14.11.2012 Views

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

Comprehensive District Annual Plan 2011-12 Balasore District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Comprehensive</strong> <strong>District</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>12</strong> <strong>Balasore</strong> <strong>District</strong><br />

Department Sector/Sub-Sector/Scheme Allocation Expenditure<br />

<strong>Plan</strong><br />

Rural Dev. ARWSP-Public Water Supply Scheme 2022.00 2022.00<br />

H & UD<br />

Augmentation of W/S to <strong>Balasore</strong> town under UIDSSMT<br />

(Construction of ESR and UGR)<br />

Augmentation of W/S to <strong>Balasore</strong> town under EAP<br />

300.00 300.00<br />

H & UD (Improvement of water supply to <strong>Balasore</strong> town from river Sonoconstruction<br />

of intake well and laying of rising mains)<br />

300.00 300.00<br />

H & UD Integrated Housing & Urban Development Programme 348.63 348.63<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 66.31 66.31<br />

H & UD Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) 48.36 48.36<br />

H & UD National Urban Information System (NUIS) 0.33 0.33<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 23.35 23.35<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 11.00 11.00<br />

H & UD Swarna Jayanti Sahari Rojagar Yojana (SJSRY) 50.00 50.00<br />

Panchayatiraj Indira Awas Yojana (IAY) 8697.20 8697.20<br />

W&CD Supplementary Nutrition Programme 2394.26 2394.26<br />

W&CD Mid Day Meal Programme (Pry+UP) 1959.29 1959.29<br />

W&CD Mid Day Meal Programme (Kitchen-cum-store) 136.64 136.64<br />

W&CD Mid Day Meal Programme (Utensils) 11.60 11.60<br />

W&CD<br />

Mid Day Meal Programme (Monitoring Mechanism &<br />

Evaluation)<br />

20.50 20.50<br />

W&CD Mid Day Meal Programme (Transportation charges) 27.10 27.10<br />

W&CD Mid Day Meal Programme (Honorarium to cook & helper) 82.00 82.00<br />

W&CD Construction of AWC Building 25.00 25.00<br />

Sub total<br />

State <strong>Plan</strong><br />

37420.891 37420.891<br />

Agriculture RIDF-XIII (PLIP) 828.00 828.00<br />

Agriculture Mission Sakti Programme 4.80 4.80<br />

F & ARD Bird Flu Training 0.96 0.96<br />

F & ARD Disaster Management Preparedness 18.50 18.50<br />

F & ARD Skill up-gradation Training 3.80 3.80<br />

F & ARD Genetic up-gradation of goat & Deworing 2.00 2.00<br />

Cooperation Share capital to co-operative credit institutions under NRC-LTO fund 202.02 202.02<br />

Cooperation Revival of the short term co-operative credit institution <strong>12</strong>4.00 <strong>12</strong>4.00<br />

Cooperation Loan Support to Co-operatives 2<strong>12</strong>.16 2<strong>12</strong>.16<br />

Cooperation Modernisation of Co-op Processing Rice Mill 30.00 30.00<br />

Cooperation Share capital and Transport subsidy for PDS to Consumer Cooperatives 24.25 24.25<br />

Cooperation<br />

Infrastructure Strengthening and Managerial subsidy to<br />

Marketing Co-operatives (PACs & RCMS)<br />

131.00 131.00<br />

Cooperation<br />

Financial assistance in shape of loan/subsidy or share to other<br />

co-operatives<br />

<strong>12</strong>.20 <strong>12</strong>.20<br />

F & ARD Dev. of freshwater Aquaculture through FFDA <strong>12</strong>.50 <strong>12</strong>.50<br />

F & ARD Exhibition and Organisation of Buyer Seller meet 1.00 1.00<br />

F & ARD Assistance to Mechanisation Programme 5.00 5.00<br />

F & ARD<br />

Survey and Investigation and establishment of fishing<br />

Harbour & Fish landing Centres<br />

667.00 667.00<br />

F & ARD Safety measures for Marine Fishermen 5.00 5.00<br />

Panchayatiraj Gopabandhu Gramin Yojana (GGY) 2000.00 2000.00<br />

Panchayatiraj Construction of C.C Road (New Scheme) 287.00 287.00<br />

SC&ST Dev. Construction of Hostel for ST Girls 163.75 163.75<br />

DOWR Minor Irrigation Projects (NABARD - RIDF) 200.00 200.00<br />

DOWR Instream Reservoir (Construction of Check Dam) 300.00 300.00<br />

DOWR Installation of Lift Irrigation Projects under BKVY 581.60 581.60<br />

DOWR Minor Irrigation- Biju Krushak Vikash Yojana 261.25 261.25<br />

DOWR Bank Protection work (Flood Control) 92.71 92.71<br />

DOWR Drainage Projects (NABARD - RIDF - XII & XIV) 156.00 156.00<br />

Energy Biju Gram Jyoti Yojana 485.42 485.42<br />

Energy Biju Saharanchal Vidyutikaran Yojana 140.00 140.00<br />

Industry Promotion of Industry Sector 4.90 4.90<br />

Handl. & Tex. Promotion of Handloom Industry 15.00 15.00<br />

Handl. & Tex. Workshed-cum-Housing 17.50 17.50<br />

Handl. & Tex. Skill Upgradation Training 9.42 9.42<br />

Rural Dev. Minimum Needs Programme - Constituency Wise Allotment 80.00 80.00<br />

Rural Dev.<br />

Completion of incomplete roads and bridges and<br />

different stretches of RIDF and other schemes<br />

100.00 100.00<br />

TSI: NABARD Consultancy Services (NABCONS) 94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!