Renewegy - Small Wind Conference
Renewegy - Small Wind Conference
Renewegy - Small Wind Conference
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Renewegy</strong><br />
VP-20<br />
Overview<br />
June, 2012
<strong>Renewegy</strong><br />
• Located in Oshkosh, Wisconsin<br />
<strong>Renewegy</strong> at a Glance<br />
Light Commercial <strong>Small</strong> <strong>Wind</strong> Farm<br />
• Experienced team together for 15 years<br />
• Business focus:<br />
- Light commercial wind<br />
- Hybrid renewable systems<br />
- Hybrid powertrain<br />
• Strategic partnership with Danaher Motion<br />
• Privately held, board directed<br />
Military Hybrid Renewables<br />
<strong>Renewegy</strong> Facility<br />
2
<strong>Renewegy</strong><br />
Virtual Plant Tour - Manufacturing<br />
3
<strong>Renewegy</strong><br />
Virtual Plant Tour – Research & Development<br />
4
<strong>Renewegy</strong><br />
Virtual Plant Tour – Installation & Service<br />
5
<strong>Renewegy</strong><br />
Initial VP-20 <strong>Wind</strong> Turbine Offering<br />
• Big turbine technology scaled for the Corporate market<br />
• Make a statement – Attractive design<br />
• Safe and Reliable – Electronic control systems<br />
• Turn-key installation and service - Tip-up monopole<br />
• Help companies achieve their sustainability targets<br />
• Five year warranty – no scheduled maintenance<br />
• Made in the USA<br />
Unique hydraulic<br />
Tip-up Tower<br />
Composite<br />
Blades<br />
Planetary<br />
Gearbox (6:1)<br />
3-Axis<br />
Accelerometer<br />
Electronic<br />
Controls<br />
Inductive<br />
Generator<br />
Ultrasonic<br />
Anemometer<br />
Variable Pitch<br />
Rotor Hub<br />
Easily transported on<br />
a standard flatbed trailer<br />
Twin Caliper<br />
Rotor Brake<br />
Single Caliper<br />
Yaw Brake<br />
Active Pitch<br />
Servo<br />
Electro-hydraulic<br />
Brake Control<br />
Greaseless<br />
Slew Bearing<br />
Anti - <strong>Wind</strong>up<br />
(No Slip Ring)<br />
Active Yaw<br />
Servo<br />
6
<strong>Renewegy</strong><br />
Corporate<br />
Typical Installations<br />
Industrial<br />
Commercial<br />
Education<br />
7
Availability (Up-time)<br />
<strong>Renewegy</strong> #1<br />
SCA #1<br />
SCA #2<br />
SCA #3<br />
SCA #4<br />
Orion #1<br />
Bergstrom #1<br />
JJ Keller #1<br />
JJ Keller #2<br />
JJ Keller #3<br />
Y7 #1<br />
Y7 #2<br />
Corrim #1<br />
Corrim #2<br />
Corrim #3<br />
Corrim #4<br />
Corrim #5<br />
Menasha #1<br />
Menasha #2<br />
Menasha #3<br />
Menasha #4<br />
Menasha #5<br />
Maple Ln #1<br />
KHS #1<br />
KHS #2<br />
Kohl's #1<br />
Kohl's #2<br />
McKinney #1<br />
McKinney #2<br />
Laredo #1<br />
Global #1<br />
WAGO<br />
LCHS<br />
Warren Cty<br />
Global #2<br />
Y7 #3<br />
Platteville #1<br />
Werner-WI #1<br />
Serra #1<br />
Serra #2<br />
Maida #1<br />
Litchfield #1<br />
Nighthawk #1<br />
Nighthawk #2<br />
NTC +1<br />
Operating Time (Years)<br />
<strong>Renewegy</strong><br />
Reliability Achieved to Date<br />
100.00%<br />
Turbine Reliability As of May 30th, 2012<br />
Number of installs = 46<br />
Fleet Availability = 99.61%<br />
Cummulative Operating Years = 52.75<br />
3.0<br />
2.5<br />
80.00%<br />
2.0<br />
60.00%<br />
1.5<br />
40.00%<br />
1.0<br />
20.00%<br />
0.5<br />
0.00%<br />
0.0<br />
7/5/2012 8
<strong>Renewegy</strong><br />
Distribution Model<br />
<strong>Small</strong> Businesses, Farmers<br />
& Individual Customers<br />
Large Business<br />
Customers<br />
National<br />
Chains<br />
Typical Roles and<br />
Responsibilities<br />
<strong>Renewegy</strong> Sales & Support<br />
Assist with Sales and<br />
Project Management<br />
Contractor Contractor Contractor<br />
Sales, Installation, and<br />
Project Management<br />
Distributors<br />
(RISE Kit Available)<br />
Sales and<br />
Project Management<br />
<strong>Renewegy</strong>, LLC<br />
Factory Support and<br />
Warranty<br />
9
<strong>Renewegy</strong><br />
<strong>Renewegy</strong> Installation and Service Equipment (RISE) Kit<br />
TARP FOR SHIPPING CRATE<br />
SHIPPING CRATE<br />
TOWER STAND<br />
SPARE PARTS BOXES<br />
TOOL AND ACCESSORY BOXES<br />
ERAD BOLT TORQUE SYSTEM<br />
FORK TUBES<br />
HYD POWER UNIT<br />
SPREADER ASSEMBLY<br />
HAND TOOL BOX<br />
SPARE HYD OIL<br />
TILT CYLNDER CRADLE<br />
TOWER SPLICE SYSTEM<br />
GENERATOR INCLUDED – NOT SHOWN<br />
10
<strong>Renewegy</strong><br />
Foundation Construction and Forms<br />
7/5/2012 11
<strong>Renewegy</strong><br />
Controls and Interconnect<br />
7/5/2012 12
<strong>Renewegy</strong><br />
Installation Process (Two people - 8 hours)<br />
7/5/2012 13
<strong>Renewegy</strong><br />
Thanks for your time<br />
www.renewegy.com<br />
14