Dandahairpur Pitalapada Earth & stone patching work of Thakurani Pokhari Adhi 1.30 Land Development<br />

155 Bahanaga Dandahairpur Aruha Improvement of road from Arhua Mouhria Gohiri Chhak to Gandasthapur Samiti road via Behera sahi. 1.30 Rural Connectivity<br />

156 Bahanaga Dandahairpur Asimila Renovation of Thakura Pokhari 1.30 Water Conservation<br />

157 Bahanaga Dandahairpur Dandaharipur Renovation & water harvesting of Dandaharipur Jarahali Pokhari 1.30 Irrigation<br />

158 Bahanaga Dandahairpur Gandasthapur Improvement of road from Gandasthapur Chamapakana diha to Padmalochan Panda house 1.30 Rural Connectivity<br />

159 Bahanaga Kochiakoili Kanthigadia Excavation of Kanthigadia Bada Pokhari 1.20 Water Conservation<br />

160 Bahanaga Kochiakoili Bedmud Improvement of road from Patana Raghu Bila to Ganga Mahalik house via Patana U.P. School 1.20 Rural Connectivity<br />

161 Bahanaga Kochiakoili Kochiakoili Improvement of road from P.S. road to Sankhua sahi road via Baina Panda house 1.20 Rural Connectivity<br />

162 Bahanaga Kasaba Jayapur Alasuan Construction of drain from side of Ghanashyam Sethy house to Malik sahi road 1.30 Irrigation<br />

163 Bahanaga Kasaba Jayapur Jirtal Excavation and guard wall of Laxmidhar Pokhari 1.30 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

164 Bahanaga Kasaba Jayapur K. Jayapur Construction of stone packing near of Grama Panchayat Pokhari 1.30 Land Development<br />

165 Bahanaga Kasaba Jayapur Routmanakahani Excavation of Kusuda Pokhari 1.30 Water Conservation<br />

166 Bahanaga Kasaba Jayapur Chhatrapur Excavation of Phuti Godia 1.30 Water Conservation<br />

167 Bahanaga Kasaba Jayapur Dalingia Excavation of Gandastha Pokhari 1.30 Water Conservation<br />

168 Bahanaga Kasaba Jayapur Jugala Improvement of road from Jugala Sasan to Chhatrapur of earth and morrum work 1.30 Water Conservation<br />

169 Bahanaga Kasaba Jayapur Oliapatan Improvement of road from Chandi club to Karandia Adibasi sahi 1.30 Rural Connectivity<br />

170 Bahanaga Kasaba Jayapur Manakahani Excavation of Arhuna Pokhari 1.30 Water Conservation<br />

171 Bahanaga Kasaba Jayapur Rasalpur Improvement of road from Nahara Patana Jena sahi chhaka to Sambu Das road 1.30 Rural Connectivity<br />

172 Bahanaga Kasaba Jayapur Abadulanagar Excavation of Muni Pada Pokhari, Abadulanagar 1.30 Water Conservation<br />

173 Bahanaga Kharasahapur Kharasahapur Improvement of road from Kharasahapur Majhi sahi R.D. road to Khunta Pokhari 1.30 Rural Connectivity<br />

174 Bahanaga Kharasahapur Kharasahapur Digging of Ramtali Jay Durga Maha Puskarini Tank 2.20 Water Conservation<br />

Sub-Total 319.90<br />

1 <strong>Balasore</strong> Nagram Nagram Const.of road from Pradyumna Padhi house to N.H.-60 via-Nagram U.P. School. 2.75 Rural Connectivity<br />

2 <strong>Balasore</strong> Nagram Nagram Renovation of Nagram tank 1.50 Water Conservation<br />

3 <strong>Balasore</strong> Nagram Kaharakul Const.of road from Kaharakul Umakanta Jena house to Panchyat Fruit orchard. 1.50 Rural Connectivity<br />

4 <strong>Balasore</strong> Nagram Fulwar Kasaba Const.of road from F.Kasba Purna Ch.Das house to Budha Balang bridge via-Rly gate and Akshaya Mohapatra. 2.00 Rural Connectivity<br />

5 <strong>Balasore</strong> Nagram B.P.Orada Const.of road from Chakradhar M.E.School to Budha Balanga bridge. 2.00 Rural Connectivity<br />

6 <strong>Balasore</strong> Nagram Mallipur Const.of road from Mallipur Holi Mandap to Rama Ch.Behera house. 1.75 Rural Connectivity<br />

7 <strong>Balasore</strong> Nagram Tikirapal Const.of road fromTikirapal Narendra Jena house to Mallipur Holi Mandap. 1.50 Rural Connectivity<br />

8 <strong>Balasore</strong> Ranasahi Ranasahi Const.of road from Ranasahi Kalika Chhak to coast canal via-Mundagadia road. 2.00 Rural Connectivity<br />

9 <strong>Balasore</strong> Ranasahi Ranasahi Const.of road from Ranasahi Murali Mohanty house to Baidhar Das housevia-Chhuadiapada. 1.50 Rural Connectivity<br />

10 <strong>Balasore</strong> Ranasahi Ranasahi Renovation of Athilamal Mahanal. 2.00 Water Conservation<br />

11 <strong>Balasore</strong> Ranasahi Tapasi Const of road from Salandri Mangala Chhaka to Pranabandhu Mallik house via-Bhagabat Mallik house road. 1.50 Rural Connectivity<br />

<strong>12</strong> <strong>Balasore</strong> Ranasahi Dasi Const.of road from Dasi R.D. road to Kathua Pokhari via- Bhagaban Mallik house. 2.00 Rural Connectivity<br />

13 <strong>Balasore</strong> Ranasahi Jhagadapadhi Const.of road from Jhagada Padhi R.D road to Nangudi Mahendra Nayak house via-Adibasi sahi. 2.00 Rural Connectivity<br />

14 <strong>Balasore</strong> Ranasahi Sunadeolabad Const.of road from Jhagada Padhi Rajani Bhuyan house to B.N.C.C Sanadeolabad 1.50 Rural Connectivity<br />

15 <strong>Balasore</strong> Buanl Kudia Renovation of Govt. Tank at Kadia 1.50 Water Conservation<br />

16 <strong>Balasore</strong> Buanl Kaudiapatana Const.of road from Kaudia Patna Bridge to Buanla Karuna sahi. 2.00 Rural Connectivity<br />

17 <strong>Balasore</strong> Buanl Parikul Renovation of Govt. Tank at Parikul 1.50 Water Conservation<br />

18 <strong>Balasore</strong> Buanl Buanl Renovation of Buanla Bila Pokhari 2.00 Water Conservation<br />

19 <strong>Balasore</strong> Buanl Buanl Const. of road from Adivasi sahi to Sindhia Ferry Ghat via Dula Das house. 2.00 Rural Connectivity<br />

20 <strong>Balasore</strong> Buanl Dipapal Const.of road from Dipapal Chhak to Ichhapur chhaka via- Jaga Chhaka 2.00 Rural Connectivity<br />

21 <strong>Balasore</strong> Buanl Nuapur Const.of road from Nuapur Harihata Mandap to Gujuri Bazar chhaka. 2.00 Rural Connectivity<br />

22 <strong>Balasore</strong> Buanl Sindia Const.of road from Sindhia Dulu Das house to Kangali Das house via-Hari Sabha 2.00 Rural Connectivity<br />

23 <strong>Balasore</strong> J.Kasaba J.Kasabapahi Impvt.of road from Atha-Maili coast canal to Huda Pada chhaka with hume pipe and morum work. 2.00 Rural Connectivity<br />

24 <strong>Balasore</strong> J.Kasaba J.Kasaba Impvt.of road from Panthei chhaka to Dama Das house. 1.50 Rural Connectivity<br />

25 <strong>Balasore</strong> J.Kasaba Bardhanpur Renovation of Kuamalla Pokhari. 2.00 Water Conservation<br />

26 <strong>Balasore</strong> J.Kasaba Sahajanagar Renovation of Mahisasuri Pokhari. 2.00 Water Conservation<br />

27 <strong>Balasore</strong> J.Kasaba Mayadharpur Impvt.of road from Harekrushna Jena house to Kutu Saha house. 2.00 Rural Connectivity<br />

28 <strong>Balasore</strong> J.Kasaba Tikarpada Renovation of Mathapada Pokhari. 2.00 Water Conservation<br />

29 <strong>Balasore</strong> Gudu Bidei Earth work from Bidei Mahavir Club to Sundi Badi Chaka. 1.50 Land Development<br />

30 <strong>Balasore</strong> Gudu Gudu Earth and morrum work from Chatara E.G.S centre to Nitai Adi house. 1.50 Land Development<br />

31 <strong>Balasore</strong> Gudu Gudu Road from ITR road to ITR road via-Mandal sahi. 2.00 Rural Connectivity<br />

32 <strong>Balasore</strong> Gudu Sahada Road from Rukmani Pond to Brahma Sasan, Sahada. 2.00 Rural Connectivity<br />

33 <strong>Balasore</strong> Gudu Sahada Road from Sahada Sub-station to Sekh Patana. 2.00 Rural Connectivity<br />

34 <strong>Balasore</strong> Bahabalapur Dubulagadi Digging and pucca ghat at Gujuri Kalikata New Pond 1.50 Water Conservation<br />

35 <strong>Balasore</strong> Bahabalapur Bagada Digging and pucca ghat at Karanja Pahi Adibasi sahi new Pond 2.00 Water Conservation<br />

36 <strong>Balasore</strong> Bahabalapur Bahabalpur Soil and morrum work from Ranga Mathia bridge to Satyanagar Pahi bridge. 2.00 Flood Control<br />

37 <strong>Balasore</strong> Bahabalapur Bahabalpur Impvt.of road from Fishery road to Kanchilal 2.00 Rural Connectivity<br />

38 <strong>Balasore</strong> Bahabalapur Endrai Soil and morrum work from Endrai GP pond to Raghabpur Kesab Jena house. 2.00 Land Development<br />

39 <strong>Balasore</strong> Bahabalapur Endrai Construction of Mound in Endrai 2.00 Flood Control<br />

40 <strong>Balasore</strong> Bahabalapur Endrai Digging and pucca ghat of Old GP Pond at Nuagan. 2.00 Water Conservation<br />

41 <strong>Balasore</strong> Padmapur Padmapur Impvt.of road from Padmapur Ullasa Sethi house to Kartik Pati house, via-Balabhadra. 2.00 Rural Connectivity<br />

42 <strong>Balasore</strong> Padmapur Padmapur Impvt.of road from Padmapur Ananta Patra house to Dalei sahi, via-Mangala Pada. 2.00 Rural Connectivity<br />

43 <strong>Balasore</strong> Padmapur Padmapur Renovation of Karanja Pokhari. 1.50 Water Conservation<br />

44 <strong>Balasore</strong> Padmapur Bankeswar Const.of pucca road from Bankeswar Durga Mandap to Bakreswar Mahadev Mandir,via-G.P.Office. 2.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

45 <strong>Balasore</strong> Padmapur Majhikia Completed road from Majhikia Abhirapada chhaka to Bhima Mahallik house. 2.00 Rural Connectivity<br />

46 <strong>Balasore</strong> Padmapur Badakia Renovation of Mati Godia. 1.50 Water Conservation<br />

47 <strong>Balasore</strong> Hidigan Hidigan Construction of road from Hidigan main road to Adibasi sahi via-Rayam Pada 2.00 Rural Connectivity<br />

48 <strong>Balasore</strong> Hidigan Mulanagar Earth and morrum work from Mulanagar Markanda house to Nima Pada. 2.00 Rural Connectivity<br />

49 <strong>Balasore</strong> Hidigan Aladia Const.of road from Aladia School to Coast canal Adia Yem Hidim Chandi 2.00 Rural Connectivity<br />

50 <strong>Balasore</strong> Hidigan Salapada Impvt.of road from Coast canal Adi to Salapada Rabindra Mallik house. 1.50 Rural Connectivity<br />

51 <strong>Balasore</strong> Hidigan Salapada Excavation of Salapada Gola Khala 2.00 Irrigation<br />

52 <strong>Balasore</strong> Patrapada Tigiria Const.of road from Chandipur ITR road to Tigiria A.W center with morrum and earth work 1.50 Rural Connectivity<br />

53 <strong>Balasore</strong> Patrapada Chakasimulia Const.of Dakhina side pucca ghat and renovationa of Golagodia Pokhari 2.00 Water Conservation<br />

54 <strong>Balasore</strong> Patrapada Purunabalasore Excavation and const.of pucca ghat at Purunabalasore Godhi Pokhari. 2.00 Water Conservation<br />

55 <strong>Balasore</strong> Patrapada Purunabalasore Earth and hume pipe work from Tulasipada Ramesh Majhi house to Bagicha. 1.50 Irrigation<br />

56 <strong>Balasore</strong> Patrapada Patrapada Impvt.of Road from Gobagan Basuli Chhak to Gojendra Das house 1.30 Rural Connectivity<br />

57 <strong>Balasore</strong> Odangai Odangi Road from Ratnakara Das house to Baghajatin road, via-Vasuain Pada 2.00 Rural Connectivity<br />

58 <strong>Balasore</strong> Odangai Narasinghpur Road from Narasinghpur main road to Dasarathi house 1.50 Rural Connectivity<br />

59 <strong>Balasore</strong> Odangai Silad Road from Silad main road to Maira Behera house. 1.50 Rural Connectivity<br />

60 <strong>Balasore</strong> Odangai Junagodia Road from Junagodia machine ghara to Tala Amara Parida sahi. 2.00 Rural Connectivity<br />

61 <strong>Balasore</strong> Odangai Kaudipur Excavation of drain from Kaudipur Kaudia Pada to Chhamunla drain. 2.00 Irrigation<br />

62 <strong>Balasore</strong> Odangai Malad Excavation of Malad Pada Pokhari. 1.50 Water Conservation<br />

63 <strong>Balasore</strong> Odangai Tala Amara Road from Tala Amara Parida sahi to Beria Pada and Tala Amara Mangala Mandap to Palasia Pada via-Cross Bandha 2.00 Rural Connectivity<br />

64 <strong>Balasore</strong> Kasafal Alumeda Impvt. Of road from Alumeda Mauza Mirga Pahi Pradhan sahi chhak to Biswanath Mandal house chhak foot Bridge. 2.00 Rural Connectivity<br />

65 <strong>Balasore</strong> Kasafal Kasafal Impvt.of road from A.P.H.C. chhaka to Jeti Ghat Kasafal 2.00 Flood Control<br />

66 <strong>Balasore</strong> Kasafal Kasafal Impvt. of road from Gima Gadia S. Sahu chhak to U. Mandal house chhak Pota Khalo with sluice -1 2.00 Flood Control<br />

67 <strong>Balasore</strong> Kasafal Kalabudhi Impvt. of road from Kalabudhi Panchayat Pokhari chhak to Nua Gaon B. Behera & sluice -1 2.00 Flood Control<br />

68 <strong>Balasore</strong> Kasafal Juari Impvt. Of road from Juari Sitala Mata Chhak to Alumeda School via- padhi sahi 2.00 Rural Connectivity<br />

69 <strong>Balasore</strong> Kasafal Sarthabindha Imp. of Road from Sarthabindha A. Khanda Chhak to Sarthabindha Ghola School 2.00 Rural Connectivity<br />

70 <strong>Balasore</strong> Chhanua Chhanua Const.of road from Chhanua Kaibarta sahi to Gandhi road 2.00 Rural Connectivity<br />

71 <strong>Balasore</strong> Chhanua Chhanua Excavation of drain from Chhanua Bansi Jena house to Chirakuni Nala. 2.00 Irrigation<br />

72 <strong>Balasore</strong> Chhanua Silida Const.of road from Silida to Pathara Pada road. 2.00 Rural Connectivity<br />

73 <strong>Balasore</strong> Chhanua Silida Const.of road from Silida Fishery road to Melaka Dangar chaka road. 2.00 Rural Connectivity<br />

74 <strong>Balasore</strong> Chhanua Solpata Const.of road from Solpata Mahadev Mandir to Coast canal, via-Anadi Nayak. 2.00 Rural Connectivity<br />

75 <strong>Balasore</strong> Chhanua Sanagobara Const.of road and culvert work from Sanagobara School to Coast canal road. 2.00 Irrigation<br />

76 <strong>Balasore</strong> Chhanua Brahmanada Renovation of Brahmanada Pokhari 1.00 Water Conservation<br />

77 <strong>Balasore</strong> Chhanua Bhadrasia Renovation of Bhadrasia Pokhari. 2.00 Water Conservation<br />

78 <strong>Balasore</strong> Gopinathpur Gopinathpur Excavation of Panchayat High School tank, Gopinathpur. 2.00 Water Conservation<br />

79 <strong>Balasore</strong> Gopinathpur Mundideula Earth and morrum work from Mantu Basantia house to G.P.road 2.00 Rural Connectivity<br />

80 <strong>Balasore</strong> Gopinathpur Badakhua Excavation of Saraswati tank 1.50 Water Conservation<br />

81 <strong>Balasore</strong> Gopinathpur Hasanpur Excavation of Hasanpur Sebasram School tank with pucca ghat 2.00 Water Conservation<br />

82 <strong>Balasore</strong> Gopinathpur Jagannathpur Earth and morrum work from Jagannathpur to Charigochhia and Jagannathpur to Coast canal Adi 2.00 Land Development<br />

83 <strong>Balasore</strong> Gopinathpur Mauda Excavation of Mouda village tank with pucca ghat 2.00 Water Conservation<br />

84 <strong>Balasore</strong> Gopinathpur Nulkuli Earth and morrum work from Nalkuli Harijan sahi to Kathpal via-Jagannathpur. 2.00 Rural Connectivity<br />

85 <strong>Balasore</strong> Rasalpur Badadhanadi Earth morrum work from Sankarnath to Aprati Majhi sahi. 2.00 Land Development<br />

86 <strong>Balasore</strong> Rasalpur Kusudiha Earth work at Haladhar Pradhan chhaka to Danda Nala 2.00 Land Development<br />

87 <strong>Balasore</strong> Rasalpur Mainsali Earth and murrum work from Mainsali chhaka to Nayak sahi 2.00 Rural Connectivity<br />

88 <strong>Balasore</strong> Rasalpur Manudiha Earth work from Phakir Jena house to Baikhia Nala. 2.00 Land Development<br />

89 <strong>Balasore</strong> Rasalpur Oladi Excavation of Oladi G.P.Tank. 2.00 Water Conservation<br />

90 <strong>Balasore</strong> Rasalpur Parvilla Earth and morrum work at Parvilla Behera sahi, Gaan sahi and Majhi sahi. 2.00 Rural Connectivity<br />

91 <strong>Balasore</strong> Rasalpur Rasulpur Excavation of Tank near Ghosara Nallah at Badadhanadi Village of Rasulpur 2.00 Water Conservation<br />

92 <strong>Balasore</strong> Sasanga Nuapur Impvt.of road from Nuapur Naligohari chhaka to Deba house. 2.00 Rural Connectivity<br />

93 <strong>Balasore</strong> Sasanga Nuapur Impvt.of road from Nuapur Chatana chhaka to Basanti Mandap. 2.00 Rural Connectivity<br />

94 <strong>Balasore</strong> Sasanga Sasang Impvt.of road from Jagannathpur Sasan to Mallik sahi Laxmi Narayan Temple. 2.00 Rural Connectivity<br />

95 <strong>Balasore</strong> Sasanga Sasang Excavation of Sasang Ahar Pokhari Sasang 2.00 Water Conservation<br />

96 <strong>Balasore</strong> Sasanga Saraswatipur Renovation of Tank Sukla Pokhari Saraswatipur 2.00 Water Conservation<br />

97 <strong>Balasore</strong> Sasanga Astia Impvt.of road from Astia Harihat to Astia School chhaka. 2.00 Rural Connectivity<br />

98 <strong>Balasore</strong> Parikhi Parikhi Const.of road from Parikhi Fandi to Kayakadla ghat. 2.00 Rural Connectivity<br />

99 <strong>Balasore</strong> Parikhi Sarisapada Const.of road from Kara chhaka to Gokulpur 2.00 Rural Connectivity<br />

100 <strong>Balasore</strong> Parikhi Talborai Const.of road from Talborai School to Irrigation bandha, via-Jahar Maity house. 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

101 <strong>Balasore</strong> Parikhi Badadiha Const.of road from Parikhi Boarder to R.N.road , via-Shiva Temple. 2.00 Rural Connectivity<br />

102 <strong>Balasore</strong> Parikhi Baulabeni Const.of road from Parikhi School to Baulabeni 2.00 Rural Connectivity<br />

103 <strong>Balasore</strong> Parikhi Kayakadala Const.of from Islam house to Doctor Sila, via-Majar 1.50 Rural Connectivity<br />

104 <strong>Balasore</strong> Parikhi Pauta Const.of road from Irrigation Bandha to Pauta Harijan sahi 1.50 Rural Connectivity<br />

105 <strong>Balasore</strong> Genguti Khannagar Impvt.road from R.D.road to Abandha chhaka, via-Mangala Mandir. 2.00 Rural Connectivity<br />

106 <strong>Balasore</strong> Genguti Jambeswarpur Impvt. Of road from Jambeswarpur Switz Pola to Purusottampur RD road. 2.00 Rural Connectivity<br />

107 <strong>Balasore</strong> Genguti Genguti Renovation & Const. of pucca ghat at Genguti Solanga Pokhari 2.00 Water Conservation<br />

108 <strong>Balasore</strong> Genguti Kantabania Impvt. Of road at Kantabania Gramya Village road 1.75 Rural Connectivity<br />

109 <strong>Balasore</strong> Genguti Kurkura Renovation and Const.of pucca ghat at Kurkura Kochila Pokhari 1.75 Water Conservation<br />

110 <strong>Balasore</strong> Genguti Pakharsaun Impvt. Road at Pakharsaun Village road Parida sahi, Samal sahi & Pradhan sahi. 1.75 Rural Connectivity<br />

111 <strong>Balasore</strong> Genguti Baringia Renovation & Const. of Pucca ghat at Baringia Brahamanipada Harihat Pokhari. 1.75 Water Conservation<br />

1<strong>12</strong> <strong>Balasore</strong> Genguti Pachhudiha Impvt. Of road from Pachhudiha Tala pokhari to Judhistirapur Patna road. 1.75 Rural Connectivity<br />

113 <strong>Balasore</strong> Sartha Asuradiha Road from Baradiha Nadi to Khatua Ghar and Canal Adi 1.50 Rural Connectivity<br />

114 <strong>Balasore</strong> Sartha Panchupada Road from Mangala Badi to Mohanty Chhak 1.00 Rural Connectivity<br />

115 <strong>Balasore</strong> Sartha Panchupada Road from Panchupada Hadapada to Wadu Chhak Nadighat Road 1.00 Rural Connectivity<br />

116 <strong>Balasore</strong> Sartha Sartha Const.of Road from Dasahara Padia Kabuli Chhak to Luna Pokhari 1.50 Rural Connectivity<br />

117 <strong>Balasore</strong> Sartha Sartha Const.of Road from Sartha Sripancham to Bada Ghodapada Via-Girisahi Hadapada and Padusahu House 1.50 Rural Connectivity<br />

118 <strong>Balasore</strong> Sartha Sartha Const.of Road from Gochar to Girichhak Foot Bridge 1.50 Rural Connectivity<br />

119 <strong>Balasore</strong> Kasipada Agria Impv of road from Mahadev Temple to NH-60 1.00 Rural Connectivity<br />

<strong>12</strong>0 <strong>Balasore</strong> Kasipada Anko Impv of road from Anka Bidyadhar Das house to Ajit Behera 1.00 Rural Connectivity<br />

<strong>12</strong>1 <strong>Balasore</strong> Kasipada Ankabindha Impv of road from PWD road fish market to Mirigimundi Chenga Gadia 1.50 Rural Connectivity<br />

<strong>12</strong>2 <strong>Balasore</strong> Kasipada Chak Podadiha Impv of road from Chak Podadiha Rly line to Jhuta nala Colony via Sanman 1.50 Rural Connectivity<br />

<strong>12</strong>3 <strong>Balasore</strong> Kasipada Kadamouda Impv of road from PWD road to NH-60 via Banisahi and Sanman 1.00 Rural Connectivity<br />

<strong>12</strong>4 <strong>Balasore</strong> Kasipada Patpur Impv of road from Patpur Railway line pitch road to Fakira Das house via Mangal Sing house 1.50 Rural Connectivity<br />

<strong>12</strong>5 <strong>Balasore</strong> Kasipada Podadiha Impv of road from PWD road to Mirigimundi Rana Pratap Yubak Sangha via Bhagirathi Mohanty house and Const. of drain 2.00 Rural Connectivity<br />

<strong>12</strong>6 <strong>Balasore</strong> Kasipada Taharpur Impv or road and const. of drain from Taharpur Nini Cycle store to Sankar Behera house 2.00 Rural Connectivity<br />

<strong>12</strong>7 <strong>Balasore</strong> Rasalpur Chhachina Development of village road from School chhak to Bhimpur ITR road Haladibadi chhak 1.75 Rural Connectivity<br />

<strong>12</strong>8 <strong>Balasore</strong> Rasalpur Rasalpur Const. of road from Phandi sahi C.C. road to Bhimpur Village road. 1.75 Rural Connectivity<br />

<strong>12</strong>9 <strong>Balasore</strong> Rasalpur Rasalpur Earthwork from GP chhak Nimiki Sadak to Nadigaon Sasan Via-Ji sahi 1.75 Rural Connectivity<br />

130 <strong>Balasore</strong> Rasalpur Pachhagaon Earthwork from Nimiki Sadak to Nilakantha Patra house. 1.75 Rural Connectivity<br />

131 <strong>Balasore</strong> Rasalpur Kuanarpur Development of village road from Harihat ghar to Ratha house and Markanda house 1.50 Rural Connectivity<br />

132 <strong>Balasore</strong> Rasalpur Chheliapada Development of village road from Rasalpur GP chhak to Ghangua Pokhari 1.75 Rural Connectivity<br />

133 <strong>Balasore</strong> Rasalpur Chandipur Development of road from Dalapanta chhak to ITR road Via- Narendra Shop 1.75 Rural Connectivity<br />

134 <strong>Balasore</strong> Srikona Naupalgadi Const.of road and Embankment of Nadi Bandha side of Naupalagadi Budhabalanga 1.75 Flood Control<br />

135 <strong>Balasore</strong> Srikona Srikona Const.of road from Jhampara sahi Thakurani to Sk.Gyasu house 1.50 Rural Connectivity<br />

136 <strong>Balasore</strong> Srikona Srikona Const.of Road from Giyasuddin house to Khandakali bridge 1.75 Rural Connectivity<br />

137 <strong>Balasore</strong> Srikona Chandipur Excavation of Pokhari at Chandipur river side Govt.land. 1.75 Water Conservation<br />

138 <strong>Balasore</strong> Srikona Charigochhia Renovation of Govt.Pokhari at Charigochhia Govt.land 1.75 Water Conservation<br />

139 <strong>Balasore</strong> Sindhia Baincha Excavation of Baincha America Pond & Excavation of Pucca Ghat. 1.75 Water Conservation<br />

140 <strong>Balasore</strong> Sindhia Belda Development of road from Laxminarayana Mandap to School road 1.75 Rural Connectivity<br />

141 <strong>Balasore</strong> Sindhia Chaka Sindhia Excavation of Chakasindhia Lunagadia Pond and Const. of pucca Ghat with stone patching 1.75 Water Conservation<br />

142 <strong>Balasore</strong> Sindhia Dumuria Excavation of Dumuria Mada Pokhari and Const. of Pucca Ghat 1.75 Water Conservation<br />

143 <strong>Balasore</strong> Sindhia Kusadiha Excavation of pond near Kusudia Coast canal and Const. of pucca Ghat 1.75 Water Conservation<br />

144 <strong>Balasore</strong> Sindhia Nayapada Excavation of Nayapada Bada Pokhari and Const. of pucca Ghat 2.00 Water Conservation<br />

145 <strong>Balasore</strong> Sindhia Raghunathpur Const. of road from Raghunathpur Benapadia to Laxmi Narayan Mandap and culvert Via- Chatar. 1.75 Rural Connectivity<br />

146 <strong>Balasore</strong> Sindhia Totapal Excavation of Totapal Chandana Pokhari and Const. of pucca Ghat 1.70 Water Conservation<br />

147 <strong>Balasore</strong> Srirampur Balabudhi Road from Uttara sahi Boundary Chhak to Purba Ghat 1.70 Rural Connectivity<br />

148 <strong>Balasore</strong> Srirampur Binjha Renovation of Sansantra Pokhari and const.of Pucca Ghat 2.00 Water Conservation<br />

149 <strong>Balasore</strong> Srirampur Gunduripada RD road Dokan chhaka to RD road Mada Pakha, via-Sanakua sahi 1.50 Rural Connectivity<br />

150 <strong>Balasore</strong> Srirampur Khadikapada Road from RD Road to Khadikapada to Asuradiha Chhak Road 1.70 Rural Connectivity<br />

151 <strong>Balasore</strong> Srirampur Machhadiha R.D.road toHarijan sahi chhaka road, via-Joka 2.00 Rural Connectivity<br />

152 <strong>Balasore</strong> Srirampur Nima Road from Nima Mahadev Mandir to Kantabani Chhak 1.75 Rural Connectivity<br />

153 <strong>Balasore</strong> Srirampur Srirampur Road from Mahadev Mandir to RD Road, two side earth work 1.50 Rural Connectivity<br />

154 <strong>Balasore</strong> Saragan Saragan Renovation of Saragan Patta godia pokhari 1.50 Water Conservation<br />

155 <strong>Balasore</strong> Saragan Saragan Renovation of Saragan Khajira Pokhari and Const. of pucca Ghat 2.00 Water Conservation<br />

156 <strong>Balasore</strong> Saragan Kadrabad Excavation of Thakura Pokhari 3.00 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

157 <strong>Balasore</strong> Saragan Haraspura Earth and morrum work from Haraspura Nimaki road to Pucca road 1.50 Land Development<br />

158 <strong>Balasore</strong> Saragan Kanchanibag Const.of road fromKanchanibag Purna Majhi chhaka to Adibasi Nalakupa 1.00 Rural Connectivity<br />

159 <strong>Balasore</strong> Saragan Kherana Const.of road and both side canal from Kherana village road to Adibasi sahi 1.70 Rural Connectivity<br />

160 <strong>Balasore</strong> Saragan Susa Const.of road from Kanchakhai Thakurani to Susa village. 1.70 Rural Connectivity<br />

161 <strong>Balasore</strong> Saragan Dolasusa West and South side of stone pathching at Dolasusa Bisei Pokhari 1.50 Land Development<br />

162 <strong>Balasore</strong> O.Saragan O.Saragan Road from Samiti Road to Coast canal via Mirzapur Harijansahi 1.70 Irrigation<br />

163 <strong>Balasore</strong> O.Saragan Potagaon Impvt.of road from O.Saragan to Digija Panchayat Samiti road 1.50 Rural Connectivity<br />

164 <strong>Balasore</strong> O.Saragan Duburai Impvt.of Road from Talasingarpur to NH-60 Via- Dubarai 1.70 Rural Connectivity<br />

165 <strong>Balasore</strong> O.Saragan Mahapada Const. of road from Mahapada to Malli sahi 1.70 Rural Connectivity<br />

166 <strong>Balasore</strong> O.Saragan Digida Const.of road from Digida to Gopinathpur 1.50 Rural Connectivity<br />

167 <strong>Balasore</strong> O.Saragan Potadiha Impvt.of road from Potadiha to Coast Canal 2.00 Rural Connectivity<br />

168 <strong>Balasore</strong> O.Saragan Jhinkiria Renovation of Jhinkiria Pokhari 1.50 Water Conservation<br />

169 <strong>Balasore</strong> O.Saragan Saharda Renovation of Saharda Gramya Pokhari and const.of pucca ghat. 1.50 Water Conservation<br />

170 <strong>Balasore</strong> O.Saragan Oupal Const.of road from Oupal School to Silada Nadi Bandha 1.70 Rural Connectivity<br />

171 <strong>Balasore</strong> O.Saragan Talasingarpur Const.of road from Talasingarpur to Maha Pada via-Dobarai. 1.75 Rural Connectivity<br />

172 <strong>Balasore</strong> O.Saragan Sasan Const.of road from Coast canal to Mahapada, via- Sasan. 1.70 Rural Connectivity<br />

173 <strong>Balasore</strong> Haladipada Gobinda Earth and morrum work from Bhagabat Mandap to Jagannath Sadak 1.70 Land Development<br />

174 <strong>Balasore</strong> Haladipada SapaniKhunta Excavation of Ambagadia Pokhari. 1.70 Water Conservation<br />

175 <strong>Balasore</strong> Haladipada Khandahar Earth and morrum work from Laxmidhar Mahalik house to Raghunath Mahalik house via Baishnavsahi. 1.70 Land Development<br />

176 <strong>Balasore</strong> Haladipada Ambapuja Earth and morrum work Raneswar Temple to Harihar Swain house. 1.70 Land Development<br />

177 <strong>Balasore</strong> Haladipada Singarpur Const.of drain, morrum and both side drain from Singarpur Pokhari to Bhudi Adi to Khandahar boundary 1.70 Irrigation<br />

178 <strong>Balasore</strong> Haladipada Ramachandrapur Earth and morrum work from Seru chhaka to Sole chhaka 1.70 Land Development<br />

179 <strong>Balasore</strong> Haladipada Gohipur Earth and morrum work from Gunasagar Pokhari to Guhipur 1.70 Land Development<br />

180 <strong>Balasore</strong> Haladipada Kalama Earth and morrum work from Lembua Jena house to Ganga Jena house 4.00 Land Development<br />

181 <strong>Balasore</strong> Kuradiha Sanadhanadi Earth and morrum work from Sanadhanadi U.P.School to NN-60, via-Baghamari Pada 1.70 Rural Connectivity<br />

182 <strong>Balasore</strong> Kuradiha Koilisahi Const. of Earth & Morrum Road from Koilisahi Panchamania to Kharji Tubewell . 1.70 Rural Connectivity<br />

183 <strong>Balasore</strong> Kuradiha Kuradiha Const. of Earth & Morrum Road from Kuradhia Chapamunha to Benamatia Pada 1.70 Rural Connectivity<br />

184 <strong>Balasore</strong> Kuradiha Malli sahi Const. of Earth & Morrum Road from Solpata O.T. Road to Malli sahi School 1.70 Rural Connectivity<br />

185 <strong>Balasore</strong> Kuradiha Rahimpada Earth and morrum work from Saraswati Mandap to Rahimpada Kalia Das 1.70 Land Development<br />

186 <strong>Balasore</strong> Kuradiha Samsarpur Const. of Earth & Morrum Road from Samsarpur Dakhini Majhi house to Bhagaban Das house 1.70 Rural Connectivity<br />

187 <strong>Balasore</strong> Kuradiha Chaulapura Const. of Earth & Morrum Road from Chaulapura Pokhari Adi to E.G.S. School 1.70 Rural Connectivity<br />

188 <strong>Balasore</strong> Kuradiha Pokharisahi Const. of Earth & Morrum Road from Pokharisahi Harihar Pradhan house to Manga Das house . 1.70 Rural Connectivity<br />

189 <strong>Balasore</strong> Nagram Kaharakul Renovation of Kajibag Panchayat Fruit orchard Pokhari. 1.30 Water Conservation<br />

190 <strong>Balasore</strong> Nagram Fulwar Kasaba Renovation of Bhagabati tank at F.Kasba. 1.30 Water Conservation<br />

191 <strong>Balasore</strong> Nagram B.P.Orada Renovation of Udapada Kala Godia. 1.30 Water Conservation<br />

192 <strong>Balasore</strong> Nagram Kalipur Const.of road from Kalipur Rama Ch.Nayak house to convent field. 1.30 Rural Connectivity<br />

193 <strong>Balasore</strong> Nagram Mallipur Const.of road from Kartik Behera house to Tikirapal Rly. Station. 1.30 Rural Connectivity<br />

194 <strong>Balasore</strong> Nagram Tikirapal Const.of road from Tkiripal Mandap to Chintamani Behera house. 2.20 Rural Connectivity<br />

195 <strong>Balasore</strong> Ranasahi Ranasahi Const. of road from Baikuntha Nath Nayak house to Kalika Chhaka road. 1.30 Rural Connectivity<br />

196 <strong>Balasore</strong> Ranasahi Ranasahi Excavation of Athilamal Madagadia Tank 1.30 Water Conservation<br />

197 <strong>Balasore</strong> Ranasahi Dasi Const.of road from R.D. road Daitari Behera house via-Jiban Behera house. 2.20 Rural Connectivity<br />

198 <strong>Balasore</strong> Ranasahi Jhagadapadhi Const. of road from R.D. road to Baincha Mangala Chhaka via-Narasingh Kara road 1.30 Rural Connectivity<br />

199 <strong>Balasore</strong> Ranasahi Badadeolabad Const. of road from Badadeolabad to Daya Nana Katha Godam via-Digirania Fishery. 2.20 Rural Connectivity<br />

200 <strong>Balasore</strong> Buanl Kudia Const.of road from Kudia Chhaka to Manu Panda house. 2.20 Rural Connectivity<br />

201 <strong>Balasore</strong> Buanl Kaudiapatana Const.of road from Kaudiapatna chhaka to Dipapal Sankha 1.30 Rural Connectivity<br />

202 <strong>Balasore</strong> Buanl Parikul Const.of road from Parikula chhaka to Parikul Tota sahi 2.20 Rural Connectivity<br />

203 <strong>Balasore</strong> Buanl Buanl Const.of road from Buanla Sethi sahi to Buanla Jena sahi via-Anu Sethi. 1.30 Rural Connectivity<br />

204 <strong>Balasore</strong> Buanl Belbaria Const.of road from Belbaria Club to B.P road Rly. Gate 1.30 Rural Connectivity<br />

205 <strong>Balasore</strong> Buanl Sindia Const.of road from Sindhia Bhandar to Nuapur Pheri Ghat via- Mohanty sahi. 1.30 Rural Connectivity<br />

206 <strong>Balasore</strong> J.Kasaba J.Kasabapahi Const.of road, morrum work and hume pipe work from Mula Basa to Manu Daktar house. 1.30 Irrigation<br />

207 <strong>Balasore</strong> J.Kasaba J.Kasaba Impvt.of road from Salt road chhaka to Abhira chhaka with morrum and hume pipe work. 1.30 Irrigation<br />

208 <strong>Balasore</strong> J.Kasaba J.kasaba Excavation of Chakra Pokhari 1.30 Water Conservation<br />

209 <strong>Balasore</strong> J.Kasaba Bardhanpur Impvt.of road from R.D. road to I.T.R. road, via-Telia Danda. 1.20 Rural Connectivity<br />

210 <strong>Balasore</strong> J.Kasaba Sahajanagar Impvt.of road from Sahajanagar School to Chhelia Pada. 2.20 Rural Connectivity<br />

211 <strong>Balasore</strong> J.Kasaba Nidhipada Impvt.of road from I.T.R. road to Bhaku Ojha house with morrum and hume pipe work. 1.20 Irrigation<br />

2<strong>12</strong> <strong>Balasore</strong> J.Kasaba Khuntabadi Impvt.of road from Khunta Badi School to Balabhadra via-Sutar sahi 2.20 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

213 <strong>Balasore</strong> Gudu Bidei Road from Bidei to Padmapur road 1.30 Rural Connectivity<br />

214 <strong>Balasore</strong> Gudu Gudu Construction of Sahada Gunthanapada Adivasi sahi road 1.00 Rural Connectivity<br />

215 <strong>Balasore</strong> Gudu Gudu Excavation of Gudu Nala from Kabiraj Bridge to Saipur Chatara bridge. 1.20 Rural Connectivity<br />

216 <strong>Balasore</strong> Gudu Sahada Road from Gothana Pada Adibasi sahi. 1.30 Rural Connectivity<br />

217 <strong>Balasore</strong> Gudu Sahada Digging of Swapneswar Mahadev Temple pond,Sahada 1.00 Water Conservation<br />

218 <strong>Balasore</strong> Bahabalapur Dubulagadi Soil and morrum work from Gobinda Pradhan house to Sabuja Sangha Club. 1.30 Land Development<br />

219 <strong>Balasore</strong> Bahabalapur Bagada Soil and morrum work from Idga field to Pranakrushsna Pradhan house 1.30 Land Development<br />

220 <strong>Balasore</strong> Bahabalapur Bahabalpur Digging and pucca ghat at Siba temple pond near G.P.Office. 1.20 Water Conservation<br />

221 <strong>Balasore</strong> Bahabalapur Endrai Digging and pucca ghat of Old GP Pond at Endrai. 1.30 Water Conservation<br />

222 <strong>Balasore</strong> Bahabalapur Nuagan Soil and morrum work from Kuldiha to Sitala Thakurani 1.20 Land Development<br />

223 <strong>Balasore</strong> Bahabalapur Raghabpur Construction of Mound in Rghabpur 1.30 Flood Control<br />

Sub total 388.25<br />

1 Baliapal Aladiha Balibil Construction of road from Banshi Behera Chhak to sea beach 2.00 Rural Connectivity<br />

2 Baliapal Aladiha Aladiha Renovation of Gahamagadia Pokhari 1.75 Water Conservation<br />

3 Baliapal Aladiha Aladiha Drain from Birakuli Ganda to sea beach 1.00 Irrigation<br />

4 Baliapal Asti Badhapal Earth filling in from of Badhapal Basuli Mandap 4.00 Land Development<br />

5 Baliapal Asti Parula Construction of road from Parulia Ramchandra Pradhan house to Umakanta Mohanty house 1.00 Rural Connectivity<br />

6 Baliapal Asti Suryapur Construction of road from Kantabani culvert to Suryapur Karekrushna Behera house 1.00 Rural Connectivity<br />

7 Baliapal Asti Kanrbani Construction of road with culvert from Tulasi Chaura 1.00 Rural Connectivity<br />

8 Baliapal Balarampur Sunaruhi Construction of road from Sunaruhi Mahadev Mandap to Mohanala via patra sahi chhak 1.50 Rural Connectivity<br />

9 Baliapal Balarampur Kalanda Road from Mohapatra sahi chhak to Adibasi sahi via Kuna Besra road 1.00 Rural Connectivity<br />

10 Baliapal Balarampur Itapatua Road from Itapatua Brundaban Das house to Sambhu Nath house 4.00 Rural Connectivity<br />

11 Baliapal Balikuti Chada Renovation of Chada Padma Pokhari 2.00 Water Conservation<br />

<strong>12</strong> Baliapal Balikuti Kasudiha Construction of road from Kasudiha Parbati Nandi bridge to Baishnab sahi 1.00 Rural Connectivity<br />

13 Baliapal Balikuti Malangbalikuti Renovation of Malangbalikuti Bauba Pokhari 1.50 Water Conservation<br />

14 Baliapal Balikuti Balikuti Renovation of Baitingari Kana Goharini Pokhari 1.50 Water Conservation<br />

15 Baliapal Balikuti Damuria Construction of road with culvert from Damuria Chitabinodana road to Kantabani 1.50 Rural Connectivity<br />

16 Baliapal Balikuti Mohabala Construction of road from South Mohabal School chhak to Banamali Behera chhak 1.00 Rural Connectivity<br />

17 Baliapal Baniadiha Langaleswar Construction of road from Langaleswar RD road Mangoinda house to Rajendra Sahu Chhak via Adivasi sahi & Mehentar sahi 1.50 Rural Connectivity<br />

18 Baliapal Baniadiha Raipur Repairing of road with drain from Raipur School to Narayan Das Chhak 2.00 Rural Connectivity<br />

19 Baliapal Baniadiha Biswanathpur Renovation of Hakand Pond 1.50 Water Conservation<br />

20 Baliapal Baliapal Athabatia Renovation of Athabidia Mahadev tank & plantation 1.50 Water Conservation<br />

21 Baliapal Baliapal Kachuapada Repairing of road from Chita Mohanty house to B.K. road 1.00 Rural Connectivity<br />

22 Baliapal Baliapal Baliapal Repairing of road from Baliapal old market to Jamkunda irrigation Bandha via EGS school 1.50 Rural Connectivity<br />

23 Baliapal Baliapal Manunagar Improvement of road from Kudmansing Rahas Mandap to Trilochan Sahoo house 1.70 Rural Connectivity<br />

24 Baliapal Betagadia Narayanpur Improvement of road from Manmath Das chhak to Pratap Rout chhak 1.75 Rural Connectivity<br />

25 Baliapal Betagadia Narayanpur Renovation of Hadua Pokhari 1.50 Water Conservation<br />

26 Baliapal Betagadia Betagadia Improvement of road from Utikiri Giri chhak to Narayanpur High School 1.50 Rural Connectivity<br />

27 Baliapal Betagadia Kashipur Renovation of Kashipur Mahadev Pokhari 1.50 Water Conservation<br />

28 Baliapal Betagadia Dangapita Renovation of Dangapita Mahadev Pokhari 1.75 Water Conservation<br />

29 Baliapal Betagadia Dangapita Improvement of road from Dangapita Srikanta Barik chhak to Tulasi Mandap 1.50 Rural Connectivity<br />

30 Baliapal Betagadia Kaliakhia Construction of road from Kaliakhia school chhak to Narayanpur High School 1.50 Rural Connectivity<br />

31 Baliapal Bishnupur Bishnupur Construction of road from Chada sahi Gola Pukhri 1.00 Rural Connectivity<br />

32 Baliapal Bishnupur Rasalpur Construction of road with fround wall both side of road from Kar sahi to PM road 4.00 Rural Connectivity<br />

33 Baliapal Bishnupur Nayabali Earth filling infront of GP office with boundary wall 1.00 Land Development<br />

34 Baliapal Bishnupur Ikadpal Construction of road from irrigation road to Madhu Patra 5.00 Rural Connectivity<br />

35 Baliapal Bodas Navoda Renovation of canal from Navada Chupi Gohiri to Paskhikhal 1.70 Irrigation<br />

36 Baliapal Bodas Jagai Improvement of road from RD road to Kathasagada Harijansahi via Rama Nayak Diha 1.70 Rural Connectivity<br />

37 Baliapal Bodas Gopinathpur Improvement of road from RD road to Sulishapantha via Mandal sahi 1.70 Rural Connectivity<br />

38 Baliapal Bodas Bodas Improvement of road from RD road to Sulishapantha via Bodas Patrasahi 2.00 Rural Connectivity<br />

39 Baliapal Bodas Pakamudi Improvement of road from Kacha to Srihari Nayak house via Pakamudi School 1.70 Rural Connectivity<br />

40 Baliapal Bolanga Gobindapur Improvement of road with culvert from Gobindapur chhak to Kishori Gochhayat house to Paban Gochhayat house 1.70 Rural Connectivity<br />

41 Baliapal Bolanga Bolanga Improvement of road with culvert from Bagal Pokhari to Ajaya Mallik house 1.75 Rural Connectivity<br />

42 Baliapal Bolanga Teluni Renovation of Teluni Harijan sahi tank 2.00 Water Conservation<br />

43 Baliapal Bolanga Saudi Construction of road with culvert from Saudi Gadadhara Mallik house to Trailakya Mallik house 1.75 Rural Connectivity<br />

44 Baliapal Chaumukha Chaumukha Construction of road from High School chhaka to Iswar Barik Chhaka 1.75 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

45 Baliapal Chaumukha Chaumukha Renovation of Kankadpal Satyanarayan Pond 2.00 Water Conservation<br />

46 Baliapal Dagara Dagara Renovation of Dagara Rudra diha pond 2.00 Water Conservation<br />

47 Baliapal Dagara Dagara Renovation of Dagara Jhaunbana Rout road pond 1.50 Water Conservation<br />

48 Baliapal Dagara Jamatkula Construction of road from Jamutkula Panchami Padia to Ambachua Hat via Hatimahi 1.50 Rural Connectivity<br />

49 Baliapal Deula B.Kachuapada Renovation of Bada Kachuapada Pokhari 1.50 Water Conservation<br />

50 Baliapal Deula Jathia Improvement of road from Barik Chhak to Madhiapada with drain 1.00 Rural Connectivity<br />

51 Baliapal Deula Jathia Improvement of Jathia village road 4.00 Rural Connectivity<br />

52 Baliapal Deula Kushadia Construction of road from Patra chhak to Basudevpur with drain 1.50 Rural Connectivity<br />

53 Baliapal Deula Katisahi Renovation of Chhangodi pokhari tank 1.50 Water Conservation<br />

54 Baliapal Deula Deula Improvement of road from Rasik Todu house to Dugor house 1.00 Rural Connectivity<br />

55 Baliapal Deula Birpalia Renovation of Judagadia tank 1.00 Water Conservation<br />

56 Baliapal Deula Nachindia Improvement of road from Uday Pujari house to cost canal 1.00 Rural Connectivity<br />

57 Baliapal Debhog Debhog Renovation and construction of drain in Debhog north side Pasikhala 2.00 Water Conservation<br />

58 Baliapal Debhog Khalamuhani Earthfilling in Khalamuhani Sankamath Mandir campous 1.00 Land Development<br />

59 Baliapal Debhog Ghantiadi Repairing of road from Ghantiadi Janmujay Das house to Pursottam Dalai house 1.50 Rural Connectivity<br />

60 Baliapal Debhog Dumichaka Repairing of road from Dumichaka School to Nanda Dalai house 1.00 Rural Connectivity<br />

61 Baliapal Debhog Bishnupur Repairing of road from Nuagaon Chhaka to Banshidhara Rana house 1.00 Rural Connectivity<br />

62 Baliapal Debhog Bilkumhari Construction of Bilkumahari Matha Pokhari Pakaghata 4.00 Water Conservation<br />

63 Baliapal Ghantua Ghantua Construction of road from Shayam Sundar Nayak to Smshana Pada 2.00 Rural Connectivity<br />

64 Baliapal Ghantua Malikuda Construction of road from Suranene Swar Mahadev Temple to Gochar Pada 2.00 Rural Connectivity<br />

65 Baliapal Ghantua Ghantua Construction of earthen road from Kritick Giri house to Kalicharan Behera house 1.50 Rural Connectivity<br />

66 Baliapal Ghantua Ghantua Construction of earthen raod from Ghantua M.E.School to Kedar Pradhan house 1.00 Rural Connectivity<br />

67 Baliapal Jagatipur Karanja Construction of road from Karanja High School to coast canal 1.50 Rural Connectivity<br />

68 Baliapal Jagatipur Bagada Construction of road from Purna Das house to main road 1.75 Rural Connectivity<br />

69 Baliapal Jagatipur Gutamuli Construction of road from B.Baisida to coast canal 2.00 Rural Connectivity<br />

70 Baliapal Jagatipur Ranikhudi Construction of road from Tumuri Kana to Singar Pokhari 1.50 Rural Connectivity<br />

71 Baliapal Jagatipur Jagatipur Construction of drain from Kartik Parida house to Dhoba tutha gadia 2.00 Irrigation<br />

72 Baliapal Jagatipur Mendhapada Cosntruction of road from Jebra chhak road 2.00 Rural Connectivity<br />

73 Baliapal Jagatipur Karanja Construction of road from Pagala chhak to Daitari Mahuri house 1.75 Rural Connectivity<br />

74 Baliapal Jambhirai Jambhirai Repairing of Jambhirai Chaulati Lunibandha 1.70 Rural Connectivity<br />

75 Baliapal Jambhirai Jambhirai Improvement of road from Gohiri Baragachha to Behera sahi chhaka road via Nuagaon Machha market in 11 no.ward 1.75 Rural Connectivity<br />

76 Baliapal Jamkunda Kalarui Digging of Kalarui westside Rasa pond 1.50 Water Conservation<br />

77 Baliapal Jamkunda Palajamkunda Construction of road from Lokpal main road to Pradhan sahi road 5.00 Rural Connectivity<br />

78 Baliapal Jamkunda Jamkunda Construction of road from Jamkunda Sahankra Nath to Hospital 1.50 Water Conservation<br />

79 Baliapal Jamkunda Talapada Construction of road from Choto Talapada Basanta Jena house to High School 1.50 Rural Connectivity<br />

80 Baliapal Kumbhari Kumbhari<br />

Construction of drain for irrigation purpose from Srikant Jena house to Dhananda RD road both side Kumbhari via Mrutyunjay<br />

Mohapatra house<br />

1.75 Irrigation<br />

81 Baliapal Kumbhari Kumbhari Renovation of Jena sahi tank at Kumbhari 1.75 Water Conservation<br />

82 Baliapal Kumbhari Nuasahi Repairing of road from Nuasahi Nadighat to Jhalijhalia Gourmohan Jena house via east side Keshaba Sahu house 1.50 Rural Connectivity<br />

83 Baliapal Kumbhari Sunakania Repairing of road from RD road to primary school playground Sunakania 1.50 Rural Connectivity<br />

84 Baliapal Kumbhari Guapada Earthfilling at Ganapati Mandap Khala field, Raidhenk 1.00 Land Development<br />

85 Baliapal Kumbhari Tapandia Repairing of road from Paramananda Das house to Jamalpur 1.50 Rural Connectivity<br />

86 Baliapal Kunduli Bhanupur Repair of road from Dandua pada to Bikartan patra house 1.50 Rural Connectivity<br />

87 Baliapal Kunduli Talanendua Construction of Chakabandi road from pacha Gadia culvert to Nimapada 2.00 Rural Connectivity<br />

88 Baliapal Kunduli Indipada Repair of road of Indipada village 1.50 Rural Connectivity<br />

89 Baliapal Kunduli Sibapura Construction of road from Sanatan Behera house to Kunduli Chhaka flood evran 1.75 Rural Connectivity<br />

90 Baliapal Kunduli Mahapada Construction of Salt embankment from Mahapada Ghat north side of coast canal to Teluni 1.75 Flood Control<br />

91 Baliapal Kunduli Bisikadeipur Construction of road from village Bisikadeipur to Chakasahi 1.50 Rural Connectivity<br />

92 Baliapal Kunduli Kunduli Renovation of Kani Gadia 2.00 Water Conservation<br />

93 Baliapal Kunduli Mahapada Renovation of Mahapada Kadagadia 1.50 Water Conservation<br />

94 Baliapal Madhupura Madhupura Repair of road from Madhupura Raghunath Jena house to coast canal 1.75 Rural Connectivity<br />

95 Baliapal Madhupura Chaudhurikuda Construction of road with culvert from Chaudhurikuda School to Majhikuda 1.50 Rural Connectivity<br />

96 Baliapal Nikhira Nikhira Construction of road from Jadunath Giri house to Nikhira Sadhu Charan Patra house via Kasi Nath Giri house 2.00 Rural Connectivity<br />

97 Baliapal Nikhira Palbegunia Construction of road from Arjun Pradhan house to Taladhanda Debrai Mandir 1.50 Rural Connectivity<br />

98 Baliapal Nikhira Taldhanada Construction of road from Irrigation bandha to Taldhanda Charu Rout house 2.00 Rural Connectivity<br />

99 Baliapal Nikhira Palpada Construction of road from Chada Palpada Gramya Jangle to Chada Pelbegunia Srustidhar Jena house 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

100 Baliapal Nikhira Manpur Development & Construction of Basanti Mandal of Manpur 1.50 Land Development<br />

101 Baliapal Nuagan Kataramahal Construction of road and drainage work from Arjun Giri house to North cultivation field 2.00 Irrigation<br />

102 Baliapal Nuagan Jamunasul Construction of road from Jamunasul Daharmuha to Tazia chhaka 2.00 Rural Connectivity<br />

103 Baliapal Nuagan Kataramohal Construction of road from Kataramahal Tungi chhaka to Batagachha chhaka 2.00 Rural Connectivity<br />

104 Baliapal Nuagan Kaumari Construction of road from Behera sahi chhaka to Jagannath Sethi house 2.00 Rural Connectivity<br />

105 Baliapal Panchupali Panchupali Construction of road from Panchana bodhi to Panchupali village road 1.00 Rural Connectivity<br />

106 Baliapal Panchupali Panchupali Renovation of Panchupali Giri market Pokhari 1.50 Water Conservation<br />

107 Baliapal Panchupali Kalasimuli Repairing of road from Ramkrusna Jena Chhaka to Gandapal Nadi 1.00 Rural Connectivity<br />

108 Baliapal Pratappur Pratappur Renovation of Chaulkundi Pokhari with pucca Ghat 1.50 Water Conservation<br />

109 Baliapal Pratappur Mandananji Renovation of GP tank Artta Biswal Pokhari 1.50 Water Conservation<br />

110 Baliapal Pratappur Surudiha Excartion new tank Surudiha Pokhari 1.75 Water Conservation<br />

111 Baliapal Ratei Ratei Construction of road from Ratai to coast canal 1.75 Irrigation<br />

1<strong>12</strong> Baliapal Ratei Sankarpur Construction of mud road from irrigation road to bank of pond of west Sankarpur 1.50 Irrigation<br />

113 Baliapal Ratei Badakaurda Construction of drain from Gobinda Sahoo pond to Patra pond 1.50 Irrigation<br />

114 Baliapal Srirampur Dhanda Construction of road with earth filling from Kinaram Jena house to Ratnakara Jena Pokhari 2.00 Rural Connectivity<br />

115 Baliapal Srirampur Remu Construction of road from Bhagaban Patra house to Mnguli Biswal house 2.00 Rural Connectivity<br />

116 Baliapal Srirampur Srirampur Earth filling pf Srirampur Jahavi Pada 1.50 Land Development<br />

117 Baliapal Srirampur Dhanda Construction of road from Remu Babu pokhari to ME School 2.00 Rural Connectivity<br />

118 Baliapal Srirampur Srirampur Construction of water drainage from Kartik Dutta house to Bagha house gadia 1.50 Irrigation<br />

119 Baliapal Bolanga Saudi Improvement of road with culvert from Saudi chhak Mandal sahi Handivasa river to Biren Mallik house 1.30 Rural Connectivity<br />

<strong>12</strong>0 Baliapal Chaumukha Chaumukha Renovation of Hakand Pokhari 1.00 Water Conservation<br />

<strong>12</strong>1 Baliapal Chaumukha Chaumukha Repairing of road from Luni Bandha Babu chhaka to Kankadpal 1.30 Flood Control<br />

<strong>12</strong>2 Baliapal Dagara Dagara Renovation of Dagara Babaji pond 2.20 Water Conservation<br />

<strong>12</strong>3 Baliapal Dagara Jamatkula Construction of road from Jamutkula Durga Mandap to Niranjan Patra house 1.30 Rural Connectivity<br />

<strong>12</strong>4 Baliapal Dagara Jugadiha Construction of water drainage with culvert from Jufadiha Panchanan Jena Hajira bridge to Sambu Jena culvert 1.20 Irrigation<br />

<strong>12</strong>5 Baliapal Deula B.Kachuapada Construction of road from Bisal Chhak to Biripalia via Majhipada 1.30 Rural Connectivity<br />

<strong>12</strong>6 Baliapal Deula Jathia Renovation of Ghama Pokhari tank 1.00 Water Conservation<br />

<strong>12</strong>7 Baliapal Deula Kushadia Renovation of Talapada Pokhari 1.00 Water Conservation<br />

<strong>12</strong>8 Baliapal Deula Basudevpur Improvement of road from Sek Pokhari to Madhupura via Bimal with drain & culvert 1.30 Rural Connectivity<br />

<strong>12</strong>9 Baliapal Deula Katisahi Impovement of road from Srihani Jena house to RD road 1.00 Rural Connectivity<br />

130 Baliapal Deula Deula Improvement of road from Rama Jena Chhak to HasImpur via Mill Pakha 4.00 Rural Connectivity<br />

131 Baliapal Deula Birpalia Improvement of road from Birapalia to Katisahi 1.00 Rural Connectivity<br />

132 Baliapal Debhog Debhog Renovation of Debhog Gobara Khala from Khalamuhani to Ghantua end point 1.20 Irrigation<br />

133 Baliapal Debhog Khalamuhani Renovation of Khalamuhani from Bilakumhari Pols to Santosh Sahoo house 5.00 Irrigation<br />

134 Baliapal Debhog Dantunida Renovation of Dantunida Radhasagar Pokhari 1.30 Water Conservation<br />

135 Baliapal Debhog Ghantiadi Repairing of raod from Ghantiadi Ajya Das house to Pathagadia 2.20 Rural Connectivity<br />

136 Baliapal Debhog Dumichaka Repairing of road from Dumichaka Pola to Kuara sahi 1.00 Rural Connectivity<br />

137 Baliapal Debhog Bishnupur Repairing of road from Bishnupur Gouranga Malik chhak to Panasahi chhak 2.20 Rural Connectivity<br />

138 Baliapal Ghantua Malikuda Construction of road from Pravakar Sahu house to Surendra Giri house 1.00 Rural Connectivity<br />

139 Baliapal Ghantua Dharamdura Construction of earthen road from Banamali Giri house to Raj Narayan Nayak house 1.00 Rural Connectivity<br />

140 Baliapal Ghantua Badakasada Construction of earthen road from Jena sahi Mahadev Mandir to Markanda Jena house 1.00 Rural Connectivity<br />

141 Baliapal Jagatipur Bagada Renovation of Budhi Pokhari 2.20 Water Conservation<br />

142 Baliapal Jagatipur Bhikagadia Construction of road from Guthuna to Khandiadia via padima 1.30 Rural Connectivity<br />

143 Baliapal Jagatipur B.Baisida Construction of road from Kamila chhaka to coast canal 2.20 Rural Connectivity<br />

144 Baliapal Jagatipur Anadeula Construction of road from Amla Pokhari to coast canal 2.20 Rural Connectivity<br />

145 Baliapal Jagatipur Mendhapada Construction of road with drainage from main road to Srustidhara Nayak house 2.20 Irrigation<br />

146 Baliapal Jagatipur Karanja Construction of road from Basnsidhara Harira house to main road via Bali Gadia with guard wall 2.20 Rural Connectivity<br />

147 Baliapal Jambhirai Jambhirai Excavation of Jambhirai GP office tank 2.20 Water Conservation<br />

148 Baliapal Jamkunda Palajamkunda Renovation & pucca Ghat building in Palajamkunda School pond 1.30 Water Conservation<br />

149 Baliapal Jamkunda Jamkunda Digging of Jamkunda Bukudi channel 2.20 Irrigation<br />

150 Baliapal Jamkunda Kuhlachada Filling of soil in near Kuhlachada UP School pond 1.30 Land Development<br />

151 Baliapal Jamkunda Kenduadia Construction of road from Keduadia Kara house to Gadashaia 1.00 Rural Connectivity<br />

152 Baliapal Kumbhari Kumbhari Construction of drain for irrigation purpose from Kumbhari Chittaranjan Mohapatra house to GP chhak pola via promary school 1.30 Irrigation<br />

Sub total 259.80<br />

1 Basta Brahmada Brahmanda Improvement of road from Brahmada Village Sanatan Behera House to Ramachandra Mahanta House. 2.50 Rural Connectivity<br />

2 Basta Brahmada Kiapansi Improvement of road from N.H.-60 to Kiapansi village Thakurani Mandap. 2.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

3 Basta Brahmada Bruna gadia Improvement of road from Baruna gadia school front to Achyuta behera house 2.50 Rural Connectivity<br />

4 Basta Brahmada Jhingpura Improvement of road from Jhingpura vill pokhari adi to Sanjay Behera house 1.50 Rural Connectivity<br />

5 Basta Brahmada Kundpur Renovation of Padma tank 1.50 Water Conservation<br />

6 Basta Brahmada Dubulia Renovation of G.P. tank at Dubulia 2.00 Water Conservation<br />

7 Basta Brahmada Mulida Improvement of embankment from Mulida village thakurani to Telisahi via Maikap sahi with drain 2.00 Flood Control<br />

8 Basta Brahmada Mankadagadia Improvement of embankment from NH 60 to Mankadagadia Thakurani mandap road with drain 1.50 Flood Control<br />

9 Basta Kulida Dhuliuda Improvement of CC Road from Dhuliuda Jatindra Jena's house to Main road 2.00 Rural Connectivity<br />

10 Basta Kulida Gudikhal Improvement of CC Road from Gudikhal river to Main Road via Senapati sahi 1.50 Rural Connectivity<br />

11 Basta Kulida Agarada Improvement of Road from Agarada Tubewell to Mahadev temple 1.50 Rural Connectivity<br />

<strong>12</strong> Basta Kulida Belagaon Improvement of Road side of CC in the village of Belagan main sahi to Mahajania sahi 2.00 Rural Connectivity<br />

13 Basta Kulida Nabinpur Improvement of embankment from Nabinpur main road to Agl. Land 2.00 Flood Control<br />

14 Basta Kulida Belagaon Construction of Drainage from Mahajania pond to Gudikhal Bridge 1.50 Irrigation<br />

15 Basta Kulida Kulida Excavation of Pond at Kulida 2.00 Water Conservation<br />

16 Basta Kulida Junbalada <strong>Plan</strong>tation at Junbalada 2.00 Drought Proofing<br />

17 Basta Putura Bahadalpur Imp of road from Jamsuli- Langaleswar PWD road to Sanjay Mohapatra house 2.50 Rural Connectivity<br />

18 Basta Putura Akandi Renovation of Akandi Desa pond 2.00 Water Conservation<br />

19 Basta Putura Dundakut Imp of road from Harendra Bag chhaka to Nua pokhari 2.00 Rural Connectivity<br />

20 Basta Putura Putura Imp of road from Hadibandhu Behera chhaka to Bibhaban Rana house 2.50 Rural Connectivity<br />

21 Basta Putura Kamaragadia Imp of road from Manu Sahu house to Pani Panchayat 2.00 Rural Connectivity<br />

22 Basta Putura Guhalipada Imp of road from School chhaka to Chaitanya Mohanty house 2.00 Rural Connectivity<br />

23 Basta Putura Bahadalpur Improvement of embankment from Schhol to Chandra Mohan Sahu 1.50 Flood Control<br />

24 Basta Putura Putura Excavation of new pond at Santara sahi 1.50 Water Conservation<br />

25 Basta Mathani Mathani Improvement of CC road from Mathani Balasram to Sankhudi Giri sahi 2.50 Rural Connectivity<br />

26 Basta Mathani Bhagichakurai Improvement of CC road from Bhagichakurai to Debi Chanda Behera house to 2.50 Rural Connectivity<br />

27 Basta Mathani Tigiria Improvement of CC road from Tigiria RD road to RD road via Sachindra Dandapat 2.00 Rural Connectivity<br />

28 Basta Mathani Nalbahar Improvement of CC road from Nalabahar NH-60 to Sundarhota Dalei sahi 2.50 Rural Connectivity<br />

29 Basta Mathani Dhobachakurai Improvement of CC road from Binod Das house to Madan Barik house 2.50 Rural Connectivity<br />

30 Basta Mathani Badakhudi Improvement of CC road from Mohapatra house to Project RD road 2.50 Rural Connectivity<br />

31 Basta Mathani Paikapada Improvement of CC road fat Paikapada Mahata sahi road 2.50 Rural Connectivity<br />

32 Basta Mathani Dhobachakurai Renovation of Dhobachakurai Bana sahitank 1.00 Water Conservation<br />

33 Basta Mathani Mulakanda Renovation of Mulakand village tank 1.50 Water Conservation<br />

34 Basta Mathani Dhapakand Improvement of embankment from Dhapakand well chhak to Badkhudi sima 1.00 Flood Control<br />

35 Basta Mathani Shiva Gatia Improvement of embankment from Shiva gatia Purastam house to Laxman pada 1.50 Flood Control<br />

36 Basta Sahada Pahiasti Improvement of road from Pahiasta hata to Sankhua 1.00 Rural Connectivity<br />

37 Basta Sahada Sahada Improvement of road from Chintamani Das house to Gangadhara Senappati house via Bati Ghara 1.50 Rural Connectivity<br />

38 Basta Sahada Kainagari Improvement of road from Kainagari chikina nala to Subas Samanta house 1.00 Rural Connectivity<br />

39 Basta Sahada Kainagari Improvement of road from Kainagari high school chhak to Gagan Sasmal haller 1.50 Rural Connectivity<br />

40 Basta Sahada Gutdiha Improvement of road from Gutdiha Adibasi sahi to Patayat sahi 2.00 Rural Connectivity<br />

41 Basta Sahada Nischintapur Improvement of road of Niscinta pur village west side road 1.75 Rural Connectivity<br />

42 Basta Sahada Pahana Excavation of new pond at Jogisul 1.50 Water Conservation<br />

43 Basta Sahada Kainagari Renovation of Nodal school pokhari with Puccaghat 2.00 Water Conservation<br />

44 Basta Sahada Kusudiha Improvement of Embankment of Kusudiha to Kainagari Palpala river 1.50 Flood Control<br />

45 Basta Irda Irda Construction of CC road from Pani chhak to Krushna Jena house 2.00 Rural Connectivity<br />

46 Basta Irda Kalanda Construction of CC road Kalanda village road 1.75 Rural Connectivity<br />

47 Basta Irda Narsinghadiha Construction of CC road from Panchyat to Sahu house 2.00 Rural Connectivity<br />

48 Basta Irda Gaguda Construction of CC Gaguda village road 1.75 Rural Connectivity<br />

49 Basta Irda Irda Construction of CC road from Hata pokhari to Dey pada 1.50 Rural Connectivity<br />

50 Basta Irda Gambhalundi Renovation of Pathana gadia tank 2.00 Water Conservation<br />

51 Basta Irda Kalanda Renovation of Arkha tank 2.00 Water Conservation<br />

52 Basta Irda Ganjuda Improvement of embankment from Ganguda to Bania nala 1.50 Flood Control<br />

53 Basta Irda Machhada Improvement of embankment from Machhad Irda PMGSY road to Adibasi sahi 2.00 Flood Control<br />

54 Basta Purusottampur Sarisa Improvement of CC road from Mandei chhak to Purusottampur via Tribrikrama Panda with drain 1.75 Rural Connectivity<br />

55 Basta Purusottampur Bagaldiha Improvement of CC road from Bagaldiha Bansidar Sing house to Substation 2.00 Rural Connectivity<br />

56 Basta Purusottampur Purosottampur Improvement of road from Purusottampur Pradhan house chhak to Kasalpada 1.50 Rural Connectivity<br />

57 Basta Purusottampur Pansapada Improvement of road from Pansapada Sachindra sahu house to Basudev sahu House 1.75 Rural Connectivity<br />

58 Basta Purusottampur Gopinathpur Renovation of Jamagadia Pokhari 2.00 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

59 Basta Purusottampur Sarisa Renovation of Jagati Pokhari 2.00 Water Conservation<br />

60 Basta Purusottampur Sundarkuli Renovation of Mahajan Pokhari 2.00 Water Conservation<br />

61 Basta Routpada Jhinkiria Improvement of CC road from Chaturbhuja mahanty house to Jagannath Pandit house 1.50 Rural Connectivity<br />

62 Basta Routpada Barahapal Improvement of CC road from Barahapal Gadpada school chhak to Chandra Sekhar Mahanty house 1.75 Rural Connectivity<br />

63 Basta Routpada Jantikapal Improvement of CC road from Sridhara Mahalik house to Laxmi Dhara house with Guardwall 1.75 Rural Connectivity<br />

64 Basta Routpada Barahapal Renovation of Barahapal Santara pokhari 1.75 Water Conservation<br />

65 Basta Routpada Jhinkiria Improvement of embankment from Pich Sadak to Paikasahi sima 1.75 Flood Control<br />

66 Basta Routpada Barhapal Improvement of road from Barhapal School chhak to Satya Mohapatra house 1.50 Rural Connectivity<br />

67 Basta Chormara Chormara Construction of CC road from Chormara Pradhan sahi chhaka to Samaj padia 1.75 Rural Connectivity<br />

68 Basta Paunsakuli Sonepur Imp of CC road from Sonepur Sena ghara to Nabda Sima 1.75 Rural Connectivity<br />

69 Basta Paunsakuli Begunia Imp of CC road from Begunia Parsu Das house to Paunsakuli Hata Padia 1.75 Rural Connectivity<br />

70 Basta Paunsakuli Padhiarypur Imp of CC road from Padhiary pur PMGSY road to Rama Patra house 2.00 Rural Connectivity<br />

71 Basta Paunsakuli Ujuda Imp of CC road from Ujuda Church to Farakpada 2.00 Rural Connectivity<br />

72 Basta Paunsakuli Sana Padhiarypur Imp of CC road from Madhupura to Padhiarypur school 1.50 Rural Connectivity<br />

73 Basta Paunsakuli Gambharia Renovation of Gambharia Sagara pokhari 2.00 Water Conservation<br />

74 Basta Paunsakuli Masada Imp of embankment from Masada PMGSY road to Masjid 2.00 Flood Control<br />

75 Basta Paunsakuli Hatimara Imp of embankment from Hatimara main road to pala 1.50 Flood Control<br />

76 Basta Sadanandapur Bidyadharapur Improvement of road from Sk Samiruddin house to Bakkar house with drain. 1.50 Rural Connectivity<br />

77 Basta Sadanandapur Badabazar Improvement of road from Nausad house to Khujiria wadi 2.00 Rural Connectivity<br />

78 Basta Sadanandapur Bhagabanpur Improvement of road from Mundibati Ram Soren House to Dai sahi with drain & Culvert. 1.50 Rural Connectivity<br />

79 Basta Sadanandapur Sulemanpur Improvement of road from Sania Nayak house to Mayurbhanja Sima with Culvert. 1.50 Rural Connectivity<br />

80 Basta Sadanandapur Tikarpada Improvement of road from Kendupada polo to Adibasi sahi with drain.ada 2.00 Rural Connectivity<br />

81 Basta Sadanandapur Machia Improvement of road from Ashok Das house to Railway line with Drain. 1.50 Rural Connectivity<br />

82 Basta Sadanandapur Baunsamukha Improvement of road from Sitaram Mohanty house to Ramgobinda Mohanty house with drain. 1.75 Rural Connectivity<br />

83 Basta Sadanandapur Baramardhia Improvement of road & construction of bridge from Banamali ram house to Paresh Marandi house with Drain. 2.00 Rural Connectivity<br />

84 Basta Sadanandapur Kurumakhunta Excavation of New pond At-Kurumkhunta. 1.75 Water Conservation<br />

85 Basta Sadanandapur Mangalpur Renovation of Parava Khan Pond Near Patul House. 1.75 Water Conservation<br />

86 Basta Sadanandapur Jalalpur Renovation of Govt.Pond. 1.75 Water Conservation<br />

87 Basta Sadanandapur Tikarpada Improvement of embankment & road from Prafulla Sahu house to Ksaimiri Adivasi sahi. 1.75 Flood Control<br />

88 Basta Sadanandapur Nabha Improvement of embankment & road from Sukul Soren house to Jalaka River for prevention of flood. 2.00 Flood Control<br />

89 Basta Darada Chakrada Improvement of road from U.P School to Bhandari wadi Via-Mandal sahi C.C road. 1.75 Rural Connectivity<br />

90 Basta Darada Darada Improvement of road from Darada Adivasi sahi Chhak to Darada G.P. 1.75 Rural Connectivity<br />

91 Basta Darada Palasia Improvement of road from Palasia Uncomplited road to Kundei Sima. 2.00 Rural Connectivity<br />

92 Basta Darada Kothapada Improvement of road from Kothapada Gohirpada to Hadia Rana house. 2.00 Rural Connectivity<br />

93 Basta Darada Mandrada Improvement of road from Chhapan madal field to Basanti mandap. 1.50 Rural Connectivity<br />

94 Basta Darada Ekdalia Imp of road from Ekdalia sima to river 1.50 Rural Connectivity<br />

95 Basta Darada Dakhina sarisa Renovation of GP tank & ghat 2.00 Water Conservation<br />

96 Basta Darada Palasia Renovation of Chilika tank 1.75 Water Conservation<br />

97 Basta Darada Kothapada <strong>Plan</strong>tation at Githunapada 2.00 Drought Proofing<br />

98 Basta Gadapada Jamunia Improvement of CC road from Jamunia Kendudangiri Bdal Sing house to Ghan shyam sing house 1.75 Rural Connectivity<br />

99 Basta Gadapada Jahata Improvement of CC road from Musundia pokhari to Chaturbhuja Mohanty house 2.00 Rural Connectivity<br />

100 Basta Gadapada Gadpada Improvement of CC road from Halib Khan house to Raju Khan House 1.50 Rural Connectivity<br />

101 Basta Gadapada Budha khandi Renovation of Budhikhandi new pond with pucca ghat 1.50 Water Conservation<br />

102 Basta Gadapada Dimicha Improvement of embankment from Dimichha Baunsa river North side to Dimichha field 1.75 Flood Control<br />

103 Basta Gadapada Paschimasimulia Improvement of CC road from Narayan Das house tomahadev Mandir 1.75 Rural Connectivity<br />

104 Basta Gadapada Hirapur Improvement of CC road from Hirapur Bidyadhara Biswal house to Bhuyan sadak 2.00 Rural Connectivity<br />

105 Basta Gadapada Budhi khandi Improvement of embankment from Rly gate to Kali bana 1.50 Rural Connectivity<br />

106 Basta Gadapada Bakharabad Improvement of CC road from Natabara Nayak house to Rly gate via Purnachandra lenka 2.00 Rural Connectivity<br />

107 Basta Gadapada Oriyasasan Improvement of road from Sulia Burdhi polo to Majhi Mahanty house 1.75 Rural Connectivity<br />

108 Basta Singla Patha Durga Improvement of embankment from Kankudi polo to Madan Pandit house 1.75 Flood Control<br />

109 Basta Singla Jamsuli Improvement of cc road from Jamsola RD road to Behera sahi house 1.50 Rural Connectivity<br />

110 Basta Singla Rajuapada Construction of embankment from Rajuapada to Rajua pokhari adi 2.00 Flood Control<br />

111 Basta Singla Singla Renovation of Kankuli river from Singla Kankuli river polo Bansidhara Dalei house 1.75 Water Conservation<br />

1<strong>12</strong> Basta Nabara Nabra Improvement of road from East Nabara maraata pond to Narahanja 1.75 Rural Connectivity<br />

113 Basta Nabara Rasalpur Improvement of road from Pitambara Rout chhak to Rasal pur Adibasi sahi 1.50 Rural Connectivity<br />

114 Basta Nabara Sitadiha Improvement of road of Sitadiha Adibasi sahi to Jamalpur road 2.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

115 Basta Nabara Parakankuli Improvement of road from Parakankuli chhak to Bansi Sahoo house 1.50 Rural Connectivity<br />

116 Basta Nabara Barahampur Renovation of Barahmapur Gobar pokhari with pucca ghat 1.50 Water Conservation<br />

117 Basta Nabara Nahanjara Renovation of School pokhari 1.50 Water Conservation<br />

118 Basta Nabara Mathakankuli Renovation of Dhenkapada Dharmanath pokhari 2.00 Water Conservation<br />

119 Basta Nabara Simulia Excavation of new pond at Simulia pada 1.50 Water Conservation<br />

<strong>12</strong>0 Basta Nabara Nabra Improvement of embankment from Marhata pokhari PWD chhak to Kandara pokhari 1.50 Flood Control<br />

<strong>12</strong>1 Basta Naikudi Agatamala Improvement of CC road from Sidheswar Parida house to Rabindra Das house 2.00 Rural Connectivity<br />

<strong>12</strong>2 Basta Naikudi Uttar Naikudi Improvement of CC road from concrete road to Bishnu Hatai house 2.00 Rural Connectivity<br />

<strong>12</strong>3 Basta Naikudi Baya Improvement of CC road from Adibasi sahi to Baya school 1.50 Rural Connectivity<br />

<strong>12</strong>4 Basta Naikudi Purba Naikudi Improvement of CC road from PWD road to Babulal Bhanja house 1.50 Rural Connectivity<br />

<strong>12</strong>5 Basta Naikudi Baliapati Improvement of embankment from PWD road Pradeep Samanta house to Gheribandha 1.50 Flood Control<br />

<strong>12</strong>6 Basta Naikudi Bardhana Improvement of embankment from Manguli Jena house to Setha sahivia Panchanan Patra 1.50 Flood Control<br />

<strong>12</strong>7 Basta Naikudi Nadbani Improvement of embankment from Ganesh Pramanik house to Gouranga Sethi house 2.00 Flood Control<br />

<strong>12</strong>8 Basta Naikudi Simulipal Renovation of Desa tank and construction of pucca ghat 1.50 Water Conservation<br />

<strong>12</strong>9 Basta Mukulisi Renupada Improvement of CC road from Renupada Mohapatra sahi to Rout sahi chhak 1.50 Rural Connectivity<br />

130 Basta Mukulisi Kothia Improvement of road from Kothia Chhachina college field 1.50 Rural Connectivity<br />

131 Basta Mukulisi Kalidiha Improvement of road from Kalidiha Thakurani to Mukulisi Barada via Jena sahi 1.50 Rural Connectivity<br />

132 Basta Mukulisi Mululisi Improvement of road from Mukulisi Barada road to river side 1.50 Rural Connectivity<br />

133 Basta Mukulisi Barada Renovation of Barada pokhiri 1.50 Water Conservation<br />

134 Basta Mukulisi Dandi Renovation of Kacheri pokhiri 1.30 Water Conservation<br />

135 Basta Mukulisi Kuchuli Improvement of embankment from Benimula to Darada polo 1.70 Flood Control<br />

136 Basta Mukulisi Talapada Improvement of embankment from Dunda polo to Bania nala 1.30 Flood Control<br />

137 Basta Tadada Tadada Improvement of CC road from Tadda Mahadev Temple to Tadda School 1.30 Rural Connectivity<br />

138 Basta Tadada Shyamraipur Improvement of CC road from Shyamraipur mahadev temple to Hadibandhu Das house 1.30 Rural Connectivity<br />

139 Basta Tadada Simulia Renovation of Simulia Mahadev tank 2.00 Water Conservation<br />

140 Basta Tadada Panisulia Improvement of embankment from Purba Panisulia vill. Tulasi temple to Gothana pada 1.30 Flood Control<br />

141 Basta Tadada Tadada Earth and morum work at Tadada Gram Panchayat 1.30 Land Development<br />

142 Basta Tadada Bentapur Construction of canal from Bentapur north dahana to Palpala river 1.30 Irrigation<br />

143 Basta Natakata Badacharaneswarpur Improvement of road from Girish Behera house to Gangadhara Bhera house via Chakradhara Patuari 1.30 Rural Connectivity<br />

144 Basta Natakata Naranpur Improvement of road from Laxminarayan ouse to Gangadhara house 1.30 Rural Connectivity<br />

145 Basta Natakata Shyamsundarpur Improvement of road from Shyamsunderpur Mahadev Mandir to Purneswara house 1.30 Rural Connectivity<br />

146 Basta Natakata Khandapasa Improvement of road from Pokhari to Khala 1.30 Rural Connectivity<br />

147 Basta Natakata Paninagar Improvement of road from Paninagar Chasipada road to Pninagar gaon 2.00 Rural Connectivity<br />

148 Basta Natakata Shyamsundarpur Renovation of Pathuria 1.30 Water Conservation<br />

149 Basta Natakata Hadmod Improvement of embankment from Hadmouj Narahari Senapati house to Bila Asta tree both side 1.30 Flood Control<br />

150 Basta Natakata Khandapasa Construction of Drain from Khandapasa Angana badi center to Sridhara house 2.00 Irrigation<br />

151 Basta Natakata Paninagar Construction of Drain from Parninagar Pachi Patra Field to Rama Swenapati Field 1.30 Irrigation<br />

152 Basta Raghunathpur Deybhog Improvement of CC road from Irda field to Gopinathpur chhak road via Jena sahi 2.00 Rural Connectivity<br />

153 Basta Raghunathpur Gholai Improvement of CC road from Bada gholai polo to Ajay puri house 1.70 Rural Connectivity<br />

154 Basta Raghunathpur Ramchhak Improvement of CC road from Chagala Patra house to Das sahi via Gadadhara Sahu house to Bag sahi 1.70 Rural Connectivity<br />

155 Basta Raghunathpur Maxharanka Improvement of CC road from Prabhakara Behera house to Ajit Behera house via Laxmikanta house CC road 1.30 Rural Connectivity<br />

156 Basta Raghunathpur Kadrayan Improvement of road from Liakat Khan chhak to Rahim Khan sallon 1.30 Rural Connectivity<br />

157 Basta Raghunathpur Deybhog Excavation of new pond at Deybhog hadi sahi 1.30 Water Conservation<br />

158 Basta Raghunathpur Ghoei Excavation of new pond at Bad gholei 2.00 Water Conservation<br />

159 Basta Raghunathpur Asti Renovation of Asti Khala pond 1.30 Water Conservation<br />

160 Basta Raghunathpur Belahandia Renovation of School side pond 2.00 Water Conservation<br />

161 Basta Raghunathpur Macharanka Construction of Swis gate at Mangala mandir side 1.30 Water Conservation<br />

162 Basta Baharda Barida Improvement of road from Rani bandha to Talatapanda Haudisahu house. 1.30 Rural Connectivity<br />

163 Basta Baharda Gahirasimulia Improvement of road from Gahira Simulia polo to Jamupada and polo to Katia Marandi house 1.30 Rural Connectivity<br />

164 Basta Baharda Begunia Improvement of road from PMGSY road to village end via Benugadia Adibasi sahi 1.30 Rural Connectivity<br />

165 Basta Baharda Kulida Improvement of Embankment from PMGSY road to River via Sanjay Patra pond side. 1.30 Rural Connectivity<br />

166 Basta Baharda Machhia Improvement of Embankment from Tana Tdu house to Sahadev house. 1.30 Flood Control<br />

167 Basta Baharda Baharda Improvement of Embankment from Baharda Farm to River North side. 1.30 Flood Control<br />

168 Basta Baharda Chandan sia Renovation of Chandan sia Pond with Adibandha. 1.30 Water Conservation<br />

169 Basta Santoshpur Teghari Improvement of C.C. road from River side Ajay Dey shop to Saha Buddin Khan house. 1.30 Rural Connectivity<br />

170 Basta Santoshpur Santoshpur Improvement of C.C. road from Santoshpur Kartikeswar Mandapp to Mainroad via Mohanty sahi and Pada sahi 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

171 Basta Santoshpur Baitipada Construction of road from Bidudalei house to Badal house 1.30 Rural Connectivity<br />

172 Basta Santoshpur Benapura Construction of road from Nuasahi Mhanta Babu house to Bharat Mahalik house 1.30 Rural Connectivity<br />

173 Basta Santoshpur Santoshpur Improvement of Embankment from Main village road to Kedar Patra house road 1.30 Flood Control<br />

174 Basta Santoshpur Chalanti Renovation of Chalanti Adibasi sahi tank 2.00 Water Conservation<br />

175 Basta Santoshpur Oriyapada Renovation of Oriya pada tank with pucca ghat 2.00 Water Conservation<br />

176 Basta Santoshpur Anandapur <strong>Plan</strong>tation at Anandapur tank bandha and Patita field 1.30 Drought Proofing<br />

177 Basta Natakata Chasipada Improvement of road from Kina ram Nayak Bari to Mania chhak 2.20 Rural Connectivity<br />

178 Basta Natakata Bhandipur Improvement of road from Bhandipur shop chhak to Bada diha road 1.30 Rural Connectivity<br />

179 Basta Natakata Badacharigaon Improvement of road from Badacharigaon Abhimanyu Senapati house to Muslim basti via Baishanav sahi 1.30 Rural Connectivity<br />

180 Basta Natakata Kothacharigaon Improvement of road from Kotha charigaon Gudia sahi to school pokhari 1.30 Rural Connectivity<br />

181 Basta Natakata Hadmoj Renovation of Bidyadhara tank 2.20 Water Conservation<br />

182 Basta Natakata Bela Renovation of Nua tank 2.20 Water Conservation<br />

183 Basta Natakata Naranpur Improvement of embankment from Naranpur cultivation land cultivation land both side 2.20 Flood Control<br />

184 Basta Natakata Basantpur Improvement of embankment of Basantapur Badagadia side 1.30 Flood Control<br />

185 Basta Natakata Panchabatia Construction of Drain from Panchabatia pond to Mahadev Mandir 2.20 Drought Proofing<br />

186 Basta Raghunathpur Kadrayan Improvement of road from Post Office chhak to river side CC road 2.20 Rural Connectivity<br />

187 Basta Raghunathpur Asti Improvement of road from Purastam Kamila road to Sudhansu Giri house 2.20 Rural Connectivity<br />

188 Basta Raghunathpur Ambakudichi Improvement of road from Senapati sahi Tulasi mandir to River ghat 2.20 Flood Control<br />

189 Basta Raghunathpur Gholai Excavation of new pond at Tutapada 2.20 Water Conservation<br />

190 Basta Raghunathpur Beli Renovation of G.P. Pond 1.30 Water Conservation<br />

191 Basta Raghunathpur Chaka Arjuni Excavation of ew pond at Adibasi sahi 2.20 Water Conservation<br />

192 Basta Raghunathpur Ramachaka Renovation of Sarba sadharana (common) pond 2.20 Water Conservation<br />

193 Basta Baharda Dhenukhoja Improvement of road from Harekrushna Pradhan house to Patra house via Paschima sahi 2.20 Rural Connectivity<br />

194 Basta Baharda Baharda Improvement of road from Main road to Mahiraj Alli house. 1.30 Rural Connectivity<br />

195 Basta Baharda Kulida Improvement of Embankment at Gandhi chhak South side Nayanjodi and Kudia polo to Nali polo and WHS Project both side. 2.20 Rural Connectivity<br />

196 Basta Baharda Punisita Improvement of Embankment from Duttapur Nayak sahi polo to Handibhasa east side. 2.20 Flood Control<br />

197 Basta Baharda Kudia Renovation of Krushna gadia Pond 2.20 Water Conservation<br />

198 Basta Santoshpur Dhitpura Improvement of road from Lodha Behera house to Lokanathpur Adibasi sahi. 1.30 Rural Connectivity<br />

199 Basta Santoshpur Baniamari Improvement of road from Badagadia pada to Gudikhal river vai School. 1.30 Rural Connectivity<br />

200 Basta Santoshpur Anantapur Improvement of road from Bibekanand Das chhak to Balia Pokhari road 1.30 Rural Connectivity<br />

201 Basta Santoshpur Thengdiha Improvement of road from Purnachandra Pradhan house to Dayanidhi Sahu house to Sudhir Mohapatra house 2.20 Rural Connectivity<br />

202 Basta Santoshpur Vellora Improvement of Embankment from Vellora Patra sahi to Vellora Hata 2.20 Flood Control<br />

203 Basta Santoshpur Chandipur Renovation of Maita pond with Pucca ghat 1.30 Water Conservation<br />

204 Basta Santoshpur Binjpura <strong>Plan</strong>tation at Binjpura village field 1.30 Drought Proofing<br />

Sub total 351.65<br />

1 Bhograi Sankhari Santeghari Repair of Road from Santinagar Brajendra Pradhan house to Gopal Pradhan house with drain 1.50 Rural Connectivity<br />

2 Bhograi Sankhari Mangarajpur Repair of Road from Mangarajpur Kalicharan Pradhan house to Laxmikanta Parida house 1.50 Rural Connectivity<br />

3 Bhograi Sankhari Nayabanisaris Repair of Road from Nayabanisarisa main road to Gobinda Barik house 1.50 Rural Connectivity<br />

4 Bhograi Sankhari Aruapal Repair of Road from Aruapal Kalicharan Pradhan house to Ranibasan 1.50 Rural Connectivity<br />

5 Bhograi Sankhari Gochhidateghari Repair of Road from Gochhidateghari Trilochan Pradhan house to Aruapal 1.50 Rural Connectivity<br />

6 Bhograi Sankhari Kuanrsarisa Renovation of Kuanrsarisa Bhagaban Dey tank 1.50 Water Conservation<br />

7 Bhograi Bajitpur Bajitpur Repair of Road from Bajitpur Subal Dey house to Prafulla Sahu house 1.50 Rural Connectivity<br />

8 Bhograi Bajitpur Bajitpur Repair of Road from Bajitpur Mohanty chhak to Balikbard boarder 1.50 Rural Connectivity<br />

9 Bhograi Bajitpur Sahapur Repair of Road from Sahapur Subal Senapaty house to Gambharia boarder via Daxinsarisa Adhir Senapaty house 2.00 Rural Connectivity<br />

10 Bhograi Bajitpur Daxinsarisa Sand filling in front of Daxinsarisa Primary School with boundary wall 1.30 Land Development<br />

11 Bhograi Kanthibhaunri Ransinghpur Renovation of Ransinghpur Chaula Khoal pond 1.50 Water Conservation<br />

<strong>12</strong> Bhograi Kanthibhaunri Bichitrapur Repair of Road from Bichitrapur Nalu Dalai house to Nias Khilar house 1.50 Rural Connectivity<br />

13 Bhograi Kanthibhaunri Badpahi Repair of Road from Badpahi EO road to Kaukani via Bijay Mohanty house 1.50 Rural Connectivity<br />

14 Bhograi Kanthibhaunri Kanthibhaunri Renovation of Kanthibhaunri Ratan Das chua 1.50 Water Conservation<br />

15 Bhograi Kanthibhaunri Kanthibhaunri Repair of Road from Kanthibhaunri Jagannath Dey house to Raibrahmani bandha 2.00 Rural Connectivity<br />

16 Bhograi Guneibasan Bandhamundi Repair of Road from Bandhamundi PWD road to Banabasan 2.00 Rural Connectivity<br />

17 Bhograi Guneibasan Sunduradi Drain from Sunduradi bridge to Ketika bridge 1.50 Irrigation<br />

18 Bhograi Guneibasan Gopalpur Renovation of Gopalpur village pond 1.50 Water Conservation<br />

19 Bhograi Guneibasan Digrasi Renovation of Digrasi village pond 2.00 Water Conservation<br />

20 Bhograi Guneibasan Haripur Repair of Road from Haripur Anadi Mohan house to Palusia chhak 1.00 Rural Connectivity<br />

21 Bhograi Guneibasan Kumbharmuli Repair of Road from Kumbharmuli Mahadev mandir to Bandhamundi 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

22 Bhograi Guneibasan Kumbharmuli Repair of Road from Kumbharmuli Brahman house to Pradhan house 2.00 Rural Connectivity<br />

23 Bhograi Guneibasan Naidoli Renovation of Naidoli smasan tank 2.00 Water Conservation<br />

24 Bhograi Guneibasan Naidoli Drain from Naidoli Ketika bridge to Sunduradi 1.50 Irrigation<br />

25 Bhograi Putina Uladi Repair of Road from Uladi Harish Mohanty kharibadi to Baunsadiha GP Office 2.00 Rural Connectivity<br />

26 Bhograi Putina Uladi Renovation of Uladi Arjuna pond 1.50 Water Conservation<br />

27 Bhograi Putina Putina Repair of Road from Putina ABD Road to Narendra Giri house via Barendra Giri 1.50 Rural Connectivity<br />

28 Bhograi Putina Putina Repair of Road from Putina Manasabudhi chhak to Mada pokhari 1.50 Rural Connectivity<br />

29 Bhograi Putina Kuliha Repair of Road from Kuliha Kanguhi bandha to Nua pokhari 1.30 Rural Connectivity<br />

30 Bhograi Putina P. Analia Repair of Road from Paschim Analia ADB road to Gauranga Bisi house via Dhananjay Mandal 1.30 Rural Connectivity<br />

31 Bhograi Deula Deula Renovation of drainage from Deula Kumar khana to Deula Suasuni bridge 1.50 Irrigation<br />

32 Bhograi Deula Deula Road from Deula Kamila sahi to Chadheigudia 1.50 Rural Connectivity<br />

33 Bhograi Deula Deula Road from Deula Raghu chhak to Haridaspur via Bhaskar Nayak house 1.50 Rural Connectivity<br />

34 Bhograi Deula Haridaspur Road from Haridaspur Prafulla Patra house to Cost canal 2.00 Rural Connectivity<br />

35 Bhograi Deula Saraswatipur Excavation of Saraswatipur M.E. School pond 1.30 Water Conservation<br />

36 Bhograi Deula Raghuchhak Road from Deula Raghuchak EGS School to Cost canal via Gaidaha bandha 2.00 Rural Connectivity<br />

37 Bhograi Kasaba Kamarda Kamarda Road from Kamarda Pirabadi to Kamial chhak 1.50 Rural Connectivity<br />

38 Bhograi Kasaba Kamarda Kamarda Renovation of Kamarda Dhanagadi pond 1.30 Water Conservation<br />

39 Bhograi Kasaba Kamarda S. N. Patna Road from Sahebnagarpatna School to Bhaskar Behera house 2.00 Rural Connectivity<br />

40 Bhograi Kasaba Kamarda Kiarda Road from Kiarda Bijay Padhi house to Kiarda Chandi mandir 1.30 Rural Connectivity<br />

41 Bhograi N. M. Padia Kirtania Renovation of Behera sahi pond 1.75 Water Conservation<br />

42 Bhograi N. M. Padia Kirtania Construction of flood mound Kirtania Bhirkiti angle 1.75 Flood Control<br />

43 Bhograi N. M. Padia Chandrabali Road from Chandrabali jethi to Radhashyam Bej badi 1.75 Rural Connectivity<br />

44 Bhograi N. M. Padia N. M. Padia Renovation of Nuna pond 1.75 Water Conservation<br />

45 Bhograi N. M. Padia N. M. Padia Road from Matikencha south side Bihari jhill pump house to Chandrabali luni bandha via Subash Dhal badi with culvert 1.75 Rural Connectivity<br />

46 Bhograi Gunsartha Gunsartha Road from Gunsartha connectivity road to Siaroin via Saula 1.50 Rural Connectivity<br />

47 Bhograi Gunsartha Basulipat Road from Basulipat RD road to Gunsartha GP Office via Agarda School 1.50 Rural Connectivity<br />

48 Bhograi Gunsartha Kalyanpur Road from Kalyanpur Tarini to Kiagadia via Setu Pradhan pond 1.50 Rural Connectivity<br />

49 Bhograi Gunsartha Uplat Road from Suhagi chhak to Bengal boarder Uplat via Mahadev mandir 1.50 Rural Connectivity<br />

50 Bhograi Gunsartha Dubsahi Road from Dubsahi High School chhak to Parida pokhari via Chandi chhak 1.50 Rural Connectivity<br />

51 Bhograi Gunsartha Priyabag Road from Priyabag RD road to Bibhuti Mandal house via Sasikanta house 1.50 Rural Connectivity<br />

52 Bhograi Gunsartha Siaroin Road from Siaroin hat to Sahada Bengal boarder via Nadbani School 1.50 Rural Connectivity<br />

53 Bhograi Gunsartha Siaroin Road from Siaroin RD road to Dadhibadi via Arun Tripathy house 1.50 Rural Connectivity<br />

54 Bhograi Gunsartha Agarda Renovation of Agarda Pal pokhari 1.50 Water Conservation<br />

55 Bhograi Baunsadiha Katisahi Road from Katisahi ANM centre to High School via Prafulla Sen 1.30 Rural Connectivity<br />

56 Bhograi Baunsadiha Baunsadiha Road from Baunsadiha PWD road to Putina road via Ananta Patra 1.50 Rural Connectivity<br />

57 Bhograi Baunsadiha Mukulishpur Road from Mukulishpur Chandi Thakurani to Charmania Purba adi beda chhak 1.30 Rural Connectivity<br />

58 Bhograi Baunsadiha Kachuadi Road from Kachuadi PWD road to Manmatha Dutta house via Srimanta Pradhan house 1.30 Rural Connectivity<br />

59 Bhograi Baunsadiha D nadbani Road from D nadbani Chandi mandir to Kamila diha via Basanta Jena and Chakradhara Bhol 1.30 Rural Connectivity<br />

60 Bhograi Baunsadiha Naiduba Road from Mohagab chhak RD road to Naiduba badchhak via Panchugopal 1.50 Rural Connectivity<br />

61 Bhograi Baunsadiha Chakeisab Road from Chakeisab Santosh mandap to Chakeisab M.E. School via Ananta Ban 1.50 Rural Connectivity<br />

62 Bhograi Mandarsahi Mandarsahi Road from Mandarsahi Mali bandha to Haripur hat via Mandarsahi U. P. School 2.00 Rural Connectivity<br />

63 Bhograi Mandarsahi Mandarsahi Renovation of GP Office boundary tank 1.30 Water Conservation<br />

64 Bhograi Mandarsahi Mandarsahi Road from Mandarsahi PMGSY road to Subhanandipur via Giri pokhari and Jokamandarsahi U. P. School 2.00 Rural Connectivity<br />

65 Bhograi Mandarsahi Mandarsahi Road from Mandarsahi Patna Bipin Sethi house to Mandarsahi U. P. School via KC ME School 1.30 Rural Connectivity<br />

66 Bhograi Mandarsahi Ganeswarpur Road from Mandarsahi Guhi Mohakud pond to Ganeswarpur hat via Sub- station 2.00 Rural Connectivity<br />

67 Bhograi Bhograi Bhograi Construction of drainage from Bhograi hat to Bhandaria khala 1.30 Irrigation<br />

68 Bhograi Bhograi Bartana Development of Dalai Banki road 1.30 Rural Connectivity<br />

69 Bhograi Bhograi Chakapalasia Road from Chakapalasia J. Dutta house to Bhandaria khala 2.00 Rural Connectivity<br />

70 Bhograi Bhograi Matikhana Road from Matikhana RD road to Sunadharbasan baragahha via Basanta Mohanty chhak 1.30 Rural Connectivity<br />

71 Bhograi Bhograi Malaruan Road from Malaruan Madhu Giri house to Bamhunda canal 2.00 Rural Connectivity<br />

72 Bhograi Dehurda Balharpur Road from Balharpur Jagneswar Mohanty house to Anantapur boarder via Radhashyam Bej betel field 1.30 Rural Connectivity<br />

73 Bhograi Dehurda Dehurda Road from Mohanty chhak to Kalipada Acharya house 1.50 Rural Connectivity<br />

74 Bhograi Dehurda Jaleswarpur Excavation of Jaleswarpur CHC pokhari 1.50 Water Conservation<br />

75 Bhograi Dehurda Batagram Renovation and plantation of Batagram Hatapal pokhari 1.50 Water Conservation<br />

76 Bhograi Dehurda Banabasan Excavation of pond and plantation at Teghari smasan 1.30 Water Conservation<br />

77 Bhograi Dehurda Sribatsapur Road from Sribatsapur Bhaskar Hazira chhak to Gopal Dhar with culvert 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

78 Bhograi Dehurda Anantapur Soil filling at Anantapur U. P. School pokhari 1.50 Land Development<br />

79 Bhograi Dehurda Mirkasimpur Road from Mirkasimpur Narayan Sahu house to Mishra chhak 1.50 Rural Connectivity<br />

80 Bhograi Dehurda Gabardhanpur Renovation of Jhagadeswar Mahadev kunda pokhari 1.00 Water Conservation<br />

81 Bhograi Analia Khaedsahi Road from Khaedsahi D Paramanik chhak to Abhay Mahal via smasan 1.30 Rural Connectivity<br />

82 Bhograi Analia Hadki Renovation of Hadki Hota pokhari 1.50 Water Conservation<br />

83 Bhograi Analia Mankunda Road from Mankunda Chandi mandir to Ajit Sahu house 1.30 Rural Connectivity<br />

84 Bhograi Analia Mankunda Road from Mankunda School to Mishra chhak field 1.30 Rural Connectivity<br />

85 Bhograi Analia Nasirabad Renovation of Nasirabad gochar pokhari 1.50 Water Conservation<br />

86 Bhograi Analia Nisanpur Road from Nisanpur Kopasia bandha Panisanda chhak to Khaedsahi chhak 1.30 Rural Connectivity<br />

87 Bhograi Mohagab Mohadia Road from Mohadia Chandi to Ghadai chhak 1.00 Rural Connectivity<br />

88 Bhograi Mohagab Daruha Road from Daruha Amulya Khatua house to CC road via Tapas Jena 1.30 Rural Connectivity<br />

89 Bhograi Mohagab Chandakusumi Road from Chandakusumi Chingda pokhari to Kusuti Barik chhak via Nainpura 1.30 Rural Connectivity<br />

90 Bhograi Mohagab Kulida Road from Kulida Pradhan house to RD road via High School 1.30 Rural Connectivity<br />

91 Bhograi Mohagab Kusuti Road from Kusuti Bayani ghata road to Iswar Das chhak via Barun Barik 1.00 Rural Connectivity<br />

92 Bhograi Mohagab Madhupur Road from Madhupur Maheswar chhak to Guru Gauranga M. E. School via Bhanu Dey 1.30 Rural Connectivity<br />

93 Bhograi Mohagab Mohagab Road from Mohagab Sawn chhak to Kusuti road via Ganesh Behera 1.30 Rural Connectivity<br />

94 Bhograi Nachinda Nachinda Road from Nachinda Mahadev mandir to Kamalalochan Das house via Basanta Bana 1.30 Rural Connectivity<br />

95 Bhograi Nachinda Kharidchak Road from Kharidchak Golam khala muhan to Soladhara 1.30 Rural Connectivity<br />

96 Bhograi Nachinda Deunr Renovation of Deunr School tank 1.00 Water Conservation<br />

97 Bhograi Nachinda Nischintadiha Road from Nischintadiha PMGSY road to Pramanik house via Sanyasi Mandal 1.50 Rural Connectivity<br />

98 Bhograi Nachinda Baga Road from Baga Pradhan sahi to PMGSY road 1.50 Rural Connectivity<br />

99 Bhograi Nachinda Uluda Road from Uluda PMGSY road to Madamasani 1.50 Rural Connectivity<br />

100 Bhograi Nachinda Uluda Renovation of Uluda Bada pokhari 1.00 Water Conservation<br />

101 Bhograi Nachinda Mahammadpur Renovation of Mahammadpur Bada gadia 1.00 Water Conservation<br />

102 Bhograi Nahara Rautmandaruni Road from Rautmandaruni Anadi Kanongo house to Jhampudi 1.10 Rural Connectivity<br />

103 Bhograi Nahara Mandaruni Road from Mandaruni gochar to Indira road via Deep T. well field 1.50 Rural Connectivity<br />

104 Bhograi Nahara Kanpur Road from Kanpur Sadanan Tripathy house to Ganesh Jena house 1.50 Rural Connectivity<br />

105 Bhograi Nahara Nahara Renovation of Kandara pokhari 1.50 Water Conservation<br />

106 Bhograi Nahara Satsulia Road from Satsulia Subal Sur house to Godanda via Rajani Mohanty 1.50 Rural Connectivity<br />

107 Bhograi Kharidpipal Aruhabruti-I Road from Aruhabruti-I Chandi mandir to Pahipada khala via Sarisaganj 1.30 Rural Connectivity<br />

108 Bhograi Kharidpipal Aruhabruti-II Road from Aruhabruti-II Srimaa School to Kharidchak via Nuasahi 1.50 Rural Connectivity<br />

109 Bhograi Kharidpipal Miapatna Road from Miapatna village road with culvert 1.30 Rural Connectivity<br />

110 Bhograi Kharidpipal Barbatia Road from Barbatia village road with hume pipe 1.50 Rural Connectivity<br />

111 Bhograi Kharidpipal Sarisaganjpatna Road from Sarisaganjpatna village road 1.50 Rural Connectivity<br />

1<strong>12</strong> Bhograi Kharidpipal Nathipur Road from Nathipur village road with hume pipe 1.30 Rural Connectivity<br />

113 Bhograi Balim Hiranandapur Renovation of Hiranandapur Bada pokhari 1.50 Water Conservation<br />

114 Bhograi Balim Kuruthia Renovation of Kuruthia Kamili pond 1.10 Water Conservation<br />

115 Bhograi Balim Balim Road from Balim Balipada chhak to Gopal Krushna chhak via Surapada 1.50 Rural Connectivity<br />

116 Bhograi Balim Anturai Road from Anturai SCS to Tildapada via High School 1.50 Rural Connectivity<br />

117 Bhograi Balim Budhakusumi Road from Budhakusumi Tildapada road to Harinarayan Chand house 1.50 Rural Connectivity<br />

118 Bhograi Balim Haldihata Road from Haldihata Surendra Das house to khala bridge via Bisal badi 1.50 Rural Connectivity<br />

119 Bhograi Balim Jatiamari Road from Jatiamari sahi Asta tree to Haldihata Shiba Parida via Sub-station 1.50 Rural Connectivity<br />

<strong>12</strong>0 Bhograi Balim Jaysankhapur Road from Jaysankhapur Krushna Joti mini to Bengal boarder via Biswahari Das 1.50 Rural Connectivity<br />

<strong>12</strong>1 Bhograi Kakhada Mandari Road from Mandari Gouri Sahu house to RD road 1.30 Rural Connectivity<br />

<strong>12</strong>2 Bhograi Kakhada Hatsarisa Road from Hatsarisa Banamali Pradhan house to RD road 1.50 Rural Connectivity<br />

<strong>12</strong>3 Bhograi Kakhada Daudpur Road from Daudpur bagad to RD road via Netaji club 1.50 Rural Connectivity<br />

<strong>12</strong>4 Bhograi Kakhada Purusottampur Road from Purusottampur RD road Radhakrushna Das house to Kundia 1.50 Rural Connectivity<br />

<strong>12</strong>5 Bhograi Kakhada Bahalia Road from Bahalia Balabhadra Bhanja house back side to Damodarpur Ashok Das house 1.50 Rural Connectivity<br />

<strong>12</strong>6 Bhograi Kakhada Khageswarpur Road from Khageswarpur Balakrushna Sahu house to Baikuntha Barik 1.50 Rural Connectivity<br />

<strong>12</strong>7 Bhograi Gopinathpur Gopinathpur Road from Laxmikanta Das chhak to Bibhuti Bhuiyan house 1.30 Rural Connectivity<br />

<strong>12</strong>8 Bhograi Gopinathpur Palusia Road from Palusia Baga chhak to Ramshankar Mohanty house 1.30 Rural Connectivity<br />

<strong>12</strong>9 Bhograi Gopinathpur Kanchangadia Renovation of Kanchangadia School pokhari 1.30 Water Conservation<br />

130 Bhograi Gopinathpur Mahisamunda Renovation of Mahisamunda Baragachha pokhari 1.50 Water Conservation<br />

131 Bhograi Gopinathpur Dwaripatar Road from Dwaripatar Gauranga Singh house to Shyamsundar Das house 1.50 Rural Connectivity<br />

132 Bhograi Gopinathpur Narayanpur Renovation of Ramchandi pokhari 1.50 Water Conservation<br />

133 Bhograi Soharia Jalsoharia Road from Bhanu Giri chhak to Bhuban Adhek house 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

134 Bhograi Soharia Narasinghapur Road from Narasinghpur School to Debendra Pradhan house 1.50 Rural Connectivity<br />

135 Bhograi Soharia Soharia Renovation of pond at Soharia gochar 1.50 Water Conservation<br />

136 Bhograi Soharia Soharia Road from Gaurahari Das house to Rabindra Mandal house 1.50 Rural Connectivity<br />

137 Bhograi Soharia Jhadsimulia Road from Srikanta Behera house front to Smasan 1.50 Rural Connectivity<br />

138 Bhograi Soharia Raipur Road from Sudhakar Giri house to Jatindra Sahu house 1.50 Rural Connectivity<br />

139 Bhograi Soharia Raipur Renovation of Sitala mandir pokhari 1.50 Water Conservation<br />

140 Bhograi Sultanpur Alalbindha Renovation of Alalbindha Kaya pokhari 1.50 Water Conservation<br />

141 Bhograi Sultanpur Alalbindha Road from Alalbindha Taraprasad Nayak chhak to Parsu Barik pada 1.30 Rural Connectivity<br />

142 Bhograi Sultanpur Bagrukhi Renovation of Bagrukhi Duma pokhari 1.50 Water Conservation<br />

143 Bhograi Sultanpur Mahispur Road from Mahispur Gramchandi to Bada meda via Jiagodhi 1.50 Rural Connectivity<br />

144 Bhograi Sultanpur Mahispur Renovation of Mahispur Chatra pokhari 1.50 Water Conservation<br />

145 Bhograi Sultanpur Rasidpur Road from Rasidpur RD road to Bimbadhar Pradhan house via Banamali Das house 1.30 Rural Connectivity<br />

146 Bhograi Rasalpur Kulha Road from Kulha Kanhu Nayak house to Umakanta Pila 1.50 Rural Connectivity<br />

147 Bhograi Rasalpur Pithapur Road from Pithapur Kala chhak to Chaudhuri pond 1.50 Rural Connectivity<br />

148 Bhograi Rasalpur Pithapur Road from Pithapur Kalicharan Behera house to Debendra Sethy 1.50 Rural Connectivity<br />

149 Bhograi Rasalpur Kumbhirigadi Road from Kumbhirigadi ADB road to Lokanath Panigrahi via Bhupesh Patra 1.30 Rural Connectivity<br />

150 Bhograi Rasalpur A Pantei Road from Pantei Bibhuti Majhi house to Pheri ghat via Recreation centre 1.30 Rural Connectivity<br />

151 Bhograi Rasalpur Baunsakhana Road from Baunsakhana Thakurani to Prafulla Majhi via Baikuntha Majhi 1.50 Rural Connectivity<br />

152 Bhograi Nimatpur Nimatpur Renovation of Nimatpur Hata tank 1.50 Water Conservation<br />

153 Bhograi Nimatpur Nimatpur Road from Nimatpur Ananta Sahu house to Nimatpur Society 1.50 Rural Connectivity<br />

154 Bhograi Nimatpur Bela Road from Bela U. P. School chhak to Digrasi boarder 1.50 Rural Connectivity<br />

155 Bhograi Nimatpur Pasarbindha Road from Pasarbindha Umakanta Dey house to Kacheribadi 1.50 Rural Connectivity<br />

156 Bhograi Nimatpur Kakudibodha Road from Kakudibodha Tarini Das house to Jayrampur boarder 1.50 Rural Connectivity<br />

157 Bhograi Nimatpur Gobindpur Road from Gobindpur Uttar Das house to Chaturbhuja Mohanty house 1.50 Rural Connectivity<br />

158 Bhograi Dahunda Belda Renovation of Belda Mahadev pokhari 1.10 Water Conservation<br />

159 Bhograi Dahunda Kasia Road from Bagda RD road to Bengal boarder via Kasia School 1.50 Rural Connectivity<br />

160 Bhograi Dahunda Dahunda Road from Dahunda School chhak to Siba sahi Sarat sima 1.50 Rural Connectivity<br />

161 Bhograi Dahunda Karihanda Road from Naiduba Marei gadia to Belda RD road via Gokuleswar temple 1.50 Rural Connectivity<br />

162 Bhograi Dahunda Karihanda Renovation of Karihanda Raulia pokhari 1.10 Water Conservation<br />

163 Bhograi Dahunda Sibasahi Road from Anirudha Lenka house to Ranigoda boarder via Parida house 1.50 Rural Connectivity<br />

164 Bhograi Dahunda Demuria Road from Ranigoda PMGSY road to Demuria north boarder 1.50 Rural Connectivity<br />

165 Bhograi Dahunda Ranigoda Road from Hemanta Pal gadia adi CC road to Sibasahi road 1.50 Rural Connectivity<br />

166 Bhograi Huguly Bindhapadmapur Road from Bindhapadmapur Tarini club to Baida Pattayat house 1.30 Rural Connectivity<br />

167 Bhograi Huguly Krushnanagar Road from Laxman Das house chhak to EGS centre 1.50 Rural Connectivity<br />

168 Bhograi Huguly Gazipur Renovation of Gaurgobinda matha pokhari 1.10 Water Conservation<br />

169 Bhograi Huguly Gambharia Road from Markanda Senapaty house to Sanyasi Senapaty 1.50 Rural Connectivity<br />

170 Bhograi Huguly Naichhanpur Road from Gazipur boarder Naichhanpur Nabin Pradhan bagan to Astatota 1.50 Rural Connectivity<br />

171 Bhograi Huguly Amchua Renovation of Matikhana general pokhari 1.00 Water Conservation<br />

172 Bhograi Huguly Udaypur Renovation of Luhagodhi pokhari 1.00 Water Conservation<br />

173 Bhograi Huguly Bhhatpur Leveling of Gramchandi field 1.00 Land Development<br />

174 Bhograi Jayrampur Jayrampur Road from Jayrampur transformer to PWD bandha via Baburam Das house front 1.50 Rural Connectivity<br />

175 Bhograi Jayrampur Tengramari Road from Tengramari Surendra Mahuri house to Chandi mandir 1.50 Rural Connectivity<br />

176 Bhograi Jayrampur Tengramari Road from Tengarmari asta gachha to Bhograi main road 1.50 Rural Connectivity<br />

177 Bhograi Jayrampur Khadikabadi Road from Khadikabadi Simili river to Madhu Jena house 1.50 Rural Connectivity<br />

178 Bhograi Jayrampur Thakurbhaunri Road from Thakurbhaunri Jatindra Sahu house to Bhanu Mohanty house 1.30 Rural Connectivity<br />

179 Bhograi Kusuda Kusuda Road from Kusuda Tarini chhak to Khatua house 1.30 Rural Connectivity<br />

180 Bhograi Kusuda Kusuda Road from Kusuda Nrusinghanath temple to Barik house 1.30 Rural Connectivity<br />

181 Bhograi Kusuda Gabgaun Road from Gabgaun Shebashram School to Markandia pada road 1.50 Rural Connectivity<br />

182 Bhograi Kusuda Purusottampur Excavation of Purusottampur Mahadev kunda tank 1.50 Water Conservation<br />

183 Bhograi Kusuda Krushnapur Road from Krushnapur School to Dubadia Brajendra Parida house 1.50 Rural Connectivity<br />

184 Bhograi Kusuda Dubadia Road from Dubadia School to Ramakanta Khilar house 1.50 Rural Connectivity<br />

185 Bhograi Kusuda Nilpura Excavation of Nilpura School tank 1.50 Water Conservation<br />

186 Bhograi Sradhapur Sarbani Road from Sarbani Laxmikanta Patra house to Radhashyam Patra house 1.00 Rural Connectivity<br />

187 Bhograi Sradhapur Chaknafrai Road from Prafulla Patra house to Chaknafrai chhak 1.00 Rural Connectivity<br />

188 Bhograi Sradhapur Khadibil Road from Forest Office to Kalicharan Nayak house 1.30 Rural Connectivity<br />

189 Bhograi Sradhapur Palasia Road from Jhagadeswar Jena chhak to Bayan chhak 1.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

190 Bhograi Sradhapur Kismat Nafrai Road from Suresh Patra house to Chatra khala 1.00 Rural Connectivity<br />

191 Bhograi Sradhapur Kanyanagari Road from Pulin Chandra Mandal chhak to Prahlad Mohanty house 1.00 Rural Connectivity<br />

192 Bhograi Barbatia Bagarda Road from JBC road Giridhari Das house to Daudpur west boarder 1.00 Rural Connectivity<br />

193 Bhograi Barbatia Barbatia Road from Barbatia bara gachha to Bagard School via Mohanala 1.00 Rural Connectivity<br />

194 Bhograi Barbatia Kukudia Renovation of Kukudia Kaliapantha pokhari 1.00 Water Conservation<br />

195 Bhograi Barbatia Dihakakhada Road from Dihakakhada Padu Barik house to Nandikishore mandir 1.50 Rural Connectivity<br />

196 Bhograi Barbatia Kantabania Road from Kantabania Chakradhar Mandal house to Bali pokhari 1.50 Rural Connectivity<br />

197 Bhograi Barbatia Debdha Road from Debdha to Kukudia Harendra Giri pokhari 1.50 Rural Connectivity<br />

198 Bhograi T. Hazira Sanausa Road from Madhusudan Behera house to Gobindapur School 1.00 Rural Connectivity<br />

199 Bhograi T. Hazira Fulbani Road from Nilu Samal house to Chakfulbani School 1.00 Rural Connectivity<br />

200 Bhograi T. Hazira Bindhamuhan Road from Bindhamuhan Ramchandra Kunda house to Andhari via Phatepadia 1.00 Rural Connectivity<br />

201 Bhograi T. Hazira Andhari Renovation of Chaudhury pond with plantation 1.50 Water Conservation<br />

202 Bhograi T. Hazira Ausa Renovation of Ausa School pond 1.50 Water Conservation<br />

203 Bhograi T. Hazira Rankotha Renovation of Kunda tank at Rankotha 1.50 Water Conservation<br />

204 Bhograi Putina P. Analia Repair of Road from Paschim Analia ADB road to Gauranga Bisi house via Narayan Bhuiyan 2.20 Rural Connectivity<br />

205 Bhograi Deula Deula Renovation of Uttar Deula Nodal School tank 1.30 Water Conservation<br />

206 Bhograi Deula Deula Excavation of Deula Mohapuskarini 1.30 Water Conservation<br />

207 Bhograi Deula Haridaspur Excavation of NN High School tank 1.00 Water Conservation<br />

208 Bhograi Deula Saraswatipur Excavation of Saraswatipur School tank 1.00 Water Conservation<br />

209 Bhograi Kasaba Kamarda Kamarda Road from Putina road to Kantabani School via Ramchandra 1.00 Rural Connectivity<br />

210 Bhograi Kasaba Kamarda Kamarda Renovation of Kamarda Dhanagadi pond 1.30 Water Conservation<br />

211 Bhograi Kasaba Kamarda S. N. Patna Road from Sahebnagarpatna School to Bhaskar Behera house 1.00 Rural Connectivity<br />

2<strong>12</strong> Bhograi N. M. Padia Kirtania Renovation of Behera sahi pond 1.30 Water Conservation<br />

213 Bhograi N. M. Padia Chandrabali Road from Chandrabali jethi to Radhashyam Bej badi 1.30 Rural Connectivity<br />

214 Bhograi N. M. Padia N. M. Padia Renovation of Nuna pond 1.30 Water Conservation<br />

215 Bhograi Gunsartha Gunsartha Road from Gunsartha connectivity road to Siaroin via Saula 1.00 Rural Connectivity<br />

216 Bhograi Gunsartha Basulipat Road from Basulipat RD road to Gunsartha GP Office via Agarda School 1.00 Rural Connectivity<br />

217 Bhograi Gunsartha Kalyanpur Road from Kalyanpur Tarini to Kiagadia via Setu Pradhan pond 1.00 Rural Connectivity<br />

218 Bhograi Gunsartha Uplat Road from Suhagi chhak to Bengal boarder Uplat via Mahadev mandir 1.00 Rural Connectivity<br />

219 Bhograi Gunsartha Dubsahi Road from Dubsahi High School chhak to Parida pokhari via Chandi chhak 1.00 Rural Connectivity<br />

220 Bhograi Gunsartha Priyabag Road from Priyabag RD road to Bibhuti Mandal house via Sasikanta house 1.00 Rural Connectivity<br />

221 Bhograi Gunsartha Siaroin Road from Siaroin RD road to Dadhibadi via Arun Tripathy house 1.00 Rural Connectivity<br />

222 Bhograi Gunsartha Agarda Renovation of Agarda Pal pokhari 1.00 Water Conservation<br />

223 Bhograi Baunsadiha Katisahi Road from Katisahi Gauranga Sen house to Narayan Ojha via Smasan 1.00 Rural Connectivity<br />

224 Bhograi Baunsadiha Baunsadiha Road from Baunsadiha PWD road to Madan Mohan mandir via Dinesh Ray 1.30 Rural Connectivity<br />

225 Bhograi Baunsadiha Mukulishpur Road from Mukulishpur PWD road to Tala pokhari via Banshidhara Pradhan 1.30 Rural Connectivity<br />

226 Bhograi Baunsadiha Kachuadi Road from Kachuadi PWD road to Chhamuna Kundia via Kachuadi College 1.30 Rural Connectivity<br />

227 Bhograi Baunsadiha Parulia Road from Parulia CC road Das house to Mahan gudi with guard wall 1.00 Rural Connectivity<br />

228 Bhograi Mandarsahi Mandarsahi Renovation of GP Office boundary tank 2.20 Water Conservation<br />

229 Bhograi Mandarsahi Mandarsahi Road from Mandarsahi PMGSY road to Subhanandipur via Giri pokhari and Jokamandarsahi U. P. School 2.20 Rural Connectivity<br />

230 Bhograi Mandarsahi Ganeswarpur Road from Mandarsahi Guhi Mohakud pond to Ganeswarpur hat via Sub- station 1.30 Rural Connectivity<br />

231 Bhograi Bhograi Bhograi Road from Bhograi Majhi basti chhak to Uttar basti 1.30 Rural Connectivity<br />

232 Bhograi Bhograi Bartana Road from Bartana Hum chhak to canal bandha 1.30 Rural Connectivity<br />

233 Bhograi Bhograi KasImpur Road from KasImpur main road to Gohiri bandha via KasImpur chatsali 1.30 Rural Connectivity<br />

234 Bhograi Bhograi Palasia Road from Palasia RD road to Sarbeswar Jena house 1.30 Rural Connectivity<br />

235 Bhograi Bhograi Sunadharbasan Renovation of Satabahita pokhari 1.30 Water Conservation<br />

236 Bhograi Dehurda Balharpur Renovation of Balharpur High School pokhari 1.30 Water Conservation<br />

237 Bhograi Dehurda Dehurda Road from Dehurda chhak JBC road to Nidhubani via N. Das house 1.00 Rural Connectivity<br />

238 Bhograi Dehurda Jaleswarpur Renovation of Chatanchhak east side pond 1.00 Water Conservation<br />

239 Bhograi Dehurda Teghari Excavation of Teghari smasan pond 1.00 Water Conservation<br />

240 Bhograi Dehurda Jaynagar Road from Jaynagar School to Banabasan boarder 1.30 Rural Connectivity<br />

241 Bhograi Analia Champabanipatna Renovation of Champabanipatna Nodal U. P. School pond 1.00 Water Conservation<br />

242 Bhograi Analia Khaedsahi Renovation of Khaedsahi Bahalia pond 1.00 Water Conservation<br />

243 Bhograi Analia Hadki Road from Hadki chhak to Sitala mandap 1.30 Rural Connectivity<br />

244 Bhograi Analia Mankunda Renovation of Mankunda pokhari 1.00 Water Conservation<br />

Sub total 341.75<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

1 Jaleswar Aruha Salikotha Road from Kapasia to Trilochan Jena Tank via Arun Jena 2.00 Rural Connectivity<br />

2 Jaleswar Aruha Salikotha Road from Naba Dey house to GP office via Tarapada Mohanty 1.30 Rural Connectivity<br />

3 Jaleswar Aruha Salikotha Improvement of road from Kapasia to Madagadia via Bijay Ku.Das house 1.50 Rural Connectivity<br />

4 Jaleswar Aruha Aruha Road from Bakula Chandi to Alalpur via Siba Mohapatra and Harijan sahi 1.50 Rural Connectivity<br />

5 Jaleswar Aruha Nimpur Improvement of road from Kapasia to Chakbaban border via Durba Rana house 1.50 Rural Connectivity<br />

6 Jaleswar Aruha Nimpur Renovation of Madapokhari with bathing ghat 1.50 Water Conservation<br />

7 Jaleswar Aruha Chakarjuni Road from Mahadev Mandir to Aruha Lambodar Pal house 1.50 Rural Connectivity<br />

8 Jaleswar Baiganbadia Chhotakhanpur Cont.of road from Irrigation Bandha to Gagan Mahana house 2.00 Rural Connectivity<br />

9 Jaleswar Baiganbadia Ghantiadi Const.of road from Ghantiali School to kalika Pur kali mandir 1.50 Rural Connectivity<br />

10 Jaleswar Baiganbadia Jhadapimpad Construction of road from Irrigation Bandha Ramakanta house to Narada Ghadai via Satnu Giri 2.00 Rural Connectivity<br />

11 Jaleswar Baiganbadia Akna Improvement of road from Jagannath Rana house to Irriagation Bandha Bani Asta Gacha via Jiban Dalai 1.50 Rural Connectivity<br />

<strong>12</strong> Jaleswar Baiganbadia Jharpimpada Construction of road from Anadia Khala to Surendra Dalai house 1.70 Rural Connectivity<br />

13 Jaleswar Baiganbadia Baiganbadia Construction of road from Baiganbadia UP school to Madhu Prahan Bila via Naguani Khala 1.50 Rural Connectivity<br />

14 Jaleswar Baiganbadia Kalikapur Construction of road from Kalika Devi temple to Ghantiali 1.50 Rural Connectivity<br />

15 Jaleswar Baradiha Baradiha Renovation of Dudhiasole Tank with Bathing Ghat 1.50 Water Conservation<br />

16 Jaleswar Baradiha Baradiha Road from Kandada to Baradiha Bhola road 1.50 Rural Connectivity<br />

17 Jaleswar Baradiha Baradiha Excavation of tank at Uppar Gukundi with bathing ghat 1.50 Water Conservation<br />

18 Jaleswar Baradiha Baradiha Excavation of Khirakoli sahi tank with bathing ghat 1.50 Water Conservation<br />

19 Jaleswar Baradiha Kalama Road from Kuchabania Ma Mangala Thakurani to main road 1.50 Rural Connectivity<br />

20 Jaleswar Baradiha Kalama Renovation of Mati Pokhari 1.50 Water Conservation<br />

21 Jaleswar Baradiha Kankai Renovation of Kankai sahi Pokhari with Bathing ghat 1.50 Water Conservation<br />

22 Jaleswar Bartana Kasida Renovation of Baulia Tank with Bathing Ghat 2.00 Water Conservation<br />

23 Jaleswar Bartana Badanagar Imp of road from East Harijan sahi to Kapasia via Kashi Das 1.50 Rural Connectivity<br />

24 Jaleswar Bartana Asuradiha Imp of road from Rabi Chanda house to Mahadev Temple 1.00 Rural Connectivity<br />

25 Jaleswar Bartana Bartana Improvement of road from Gangadhara Das house to Matha 1.50 Rural Connectivity<br />

26 Jaleswar Bartana Kharida Road from Charigodia Ambadiha via Bada Pokhar with bridge 1.50 Rural Connectivity<br />

27 Jaleswar Bartana Solsanda Improvement of road from Harisamaj to Padma Pokhari 1.50 Water Conservation<br />

28 Jaleswar Bartana Gouribelda Renovation of Saria tank with bathing ghat 1.50 Water Conservation<br />

29 Jaleswar Bartana Khuluda Improvement of road from Panchu Giri Sahapur Chhak via Tahalia 1.00 Rural Connectivity<br />

30 Jaleswar Chamargan Bhandaripalli Renovation of Bhandaripalli Hatapadia Tank with and Bathing Ghat 1.00 Water Conservation<br />

31 Jaleswar Chamargan Saradiha Imp of road with drain from Saradiha Hata Pada toTeghari border 1.00 Rural Connectivity<br />

32 Jaleswar Chamargan Chamaragan Renovation of Nua Pokhari with bathing Ghat 1.50 Water Conservation<br />

33 Jaleswar Chamargan Chafla Drain from Chafla west side border to Basanti Padia 1.50 Irrigation<br />

34 Jaleswar Chamargan Chengada Improvement of road from Santipur road to Mandira well via Nityananda Das house 1.50 Rural Connectivity<br />

35 Jaleswar Chamargan Taradighi Renovation of Taradighi tank with bathing ghat 1.50 Water Conservation<br />

36 Jaleswar D.P. Pur D.P.Pur Road from Mahayastha to Basanti Mandap Via- Simulia Chhak 2.00 Rural Connectivity<br />

37 Jaleswar D.P. Pur D.P.Pur Improvement of road from Anadi Pramanik Chhak to Bhuban Behera Chhak via Basuli Mandap 1.50 Rural Connectivity<br />

38 Jaleswar D.P. Pur D.P.Pur Road from Khitis Jena house to Dhana Sahllow road 1.50 Rural Connectivity<br />

39 Jaleswar D.P. Pur D.P.Pur Renovation of Magunia Pada Digi tank 1.00 Water Conservation<br />

40 Jaleswar D.P. Pur D.P.Pur Construction of road from Malipal border to sub-station chhak via Pradhan chhak 1.50 Rural Connectivity<br />

41 Jaleswar D.P. Pur Praharajpur Road from Baragachha chhak to Mimadhara chhak via- Kasaphala 1.50 Rural Connectivity<br />

42 Jaleswar D.P. Pur Praharajpur Renovation of Chaulia tank 1.50 Water Conservation<br />

43 Jaleswar G.M.Pur Sarsida Conectivity road from Umesh Kar house to Ananda Bazar Via-Laxminarayan Parida 1.50 Rural Connectivity<br />

44 Jaleswar G.M.Pur Sarasida Renovation of Panda Pokhari with Bathing Ghat, Stone Patching, <strong>Plan</strong>tation 2.00 Water Conservation<br />

45 Jaleswar G.M.Pur Gopimohanpur Road from Gopimohanpur Sankhamuha to Narayan Jena via Niasi Gochhayt , Harendra Singh and Kartik Dey 1.50 Rural Connectivity<br />

46 Jaleswar G.M.Pur Mahisamunda Connectivity of road from Pani Panchayat Govt. Sallo to Kapasiya PMGSY road with draingae 1.50 Rural Connectivity<br />

47 Jaleswar G.M.Pur G.M.Pur Road from G.M.Pur Kalyanpur Distboard tank to kapasia via Sabara sahi Kalyanpur Badapokhari 1.50 Rural Connectivity<br />

48 Jaleswar G.M.Pur G.M.Pur Road from Kapasia to Laxmipokhati via Gachagadia 1.50 Rural Connectivity<br />

49 Jaleswar G.M.Pur Mahisamunda Renovation of Jadagadia tank with bathing ghat 2.00 Water Conservation<br />

50 Jaleswar Khalina Ikada Imp of road from Goura Hari Das Chhak to Sub Station via Muna Pradhan house 2.00 Rural Connectivity<br />

51 Jaleswar Khalina Khalina Imp of water channel from Badakhala to Ghodachadhia 1.70 Irrigation<br />

52 Jaleswar Khalina Khalina Improvement of road from Narayan Dey house to Rakishore Dey 2.00 Rural Connectivity<br />

53 Jaleswar Khalina Ambadiha Improvement of road from Nagendra Pramanik house to Kuluda Khala via Siba Mandir 1.50 Rural Connectivity<br />

54 Jaleswar Khalina Sarisa Improvement of road from Rajkishor Panda house to Kainta Pada via Guru Pahia Nalla 1.50 Rural Connectivity<br />

55 Jaleswar Khalina Sarisa Improvement of road from Rajendra Mohanty house to L.I. point 2.00 Rural Connectivity<br />

56 Jaleswar Khalina Ambadiha Improvement of road from Mada Pokhari to UP School via Manas Datta house 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

57 Jaleswar K.M.sahi Beherasahi. Road from Manu Behera house to Subarna Rekha Nadi road via Bhagabata Binda house. 1.50 Rural Connectivity<br />

58 Jaleswar K.M.sahi K.M.sahi Road from Gadasahi Chhak to Malia khali 2.00 Rural Connectivity<br />

59 Jaleswar K.M.sahi K.M.sahi Development of road from Lambodhar Tunik house to Manash Das Mohapatra 1.50 Rural Connectivity<br />

60 Jaleswar K.M.sahi K.M.sahi Renovation of Gada Pokhari 2.00 Water Conservation<br />

61 Jaleswar K.M.sahi Munutunia Road from School pada to Liba Marandi house 1.00 Rural Connectivity<br />

62 Jaleswar K.M.sahi Balabhadrapur Main road from Gandhisahi community center to PMG road 2.00 Rural Connectivity<br />

63 Jaleswar K.M.sahi Gopalprasad Road from K.M.sahi to Raibania Sima via Gopal Prasad house 1.50 Rural Connectivity<br />

64 Jaleswar Kalika Bhadua Digging of Tentula Gudi Pokhari and const of Paka Ghat and <strong>Plan</strong>tation on the Embakment 1.50 Drought Proofing<br />

65 Jaleswar Kalika Kalika Const of road from Sahadev house to Bridge via jahira 1.30 Rural Connectivity<br />

66 Jaleswar Kalika Bhadua Excavation of Dudhiakhali tank 1.30 Water Conservation<br />

67 Jaleswar Kalika Bhadua Construction of road from Tentula School to Daldali bridge with four culvert 1.30 Rural Connectivity<br />

68 Jaleswar Kalika Kalika Construction of road from Jatin Patra house to Kaintha Gadia 1.30 Rural Connectivity<br />

69 Jaleswar Kalika Kalika Improvement of road from Pandu house to Raghu Sir house 1.30 Rural Connectivity<br />

70 Jaleswar Kalika Kalika Road from Tubewell to Kanhu Sahu house 1.30 Rural Connectivity<br />

71 Jaleswar Khuard Nuagan Imp road from Nuagan Panchanan Hati Cycle shop to west bengal Border with culvart 1.30 Rural Connectivity<br />

72 Jaleswar Khuard Badahaldigundi Imp. Of road from bada haladi gundi village to Nuagan 2.00 Rural Connectivity<br />

73 Jaleswar Khuard Purunapani Road from Mahuduma Pravat Mallik Bari to Itavati 2.00 Rural Connectivity<br />

74 Jaleswar Khuard Purunapani Renovation of Darakhulu tank 1.30 Water Conservation<br />

75 Jaleswar Khuard Mahuduma Improvement of road from sub-station ot Purna Machine shop 2.00 Rural Connectivity<br />

76 Jaleswar Khuard Harinabandh Improvement of road from Harinabandha to suleman road 1.30 Rural Connectivity<br />

77 Jaleswar Khuard Kendukhunta Soil filling of tank in front of Kendukhunta community center 2.00 Land Development<br />

78 Jaleswar Khuard Bhadrapada Construction of new road from Bhadrapada Soleman road to Bagbuda tank 1.00 Rural Connectivity<br />

79 Jaleswar L.Nath Gobarghata Road fom Sonaram Murmu to Gangu Baske 1.30 Rural Connectivity<br />

80 Jaleswar L.Nath Gobarghata Renovation of Dhobala Khai nala 1.00 Water Conservation<br />

81 Jaleswar L.Nath Birishpur Imp of road from Arjun Singh house to Rameswar Singh 1.30 Rural Connectivity<br />

82 Jaleswar L.Nath Birishpur Improvement of road from Bririshpur Pakua shop to Siba Patual 2.00 Rural Connectivity<br />

83 Jaleswar L.Nath Bramhapur patna Improvement of road from Bramhapur Patna Ramakanta Sethi to Harihara Dey house 1.30 Rural Connectivity<br />

84 Jaleswar L.Nath Laxman Nath Improvement of road from Mansha Mandira to Maheswar Pati 1.30 Rural Connectivity<br />

85 Jaleswar L.Nath Krushnagar Road from RD road to Ranti Hemram 1.30 Rural Connectivity<br />

86 Jaleswar Makidia Gopalprasad Road from CC road to Himanshu Pradhan house 1.00 Rural Connectivity<br />

87 Jaleswar Makidia Gopalprasad Road from main road to Siba Ghosh house and stone patching 1.30 Rural Connectivity<br />

88 Jaleswar Makidia Kuanarpur Improvement of Village road 1.30 Rural Connectivity<br />

89 Jaleswar Makidia Kuanarpur Land development of Kuanarpur Durga Mandap field 1.00 Land Development<br />

90 Jaleswar Makidia Makidia Road from Makidia Hata Pada to Makidia Sima via Bijay Koila chhak 1.30 Rural Connectivity<br />

91 Jaleswar Makidia Makidia Road from Makidia ME school to Mahunta Pokhari 1.30 Rural Connectivity<br />

92 Jaleswar Makidia Makidia Renovation of Kumbhadubi tank 1.30 Water Conservation<br />

93 Jaleswar Nampo Nampo (W -4) Imp of road from Atul Sahoo hosue to Dhunda Singh house via Kalicharan Sheet, Hatapada and Kabarsthan 1.30 Rural Connectivity<br />

94 Jaleswar Nampo W.No. -7 Imp of road from Murali Patra house to Melaka Adibashi sahi Bukai Tudu house with bridge at Kanhu Nayak house 1.30 Rural Connectivity<br />

95 Jaleswar Nampo Samptia Improvement of road from Sankar Kamila house to Radhi sahi 1.30 Rural Connectivity<br />

96 Jaleswar Nampo Bagpunji Improvement of road from PWD road to LI point via Bhima Jena & Banchanidhi Samal house 1.30 Rural Connectivity<br />

97 Jaleswar Nampo Sarkatia PWD road to Nigamananda High School via Sukaumar Jena 1.30 Rural Connectivity<br />

98 Jaleswar Nampo Nampo Renovation of Hatapada tank 1.00 Water Conservation<br />

99 Jaleswar Nampo Jalakapadia Improvement of road from Radha Mohan Mohanty house to PWD road Nampo via Darkholi pond 1.30 Rural Connectivity<br />

100 Jaleswar Nampo Demuna Improvement of road from PWD road to Chandi temple via Kartik Hui 1.30 Rural Connectivity<br />

101 Jaleswar Netua Sahapur Imp of road from Kamarsali Sahapur border to Trisakti Market 1.00 Rural Connectivity<br />

102 Jaleswar Netua Adinaga Imp of road from Pranabananda Mohapatra house to Pirabag Adibashi sahi 2.00 Rural Connectivity<br />

103 Jaleswar Netua Kamarsalia Improvement of road from Purna Pramanik house to Umakanta Pramanik house 2.00 Rural Connectivity<br />

104 Jaleswar Netua Adinaga Improvement of road from Mahadev Mandir to west Bengal border via Subal Ku. Jena 1.30 Rural Connectivity<br />

105 Jaleswar Naschimpur Beligopinathpur. Road from School to Bhagabat Pradhan. 1.30 Rural Connectivity<br />

106 Jaleswar Naschimpur Naschimpur. Road from R.D.Road to Smasan 1.00 Rural Connectivity<br />

107 Jaleswar Naschimpur Sahadapada Improvement of road from Kausalyamoda chhaka to Gayasur Patra house 2.00 Rural Connectivity<br />

108 Jaleswar Naschimpur Deula Road from Srusidhara Jena house to Nagendra Barik via Himanshu Mohanty 2.00 Rural Connectivity<br />

109 Jaleswar Naschimpur Naschimpur. Renovation of Bisal Pokhari at Nacshimpur 2.00 Water Conservation<br />

110 Jaleswar Naschimpur Beligopinathpur. Drainage from Paschim Banga border to RD road 2.00 Irrigation<br />

111 Jaleswar Naschimpur Arjuni Drainage from Mahadev temple to Dasha Mania Girhiri 2.00 Irrigation<br />

1<strong>12</strong> Jaleswar Naschimpur Nangudsahi Road from gate to Kartik Sen via Nangudashi railay bridge 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

113 Jaleswar Naschimpur Arjuni Road from Arjuni Balamukunda Dey land to Mahadev Mandir 1.30 Rural Connectivity<br />

114 Jaleswar Olmara Rajnagar Imp.of road from Rajnagar Kartik Rana chhak to river & River to Bhagabati Mandir 1.70 Rural Connectivity<br />

115 Jaleswar Olmara Rajnagar Improvement of road from Rajnagar main road Kalidanpat house to Suleman Adia Gopal Prasad Chhak ith culvert 1.30 Rural Connectivity<br />

116 Jaleswar Olmara Rajnagar Renovation of Shunga Buda Pokhari with bathing ghat 1.00 Water Conservation<br />

117 Jaleswar Olmara Gopalpur Imp.of road from Gopal Pur Ashram house to Kalapati road 1.30 Rural Connectivity<br />

118 Jaleswar Olmara Gopalpur Renovation of Jagannath Pokhari at Gopalpur 1.30 Water Conservation<br />

119 Jaleswar Olmara Brahmapur Improvement of road from Bramhanpur UP school to Mahal sahi Solema Adia 1.30 Rural Connectivity<br />

<strong>12</strong>0 Jaleswar Paikasida Balikbad Road from Gaya Ghadai Chhak to chormara border via-laxman pradhan 1.30 Rural Connectivity<br />

<strong>12</strong>1 Jaleswar Paikasida Paikasida WHS at Paikasida old river route of Subarnarekha 1.30 Irrigation<br />

<strong>12</strong>2 Jaleswar Paikasida Uttarpada. Road from Uttarapada to sanakasida. 1.30 Rural Connectivity<br />

<strong>12</strong>3 Jaleswar Paikasida Chitmishra Renovation of Bramhana Pokhari 1.30 Water Conservation<br />

<strong>12</strong>4 Jaleswar Paikasida Talagachhia Road from Talagochhia to Paikasida 1.30 Rural Connectivity<br />

<strong>12</strong>5 Jaleswar Paikasida Keshpura Improvement of road from bridge to Totapada vbia Harekrushna Mohanty 1.00 Rural Connectivity<br />

<strong>12</strong>6 Jaleswar Paikasida Keshpura Road from Dayanidhi Majhi to Purna Majhi house 1.30 Rural Connectivity<br />

<strong>12</strong>7 Jaleswar Paikasida Jampur Road from Jampura Mangala Mandir to Kasimpur 1.30 Rural Connectivity<br />

<strong>12</strong>8 Jaleswar Paschimbard Rela Land development of school padia 1.30 Land Development<br />

<strong>12</strong>9 Jaleswar Paschimbard Paschimabad Road from Harendra Jebna house to Malhu Jena via chhuapadi 1.00 Rural Connectivity<br />

130 Jaleswar Paschimbard Rela Improvement of road from Nadibandha to Harishchandra Jena via Kalicharan Jena house 1.30 Rural Connectivity<br />

131 Jaleswar Paschimbard Paschimabad Road from Malhu Jena Baisi Mandap Khala 1.00 Rural Connectivity<br />

132 Jaleswar Paschimbard Devkumar Road with drainage with culvert from Manicha Chhak to Harekrushna Barik house 1.00 Irrigation<br />

133 Jaleswar Rajpur Olinda Imp of road from Nigamananda Ashram to Railway gate 1.00 Rural Connectivity<br />

134 Jaleswar Rajpur MN Patna Imp of road from Gadmuha Chhak to Totahata 1.70 Rural Connectivity<br />

135 Jaleswar Rajpur Chalanti Improvement of road from Chalanti sub-station to Naudaha via Uttarsahi 1.30 Rural Connectivity<br />

136 Jaleswar Rajpur Rajpur Improvement of road from OT road to Trilochan Pradhan 1.30 Rural Connectivity<br />

137 Jaleswar Rajpur Rajpur Improvement of road from Sek Ushman house to Sek Dafir house 1.30 Rural Connectivity<br />

138 Jaleswar Rajpur Taribatpur Guar wall from Khitish Bhuyan house to Ramachandra Dey Pond 1.30 Rural Connectivity<br />

139 Jaleswar Rajpur Chakarda Road from Anil Nayak house main road to Thakurani Tentuli gachha 1.70 Rural Connectivity<br />

140 Jaleswar Rajpur Jaleswarpur Improvement of road from Jaleswarpur Railway gate to Bhatisahi 1.70 Rural Connectivity<br />

141 Jaleswar Rajpur Military Bazar Improvement of road from OT road to GP High school 1.00 Rural Connectivity<br />

142 Jaleswar R.R.Pur R.R.Pur Imp of road from PMGSY road to Bhagirathi Pal via Durgamandir & Drainage 1.70 Rural Connectivity<br />

143 Jaleswar R.R.Pur R.R.Pur Improvement of road with drainage from PMGSY road to Hata Palia via Bhagirath Pala house 1.70 Rural Connectivity<br />

144 Jaleswar R.R.Pur Ektali Renovation of Mahadev Mandir Tank with Bathing Ghat and Stone Patching 1.70 Water Conservation<br />

145 Jaleswar R.R.Pur Kasimpur Improvement of road from Kasimpur to Jampur 1.70 Rural Connectivity<br />

146 Jaleswar R.R.Pur Gobardhanpur Improvement of road from Gobardhanpur Khetramohn Nath house to Syamsundar Nath house 1.70 Rural Connectivity<br />

147 Jaleswar R.R.Pur Chaughani Improvement of road from Bhagaban Sahoo house to GM Pur road 1.70 Rural Connectivity<br />

148 Jaleswar R.R.Pur Bhagmari Renovation of Basuli tank 1.70 Water Conservation<br />

149 Jaleswar Raibania Ward No 5 Road from Gadachandi road to Nuasahi via Ambasahi 1.70 Rural Connectivity<br />

150 Jaleswar Raibania Ward No 10 Road from Gada Vitar Ugala to Ramachandra Bhuyan hosue via Ghunta Dwara Nandika 1.70 Rural Connectivity<br />

151 Jaleswar Raibania Ward No 4 Renovation of Pula Pokhari 1.70 Water Conservation<br />

152 Jaleswar Raibania Ward No 8 Improvement of road from Maushi Mandir Khela Padia 1.70 Rural Connectivity<br />

153 Jaleswar Raibania Ward No 2 Renovation of Koiligadia Pokhari 1.70 Water Conservation<br />

154 Jaleswar Raibania Ward No 3 Road from RD road to Chandi 1.70 Rural Connectivity<br />

155 Jaleswar Raibania Ward No 11 Road from RD road to Bila Gaida 1.70 Rural Connectivity<br />

156 Jaleswar Sardarbandh Biswanathpur Imp.of road from Khaira house to kanda house 1.00 Rural Connectivity<br />

157 Jaleswar Sardarbandh Ghuntabani Imp.of road from Ghuntabni Monadhar house to Jagannath house 1.00 Rural Connectivity<br />

158 Jaleswar Sardarbandh Patharchatia Renovation of Raja Pokhari 1.70 Water Conservation<br />

159 Jaleswar Sardarbandh Chudamanipur Improvement of road from Nagendra house to Bengal border 1.70 Rural Connectivity<br />

160 Jaleswar Sardarbandh Ghuntabani Excavation of tank at Ghunabani 2.00 Water Conservation<br />

161 Jaleswar Sardarbandh Badatikayatpur Renovation of Chhotagudi tank 1.70 Water Conservation<br />

162 Jaleswar Sardarbandh Picchabani Renovation of Pichhabani tank 1.70 Water Conservation<br />

163 Jaleswar Shyamnagar Chandrapur Excavation of Pond at Chndrapur east side Padia 1.70 Water Conservation<br />

164 Jaleswar Shyamnagar Kanpur Road from Kanpur to Demburabani. 1.70 Rural Connectivity<br />

165 Jaleswar Shyamnagar Shyamnagar Road fro m Baunsabani UP school to Ranjha. 1.70 Rural Connectivity<br />

166 Jaleswar Shyamnagar Shyamnagar Renovation of Dhanaghera Rani Pokhari 1.70 Water Conservation<br />

167 Jaleswar Shyamnagar Shyamnagar Improvement of road from Sukajudi to Ghasipada 1.70 Rural Connectivity<br />

168 Jaleswar Shyamnagar Begunia Road from Sakika sahi to PMGSY road 1.70 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

169 Jaleswar Sikharpur Bazarsole Road ffrom Bazarsole Duman Murmu chhak to Badkhal 1.70 Rural Connectivity<br />

170 Jaleswar Sikharpur Bhanupur Renovation of pond at Khandiadandi pokhari & Bathing ghat 1.70 Water Conservation<br />

171 Jaleswar Sikharpur Rajnagar Road from Tilochan Pradhan house to Shidheswar Pradhan house 1.00 Rural Connectivity<br />

172 Jaleswar Sikharpur Mahulia Renovation of new tank with bathing ghat 1.70 Water Conservation<br />

173 Jaleswar Sikharpur Mahulia Road from Temuhani Khala to Jalapatur 1.70 Rural Connectivity<br />

174 Jaleswar Sikharpur Sikharpur Road from Madhu Behera house to Sunil Giri shop via Siba Behera house 1.70 Rural Connectivity<br />

175 Jaleswar Sikharpur Chakahari Road from Pradhan house to Nadi Bandha 1.00 Rural Connectivity<br />

176 Jaleswar Srirampur Srikanthapur Imp of road from Narayan Mallik Chhak to Teghari border via Pandu house 1.70 Rural Connectivity<br />

177 Jaleswar Srirampur Srikanthapur Road from Narayana Mallik Chhak to Teghari boarder via Pandu Hansda 1.70 Rural Connectivity<br />

178 Jaleswar Srirampur Srirampur Renovation of Madikhana 1.70 Water Conservation<br />

179 Jaleswar Srirampur Gurudaspur Renovation of Canal from Gurudaspur Durga Singh house to Kanga Dera khala 1.70 Irrigation<br />

180 Jaleswar Srirampur Narayanpur Improvement of road from Ardhendu house to Sahu chhak 1.00 Rural Connectivity<br />

181 Jaleswar Srirampur Malipal Improvement of road from Gohira Khala bridge to school pond 1.70 Rural Connectivity<br />

182 Jaleswar Srirampur Pendrasahi Improvement of road from Pendrasahi sub-station to Bharat Ghosh Bila 2.00 Rural Connectivity<br />

183 Jaleswar Sugo Sugo Imp of road from Basuli Tala to Paschima Bila via Ashok Jena 1.50 Rural Connectivity<br />

184 Jaleswar Sugo Dhansimulia Imp of road from Thakurani to Dakhina Bila via Sibanarayan Bir 1.70 Rural Connectivity<br />

185 Jaleswar Sugo Banida Road from JBC road via Suresh Mohanty house 1.70 Rural Connectivity<br />

186 Jaleswar Sugo Sugo Drain from Babaji Palai house to ramanath Kaunar via Gadadhar Jena 1.50 Irrigation<br />

187 Jaleswar Sugo Banida Renovation of Banida Nodal UP school 2.00 Water Conservation<br />

188 Jaleswar Sugo Dhansimulia Drain from Rabindra Mohanty house to Mahanti Pokhari 1.70 Irrigation<br />

189 Jaleswar Sugo Bhurukunda Improvement of road from Bhurkunta Mahadev Mandira to Rabindra Jena house 1.50 Rural Connectivity<br />

190 Jaleswar Sugo Surula Improvement of road from Rabindra Giri house to Bila 2.00 Rural Connectivity<br />

191 Jaleswar Baradiha Baradiha Excavation of Tank at Baradiha Bhikari Singh house 1.30 Water Conservation<br />

192 Jaleswar Baradiha Baradiha Renovation of Bankati Nuapokhari tank and bathing Ghat 1.30 Water Conservation<br />

193 Jaleswar Baradiha Kalama WHS near Prasadsole Jalandhar High School 1.30 Irrigation<br />

194 Jaleswar Baradiha Kankai WHS at Kankai west side Khala 1.30 Irrigation<br />

195 Jaleswar Baradiha Kankai Renovation of Tala Gokundi Pokhari 1.30 Water Conservation<br />

196 Jaleswar Bartana Medinipur Renovation of Matha Tank 1.20 Water Conservation<br />

197 Jaleswar Bartana Badanagar Imrovement of road from Kapasia to Bhuban Jena via Majana Adi 1.20 Rural Connectivity<br />

198 Jaleswar Bartana Bartana Renovation of Mahadev Kunda 1.30 Water Conservation<br />

199 Jaleswar Bartana Kharida Renovation of Benapatia tank with bathing ghat 1.30 Water Conservation<br />

200 Jaleswar Bartana Solsanda Improvement of road from Fakira Jena house to Benapatia 1.30 Rural Connectivity<br />

201 Jaleswar Bartana Sankasida Improvement of road from Rajani Jena chhak to Brundabati via Kakudia 2.20 Rural Connectivity<br />

202 Jaleswar Bartana Sultanpur Renovation of Sultanpur village tank with bathing ghat 1.30 Water Conservation<br />

203 Jaleswar Chamargan Bhandaripalli Excavation of tank Nuasahi Mahula Bania 1.30 Water Conservation<br />

204 Jaleswar Chamargan Gholai Imp of road from Santipur road to UP School 2.20 Rural Connectivity<br />

205 Jaleswar Chamargan Saradiha Renovation of Godi tank with bathing 1.30 Water Conservation<br />

206 Jaleswar Chamargan Chafla Renovation of Jhatia tank 1.30 Water Conservation<br />

207 Jaleswar Chamargan Chafla Renovation of Nahma tank with bathing ghat 2.20 Water Conservation<br />

208 Jaleswar Chamargan Teghari Renovation of Palama tank 1.30 Water Conservation<br />

209 Jaleswar D.P. Pur Maguniapada Const. of Road from Madhugadia chhak to Malipal Dalai sahi Boarder Via- School Chhak ,Stone patching Maghugadia to Satabhari 1.30 Rural Connectivity<br />

210 Jaleswar D.P.Pur D.P.Pur Renovation of Guagadia M.E school pond 1.30 Water Conservation<br />

211 Jaleswar D.P. Pur D.P.Pur Renovation of Kandaradiha school pond 1.30 Water Conservation<br />

2<strong>12</strong> Jaleswar D.P. Pur D.P.Pur Repair of D.P. Pur playground 1.30 Land Development<br />

213 Jaleswar D.P. Pur Praharajpur Road from Birendra chhak to Sadar road via Ramchandra Ghosh 1.30 Rural Connectivity<br />

214 Jaleswar G.M.Pur Basulia Renovation Basulia Purna Tank 1.30 Water Conservation<br />

215 Jaleswar G.M.Pur Sarasida Connectivity of road from Raghu Mahuri huse ( GM Pur road) to PMGSY road via Rama Behera and High School 1.30 Rural Connectivity<br />

216 Jaleswar G.M.Pur Sarsida Renovation of Sarasida Toadaka Gadia with bathing ghat and stone packing 1.30 Water Conservation<br />

217 Jaleswar G.M.Pur Mahisamunda Renovation of Jodagadia tank with bathing ghat 1.30 Water Conservation<br />

218 Jaleswar G.M.Pur Dibakarpur Renovation of Gohiri from Pradhan Pokhari to Nandi Pokhari 1.30 Irrigation<br />

219 Jaleswar G.M.Pur G.M.Pur Road from Kalapada to Jamalpur 2.20 Rural Connectivity<br />

220 Jaleswar G.M.Pur Kalyanpur Improvement of road from Purna Jena house to Pulin Pradhan with guard wall 1.30 Rural Connectivity<br />

221 Jaleswar Khalina Ikada Imp.road from Kartik Pradhan Chhak to dakshina sahi LI point Via-Gourahari Samal 1.30 Rural Connectivity<br />

222 Jaleswar Khalina Ikada Renovation of Mahadev Mandir pond with Bathing Ghat and <strong>Plan</strong>atation 1.30 Water Conservation<br />

223 Jaleswar Khalina Khalina Improvement of road from Nahurunia Pokhari to Ikada sub-station via Bati gadia 1.30 Rural Connectivity<br />

224 Jaleswar Khalina Khalina Renovation of Hakanda Pond with bathing ghat 2.20 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

225 Jaleswar Khalina Ambadiha Improvement of road from Bangali pokhari Adi to Sanyashi Jena house via subal Jena 2.20 Rural Connectivity<br />

Sub total 336.70<br />

1 Khaira Baunsagadia Baunsagadia Expandation of Teliabanka tank with Ghat 1.70 Water Conservation<br />

2 Khaira Baunsagadia Kalamachhua Digging of Paika sahi tank 1.70 Water Conservation<br />

3 Khaira Baunsagadia Barapada Construction of Barapada Barik road with Ghat 1.70 Rural Connectivity<br />

4 Khaira Baunsagadia Bageipur Digging of Badabil Sakhigadia with Ghat 2.00 Water Conservation<br />

5 Khaira Baunsagadia Salagadia Renovation of Salagadia Mahadev Pokhari 2.00 Water Conservation<br />

6 Khaira Baunsagadia Ostapal Construction of road from Ostapal to Baunsagadia with culvert 1.70 Rural Connectivity<br />

7 Khaira Kaithagadia Kaithagadia Development of road from Kaithagadia to Sarisua via Damodarpur 1.70 Rural Connectivity<br />

8 Khaira Kaithagadia Sananuagan Renovation of Sananuagan Jamabani tank 1.70 Water Conservation<br />

9 Khaira Kaithagadia Mundahata Development of road from Simulia chhaka to Dahi Chhaka via Tisalpur 1.70 Rural Connectivity<br />

10 Khaira Kaithagadia Damodarpur Development of RD road to Sarisua via Damodarpur 1.70 Rural Connectivity<br />

11 Khaira Nandoor Nandoor Construction of road and bridge from PWD road to Bhaloke village` 1.70 Rural Connectivity<br />

<strong>12</strong> Khaira Nandoor Sunguda Development of road from Pokhari to Biswal sahi 1.75 Rural Connectivity<br />

13 Khaira Nandoor Mathanuagan Development of road from Mathanuagan Behera sahi 2.00 Rural Connectivity<br />

14 Khaira Nandoor Brahamachari Development of road from Muni Mandap to Thakurani 1.30 Rural Connectivity<br />

15 Khaira Achyutapur Mirjapur Implementation of Mirjapur Barahampur road 1.50 Rural Connectivity<br />

16 Khaira Achyutapur Deuli Construction of Bada Bandha 2.00 Rural Connectivity<br />

17 Khaira Achyutapur Nuasahi Renovation of Nuasahi tank with ghat 2.00 Water Conservation<br />

18 Khaira Achyutapur Chakaohada Development of road from Chakaohada village to Krushanadaspur 2.00 Rural Connectivity<br />

19 Khaira Achyutapur Munida Renovation of Sudam Behera tank with Ghat 1.30 Water Conservation<br />

20 Khaira Achyutapur Achyutipur Construction of drain from Mahilasamiti to Parhisahi chhak 1.30 Irrigation<br />

21 Khaira Achyutapur Ohada Implementation of road from Brahaman Pokhari Ohada main road to Madapada 1.50 Rural Connectivity<br />

22 Khaira Shyamsudarpur Krushnadaspur Digging of Krushnadaspur Badhainala 1.50 Irrigation<br />

23 Khaira Shyamsudarpur Chakapada <strong>Plan</strong>tation at Chakapada field 1.50 Drought Proofing<br />

24 Khaira Shyamsudarpur Randakhaguri Digging of drain from Parbatipur to Bharadamula 2.00 Irrigation<br />

25 Khaira Shyamsudarpur Parbatipur Digging of new pond at School field 2.00 Water Conservation<br />

26 Khaira Shyamsudarpur S.S.pur Renovation of Santiapokhari with ghat 1.30 Water Conservation<br />

27 Khaira Shyamsudarpur Chandagochhi Implementation of Chandagochhi village road 2.00 Rural Connectivity<br />

28 Khaira Shyamsudarpur Srirampur Renovation of Nachipur tank with ghat 2.00 Water Conservation<br />

29 Khaira Garasang Garasang Construction of road from Garasang Girgobardhan Chhak to Kalamagadia 1.30 Rural Connectivity<br />

30 Khaira Garasang Krushnapur Renovation of Krushnapur Tupa gadia 2.00 Water Conservation<br />

31 Khaira Garasang Mundiadhi Construction of road from Canal bandha to Mundiadhi 1.50 Rural Connectivity<br />

32 Khaira Garasang Baulanipatana Construction of road from Baulanipatana to Baulani 1.50 Rural Connectivity<br />

33 Khaira Saradang Bhualgadhia Renovation of Damodarpur Primary school 2.00 Water Conservation<br />

34 Khaira Saradang Andelio Construction of Andilo Sahanisahi road 1.00 Rural Connectivity<br />

35 Khaira Saradang Alipur Construction of road from RD chhaka to Chakara sahi 1.50 Rural Connectivity<br />

36 Khaira Saradang Ambagadia Construction of road from Saradang High School chhaka to Saradang Tantisahi 1.30 Rural Connectivity<br />

37 Khaira Saradang Saradang Construction of road from Saradang Das sahi chhaka to Pandasahi 2.00 Rural Connectivity<br />

38 Khaira Saradang Asuria Improvement of road from Asuria Swain sahi to Das sahi road via Samalasahi with culvert 2.00 Rural Connectivity<br />

39 Khaira Saradang Mirzapur Improvement of Mirzapur Bankasahi village road 2.00 Rural Connectivity<br />

40 Khaira Sarugaon Sarugaon Construction of road from Jagannath Mandir to Sanskrit School 1.50 Rural Connectivity<br />

41 Khaira Sarugaon Kakudia Construction of road from Kakudia to Natapada 1.50 Rural Connectivity<br />

42 Khaira Sarugaon Tilada Construction of road from Majhisahi CC road to Sahu sahi road 1.50 Rural Connectivity<br />

43 Khaira Khaira Natapada Construction of road from Natapada Dehurisahi to PWD road 1.50 Rural Connectivity<br />

44 Khaira Khaira Banaparia Construction of road from Banaparia to Nayak sahi 1.50 Rural Connectivity<br />

45 Khaira Khaira Jianipada Renovation of Jianipada tank 1.00 Water Conservation<br />

46 Khaira Khaira Bishnupur Renovation of Bishnupur tank 1.30 Water Conservation<br />

47 Khaira Khaira Purosottampur Construction of road from PWD road to Nilambar Sahoo house 2.00 Rural Connectivity<br />

48 Khaira Rapeya Rapeya Improvement of road from Antara Dhauli to Roulasahi road 1.50 Rural Connectivity<br />

49 Khaira Rapeya Dhauli Improvement of road from Ranital main canal to Dhauli 2.00 Rural Connectivity<br />

50 Khaira Rapeya Chuapada Improvement of road from Adarapeya to Mahapatra sahi via Barik sahi 1.50 Rural Connectivity<br />

51 Khaira Rapeya Chaupokhri Improvement of road from Chaupokhri to Ranital main canal 1.50 Rural Connectivity<br />

52 Khaira Rapeya Nachhipur Improvement of road from Antara Dhauli to Nachhipur Patrasahi 2.00 Rural Connectivity<br />

53 Khaira Haripur Haripur Construction of Haripur Damani Hata to Ostapal road with culvert 2.00 Rural Connectivity<br />

54 Khaira Haripur Talakuruda Construction of road from canal bandha to Lokanath Behera house 1.75 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

55 Khaira Haripur Ekadoli Construction of road with culvert 2.00 Rural Connectivity<br />

56 Khaira Haripur Chunanatti Construction of road from Nayak sahi to Chunanatti School with drain 2.00 Rural Connectivity<br />

57 Khaira Gangadhuli Dalanga I Improvement of road from Hanuman Mandir to Nayak sahi via Prusty sahi 1.50 Rural Connectivity<br />

58 Khaira Gangadhuli Praharajpur Construction of Haria Pokhari and Ghat 1.50 Rural Connectivity<br />

59 Khaira Gangadhuli Khairadihi Development of Natabasuli field 2.00 Land Development<br />

60 Khaira Gangadhuli Machada Improvement of road from Manoharapur Chhak to Kamar sahi 1.50 Rural Connectivity<br />

61 Khaira Gangadhuli Gandua Construction of new road from Jamakoli Matha to Gauda sahi 2.00 Rural Connectivity<br />

62 Khaira Gangadhuli Manoharpur Construction of new road from Hariat to Antadas Ghara and Malika sahi to Panda Ghara tank 2.00 Rural Connectivity<br />

63 Khaira Gangadhuli Rafayatpur Improvement of road from Rafayatpur School to Gandua 1.50 Rural Connectivity<br />

64 Khaira Gangadhuli Gagandhuli Improvement of road from RD road to Prusty sahi 2.00 Rural Connectivity<br />

65 Khaira Gangadhuli Tudigadia Improvement of road from village road to colony road 1.50 Rural Connectivity<br />

66 Khaira Gangadhuli Tentuliapada Renovation of Paschima tank and construction of Ghat 2.00 Water Conservation<br />

67 Khaira Antara Parti Construction of road from Muruna Minior to Parthi Harijansahi 2.00 Rural Connectivity<br />

68 Khaira Antara Kanadada Construction of road from Sulka house to Mohanty sahi 2.00 Rural Connectivity<br />

69 Khaira Antara Antara Renovation of Guhaladiha tank 1.75 Water Conservation<br />

70 Khaira Jhinkiria Jhinkiria Const of road from G.P office to Cannel with culvert 1.50 Rural Connectivity<br />

71 Khaira Jhinkiria Tutapada Digging of Tutapada Bhuanlagadia Tank 2.00 Water Conservation<br />

72 Khaira Jhinkiria Mustafabad Const. of road from Mustafabad Ganesh Bangala Muni Pokhari via: - Laxmibangala with culvert 1.50 Rural Connectivity<br />

73 Khaira Jhinkiria Patirajpur Const. of road from Patirajpur Beherasahi to Jhinkiria G.P Office with culvert 1.50 Rural Connectivity<br />

74 Khaira Jhinkiria Tarapur Digging of Tarapur Thakurani Pokhari 1.50 Water Conservation<br />

75 Khaira Jhinkiria Indupur <strong>Plan</strong>tation of Indupur village Govt. land. 1.50 Drought Proofing<br />

76 Khaira Jhinkiria Paikalpur Const. of road and culvert from Paikalpur Sahusahi to Thakurani 1.30 Rural Connectivity<br />

77 Khaira Jhinkiria Gagandhuli Const. of road and culvert from Palasahir Indupur 2.00 Rural Connectivity<br />

78 Khaira Jhinkiria Mustafabad <strong>Plan</strong>tation on Mustafabad village Govt. land 2.00 Drought Proofing<br />

79 Khaira Jhinkiria Patirajpur Digging of Patirajpur Harihat Tank 2.00 Water Conservation<br />

80 Khaira Jhinkiria Tarapur Const. of road from PMGSY road to Tarapur Adibasisahi with culvert 1.75 Rural Connectivity<br />

81 Khaira Barada Barada Const. of road from Barada R.D road to Canel Bandha via: - Sahusahi 1.30 Rural Connectivity<br />

82 Khaira Barada Rasuna Const. of road from Rasuna CC road to Baishnabsahi 1.50 Rural Connectivity<br />

83 Khaira Barada Niranjanbindha Const. of road from Charampa canal to Niranjanbindha Adibasisahi via: - Garadi Adibasisahi 1.30 Rural Connectivity<br />

84 Khaira Barada Bishnupur Const. of road from Bishnupur RD to Sana sasan via: - Patrasahi to Suklasahi 1.30 Rural Connectivity<br />

85 Khaira Barada Garadi Const. of road from Charampa Canel bandha to Harijansahi via: - Gohirabani Adibasisahi 1.50 Rural Connectivity<br />

86 Khaira Barada Mirjapur Const. of road from Mirjapur RD road to Salandi Nadi ghat 2.00 Rural Connectivity<br />

87 Khaira Barada Niranjanbindha Const. of road from RD road to incomplite CC road 1.75 Rural Connectivity<br />

88 Khaira Ratina Ratina Const. of Ratina Nodal School Baundurywal 1.50 Rural Connectivity<br />

89 Khaira Ratina Tumbapadi Const. of Tumbapadi Desabandha 1.50 Rural Connectivity<br />

90 Khaira Ratina Bagadia Const. of road from Tumbapadi road to Ratina Sub-Minor krasbandha via: - Sanabagadia water resourses with culvert 2.00 Rural Connectivity<br />

91 Khaira Ratina Ratina Const. of road from Bindhanisahi to PWD road with culvert 1.30 Rural Connectivity<br />

92 Khaira Mahatipur Mahatipur Improvement of Gaidandi road and culvert 1.30 Rural Connectivity<br />

93 Khaira Mahatipur Sundhira Improvement of road from Munipada to Basulipokhari via-Dehurisahi, Mukhisahi with Culvert 1.30 Rural Connectivity<br />

94 Khaira Mahatipur Nuasahi Improvement of road from RD Road to Bariksahi Bila 2.00 Rural Connectivity<br />

95 Khaira Mahatipur Kalarapal Renovation of Kalarapal Tank with Ghat 2.00 Water Conservation<br />

96 Khaira Mahatipur Ghusurigadia Improvement of Village road 2.00 Rural Connectivity<br />

97 Khaira Mahatipur Teldia Improvement of Behera sahi road and Mohapatrasahi road 2.00 Rural Connectivity<br />

98 Khaira Mahatipur Kantapada Renovation of Kantapada sasan Tank with Ghat 1.30 Water Conservation<br />

99 Khaira Mahatipur Gandhali Improvement of road from Gandhali to Bateswar with Culvert 1.30 Rural Connectivity<br />

100 Khaira Mahatipur Binapur Improvement of road from R & B to Kantapada Via- Binapur Giri sahi 2.00 Rural Connectivity<br />

101 Khaira Mahatipur Pitapania Improvement of road from R&B road to Chatraburei 1.30 Rural Connectivity<br />

102 Khaira Mahatipur Mahatipur Improvement of Mahatipur Samalsahi road 1.50 Rural Connectivity<br />

103 Khaira Mahatipur Purbapada Renovation of Kantapada Pokhari with Ghat 1.30 Water Conservation<br />

104 Khaira Mahatipur Trilochanpur Improvement of road from Nuasahi to Trilochanpur 1.30 Rural Connectivity<br />

105 Khaira Mahatipur Agapada Improvement of road from Agapada to Bateswar via- Teldia Chandagochi 1.30 Rural Connectivity<br />

106 Khaira Mahatipur Gopalabedha Renovation of Sendhubhoi Tank with Ghat 1.30 Water Conservation<br />

107 Khaira Makhanpur Saundia Const. of Kharida Desa Bandha 1.30 Rural Connectivity<br />

108 Khaira Makhanpur Dularpur Const. of road from Makhanpur Chaka to Raikula via: - Dularpur 1.50 Rural Connectivity<br />

109 Khaira Makhanpur Anantapur Const. of road from Medinipur Taranga via: - Charighiria Sasan 1.00 Rural Connectivity<br />

110 Khaira Makhanpur Bhaskarpur Const. of road from Bhaskarpur culvert to Tipisi gadia chaka 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

111 Khaira Makhanpur Bhatapada Renovation of Bhateswari Pokhari 1.75 Water Conservation<br />

1<strong>12</strong> Khaira Makhanpur Kutapur Const. of road from Kutapur viallge 1.75 Rural Connectivity<br />

113 Khaira Makhanpur Anantabada Const. of road from Kurunta Makhanpur road to Anantabada 1.75 Rural Connectivity<br />

114 Khaira Makhanpur Taranga Const. of road from Taranga Siala sahi to Sahusahi 1.75 Rural Connectivity<br />

115 Khaira Makhanpur Khirpada Const. of road from Taranga palasa road to Baradihi 1.30 Rural Connectivity<br />

116 Khaira Dagarapada Purusottampur Implementation of road from Dagarpada Bauti Pokhari to Kantabania Dalang Aradi road via: - Harijansahi 1.00 Rural Connectivity<br />

117 Khaira Dagarapada Naranpur <strong>Plan</strong>tation of Bainchabania and Panapada 1.30 Drought Proofing<br />

118 Khaira Dagarapada Dighitentuli Implementation of road from Aradi road Thakurani chaka to Nathsahi 1.50 Rural Connectivity<br />

119 Khaira Dagarapada Ogalpur Implementation of road from Maharana House to Beherasahi Kelapadi via: - Mohapatrasahi 1.00 Rural Connectivity<br />

<strong>12</strong>0 Khaira Dagarapada Mangalapada Const. of Drean from Mangalapada CC road to Pandasahi 1.00 Rural Connectivity<br />

<strong>12</strong>1 Khaira Dagarapada Dagarpada Renovation of Dagarpada Bauti Pokhari with Ghat 1.50 Water Conservation<br />

<strong>12</strong>2 Khaira Dagarapada Bahadalpur Renovation of Adikimbhiria Pokhari with Ghat 1.00 Water Conservation<br />

<strong>12</strong>3 Khaira Dagarapada Chakamadhusudanpur Implementation of road from Madhusudanpur to Chakamadhusudanpur via: - Hadigadia 1.30 Rural Connectivity<br />

<strong>12</strong>4 Khaira Dagarapada Nijourus Implementation of road from Aradi road to Kambhusahi road with Const. of Protection wall 1.75 Rural Connectivity<br />

<strong>12</strong>5 Khaira Dagarapada Naranpur Implementation of road from Naranpur sethisahi to Dassahi via: - Khadipada with culvert 1.30 Rural Connectivity<br />

<strong>12</strong>6 Khaira Dagarapada Dightentuli Implementation of road from R.D road to Prustisahi 1.75 Rural Connectivity<br />

<strong>12</strong>7 Khaira Dagarapada Ogalpur Renovation of Bahadalpur Sasan to Jalada, Ogalpur village's North side river 1.75 Irrigation<br />

<strong>12</strong>8 Khaira Dagarapada Mangalapada Const. of Mangalapada Canal Bandha 1.75 Irrigation<br />

<strong>12</strong>9 Khaira Dagarapada Bahadalpur Renovation of Madagadia Pokhari with Ghat 1.75 Water Conservation<br />

130 Khaira Kurunta Raikula Const. of Raikula village road 1.30 Rural Connectivity<br />

131 Khaira Kurunta Miripur Khaira Const. of road from Miripur Khaira Bania sahi 2.00 Rural Connectivity<br />

132 Khaira Kurunta Kurunta Renovation of Kurunta Hata Tank 1.50 Water Conservation<br />

133 Khaira Kurunta Basudevpur Const. of road from Basudevpur Jena sahi to Kurunta 1.30 Rural Connectivity<br />

134 Khaira Kurunta Kauha Const. of road from Kaliha village 1.50 Rural Connectivity<br />

135 Khaira Kurunta Bagadia Const. of Bagadia village road 2.00 Rural Connectivity<br />

136 Khaira Kurunta Sitapur Const. of road from Sitapur village 1.50 Rural Connectivity<br />

137 Khaira Kurunta Raghunathpur Const. of road from Raghunathpur to Anantabad 1.50 Rural Connectivity<br />

138 Khaira Kurunta Panchagochhia Const. of road from Panchagochhia village road 2.00 Rural Connectivity<br />

139 Khaira Kurunta Baringia Const. of road from Baringia to Panchagochhia 1.30 Rural Connectivity<br />

140 Khaira Badajaypur Badajaypur Renovation of Mahadeb Pokhari with ghat 2.00 Water Conservation<br />

141 Khaira Badajaypur Orinda Const. of road from Charampa Dungura road to Bariksahi 2.00 Rural Connectivity<br />

142 Khaira Badajaypur Aliha Implementation of road from Mandalsahi to Berunapadi 2.00 Rural Connectivity<br />

143 Khaira Badajaypur Kunkipada Renovation of Bali Pokhari with ghat 2.00 Water Conservation<br />

144 Khaira Badajaypur Banthunia <strong>Plan</strong>tation of Thakurani field 1.50 Drought Proofing<br />

145 Khaira Badajaypur Belkula Renovation of Mahadev Pokhari with ghat 2.00 Water Conservation<br />

146 Khaira Badajaypur Banapur Digging of Adibasi sahi tank 1.50 Water Conservation<br />

147 Khaira Badajaypur Aliha Renovation of Bali Pokhari 1.75 Water Conservation<br />

148 Khaira Badajaypur Oliha Renovation of Matha Pokhari with ghat 1.75 Water Conservation<br />

149 Khaira Palasa Nahanga Digging of Beherasahi Ghuda Melana Tank 1.75 Water Conservation<br />

150 Khaira Palasa Arjunpur Digging of School Tank 2.00 Water Conservation<br />

151 Khaira Palasa Maliha Const. of road from Samiti road to Pandasahi road 1.75 Rural Connectivity<br />

152 Khaira Palasa Nachhipur Const. of road from school road to Patra sahi 2.00 Rural Connectivity<br />

153 Khaira Palasa Palasa Digging of Lenka Tank and Soil Congection 1.75 Water Conservation<br />

154 Khaira Palasa Talamahuri Const. of road from Harijan sahi to Kuchiakoili Via:- Muduli sahi 2.00 Rural Connectivity<br />

155 Khaira Palasa Belagadhia Const. of road from CC road to Khatua House 1.50 Rural Connectivity<br />

156 Khaira Palasa Kudiasahi Digging of new Tank from Kudiasahi Thakurani Pada 1.50 Water Conservation<br />

157 Khaira Palasa Arendei Const. of road from Arendei road to Rustampur and Breze 1.75 Rural Connectivity<br />

158 Khaira Palasa Raintira Const. of road from Raintira Barik sahi to Talasahi Via:- Sendhasahi 2.00 Rural Connectivity<br />

159 Khaira Palasa Rustampur Const. of road from Rusampur Chaka to Talamahuri 1.75 Rural Connectivity<br />

160 Khaira Palasa Talamahuri Renovation of Talamahuri Nua Pokhari and Const. of Ghat 2.00 Water Conservation<br />

161 Khaira Palasa Maliha Const. of road from Maliha to Agapada 2.00 Rural Connectivity<br />

162 Khaira Palasa Kudiasahi Digging of Kudiasahi Saria Tank 2.00 Water Conservation<br />

163 Khaira Palasa Nachhipur Digging og Nachhipur Mishra Pokhari Tank 2.00 Water Conservation<br />

164 Khaira Palasa Rustampur Digging og Rustampur Gaidandi Pokhari Tank 2.00 Water Conservation<br />

165 Khaira Palasa Nahanga Const. of road from Nahanga college road to Beherasahi road via - Das house. 2.00 Rural Connectivity<br />

166 Khaira Palasa Arjunpur Const. of Patada Bandha & Canal 1.75 Irrigation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

167 Khaira Palasa Maliha Const. of road from R.D. road to Maliha Aghapada road 1.75 Rural Connectivity<br />

168 Khaira Gadapokhari Gaudasahi Const. of road from Gauda sahi to Parikhama road. 1.50 Rural Connectivity<br />

169 Khaira Gadapokhari Gadapokhri Const. of road from Simulia to Kaithagadia Border. 1.50 Rural Connectivity<br />

170 Khaira Gadapokhari Kutripal Const. of road from Kutripal Brahamani dhia to Samulei via - Kaithasahi. 1.50 Rural Connectivity<br />

171 Khaira Gadapokhari Sarat Const. of road from Makara Parida house to Babaji parida house . 1.50 Rural Connectivity<br />

172 Khaira Gadapokhari Bhodeisula Const. of road from Bhudeisula gadia to gavor 1.00 Rural Connectivity<br />

173 Khaira Gadapokhari Sarisua Digging of Canal from sundar dhia nal to Biswkarma chhak . 1.50 Irrigation<br />

174 Khaira Gadapokhari Parikhama Digging of Parikhama tank 1.75 Water Conservation<br />

175 Khaira Gadapokhari Dahi <strong>Plan</strong>tation of trees from Dahi to Anlajhuri 1.75 Drought Proofing<br />

176 Khaira Gadapokhari Jayagad Const. of Flood Protection wall at Jaygard Talasahi 1.75 Flood Control<br />

177 Khaira Gadapokhari Barajodi Digging of Barajodi to Samolei 1.75 Water Conservation<br />

178 Khaira Gadapokhari Gavor Digging of Gavor Banapokhri with Ghat 1.75 Water Conservation<br />

179 Khaira Gadapokhari Kutripal Digging of Manika sahi tank with Ghat. 1.75 Water Conservation<br />

180 Khaira Gadapokhari Sarat. Digging of Sarat Desha tank 1.75 Water Conservation<br />

181 Khaira Gadapokhari Bhudeisula Digging of Kanjiaamba tank. 1.75 Water Conservation<br />

182 Khaira Gadapokhari Gagua <strong>Plan</strong>tation trees at Deuali Budhia 1.75 Drought Proofing<br />

183 Khaira Gadapokhari Guapal <strong>Plan</strong>tation of trees at Guapal 1.75 Drought Proofing<br />

184 Khaira Gobindpur Samserpur Renovation of Ghoda Pokhari with Ghat 1.50 Water Conservation<br />

185 Khaira Gobindpur Gobindpur Improvement of Mukhi sahi to Shedheswar Mohadeb Mandir via; - Samal sahi 1.30 Rural Connectivity<br />

186 Khaira Gobindpur Panisauli Improvement from Tarani Mandir to Mohanty sahi CC road 1.30 Rural Connectivity<br />

187 Khaira Gobindpur Salapada Renovation of Dalagaria tank with Ghat and drainage of water and Protection wall 1.30 Water Conservation<br />

188 Khaira Gobindpur Balikarnpur Renovation of Debata Garia with Ghat 1.75 Water Conservation<br />

189 Khaira Gobindpur Ramachandrapur Renovation of Manapatra Pokhari with Ghat 1.75 Water Conservation<br />

190 Khaira Gobindpur Sahapur Improvement of incomplite CC road to Thakurani 2.00 Rural Connectivity<br />

191 Khaira Gobindpur Guhalagadia Renovation of Guhalagadia G.P tank with ghat 1.75 Water Conservation<br />

192 Khaira Gobindpur Jaipur Improvement of PMGSY road to Budhagaria Chhaka via: - Kalua Bank pry. School road 1.75 Rural Connectivity<br />

193 Khaira Jalada Jalada Improvement of road from Natha Prusti Pokhari to Harihat via: - Mohanty sahi, Behera sahi, Pandia sahi 1.30 Rural Connectivity<br />

194 Khaira Jalada Tuto Improvement of road from Transfremer to AWC building via Jena sahi Pradhan sahi 2.00 Rural Connectivity<br />

195 Khaira Jalada Sampei Improvement of road from Samiti road to Jena sahi via Giri sahi 1.50 Rural Connectivity<br />

196 Khaira Jalada Sadikpur Renovation of Kia Gadia Pokhary 1.50 Water Conservation<br />

197 Khaira Jalada Sampei Renovation of School Pokhary 1.75 Water Conservation<br />

198 Khaira Jalada Kanpur Improvement of Kanpur Village road 1.30 Rural Connectivity<br />

199 Khaira Kupari Kabar Const of Road from Kabar Tarini Chhak tto Mahadev Mandir 1.50 Rural Connectivity<br />

200 Khaira Kupari Dobagadia Extension of road from Dhubagadi Chinta Gadia to PWD road and construction of bridge 1.50 Rural Connectivity<br />

201 Khaira Kupari Hatimunda Construction of Bandha at Hatimunda Baramula 1.00 Drought Proofing<br />

202 Khaira Kupari Dhobagadia Implementation of Dobagadia Dassahi, Dhalasahi, and School road 1.75 Rural Connectivity<br />

203 Khaira Kupari Itamundi Implementation of Itamundi Incomplite CC road and Const. of Pokhari side Gard wall 1.75 Rural Connectivity<br />

204 Khaira Barttana Padana Const. of Padana Nuasahi road 1.50 Rural Connectivity<br />

205 Khaira Barttana Dhatrigadia Const. of road from Ps road to PS road 1.30 Rural Connectivity<br />

206 Khaira Barttana Gengutia Const. of road from Sridhar House to Mahadeb Mandir 1.30 Rural Connectivity<br />

207 Khaira Barttana Kalyani Const. of road from Kalyani Tarini chhaka to Harijansahi 1.30 Rural Connectivity<br />

208 Khaira Barttana Badanuagan Const. of road from Badanuagan Rout sahi to canal Bandha via; - Harijansahi 1.30 Rural Connectivity<br />

209 Khaira Barttana Udaypur Const. of road from Udaypur School to Beherasahi via: - Swainsahi 1.30 Rural Connectivity<br />

210 Khaira Barttana Badakamari Const.of road from Barttana to Badakamari 1.30 Rural Connectivity<br />

211 Khaira Barttana Andola Const. of CC road from RD road to Andola Harijansahi 1.30 Rural Connectivity<br />

2<strong>12</strong> Khaira Barttana Barttana Const. of road from Andola road to Barttana Bhaskar Das House via; - Usta Pokhari 1.30 Rural Connectivity<br />

213 Khaira Barttana Kumarmauda Const. of Road from PS road to Kumarmauda Barik sahi via: - Kothaghar 1.30 Rural Connectivity<br />

214 Khaira Barttana Dhangharpada Const. of road from Padana RD road to Sain road via; - Dhangharpada , Dhedapada 1.30 Rural Connectivity<br />

215 Khaira Barttana Baghua <strong>Plan</strong>tation of trees at Baghua School 2.00 Drought Proofing<br />

216 Khaira Barttana Daligadia Const. of road from RD road to Harijansahi with culvert 1.30 Rural Connectivity<br />

217 Khaira Barttana Kantia Const. of road from RD road to Kantia 1.30 Rural Connectivity<br />

218 Khaira Barttana Udaypur Const. of road from RD road to Udaypur School via: - Pokhari adi Dakabangala 1.30 Rural Connectivity<br />

219 Khaira Barttana Sanakamari Const. of road from Sanakamari canal Bandha to Ganga Mohanty House via; - Harihat 1.30 Rural Connectivity<br />

220 Khaira Manitri Tentulia Renovation of Tentulia School Tank with ghat 2.00 Water Conservation<br />

221 Khaira Manitri Manitri Renovation of Manitri village Tank with ghat (Harijan sahi ) 1.75 Water Conservation<br />

222 Khaira Manitri Achutipur Const. of road from Ada Bishnupur road to Jena sahi, via: - Melanapadia with culvert 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

223 Khaira Manitri Madhapur Const. of road from Ada Bishnupur road to TecChandanpur via - Madhapur (Murunaminor) 1.30 Rural Connectivity<br />

224 Khaira Manitri Akhuapala Const. of road from Akhuapal to Halisa School via: - Akhuapala Beherasahi 2.00 Rural Connectivity<br />

225 Khaira Manitri Jalang Gandibed Const. of road from Galang Gandibed village road via: - Basang Harijansahi 1.30 Rural Connectivity<br />

226 Khaira Manitri Narayanpur Renovation of Narayanpur village tank with Ghat (Melanaparida) 2.00 Water Conservation<br />

227 Khaira Manitri Chandanpur Const. of road from Ada Chudunga road to Chandanpur Harijansahi road with culvert 1.75 Rural Connectivity<br />

228 Khaira Manitri Begunia <strong>Plan</strong>tation of Begunia Govt. Land 1.75 Drought Proofing<br />

229 Khaira Manitri Palli Const. of road from Ranital Kupari road to Palli Harihat road and culvert 1.75 Rural Connectivity<br />

230 Khaira Nayakhandi Baichakhunta Const. of Bainchakhunta village road and Culvert from PMGSY Road 1.50 Rural Connectivity<br />

231 Khaira Nayakhandi Jhinkiria Const. of Harijana sahi villge Road 1.00 Rural Connectivity<br />

232 Khaira Nayakhandi Dadhibamanpur Const. of Dadhibamanpur village road from Alada-Kaithagadia main road 1.50 Rural Connectivity<br />

233 Khaira Nayakhandi Sujagada Renovation of Andhari Pokhari 1.50 Water Conservation<br />

234 Khaira Nayakhandi Sarakhia Renovation of Sarakhia Pokhari with Ghata 1.50 Water Conservation<br />

235 Khaira Nayakhandi Gada Const. of Road from Parida sahi to Behera sahi 1.00 Rural Connectivity<br />

236 Khaira Nayakhandi Turanipada Const. of Behera sahi Road and Bridge from Main Road 1.00 Rural Connectivity<br />

237 Khaira Nayakhandi Kochiakoili Const. Road from Thakuri to Sahu sahi 1.00 Rural Connectivity<br />

238 Khaira Nayakhandi Kandaragadhia Const. of Road from Kandaragadhia village to PMGSY Road 1.30 Rural Connectivity<br />

239 Khaira Nayakhandi Kadamian Impletion of Road from Sahu sahi & Nayak sahi to PMGSY 1.00 Rural Connectivity<br />

240 Khaira Nayakhandi Nayakhandi Const. of Road from Main Road to Basuki Thakurani 1.00 Rural Connectivity<br />

241 Khaira Nayakhandi Nayakhandi Renovation of TalaPokhari 1.50 Water Conservation<br />

242 Khaira Nayakhandi Sundarpur Const. of Sundarpur Haladi Gadhia Road 1.00 Rural Connectivity<br />

243 Khaira Nayakhandi Kendubhadali Completion Of Road from School to Khaira-Fatepur Road 1.30 Rural Connectivity<br />

244 Khaira Dungura Alada Const. of road from P.S road to Nadibandha 1.50 Rural Connectivity<br />

245 Khaira Dungura Ramakrushnapur Repair of RD CC road to Baragadia road 1.50 Rural Connectivity<br />

246 Khaira Dungura Subuliapatana Repair of Subuliapatana village road 1.00 Rural Connectivity<br />

247 Khaira Dungura Kiswarinagar Repair of RD road to Beherasahi 1.50 Rural Connectivity<br />

248 Khaira Dungura Barunapadi Const. of road from RD road to Beherasahi 2.00 Rural Connectivity<br />

249 Khaira Dungura Raghunathpur B Repair of road from Raghunathpur Kha uparsahi to canal 1.50 Rural Connectivity<br />

250 Khaira Dungura Barahpur Repair of road from Mohanty sahi to Adibasisahi 1.50 Rural Connectivity<br />

251 Khaira Dungura Nichinta Repair of Nichinta to Kalyani road 1.30 Rural Connectivity<br />

252 Khaira Dungura Dungura Repair of road from RI office to Thakurani Mandir 1.50 Rural Connectivity<br />

253 Khaira Dungura Agnipur Repair of Agnipur Jenasahi road 1.50 Rural Connectivity<br />

254 Khaira Dungura Singidi Const. of road from Arjunakhala to Raintira 1.80 Rural Connectivity<br />

255 Khaira Dungura Khanpur Repair of Khanpur village road 1.00 Rural Connectivity<br />

256 Khaira Dungura Manoharpur Repair of road from Manoharpur Main road to Pradhansahi 2.00 Rural Connectivity<br />

257 Khaira Dungura Barabhagia Repair of road from Majhisahi to Talasahi Pokhari 1.00 Rural Connectivity<br />

258 Khaira Dungura Golihamadhab Repair of Golihamadhab village road 1.00 Rural Connectivity<br />

259 Khaira Dungura Jemadei Digging of New Tank 1.00 Water Conservation<br />

260 Khaira Dungura Gobindapur Repair of Gobindapur village road 1.00 Rural Connectivity<br />

261 Khaira Dungura Singidi Repair of road from Singidi to Raintira 2.00 Rural Connectivity<br />

262 Khaira Dungura Khandapada Repair of Khandapada to Bhimnathpur road 1.75 Rural Connectivity<br />

263 Khaira Dungura Goliha Repair of road from Goliha P.S road to Ghadeisahi 1.75 Rural Connectivity<br />

264 Khaira Dungura Jemadei Repair of Jemadei to Agnipur road 1.75 Rural Connectivity<br />

265 Khaira Baunsagadia Barapada Construction of Barapada Patrasahi road 1.30 Rural Connectivity<br />

266 Khaira Baunsagadia Bageipur Construction of road from Badabil to Upara Kolhasahi with culvert 1.30 Rural Connectivity<br />

267 Khaira Baunsagadia Salagadia Construction of road from Swain sahi to Paikasahi with culvert 1.30 Rural Connectivity<br />

268 Khaira Baunsagadia Ostapal Construction of road from Ostapal CC road to Kendujhar PMGSY road with ghat 1.30 Rural Connectivity<br />

269 Khaira Kaithagadia Kaithagadia Renovation of Banadahara tank 1.30 Water Conservation<br />

270 Khaira Kaithagadia Sananuagan Development of road from Sananuagan Patanasahi CC road to Kaitagadia Alada road 1.30 Rural Connectivity<br />

271 Khaira Kaithagadia Barabati Development of Gopalsahi field Adhibandha at Barabati village 1.30 Land Development<br />

272 Khaira Kaithagadia Mundahata Development of road from Kaithagadia main road to Barabati road via Singhasahi 1.30 Rural Connectivity<br />

273 Khaira Kaithagadia Damodarpur Filling of earth from Damodarpur School Boundary 2.20 Land Development<br />

274 Khaira Nandoor Nandoor Development of road from Ujhasahi and Girisahi 1.30 Rural Connectivity<br />

275 Khaira Nandoor Sunguda Development of road from Siala sahi to Pokhari 2.20 Rural Connectivity<br />

276 Khaira Nandoor Mathanuagan Renovation of Nua tank 2.20 Water Conservation<br />

277 Khaira Achyutapur Baisindipur Implementation of road from Basandipur to RD road via- Munipadia 1.30 Rural Connectivity<br />

278 Khaira Achyutapur Mirjapur Renovation of Mirjapur Nodal tank 1.30 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

279 Khaira Achyutapur Deuli Construction of road from Ghadei sahi to Aradei sahi 2.20 Rural Connectivity<br />

280 Khaira Achyutapur Nuasahi Development of road from Jaganath Mahala house to Nuasahi Ohada main road 1.20 Rural Connectivity<br />

281 Khaira Achyutapur Chakaohada Construction of new road from Chakaohada to Mirjapur 1.30 Rural Connectivity<br />

282 Khaira Achyutapur Munida Construction of Kuamunda ater resources and digging of canal 1.20 Irrigation<br />

283 Khaira Achyutapur Achyutipur Renovation of Padagadia tank 2.20 Water Conservation<br />

284 Khaira Achyutapur Ohada Rennovation of Harijansahi tank 2.20 Water Conservation<br />

285 Khaira Shyamsudarpur Chakapada Compleption of road from Chakapada to Parbatipur via Mahisamunda 2.20 Rural Connectivity<br />

286 Khaira Shyamsudarpur Mahisamunda Digging of drain from Mahisasuri Thakurani to Baringia 2.20 Irrigation<br />

287 Khaira Shyamsudarpur Parbatipur Implementation of road from Gandibed Kurunta RD road to Jena sahi via Patisahi 1.30 Rural Connectivity<br />

288 Khaira Shyamsudarpur S.S.pur Implementation of road from Soro Kupari PWD to Mukhisahi 1.30 Rural Connectivity<br />

289 Khaira Shyamsudarpur Jhatia Implementation of road from Jhatia Chandagochhi main road to Talasahi CC road 2.20 Rural Connectivity<br />

290 Khaira Shyamsudarpur Srirampur Construction of Sisupada Badabandha & drainage 2.20 Irrigation<br />

291 Khaira Shyamsudarpur Sayadnagar Implementation of road from Sayadnagar to Gandibed RD road 2.20 Rural Connectivity<br />

292 Khaira Garasang Garasang Construction of road from Garasang Adabashi sahi to Behera sahi 1.30 Rural Connectivity<br />

293 Khaira Garasang Krushnapur Construction of road from Krushnapur Maharanasahi to canal Bandha 1.20 Rural Connectivity<br />

294 Khaira Garasang Mundiadhi Renovation of Mundiadhi village tank 1.30 Water Conservation<br />

295 Khaira Garasang Baulanipatana Construction of road from Baulani Padana to Jalangagandibed 1.20 Rural Connectivity<br />

Sub total 470.65<br />

1 Nilgiri Ajodhya Gopalpur Improvement & renovation of Baishanvagadia tank. 2.00 Water Conservation<br />

2 Nilgiri Ajodhya Gopalpur Improvement of road from Gopalpur R.D. road to Baragachha to Tangasuka house 1.70 Rural Connectivity<br />

3 Nilgiri Ajodhya Ajodhya Improvement of & renovation of Nuagadia tank. 2.00 Water Conservation<br />

4 Nilgiri Ajodhya Ajodhya Construction of Adibandha from Junakoili Baragachha to Haria Jena house 1.70 Rural Connectivity<br />

5 Nilgiri Ajodhya Balipal Improvement of road from Balipal Bhaskar Roul houe to Nadighat 1.70 Rural Connectivity<br />

6 Nilgiri Ajodhya Balipal Renovation of Balipal Badadanda canal 1.70 Water Conservation<br />

7 Nilgiri Arabandh Arabandh Improvement & renovation of Chirkuni Chua Pokhari tank. 2.00 Water Conservation<br />

8 Nilgiri Arabandh Arabandh Improvement of road from R.D. road to Kanika Bandha 1.70 Rural Connectivity<br />

9 Nilgiri Arabandh Badapalasa Improvement & renovation of Baranasi tank 2.00 Water Conservation<br />

10 Nilgiri Arabandh Badapalasa Improvement of road from Barahgadi village to R.D. road Saldahara Chhak 1.70 Rural Connectivity<br />

11 Nilgiri Arabandh Uparadiha Improvement of road from Sudarshan Sahoo house to Benudhar Barik house 1.70 Rural Connectivity<br />

<strong>12</strong> Nilgiri Arabandh Uparadiha Construction of Karatia Dam at Tentuligachha Chhaka 1.70 Irrigation<br />

13 Nilgiri Arabandh Uparadiha Improvement of road from P.S. road to Hadibanhu house 1.70 Rural Connectivity<br />

14 Nilgiri Arabandh Saldhar Improvement & renovation of Mankadapal tank 2.00 Water Conservation<br />

15 Nilgiri Arabandh Saldhar Excavation of Saladhar new tank 1.70 Water Conservation<br />

16 Nilgiri Arabandh Saldhar Improvement of road from Baikuntha Mallick house to R.D. road 1.70 Rural Connectivity<br />

17 Nilgiri Arabandh Bhandagaon Improvement & renovation of Mahabalia tank 2.00 Water Conservation<br />

18 Nilgiri Arabandh Bhandagaon Improvement of road from Kirtan house to Tangna river 1.70 Rural Connectivity<br />

19 Nilgiri Arabandh Bhandagaon Improvement of road from Podamandadi to Mahabaliatala 1.70 Rural Connectivity<br />

20 Nilgiri Arabandh Bhandagaon Construction of Vedibandh from Barahgadi to Bayanpali 1.70 Flood Control<br />

21 Nilgiri Begunia Dobati Excavation of new tank at Dobati Kakimagadia 1.70 Water Conservation<br />

22 Nilgiri Begunia Dobati Improvement of road from Bhika Patra house to Nadighat 1.70 Rural Connectivity<br />

23 Nilgiri Begunia Nishankhapur Improvement of road from Mangala Thakurani to Tikirapal R.R. road 1.70 Rural Connectivity<br />

24 Nilgiri Begunia Nishankhapur Improvement of road from Rahasa Mandap to odapada PMGSY road 1.70 Rural Connectivity<br />

25 Nilgiri Begunia Begunia Improvement & renovation of Adibasi tank 2.00 Water Conservation<br />

26 Nilgiri Begunia Begunia Improvement of road from Bijuli Maharna house to Ram Singh house via Thakura Singh house 1.70 Rural Connectivity<br />

27 Nilgiri Begunia Patharagarh Improvement of road form tube well Chhak to Suryapur Chhak via stonewell Chhak 1.70 Rural Connectivity<br />

28 Nilgiri Begunia Sansapal Improvement of road from Sansapal to Manthia 1.70 Rural Connectivity<br />

29 Nilgiri Begunia Laichhanapur Improvement of road from Behera sahi Nadighat to Baragachha chhak 1.70 Rural Connectivity<br />

30 Nilgiri Begunia Laichhanapur Improvement of road from Lachhanpur Chhak to Majhisahi Chhak via Nadighat 1.70 Rural Connectivity<br />

31 Nilgiri Begunia Dumagandira Improvement of Dumagandira road 1.70 Rural Connectivity<br />

32 Nilgiri Begunia Kusanpur Improvement of road from middle of the Kusanpur village to Bhatagadia 1.70 Rural Connectivity<br />

33 Nilgiri Begunia Kusanpur Construction of Adibandha from Baishnav Mukhi house to Barehi Thakurani 1.70 Flood Control<br />

34 Nilgiri Begunia Totapada Improvement of road from Totapada community centre chhak to Majhisahi Nadighat 1.70 Rural Connectivity<br />

35 Nilgiri Begunia Totapada Improvement of road from Srinath Majhi house to sub-station 1.70 Rural Connectivity<br />

36 Nilgiri Begunia Bhaktanandapur Improvement of road from Bhaktanandapur to Mantia 1.70 Rural Connectivity<br />

37 Nilgiri Begunia Bhaktanandapur Improvement of road from Upendra Das house to Bhaktananadapur C.C. road 1.70 Rural Connectivity<br />

38 Nilgiri Berhampur Punasia Improvement & renovation of Punasia tank 2.00 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

39 Nilgiri Berhampur Punasia Improvement of road from Punasia Maheswar Palei house to Canal bridge Narayan Bhera house 1.70 Rural Connectivity<br />

40 Nilgiri Berhampur Bhogdia Improvement of road from Rama Singh house to Rabindra Behera house 1.70 Rural Connectivity<br />

41 Nilgiri Berhampur Bhogdia Improvement & renovation of Pothal Pokhari 2.00 Water Conservation<br />

42 Nilgiri Berhampur Kuanr Bhogdia Improvement of road from Kuanr Bhogdia to R.D. road 1.70 Rural Connectivity<br />

43 Nilgiri Berhampur Kuanr Bhogdia Construction of WHS at Iswar Chandar house 1.70 Irrigation<br />

44 Nilgiri Berhampur Anlapal Improvement of road from Dibakar Sahoo house to Satrughana Padhiary 1.70 Rural Connectivity<br />

45 Nilgiri Berhampur Anlapal Improvement of road from Anlapal Mandir to Kartik Singh house 1.70 Rural Connectivity<br />

46 Nilgiri Berhampur Berhampur Improvement & renovation of Kadala tank 1.70 Water Conservation<br />

47 Nilgiri Berhampur Berhampur Improvement of road from Nuapokhari Chintaram house to Punasia 1.70 Rural Connectivity<br />

48 Nilgiri Bhaunribad Bhaunribad Improvement & renovation of Desabandha tank at Tulsidiha 2.00 Water Conservation<br />

49 Nilgiri Bhaunribad Bhaunribad Improvement of road from R.D. road to Bidyadhar house, Balijhar 1.70 Rural Connectivity<br />

50 Nilgiri Bhaunribad Bhaunribad Construction of Adibandha near Sindhunala dam 1.70 Flood Control<br />

51 Nilgiri Bhaunribad Hatimunda Improvement & renovation of Kumudiha tank 2.00 Water Conservation<br />

52 Nilgiri Bhaunribad Hatimunda Excavation of new tank at Bhanabhuin Motor tank 1.70 Water Conservation<br />

53 Nilgiri Bhaunribad Hatimunda Improvement of road from Mohan house to Kartik Dehuri house at Banabhuin 1.70 Rural Connectivity<br />

54 Nilgiri Bhaunribad Jadibali Improvement of road from Paschima to Dumagadia via Laxmi Mandap 1.70 Rural Connectivity<br />

55 Nilgiri Bhaunribad Jadibali Improvement of Bania bandha & canal 1.70 Drought Proofing<br />

56 Nilgiri Bhaunribad Kudimpal Improvement of road from to Asta Chhak to Nadighat road 1.70 Rural Connectivity<br />

57 Nilgiri Bhaunribad Kudimpal Construction of Adibandha at Ghagara river 1.70 Drought Proofing<br />

58 Nilgiri Chhatrapur Bhagabandh Improvement of road from Babuli Bindhani house to Durga Mandap, Saruchampa 1.70 Rural Connectivity<br />

59 Nilgiri Chhatrapur Bhagabandh Improvement of road from Bhera house to Surendra Mahakud house 1.70 Rural Connectivity<br />

60 Nilgiri Chhatrapur Parasipal Improvement & renovation of Swayambarduba Adibasi sahi tank 2.00 Water Conservation<br />

61 Nilgiri Chhatrapur Parasipal Construction of new road from Padana Dhanika house to Singidipa 1.70 Rural Connectivity<br />

62 Nilgiri Chhatrapur Madhupuria Improvement & renovation of Jahira field tank 2.00 Water Conservation<br />

63 Nilgiri Chhatrapur Madhupuria Construction of new road from Birisahi to Kara sahi 1.70 Rural Connectivity<br />

64 Nilgiri Chhatrapur Chhatrapur Improvement of road from PWD road to Talabani 1.70 Rural Connectivity<br />

65 Nilgiri Chhatrapur Chhatrapur Improvement & renovation of Bhudurubani tank 2.00 Water Conservation<br />

66 Nilgiri Chhatrapur Kaduani Improvement & renovation of Singhsahi tank 2.00 Water Conservation<br />

67 Nilgiri Chhatrapur Kaduani Improvement of road from Hemendra Panda house to Daitari Panigrahi house 1.70 Rural Connectivity<br />

68 Nilgiri Chhatrapur Khuntadiha Construction of new road from Khuntadiha Bahagabat tungi to nua pokhari 1.70 Rural Connectivity<br />

69 Nilgiri Chhatrapur Khuntadiha Improvement of road from Lasa Majhi to Pitha Majhi house 1.70 Rural Connectivity<br />

70 Nilgiri Chhatrapur Bhalukaposh Improvement of road from Bhallukaposhi PWD road to Bhalukaposhi Yubak Sangha 1.70 Rural Connectivity<br />

71 Nilgiri Dharampur Isanedi Improvement of road form PWD road to Girls High School Hostel 1.70 Rural Connectivity<br />

72 Nilgiri Dharampur Isanedi Construction of Kamala Nadinala 1.70 Irrigation<br />

73 Nilgiri Dharampur Baunsapal Improvement & renovation of Chigal sahi tank 2.00 Water Conservation<br />

74 Nilgiri Dharampur Baunsapal Improvement of road from PWD road to Supai house 1.70 Rural Connectivity<br />

75 Nilgiri Dharampur Baunsapal Construction of WHC at Badanala Talamuhuria sahi 1.70 Irrigation<br />

76 Nilgiri Dhobasila Agiria Improvement of road from Agaira Dibakar Panda house to Batapada bridge 1.70 Rural Connectivity<br />

77 Nilgiri Dhobasila Agiria Construction of new tank at Batapada 1.70 Water Conservation<br />

78 Nilgiri Dhobasila Sarupal Construction of drain from Urmila Barik house to PWD road 1.70 Irrigation<br />

79 Nilgiri Dhobasila Sarupal Improvement of road from Trishakti club to Kara Pokhari Nilakantheswar 1.70 Rural Connectivity<br />

80 Nilgiri Dhobasila Badhiachanduapada Constriuction of small irrigation project at Badhiachanduapada village 1.70 Irrigation<br />

81 Nilgiri Dhobasila Karadia Improvement of road from end of the field of Karadia to Talapokhari 1.70 Rural Connectivity<br />

82 Nilgiri Dhobasila Dhobasila Improvement & renovation of Benagadia tank 2.00 Water Conservation<br />

83 Nilgiri Dhobasila Dhobasila Improvement of road from Gopinathpur PWD road to Mahadev Mandir 1.70 Rural Connectivity<br />

84 Nilgiri Dhobasila Kantabania Improvement of road from Kantabania PWD toad to Keratapadia 1.70 Rural Connectivity<br />

85 Nilgiri Dhobasila Kendukhunta Improvement & renovation of Kendukhunta nua Pokhari 2.00 Water Conservation<br />

86 Nilgiri Dhobasila Kendukhunta Construction of Adibandha with drain from Mangalagadia to Janasahi Pokhari, Radhaballabhapur 1.70 Drought Proofing<br />

87 Nilgiri Garadihi Garadihi Improvement & renovation of Balicha tank 2.00 Water Conservation<br />

88 Nilgiri Garadihi Garadihi Improvement of road from Gamha house to Patapani Mahadev Mandir 1.70 Rural Connectivity<br />

89 Nilgiri Garadihi Dwarikasuni Excavation of new tank at middle Dwarikasuni village 1.70 Water Conservation<br />

90 Nilgiri Garadihi Dwarikasuni Construction of WHS at Kendupani 1.70 Irrigation<br />

91 Nilgiri Garadihi Sanatihudia Construction of Pichhal on Bandhari river 1.70 Flood Control<br />

92 Nilgiri Garadihi Sanakanjiamba Improvement of road from Sanakanjiamba to Badakanjiamba 1.70 Rural Connectivity<br />

93 Nilgiri Garadihi Nuapal Construction of road from Narahari house to Pandit house 1.70 Rural Connectivity<br />

94 Nilgiri Garadihi Nuapal Construction WHS at Nuapal 1.70 Irrigation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

95 Nilgiri Garadihi Kadambagad Construction of road from Nina Mandal house to Anadi Rout house 1.70 Rural Connectivity<br />

96 Nilgiri Garadihi Saidimal Sah Improvement of road from Brajakishore Singh house to end of the village 1.70 Rural Connectivity<br />

97 Nilgiri Garadihi Ambajhar Construction of road from Kshetramohan Singh house to Jogendra house 1.70 Rural Connectivity<br />

98 Nilgiri Garadihi Ambajhar Construction of morum road from Gudrai house to Sunari Singh house 1.70 Rural Connectivity<br />

99 Nilgiri Garadihi Bankisahi Mahal Construction of road from Kshinath house to Badudev Dehuri 1.70 Rural Connectivity<br />

100 Nilgiri Garadihi Chandinipur Construction of road from Chandinipur Chhak to Nadighat 1.70 Rural Connectivity<br />

101 Nilgiri Garadihi Sapbania Improvement of road from Sapbania to Kunchibania 1.70 Rural Connectivity<br />

102 Nilgiri Garadihi Bada Kanjiamba Improvement of road from Bada Kanjiamba to Sana Kanjiamba 1.70 Rural Connectivity<br />

103 Nilgiri Jadida Jamudihi Improvement & renovation of Baunsanala tank 2.00 Water Conservation<br />

104 Nilgiri Jadida Jamudihi Renovation of Baunsanala village canal 1.70 Water Conservation<br />

105 Nilgiri Jadida Jukunanda Construction of village road side canal 1.70 Rural Connectivity<br />

106 Nilgiri Jadida Jukunanda Improvement of Jukunanda Khajuri bund 1.70 Flood Control<br />

107 Nilgiri Jadida Jadida Improvement of Jadida canal 1.70 Irrigation<br />

108 Nilgiri Jadida Podasul Improvement of Podasul Patra sahi road 1.70 Rural Connectivity<br />

109 Nilgiri Jadida Podasul Improvement of road from Chandrapur Dengapiasal road 1.70 Rural Connectivity<br />

110 Nilgiri Jadida Jagannathpur Excavation of new tank end of the Jagannathpur village 1.70 Water Conservation<br />

111 Nilgiri Jadida Jagannathpur Improvement of Basuli Thakurani road 1.70 Rural Connectivity<br />

1<strong>12</strong> Nilgiri Jadida Jagannathpur Improvement of South Jagannathpur canal 1.70 Irrigation<br />

113 Nilgiri Jadida Khardiha Improvement of road from Banchhanidhi Pati house to Nadighat 1.70 Rural Connectivity<br />

114 Nilgiri Jadida Khardiha Construction WHS at near Khageswar Pati house 1.70 Irrigation<br />

115 Nilgiri Jamudiha Jamudiha Improvement & renovation of Bholagadia tank 2.00 Water Conservation<br />

116 Nilgiri Jamudiha Jamudiha Improvement of road from Balukeswar house to Akhandalamani temple 1.70 Rural Connectivity<br />

117 Nilgiri Jamudiha Jamudiha Improvement of road from Godisul R.D. road to Sevashram 1.70 Rural Connectivity<br />

118 Nilgiri Jamudiha Jamudiha Improvement of road from Baghamara Mahadev Temple to Mukunda house 1.70 Rural Connectivity<br />

119 Nilgiri Jamudiha Jamudiha Construction of Kumbhi Bandha 1.70 Flood Control<br />

<strong>12</strong>0 Nilgiri Jamudiha Badbil Improvement of road from Babaji Rout house to Baragchha Chhak 1.70 Rural Connectivity<br />

<strong>12</strong>1 Nilgiri Jamudiha Badbil Improvement of road from Badbil U.P. School to Jamudiha Kuna Nauak house 1.70 Rural Connectivity<br />

<strong>12</strong>2 Nilgiri Lakharaj K.P. Mahal Improvement of road from Siba Rout house to Father tank & PWD road to Kachi saha house 1.70 Rural Connectivity<br />

<strong>12</strong>3 Nilgiri Lakharaj Chandipur Improvement of road from Ram Chandra Dash house to Routarani Thakurani 1.70 Rural Connectivity<br />

<strong>12</strong>4 Nilgiri Lakharaj Chandipur Construction of canal from Nana house to Pitch road 1.70 Irrigation<br />

<strong>12</strong>5 Nilgiri Lakharaj Chatrikhunta Improvement of road from Makhapada club house to Shyam Singh house 1.70 Rural Connectivity<br />

<strong>12</strong>6 Nilgiri Lakharaj Kathagochhi Improvement of road from Ramesh house to Schoo 1.70 Rural Connectivity<br />

<strong>12</strong>7 Nilgiri Lakharaj Mardarajpur Improvement of road from Surendra Patra house to Indra Singh house 1.70 Rural Connectivity<br />

<strong>12</strong>8 Nilgiri Lakharaj Gobardhanpur Construction of canal from Chandipur Nadulinala to Fauanidhi Mahapatra house 1.70 Irrigation<br />

<strong>12</strong>9 Nilgiri Lakharaj K.P. Lakhraj Construction of canal from PWD road to Brudaban Das house 1.70 Irrigation<br />

130 Nilgiri Lakharaj Karanjia Improvemetn of road from Karanjia to Shyamapada Chhaka 1.70 Rural Connectivity<br />

131 Nilgiri Kansa Kulahapal Improvement of road from Babu Nana house to R.D. road, Kansa 1.70 Rural Connectivity<br />

132 Nilgiri Kansa Nadiapal Improvement of road from PMGSY Chhatna Chhaka to Routasahi Kalandi Chhaka 1.70 Rural Connectivity<br />

133 Nilgiri Kansa Kansa Improvement of road from Chatubhuj Barik house to Pradhallad Nayak house 1.70 Rural Connectivity<br />

134 Nilgiri Kansa Sangarampur Improvement of road from Narasingh Thakurani to Antaryami house 1.70 Rural Connectivity<br />

135 Nilgiri Kishore Chnadrapur Betakata Improvement of road from Susandi Gadia to Nimachatri 1.70 Rural Connectivity<br />

136 Nilgiri Kishore Chnadrapur Betakata Construction of Tala Khadichua Teranala WHS 1.70 Irrigation<br />

137 Nilgiri Kishore Chnadrapur Chandigarh Improvement of road from R.D. road to Bhaskar house lane 1.70 Rural Connectivity<br />

138 Nilgiri Kishore Chnadrapur Kishore Chandrapur Improvement & renovation of Barahkheda tank 1.70 Water Conservation<br />

139 Nilgiri Kishore Chnadrapur Risia Improvement of road from R.D. road to Saruphita 1.70 Rural Connectivity<br />

140 Nilgiri Kishore Chnadrapur Risia Construction of Jamachuanala WHS 1.70 Irrigation<br />

141 Nilgiri Machhua Sanakaliapada Improvement of road from Ganeshwar Singh house to Sanadugura Singh house 1.70 Rural Connectivity<br />

142 Nilgiri Machhua Badakaliapada Improvement of road from Singiri Chhak to Kalia Pada 1.70 Rural Connectivity<br />

143 Nilgiri Machhua Singiri Improvement of road from Ghagara bridge to Paschima Thakurani 1.70 Rural Connectivity<br />

144 Nilgiri Machhua Kathapal Improvement of road from Majana to Thakurani 1.70 Rural Connectivity<br />

145 Nilgiri Machhua Kalyani Excavation of new tank at Kalyani School 1.70 Water Conservation<br />

146 Nilgiri Machhua Machhua Improvement of road from Abhimanyu Kar house to Palei Singh house 1.70 Rural Connectivity<br />

147 Nilgiri Mahisapata Mahisapata Improvement & renovation of Kuanali Gudi Pokhari tank 2.00 Water Conservation<br />

148 Nilgiri Mahisapata Mahisapata Improvement of road from Hatiasila tube well Chhaka to Baragachha Chhaka 1.70 Rural Connectivity<br />

149 Nilgiri Mahisapata Sathilo Balabalia Improvement & renovation of Damvurughati School tank 2.00 Water Conservation<br />

150 Nilgiri Mahisapata Sathilo Balabalia Improvement of road from AWC Chhak to Soren house 1.70 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

151 Nilgiri Mahisapata Patana Improvement of road from Jamabani Mahendra Singh house to Jhilipi Singh house 1.70 Rural Connectivity<br />

152 Nilgiri Mahisapata Patana Improvement & renovation of Kusumila tank 2.00 Water Conservation<br />

153 Nilgiri Matiali Matiali Improvement & renovation of Sirpati Bila Pokhari 2.00 Water Conservation<br />

154 Nilgiri Matiali Matiali Improvement of road from Muni Samaj Chhak to Nalassahi road 1.70 Rural Connectivity<br />

155 Nilgiri Matiali Matiali Construction of Adibandha near Sripati village nala 1.70 Drought Proofing<br />

156 Nilgiri Naranapur Dalimpal Improvement of road from Dalimpal Madulibhanga to Tarunia chhaka 1.70 Rural Connectivity<br />

157 Nilgiri Naranapur Dalimpal Improvement & renovation of Uda tank 2.00 Water Conservation<br />

158 Nilgiri Naranapur Naranpur Improvement & renovation of Naranpur Uda chhaka to Saharadihi Chhaka 1.70 Rural Connectivity<br />

159 Nilgiri Naranapur Naranpur Improvement of road from Bhulapadia to Santiasul 1.70 Rural Connectivity<br />

160 Nilgiri Naranapur Bada Nuagaon Construction of road from San Tokipada Narendra Sahu Sahoo to Bada Tokipada 1.70 Rural Connectivity<br />

161 Nilgiri Naranapur San Tokipada Construction of Adibandha at Sanatokipada tank 1.70 Land Development<br />

162 Nilgiri Naranapur Bada Tokipada Construction of Dam at Sukhia 1.70 Irrigation<br />

163 Nilgiri Naranapur Chasunikula Construction of Adibandha on Kamala river from Chasunikula to Khumutana 1.70 Drought Proofing<br />

164 Nilgiri Narasinghpur Purunagan Improvement & renovation of Phata Mahadev tank 1.70 Water Conservation<br />

165 Nilgiri Narasinghpur Purunagan Improvement of road from Dehurisahi C.C. road to Baula chhaka 1.70 Rural Connectivity<br />

166 Nilgiri Narasinghpur Tindesh Improvement of Tindesh Mukhisahi road 1.70 Rural Connectivity<br />

167 Nilgiri Narasinghpur Tindesh Improvement of Upara Palasabani road 1.70 Rural Connectivity<br />

168 Nilgiri Narasinghpur Ambikapur Improvement & renovation of Saptanga tank 2.00 Water Conservation<br />

169 Nilgiri Narasinghpur Birasahupura Improvement of road from PWD road to CC road 2.00 Rural Connectivity<br />

170 Nilgiri Narasinghpur Baincha Naranapur Improvement of road from Sura Singh house to Tubewell Chhak 1.70 Rural Connectivity<br />

171 Nilgiri Narasinghpur Nimapal Improvement of road from Halagohiri to Nimapal CC road via Kalinidhara 1.70 Rural Connectivity<br />

172 Nilgiri Narasinghpur Durgapur Improvement to Adibasi sahi road 1.70 Rural Connectivity<br />

173 Nilgiri Narasinghpur Narasinghpur Improvement & renovation of Patharagadia tank 2.00 Water Conservation<br />

174 Nilgiri Narasinghpur Narasinghpur Improvement of Galigohiri road 1.70 Rural Connectivity<br />

175 Nilgiri Pithahata Jamuna Improvement & renovation of Jharanasahi ghati Adibasi sahi tank 2.00 Water Conservation<br />

176 Nilgiri Pithahata Jamuna Improvement of road from PWD road to Sirsa sahi 1.70 Rural Connectivity<br />

177 Nilgiri Pithahata Pithahata Improvement & renovation of Jodagadia 2.00 Water Conservation<br />

178 Nilgiri Pithahata Pithahata Improvement of road from Bandhu Madhei house to Dangarasahi PMGSY road 1.70 Rural Connectivity<br />

179 Nilgiri Pithahata Sana Nuagar Improvement of road from PWD road to Jamabani village 1.70 Rural Connectivity<br />

180 Nilgiri Pithahata Sana Nuagar Construction of Adibandha from Pallei sahi to Gadighat 1.70 Flood Control<br />

181 Nilgiri Radha Kishorepur Radha Kishorepur Improvement of road from Radhakishorepur Sala sahi to Pathar Chhak to Kunisahi 1.70 Rural Connectivity<br />

182 Nilgiri Radha Kishorepur Pundala Improvement of road from R.D. road to pichal via Karikeswar Mandap 1.70 Rural Connectivity<br />

183 Nilgiri Radha Kishorepur Kulata Berhampur Cosntruction of Sona river Adibandha at Kulata Berhampur 1.70 Flood Control<br />

184 Nilgiri Sajanagarh Tenda Improvement & renovation of Mundaghrura sahi tank 2.00 Water Conservation<br />

185 Nilgiri Sajanagarh Tenda Improvement of road from Banthipada to Mundaghura tube well chhak 1.70 Rural Connectivity<br />

186 Nilgiri Sajanagarh Banthiapada Construction of drain from Jaychandra Singh house to Kanyashram 1.70 Irrigation<br />

187 Nilgiri Sajanagarh Kusumian Improvement of road from Kusumia Bandhasahi to Pokhari chhaka 1.70 Rural Connectivity<br />

188 Nilgiri Sajanagarh Nuasahi Improvement of road from Puruna Khandei house to Nuasahi Pokhari 1.70 Rural Connectivity<br />

189 Nilgiri Sajanagarh Sajangarh Improvement & renovation of new Bhalukasuni Pokhari 1.70 Water Conservation<br />

190 Nilgiri Sajanagarh Sajangarh Improvement of road from PWD road to Church via Sanshyam Singh house 1.70 Rural Connectivity<br />

191 Nilgiri Siadimal Chatar Improvement of road from Gopinath Swain house to Gouri bridge 1.70 Rural Connectivity<br />

192 Nilgiri Siadimal Gokulapani Improvement of road from Gokulapani CC road 1.70 Rural Connectivity<br />

193 Nilgiri Siadimal Siadimal Improvement of road from Baubandh to Deunchakhal village 1.70 Rural Connectivity<br />

194 Nilgiri Siadimal Siadimal Improvement of road from Sridhara Behera house to Gourahari house 1.70 Rural Connectivity<br />

195 Nilgiri Telipal Telipal-1 Improvement of road from PWD road to Desbandh 1.70 Rural Connectivity<br />

196 Nilgiri Telipal Telipal-1 Construction of Adibandha at Kamalanala Banka Mahula 1.70 Flood Control<br />

197 Nilgiri Telipal Telipal-2 Improvement & renovation of Hudisahi tank 2.00 Water Conservation<br />

198 Nilgiri Telipal Telipal-2 Improvement of Phutibandha canal 1.70 Irrigation<br />

199 Nilgiri Telipal Bhagabandh Improvement & renovation of Bholandal tank 2.00 Water Conservation<br />

200 Nilgiri Telipal Bhagabandh Construction of Tasarada Bandha 1.70 Drought Proofing<br />

201 Nilgiri Telipal Gohira Improvement of road from PWD road to Khilar house 1.70 Rural Connectivity<br />

202 Nilgiri Telipal Gohira Construction of Kamalanala Nadibandha 1.70 Drought Proofing<br />

203 Nilgiri Tentulia Bauriora Improvement of road from Deurisula to Bidiodahi 1.70 Rural Connectivity<br />

204 Nilgiri Tentulia Charbadi Improvement of road from Singhasahi Chhak to AWC 1.70 Rural Connectivity<br />

205 Nilgiri Tentulia Charbadi Improvement of Charbadi Domuhani nala 1.70 Irrigation<br />

206 Nilgiri Tentulia Tentulia Improvement & renovation of Nuasahi Pandabandha Pokhari 2.00 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

207 Nilgiri Tentulia Tentulia Improvement of Balisahabandha 1.70 Irrigation<br />

208 Nilgiri Tentulia Kanigadia Improvement of road from Kanigadia to Nuasahi 1.70 Rural Connectivity<br />

209 Nilgiri Tentulia Kanigadia Improvement of Kanigadia Bana Pokhari 1.70 Water Conservation<br />

210 Nilgiri Arabandh Saldhar Improvement & renovation of Saladhar Gudipokhari tank 2.20 Water Conservation<br />

211 Nilgiri Arabandh Khumutana Improvement & renovation of Khumutana Desa Pokhari tank 2.20 Water Conservation<br />

2<strong>12</strong> Nilgiri Arabandh Bhandagaon Excavation of new tank at Banakhala 1.30 Water Conservation<br />

213 Nilgiri Arabandh Bhandagaon <strong>Plan</strong>tation from Dhaleghat to Tendaghat 1.30 Drought Proofing<br />

214 Nilgiri Begunia Dobati Improvement & renovation of Bhikapatra tank 2.20 Water Conservation<br />

215 Nilgiri Begunia Nishankhapur Improvement & renovation of Bagichagadia tank 2.20 Water Conservation<br />

216 Nilgiri Begunia Begunia Improvement & renovation of Jhargadia tank 2.20 Water Conservation<br />

217 Nilgiri Begunia Patharagarh Excavation of new tank at Sitanth field 1.30 Water Conservation<br />

218 Nilgiri Begunia Ramachandrapur Improvement of road from Rabi Jena house to Melana Pada via Mahadevghat 1.30 Rural Connectivity<br />

219 Nilgiri Begunia Sansapal Improvement & renovation of Jahnanal tank 2.20 Water Conservation<br />

220 Nilgiri Begunia Laichhanapur Improvement of road from Bhagabat Das house to Bijay Mahapatra house via Nadighat 1.30 Rural Connectivity<br />

221 Nilgiri Begunia Dumagandira Excavation of new tank at Dumagandira 1.30 Water Conservation<br />

222 Nilgiri Begunia Kusanpur Improvement & renovation of Bhatagadia tank 2.20 Water Conservation<br />

223 Nilgiri Begunia Kusanpur Improvement of road from Anand Das house to Babaji Jena house 1.30 Rural Connectivity<br />

224 Nilgiri Begunia Totapada Improvement & renovation of Totapada sub-station tank 2.20 Water Conservation<br />

225 Nilgiri Begunia Totapada Improvement of road from Thakura Nayak house to Judghat 1.30 Rural Connectivity<br />

226 Nilgiri Begunia Bhaktanandapur Improvement & renovation of Jahananal tank 2.20 Water Conservation<br />

227 Nilgiri Begunia Bhaktanandapur Improvement of road from Sanatan Danpat house to Karunakar Das house 1.30 Rural Connectivity<br />

228 Nilgiri Berhampur Punasia Improvement & renovation of tank in front of Police station 2.20 Water Conservation<br />

229 Nilgiri Berhampur Punasia Improvement of road from AWC Punasia to Tangana river 1.30 Rural Connectivity<br />

230 Nilgiri Berhampur Bhogdia Improvement of road from Bhogdia AWC to Taltalia 1.30 Rural Connectivity<br />

231 Nilgiri Berhampur Bhogdia Improvement of road from Surendra Mahapatra house to AWC 1.30 Rural Connectivity<br />

232 Nilgiri Berhampur Kuanr Bhogdia Improvement of Kuanr Bhogdia road and construction of bridge` 1.30 Rural Connectivity<br />

233 Nilgiri Berhampur Kuanr Bhogdia Improvement & renovation of Kuanr Bhogdia tank 2.20 Water Conservation<br />

234 Nilgiri Berhampur Anlapal Improvement & renovation of Madhesahi tank 2.20 Water Conservation<br />

235 Nilgiri Berhampur Anlapal Improvement of road from Analapal AWC chhak to Uday Padhiary 1.30 Rural Connectivity<br />

236 Nilgiri Berhampur Berhampur Improvement & renovation of Mahima tank 2.20 Water Conservation<br />

237 Nilgiri Bhaunribad Bhaunribad Improvement & renovation of Sorisakandh tank 2.20 Water Conservation<br />

238 Nilgiri Bhaunribad Bhaunribad Improvement of road from Jhuna house to Bharada Chhaka, Bayarsahi 1.30 Rural Connectivity<br />

Sub-Total 416.10<br />

1 Oupada Kandagaradi Baulagadia Improvement of Road from Baulagadia Sankara Sethi house to Rana sahi via Upa Pradhan 1.50 Rural Connectivity<br />

2 Oupada Kandagaradi Baulagadia Excavation at Baulagadia Raghu Pradhan tank 1.50 Water Conservation<br />

3 Oupada Kandagaradi Baulagadia Improvement of road from Baulagadia Mahakuda sahi to Patra sahi chhak 1.50 Rural Connectivity<br />

4 Oupada Kandagaradi Kandagaradi Excavation of Kandagaradi Sadei Rout tank with Pucca Ghat 1.50 Water Conservation<br />

5 Oupada Kandagaradi Kandagaradi Improvement of road from Kandagaradi Giri sahi PWD road to Mardarajpur Behera sahi 1.50 Rural Connectivity<br />

6 Oupada Kandagaradi Golabandha Improvement of road from Golabandha Akhilasa Bila, bridge to Madhukarakhunta Babaji Malik house 1.00 Rural Connectivity<br />

7 Oupada Kandagaradi Sikidia Excavation at Sikidia tank with pucca ghat 1.50 Water Conservation<br />

8 Oupada Baunsabania Baunsabania Renovation of tank at Baunsabania Paschimeswar Mahadev mandir and tree plantation 1.50 Water Conservation<br />

9 Oupada Baunsabania Baunsabania Renovation of tank at Baunsabania Khali sahi 1.50 Water Conservation<br />

10 Oupada Baunsabania Chotakanpur Construction of road from Chotakanpur Gandhi Pradhan house chhak to Panchukhania bridge 1.50 Rural Connectivity<br />

11 Oupada Baunsabania Mangarh Improvement of road from Mangarh Gangadhar Barik house to Khandia Hudi via Panda pokhari Dehuri sahi 1.50 Rural Connectivity<br />

<strong>12</strong> Oupada Baunsabania Guhalia Excavation of tank at Guhalia Kharakhai 1.00 Water Conservation<br />

13 Oupada Baunsabania Baliora Improvement of road from Baliora L. I. point chhak to Raipur Duma pokhari chhak via Tala Baliora 1.50 Rural Connectivity<br />

14 Oupada Baunsabania Dholpur Improvement of playground at Dholpur Astapada 1.50 Land Development<br />

15 Oupada Baunsabania Sanapatpur Earth work at Sanapatpur inside High School campus and tree plantation 1.50 Land Development<br />

16 Oupada Baunsabania Chasakhanda Completion of road from PWD road Baunsabania pokhari chhak to Bilasuni bridge via Sahani sahi 1.50 Rural Connectivity<br />

17 Oupada Badapokhari Badapokhari Renovation of tank at Badapokhari Barapada 1.50 Water Conservation<br />

18 Oupada Badapokhari Badapokhari Renovation of tank at Padmapokhari, Badapokhari 1.50 Water Conservation<br />

19 Oupada Badapokhari Badapokhari Renovation of Madhaba Rao tank at Badapokhari 1.50 Water Conservation<br />

20 Oupada Badapokhari Badapokhari Renovation of Ambagadia tank 1.50 Water Conservation<br />

21 Oupada Badapokhari Badapokhari Renovation of Kundakhai tank 1.50 Water Conservation<br />

22 Oupada Badapokhari Badapokhari Improvement of road from Badapokhari RD road to Bankisahi road 1.00 Rural Connectivity<br />

23 Oupada Badapokhari Badapokhari Improvement of road from Badapokhari GP to Mohapatra sahi 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

24 Oupada Badapokhari Balimunduli Excavation of tank at Balimunduli Champeswar Mahadev 1.50 Water Conservation<br />

25 Oupada Badapokhari Balimunduli Excavation of tank at Mahula chhak 1.50 Water Conservation<br />

26 Oupada Badapokhari Durgapur Improvement of Durgapur village road 1.50 Rural Connectivity<br />

27 Oupada Badapokhari Gadapatana Improvement of road from Badapokhari RD road to Gadapatana road 1.50 Rural Connectivity<br />

28 Oupada Badapokhari Gajamba Improvement of road from Gajamba to Birasahi road 1.50 Rural Connectivity<br />

29 Oupada Badapokhari Aghasol Improvement of road from Aghasol RD road to Barapada 1.50 Rural Connectivity<br />

30 Oupada Badapokhari Jokagadia Improvement of road from Jokagadia RD road to Jharasol road 1.50 Rural Connectivity<br />

31 Oupada Badapokhari Jaynarayanpur Improvement of road from RD road to Bhola Nalapada via Jaynarayanpur 1.00 Rural Connectivity<br />

32 Oupada Badapokhari Jayrampur Improvement of road from RD road to Jayramsahi road 1.50 Rural Connectivity<br />

33 Oupada Badapokhari Kandipur Improvement of road from GP road to Kandipur well 1.50 Rural Connectivity<br />

34 Oupada R. R. Pur Janihapada Renovation of Janihapada Talasahi tank 1.50 Water Conservation<br />

35 Oupada R. R. Pur Janihapada Improvement of road from Upper Janhiapada to Rangamatia via Godandi 1.50 Rural Connectivity<br />

36 Oupada R. R. Pur Janihapada Improvement of road from Pradhandiha to Talasahi via Patada chhak 1.50 Rural Connectivity<br />

37 Oupada R. R. Pur Mahinsadali Improvement of road from Dehuri sahi to Sunari chhak via Poda chatiri 1.50 Rural Connectivity<br />

38 Oupada R. R. Pur Mahinsadali Renovation of Podachatiri Gopani Pani Nal canal 1.50 Water Conservation<br />

39 Oupada R. R. Pur Mahinsadali Improvement of road from Mahinsadali to Kaspa 1.50 Rural Connectivity<br />

40 Oupada R. R. Pur Totasahi Improvement of road from Bandhagadia to Jagannathpur RD road 1.50 Rural Connectivity<br />

41 Oupada R. R. Pur Tipura Improvement of road from Nuagoan RD road to Krushnadaspur via Tipura 1.00 Rural Connectivity<br />

42 Oupada Aghirapada Aghirapada Improvement of road from PWD road to Bansikhola road 1.50 Rural Connectivity<br />

43 Oupada Aghirapada Aghirapada Improvement of road from Jena sahi ( Patra sahi) Gohiri to PWD road 1.50 Rural Connectivity<br />

44 Oupada Aghirapada Aghirapada Improvement of road from Kanchi Manika house to Aguansahi PWD road 1.50 Rural Connectivity<br />

45 Oupada Aghirapada Aghirapada Improvement of road from PWD road to Pandabaghera 1.50 Rural Connectivity<br />

46 Oupada Aghirapada Aghirapada Improvement of road from GP road to Badsahi School 1.50 Rural Connectivity<br />

47 Oupada Aghirapada Kamarpal Improvement of road from RD road to Ghadeisahi - Paida sahi - Kina Behera sahi - Nimapada - Magalapad RD road 1.50 Rural Connectivity<br />

48 Oupada Aghirapada Kamarpal Improvement of road from Paidajhara to RD road via Bauladiha 1.50 Rural Connectivity<br />

49 Oupada Aghirapada Kamarpal Renovation of Kamarpal Hatapokhari 1.50 Water Conservation<br />

50 Oupada Aghirapada Kamarpal Renovation of Bauladiha pokhari near RD road 1.50 Water Conservation<br />

51 Oupada Aghirapada Kamarpal Renovation of Paidapokhari 1.50 Water Conservation<br />

52 Oupada Aghirapada Mahulagadia Improvement of Roulsahi road 1.50 Rural Connectivity<br />

53 Oupada Aghirapada Mahulagadia Renovation of Baidapokhari 1.50 Water Conservation<br />

54 Oupada Aghirapada Laxmisol Improvement of road from Pokhari sahi to Anlasuni Thakurani road 1.50 Rural Connectivity<br />

55 Oupada Aghirapada Garudahata Improvement of road from Garudahata RD road to Bhaskar Behera house 1.50 Rural Connectivity<br />

56 Oupada S. S. Pur Koligadi Renovation of Koligadi pokhari 1.50 Water Conservation<br />

57 Oupada S. S. Pur Koligadi Renovation of Koligadia Balipatana Mahadevsahi pokhari 1.50 Water Conservation<br />

58 Oupada S. S. Pur Santragadia Renovation of Santragadia pokhari 1.50 Water Conservation<br />

59 Oupada S. S. Pur Santragadia Improvement of road from PWD road Santragadia to Daldali Chuasahi via High School 1.50 Rural Connectivity<br />

60 Oupada S. S. Pur Jemadeipur Renovation of Jemadeipur Dandagadia pokhari 1.50 Water Conservation<br />

61 Oupada S. S. Pur Hatikholia Renovation of Rairampur pokhari 1.50 Water Conservation<br />

62 Oupada S. S. Pur Rangamatia Renovation of Rangamatia pokhari 1.50 Water Conservation<br />

63 Oupada S. S. Pur S. S. Pur Renovation of Senapati pokhari 1.50 Water Conservation<br />

64 Oupada S. S. Pur Srideipur Improvement of road from Srideipur to Sabjapur 1.50 Rural Connectivity<br />

65 Oupada S. S. Pur Astia Improvement of road from PWD road Astia to Astiapatana Mohalik 1.50 Rural Connectivity<br />

66 Oupada S. S. Pur Khadipada Improvement of road from PWD road to Khadipada 1.50 Rural Connectivity<br />

67 Oupada S. S. Pur Patanapada Improvement of road from Patanapada to Khumkut 1.50 Rural Connectivity<br />

68 Oupada S. S. Pur Kantiatikar Improvement of Kantiatikar Pandasahi road 1.50 Rural Connectivity<br />

69 Oupada Iswarpur Pinchhabania Improvement of road from PWD road Pinchhabania School road to Mardarajpur Adibasisahi 1.10 Rural Connectivity<br />

70 Oupada Iswarpur Mardarajpur Improvementof road from Harekrushnapur Jenasahi chhak to Mardarajpur 1.50 Rural Connectivity<br />

71 Oupada Iswarpur Tartua Improvement of road from Tartua Paschima Dasasahi to Tartua tank 1.50 Rural Connectivity<br />

72 Oupada Iswarpur Tartua Improvement of road from Tartua Chalani hat to Lenkasahi 1.50 Rural Connectivity<br />

73 Oupada Iswarpur Chintamanipur Improvement of road from Chintamanipur Baidyasahi to Sikidia RD road 1.50 Rural Connectivity<br />

74 Oupada Iswarpur Bahabalpur Improvement of road from Bahabalpur Dasa sahi to Pitam pokhari 1.50 Rural Connectivity<br />

75 Oupada Iswarpur Iswarpur Renovation of Palia pokhari 1.50 Water Conservation<br />

76 Oupada Iswarpur Iswarpur Improvement of road from Rout sahi chhak to Bhola house via Ganesh Rout house 1.50 Rural Connectivity<br />

77 Oupada Iswarpur Iswarpur Improvement of road from Iswarpur market pola to Giri sahi 1.50 Rural Connectivity<br />

78 Oupada Iswarpur Andra Renovation of Madagadia pokhari 1.50 Water Conservation<br />

79 Oupada Iswarpur Bhimei Renovation of Bhimei pokhari 1.50 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

80 Oupada Iswarpur Nayakbandha Renovation of Nayak bandha pokhari 1.50 Water Conservation<br />

81 Oupada Iswarpur Mareigaon Renovation of Samudiai pokhari 1.50 Water Conservation<br />

82 Oupada Fatepur Paikapada Improvement of road from Gangadhara Sahu house to Kaithagadia PMGSY road 1.50 Rural Connectivity<br />

83 Oupada Fatepur Paikapada Renovation of Kaligadia 1.50 Water Conservation<br />

84 Oupada Fatepur Benagadia Improvement of road from Benagadia sasan to Ketakijhuri 1.50 Rural Connectivity<br />

85 Oupada Fatepur Fatepur Renovation of Brahmani pokhari 1.50 Water Conservation<br />

86 Oupada Fatepur Fatepur Renovation of Bela pokhari 1.00 Water Conservation<br />

87 Oupada Fatepur Bikrampur Excavation of New tank at Baragadia 1.50 Water Conservation<br />

88 Oupada Fatepur Naranpur Renovation of Naranpur tank 1.50 Water Conservation<br />

89 Oupada Fatepur Naranpur Improvement of road from Naranpur Thakurani to Kaspa 1.50 Rural Connectivity<br />

90 Oupada Fatepur Dimirichua Renovation of Hatisahi tank 1.50 Water Conservation<br />

91 Oupada Fatepur Dimirichua Improvement of road fromDimirichua Pandasahi to Harichandanpur 1.50 Rural Connectivity<br />

92 Oupada Fatepur Sagirigadia Improvement of road from RD road to Sagirigadia Mukhisahi 1.50 Rural Connectivity<br />

93 Oupada Fatepur Lunipada Improvement of road fromHaladisuni Thakurani to Lunipada 1.50 Rural Connectivity<br />

94 Oupada Fatepur Basudeipur Improvement of road from Basudeipur Veterinary chhak to Singh sahi via Mohanty sahi 1.50 Rural Connectivity<br />

95 Oupada D. N. Pur Chasakhanda Improvement of road from Chasakhanda PMGSY road to Baragadia Banamali Singh house 1.50 Rural Connectivity<br />

96 Oupada D. N. Pur Chasakhanda Renovation of Bindusagar pokhari at Chasakhanda 1.50 Water Conservation<br />

97 Oupada D. N. Pur Oldang Improvement of road from Oldang main road to Harijansahi 1.50 Rural Connectivity<br />

98 Oupada D. N. Pur Pratapada Improvement of road from Pratapada Agasti pokhari chhak to Belabandha via Adibasi sahi 1.50 Rural Connectivity<br />

99 Oupada D. N. Pur Pratapada Renovation of Pratapada Bada pokhari 1.50 Water Conservation<br />

100 Oupada D. N. Pur Samraipur Improvement of road from Samraipur main road to Biridiha 1.50 Rural Connectivity<br />

101 Oupada Gadasahi Gadasahi Excavation of new tank at Gadasahi 1.50 Water Conservation<br />

102 Oupada Gadasahi Kusumdaspur Renovation of Balaba Nayak tank 1.50 Water Conservation<br />

103 Oupada Gadasahi Kusumdaspur Improvement of road from Kusumdaspur RD road to Lenkasahi 1.50 Rural Connectivity<br />

104 Oupada Gadasahi Kabisol Renovation of Kabisol tank 1.50 Water Conservation<br />

105 Oupada Gadasahi Kabisol Improvement of road from Chanpur RD road to Kabisol Primary School 1.50 Rural Connectivity<br />

106 Oupada Gadasahi Janikapal Renovation of Bada Pandua pada pokhari 1.50 Water Conservation<br />

107 Oupada Gadasahi Janikapal Improvement of road from Nuapada to Kabisol road 1.50 Rural Connectivity<br />

108 Oupada Gadasahi Janikapal Improvement of road from Janikapal RD road to Nuapada CC road 1.50 Rural Connectivity<br />

109 Oupada Gadasahi Batei Renovation of Batei School pokhari 1.50 Water Conservation<br />

110 Oupada Gadasahi Batei Excavation of new tank at Narsinghasila 1.50 Water Conservation<br />

111 Oupada Gadasahi Batei Improvement of road from Amerika pokhari to Bada Jama via Jurasahi 1.50 Rural Connectivity<br />

1<strong>12</strong> Oupada Gadasahi Pindabasa Improvement of road from Pindabasa to Madichua 1.50 Rural Connectivity<br />

113 Oupada Gadasahi Majhisahi Improvement of road from Gangadhuli to Mahanasuni 1.50 Rural Connectivity<br />

114 Oupada Talakia Astapatana Improvement of road from Astapatana RD road to Dhimpura 1.50 Rural Connectivity<br />

115 Oupada Talakia Jalapanka Improvement of road from RD road to Jalapanka 1.50 Rural Connectivity<br />

116 Oupada Talakia Jalapanka Renovation of Jalapanka pokhari 1.50 Water Conservation<br />

117 Oupada Talakia Biriha Improvement of road from Biriha to Darakholi 1.50 Rural Connectivity<br />

118 Oupada Talakia Darakholi Improvement of road from Darakholi RD road to Hadasahi 1.50 Rural Connectivity<br />

119 Oupada Talakia Talakia Improvement of Talakia village road 1.50 Rural Connectivity<br />

<strong>12</strong>0 Oupada Talakia Talakia Renovation of Badapokhari 1.50 Water Conservation<br />

<strong>12</strong>1 Oupada Talakia Chanpur Improvement of road from Chanpur Sasan to Matiasahi 1.50 Rural Connectivity<br />

<strong>12</strong>2 Oupada Talakia Chanpur Improvement of road from Chanpur Das sahi to RD road 1.50 Rural Connectivity<br />

<strong>12</strong>3 Oupada Talakia Chanpur Renovation of Chanpur Matiasahi 1.50 Water Conservation<br />

<strong>12</strong>4 Oupada Talakia Patpur Improvement of road from Patpur to Daleisahi road 1.50 Rural Connectivity<br />

<strong>12</strong>5 Oupada Talakia Khaira Improvement of road from Khaira CC road to Behera sahi road 1.50 Rural Connectivity<br />

<strong>12</strong>6 Oupada Talakia Pratappur Improvement of road from Pratappur road to Majhisahi 1.50 Rural Connectivity<br />

<strong>12</strong>7 Oupada Talakia Pratappur Renovation of Bhagabanpur Primary School tank 1.50 Water Conservation<br />

<strong>12</strong>8 Oupada Talakia Pratappur Improvement of Chaudhury bandha 1.50 Drought Proofing<br />

<strong>12</strong>9 Oupada Talakia Kasigadia Renovation of Kasigadia tank 1.50 Water Conservation<br />

130 Oupada Talakia Kalajhatia Renovation of Champa pokhari 1.50 Water Conservation<br />

131 Oupada Talakia Dhimpura Renovation of Badhi pokhari 1.50 Water Conservation<br />

132 Oupada Talakia Jodagadia Renovation of Jodagadia pokhari 1.00 Water Conservation<br />

133 Oupada Talakia Jagannathpur Renovation of Bhagua pokhari 1.50 Water Conservation<br />

134 Oupada Talakia Matigada Renovation of School pokhari 1.50 Water Conservation<br />

135 Oupada Kandagaradi Kandagaradi Improvement of road from Kandagaradi Giri sahi PWD road to Mardarajpur Behera sahi 1.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

136 Oupada Kandagaradi Golabandha Improvement of road from Golabandha Akhilasa Bila, bridge to Madhukarakhunta Babaji Malik house 1.30 Rural Connectivity<br />

137 Oupada Kandagaradi Sikidia Excavation at Sikidia tank with pucca ghat 1.00 Water Conservation<br />

138 Oupada Baunsabania Baunsabania Renovation of tank at Baunsabania Paschimeswar Mahadev mandir and tree plantation 1.00 Water Conservation<br />

139 Oupada Baunsabania Baunsabania Renovation of tank at Baunsabania Khali sahi 1.00 Water Conservation<br />

140 Oupada Baunsabania Chotakanpur Construction of road from Chotakanpur Gandhi Pradhan house chhak to Panchukhania bridge 1.00 Rural Connectivity<br />

141 Oupada Baunsabania Mangarh Improvement of road from Mangarh Gangadhar Barik house to Khandia Hudi via Panda pokhari Dehuri sahi 1.00 Rural Connectivity<br />

142 Oupada Baunsabania Guhalia Excavation of tank at Guhalia Kharakhai 1.30 Water Conservation<br />

143 Oupada Baunsabania Baliora Improvement of road from Baliora L. I. point chhak to Raipur Duma pokhari chhak via Tala Baliora 1.00 Rural Connectivity<br />

144 Oupada Baunsabania Dholpur Improvement of playground at Dholpur Astapada 1.00 Land Development<br />

145 Oupada Baunsabania Sanapatpur Earth work at Sanapatpur inside High School campus and tree plantation 1.00 Land Development<br />

146 Oupada Baunsabania Chasakhanda Completion of road from PWD road Baunsabania pokhari chhak to Bilasuni bridge via Sahani sahi 1.00 Rural Connectivity<br />

147 Oupada Badapokhari Badapokhari Renovation of tank at Badapokhari Barapada 1.00 Water Conservation<br />

148 Oupada Badapokhari Badapokhari Renovation of tank at Padmapokhari, Badapokhari 1.00 Water Conservation<br />

149 Oupada Badapokhari Badapokhari Renovation of Madhaba Rao tank at Badapokhari 1.00 Water Conservation<br />

150 Oupada Badapokhari Badapokhari Renovation of Ambagadia tank 1.00 Water Conservation<br />

151 Oupada Badapokhari Badapokhari Renovation of Kundakhai tank 1.00 Water Conservation<br />

152 Oupada Badapokhari Badapokhari Improvement of road from Badapokhari RD road to Bankisahi road 1.30 Rural Connectivity<br />

153 Oupada Badapokhari Badapokhari Improvement of road from Badapokhari GP to Mohapatra sahi 1.00 Rural Connectivity<br />

154 Oupada Badapokhari Balimunduli Excavation of tank at Balimunduli Champeswar Mahadev 1.00 Water Conservation<br />

155 Oupada Badapokhari Balimunduli Excavation of tank at Mahula chhak 1.00 Water Conservation<br />

156 Oupada Badapokhari Durgapur Improvement of Durgapur village road 1.00 Rural Connectivity<br />

157 Oupada Badapokhari Gadapatana Improvement of road from Badapokhari RD road to Gadapatana road 1.00 Rural Connectivity<br />

158 Oupada Badapokhari Gajamba Improvement of road from Gajamba to Birasahi road 1.00 Rural Connectivity<br />

159 Oupada Badapokhari Aghasol Improvement of road from Aghasol RD road to Barapada 1.00 Rural Connectivity<br />

160 Oupada Badapokhari Jokagadia Improvement of road from Jokagadia RD road to Jharasol road 1.00 Rural Connectivity<br />

161 Oupada Badapokhari Jaynarayanpur Improvement of road from RD road to Bhola Nalapada via Jaynarayanpur 1.30 Rural Connectivity<br />

162 Oupada Badapokhari Jayrampur Improvement of road from RD road to Jayramsahi road 1.00 Rural Connectivity<br />

163 Oupada Badapokhari Kandipur Improvement of road from GP road to Kandipur well 1.00 Rural Connectivity<br />

164 Oupada R. R. Pur Janihapada Renovation of Janihapada Talasahi tank 1.00 Water Conservation<br />

165 Oupada R. R. Pur Janihapada Improvement of road from Upper Janhiapada to Rangamatia via Godandi 1.00 Rural Connectivity<br />

166 Oupada R. R. Pur Janihapada Improvement of road from Pradhandiha to Talasahi via Patada chhak 1.00 Rural Connectivity<br />

167 Oupada R. R. Pur Mahinsadali Improvement of road from Dehuri sahi to Sunari chhak via Poda chatiri 1.00 Rural Connectivity<br />

168 Oupada R. R. Pur Mahinsadali Renovation of Podachatiri Gopani Pani Nal canal 1.00 Water Conservation<br />

169 Oupada R. R. Pur Mahinsadali Improvement of road from Mahinsadali to Kaspa 1.00 Rural Connectivity<br />

170 Oupada R. R. Pur Totasahi Improvement of road from Bandhagadia to Jagannathpur RD road 1.00 Rural Connectivity<br />

171 Oupada R. R. Pur Tipura Improvement of road from Nuagoan RD road to Krushnadaspur via Tipura 1.30 Rural Connectivity<br />

172 Oupada Aghirapada Aghirapada Improvement of road from PWD road to Bansikhola road 1.00 Rural Connectivity<br />

173 Oupada Aghirapada Aghirapada Improvement of road from Jena sahi ( Patra sahi) Gohiri to PWD road 1.00 Rural Connectivity<br />

174 Oupada Aghirapada Aghirapada Improvement of road from Kanchi Manika house to Aguansahi PWD road 1.00 Rural Connectivity<br />

175 Oupada Aghirapada Aghirapada Improvement of road from PWD road to Pandabaghera 1.00 Rural Connectivity<br />

176 Oupada Aghirapada Aghirapada Improvement of road from GP road to Badsahi School 1.00 Rural Connectivity<br />

177 Oupada Aghirapada Kamarpal Improvement of road from RD road to Ghadeisahi - Paida sahi - Kina Behera sahi - Nimapada - Magalapad RD road 1.00 Rural Connectivity<br />

178 Oupada Aghirapada Kamarpal Improvement of road from Paidajhara to RD road via Bauladiha 1.00 Rural Connectivity<br />

179 Oupada Aghirapada Kamarpal Renovation of Kamarpal Hatapokhari 1.00 Water Conservation<br />

180 Oupada Aghirapada Kamarpal Renovation of Bauladiha pokhari near RD road 1.00 Water Conservation<br />

181 Oupada Aghirapada Kamarpal Renovation of Paidapokhari 1.00 Water Conservation<br />

182 Oupada Aghirapada Mahulagadia Improvement of Roulsahi road 1.00 Rural Connectivity<br />

183 Oupada Aghirapada Mahulagadia Renovation of Baidapokhari 1.00 Water Conservation<br />

184 Oupada Aghirapada Laxmisol Improvement of road from Pokhari sahi to Anlasuni Thakurani road 1.00 Rural Connectivity<br />

Sub total 248.60<br />

1 Remuna Sirijung Mahamadabad Renovation of Kalara gadia 1.50 Water Conservation<br />

2 Remuna Sirijung Srijung Renovation of Bainsa godia 1.50 Water Conservation<br />

3 Remuna K.Mukhura Purosattampur Renovation of nadia pokhari 1.50 Water Conservation<br />

4 Remuna K.Mukhura Tadap Renovation of Tala Pokhari 1.50 Water Conservation<br />

5 Remuna K.Mukhura K.Mukhura Renovation of Sarisa Pokhari 1.50 Water Conservation<br />

6 Remuna K.Mukhura Pokasalma Improvement of Kadamba chhak to Sarisa Padia Hata with drain at both sides 1.50 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

7 Remuna K.Mukhura Mahadia Improvement of road from Mahadia Tube well chhaka to Poka Salama and drain 1.50 Rural Connectivity<br />

8 Remuna Mangalpur Mangalpur Renovation of Mangalpur Maujud Pokhari 1.50 Water Conservation<br />

9 Remuna K.Mukhura Govindapur Improvement of road from Karunakara Behera house to Chandan Pokhari 1.50 Rural Connectivity<br />

10 Remuna K.Mukhura Basukhunta Improvement of road from Kamara sahi to Astia sahi 1.50 Rural Connectivity<br />

11 Remuna Kalyanpur Srirampur Renovation of Srirampur Tank 1.50 Water Conservation<br />

<strong>12</strong> Remuna Kalyanpur Panchurukhi Renovation of Disautunia Tank 1.50 Water Conservation<br />

13 Remuna Kalyanpur Talamedhy Renovation of Badapokhari 2.00 Water Conservation<br />

14 Remuna Kalyanpur Palasia Impvt of road from Charu Mohanty house Kalakalia 1.30 Rural Connectivity<br />

15 Remuna Kalyanpur Kakyanpur Renovation of Aswastha Pokhari 1.75 Water Conservation<br />

16 Remuna Kalyanpur Makundapur Impvt of Road from Hanuman chhak to Pravas Mohalik 2.00 Rural Connectivity<br />

17 Remuna Kalyanpur Chadeipur Impvt of Road from Chadheipur Khatua sahi Nadi ghat to Makanda via Ananta Behera 1.30 Rural Connectivity<br />

18 Remuna Kalyanpur Haladia Impvt of Road from Matha sahi to Dingabali Panchayat Road 1.30 Rural Connectivity<br />

19 Remuna Kalyanpur Palasia Consnt.of Flood mound at Palasia 1.50 Flood Control<br />

20 Remuna Tentulida Haripur imp of road from haripur holi mandap to ganeswar jena house 1.50 Rural Connectivity<br />

21 Remuna Tentulida Suryapur imp of road from suryapur khagdey house to kartika majhi house 2.00 Rural Connectivity<br />

22 Remuna Tentulida Kantabania Imp of road from kantabani pola to gopal patra house 1.50 Rural Connectivity<br />

23 Remuna Tentulida Samantahati imp of road from samanta hata bijay kumar kara's house to ambatota 1.50 Rural Connectivity<br />

24 Remuna Tentulida Dharaganj imp of road from dharaganj u.p school to puhana chhaka via gouranga patra 1.50 Rural Connectivity<br />

25 Remuna Tentulida Junuda Renovation of junuda nua pokhari 2.00 Water Conservation<br />

26 Remuna Tentulida Jaguli construction of pucca drain from manoranjan bhuiyan house to seminakhala 1.50 Irrigation<br />

27 Remuna Tentulida Boitabank Imp of road from boita bank dhirendra mohanty house to thhakurani chhaka 1.50 Rural Connectivity<br />

28 Remuna Tentulida Ghungi Renovation of belapokhari ghunji 1.50 Water Conservation<br />

29 Remuna Haripur Balia Impvt.of road from Rameswar Mandir to CT Clinic chhaka 1.30 Rural Connectivity<br />

30 Remuna Haripur Bhimpura Renovation of Bhimpura School Tank. 1.50 Water Conservation<br />

31 Remuna Haripur Balia Impvt.of road from Niranjan Nayak house to Gudipada via- Surendra Nath Kara house 1.50 Rural Connectivity<br />

32 Remuna Tundura Tundra Impvt. Of Road from Rama Jena house to Gola Pokhari 1.30 Rural Connectivity<br />

33 Remuna Tundura Khadupali Impvt of Road from I.T.R. Road to Bijay house 1.30 Rural Connectivity<br />

34 Remuna Tundura Deulabad Impvt of Road from I.T.R. Road to Adibasi sahi 2.00 Rural Connectivity<br />

35 Remuna Tundura Tundra pahi Impvt of Road from Rama Sing house chhaka to Bhaku Maiti house 1.30 Rural Connectivity<br />

36 Remuna Kuligan Kuligan Impvt, of road from kuligan RD road to Ram Satpathi House via Patrasahi 2.00 Rural Connectivity<br />

37 Remuna Kuligan Rehanga Renovation of Kalinaga Tank at Rehang, Kuligan, 1.30 Water Conservation<br />

38 Remuna Kuligan Tentulia Renovation of Kalika Tank at Tentulia 1.30 Water Conservation<br />

39 Remuna Kuligan Bedipur Impvt. Of road from Bedipur incomplete CC road to Patra sahi 1.50 Rural Connectivity<br />

40 Remuna Kuligan Gambharia Impvt. Of road from Gambaria incomplete CC road to Jagulai 1.50 Rural Connectivity<br />

41 Remuna Kuligan Ganjia Impvt. Of road from Ganjia Uttam Das house to Siva Nayak house via Dasara Jena. 1.75 Rural Connectivity<br />

42 Remuna Nizampur Sankarpur Impvt of Road from Sankarpur A.W.C.to Nuagan 2.00 Rural Connectivity<br />

43 Remuna Nizampur Patukasasan Impvt of Road from Patuka Andhari Nala to Ougachha 1.30 Rural Connectivity<br />

44 Remuna Nizampur Davakuili Impvt of road from Dhukudi Nala to Mangala Nala 2.00 Rural Connectivity<br />

45 Remuna Nizampur Gandarda Renovation of Makara Nala 1.50 Water Conservation<br />

46 Remuna Nizampur Ambulakuda Impvt Of Road from Ambulakuda Nadighat to Jagu Mohalik Nadi ghat Via Sitala Mandap 1.30 Rural Connectivity<br />

47 Remuna Nizampur Palapada Impvt of road from Palapada Dipensary chhak to sitala Mandap 1.75 Rural Connectivity<br />

48 Remuna Nizampur Banktira Imp. of Road from RD Road to Ganesh Jena 1.50 Rural Connectivity<br />

49 Remuna Nizampur Nizampur Impvt of Road from at Nizampur Harizon sahi 1.75 Rural Connectivity<br />

50 Remuna Nizampur Padmapur Renovation of Darakhoili Tank 1.30 Water Conservation<br />

51 Remuna Nizampur Sahupada Impvt of road from Ranasahi Chhak to Tarini Mandir 1.75 Rural Connectivity<br />

52 Remuna Nizampur Khamtana Renovation of Udapada Tank 1.50 Water Conservation<br />

53 Remuna Nizampur Gavindpur Renovation of Goavindpur School Tank 2.00 Water Conservation<br />

54 Remuna Nizampur Basudevpur Impvt.of road from Basudevpur Pokhari to Darkoili road with Culvert 2.00 Rural Connectivity<br />

55 Remuna Nizampur Darkoili Impvt.of road from Darkoili chhaka to Basudevpur with Culvert 1.50 Rural Connectivity<br />

56 Remuna Nizampur Gandarda Impvt.of road from Kartika house to Mandir 1.75 Rural Connectivity<br />

57 Remuna Nizampur Tamachhada Impvt.of road from Tamchhada Nadi Boarder Kantipur Nadi Boarder 1.50 Rural Connectivity<br />

58 Remuna Nizampur Sahupada Improvement of road from N.H. 5 sardarpal to High school 1.50 Rural Connectivity<br />

59 Remuna Nizampur Dhoipala Improvement of road from dhoipal pokhori adi to smasana 1.30 Rural Connectivity<br />

60 Remuna Nizampur Gobindpur Renovation of tank at Gobindpur primary school. 1.75 Water Conservation<br />

61 Remuna Mandarpur Udambara Renovation of Matikholca 1.75 Water Conservation<br />

62 Remuna Mandarpur Kathasangada Renovation of Kathasangada Village 1.30 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

63 Remuna Mandarpur Mandarpur Renovation of Nala from Sona Nadi to Telia Nala 1.30 Water Conservation<br />

64 Remuna Mandarpur Mendra Renovation of Nua pokhari 2.00 Water Conservation<br />

65 Remuna Mandarpur Bahabalpur Impvt of Bahabalpur Village Road 2.00 Rural Connectivity<br />

66 Remuna Mandarpur Niabag Renovation of Nua pokhari 2.00 Water Conservation<br />

67 Remuna Mandarpur Chanimandal Renovation of Saptasara Nadi 1.30 Water Conservation<br />

68 Remuna Mandarpur Goriapal Construction of Guard wall from Babu Das house to Amulya Mohanty house 1.30 Flood Control<br />

69 Remuna Mandarpur Dolagohira Impvt.of R/F-Dolagohira Hadapada Tube Well Chhaka to Budhi Baishnabani Thakurani. 1.30 Rural Connectivity<br />

70 Remuna Naraharipur Begumpur Renovation of Begumpur Jamu Pokhari 2.00 Water Conservation<br />

71 Remuna Naraharipur khaprapada Renovation of khaparapada Tahalia Pokhari with Pucca Ghat 2.00 Water Conservation<br />

72 Remuna Naraharipur Achutpur Impvt. Of road from Achutpur Kharakhai thakurani to Purna Masi hazra via-School front with Culvet. 2.00 Rural Connectivity<br />

73 Remuna Naraharipur Naraharipur Impvt.of road from Baidhara Rana house to Puruna Vaterinary Center. 2.00 Rural Connectivity<br />

74 Remuna Naraharipur Armala Impvt.of road from Armala Janhia bari Pucca Road to Janhia Pokhri with culvet. 1.30 Rural Connectivity<br />

75 Remuna Naraharipur Pahadpur Renovation of Matha Pokhari 2.00 Water Conservation<br />

76 Remuna Inchudi Shalapadhi Construction of road from Harekrushna house to Lokanath chhak 1.30 Rural Connectivity<br />

77 Remuna Inchudi Inchudi Impvt of road from Pachima to Bagadhipa Road 1.30 Rural Connectivity<br />

78 Remuna Inchudi Balichaunria Construction of road from Das sahi chhak to Balichaunria school 1.30 Rural Connectivity<br />

79 Remuna Inchudi Inchudi <strong>Plan</strong>tation at Panchayat Hata 1.75 Drought Proofing<br />

80 Remuna Badapal Kasimpur Completion of WHS at Mahisamunda across Prasanna Nalla 1.30 Irrigation<br />

81 Remuna Badapal Badapal Impvt. Of Mala sahi Harihata house to Transformer 1.30 Rural Connectivity<br />

82 Remuna Badapal Mayurgram Renovation of Baisnab Tank 1.75 Water Conservation<br />

83 Remuna Badapal Srikrushnapur Renovation of Teluni tank 1.75 Water Conservation<br />

84 Remuna Badapal Gopal Ditca filling near Binapani Community Centre 1.00 Land Development<br />

85 Remuna Badapal Mahanty Pada Impvt. Of Road from R.D road to Gopalpur Pucca road 1.30 Rural Connectivity<br />

86 Remuna Badapal Barabank Renovation of Barabanka Tank 1.75 Water Conservation<br />

87 Remuna Nuagan Uthuli Impvt of Road from Behera Bishu Mohanty house to Mohadeb Mandir via Bhagabat Tungi 1.30 Rural Connectivity<br />

88 Remuna Nuagan Bhuinpada Impvt.of Road from Nilagiri PWD road to Bhandaria Bahara 1.30 Rural Connectivity<br />

89 Remuna Nuagan Naraharipur Impvt. Of Road from Naraharipur Mahadev Mandir to Baidhar Sethi house via Kanak durga Mandir 1.30 Rural Connectivity<br />

90 Remuna Nuagan Chandipur Renovation of Bhandari pokhari 2.00 Water Conservation<br />

91 Remuna Nuagan Sunamuhin Impvt of Road from Sundiapada chhak to Achutananda house via Paramananda Panda house 1.30 Rural Connectivity<br />

92 Remuna Nuagan Bahal Renovation of Pucca ghat and stone paching at ketrang Pokhari 2.00 Water Conservation<br />

93 Remuna Nuagan Dikhapada Renovation of Pucca ghat and stone paching at ketrang Pokhari Sua Pokhari 2.00 Water Conservation<br />

94 Remuna Nuagan Sasanpada Renovation of Muni Pokhari at Dikhapada 2.00 Water Conservation<br />

95 Remuna Nuagan Nuagan Renovaton of Sasanpada Khajira Pokhari 2.00 Water Conservation<br />

96 Remuna Nuagan Sunamuhin Renovation of Gobara Pokhari 2.00 Water Conservation<br />

97 Remuna Nuagan Dikhapada Renovation of Hentusura Kunda Pokhari 1.30 Water Conservation<br />

98 Remuna Kuruda Banaparia Impvt of road from Banaparia Mahadev Mandir to Harenra Malllik house 1.30 Rural Connectivity<br />

99 Remuna Kuruda Nutipatana Renovation of Chanda godia Tank 1.30 Water Conservation<br />

100 Remuna Kuruda Karanjia Renovation of Karanjia Tank 1.30 Water Conservation<br />

101 Remuna Kuruda Tulanka Renovation of Budhabaga Tank 1.75 Water Conservation<br />

102 Remuna Kuruda Olipur Renovation of Mundi Pokhari 1.30 Water Conservation<br />

103 Remuna Kuruda Meghadamburu Impvt of Road from Meghadamburu Prasanta Podhi house to Trilochan Makhi house 1.30 Rural Connectivity<br />

104 Remuna Kuruda Sribantapur Renovation of Nua Pokhari 1.30 Water Conservation<br />

105 Remuna Kuruda Ambua Impvt of Road from Janata Ucca Bidyalaya to BK & BK Petrol Pump 2.00 Rural Connectivity<br />

106 Remuna Kuruda Tamulia Impvt of road from Gagan sahi house to Muduli Pokhari 2.00 Rural Connectivity<br />

107 Remuna Kuruda Sribantapur Impvt of road from Naba Kumar Pani house to Adikanta Mohapatra house via CC 2.00 Rural Connectivity<br />

108 Remuna Kuruda Bisoikhunta Impvt of road from R/F-Jagannath Ghadei house to CC road. 1.30 Rural Connectivity<br />

109 Remuna Kuruda Tulanka Impvt of Road from Bhabendra Das house to Jaladhar Biswal house 1.30 Rural Connectivity<br />

110 Remuna Saraswatipur Chhanapur Impvt of Road from Sirisa Gochha chhak to NH-5 via fula pada 1.30 Rural Connectivity<br />

111 Remuna Saraswatipur Saraswatipur Impvt of road from Muduli Pokhari to O.T. Road via Arjun Ghosh house 1.30 Rural Connectivity<br />

1<strong>12</strong> Remuna Saraswatipur Barchikhunta Improvement of road from Basnata Mohanty house to Surendra Dalai house 1.30 Rural Connectivity<br />

113 Remuna Saraswatipur Baraghai Expansion of Kalara Khal 1.30 Irrigation<br />

114 Remuna Saraswatipur Jugalalpatana Impvt of road from Paschimani Thakurani to Raja pada via Basuli Thakurani 1.30 Rural Connectivity<br />

115 Remuna Saraswatipur Saraswatipur Impvt of road from Nilakantha Sing house to Masani Pada 1.30 Rural Connectivity<br />

116 Remuna Saraswatipur Shyamraipur Impvt of Road from Kalika Thakurani to Sukuda 1.50 Rural Connectivity<br />

117 Remuna Saraswatipur Jugalalpatana Impvt of Road from Rajapada to Medenmohan Tank 1.30 Rural Connectivity<br />

118 Remuna Saraswatipur Bampada Impvt of road from Tanini Mandir to Muduli chhak via Bhuban Kuanar House 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

119 Remuna Saraswatipur Shyamraipur Renovation of Baipani Tank 1.30 Water Conservation<br />

<strong>12</strong>0 Remuna Saraswatipur Samalpur Renovation of Bania Pokhari 1.30 Water Conservation<br />

<strong>12</strong>1 Remuna Saraswatipur Uparsanakia Renovation of Jugaleswar Mahadev Temple 1.30 Water Conservation<br />

<strong>12</strong>2 Remuna Saraswatipur Chhanpur Excavation of New tank at Khanduapada 1.30 Water Conservation<br />

<strong>12</strong>3 Remuna Saraswatipur Chhanpur Improvement of road from Harish ch. Bindhani house to Golak Madhual house 1.30 Rural Connectivity<br />

<strong>12</strong>4 Remuna Maharajpur Maharajpur <strong>Plan</strong>tation of Rampur school infront field 1.00 Drought Proofing<br />

<strong>12</strong>5 Remuna Maharajpur Maharajpur Completion of road from Maharajpur chhak to Budhi Mangala chhak 1.30 Rural Connectivity<br />

<strong>12</strong>6 Remuna Maharajpur Maharajpur Impvt of road from Ramapur School chhak to Bhagada Padia via Behera sahi 1.30 Rural Connectivity<br />

<strong>12</strong>7 Remuna Maharajpur Moharajpur Impvt.of road from Batitanki Pump house chhaka to Nua Pukhari 2.00 Rural Connectivity<br />

<strong>12</strong>8 Remuna Maharajpur Dahigadia Renovation of Aswath gadia 1.30 Water Conservation<br />

<strong>12</strong>9 Remuna Maharajpur Dahigadia <strong>Plan</strong>tation of Dahigadia nai field 1.30 Drought Proofing<br />

130 Remuna Maharajpur Boita Renovation of Banastia Tank and pucca Ghat 1.30 Water Conservation<br />

131 Remuna Maharajpur Boita Impvt.of road from Boita Mahadev Temple to Harihara Biswal house via Nidhiram Behera house 2.00 Rural Connectivity<br />

132 Remuna Patripal Naigopalpur Impvt. Of R/F Naigopalpur Mahada P.M.G.S.Y road to Bhimeswar Temple 1.30 Rural Connectivity<br />

133 Remuna Patripal Mukundapur Impvt. Of road from Mukundapur RD road Ward No <strong>12</strong> to Bansidhar Majhi Ghara via-Lanjipada. 1.30 Rural Connectivity<br />

134 Remuna Patripal Faritpur Impvt. Of R/F Fartipur Upendra Das house to Nadighat 1.30 Rural Connectivity<br />

135 Remuna Patripal Balipal Renovation of Balipal School Tank 1.30 Water Conservation<br />

136 Remuna Patripal Kuanrpur Impvt. Of R/F Kuanrapur Sudam Das house to Fakir Das house. 1.30 Rural Connectivity<br />

137 Remuna Patripal Patripal Renovation Patripal Kuta Pokhari 1.30 Water Conservation<br />

138 Remuna Patripal Baharda Impvt. Of R/F Baharda L.I. Point to Baharda pokhari via Purna chandra Das house 1.30 Rural Connectivity<br />

139 Remuna Patripal Patripal Renovation of Patripal Dipu Pokhari 2.00 Water Conservation<br />

140 Remuna Remuna Shrikrushnapur Improvement of road from Shrikrushnapur pump house to Achutapur 1.30 Rural Connectivity<br />

141 Remuna Remuna Ganeswarpur Renovation of Gaudadanda Gokula tank 2.00 Water Conservation<br />

142 Remuna Remuna Athantar Improvement of road from Athantar community centre to Gopinath Mandir Darmashala 2.00 Rural Connectivity<br />

143 Remuna Remuna Radhanagar Improvement of road from Dalaphin club to Jogesh shop via Pravakara house 2.00 Rural Connectivity<br />

144 Remuna Remuna Dhiha Remuna Improvement of road from Harekrushna Das house to Tuna Dalei house 2.00 Rural Connectivity<br />

145 Remuna Chasakhand Digapada Impvt.of road from digapada Triveni pokhari to Rabindra Sahoo 2.00 Rural Connectivity<br />

146 Remuna Chasakhand Jodapada Impvt.of road from Jodapada mardavay chhak to surendra pal 2.00 Rural Connectivity<br />

147 Remuna Chasakhand Bhandeswar Impvt.of road from Bhandeswar RD road to Handarpada via Radhakrusna Behera 2.00 Rural Connectivity<br />

148 Remuna Chasakhand Maheshpur Impvt.of road from Mahespur Markanda Rana house to Narahari Mishra house 2.00 Rural Connectivity<br />

149 Remuna Chasakhand Thanagadia Impvt.of road from Thanagadia Laxmidhara Das to house Kalia house 2.00 Rural Connectivity<br />

150 Remuna Chasakhand Chasakhand Constn.of road from Karanjia chhak to Niali 1.30 Rural Connectivity<br />

151 Remuna Chasakhand Digapada Renovation of Trivani pokhari Digapada 2.00 Water Conservation<br />

152 Remuna Chasakhand Jodapada Excavation of New Tank at Mardarajpada , Jadapada 2.00 Water Conservation<br />

153 Remuna Chasakhand Balisuan Renovation of Bilagadia Balisuan 2.00 Water Conservation<br />

154 Remuna Chasakhand Madhupura Renovation of Madhupura Bana Nuapakhari 2.00 Water Conservation<br />

155 Remuna Chasakhand Olipur Renovation of Olipur Talapakhari 2.00 Water Conservation<br />

156 Remuna Chasakhand Kulkunda Renovation of Kulkunda Singar Pokhari 2.00 Water Conservation<br />

157 Remuna Chasakhand Padabadgana Renovation of Andharua Pokhari Padapadagan 2.00 Water Conservation<br />

158 Remuna Chasakhand Digapada Constn.of flood mount at Digapada 1.30 Flood Control<br />

159 Remuna Chasakhand Kulakunda Improvement of Road from Kulkunda to Singar Pokhari 1.30 Rural Connectivity<br />

160 Remuna Gududa Bhadrasia Renovation of Mada Pokhari 1.30 Water Conservation<br />

161 Remuna Gududa Gaudagan Renovation of Gaudagan Point Pokhari 1.75 Water Conservation<br />

162 Remuna Gududa Dududa Dev. Of Nadibandha over Prasnna river near Antaryami Das house 2.00 Flood Control<br />

163 Remuna Gududa Silasuan Excavation of New tank Madalabaja Chhancha Matiapada 2.00 Water Conservation<br />

164 Remuna Gududa Mahada impvt. Road from mahada dhalasahi Astachhak to Dhalasahi 1.30 Rural Connectivity<br />

165 Remuna Gududa Nachhipur Impvt. Of Road from Nachhipur Tutapada Harihata Mandap chhak to Badapokhari Adi 1.30 Rural Connectivity<br />

166 Remuna Gududa Sirakoili Sirakoili Pola Ghata to Gududa utha Baragachha chhaka 2.00 Rural Connectivity<br />

167 Remuna Gududa Gududa Impvt. Of road from Gududa Ganja Tata to Sadhu Mahalik Ghera 2.00 Rural Connectivity<br />

168 Remuna Gududa Goudagan Constn.of Flood mound at Goudagan 1.30 Flood Control<br />

169 Remuna Gududa Gududa Renovation of Gududa Biripada Tank 1.30 Water Conservation<br />

170 Remuna Gududa Sirakoili Improvement road from sirakoili kudasahi to gaudagan road 2.00 Rural Connectivity<br />

171 Remuna Mangalpur Ghagarapal Impvt of road from NH-5 to O.T. road ,via - Ghagarapal 1.30 Rural Connectivity<br />

172 Remuna Mangalpur Haraspur Impvt of Road from Haraspur Samiti road Bata Mangala to Bila Thakurani 2.00 Rural Connectivity<br />

173 Remuna Mangalpur Singla Impvt of road from Sinla Samiti Road to Bhimabhukta house via Bilapokhari 1.30 Rural Connectivity<br />

174 Remuna Mangalpur Nuagan Impvt of Road Nuagan Gavinda Parida house to NH-5 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

175 Remuna Mangalpur Salabani Renovation of Salabani Gora Pokhari 1.50 Water Conservation<br />

176 Remuna Mangalpur Ghagarapal Constn.of Flood mound at Ghagarapal 1.30 Flood Control<br />

177 Remuna Mangalpur Haraspur Renovation of Bila Pokhori 2.00 Water Conservation<br />

178 Remuna Durgadevi Bhanjachhada Renovation Of Rama Sahu Pokhari 1.30 Water Conservation<br />

179 Remuna Durgadevi Dharapaikali Impvt.of road from Baula Chhak to Matha chhaka 1.30 Rural Connectivity<br />

180 Remuna Durgadevi Routarapur Impvt. Of road from Maliguhira to Nadighat with culvert 1.30 Rural Connectivity<br />

181 Remuna Durgadevi Kudia Renovation of Kudia bedhi Tank 1.30 Water Conservation<br />

182 Remuna Durgadevi Kuanlahati Renovation of Kuanlahati Dahanigadia 2.00 Water Conservation<br />

183 Remuna Durgadevi Sutanati Excavation of tank at Babaji matha 2.00 Water Conservation<br />

184 Remuna Durgadevi Harichandanpur Impvt. Of R/F Tube well chhaka to Bastimanipada 1.30 Rural Connectivity<br />

185 Remuna Durgadevi Udayapur Renovation of Gandadhar Tank 1.30 Water Conservation<br />

186 Remuna Durgadevi Deokhand Impvt.of road from Deokhand school R.D chhak to East side Thakunari 1.30 Rural Connectivity<br />

187 Remuna Durgadevi Deokhand Excavation of New tank at Deokhand mahadev Temple 2.00 Water Conservation<br />

188 Remuna Durgadevi Deokhand Impvt.of road from Deokhand RD road to Bagichasahi 1.30 Rural Connectivity<br />

189 Remuna Biruhan Biruhan Impvt of Road from incomplete CC road to Kasipur Nama house 1.30 Rural Connectivity<br />

190 Remuna Biruhan Hiratikiri Road from NH-5 to Rangi badi at Hinatikiri 1.30 Rural Connectivity<br />

191 Remuna Biruhan Samonathpur Road from Kati Muna Chhak to Maszid chhak via china house Saijupada 1.30 Rural Connectivity<br />

192 Remuna Biruhan Bartana Impvt of Road from Bartana R.D Road to Beliri. 1.30 Rural Connectivity<br />

193 Remuna Biruhan Chillapada Impvt.of road from RD road to Chillapada via- Ananta Panda house 1.30 Rural Connectivity<br />

194 Remuna Barunasing Mandagan Impvt.R/F- Thanamatha Thakurani to Mala RD road 2.00 Rural Connectivity<br />

195 Remuna Barunasing Uttarchaka Impvt.of R/F- Banamali house (Tulasi Chaura) to Pry. School to and Kali Mandir 2.00 Rural Connectivity<br />

196 Remuna Barunasing Tahalia Tahalia to Randa Pokhari Rana Bandha with Switch gate 2.00 Flood Control<br />

197 Remuna Barunasing Saharda Renovation of Digi Pokhari 1.30 Water Conservation<br />

198 Remuna Barunasing Anantapani Anantapanito Saharda 2.00 Rural Connectivity<br />

199 Remuna Barunasing Tina Incomplete road to Pitambar Mallick house 2.00 Rural Connectivity<br />

200 Remuna Barunasing Uttarchaka Road from Biranchi Narayan Mahadev Mandir to Mohanala 2.00 Rural Connectivity<br />

201 Remuna Seragarh Seragarh Impvt.of R/F- Seragarh Main road Sarat Senapati house to Maa Jhurei thakurani via-Krushna Bag house 2.00 Rural Connectivity<br />

202 Remuna Seragarh Seragarh Construction of road from Sergarh Mangala Mandir to Dinabandhu Pati house 2.00 Rural Connectivity<br />

203 Remuna Seragarh Panchagarh Construction of road from Panchagad Biswanath Nayak house to Panchagad Mangala Mandir and drain and guard wall 1.75 Rural Connectivity<br />

204 Remuna Seragarh Baunsamuhan Construction of road from Baunshamuha Surendra Mahakud house conkrit road to Club house 2.00 Rural Connectivity<br />

205 Remuna Seragarh Oukhunta Construction of road from Oukhunta Asampurna Pucca road to Barapada Sima 2.00 Rural Connectivity<br />

206 Remuna Seragarh Baunsamuhan Impvt of road from Baunshamuha Birendra Barik house to Shankhua Road 2.00 Rural Connectivity<br />

207 Remuna Seragarh Barpada Impvt.of R/F- Panchagarh Mangala Mandir to Khejureswar Mahadev Mandir via- Adibasisahi 1.30 Rural Connectivity<br />

208 Remuna Seragarh Madagadasahi Renovation of Chaitanya Pokhari 1.30 Water Conservation<br />

209 Remuna Ganipur Ganipur Impvt. Of R/F Haripur Masjid chhak Transforma to Purna shop 1.30 Rural Connectivity<br />

210 Remuna Ganipur Bidyadharapur Impvt. Of R/F Govinda selly house to Ganesh Makhi house 1.30 Rural Connectivity<br />

211 Remuna Ganipur Kanrahi Impvt. Of R/F Kanrali Sana Nadi Ghata to Nana gali R.D road. 1.30 Rural Connectivity<br />

2<strong>12</strong> Remuna Ganipur Kurunia Impvt. Of R/F Kurunia R.I. Office to Hagura Sing house. 1.30 Rural Connectivity<br />

213 Remuna Ganipur Jaganathpur Renovation of Jagnnthpur Harijan sahi 1.00 Water Conservation<br />

214 Remuna Ganipur Brahmanchhada Renovation of Brahmania Tank 1.30 Water Conservation<br />

215 Remuna Ganipur Bramhanchhada Renovation of Jhaljhalia Pokhari 1.30 Water Conservation<br />

216 Remuna Ganipur Bidyadharapur Patana Renovation of Bada Pokhari 1.30 Water Conservation<br />

217 Remuna Ganipur Ganipur Impvt.of road from Remuna Durgadevi PWD road to Kurunia RI office via- Anadi Behera house. 1.30 Rural Connectivity<br />

218 Remuna Ganipur Bidyadharpur Impvt.of road from Gouranga Das house to Gochara Pada 2.00 Rural Connectivity<br />

219 Remuna Ganipur Bramhanachhada Excavation of New tank near Hanuman Mandir 1.30 Water Conservation<br />

220 Remuna Ganipur Kanrali Impvt.of road from Hatiagand Kanrali boarder to Jagannathpur via- Pandasahi chhaka 2.00 Rural Connectivity<br />

221 Remuna Ganipur Bramhanachhada Impvt.of road from Bramhana chhada Hanuman Mandir Chhaka to Gada Mahanty House via- Gourahari Das house 2.00 Rural Connectivity<br />

222 Remuna Ganipur Ganipur Impvt.of road from Khusaliganj school chhaka to Laxmidhar Maharana house 2.00 Rural Connectivity<br />

223 Remuna Talapada Talapada Impvt of Road from Mohanty Pokhari to Kasipada 2.00 Rural Connectivity<br />

224 Remuna Nuapadhi Nuapadhi Construction of road from P.W.D to ( Nuapadi Jamabashi Adibasi sahi ) College Pacheri near Shasapala Talabandha 1.30 Rural Connectivity<br />

225 Remuna Nuapadhi Rasalpur Renovation of Uda Tank 1.30 Water Conservation<br />

226 Remuna Nuapadhi Balgopalpur Construction of both side drain Emami chhak to Ispat chhak 1.30 Irrigation<br />

227 Remuna Nuapadhi Shireipur Construction of road from Ispat chhak to Bhagatpur chhak and drain 2.00 Rural Connectivity<br />

228 Remuna Nuapadhi Halupatana Construction of road from P.W.D road Krasar chhak to Kaitha Pada chhak 1.30 Rural Connectivity<br />

229 Remuna Nuapadhi Batitanki Construction of road from Nuapadhi Gundicha Mandir chhak to patra sahi chhak via Khasakanda Padia 2.00 Rural Connectivity<br />

230 Remuna Nuapadhi Nuapadhi Construction of road from Thanasi Thakurani to Narotam Dash 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

231 Remuna Nuapadhi Halupatana Impvt of road from P.W.D. road Krasar chhak to Kaitha Panda Chhak 1.30 Rural Connectivity<br />

232 Remuna K.Mukhura Dhobeiti Renovation of Dhobeiti Pokhari 1.30 Water Conservation<br />

233 Remuna K.Mukhura Agalpur Improvement of Total Pola to Marchei Thakurani 1.30 Rural Connectivity<br />

234 Remuna K.Mukhura Mangalpur Improvement of road from Kadamba Gachha chhaka to Katia Sing house 1.30 Rural Connectivity<br />

235 Remuna Mangalpur Mangalpur Impvt road Mangalpur Matha to Jamupaida NH5 1.30 Rural Connectivity<br />

236 Remuna K.Mukhura Bimburia Improvement of road from Puhuni Chhaka to Armala Matha 1.30 Rural Connectivity<br />

237 Remuna Kalyanpur Gangapur Impvt of Road from Gunuda Jhampura main road to Srirampur via Gangapura 1.30 Rural Connectivity<br />

238 Remuna Kalyanpur Gunuda Renovation of Gunuda Panifala Tank 2.20 Water Conservation<br />

239 Remuna Kalyanpur Panchurukhi Impvt of Road from Malaghara chhak to Samity road via Haraprasad 1.30 Rural Connectivity<br />

240 Remuna Kalyanpur Talamedhy Impvt of Road from Akhila Maharna house to Ashox Das 1.30 Rural Connectivity<br />

241 Remuna Kalyanpur Palasia Impvt of Road from Parama Baisnabani to Tentuli gadia 2.20 Rural Connectivity<br />

242 Remuna Kalyanpur Rabaneswar Construction of Canal from Rabeneswar Nadighat to Pakhanala 2.20 Irrigation<br />

243 Remuna Kalyanpur Kakyanpur Impvt of road from majhi sahi chhak to Bramhana sahi Nadighat via Dampanda 2.20 Rural Connectivity<br />

244 Remuna Kalyanpur Alada Impvt of Road from Transforma chhak to Kajipada via Adibasi sahi 1.30 Rural Connectivity<br />

245 Remuna Kalyanpur Makanda Impvt of Road from Budha Majhi house to Tepa Majhi via Jaga majhi 1.30 Rural Connectivity<br />

246 Remuna Kalyanpur Haladia Renovation of Mada pokhari 2.20 Water Conservation<br />

247 Remuna Kalyanpur Haladia Consnt.of Flood mound at Haladia 1.30 Water Conservation<br />

248 Remuna Kalyanpur Kalyanpur Consnt.of Flood mound at Kalyanpur 1.30 Flood Control<br />

249 Remuna Tentulida Purukhi Imp of road from Podapala bhairaba Mohanty house to Baina Singh via Purna Singh 2.20 Rural Connectivity<br />

250 Remuna Tentulida Suryapur Renovation of baragadia with bathing ghat at suryapur 2.20 Water Conservation<br />

251 Remuna Tentulida Kantabania Renovation of kantabani pokkari 1.30 Water Conservation<br />

252 Remuna Tentulida Tikirapal Imp. of road from tikirapal mayaddhara patra house to dharganj jayadev acharya 1.20 Rural Connectivity<br />

253 Remuna Tentulida Similipal Imp of road from Rajghat pola to Similipal 1.30 Rural Connectivity<br />

254 Remuna Tentulida Dharaganj Imp of road from dharaganj satrughna jena 's house to khaparapada balighat via khandia bandh 1.30 Rural Connectivity<br />

255 Remuna Tentulida Boitabank construction of guard wall at Chintamani Panda gadia boita bank 1.20 Flood Control<br />

256 Remuna Tentulida Junuda Re-construction of junuda gola pokhari 2.20 Water Conservation<br />

257 Remuna Tentulida Kujigadia Renovation of bhagabat gadia of village kujigadia 1.20 Water Conservation<br />

258 Remuna Tentulida Nagapal Imp of road from nagapala school chhaka nabina sethi 1.30 Rural Connectivity<br />

259 Remuna Tentulida Tikirapal Renovation of dipu pokhari tikirapala 1.30 Water Conservation<br />

260 Remuna Haripur Dahapada Impvt.of road from Krushna Sethi house to Adibasisahi Nadighar 1.20 Rural Connectivity<br />

261 Remuna Haripur Kespur Impvt.of road from Bholanatha house to Bhajahari hose 1.30 Rural Connectivity<br />

262 Remuna Haripur Dharampur Impvt. Of Road from NH-60 to Bhagabat Mahalik house 1.30 Rural Connectivity<br />

263 Remuna Tundura Tundra Impvt of Road from Mahadev Mandir to Sasan Bali 2.20 Rural Connectivity<br />

264 Remuna Tundura Tundra Impvt of Road from Matha to Mahakuda Badi 1.30 Rural Connectivity<br />

Sub total 414.95<br />

1 Simulia Abjhuna Abjhuna Imp of Abjhuna RD road to Bala sahi via Nachhipur road 1.50 Rural Connectivity<br />

2 Simulia Abjhuna Ramkrushnapur Road from Ramkrushnapur Bandhasahi to Bramahana sahi road 1.30 Rural Connectivity<br />

3 Simulia Abjhuna Somanathpur Road from Somanathpur Budhira canal to Singhani pokhari road 1.50 Rural Connectivity<br />

4 Simulia Abjhuna Somanathpur Road from Somanathpur parbatipur road to Raktia road 1.30 Rural Connectivity<br />

5 Simulia Abjhuna Nachhipur Road from Nachhipur Bandhasahi panda gadia gramya road via behera sahi 1.10 Rural Connectivity<br />

6 Simulia Abjhuna Mundamara Road from Mundamara concrete road to Harijan sahi via Nayak sahi School road 1.00 Rural Connectivity<br />

7 Simulia Bati Rudunga Road from Rudunga samiti and Tentulia Pokhari Adi to Nathasahi via Rameswar Temple 1.75 Rural Connectivity<br />

8 Simulia Bati Sunguda Const. of road from Sunguda club to Adivashi sahi road 1.75 Rural Connectivity<br />

9 Simulia Bati Ankula Const. of road from Ankula irrigation bandha to Haribansha road 1.10 Rural Connectivity<br />

10 Simulia Bati Bati Const. of road from Bati Sial sahi road to Nabara road via Sasan road connecting 2.00 Rural Connectivity<br />

11 Simulia Bati Sunguda Const. of road from Sunguda Satura Panda house road to Maheswar Jena house road 1.35 Rural Connectivity<br />

<strong>12</strong> Simulia Bati Rudunga Const. of road from Rudunga Astia Chhak to Madhupur road via Dasasahi and Jenasahi road 2.00 Rural Connectivity<br />

13 Simulia Bati Bati Const. of road from Bati Panchayat Samity road to Dalei sahi road 1.10 Rural Connectivity<br />

14 Simulia Bati Bati Const. of road from Bati Amania Paridasahi road to Dutta Pokhari 2.00 Rural Connectivity<br />

15 Simulia Bati Chhachina Renovation of Chhachinda Tank 1.00 Water Conservation<br />

16 Simulia Markona Bana Const. of road from Bana Mahapatra sahi to Bana Baragadia river bridge -Earth morrum 1.30 Rural Connectivity<br />

17 Simulia Markona Bana Const. of road from Markona Gandibed RD road to Sitaram Sing house-Earth Morrum 1.75 Rural Connectivity<br />

18 Simulia Markona Khadigadia Const. of road from Bana Saradang RD road to Belagadia Sasan road 1.75 Rural Connectivity<br />

19 Simulia Markona Khadigadia Const. of road from Markona RD road to Khadigadia Chandisahi -Earth Morrum 1.75 Rural Connectivity<br />

20 Simulia Markona Gaudadia Const. of road from Markona Ada RD road to Gaudadia west side Padhi sahi road -earth morrum 1.75 Rural Connectivity<br />

21 Simulia Markona Gaudadia Const. of road from NH -5 to Gaudadia Majhi sahi -Earth Morrum 1.30 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

22 Simulia Markona Ria Const. of road from Ria Harihat Ghar road to Gandibed road -Earth Morrum 1.75 Rural Connectivity<br />

23 Simulia Markona Markona Const. of road from Markona Sadananda pur RD road to Markona Brahmansahi 1.75 Rural Connectivity<br />

24 Simulia Markona Markona Const. of road from Markona Library to Munipada via Dasasahi -Earth morrum 1.75 Rural Connectivity<br />

25 Simulia Markona Markona Const. of road from NH-5 to Nanda house via Nearby Simulia Police Station- Earth morrum 1.10 Rural Connectivity<br />

26 Simulia Markona Markona Renovation of Markona Murudia Tank 2.00 Water Conservation<br />

27 Simulia Markona Markona Renovation of Markona Kaintira Tank 1.00 Water Conservation<br />

28 Simulia Markona Bisunpur Renovation of Bisunpur Tank 1.00 Water Conservation<br />

29 Simulia Markona Bana Renovation of Kanhei Tank 1.00 Water Conservation<br />

30 Simulia Andarai Andarai Const. of road from Rasun Chak Swainsahi to Rasun chak sasan via Sabarang canal road 1.30 Rural Connectivity<br />

31 Simulia Andarai Andarai Const. of road from Dharampur Paschima Thakurani to Badheigadia pada road 1.10 Rural Connectivity<br />

32 Simulia Andarai Andarai Const. of road from Dharampur Gobind Temple to Sahusahi via Jenasahi 1.75 Rural Connectivity<br />

33 Simulia Andarai Andarai Const. of road from Digi Dhanagadia to Palei sahi and Pravakar Pani sahi 1.30 Rural Connectivity<br />

34 Simulia Andarai Andarai Const. of road from Veternary Hospital road to Chandrama Tank 1.75 Rural Connectivity<br />

35 Simulia Andarai Andarai Const. of road from Digi Samal sahi to Gudi Pokhari 1.10 Rural Connectivity<br />

36 Simulia Andarai Andarai Const. of road from Andarai Pandasahi to RD road via Beherasahi 1.10 Rural Connectivity<br />

37 Simulia Andarai Andarai Const. of road from Rasun Chak sasan to Amrutmani road -Earth work 1.30 Rural Connectivity<br />

38 Simulia Andarai Andarai Const. of road from Andarai ME School Gate to Office -CC road 1.30 Rural Connectivity<br />

39 Simulia Andarai Andarai Const. of road from Mahadev Tenk East side to Srinibas Mohanty sahi road 1.10 Rural Connectivity<br />

40 Simulia Andarai Andarai Earth filling of Andarai ANM Centre 1.50 Land Development<br />

41 Simulia Andarai Andarai Const. of Rasunchak Mahakudsahi and Behera sahi road 1.10 Rural Connectivity<br />

42 Simulia Andarai Andarai Const. of road from Dharampur Gobind Temple to Mohanty sahi-CC road 1.10 Rural Connectivity<br />

43 Simulia Andarai Kuladharbindha Const. of road from Kuladhar Bindha CC Road to Kanchudi River 1.30 Rural Connectivity<br />

44 Simulia Andarai Serpur Const. of road from Serpur Pual Tank to Dukhama Tank via Kanchudi river 1.50 Rural Connectivity<br />

45 Simulia Andarai Serpur Const. of road from Kuladhar Bindha CC road to Serpur Maliksahi CC road 1.10 Rural Connectivity<br />

46 Simulia Andarai Serpur Const. of road from RD road to Kanchpada -Earth Work 1.70 Rural Connectivity<br />

47 Simulia Andarai Andarei <strong>Plan</strong>tation at Andarai Grampanchayat Office 1.00 Drought Proofing<br />

48 Simulia Andarai Andarai Renovation of Digi UP school pokhari 2.00 Water Conservation<br />

49 Simulia Andarai Andarai Renovation of Chandrama Pokhari 2.00 Water Conservation<br />

50 Simulia Andarai Andarai Renovation of Andarai ME School Tank 2.00 Water Conservation<br />

51 Simulia Andarai Kuladharbindha Renovation of Saitama Tank 1.00 Water Conservation<br />

52 Simulia Jamujhadi Jamujhadi Imp of road from Jamujhadi Mohanty sahi to Biswalsahi 1.75 Rural Connectivity<br />

53 Simulia Jamujhadi Kupura Imp of road from Babusahi to Canal 1.75 Rural Connectivity<br />

54 Simulia Jamujhadi Kupura Imp of road from Maharansahi to Babusahi 1.75 Rural Connectivity<br />

55 Simulia Jamujhadi Gaudapada Imp of road from Canal to Fakir Matha 1.75 Rural Connectivity<br />

56 Simulia Jamujhadi Chandoti Imp of road from Canal to Jenasahi via Bhima Sahu house 1.75 Rural Connectivity<br />

57 Simulia Jamujhadi Patuli Imp of road from Patuli to Panabaraja via Minapada 1.50 Rural Connectivity<br />

58 Simulia Jamujhadi Patuli Imp of Patuli villag road 1.75 Rural Connectivity<br />

59 Simulia Jamujhadi RB Pur Imp of road from Mahinsasuri Thakurani to Naganda 1.10 Rural Connectivity<br />

60 Simulia Jamujhadi RB Pur Imp of road from Sethi sahi to Malik sahi 1.10 Rural Connectivity<br />

61 Simulia Jamujhadi Naharpada Imp of road from River Bridge to Harihat 1.10 Rural Connectivity<br />

62 Simulia Jamujhadi Naharpada Imp of road from village CC road to River Dam 1.10 Rural Connectivity<br />

63 Simulia Jamujhadi Naharpada Imp of road from Harihat to Gopalpur Minor 1.10 Rural Connectivity<br />

64 Simulia Jamujhadi Gopalpur Imp of road from RD road to Mayadahr Sahu house 1.10 Rural Connectivity<br />

65 Simulia Jamujhadi Jamujhadi Const. of WHS from Mangala sahi to NH-5 1.75 Irrigation<br />

66 Simulia Jamujhadi Kupura Const. of WHS from Hanuman Temple to Baragadia river via Sial sahi 1.50 Irrigation<br />

67 Simulia Jamujhadi RB Pur Const. of WHS from Pani Karanja to NH-5 1.10 Irrigation<br />

68 Simulia Jamujhadi Jamujhadi Renovation of Otamara Tank 2.00 Water Conservation<br />

69 Simulia Jamujhadi Kupura Renovation of Bania Tank 1.50 Water Conservation<br />

70 Simulia Jamujhadi Gaudapada Renovation of Kali Nahana tank 1.50 Water Conservation<br />

71 Simulia Khirkona Sajanabad Const. of road from Sajanabad to Madhupur 1.75 Rural Connectivity<br />

72 Simulia Khirkona Bankapatna Const. of Bankapatna School road 1.75 Rural Connectivity<br />

73 Simulia Khirkona Narendrapur Const. of Narendrapur Uttarali Road 1.10 Rural Connectivity<br />

74 Simulia Khirkona Majhikhandi Const. of road from Majhikhandi Karanjabadi to Khandeita 1.75 Rural Connectivity<br />

75 Simulia Khirkona Naranpur Const. of road from Naranpur Mahadev Temple to Gheribandha 1.50 Rural Connectivity<br />

76 Simulia Khirkona Rasidpur Const. of Rasidpur Jenasahi road 1.75 Rural Connectivity<br />

77 Simulia Khirkona Rasidpur Const. of Rasidpur Mohantysahi road 1.75 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

78 Simulia Khirkona Pahitorana Const. of road from Phitorana to Khajira Jodasahada road 1.75 Rural Connectivity<br />

79 Simulia Khirkona Rampur Const. of road from Rampur Mahadev to Pati Pokhari 1.75 Rural Connectivity<br />

80 Simulia Khirkona Khirkona Const. of road from Khirkona Maliksahi to Canal 1.75 Rural Connectivity<br />

81 Simulia Khirkona Biranchipur Const. of road from Biranchipur to Kuagadia P.Pur road 1.50 Rural Connectivity<br />

82 Simulia Khirkona Pratapur Const. of Pratappur Village road 1.75 Rural Connectivity<br />

83 Simulia Khirkona Kuagadia Const. of road from Kuagadia to Pratappur Minor 1.75 Rural Connectivity<br />

84 Simulia Khirkona P.Pur Const. of Purusottampur village road 1.75 Rural Connectivity<br />

85 Simulia Khirkona Dhulipur Const. of road from Dhulipur to Betada Ghasua road 1.75 Rural Connectivity<br />

86 Simulia Khirkona Ganeswarpur Const. of Ganeswarpur village road 1.75 Rural Connectivity<br />

87 Simulia Khirkona Rasidpur Const. of Astia to Khirkona Minor drain in village Rasidpur 1.75 Irrigation<br />

88 Simulia Khirkona Badakhua Renovation of Badakhua Matha Pokhari tank 2.00 Water Conservation<br />

89 Simulia Khirkona Chaka Renovation of Chaka Jenasahi pokhari tank 1.00 Water Conservation<br />

90 Simulia Khirkona P.Pur Renovation of Purusottampur Baidandi Tank 2.00 Water Conservation<br />

91 Simulia Khirkona Biranchipur Renovation of Biranchipur Bada Pokhari tank 1.00 Water Conservation<br />

92 Simulia Khirkona Rasidpur Renovation of Rasidpur ME School Pokhari tank 1.00 Water Conservation<br />

93 Simulia Chalunigaon Chalunigaon Const. of road from Chalunigaon Mahadev to Kubmbharsahi Jodagadia road 1.70 Rural Connectivity<br />

94 Simulia Chalunigaon Haripur Const. of road from Haripur Behera sahi to Sethisahi, Nathsahi, Pradhansahi and Bariksahi road 1.70 Rural Connectivity<br />

95 Simulia Chalunigaon Isanpur Const. of road from Isanpur Harihat to Telisahi via Betada Ghasua road 1.70 Rural Connectivity<br />

96 Simulia Chalunigaon Mangarajpur Const. of road from Mangarajpur Canal bridge to Harihat via Manasa Thakurani road 1.50 Rural Connectivity<br />

97 Simulia Chalunigaon Kanheibanka Const. of road from Kanheibanka Panigrahisahi to Dasasahi, Ghadiasahi road 1.50 Rural Connectivity<br />

98 Simulia Chalunigaon Chalunigaon Const. of Chalunigaon Jodagadia to Badabandha WHS 1.70 Irrigation<br />

99 Simulia Chalunigaon Malibrahmapur Const. of Maliberhampur to Haripur WHS 1.70 Irrigation<br />

100 Simulia Chalunigaon M. Berhampur Renovation of Maliberhampur Sabitri Tank 1.00 Water Conservation<br />

101 Simulia Chalunigaon Chalunigaon Renovation of Chalunigan Kalinayak Pokhari tank 2.00 Water Conservation<br />

102 Simulia Chalunigaon Bainsibati Renovation of Bainshibati Pokhari tank 1.00 Water Conservation<br />

103 Simulia Ada Hatpaikalpur Const. of Hatpaikalpur village road 1.75 Rural Connectivity<br />

104 Simulia Ada Maminabad Const. of Maminabad Sethisahi road 1.10 Rural Connectivity<br />

105 Simulia Ada Ada Const. of Bangalabadi road 1.10 Rural Connectivity<br />

106 Simulia Ada Ada Renovation of Teli Tank 1.00 Water Conservation<br />

107 Simulia Ada Chudunga Renovation of Gachhagadia 1.00 Water Conservation<br />

108 Simulia Ada Ada Renovation of Santia Tank 1.00 Water Conservation<br />

109 Simulia Ada Narsingpur Renovation of Mati Gadia Tank 2.00 Water Conservation<br />

110 Simulia Ada Chudunga Renovation of Hua Pokhari Tank 1.50 Water Conservation<br />

111 Simulia Sabanga Sahajapada Const. of road from RD road to Naigadia bandha road via Mahalasahi 1.10 Rural Connectivity<br />

1<strong>12</strong> Simulia Sabanga Anandapur Const. of road from Anandapur Behera sahi to River bank 1.00 Rural Connectivity<br />

113 Simulia Sabanga Sabanga Const. of road from Harighat chhak to Hatimunda Bandha 1.00 Rural Connectivity<br />

114 Simulia Sabanga Kundi Const. of road from RD road to Dasasahi 1.00 Rural Connectivity<br />

115 Simulia Sabanga Anandapur Const. of road from RD road to Bakreswar via Kantapada Sasan 1.00 Rural Connectivity<br />

116 Simulia Sabanga Anandapur Const. of road from RD road to Melan Padia via Behera sahi 1.00 Rural Connectivity<br />

117 Simulia Sabanga Anandapur <strong>Plan</strong>tation at Anandapur UGME School compound 1.00 Drought Proofing<br />

118 Simulia Sabanga Kundi <strong>Plan</strong>tation at Kundi Nodal UP compound 1.00 Drought Proofing<br />

119 Simulia Sabanga Sahajapada <strong>Plan</strong>tation at Sahajapada Nodal UP compound 1.00 Drought Proofing<br />

<strong>12</strong>0 Simulia Sabanga Anandapur Const. of Drain from Dasasahi chhak to Kansabansa river 1.00 Irrigation<br />

<strong>12</strong>1 Simulia Sabanga Sahajapada Const. of Drain from Sahajapada Behera sahi to Patrasahi 1.10 Irrigation<br />

<strong>12</strong>2 Simulia Sabanga Sabanga Renovation of Grampanchayat Tank 2.00 Water Conservation<br />

<strong>12</strong>3 Simulia Sabanga Ajipur Renovation of Ajipur Tank 1.00 Water Conservation<br />

<strong>12</strong>4 Simulia Sabanga Sahajapada Renovation of Sarastia Tank 1.00 Water Conservation<br />

<strong>12</strong>5 Simulia Sabanga Kundi Renovation of Ambagadia Tank 2.00 Water Conservation<br />

<strong>12</strong>6 Simulia Bauripada Bhubunpur Const. of road from RD road to Bhubunpur Jenasahi road connectivity 1.00 Rural Connectivity<br />

<strong>12</strong>7 Simulia Bauripada Kurkuria Const. of road from Nayak sahi to Gopal pur Minor road connectivity 1.30 Rural Connectivity<br />

<strong>12</strong>8 Simulia Bauripada Rampo Const. of road from RD road to Rampo Sasan road and Samity Road via Behera and Nayaksahi road 1.00 Rural Connectivity<br />

<strong>12</strong>9 Simulia Bauripada Nischinta Const. of road from Club Ghar to Bakreswar Temple Road connectivity 1.10 Rural Connectivity<br />

130 Simulia Bauripada Bauripada Const. of road from Kancheri Danda to Dasasahi 1.00 Rural Connectivity<br />

131 Simulia Bauripada Pandu Const. of road from Pandu School to Senapatisahi road connectivity 1.00 Rural Connectivity<br />

132 Simulia Bauripada Bhubunpur Const. of road from RD road to Kubersahi road connectivity 1.00 Rural Connectivity<br />

133 Simulia Bauripada Rampo <strong>Plan</strong>tation at Rampo field and nearby road 1.50 Drought Proofing<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

134 Simulia Bauripada Rampo Renovation of Rampo Sasan Tank 2.00 Water Conservation<br />

135 Simulia Bauripada Balihanti Renovation of Balihanti Baragadia Tank 1.00 Water Conservation<br />

136 Simulia Bauripada Pandu Renovation of Pandu Thakurani Tank 1.00 Water Conservation<br />

137 Simulia Kanchpada Begunia Imp of road from Ertal Minor to Budhi Basuli via Nil Parhi sahi road 1.10 Rural Connectivity<br />

138 Simulia Kanchpada Begunia Imp of road from Kanchpada RD road to Begunai Paschima Pada via Baipada school road 1.10 Rural Connectivity<br />

139 Simulia Kanchpada Purusotampur Imp of Purusottampur village road 1.10 Rural Connectivity<br />

140 Simulia Kanchpada Begunia Imp of road from Begunia Canal to Amrutapur road 1.10 Rural Connectivity<br />

141 Simulia Kanchpada Begunia Dian Purusottampur UP School Boundary filling 1.10 Rural Connectivity<br />

142 Simulia Kanchpada Kanchpada Imp of road from Kanchapda RD road to Gopinathpur village 1.10 Rural Connectivity<br />

143 Simulia Kanchpada Talapada Renovation of Baragadia Tank 1.00 Water Conservation<br />

144 Simulia Kanchpada D.Purusotampur Renovation of Kantagadia 2.00 Water Conservation<br />

145 Simulia Purusottampur Purusotampur Imp of road from Kanchpada RD road Malapadia to Jagannathpur via Bariksahi road 1.00 Rural Connectivity<br />

146 Simulia Purusottampur Purusotampur Imp of road from Kanchpada RD road to Bachhia Adi via Anandanagar Gopalsahi road 1.00 Rural Connectivity<br />

147 Simulia Purusottampur Bomtia Imp of road from Kiapada RD road to Jagannath Temple via Agani Sahu house 1.00 Rural Connectivity<br />

148 Simulia Purusottampur Bomtia Imp of road from Talapokhari to Radhamohanpur road 1.00 Rural Connectivity<br />

149 Simulia Purusottampur Kakhadpada Imp of road from Andarai RD road to Nuauasa via Damudia Jena sahi 1.00 Rural Connectivity<br />

150 Simulia Purusottampur Purusotampur Earth filling of Balikhand Hospital compound 1.00 Land Development<br />

151 Simulia Purusottampur Chakradharpur Earth filling of Chakradharpur School compound 1.50 Land Development<br />

152 Simulia Purusottampur Bomtia Earth filling of Bomtia Sanskrit School compound 1.00 Land Development<br />

153 Simulia Purusottampur Parbatipur Earth filling of Parbatipur school compound 1.00 Land Development<br />

154 Simulia Purusottampur Bomtia Const. of Barriage at Lokanath Das Land near Bisu Behera Pola at Kiapada RD road. 1.50 Irrigation<br />

155 Simulia Purusottampur Parbatipur Const. of Flood Control Barriage from Parbatipur to Northen side bridge of Kanchan River 1.10 Irrigation<br />

156 Simulia Purusottampur Parbatipur Renovation of Banadas Pokhari tank 1.00 Water Conservation<br />

157 Simulia Purusottampur Purusotampur Renovation of Hata Nua Pokhari tank 1.00 Water Conservation<br />

158 Simulia Purusottampur Purusottampur Renovation of Balikhand college tank 2.00 Water Conservation<br />

159 Simulia Bari Shyamsunderpur Const. of Gudia sahi and Dasasahi road via Jadav Mohantysahi road 1.50 Rural Connectivity<br />

160 Simulia Bari Bari Const. of road from Bari Market to Begrajpur Nayaksahi and Ertal Minor 1.75 Rural Connectivity<br />

161 Simulia Bari Anantapur Const. of road from Antapur Sutarsahi to Maharanasahi via Dalasahi 1.75 Rural Connectivity<br />

162 Simulia Bari Inayatpur Const. of road from Inayatpur to Antapur Jenasahi road 1.70 Rural Connectivity<br />

163 Simulia Bari Barimelak-2 Renovation of Pela Tank 1.00 Water Conservation<br />

164 Simulia Bari Bari Renovation of SanBalikunda Tank 2.00 Water Conservation<br />

165 Simulia Bari Sadanandapur Renovation of Ambagadia Tank 1.00 Water Conservation<br />

166 Simulia Maitapur Amania sahi Const. of road from Munipada to Gouragadi via Amaniasahi 1.00 Rural Connectivity<br />

167 Simulia Maitapur Kamarpatna Const. of Kamarpatna village road 1.50 Rural Connectivity<br />

168 Simulia Maitapur Simulia Const. of Simulia Chamarsahi road 1.50 Rural Connectivity<br />

169 Simulia Maitapur Balibania Const. of Balibania village road (Markona Sadanandapur RD road to Balibania) 1.70 Rural Connectivity<br />

170 Simulia Maitapur Mohantypokhari Const. of road from Ranital Canal to Mohanty pokhari via Kaingadia 1.70 Rural Connectivity<br />

171 Simulia Maitapur Deopada Const. of road from Maitapur sasan to Karanja gadia via Deopada Harijansahi 1.70 Rural Connectivity<br />

172 Simulia Maitapur Badagahama Const. of road from Ranital Canal to Jhatia school via Badagahama 1.70 Rural Connectivity<br />

173 Simulia Maitapur Churunia Const. of Churunia Adivashi sahi village road 1.75 Rural Connectivity<br />

174 Simulia Maitapur Khalada Const. of Khalada Colony village road 1.50 Rural Connectivity<br />

175 Simulia Maitapur Mahadevsahi Const. of road from Munipada to Mohanty sahi via Mahadev sahi 1.50 Rural Connectivity<br />

176 Simulia Maitapur Hatamaitapur Const. of road from Maitapur Samity road to Ranital Canal via Hatmaitapur Gochhayatsahi 1.50 Rural Connectivity<br />

177 Simulia Maitapur Bangalpur Const. of road from Bangalpur Harijan sahi to Mahapatra sahi via School 1.70 Rural Connectivity<br />

178 Simulia Maitapur Talapada Const. of road from Ranital Canal to Jhatia School via Talapada 1.50 Rural Connectivity<br />

179 Simulia Maitapur Bangalpur Const. of Bangalpur Mahapatra sahi, Kali Jena sahi road 1.50 Rural Connectivity<br />

180 Simulia Maitapur Sahupada Const. of Sahupada village road 1.75 Rural Connectivity<br />

181 Simulia Maitapur Khalada Renovation of Khalada Pokhari tank 2.00 Water Conservation<br />

182 Simulia Maitapur Maitapur Renovation of Kaingadia tank 1.00 Water Conservation<br />

183 Simulia Maitapur Maitapur Renovation of Jhatia Pokhari tank 1.00 Water Conservation<br />

184 Simulia Maitapur Bangalpur Renovation of Bangalpur Badapokhari tank 1.00 Water Conservation<br />

185 Simulia Muruna Muruna Const. of road from Muruna to Gobindapur -Earth work 1.50 Rural Connectivity<br />

186 Simulia Muruna Bangurpada Const. of Bangurpada Jenasahi, Bariksahi and Adivashisahi road -Earth work 1.50 Rural Connectivity<br />

187 Simulia Iswarpur Iswarpur Const. of road from Kalasuni Hatuary road to Mahantysahi Mangala road 1.10 Rural Connectivity<br />

188 Simulia Iswarpur Iswarpur Const. of road from Sabanga Pola to Nayaksahi 1.10 Rural Connectivity<br />

189 Simulia Iswarpur Iswarpur Const. of road from Iswarpur Jenasahi to Sethi sahi 1.10 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

190 Simulia Iswarpur Dhumpur Const. of road from Kalasuni Hatuary RD road to Dhumpur Pandasahi 1.10 Rural Connectivity<br />

191 Simulia Iswarpur Raghubindha Const. of road from Ada markona RD road to Raghubindha Sahu sahi and Bariksahi via Durgaghar 1.10 Rural Connectivity<br />

192 Simulia Iswarpur Raghubindha Const. of road from Ada Markona RD road to Raghubindha Lenka sahi road 1.75 Rural Connectivity<br />

193 Simulia Iswarpur Chandrapada Const. of road from Chandrapada Beherasahi CC road to Gopal Minor 1.75 Rural Connectivity<br />

194 Simulia Iswarpur Chandrapada Const. of road from Kalasuni Hatuary RD road to Kuanrsahi 1.10 Rural Connectivity<br />

195 Simulia Iswarpur Chandrapada Const. of road from Kalasuni Hatuary RD road to Gudia sahi 1.10 Rural Connectivity<br />

196 Simulia Iswarpur Chandrapada Const. of road from Ada Markona RD road to Balipokhari via Bani 1.10 Rural Connectivity<br />

197 Simulia Iswarpur Chandrapada Const. of road from Bhagia Chandrapada RD road to Chatrapur Jenasahi 1.10 Rural Connectivity<br />

198 Simulia Iswarpur Kalasuni Const. of road from Kalasuni Bhagia RD road to Jenasahi road 1.10 Rural Connectivity<br />

199 Simulia Iswarpur Kalasuni Const. of road from Kalasuni Bhagia RD road to Panigrahi sahi and Bariksahi road 1.10 Rural Connectivity<br />

200 Simulia Iswarpur Chandrapada Renovation of Kusuna Gadia tank 1.00 Water Conservation<br />

201 Simulia Iswarpur Kalasuni Renovation of Nalita gadia 2.00 Water Conservation<br />

202 Simulia Kanheibindha Kanheibindha Const. of road from Kanheibindha Jenasahi to Manaspada Pakalasahi via Nadiapada road -Earth work 1.50 Rural Connectivity<br />

203 Simulia Kanheibindha Radhakrushnapur Const. of road from Ertal Minor to Runjumalia via Sasan -Earth work 1.75 Rural Connectivity<br />

204 Simulia Kanheibindha Kanheibindha Const. of WHS from Bari Kanehibindha road crossing to Ertal Minor road both side up to Rampur 1.00 Irrigation<br />

205 Simulia Kanheibindha Kutari Sindhua Pokhari 2.00 Water Conservation<br />

206 Simulia Kanheibindha Parameswarpur Thakurani Pokhari 1.00 Water Conservation<br />

207 Simulia Kanheibindha Kanheibindha Peda Gadia Tank 2.00 Water Conservation<br />

208 Simulia Kanheibindha Kainshi/ Baduli Renovation of Madhua Pokhari 2.00 Water Conservation<br />

209 Simulia Kanheibindha Parameswarpur Renovation of Thakurani Pokhari 1.00 Water Conservation<br />

210 Simulia Kanheibindha Kanheibindha Renovation Gotha Gohiri tank 1.50 Water Conservation<br />

211 Simulia Bati Sunguda Const. of road from Sunguda Majhisahi Harihat road to Baligadia road 1.30 Rural Connectivity<br />

2<strong>12</strong> Simulia Bati Rudunga Const. of road from Rudhunga Canal to Mahinsamunda GP road 1.25 Rural Connectivity<br />

213 Simulia Bati Rudhunga Renovation Rudhunga Panda Tank 1.30 Water Conservation<br />

214 Simulia Markona Bana Const. of road from Bana Jamujhadi RD road to Bana Beherasahi road and Banasasan 1.30 Rural Connectivity<br />

215 Simulia Markona Bana Const. of road from Bana Kupura RD road to Mahapatra sahi road to Malik sahi and Chamarsahi -Earth morrum 1.30 Rural Connectivity<br />

216 Simulia Markona Chhachina Const. of road from Bana Sradanga RD road to Chhachinda Panigrahi sahi road via Chhachinda Beherasahi road -Earth Morrum 1.30 Rural Connectivity<br />

217 Simulia Markona Khadigadia Const. of Ada Markona RD rod Khdigadia Singhashi via Dighi sahi road -Earth Morrum 1.30 Rural Connectivity<br />

218 Simulia Markona Khadigadia Const. of road from Markona Ada RD road to Khadigadia Sahu sahi 1.30 Rural Connectivity<br />

219 Simulia Markona Gaudadia Const. of road from Gaudadia canal to Dharisial house road-Earth Morrum 1.30 Rural Connectivity<br />

220 Simulia Markona Ria Const. of road from Ria Canal to Ria Bahadalpur road -Earth Morrum 1.30 Rural Connectivity<br />

221 Simulia Markona Ria Const. of road from Ria Tahasil road to Ria Canal -earth morrum 1.30 Rural Connectivity<br />

222 Simulia Markona Markona Const. of road from Markona Librarypada to Sadanandapur RD road via Boitysahi, Bariksahi, Ranasahi & Beherasahi -earth and 1.30 Rural Connectivity<br />

223 Simulia Markona Markona Const. of road from Markona Sadanandapur RD road to Talasahi Bhagabat Tungi ghar -earth morrum 1.30 Rural Connectivity<br />

224 Simulia Markona Markona Renovation of Markona GP Tank 2.20 Water Conservation<br />

225 Simulia Markona Markona Renovation of Markona Dandapokhari 1.30 Water Conservation<br />

226 Simulia Markona Markona Renovation of Markona Bazar Tank 2.20 Water Conservation<br />

227 Simulia Markona Khadigadia Renovation of Dighi Tank 1.30 Water Conservation<br />

228 Simulia Andarai Andarai Const. of road from Andarai Pandasahi to RD road via Galigohiri 1.30 Rural Connectivity<br />

229 Simulia Andarai Andarai Const. of road from Andarai high school to Rasunchak sasan road 1.30 Rural Connectivity<br />

230 Simulia Andarai Andarai Const. of road from RD road to Digi Biswalsahi 1.25 Rural Connectivity<br />

231 Simulia Andarai Andarai Const. of road from Dharampur Gudiasahi to Canal via Kalandi Sagar 1.30 Rural Connectivity<br />

232 Simulia Andarai Andarai Const. of road from Andarai Mahadev Tank to Barik sahi via Nalagohiri 1.25 Rural Connectivity<br />

233 Simulia Andarai Andarai Const. of road from Digi Dhanagadia to Kanchudi river 1.30 Rural Connectivity<br />

234 Simulia Andarai Andarai Const. of road from RD road to Andarai Barik sahi CC road 1.25 Rural Connectivity<br />

235 Simulia Andarai Andarai Const. of road from Dharampur Mohanty sahi to Majana 1.00 Rural Connectivity<br />

236 Simulia Andarai Andarai Const. of road from Grampanchayat Gate ot Panchayat Office -CC road 1.00 Rural Connectivity<br />

237 Simulia Andarai Andarai Const. of road from Dharampur Jenasahi to Omkar Mandir-Earth work 1.25 Rural Connectivity<br />

238 Simulia Andarai Andarai Const. of road to Andarai Baniasahi 1.00 Rural Connectivity<br />

239 Simulia Andarai Andarai Const. of road from Rasunchak Kapil Behera to Sasan CC road 1.00 Rural Connectivity<br />

240 Simulia Andarai Andarai Const. of road from Andarai to Balikhand College Purusottampur 1.30 Rural Connectivity<br />

241 Simulia Andarai Kuladharbindha Const. of road from Kuladhar Bindha Dasasahi to Kanchudi river-Earth work 1.30 Rural Connectivity<br />

242 Simulia Andarai Kuladharbindha Const. of road from Malik sahi to DAS sahi via UP School- CC road 1.25 Rural Connectivity<br />

243 Simulia Andarai Serpur Const. of road from RD road to Serpur Maliksahi and Nayak sahi 1.30 Rural Connectivity<br />

244 Simulia Andarai Serpur Const. of road to Serpur Chhagharia sahi -Earth Work 1.00 Rural Connectivity<br />

245 Simulia Andarai Serpur Const. of road from Serpur Nayak sahi to Brahman sahi-CC road 1.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

246 Simulia Andarai andarei <strong>Plan</strong>tation at Andarai Maharpada Play Ground 1.00 Drought Proofing<br />

247 Simulia Andarai Andarai Renovation of Digi Genguti Pokhari 2.20 Water Conservation<br />

248 Simulia Andarai Andarai Renovation of Gudi Pokhari 1.30 Water Conservation<br />

Sub total 342.65<br />

1 Soro Anantapur Ainiri Renovation of Hat Tank with Stone packing 2.00 Water Conservation<br />

2 Soro Anantapur Aharpur Imp. of road of Ahar pur village road 2.00 Rural Connectivity<br />

3 Soro Anantapur Kanhupur Imp. of Kanhupur village road 1.70 Rural Connectivity<br />

4 Soro Anantapur Kanhupur Imp. of road from Mahdev Temple to Balipadia with Drain 2.00 Rural Connectivity<br />

5 Soro Anantapur Anantapur Renovation of Balipadia Tank with Stone paking 2.00 Water Conservation<br />

6 Soro Anantapur Mulakaida Renovation of Balipadia Tank with Stone paking 2.00 Water Conservation<br />

7 Soro Jadida Bharadapada Imp. of Bhara pada Mangalabandha 2.00 Flood Control<br />

8 Soro Jadida Rusa-18 Imp. of Rusa -18 Nua pokhiri Bandha 2.00 Water Conservation<br />

9 Soro Jadida Narsingnagar Imp. of road from Raghunath pur to Kalia Bandha via- Bisal sahi 1.70 Rural Connectivity<br />

10 Soro Jadida Adia Imp. of road from Tala Nayak sahi to Nua patana 1.70 Rural Connectivity<br />

11 Soro Jadida Baghua Digging of Drain at Mandanal vill- Bhguga 1.00 Irrigation<br />

<strong>12</strong> Soro Tentei Tentei Imp. of RD Road Deula Pokhari to Tentuli Via-Joda 1.18 Rural Connectivity<br />

13 Soro Tentei Tentei Imp. of road from Sologan RD road to Kantabania 2.00 Rural Connectivity<br />

14 Soro Tentei Sologan Imp. of road Dayanidhhipur village road (Nayak sahi, Behera sahi,Mohanty sahi ,Rout sahi and Giri sahi) 2.00 Rural Connectivity<br />

15 Soro Tentei Sologan Imp. of road from Sologan Hat to Karanja Mela Via-Bitu,Rasika sahi 1.00 Rural Connectivity<br />

16 Soro Tentei Sologan Imp. of road from RD road to Deula Pokhari Via- Joda 1.70 Rural Connectivity<br />

17 Soro Tentei Sologan Renovation of Dayanadhipur NodalSchool tank 2.00 Water Conservation<br />

18 Soro Tentei Biripada Renovation of Biripada Bada Padia Pokhari 1.75 Water Conservation<br />

19 Soro Tentei Tantulia Imp. of road from Balrampur to Tentulia Matha 2.00 Rural Connectivity<br />

20 Soro Gud Gud Imp. of road from Panchayat road Bhagi Behera house to Bhaskar Das house 1.00 Rural Connectivity<br />

21 Soro Gud Gud Imp. of road from Gouranga Mohanty house to Piansuni temple via-Badei sahi ,Biswal sahi 2.00 Rural Connectivity<br />

22 Soro Gud Gud Const. of Drain from Panchayat Office to Matigadia drain 2.00 Irrigation<br />

23 Soro Gud Gud Imp. of Rani Pada to Tetulia Gachha Pada road 2.00 Rural Connectivity<br />

24 Soro Gud Gud Renovation of Nandhi Pokhari 1.00 Water Conservation<br />

25 Soro Pakhar M.K.Pur Imp. of road Kalamanga Well Chhak to Gola sahi 1.70 Rural Connectivity<br />

26 Soro Pakhar M.K.Pur Imp. of road from Anantapur PWD road to Balanga RCP Road via-Giri sahi 1.70 Rural Connectivity<br />

27 Soro Pakhar Balanga Imp. of Alekha Matha to Bhalia Gohiri to Pokhari(Pacheei) 1.70 Rural Connectivity<br />

28 Soro Pakhar Simulia Imp. of road from Chhudhurai Pokhari to Harabarik sahi 1.70 Rural Connectivity<br />

29 Soro Pakhar Simulia Imp. of Road to School to Sukura Barik sahi & Hara Barik sahi 1.70 Rural Connectivity<br />

30 Soro Pakhar Panada Imp. of road from Balanga RCP road to Mahadev mandira via-Panada UGMY school 1.70 Rural Connectivity<br />

31 Soro Pakhar Janhia Renovation of Janhia Pokhari 1.70 Water Conservation<br />

32 Soro Pakhar Pakhar Imp. of road from Dhuba pokhari to Gopinathpur 2.00 Rural Connectivity<br />

33 Soro Pakhar Pakhar Imp. of road from Gelhei Pokhari to Rout sahi 2.00 Rural Connectivity<br />

34 Soro Pakhar Pakhar Imp. of road to Barik sahi Chhak to Kalamanga via-Chandua Pada 2.00 Rural Connectivity<br />

35 Soro Pakhar Pakhar Renovation of Raghunath Sagar pokhari 1.70 Water Conservation<br />

36 Soro Pakhar Pakhar Renovation of Chandua Pokhari 1.70 Water Conservation<br />

37 Soro Pakhar Pakhar Imp. of road Balarampur Mandira To Thakurani 1.70 Rural Connectivity<br />

38 Soro Gopinathpur Digibhanra Imp..of road from Digi main road to Maharana sahi Kumbharsahi Sahugharsahi 1.70 Rural Connectivity<br />

39 Soro Gopinathpur Digibhanra Renovation of Baunsapal tank and Ghat 2.00 Water Conservation<br />

40 Soro Gopinathpur Digibhanra Renovation of Baunsapal Adibasisahi tank 2.00 Water Conservation<br />

41 Soro Gopinathpur Digibhanra Imp. of road from Baghaampuda to Upergard 2.00 Rural Connectivity<br />

42 Soro Gopinathpur Digibhanra Renovation of Baghampuda tank 1.00 Water Conservation<br />

43 Soro Gopinathpur Raipitambar Imp..of road from PWD road to Champkuli Jenasahi via Sahusahi 2.00 Rural Connectivity<br />

44 Soro Gopinathpur Raghunathpur Renovation of Matikhania tank 2.00 Water Conservation<br />

45 Soro Gopinathpur Gopinathpur Imp.. of Dungam tank and ghat 2.00 Water Conservation<br />

46 Soro Gopinathpur Joka Imp..of adi bandha on two sides of Joka West side river 1.00 Flood Control<br />

47 Soro Manipur Ranapur Const.of drain from Ranapur Gahana sahi Chhak to Panda sahi 2.00 Irrigation<br />

48 Soro Manipur Khunta Imp.. Of road from Badhi Mangalpur PWD to Gulunia 1.75 Rural Connectivity<br />

49 Soro Manipur Beheranapur Imp. road from PWD road to Beheranpur Patra sahi via Mudupur 2.00 Rural Connectivity<br />

50 Soro Manipur Manipur Imp..of road from Padmapur Mulia bandha 1.75 Rural Connectivity<br />

51 Soro Manipur Manipur Renovation of Duli pada Tank 2.00 Water Conservation<br />

52 Soro Manipur Manipur Renovation Hata Pokhari Tank 2.00 Water Conservation<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

53 Soro Manipur Manipur Digging of Drain from Haridagia to Corn Field 1.00 Irrigation<br />

54 Soro Manipur Chhatra Renovation of Mundibara Tank 2.00 Water Conservation<br />

55 Soro Manipur Chhatra Digging of Gulunia Nala 1.50 Irrigation<br />

56 Soro Manipur Chhatra Renovation Babu Patana Tank 1.00 Water Conservation<br />

57 Soro Natapada Natapada Digging of Nimanala Tilada 2.00 Irrigation<br />

58 Soro Natapada Wada Imp. of Road from Malik sahi, Mohanty sahi and Jadu Mishra Wada 2.00 Rural Connectivity<br />

59 Soro Natapada Chahalima Digging of Basudeva Nala, Chahalima 2.00 Irrigation<br />

60 Soro Madhusudanpur Naharpada Renovation of Naharapada Tasuni Pokhari 2.00 Water Conservation<br />

61 Soro Madhusudanpur Madhusudan pur Imp. of Madhusudanpur village Road 2.00 Rural Connectivity<br />

62 Soro Madhusudanpur Madhusudan pur Imp. of Road from Bada Sethy sahi to Sana Sethi sahi &Telisahi to Naipari Telisahi 2.00 Rural Connectivity<br />

63 Soro Madhusudanpur Krushnadaspur Renovation of KD Pur Bada Pokhari 2.00 Water Conservation<br />

64 Soro Dahisada Dahisada Imp. of Road from RD Road to Gopal Jena house 2.00 Rural Connectivity<br />

65 Soro Dahisada Dahisada Imp. of Road & Drain from RD Road to Gopal Jena via Pitambar Mohanty House 2.00 Rural Connectivity<br />

66 Soro Dahisada Dahisada Renovation of Praharaj Tank 1.70 Water Conservation<br />

67 Soro Dahisada Nugan Renovation of Ranajei Tank 1.70 Water Conservation<br />

68 Soro Dahisada Sultanpur Imp. of road from RD road to Pratima Pokhari road 2.00 Rural Connectivity<br />

69 Soro Dahisada Madhusudanpur Imp. of road from Main road to Sudakar Panda 2.00 Rural Connectivity<br />

70 Soro Dahisada Jagannathpur Imp.. of Road from RD Road to Dhira Panda House to Bhol sahi 2.50 Rural Connectivity<br />

71 Soro Mahumuhan Mahumuhan Imp. of road from Ananda Dalai house to UGME school 2.00 Rural Connectivity<br />

72 Soro Mahumuhan Mahumuhan Imp. of Road from Bagudi khutia sani to judamba Mallik sahi 2.00 Rural Connectivity<br />

73 Soro Mahumuhan Angula Imp. of Angula checkgate to Maharanasahi CC road 1.00 Rural Connectivity<br />

74 Soro Mahumuhan Katuni Digging of Katuni Balibandha 1.50 Water Conservation<br />

75 Soro Mahumuhan Mahumuhan Imp. of road from Bagudi PWD road to Wada 2.00 Rural Connectivity<br />

76 Soro Mahumuhan Khanjamahal Renovation of Khanjamahal Mani Mandir tank 2.00 Water Conservation<br />

77 Soro Singakhunta Gujudiha Const of Padaga Bandha earthan WHS 1.70 Irrigation<br />

78 Soro Singakhunta Gujadiha Imp. of road from PMGSY road to Naryan Behera house 2.00 Rural Connectivity<br />

79 Soro Singakhunta Sindhua Imp. of road from Simuli Khula to Karanja Bania Earth Work & moruam 1.75 Rural Connectivity<br />

80 Soro Singakhunta Sindhua Digging of Pudadiha Tank 1.70 Water Conservation<br />

81 Soro Singakhunta Brundadeipur Imp. of Brundadeipur Gujudia dalei sahi 1.50 Rural Connectivity<br />

82 Soro Singakhunta Singakhunta Renovation of Simuli Gourangi Pokhari 2.00 Water Conservation<br />

83 Soro Singakhunta Singakhunta Imp. of road from Bandha sahi chhak to Phata amba 2.00 Rural Connectivity<br />

84 Soro Talanagar Sunari Imp. of road from astabanka Sasan to Panasabanka LI point 2.00 Rural Connectivity<br />

85 Soro Talanagar Sunari Imp. of Road from Irrigation Road to RD Road 2.00 Rural Connectivity<br />

86 Soro Talanagar Sunari Imp. of road from Laxmana Panda house to Musa Panda house via EGS school 2.00 Rural Connectivity<br />

87 Soro Talanagar B.Sabira Imp. of road from Rahania Sridhar Maharana house to Harihata Sanabehera House & Gobinda with Culvert 2.00 Rural Connectivity<br />

88 Soro Talanagar H.Gandatara Imp. of road from Gandatara Jena sahi to Mahakuda sahi 2.00 Rural Connectivity<br />

89 Soro Mulising Mulising Digging of Mulishing Dayabagicha Pokhari(2). 2.00 Water Conservation<br />

90 Soro Mulising Bartana Digging of Bartana Gopirana Pokhari. 2.00 Water Conservation<br />

91 Soro Mulising Thala Digging of Thala Thakurani Pokhari. 2.00 Water Conservation<br />

92 Soro Mulising Mangeswerpur Imp.. Of road from Mangeswarpur Trinath mandap to Shyampur High School via Nayak sahi. 2.00 Rural Connectivity<br />

93 Soro Mulising Tentuligochhi Digging of Tentuligachhi Nuapokhari. 2.00 Water Conservation<br />

94 Soro Mulising Shyampur Imp.. Of Road from Shyampur High School to Talapadhi road via Tentuligachhi. 2.00 Rural Connectivity<br />

95 Soro Sarasankha Sarasankha Imp. of road from Sarasankha Samiti road to Sasmal sahi ,Barik sahi and Behera sahi road and Hume pipe 2.00 Rural Connectivity<br />

96 Soro Sarasankha Sarasankha Imp. of road from Sarasankha Samiti road to Jena sahi,via- Khilarsahi ,Rout sahi and Khuntia sahi and drain 2.00 Rural Connectivity<br />

97 Soro Sarasankha Sarasankha Digging of canal Sarasankha Dhikniapada Bagicha to Binagadhia 1.50 Irrigation<br />

98 Soro Sarasankha Mangrajpur Imp. of road from Sarasankha Chhak CC road to Bainanda Mangarajpur road and wall 1.00 Rural Connectivity<br />

99 Soro Sarasankha B.sahi Digging of canal Baladia Biswal sahi 2.00 Irrigation<br />

100 Soro Sarasankha Baladia Imp. of road from Sarsankha Samiti Road to Baladia road 2.00 Rural Connectivity<br />

101 Soro Kedarpur Kedarpur Renovation of Kedarpur Gudia Pokhari and bathing Ghat 1.00 Water Conservation<br />

102 Soro Kedarpur Kedarpur Renovation of Naikani Patana Nua Pokhari 2.00 Water Conservation<br />

103 Soro Kedarpur Santapada Digging of Drain from Santapada Gauja Patana Patra sahi to Santapada Joda 2.00 Irrigation<br />

104 Soro Kedarpur Thaneswar Renovation of Thaneswar Baitalu Pokhari 1.00 Water Conservation<br />

105 Soro Kedarpur Thaneswar Imp. of Uchhabpur Melana Padia 1.00 Land Development<br />

106 Soro Kedarpur Ghasua Imp. of Ghasua Village road (Nayak sahi, Pradhan sahi and Barik sahi) 2.50 Rural Connectivity<br />

107 Soro Kedarpur Bantada Imp. of Bantada Village road (Puhan sahi and Hota sahi) 1.00 Rural Connectivity<br />

108 Soro Kedarpur Banasiha Imp. of road from Patripal Irrigation Bandha to Kanjabansa river and stone Patching 1.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

109 Soro Kedarpur Kiarpur Renovation of Kiarpur Nua Pokhari 1.00 Water Conservation<br />

110 Soro Kedarpur Kantabanki Imp. of Kantabanki Village road(Nayak sahi,Dhala sahi) 2.00 Rural Connectivity<br />

111 Soro Kedarpur Sautapada Renovation of Sautapada Pati sashan ponds and Bathing ghat 2.00 Water Conservation<br />

1<strong>12</strong> Soro Manatri Manatri Imp. of road from Sahu sahi to Sulapata at Manatri road 2.00 Rural Connectivity<br />

113 Soro Manatri Rangapati Imp. of Rangapati Santara sahi Chhak to Das sahi road 1.00 Rural Connectivity<br />

114 Soro Manatri Rangapati Imp. of Rangapati Mahadeb Temple to Jena sahi RD road 1.00 Rural Connectivity<br />

115 Soro Manatri Rangapati Renovation of New Tank at Rangapati 2.00 Water Conservation<br />

116 Soro Manatri Nuapur Imp. of road from Nuapur Patra sahi house to Das house road 2.00 Rural Connectivity<br />

117 Soro Manatri Dahipur Renovation of Tank Dahipur Malik sahi 1.00 Water Conservation<br />

118 Soro Manatri Dahipur Renovation of Dahipur Ghana Tank 2.00 Water Conservation<br />

119 Soro Attapur Attapur Renovation of Raghunathpur Sasan Tank 2.00 Water Conservation<br />

<strong>12</strong>0 Soro Attapur Attapur Imp. of road from Panchayat Office to Sairam Temple 2.00 Rural Connectivity<br />

<strong>12</strong>1 Soro Attapur Attapur Imp. of Road from Panchayat to Manipur Road & Pitakalia Pola 2.00 Rural Connectivity<br />

<strong>12</strong>2 Soro Attapur Belda Renovation of Paeika Pokhari 2.00 Water Conservation<br />

<strong>12</strong>3 Soro Attapur Belda Imp. of Belda Gudia sahi to Gotha road via- Muduli sahi 2.00 Rural Connectivity<br />

<strong>12</strong>4 Soro Attapur Hansi patana Imp. of road from RD road to Hansipatana 2.00 Rural Connectivity<br />

<strong>12</strong>5 Soro Attapur Ghasipada Imp. of road from khasagadia to Jadida road 2.00 Rural Connectivity<br />

<strong>12</strong>6 Soro Nadigan Nadigan Imp. of Nadigan Mituani to Hatisahi road 2.00 Rural Connectivity<br />

<strong>12</strong>7 Soro Nadigan Nadigan Imp. of road from Mituani Polo to Nayak sahi Via- Mohanty sahi 2.00 Rural Connectivity<br />

<strong>12</strong>8 Soro Nadigan Nadigan Renovation of Haridapada Grama Pokhari 2.00 Water Conservation<br />

<strong>12</strong>9 Soro Nadigan Nadigan Renovation of Guhaladihia School Pokhari 2.00 Water Conservation<br />

130 Soro Nadigan Guhaladihi Imp. of road from Guhaldihi Mahadev to Lenka sahi 2.00 Rural Connectivity<br />

131 Soro Nadigan Kanpur Renovation of Kaeitha Pokhari 2.00 Water Conservation<br />

132 Soro Sabira Sabira Imp. of Road form Sabira to Madhu road 2.00 Rural Connectivity<br />

133 Soro Sabira Sabira Bandha at Baunsakhunta to Dhanabar Khunta 1.00 Drought Proofing<br />

134 Soro Sabira Sabira Imp. of road from Agapada Tapisa village road and stone packing 2.00 Land Development<br />

135 Soro Sabira Sabira Renovation of Churadhi Tank 1.57 Water Conservation<br />

136 Soro Sabira Sabira Digging of drain from Mahanala to Gobanala 1.00 Irrigation<br />

137 Soro Sabira Bhatapada Imp. of road from Bhatapada to Sabira Hospital 1.00 Rural Connectivity<br />

138 Soro Sabira Danda Palas Digging of Sarat Drain for Cultivation 1.50 Irrigation<br />

139 Soro Sajanpur Sirapur Imp. of road from Sirapur Gayapatra house to Kesh Pur Samitiroad via-Mukundia 1.00 Rural Connectivity<br />

140 Soro Sajanpur Sirapur Imp. of road from WN-10 Mohapatra sahi to Daitari sethi 1.00 Rural Connectivity<br />

141 Soro Sajanpur Sajanpur Imp. of road from Sajan pur Mahadev Pokhari to Sanabrahamapur 1.50 Rural Connectivity<br />

142 Soro Nischintapur Kudei Imp. of road from Pradhan sahi to Baid sahi Via Ojhas 1.50 Rural Connectivity<br />

143 Soro Nischintapur Kudei Imp. of road from Hat sahi bridge to Harisagar Tank 1.50 Rural Connectivity<br />

144 Soro Nischintapur Nischintapur Imp. of road from Bhima Panda, Kati Panda hous to Sasan road via-Thakuranai 1.50 Rural Connectivity<br />

145 Soro Nischintapur Hensaguda Imp. of road from Banabisnupur road to hensa guda polo via-Behera sahi 1.73 Rural Connectivity<br />

146 Soro Nischintapur Hensaguda Imp. of road from PWD road to Barik sahi 3.50 Rural Connectivity<br />

147 Soro Anantapur Kanhapur Renovation of Sarakari Tank with Stone paking 2.50 Water Conservation<br />

148 Soro Anantapur BelPur Imp. of road fom Belpur Village road to Bania Sah Via- UP School Behera sahi and Rana sahi Road 3.30 Rural Connectivity<br />

149 Soro Anantapur Anantapur Renovation of Hata Tank with Stone paking 2.50 Water Conservation<br />

150 Soro Jadida Patulida Imp. of road from Pradhan sahi to Gangei 2.50 Rural Connectivity<br />

151 Soro Jadida Bharadapada Imp. f road from Soro Mainipur RD Road to Varada Pada via kusi pada 2.50 Rural Connectivity<br />

152 Soro Jadida Rusa-18 Imp. of ruad from Rusa-18 Samiti road to Nurusingha Nagar 2.50 Rural Connectivity<br />

153 Soro Jadida Rusa-19 Imp. of road from Samiti road to Sethi sahi 2.50 Rural Connectivity<br />

154 Soro Jadida Narsingnagar Renovation of GP Tank 1.30 Water Conservation<br />

155 Soro Jadida Adia Imp. of road from Soro Manipur road to Palai sahi 1.30 Rural Connectivity<br />

156 Soro Jadida Baghua Imp. of road from Baghua Muduli sahi to Tantua Barik sahi 3.70 Rural Connectivity<br />

157 Soro Jadida Gangei Renovation of Duhudi Bandha 1.30 Water Conservation<br />

158 Soro Tentei Tentei Barapada Tentei Barapada Sasan Hansiani to Kansabansa canal digging 1.33 Irrigation<br />

159 Soro Tentei Tentei Imp. of road from Bangali sahi to Gaydhar sankhua via-Sankhua sahi 1.00 Rural Connectivity<br />

160 Soro Tentei Slongan Renovation of Deula pokhari 4.36 Water Conservation<br />

161 Soro Tentei Sologan Imp. of road from Daynidhipur R D road to Padu Nayk via-KamalaNayak sahi 2.50 Rural Connectivity<br />

162 Soro Tentei Biripada Renovation of Biripada Sankhua sahi San Pokhari 1.30 Water Conservation<br />

163 Soro Tentei Tentulia Imp. of Tentula village road 1.30 Rural Connectivity<br />

164 Soro Gud Gud Imp. of road from CC road to Bidhara Palia road 2.00 Rural Connectivity<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

SI.<br />

No.<br />

Block Panchayat Village List of the Work Outlay Category<br />

165 Soro Gud Gud Imp. of road from Bhua Phokhari to Kesa gadia road 1.00 Rural Connectivity<br />

166 Soro Gud Gud Renovation of Sankhua Pond 1.30 Water Conservation<br />

167 Soro Gud Gud Renovation of Kesa gadia pond 1.86 Water Conservation<br />

168 Soro Gud Gud Imp. of road from Gud to Dayanadhipur Via- Ramachandrapur 1.30 Rural Connectivity<br />

169 Soro Pakhar M.K.Pur Imp. of road Mataji Pokhari to Sundari Pada 5.63 Rural Connectivity<br />

170 Soro Pakhar Balanga Imp. of road from Balanga Chhak to School via-panada ,Janhia& M.K.Pur 2.00 Rural Connectivity<br />

171 Soro Pakhar Simulia Imp. of road Simulia Chhak to Alekha Matha 1.20 Rural Connectivity<br />

172 Soro Pakhar Simulia Renovation of Chaudhuri Pokhari 1.30 Water Conservation<br />

173 Soro Pakhar Panada Imp. of road from Panada Majhi sahi to dasa sahi Via-Sahu sahi 2.20 Rural Connectivity<br />

174 Soro Pakhar Janhia Imp. of road from Mahakud sahi to Balanga RCP road 1.30 Rural Connectivity<br />

175 Soro Pakhar Julingia Imp. of road from Julingia sasan Chhak to Sampur 1.30 Rural Connectivity<br />

176 Soro Pakhar Pakhar Imp. of road from pakhar RD road to Kalamanga via-Saatani Pokhari 1.30 Rural Connectivity<br />

177 Soro Pakhar Pakhar Imp. of road from Rd Road to Substation Via-raghunath Satpathi road 4.30 Rural Connectivity<br />

178 Soro Pakhar Pakhar Renovation.of Mahadev Pokhari ,M.K Pur 1.30 Water Conservation<br />

179 Soro Pakhar Malipur Imp. of road pakhara RD road to Nabin Nayak Chhak Via-Madan Chhak Malipur Thakurani 1.30 Rural Connectivity<br />

180 Soro Gopinathpur Digibhanra Karanjadandi Bridge to Basumata Thakurani WHS 1.50 Irrigation<br />

Sub-Total 327.56<br />

Total 4218.56<br />

NB: Though the outlay under MGNREGS for <strong>2011</strong>-<strong>12</strong> has been finalized by DRDA, the list of work is yet to be finalized. Hence this proposed list has been prepared based on needs and priorities identified through<br />

primay survey<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure XX


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

ABSTRACT OF ADDITIONAL FUND REQUIREMENT (<strong>2011</strong>-<strong>12</strong>) SUMMARY OF<br />

VISIONING AND PLANNING EXERCISE CONDUCTED AT ZP, PS & GP LEVEL<br />

A. <strong>Plan</strong> Proposals suggested by PRI members of Panchayat Samitis and Gram<br />

Panchayats<br />

<strong>Plan</strong> Proposals Suggested<br />

Agriculture & Allied Activities/Irrigation<br />

Units Nos.<br />

Fund Requirement<br />

(Rs. in Lakh)<br />

Setting up of Livestock Aid Centre Nos. 27 270.00<br />

Construction of Livestock Aid-centre building Nos. 16 80.00<br />

Construction of cross bandha & sluice gate Nos. 3 25.00<br />

Construction of Ferry Ghat Nos. 2 18.00<br />

Construction of Drainage channels km 26 260.00<br />

Construction of River Embankment km 7 214.00<br />

Construction of Water Harvesting Structure Nos. 6 180.00<br />

Renovation of Canal Km. 5 65.00<br />

Renovation of Pond Nos. 17 85.00<br />

Repairing of L.I. Point Nos. 5 3.40<br />

Setting up of L.I. Point for Irrigation Nos. 140 1400.00<br />

Sub total<br />

Road Connectivity/Transport Sector<br />

2600.40<br />

Construction of Black Top Road Kms. 35 350.00<br />

Construction of Bridge Nos. 4 225.00<br />

Construction of CC Road Kms. 285.5 2850.00<br />

Construction of road to Village Kms. 180.5 1800.00<br />

Sub total<br />

Social Services<br />

5225.00<br />

Avenue <strong>Plan</strong>tation Kms. 38 19.00<br />

Construction of Drainage in Habitation Kms. 19 190.00<br />

Construction of Drains in Market place Kms. 2 20.00<br />

Provision of Drinking water Tube well Nos. 133 66.50<br />

Provision of Houses under IAY Nos. 2623 1180.35<br />

Provision of Individual Household Latrine Nos. <strong>12</strong>70 38.10<br />

Provision of Pipe water Supply Nos. 115 1725.00<br />

Provision of Street Light Nos. 201 70.35<br />

Construction of Cyclone Shelter Nos. 21 168.00<br />

Construction of additional class room in School Nos. 28 35.00<br />

Construction of AWC Building Nos. 454 2270.00<br />

Construction of Ayurvedic Hospital Building Nos. 1 30.00<br />

Construction of Community Hall Nos. 3 15.00<br />

Construction of Health Sub Centre Building Nos. 6 60.00<br />

Construction of High School Hostel Building Nos. 2 60.00<br />

Construction of PHC Building Nos. 4 <strong>12</strong>0.00<br />

Construction of School Boundary Wall Nos. 20 204.00<br />

Construction of School Building Nos. 79 1155.00<br />

Construction of Secondary School Building Nos. 1 15.00<br />

Sub total<br />

Energy<br />

7441.30<br />

Electrification of hamlets Nos. 10 185.00<br />

Sub total<br />

Rural Development<br />

185.00<br />

Construction of Market Complex Nos. 13 390.00<br />

Construction of GP Boundary Wall Nos. 2 15.00<br />

Construction of GP Godown Nos. 2 40.00<br />

Construction of GP Office Building Nos. 4 20.00<br />

Sub total 465.00<br />

Grand Total 15916.70<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-XXI


<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

B. <strong>Plan</strong> Proposals suggested by Ward Councilors of ULBs<br />

<strong>Plan</strong> Proposals Suggested<br />

Social Services<br />

Unit/Nos.<br />

Fund Requirement<br />

(Rs. in Lakh)<br />

Renovation of Ponds 15 114.00<br />

Provision of Drinking water stand posts 8 0.80<br />

Provision of Pipe water Supply 23 345.00<br />

Construction of Over head Tank 1 70.00<br />

Construction of Toilets in High School 8 4.00<br />

Provision of Public Toilets 18 9.00<br />

Construction of Drains in Wards 81 882.00<br />

Construction of Sulava Souchalaya 17 85.00<br />

Construction of Bathing Ghat 1 1.00<br />

Provision of Tube well for drinking water 44 22.00<br />

Construction of Anganwadi Center Building 57 285.00<br />

Construction of School Boundary wall 16 172.00<br />

Setting up of Urdu Library 2 4.00<br />

Construction of School Class room 10 <strong>12</strong>.50<br />

Repairing of School Building 7 60.00<br />

Provision of Houses to Poor under IHSDP/VAAY 960 432.00<br />

Provision of Street light 56 19.60<br />

Construction of Bus Stand 3 150.00<br />

Construction of Mini Park 5 100.00<br />

Construction of Mini Stadium 3 180.00<br />

Construction of Burial Ground 5 37.00<br />

Construction of Play ground 1 10.00<br />

Construction of Traffic Post 3 0.90<br />

Construction of Market Complex 6 180.00<br />

Construction of Rest shed at Bus stops 3 1.20<br />

Construction of Auditorium 1 40.00<br />

Construction of Town hall 1 42.00<br />

Provision of Cool Water System 8 8.00<br />

Construction of Cyclone Shelter 10 80.00<br />

Avenue <strong>Plan</strong>tation 11km 5.50<br />

Provision of Town Bus 2 40.00<br />

Provision of Ambulance 2 <strong>12</strong>.00<br />

Provision of Blood bank 1 30.00<br />

Construction of Kalyan Mandap<br />

Transport<br />

4 200.00<br />

Improvement of road 28km 334.00<br />

Construction of Bridge 17 183.00<br />

Construction of CC road 137km 1780.00<br />

Construction of Fly Over Bridge<br />

Irrigation & Drainage<br />

1 240.00<br />

Construction of Protection Wall<br />

Energy<br />

2 8.00<br />

Extension of LT Line<br />

Agriculture<br />

32 250.00<br />

Construction of Check Dam 1 100.00<br />

Setting up of Rice Mill 1 25.00<br />

Setting up of Cold Store 2 110.00<br />

Provision of Veterinary Hospital 1 25.00<br />

Provision of Milk Processing <strong>Plan</strong>t 1 100.00<br />

Total 6789.50<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-XXI


Sl.<br />

No.<br />

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

C. Proposed development plan for Tourism sector in <strong>Balasore</strong> district<br />

Name of Tourist<br />

Centre<br />

Details of proposed work<br />

TSI: NABARD Consultancy Services (NABCONS) Annexure-XXI<br />

Amount<br />

(Rs. in<br />

lakh)<br />

1 Chandipur<br />

Stone Packing from Chandipur to Balaramgadi, Illumination<br />

and Pathway<br />

400.00<br />

2 Balaramgadi Creation of water Sports and Toilet block 70.00<br />

3 Chandeneswar Furnishing of Yatrinivas <strong>12</strong>.00<br />

4 Panchalingeswar<br />

Water supply to Pitha and Panthanivas, Development of Picnic<br />

area, Renovation of steps and Renovation of pond at Khemkote<br />

100.00<br />

5 Raibania Preservation and conservation of old ruined fort 30.00<br />

6 Langaleswar<br />

Construction of Rest shed and Parking area development,<br />

illumination and Drinking water facilities.<br />

Pathway, stone packing, street light on sea beach, sitting<br />

arrangement, landscaping for beautification of sea beach,<br />

60.00<br />

7 Talasari<br />

development of road from Talasari to Udayapur, development<br />

of road from Chandaneswar temple to Talasari beach,<br />

Boundary wall of Panthasala, Talasari, Restaurant near Jetty.<br />

2500.00<br />

8 Kasafal<br />

Provision of accommodation facilities, approach road<br />

(Langaleswar to Sea beach)<br />

Development of village road from NH-60 to the spot (8 kms.),<br />

40.00<br />

9 Laxmannath Toilet block, Rest shed, Parking place and drinking water<br />

facilities.<br />

Development of Santiniketan park, renovation of pond, boating<br />

10.00<br />

10 <strong>Balasore</strong><br />

facilities, preservation of Dutch used area i.e., Dinga-ma-dinga<br />

and Farashi-dinga, Renovation of Landa Goswami Matha.<br />

50.00<br />

11 Sajangarh Provision of Parking, Toilet block and Illumination 15.00<br />

<strong>12</strong> Ayodhya Provision of Toilet block, Rest shed, Drinking water facilities 15.00<br />

13 Bardhanpur Provision of Toilet block, Rest shed, Drinking water facilities 10.00<br />

14 Chasakhand<br />

Development of Picnic area, provision of drinking water, toilet<br />

block, boundary wall of the monument.<br />

25.00<br />

15 Chaumukha Dagara<br />

Provision of Accommodation, Illumination, road from Kalipada<br />

to beach (8 kms.)<br />

40.00<br />

16 Tipisigadia<br />

Development of road (3 kms.) from NH-5, parking,<br />

illumination, Toilet block, drinking water facilities.<br />

50.00<br />

17 Kupari Development of Toilet block, Rest shed, Parking area. 25.00<br />

18 Inchudi Provision of Toilet facilities 5.00<br />

19 Gud<br />

Rest shed and Parking area development, illumination and<br />

Drinking water facilities.<br />

25.00<br />

Total 3482.00<br />

D. Additional Fund Requirement for construction of Zilla Sanskruti Bhawan<br />

In order to high light the Cultural Significance of the district, Govt. in Department of<br />

Culture, Odisha planned to construct a Zilla Sanskruti Bhawan in the district. This<br />

Bhawan will accommodate <strong>District</strong> Museum, <strong>District</strong> library and Conference Hall. The<br />

Museum will preserve local art and craft, ancient Sculpture and other historical collection<br />

and attract visitors. The Conference Hall shall facilitate interaction of Poets, authors,<br />

musicians, dancers, historians, and other important personalities through Kabi sammelan,<br />

workshops, seminars and Conferences etc. The Library shall promote reading facilities for<br />

the readers. The premises shall be a place for Cultural programme etc.<br />

Keeping in view the objectives, Govt. had placed at the district Rs. 20.00 lakh for<br />

construction of the building and requested the district authorities to arrange balance<br />

amount of funds of the total estimate. Accordingly plan was prepared for a three storied<br />

building and the B.D.O, Sadar, <strong>Balasore</strong> entrusted the work by the Collector. Using the<br />

available funds, civil work of the ground floor having 1600 sq.ft. was executed. The site is<br />

located in an important place i.e., in the premises of Fakir Mohan Memorial at Mallikashpur<br />

near F.M. Collage. The civil construction work of Ground floor is about to be completed. In<br />

order to make the building functional with construction of all three stories along with PHED<br />

work and electrical fittings, an additional amount of Rs. 55/- lakhs is required.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!