Fit Criterion<br />
Name of the phase<br />
Required operational date<br />
Operating environment components included<br />
Functional requirements included<br />
Non-functional requirements included<br />
Considerations<br />
Identify which hardware and other devices are necessary for each phase of<br />
the new system. This may not be known at the time of the requirements<br />
process, as these devices may be decided at design time.<br />
22 Cutover<br />
22a. What special requirements do we have to get the existing data, and<br />
procedures to work for the new system?<br />
Content<br />
A list of the Cutover activities. Timetable for implementation.<br />
Motivation<br />
To identify cutover tasks as input to the project planning process.<br />
Considerations<br />
Will you be using phased implementation to install the new system? If so,<br />
describe the requirements that will be implemented by each of the major<br />
phases.<br />
What data conversion has to be done? Are there special programs to be<br />
written to transport data from an existing system to the new one? If so, the<br />
requirements for this program(s) are to be described here.<br />
What manual backup is needed while the new system is installed?<br />
When are each of the major components to be put in place, when are phases<br />
of the implementation to be released?<br />
This section is the timetable for implementation of the new system.<br />
22b. What data has to be modified/translated for the new system?<br />
Content<br />
List of data translation tasks.<br />
<strong>Volere</strong> <strong>Template</strong> V6.1 Copyright © Atlantic Systems Guild 47<br />
This template may be copied for internal use provided copyright is acknowledged