15.11.2012 Views

Proposal - start [kondor.etf.rs]

Proposal - start [kondor.etf.rs]

Proposal - start [kondor.etf.rs]

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D0.1 Progress report for the<br />

six months of work<br />

0 R PU M6<br />

D0.2 Progress report for the 0<br />

six months of work<br />

R PU M12<br />

D0.3 Progress report for the 0<br />

six months of work<br />

R PU M18<br />

D0.4 Progress report for the 0<br />

six months of work<br />

R PU M24<br />

D0.5 Progress report for the 0<br />

six months of work<br />

R PU M30<br />

D0.6 Progress report for the 0<br />

six months of work<br />

R PU M36<br />

D0.7 Progress report of the 0<br />

whole project<br />

R PU M36<br />

D1.1 Rationales and<br />

functionalities<br />

1 R PU M6<br />

D1.2 List of paramete<strong>rs</strong> and<br />

their definition<br />

1 R PU M6<br />

D2.1 Report on HW built into 2<br />

the system<br />

R PU M9<br />

D2.2 Report on 2 R PU M9<br />

Communication system<br />

built in the system<br />

D2.3 Report on SW built into 2<br />

the system<br />

R PU M9<br />

D3.1 Procedure details 3 R PU M9<br />

D3.2 Algorithmic details 3 R PU M12<br />

D3.3 Decision making details 3 R PU M12<br />

D4.1 Schematics 4 R PU M12<br />

D4.2 Documentation, in-block 4<br />

and in-line<br />

R CO M18<br />

D5.1 CMMI and system<br />

schemes<br />

5 R CO M12<br />

D5.2 Documented code 5 R CO M18<br />

D5.3 Documented testing<br />

procedures and final<br />

code documented<br />

5 R CO M24<br />

D6.1 Report on testing results 6<br />

in Slovenia - Ljubljana<br />

R PU M34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!