14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Programmes<br />

maintenance)<br />

Completion of incomplete roads<br />

and bridges and different stretches<br />

of RIDF and other schemes<br />

Rural Work Division - Jaleswar<br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funded<br />

RIDF Project<br />

Minimum Needs Programme -<br />

Constituency Wise Allotment<br />

(CWA)<br />

Construction of Rural Road<br />

(Improvement/Widening/Periodical<br />

maintenance)<br />

Central <strong>Plan</strong><br />

Construction of Road under<br />

Bharat Nirman<br />

R & B Division, <strong>Balasore</strong><br />

State <strong>Plan</strong><br />

Construction of Rural Roads &<br />

Bridge under NABARD funding<br />

RIDF Project<br />

Funding Pattern (%) <strong>Annual</strong> <strong>Plan</strong> Outlay <strong>2011</strong>-<strong>12</strong><br />

Central<br />

Share<br />

State<br />

Share<br />

Central <strong>Plan</strong> +<br />

Central Share<br />

of Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

State <strong>Plan</strong> +<br />

State Share of<br />

Central<br />

Sponsored<br />

<strong>Plan</strong>s<br />

TSI: NABARD Consultancy Services (NABCONS) 136<br />

Total<br />

0.00 100.00 0.00 253.00 253.00<br />

0.00 100.00 0.00 803.00 803.00<br />

0.00 100.00 0.00 40.00 40.00<br />

0.00 100.00 0.00 567.00 567.00<br />

100.00 0.00 2500.00 0.00 2500.00<br />

0.00 100.00 0.00 10941.18 10941.18<br />

Central <strong>Plan</strong><br />

Construction of Road under<br />

Central Road Fund<br />

100.00 0.00 2577.44 0.00 2577.44<br />

One time Additional Central<br />

Assistance<br />

100.00 0.00 200.00 0.00 200.00<br />

Total 5277.44 13929.18 19206.62<br />

Table 6.30. Details of activities and physical targets: Transport<br />

Programme<br />

Rural Works Division , <strong>Balasore</strong><br />

Units<br />

<strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong><br />

Targets<br />

Minimum Needs Programme - Constituency Wise Allotment (CWA)<br />

Black Topped Kms. 0.700<br />

Metalling Kms. 0.950<br />

Cement Concrete Road Kms. 1.500<br />

Cross drainage works Nos. 2<br />

R.T. Well Mts. 0.800<br />

Completion of incomplete roads and bridges and different stretches of RIDF and other schemes<br />

Black Topped Road Kms. 0.150<br />

Cement Concrete Road Kms. 0.200<br />

Cross Drainage Works Nos. 2<br />

Construction of Rural Road (Improvement/Widening/ Periodical maintenance)<br />

Black Topped Kms. 3.000<br />

Metalling Kms. 3.000<br />

Concrete Road Kms. 7.000<br />

Cross drainage works Nos. 25<br />

R.T. Well Kms. 3.000<br />

C. Drain<br />

Rural Works Division- II, <strong>Balasore</strong><br />

Minimum Needs Programme - Constituency Wise<br />

Allotment (CWA)<br />

Kms. 0.330<br />

Cement Concrete K.M. 1.180

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!