14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

• Bank protection work on right bank of river Burhabalanga including construction of 4<br />

nos. of high level spur near village Puruna <strong>Balasore</strong><br />

• Bank protection work on left bank of river Subarnarekha near village Balikbard<br />

(construction of one number of new spur and repair of 3 nos. of spur with launching and<br />

packing of 300 meters)<br />

• Bank protection work on left bank of river Burhabalanga and Gangahar near village<br />

Potukasasan, Sankarpur, Darakhuli, Gandarda, Amulkud, Banktira, Sahupada,<br />

Sardarpur, Khamanta, Dharampur, Palasia, Rabeneswar, Narayanpur, Makanda,<br />

Bhadrasia, Srirampur, Gandapura and Muturidei.<br />

• Protection of sea wall from Talasari Jetty to Udaypur Forest IB by providing Guard Wall<br />

and Dumping Armory stone from RD 0.00 to 2.80 km.<br />

Drainage Division, <strong>Balasore</strong><br />

Renovation & Structure work (Flood Management Programme)<br />

• Renovation, Extension & Improvement of Paga Nallah system<br />

• Improvement of Parvati Nallah system of Basta and Baliapal Block<br />

• Renovation, Extension & Improvement of Kaonra Nallah system<br />

• Renovation, Extension & Improvement of Baharda Nallah system<br />

• Renovation, Extension & Improvement of Aruadham Nallah system<br />

Renovation & Structure work (NABARD) (RIDF-XII & XIV)<br />

• Improvement of Nembu Nallah system<br />

• Renovation of Kochiakoli Nallah and its link drain<br />

Table 6.23. Programme wise <strong>Plan</strong> Outlays: Irrigation & Flood Control<br />

(Rs. in lakhs)<br />

Funding Pattern<br />

(%)<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Programmes<br />

State <strong>Plan</strong><br />

Minor Irrigation Projects<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> + Central<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

funded from NABARD -<br />

RIDF - MI Division,<br />

<strong>Balasore</strong><br />

Instream Reservoir<br />

0.00 100.00 0.00 200.00 200.00<br />

(Construction of Check<br />

Dams) - MI Division,<br />

<strong>Balasore</strong><br />

Installation of Lift<br />

Irrigation Projects under<br />

0.00 100.00 0.00 300.00 300.00<br />

Biju Krushak Vikash<br />

Yojana - LI Division,<br />

<strong>Balasore</strong><br />

Installation of Lift<br />

Irrigation Projects under<br />

0.00 100.00 0.00 581.60 581.60<br />

Biju Krushak Vikash<br />

Yojana - LI Division<br />

Jaleswar<br />

Bank Protection Work<br />

0.00 100.00 0.00 261.25 261.25<br />

(Flood Control) -<br />

Irrigation Division,<br />

<strong>Balasore</strong><br />

Drainage Projects<br />

0.00 100.00 0.00 92.71 92.71<br />

funded from NABARD -<br />

RIDF - XIV - Drainage<br />

Division, <strong>Balasore</strong><br />

Central Sponsored <strong>Plan</strong><br />

0.00 100.00 0.00 156.00 156.00<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!