14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

Funding Pattern<br />

(%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share of<br />

Central Sponsored<br />

<strong>Plan</strong>s<br />

<strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

State <strong>Plan</strong> + State<br />

Share of Central<br />

Sponsored <strong>Plan</strong>s<br />

Total<br />

Sub <strong>Plan</strong> areas (TSP)<br />

MADA, Jaleswar<br />

Central <strong>Plan</strong><br />

Grants under Provision<br />

to Article 275 (1)<br />

Special Central<br />

100.00 0.00 15.00 0.00 15.00<br />

Assistance to Tribal<br />

Sub <strong>Plan</strong> areas (TSP)<br />

100.00 0.00 20.00 0.00 20.00<br />

Total 301.00 163.75 464.75<br />

Table 6.21 Details of activities & physical targets: Special Area Programmes<br />

Activities<br />

ITDA, Nilgiri<br />

Grants under Provision to Article 275 (1)<br />

Units<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Construction of Boundary Wall of<br />

School/Hostel<br />

Nos. 5<br />

Construction of School/Hostel Building Nos. 2<br />

Electrification of School/Hostel Nos. 7<br />

Construction of Cross Drainage works Nos. 6<br />

Drainage work at School Nos. 3<br />

Special Central Assistance to Tribal Sub <strong>Plan</strong> areas (TSP)<br />

Group finance to SHGs No. of SHGs 7<br />

Bee keeping No. of families 50<br />

Lac cultivation No. of families 100<br />

Aid to tassar cultivators No. of families -<br />

Training on finishing products on lac<br />

No. of<br />

individuals<br />

-<br />

Installation of Shallow Tube Wells Nos. 150 (18)<br />

Installation of River Lift Irrigation Points Nos. 60(1)<br />

Construction of Water Harvesting<br />

Structures<br />

Nos. 7<br />

Construction of Cross Drainage works Nos. 15<br />

Training programme for tribal<br />

MADA, Jaleswar<br />

No. of trainee 50<br />

Group finance to SHGs No. of SHGs 10<br />

Construction of School/Hostel Building Nos. 3<br />

6.4. Irrigation & Flood Control<br />

<strong>Balasore</strong> district is fairly irrigated. Out of the total cultivated area 55.58% is irrigated in<br />

Kharif season and 42.02% in Rabi season. This is much higher than state figures, which is<br />

only 46.39% in kharif and 22.77% in Rabi season. In fact irrigation is required in Kharif<br />

season to save the crop only during drought. But in Rabi season irrigation is required<br />

throughout the crop growth period. Hence, irrigation facility in Rabi season is essential for<br />

the farmers. But, only 42.02% of the total cultivated area is irrigated in Rabi season. Lack<br />

of irrigation prevents the farmers in non-irrigated areas to take up a second crop, mainly<br />

cash crops during Rabi season.<br />

Regarding Lift Irrigation Projects, <strong>12</strong>09 LI Projects are there in the district. Out of <strong>12</strong>09 LI<br />

points, only 632 (52.27%) are operating and rest 577 are defunct.<br />

In <strong>Balasore</strong> district, major problem is flood, water logging and development of salinity in the<br />

cultivated land due to lack of drainage facility. Every year due to occurrence of natural<br />

TSI: NABARD Consultancy Services (NABCONS) <strong>12</strong>6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!