14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Block/ULB Type of Members Nos.<br />

Members of CSO/NGOs 226<br />

Local People 494<br />

Total 1685<br />

% to total participants<br />

29.61<br />

Profile of the participants of the workshop<br />

27.66<br />

PRI Members Government<br />

Officials<br />

Participants<br />

13.41<br />

Members of<br />

CSO/NGOs<br />

29.32<br />

Local People<br />

Table 1.3. Major issues and Prioritized needs identified in the workshops<br />

Block/ULB Major Issues Prioritized Needs<br />

Bahanaga 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of irrigation facilities 2. Construction of irrigation channels<br />

3. Scarcity of drinking water 3. Pipe water supply to every village<br />

4. Inadequate class rooms in school 4. Construction of school building<br />

5. Flood Control 5. Construction of flood embankment/protection<br />

<strong>Balasore</strong> 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of irrigation facilities 2. Construction of water harvesting structure<br />

3. Scarcity of drinking water 3. Pipe water supply to every village<br />

4. Insufficient Anganwadi Centre 4. Setting up Anganwadi Centre<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Baliapal 1. Lack of connectivity 1. Construction of roads<br />

2. Scarcity of drinking water 2. Provision of pipe water supply<br />

3. Problem of Waterlogging 3. Construction of drainage channel<br />

4. Scarcity of fuel 4. <strong>Plan</strong>tation<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Basta 1. Lack of connectivity 1. Construction of roads<br />

2. Scarcity of drinking water 2. Installation of tube well<br />

3. Lack of safe drinking water 3. Provision of pipe water supply<br />

4. Frequent Flood 4. Construction of flood embankment/protection<br />

5. Improvement of Pisciculture 5. Renovation of pond<br />

6. Flood control 6. Construction of flood embankment/protection<br />

Bhograi 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Lack of irrigation facilities 3. Construction of water harvesting structure<br />

4. Problem of waterlogging 4. Construction of drainage channel<br />

5. Flood control 5. Construction of flood embankment/protection<br />

Jaleswar 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

3. Scarcity of fuel 3. Avenue tree plantation<br />

4. Frequent Flood 4. Construction of flood embankment/protection<br />

5. Insufficient Anganwadi Centre 5. New Anganwadi Centre<br />

6. Flood control 6. Construction of flood embankment/protection<br />

Khaira 1. Lack of connectivity 1. Construction of roads<br />

2. Lack of safe drinking water 2. Provision of pipe water supply<br />

TSI: NABARD Consultancy Services (NABCONS) 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!