14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Table 1.13. Public Infrastructure and service quality: Anganwadi Centers<br />

Facility Norm<br />

Requirement<br />

as per norm<br />

Actual<br />

status<br />

Provision of<br />

Anganwadi<br />

Per 1500 population 1611 3630 +2019<br />

Location In each habitation* 4158 3630 -528<br />

Housing of<br />

Anganwadi<br />

Dedicated Pucca building 4158 250 -3908<br />

Provision of<br />

ASHA<br />

Per 1000 population 2416 1847 -569<br />

Human<br />

resource<br />

1 AWW and 1 assistant/Anganwadi 8316 5653 -2663<br />

Toilet facility Attached toilet 4158 33 -4<strong>12</strong>5<br />

Water facility Potable drinking water connection 4158 Nil -4158<br />

Wash facility<br />

Separate place for washing hands with<br />

adequate soap and water<br />

4158 <strong>12</strong>2 -4036<br />

Utensils 4158 2026 -2132<br />

Furniture 4158 2026 -2132<br />

Darry/Mat 4158 2026 -2132<br />

Equipment Kit 4158 2026 -2132<br />

Scale 4158 2026 -2132<br />

Register 4158 2026 -2132<br />

Playing equipment 4158 2026 -2132<br />

*<strong>Balasore</strong> is a natural calamity prone district. Flood/cyclone occurs every year. During natural calamities women and<br />

children face problem in accessing Anganwadi center located outside habitation. Hence, in many of the gram<br />

panchayats there is demand to provide Anganwadi in each habitation.<br />

Table 1.14. Public Infrastructure and service quality – Schools (A)<br />

Facility Norm<br />

Requirement as<br />

per norm<br />

Actual<br />

status<br />

Gap<br />

Provision of primary schools Each village 2586 2227 -359<br />

Provision of Upper Primary schools Each village 2586 <strong>12</strong>39 -1347<br />

Provision of Secondary schools Each Gram Pan. 289 556 +267<br />

Table 1.14. Status on Infrastructure lacking in Government Schools (Primary & Upper<br />

Primary Education) (B)<br />

Primary Schools* Upper Primary Schools**<br />

No. of Schools without<br />

No. of<br />

Schools<br />

% to total Schools<br />

No. of<br />

Schools<br />

% to total<br />

Schools<br />

Drinking water facility 158 11.04 33 3.84<br />

Common Toilet facility 941 65.76 585 68.10<br />

Separate Toilet for girls <strong>12</strong>41 86.72 665 77.42<br />

Access ramps 671 46.89 334 38.88<br />

Boundary walls 970 67.78 523 60.88<br />

Play ground 1099 76.80 503 58.56<br />

NB: *Primary School means schools having education facility up to primary only.<br />

**The Upper Primary schools include purely Upper Primary; Primary with Upper Primary; Primary, Upper Primary &<br />

Secondary and Upper Primary & Secondary<br />

Table 1.14. Status on Infrastructure lacking in Government Schools (Secondary<br />

Education) (C)<br />

Available Shortfall<br />

Type of Infrastructure<br />

No. of % to total No. of % to total<br />

Schools Schools Schools Schools<br />

Science Laboratory 29 11.65 220 88.35<br />

Separate Room for Headmaster/Principal 150 60.24 99 39.76<br />

Separate Room for Asst. Headmaster/Vice Principal 3 1.20 246 98.80<br />

Library 47 18.88 202 81.<strong>12</strong><br />

Separate Toilet Blocks for Boys and Girls 180 72.29 69 27.71<br />

Art & Craft Room/Activity Room 4 1.61 245 98.39<br />

Drinking Water facility 245 98.39 4 1.61<br />

TSI: NABARD Consultancy Services (NABCONS) 15<br />

Gap

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!