CHAPTER IV<br />

RESOURCE ENVELOPE FOR ANNUAL PLAN: <strong>2011</strong>-<strong>12</strong><br />

In any <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong>, preparation of Resource Envelope and identification of<br />

Resource Gap in each development sector is a basic requirement. Resource envelope is<br />

basically created by adding all sources of fund flow to the district. The plans estimates for a<br />

year for each and every sector is finalized and the funds are supposed to be released<br />

accordingly. The release of funds may be one-time, or in installments. Sometimes additional<br />

funds may be released under specific circumstances. The resource envelope excluded from<br />

the estimated cost of programmes suggested by implementing agencies/officials indicates<br />

the resource gap. This gap implies that additional funds are to be ensured either from<br />

government sources or from other sources. The need for integrated local area plans based<br />

on specific requirements and needs of each area are identified from the beginning of<br />

planned development. Attempt has been made by TSI to identify grass root level<br />

requirement to that of district level to make the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> for the <strong>Balasore</strong><br />

<strong>District</strong>. The following table indicates the resource gap in the <strong>Annual</strong> <strong>Plan</strong> of <strong>Balasore</strong><br />

district for the year <strong>2011</strong>-<strong>12</strong>. The information was collected by TSI using the formats<br />

supplied by P & C Department.<br />

Table 4.1. Sector-wise Resource Envelope and Gap in <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

(Rs. in Lakhs)<br />

<strong>Plan</strong> Total Resource<br />

Sectors<br />

Gap filling sources<br />

Outlay Requirement Gap<br />

Agriculture & Allied 9790.97 <strong>12</strong>751.370 2960.400 MGNREGS & RIDF<br />

Rural Development 9039.31 9504.310 465.000 MGNREGS/RIDF<br />

Special Area Programmes 464.75 464.750 0.000 -<br />

Irrigation & Flood Control 5084.<strong>12</strong> 5092.<strong>12</strong>0 8.000 RIDF<br />

Energy 968.46 1403.460 435.000 BGJY<br />

Industry & Minerals 401.54 401.540 0.000 -<br />

Transport 19206.62 26968.620 7762.000<br />

Science, Technology &<br />

Environment<br />

MGNREGS/Finance<br />

Commission Grants<br />

66.43 66.430 0.000 -<br />

Social Services 33849.10 44924.900 11075.800<br />

General Services 296.99 3833.990 3537.000<br />

Total 79168.29 105411.49 26243.20<br />

NRHM, SSA, RIDF &<br />

Finance Commission<br />

Grants<br />

Finance Commission<br />

Grants<br />

For development of <strong>Balasore</strong> district in all sectors a sum of Rs. 105411.49 lakh has been<br />

proposed for the <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong>. Basing on the local requirement, Agriculture and<br />

Allied Activities, Rural Development, Transport, Irrigation & Flood Control and Social<br />

Services have given been high priority in <strong>Balasore</strong> district. The requirement based on the<br />

proposals received from grassroots level is Rs. 105411.49 lakh, as against plan outlay of Rs.<br />

79168.29 lakhs. Thus the resource gap is Rs. 26243.20 lakh, which can be filled up<br />

through additional allocation under flagship programmes namely, MGNREGS (Rs. 1037.00<br />

lakhs), PMGSY (Rs. 5225.00 lakhs), IAY (Rs. 1180.35 lakhs), CRSP (Rs. 38.10 lakhs),<br />

ARWSP (Rs. 1725.00 lakhs), NRHM (Rs. 2480.00 lakhs), SSA (Rs. 1717.50 lakhs), BGJY<br />

(Rs. 255.35 lakhs), BSVY (Rs. 269.60 lakhs), IHSDP (Rs. 432.00 lakhs), RKVY (Rs. 260.00<br />

lakhs), RIDF (Rs. 1753.40 lakhs) and from Finance Commission Grants (Rs. 9869.90 lakhs).<br />