23.02.2015 Views

AC Coupling Small Wind Turbines Off-Grid - Small Wind Conference

AC Coupling Small Wind Turbines Off-Grid - Small Wind Conference

AC Coupling Small Wind Turbines Off-Grid - Small Wind Conference

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>AC</strong> <strong>Coupling</strong> <strong>Small</strong> <strong>Wind</strong> <strong>Turbines</strong><br />

<strong>Off</strong>-<strong>Grid</strong>


Original DC Coupled System<br />

•48V<br />

•4400W<br />

Inverter/Charger (I/C)<br />

•740ah Battery<br />

•2.5kW <strong>Wind</strong><br />

•2.5kW Tracked PV


DC Coupled<br />

Pill<br />

Box<br />

DC Coupled<br />

Yurt


Ranch Expansion<br />

Ranch Expansion<br />

• Water Pumping for Cattle Operation<br />

• Bakery & Pico Brewery<br />

At Limits of Original System


DC Coupled<br />

Pill<br />

Box<br />

DC Coupled<br />

Yurt<br />

DC Coupled<br />

Power<br />

House<br />

Bakery<br />

DC Coupled


2 nd DC Coupled System<br />

•48V<br />

•8,800W I/C<br />

•1,780ah Battery<br />

•2.5kW <strong>Wind</strong><br />

•3.2 kW PV


New System<br />

otherpower.com Workshop<br />

May 2012


Down with the Old/Up with the New


The Road to <strong>AC</strong> <strong>Coupling</strong><br />

• The Need to Combine<br />

New and Old System<br />

• Large <strong>AC</strong> Loads<br />

• I/C with Frequency<br />

Shifting New to the<br />

Market


<strong>AC</strong> <strong>Coupling</strong><br />

• GTI Latches onto 240V<strong>AC</strong>-60 Hz Produced from I/C<br />

• Loads & Energy Sources are Coupled More Closely<br />

• Excess Energy is Pushed Back thru I/C to Battery


<strong>AC</strong> Coupled<br />

Pill<br />

Box<br />

<strong>AC</strong> Coupled<br />

Yurt<br />

DC Coupled<br />

Power<br />

House<br />

Bakery<br />

<strong>AC</strong> Coupled<br />

DC Coupled<br />

<strong>AC</strong> Coupled


Combined <strong>AC</strong>/DC Coupled System<br />

48V<br />

17,600W I/C<br />

1,780ah Battery<br />

12’ <strong>Wind</strong> Turbine DC Coupled<br />

12’ <strong>Wind</strong> Turbine <strong>AC</strong> Coupled<br />

3.2 kW PV DC Coupled<br />

7.5 kW PV <strong>AC</strong> Coupled


Magnum Energy PAE<br />

Inverter/Charger


Regulating Strategies<br />

•Diversion Loads<br />

•Frequency Shift<br />

•Monitoring and<br />

Controlling Loads


Diversion Loads


Frequency Shift<br />

• Frequency Shift to<br />

60.5 Herz @ 4V<br />

above Absorb....<br />

GTI's go <strong>Off</strong>line per<br />

UL 1741<br />

• Frequency Shift Back<br />

to 60.0 ish Herz @ 4V<br />

below Absorb.....GTI's<br />

Back Online


Monitoring and Controlling Loads<br />

•Domestic Hot Water Pre-Heat<br />

• Radiant in-floor Hot Water Pre-Heat<br />

• Well pump for filling Cisterns<br />

• Heater for battery vault<br />

Too Much Power...Put it to Work


System Equipment<br />

• 2 otherpower 12' <strong>Wind</strong> <strong>Turbines</strong> 100V & 48V Stator<br />

• 16 Trojan IND-6 Batteries 890 Ah<br />

• 1 Ginlong 3K GT <strong>Wind</strong> Inverter<br />

• 3 Ginlong 3K GT Solar Inverter<br />

• 1 TriStar MPPT Solar Charge Controller<br />

• 4 Magnum PAE 4400W-48V Inverter/Chargers 17,600W<br />

• 4 TriStar Diversion Load Controller with 17,280W Load<br />

Resistor Heaters


<strong>AC</strong> <strong>Coupling</strong> <strong>Off</strong>-<strong>Grid</strong><br />

Disadvantages<br />

• GTI knocked <strong>Off</strong>-Line when Large Loads Turn on<br />

- Extreme Under/Over Voltage<br />

- Extreme Under/Over Frequency<br />

•Cost?....Maybe


<strong>AC</strong> <strong>Coupling</strong> <strong>Off</strong>-<strong>Grid</strong><br />

Advantages<br />

• Increases Turbine Placement Options<br />

• Savings on Conductors<br />

• Large Loads & Energy Sources are Coupled<br />

• Cost?..........Maybe


Observations<br />

• The need for DC<br />

Coupled <strong>Wind</strong> & Solar<br />

to keep the Micro-<strong>Grid</strong><br />

alive<br />

• Higher Resource to<br />

Load Conversion<br />

• 1741 Five minute<br />

Requirement Altered


Project Credits<br />

Robert’s Electric<br />

King Canyon Buffalo<br />

Hencey Plumbing<br />

APRS World<br />

<strong>Wind</strong>Farmer<br />

otherpower.com<br />

Todd Hanley<br />

Roy Rak<br />

marc@windfarmer.us

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!