Public Service - Uganda Communications Commission
Public Service - Uganda Communications Commission
Public Service - Uganda Communications Commission
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
Table of Contents<br />
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
PRELIMINARY<br />
Foreword<br />
Abbreviations and Acronyms<br />
Structure of Report<br />
Executive Summary<br />
Vote: 005 Ministry of <strong>Public</strong> <strong>Service</strong><br />
V1: Vote Overview<br />
V2: Past Vote Performance and Medium Term Plans<br />
V3: Proposed Budget Allocations for 2010/11 and the Medium Term<br />
V4: Vote Challenges and Unfunded Outputs for 2010/11 and the Medium Term<br />
V5: Vote Crosscutting Issues<br />
Annex 1: Vote function Profiles and Composition<br />
Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes<br />
Annex 3: Staff Establishment Structures<br />
Vote: 146 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
V1: Vote Overview<br />
V2: Past Vote Performance and Medium Term Plans<br />
V3: Proposed Budget Allocations for 2010/11 and the Medium Term<br />
V4: Vote Challenges and Unfunded Outputs for 2010/11 and the Medium Term<br />
V5: Vote Crosscutting Issues<br />
Annex 1: Vote function Profiles and Composition<br />
Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes<br />
Annex 3: Staff Establishment Structures<br />
Foreword<br />
Preliminary<br />
1
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
Foreword<br />
<strong>Public</strong> <strong>Service</strong><br />
Mr. Speaker Sir and Honorable Members.<br />
Ministerial Policy Statement<br />
I have the honor to present the Ministerial Policy Statement of the Ministry of <strong>Public</strong> <strong>Service</strong> and that of<br />
the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> for the Financial Year 2010/2011. The Ministry of <strong>Public</strong> <strong>Service</strong> and the<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> both fall under the <strong>Public</strong> Sector Management (PSM) Working Group. The<br />
Ministry of <strong>Public</strong> <strong>Service</strong> (VOTE 005) is organized under six vote functions namely; Human Resource<br />
Management; Management Systems and Structures; <strong>Public</strong> <strong>Service</strong> Inspection; <strong>Public</strong> <strong>Service</strong> Pensions<br />
(Statutory), <strong>Public</strong> <strong>Service</strong> Pensions (Reform) and the Policy, Planning and Support <strong>Service</strong>s. The <strong>Public</strong><br />
<strong>Service</strong> <strong>Commission</strong> (Vote 146) is organized under one vote function namely <strong>Public</strong> <strong>Service</strong> Selection and<br />
Disciplinary System and three programmes namely; Head-quarters, Selection Systems Department and<br />
Guidance and Monitoring.<br />
The Ministerial Policy Statement for FY 2010/11 has been developed taking into consideration the National<br />
Development Plan. It also demonstrates a clear link between the detailed budget estimates, work plans,<br />
outputs and outcomes. A workplan and procurement plan have been prepared to guide implementation.<br />
The overview of the Ministry of <strong>Public</strong> <strong>Service</strong> and <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> performance during the<br />
Financial Year 2009/10 and the detailed planned outputs for the Financial Year 2010/11 is clearly stated in<br />
the Policy Statement. It also gives 2010/11 expenditure plans within the individual votes, the vote functions<br />
and the programmes by item and input.<br />
The third phase of the <strong>Public</strong> <strong>Service</strong> Reform Programme (PSRP) came to an end in the 2009/10 financial<br />
year. The PSRP (2005/06 – 2009/10) focused on improving public service performance in a more<br />
comprehensive and coherent manner, and emphasized results and outcome in relation to facilitating the<br />
Poverty Eradication Action Plan (PEAP) which expired in 2009/2010. The overall objective of the PSRP is<br />
to develop and maintain human resource policies, an institutional environment and public management<br />
systems that supported national development and improved service delivery.<br />
Government is committed to clearing all outstanding pension and gratuity arrears. In the 2009/10 the<br />
Auditor General carried out a forensic audit and Shs 113bn was verified as pension arrears and has been<br />
provided for in the 2010/11 budget.<br />
In the Financial Year 2009/10 the Ministry in consultation with the Ministry of Agriculture, Animal<br />
Industry and Fisheries finalized and customized the production and marketing structure in Local<br />
Government. This was in response to the decision to convert all production and marketing staff at sub<br />
county level to the National Agricultural Advisory <strong>Service</strong>s (NAADS). During the Financial Year 2010/11<br />
the Ministry will guide Local Governments on the operationalization of the new structures.<br />
In the FY 2010/11 the Ministry of <strong>Public</strong> <strong>Service</strong> will endeavor to attract and retain qualified and<br />
competent staff in Local Governments. The development and implementation of the “Hard to Reach” frame<br />
work is a package that will be instrumental in attracting and retaining public officers in Local Governments.<br />
In the 2010/11 financial year Government has provided 15bn for payment of hardship allowance.<br />
It is also important to note that in the Financial Year 2010/2011 the Ministry will implement the <strong>Uganda</strong><br />
<strong>Public</strong> <strong>Service</strong> Performance Enhancement Programme (UPSPEP). The main objective of UPSPEP is to<br />
support transformation of the public service so that it is affordable, efficient, accountable and responsive to<br />
the needs of the clients.<br />
Preliminary<br />
2
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
The Ministerial Policy Statement clearly shows the commitment and determination of the <strong>Public</strong> <strong>Service</strong><br />
<strong>Commission</strong> to actualize its mission of providing Government with employees of the right caliber, in right<br />
numbers, placed in the right jobs at the right time. It gives an overview of the performance of the <strong>Public</strong><br />
<strong>Service</strong> <strong>Commission</strong> for the year 2009/10 and also states the planned outputs and activities for the year<br />
2010/11.<br />
The emphasis of the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> in this financial year will be to implement an online<br />
recruitment and selection system, to guide and support District service commissions and increase the use of<br />
modern selection instruments like examinations and psychometric tests.<br />
The Ministry of <strong>Public</strong> <strong>Service</strong> and the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> are committed to the implementation of<br />
their mandates in order to enhance the provision of efficient and effective public service delivery.<br />
Mr. Speaker and Honorable Members; I beg to move that this August House considers the budget estimates<br />
for the Ministry of <strong>Public</strong> <strong>Service</strong> and the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> for the Financial Year 2010/2011.<br />
Mr. Speaker Sir, I beg to Move.<br />
OLEBound160:<br />
Henry Muganwa Kajura<br />
RT. HON. 2ND DEPUTY PRIME MINISTER AND MINISTER OF PUBLIC SERVICE<br />
Abbreviations and Acronyms<br />
Preliminary<br />
3
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS:<br />
<strong>Public</strong> <strong>Service</strong><br />
Abbreviations and Acronyms<br />
AAPAM Association of African <strong>Public</strong> Administration and Management<br />
AIDS<br />
Acquired Immune Deficiency Syndrome<br />
APR<br />
Annual Performance Report<br />
APSCOM Association of African <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
BFP<br />
Budget Framework Paper<br />
CAO<br />
Chief Administrative Officer<br />
CAPAM Common Wealth Association for Administration and Management<br />
CIDA<br />
Canadian International Development Association<br />
CSC<br />
Civil <strong>Service</strong> College<br />
CSO<br />
Civil Society Organization<br />
DSC<br />
District <strong>Service</strong> <strong>Commission</strong><br />
EAC<br />
East African Community<br />
EQA<br />
Efficiency and Quality Assurance<br />
ESC<br />
Education <strong>Service</strong> <strong>Commission</strong><br />
FY<br />
Financial Year<br />
GOU<br />
Government of <strong>Uganda</strong><br />
HIV<br />
Human Immune- deficiency Virus<br />
HoD<br />
Heads of Department<br />
HR<br />
Human Resource<br />
HRD<br />
Human Resource Development<br />
HRM<br />
Human Resource Management<br />
HRP<br />
Human Resource Planning<br />
HSC<br />
Health <strong>Service</strong> <strong>Commission</strong><br />
HTR<br />
Hard To Reach<br />
HTS<br />
Hard To Stay<br />
IEC<br />
Information, Education and Communication<br />
IFMS<br />
Integrated Financial Management System<br />
IMS<br />
Information Management System<br />
IPAC<br />
Institute of <strong>Public</strong> Administration Canada<br />
IPPS<br />
Integrated Personnel and Payroll System<br />
ISDN<br />
Integrated <strong>Service</strong> Digital Network<br />
IT<br />
Information Technology<br />
JAF<br />
Joint Assessment Framework<br />
JAR<br />
Joint Annual Review<br />
JDs<br />
Job Descriptions<br />
JSC<br />
Judicial <strong>Service</strong> <strong>Commission</strong><br />
KCC<br />
Kampala City Council<br />
KRM<br />
Key Result Matrix<br />
LATE<br />
Laboratory Assistants Training and Examination<br />
LGs<br />
Local Governments<br />
M&E<br />
Monitoring and Evaluation<br />
MAAIF Ministry of Agriculture Animal Industry and Fisheries<br />
Preliminary<br />
4
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
MDAs<br />
MEACA<br />
MFT<br />
MGLSD<br />
MIS<br />
MoD<br />
MoES<br />
MoFPED<br />
MoH<br />
MoIA<br />
MoICT<br />
MoJCA<br />
MoLG<br />
MoPS<br />
MoWE<br />
MT<br />
MTEF<br />
MTTI<br />
MUBS<br />
N/A<br />
NAADS<br />
NBS<br />
NDP<br />
NGOs<br />
NIMES<br />
NPA<br />
NRAC<br />
NSDS<br />
NTR<br />
NTV<br />
OOB<br />
OP<br />
OPM<br />
PAF<br />
PEAP<br />
PIMS<br />
PSC<br />
PSI<br />
PSM<br />
PSRP<br />
PSTT<br />
R&D<br />
RIM<br />
<strong>Public</strong> <strong>Service</strong><br />
Ministries Departments and Agencies<br />
Ministry of East African Community Affairs<br />
Medium Fund Transfer<br />
Ministry of Gender, Labour and Social Development<br />
Management Information System<br />
Ministry of Defence<br />
Ministry of Education and Sports<br />
Ministry of Finance Planning and Economic Development<br />
Ministry of Health<br />
Ministry of Internal Affairs<br />
Ministry of Information and <strong>Communications</strong> Technology<br />
Ministry of Justice and Constitutional Affairs<br />
Ministry of Local Government<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministry of Water and Environment<br />
Medium Term<br />
Medium Term Expenditure Framework<br />
Ministry of Trade Tourism and Industry<br />
Makerere University Business School<br />
Not Applicable<br />
National Agricultural Advosory <strong>Service</strong><br />
National Broadcasting <strong>Service</strong>s<br />
National Development Plan<br />
Non Governmental Organisations<br />
National Integrated Monitoring and Evaluation Strategy<br />
National Planning Authority<br />
National Records and Archives Center<br />
National <strong>Service</strong> Delivery Survey<br />
Non Tax Revenue<br />
National Television<br />
Output Oriented Budgeting<br />
Office of the President<br />
Office of the Prime Minister<br />
Poverty Action Fund<br />
Poverty Eradication Action Plan<br />
Pension Information Management System<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
<strong>Public</strong> Sector Management<br />
<strong>Public</strong> <strong>Service</strong> Reform Programme<br />
<strong>Public</strong> <strong>Service</strong> Transformation Team<br />
Research and Development<br />
Records and Information Management<br />
Ministerial Policy Statement<br />
Preliminary<br />
5
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
ROM<br />
SATEP<br />
SDN<br />
SPEAR<br />
SSD<br />
STP<br />
ToR<br />
TOT<br />
TV<br />
UAC<br />
UBC<br />
UBOS<br />
UPDF<br />
UPSPEP<br />
USF&A<br />
VF<br />
WBS<br />
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Result Oriented Management<br />
Stores Assistants Training and Examination Panel<br />
<strong>Service</strong> Digital Network<br />
Supporting <strong>Public</strong> Sector work places to Expand Action and Responses to HIV/AIDS<br />
Selection Systems Department<br />
Straight Through Processing<br />
Terms of Reference<br />
Training of Trainers<br />
Television<br />
<strong>Uganda</strong> Aids <strong>Commission</strong><br />
<strong>Uganda</strong> Broadcasting Cooperation<br />
<strong>Uganda</strong> Bureau of Statistics<br />
<strong>Uganda</strong> People’s Defense Force<br />
<strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Project<br />
Under Secretary Finance and Administration<br />
Vote Function<br />
Wavah Broadcasting <strong>Service</strong><br />
Preliminary<br />
6
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
<strong>Public</strong> <strong>Service</strong><br />
Structure of the Ministerial Policy Statement<br />
Structure<br />
The Ministerial Policy Statement is structured by Vote, as follows:<br />
Ministerial Policy Statement<br />
“Each Minister shall cause to be prepared and submitted to Parliament a Policy Statement of the relevant<br />
Ministry on the preliminary [budget] estimates .... by the 30th day of June in each year”. Budget Act 2001,<br />
Section 6 (1)<br />
Vote Functions<br />
Since the FY2008/09 budget cycle, the preparation of sector BFPs, Ministerial Policy Statements and<br />
Budget Estimates centre around the notion of Vote Functions. A Vote Function is a set of programmes,<br />
projects, and Local Government Grants, defining the roles and responsibilities of a vote/institution, and<br />
contributing towards the attainment of vote and overall sector objectives.<br />
As such, a Vote Function provides detailed information on centralised services, by capturing allocations to<br />
Central Ministries and Stand Alone Votes, and decentralised services funded via grants to Local<br />
Governments<br />
• Vote Overview<br />
This section sets out past performance and future plans for Central and Local Government Votes in<br />
more detail. It is structured as follows for each Vote: A Vote Overview sets out key details of the<br />
vote, including past performance, future plans and key performance issues to be addressed including<br />
costing implications.<br />
• Vote Annexes<br />
Annex 1 provides profiles for Vote Functions, and their composition. Annex 2 provides detailed<br />
profiles and annual workplan of each project and programme under the vote. Annex 3 provides<br />
details of approved staff structure for each programme and project (including names of staff and<br />
vacant posts). This is clearly demonstrated in the form of an organogram Annexes 2 and 3 are not<br />
present for LGs as it forms part of the Local Government BFPs.<br />
Preliminary<br />
7
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Executive Summary<br />
The mandate of the Ministry of <strong>Public</strong> <strong>Service</strong> is to develop, manage and administer human resource<br />
policies, management systems and procedures for the <strong>Public</strong> <strong>Service</strong>. This mandate is implemented by nine<br />
(9) Departments which fall under three (3) Directorates namely; Research and Development, Human<br />
Resource Management and Efficiency and Quality Assurance. In fulfillment of the mandate the Ministry<br />
has been implementing the <strong>Public</strong> <strong>Service</strong> Reform Programme (PSRP) (2005/6- 2009/10).<br />
The mandate of the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> is to attract recruit, develop and retain an efficient and<br />
motivated workforce that is able to deliver services. In fulfilling its mandate, the <strong>Commission</strong> performs the<br />
functions of; advising the President; processing appointments, confirmation, promotions and disciplinary<br />
control over <strong>Public</strong> Officers; reviewing the terms and conditions of service; guiding and coordinating<br />
District <strong>Service</strong> <strong>Commission</strong>s and hearing and determining appeals.<br />
During the Financial Year 2009/2010, Parliament voted UGX Shs, 112.383 bn under the recurrent budget<br />
out of which UGX Shs. 1.633bn was for wage and UGX Shs. 110.750bn was for the non wage. The capital<br />
development budget was UGX Shs. 1.001bn as Government contribution to the <strong>Public</strong> <strong>Service</strong> Reform<br />
Programme (PSRP) out of which 0.2bn was for payment of taxes. The donor Project was 31.391bn. The<br />
statutory budget was UGX Shs 103.390bn for recurrent pension obligations while Shs. 12bn was for<br />
Pension arrears.<br />
For the FY 2009/10, the actual release of funds was as follows: Statutory at 186% (Ug. Shs 192.397bn),<br />
Wage at 91% (Ug. Shs 1.487bn); Non Wage at 97% (Ug. Shs 7.150bn); Capital development 100% (Ug.<br />
Shs 1.001bn).with these resources, the Ministry of <strong>Public</strong> <strong>Service</strong> has been able to attain most of its key<br />
planned outputs for the year.<br />
The <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> received a total of Shs 3,327,000,000/= (93.5% of approved) from Ministry<br />
of Finance, Planning and Economic Development including Shs 628,000,000/= (75% of the approved) for<br />
wages, Shs 2,007,000,000/= (100% of the approved) for Non-wage Recurrent and Shs: 632,000,000/=<br />
(100%) for Capital Development. The <strong>Commission</strong> also received Shs: 620,000,000/= under the PSRP and<br />
Shs 279,560,000= under the Support for Decentralization Programme (SDP).<br />
Using the funds received the <strong>Commission</strong> was able to handle 2,155 cases including appointments,<br />
confirmations, promotions and disciplinary cases. The <strong>Commission</strong> was able to monitor and guide the<br />
DSCs and to also develop and use the modern selection instruments.<br />
In the Policy Statement, the various challenges which were experienced in 2009/10 financial year have been<br />
highlighted. Interventions to rectify these challenges are proposed for the medium term.<br />
Mr. Speaker Sir the prioritization of outputs and allocation of resources as reflected in the workplan and<br />
budget has been driven by; the National Development Plan Framework (2010/11 – 2015/16); Sector issues<br />
arising from Out Reach Consultations with stake holders; Inspection Reports and joint assessment as well<br />
as dialogue with Development Partners.<br />
Though the Ministerial Policy Statement addresses several issues, priority will be attached to;<br />
implementation of the IPPS; comprehensive restructuring of the MDAs; strengthening of <strong>Public</strong> <strong>Service</strong><br />
performance management for enhanced service delivery and accountability; construction of the National<br />
Preliminary<br />
8
<strong>Public</strong> <strong>Service</strong><br />
MPS:<br />
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Records and Archives Centre; establishment of the Civil <strong>Service</strong> College and implementing the Pay Policy.<br />
Mr. Speaker Sir, the Ministry falls under the enabling cluster in the NDP. This is a cluster that comprises<br />
sectors and sub sectors that provide a conducive environment and frame work for efficient performance of<br />
the economy. The major issues highlighted in the NDP that relate to my Ministry are:<br />
• Poor allocation of the roles and responsibilities which some times affect service delivery.<br />
• The organization of some public institutions impedes the delivery of public services. Most public<br />
institutions were formed in the early 1960s before the liberalization policies of the 1990s.<br />
• Over lap & duplication of mandates and<br />
• Poor remuneration of Civil Servants which limits their productivity.<br />
Mr. Speaker Sir, the NDP points out several binding constraints that are most likely to hinder the attainment<br />
of the NDP vision. In the medium term the Ministry has aligned itself to addressing the weak public sector<br />
management and administration which is characterized by weak institutional structures & systems. This has<br />
resulted into inappropriate organizational structures, inadequate systems, under staffing, limited strategic<br />
oversight, overlapping and duplication of roles, weak client responsiveness and inefficient beaucracy. These<br />
challenges will be addressed through the continued rolling out of client charters and the comprehensive<br />
restructuring of Ministries Departments and Agencies. The Ministry of <strong>Public</strong> <strong>Service</strong> and the <strong>Public</strong><br />
<strong>Service</strong> <strong>Commission</strong> will also address the inadequate quality and quantity of the Human Resource by<br />
looking into issues of limited availability of skilled labor, vacancy rates and poor service delivery.<br />
Furthermore, the Ministry has taken into consideration strategies for unlocking the binding constraints<br />
mentioned in the National Development Plan. The specific actions proposed (in the NDP) to address<br />
inefficiencies and delivery issues in the <strong>Public</strong> Sector Management and Administration that have a direct<br />
bearing on my Ministry are.<br />
A) The introduction of Performance Agreements for Senior Managers.<br />
B) Deepening the current practice or hiring on contract to ensure that senior staff and management of public<br />
service are on contract employment terms;<br />
c) Reviewing the current policy framework to provide a basis for streamlining institutional mandates and<br />
improving institutional interfaces;<br />
d) Completing the review and implementation of the improved pay and incentive systems of the public<br />
sector; reviewing the frame work for rationalization and oversights of the privatized institutions; and<br />
increasing the quantity and strengthening the quantity of the Human Resource.<br />
In the Financial Year 2010/11 the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> plans to implement an online recruitment and<br />
selection system, to handle cases of appointments, confirmation, promotions and exercise of disciplinary<br />
control to guide and coordinate the District <strong>Service</strong> <strong>Commission</strong>s and enhance their capacity to perform.<br />
Mr. Speaker Sir, I am seeking Parliament to approve the appropriation of Ug Shs. 226.299bn to meet the<br />
Ministry of <strong>Public</strong> <strong>Service</strong>’s Expenditure Framework for 2010/2011 with Ug Shs 1.819bn for wages and Ug<br />
Shs 213.834bn for non wage recurrent, (of which Ug Shs 193.036bn falls under pension statutory), Ug Shs<br />
1.001bn for domestic capital development while Ug Shs 9.6bn is Donor contribution.<br />
For the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> I seek approval of Ug Shs 3.848bn of which Ug Shs 1.129bn is for<br />
wage, Ug Shs 2.007bn for non wage and Ug Shs 0.632bn is for domestic development.<br />
Preliminary<br />
9
Administration and<br />
Support <strong>Service</strong>s<br />
HR Management<br />
Management<br />
Systems and<br />
Structures<br />
<strong>Public</strong> <strong>Service</strong><br />
Inspection<br />
<strong>Public</strong> <strong>Service</strong><br />
Pensions Reform<br />
<strong>Public</strong> <strong>Service</strong><br />
Pensions(Statutory)<br />
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
V1: Vote Overview<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
This section sets out the Vote Mission, Strategic Objectives, and provides a description of the vote's services<br />
(i) Snapshot of Medium Term Budget Allocations<br />
Table V1 below summarises the Medium Term Budget allocations for the Vote:<br />
Table V1.1: Overview of Vote Expenditures (UShs Billion)<br />
(i) Excluding Arrears, Taxes<br />
Wage<br />
Recurrent<br />
Non Wage<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Budget Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12 2012/13<br />
1.582 1.633 1.487 1.819 1.910<br />
80.051 110.750 199.757 200.400 170.987<br />
1.948<br />
218.863<br />
GoU<br />
Development<br />
Donor*<br />
GoU Total<br />
Total GoU + Donor (MTEF)<br />
0.606 1.001 1.001 1.001 1.101<br />
N/A 31.391 N/A 9.645 10.446<br />
82.239 113.385 202.245 203.220 173.998<br />
N/A 144.775 N/A 212.865 184.444<br />
1.398<br />
12.599<br />
222.209<br />
234.808<br />
(ii) Arrears<br />
and Taxes<br />
Arrears 100.872 12.000 12.000 113.017 N/A<br />
Taxes** 0.165 0.200 0.100 0.650<br />
N/A<br />
N/A<br />
N/A<br />
Total Budget N/A 156.975 N/A 326.532<br />
N/A<br />
N/A<br />
* Donor expenditure data unavailable<br />
** Non VAT taxes on capital expenditure<br />
The chart below shows total funding allocations to the Vote by Vote Function over the medium term:<br />
Chart V1.1: Medium Term Budget Projections by Vote Function (UShs Bn, Excluding Taxes, Arrears<br />
250<br />
200<br />
150<br />
100<br />
50<br />
0<br />
2009/10 Approved Budget Estimates 2010/11 Budget Projections<br />
2011/12 Budget Projections 2012/13 Budget Projections<br />
Section A - Vote Overview<br />
10
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
(ii) Vote Mission Statement<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
The Vote's Mission Statement is:<br />
To develop, manage and administer human resource policies, management systems, procedures and<br />
structures for the <strong>Public</strong> <strong>Service</strong>.<br />
(iii) Key Sector Outputs which Contribute to Sector Outcomes<br />
The table below sets out the vote functions and outputs delivered by the vote which the sector considers as<br />
contributing most to priority sector outcomes.<br />
Table V1.2: Sector Outcomes, Vote Functions and Key Outputs<br />
Sector Outcome 1: Sector Outcome 2: Sector Outcome 3:<br />
Mechanisms that will promote<br />
coordinated and harmonized planning<br />
and budgeting of national and Local<br />
Governments levels<br />
Vote Function:<br />
13 12 HR Management<br />
Effective and efficient <strong>Public</strong> <strong>Service</strong><br />
delivery at the Centre and LG level<br />
(based on a highly skilled and<br />
professional workforce recruited and<br />
retained)<br />
Integration of member states into the<br />
East African Community<br />
Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:<br />
None<br />
Vote Function:<br />
Outputs Provided<br />
130212<br />
130312<br />
Upgrading of the Civil <strong>Service</strong><br />
College Facility<br />
MDAs and LGs Capacity Building<br />
130412<br />
<strong>Public</strong> <strong>Service</strong> Performance<br />
management<br />
130612<br />
Management of the <strong>Public</strong> <strong>Service</strong><br />
Payroll and Wage Bill<br />
Outputs Funded<br />
135112<br />
HR Systems and Processes<br />
(<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong>)<br />
135212<br />
Support to service delivery<br />
workers in hard to reach areas<br />
13 13 Management Systems and Structures<br />
Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:<br />
None<br />
Vote Function:<br />
Outputs Provided<br />
130113<br />
130213<br />
130313<br />
13 14 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Organizational Structures for<br />
MDAs developed and reviewed<br />
Review of Dysfunctional Systems<br />
in MDAs and LGs<br />
Analysis of Cost<br />
Centres/Constituents in MDAs<br />
and LGs<br />
130413<br />
Construction of the National<br />
Records Centre and Archives<br />
130513<br />
Development and Dissemination<br />
of Policies, Standards and<br />
Procedures<br />
Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:<br />
None<br />
None<br />
Section A - Vote Overview<br />
11
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Sector Outcome 1: Sector Outcome 2: Sector Outcome 3:<br />
Mechanisms that will promote<br />
coordinated and harmonized planning<br />
and budgeting of national and Local<br />
Governments levels<br />
None<br />
Vote Function:<br />
13 15 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Effective and efficient <strong>Public</strong> <strong>Service</strong><br />
delivery at the Centre and LG level<br />
(based on a highly skilled and<br />
professional workforce recruited and<br />
retained)<br />
Outputs Provided<br />
130114<br />
Results - Oriented Management<br />
systems strengthened across<br />
MDAs and LGs<br />
130214<br />
<strong>Service</strong> Delivery Standards<br />
Developed, Disseminated and<br />
Utilized<br />
130314<br />
Compliance to service delivery<br />
standards<br />
130414<br />
Demand for <strong>Service</strong> Delivery<br />
Accountability Strengthened<br />
through Client Charters<br />
130514<br />
Dissemination of the National<br />
<strong>Service</strong> Delivery Survey results<br />
130614<br />
Vehicle Census<br />
V2: Past Vote Performance and Medium Term Plans<br />
Ministerial Policy Statement<br />
This section describes past and future vote performance, in terms of key vote outputs and plans to address<br />
sector policy implementation issues.<br />
(i) Past and Future Planned Vote Outputs<br />
2008/09 Performance<br />
HR MANAGEMENT:<br />
12 MSD staff trained in Business Process Re engineering and Cost Efficiency studies;<br />
Integration of member states into the<br />
East African Community<br />
Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:<br />
None<br />
Vote Function:<br />
Outputs Provided<br />
130115<br />
13 16 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Payment of Statutory Pensions<br />
Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:<br />
None<br />
Outputs Provided<br />
130116<br />
Implementation of the <strong>Public</strong><br />
<strong>Service</strong> Pension Reforms<br />
Draft systems review manual produced with support and guidance from the Technical Assistant;<br />
Post restructuring issues and concerns in LGs identified and addressed by the restructuring technical team.<br />
Updated the Personnel, Payroll and Pension Records. However, the implementation of IPPS in the 11 pilot<br />
sites namely; MoPS, MoFPED, MoES, MoH, PSC, ESC, HSC, JSC, Judiciary, Jinja and Lira LGs was not<br />
undertaken this Financial Year. This activity will be undertaken during the Financial Year 2009/2010.<br />
Had the <strong>Public</strong> <strong>Service</strong> Act, 2007, the <strong>Public</strong> <strong>Service</strong> (Negotiation, Consultative and Disputes settlement<br />
Machinery) Act and the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> Act, 2007 passed by Parliament. Carried out an annual<br />
sector review of the <strong>Public</strong> <strong>Service</strong> Reform Programme (PSRP), continued with the implementation of the<br />
recommendations of the Payroll Cleaning Report and had the <strong>Public</strong> <strong>Service</strong> Pay Policy approved by<br />
Cabinet.<br />
Section A - Vote Overview<br />
None<br />
None<br />
None<br />
12
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Produced the draft White Paper on the <strong>Public</strong> <strong>Service</strong> Transformation. The setting up and training of the<br />
planned <strong>Public</strong> <strong>Service</strong> Transformation Teams (PSSTS) in ten (10) MDAs and fifteen (15) LGs has been<br />
deferred to the next financial year.<br />
MANAGEMENT SYSTEMS AND STRUCTURES:<br />
Introduced Records Management Systems to ten (10) Local Governments namely: Bukedea, Bududa,<br />
Butaleja, Namutumba, Isingiro, Bulisa, Hoima, Nakasongola and Luweero. This was meant to ensure that<br />
vital official records are efficiently stored and utilized in planning, decision-making and accountability at<br />
the local government level. Established a Photo bank which is constantly updated.<br />
Developed and finalized the Schemes of <strong>Service</strong> for the eleven (11) selected cadres namely; Procurement,<br />
Accounts, Policy Analysis, Stores and Supplies, Secretarial, Human Resource Management, Auditing,<br />
Nursing, Records, Administration and Office Supervision.<br />
Undertook the preliminary activities for the construction of the National Archives and Records Centre<br />
PUBLIC SERVICE INSPECTION:<br />
Under this Vote Function, the Ministry completed and launched the 2008 National <strong>Service</strong> Delivery Survey<br />
(NSDS) Report. This survey report contains feedback from service recipients regarding the service<br />
standards across the <strong>Public</strong> <strong>Service</strong>.<br />
PUBLIC SERVICE PENSIONS(Statutory):<br />
Paid pension Arrears to 17,189 beneficiaries. This reduced the overall Pension Arrears liability by 78%<br />
instead of the targeted 80% that had been planned. At the beginning of the Financial Year, the Pension<br />
Arrears liability was UGX Shs.128 billion and UGX Shs.100 billion was released which is a 78% Pension<br />
Arrears liability reduction. Promptly paid the monthly Pension to the beneficiaries thought-out the<br />
Financial Year.<br />
Visited all the Local Government (LGs) to establish the status of their pension payment and obligations.<br />
The visitation reports are ready for dissemination and discussion with all the stakeholders.<br />
PUBLIC SERVICE PENSION REFORM:<br />
Evaluated the bids for the Expression of Interest for a Pensions Advisor who is meant to advise the Ministry<br />
on the proposed Pension Reforms. Convened the coverage of 11 press functions by WBS TV, UBC TV,<br />
UBC Radio, Record TV, NTV and NBS TV. In addition, 5 talk shows on Pension Management and HR<br />
were convened in 5 regions countrywide.<br />
POLICY, PLANNING AND SUPPORT SERVICES:<br />
Under this Vote Function the Ministry completed the evaluation of bids for the consultancy services for the<br />
assessment of IEC Strategy. Undertook consultations with the stakeholders regarding the preliminary<br />
activities for undertaking the Motor Vehicle census in all the MDAs and LGs in order to inform the Motor<br />
vehicle management reforms in the <strong>Public</strong> <strong>Service</strong>. The Ministry also distributed widely the HIV/AIDS<br />
policy in all the MDAs and LGs. The Ministry created a forum for sharing best practices through the<br />
quarterly meetings for line Ministries. It ensured the designation of the Focal Point Officers in Ministries<br />
who have started budgeting for HIV/AIDS related activities.<br />
Section A - Vote Overview<br />
13
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Preliminary 2009/10 Performance<br />
HUMAN RESOURCE MANAGEMENT<br />
The Civil <strong>Service</strong> College Advisor has been hired was hired to support the Ministry to establish the CSC;<br />
Training needs assessment has been finilised to guide implementation of targeted capacity building<br />
programme for <strong>Public</strong> <strong>Service</strong>;<br />
The operations and implementation manual for management of UPSPEP was developed;<br />
Human Resource Technical Support and guidance provided to all MDAs and LGs.<br />
Performance and Accountability in the <strong>Public</strong> <strong>Service</strong>, a Performance Agreement Instrument has been<br />
developed for Permanent Secretaries, Chief Administrative Officers and Town Clerks.<br />
A draft for attaching performance agreements to appointment letters of Medical Superintendents and Head<br />
teachers developed.<br />
Implementation of the reward and recognition scheme monitored and technical guidance provided;<br />
In order to attract and retain staff in the Hard to Reach and Stay areas, a Hard to Reach framework was<br />
developed and adopted by Government;<br />
Straight Through Processing of pension payment was introduced;<br />
Phase 1 of IPPS was launched and preparatory work commensed updating of personnel records os ongoing;<br />
Implementation of the Straight Through Processing (STP) was rolled out to all MDAs and LGs and they<br />
were supported to ensure effective implementation of STP;<br />
Issued a circular on the distribution of wage to all MDAs and LGs.<br />
MANAGEMENT SYSTEMS AND STRUCTURES<br />
A process to procure a consultant for the review and rationalization of the 22 Ministries, their Departments<br />
and Agencies.<br />
8 restructuring reports for MDAs produced these include MoES, MoW&T, MoWE, MoLH&UD, MoICT,<br />
MEACA, OPM, MoLG. 4 MDAs are undergoing restructuring<br />
Structures for 14 district Local Governments (newly gazzetted and 7 parent districts) and 15 Urban<br />
Councils, customized and reports produced.<br />
Structures for the Department of Production and Marketing for district LGs headquarters updated and<br />
implemented.<br />
The vote function continued to provide technical support and guidance to MDAs and LGs on<br />
implementation of structures and systems.<br />
Data collected on 2 cost centers in LGs and MDAs. Repair and maintenance of office tools and equipment<br />
(computers, printers and photocopiers) and Physical infrastructure put in place.<br />
Section A - Vote Overview<br />
14
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Vote Summary<br />
Negotiations with the best evaluated Consultant for design review, tender action and supervision for the<br />
Construction of the Proposed National Records Centre and Archives Building carried out.<br />
Records retention and disposal schedules rolled out in three MDAs namely; MTTI, MGLSD, MoLG, and 7<br />
LGs namely; Kasese, Bushenyi, Hoima, Masindi, Arua, Nebbi and Gulu.<br />
Records management systems introduced to 2 MDAs namely; MoICT and MoWE and three LGs namely;<br />
Sironko, Kalangala and Manafwa<br />
PUBLIC SERVICE INSPECTION<br />
Draft frame work for the implementation of ROM/OOB in place. ROM handbook reviewed and technical<br />
support for ROM implementation provided to MDAs and LGs particularly those where client charters are<br />
being developed.<br />
Client Charters have been launched in the districts of Moyo, Nebbi, Nakasongora and Budaka while those<br />
printed include Kampala City Council, Adjumani, Moroto, Pallisa, Butaleja and Busia. The next batch<br />
ready for printing include Katakwi, Lira, Soroti, Gulu, Ibanda, Kamwenge, Kasese, sironko, Mbale,<br />
Manafwa, Busolwe, Bududa, Tororo, Bugiri, Arua, Kasese and Yumbe. A Civil Society Organisation has<br />
been engaged to monitor and assess the implementation of Client charters in three ministries. Balanced<br />
score card and a comprehensive assessment tool were developed to monitor progress of clent charters.<br />
Four regional sessions for dissemination of the National <strong>Service</strong> Deliverly Survey Report 2008 held in<br />
Mbarara and Gulu.<br />
Draft Guidelines for development, documentation and dissemination of <strong>Service</strong> Delivery Standards<br />
prepared. Stakeholders consultative meeting held in November 2009 to review the guide lines.<br />
Join up compliance inspections carried out and quarterly meetings for all Inspectorate Agencies conducted<br />
to harmonize the process and subsequently ensure efficiency and effectiveness. Nine (9) MDAs inspected:<br />
MoLG, MoJCA, ESC, JSC, MoE&S, MoFA MoGLSD, MoH, and MoIA. Joined up inspections carried out<br />
in LGs, Urban Authorities and selected Health and Education facilities in Kayunga, Mukono, Mpigi,<br />
Luweero, Kampala City Council, Wakiso, Apac and Iganaga. Inspection reports produced.<br />
PUBLIC SERVICE PENSION STATUTORY<br />
56,000 Pensioners paid by 28th of every month;<br />
Effective implementation of STP with about 5,000 invalid records updated;<br />
PUBLIC SERVICE PENSION REFORM<br />
95% Pensioners files for Traditional, Teachers, Veterans, Widows, Contracts and former EAC Assessed on<br />
Monthly Pension<br />
Pending submissions from payment of terminal benefits processed and accessed on pension payroll;<br />
Files retrieved within 15 minutes of request.<br />
POLICY PLANNING AND SUPPORT SERVICES<br />
Section A - Vote Overview<br />
15
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Assorted office stationery and small office equipment,computers,software purchased. Minor civil works and<br />
repairs on the office premises and cleaning services carried out. Motor vehicle maintenance and servicing of<br />
office equipment done. Postage and courier services provided. Paid rent for former leaders.<br />
Financial Reports, Plans and Statements prepared and submitted. Change management workshops held.<br />
PSRP work plan prepared and submitted. Final accounts prepared and submitted. Responded to the Audit<br />
and Management letters.<br />
Work plans prepared and submitted. Guidance on planning provided.<br />
Annual work plan and reports submitted to MoFPED. PSRP work plan and budgets FY 2009/10 finalized<br />
and approved by Development Partners. Guided MoPS staff and LGs on budgeting and planning issues.<br />
Computers and digitized equipment procured. Finalized the procurement process for audio-visual<br />
equipment for the Ministry.<br />
MoPS toll free hot line installed and subscribed for 12 months integrated services Digital networks (ISDN)<br />
line installed at MoPS. The No. is 0800100200.<br />
Membership fees to ESAMI paid.<br />
Procured various Audio-Visual aids, Professional Recording equipment, and consumables<br />
Out reach sessions to 4 MDAs carried out;<br />
12 Press Conferences, 14 Radio programs, 4 TV Programs, and 12 Press releases made;<br />
A Documentary film on successes of the PSRP developed;<br />
TOR for Knowledge Management Strategy prepared and procurement for consultant started;<br />
Dissemination activities to support Pension Reform process carried out;<br />
Joint Annual Review preparations, Piloted M&E instruments, Preparatory activities for impact assessment<br />
of PSRP and staff survey done;<br />
Quarterly Reports produced and M&E readiness intervention of PSRP undertaken.<br />
Table V2.1: Past and Medum Term Key Vote Output Indicators*<br />
2009/10<br />
MTEF Projections<br />
Vote Function Key Output<br />
2008/09 Approved<br />
* Excluding Taxes and Arrears Releases<br />
Indicators and Costs:<br />
Outturn Plan 2010/11 2011/12 2012/13<br />
Prel.<br />
Vote: 005 Ministry of <strong>Public</strong> <strong>Service</strong><br />
Section A - Vote Overview<br />
16
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
2010/11 Planned Outputs<br />
In the FY 2010/11, the Ministry of <strong>Public</strong> <strong>Service</strong> plans to undertake the following activities:<br />
Ministerial Policy Statement<br />
2009/10<br />
MTEF Projections<br />
Vote Function Key Output<br />
2008/09 Approved Releases<br />
Indicators and Costs:<br />
Outturn Plan 2010/11 2011/12 2012/13<br />
Prel.<br />
Vote Function:1312 HR Management<br />
Output 13 1204 <strong>Public</strong> <strong>Service</strong> Performance management<br />
Percentage staff retention rate in<br />
hard to reach areas.<br />
N/A 65% - 75% 95%<br />
Output 13 1206 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wage Bill<br />
No. MDAs/LGs where Integrated<br />
0 N/A - - -<br />
<strong>Public</strong> Payroll System has been<br />
operationalised.<br />
Vote Function Cost (UShs bn) N/A 20.038 N/A 6.530 7.970 9.603<br />
VF Cost Excluding Donor<br />
1.148 1.678 1.372 2.186 N/A N/A<br />
Vote Function:1313 Management Systems and Structures<br />
Vote Function Cost (UShs bn) N/A 7.470 N/A 4.139 3.833 4.225<br />
VF Cost Excluding Donor<br />
Vote Function:1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
0.356 0.412 0.363 1.175 N/A N/A<br />
Output 13 1401 Results - Oriented Management systems strengthened across MDAs and LGs<br />
% of MDAs and LGs that have<br />
mainstreamed results framework into<br />
their work processes.<br />
75% 90% - 95% 97% 98%<br />
Output 13 1402 <strong>Service</strong> Delivery Standards Developed, Disseminated and Utilized<br />
No. of sectors that have disseminated<br />
0<br />
3 - 6 9<br />
service delivery standards.<br />
Vote Function Cost (UShs bn) N/A 0.960 N/A 0.578 0.333 0.344<br />
VF Cost Excluding Donor<br />
0.167 0.190 0.174 0.478 N/A N/A<br />
Vote Function:1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Vote Function Cost (UShs bn) 78.300 103.390 192.665 193.036 163.233 210.536<br />
Vote Function:1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Output 13 1601 Implementation of the <strong>Public</strong> <strong>Service</strong> Pension Reforms<br />
Percentage of retiring officers who<br />
30% 90% - 90% 90% 90%<br />
received pre-retirement training<br />
Vote Function Cost (UShs bn) N/A 4.547 N/A 3.572 3.676 4.421<br />
VF Cost Excluding Donor<br />
0.206 4.227 4.005 3.372 N/A N/A<br />
Vote Function:1349 Policy, Planning and Support <strong>Service</strong>s<br />
Vote Function Cost (UShs bn) N/A 8.370 N/A 5.011 5.399 5.679<br />
VF Cost Excluding Donor<br />
2.062 3.487 3.666 3.624 N/A N/A<br />
Cost of Vote <strong>Service</strong>s (UShs Bn) N/A 144.775 N/A 212.865 184.444 234.808<br />
Vote Cost Excluding Donor<br />
82.239 113.385 202.245 203.220 N/A N/A<br />
1. Undertake Civil <strong>Service</strong> College Civil works and develop Civil <strong>Service</strong> College Business Plan;<br />
2. Undertake Capacity Building programmes and continue to provide Technical guidance and support<br />
supervision to HR practitioners in MDAs and LGs;<br />
3. Finalize and implement the Rewards and Sanctions framework;<br />
4 . Develop Performance agreements and targets for the health & education sectors ;<br />
5. Support implementation of Perfomance Agreement for PS, CAO and Town Clerks;<br />
Section A - Vote Overview<br />
17
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
6. Monitor the implementation of HTR and HTS Strategy;<br />
7. Monitor implementation of reward and recognition scheme;<br />
8. Disseminate rules and regulations across the service;<br />
9. Provide technical assistance and support in performance management and human resource management<br />
in MDAs and LGs<br />
10. Complete and implement IPPS Phase 1; and continue with updating of personnel records;<br />
11. Support and monitor Implementation of STP of salaries and pensions;<br />
12. Provide support supervision to Human Resource;<br />
13. Develop and review Organizational structures for 22 Ministries their Departments and Agencies;<br />
customize and adopt 26 newly gazetted LGs;<br />
14. Study Review and Re-engineer 2 Dysfunctional and Cumbersome Systems in MDAs and LGs and<br />
produce 2 Systems Review Reports;<br />
15. Study, analyze and make recommendations for 3 Cost Centers in MDAs and LGs;<br />
16. Finalize Designing, reviewing and initiating tender action for the National Records and Archives<br />
Centre (NRAC).<br />
17. Roll out Records retention and disposal schedules to 6 MDAs and 14 LGs; and train Records staff in<br />
the application of the records centre and archives manuals;<br />
18. Implement and Enhance capacity for implementation of ROM and OOB Framework including budget<br />
monitoring of MDAs and LGs;<br />
19. Support Sectors to develop, document and disseminate service delivery standards against the findings<br />
of the NSDS 2008 and undertake Joint inspection of MDAs and LGs;<br />
20. Complete review of Central Government Inspection and supervision regimes of local governments and<br />
align the roadmap for implementation with the corresponding PSM action;<br />
21. Empower Clients to demand for efficient and effective services by scaling up the development,<br />
implementation and dissemination of client charters in MDAs and LGs and institutionalizing a mechanism<br />
for obtaining feedback from clients on service delivery.<br />
22. Provide Technical support to MDAs/LGs on the pension reform and update pension’s payroll;<br />
23. Prepare Work plans, procurement plans, Budgets and Ministerial Policy Statement as well as providing<br />
relevant policy advice;<br />
24. General support & sensitization on planning, budgeting frameworks and policy development;<br />
25. Revise M&E framework for MoPS activities as well as demonstration of their link to the National<br />
Section A - Vote Overview<br />
18
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Vote Summary<br />
Development Plan; Strengthen Management Information System (MIS) for M&E through review of tools<br />
and training to improve reporting.<br />
26. Develop a knowledge management strategy for the <strong>Public</strong> <strong>Service</strong>;<br />
27. Conduct a Vehicle census (validation and valuation)<br />
Medium Term Plans<br />
In the Medium term, the Ministry of <strong>Public</strong> <strong>Service</strong> plans to undertake the following activities:<br />
1. Implement strategies for <strong>Public</strong> <strong>Service</strong> Transformation;<br />
2. Attract, recruit, develop and retain a highly skilled and professional workforce;<br />
3. Develop management and operational structures for the effective and efficient service delivery in the<br />
public service;<br />
4. Roll-out IPPS in all MDAs and LGS;<br />
5. Construct the National Records Centre and Archives building;<br />
6. Finalise the rationalization of 22 Ministries and their Departments and Agencies and customize 26 newly<br />
gazzetted Local Government Structures and 03 Systems;<br />
7. Finalize arrangements for the implementation of the Pay Policy;<br />
8. Monitor the implementation of HIV/AIDS Policy in MDAs and LGs.<br />
(ii) Costing of Outputs for <strong>Service</strong> Delivery<br />
Table V2.2: Key Unit Costs of <strong>Service</strong>s Provided and <strong>Service</strong>s Funded<br />
(iii) Priority Vote Actions to Improve Sector Performance<br />
To address the Ministry’s performance issues and achieve the Ministerial Policy objectives, the Ministry<br />
plans to undertake the following:<br />
1. Attract, recruit, develop and retain a highly skilled and professional workforce;<br />
2. Establish the Civil <strong>Service</strong> College;<br />
3. Rationalize and develop management and operational structures and systems for effective and efficient<br />
service delivery;<br />
4. Implement the Hard to Reach Action Plan;<br />
5. Implement the Pay Policy across the entire <strong>Public</strong> <strong>Service</strong> including Payroll Management Reform;<br />
6. Monitor the implementation of HIV/AIDS Policy and other cross cutting initiatives in MDAs and LGs;<br />
7. Review of inspection and Sanctions regimes as well as measures to combat absenteeism;<br />
Section A - Vote Overview<br />
19
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
8. Strengthen the Integrate Performance management system ROM/OOB.<br />
Table V2.4: Vote Actions to Improve Sector Performance<br />
2009/10 Planned Actions: 2009/10 Actual Actions: 2010/11 Planned Actions: MT Strategy:<br />
Ministerial Policy Statement<br />
Sector Outcome 2: Effective and efficient <strong>Public</strong> <strong>Service</strong> delivery at the Centre and LG level (based on a highly skilled and<br />
professional workforce recruited and retained)<br />
Vote Function: 13 12<br />
VF Performance Issue:<br />
Civil <strong>Service</strong> College Advisor<br />
procured & CSC business<br />
plan developed.<br />
Leadership capacity and<br />
management development<br />
programmes conducted.<br />
VF Performance Issue:<br />
HR Management<br />
Issuance of a circular to call<br />
for the training plans and<br />
developing capacity of MDAs<br />
to prepare training plans.<br />
Absence of a Civil <strong>Service</strong> College to Address training needs for performance enhancement in the<br />
<strong>Public</strong> <strong>Service</strong><br />
Undertake CSC Civil works; Establishment of the Civil<br />
<strong>Service</strong> College.<br />
Pre-feasibility study and<br />
concept paper for<br />
establishment of CSC<br />
finilised; Civil <strong>Service</strong> College<br />
advisor hired ; Training needs<br />
assessment for targeted<br />
capacity building conducted;<br />
operations and implementation<br />
manual for UPSPEP<br />
developed;<br />
Lack of funds to implement the pay policy<br />
Implementation guidelines<br />
issued<br />
Implement the training plan<br />
for targeted capacity building;<br />
Develop CSC Business Plan<br />
Monitoring of the training and<br />
development function<br />
Reprimand/Sanction non<br />
compliant MDAs and LGs.<br />
Carrying out support<br />
supervision exercises.<br />
VF Performance Issue: Performance of <strong>Public</strong> Servants across the country<br />
Attract, recruit, develop and A HTR/HTS framework Develop customized HTR<br />
retain a highly skilled and developed and adopted by policies for health, educ &<br />
professional workforce; Government<br />
water sectors;<br />
Vote Function: 13 13<br />
MDAs and LGs supervisied<br />
and supported to ensure<br />
effective implementation of<br />
HR policies, systems and<br />
procedures<br />
IPPS preparatory activities<br />
commensed and personnel<br />
records updated.<br />
Management Systems and Structures<br />
VF Performance Issue: Dysfunctional or cumbersome systems<br />
Three(3) Systems studied and Company registration and<br />
reviewed.<br />
birth and death registration,<br />
and Teacher Registration<br />
system study on going.<br />
VF Performance Issue:<br />
2 Draft Systems Reports<br />
produced;<br />
A Draft Systems Manual<br />
produced;<br />
IPPS rolled out;<br />
Performance Agreements &<br />
targets established in the<br />
Social sectors ;<br />
Support performance<br />
Agreements<br />
Unharmonized, duplicated and inadequate structures<br />
Implement the<br />
rewards/sanctions framework .<br />
Studying, reviewing & redesigning<br />
the dysfunctional &<br />
cumbersome systems in<br />
MDAs & LGs<br />
Writing reports for 2<br />
dysfunctional systems in<br />
MDAs & LGs<br />
Providing technical support on<br />
implementation of reengineered<br />
systems in MDAs<br />
& LGs.<br />
Hard to Reach/Staff strategy<br />
implemented. Performance<br />
agreements and targets<br />
established in <strong>Public</strong> <strong>Service</strong><br />
Institutions. Sanctions<br />
framework/reward and<br />
recognition scheme finalized<br />
and enforced.<br />
Dysfunctional Structures in<br />
MDAs and LGs studied and reengineered.<br />
Section A - Vote Overview<br />
20
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
2009/10 Planned Actions: 2009/10 Actual Actions: 2010/11 Planned Actions: MT Strategy:<br />
Structures of 22 MDAs and<br />
16 LGs rationalized.<br />
VF Performance Issue:<br />
Three(3)Cost Centres in<br />
Five(5) MDAs and five(5)<br />
LGs studied.<br />
Vote Function: 13 14<br />
VF Performance Issue:<br />
Increase coverage of MDAs<br />
and LGs in developing and<br />
implementing the client<br />
charters from 5% to 35%.<br />
Institutionalize a mechanism<br />
for obtaining client feedback<br />
on service delivery.<br />
VF Performance Issue:<br />
Increased allocation of<br />
resources to the inspectorate<br />
function.<br />
Increase coverage of<br />
inspection in terms of number<br />
of MDAs and LGs inspected,<br />
frequency and issues<br />
addressed.<br />
VF Performance Issue:<br />
A process to procure a<br />
Consultant on going<br />
Structures for 16 Newly<br />
Gazzetted Local Governments<br />
and Urban Councils<br />
developed, customised and<br />
reports produced<br />
Undertake the comprehensive<br />
review and rationalization of<br />
structures and recommend<br />
wage rationalization scenarios<br />
based on the review.<br />
Technical support on<br />
implementation of<br />
recommended structures for 5<br />
MDAs and 5 LGs provided;<br />
Wasteful Cost Centres in MDAs and Local Governments.<br />
Three cost centres in LGs<br />
studied these include the<br />
support staff and drivers<br />
secritarial staff.<br />
Data collected on 2 cost<br />
centres in LGs.(Repair and<br />
maintanence of office tools<br />
and equip (computers, printers<br />
& Photocopier) and Physical<br />
infrastructure.<br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
Studying, analyzing & making<br />
positive recommendations on<br />
3 wasteful cost centres in<br />
MDAs & LGs<br />
Writing reports for 3<br />
efficiencies studies.<br />
Providing technical support on<br />
implementation of reengineered<br />
systems in MDAs<br />
& LGs.<br />
Ministerial Policy Statement<br />
Provision of appropriate<br />
structures for MDAs and LGs.<br />
Study and manage<br />
Productivity Practices in<br />
MDAs and LGs.<br />
Low capacity of service recipients to demand for quality services against the standards and client<br />
charters<br />
Stake holders consultative Increase coverage of MDAs Monitor the implementation of<br />
meeting held in November and LGs in developing and client charters.<br />
2009 to review the guide lines. implementing client charters;<br />
Institutionalize a mechanism<br />
Draft deadlines for<br />
for obtaining client feedback<br />
development , documentation on service delivery; put in<br />
and implementation of public place a mechanism for<br />
service delivery standards in tracking implementation of<br />
place.<br />
client charters.<br />
Low level of development, documentation and dissemination of service delivery standards, compliance<br />
to the service delivery standards and utilization of NSDS findings.<br />
4 MDAs inspected :MoLG, Issue policy guidelines on Step up guidance to all sectors<br />
MoJCA, ESC,JSC, & development, documentation to develop, document and<br />
MoES,MoH,& MoIA. and dissemination of service disseminate service delivery<br />
delivery standards.Document standards.<br />
service delivery standards<br />
already developed in key<br />
sectors.<br />
The need to fully integrate ROM across Government Systems and Processes especially with Output<br />
Oriented Budgeting.<br />
Section A - Vote Overview<br />
21
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
2009/10 Planned Actions: 2009/10 Actual Actions: 2010/11 Planned Actions: MT Strategy:<br />
Support MDAs and LGs to<br />
develop performance<br />
indicators.<br />
Enhance MDAs and LGs's<br />
capacity to implement ROM<br />
and increase compliance to<br />
performance reporting and<br />
performance<br />
information requirements.<br />
Vote Function: 13 15<br />
Draft frame work for the<br />
imlementation of ROM /OOB<br />
in place.<br />
Techinical support provided to<br />
LGs and urban authorities of<br />
Katakwi, Lira, soroti,<br />
Gulu,Ibanda, Kamwenge,<br />
<strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Implement the framework for<br />
ROM and OOB ; Enhance<br />
capacity of MDAs and LGs to<br />
implement ROM and OOB.<br />
Increase compliance to<br />
performance reporting and<br />
performance information<br />
requirements.<br />
VF Performance Issue:<br />
Limited Budgetary provision for the Payment of Pensions<br />
Request made to Ministry of More pensioners to be cleared<br />
Make request to Government Finance, Planning and<br />
to increase the budgetary Economic Development for<br />
allocations for the payment of more fundin<br />
Pensions.<br />
VF Performance Issue: Cumbersome Pension Management Systems<br />
Pension Management System<br />
simplified.<br />
Vote Function: 13 16<br />
VF Performance Issue:<br />
Pension Management System<br />
simplified.<br />
The issue is for the FY10/11<br />
<strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Cumbersome Pension Management System<br />
Penson Advisior recruited;<br />
Simplifying the cumbersome<br />
procedures and systems of<br />
administering and processing<br />
Pensions.<br />
Penson Advisior recruited;<br />
Pension Audit finalized and<br />
recommendations<br />
implemented.<br />
VF Performance Issue:<br />
Delayed implementation of Pension Reforms<br />
Perfecting the integration of<br />
the PIMS into the IPPS.<br />
Process of hiring a pensions<br />
advisor commenced.<br />
Pensions arrears cleared and<br />
PIMS integrated into IPPS;<br />
VF Performance Issue:<br />
Inadequate funds for payment of Pension liabilities<br />
Commencement of the<br />
implementation of pension<br />
reforms.<br />
Vote Function: 13 49<br />
VF Performance Issue:<br />
Development and<br />
implementation of client<br />
charters rolled out to<br />
additional MDAs and LGs<br />
after the pilot implementation<br />
and an independent review of<br />
the implementation of client<br />
charters in MDAs and LGs<br />
undertaken.<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Penson Advisior recruited;<br />
Pension Audit finalized and<br />
recommendations<br />
implemented.<br />
Ministerial Policy Statement<br />
Review the performance<br />
indicators for MDAs and LGs.<br />
Monitor progress of ROM<br />
implementation.Develop<br />
avenues to increase demand<br />
for performance information.<br />
Prioritising Payment of<br />
Pension.<br />
Simplifying the cumbersome<br />
procedures and systems of<br />
administering and processing<br />
Pensions.<br />
Simplification of the Pension<br />
management systems.<br />
Pension reforms implemented.<br />
Pension reforms implemented<br />
and the Establishment of the<br />
Pension Fund.<br />
Inadequate capacity to Monitor and Evaluate the implemetation of <strong>Public</strong> <strong>Service</strong> Policies, Systems<br />
and Processes.<br />
Section A - Vote Overview<br />
22
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
2009/10 Planned Actions: 2009/10 Actual Actions: 2010/11 Planned Actions: MT Strategy:<br />
Improve MIS and M&E<br />
Capacity in the Ministry of<br />
<strong>Public</strong> <strong>Service</strong>.<br />
Carry out surveys for<br />
collecting and compiling<br />
performance data.<br />
PSRP Evaluation.<br />
VF Performance Issue:<br />
Procurement of adequate<br />
goods & services.<br />
Maintanance of office<br />
equipment and<br />
Paymenet of postage<br />
,Courier, utility bills.<br />
VF Performance Issue:<br />
Undertake the study of the<br />
procurement and contract<br />
management process in order<br />
to improve them.<br />
V3 Proposed Budget Allocations for 2010/11 and the Medium Term<br />
Table V3.1: Past Outturns and Medium Term Projections by Vote Function*<br />
Ministerial Policy Statement<br />
This section sets out the proposed vote budget allocations for 2010/11 and the medium term, including<br />
major areas of expenditures and any notable changes in allocations.<br />
* Excluding Taxes and Arrears<br />
Vote: 005 Ministry of <strong>Public</strong> <strong>Service</strong><br />
1312 HR Management<br />
1313 Management Systems and Structures<br />
1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
1349 Policy, Planning and Support <strong>Service</strong>s<br />
Quarterly progress reports<br />
produced; pilot data collection<br />
undertaken and preparation for<br />
data processing made.<br />
Build capacity of M&E in<br />
MoPS<br />
Monitoring and Evaluation<br />
Systems and processes<br />
strengthened.<br />
Implementing the PSRP<br />
Evaluation recommendations.<br />
Inadequate logistical support to Staff & the Departments(funding, transport, office space) for them to<br />
perform their functions.<br />
Assorted stationary and Procure office equipments and Office equipment and facilities<br />
equipment to all user facilities<br />
provided.<br />
departments; staff welfare<br />
provided; Maintenance of<br />
office equipments and<br />
computers carried out;<br />
postage, courier and utility<br />
bills for the Ministry paid.<br />
Long and strenous procurement processes<br />
Ministries officials trained on<br />
procurement and contract<br />
management.<br />
Undertake short term<br />
trainings on procurement;<br />
Undertake short training<br />
courses in procurement and<br />
contract management.<br />
2008/09<br />
Outturn<br />
Improving the procurement<br />
process in the Ministry.<br />
2009/10 MTEF Budget Projections<br />
Appr. Releases<br />
Budget 2010/11 2011/12 2012/13<br />
N/A 20.038 N/A 6.530 7.970<br />
N/A 7.470 N/A 4.139 3.833<br />
N/A 0.960 N/A 0.578 0.333<br />
78.300 103.390 192.665 193.036 163.233<br />
N/A 4.547 N/A 3.572 3.676<br />
N/A 8.370 N/A 5.011 5.399<br />
(i) The Total Budget over the Medium Term<br />
Ug Shs. 226.299bn has been proposed to meet the Ministry's Expenditure Framework for 2010/2011 with<br />
Ug Shs 1.819bn for wages and Ug Shs 213.834bn for non wage recurrent, (of which Ug Shs 193.036bn falls<br />
under pension statutory), Ug Shs 1.001bn for domestic capital development while Ug Shs 9.6bn is for<br />
Donor development .Ug shs 184.444 and 234.768bn, for the financial years 2011/12 to 2012/13<br />
respectively. Over the medium term most of these resources will go to towards pension payment,<br />
construction of the records centre and archives, comprehensive restructuring of MDAs and operationalizing<br />
9.603<br />
4.225<br />
0.344<br />
210.536<br />
Total for Vote: N/A 144.775 N/A 212.865 184.444 234.808<br />
Section A - Vote Overview<br />
4.421<br />
5.679<br />
23
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
of the Civil <strong>Service</strong> College. The increment is mainly brought about by the increasing pension payment<br />
requirements and the commencement of construction works for the Records Centre.<br />
(ii) The major expenditure allocations in the Vote for 2010/11<br />
In the FY 2010/2011, the major planned expenditure allocations will be the Finalization of IPPS phase 1<br />
and commencement of IPPS phase 2 which has been allocated Ug shs 2.885bn, Construction of the Records<br />
Centre and Archives at Ug shs 2.658bn, others are Targeted Capacity Building, Operationalization of the<br />
Civil <strong>Service</strong> College, , Continuation of the Comprehensive Restructuring of MDAS and payment of<br />
pension.<br />
(iii) The major planned changes in resource allocations within the Vote for 2010/11<br />
In the FY 2010/2011, the major planned changes in resource allocation are; increased allocations to the<br />
Management Structures and Systems vote function to allow for commencement of the Construction of the<br />
Records Center and Archives while less resources for the Restructuring have been allocated given that the<br />
bulk of the money for the comprehensive restructuring consultancy was provided for in FY 2009/10.<br />
Regarding the Human Resource Management Vote function there is also less funding as compared to last<br />
financial year given that the supplier of the IPPS software( provided in the 2009/10 budget was taking the<br />
bigger chunk of the resources as compared to the rolling out of IPPS in various MDAs and LGs.<br />
Furthermore donor funding under PSRP III is coming to an end in June 2010. This will lead to less resource<br />
allocation to some vote functions.<br />
Table V3.2: Key Changes in Vote Resource Allocation<br />
Changes in Budget Allocations and Outputs<br />
in 2010/11 from 2009/10 Planned Levels:<br />
Table V3.3: 2009/10 and 2010/11 Budget Allocations by Item<br />
Million <strong>Uganda</strong> Shillings<br />
Justification for proposed Changes<br />
in Expenditure and Outputs<br />
Vote Function:1302 HR Management<br />
Output: 1312 02 Upgrading of the Civil <strong>Service</strong> College Facility<br />
UShs Bn: -3.613<br />
This is an ongoing venture with funding from the World Bank<br />
Some funds for this activity were provided for in the already secured.<br />
financial year 2009/10 and this is a continuing activity with<br />
some of the donor funds being rolled over.<br />
Output: 1312 06 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wage Bill<br />
UShs Bn: -9.505<br />
The IPPS supplier of the system signed the contract in the<br />
2009/10 financial year and this money therefore had to be<br />
committed in that budget though it spills beyond the FY<br />
2009/10..<br />
Vote Function:1372 Management Systems and Structures<br />
Output: 1313<br />
UShs Bn: -2.342<br />
This was an allocation for the Construction of the National<br />
Records Centre and Archives provided for in 2009/10 was<br />
catered for under the key output for construction of the<br />
National Records and Archives Centre.<br />
Vote Function:1301 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Output: 1315 01 Payment of Statutory Pensions<br />
UShs Bn: 89.646<br />
Priority additional funding received for settlement of pension<br />
obligations<br />
Vote Function:1311 Policy, Planning and Support <strong>Service</strong>s<br />
Output: 1349 11 Provision of Office Equipment and Facilities<br />
UShs Bn: -0.976<br />
72 Government Buildings and Administrative Infrastructure<br />
Since the contract obligations spill over the 2009/10 financial<br />
year there is continuity of activities through the 2010/11 FY.<br />
In the FY 2010/11 this has been captured under the key output for<br />
construction of the Records and Archives Centre and not under<br />
this key output of government buildings and administrative<br />
infrastructure.<br />
The additional resource is required for the settlement of pension<br />
obligations to improve the performance and image of <strong>Public</strong><br />
<strong>Service</strong>.<br />
2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
Section A - Vote Overview<br />
24
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Vote Summary<br />
2009/10 Approved Budget 2010/11 Draft Estimates<br />
Million <strong>Uganda</strong> Shillings<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
Output Class: Outputs Provided 112,767.3 25,470.9 N/A 138,238.2 203,363.0 6,986.5 N/A 210,349.5<br />
211101 General Staff Salaries<br />
211102 Contract Staff Salaries (Incl. Casuals, Temp<br />
211103 Allowances<br />
211106 Emoluments paid to former Presidents/Vice<br />
212101 Social Security Contributions (NSSF)<br />
212102 Pension for General Civil <strong>Service</strong><br />
212103 Pension for Teachers<br />
212104 Pension for Military <strong>Service</strong><br />
212105 Pension and Gratuity for Local Government<br />
213001 Medical Expenses(To Employees)<br />
213002 Incapacity, death benefits and funeral expen<br />
213004 Gratuity Payments<br />
221001 Advertising and <strong>Public</strong> Relations<br />
221002 Workshops and Seminars<br />
221003 Staff Training<br />
221005 Hire of Venue (chairs, projector etc)<br />
221006 <strong>Commission</strong>s and Related Charges<br />
221007 Books, Periodicals and Newspapers<br />
221008 Computer Supplies and IT <strong>Service</strong>s<br />
221009 Welfare and Entertainment<br />
221010 Special Meals and Drinks<br />
221011 Printing, Stationery, Photocopying and Bind<br />
221012 Small Office Equipment<br />
221014 Bank Charges and other Bank related costs<br />
221016 IFMS Recurrent Costs<br />
222001 Telecommunications<br />
222002 Postage and Courier<br />
223001 Property Expenses<br />
223005 Electricity<br />
223006 Water<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
226002 Licenses<br />
227001 Travel Inland<br />
227002 Travel Abroad<br />
227003 Carriage, Haulage, Freight and Transport Hi<br />
227004 Fuel, Lubricants and Oils<br />
228001 Maintenance - Civil<br />
228002 Maintenance - Vehicles<br />
228003 Maintenance Machinery, Equipment and Fu<br />
312201 Transport Equipment<br />
1,633.2 0.0 N/A 1,633.2 1,818.7 0.0 N/A 1,818.7<br />
0.0 93.7 N/A 93.7 88.6 0.0 N/A 88.6<br />
728.9 1,454.5 N/A 2,183.4 925.8 375.8 N/A 1,301.6<br />
0.0 0.0 N/A<br />
264.8 0.0 N/A 264.8<br />
0.0 0.0 N/A<br />
44,121.3 0.0 N/A 44,121.3<br />
53,464.1 0.0 N/A 53,464.1 60,000.1 0.0 N/A 60,000.1<br />
36,203.8 0.0 N/A 36,203.8 48,000.1 0.0 N/A 48,000.1<br />
13,722.1 0.0 N/A 13,722.1 24,000.1 0.0 N/A 24,000.1<br />
4,000.0 0.0 N/A 4,000.0 15,000.0 0.0 N/A 15,000.0<br />
38.5 0.0 N/A 38.5 25.0 0.0 N/A 25.0<br />
25.0 0.0 N/A 25.0 25.0 0.0 N/A 25.0<br />
0.0 0.0 N/A<br />
4,649.9 0.0 N/A 4,649.9<br />
205.3 30.5 N/A 235.9 140.5 80.0 N/A 220.5<br />
551.8 1,224.5 N/A 1,776.3 395.5 329.0 N/A 724.5<br />
51.5 3,792.4 N/A 3,843.9 107.1 605.3 N/A 712.3<br />
4.0 201.6 N/A 205.6 1.5 50.0 N/A 51.5<br />
62.2 0.0 N/A 62.2 121.8 0.0 N/A 121.8<br />
34.4 164.4 N/A 198.8 46.8 28.6 N/A 75.4<br />
52.0 165.1 N/A 217.1 80.0 0.0 N/A 80.0<br />
97.7 323.0 N/A 420.7 150.7 108.0 N/A 258.7<br />
0.0 5.0 N/A 5.0 0.0 0.0<br />
129.5 1,281.9 N/A 1,411.4 281.4 224.0 N/A 505.4<br />
51.2 217.5 N/A 268.7 81.2 42.5 N/A 123.7<br />
2.0 0.0 N/A 2.0 2.0 0.0 N/A 2.0<br />
60.0 0.0 N/A 60.0 60.0 0.0 N/A 60.0<br />
100.0 135.0 N/A 235.0 235.0 110.0 N/A 345.0<br />
9.0 0.0 N/A 9.0 9.0 0.0 N/A 9.0<br />
149.9 0.0 N/A 149.9 70.6 0.0 N/A 70.6<br />
60.0 0.0 N/A 60.0 60.0 0.0 N/A 60.0<br />
35.0 0.0 N/A 35.0 35.0 0.0 N/A 35.0<br />
103.6 9,516.2 N/A 9,619.9 794.7 1,078.3 N/A 1,872.9<br />
0.0 1,495.7 N/A 1,495.7 0.0 874.4 N/A 874.4<br />
0.0 3,216.5 N/A 3,216.5 0.0 1,592.4 N/A 1,592.4<br />
1.5 0.0 N/A 1.5 0.0 0.0<br />
223.7 437.3 N/A 661.0 666.6 688.7 N/A 1,355.3<br />
94.2 201.4 N/A 295.5 149.0 324.5 N/A 473.5<br />
0.0 27.0 N/A 27.0 0.0 0.0<br />
443.8 647.4 N/A 1,091.2 369.2 331.0 N/A 700.2<br />
84.0 0.0 N/A 84.0 61.2 0.0 N/A 61.2<br />
232.4 324.0 N/A 556.4 424.9 144.1 N/A 569.0<br />
113.0 15.1 N/A 128.1 100.0 0.0 N/A 100.0<br />
0.0 501.3 N/A 501.3 0.0 0.0<br />
Output Class: Outputs Funded 157.2 750.0 N/A 907.2 13,050.0 0.0 N/A 13,050.0<br />
262101 Contributions to International Organisations<br />
263104 Transfers to other gov't units(current)<br />
263106 Other Current grants(current)<br />
263204 Transfers to other gov't units(capital)<br />
264201 Contributions to Autonomous In<br />
312206 Gross Tax<br />
145.2 0.0 N/A 145.2 0.0 0.0<br />
0.0 500.0 N/A 500.0 0.0 0.0<br />
0.0 0.0 N/A<br />
13,000.0 0.0 N/A 13,000.0<br />
0.0 250.0 N/A 250.0 0.0 0.0<br />
12.0 0.0 N/A 12.0 0.0 0.0<br />
0.0 0.0 N/A<br />
50.0 0.0 N/A 50.0<br />
Output Class: Capital Purchases 660.0 5,170.0 N/A 5,830.0 891.0 2,658.4 N/A 3,549.4<br />
312101 Non-Residential Buildings<br />
49.0 5,170.0 N/A 5,219.0 80.0 2,658.4 N/A 2,738.4<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
Section A - Vote Overview<br />
25
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Million <strong>Uganda</strong> Shillings<br />
312105 Taxes on Buildings and Structures<br />
312201 Transport Equipment<br />
312203 Furniture and Fixtures<br />
312204 Taxes on Machinery, Furniture & Vehicles<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
V4: Vote Unfunded Outputs for 2010/11 and the Medium Term<br />
Ministerial Policy Statement<br />
This section sets the outputs which the vote will not be able to avhieve in 2010/11 and the medium given<br />
proposed funding allocations.<br />
The Ministry continues to face the following challenges:<br />
1. The Performance of <strong>Public</strong> Servants across the country is still unsatisfactory due to inadequate skills and<br />
poor attitudes, there is therefore a need to put up a Civil <strong>Service</strong> College to address the training needs for<br />
Performance enhancement in the <strong>Public</strong> <strong>Service</strong>.<br />
2. Cumbersome Pension Management Systems, inadequate funds to implement the Pay Policy and limited<br />
budgetary provision for the Payment of Pensions remain a major challenge.<br />
3. The need to fully integrate ROM across Government Systems and Processes especially with Output<br />
Oriented Budgeting<br />
4. Low level of development, documentation and dissemination of service delivery standards, compliance to<br />
the service delivery standards and utilization of NSDS findings<br />
5. Low capacity of service recipients to demand for quality services against the standards and client charters.<br />
6. Long and strenuous procurement processes and inadequate capacity to monitor and evaluate the<br />
implementation of<br />
<strong>Public</strong> <strong>Service</strong> Policies, Systems and Processes.<br />
7. Unharmonized, duplicated and inadequate structures.<br />
Table V4.1: Additional Output Funding Requests<br />
2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
0.0 0.0 N/A<br />
550.0 0.0 N/A 550.0<br />
360.0 0.0 N/A 360.0 160.0 0.0 N/A 160.0<br />
51.0 0.0 N/A 51.0 51.0 0.0 N/A 51.0<br />
200.0 0.0 N/A 200.0 50.0 0.0 N/A 50.0<br />
Output Class: Arrears 12,000.0 0.0 N/A 12,000.0 113,017.2 0.0 N/A 113,017.2<br />
321608 Pension Arrears<br />
12,000.0 0.0 N/A 12,000.0 113,017.2 0.0 N/A 113,017.2<br />
Grand Total:<br />
125,584.5 31,390.9 N/A 156,975.4 330,321.3 9,644.9 N/A 339,966.1<br />
Total Excluding Taxes, Arrears and NTR 113,384.5 31,390.9 0.0 144,775.4 216,654.0 9,644.9 0.0 226,298.9<br />
Additional Requirements for Funding and<br />
Outputs in 2010/11:<br />
Justification of Requirement for<br />
Additional Outputs and Funding<br />
Vote Function:1304 HR Management<br />
Output: 1312 04 <strong>Public</strong> <strong>Service</strong> Performance management<br />
UShs Bn: 0.070<br />
Modalities to enforce revised standing orders<br />
Output: 1312 06 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wage Bill<br />
UShs Bn: 0.070<br />
Support to new LGs in payroll management<br />
Vote Function:1305 Management Systems and Structures<br />
Output: 1313 05 Development and Dissemination of Policies, Standards and Procedures<br />
UShs Bn: 0.080<br />
Reviewing the Job descriptions and specifications for all jobs<br />
in MDAs.<br />
Vote Function:1303 <strong>Public</strong> <strong>Service</strong> Inspection<br />
The current regulations have been revised and there is therefore<br />
need to bring them to the attention of <strong>Public</strong> Servants.<br />
The newly created LGs will need support in the STP of salaries<br />
and payroll management<br />
It's a JAF requirement that heads of health centre 3 and 4 are<br />
held responsible for performance in the health units.<br />
Section A - Vote Overview<br />
26
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Additional Requirements for Funding and<br />
Outputs in 2010/11:<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Output: 1314 03 Compliance to service delivery standards<br />
UShs Bn: 0.600<br />
Implementing the framework for ROM and OOB.<br />
Vote Function:1301 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Output: 1315 01 Payment of Statutory Pensions<br />
UShs Bn: 139.614<br />
TThere is a shortfall of 136.614 as payment to statutory<br />
institutions; 1.4Bn for Payroll Consumables; 0.8Bn for<br />
implementation of the ROM/OOB Framework and 0.5 for<br />
implementation of the Joint Inspection functions<br />
Ministerial Policy Statement<br />
V5: Vote Cross-Cutting Policy and Other Budgetary Issues<br />
This section discusses how the vote's plans will address and respond to the cross-cutting policy, issues of<br />
gender and equity; HIV/AIDS; and the Environment, and other budgetary issues such as Arrears and NTR..<br />
(i) Cross-cutting Policy Issues<br />
(i) Gender and Equity<br />
The Ministry of <strong>Public</strong> <strong>Service</strong> is committed to mainstreaming gender concerns in the planning,<br />
implementing and monitoring of its activities.<br />
The Ministry of <strong>Public</strong> <strong>Service</strong> will develop a Gender profile for the entire public service. It is enviseged<br />
that the profile will help in identifying gender gaps and issues in the public service. Guidelines for<br />
mainstreaming gender concerns in the <strong>Public</strong> <strong>Service</strong> will be developed and will be issued for<br />
implementation to the <strong>Service</strong>. It is proposed that given the crosscutting nature of gender mainstreaming<br />
Policy, Planning and Support services vote function coordinates it.<br />
(ii) HIV/AIDS<br />
#Deleted<br />
(iii) Environment<br />
#Deleted<br />
(ii) Payment Arrears<br />
Justification of Requirement for<br />
Additional Outputs and Funding<br />
The table below shows all the payment arrears outstanding for the Vote:<br />
Integrating ROM and OOB to link institutional and individual<br />
performance in the <strong>Public</strong> <strong>Service</strong> is a key focus of the Ministry's<br />
interventions. This will be rolled out to more MDAs in 2010/11<br />
Pension obligation increases annually as retirement is continous.<br />
MoPS will now be printing the payroll with the (IPPS)<br />
implementation<br />
This was a recommendation from the cabinet and Permanent<br />
Secretary's retreat. MoPS is a member of the ESAMI board which<br />
requires US $ 60,000 annually.<br />
Vote Function:1301 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Output: 1316 01 Implementation of the <strong>Public</strong> <strong>Service</strong> Pension Reforms<br />
UShs Bn: 0.037<br />
The three computers are requirred for Pension Information<br />
Heavy duty printer at 25 m. And 3 desk top computers at<br />
12m.<br />
management system. The heavy duty printer is requirred for<br />
printing the pensions payroll.<br />
Vote Function:1316 Policy, Planning and Support <strong>Service</strong>s<br />
Output: 1349 16 PSRP Monitoring and Evaluation Framework developed and implemented<br />
UShs Bn: 0.500<br />
Revising the M&E framework to incorporate critical paths<br />
and related indicators for MoPS activities, projects and<br />
programmes and demonstrating their link to the NDP.<br />
To improve capacity in the Ministry of <strong>Public</strong> <strong>Service</strong> to supply<br />
M&E information and capacity to demand and utilize M&E<br />
information.<br />
Payee Payment Due Date Amount (UShs Bn)<br />
Pension payments 7/15/2010 113.00<br />
contribution to International Organisations 7/15/2010 0.14<br />
Total: 113.142<br />
The Ministry continues to face a challenge of pensions payment as such a total of UGX 113.000bn is the<br />
approved outstanding arrears. Futhermore, a total of UGX 0.142bn is the approved arrears for contribution<br />
to International Organisations of which Ministry of <strong>Public</strong> <strong>Service</strong> is a member.<br />
Section A - Vote Overview<br />
27
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
(ii) Non Tax Revenue Collections<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
The table below shows Non-Tax Revenues that will be collected under the Vote:<br />
Source of NTR<br />
The Ministry collects rent from the canteen at UGX 120,000= per month.<br />
V6: Key Vote Function Outputs Planned for 2010/11<br />
Ministerial Policy Statement<br />
The table below sets out the key outputs under each Vote Function, and provides details of prelimary<br />
achievements for 2009/10 and plans for 2010/11<br />
Table V6.1: Past Outputs and 2010/11 Plans<br />
Vote, Vote Function<br />
Key Output<br />
Vote: 005 Ministry of <strong>Public</strong> <strong>Service</strong><br />
Vote Function: 1312 HR Management<br />
Output: 131202<br />
Upgrading of the Civil<br />
<strong>Service</strong> College Facility<br />
Approved Budget and<br />
Planned outputs<br />
UShs Bn<br />
Finalise the preparatory<br />
activities for the establishment<br />
of the CSC.Develop and<br />
submit a paper on the<br />
transformation of the <strong>Public</strong><br />
service and Implement the<br />
recommendations<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
Pre-feasibility study and Undertake CSC Civil works <br />
concept paper for establishment <br />
of CSC finilised; Civil <strong>Service</strong> Develop CSC Business Plan<br />
College advisor hired ; Training<br />
needs assessment for targeted<br />
capacity building conducted;<br />
operations and implementation<br />
manual for UPSPEP developed;<br />
1.667<br />
0.157<br />
Output Cost: UShs Bn: 5.280 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.170 UShs Bn: 0.150 UShs Bn:<br />
Output: 131203<br />
Scheme of service and<br />
MDAs and LGs Capacity<br />
competence profile developed<br />
Building<br />
Field visits and technical<br />
guidance offered to MDAs and<br />
LGs.Undertake Sensitisation<br />
on the negotiation machinery<br />
and the new labour<br />
laws.Develop Schemes of<br />
<strong>Service</strong> for 04 selected cadres;<br />
Fisheries, Agricultural,<br />
Veterinary, and Foreign <strong>Service</strong>.<br />
Output Cost: UShs Bn: 1.204 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.358 UShs Bn: 0.305 UShs Bn:<br />
Output: 131204<br />
<strong>Public</strong> <strong>Service</strong> Performance<br />
management<br />
The Code of conduct and work<br />
ethics monitored.The Hard<br />
to reach framework developed<br />
and disseminated.Reward<br />
and Recognition scheme<br />
implementation<br />
monitored.The human<br />
resource function strengthened<br />
in all MDAs and LGs.<br />
2008/09<br />
Actual<br />
2009/10<br />
Budget<br />
Sales of <strong>Public</strong>ations 0.008<br />
Rent of the canteen 0.001<br />
Total: 0.010<br />
Finalizing procurement of<br />
consultant to support<br />
finalization of HTR/HTS<br />
Policy. Reward and recognition<br />
scheme monitored and technical<br />
guidance provided<br />
2008/09<br />
Prel<br />
Actual<br />
Output Cost: UShs Bn: 0.575 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.120 UShs Bn: 0.120 UShs Bn:<br />
2010/11<br />
Projected<br />
Technical guidance and support<br />
supervision provided to HR<br />
practioners in MDAs and LGs.<br />
<br />
Capacity Building undertaken<br />
in MDAs and LGs.<br />
0.722<br />
0.318<br />
Sanctions framework finalized<br />
and enforced;Performance<br />
agreements and targets<br />
established in the health &<br />
education sectors & rolled out<br />
for Accounting officers; HTR/S<br />
Strategy implemented and<br />
monitored; reward and<br />
recognition scheme<br />
implemented.<br />
1.166<br />
0.581<br />
Section A - Vote Overview<br />
28
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote, Vote Function<br />
Key Output<br />
Output: 131206<br />
Management of the <strong>Public</strong><br />
<strong>Service</strong> Payroll and Wage<br />
Bill<br />
Approved Budget and<br />
Planned outputs<br />
Support and monitor the<br />
implementation of the Straight<br />
Through Processing (STP) of<br />
salaries.Clean the Payroll of<br />
the five <strong>Public</strong> Universities<br />
namely; Makerere, Kyambogo,<br />
MUBS, Gulu, and Mbarara.<br />
Consolidate the implementation<br />
of IPPS in 11 Pilot Sites.<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
Phase 1 of IPPS was launched<br />
and preparatory work ; Payroll<br />
cleaning exercise is on-going;<br />
Implementation of the straight<br />
through processing of salaries<br />
undertaken and rolled out<br />
further to government agencies<br />
that obtain wages from the<br />
consolidated fund.<br />
Output Cost: UShs Bn: 12.479 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 1.030 UShs Bn: 0.797 UShs Bn:<br />
Output: 131251<br />
HR Systems and Processes<br />
(<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong>)<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
Phase 1 of IPPS completed;<br />
IPPS Phase 2 implemented;<br />
Preparatory ; Payroll cleaning<br />
undertaken; ;Payroll inspection<br />
undertaken and support<br />
supervision provided;<br />
<br />
Implementation of STP of<br />
salaries supported and<br />
monitored;<br />
2.974<br />
1.129<br />
Support to be provided to STP<br />
Support and Monitor the<br />
Implementation of the Straight<br />
Through Processing (STP) of<br />
Salaries Consolidate the<br />
implementation of the<br />
Integrated Personnel and<br />
Payroll System (IPPS)<br />
Output Cost: UShs Bn: 0.500 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
0.000<br />
Vote Function Cost UShs Bn:<br />
20.038 UShs Bn:<br />
N/A UShs Bn: 6.530<br />
VF Cost Excluding Donor UShs Bn<br />
1.678 UShs Bn<br />
1.372 UShs Bn<br />
2.186<br />
Vote Function: 1313 Management Systems and Structures<br />
Output: 131301<br />
Organizational Structures for<br />
MDAs developed and<br />
reviewed<br />
22 MDA structures<br />
rationalized12 Newly<br />
Gazetted Local<br />
Governmentstructures<br />
customized.<br />
Printed and disseminated 500<br />
copies of restructuring<br />
guidelines to MDAs and LGs;<br />
20 newly gazetted urban council<br />
structures customized 15 MDAs<br />
and 15 LGs provided with<br />
technical support; Structures for<br />
the Department of Product<br />
Organisational structures for 22<br />
Ministries developed and<br />
reviewed; Organisational<br />
structuctures for 20 newly<br />
gazetted LGs reviewed,<br />
customised and adopted;<br />
<br />
Positions of Heads of Health<br />
Centre 4s and 3s reviewed.<br />
Output Cost: UShs Bn: 1.974 UShs Bn: N/A UShs Bn:<br />
1.030<br />
Output Cost Excluding Donor UShs Bn: 0.226 UShs Bn: 0.203 UShs Bn:<br />
0.275<br />
Output: 131302<br />
Review of Dysfunctional<br />
Systems in MDAs and LGs<br />
Three (3) systems studied &<br />
reviewed.<br />
Company registration and birth<br />
and death registration, and<br />
Teacher Registration system<br />
study on going.<br />
2 Dysfunctional and<br />
Cumbersome Systems in MDAs<br />
and LGs studied Reviewd and<br />
Re-engineered; 2 Systems<br />
Review Reports produced;<br />
2 Draft Systems Reports<br />
produced;<br />
A Draft Systems Manual<br />
produced;<br />
Output Cost: UShs Bn: 0.157 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
0.053<br />
0.053<br />
Section A - Vote Overview<br />
29
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Vote Summary<br />
Vote, Vote Function<br />
Key Output<br />
Output: 131303<br />
Analysis of Cost<br />
Centres/Constituents in<br />
MDAs and LGs<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Approved Budget and<br />
Planned outputs<br />
Three cost centres in MDAs<br />
studiedand analyzed.<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
Three cost centres in LGs<br />
studied these include the<br />
support staff and drivers<br />
secritarial staff.<br />
Ministerial Policy Statement<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
3 Wasteful Cost Centres in<br />
MDAs and LGs studied,<br />
analysed and recommendations<br />
made;<br />
Data collected on 2 cost centres<br />
in LGs.(Repair and maintanence<br />
of office tools and equip<br />
(computers, printers &<br />
Photocopier) and Physical<br />
infrastructure.<br />
Output Cost: UShs Bn: 0.112 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
Output: 131304<br />
Preliminary arrangements for<br />
Construction of the National the construction of the National<br />
Records Centre and Archives Records Centre and Archives<br />
finalised.<br />
Output: 131305<br />
Development and<br />
Dissemination of Policies,<br />
Standards and Procedures<br />
Contract awarded and signed to<br />
carry design, tender action and<br />
supervision of the proposed<br />
National Records Centre and<br />
Archives Building<br />
Output Cost: UShs Bn: 0.186 UShs Bn: 0.160 UShs Bn:<br />
Roll out Records Retention and<br />
DisposalSchedules in 03<br />
MDAs and 7 LGs.<br />
Rolled out records retention and<br />
disposal schedules for 7 LGs 3<br />
MDAs.<br />
Design, review and initiating<br />
tender action for the National<br />
Records and Archives Centre<br />
(NRAC) finalized.<br />
0.048<br />
0.048<br />
Introduced<br />
records management systems to<br />
3 LGs and 2 MDAs.<br />
to 6 newly created LGs.<br />
Output Cost: UShs Bn: 0.041 UShs Bn: N/A UShs Bn:<br />
0.151<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
0.151<br />
Vote Function Cost UShs Bn:<br />
7.470 UShs Bn:<br />
N/A UShs Bn: 4.139<br />
VF Cost Excluding Donor UShs Bn<br />
0.412 UShs Bn<br />
0.363 UShs Bn<br />
1.175<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Output: 131401<br />
Results - Oriented<br />
Management systems<br />
strengthened across MDAs<br />
and LGs<br />
Implementation of the ROM<br />
results framework strengthened<br />
throughsupport supervision.<br />
0.198<br />
Records retention and disposal<br />
schedules rolled out to 6 MDAs<br />
and 12 LGs; Records staff<br />
trained in the application of the<br />
records centre and archives<br />
manuals; Records<br />
management systems introduced<br />
ROM handbook reviewed, Framework for implementation<br />
balanced score card and a of ROM and OOB including<br />
comprehensive assessment tool budget monitoring<br />
developed and draft<br />
implemented; Enhance capacity<br />
implementation framework for of MDAs and LGs to implement<br />
ROM and OOB prepared. ROM and OOB.<br />
Technical support for ROM<br />
implementation provided to LGs.<br />
0.058<br />
0.058<br />
Output Cost: UShs Bn: 0.354 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.159 UShs Bn: 0.143 UShs Bn:<br />
Output: 131402<br />
National <strong>Service</strong> Delivery Draft Guidelines for<br />
<strong>Service</strong> Delivery Standards Standards<br />
development, documentation<br />
Developed, Disseminated developed.Sectors, MDAs and dissemination of service<br />
and Utilized<br />
and LGs supported to develop, delivery standards prepared.<br />
document and disseminate<br />
service delivery standards.<br />
Output Cost: UShs Bn: 0.110 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.020 UShs Bn: 0.020 UShs Bn:<br />
Support Sectors to develop,<br />
document and disseminate<br />
service delivery standards<br />
against the findings of the<br />
NSDS 2008.<br />
0.033<br />
0.033<br />
Section A - Vote Overview<br />
30
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote, Vote Function<br />
Key Output<br />
Output: 131403<br />
Compliance to service<br />
delivery standards<br />
Approved Budget and<br />
Planned outputs<br />
12 MDAs and 25 LGs<br />
inspected.Follow-up<br />
inspections and technical<br />
support supervision provided to<br />
MDAs.<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
Joined up compliance<br />
inspections carried out and<br />
quarterly meetings for all<br />
inspectorate agencies conducted<br />
to harmonize the process and<br />
subsequently ensure efficiency,<br />
effectiveness and economy.<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
Review of Central Government<br />
Inspection and supervision<br />
regimes of local governments<br />
completed and roadmap for<br />
implementation closely aligned<br />
with the corresponding PSM<br />
action prepared; Joined up<br />
inspection of MDAs and LGs<br />
undertaken.<br />
Output Cost: UShs Bn: 0.075 UShs Bn: N/A UShs Bn:<br />
0.187<br />
Output Cost Excluding Donor UShs Bn: 0.011 UShs Bn: 0.011 UShs Bn:<br />
0.187<br />
Output: 131404<br />
The implementation of client Development and<br />
Clients empowered to demand<br />
Demand for <strong>Service</strong> Delivery charters using the client implementation of client for efficient and effective<br />
Accountability Strengthened<br />
through Client Charters<br />
feedback mechanism monitored<br />
in 03 MDAs and 03 LGs.<br />
charters rolled out to additional<br />
MDAs and LGs. A CSO has<br />
been engaged to monitor and<br />
assess the implementation of<br />
Client Charters in three<br />
ministries.<br />
services by scaling up the<br />
development, implementation<br />
and dissemination of client<br />
charters in MDAs and LGs and<br />
institutionalizing a mechanism<br />
for obtaining feedback from<br />
clients on service delivery.<br />
Output Cost: UShs Bn: 0.121 UShs Bn: N/A UShs Bn:<br />
0.240<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
0.140<br />
Output: 131405<br />
Dissemination of the<br />
National <strong>Service</strong> Delivery<br />
Survey results<br />
The National <strong>Service</strong> Delivery<br />
Survey (2008) Report finalised<br />
and disseminated<br />
Regional workshops to<br />
disseminate findings of the<br />
NSDS 2008 held.<br />
This key output which was a<br />
one off was taken care of in the<br />
2009/10 budget.<br />
Output Cost: UShs Bn: 0.300 UShs Bn: N/A UShs Bn:<br />
0.060<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
0.060<br />
Vote Function Cost UShs Bn:<br />
0.960 UShs Bn:<br />
N/A UShs Bn: 0.578<br />
VF Cost Excluding Donor UShs Bn<br />
0.190 UShs Bn<br />
0.174 UShs Bn<br />
0.478<br />
Vote Function: 1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Output: 131501<br />
Payment of Statutory<br />
Pensions<br />
Pension requirement for the FY<br />
2009/2010 amounting to 152.2<br />
bn paid.The projected<br />
pension arrears as at June 30th<br />
2008 stands at UGX Shs 130<br />
bn. However, this may not be<br />
possible since only 12 billion<br />
has been provided for the<br />
payment of Arrears.<br />
Output Cost: UShs Bn: 103.390 UShs Bn: 192.665 UShs Bn:<br />
Vote Function Cost UShs Bn:<br />
103.390 UShs Bn:<br />
192.665 UShs Bn:<br />
Vote Function: 1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Output: 131601<br />
Implementation of the <strong>Public</strong><br />
<strong>Service</strong> Pension Reforms<br />
Support activities to the<br />
projectcomponent of the<br />
pension reforms.Making the<br />
public knowledgeableabout<br />
the pension reforms. <strong>Public</strong><br />
<strong>Service</strong> Pension Reforms<br />
implemented.Pension<br />
management systems reviewed.<br />
Output Cost: UShs Bn: 4.547 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 4.227 UShs Bn: 4.005 UShs Bn:<br />
Monthly pension paid<br />
(Tradional, Teachers, Veterans,<br />
widows and Claimants) <br />
<br />
Outstanding Arrears Paid<br />
193.036<br />
193.036<br />
Pension arrears cleared & PIMS<br />
integrated into IPPS; implement<br />
recommendations of the<br />
ongoing pension<br />
audit;Severance packages to<br />
NAADS staff paid; technical<br />
support to MDAs/LGs on the<br />
pension reform provided;<br />
pensions payroll updated and<br />
run;<br />
3.572<br />
3.372<br />
Section A - Vote Overview<br />
31
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote, Vote Function<br />
Key Output<br />
Approved Budget and<br />
Planned outputs<br />
UShs Bn:<br />
UShs Bn<br />
Vote Function Cost<br />
VF Cost Excluding Donor<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Output: 134911<br />
Provision of Office<br />
Equipment and Facilities<br />
Office equipment and facilities<br />
provided.General support<br />
services provided.<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
4.547 UShs Bn:<br />
N/A UShs Bn: 3.572<br />
4.227 UShs Bn<br />
4.005 UShs Bn<br />
3.372<br />
Office equipment and facilities<br />
provided.<br />
Output Cost: UShs Bn: 3.957 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 2.558 UShs Bn: 2.672 UShs Bn:<br />
Output: 134912<br />
Production of Workplans<br />
and Budgets<br />
The MoPS BFP, Workplan and<br />
Budget for FY 2009/10<br />
prepared on time.Ministerial<br />
Policy Statement prepared on<br />
time. MoPS Staff guided on<br />
policy and planning<br />
issues.Relevant Policy<br />
Advice provided.<br />
Annual workplan and the first<br />
and second quarterly workplans<br />
and reports submitted to<br />
MoFPED. PSRP workplan and<br />
budgets finalized and approved<br />
by development partners.<br />
Guided MoPS staff and LGs on<br />
budgeting and planning issues.<br />
Output Cost: UShs Bn: 0.861 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.006 UShs Bn: 0.006 UShs Bn:<br />
Output: 134913<br />
The Internal audit function and Internal audit functions carried<br />
Financial Management related activities strengthened out.<br />
and undertaken.<br />
Output Cost: UShs Bn: 0.164 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.060 UShs Bn: 0.059 UShs Bn:<br />
Output: 134914<br />
The Minstry Resource Centre Resource Centre and registries<br />
Management of Resouce transformed and modernised. managed.<br />
Centre and Registries<br />
Output Cost: UShs Bn: 0.080 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.035 UShs Bn: 0.035 UShs Bn:<br />
Output: 134915<br />
Implementation of the IEC<br />
Strategy<br />
Carrying out an IEC<br />
assessment.Number of Press<br />
Coverage<br />
Undertaken.Develop an IEC<br />
Policy.Develop and print a<br />
magazine on the successes of<br />
the PSRP 3rd Phase.Develop<br />
and run a documentary on the<br />
<br />
PSRP 3rd Phase.An ISDN<br />
line installed at MoPS<br />
IEC strategy assessment<br />
completed; MoPS toll free<br />
installed;14 radio &4 TV<br />
talkshows held;12 press releases<br />
issued; Documentary on the<br />
PSRP produced;16 out reach<br />
visits carried out to LGs;MoPS<br />
website redisigned; MoPS<br />
knowledge mgt strategy dev't<br />
initited<br />
Output Cost: UShs Bn: 1.312 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.182 UShs Bn: 0.164 UShs Bn:<br />
Office equipment and facilities<br />
provided;Office ambience and<br />
cleaning service; Purchase and<br />
maintanance of office<br />
equipment;Maintanance and<br />
fuelling of vehicles<br />
2.981<br />
2.477<br />
Workplans,Budgets and<br />
Ministerial Policy Statement<br />
developed; Relevant policy<br />
advice given;General support &<br />
sensitization on planning,<br />
budgeting and policy functions;<br />
Harmonization of the various<br />
planning and budgeting<br />
frameworks.<br />
0.524<br />
0.176<br />
Final Accounts for the Ministry<br />
prepared and the relevant<br />
financial advice given. <br />
<br />
Internal Audit function and<br />
activities strengthened<br />
0.183<br />
0.163<br />
Specialised equipment, books<br />
and periodicals for the Resource<br />
Centre procured; Resource<br />
Centre Operattional guidelines<br />
drafted; staff trained in usage of<br />
new Audio Visual aids and<br />
equipment.<br />
0.116<br />
0.101<br />
8 Press Conferences held at<br />
MoPS;4 Radio Programs; 4 TV<br />
Programs; 4 Print Press<br />
Adverts; 3 Adverts in Strategic<br />
Magazines; Staff Skill Profiling;<br />
Business Continuity Plan for<br />
MoPS drafted; out outreach<br />
sessions to 10 MDAs and 12<br />
LGs carried out.<br />
0.396<br />
0.236<br />
Section A - Vote Overview<br />
32
<strong>Public</strong> <strong>Service</strong><br />
Vote: 005<br />
Vote Summary<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote, Vote Function<br />
Key Output<br />
Output: 134916<br />
PSRP Monitoring and<br />
Evaluation Framework<br />
developed and implemented<br />
Approved Budget and<br />
Planned outputs<br />
M&E Capacity in the Ministry<br />
of <strong>Public</strong> <strong>Service</strong> strengthened.<br />
<br />
PSRP Performance data<br />
collected and compiled.<br />
<br />
PSRP 3rd phase Evaluated.<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
Quartely Reports produced<br />
M&E readiness intervention<br />
undertaken M&E of PSRP<br />
undertaken<br />
Output Cost: UShs Bn: 0.958 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.030 UShs Bn: 0.030 UShs Bn:<br />
Output: 134952<br />
Financial and technical support<br />
Policy Development to the Cabinet Secretariat in the<br />
(Cabinet Secretariat) Policy development provided.<br />
Output Cost: UShs Bn: 0.250 UShs Bn: N/A UShs Bn:<br />
Output Cost Excluding Donor UShs Bn: 0.000 UShs Bn: 0.000 UShs Bn:<br />
Output: 134953<br />
Participation in International 50% of international<br />
Membership to international Organisations activities. organisation subscriptions paid<br />
Organization (xxxxxxx) <br />
Payment of membership fees to<br />
International Organisations.<br />
Output Cost: UShs Bn: 0.157 UShs Bn: 0.240 UShs Bn:<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
M&E framework revised to<br />
include indicators for all MoPS<br />
activities as well as<br />
demonstration of their link to<br />
the National Development Plan;<br />
Strengthening Management<br />
Information System (MIS) for<br />
M&E through review of tools,<br />
training to improve reporting;<br />
0.520<br />
0.080<br />
Vote Function Cost UShs Bn:<br />
8.370 UShs Bn:<br />
N/A UShs Bn: 5.011<br />
VF Cost Excluding Donor UShs Bn<br />
3.487 UShs Bn<br />
3.666 UShs Bn<br />
3.624<br />
Cost of Vote <strong>Service</strong>s: UShs Bn: 144.775 UShs Bn: N/A UShs Bn:<br />
212.865<br />
Vote Cost Excluding Donor UShs Bn<br />
113.385 UShs Bn<br />
202.245 UShs Bn 203.220<br />
0.000<br />
0.000<br />
Section A - Vote Overview<br />
33
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function: 13 12 HR Management<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
<strong>Service</strong>s:<br />
<strong>Commission</strong>er HRM<br />
To initiate, formulate and plan policies on the management of Human Resource<br />
functions for the entire <strong>Public</strong> <strong>Service</strong>.<br />
The purpose of this function is to develop, review and monitor the implementation<br />
of Human Resource Management and Human Resource Development policies,<br />
regulations, guidelines, standards, procedures and systems for an efficient and<br />
effective <strong>Public</strong> <strong>Service</strong>.<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
The vote function also supports the payment of Pension through verification of<br />
records of pension claimants.<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
* Excluding Taxes and Arrears<br />
Responsible Officer<br />
03 Human Resource Management <strong>Commission</strong>er HRM<br />
04 Human Resource Development <strong>Commission</strong>er HRD<br />
Development Projects<br />
0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Prog <strong>Commission</strong>er HRD<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
2012/13<br />
Vote Function:1312 HR Management<br />
Output: 13 1204 <strong>Public</strong> <strong>Service</strong> Performance management<br />
Percentage staff retention rate in<br />
65% - 75% 95%<br />
hard to reach areas.<br />
Output: 13 1206 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wage Bill<br />
No. MDAs/LGs where Integrated<br />
<strong>Public</strong> Payroll System has been<br />
operationalised.<br />
0<br />
- - -<br />
Vote Function Cost (UShs bn) N/A 20.038 N/A 6.530 7.970 9.603<br />
VF Cost Excluding Donor<br />
1.148 1.678 1.372 2.186 N/A N/A<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
<strong>Service</strong>s Provided<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
2012/13<br />
Section B - Details - Vote 005 - Vote Function 1312<br />
34
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
Output Indicators and Cost<br />
13 12<br />
13 1202 Upgrading of the Civil <strong>Service</strong><br />
College Facility<br />
Output Cost Excluding Donor<br />
13 1203 MDAs and LGs Capacity Building<br />
Output Cost Excluding Donor<br />
13 1204 <strong>Public</strong> <strong>Service</strong> Performance<br />
management<br />
Output Cost Excluding Donor<br />
13 1206 Management of the <strong>Public</strong> <strong>Service</strong><br />
Payroll and Wage Bill<br />
Output Cost Excluding Donor<br />
<strong>Service</strong>s Funded<br />
13 1251 HR Systems and Processes (<strong>Public</strong><br />
<strong>Service</strong> <strong>Commission</strong>)<br />
Output Cost Excluding Donor<br />
Total VF Cost (UShs Bn)<br />
Total VF Cost Excl. Donor (UShs Bn)<br />
* Excluding Taxes and Arrears<br />
HR Management<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue:<br />
Procurement of IPPS<br />
hardware and software.<br />
Personell, payroll and<br />
pension records updating in<br />
pilot sites.<br />
VF Performance Issue:<br />
Civil <strong>Service</strong> College Advisor<br />
procured & CSC business<br />
plan developed.<br />
Leadership capacity and<br />
management development<br />
programmes conducted.<br />
VF Performance Issue:<br />
2008/09<br />
Outturn<br />
Project team put in place;<br />
supplier procured to handle<br />
both hard and soft ware<br />
components; work on updating<br />
personnel records commenced;<br />
MoPS in process of data<br />
validation and development of<br />
mechanism for handling of<br />
exception.<br />
IPPS implemented as a pilot in<br />
9 MDAs and 2 LGs. Payroll<br />
put on IPPS for all MDAs and<br />
LGs.<br />
Implement the training plan<br />
for targeted capacity building;<br />
Develop CSC Business Plan<br />
Development and<br />
implementation of IPPS.<br />
Absence of a Civil <strong>Service</strong> College to Address training needs for performance enhancement in the<br />
<strong>Public</strong> <strong>Service</strong><br />
Undertake CSC Civil works; Establishment of the Civil<br />
<strong>Service</strong> College.<br />
Pre-feasibility study and<br />
concept paper for<br />
establishment of CSC<br />
finilised; Civil <strong>Service</strong> College<br />
advisor hired ; Training needs<br />
assessment for targeted<br />
capacity building conducted;<br />
operations and implementation<br />
manual for UPSPEP<br />
developed;<br />
Lack of funds to implement the Pay Policy<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 5.280 N/A<br />
N/A 0.170 0.150<br />
N/A 1.204 N/A<br />
N/A 0.358 0.305<br />
N/A 0.575 N/A<br />
N/A 0.120 0.120<br />
N/A 12.479 N/A<br />
N/A<br />
1.030 0.797<br />
N/A 0.500 0.000<br />
N/A<br />
N/A<br />
0.983<br />
0.000 0.000<br />
20.038 N/A<br />
1.678 1.372<br />
2012/13<br />
1.667 2.683 4.314<br />
0.157 N/A N/A<br />
0.722 1.048 1.048<br />
0.318 N/A N/A<br />
1.166 1.241 1.241<br />
0.581 N/A N/A<br />
2.974 2.931 2.932<br />
1.129 N/A N/A<br />
0.000 0.067 0.067<br />
0.000 N/A N/A<br />
6.530 7.970 9.603<br />
2.186 N/A N/A<br />
Section B - Details - Vote 005 - Vote Function 1312<br />
35
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 12<br />
HR Management<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
Mobilization of resources to<br />
implement the pay policy.<br />
Guidelines on implementation<br />
of the pay policy developed<br />
and disseminated.<br />
Issuance of a circular to call<br />
for the training plans and<br />
developing capacity of MDAs<br />
to prepare training plans.<br />
Government commitment to<br />
carry out pay reform starting<br />
with scientists (including those<br />
positions that have proven<br />
retention problems).<br />
Implementation guidelines<br />
issued<br />
Undertake a functional review<br />
and wage rationalization as a<br />
mechanism to achieve pay<br />
reform targets; Implement the<br />
agreed pay reform targets;<br />
Enhance <strong>Public</strong> <strong>Service</strong> Pay,<br />
complete phase 1 of IPPS and<br />
implement IPPS phase 2.<br />
Monitoring of the training and<br />
development function<br />
Pay reform targets<br />
implemented; Sustained<br />
enhancement of <strong>Public</strong> <strong>Service</strong><br />
Pay and implementation of<br />
IPPS.<br />
Reprimand/Sanction non<br />
compliant MDAs and LGs.<br />
Carrying out support<br />
supervision exercises.<br />
VF Performance Issue: Performance of <strong>Public</strong> Servants across the country<br />
Attract, recruit, develop and A HTR/HTS framework Develop customized HTR<br />
retain a highly skilled and developed and adopted by policies for health, educ &<br />
professional workforce; Government<br />
water sectors;<br />
MDAs and LGs supervisied<br />
and supported to ensure<br />
effective implementation of<br />
HR policies, systems and<br />
procedures<br />
IPPS rolled out;<br />
Performance Agreements &<br />
targets established in the<br />
Social sectors ;<br />
Hard to Reach/Staff strategy<br />
implemented. Performance<br />
agreements and targets<br />
established in <strong>Public</strong> <strong>Service</strong><br />
Institutions. Sanctions<br />
framework/reward and<br />
recognition scheme finalized<br />
and enforced.<br />
IPPS preparatory activities<br />
commensed and personnel<br />
records updated.<br />
Support performance<br />
Agreements<br />
Implement the<br />
rewards/sanctions framework .<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
03 Human Resource Management 248.0 1,240.0 0.0 1,488.0 289.6 14,640.0 0.0 14,929.6<br />
04 Human Resource Development 150.0 40.0 0.0 190.0 176.0 80.0 0.0 256.0<br />
Total Recurrent Budget Estimates for VF<br />
398.0 1,280.0 0.0 1,678.0 465.5 14,720.0 0.0 15,185.5<br />
Development Budget Estimates<br />
GoU Dev Donor NTR Total GoU Dev Donor NTR Total<br />
0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancem 0.0 18,360.0 0.0 18,360.0 0.0 4,344.5 0.0 4,344.5<br />
Total Development Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1312<br />
Total Excluding Taxes, Arrears and NTR<br />
0.0 18,360.0 0.0 18,360.0 0.0 4,344.5 0.0 4,344.5<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
1,678.0 18,360.0 0.0 20,038.0 15,185.5 4,344.5 0.0 19,530.0<br />
1,678.0 18,360.0 0.0 20,038.0 15,185.5 4,344.5 0.0 19,530.0<br />
Section B - Details - Vote 005 - Vote Function 1312<br />
36
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 12<br />
HR Management<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 1,678.0 17,860.0 N/A 19,538.0<br />
131202 Upgrading of the Civil <strong>Service</strong> College Facility<br />
Description of Planned Outputs:<br />
170.0 5,110.0 N/A 5,280.0<br />
Finalise the preparatory activities for the<br />
establishment of the CSC.Develop and submit a<br />
paper on the transformation of the <strong>Public</strong> service and<br />
Implement the recommendations<br />
211101 General Staff Salaries<br />
150.0 0.0 N/A 150.0<br />
211103 Allowances<br />
2.0 326.3 N/A 328.3<br />
221001 Advertising and <strong>Public</strong> Relations<br />
0.0 30.5 N/A 30.5<br />
221002 Workshops and Seminars<br />
0.0 120.6 N/A 120.6<br />
221003 Staff Training<br />
1.0 3,192.5 N/A 3,193.5<br />
221005 Hire of Venue (chairs, projector etc)<br />
0.0 5.7 N/A 5.7<br />
221006 <strong>Commission</strong>s and Related Charges<br />
1.9 0.0 N/A 1.9<br />
221007 Books, Periodicals and Newspapers<br />
0.0 0.0 N/A<br />
221009 Welfare and Entertainment<br />
1.5 10.0 N/A 11.5<br />
221011 Printing, Stationery, Photocopying and Binding<br />
2.7 74.0 N/A 76.7<br />
221012 Small Office Equipment<br />
0.0 12.5 N/A 12.5<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
1.0 0.0 N/A 1.0<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 639.6 N/A 639.6<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 514.8 N/A 514.8<br />
227001 Travel Inland<br />
3.0 0.0 N/A 3.0<br />
227002 Travel Abroad<br />
1.0 117.0 N/A 118.0<br />
227004 Fuel, Lubricants and Oils<br />
3.0 66.5 N/A 69.5<br />
228002 Maintenance - Vehicles<br />
3.0 0.0 N/A 3.0<br />
131203 MDAs and LGs Capacity Building<br />
Description of Planned Outputs:<br />
358.0 846.0 N/A 1,204.0<br />
GoU Donor NTR Total<br />
2,185.5 4,344.5 N/A 6,530.0<br />
110,305.6 1,510.0 N/A 1,667.3<br />
Undertake CSC Civil works Develop CSC<br />
Business Plan<br />
110,258.6 0.0 N/A 110.3<br />
14.0 140.0 N/A 154.0<br />
0.0 50.0 N/A 50.0<br />
0.0 130.0 N/A 130.0<br />
8.0 260.0 N/A 268.0<br />
0.0 50.0 N/A 50.0<br />
0.0 0.0 N/A<br />
0.0 3.0 N/A 3.0<br />
9.0 1.2 N/A 10.2<br />
1.0 1.0 N/A 2.0<br />
1.2 0.5 N/A 1.7<br />
5.0 5.0 N/A 10.0<br />
0.0 148.6 N/A 148.6<br />
0.0 200.0 N/A 200.0<br />
1.4 200.7 N/A 202.1<br />
1.4 270.0 N/A 271.4<br />
3.0 50.0 N/A 53.0<br />
3.0 0.0 N/A 3.0<br />
154,970.6 404.5 N/A 722.3<br />
Field visits and technical guidance offered to MDAs Technical guidance and support supervision<br />
and LGs.Undertake Sensitisation on the provided to HR practioners in MDAs and LGs. <br />
negotiation machinery and the new labour<br />
<br />
laws.Develop Schemes of <strong>Service</strong> for 04 selected Capacity Building undertaken in MDAs and LGs.<br />
cadres; Fisheries, Agricultural, Veterinary, and<br />
Foreign <strong>Service</strong>.<br />
211101 General Staff Salaries<br />
248.0 0.0 N/A 248.0<br />
211103 Allowances<br />
12.1 100.0 N/A 112.1<br />
221001 Advertising and <strong>Public</strong> Relations<br />
3.5 0.0 N/A 3.5<br />
221002 Workshops and Seminars<br />
3.0 106.0 N/A 109.0<br />
221003 Staff Training<br />
3.0 0.0 N/A 3.0<br />
221006 <strong>Commission</strong>s and Related Charges<br />
10.0 0.0 N/A 10.0<br />
221007 Books, Periodicals and Newspapers<br />
0.7 30.0 N/A 30.7<br />
221009 Welfare and Entertainment<br />
10.0 20.0 N/A 30.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
26.1 50.0 N/A 76.1<br />
221012 Small Office Equipment<br />
2.2 0.0 N/A 2.2<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
1.3 20.0 N/A 21.3<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 50.0 N/A 50.0<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 250.0 N/A 250.0<br />
227001 Travel Inland<br />
15.0 120.0 N/A 135.0<br />
227002 Travel Abroad<br />
2.0 0.0 N/A 2.0<br />
227004 Fuel, Lubricants and Oils<br />
12.0 50.0 N/A 62.0<br />
228001 Maintenance - Civil<br />
2.0 0.0 N/A 2.0<br />
228002 Maintenance - Vehicles<br />
7.0 50.0 N/A 57.0<br />
Section B - Details - Vote 005 - Vote Function 1312<br />
154,807.6 0.0 N/A 154.8<br />
36.0 12.0 N/A 48.0<br />
4.5 0.0 N/A 4.5<br />
16.0 59.0 N/A 75.0<br />
8.2 0.0 N/A 8.2<br />
10.0 0.0 N/A 10.0<br />
1.2 0.0 N/A 1.2<br />
14.4 0.0 N/A 14.4<br />
7.0 0.0 N/A 7.0<br />
3.0 0.0 N/A 3.0<br />
18.0 66.5 N/A 84.5<br />
0.0 70.0 N/A 70.0<br />
0.0 82.0 N/A 82.0<br />
26.2 85.0 N/A 111.2<br />
10.0 0.0 N/A 10.0<br />
3.6 30.0 N/A 33.6<br />
1.2 0.0 N/A 1.2<br />
3.7 0.0 N/A 3.7<br />
37
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 12<br />
HR Management<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
131204 <strong>Public</strong> <strong>Service</strong> Performance management<br />
Description of Planned Outputs:<br />
GoU Donor NTR Total<br />
120.0 455.0 N/A 575.0<br />
The Code of conduct and work ethics<br />
monitored.The Hard to reach framework<br />
developed and disseminated.Reward and<br />
Recognition scheme implementation<br />
monitored.The human resource function<br />
strengthened in all MDAs and LGs.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
21.5 55.0 N/A 76.5<br />
221001 Advertising and <strong>Public</strong> Relations<br />
3.5 0.0 N/A 3.5<br />
221002 Workshops and Seminars<br />
4.5 0.0 N/A 4.5<br />
221003 Staff Training<br />
3.0 0.0 N/A 3.0<br />
221005 Hire of Venue (chairs, projector etc)<br />
1.0 0.0 N/A 1.0<br />
221006 <strong>Commission</strong>s and Related Charges<br />
30.0 0.0 N/A 30.0<br />
221009 Welfare and Entertainment<br />
0.0 30.0 N/A 30.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
22.2 50.0 N/A 72.2<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
12.3 0.0 N/A 12.3<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 90.0 N/A 90.0<br />
227001 Travel Inland<br />
7.0 80.0 N/A 87.0<br />
227002 Travel Abroad<br />
2.0 0.0 N/A 2.0<br />
227004 Fuel, Lubricants and Oils<br />
11.5 70.0 N/A 81.5<br />
228002 Maintenance - Vehicles<br />
1.5 80.0 N/A 81.5<br />
131206 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wa<br />
Description of Planned Outputs:<br />
1,030.0 11,449.0 N/A 12,479.0<br />
Support and monitor the implementation of the<br />
Straight Through Processing (STP) of<br />
salaries.Clean the Payroll of the five <strong>Public</strong><br />
Universities namely; Makerere, Kyambogo, MUBS,<br />
Gulu, and Mbarara. Consolidate the implementation<br />
of IPPS in 11 Pilot Sites.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211102 Contract Staff Salaries (Incl. Casuals, Temporary)<br />
0.0 93.7 N/A 93.7<br />
211103 Allowances<br />
305.0 290.4 N/A 595.4<br />
221001 Advertising and <strong>Public</strong> Relations<br />
1.5 0.0 N/A 1.5<br />
221002 Workshops and Seminars<br />
501.0 120.2 N/A 621.2<br />
221003 Staff Training<br />
1.0 278.2 N/A 279.2<br />
221005 Hire of Venue (chairs, projector etc)<br />
0.0 123.9 N/A 123.9<br />
221006 <strong>Commission</strong>s and Related Charges<br />
3.0 0.0 N/A 3.0<br />
221007 Books, Periodicals and Newspapers<br />
3.0 14.2 N/A 17.2<br />
221008 Computer Supplies and IT <strong>Service</strong>s<br />
0.0 0.0 N/A<br />
221009 Welfare and Entertainment<br />
3.0 0.0 N/A 3.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
5.0 290.0 N/A 295.0<br />
221012 Small Office Equipment<br />
1.0 50.0 N/A 51.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
3.0 8,500.0 N/A 8,503.0<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 721.5 N/A 721.5<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 465.8 N/A 465.8<br />
226002 Licenses<br />
1.5 0.0 N/A 1.5<br />
227001 Travel Inland<br />
0.0 0.0 N/A<br />
227002 Travel Abroad<br />
1.0 0.0 N/A 1.0<br />
227004 Fuel, Lubricants and Oils<br />
201.0 0.0 N/A 201.0<br />
228002 Maintenance - Vehicles<br />
0.0 0.0 N/A<br />
312201 Transport Equipment<br />
0.0 501.3 N/A 501.3<br />
GoU Donor NTR Total<br />
111,842.4 585.0 N/A 1,166.4<br />
Sanctions framework finalized and<br />
enforced;Performance agreements and targets<br />
established in the health & education sectors &<br />
rolled out for Accounting officers; HTR/S Strategy<br />
implemented and monitored; reward and<br />
recognition scheme implemented.<br />
111,372.4 0.0 N/A 111.4<br />
34.0 76.0 N/A 110.0<br />
14.7 0.0 N/A 14.7<br />
52.6 0.0 N/A 52.6<br />
20.6 0.0 N/A 20.6<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 41.0 N/A 41.0<br />
93.2 70.0 N/A 163.2<br />
77.5 0.0 N/A 77.5<br />
0.0 113.0 N/A 113.0<br />
90.0 96.0 N/A 186.0<br />
28.4 29.5 N/A 57.9<br />
42.0 84.0 N/A 126.0<br />
17.0 75.5 N/A 92.5<br />
90,137.9 1,845.0 N/A 2,974.1<br />
Phase 1 of IPPS completed; IPPS Phase 2<br />
implemented; Preparatory ; Payroll cleaning<br />
undertaken; ;Payroll inspection undertaken and<br />
support supervision provided; Implementation<br />
of STP of salaries supported and monitored;<br />
89,097.9 0.0 N/A 89.1<br />
0.0 0.0 N/A<br />
205.0 0.0 N/A 205.0<br />
1.5 0.0 N/A 1.5<br />
203.7 0.0 N/A 203.7<br />
7.0 245.3 N/A 252.3<br />
0.0 0.0 N/A<br />
111.8 0.0 N/A 111.8<br />
3.0 0.0 N/A 3.0<br />
30.0 0.0 N/A 30.0<br />
4.0 4.8 N/A 8.8<br />
25.0 0.0 N/A 25.0<br />
1.0 0.0 N/A 1.0<br />
3.0 811.8 N/A 814.8<br />
0.0 466.8 N/A 466.8<br />
0.0 172.4 N/A 172.4<br />
0.0 0.0 N/A<br />
200.0 144.0 N/A 344.0<br />
24.0 0.0 N/A 24.0<br />
20.0 0.0 N/A 20.0<br />
201.0 0.0 N/A 201.0<br />
0.0 0.0 N/A<br />
Section B - Details - Vote 005 - Vote Function 1312<br />
38
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 12<br />
HR Management<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Grants, Transfers and Subsides (Outputs Funded) 0.0 500.0 N/A 500.0<br />
131251 HR Systems and Processes (<strong>Public</strong> <strong>Service</strong> Commi<br />
Description of Planned Outputs:<br />
0.0 500.0 N/A 500.0<br />
Support and Monitor the Implementation of the<br />
Straight Through Processing (STP) of Salaries<br />
Consolidate the implementation of the Integrated<br />
Personnel and Payroll System (IPPS)<br />
263104 Transfers to other gov't units(current)<br />
0.0 500.0 N/A 500.0<br />
131252 Support to service delivery workers in hard to reac<br />
0.0 0.0 N/A<br />
263106 Other Current grants(current)<br />
0.0 0.0 N/A<br />
Grand Total Vote 005 1,678.0 18,360.0 N/A 20,038.0<br />
GoU Donor NTR Total<br />
13,000.0 0.0 N/A 13,000.0<br />
0.0 0.0 N/A<br />
Support to be provided to STP<br />
0.0 0.0 N/A<br />
13,000.0 0.0 N/A 13,000.0<br />
13,000.0 0.0 N/A 13,000.0<br />
15,185.5 4,344.5 N/A 19,530.0<br />
Total Excluding Taxes, Arrears and NTR 1,678.0 18,360.0 0.0 20,038.0 15,185.5 4,344.5 0.0 19,530.0<br />
Section B - Details - Vote 005 - Vote Function 1312<br />
39
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function: 13 13 Management Systems and Structures<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
<strong>Service</strong>s:<br />
Director EQA<br />
To develop and review management and operational structures, systems and<br />
productivity practices that are responsive to efficient and effective service delivery<br />
of public services.<br />
To rationalise MDAs and LG Structures, Systems and Productivity Practices in<br />
<strong>Public</strong> <strong>Service</strong> Institutions; to ensure that appropriate organisational structures,<br />
systems and procedures are developed and implemented in a harmonised manner<br />
in line with the current Government Laws, Policies, Plans and Programmes.<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
The function also promotes efficient, economic and effective Records and<br />
Information Management Systems in the <strong>Public</strong> <strong>Service</strong> and oversees the<br />
preservation of the documented heritage (Archives) for <strong>Uganda</strong>’s posterity.<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
* Excluding Taxes and Arrears<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
Responsible Officer<br />
07 Management <strong>Service</strong>s <strong>Commission</strong>er Management <strong>Service</strong>s Department<br />
08 Records and Information Management <strong>Commission</strong>er/RIM<br />
Development Projects<br />
0025d <strong>Public</strong> <strong>Service</strong> Reform Comp.2 Records Management Director EQA<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
2012/13<br />
Vote Function:1313 Management Systems and Structures<br />
Output: 13 1301 Organizational Structures for MDAs developed and reviewed<br />
No. of MDAs and LGs that have<br />
developed and implemented client<br />
charters<br />
18<br />
22 - 30 40 55<br />
Vote Function Cost (UShs bn) N/A 7.470 N/A 4.139 3.833 4.225<br />
VF Cost Excluding Donor<br />
0.356 0.412 0.363 1.175 N/A N/A<br />
<strong>Service</strong>s Provided<br />
13 1301 Organizational Structures for MDAs<br />
developed and reviewed<br />
Output Cost Excluding Donor<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 1.974 N/A<br />
N/A<br />
0.226 0.203<br />
Section B - Details - Vote 005 - Vote Function 1313<br />
2012/13<br />
1.030 0.789 0.787<br />
0.275 N/A N/A<br />
40
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
Output Indicators and Cost<br />
13 13<br />
13 1302 Review of Dysfunctional Systems in<br />
MDAs and LGs<br />
Output Cost Excluding Donor<br />
13 1303 Analysis of Cost Centres/Constituents<br />
in MDAs and LGs<br />
Output Cost Excluding Donor<br />
13 1304 Construction of the National Records<br />
Centre and Archives<br />
Output Cost Excluding Donor<br />
13 1305 Development and Dissemination of<br />
Policies, Standards and Procedures<br />
Output Cost Excluding Donor<br />
Capital Purchases<br />
13 1372 Government Buildings and<br />
Administrative Infrastructure<br />
Output Cost Excluding Donor<br />
Total VF Cost (UShs Bn)<br />
Total VF Cost Excl. Donor (UShs Bn)<br />
* Excluding Taxes and Arrears<br />
Management Systems and Structures<br />
2008/09<br />
Outturn<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue: Dysfunctional or cumbersome systems<br />
Three(3) Systems studied and Company registration and<br />
reviewed.<br />
birth and death registration,<br />
and Teacher Registration<br />
system study on going.<br />
2 Draft Systems Reports<br />
produced;<br />
A Draft Systems Manual<br />
produced;<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 0.157 0.000<br />
N/A 0.000 0.000<br />
N/A 0.112 0.000<br />
N/A 0.000 0.000<br />
N/A 0.186 N/A<br />
N/A 0.186 0.160<br />
N/A 0.041 0.000<br />
0.000 0.000<br />
Studying, reviewing & redesigning<br />
the dysfunctional &<br />
cumbersome systems in<br />
MDAs & LGs<br />
Writing reports for 2<br />
dysfunctional systems in<br />
MDAs & LGs<br />
Providing technical support on<br />
implementation of reengineered<br />
systems in MDAs<br />
& LGs.<br />
VF Performance Issue: Lack of Records Centre and Archives building.<br />
Finalisation of the<br />
preliminary activities for the<br />
construction of the National<br />
Records Centre and Archives<br />
building.<br />
Contract a warded and signed<br />
to design review, tender action<br />
and supervision for the<br />
Construction of the Proposed<br />
National Records Centre and<br />
Construction of the National<br />
Records Centre and Archives<br />
building.<br />
Archives Building.<br />
VF Performance Issue: Lack of specialized training in Records Management<br />
Training Records Staff in<br />
Records Management<br />
VF Performance Issue: Unharmonized, duplicated and inadequate structures<br />
N/A<br />
N/A 5.000 N/A<br />
N/A<br />
N/A<br />
0.356<br />
0.000 0.000<br />
7.470 N/A<br />
0.412 0.363<br />
Dysfunctional Structures in<br />
MDAs and LGs studied and reengineered.<br />
Records storage and retrieval<br />
improvement.<br />
Professionalization of the<br />
Records Cadre<br />
2012/13<br />
0.053 0.053 0.054<br />
0.053 N/A N/A<br />
0.048 0.006 0.010<br />
0.048 N/A N/A<br />
0.198 0.198 0.198<br />
0.098 N/A N/A<br />
0.151 0.118 0.118<br />
0.151 N/A N/A<br />
2.658 2.669 3.058<br />
0.000 N/A N/A<br />
4.139 3.833 4.225<br />
0.625 N/A N/A<br />
Section B - Details - Vote 005 - Vote Function 1313<br />
41
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 13<br />
Management Systems and Structures<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
Structures of 22 MDAs and<br />
16 LGs rationalized.<br />
A process to procure a<br />
Consultant on going<br />
Structures for 16 Newly<br />
Gazzetted Local Governments<br />
and Urban Councils<br />
developed, customised and<br />
reports produced<br />
Undertake the comprehensive<br />
review and rationalization of<br />
structures and recommend<br />
wage rationalization scenarios<br />
based on the review.<br />
Provision of appropriate<br />
structures for MDAs and LGs.<br />
VF Performance Issue:<br />
Three(3)Cost Centres in<br />
Five(5) MDAs and five(5)<br />
LGs studied.<br />
Technical support on<br />
implementation of<br />
recommended structures for 5<br />
MDAs and 5 LGs provided;<br />
Wasteful Cost Centres in MDAs and Local Governments.<br />
Three cost centres in LGs<br />
studied these include the<br />
support staff and drivers<br />
secritarial staff.<br />
Data collected on 2 cost<br />
centres in LGs.(Repair and<br />
maintanence of office tools<br />
and equip (computers, printers<br />
& Photocopier) and Physical<br />
infrastructure.<br />
Studying, analyzing & making<br />
positive recommendations on<br />
3 wasteful cost centres in<br />
MDAs & LGs<br />
Writing reports for 3<br />
efficiencies studies.<br />
Providing technical support on<br />
implementation of reengineered<br />
systems in MDAs<br />
& LGs.<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Study and manage<br />
Productivity Practices in<br />
MDAs and LGs.<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
07 Management <strong>Service</strong>s 176.0 50.0 0.0 226.0 206.0 170.0 0.0 376.0<br />
08 Records and Information Management 136.0 50.0 0.0 186.0 159.3 90.0 0.0 249.3<br />
Total Recurrent Budget Estimates for VF<br />
312.0 100.0 0.0 412.0 365.3 260.0 0.0 625.3<br />
Development Budget Estimates<br />
GoU Dev Donor NTR Total GoU Dev Donor NTR Total<br />
0025d <strong>Public</strong> <strong>Service</strong> Reform Comp.2 Records Man 0.0 7,058.4 0.0 7,058.4 550.0 3,513.4 0.0 4,063.4<br />
Total Development Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1313<br />
Total Excluding Taxes, Arrears and NTR<br />
0.0 7,058.4 0.0 7,058.4 550.0 3,513.4 0.0 4,063.4<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
412.0 7,058.4 0.0 7,470.4 1,175.3 3,513.4 0.0 4,688.7<br />
412.0 7,058.4 0.0 7,470.4 625.3 3,513.4 0.0 4,138.7<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 412.0 2,058.4 N/A 2,470.4<br />
131301 Organizational Structures for MDAs developed an<br />
Description of Planned Outputs:<br />
226.0 1,748.4 N/A 1,974.4<br />
GoU Donor NTR Total<br />
625.3 855.0 N/A 1,480.3<br />
144,914.1 755.0 N/A 1,029.8<br />
22 MDA structures rationalized12 Newly Gazetted Organisational structures for 22 Ministries<br />
Local Governmentstructures customized. developed and reviewed; Organisational<br />
structuctures for 20 newly gazetted LGs reviewed,<br />
customised and adopted; Positions of Heads of<br />
Health Centre 4s and 3s reviewed.<br />
Section B - Details - Vote 005 - Vote Function 1313<br />
42
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 13<br />
Management Systems and Structures<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
211101 General Staff Salaries<br />
176.0 0.0 N/A 176.0<br />
211103 Allowances<br />
6.8 246.7 N/A 253.5<br />
221002 Workshops and Seminars<br />
1.0 0.0 N/A 1.0<br />
221005 Hire of Venue (chairs, projector etc)<br />
1.0 0.0 N/A 1.0<br />
221007 Books, Periodicals and Newspapers<br />
1.0 0.0 N/A 1.0<br />
221009 Welfare and Entertainment<br />
6.0 77.4 N/A 83.4<br />
221011 Printing, Stationery, Photocopying and Binding<br />
1.0 76.8 N/A 77.8<br />
221012 Small Office Equipment<br />
1.5 0.0 N/A 1.5<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
2.0 0.0 N/A 2.0<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 7.2 N/A 7.2<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 1,240.0 N/A 1,240.0<br />
227001 Travel Inland<br />
13.7 0.0 N/A 13.7<br />
227004 Fuel, Lubricants and Oils<br />
11.0 85.2 N/A 96.2<br />
228001 Maintenance - Civil<br />
2.0 0.0 N/A 2.0<br />
228002 Maintenance - Vehicles<br />
3.0 0.0 N/A 3.0<br />
228003 Maintenance Machinery, Equipment and Furniture<br />
0.0 15.1 N/A 15.1<br />
131302 Review of Dysfunctional Systems in MDAs and LG<br />
Description of Planned Outputs:<br />
0.0 157.0 N/A 157.0<br />
Three (3) systems studied & reviewed.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
0.0 10.0 N/A 10.0<br />
221002 Workshops and Seminars<br />
0.0 10.0 N/A 10.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 0.0 N/A<br />
221012 Small Office Equipment<br />
0.0 10.0 N/A 10.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
0.0 10.0 N/A 10.0<br />
227001 Travel Inland<br />
0.0 40.0 N/A 40.0<br />
227004 Fuel, Lubricants and Oils<br />
0.0 37.0 N/A 37.0<br />
228002 Maintenance - Vehicles<br />
0.0 40.0 N/A 40.0<br />
131303 Analysis of Cost Centres/Constituents in MDAs an<br />
Description of Planned Outputs:<br />
0.0 112.0 N/A 112.0<br />
Three cost centres in MDAs studiedand analyzed.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
0.0 10.0 N/A 10.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 20.0 N/A 20.0<br />
221012 Small Office Equipment<br />
0.0 20.0 N/A 20.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
0.0 20.0 N/A 20.0<br />
227001 Travel Inland<br />
0.0 10.0 N/A 10.0<br />
227004 Fuel, Lubricants and Oils<br />
0.0 20.0 N/A 20.0<br />
228002 Maintenance - Vehicles<br />
0.0 12.0 N/A 12.0<br />
131304 Construction of the National Records Centre and<br />
Description of Planned Outputs:<br />
186.0 0.0 N/A 186.0<br />
Preliminary arrangements for the construction of the<br />
National Records Centre and Archives finalised.<br />
211101 General Staff Salaries<br />
136.0 0.0 N/A 136.0<br />
211103 Allowances<br />
21.0 0.0 N/A 21.0<br />
221001 Advertising and <strong>Public</strong> Relations<br />
0.0 0.0 N/A<br />
221003 Staff Training<br />
4.8 0.0 N/A 4.8<br />
221009 Welfare and Entertainment<br />
0.0 0.0 N/A<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 0.0 N/A<br />
Section B - Details - Vote 005 - Vote Function 1313<br />
GoU Donor NTR Total<br />
144,784.1 0.0 N/A 144.8<br />
57.0 23.8 N/A 80.8<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
8.1 5.0 N/A 13.1<br />
27.2 5.0 N/A 32.2<br />
0.0 0.0 N/A<br />
9.0 12.0 N/A 21.0<br />
0.0 0.0 N/A<br />
0.0 655.0 N/A 655.0<br />
0.0 40.0 N/A 40.0<br />
23.8 12.6 N/A 36.4<br />
0.0 0.0 N/A<br />
5.0 1.6 N/A 6.6<br />
0.0 0.0 N/A<br />
33,431.7 0.0 N/A 53.4<br />
2 Dysfunctional and Cumbersome Systems in<br />
MDAs and LGs studied Reviewd and Reengineered;<br />
2 Systems Review Reports produced;<br />
33,411.7 0.0 N/A 33.4<br />
9.7 0.0 N/A 9.7<br />
0.0 0.0 N/A<br />
2.1 0.0 N/A 2.1<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
5.2 0.0 N/A 5.2<br />
3.0 0.0 N/A 3.0<br />
27,863.1 0.0 N/A 47.8<br />
3 Wasteful Cost Centres in MDAs and LGs<br />
studied, analysed and recommendations made;<br />
27,843.1 0.0 N/A 27.8<br />
4.7 0.0 N/A 4.7<br />
1.9 0.0 N/A 1.9<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
8.0 0.0 N/A 8.0<br />
3.4 0.0 N/A 3.4<br />
2.0 0.0 N/A 2.0<br />
77,980.7 100.0 N/A 198.0<br />
Design, review and initiating tender action for the<br />
National Records and Archives Centre (NRAC)<br />
finalized.<br />
77,960.7 0.0 N/A 78.0<br />
5.0 20.0 N/A 25.0<br />
0.0 5.0 N/A 5.0<br />
0.0 0.0 N/A<br />
2.0 15.0 N/A 17.0<br />
2.0 10.0 N/A 12.0<br />
43
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 13<br />
Management Systems and Structures<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
221012 Small Office Equipment<br />
0.0 0.0 N/A<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
5.0 0.0 N/A 5.0<br />
227001 Travel Inland<br />
6.0 0.0 N/A 6.0<br />
227004 Fuel, Lubricants and Oils<br />
7.3 0.0 N/A 7.3<br />
228002 Maintenance - Vehicles<br />
6.0 0.0 N/A 6.0<br />
131305 Development and Dissemination of Policies, Standa<br />
Description of Planned Outputs:<br />
0.0 41.0 N/A 41.0<br />
Roll out Records Retention and DisposalSchedules<br />
in 03 MDAs and 7 LGs.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
0.0 5.0 N/A 5.0<br />
221002 Workshops and Seminars<br />
0.0 5.0 N/A 5.0<br />
221005 Hire of Venue (chairs, projector etc)<br />
0.0 5.0 N/A 5.0<br />
221007 Books, Periodicals and Newspapers<br />
0.0 0.0 N/A<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 0.0 N/A<br />
221012 Small Office Equipment<br />
0.0 0.0 N/A<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
0.0 6.0 N/A 6.0<br />
227001 Travel Inland<br />
0.0 10.0 N/A 10.0<br />
227004 Fuel, Lubricants and Oils<br />
0.0 10.0 N/A 10.0<br />
228002 Maintenance - Vehicles<br />
0.0 0.0 N/A<br />
Investment (Capital Purchases) 0.0 5,000.0 N/A 5,000.0<br />
131371 Acquisition of Land by Government<br />
Description of Planned Outputs:<br />
0.0 0.0 N/A<br />
312105 Taxes on Buildings and Structures<br />
0.0 0.0 N/A<br />
131372 Government Buildings and Administrative Infrastr<br />
Description of Planned Outputs:<br />
0.0 5,000.0 N/A 5,000.0<br />
312101 Non-Residential Buildings<br />
0.0 5,000.0 N/A 5,000.0<br />
Grand Total Vote 005 412.0 7,058.4 N/A 7,470.4<br />
GoU Donor NTR Total<br />
0.0 5.0 N/A 5.0<br />
4.0 25.0 N/A 29.0<br />
0.0 0.0 N/A<br />
5.0 10.0 N/A 15.0<br />
2.0 10.0 N/A 12.0<br />
81,371.8 0.0 N/A 151.3<br />
Records retention and disposal schedules rolled<br />
out to 6 MDAs and 12 LGs; Records staff trained<br />
in the application of the records centre and<br />
archives manuals; Records management systems<br />
introduced to 6 newly created LGs.<br />
81,301.8 0.0 N/A 81.3<br />
20.0 0.0 N/A 20.0<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.5 0.0 N/A 0.5<br />
6.0 0.0 N/A 6.0<br />
2.0 0.0 N/A 2.0<br />
6.0 0.0 N/A 6.0<br />
23.0 0.0 N/A 23.0<br />
8.0 0.0 N/A 8.0<br />
4.5 0.0 N/A 4.5<br />
550.0 2,658.4 N/A 3,208.4<br />
550.0 0.0 N/A 550.0<br />
550.0 0.0 N/A 550.0<br />
0.0 2,658.4 N/A 2,658.4<br />
0.0 2,658.4 N/A 2,658.4<br />
1,175.3 3,513.4 N/A 4,688.7<br />
Total Excluding Taxes, Arrears and NTR 412.0 7,058.4 0.0 7,470.4 625.3 3,513.4 0.0 4,138.7<br />
Section B - Details - Vote 005 - Vote Function 1313<br />
44
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function: 13 14 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
<strong>Commission</strong>er, <strong>Public</strong> <strong>Service</strong> Inspection<br />
To promote compliance with policies, standards, rules, regulations and procedures<br />
in order to enhance the efficiency and effectiveness of the MDAs and LGs.<br />
To provide technical support supervision and guidance to <strong>Public</strong> <strong>Service</strong><br />
Institutions.<br />
To improve client focus, responsiveness, accountability, transparency, efficiency<br />
and effectiveness in service delivery by <strong>Public</strong> <strong>Service</strong> Institutions.<br />
<strong>Service</strong>s:<br />
Under this vote function the Ministry will strengthen performance indicators and<br />
performance reporting of the capacity of MDAs and LGs to implement ROM. In<br />
addition the collaboration between the key coordinating institutions responsible for<br />
planning, budgeting, staff performance appraissal and monitoring and evaluation<br />
to be strengthened.<br />
Under the vote function there shall also be scaled up inspections and follow up on<br />
recommendations from various reports. The service recipients that benefit from<br />
services provided by the Government shall also be empowered to demand efficient<br />
and effective services through development and implementation of client charters.<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
* Excluding Taxes and Arrears<br />
Responsible Officer<br />
06 <strong>Public</strong> <strong>Service</strong> Inspection <strong>Commission</strong>er, <strong>Public</strong> <strong>Service</strong> Inspection(PSI)<br />
Development Projects<br />
0025b <strong>Public</strong> <strong>Service</strong> Reform Comp 3: Pub Serv Inspection <strong>Commission</strong>er, <strong>Public</strong> <strong>Service</strong> Inspection<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
2012/13<br />
Vote Function:1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Output: 13 1401 Results - Oriented Management systems strengthened across MDAs and LGs<br />
% of MDAs and LGs that have<br />
75% 90% - 95% 97% 98%<br />
mainstreamed results framework into<br />
their work processes.<br />
Output: 13 1402 <strong>Service</strong> Delivery Standards Developed, Disseminated and Utilized<br />
No. of sectors that have disseminated<br />
service delivery standards.<br />
0<br />
3 - 6 9<br />
Vote Function Cost (UShs bn) N/A 0.960 N/A 0.578 0.333 0.344<br />
VF Cost Excluding Donor<br />
0.167 0.190 0.174 0.478 N/A N/A<br />
Section B - Details - Vote 005 - Vote Function 1314<br />
45
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 14<br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
<strong>Service</strong>s Provided<br />
* Excluding Taxes and Arrears<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue:<br />
Increase coverage of MDAs<br />
and LGs in developing and<br />
implementing the client<br />
charters from 5% to 35%.<br />
Institutionalize a mechanism<br />
for obtaining client feedback<br />
on service delivery.<br />
VF Performance Issue:<br />
Increased allocation of<br />
resources to the inspectorate<br />
function.<br />
Increase coverage of<br />
inspection in terms of number<br />
of MDAs and LGs inspected,<br />
frequency and issues<br />
addressed.<br />
VF Performance Issue:<br />
2008/09<br />
Outturn<br />
13 1401 Results - Oriented Management N/A 0.354 0.143<br />
systems strengthened across MDAs<br />
Output Cost Excluding Donor N/A 0.159 0.143<br />
13 1402 <strong>Service</strong> Delivery Standards<br />
N/A 0.110 0.020<br />
Developed, Disseminated and Utilized<br />
Output Cost Excluding Donor N/A 0.020 0.020<br />
13 1403 Compliance to service delivery N/A 0.075 0.011<br />
standards<br />
Output Cost Excluding Donor N/A 0.011 0.011<br />
13 1404 Demand for <strong>Service</strong> Delivery N/A 0.121 N/A<br />
Accountability Strengthened through<br />
Output Cost Excluding Donor N/A 0.000 0.000<br />
13 1405 Dissemination of the National <strong>Service</strong> N/A 0.300 0.000<br />
Delivery Survey results<br />
Output Cost Excluding Donor N/A 0.000 0.000<br />
Total VF Cost (UShs Bn)<br />
N/A 0.960 N/A<br />
Total VF Cost Excl. Donor (UShs Bn) 0.167 0.190 0.174<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
Low capacity of service recipients to demand for quality services against the standards and client<br />
charters<br />
Stake holders consultative Increase coverage of MDAs Monitor the implementation of<br />
meeting held in November and LGs in developing and client charters.<br />
2009 to review the guide lines. implementing client charters;<br />
Institutionalize a mechanism<br />
Draft deadlines for<br />
for obtaining client feedback<br />
development , documentation on service delivery; put in<br />
and implementation of public place a mechanism for<br />
service delivery standards in tracking implementation of<br />
place.<br />
client charters.<br />
Low level of development, documentation and dissemination of service delivery standards, compliance<br />
to the service delivery standards and utilization of NSDS findings.<br />
4 MDAs inspected :MoLG, Issue policy guidelines on Step up guidance to all sectors<br />
MoJCA, ESC,JSC, & development, documentation to develop, document and<br />
MoES,MoH,& MoIA. and dissemination of service disseminate service delivery<br />
delivery standards.Document standards.<br />
service delivery standards<br />
already developed in key<br />
sectors.<br />
The need to fully integrate ROM across Government Systems and Processes especially with Output<br />
Oriented Budgeting.<br />
2012/13<br />
0.058 0.052 0.055<br />
0.058 N/A N/A<br />
0.033 0.036 0.046<br />
0.033 N/A N/A<br />
0.187 0.154 0.157<br />
0.187 N/A N/A<br />
0.240 0.091 0.087<br />
0.140 N/A N/A<br />
0.060 0.000 0.000<br />
0.060 N/A N/A<br />
0.578 0.333 0.344<br />
0.478 N/A N/A<br />
Section B - Details - Vote 005 - Vote Function 1314<br />
46
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 14<br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
Support MDAs and LGs to<br />
develop performance<br />
indicators.<br />
Enhance MDAs and LGs's<br />
capacity to implement ROM<br />
and increase compliance to<br />
performance reporting and<br />
performance<br />
information requirements.<br />
Draft frame work for the<br />
imlementation of ROM /OOB<br />
in place.<br />
Techinical support provided to<br />
LGs and urban authorities of<br />
Katakwi, Lira, soroti,<br />
Gulu,Ibanda, Kamwenge,<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
Implement the framework for<br />
ROM and OOB ; Enhance<br />
capacity of MDAs and LGs to<br />
implement ROM and OOB.<br />
Increase compliance to<br />
performance reporting and<br />
performance information<br />
requirements.<br />
Review the performance<br />
indicators for MDAs and LGs.<br />
Monitor progress of ROM<br />
implementation.Develop<br />
avenues to increase demand<br />
for performance information.<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
06 <strong>Public</strong> <strong>Service</strong> Inspection 130.0 60.3 0.0 190.3 152.6 759.0 0.0 911.6<br />
Total Recurrent Budget Estimates for VF<br />
130.0 60.3 0.0 190.3 152.6 759.0 0.0 911.6<br />
Development Budget Estimates<br />
GoU Dev Donor NTR Total GoU Dev Donor NTR Total<br />
0025b <strong>Public</strong> <strong>Service</strong> Reform Comp 3: Pub Serv Ins 0.0 770.0 0.0 770.0 0.0 100.0 0.0 100.0<br />
Total Development Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1314<br />
Total Excluding Taxes, Arrears and NTR<br />
0.0 770.0 0.0 770.0 0.0 100.0 0.0 100.0<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
190.3 770.0 0.0 960.3 911.6 100.0 0.0 1,011.6<br />
190.3 770.0 0.0 960.3 911.6 100.0 0.0 1,011.6<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 190.3 770.0 N/A 960.3<br />
131401 Results - Oriented Management systems strengthe<br />
Description of Planned Outputs:<br />
159.3 195.0 N/A 354.3<br />
Implementation of the ROM results framework<br />
strengthened throughsupport supervision.<br />
211101 General Staff Salaries<br />
130.0 0.0 N/A 130.0<br />
211103 Allowances<br />
2.4 81.0 N/A 83.4<br />
221002 Workshops and Seminars<br />
2.3 0.0 N/A 2.3<br />
221003 Staff Training<br />
1.0 0.0 N/A 1.0<br />
221005 Hire of Venue (chairs, projector etc)<br />
0.0 37.0 N/A 37.0<br />
221006 <strong>Commission</strong>s and Related Charges<br />
1.0 0.0 N/A 1.0<br />
221009 Welfare and Entertainment<br />
1.0 3.0 N/A 4.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
1.6 26.0 N/A 27.6<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 48.0 N/A 48.0<br />
227001 Travel Inland<br />
5.0 0.0 N/A 5.0<br />
227002 Travel Abroad<br />
2.0 0.0 N/A 2.0<br />
227004 Fuel, Lubricants and Oils<br />
7.0 0.0 N/A 7.0<br />
228002 Maintenance - Vehicles<br />
6.0 0.0 N/A 6.0<br />
GoU Donor NTR Total<br />
911.6 100.0 N/A 1,011.6<br />
30,098.5 0.0 N/A 58.1<br />
Framework for implementation of ROM and OOB<br />
including budget monitoring implemented;<br />
Enhance capacity of MDAs and LGs to implement<br />
ROM and OOB.<br />
30,070.5 0.0 N/A 30.1<br />
4.0 0.0 N/A 4.0<br />
4.0 0.0 N/A 4.0<br />
3.0 0.0 N/A 3.0<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
2.0 0.0 N/A 2.0<br />
4.0 0.0 N/A 4.0<br />
0.0 0.0 N/A<br />
6.0 0.0 N/A 6.0<br />
3.0 0.0 N/A 3.0<br />
1.0 0.0 N/A 1.0<br />
1.0 0.0 N/A 1.0<br />
Section B - Details - Vote 005 - Vote Function 1314<br />
47
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 14<br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
131402 <strong>Service</strong> Delivery Standards Developed, Disseminat<br />
Description of Planned Outputs:<br />
GoU Donor NTR Total<br />
20.0 90.0 N/A 110.0<br />
National <strong>Service</strong> Delivery Standards<br />
developed.Sectors, MDAs and LGs supported to<br />
develop, document and disseminate service delivery<br />
standards.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
3.0 57.0 N/A 60.0<br />
221002 Workshops and Seminars<br />
2.0 0.0 N/A 2.0<br />
221003 Staff Training<br />
2.0 0.0 N/A 2.0<br />
221007 Books, Periodicals and Newspapers<br />
1.0 0.0 N/A 1.0<br />
221009 Welfare and Entertainment<br />
2.0 2.0 N/A 4.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 11.0 N/A 11.0<br />
221012 Small Office Equipment<br />
1.0 0.0 N/A 1.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
1.0 0.0 N/A 1.0<br />
227001 Travel Inland<br />
2.0 0.0 N/A 2.0<br />
227002 Travel Abroad<br />
1.0 0.0 N/A 1.0<br />
227004 Fuel, Lubricants and Oils<br />
3.0 15.0 N/A 18.0<br />
228002 Maintenance - Vehicles<br />
2.0 5.0 N/A 7.0<br />
131403 Compliance to service delivery standards<br />
Description of Planned Outputs:<br />
11.0 64.0 N/A 75.0<br />
12 MDAs and 25 LGs inspected.Follow-up<br />
inspections and technical support supervision<br />
provided to MDAs.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
2.0 45.4 N/A 47.4<br />
221002 Workshops and Seminars<br />
1.0 0.0 N/A 1.0<br />
221007 Books, Periodicals and Newspapers<br />
1.0 0.0 N/A 1.0<br />
221010 Special Meals and Drinks<br />
0.0 5.0 N/A 5.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 4.0 N/A 4.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
1.0 0.0 N/A 1.0<br />
227001 Travel Inland<br />
3.0 0.0 N/A 3.0<br />
227004 Fuel, Lubricants and Oils<br />
2.0 9.6 N/A 11.6<br />
228002 Maintenance - Vehicles<br />
1.0 0.0 N/A 1.0<br />
131404 Demand for <strong>Service</strong> Delivery Accountability Stren<br />
Description of Planned Outputs:<br />
0.0 121.0 N/A 121.0<br />
The implementation of client charters using the client<br />
feedback mechanism monitored in 03 MDAs and 03<br />
LGs.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
0.0 23.0 N/A 23.0<br />
221002 Workshops and Seminars<br />
0.0 0.0 N/A<br />
221009 Welfare and Entertainment<br />
0.0 21.0 N/A 21.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 20.0 N/A 20.0<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 20.0 N/A 20.0<br />
227001 Travel Inland<br />
0.0 0.0 N/A<br />
227003 Carriage, Haulage, Freight and Transport Hire<br />
0.0 17.0 N/A 17.0<br />
227004 Fuel, Lubricants and Oils<br />
0.0 20.0 N/A 20.0<br />
228002 Maintenance - Vehicles<br />
0.0 0.0 N/A<br />
Section B - Details - Vote 005 - Vote Function 1314<br />
GoU Donor NTR Total<br />
11,159.2 0.0 N/A 33.1<br />
Support Sectors to develop, document and<br />
disseminate service delivery standards against the<br />
findings of the NSDS 2008.<br />
11,137.2 0.0 N/A 11.1<br />
3.0 0.0 N/A 3.0<br />
3.0 0.0 N/A 3.0<br />
2.0 0.0 N/A 2.0<br />
1.0 0.0 N/A 1.0<br />
2.0 0.0 N/A 2.0<br />
0.0 0.0 N/A<br />
1.0 0.0 N/A 1.0<br />
1.0 0.0 N/A 1.0<br />
3.0 0.0 N/A 3.0<br />
1.0 0.0 N/A 1.0<br />
3.0 0.0 N/A 3.0<br />
2.0 0.0 N/A 2.0<br />
66,943.4 0.0 N/A 186.8<br />
Review of Central Government Inspection and<br />
supervision regimes of local governments<br />
completed and roadmap for implementation<br />
closely aligned with the corresponding PSM action<br />
prepared; Joined up inspection of MDAs and LGs<br />
undertaken.<br />
66,823.4 0.0 N/A 66.8<br />
20.0 0.0 N/A 20.0<br />
15.0 0.0 N/A 15.0<br />
1.0 0.0 N/A 1.0<br />
0.0 0.0 N/A<br />
7.0 0.0 N/A 7.0<br />
4.4 0.0 N/A 4.4<br />
44.0 0.0 N/A 44.0<br />
24.6 0.0 N/A 24.6<br />
4.0 0.0 N/A 4.0<br />
44,643.9 100.0 N/A 239.5<br />
Clients empowered to demand for efficient and<br />
effective services by scaling up the development,<br />
implementation and dissemination of client<br />
charters in MDAs and LGs and institutionalizing a<br />
mechanism for obtaining feedback from clients on<br />
service delivery.<br />
44,548.9 0.0 N/A 44.5<br />
15.0 5.0 N/A 20.0<br />
20.0 0.0 N/A 20.0<br />
0.0 15.0 N/A 15.0<br />
10.0 20.0 N/A 30.0<br />
0.0 20.0 N/A 20.0<br />
30.0 20.0 N/A 50.0<br />
0.0 0.0 N/A<br />
15.0 15.0 N/A 30.0<br />
5.0 5.0 N/A 10.0<br />
48
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 14<br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
131405 Dissemination of the National <strong>Service</strong> Delivery Sur<br />
Description of Planned Outputs:<br />
GoU Donor NTR Total<br />
0.0 300.0 N/A 300.0<br />
The National <strong>Service</strong> Delivery Survey (2008) Report<br />
finalised and disseminated<br />
211103 Allowances<br />
0.0 0.0 N/A<br />
221009 Welfare and Entertainment<br />
0.0 100.0 N/A 100.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 200.0 N/A 200.0<br />
227001 Travel Inland<br />
0.0 0.0 N/A<br />
227004 Fuel, Lubricants and Oils<br />
0.0 0.0 N/A<br />
228002 Maintenance - Vehicles<br />
0.0 0.0 N/A<br />
131406 Vehicle Census<br />
0.0 0.0 N/A<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
0.0 0.0 N/A<br />
Grand Total Vote 005 190.3 770.0 N/A 960.3<br />
GoU Donor NTR Total<br />
60.0 0.0 N/A 60.0<br />
This key output which was a one off was taken<br />
care of in the 2009/10 budget.<br />
5.0 0.0 N/A 5.0<br />
10.0 0.0 N/A 10.0<br />
5.0 0.0 N/A 5.0<br />
25.0 0.0 N/A 25.0<br />
10.0 0.0 N/A 10.0<br />
5.0 0.0 N/A 5.0<br />
434.0 0.0 N/A 434.0<br />
434.0 0.0 N/A 434.0<br />
911.6 100.0 N/A 1,011.6<br />
Total Excluding Taxes, Arrears and NTR 190.3 770.0 0.0 960.3 911.6 100.0 0.0 1,011.6<br />
Section B - Details - Vote 005 - Vote Function 1314<br />
49
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function: 13 15 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
<strong>Service</strong>s:<br />
<strong>Commission</strong>er Compensation<br />
To ensure fair, equitable, transparent, and prompt system of computation and<br />
payment of pension benefits and other terminal benefits.<br />
The purpose of the vote function is to manage the Pensions Scheme for the<br />
traditional <strong>Public</strong> <strong>Service</strong>, the Police Force, the Prisons <strong>Service</strong>, the Education<br />
<strong>Service</strong>, Defence and the compensation of the former employees of the defunct East<br />
African Community(EAC).<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
* Excluding Taxes and Arrears<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
Total VF Cost (UShs Bn) 78.300<br />
* Excluding Taxes and Arrears<br />
Responsible Officer<br />
09 <strong>Public</strong> <strong>Service</strong> Pensions <strong>Commission</strong>er, Compensation<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue:<br />
2008/09<br />
Outturn<br />
Vote Function:1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Vote Function Cost (UShs bn) 78.300 103.390 192.665<br />
<strong>Service</strong>s Provided<br />
13 1501 Payment of Statutory Pensions<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
2012/13<br />
193.036 163.233 210.536<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 103.390 192.665<br />
103.390 192.665<br />
2012/13<br />
193.036 163.233 210.536<br />
193.036 163.233 210.536<br />
VF Performance Issue:<br />
Limited Budgetary provision for the Payment of Pensions<br />
Request made to Ministry of More pensioners to be cleared<br />
Make request to Government Finance, Planning and<br />
to increase the budgetary Economic Development for<br />
allocations for the payment of more fundin<br />
Pensions.<br />
VF Performance Issue: Cumbersome Pension Management Systems<br />
Section B - Details - Vote 005 - Vote Function 1315<br />
Prioritising Payment of<br />
Pension.<br />
50
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 15<br />
<strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
Pension Management System<br />
simplified.<br />
The issue is for the FY10/11<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
Simplifying the cumbersome<br />
procedures and systems of<br />
administering and processing<br />
Pensions.<br />
Simplifying the cumbersome<br />
procedures and systems of<br />
administering and processing<br />
Pensions.<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
09 <strong>Public</strong> <strong>Service</strong> Pensions 0.0 115,390.0 0.0 115,390.0 0.0 306,053.5 0.0 306,053.5<br />
Total Recurrent Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1315<br />
Total Excluding Taxes, Arrears and NTR<br />
0.0 115,390.0 0.0 115,390.0 0.0 306,053.5 0.0 306,053.5<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
115,390.0 0.0 0.0 115,390.0 306,053.5 0.0 0.0 306,053.5<br />
103,390.0 0.0 0.0 103,390.0 193,036.3 0.0 0.0 193,036.3<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 103,390.0 0.0 N/A 103,390.0<br />
131501 Payment of Statutory Pensions<br />
Description of Planned Outputs:<br />
103,390.0 0.0 N/A 103,390.0<br />
211106 Emoluments paid to former Presidents/Vice Preside<br />
0.0 0.0 N/A<br />
212101 Social Security Contributions (NSSF)<br />
0.0 0.0 N/A<br />
212102 Pension for General Civil <strong>Service</strong><br />
53,464.1 0.0 N/A 53,464.1<br />
212103 Pension for Teachers<br />
36,203.8 0.0 N/A 36,203.8<br />
212104 Pension for Military <strong>Service</strong><br />
13,722.1 0.0 N/A 13,722.1<br />
212105 Pension and Gratuity for Local Governments<br />
0.0 0.0 N/A<br />
213004 Gratuity Payments<br />
0.0 0.0 N/A<br />
Arrears 12,000.0 0.0 N/A 12,000.0<br />
131599 Arrears<br />
Description of Planned Outputs:<br />
GoU Donor NTR Total<br />
193,036.3 0.0 N/A 193,036.3<br />
193,036.3 0.0 N/A 193,036.3<br />
Pension requirement for the FY 2009/2010 amounting Monthly pension paid (Tradional, Teachers,<br />
to 152.2 bn paid.The projected pension arrears as Veterans, widows and Claimants) Outstanding<br />
at June 30th 2008 stands at UGX Shs 130 bn. Arrears Paid<br />
However, this may not be possible since only 12<br />
billion has been provided for the payment of Arrears.<br />
12,000.0 0.0 N/A 12,000.0<br />
321608 Pension Arrears<br />
12,000.0 0.0 N/A 12,000.0<br />
Grand Total Vote 005 115,390.0 0.0 N/A 115,390.0<br />
264.8 0.0 N/A 264.8<br />
44,121.3 0.0 N/A 44,121.3<br />
60,000.1 0.0 N/A 60,000.1<br />
48,000.1 0.0 N/A 48,000.1<br />
24,000.1 0.0 N/A 24,000.1<br />
12,000.0 0.0 N/A 12,000.0<br />
4,649.9 0.0 N/A 4,649.9<br />
113,017.2 0.0 N/A 113,017.2<br />
113,017.2 0.0 N/A 113,017.2<br />
113,017.2 0.0 N/A 113,017.2<br />
306,053.5 0.0 N/A 306,053.5<br />
Total Excluding Taxes, Arrears and NTR 103,390.0 0.0 0.0 103,390.0 193,036.3 0.0 0.0 193,036.3<br />
Section B - Details - Vote 005 - Vote Function 1315<br />
51
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function: 13 16 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
<strong>Service</strong>s:<br />
<strong>Commission</strong>er, Compensation<br />
To ensure fair, equitable, transparent and prompt system of computation and<br />
payment of pension and other terminal benefits.<br />
Payment of Pension for Traditional Civil Servants, Education <strong>Service</strong>, former East<br />
African Community (EAC) Employees, staff of the Police and Prisons Departments,<br />
the UPDF and the Local Government Staff.<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
* Excluding Taxes and Arrears<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
* Excluding Taxes and Arrears<br />
Responsible Officer<br />
05 Compensation <strong>Commission</strong>er,Compensation<br />
Development Projects<br />
0025c <strong>Public</strong> <strong>Service</strong> Reform Comp 4 : Pension Reform <strong>Commission</strong>er, Compensation<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
2012/13<br />
Vote Function:1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Output: 13 1601 Implementation of the <strong>Public</strong> <strong>Service</strong> Pension Reforms<br />
Percentage of retiring officers who<br />
received pre-retirement training<br />
30% 90% - 90% 90% 90%<br />
Vote Function Cost (UShs bn) N/A 4.547 N/A 3.572 3.676 4.421<br />
VF Cost Excluding Donor<br />
0.206 4.227 4.005 3.372 N/A N/A<br />
<strong>Service</strong>s Provided<br />
13 1601 Implementation of the <strong>Public</strong> <strong>Service</strong><br />
Pension Reforms<br />
Output Cost Excluding Donor<br />
Total VF Cost (UShs Bn)<br />
Total VF Cost Excl. Donor (UShs Bn)<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 4.547 N/A<br />
N/A<br />
N/A<br />
0.206<br />
4.227 4.005<br />
4.547 N/A<br />
4.227 4.005<br />
2012/13<br />
3.572 3.676 4.421<br />
3.372 N/A N/A<br />
3.572 3.676 4.421<br />
3.372 N/A N/A<br />
Section B - Details - Vote 005 - Vote Function 1316<br />
52
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 16<br />
<strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue:<br />
Pension Management System<br />
simplified.<br />
Cumbersome Pension Management System<br />
Penson Advisior recruited;<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
Penson Advisior recruited;<br />
Pension Audit finalized and<br />
recommendations<br />
implemented.<br />
VF Performance Issue:<br />
Delayed implementation of Pension Reforms<br />
Perfecting the integration of<br />
the PIMS into the IPPS.<br />
Process of hiring a pensions<br />
advisor commenced.<br />
Pensions arrears cleared and<br />
PIMS integrated into IPPS;<br />
VF Performance Issue:<br />
Inadequate funds for payment of Pension liabilities<br />
Commencement of the<br />
implementation of pension<br />
reforms.<br />
Development and<br />
implementation of client<br />
charters rolled out to<br />
additional MDAs and LGs<br />
after the pilot implementation<br />
and an independent review of<br />
the implementation of client<br />
charters in MDAs and LGs<br />
undertaken.<br />
Penson Advisior recruited;<br />
Pension Audit finalized and<br />
recommendations<br />
implemented.<br />
Simplification of the Pension<br />
management systems.<br />
Pension reforms implemented.<br />
Pension reforms implemented<br />
and the Establishment of the<br />
Pension Fund.<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
05 Compensation 147.0 4,080.0 0.0 4,227.0 171.5 3,200.0 0.0 3,371.5<br />
Total Recurrent Budget Estimates for VF<br />
147.0 4,080.0 0.0 4,227.0 171.5 3,200.0 0.0 3,371.5<br />
Development Budget Estimates<br />
GoU Dev Donor NTR Total GoU Dev Donor NTR Total<br />
0025c <strong>Public</strong> <strong>Service</strong> Reform Comp 4 : Pension Ref 0.0 320.0 0.0 320.0 0.0 200.0 0.0 200.0<br />
Total Development Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1316<br />
Total Excluding Taxes, Arrears and NTR<br />
0.0 320.0 0.0 320.0 0.0 200.0 0.0 200.0<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
4,227.0 320.0 0.0 4,547.0 3,371.5 200.0 0.0 3,571.5<br />
4,227.0 320.0 0.0 4,547.0 3,371.5 200.0 0.0 3,571.5<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 4,227.0 320.0 N/A 4,547.0<br />
131601 Implementation of the <strong>Public</strong> <strong>Service</strong> Pension Refo<br />
Description of Planned Outputs:<br />
4,227.0 320.0 N/A 4,547.0<br />
Support activities to the projectcomponent of the<br />
pension reforms.Making the public<br />
knowledgeableabout the pension reforms. <strong>Public</strong><br />
<strong>Service</strong> Pension Reforms implemented.Pension<br />
management systems reviewed.<br />
211101 General Staff Salaries<br />
147.0 0.0 N/A 147.0<br />
Section B - Details - Vote 005 - Vote Function 1316<br />
GoU Donor NTR Total<br />
3,371.5 200.0 N/A 3,571.5<br />
174,713.4 200.0 N/A 3,571.5<br />
Pension arrears cleared & PIMS integrated into<br />
IPPS; implement recommendations of the ongoing<br />
pension audit;Severance packages to NAADS staff<br />
paid; technical support to MDAs/LGs on the<br />
pension reform provided; pensions payroll<br />
updated and run;<br />
171,513.4 0.0 N/A 171.5<br />
53
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 16<br />
<strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
211103 Allowances<br />
17.2 20.7 N/A 37.9<br />
212105 Pension and Gratuity for Local Governments<br />
4,000.0 0.0 N/A 4,000.0<br />
213001 Medical Expenses(To Employees)<br />
3.5 0.0 N/A 3.5<br />
221002 Workshops and Seminars<br />
0.0 28.0 N/A 28.0<br />
221003 Staff Training<br />
1.9 30.0 N/A 31.9<br />
221005 Hire of Venue (chairs, projector etc)<br />
0.0 5.0 N/A 5.0<br />
221006 <strong>Commission</strong>s and Related Charges<br />
3.0 0.0 N/A 3.0<br />
221007 Books, Periodicals and Newspapers<br />
0.0 0.0 N/A 0.0<br />
221009 Welfare and Entertainment<br />
4.5 36.6 N/A 41.1<br />
221011 Printing, Stationery, Photocopying and Binding<br />
20.0 3.0 N/A 23.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
14.0 0.0 N/A 14.0<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 114.1 N/A 114.1<br />
227001 Travel Inland<br />
0.0 0.0 N/A<br />
227002 Travel Abroad<br />
0.0 34.4 N/A 34.4<br />
227004 Fuel, Lubricants and Oils<br />
5.0 48.3 N/A 53.3<br />
228002 Maintenance - Vehicles<br />
10.9 0.0 N/A 10.9<br />
Grand Total Vote 005 4,227.0 320.0 N/A 4,547.0<br />
GoU Donor NTR Total<br />
22.0 0.0 N/A 22.0<br />
3,000.0 0.0 N/A 3,000.0<br />
0.0 0.0 N/A<br />
20.0 0.0 N/A 20.0<br />
12.8 0.0 N/A 12.8<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
15.8 0.0 N/A 15.8<br />
21.5 0.0 N/A 21.5<br />
41.5 0.0 N/A 41.5<br />
0.0 200.0 N/A 200.0<br />
30.0 0.0 N/A 30.0<br />
0.0 0.0 N/A<br />
21.2 0.0 N/A 21.2<br />
15.2 0.0 N/A 15.2<br />
3,371.5 200.0 N/A 3,571.5<br />
Total Excluding Taxes, Arrears and NTR 4,227.0 320.0 0.0 4,547.0 3,371.5 200.0 0.0 3,571.5<br />
Section B - Details - Vote 005 - Vote Function 1316<br />
54
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function: 13 49 Policy, Planning and Support <strong>Service</strong>s<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
Under Secretary Finance and Administration<br />
The objective of this vote function is to ensure that the Ministry of <strong>Public</strong> <strong>Service</strong><br />
has standardized office facilities and services for effective service delivery.<br />
It also ensures the supervision and coordination of the implementation of Human<br />
Resource Policies, Systems and Processes and the Monitoring & Evaluation of the<br />
impact of the aforesaid initiatives on <strong>Service</strong> Delivery.<br />
The vote function also ensures that the Information, Education and Communication<br />
(IEC) issues pertaining to the Ministry are appropriately handled.<br />
<strong>Service</strong>s:<br />
The purpose of this vote function is to ensure the efficient and effective utilisation<br />
of the Human, Financial and Material resources in the Ministry. In this regard, the<br />
vote function is mandated to create a conducive working environment for staff<br />
through the provision of support services in the areas of: Administration;<br />
Establishment Management; Financial Management; Procurement; Policy<br />
Analysis; Planning and Staff Development.<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
The vote function facilitates the operations of all the technical Departments of the<br />
Ministry through the provision of appropriate tools and services for effective<br />
delivery of services to both the internal and external clientele.<br />
Additionally, this vote function takes care of Monitoring and Evaluation(M&E) of<br />
Policies and Programmes and caters for the Information, Education and<br />
Communication(IEC) issues across the entire Ministry.<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
Responsible Officer<br />
01 Finance and Administration Under Secretary Finance and Administration<br />
02 Administrative Reform Director R&D<br />
10 Internal Audit Under-Secretary, Finance and Administration<br />
Development Projects<br />
0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s US F&A;<br />
2008/09<br />
Outturn<br />
Vote Function:1349 Policy, Planning and Support <strong>Service</strong>s<br />
Vote Function Cost (UShs bn) N/A 8.370 N/A<br />
VF Cost Excluding Donor<br />
2.062 3.487 3.666<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
2012/13<br />
5.011 5.399 5.679<br />
3.624 N/A N/A<br />
55
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
* Excluding Taxes and Arrears<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
<strong>Service</strong>s Provided<br />
2008/09<br />
Outturn<br />
13 4911 Provision of Office Equipment and<br />
Facilities<br />
Output Cost Excluding Donor<br />
13 4912 Production of Workplans and Budgets<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 3.957 N/A<br />
N/A 2.558 2.672<br />
N/A 0.861 N/A<br />
2012/13<br />
2.981 3.852 3.910<br />
2.477 N/A N/A<br />
0.524 0.592 0.691<br />
Output Cost Excluding Donor<br />
13 4913 Financial Management<br />
Output Cost Excluding Donor<br />
13 4914 Management of Resouce Centre and<br />
Registries<br />
Output Cost Excluding Donor<br />
13 4915 Implementation of the IEC Strategy<br />
Output Cost Excluding Donor<br />
13 4916 PSRP Monitoring and Evaluation<br />
Framework developed and<br />
Output Cost Excluding Donor<br />
<strong>Service</strong>s Funded<br />
13 4952 Policy Development (Cabinet<br />
Secretariat)<br />
Output Cost Excluding Donor<br />
13 4953 Membership to international<br />
Organization (xxxxxxx)<br />
Capital Purchases<br />
13 4972 Government Buildings and<br />
Administrative Infrastructure<br />
Output Cost Excluding Donor<br />
13 4975 Purchase of Motor Vehicles and<br />
Other Transport Equipment<br />
13 4978 Purchase of Office and Residential<br />
Furniture and Fittings<br />
Total VF Cost (UShs Bn)<br />
Total VF Cost Excl. Donor (UShs Bn)<br />
* Excluding Taxes and Arrears<br />
N/A 0.006 0.006<br />
N/A 0.164 N/A<br />
N/A 0.060 0.059<br />
N/A 0.080 N/A<br />
N/A 0.035 0.035<br />
N/A 1.312 N/A<br />
N/A 0.182 0.164<br />
N/A 0.958 N/A<br />
N/A 0.030 0.030<br />
N/A 0.250 0.000<br />
N/A 0.000 0.000<br />
N/A 0.157 0.240<br />
N/A 0.219 0.049<br />
N/A 0.049 0.049<br />
N/A 0.360 0.360<br />
N/A 0.051 0.051<br />
N/A 8.370 N/A<br />
2.062 3.487 3.666<br />
0.176 N/A N/A<br />
0.183 0.165 0.182<br />
0.163 N/A N/A<br />
0.116 0.107 0.204<br />
0.101 N/A N/A<br />
0.396 0.325 0.365<br />
0.236 N/A N/A<br />
0.520 0.228 0.326<br />
0.080 N/A N/A<br />
0.000 0.000 0.000<br />
0.000 N/A N/A<br />
0.000 0.000 0.000<br />
0.080 0.080 0.000<br />
0.080 N/A N/A<br />
0.160 0.000 0.000<br />
0.051 0.051 0.000<br />
5.011 5.399 5.679<br />
3.524 N/A N/A<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
56
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue:<br />
Communication and<br />
popularization of the various<br />
MoPS priorities.<br />
Transformation and operation<br />
of a modern resource centre<br />
for MoPS.<br />
Strengthening internal and<br />
external communications<br />
capacity.<br />
VF Performance Issue:<br />
Improve MIS and M&E<br />
Capacity in the Ministry of<br />
<strong>Public</strong> <strong>Service</strong>.<br />
Carry out surveys for<br />
collecting and compiling<br />
performance data.<br />
PSRP Evaluation.<br />
VF Performance Issue:<br />
Procurement of adequate<br />
goods & services.<br />
Maintanance of office<br />
equipment and<br />
Paymenet of postage<br />
,Courier, utility bills.<br />
VF Performance Issue:<br />
An IEC Policy that covers both the Ministry of <strong>Public</strong> <strong>Service</strong> and the Wider Stakeholder Community.<br />
Installed MoPS toll free line; Finalize and implement Implement actions of the<br />
Increased outreach to LGs; knowledge management revised MoPS, IEC and IT<br />
Initiated consultancy to design strategy; implement the strategies.<br />
knowledge management Ministry's out reach plan;<br />
strategy for MoPS<br />
implement media partnership<br />
and public relations activities;<br />
popularise new MoPS website;<br />
Began Phase 2 of the MoPs<br />
intranet/extranet design.<br />
Began redesign of the MoPS<br />
website<br />
Implement MoPS business<br />
continuity plan.<br />
Inadequate capacity to Monitor and Evaluate the implemetation of <strong>Public</strong> <strong>Service</strong> Policies, Systems<br />
and Processes.<br />
Build capacity of M&E in<br />
MoPS<br />
Quarterly progress reports<br />
produced; pilot data collection<br />
undertaken and preparation for<br />
data processing made.<br />
Monitoring and Evaluation<br />
Systems and processes<br />
strengthened.<br />
Implementing the PSRP<br />
Evaluation recommendations.<br />
Inadequate logistical support to Staff & the Departments(funding, transport, office space) for them to<br />
perform their functions.<br />
Procure office equipments and Office equipment and facilities<br />
facilities<br />
provided.<br />
Assorted stationary and<br />
equipment to all user<br />
departments; staff welfare<br />
provided; Maintenance of<br />
office equipments and<br />
computers carried out;<br />
postage, courier and utility<br />
bills for the Ministry paid.<br />
Inadequate policy capacity within the Ministry of <strong>Public</strong> <strong>Service</strong>.<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
57
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
Policy, Planning and Support <strong>Service</strong>s<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
Strengthen the policy<br />
capacity within the Ministry<br />
through training and research<br />
in the identified key areas.<br />
Policy research study finalized.<br />
The ministry intends to<br />
recruit more competent staff<br />
to do monitoring and<br />
evaluation of policies and<br />
programmes<br />
VF Performance Issue:<br />
Long and strenous procurement processes<br />
Undertake the study of the<br />
procurement and contract<br />
management process in order<br />
to improve them.<br />
VF Performance Issue:<br />
Consensus building<br />
workshops carried out.<br />
Ministries officials trained on<br />
procurement and contract<br />
management.<br />
Improve capacity by<br />
undertaking short trainings<br />
Undertake short term<br />
trainings on procurement;<br />
Undertake short training<br />
courses in procurement and<br />
contract management.<br />
Implementing<br />
recommendations study<br />
recommendations.<br />
Improving the procurement<br />
process in the Ministry.<br />
Slow consensus building processes for approving Workplans and Budgets for the Ministry.<br />
3 concensus workshops<br />
planned for 2010/11<br />
One concensus building<br />
workshop carried<br />
out<br />
Networking to build<br />
Consensus in advance.<br />
Quarterly and annual<br />
workplans timely developed.<br />
1st and<br />
2nd quarter workplans were<br />
timely produced and submitted<br />
to Finance<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Workplans and Budgets timely<br />
developed and supported.<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
01 Finance and Administration 479.2 1,730.0 0.0 2,209.2 470.0 1,649.0 0.0 2,119.0<br />
02 Administrative Reform 142.0 80.0 0.0 222.0 165.9 160.0 0.0 325.9<br />
10 Internal Audit 25.0 30.0 0.0 55.0 27.8 50.0 0.0 77.8<br />
Total Recurrent Budget Estimates for VF<br />
646.2 1,840.0 0.0 2,486.2 663.8 1,859.0 0.0 2,522.8<br />
Development Budget Estimates<br />
GoU Dev Donor NTR Total GoU Dev Donor NTR Total<br />
0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support Servi 1,201.0 4,882.5 0.0 6,083.5 1,101.0 1,487.0 0.0 2,588.0<br />
Total Development Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1349<br />
Total Excluding Taxes, Arrears and NTR<br />
1,201.0 4,882.5 0.0 6,083.5 1,101.0 1,487.0 0.0 2,588.0<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
3,687.2 4,882.5 0.0 8,569.7 3,623.8 1,487.0 0.0 5,110.8<br />
3,487.2 4,882.5 0.0 8,369.7 3,523.8 1,487.0 0.0 5,010.8<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 2,870.0 4,462.5 N/A 7,332.5<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
GoU Donor NTR Total<br />
3,232.8 1,487.0 N/A 4,719.8<br />
58
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
134911 Provision of Office Equipment and Facilities<br />
Description of Planned Outputs:<br />
GoU Donor NTR Total<br />
2,557.5 1,399.7 N/A 3,957.2<br />
Office equipment and facilities provided.General<br />
support services provided.<br />
211101 General Staff Salaries<br />
479.2 0.0 N/A 479.2<br />
211102 Contract Staff Salaries (Incl. Casuals, Temporary)<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
311.4 0.0 N/A 311.4<br />
213001 Medical Expenses(To Employees)<br />
35.0 0.0 N/A 35.0<br />
213002 Incapacity, death benefits and funeral expenses<br />
25.0 0.0 N/A 25.0<br />
221001 Advertising and <strong>Public</strong> Relations<br />
196.8 0.0 N/A 196.8<br />
221002 Workshops and Seminars<br />
30.6 112.1 N/A 142.7<br />
221003 Staff Training<br />
30.0 146.7 N/A 176.7<br />
221006 <strong>Commission</strong>s and Related Charges<br />
10.0 0.0 N/A 10.0<br />
221007 Books, Periodicals and Newspapers<br />
26.0 55.2 N/A 81.2<br />
221008 Computer Supplies and IT <strong>Service</strong>s<br />
50.0 0.0 N/A 50.0<br />
221009 Welfare and Entertainment<br />
64.0 0.0 N/A 64.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
47.5 360.0 N/A 407.5<br />
221012 Small Office Equipment<br />
44.0 100.0 N/A 144.0<br />
221014 Bank Charges and other Bank related costs<br />
2.0 0.0 N/A 2.0<br />
221016 IFMS Recurrent Costs<br />
60.0 0.0 N/A 60.0<br />
222001 Telecommunications<br />
100.0 135.0 N/A 235.0<br />
222002 Postage and Courier<br />
9.0 0.0 N/A 9.0<br />
223001 Property Expenses<br />
149.9 0.0 N/A 149.9<br />
223005 Electricity<br />
60.0 0.0 N/A 60.0<br />
223006 Water<br />
35.0 0.0 N/A 35.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
19.0 300.0 N/A 319.0<br />
227001 Travel Inland<br />
150.0 0.0 N/A 150.0<br />
227002 Travel Abroad<br />
81.2 0.0 N/A 81.2<br />
227003 Carriage, Haulage, Freight and Transport Hire<br />
0.0 10.0 N/A 10.0<br />
227004 Fuel, Lubricants and Oils<br />
172.0 80.7 N/A 252.7<br />
228001 Maintenance - Civil<br />
80.0 0.0 N/A 80.0<br />
228002 Maintenance - Vehicles<br />
180.0 100.0 N/A 280.0<br />
228003 Maintenance Machinery, Equipment and Furniture<br />
110.0 0.0 N/A 110.0<br />
134912 Production of Workplans and Budgets<br />
Description of Planned Outputs:<br />
5.5 855.9 N/A 861.4<br />
The MoPS BFP, Workplan and Budget for FY<br />
2009/10 prepared on time.Ministerial Policy<br />
Statement prepared on time. MoPS Staff guided<br />
on policy and planning issues.Relevant Policy<br />
Advice provided.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
1.5 26.0 N/A 27.5<br />
221002 Workshops and Seminars<br />
1.5 460.0 N/A 461.5<br />
221003 Staff Training<br />
0.0 0.0 N/A<br />
221007 Books, Periodicals and Newspapers<br />
0.0 30.0 N/A 30.0<br />
221009 Welfare and Entertainment<br />
1.5 8.0 N/A 9.5<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.5 17.0 N/A 17.5<br />
221012 Small Office Equipment<br />
0.5 0.0 N/A 0.5<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
0.0 0.0 N/A<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 9.4 N/A 9.4<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 279.4 N/A 279.4<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
GoU Donor NTR Total<br />
344,048.2 504.0 N/A 2,980.9<br />
Office equipment and facilities provided;Office<br />
ambience and cleaning service; Purchase and<br />
maintanance of office equipment;Maintanance<br />
and fuelling of vehicles<br />
341,913.2 0.0 N/A 341.9<br />
88.6 0.0 N/A 88.6<br />
305.0 0.0 N/A 305.0<br />
25.0 0.0 N/A 25.0<br />
25.0 0.0 N/A 25.0<br />
116.8 0.0 N/A 116.8<br />
30.6 30.0 N/A 60.6<br />
30.0 30.0 N/A 60.0<br />
0.0 0.0 N/A<br />
26.0 0.0 N/A 26.0<br />
50.0 0.0 N/A 50.0<br />
51.0 0.0 N/A 51.0<br />
47.5 94.0 N/A 141.5<br />
60.0 20.0 N/A 80.0<br />
2.0 0.0 N/A 2.0<br />
60.0 0.0 N/A 60.0<br />
235.0 110.0 N/A 345.0<br />
9.0 0.0 N/A 9.0<br />
70.6 0.0 N/A 70.6<br />
60.0 0.0 N/A 60.0<br />
35.0 0.0 N/A 35.0<br />
156.8 100.0 N/A 256.8<br />
120.0 0.0 N/A 120.0<br />
81.2 0.0 N/A 81.2<br />
0.0 0.0 N/A<br />
140.0 70.0 N/A 210.0<br />
60.0 0.0 N/A 60.0<br />
150.0 50.0 N/A 200.0<br />
100.0 0.0 N/A 100.0<br />
22,428.5 348.0 N/A 524.3<br />
Workplans,Budgets and Ministerial Policy<br />
Statement developed; Relevant policy advice<br />
given;General support & sensitization on planning,<br />
budgeting and policy functions; Harmonization of<br />
the various planning and budgeting frameworks.<br />
22,274.5 0.0 N/A 22.3<br />
59.3 14.0 N/A 73.3<br />
15.7 26.0 N/A 41.7<br />
14.0 20.0 N/A 34.0<br />
0.0 19.6 N/A 19.6<br />
3.0 3.0 N/A 6.0<br />
20.0 20.0 N/A 40.0<br />
2.0 10.0 N/A 12.0<br />
0.0 40.0 N/A 40.0<br />
0.0 89.0 N/A 89.0<br />
0.0 0.0 N/A<br />
59
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
227001 Travel Inland<br />
0.0 0.0 N/A<br />
227002 Travel Abroad<br />
0.0 0.0 N/A<br />
227004 Fuel, Lubricants and Oils<br />
0.0 26.1 N/A 26.1<br />
134913 Financial Management<br />
Description of Planned Outputs:<br />
60.0 104.0 N/A 164.0<br />
The Internal audit function and related activities<br />
strengthened and undertaken.<br />
211101 General Staff Salaries<br />
25.0 0.0 N/A 25.0<br />
211103 Allowances<br />
9.0 10.0 N/A 19.0<br />
221002 Workshops and Seminars<br />
2.0 10.0 N/A 12.0<br />
221003 Staff Training<br />
2.0 0.0 N/A 2.0<br />
221006 <strong>Commission</strong>s and Related Charges<br />
0.3 0.0 N/A 0.3<br />
221007 Books, Periodicals and Newspapers<br />
1.7 10.0 N/A 11.7<br />
221008 Computer Supplies and IT <strong>Service</strong>s<br />
2.0 0.0 N/A 2.0<br />
221009 Welfare and Entertainment<br />
2.0 10.0 N/A 12.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
1.0 0.0 N/A 1.0<br />
221012 Small Office Equipment<br />
1.0 10.0 N/A 11.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
0.0 34.0 N/A 34.0<br />
227001 Travel Inland<br />
5.0 10.0 N/A 15.0<br />
227002 Travel Abroad<br />
2.0 0.0 N/A 2.0<br />
227004 Fuel, Lubricants and Oils<br />
1.0 0.0 N/A 1.0<br />
228002 Maintenance - Vehicles<br />
3.0 10.0 N/A 13.0<br />
228003 Maintenance Machinery, Equipment and Furniture<br />
3.0 0.0 N/A 3.0<br />
134914 Management of Resouce Centre and Registries<br />
Description of Planned Outputs:<br />
35.0 45.0 N/A 80.0<br />
The Minstry Resource Centre transformed and<br />
modernised.<br />
211101 General Staff Salaries<br />
0.0 0.0 N/A<br />
211103 Allowances<br />
0.0 5.0 N/A 5.0<br />
221007 Books, Periodicals and Newspapers<br />
0.0 15.0 N/A 15.0<br />
221008 Computer Supplies and IT <strong>Service</strong>s<br />
0.0 5.0 N/A 5.0<br />
221009 Welfare and Entertainment<br />
0.0 5.0 N/A 5.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 0.0 N/A<br />
221012 Small Office Equipment<br />
0.0 5.0 N/A 5.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
35.0 10.0 N/A 45.0<br />
134915 Implementation of the IEC Strategy<br />
Description of Planned Outputs:<br />
182.0 1,130.0 N/A 1,312.0<br />
Carrying out an IEC assessment.Number of Press<br />
Coverage Undertaken.Develop an IEC<br />
Policy.Develop and print a magazine on the<br />
successes of the PSRP 3rd Phase.Develop and run<br />
a documentary on the PSRP 3rd Phase.An ISDN<br />
line installed at MoPS<br />
211101 General Staff Salaries<br />
142.0 0.0 N/A 142.0<br />
211103 Allowances<br />
8.0 68.0 N/A 76.0<br />
221001 Advertising and <strong>Public</strong> Relations<br />
0.0 0.0 N/A<br />
221002 Workshops and Seminars<br />
3.0 210.0 N/A 213.0<br />
221003 Staff Training<br />
1.8 10.0 N/A 11.8<br />
221005 Hire of Venue (chairs, projector etc)<br />
2.0 25.0 N/A 27.0<br />
221006 <strong>Commission</strong>s and Related Charges<br />
3.0 0.0 N/A 3.0<br />
221007 Books, Periodicals and Newspapers<br />
0.0 10.0 N/A 10.0<br />
GoU Donor NTR Total<br />
25.0 45.0 N/A 70.0<br />
0.0 25.0 N/A 25.0<br />
15.0 36.4 N/A 51.4<br />
78,045.7 20.0 N/A 183.0<br />
Final Accounts for the Ministry prepared and the<br />
relevant financial advice given. Internal Audit<br />
function and activities strengthened<br />
77,960.7 0.0 N/A 78.0<br />
40.0 5.0 N/A 45.0<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
8.0 4.0 N/A 12.0<br />
0.0 0.0 N/A<br />
12.0 5.0 N/A 17.0<br />
0.0 0.0 N/A<br />
7.0 3.0 N/A 10.0<br />
18.0 3.0 N/A 21.0<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
55,731.2 15.0 N/A 115.7<br />
Specialised equipment, books and periodicals for<br />
the Resource Centre procured; Resource Centre<br />
Operattional guidelines drafted; staff trained in<br />
usage of new Audio Visual aids and equipment.<br />
55,686.2 0.0 N/A 55.7<br />
27.0 8.0 N/A 35.0<br />
5.0 0.0 N/A 5.0<br />
0.0 0.0 N/A<br />
5.0 2.0 N/A 7.0<br />
0.0 2.0 N/A 2.0<br />
3.0 3.0 N/A 6.0<br />
5.0 0.0 N/A 5.0<br />
166,014.8 160.0 N/A 395.9<br />
8 Press Conferences held at MoPS;4 Radio<br />
Programs; 4 TV Programs; 4 Print Press Adverts;<br />
3 Adverts in Strategic Magazines; Staff Skill<br />
Profiling; Business Continuity Plan for MoPS<br />
drafted; out outreach sessions to 10 MDAs and 12<br />
LGs carried out.<br />
165,944.8 0.0 N/A 165.9<br />
20.0 22.0 N/A 42.0<br />
3.0 25.0 N/A 28.0<br />
15.0 34.0 N/A 49.0<br />
1.5 10.0 N/A 11.5<br />
1.5 0.0 N/A 1.5<br />
0.0 0.0 N/A<br />
1.1 2.0 N/A 3.1<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
60
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
221009 Welfare and Entertainment<br />
2.2 0.0 N/A 2.2<br />
221011 Printing, Stationery, Photocopying and Binding<br />
2.0 10.0 N/A 12.0<br />
221012 Small Office Equipment<br />
0.0 10.0 N/A 10.0<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
5.0 580.0 N/A 585.0<br />
227001 Travel Inland<br />
3.0 100.0 N/A 103.0<br />
227002 Travel Abroad<br />
2.0 0.0 N/A 2.0<br />
227004 Fuel, Lubricants and Oils<br />
4.0 80.0 N/A 84.0<br />
228002 Maintenance - Vehicles<br />
4.0 27.0 N/A 31.0<br />
134916 PSRP Monitoring and Evaluation Framework dev<br />
Description of Planned Outputs:<br />
30.0 927.9 N/A 957.9<br />
M&E Capacity in the Ministry of <strong>Public</strong> <strong>Service</strong><br />
strengthened. PSRP Performance data collected<br />
and compiled. PSRP 3rd phase Evaluated.<br />
211103 Allowances<br />
6.0 75.0 N/A 81.0<br />
221002 Workshops and Seminars<br />
0.0 42.6 N/A 42.6<br />
221003 Staff Training<br />
0.0 135.0 N/A 135.0<br />
221008 Computer Supplies and IT <strong>Service</strong>s<br />
0.0 160.1 N/A 160.1<br />
221009 Welfare and Entertainment<br />
0.0 0.0 N/A<br />
221011 Printing, Stationery, Photocopying and Binding<br />
0.0 70.1 N/A 70.1<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
4.0 36.2 N/A 40.2<br />
225001 Consultancy <strong>Service</strong>s- Short-term<br />
0.0 0.0 N/A<br />
225002 Consultancy <strong>Service</strong>s- Long-term<br />
0.0 262.5 N/A 262.5<br />
227001 Travel Inland<br />
11.0 67.3 N/A 78.3<br />
227002 Travel Abroad<br />
0.0 50.0 N/A 50.0<br />
227004 Fuel, Lubricants and Oils<br />
4.0 29.1 N/A 33.1<br />
228002 Maintenance - Vehicles<br />
5.0 0.0 N/A 5.0<br />
Grants, Transfers and Subsides (Outputs Funded) 157.2 250.0 N/A 407.2<br />
134952 Policy Development (Cabinet Secretariat)<br />
Description of Planned Outputs:<br />
0.0 250.0 N/A 250.0<br />
Financial and technical support to the Cabinet<br />
Secretariat in the Policy development provided.<br />
263204 Transfers to other gov't units(capital)<br />
0.0 250.0 N/A 250.0<br />
312206 Gross Tax<br />
0.0 0.0 N/A<br />
134953 Membership to international Organization (xxxxxx<br />
Description of Planned Outputs:<br />
157.2 0.0 N/A 157.2<br />
Participation in International Organisations activities.<br />
<br />
Payment of membership fees to International<br />
Organisations.<br />
262101 Contributions to International Organisations (Curren 145.2 0.0 N/A 145.2<br />
264201 Contributions to Autonomous In<br />
12.0 0.0 N/A 12.0<br />
Investment (Capital Purchases) 660.0 170.0 N/A 830.0<br />
134972 Government Buildings and Administrative Infrastr<br />
Description of Planned Outputs:<br />
49.0 170.0 N/A 219.0<br />
312101 Non-Residential Buildings<br />
49.0 170.0 N/A 219.0<br />
134975 Purchase of Motor Vehicles and Other Transport<br />
Description of Planned Outputs:<br />
560.0 0.0 N/A 560.0<br />
312201 Transport Equipment<br />
360.0 0.0 N/A 360.0<br />
312204 Taxes on Machinery, Furniture & Vehicles<br />
200.0 0.0 N/A 200.0<br />
134978 Purchase of Office and Residential Furniture and<br />
Description of Planned Outputs:<br />
51.0 0.0 N/A 51.0<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
GoU Donor NTR Total<br />
2.4 6.0 N/A 8.4<br />
1.0 2.0 N/A 3.0<br />
1.0 1.0 N/A 2.0<br />
1.5 15.0 N/A 16.5<br />
15.0 28.0 N/A 43.0<br />
0.0 0.0 N/A<br />
5.5 13.0 N/A 18.5<br />
1.5 2.0 N/A 3.5<br />
80.0 440.0 N/A 520.0<br />
M&E framework revised to include indicators for<br />
all MoPS activities as well as demonstration of<br />
their link to the National Development Plan;<br />
Strengthening Management Information System<br />
(MIS) for M&E through review of tools, training<br />
to improve reporting;<br />
20.0 50.0 N/A 70.0<br />
0.0 50.0 N/A 50.0<br />
0.0 40.0 N/A 40.0<br />
0.0 0.0 N/A<br />
10.0 10.0 N/A 20.0<br />
0.0 0.0 N/A<br />
10.0 0.0 N/A 10.0<br />
0.0 80.0 N/A 80.0<br />
0.0 170.0 N/A 170.0<br />
20.0 30.0 N/A 50.0<br />
0.0 0.0 N/A<br />
20.0 10.0 N/A 30.0<br />
0.0 0.0 N/A<br />
50.0 0.0 N/A 50.0<br />
50.0 0.0 N/A 50.0<br />
0.0 0.0 N/A<br />
50.0 0.0 N/A 50.0<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
0.0 0.0 N/A<br />
341.0 0.0 N/A 341.0<br />
80.0 0.0 N/A 80.0<br />
80.0 0.0 N/A 80.0<br />
210.0 0.0 N/A 210.0<br />
160.0 0.0 N/A 160.0<br />
50.0 0.0 N/A 50.0<br />
51.0 0.0 N/A 51.0<br />
61
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 49<br />
Policy, Planning and Support <strong>Service</strong>s<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
312203 Furniture and Fixtures<br />
51.0 0.0 N/A 51.0<br />
Grand Total Vote 005 3,687.2 4,882.5 N/A 8,569.7<br />
GoU Donor NTR Total<br />
51.0 0.0 N/A 51.0<br />
3,623.8 1,487.0 N/A 5,110.8<br />
Total Excluding Taxes, Arrears and NTR 3,487.2 4,882.5 0.0 8,369.7 3,523.8 1,487.0 0.0 5,010.8<br />
Section B - Details - Vote 005 - Vote Function 1349<br />
62
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 03 Human Resource Management<br />
Programme Profile<br />
Responsible Officer:<br />
<strong>Commission</strong>er HRM<br />
Objectives:<br />
Outputs:<br />
To initiate, fomulate and plan policies and management of Human Resource functions for the<br />
entire <strong>Public</strong> <strong>Service</strong>.<br />
Ensure that Human Resource Management regurations, guidelines, standards, procedures and<br />
systems are developed, implemented, monitored and evaluated.<br />
To plan, develop, review and monitor the implementation of Human Resource Management,<br />
regurations, guidelines, standards, procedures and systems for an effective and efficient <strong>Public</strong><br />
service.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 12 03MDAs and LGs Capacity<br />
Building<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Field visits and technical<br />
guidance offered to MDAs and<br />
LGs<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Support supervision for 6 local<br />
Governments conducted<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Technical guidance and support<br />
supervision provided to HR<br />
practioners in MDAs and LGs<br />
Scheme of service and<br />
competence profile developed<br />
Total<br />
348,000<br />
166,361<br />
219,098<br />
Wage Recurrent<br />
248,000<br />
166,361<br />
89,098<br />
Non Wage Recurrent<br />
100,000<br />
0<br />
130,000<br />
63
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 03 Human Resource Management<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 12 04<strong>Public</strong> <strong>Service</strong><br />
Performance management<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Support activities for the<br />
implementation of activities<br />
under the HRM function<br />
undertaken.<br />
The code of conduct and work<br />
ethics monitored.<br />
Field visits and technical<br />
guidance on Perfomance<br />
offered to MDAs and LGs<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Human Resource support<br />
supervision undertaken<br />
field visits to MDAs and LGs<br />
carried out.<br />
Developed the draft for Hard to<br />
reach framework.<br />
Developed the TOR for the<br />
consultant for Hard to reach<br />
credible action to reduce<br />
vacancies in education and<br />
Health sectors<br />
developed a draft for attaching<br />
perfomance agreements to<br />
appointment letters of health<br />
workers and teachers.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Performance agreement and<br />
targets established in the Health<br />
and Education Sectors.<br />
Modalities for implementing<br />
public reward and Sanction<br />
Framework developed.<br />
Sanctions framework finalized<br />
and enforced<br />
New <strong>Public</strong> <strong>Service</strong> Pay System<br />
based on performance principles<br />
introduced.<br />
Hard to reach Reach/Staff<br />
Strategy implemented.<br />
Revised performance appraisal<br />
instrument cascaded in the<br />
newly created districts.<br />
Finalizing procurement of<br />
consultant to support<br />
finalization of HTR/HTS Policy.<br />
Reward and recognition scheme<br />
monitored and technical<br />
guidance provided<br />
Code of conduct andwork ethics<br />
implementation monitored.<br />
Hard to reach framework<br />
monitored.<br />
Identification of vacancies in<br />
MDA'S and LG'S and action<br />
taken to reduce them.<br />
Baseline survey conducted in<br />
line with the reward and<br />
recognition scheme.<br />
Human resource systems and<br />
processes reviewed and<br />
disseminated<br />
Total<br />
110,000<br />
0<br />
581,373<br />
Wage Recurrent<br />
0<br />
0<br />
111,372<br />
Non Wage Recurrent<br />
110,000<br />
0<br />
470,001<br />
64
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 03 Human Resource Management<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 12 06Management of the <strong>Public</strong><br />
<strong>Service</strong> Payroll and Wage<br />
Bill<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Support to IPPS and Straight<br />
Through Processing (STP) of<br />
salaries in MDAs and LGs.<br />
Field visits and technical<br />
guidance on payroll issues<br />
offered to MDAs and LGs<br />
Enhanced public service pay<br />
through the annual salary<br />
increments.<br />
1,030,000<br />
2009/10<br />
0<br />
1,030,000<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Payroll inspection and support<br />
supervision carried out<br />
Implementation of STP of<br />
Salaries supported and<br />
monitered<br />
IPPS installation completed<br />
Phase 1 of IPPS was launched<br />
and preparatory work ; Payroll<br />
cleaning exercise is on-going;<br />
Implementation of the straight<br />
through processing of salaries<br />
undertaken and rolled out<br />
further to government agencies<br />
that obtain wages from the<br />
consolidated fund.<br />
0<br />
0<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Payroll cleaning undertaken<br />
IPPS integrated into the IFMS.<br />
Payroll inspection undertaken<br />
and support supervision<br />
provided<br />
Implementation of STP of<br />
salaries supported and<br />
monitored.<br />
IPPS rolled out in Ministries<br />
and Deparments.<br />
<strong>Public</strong> <strong>Service</strong> pay enhanced<br />
through the annual salary<br />
increments.<br />
Field visits and techinical<br />
guidance offered to MDAs and<br />
LGs<br />
1,129,100<br />
89,098<br />
1,040,002<br />
GRAND TOTAL<br />
1,488,000<br />
166,361<br />
1,929,572<br />
Wage Recurrent<br />
248,000<br />
166,361<br />
289,568<br />
Non Wage Recurrent<br />
1,240,000<br />
0<br />
1,640,004<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
65
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 03 Human Resource Management<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1203 MDAs and LGs Capacity Building<br />
Technical guidance and support supervision provided to HR practioners<br />
in MDAs and LGs<br />
Activities to Deliver Outputs:<br />
Field visits for at least 12 MDAs and LGs Workshops.<br />
Develop, monitor HRM capacity building policies and standards.<br />
Monitor and supervise the implementation of HRM policie/standards in<br />
MDAs and LGs.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for dev'ping HRM policies and standards 1.0 20,000<br />
(days)<br />
Fuel lubricants and Oils (litres) 1.0 2,200<br />
commissions and related charges (number) 1.0 10,000<br />
Goods acquired for immediate use eg cleaning etc<br />
(number)<br />
Meetings, sholarstic materials &transport expenses<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 10,000<br />
1.0 1,210<br />
Motor vehicle repairs and spares (number) 1.0 2,500<br />
per diem, transport expenses (number) 1.0 25,000<br />
perdiem , transport expenses (number) 1.0 10,000<br />
Press release, talk shows (number) 1.0 4,500<br />
refreshments and welfare (number) 1.0 12,410<br />
small office equipment eg calculator,stapler etc<br />
(number)<br />
1.0 3,000<br />
stationary,photo copying (number) 1.0 16,000<br />
Travel expenses, training materials, (number) 1.0 8,180<br />
Assorted stationary, photo copying, printing.<br />
(numbers)<br />
1.0 5,000<br />
Permanent staff (Person Years) 0.0 80,000<br />
219,098<br />
89,098<br />
130,000<br />
66
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 03 Human Resource Management<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1204 <strong>Public</strong> <strong>Service</strong> Performance management<br />
Performance agreement and targets established in the Health and<br />
Education Sectors.<br />
Modalities for implementing public reward and Sanction Framework<br />
developed.<br />
Sanctions framework finalized and enforced<br />
New <strong>Public</strong> <strong>Service</strong> Pay System based on performance principles<br />
introduced.<br />
Hard to reach Reach/Staff Strategy implemented.<br />
Revised performance appraisal instrument cascaded in the newly created<br />
districts.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Fuel, lubricants and oils (litres) 1.0 42,000<br />
Assorted stationary, printing and photocopying<br />
(number)<br />
Goods acquired for immediate use eg cleaning<br />
(number)<br />
hall hire,assorted stationary, transport refund<br />
(number)<br />
Honoraria for dev'ping policies and guidelines<br />
(number)<br />
1.0 93,240<br />
1.0 77,460<br />
1.0 52,600<br />
1.0 34,000<br />
motor vehicle repairs and spares (number) 1.0 17,000<br />
Perdiem and transport expenses (number) 2.0 118,400<br />
Press releasese and talk shows. (number) 1.0 14,700<br />
Training materials & travel expenses (number) 1.0 20,600<br />
Permanent staff (Person Years) 0.0 100,000<br />
Code of conduct andwork ethics implementation monitored.<br />
Hard to reach framework monitored.<br />
Identification of vacancies in MDA'S and LG'S and action taken to reduce<br />
them.<br />
Baseline survey conducted in line with the reward and recognition scheme.<br />
Human resource systems and processes reviewed and disseminated<br />
Activities to Deliver Outputs:<br />
Carry out consultantions with the <strong>Service</strong> <strong>Commission</strong>s on the developed<br />
guidelines and modalities for attaching performance agreements to<br />
appointments of Health workers and teachers.<br />
Develop a new <strong>Public</strong> <strong>Service</strong> Pay System based on Performance<br />
Principles.<br />
Roll out new roles on reporting relations and career management of<br />
Inspectors and new rules for initiating and applying sanctions.<br />
Define performance agreements for Medical superitendents in 12 regional<br />
hospitals.<br />
Establish mandatory performance targets for headteachers (primary and<br />
secondary) in at least 4 Districts.<br />
Finalization and dissemination of the Sanctions framework.<br />
Monitor enforcement/implementation of the Sanctions Framework.<br />
Review and streamline roles and responsibilities for initiating and<br />
applying sanctions.<br />
Develop and implement the Action Plan for the Hard to Reach/Stay<br />
Strategy.<br />
Monitoring implementation of the customized HTR/S policies and<br />
67
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 03 Human Resource Management<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
implementation strategies by the JBSF sectors.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Introduce management flexibility for accredited institutions in Hard to<br />
Reach Areas allowing them to define incentives within budgetary limits.<br />
Expand the budget management flexibility for accredited institutions in<br />
Hard to Reach areas to at least 50% of institutions.<br />
Developing and managing Human resurce systems in the entire <strong>Public</strong><br />
<strong>Service</strong>.<br />
Senstizing public officers in the new districts the performance appraisal<br />
tool.<br />
Develop a framework for Hard to reach areas and monitor it.<br />
Filling of vacant posts in ministries and local Goverments.<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
581,373<br />
111,372<br />
470,001<br />
Output:<br />
13 1206 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wage Bill<br />
Planned Outputs:<br />
Payroll cleaning undertaken<br />
IPPS integrated into the IFMS.<br />
Payroll inspection undertaken and support supervision provided<br />
Implementation of STP of salaries supported and monitored.<br />
IPPS rolled out in Ministries and Deparments.<br />
<strong>Public</strong> <strong>Service</strong> pay enhanced through the annual salary increments.<br />
Field visits and techinical guidance offered to MDAs and LGs<br />
Activities to Deliver Outputs:<br />
Undertaking activities of IPPS<br />
Implementation of STP of salaries in MDAs and LGs.<br />
Provision of technical guidance to MDAs and LGS.<br />
Integrating IPPS into the IFMS.<br />
Inputs Quantity Cost<br />
Honoraria for provision of techinical guidance<br />
1.0 205,000<br />
(days)<br />
perdiem and transport expenses (days) 2.0 224,000<br />
Fuel, Lubricants and oils (litres) 1.0 20,000<br />
Assorted stationary, perdiem printing & photocopy<br />
(number)<br />
Assorted stationary, photocopying and printing<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 203,705<br />
1.0 25,000<br />
commissions and other related charges (number) 1.0 111,795<br />
computer stationary & accessories (number) 1.0 30,000<br />
General goods and services acquired eg cleaning<br />
(number)<br />
1.0 3,000<br />
motor vehicle repairs and spares (number) 1.0 201,000<br />
news papers and talk shows (number) 1.0 3,000<br />
Press releases and adverts (number) 1.0 1,500<br />
refreshments and transport expenses (number) 1.0 4,000<br />
small office equipment aquired eg stapler (number) 1.0 1,000<br />
travel expenses & training materials (number) 1.0 7,000<br />
Permanent staff (Person Years) 0.0 80,000<br />
1,129,100<br />
89,098<br />
1,040,002<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1,929,572<br />
289,568<br />
1,640,004<br />
Programme 04 Human Resource Development<br />
Programme Profile<br />
Responsible Officer:<br />
<strong>Commission</strong>er HRD<br />
Objectives:<br />
To initiate, formulate, plan and oversee implementation of plans and policies on the<br />
68
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 04 Human Resource Development<br />
management of Human Resource functions for the entire public service.<br />
Outputs: MDAs & LGs capacity building programmes carried out.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 12 02Upgrading of the Civil<br />
<strong>Service</strong> College Facility<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Preliminary activities for<br />
upgrading of the Civil <strong>Service</strong><br />
College.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Support actvities and<br />
Monitoring and evaluation visits<br />
undertaken.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
CSC identified and<br />
established/upgraded.<br />
Contract awared to conduct a<br />
pre-feasibility study to identify<br />
the location of the CSC; Civil<br />
<strong>Service</strong> College advisor has<br />
been hired ; Contract for the<br />
needs assessment; Inception<br />
report to develop the operations<br />
and implementation manual;<br />
Total<br />
170,000<br />
107,382<br />
157,259<br />
Wage Recurrent<br />
150,000<br />
107,382<br />
110,259<br />
Non Wage Recurrent<br />
20,000<br />
0<br />
47,000<br />
13 12 03MDAs and LGs Capacity<br />
Building<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Support to capacity building<br />
initiatives<br />
10,000<br />
0<br />
10,000<br />
Monitoring and evaluation visits<br />
to LGs undertaken.<br />
Scheme of service and<br />
competence profile developed<br />
0<br />
0<br />
0<br />
Monitoring implementaion of<br />
capacity building initiatives<br />
supported<br />
Technical guidance and support<br />
supervision provided to HR<br />
practioners in MDAs and LGs<br />
98,710<br />
65,710<br />
33,000<br />
GRAND TOTAL<br />
180,000<br />
107,382<br />
255,969<br />
Wage Recurrent<br />
150,000<br />
107,382<br />
175,968<br />
Non Wage Recurrent<br />
30,000<br />
0<br />
80,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
69
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Programme 04 Human Resource Development<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1202 Upgrading of the Civil <strong>Service</strong> College Facility<br />
CSC identified and established/upgraded.<br />
Activities to Deliver Outputs:<br />
Hold consultative meetings<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
erdiem and travel costs (days) 1.0 1,400<br />
Honoraria on consultations (days) 1.0 14,000<br />
perdiem and travel costs (days) 1.0 1,400<br />
Fuel, lubricants and oils (litres) 1.0 3,000<br />
Assorted stationary, photocopying and printing<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 1,000<br />
Goods and services for immidiate use (number) 1.0 5,000<br />
meetings, training materials and travel expenses<br />
(number)<br />
1.0 8,000<br />
Motor vihecle repairs and spares (number) 1.0 3,000<br />
Refreshments and transport expenses (number) 1.0 9,000<br />
Small office equipment eg stapler (number) 1.0 1,200<br />
Permanent staff (Person Years) 0.0 99,000<br />
157,259<br />
110,259<br />
47,000<br />
Output:<br />
Planned Outputs:<br />
13 1203 MDAs and LGs Capacity Building<br />
Monitoring implementaion of capacity building initiatives supported<br />
Technical guidance and support supervision provided to HR practioners<br />
in MDAs and LGs<br />
Activities to Deliver Outputs:<br />
Carry out support monitorig visits<br />
Hold capacity building workshops/meetings<br />
Carry out technical support supervision to HR practioners in MDAs and<br />
LGs.<br />
Inputs Quantity Cost<br />
Honoraria for capacity building initiatives (days) 1.0 16,000<br />
Per diem and transport expenses (days) 1.0 1,200<br />
Fuel,Lubricants and Oils (Litres) 1.0 1,400<br />
Assorted stationary photocopying and printing<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 2,000<br />
Goods and services for immediate use (number) 1.0 8,000<br />
materials to maitain building (number) 1.0 1,200<br />
Motor vehicle repairs and spares (number) 1.0 1,200<br />
Refreshments and transport expenses (number) 1.0 2,000<br />
Permanent staff (Person Years) 0.0 59,000<br />
98,710<br />
65,710<br />
33,000<br />
Project 0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Prog<br />
Project Profile<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
255,969<br />
175,968<br />
80,000<br />
Responsible Officer:<br />
<strong>Commission</strong>er HRD<br />
Objectives:<br />
Outputs:<br />
Start Date:<br />
To support transformation of the public service so that it is affordable, efficient, accountable<br />
and responsive to the needs of the clients.<br />
Civil <strong>Service</strong> College established to provide a sustainable workforce for the public service;<br />
public policy research strengthened; training and researchin strategic areas supported; current<br />
gaps in leadership and mgt for better management of reforms bridged; National Records<br />
Center and Archives constructed; IPPS carried out.<br />
11/19/2008 Projected End Date:<br />
11/20/2013<br />
70
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Project 0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Prog<br />
Donor Funding for Project:<br />
Projected Donor Allocations (UShs)<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 12 02Upgrading of the Civil<br />
<strong>Service</strong> College Facility<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Build Human Resource Capacity<br />
Start up activities for Civil<br />
<strong>Service</strong> College (CSC)-<br />
Consultancy support for<br />
development of operations and<br />
implementation manual, CSC<br />
Advisor, Study Tours).<br />
CSC Premises upgraded<br />
(Preparion of designs, project<br />
management, and supervision of<br />
upgrading of the CSC).<br />
Develop Schemes of <strong>Service</strong> for<br />
13 cadres<br />
Strengthen HRD quality control<br />
mechanisms (Training Policy<br />
structures , pre and post training<br />
evaluation, HIV/ AIDS and<br />
gender mainstreaming in 12<br />
MDAs and 10 LGs)<br />
Develop and submit a paper on<br />
transformation of the <strong>Public</strong><br />
<strong>Service</strong> for Cabinet approval<br />
Conduct professional<br />
development workshops for<br />
selected common cadre staff<br />
2009/10<br />
2008/09<br />
Budget<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Pre-feasibility study and<br />
concept paper for establishment<br />
of CSC finilised; Civil <strong>Service</strong><br />
College advisor hired ; Training<br />
needs assessment for targeted<br />
capacity building conducted;<br />
operations and implementation<br />
manual for UPSPEP developed;<br />
MTEF Projections<br />
2009/10<br />
Budget 2010/11 2011/12<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Upgraded CSC Facility<br />
2012/13<br />
410 International Development Association (I 0.000 0.000 0.000 0.000 0.000<br />
Total Donor Funding for Project<br />
0.000 0.000 0.000 0.000 0.000<br />
Targeted capacity building.<br />
Total<br />
5,110,000<br />
N/A<br />
1,510,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
5,110,000<br />
N/A<br />
1,510,000<br />
71
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Project 0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Prog<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 12 03MDAs and LGs Capacity<br />
Building<br />
Total<br />
GoU Development<br />
Donor Development<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Conducted strategic Leadership<br />
and Management Development<br />
training for selected common<br />
cadre staff.<br />
Development and dissemination<br />
of the capacity building policy.<br />
Training and capacity building<br />
initiatives monitored.<br />
2009/10<br />
846,000<br />
0<br />
846,000<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Scheme of service and<br />
competence profile developed<br />
N/A<br />
N/A<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Capacity Building undertaken in<br />
MDAs and LGs.<br />
Capacity Building Inititatives<br />
for Task Managers, Leadership<br />
and Management development<br />
and training in Strategic Areas<br />
for Industrialization and national<br />
development undertaken.<br />
404,500<br />
0<br />
404,500<br />
13 12 04<strong>Public</strong> <strong>Service</strong><br />
Performance management<br />
Reward and Recognition<br />
scheme implementation<br />
monitored.<br />
Strategy and action plan to fill<br />
posts in the Hard to Reach areas<br />
completed and submitted to<br />
cabinet.<br />
Finalizing procurement of<br />
consultant to support<br />
finalization of HTR/HTS Policy.<br />
Reward and recognition scheme<br />
monitored and technical<br />
guidance provided<br />
HRD quality control<br />
mechanisms strengthened in<br />
MDAs and LGs.<br />
Implementation, monitoring and<br />
evaluating cabinet<br />
recommendations supported.<br />
Strategy for Hard to Reach<br />
areas reflected in the 2010/2011<br />
Budget.<br />
System developed to identify,<br />
track and analyze Hard to stay<br />
and Hard to reach posts.<br />
Total<br />
GoU Development<br />
Donor Development<br />
Code of conduct and Work<br />
Ethics implementation<br />
monitored.<br />
455,000<br />
0<br />
455,000<br />
N/A<br />
N/A<br />
585,000<br />
0<br />
585,000<br />
13 12 06Management of the <strong>Public</strong><br />
<strong>Service</strong> Payroll and Wage<br />
Bill<br />
Phases 1 and 2 of the IPPS<br />
completed.<br />
Payroll cleaning work finalized.<br />
Phase 1 of IPPS was launched<br />
and preparatory work ; Payroll<br />
cleaning exercise is on-going;<br />
Implementation of the straight<br />
through processing of salaries<br />
undertaken and rolled out<br />
further to government agencies<br />
that obtain wages from the<br />
consolidated fund.<br />
Phase 1 of IPPS completed.<br />
IPPS Phase 2 implemented.<br />
Preparatory Activities/prior<br />
actions for the Launch of IPPS<br />
Phase 111 - V carried out.<br />
Total<br />
GoU Development<br />
Donor Development<br />
Payroll inspection and support<br />
supervision<br />
11,449,000<br />
0<br />
11,449,000<br />
N/A<br />
N/A<br />
1,845,000<br />
0<br />
1,845,000<br />
72
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Project 0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Prog<br />
GRAND TOTAL<br />
17,860,000<br />
N/A<br />
4,344,500<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
17,860,000<br />
N/A<br />
4,344,500<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
Upgraded CSC Facility<br />
Undertake CSC Civil works<br />
Develop CSC Business Plan and curriculum development.<br />
Consultancy Support for Design, Project Management and Supervision of<br />
upgrading the Civil <strong>Service</strong> College.<br />
Strengthening Policy Research.<br />
Study Tours for Civil service College implementation teams.<br />
Operational Costs<br />
13 1202 Upgrading of the Civil <strong>Service</strong> College Facility<br />
Activities to Deliver Outputs:<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for developing the CSC business plan.<br />
1.0 140,000<br />
(days)<br />
Per diem and transport expenses (days) 1.0 270,000<br />
Fuel, Lubricants and Oils (litres) 1.0 50,000<br />
Advertising expenses (number) 1.0 50,000<br />
Consultancy services-long-term (number) 1.0 200,000<br />
Consultancy services-short term (number) 1.0 148,600<br />
Goods and services for immidiate use (number) 1.0 5,000<br />
hire of venue for meetings (number) 1.0 50,000<br />
meetings, training materials & tranport expenses<br />
(number)<br />
Total<br />
GoU Development<br />
Donor Development<br />
1.0 260,000<br />
Per diem and transport expenses (number) 1.0 200,700<br />
Refreshment and transport expenses (number) 1.0 1,200<br />
Small office equipment (number) 1.0 500<br />
Stationary,photocopying and transport expenses.<br />
(number)<br />
Assorted stationary phocopying and printing<br />
(numbers)<br />
1.0 130,000<br />
1.0 1,000<br />
Newspapers (numbers) 1.0 3,000<br />
1,510,000<br />
0<br />
1,510,000<br />
Output:<br />
13 1203 MDAs and LGs Capacity Building<br />
Planned Outputs:<br />
Capacity Building undertaken in MDAs and LGs.<br />
Capacity Building Inititatives for Task Managers, Leadership and<br />
Management development and training in Strategic Areas for<br />
Industrialization and national development undertaken.<br />
Activities to Deliver Outputs:<br />
Develop, Monitor capacity building policies and standards<br />
Train managers/Officers in identified capacity needs<br />
Inputs Quantity Cost<br />
Honoraria for capacity building in MDAs & LGs. 1.0 12,000<br />
(days)<br />
Fuel,Lubricants and Oils (litres) 1.0 30,000<br />
Consultancy-short term for capacity building<br />
(number)<br />
Total<br />
GoU Development<br />
Donor Development<br />
1.0 70,000<br />
Conultancy-long term for capacity building (number) 1.0 82,000<br />
Goods & services for immidiate use (number) 1.0 66,500<br />
per diem and transport expenses (number) 1.0 85,000<br />
stationary, photocopying and transport expenses<br />
(number)<br />
1.0 59,000<br />
404,500<br />
0<br />
404,500<br />
73
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1312 HR Management<br />
Project 0025 <strong>Uganda</strong> <strong>Public</strong> <strong>Service</strong> Performance Enhancement Prog<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1204 <strong>Public</strong> <strong>Service</strong> Performance management<br />
HRD quality control mechanisms strengthened in MDAs and LGs.<br />
Implementation, monitoring and evaluating cabinet recommendations<br />
supported.<br />
Activities to Deliver Outputs:<br />
Evaluate HRD quality control mechanisms (Policy structures, pre and post<br />
training evaluations) in 10 MDAs and 8 LGs,<br />
Schemes of service for 10 critical cadres in JBSF Sectors developed.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria to review quality control mechanisms.<br />
1.0 76,000<br />
(days)<br />
perdiem and transport expenses (days) 1.0 29,500<br />
Fuel, Lubricants and Oils (litres) 0.9 84,000<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
Total<br />
GoU Development<br />
Donor Development<br />
1.0 70,000<br />
Consultancy services-long term (number) 1.0 113,000<br />
Motor vehicle and spares (number) 0.8 75,500<br />
per diem and transport expenses (number) 1.0 96,000<br />
Refresments in meetings (number) 1.0 41,000<br />
585,000<br />
0<br />
585,000<br />
Output:<br />
13 1206 Management of the <strong>Public</strong> <strong>Service</strong> Payroll and Wage Bill<br />
Planned Outputs:<br />
Phase 1 of IPPS completed.<br />
IPPS Phase 2 implemented.<br />
Preparatory Activities/prior actions for the Launch of IPPS Phase 111 - V<br />
carried out.<br />
Activities to Deliver Outputs:<br />
Migration of the Government Payroll and Pensions Information<br />
Management System (PIMS) to the IPPS.<br />
Inputs Quantity Cost<br />
perdiem and transport expenses (days) 1.0 144,000<br />
consultancy fees &IPPS team expenses (number) 1.0 172,440<br />
goods and services for immediate use (number) 1.0 811,755<br />
Meetings, training materials & transport expenses<br />
(number)<br />
1.0 245,255<br />
Review meetings (number) 1.0 4,800<br />
shortterm consultancies (number) 1.0 466,750<br />
Training of users and updating of records.<br />
IPPS implemented in the pilot sites (9 MDAs and 2 LGs.<br />
Carry out preparatory activities/prior actions for the Launch of IPPS Phase<br />
111 - v.<br />
IPPS rolled out to 13 MDAs and 6 LGs.<br />
Total<br />
GoU Development<br />
Donor Development<br />
GRAND TOTAL<br />
GoU Development<br />
Donor Development<br />
1,845,000<br />
0<br />
1,845,000<br />
4,344,500<br />
0<br />
4,344,500<br />
Vote Function: 1313 Management Systems and Structures<br />
Programme 07 Management <strong>Service</strong>s<br />
Programme Profile<br />
Responsible Officer:<br />
<strong>Commission</strong>er Management <strong>Service</strong>s Department<br />
Objectives:<br />
To develop and review management and operational structures, systems and productivity<br />
practices for efficient and effective delivery of <strong>Public</strong> <strong>Service</strong>s;<br />
74
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Programme 07 Management <strong>Service</strong>s<br />
Outputs: A comprehensive restructuring study carried out; workable recommendations to re-engineer<br />
dydsfuctional and cumbersome systems; and wasteful cost centres made.<br />
The Department carry out a comprehensive study, analysis and review of all the existing<br />
structures to rationalise structures for all the 22 Government Ministries, their Departments and<br />
Agencies; and 20 Newly Gazzetted Local Governments. Carry out a study and make workable<br />
recommendations to re-engineer 2 dydsfuctional and cumbersome systems; and 3 wasteful<br />
cost centres.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 13 01Organizational Structures<br />
for MDAs developed and<br />
reviewed<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
22 MDAs structures rationalised<br />
12 Newly Gazetted Local<br />
Governments' (Urban Councils)<br />
structures customised;<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
A process to procure Lead<br />
consultant review and<br />
rationalize 22 MDAs structures<br />
is on going.<br />
Structures for 16 Newly<br />
Gazzetted Local Governments<br />
and Urban Councils developed,<br />
customised and reports produced<br />
Technical support on<br />
implementation of<br />
recommended structures for 5<br />
MDAs and 5 LGs provided;<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Organisational structures for 22<br />
Ministries developed and<br />
reviewed;<br />
Organisational structuctures for<br />
20 newly gazetted LGs<br />
reviewed, customised and<br />
adopted;<br />
Restructuring Reports for 61<br />
MDAs and 20 New Local<br />
Governments produced;<br />
Positions of Heads of Health<br />
Centre 4s and 3s reviewed.<br />
Total<br />
226,000<br />
Job Discriptions (JDs) and<br />
specifications for jobs in MDAs<br />
produced.<br />
123,590<br />
Technical Support on<br />
Organisational Structures to<br />
MDAs and LGs provided;<br />
274,784<br />
Wage Recurrent<br />
176,000<br />
123,590<br />
144,784<br />
Non Wage Recurrent<br />
50,000<br />
0<br />
130,000<br />
13 13 02Review of Dysfunctional<br />
Systems in MDAs and LGs<br />
Three (3) systems studied and<br />
reviewed.<br />
Company registration and birth<br />
and death registration, and<br />
Teacher Registration system<br />
study on going.<br />
2 Dysfunctional and<br />
Cumbersome Systems in MDAs<br />
and LGs studied Reviewd and<br />
Re-engineered;<br />
2 Draft Systems Reports<br />
produced;<br />
2 Systems Review Reports<br />
produced;<br />
Total<br />
0<br />
A Draft Systems Manual<br />
produced;<br />
Technical Support on<br />
implementation of re-engineered<br />
Systems in MDAs and LGs<br />
provided;<br />
53,412<br />
Wage Recurrent<br />
0<br />
33,412<br />
Non Wage Recurrent<br />
0<br />
20,000<br />
75
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Programme 07 Management <strong>Service</strong>s<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 13 03Analysis of Cost<br />
Centres/Constituents in<br />
MDAs and LGs<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Three (3) cost centres in four<br />
MDAs and four LGs studied<br />
and analysed.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Three cost centres in LGs<br />
studied these include the<br />
support staff and drivers<br />
secritarial staff.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
3 Wasteful Cost Centres in<br />
MDAs and LGs studied,<br />
analysed and recommendations<br />
made;<br />
Total<br />
0<br />
Data collected on 2 cost centres<br />
in LGs and MDAs.Repair and<br />
maintanence of office tools and<br />
equipment (computers, printers<br />
and photocopying machines)<br />
and Physical infrastructure.<br />
3 Cost Efficiency Reports<br />
produced;<br />
Technical Support on<br />
implementation of re-engineered<br />
cost Centres in MDAs and LGs<br />
provided;<br />
47,843<br />
Wage Recurrent<br />
0<br />
27,843<br />
Non Wage Recurrent<br />
0<br />
20,000<br />
GRAND TOTAL<br />
226,000<br />
123,590<br />
376,039<br />
Wage Recurrent<br />
176,000<br />
123,590<br />
206,039<br />
Non Wage Recurrent<br />
50,000<br />
0<br />
170,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1301 Organizational Structures for MDAs developed and reviewed<br />
Organisational structures for 22 Ministries developed and reviewed;<br />
Organisational structuctures for 20 newly gazetted LGs reviewed,<br />
customised and adopted;<br />
Restructuring Reports for 61 MDAs and 20 New Local Governments<br />
produced;<br />
Positions of Heads of Health Centre 4s and 3s reviewed.<br />
Technical Support on Organisational Structures to MDAs and LGs<br />
provided;<br />
Activities to Deliver Outputs:<br />
Carrying out a Comprehensive Review and Restructuring for MDAs<br />
Reviewing, Customising and Adopting Organisatinal Structures for newly<br />
Gazetted Local Governmts;<br />
Preparing Reports for 61 MDAs and 20 Newly Gazzetted LGs;<br />
Providing Technical Support on Organisational Structures to MDAs and<br />
LGs;<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for developing structures in MDAs (days) 1.0 57,000<br />
Office tea and welfare for meetings (days) 1.0 8,050<br />
Fuel lubricants and oils (litres) 1.0 23,750<br />
Goods and services acquired eg cleaning (number) 1.0 9,000<br />
motor vehicle repairs and spare (number) 1.0 5,000<br />
Assorted stationary (numbers) 1.0 27,200<br />
Permanent staff (Person Years) 0.0 130,000<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
274,784<br />
144,784<br />
130,000<br />
76
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Programme 07 Management <strong>Service</strong>s<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1302 Review of Dysfunctional Systems in MDAs and LGs<br />
2 Dysfunctional and Cumbersome Systems in MDAs and LGs studied<br />
Reviewd and Re-engineered;<br />
2 Systems Review Reports produced;<br />
Technical Support on implementation of re-engineered Systems in MDAs<br />
and LGs provided;<br />
Activities to Deliver Outputs:<br />
Studying, reviewing and re-designing 2 dysfunctional and cumbersome<br />
systems in MDAs and LGs;<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for reviewing syetems in MDAs and LGs 1.0 9,720<br />
(days)<br />
fuel,lubricants and oils (litres) 1.0 5,180<br />
motor vehicle repairs and spare (number) 1.0 3,000<br />
Assorted stationary (numbers) 1.0 2,100<br />
Permanent staff (Person Years) 0.0 30,000<br />
Writing Reports for 2 Dysfunctional Systems in MDAs and LGs;<br />
Providing Technical Support on implementation of re-engineered Systems<br />
in MDAs and LGs<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
53,412<br />
33,412<br />
20,000<br />
Output:<br />
13 1303 Analysis of Cost Centres/Constituents in MDAs and LGs<br />
Planned Outputs:<br />
3 Wasteful Cost Centres in MDAs and LGs studied, analysed and<br />
recommendations made;<br />
3 Cost Efficiency Reports produced;<br />
Technical Support on implementation of re-engineered cost Centres in<br />
MDAs and LGs provided;<br />
Activities to Deliver Outputs:<br />
Studying, analysing and making positive recommendations<br />
on 3 Wasteful cost Centres in MDAs and LGs;<br />
Inputs Quantity Cost<br />
Fuel, Lubricants and Oils (litres) 1.0 3,380<br />
Assorted stationary photocopying & printing<br />
(number)<br />
Honoraria for analysing cost centres in MDAs &<br />
LGs (number)<br />
1.0 1,900<br />
1.0 4,720<br />
motor vehicle repairs and spare (number) 1.0 2,000<br />
perdiem and transport expenses (number) 1.0 8,000<br />
Permanent staff (Person Years) 0.0 25,000<br />
Writing Reports for 3 Efficiency Studies;<br />
Providing Technical Support on implementation of re-engineered Cost<br />
Centres in MDAs and LGs<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
47,843<br />
27,843<br />
20,000<br />
376,039<br />
206,039<br />
170,000<br />
Programme 08 Records and Information Management<br />
Programme Profile<br />
Responsible Officer:<br />
<strong>Commission</strong>er/RIM<br />
Objectives:<br />
To promote efficient, economic and effective records and information management systems in<br />
the public service and oversee the preservation of the documented heritage (Archives) for<br />
77
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Programme 08 Records and Information Management<br />
<strong>Uganda</strong>'s posterity.<br />
Outputs:<br />
The National Records and Centre and Archives constructed; and records management<br />
policies, regulations, standards and procedures developed and disseminated to MDAs and<br />
LGs. Records retention and disposal schedules rolled out in 6 MDAs and 14 LGs; Technical<br />
assistance on preservation and conservation of records offered in MDAs and LGs; records<br />
management systems to newly created LGs introduced; MDAs and LGs records staff trained<br />
and users sensitised.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 13 04Construction of the<br />
National Records Centre<br />
and Archives<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Preliminary activities for the<br />
construction of the National<br />
Records Centre and Archives<br />
finalised.<br />
2009/10<br />
186,002<br />
136,000<br />
50,002<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Care taker hired for plot 8-10<br />
lourdel road.<br />
Supervising consultant hired.<br />
94,360<br />
94,360<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Design review and initiating<br />
tender action for the National<br />
Records and Archieves<br />
fianalised.<br />
97,961<br />
77,961<br />
20,000<br />
13 13 05Development and<br />
Dissemination of Policies,<br />
Standards and Procedures<br />
Records retention and disposal<br />
schedules implemented in three<br />
MDAs namely;<br />
MTTI,MGLSD,MoLG,and 7<br />
LGs namely; Kasese, Bushenyi,<br />
Hoima,Masindi,Arua,Nebbi and<br />
Gulu.<br />
Records management systems<br />
introduced to 2 MDAs namel;<br />
MoICT and MoWE and three<br />
LGs namely; Sironko,<br />
Kalangala and Manafa<br />
Records management policies,<br />
standards and procedures<br />
developed and disseminated to<br />
MDAs and LGs<br />
<strong>Public</strong> outreach activities<br />
carried out by the National<br />
Archives<br />
Technical support on<br />
preservation and conservation<br />
provided to 6 MDAs and 12<br />
LGs<br />
Records and retention disposal<br />
schedules rolled out to MDAs<br />
and LGs<br />
Records management systems<br />
introduced to newly created LGs<br />
Total<br />
0<br />
151,302<br />
Wage Recurrent<br />
0<br />
81,302<br />
Non Wage Recurrent<br />
0<br />
70,000<br />
GRAND TOTAL<br />
186,002<br />
94,360<br />
249,263<br />
Wage Recurrent<br />
136,000<br />
94,360<br />
159,262<br />
Non Wage Recurrent<br />
50,002<br />
0<br />
90,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
78
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Programme 08 Records and Information Management<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
13 1304 Construction of the National Records Centre and Archives<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Planned Outputs:<br />
Design review and initiating tender action for the National Records and<br />
Archieves fianalised.<br />
Activities to Deliver Outputs:<br />
Specialized training for records staff in preparation for operationalization<br />
of the National Records Centre.<br />
Training of newly recruited records officers in TOT.<br />
Inputs Quantity Cost<br />
Honoraria for training new officers (days) 1.0 5,000<br />
Fuel, Lubricants & Oils (Litres) 1.0 5,000<br />
Assorted stationary, photocopying & printing<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 2,000<br />
goods and services for immediate use (number) 1.0 4,000<br />
motor vehicle repairs and spare (number) 1.0 2,000<br />
refreshments and transport expenses (number) 1.0 2,000<br />
Permanent staff (Person Years) 0.0 70,000<br />
97,961<br />
77,961<br />
20,000<br />
Output:<br />
13 1305 Development and Dissemination of Policies, Standards and Procedures<br />
Planned Outputs:<br />
Records management policies, standards and procedures developed and<br />
disseminated to MDAs and LGs<br />
<strong>Public</strong> outreach activities carried out by the National Archives<br />
Technical support on preservation and conservation provided to 6 MDAs<br />
and 12 LGs<br />
Records and retention disposal schedules rolled out to MDAs and LGs<br />
Records management systems introduced to newly created LGs<br />
Activities to Deliver Outputs:<br />
Roll out records retention and disposal schedules to 6 MDAs and 14 LGs<br />
Inputs Quantity Cost<br />
Honoraria for dev't and dissemination of policies<br />
1.0 20,000<br />
(days)<br />
Per diem and transport expenses (days) 1.0 23,000<br />
Fuel, Lubricants & Oils (litres) 1.0 8,000<br />
Assorted stationary, photocopying & printing<br />
(number)<br />
1.0 6,000<br />
Goods and services acquired eg cleaning (number) 1.0 6,000<br />
Motor vehicle repairs & spares (number) 1.0 4,500<br />
Newspapers (number) 1.0 500<br />
Small Office equipment eg stapler (number) 1.0 2,000<br />
Permanent staff (Person Years) 0.0 73,000<br />
Carry out registry audits in lMDAs & LGs<br />
Print and disseminate records centre and archives manuals<br />
Carry out archival exhibition during Africa Book Week<br />
Train records staff in the application of the records centre and archives<br />
manuals<br />
Introduce records management systems to 6 newly created LGs<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
151,302<br />
81,302<br />
70,000<br />
249,263<br />
159,262<br />
90,000<br />
Project 0025d <strong>Public</strong> <strong>Service</strong> Reform Comp.2 Records Management<br />
Project Profile<br />
Responsible Officer:<br />
Director EQA<br />
Objectives:<br />
To promote efficient, economic and effective records and information management systems in<br />
79
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Project 0025d <strong>Public</strong> <strong>Service</strong> Reform Comp.2 Records Management<br />
the public service and oversee the preservation of the documented heritage (Archives).<br />
To develop and review management and operational structures, systems and productivity<br />
practices for efficient and effective delivery of <strong>Public</strong> <strong>Service</strong>s;<br />
Outputs:<br />
Start Date:<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 13 01Organizational Structures<br />
for MDAs developed and<br />
reviewed<br />
The National Records and Centre and Archives constructed; A comprehensive restructuring<br />
study carried out; all the existing structures analysed and reviewed to rationalise structures in<br />
MDAs and Newly Gazzetted LGs.<br />
Donor Funding for Project:<br />
Projected Donor Allocations (UShs)<br />
11/19/2008<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
22 MDA structures rationalized<br />
Projected End Date:<br />
2009/10<br />
2008/09<br />
Budget<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
A process to procure Lead<br />
consultant review and<br />
rationalize 22 MDAs structures<br />
is on going.<br />
MTEF Projections<br />
2009/10<br />
Budget 2010/11 2011/12<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
22 Central Government<br />
Ministries and their agencies<br />
restructured.<br />
2012/13<br />
410 International Development Association (I 0.000 0.000 6.355 4.208 3.500<br />
Total Donor Funding for Project<br />
0.000 0.000 6.355 4.208 3.500<br />
16 Newly Gazetted Local<br />
Government structures<br />
customized.<br />
Structures for 16 Newly<br />
Gazzetted Local Governments<br />
and Urban Councils developed,<br />
customised and reports produced<br />
Technical support on<br />
implementation of<br />
recommended structures for 5<br />
MDAs and 5 LGs provided;<br />
Job Discriptions (JDs) and<br />
specifications for jobs in MDAs<br />
produced.<br />
Total<br />
1,748,400<br />
N/A<br />
755,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
1,748,400<br />
N/A<br />
755,000<br />
13 13 04Construction of the<br />
National Records Centre<br />
and Archives<br />
Total<br />
0<br />
Care taker hired for plot 8-10<br />
lourdel road.<br />
Supervising consultant hired.<br />
The Records and Archives<br />
Centre Constructed<br />
100,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
0<br />
100,000<br />
80
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Project 0025d <strong>Public</strong> <strong>Service</strong> Reform Comp.2 Records Management<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 13 71Acquisition of Land by<br />
Government<br />
Total<br />
GoU Development<br />
Donor Development<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
0<br />
0<br />
0<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
550,000<br />
550,000<br />
0<br />
13 13 72Government Buildings and<br />
Administrative<br />
Infrastructure<br />
Total<br />
GoU Development<br />
Donor Development<br />
Finalisation of the preparatory<br />
activities for the construcntion<br />
of of the National Records and<br />
Archives Centre.<br />
5,000,000<br />
0<br />
5,000,000<br />
N/A<br />
N/A<br />
The National Records and<br />
Archives Centre constructed.<br />
2,658,350<br />
0<br />
2,658,350<br />
GRAND TOTAL<br />
6,748,400<br />
N/A<br />
4,063,350<br />
GoU Development<br />
0<br />
550,000<br />
Donor Development<br />
6,748,400<br />
N/A<br />
3,513,350<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1301 Organizational Structures for MDAs developed and reviewed<br />
22 Central Government Ministries and their agencies restructured.<br />
Activities to Deliver Outputs:<br />
Carryout a study on restructuring<br />
Consultative meetings with MDAs;<br />
Data Collection,<br />
Data Analysis, Consensus building and Reports production.<br />
Output:<br />
Planned Outputs:<br />
13 1304 Construction of the National Records Centre and Archives<br />
The Records and Archives Centre Constructed<br />
Activities to Deliver Outputs:<br />
Consultative meetings;<br />
procuring the contractor.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
consultancy services for restructuring MDAs (days) 1.0 655,000<br />
Honoraria for providing project support. (days) 1.0 23,790<br />
perdiem and transport expenses (days) 1.0 40,000<br />
Fuel ,lubricants and oils (litres) 1.0 12,610<br />
assorted stationery, photocopying and printing<br />
(number)<br />
Total<br />
GoU Development<br />
Donor Development<br />
1.0 5,000<br />
Motor vehicle repair and spares (number) 1.0 1,600<br />
Refreshments and transport expenses (number) 1.0 5,000<br />
goods for immediate use (numbers) 1.0 12,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
755,000<br />
0<br />
755,000<br />
Inputs Quantity Cost<br />
Honoraria for construction of records centre (days) 1.0 20,000<br />
Fuel, lubricants and oils (litres) 1.0 10,000<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
1.0 10,000<br />
Goods and services for immediate use (number) 1.0 25,000<br />
Motor vehicle repairs and spares (number) 1.0 10,000<br />
Press releases and talk shows (number) 1.0 5,000<br />
Refreshment and transport expenses (number) 1.0 15,000<br />
Small office equipment acquired eg stapler (number) 1.0 5,000<br />
100,000<br />
0<br />
100,000<br />
81
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1313 Management Systems and Structures<br />
Project 0025d <strong>Public</strong> <strong>Service</strong> Reform Comp.2 Records Management<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1371 Acquisition of Land by Government<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Activities to Deliver Outputs:<br />
Total<br />
GoU Development<br />
Donor Development<br />
550,000<br />
550,000<br />
0<br />
Output:<br />
Planned Outputs:<br />
13 1372 Government Buildings and Administrative Infrastructure<br />
The National Records and Archives Centre constructed.<br />
Activities to Deliver Outputs:<br />
Construcntion of the National Records and Archives Centre.<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme 06 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme Profile<br />
Inputs Quantity Cost<br />
constuction firm (number) 1.0 2,700,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
GRAND TOTAL<br />
GoU Development<br />
Donor Development<br />
2,658,350<br />
0<br />
2,658,350<br />
4,063,350<br />
550,000<br />
3,513,350<br />
Responsible Officer:<br />
<strong>Commission</strong>er, <strong>Public</strong> <strong>Service</strong> Inspection(PSI)<br />
Objectives:<br />
Outputs:<br />
To promote compliance with policies, standards, rules, regulations and procedures in order to<br />
enhance efficiency and effectiveness of the MDAs and LGs;<br />
Results Oriented Management systems strengthened across MDAs and LGs; Technical<br />
support supervision and guidance provided to <strong>Public</strong> service institutions; <strong>Service</strong> delivery<br />
standards Developed, documented .disseminated and its utilization monitored.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
82
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme 06 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 14 01Results - Oriented<br />
Management systems<br />
strengthened across MDAs<br />
and LGs<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
Implementation of ROM results<br />
framework strengthened through<br />
technical support.<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Draft frame work for the<br />
implementation of ROM/OOB<br />
in place. ROM handbook<br />
reviewed and technical support<br />
for ROM implementation<br />
provided to MDAs and LGs<br />
particularly those where client<br />
charters are being developed.<br />
Client Charters have been<br />
launched in the districts of<br />
Moyo, Nebbi, Nakasongora<br />
and Budaka while those printed<br />
include Kampala City Council,<br />
Adjumani, Moroto, Pallisa,<br />
Butaleja and Busia. The next<br />
batch ready for printing include<br />
Katakwi, Lira, Soroti, Gulu,<br />
Ibanda, Kamwenge, Kasese,<br />
sironko, Mbale, Manafwa,<br />
Busolwe, Bududa, Tororo,<br />
Bugiri, Arua, Kasese and<br />
Yumbe. A Civil Society<br />
Organisation has been engaged<br />
to monitor and assess the<br />
implementation of Client<br />
charters in three ministries.<br />
Balanced score card and a<br />
comprehensive assessment tool<br />
were developed to monitor<br />
progress of clent charters.<br />
Four regional sessions for<br />
dissemination of the National<br />
<strong>Service</strong> Deliverly Survey Report<br />
2008 held in Mbarara and Gulu.<br />
Draft Guidelines for<br />
development, documentation<br />
and dissemination of <strong>Service</strong><br />
Delivery Standards prepared.<br />
Stakeholders consultative<br />
meeting held in November 2009<br />
to review the guide lines.<br />
Join up compliance inspections<br />
carried out and quarterly<br />
meetings for all Inspectorate<br />
Agencies conducted to<br />
harmonize the process and<br />
subsequently ensure efficiency<br />
and effectiveness. Nine (9)<br />
MDAs inspected: MoLG,<br />
MoJCA, ESC, JSC, MoE&S,<br />
MoFA MoGLSD, MoH, and<br />
MoIA. Joined up inspections<br />
carried out in LGs, Urban<br />
Authorities and selected Health<br />
and Education facilities in<br />
Kayunga, Mukono, Mpigi,<br />
Luweero, Kampala City<br />
Council, Wakiso, Apac and<br />
Iganaga. Inspection reports<br />
produced.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Framework for implementation<br />
of ROM and OOB including<br />
Budget monitoring implemented.<br />
83
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme 06 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
159,280<br />
130,000<br />
29,280<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
93,065<br />
93,065<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
58,071<br />
30,071<br />
28,000<br />
13 14 02<strong>Service</strong> Delivery<br />
Standards Developed,<br />
Disseminated and Utilized<br />
MDAs and LGs facilitated to<br />
develop and implement Client<br />
Charters.<br />
Produced client charters for the<br />
LG above ( 131401 o/put)<br />
Stake holders consultative<br />
meeting held in November 2009<br />
to review the guide lines.<br />
Accountabiity strenthened<br />
through promotion of service<br />
delivery standards.<br />
Draft deadlines for development<br />
, documentation and<br />
implementation of public<br />
service delivery standards in<br />
place.<br />
Total<br />
20,000<br />
0<br />
33,137<br />
Wage Recurrent<br />
0<br />
0<br />
11,137<br />
Non Wage Recurrent<br />
20,000<br />
0<br />
22,000<br />
13 14 03Compliance to service<br />
delivery standards<br />
12 MDAs inspected.<br />
Follow-up inspections and<br />
technical support supervision<br />
provided to 5 MDAs.<br />
25 LGs inspected.<br />
4 MDAs inspected :MoLG,<br />
MoJCA, ESC,JSC,MoE &<br />
MDA, MoGLSD,<br />
MoES,MoH,& MoIA.<br />
Joined up inspections carried<br />
out in LGs and urban authorities<br />
and selected health and<br />
education facilities;Kayunga,<br />
Mukono, Mpigi and Luweero<br />
(13 LGs, 10 Health facilities<br />
and 10 Education facilities)<br />
Joined up Inspections for<br />
performance ,systems and<br />
processes conducted in MDAs<br />
and LGs.<br />
Recommendations from the<br />
review of the inspectorate<br />
function implemented<br />
Inspection reports in place<br />
Total<br />
11,000<br />
0<br />
186,824<br />
Wage Recurrent<br />
0<br />
0<br />
66,823<br />
Non Wage Recurrent<br />
11,000<br />
0<br />
120,000<br />
84
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme 06 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 14 04Demand for <strong>Service</strong><br />
Delivery Accountability<br />
Strengthened through<br />
Client Charters<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Launched client charters:<br />
-Produced drafts that are at<br />
various stages of stake holders<br />
consultation and printing<br />
Justice and Constitutional<br />
affairs, Office of the president<br />
<strong>Public</strong> service commission and<br />
Education service commission.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
MDAs and LGs facilitated to<br />
develop, launch, disseminate<br />
and implement Client charters.<br />
Implementation of client<br />
charters rolled out to MDAs<br />
and LGs.<br />
Districts and urban authorities<br />
of Budaka, Nakasongola,<br />
Manafa, Palisa, Butaleja,<br />
Busolwe, lira,Gulu,Katakwi,<br />
Soroti, Yumbe Adjumani<br />
Arua,Mbale,Moroto, Bududa,<br />
Ibanda, Kasese Kamwenge,<br />
Moyo. Nebbi, bugiri,Busia,<br />
Sironko and Tororo.<br />
Total<br />
0<br />
139,549<br />
Wage Recurrent<br />
0<br />
44,549<br />
Non Wage Recurrent<br />
0<br />
95,000<br />
13 14 05Dissemination of the<br />
National <strong>Service</strong> Delivery<br />
Survey results<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Dissemination of the National<br />
<strong>Service</strong> Delivery Survey Report<br />
(2008) to all Sectors, MDAs<br />
and LGs.<br />
0<br />
0<br />
0<br />
2 regional sessions in Masaka<br />
and Mbale held<br />
1 sector session in Agriculture<br />
1000 copies disseminated.<br />
National <strong>Service</strong> Delivery<br />
Survey Report disseminated to<br />
all sectors<br />
60,000<br />
0<br />
60,000<br />
GRAND TOTAL<br />
190,280<br />
93,065<br />
477,581<br />
Wage Recurrent<br />
130,000<br />
93,065<br />
152,580<br />
Non Wage Recurrent<br />
60,280<br />
0<br />
325,001<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
85
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme 06 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
13 1401 Results - Oriented Management systems strengthened across MDAs and LGs<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Planned Outputs:<br />
Framework for implementation of ROM and OOB including Budget<br />
monitoring implemented.<br />
Activities to Deliver Outputs:<br />
Joint Monoitoring and review of plans and follow up activities<br />
undertaken.<br />
Printing Institutional Assessment tool.<br />
Inputs Quantity Cost<br />
Honoraria for implementation of ROM &OOB<br />
1.0 4,000<br />
(days)<br />
Fuel,lubricants and oils (litres) 1.0 1,000<br />
assorted stationary, photocopying (number) 1.0 4,000<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 4,000<br />
Meetings, training materials & transport (number) 1.0 3,000<br />
motor vehicle repairs and spares (number) 1.0 1,000<br />
Perdiem and transport expenses (number) 2.0 9,000<br />
Refreshments and transport expenses (number) 1.0 2,000<br />
Permanent staff (Person Years) 0.0 27,000<br />
58,071<br />
30,071<br />
28,000<br />
Output:<br />
13 1402 <strong>Service</strong> Delivery Standards Developed, Disseminated and Utilized<br />
Planned Outputs:<br />
Accountabiity strenthened through promotion of service delivery<br />
standards.<br />
Activities to Deliver Outputs:<br />
Disseminate Guidelines for <strong>Service</strong> delivery standards.<br />
Support MDAs to develop, document and apply service delivery standards<br />
Inputs Quantity Cost<br />
Honoraria for dissemination of service guidelines 1.0 3,000<br />
(days)<br />
Perdiem and transport expenses (days) 2.0 4,000<br />
Fuel, lubricants and oils (litres) 1.0 3,000<br />
Goods and services for immediate use eg cleaning<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 1,000<br />
Meetings, training materials & transport (number) 1.0 2,000<br />
Motor vehicle repairs and spares (number) 1.0 2,000<br />
News papers (number) 1.0 1,000<br />
Refreshments and transport expenses (number) 1.0 2,000<br />
small office equipment eg stapler (number) 1.0 1,000<br />
stationary,photo copying and printing (number) 1.0 3,000<br />
Permanent staff (Person Years) 0.0 10,000<br />
33,137<br />
11,137<br />
22,000<br />
Output:<br />
13 1403 Compliance to service delivery standards<br />
Planned Outputs:<br />
Joined up Inspections for performance ,systems and processes conducted<br />
in MDAs and LGs.<br />
Recommendations from the review of the inspectorate function<br />
implemented<br />
Activities to Deliver Outputs:<br />
Undertake joint Inspections of 25 LGs on compliance with set standards<br />
with greater focus on Health and Education Sectors.<br />
Conduct joint inspections in 12 MDAs on compliance with set standards<br />
Inputs Quantity Cost<br />
Honoraria for undertaking joint inspection of LGs 1.0 20,000<br />
(days)<br />
Perdiem and transport expenses (days) 1.0 44,000<br />
Fuel lubricants and oil (litres) 1.0 24,600<br />
assorted stationery, printing and photocopying<br />
(number)<br />
Goods and services for immediate use eg cleaning<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 7,000<br />
1.0 4,400<br />
News papers (number) 1.0 1,000<br />
Stationary, photocopying andtransport expenses<br />
(number)<br />
1.0 15,000<br />
motor vehicle repairs and spares (numbers) 1.0 4,000<br />
Permanent staff (Person Years) 0.0 60,000<br />
186,824<br />
66,823<br />
120,000<br />
86
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Programme 06 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
13 1404 Demand for <strong>Service</strong> Delivery Accountability Strengthened through Client Charters<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Planned Outputs:<br />
MDAs and LGs facilitated to develop, launch, disseminate and implement<br />
Client charters.<br />
Implementation of client charters rolled out to MDAs and LGs.<br />
Activities to Deliver Outputs:<br />
Assist 20 <strong>Public</strong> <strong>Service</strong> Institutions to produce Client Charters<br />
Follow up MDAs to monitor and evaluate implemetation of Client Charters<br />
Follow up LGs to monitor and evaluate th eimplementation of Client<br />
Charters<br />
Inputs Quantity Cost<br />
Honoraria for deve'ping client charters (days) 1.0 15,000<br />
per diem and transport expenses (days) 1.0 30,000<br />
Assorted stationary photocopying and printing<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 10,000<br />
motor vehicle repairs and spare (number) 1.0 5,000<br />
Photocopying, printing and transport expenses<br />
(number)<br />
1.0 20,000<br />
Fuel lubricants and oils (numbers) 1.0 15,000<br />
Permanent staff (Person Years) 0.0 40,000<br />
139,549<br />
44,549<br />
95,000<br />
Output:<br />
13 1405 Dissemination of the National <strong>Service</strong> Delivery Survey results<br />
Planned Outputs:<br />
National <strong>Service</strong> Delivery Survey Report disseminated to all sectors<br />
Activities to Deliver Outputs:<br />
Dissemination of the National <strong>Service</strong> Delivery Survey Report to all<br />
Sectors, MDAs and LGs.<br />
Inputs Quantity Cost<br />
Honoraria for disseminating NSD report (days) 1.0 5,000<br />
per diem and transport expenses (days) 1.0 25,000<br />
Fuel, lubricants and Oils (litres) 1.0 10,000<br />
Assorted stationary photocopying, printing (number) 1.0 5,000<br />
motor vehicle repair and spales (number) 1.0 5,000<br />
Refreshment and transport expenses (number) 1.0 10,000<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
60,000<br />
0<br />
60,000<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
477,581<br />
152,580<br />
325,001<br />
Project 0025b <strong>Public</strong> <strong>Service</strong> Reform Comp 3: Pub Serv Inspection<br />
Project Profile<br />
Responsible Officer:<br />
<strong>Commission</strong>er, <strong>Public</strong> <strong>Service</strong> Inspection<br />
Objectives:<br />
Outputs:<br />
Start Date:<br />
To promote compliance with policies, standards, rules, regulations and procedures in order to<br />
enhance efficiency and effectiveness of the MDAs and LGs;<br />
Use of client charter to improve performance reviewed.<br />
11/19/2008 Projected End Date:<br />
11/19/2013<br />
Donor Funding for Project:<br />
Projected Donor Allocations (UShs)<br />
2008/09<br />
Budget<br />
MTEF Projections<br />
2009/10<br />
Budget 2010/11 2011/12<br />
2012/13<br />
410 International Development Association (I 0.000 0.000 0.100 0.000 0.000<br />
Total Donor Funding for Project<br />
0.000 0.000 0.100 0.000 0.000<br />
87
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1314 <strong>Public</strong> <strong>Service</strong> Inspection<br />
Project 0025b <strong>Public</strong> <strong>Service</strong> Reform Comp 3: Pub Serv Inspection<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 14 04Demand for <strong>Service</strong><br />
Delivery Accountability<br />
Strengthened through<br />
Client Charters<br />
Total<br />
GoU Development<br />
Donor Development<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
The Balanced Score Card tested<br />
out in some MDAs and LGs.<br />
MDAs and LGs guided in<br />
developing client charters .<br />
2009/10<br />
121,000<br />
0<br />
121,000<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Client Charters have been<br />
launched in the districts of<br />
Moyo, Nebbi, Nakasongora<br />
and Budaka while those printed<br />
include Kampala City Council,<br />
Adjumani, Moroto, Pallisa,<br />
Butaleja and Busia. The next<br />
batch ready for printing include<br />
Katakwi, Lira, Soroti, Gulu,<br />
Ibanda, Kamwenge, Kasese,<br />
sironko, Mbale, Manafwa,<br />
Busolwe, Bududa, Tororo,<br />
Bugiri, Arua, Kasese and<br />
Yumbe. A Civil Society<br />
Organisation has been engaged<br />
to monitor and assess the<br />
implementation of Client<br />
charters in three ministries.<br />
Balanced score card and a<br />
comprehensive assessment tool<br />
were developed to monitor<br />
progress of clent charters.<br />
N/A<br />
N/A<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Use of client charters to<br />
improve performance reviewed<br />
100,000<br />
0<br />
100,000<br />
GRAND TOTAL<br />
121,000<br />
N/A<br />
100,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
121,000<br />
N/A<br />
100,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1404 Demand for <strong>Service</strong> Delivery Accountability Strengthened through Client Charters<br />
Use of client charters to improve performance reviewed<br />
Activities to Deliver Outputs:<br />
Review of the use of client charters to improve performance.<br />
Hold consultative meetings<br />
MDAs and LGs guided in developing client charters .<br />
Vote Function: 1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Consultacy for reviewing client chartes (days) 1.0 20,000<br />
Honoraria for reviewing the client charter (days) 1.0 5,000<br />
Perdiem, transport expenses (days) 1.0 20,000<br />
Fuel,lubricants and oils (litres) 1.0 15,000<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
Total<br />
GoU Development<br />
Donor Development<br />
1.0 20,000<br />
motor vehicle repairs and spares (number) 1.0 5,000<br />
Refreshments and transport expenses (number) 1.0 15,000<br />
GRAND TOTAL<br />
GoU Development<br />
Donor Development<br />
100,000<br />
0<br />
100,000<br />
100,000<br />
0<br />
100,000<br />
88
Vote: 005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Programme 09 <strong>Public</strong> <strong>Service</strong> Pensions<br />
Programme Profile<br />
Responsible Officer:<br />
<strong>Commission</strong>er, Compensation<br />
Objectives:<br />
Outputs:<br />
To ensure fair,equitable, transparent, and prompt system of computation and payment of<br />
pension benefits and other terminal benefits.<br />
Terminal benefits paid; pensions scheme for the traditional public service, the Police force,<br />
the Prisons force, education service, and the Defence forces managed.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 15 01Payment of Statutory<br />
Pensions<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Payment of 58,000 pensioners<br />
countrywide.<br />
152.2 bn is the planned pension<br />
requirement for the FY 2008/09<br />
while the projected arrears at<br />
the end of 2008/09 is estimated<br />
to be UGX 130.4.bn.<br />
103,390,000<br />
2009/10<br />
0<br />
103,390,000<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
56,000 Pensioners paid by 28th<br />
of every month<br />
Effective implmentationof STP<br />
with about 5,000 invalid records<br />
updated<br />
A total of 46,000 pensioners<br />
were paid monthly pension as at<br />
December 2009. A request for<br />
supplementary funding for<br />
clearance of outstanding arrears<br />
was made.<br />
0<br />
0<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Monthly pension paid<br />
(Tradional, Teachers, Veterans,<br />
widows and Claimants)<br />
193,036,264<br />
0<br />
193,036,264<br />
13 15 99Arrears<br />
Total<br />
12,000,000<br />
0<br />
113,017,242<br />
Wage Recurrent<br />
0<br />
0<br />
0<br />
Non Wage Recurrent<br />
12,000,000<br />
0<br />
113,017,242<br />
GRAND TOTAL<br />
115,390,000<br />
0<br />
306,053,507<br />
Wage Recurrent<br />
0<br />
0<br />
0<br />
Non Wage Recurrent<br />
115,390,000<br />
0<br />
306,053,507<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
89
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1315 <strong>Public</strong> <strong>Service</strong> Pensions(Statutory)<br />
Programme 09 <strong>Public</strong> <strong>Service</strong> Pensions<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1501 Payment of Statutory Pensions<br />
Monthly pension paid (Tradional, Teachers, Veterans, widows and<br />
Claimants)<br />
Activities to Deliver Outputs:<br />
Monthly pension paid (Tradional, Teachers, Veterans, widows and<br />
Claimants), and gratuity/ NSSF Contributions for Scientists<br />
Output:<br />
Planned Outputs:<br />
13 1599 Arrears<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
pension for military service (numbeer) 1.0 24,000,000<br />
Emoluments to former presidents/vice presidents<br />
(number)<br />
gratuity pay for teachers, traditional, UPDF, LGs<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 264,801<br />
1.0 44,121,295<br />
NSSF for scientists (number) 1.0 4,649,850<br />
pension and gratuity for local governments (number) 1.0 12,000,000<br />
Pension for general civil service (number) 1.0 60,000,000<br />
Pension for teachers (number) 1.0 48,000,000<br />
193,036,264<br />
0<br />
193,036,264<br />
Activities to Deliver Outputs:<br />
Vote Function: 1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Programme 05 Compensation<br />
Programme Profile<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
113,017,242<br />
0<br />
113,017,242<br />
306,053,507<br />
0<br />
306,053,507<br />
Responsible Officer:<br />
<strong>Commission</strong>er,Compensation<br />
Objectives:<br />
Outputs:<br />
The reliability of Pension as a post employment benefit for <strong>Public</strong> <strong>Service</strong> employees<br />
reinstated<br />
Pension Reform implemented through Assessment/computation, verification/ validation of<br />
pensioners, scheduling and payment of terminal benefits and support to MDAs and LGs.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
90
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Programme 05 Compensation<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 16 01Implementation of the<br />
<strong>Public</strong> <strong>Service</strong> Pension<br />
Reforms<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Support activities to the project<br />
component of the pension<br />
reforms.<br />
Clearence of severence package<br />
for the NAADs staff<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
95% Pensioners files for<br />
Tradional, Teachers, Veterans,<br />
Widows, Contracts and former<br />
EAC Assessed on Monthly<br />
Pension<br />
Implementation of STP<br />
effectively done and about<br />
5,000 cases of unapplied<br />
corrected<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Severance package to NAADS<br />
Paid (3bn)<br />
Technical support to MDAs/<br />
LGS on the Pension Reform<br />
Provided (105M)<br />
Pensions payroll updated and<br />
run (70M)<br />
Restructuring for NAADS not<br />
implemented<br />
Pending submissions fro<br />
payment of terminal benefits<br />
processed and accessed on<br />
pension payroll. 46,000<br />
pensioners were paid monthly<br />
pension as at December 2009.<br />
Pensioners files assessed (40M)<br />
Pensions files stored and<br />
retrieved (15M)<br />
Files retrieved within 15<br />
minutes of request.<br />
Total<br />
4,227,000<br />
104,743<br />
3,371,520<br />
Wage Recurrent<br />
147,000<br />
104,743<br />
171,513<br />
Non Wage Recurrent<br />
4,080,000<br />
0<br />
3,200,007<br />
GRAND TOTAL<br />
4,227,000<br />
104,743<br />
3,371,520<br />
Wage Recurrent<br />
147,000<br />
104,743<br />
171,513<br />
Non Wage Recurrent<br />
4,080,000<br />
0<br />
3,200,007<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
91
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Programme 05 Compensation<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
Severance package to NAADS Paid (3bn)<br />
Technical support to MDAs/ LGS on the Pension Reform Provided (105M)<br />
Pensions payroll updated and run (70M)<br />
Pensioners files assessed (40M)<br />
Pensions files stored and retrieved (15M)<br />
Assessment and payment of retrences<br />
Assessment/ computation of bebefits traditional, Trs, Veterans, widows<br />
and former MoECA<br />
Developing payment schedules<br />
Technical Support and Consultative meetings with LGs<br />
Validation of Pensioners Countrywide<br />
Updating of PIMS<br />
Retrieval of files<br />
13 1601 Implementation of the <strong>Public</strong> <strong>Service</strong> Pension Reforms<br />
Activities to Deliver Outputs:<br />
Verification exercise countrywide.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for implenting ps pension reforms (days) 1.0 22,000<br />
perdiems and transport expenses (days) 1.0 30,000<br />
Fuel, Lubricants & Oils (litres) 1.0 21,200<br />
Assorted stationary,photocopying & printing<br />
(number)<br />
1.0 21,500<br />
Goods and services for immediate use (number) 1.0 41,500<br />
Meeting, training materials & transport expenses<br />
(number)<br />
1.0 12,800<br />
meetings, stationary,transport & perdiem (number) 1.0 20,000<br />
Motor vehicle repairs and spares (number) 1.0 15,200<br />
Pension & gratuity for LGs (number) 1.0 3,000,006<br />
Refreshments and transport expenses (number) 1.0 15,800<br />
Permanent staff (Person Years) 0.0 154,000<br />
Project 0025c <strong>Public</strong> <strong>Service</strong> Reform Comp 4 : Pension Reform<br />
Project Profile<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
3,371,520<br />
171,513<br />
3,200,007<br />
3,371,520<br />
171,513<br />
3,200,007<br />
Responsible Officer:<br />
<strong>Commission</strong>er, Compensation<br />
Objectives:<br />
Outputs:<br />
Start Date:<br />
The reliability of Pension as a post employment benefit for <strong>Public</strong> <strong>Service</strong> employees<br />
reinstated<br />
Pension Reform implementation supported.<br />
11/19/2008 Projected End Date:<br />
11/20/2013<br />
Donor Funding for Project:<br />
Projected Donor Allocations (UShs)<br />
2008/09<br />
Budget<br />
MTEF Projections<br />
2009/10<br />
Budget 2010/11 2011/12<br />
2012/13<br />
92
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1316 <strong>Public</strong> <strong>Service</strong> Pensions Reform<br />
Project 0025c <strong>Public</strong> <strong>Service</strong> Reform Comp 4 : Pension Reform<br />
410 International Development Association (I 0.000 0.000 0.200 0.000 0.000<br />
Total Donor Funding for Project<br />
0.000 0.000 0.200 0.000 0.000<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 16 01Implementation of the<br />
<strong>Public</strong> <strong>Service</strong> Pension<br />
Reforms<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Making the public<br />
knowledgeable about the<br />
pension reforms.<br />
<strong>Public</strong> <strong>Service</strong> Pension Reforms<br />
implemented.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Pending submissions fro<br />
payment of terminal benefits<br />
processed and accessed on<br />
pension payroll. 46,000<br />
pensioners were paid monthly<br />
pension as at December 2009.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Pension Reform Advisorly<br />
services paid<br />
Total<br />
GoU Development<br />
Donor Development<br />
Pension management systems<br />
reviewed.<br />
320,000<br />
0<br />
320,000<br />
N/A<br />
N/A<br />
200,000<br />
0<br />
200,000<br />
GRAND TOTAL<br />
320,000<br />
N/A<br />
200,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
320,000<br />
N/A<br />
200,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 1601 Implementation of the <strong>Public</strong> <strong>Service</strong> Pension Reforms<br />
Pension Reform Advisorly services paid<br />
Activities to Deliver Outputs:<br />
Payment for the Long Term Pension Reform Advisor<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 01 Finance and Administration<br />
Programme Profile<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
payment for an advisor (days) 1.0 200,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
GRAND TOTAL<br />
GoU Development<br />
Donor Development<br />
200,000<br />
0<br />
200,000<br />
200,000<br />
0<br />
200,000<br />
Responsible Officer:<br />
Under Secretary Finance and Administration<br />
Objectives:<br />
Outputs:<br />
To ensure efficient and effective utilisation of the Human,Financial and material resources as<br />
well as coordinating and providing technical guidance on policy development, planning and<br />
budgeting, monitoring and evaluation, and IEC issues across the ministry.<br />
Technical support on policy development, planning and budgeting, financial and human<br />
resource management provided; Information, Education and Comunication [IEC] issues<br />
93
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 01 Finance and Administration<br />
pertaining to the Ministry disseminated; and monitoring and evaluation of policies and<br />
programme implementation carried out.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 11Provision of Office<br />
Equipment and Facilities<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
General support to the project<br />
component and routine activities<br />
of the Ministry provided.<br />
Procurements based on the<br />
approved workplans and<br />
budgets made.<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Assorted office stationery and<br />
small office<br />
equipment,computers,software<br />
purshased. Minor civil works<br />
and reoairs on the office<br />
premises and cleaning services<br />
carried out. Motor vehicle<br />
maintenace and servicing of<br />
office equioment done. Postage<br />
and courier services provided.<br />
Paid rent for former leaders.<br />
Financial Reports, Plans and<br />
Statements prepared and<br />
submitted. Change management<br />
workshops held. PSRP<br />
workplan prepared and subitted.<br />
Final accounts prepared and<br />
submitted. Responded to the<br />
Audit and Managemet letters.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Small office equipment<br />
purchased.<br />
General goods and services<br />
supplied.<br />
General support to the project<br />
and routine activities provided.<br />
Office equipment and facilities<br />
provided.<br />
Total<br />
2,016,479<br />
355,702<br />
1,766,916<br />
Wage Recurrent<br />
479,179<br />
355,702<br />
341,913<br />
Non Wage Recurrent<br />
1,537,300<br />
0<br />
1,425,003<br />
13 49 12Production of Workplans<br />
and Budgets<br />
Workplans,budgets and<br />
Ministerial Policy Statement for<br />
the Ministry prepared.<br />
Workplans prepared and<br />
submitted. Guidance on<br />
planning provided.<br />
Workplans,Budgets and<br />
Ministerial Policy Statements<br />
developed.<br />
Total<br />
5,500<br />
The PSRP annual workplan<br />
developed and finalized.<br />
Annual workplan and reports<br />
submitted to MoFPED. PSRP<br />
workplan and budgets finalized<br />
and approved by development<br />
partners. Guided MoPS staff<br />
and LGs on budgeting and<br />
planning issues.<br />
0<br />
Sectoral policies and guidelines<br />
reviewed, analysed and<br />
developed<br />
Relevant policy advice given.<br />
General support on planning,<br />
budgeting and policy functions<br />
provided.<br />
Harmonization of the various<br />
planning and budgeting<br />
frameworks<br />
176,275<br />
Wage Recurrent<br />
0<br />
0<br />
22,274<br />
Non Wage Recurrent<br />
5,500<br />
0<br />
154,000<br />
94
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 01 Finance and Administration<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 13Financial Management<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Final accounts and advice<br />
prepared and given to the<br />
management.<br />
2009/10<br />
5,000<br />
0<br />
5,000<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Final accounts submitted and<br />
financial technical advice<br />
tendered to management.<br />
0<br />
0<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Final Accounts for the Ministry<br />
prepared<br />
Internal Audit function<br />
strengthened<br />
85,118<br />
50,118<br />
35,000<br />
13 49 14Management of Resouce<br />
Centre and Registries<br />
Procurement of specialised<br />
Resource Centre equipment.<br />
Computers and digitized<br />
equipment procured. Finalised<br />
the procuremnt process for<br />
audio-visual equipment for the<br />
Ministry.<br />
Resource Centre and registries<br />
well managed.<br />
Resource Centre and registries<br />
managed.<br />
Total<br />
5,000<br />
0<br />
90,686<br />
Wage Recurrent<br />
0<br />
0<br />
55,686<br />
Non Wage Recurrent<br />
5,000<br />
0<br />
35,000<br />
GRAND TOTAL<br />
2,031,979<br />
355,702<br />
2,118,995<br />
Wage Recurrent<br />
479,179<br />
355,702<br />
469,991<br />
Non Wage Recurrent<br />
1,552,800<br />
0<br />
1,649,004<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
95
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 01 Finance and Administration<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4911 Provision of Office Equipment and Facilities<br />
Small office equipment purchased.<br />
General goods and services supplied.<br />
General support to the project and routine activities provided.<br />
Activities to Deliver Outputs:<br />
Provide assorted stationery, office equipment,computers,fuel and<br />
lubricants motor vehicle service and repair.<br />
Office ambience and cleaning services. Internet and intranet services and<br />
general support to the project component activities.<br />
Planning and budgeting support.<br />
Pay honoria according to the Government standing Orders.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Assorted stationary,photocopying & printing () 1.0 47,460<br />
Payment of honoraria (days) 1.0 105,000<br />
per diem and transport expenses (days) 3.0 231,759<br />
Fuel, lubricants and Oils (litres) 1.0 80,000<br />
Bank charges & other bank related costs (number) 1.0 2,000<br />
Computer supplies & IT services (number) 1.0 50,000<br />
Garbage and fumugation expenses (number) 1.0 70,610<br />
Goods for immidiate use (number) 1.0 75,396<br />
IFMS Recurrent costs (number) 1.0 60,000<br />
Incapacity,death benefits & funeral expenses<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 25,000<br />
infrastracture repairs (number) 1.0 60,000<br />
Machinery and equipment repairs (number) 1.0 50,000<br />
Medical expenses (number) 1.0 25,000<br />
meetings and training materials, travel expenses<br />
(number)<br />
1.0 30,000<br />
Motor vehicle repair and spares (number) 1.0 70,000<br />
Newspapers (number) 1.0 26,000<br />
Postage and courier (number) 1.0 9,000<br />
Press release and talk shows (number) 1.0 16,801<br />
refreshments and transport expenses (number) 1.0 51,000<br />
Small office equipment (number) 1.0 10,000<br />
Telecommunications (number) 1.0 235,001<br />
Permanent staff (Person Years) 0.0 307,000<br />
Electricity expenses (units) 1.0 60,000<br />
Water expenses (units) 1.0 34,974<br />
1,766,916<br />
341,913<br />
1,425,003<br />
Output: 13 4912 Production of Workplans and Budgets<br />
Planned Outputs:<br />
Workplans,Budgets and Ministerial Policy Statements developed.<br />
Sectoral policies and guidelines reviewed, analysed and developed<br />
Relevant policy advice given.<br />
General support on planning, budgeting and policy functions provided.<br />
Harmonization of the various planning and budgeting frameworks<br />
Activities to Deliver Outputs:<br />
Preparation of Annual workplan.<br />
Production and updating of quarterly workplans.<br />
Technical support to departments on planning and budgeting.<br />
Inputs Quantity Cost<br />
Honoraria for developing quaterly workplans (days) 1.0 59,320<br />
Perdiem and transport expenses (days) 1.0 25,000<br />
Fuel,lubricants and oils (litres) 1.0 15,000<br />
Assorted stationary,photocopying & printing<br />
(number)<br />
Meetings, training materials & transport expense<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 20,000<br />
1.0 14,000<br />
refreshments and transport expenses (number) 1.0 3,000<br />
small office equipment aquired eg stapler (number) 1.0 2,000<br />
stationary,photocopying and transport expenses<br />
(number)<br />
1.0 15,680<br />
Permanent staff (Person Years) 0.0 20,000<br />
176,275<br />
22,274<br />
154,000<br />
96
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 01 Finance and Administration<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4913 Financial Management<br />
Final Accounts for the Ministry prepared<br />
Internal Audit function strengthened<br />
Activities to Deliver Outputs:<br />
Prepare final accounts and relevant financial statements including<br />
tendering of technical advice.<br />
Respond to quarterly Internal Audit reports and the Management Letters.<br />
Output:<br />
Planned Outputs:<br />
13 4914 Management of Resouce Centre and Registries<br />
Resource Centre and registries well managed.<br />
Activities to Deliver Outputs:<br />
Purchase specialised equipment for the Resource Centre.<br />
Procure specialised books and periodicals for the Resource Centre.<br />
Programme 02 Administrative Reform<br />
Programme Profile<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for preparation of final accounts (days) 1.0 15,000<br />
News papers (number) 1.0 3,000<br />
refreshments and transport expenses (number) 1.0 5,000<br />
small equipment aquired eg stapler (number) 1.0 2,000<br />
Goods aquired for immediate use eg cleaning<br />
(numbers)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 10,000<br />
Permanent staff (Person Years) 0.0 45,000<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
85,118<br />
50,118<br />
35,000<br />
Inputs Quantity Cost<br />
Honoraria for managing resource centre (days) 1.0 22,000<br />
News papers (number) 1.0 5,000<br />
Refreshments and transport expenses (number) 1.0 5,000<br />
Small office equipment aquired eg stapler (number) 1.0 3,000<br />
Permanent staff (Person Years) 0.0 50,000<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
90,686<br />
55,686<br />
35,000<br />
2,118,995<br />
469,991<br />
1,649,004<br />
Responsible Officer:<br />
Director R&D<br />
Objectives:<br />
Outputs:<br />
To increase awareness of the public service on service delivery issues as well as popularizing<br />
usage and access to new information and technology as a better means of serving the wider<br />
stakeholder audience;<br />
Awareness of the public service on service delivery issues increased; Usage and access to new<br />
information and technology as a better means of serving the wider stakeholder audience<br />
popularized; capacity for Knowledge Management in the <strong>Public</strong> <strong>Service</strong> built;<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
97
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 02 Administrative Reform<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 14Management of Resouce<br />
Centre and Registries<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Procurement of specialised<br />
Resource Centre equipment.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Procured various Audio-Visual<br />
aids, Professional Recording<br />
equipment, and consumables<br />
Resource Centre and registries<br />
managed.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Operationalise modernised<br />
Resource Centre<br />
Collection Development<br />
Publish and disseminate<br />
Ministry's Knowledge Products<br />
Total<br />
30,000<br />
0<br />
10,000<br />
Wage Recurrent<br />
0<br />
0<br />
0<br />
Non Wage Recurrent<br />
30,000<br />
0<br />
10,000<br />
13 49 15Implementation of the IEC<br />
Strategy<br />
General Support services to the<br />
corresponding project<br />
component.<br />
Carried out outreach sessions to<br />
4 MDAs;<br />
Held 4 Press Conferences, 2<br />
Radio programs, 2 TV<br />
Programs, and 1 Press release;<br />
Media and <strong>Public</strong> Relations<br />
Developed a Documentary film<br />
on successes of the PSRP<br />
1st draft of ToR for Knowledge<br />
Management Strategy prepared;<br />
Carried out dissemination<br />
activities to support Pension<br />
Reform process<br />
Implementation of the<br />
Knowledge Management<br />
Strategy<br />
MoPS toll free hot line installed<br />
and subscribed for 12 months<br />
Integrated services Digital<br />
networks (ISDN) line installed<br />
at MoPS.<br />
Develop a Business Continuity<br />
Plan for MoPS<br />
Carry out the Ministry's<br />
Outreach Plan<br />
Total<br />
172,000<br />
101,655<br />
235,945<br />
Wage Recurrent<br />
142,000<br />
101,655<br />
165,945<br />
Non Wage Recurrent<br />
30,000<br />
0<br />
70,000<br />
98
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 02 Administrative Reform<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 16PSRP Monitoring and<br />
Evaluation Framework<br />
developed and<br />
implemented<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
PSRP monitoring and evaluation<br />
system strenghened.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Joint Annual Review<br />
preparations. Piloted M&E<br />
instruments.Preparatory<br />
activities for impact assessment<br />
of PSRP and staff survey.<br />
Conducted assessment of PSRP<br />
in 2008/09<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Improve data availability<br />
through surveys and collection<br />
from primary and secondary<br />
sources on agreed variables.<br />
Quartely Reports produced<br />
M&E readiness intervention<br />
undertaken M&E of PSRP<br />
undertaken<br />
Total<br />
20,000<br />
0<br />
80,000<br />
Wage Recurrent<br />
0<br />
0<br />
0<br />
Non Wage Recurrent<br />
20,000<br />
0<br />
80,000<br />
GRAND TOTAL<br />
222,000<br />
101,655<br />
325,945<br />
Wage Recurrent<br />
142,000<br />
101,655<br />
165,945<br />
Non Wage Recurrent<br />
80,000<br />
0<br />
160,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
99
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 02 Administrative Reform<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4914 Management of Resouce Centre and Registries<br />
Operationalise modernised Resource Centre<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for establishment of a photo bank (days) 1.0 5,000<br />
Goods and services acquired for immediate use<br />
(number)<br />
1.0 5,000<br />
Collection Development<br />
Publish and disseminate Ministry's Knowledge Products<br />
Activities to Deliver Outputs:<br />
Draft Resource Centre Operattional guidelines<br />
Train staff in usage of new Audio Visual aids and equipment<br />
Purchase of Informational materials<br />
Subscription to online resources, networks<br />
Establishment of a comprehensive photobank<br />
Design, print and disseminate Ministry's Knowledge products<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
10,000<br />
0<br />
10,000<br />
100
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 02 Administrative Reform<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4915 Implementation of the IEC Strategy<br />
Media and <strong>Public</strong> Relations<br />
Implementation of the Knowledge Management Strategy<br />
Develop a Business Continuity Plan for MoPS<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for developing mangement guidelines<br />
1.0 20,000<br />
(days)<br />
perdiem and transport expenses (days) 1.0 15,000<br />
Fuel, lubricants and oil (litres) 1.0 5,500<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
Goods and services aquired for immediate use<br />
(number)<br />
1.0 1,000<br />
1.0 1,500<br />
Hire of venue (number) 1.0 1,500<br />
meetings scholarstic materials & transport expense<br />
(number)<br />
1.0 1,500<br />
Motor vehicle repair and spare (number) 1.0 1,500<br />
News papers (number) 1.0 1,100<br />
press releases and talk shows (number) 1.0 3,000<br />
Refreshments and transport expenses (number) 1.0 2,400<br />
Small office equipment aquired eg stapler (number) 1.0 1,000<br />
stationary,photocopying and transport expenses<br />
(number)<br />
1.0 15,000<br />
Permanent staff (Person Years) 0.0 149,000<br />
Carry out the Ministry's Outreach Plan<br />
Activities to Deliver Outputs:<br />
8 Press Conferences held at MoPS<br />
4 Radio Programs<br />
4 TV Programs<br />
4 Print Press Adverts<br />
3 Adverts in Strategic Magazines<br />
Development of simple Knowledge Management Guidelines<br />
MoPS Knowledge Documentation<br />
Staff Skill Profiling<br />
Draft Business Continuity Plan for MoPS<br />
Carry out outreach sessions to 10 MDAs and 12 LGs<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
235,945<br />
165,945<br />
70,000<br />
101
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 02 Administrative Reform<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4916 PSRP Monitoring and Evaluation Framework developed and implemented<br />
Improve data availability through surveys and collection from primary and<br />
secondary sources on agreed variables.<br />
Activities to Deliver Outputs:<br />
Strengthening Management Information System (MIS) for M&E through<br />
review of tools, training to improve reporting.<br />
Data collection through surveys from primary and secondary sources to<br />
obtain agreed indicators for ongoing and future activities,projects and<br />
programmes.<br />
Programme 10 Internal Audit<br />
Programme Profile<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for strengthening MIS (days) 1.0 20,000<br />
Perdiem and transport expenses (days) 1.0 20,000<br />
Fuel lubricants and oils (litres) 1.0 20,000<br />
Goods and services for immediate use eg cleaning<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 10,000<br />
Refreshments and transport expenses (number) 1.0 10,000<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
80,000<br />
0<br />
80,000<br />
325,945<br />
165,945<br />
160,000<br />
Responsible Officer:<br />
Under-Secretary, Finance and Administration<br />
Objectives:<br />
Outputs:<br />
To assist the Accounting Officer accomplish objectives of the institution as set by the public<br />
Finance and Accountability Act 2003 and in accordance with the public Finance and<br />
Accountability regulations 27 and 28, by bringing a systematic, disciplined approach to<br />
evaluate and improve the effectiveness of risk management, internal control systems and<br />
compliance with government processes.<br />
The functions encompasses the examination of the ministry's systems of internal control and<br />
quality of performance by carrying out review and report on the system for generating<br />
financial information and data, and on the reliability and integrity of financial statements and<br />
other related accounting and financial information.<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 13Financial Management<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
The Internal Audit Function and<br />
Activities strengthened.<br />
2009/10<br />
55,000<br />
25,000<br />
30,000<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
internal audit functions carried<br />
out<br />
22,183<br />
22,183<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Internal Audit Function<br />
Activities strengthened.<br />
77,843<br />
27,843<br />
50,000<br />
GRAND TOTAL<br />
55,000<br />
22,183<br />
77,843<br />
Wage Recurrent<br />
25,000<br />
22,183<br />
27,843<br />
Non Wage Recurrent<br />
30,000<br />
0<br />
50,000<br />
102
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Programme 10 Internal Audit<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4913 Financial Management<br />
Internal Audit Function Activities strengthened.<br />
Activities to Deliver Outputs:<br />
Strengthening Internal Audit Function Activities.<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Project Profile<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for strengthening internal audit (days) 1.0 25,000<br />
Goods and services aquired for immediate use.<br />
(number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 8,000<br />
News papers (number) 1.0 5,000<br />
Refreshments and transport expenses (number) 1.0 7,000<br />
small office equipment aquired eg stapler (number) 1.0 5,000<br />
Permanent staff (Person Years) 0.0 25,000<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
77,843<br />
27,843<br />
50,000<br />
77,843<br />
27,843<br />
50,000<br />
Responsible Officer:<br />
US F&A;<br />
Objectives:<br />
Outputs:<br />
Start Date:<br />
To ensure efficient and effective utilisation of the Human,Financial and material resources as<br />
well as coordinating and providing technical guidance on policy development, planning and<br />
budgeting, monitoring and evaluation, and IEC issues across the ministry.<br />
Sector issues and the various planning and budgeting frameworks Coordinated; Resource<br />
Centre Operationalised; Staff survey carried out; Technical support to staff on planning and<br />
budgeting offered; Office equipment and facilities and support services provided.<br />
11/19/2008 Projected End Date:<br />
11/20/2013<br />
Donor Funding for Project:<br />
Projected Donor Allocations (UShs)<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2009/10<br />
2008/09<br />
Budget<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
MTEF Projections<br />
2009/10<br />
Budget 2010/11 2011/12<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
2012/13<br />
410 International Development Association (I 0.000 0.000 1.487 1.275 2.300<br />
Total Donor Funding for Project<br />
0.000 0.000 1.487 1.275 2.300<br />
103
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 11Provision of Office<br />
Equipment and Facilities<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Office equipment and facilities<br />
provided.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Office equipment and facilities<br />
provided.<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Office equipment and facilities<br />
and support services provided<br />
General Support services given.<br />
Total<br />
1,940,760<br />
N/A<br />
1,214,030<br />
GoU Development<br />
541,040<br />
287,561<br />
710,030<br />
Donor Development<br />
1,399,720<br />
N/A<br />
504,000<br />
13 49 12Production of Workplans<br />
and Budgets<br />
MoPS's BFP, Workplans<br />
PSRP Workplan for 2009/10<br />
Consolidated PSM Sector BFP<br />
Ministerial Policy Statement<br />
MOPS Staff guided on policy<br />
/planning issues<br />
PSRP workplan and budget for<br />
the FY 2011/10 finalized and<br />
approved by dev. Partners.<br />
Quarterly workplans developed.<br />
Workplans, Budgets and Budget<br />
Framework Paper prepared.<br />
Sector issues and the various<br />
planning and budgeting<br />
frameworks Coordinated.<br />
Consultations from key<br />
stakeholders on the new PSRP<br />
carried out.<br />
Relevant Policy Advice given<br />
Technical support to staff on<br />
planning and budgeting offered.<br />
Professional training in modern<br />
budgeting and planning<br />
practices.<br />
Total<br />
855,860<br />
N/A<br />
348,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
855,860<br />
N/A<br />
348,000<br />
13 49 13Financial Management Finances well managed and internal audit functions carried Finances well managed.<br />
financial advice provided. out.<br />
Total<br />
GoU Development<br />
Donor Development<br />
104,000<br />
0<br />
104,000<br />
N/A<br />
N/A<br />
20,000<br />
0<br />
20,000<br />
13 49 14Management of Resouce<br />
Centre and Registries<br />
GoU Development<br />
Donor Development<br />
13 49 15Implementation of the IEC<br />
Strategy<br />
Total<br />
Total<br />
GoU Development<br />
Donor Development<br />
Procurement of specialised<br />
resource centre equipment<br />
45,000<br />
0<br />
45,000<br />
Communication and<br />
popularization of the various<br />
MOPS initiatives.<br />
1,130,000<br />
0<br />
1,130,000<br />
Resource Centre and registries<br />
managed.<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
A modernised Resource Centre<br />
Operationalised<br />
Media and <strong>Public</strong> Relations<br />
carried out.<br />
15,000<br />
0<br />
15,000<br />
The IEC recommendations from<br />
the Impact Assessment Report<br />
implemented<br />
160,000<br />
0<br />
160,000<br />
104
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 49 16PSRP Monitoring and<br />
Evaluation Framework<br />
developed and<br />
implemented<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Baselines established with<br />
facilitation of the Action<br />
Governance Indicators<br />
Instrument. Improve M&E<br />
Capacity in the Ministry of<br />
<strong>Public</strong> <strong>Service</strong>. Performance<br />
data collected and compiled.<br />
PSRP Evaluation<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
Quartely Reports produced<br />
M&E readiness intervention<br />
undertaken M&E of PSRP<br />
undertaken<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
Data availability through<br />
surveys and collection from<br />
primary and secondary sources<br />
on agreed variables Improved.<br />
M&E framework developed and<br />
populated<br />
Joint Annual Review of the<br />
PSRP .<br />
A new Results Framework for<br />
PSRP Implementated<br />
Staff survey carried out<br />
Total<br />
927,925<br />
N/A<br />
440,000<br />
GoU Development<br />
0<br />
0<br />
Donor Development<br />
927,925<br />
N/A<br />
440,000<br />
13 49 52Policy Development<br />
(Cabinet Secretariat)<br />
Total<br />
GoU Development<br />
Donor Development<br />
13 49 72Government Buildings and<br />
Administrative<br />
Infrastructure<br />
Total<br />
GoU Development<br />
Donor Development<br />
13 49 75Purchase of Motor<br />
Vehicles and Other<br />
Transport Equipment<br />
Total<br />
GoU Development<br />
Donor Development<br />
Transfer of resources by MoPS<br />
to Cabinet Secretariat to support<br />
the Policy development<br />
initiatives.<br />
Funding the non-residential<br />
building.<br />
250,000<br />
0<br />
250,000<br />
219,000<br />
49,000<br />
170,000<br />
Purchase of motoer vehicles and<br />
other transport equipment.<br />
560,000<br />
560,000<br />
0<br />
N/A<br />
N/A<br />
N/A<br />
34,857<br />
N/A<br />
181,459<br />
181,459<br />
0<br />
50,000<br />
50,000<br />
0<br />
Office buildings maintained<br />
80,003<br />
80,003<br />
0<br />
a min bus and pickup procured<br />
210,007<br />
210,007<br />
0<br />
13 49 78Purchase of Office and<br />
Residential Furniture and<br />
Fittings<br />
Total<br />
51,000<br />
1,330<br />
furniture and fittings procured<br />
51,002<br />
GoU Development<br />
51,000<br />
1,330<br />
51,002<br />
Donor Development<br />
0<br />
0<br />
0<br />
GRAND TOTAL<br />
6,083,545<br />
N/A<br />
2,588,042<br />
GoU Development<br />
1,201,040<br />
505,206<br />
1,101,042<br />
Donor Development<br />
4,882,505<br />
N/A<br />
1,487,000<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
105
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4911 Provision of Office Equipment and Facilities<br />
Office equipment and facilities and support services provided<br />
Activities to Deliver Outputs:<br />
Advertisement and evaluation expenses to acquire providers of goods and<br />
services.<br />
Purchase and maintanance of office equipment.<br />
Purchase of assorted stationary and printing.<br />
Procure furniture and fixtures.<br />
Maintanance and fuelling of vehicles.<br />
Postage and Couier<br />
Communication Costs<br />
Support to the Central Registry<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for consultation meetings (days) 1.0 200,000<br />
Fuel, lubricants & oils (litres) 1.0 60,000<br />
Fuel, lubricants and oils (litres) 1.0 70,000<br />
vehicle repairs and spares (number) 1.0 80,000<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
Goods and services provided for immediate use<br />
(number)<br />
Goods provided for immediate use eg cleaning<br />
(number)<br />
Meetings,scholarstic materials & transport exp<br />
(number)<br />
Total<br />
GoU Development<br />
Donor Development<br />
1.0 94,000<br />
1.0 81,417<br />
1.0 100,000<br />
1.0 30,000<br />
Motor vehicle repairs and spares (number) 1.0 50,000<br />
press releases andtalk shows (number) 1.0 100,004<br />
Repairs of Equipment & machinery (number) 1.0 50,000<br />
small office equipment aquired eg flash (number) 1.0 20,000<br />
small office equipment aquired eg stapler (number) 1.0 50,000<br />
Stationary, pnotocopying and transport expenses<br />
(number)<br />
1.0 30,000<br />
telepnones,postage,internet & courier (number) 1.0 110,000<br />
Contract staff (Person Years) 9.0 88,579<br />
1,214,030<br />
710,030<br />
504,000<br />
106
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4912 Production of Workplans and Budgets<br />
Workplans, Budgets and Budget Framework Paper prepared.<br />
Sector issues and the various planning and budgeting frameworks<br />
Coordinated.<br />
Consultations from key stakeholders on the new PSRP carried out.<br />
Technical support to staff on planning and budgeting offered.<br />
Professional training in modern budgeting and planning practices.<br />
Activities to Deliver Outputs:<br />
Support to Planning and BFP preparation process.<br />
Development of annual workplan and quarterly workplans.<br />
Planning and Budgeting retreats and sessions.<br />
Updating the Ministry planning and budgeting guidelines.<br />
Printing of the planning, policy and budget documents.<br />
Procurement of Consultant to undertake Policy Research.<br />
Working sessions for coordination of sector issues and the planning<br />
frameworks.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Consultancy for policy development (days) 1.0 89,000<br />
Honoraria for preparing of work plans (days) 1.0 14,000<br />
Perdiem and transport expenses (days) 1.0 25,000<br />
Fuel,lubricants and oils (litres) 1.0 36,400<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
1.0 20,000<br />
Goods aquired for immediate use (number) 1.0 40,000<br />
Meetings, scholastic materials and transport exp<br />
(number)<br />
1.0 20,000<br />
News papers (number) 1.0 19,600<br />
Perdiem and transport expenses (number) 1.0 45,000<br />
Refreshments and transport expenses (number) 1.0 3,000<br />
Small office equipment aquired eg stapler (number) 1.0 10,000<br />
Stationary,transport expenses and perdiem (number) 1.0 26,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
348,000<br />
0<br />
348,000<br />
Output: 13 4913 Financial Management<br />
Planned Outputs:<br />
Finances well managed.<br />
Activities to Deliver Outputs:<br />
Financial management activities.<br />
Inputs Quantity Cost<br />
Honoraria for managing financial activities (days) 1.0 5,000<br />
Goods aquired for immediate use (number) 1.0 3,000<br />
News papers (number) 1.0 4,000<br />
Refreshment and transport expenses (number) 1.0 5,000<br />
Small office equipment aquired eg stapler (number) 1.0 3,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
20,000<br />
0<br />
20,000<br />
107
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4914 Management of Resouce Centre and Registries<br />
A modernised Resource Centre Operationalised<br />
Activities to Deliver Outputs:<br />
Draft Resource Centre Operattional guidelines<br />
Train staff in usage of new Audio Visual aids and equipment<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Honoraria for developing operational guidelines<br />
1.0 8,000<br />
(days)<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
1.0 2,000<br />
Refreshments and transport expenses (number) 1.0 2,000<br />
small office equipment acquired eg stapler (number) 1.0 3,000<br />
Purchase of Informational materials<br />
Subscription to online resources, networks<br />
Establishment of a comprehensive photobank<br />
Design, print and disseminate Ministry's Knowledge products<br />
Total<br />
GoU Development<br />
Donor Development<br />
15,000<br />
0<br />
15,000<br />
Output:<br />
13 4915 Implementation of the IEC Strategy<br />
Planned Outputs:<br />
Media and <strong>Public</strong> Relations carried out.<br />
The IEC recommendations from the Impact Assessment Report<br />
implemented<br />
Activities to Deliver Outputs:<br />
8 Press Conferences held at MoPS<br />
4 Radio Programs<br />
4 TV Programs<br />
4 Print Press Adverts<br />
3 Adverts in Strategic Magazines<br />
Development of simple Knowledge Management Guidelines<br />
Inputs Quantity Cost<br />
Honoraria for implementation of IEC (days) 1.0 22,000<br />
Perdiem and transport expenses (days) 1.0 28,000<br />
Fuel,lubricants and oils (litres) 1.0 13,000<br />
Assorted stationary,photocopying and printing<br />
(number)<br />
1.0 2,000<br />
Goods acquired for immediate use (number) 1.0 15,000<br />
Meetings,scholastic materials and transport exp<br />
(number)<br />
1.0 10,000<br />
Motor vehicle repairs and spares (number) 1.0 2,000<br />
News papers (number) 1.0 2,000<br />
perdiem, hall hire transport costs & stationary<br />
(number)<br />
1.0 34,000<br />
press releases and talk shows (number) 1.0 25,000<br />
Refreshment and transport expenses (number) 1.0 6,000<br />
Small office equipment acquired eg stapler (number) 1.0 1,000<br />
MoPS Knowledge Documentation<br />
Staff Skill Profiling<br />
Draft Business Continuity Plan for MoPS<br />
Carry out outreach sessions to 10 MDAs and 12 LGs<br />
Total<br />
GoU Development<br />
Donor Development<br />
160,000<br />
0<br />
160,000<br />
108
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4916 PSRP Monitoring and Evaluation Framework developed and implemented<br />
Data availability through surveys and collection from primary and<br />
secondary sources on agreed variables Improved.<br />
M&E framework developed and populated<br />
Joint Annual Review of the PSRP .<br />
A new Results Framework for PSRP Implementated<br />
Staff survey carried out<br />
Activities to Deliver Outputs:<br />
Strengthening Management Information System (MIS) for M&E through<br />
review of tools, training to improve reporting.<br />
Data collection through surveys from primary and secondary sources to<br />
obtain agreed indicators for ongoing and future activities,projects and<br />
programmes.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
consultancy for staff survey (days) 2.0 250,000<br />
Honoraria for strengthening MIS (days) 1.0 50,000<br />
Perdiem and transport expenses (days) 1.0 30,000<br />
Fuel,lubricants and oils (litres) 1.0 10,000<br />
Meetings,scholastic materials and transport exp<br />
(number)<br />
1.0 40,000<br />
Perdiem, transport expenses, hire of venue (number) 1.0 50,000<br />
Refreshments and transport expenses (number) 1.0 10,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
440,000<br />
0<br />
440,000<br />
Output:<br />
Planned Outputs:<br />
13 4952 Policy Development (Cabinet Secretariat)<br />
Activities to Deliver Outputs:<br />
Total<br />
GoU Development<br />
Donor Development<br />
50,000<br />
50,000<br />
0<br />
Output:<br />
Planned Outputs:<br />
13 4972 Government Buildings and Administrative Infrastructure<br />
Office buildings maintained<br />
Activities to Deliver Outputs:<br />
materials for maintanace procured<br />
Inputs Quantity Cost<br />
materials for maintaing buildings (number) 1.0 80,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
80,003<br />
80,003<br />
0<br />
Output:<br />
Planned Outputs:<br />
13 4975 Purchase of Motor Vehicles and Other Transport Equipment<br />
a min bus and pickup procured<br />
Activities to Deliver Outputs:<br />
procurement of vehicles<br />
Inputs Quantity Cost<br />
vehicles a minbus and a pick up (number) 1.0 160,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
210,007<br />
210,007<br />
0<br />
109
Vote:<br />
005<br />
Ministry of <strong>Public</strong> <strong>Service</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1349 Policy, Planning and Support <strong>Service</strong>s<br />
Project 0024 <strong>Public</strong> <strong>Service</strong> Reform Comp 5 - Support <strong>Service</strong>s<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 4978 Purchase of Office and Residential Furniture and Fittings<br />
furniture and fittings procured<br />
Activities to Deliver Outputs:<br />
procure office chairs and other fittings<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
office desks,chairs and other fittings (number) 1.0 51,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
GRAND TOTAL<br />
GoU Development<br />
Donor Development<br />
51,002<br />
51,002<br />
0<br />
2,588,042<br />
1,101,042<br />
1,487,000<br />
110
<strong>Public</strong> <strong>Service</strong><br />
Selection and<br />
Discplinary<br />
Systems<br />
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
V1: Vote Overview<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
This section sets out the Vote Mission, Strategic Objectives, and provides a description of the vote's services<br />
(i) Snapshot of Medium Term Budget Allocations<br />
Table V1 below summarises the Medium Term Budget allocations for the Vote:<br />
Table V1.1: Overview of Vote Expenditures (UShs Billion)<br />
(i) Excluding Arrears, Taxes<br />
Wage<br />
Recurrent<br />
Non Wage<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Budget Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12 2012/13<br />
0.650 0.837 0.628 1.129 0.879<br />
1.996 2.007 2.007 2.007 2.027<br />
0.896<br />
2.595<br />
GoU<br />
Development<br />
Donor*<br />
GoU Total<br />
Total GoU + Donor (MTEF)<br />
0.627 0.632 0.632 0.632 0.695<br />
0.000 0.000 0.000 0.000 0.000<br />
3.272 3.476 3.267 3.768 3.601<br />
3.272 3.476 3.267 3.768 3.601<br />
0.883<br />
0.000<br />
4.374<br />
4.374<br />
(ii) Arrears<br />
and Taxes<br />
Arrears 0.120 0.000 0.000 0.000 N/A<br />
Taxes** 0.042 0.080 0.060 0.080<br />
N/A<br />
N/A<br />
N/A<br />
Total Budget 3.392 3.556 3.327 3.848<br />
N/A<br />
N/A<br />
* Donor expenditure data unavailable<br />
** Non VAT taxes on capital expenditure<br />
The chart below shows total funding allocations to the Vote by Vote Function over the medium term:<br />
Chart V1.1: Medium Term Budget Projections by Vote Function (UShs Bn, Excluding Taxes, Arrears<br />
5<br />
4.5<br />
4<br />
3.5<br />
3<br />
2.5<br />
2<br />
1.5<br />
1<br />
0.5<br />
0<br />
2009/10 Approved Budget Estimates 2010/11 Budget Projections<br />
2011/12 Budget Projections 2012/13 Budget Projections<br />
Section A - Vote Overview<br />
111
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
(ii) Vote Mission Statement<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
The Vote's Mission Statement is:<br />
To provide Government with employees of th right calibre, in the right number, placed in the right jobs<br />
at the right time.<br />
(iii) Key Sector Outputs which Contribute to Sector Outcomes<br />
The table below sets out the vote functions and outputs delivered by the vote which the sector considers as<br />
contributing most to priority sector outcomes.<br />
Table V1.2: Sector Outcomes, Vote Functions and Key Outputs<br />
Sector Outcome 1: Sector Outcome 2: Sector Outcome 3:<br />
Mechanisms that will promote<br />
coordinated and harmonized planning<br />
and budgeting of national and Local<br />
Governments levels<br />
Vote Function:<br />
Effective and efficient <strong>Public</strong> <strong>Service</strong><br />
delivery at the Centre and LG level<br />
(based on a highly skilled and<br />
professional workforce recruited and<br />
retained)<br />
13 52 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
V2: Past Vote Performance and Medium Term Plans<br />
Integration of member states into the<br />
East African Community<br />
Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:<br />
None<br />
Outputs Provided<br />
130252<br />
130652<br />
Selection Systems Development<br />
Recruitment <strong>Service</strong>s<br />
This section describes past and future vote performance, in terms of key vote outputs and plans to address<br />
sector policy implementation issues.<br />
(i) Past and Future Planned Vote Outputs<br />
2008/09 Performance<br />
During the year under review, the total number of cases covered by the PSC were 2155 for the period July<br />
2008 to End of March 2009. The details included:- advice to the president in performance of his duties 143;<br />
appointment, confirmations, promotions and normal retirements 1770; approval of DSC's 77; discipline 80;<br />
approval of study leave 23; and determining of appeals 62. The PSC made guidance and monitoring visits to<br />
20 districts. A performance audit of the DSC was also carried out in 20 sampled districts. The PSC carried<br />
out induction training for 23 districts. In addition the PSC formulated the <strong>Public</strong> <strong>Service</strong> Commision<br />
regulations after the enactment of the PSC Act, revised PSC forms, cheklists and guidleine to DSCs,<br />
conducted aptitude test for GRE involving 4825 candidates against 71 vacancies and conducted<br />
examinations for various posts. The <strong>Commission</strong> was able to purchase 3 vehicles, desk computers, furniture<br />
for various offices, heavy duty photocopier and painted the offices<br />
Preliminary 2009/10 Performance<br />
The PSC formulated and approved the Performance contracts and agreements for Permanent Secretaries,<br />
Chief Administrative officers and Town clerks. PSC hosted the executive committee of the Association of<br />
Afican <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong>s (AAPSComs). The PSC handled a total of 2155 cases, including advice<br />
to the president in performance of his functions 143, appointments/confirmations/promotions/retirement<br />
1770, approval of DSCs 79, discipline 80, approval of study leave 23 and determining appeals 62. The PSC<br />
visited 20 DSCs for monitoring purposes, developed the performance standards manual for DSCs, carried<br />
out aperformance assessment in 26 sampled districts, induction training was carried out for 24 DSCs.<br />
Induction for Secretaries of DSC was carried out in 15 ditricts, produced a checklist for coordination,<br />
monitoring and guidance of DSCs, conducted mentoring visits for secretaries of DSCs in 6 districts.<br />
Provided equipment and tools for DSC registries in 19 SDP supported districts. Conducted hands on<br />
training in records and information management in DSC registry. Conducted selection tests for graduate<br />
recruitment exercises where 139 vacancies were filled out of 7128 candidates. Conducted aptitude/selection<br />
None<br />
Section A - Vote Overview<br />
112
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
tests for recruiting staff in various posts in 30 Local Governments. Conducted examinations and tests on<br />
behalf of Prisons Authority, Health <strong>Service</strong> <strong>Commission</strong>, Auditor Generals Office, Kyambogo University.<br />
Conducted a pre-examination training workshop for stores assistant and conducted various selection<br />
examinations for recruiting staff in central Ministries and Agencies. The PSC procured computers,<br />
furniture, vehicles, photocopier, paper shredder etc<br />
Table V2.1: Past and Medum Term Key Vote Output Indicators*<br />
Vote Function Key Output<br />
*<br />
Indicators<br />
Excluding<br />
and<br />
Taxes<br />
Costs:<br />
and Arrears<br />
2008/09<br />
Outturn<br />
2010/11 Planned Outputs<br />
• Interviews for all posts submitted to the PSC conducted including developing and using modern selection<br />
tools such as exams, aptitude tests and assessment centres.<br />
• Skills of DSCs and other LG officials enhanced through induction and other trainings.<br />
• All declared vacant posts including those to be filled by fresh Graduates advertised.<br />
• DSCs monitored and guidance given.<br />
• Promotion interviews for common cadre staff conducted<br />
• Appeals from staff appointed by PSC and DSC handled.<br />
• Staff of DSCs mentored<br />
• HE the president advised in accordance with Article 172 of the constitution<br />
• A computer based recruitment and selection system developed<br />
• The PSC strategic plan developed inline with the NDP<br />
• 3 Vehicles, filing cabinets, office furniture, computers and other tools and equipment procured<br />
Medium Term Plans<br />
The activities that the PSC plans to do are continous and ongoing, they will therefore cover the next<br />
Financial year and the medium term.<br />
(ii) Costing of Outputs for <strong>Service</strong> Delivery<br />
Table V2.2: Key Unit Costs of <strong>Service</strong>s Provided and <strong>Service</strong>s Funded<br />
(iii) Priority Vote Actions to Improve Sector Performance<br />
The PSC has developed and published the PSC regulations and guidelines to the DSC to improve on the<br />
Human resource Management practices. The PSC in conjuction with the Min. of <strong>Public</strong> <strong>Service</strong> also intends<br />
to implement an online recruitment system as provided in the Integrated Personnel and Payroll System<br />
(IPPS). The PSC plans to develop an examinations scheme to standardise the use of examinations in both<br />
recruitment and promotions in the entire public service.<br />
Table V2.4: Vote Actions to Improve Sector Performance<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Plan 2010/11 2011/12<br />
Prel.<br />
2012/13<br />
Vote: 146 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Vote Function:1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Output 13 5202 Selection Systems Development<br />
No. of competence based selections<br />
instruments developed<br />
16<br />
15 N/A 15 15<br />
Output 13 5206 Recruitment <strong>Service</strong>s<br />
No. of vacancies filled 444 600 666 1100 1200 1200<br />
No. of recruitment submissions<br />
handled and concluded<br />
2881 3400 3402 3500 3500 3500<br />
Vote Function Cost (UShs bn) 3.272 3.476 3.267 3.768 3.601 4.374<br />
Cost of Vote <strong>Service</strong>s (UShs Bn) 3.272 3.476 3.267 3.768 3.601 4.374<br />
2009/10 Planned Actions: 2009/10 Actual Actions: 2010/11 Planned Actions: MT Strategy:<br />
Sector Outcome 2: Effective and efficient <strong>Public</strong> <strong>Service</strong> delivery at the Centre and LG level (based on a highly skilled and<br />
Section A - Vote Overview<br />
113
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
2009/10 Planned Actions: 2009/10 Actual Actions: 2010/11 Planned Actions: MT Strategy:<br />
professional workforce recruited and retained)<br />
Vote Function: 13 52 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
V3 Proposed Budget Allocations for 2010/11 and the Medium Term<br />
Table V3.1: Past Outturns and Medium Term Projections by Vote Function*<br />
Ministerial Policy Statement<br />
VF Performance Issue: Develop and use modern Selection and recruitment methods<br />
Review the current selection<br />
and recruitment methods and<br />
compare with others then<br />
develop better ones. Training<br />
the Members and staff on the<br />
modern selection and<br />
recruitment techniques.<br />
VF Performance Issue: Enhance the Capacity and develop competence of the Members and staff of the <strong>Public</strong> <strong>Service</strong><br />
<strong>Commission</strong> and other stakeholders<br />
Training the Members and<br />
staff on the modern selection<br />
and recruitment techniques,<br />
provide Members and staff<br />
with working tools, improve<br />
on the working environment<br />
and conditions.<br />
This section sets out the proposed vote budget allocations for 2010/11 and the medium term, including<br />
major areas of expenditures and any notable changes in allocations.<br />
* Excluding Taxes and Arrears<br />
-Review and improve on the<br />
current selection and<br />
recruitment methods<br />
Develop and implement a<br />
training program for Members<br />
and Staff, Provide working<br />
tools<br />
VF Performance Issue: Modernize the recruitment process through the utilisation of Information Technology<br />
-Carry out a preliminary study<br />
of the existing IT system, do a<br />
comparitive analysis with<br />
other similar bodies. Develop<br />
strategies of how to improve<br />
IT in the <strong>Commission</strong>.<br />
Acquire the appropiate<br />
software and hardware.<br />
Training of Members & staff<br />
in IT usage<br />
-Completed preliminary<br />
preparations and study tour to<br />
Kenya Conducted, procured<br />
the hardware for the Online<br />
recrutiment system.<br />
- Complete the development of<br />
online recruitment system,<br />
launch the system<br />
- Carry out the preliminary<br />
study and acquisition of some<br />
computers and software.<br />
Vote: 146 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
2008/09<br />
Outturn<br />
2009/10 MTEF Budget Projections<br />
Appr. Releases<br />
Budget 2010/11 2011/12 2012/13<br />
3.272 3.476 3.267 3.768 3.601<br />
Total for Vote: 3.272 3.476 3.267 3.768 3.601 4.374<br />
(i) The Total Budget over the Medium Term<br />
Over the medium term, 2009/10 to 2013/14 the indicative allocation for the PSC is twenty two billion and<br />
one hundred million. The breakdown as per the five financial years is Three billion, four hundred and fifty<br />
million for 2009/10, three billion four hundred and ninety million for 2010/11, four billion and one hundred<br />
and seventy million for 20011/12, five billion for 2012/13 and five billion nine hundred and ninety million<br />
for 2013/14.<br />
(ii) The major expenditure allocations in the Vote for 2010/11<br />
Recruitment expenses including advertising costs, development and administration of pyschometric tests<br />
and examinations, monitoring and guidance to the DSC, the process of interviewing and handling of appeals<br />
from persons appointed by PSC and DSC's.<br />
4.374<br />
Section A - Vote Overview<br />
114
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
(iii) The major planned changes in resource allocations within the Vote for 2010/11<br />
Since the areas of priotisation remain the same to include development and use of modern selection<br />
instruments, competence based recruitment, building of capacity for DSCs and handling displinary and<br />
appeal cases; and the budget provision has not changed, there will be no major resource allocations.<br />
However given the recent increase in involvement of the PSC in International Activities there has been a<br />
minimal increase in resources allocated to travel abroad.<br />
Table V3.2: Key Changes in Vote Resource Allocation<br />
Changes in Budget Allocations and Outputs<br />
in 2010/11 from 2009/10 Planned Levels:<br />
Vote Function:1301 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Output: 1352 01 DSC Monitored and Technical Assistance<br />
UShs Bn: 0.064<br />
Output: 1352 02 Selection Systems Development<br />
UShs Bn: 0.029<br />
Table V3.3: 2009/10 and 2010/11 Budget Allocations by Item<br />
Million <strong>Uganda</strong> Shillings<br />
2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
Output Class: Outputs Provided 3,096.8 0.0 N/A 3,096.8 3,368.9 0.0 N/A 3,368.9<br />
211101 General Staff Salaries<br />
211103 Allowances<br />
221003 Staff Training<br />
221004 Recruitment Expenses<br />
221006 <strong>Commission</strong>s and Related Charges<br />
221007 Books, Periodicals and Newspapers<br />
221009 Welfare and Entertainment<br />
221011 Printing, Stationery, Photocopying and Bind<br />
222001 Telecommunications<br />
223003 Rent - Produced Assets to private entities<br />
223005 Electricity<br />
223006 Water<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
227001 Travel Inland<br />
227002 Travel Abroad<br />
227004 Fuel, Lubricants and Oils<br />
228001 Maintenance - Civil<br />
228002 Maintenance - Vehicles<br />
228003 Maintenance Machinery, Equipment and Fu<br />
Justification for proposed Changes<br />
in Expenditure and Outputs<br />
Output: 1352 72 Government Buildings and Administrative Infrastructure<br />
UShs Bn: 0.010 The PSC did not receive any new resources under the Capital<br />
Budget, the amount allocated in 2009/10 is the amount allocated<br />
in 2010/2011. However the PSC has caused a reallocation inline<br />
with the priorities of the year. E.g There has been an increase on<br />
allocation of Machinery and equipment from 48M to 55M b’se is<br />
implementing an online recruitment system. Under Non<br />
Residential buildings, the PSC hopes to Partition some areas to<br />
create additional office space for new Officers expected. This is<br />
to cause efficiency and improve the performance of the PSC which<br />
is inline with the NDP.<br />
Output:<br />
UShs Bn:<br />
1352 76 Purchase of Office and ICT Equipment, including Software<br />
0.008<br />
837.0 0.0 N/A 837.0 1,128.7 0.0 N/A 1,128.7<br />
546.0 0.0 N/A 546.0 689.7 0.0 N/A 689.7<br />
56.6 0.0 N/A 56.6 57.0 0.0 N/A 57.0<br />
500.0 0.0 N/A 500.0 500.8 0.0 N/A 500.8<br />
154.8 0.0 N/A 154.8 0.0 0.0<br />
29.6 0.0 N/A 29.6 32.6 0.0 N/A 32.6<br />
22.4 0.0 N/A 22.4 27.7 0.0 N/A 27.7<br />
48.8 0.0 N/A 48.8 43.6 0.0 N/A 43.6<br />
76.9 0.0 N/A 76.9 81.3 0.0 N/A 81.3<br />
6.0 0.0 N/A 6.0 6.0 0.0 N/A 6.0<br />
6.0 0.0 N/A 6.0 6.0 0.0 N/A 6.0<br />
4.6 0.0 N/A 4.6 4.6 0.0 N/A 4.6<br />
23.9 0.0 N/A 23.9 1.9 0.0 N/A 1.9<br />
418.1 0.0 N/A 418.1 398.2 0.0 N/A 398.2<br />
165.2 0.0 N/A 165.2 173.2 0.0 N/A 173.2<br />
113.3 0.0 N/A 113.3 123.7 0.0 N/A 123.7<br />
4.6 0.0 N/A 4.6 4.6 0.0 N/A 4.6<br />
83.0 0.0 N/A 83.0 83.0 0.0 N/A 83.0<br />
0.0 0.0 N/A<br />
6.2 0.0 N/A 6.2<br />
Output Class: Outputs Funded 5.0 0.0 N/A 5.0 85.0 0.0 N/A 85.0<br />
Section A - Vote Overview<br />
N/A<br />
115
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
Million <strong>Uganda</strong> Shillings<br />
262101 Contributions to International Organisations<br />
312206 Gross Tax<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
V4: Vote Unfunded Outputs for 2010/11 and the Medium Term<br />
Ministerial Policy Statement<br />
2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
5.0 0.0 N/A 5.0 5.0 0.0 N/A 5.0<br />
0.0 0.0 N/A<br />
80.0 0.0 N/A 80.0<br />
Output Class: Capital Purchases 454.0 0.0 N/A 454.0 393.6 0.0 N/A 393.6<br />
312101 Non-Residential Buildings<br />
312201 Transport Equipment<br />
312202 Machinery and Equipment<br />
312203 Furniture and Fixtures<br />
312204 Taxes on Machinery, Furniture & Vehicles<br />
28.0 0.0 N/A 28.0 38.0 0.0 N/A 38.0<br />
270.0 0.0 N/A 270.0 270.0 0.0 N/A 270.0<br />
48.0 0.0 N/A 48.0 55.6 0.0 N/A 55.6<br />
28.0 0.0 N/A 28.0 30.0 0.0 N/A 30.0<br />
80.0 0.0 N/A 80.0 0.0 0.0<br />
Grand Total:<br />
3,555.9 0.0 N/A 3,555.9 3,847.6 0.0 N/A 3,847.6<br />
Total Excluding Taxes, Arrears and NTR 3,475.9 0.0 0.0 3,475.9 3,767.6 0.0 0.0 3,767.6<br />
This section sets the outputs which the vote will not be able to avhieve in 2010/11 and the medium given<br />
proposed funding allocations.<br />
Table V4.1: Additional Output Funding Requests<br />
Additional Requirements for Funding and<br />
Outputs in 2010/11:<br />
Vote Function:1304 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Output: 1352 04 Administrative Support <strong>Service</strong>s<br />
UShs Bn: 0.000<br />
Justification of Requirement for<br />
Additional Outputs and Funding<br />
Output: 1352 05 LG DSC Capacity Building<br />
UShs Bn: 0.420 The increase in the number of Districts has created a necessity of<br />
increase in the DSC’s b’se by law each District is supposed to<br />
appoint an independent DSC it is the responsibility of the PSC to<br />
approve and induct the newly appointed DSC’s as a result of this<br />
there is a funding gap of 420,041,000 created<br />
Output: 1352 06 Recruitment <strong>Service</strong>s<br />
UShs Bn: 0.415<br />
V5: Vote Cross-Cutting Policy and Other Budgetary Issues<br />
This section discusses how the vote's plans will address and respond to the cross-cutting policy, issues of<br />
gender and equity; HIV/AIDS; and the Environment, and other budgetary issues such as Arrears and NTR..<br />
(i) Cross-cutting Policy Issues<br />
(i) Gender and Equity<br />
The <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> takes notice of Gender issues and implements them within the framework<br />
of the cardinal principles of merit, impartiality and fairness.<br />
(ii) HIV/AIDS<br />
The <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> drafted a sector HIV/AIDS policy and a staff sensitization programme for<br />
FY 2010/11 has already been prepared. The <strong>Commission</strong> has included 10,000.000/= in the Budget for<br />
Financial Year 2010/11 to cover the activities related to HIV/AIDS.<br />
N/A<br />
This item includes the cost of advertising in the media, cost of<br />
administering psychometric tests and examinations during the<br />
recruitment process both in the Central Govt and the District<br />
Local Governments where PSC gives support. This cost has been<br />
rising as a result of the increased number of applicants and<br />
districts. The Cost of advertising in papers has kept rising over<br />
time. The newly created Districts call for approval and induction<br />
of newly constituted DSCs. With envisaged introduction of online<br />
recruitment and selection the Internet Costs are likely to rise.<br />
Section A - Vote Overview<br />
116
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
Vote Summary<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
(iii) Environment<br />
The <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> is engaged on a programme of sensitizing staff on critical issues of global<br />
warming, climate change and environmental degradation as well as preservation. Staff are being exposed<br />
to key issues through attendance of national and international conferences<br />
(ii) Payment Arrears<br />
The table below shows all the payment arrears outstanding for the Vote:<br />
At the time of concluding the policy statement for the year 2009/10 the <strong>Public</strong> <strong>Service</strong> commission<br />
outstanding bills amount to Shs 170,913,655/=. These arose for various services provided to the<br />
<strong>Commission</strong> in the areas of Stationary, garages, advertising companies like Newvision and other service<br />
providers. The PSC wasnot able to pay these bills as a result of inadequacies of the Budgetary provision.<br />
However the bills are yet to be verified by Ministry of Finance Planning and Economic Development. For<br />
that Reason, there's no financial provision for clearing these bills in the Budget of 2009/10.<br />
(ii) Non Tax Revenue Collections<br />
The table below shows Non-Tax Revenues that will be collected under the Vote:<br />
The <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> projects to collect 3,000,000/= from selling of bid documents and boarded off items.<br />
V6: Key Vote Function Outputs Planned for 2010/11<br />
The table below sets out the key outputs under each Vote Function, and provides details of prelimary<br />
achievements for 2009/10 and plans for 2010/11<br />
Table V6.1: Past Outputs and 2010/11 Plans<br />
Vote, Vote Function<br />
Key Output<br />
Approved Budget and<br />
Planned outputs<br />
Vote: 146 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Output: 135201<br />
DSC Monitored and<br />
Technical Assistance<br />
Output: 135202<br />
Selection Systems<br />
Development<br />
Output: 135203<br />
Regulation and Standards<br />
Development<br />
80 DCSs to be visited; 100%<br />
appeals and requests for<br />
guidance concluded<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
-95% of requests for Guidance<br />
concluded<br />
-70% of appeals concluded<br />
Output Cost: UShs Bn: 0.419 UShs Bn: 0.369 UShs Bn:<br />
Reviewing Competence<br />
profilesfor Positions of CAO,<br />
Directors &<strong>Commission</strong>ers in<br />
Central Government;<br />
Development of 15 Selection<br />
nstruments from approved<br />
competence profiles.<br />
- 8 selection instruments<br />
developed<br />
, 11 Selection test for the Centre<br />
and 29 for the Local<br />
Governments<br />
administered,Developed draft<br />
profiles for 18 posts at U4-U3,<br />
Reviewed the profiles for 9<br />
Heads of Department in LG<br />
Output Cost: UShs Bn: 0.261 UShs Bn: 0.253 UShs Bn:<br />
Manual for Minimum<br />
conditionsand Performance<br />
standards forDCSs<br />
Developedand disseminated;<br />
Revised PSC forms, Checklist<br />
disseminated; New PSC<br />
regulation disseminated and<br />
operational in Ministries and<br />
local Govts<br />
-Manual for Minimum<br />
conditions and Performance<br />
standards for DCSs Developed<br />
and Disseminated<br />
-Revised PSC forms, Checklist<br />
disseminated<br />
-PSC regulation disseminated<br />
Output Cost: UShs Bn: 0.022 UShs Bn: 0.021 UShs Bn:<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
- All DCSs to be visited. -<br />
100% appeals and requests for<br />
guidance concluded<br />
0.483<br />
- Reviewing Competence<br />
profiles, Development of<br />
Selection Instruments from<br />
approved competence profiles,<br />
Administration of Selection,<br />
Building Capacity of PSC<br />
Secretariat in Competence<br />
Profiling.<br />
- Development of guidelines,<br />
diseminating and monitoring<br />
their implementation<br />
0.290<br />
0.022<br />
Section A - Vote Overview<br />
117
<strong>Public</strong> <strong>Service</strong><br />
Vote: 146<br />
Vote Summary<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
Vote, Vote Function<br />
Key Output<br />
Output: 135204<br />
Administrative Support<br />
<strong>Service</strong>s<br />
Output: 135205<br />
LG DSC Capacity Building<br />
Output: 135206<br />
Recruitment <strong>Service</strong>s<br />
Output: 135251<br />
Membership to International<br />
Organisations (CAPAM,<br />
AAPSCOM, AAPAM)<br />
Output: 135275<br />
Purchase of Motor Vehicles<br />
and Other Transport<br />
Equipment<br />
Output: 135278<br />
Purchase of Office and<br />
Residential Furniture and<br />
Fittings<br />
Approved Budget and<br />
Planned outputs<br />
Medium Term Expenditure<br />
Framework paper produced;<br />
Budget estimates for income<br />
and expenditure prepared and<br />
submitted to MoFPED; Office<br />
Equipment and tools provided.<br />
2009/10<br />
Releases and Preliminary<br />
Achievements<br />
- A clean environment has been<br />
maintained.<br />
- Final accounts were prepared<br />
and submitted to the<br />
MOFED/Accountant General<br />
level-Budgeting for 2010/11<br />
completed- Office Equipment<br />
and tools provided<br />
Output Cost: UShs Bn: 0.560 UShs Bn: 0.538 UShs Bn:<br />
All new DSC members<br />
Inductedperformance<br />
enhancementprogrammes<br />
conducted for 45 OldDSCs;<br />
All requests for approval<br />
ofmembers for LGs attended<br />
towithin one month<br />
2010/11<br />
Proposed Budget and<br />
Planned Outputs<br />
- Medium Term Expenditure<br />
Framework paper produced,<br />
Budget estimates for income<br />
and expenditure prepared and<br />
submitted to MoFPED, Office<br />
Equipment and tools provided,<br />
Conducive working<br />
environment provided.<br />
0.608<br />
-79 DSC's were approved -All new DSC members<br />
Inducted - performance<br />
enhancement programmes<br />
conducted for DSCs, All<br />
requests for approval of<br />
members for LGs attended to<br />
within one month<br />
0.307<br />
Output Cost: UShs Bn: 0.318 UShs Bn: 0.317 UShs Bn:<br />
8 adverts released; Annual<br />
exercise for GRE 2009/10<br />
conducted; submissions from<br />
ministries concluded.<br />
- 7 Adverts released<br />
-Called for returns from all<br />
Ministries and Departments<br />
-Minutes for various posts have<br />
been released<br />
- PSC annual exercise on GRE<br />
completed<br />
Output Cost: UShs Bn: 1.517 UShs Bn: 1.397 UShs Bn:<br />
Subcription to International<br />
Organisations<br />
Output Cost: UShs Bn: 0.005 UShs Bn: 0.005 UShs Bn:<br />
Purchase of Vehicles<br />
The Process is on going for<br />
Procurement of one Vehicle<br />
Output Cost: UShs Bn: 0.270 UShs Bn: 0.270 UShs Bn:<br />
5 Executive and 10<br />
ordinaryfurniture sets for<br />
offices procured<br />
Purchased office furniture<br />
including desks and chairs.<br />
Output Cost: UShs Bn: 0.028 UShs Bn: 0.025 UShs Bn:<br />
- 6 adverts released - Annual<br />
exercise for GRE 2010/11<br />
conducted - submissions from<br />
ministries concluded<br />
Membership to International<br />
Organisations (CAPAM,<br />
AAPSCOM, AAPAM)<br />
Purchase of office furniture<br />
including desks and chairs.<br />
Vote Function Cost UShs Bn:<br />
3.476 UShs Bn:<br />
3.267 UShs Bn: 3.768<br />
Cost of Vote <strong>Service</strong>s: UShs Bn: 3.476 UShs Bn: 3.267 UShs Bn:<br />
3.768<br />
1.659<br />
0.005<br />
0.270<br />
0.030<br />
Section A - Vote Overview<br />
118
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 52<br />
<strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Vote Function Profile<br />
Responsible Officer:<br />
Strategic Objectives:<br />
<strong>Service</strong>s:<br />
Secretary PSC, Mr. Duncan Bigirwa<br />
(a) To keep H.E the President advised and updated on Human Resource<br />
developments and needs in the <strong>Public</strong> <strong>Service</strong> and to enable him make informed<br />
decisions.<br />
(b) To attract, recruit and select competent staff.<br />
(c) To promote the cardinal principles of impartiality, fairness, equity in<br />
appointments, discipline and removal of public officer.<br />
(d) To guide and coordinate the District <strong>Service</strong> <strong>Commission</strong>s in carrying out their<br />
Human Resource function.<br />
(e) To continuously improve the selection systems by developing, availing and<br />
using systematic and relevant selection instruments.<br />
(f) To minimize performance errors in Local governments through training<br />
interventions.<br />
(g) To make proposals and advocate for improved terms and conditions of service<br />
for public officers.<br />
(h) To protect the public officers from unfair treatment.<br />
(i) To build internal performance capacity for Members and staff of <strong>Public</strong> <strong>Service</strong><br />
<strong>Commission</strong>.<br />
To attract recruit develop and retain an efficient and well motivated workforce that<br />
will enable Government deliver services to the people.<br />
The <strong>Public</strong> <strong>Service</strong> commission has a central role in the management of the Human<br />
resources in th <strong>Public</strong> service as defined under article 257(1) of th Constitution.<br />
The commission is responsible for the determination of rights, responsibilities,<br />
terms and conditions, motivation, selection and recruitment, confirmation, displine,<br />
training and development and performance of th public officers. It is responisble<br />
for guiding and monitoring the work of district service commissions and hearing<br />
and determining grievences from persons appointed by the Distric service<br />
commissions. In essence it is responsible for development and promotion of the<br />
good Human resource management practices.<br />
Vote Function Projects and Programmes:<br />
Project or Programme Name<br />
Recurrent Programmes<br />
Medium Term Vote Function Plans<br />
Responsible Officer<br />
01 Headquarters (Finance and Administration) Under Secretary, Mr. JC Dombo<br />
02 Selection Systems Department (SSD) <strong>Commission</strong>er SSD, Mrs Harriet Ssebabi<br />
03 Guidance and Monitoring Deputy Secretary, Mrs RN. Kafeero<br />
Development Projects<br />
0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> Under Secretary, Mr. JC Dombo<br />
Section B - Details - Vote 146 - Vote Function 1352<br />
119
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 52<br />
<strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Past and Medum Term Vote Function Output Indicators:*<br />
Vote Function Key Output<br />
2009/10 Indicators Planned and Costs: Outpu<br />
* Excluding Taxes and Arrears<br />
Past and Medum Term Vote Function Output Allocations:*<br />
2009/10 Output Indicators Planned and Cost Outpu<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Rekeases<br />
Plan Prel. Actual 2010/11 2011/12<br />
2012/13<br />
Vote Function:1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Output: 13 5202 Selection Systems Development<br />
No. of competence based selections<br />
16<br />
15 15 15<br />
instruments developed<br />
Output: 13 5206 Recruitment <strong>Service</strong>s<br />
No. of vacancies filled 444 600 666 1100 1200 1200<br />
No. of recruitment submissions<br />
handled and concluded<br />
2881 3400 3402 3500 3500 3500<br />
Vote Function Cost (UShs bn) 3.272 3.476 3.267 3.768 3.601 4.374<br />
<strong>Service</strong>s Provided<br />
13 5201 DSC Monitored and Technical<br />
Assistance<br />
13 5202 Selection Systems Development<br />
2008/09<br />
Outturn<br />
2009/10<br />
MTEF Projections<br />
Approved Releases<br />
Budget 2010/11 2011/12<br />
N/A 0.419 0.369<br />
N/A 0.261 0.253<br />
2012/13<br />
0.483 0.410 0.310<br />
0.290 0.478 0.482<br />
13 5203 Regulation and Standards<br />
Development<br />
13 5204 Administrative Support <strong>Service</strong>s<br />
13 5205 LG DSC Capacity Building<br />
13 5206 Recruitment <strong>Service</strong>s<br />
N/A 0.022 0.021<br />
N/A 0.560 0.538<br />
N/A 0.318 0.317<br />
N/A 1.517 1.397<br />
0.022 0.256 0.258<br />
0.608 0.492 0.496<br />
0.307 0.452 1.609<br />
1.659 1.481 1.555<br />
<strong>Service</strong>s Funded<br />
13 5251 Membership to International<br />
Organisations (CAPAM, AAPSCOM,<br />
Capital Purchases<br />
N/A 0.005 0.005<br />
13 5272 Government Buildings and<br />
N/A 0.028 0.027<br />
Administrative Infrastructure<br />
13 5275 Purchase of Motor Vehicles and N/A 0.270 0.270<br />
Other Transport Equipment<br />
13 5276 Purchase of Office and ICT<br />
N/A 0.048 0.045<br />
Equipment, including Software<br />
13 5278 Purchase of Office and Residential N/A 0.028 0.025<br />
Furniture and Fittings<br />
Total VF Cost (UShs Bn) 3.230 3.476 3.267<br />
* Excluding Taxes and Arrears<br />
0.005 0.000 0.000<br />
0.038 0.048 0.048<br />
0.270 0.522 0.385<br />
0.056 0.076 0.077<br />
0.030 0.067 0.112<br />
3.768 4.281 5.331<br />
Section B - Details - Vote 146 - Vote Function 1352<br />
120
<strong>Public</strong> <strong>Service</strong><br />
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Ministerial Policy Statement<br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 52<br />
<strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Specific 2009/10 Actions and Medium Term Strategy to Improve Vote Function Performance<br />
2009/10 Planned Actions: 2009/10 Actions:<br />
2010/11 Planned Actions: MT Strategy:<br />
VF Performance Issue: Develop and use modern Selection and recruitment methods<br />
Review the current selection<br />
and recruitment methods and<br />
compare with others then<br />
develop better ones. Training<br />
the Members and staff on the<br />
modern selection and<br />
recruitment techniques.<br />
VF Performance Issue: Enhance the Capacity and develop competence of the Members and staff of the <strong>Public</strong> <strong>Service</strong><br />
<strong>Commission</strong> and other stakeholders<br />
Training the Members and<br />
staff on the modern selection<br />
and recruitment techniques,<br />
provide Members and staff<br />
with working tools, improve<br />
on the working environment<br />
and conditions.<br />
Summary of 2010/11 Vote Function Outputs and Budget Estimates<br />
Proposed 2009/10 Budget Projections by Project and Programme (UShs Million):<br />
2009/10 Draft Budget Estimates by Output and Item:<br />
-Review and improve on the<br />
current selection and<br />
recruitment methods<br />
Develop and implement a<br />
training program for Members<br />
and Staff, Provide working<br />
tools<br />
VF Performance Issue: Modernize the recruitment process through the utilisation of Information Technology<br />
-Carry out a preliminary study<br />
of the existing IT system, do a<br />
comparitive analysis with<br />
other similar bodies. Develop<br />
strategies of how to improve<br />
IT in the <strong>Commission</strong>.<br />
Acquire the appropiate<br />
software and hardware.<br />
Training of Members & staff<br />
in IT usage<br />
-Completed preliminary<br />
preparations and study tour to<br />
Kenya Conducted, procured<br />
the hardware for the Online<br />
recrutiment system.<br />
- Complete the development of<br />
online recruitment system,<br />
launch the system<br />
- Carry out the preliminary<br />
study and acquisition of some<br />
computers and software.<br />
2009/10 Approved Budget 2010/11 Proposed Budget<br />
Recurrent Budget Estimates<br />
Wage Non-Wage NTR Total Wage Non-Wage NTR Total<br />
01 Headquarters (Finance and Administration) 544.1 1,538.0 0.0 2,082.2 733.7 1,538.0 0.0 2,271.7<br />
02 Selection Systems Department (SSD) 83.0 178.0 0.0 261.0 111.9 178.0 0.0 289.9<br />
03 Guidance and Monitoring 209.9 291.0 0.0 500.9 283.1 291.0 0.0 574.2<br />
Total Recurrent Budget Estimates for VF<br />
837.0 2,007.0 0.0 2,844.1 1,128.7 2,007.0 0.0 3,135.8<br />
Development Budget Estimates<br />
GoU Dev Donor NTR Total GoU Dev Donor NTR Total<br />
0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> 711.8 0.0 0.0 711.8 711.8 0.0 0.0 711.8<br />
Total Development Budget Estimates for VF<br />
Vote Function Total<br />
Grand Total Vote Function 1352<br />
Total Excluding Taxes, Arrears and NTR<br />
711.8 0.0 0.0 711.8 711.8 0.0 0.0 711.8<br />
GoU Donor NTR Total GoU Donor NTR Total<br />
3,555.9 0.0 0.0 3,555.9 3,847.6 0.0 0.0 3,847.6<br />
3,475.9 0.0 0.0 3,475.9 3,767.6 0.0 0.0 3,767.6<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Section B - Details - Vote 146 - Vote Function 1352<br />
GoU Donor NTR Total<br />
121
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 52<br />
<strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
Employees, Goods and <strong>Service</strong>s (Outputs Provided) 3,096.8 0.0 N/A 3,096.8<br />
135201 DSC Monitored and Technical Assistance<br />
Description of Planned Outputs:<br />
418.9 0.0 N/A 418.9<br />
80 DCSs to be visited; 100% appeals and requests<br />
for guidance concluded<br />
211101 General Staff Salaries<br />
183.6 0.0 N/A 183.6<br />
211103 Allowances<br />
0.0 0.0 N/A<br />
221003 Staff Training<br />
9.6 0.0 N/A 9.6<br />
221004 Recruitment Expenses<br />
49.5 0.0 N/A 49.5<br />
221006 <strong>Commission</strong>s and Related Charges<br />
74.0 0.0 N/A 74.0<br />
221007 Books, Periodicals and Newspapers<br />
3.0 0.0 N/A 3.0<br />
221009 Welfare and Entertainment<br />
3.0 0.0 N/A 3.0<br />
221011 Printing, Stationery, Photocopying and Binding<br />
3.0 0.0 N/A 3.0<br />
227001 Travel Inland<br />
78.3 0.0 N/A 78.3<br />
227002 Travel Abroad<br />
10.0 0.0 N/A 10.0<br />
227004 Fuel, Lubricants and Oils<br />
4.9 0.0 N/A 4.9<br />
135202 Selection Systems Development<br />
Description of Planned Outputs:<br />
261.0 0.0 N/A 261.0<br />
Reviewing Competence profilesfor Positions of<br />
CAO, Directors &<strong>Commission</strong>ers in Central<br />
Government; Development of 15 Selection<br />
nstruments from approved competence profiles.<br />
211101 General Staff Salaries<br />
83.0 0.0 N/A 83.0<br />
221003 Staff Training<br />
10.0 0.0 N/A 10.0<br />
221004 Recruitment Expenses<br />
140.0 0.0 N/A 140.0<br />
221007 Books, Periodicals and Newspapers<br />
1.0 0.0 N/A 1.0<br />
221009 Welfare and Entertainment<br />
1.9 0.0 N/A 1.9<br />
221011 Printing, Stationery, Photocopying and Binding<br />
5.5 0.0 N/A 5.5<br />
227001 Travel Inland<br />
19.6 0.0 N/A 19.6<br />
135203 Regulation and Standards Development<br />
Description of Planned Outputs:<br />
22.0 0.0 N/A 22.0<br />
Manual for Minimum conditionsand Performance<br />
standards forDCSs Developedand disseminated;<br />
Revised PSC forms, Checklist disseminated; New<br />
PSC regulation disseminated and operational in<br />
Ministries and local Govts<br />
221003 Staff Training<br />
22.0 0.0 N/A 22.0<br />
135204 Administrative Support <strong>Service</strong>s<br />
Description of Planned Outputs:<br />
560.1 0.0 N/A 560.1<br />
Medium Term Expenditure Framework paper<br />
produced; Budget estimates for income and<br />
expenditure prepared and submitted to MoFPED;<br />
Office Equipment and tools provided.<br />
211101 General Staff Salaries<br />
122.8 0.0 N/A 122.8<br />
211103 Allowances<br />
0.0 0.0 N/A<br />
221003 Staff Training<br />
15.1 0.0 N/A 15.1<br />
221007 Books, Periodicals and Newspapers<br />
25.6 0.0 N/A 25.6<br />
221009 Welfare and Entertainment<br />
17.6 0.0 N/A 17.6<br />
221011 Printing, Stationery, Photocopying and Binding<br />
40.3 0.0 N/A 40.3<br />
222001 Telecommunications<br />
76.9 0.0 N/A 76.9<br />
223003 Rent - Produced Assets to private entities<br />
6.0 0.0 N/A 6.0<br />
223005 Electricity<br />
6.0 0.0 N/A 6.0<br />
223006 Water<br />
4.6 0.0 N/A 4.6<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
1.9 0.0 N/A 1.9<br />
GoU Donor NTR Total<br />
3,368.9 0.0 N/A 3,368.9<br />
247,944.0 0.0 N/A 483.0<br />
- All DCSs to be visited. - 100% appeals and<br />
requests for guidance concluded<br />
247,708.7 0.0 N/A 247.7<br />
74.0 0.0 N/A 74.0<br />
9.6 0.0 N/A 9.6<br />
49.5 0.0 N/A 49.5<br />
0.0 0.0 N/A<br />
3.0 0.0 N/A 3.0<br />
3.0 0.0 N/A 3.0<br />
3.0 0.0 N/A 3.0<br />
77.9 0.0 N/A 77.9<br />
10.0 0.0 N/A 10.0<br />
5.3 0.0 N/A 5.3<br />
112,089.1 0.0 N/A 289.9<br />
- Reviewing Competence profiles, Development of<br />
Selection Instruments from approved competence<br />
profiles, Administration of Selection, Building<br />
Capacity of PSC Secretariat in Competence<br />
Profiling.<br />
111,911.1 0.0 N/A 111.9<br />
10.0 0.0 N/A 10.0<br />
140.8 0.0 N/A 140.8<br />
1.0 0.0 N/A 1.0<br />
1.5 0.0 N/A 1.5<br />
5.0 0.0 N/A 5.0<br />
19.6 0.0 N/A 19.6<br />
22.4 0.0 N/A 22.4<br />
- Development of guidelines, diseminating and<br />
monitoring their implementation<br />
22.4 0.0 N/A 22.4<br />
165,945.3 0.0 N/A 607.8<br />
- Medium Term Expenditure Framework paper<br />
produced, Budget estimates for income and<br />
expenditure prepared and submitted to MoFPED,<br />
Office Equipment and tools provided, Conducive<br />
working environment provided.<br />
165,503.0 0.0 N/A 165.5<br />
1.0 0.0 N/A 1.0<br />
15.1 0.0 N/A 15.1<br />
28.6 0.0 N/A 28.6<br />
23.1 0.0 N/A 23.1<br />
35.6 0.0 N/A 35.6<br />
81.3 0.0 N/A 81.3<br />
6.0 0.0 N/A 6.0<br />
6.0 0.0 N/A 6.0<br />
4.6 0.0 N/A 4.6<br />
1.9 0.0 N/A 1.9<br />
Section B - Details - Vote 146 - Vote Function 1352<br />
122
<strong>Public</strong> <strong>Service</strong><br />
Ministerial Policy Statement<br />
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 1: Vote Function Profiles, Medium Term Plans and Annual Budget Allocations<br />
Vote Function:<br />
13 52<br />
<strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Million <strong>Uganda</strong> Shillings 2009/10 Approved Budget 2010/11 Draft Estimates<br />
GoU Donor NTR Total<br />
227001 Travel Inland<br />
120.1 0.0 N/A 120.1<br />
227004 Fuel, Lubricants and Oils<br />
35.7 0.0 N/A 35.7<br />
228001 Maintenance - Civil<br />
4.6 0.0 N/A 4.6<br />
228002 Maintenance - Vehicles<br />
83.0 0.0 N/A 83.0<br />
228003 Maintenance Machinery, Equipment and Furniture<br />
0.0 0.0 N/A<br />
135205 LG DSC Capacity Building<br />
Description of Planned Outputs:<br />
317.8 0.0 N/A 317.8<br />
All new DSC members Inductedperformance<br />
enhancementprogrammes conducted for 45<br />
OldDSCs; All requests for approval ofmembers<br />
for LGs attended towithin one month<br />
211101 General Staff Salaries<br />
26.3 0.0 N/A 26.3<br />
211103 Allowances<br />
213.8 0.0 N/A 213.8<br />
224002 General Supply of Goods and <strong>Service</strong>s<br />
22.0 0.0 N/A 22.0<br />
227001 Travel Inland<br />
55.7 0.0 N/A 55.7<br />
135206 Recruitment <strong>Service</strong>s<br />
Description of Planned Outputs:<br />
1,517.0 0.0 N/A 1,517.0<br />
211101 General Staff Salaries<br />
421.3 0.0 N/A 421.3<br />
211103 Allowances<br />
332.2 0.0 N/A 332.2<br />
221004 Recruitment Expenses<br />
310.5 0.0 N/A 310.5<br />
221006 <strong>Commission</strong>s and Related Charges<br />
80.8 0.0 N/A 80.8<br />
227001 Travel Inland<br />
144.4 0.0 N/A 144.4<br />
227002 Travel Abroad<br />
155.2 0.0 N/A 155.2<br />
227004 Fuel, Lubricants and Oils<br />
72.7 0.0 N/A 72.7<br />
Grants, Transfers and Subsides (Outputs Funded) 5.0 0.0 N/A 5.0<br />
135251 Membership to International Organisations (CAP<br />
Description of Planned Outputs:<br />
GoU Donor NTR Total<br />
100.6 0.0 N/A 100.6<br />
44.7 0.0 N/A 44.7<br />
4.6 0.0 N/A 4.6<br />
83.0 0.0 N/A 83.0<br />
6.2 0.0 N/A 6.2<br />
35,711.3 0.0 N/A 307.0<br />
-All new DSC members Inducted - performance<br />
enhancement programmes conducted for DSCs,<br />
All requests for approval of members for LGs<br />
attended to within one month<br />
35,439.8 0.0 N/A 35.4<br />
215.8 0.0 N/A 215.8<br />
0.0 0.0 N/A<br />
55.7 0.0 N/A 55.7<br />
569,264.7 0.0 N/A 1,658.8<br />
8 adverts released; Annual exercise for GRE 2009/10 - 6 adverts released - Annual exercise for GRE<br />
conducted; submissions from ministries concluded. 2010/11 conducted - submissions from ministries<br />
concluded<br />
5.0 0.0 N/A 5.0<br />
Subcription to International Organisations<br />
262101 Contributions to International Organisations (Curren<br />
5.0 0.0 N/A 5.0<br />
312206 Gross Tax<br />
0.0 0.0 N/A<br />
Investment (Capital Purchases) 454.0 0.0 N/A 454.0<br />
135272 Government Buildings and Administrative Infrastr<br />
Description of Planned Outputs:<br />
28.0 0.0 N/A 28.0<br />
312101 Non-Residential Buildings<br />
28.0 0.0 N/A 28.0<br />
135275 Purchase of Motor Vehicles and Other Transport<br />
Description of Planned Outputs:<br />
350.0 0.0 N/A 350.0<br />
Purchase of Vehicles<br />
312201 Transport Equipment<br />
270.0 0.0 N/A 270.0<br />
312204 Taxes on Machinery, Furniture & Vehicles<br />
80.0 0.0 N/A 80.0<br />
135276 Purchase of Office and ICT Equipment, including<br />
Description of Planned Outputs:<br />
48.0 0.0 N/A 48.0<br />
312202 Machinery and Equipment<br />
48.0 0.0 N/A 48.0<br />
135278 Purchase of Office and Residential Furniture and<br />
Description of Planned Outputs:<br />
28.0 0.0 N/A 28.0<br />
5 Executive and 10 ordinaryfurniture sets for<br />
offices procured<br />
312203 Furniture and Fixtures<br />
28.0 0.0 N/A 28.0<br />
Grand Total Vote 146 3,555.9 0.0 N/A 3,555.9<br />
568,174.1 0.0 N/A 568.2<br />
398.9 0.0 N/A 398.9<br />
310.5 0.0 N/A 310.5<br />
0.0 0.0 N/A<br />
144.4 0.0 N/A 144.4<br />
163.2 0.0 N/A 163.2<br />
73.7 0.0 N/A 73.7<br />
85.0 0.0 N/A 85.0<br />
85.0 0.0 N/A 85.0<br />
Membership to International Organisations<br />
(CAPAM, AAPSCOM, AAPAM)<br />
5.0 0.0 N/A 5.0<br />
80.0 0.0 N/A 80.0<br />
393.6 0.0 N/A 393.6<br />
38.0 0.0 N/A 38.0<br />
38.0 0.0 N/A 38.0<br />
270.0 0.0 N/A 270.0<br />
270.0 0.0 N/A 270.0<br />
0.0 0.0 N/A<br />
55.6 0.0 N/A 55.6<br />
55.6 0.0 N/A 55.6<br />
30.0 0.0 N/A 30.0<br />
Purchase of office furniture including desks and<br />
chairs.<br />
30.0 0.0 N/A 30.0<br />
3,847.6 0.0 N/A 3,847.6<br />
Total Excluding Taxes, Arrears and NTR 3,475.9 0.0 0.0 3,475.9 3,767.6 0.0 0.0 3,767.6<br />
Section B - Details - Vote 146 - Vote Function 1352<br />
123
Vote: 146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 01 Headquarters (Finance and Administration)<br />
Programme Profile<br />
Responsible Officer:<br />
Under Secretary, Mr. JC Dombo<br />
Objectives:<br />
Outputs:<br />
To create a conducive working environment for the Chairperson, Deputy Chairperson,<br />
Members and staff of <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong> through provision of appropriate tools and<br />
to ensure that all facilities are managed in the most efficient manner. It is, therefore<br />
responsible for optimal delivery of support services and logistics to facilitate work of the<br />
<strong>Commission</strong>.<br />
- Recruitment <strong>Service</strong>s:- Make Job adverts for vacancies, Provide funds and logistics for Short<br />
listing, Arrange and facilitate the sitting of commission meetings, Payment of Board<br />
representatives.<br />
- Administrative support services:- Provide a conducive work environment, Provide tools and<br />
equipment<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 52 04Administrative Support<br />
<strong>Service</strong>s<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- Medium Term Expenditure<br />
Framework paper produced<br />
- Budget estimates for income<br />
and expenditure prepared and<br />
submitted to MoFPED<br />
- Office Equipment and tools<br />
provided<br />
- Conducive working<br />
environment provided.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
- A clean environment has been<br />
maintained.<br />
- Final accounts were prepared<br />
and submitted to the<br />
MOFED/Accountant General<br />
level<br />
-Budgeting for 2010/11<br />
completed<br />
- Medium Term Expenditure<br />
Framework paper produced<br />
- Budget estimates for income<br />
and expenditure prepared and<br />
submitted to MoFPED<br />
- Office Equipment and tools<br />
provided<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- Medium Term Expenditure<br />
Framework paper produced<br />
- Budget estimates for income<br />
and expenditure prepared and<br />
submitted to MoFPED<br />
- Office Equipment and tools<br />
provided<br />
- Conducive working<br />
environment provided.<br />
-Final Accounts prepared and<br />
submitted to MoFPED<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
-Final Accounts prepared and<br />
submitted to MoFPED<br />
560,120<br />
122,832<br />
437,288<br />
53,237<br />
53,237<br />
0<br />
607,818<br />
165,503<br />
442,315<br />
124
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 01 Headquarters (Finance and Administration)<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 52 06Recruitment <strong>Service</strong>s<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- 8 adverts released<br />
- Annual exercise for GRE<br />
2009/10 conducted<br />
- submissions from ministries<br />
concluded<br />
1,517,001<br />
2009/10<br />
421,308<br />
1,095,693<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
- 7 Adverts released<br />
-Called for returns from all<br />
Ministries and Departments<br />
-Minutes for various posts have<br />
been released<br />
- PSC annual exercise on GRE<br />
completed<br />
150,969<br />
150,969<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- 6 adverts released<br />
- Annual exercise for GRE<br />
2010/11 conducted<br />
- submissions from ministries<br />
concluded<br />
-process Submissions for<br />
presentation to PSC<br />
-submissions for<br />
Ministries/Departments<br />
regarding recruitments,<br />
confirmation, promotion,<br />
discipline, removal of persons<br />
from the <strong>Public</strong> service<br />
processed and Concluded<br />
-Appeals from Central<br />
Ministries/Departments/Agengie<br />
s handled<br />
1,658,836<br />
568,174<br />
1,090,662<br />
13 52 51Membership to<br />
International<br />
Organisations (CAPAM,<br />
AAPSCOM, AAPAM)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Subcription to International<br />
Organisations<br />
5,049<br />
0<br />
5,049<br />
0<br />
0<br />
0<br />
Subscription to International<br />
Organisations<br />
5,049<br />
0<br />
5,049<br />
GRAND TOTAL<br />
2,082,170<br />
204,206<br />
2,271,703<br />
Wage Recurrent<br />
544,140<br />
204,206<br />
733,677<br />
Non Wage Recurrent<br />
1,538,030<br />
0<br />
1,538,026<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
125
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 01 Headquarters (Finance and Administration)<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5204 Administrative Support <strong>Service</strong>s<br />
- Medium Term Expenditure Framework paper produced<br />
- Budget estimates for income and expenditure prepared and submitted to<br />
MoFPED<br />
- Office Equipment and tools provided<br />
- Conducive working environment provided.<br />
-Final Accounts prepared and submitted to MoFPED<br />
Activities to Deliver Outputs:<br />
- Maintain a clean working environment.<br />
- Preparation of the Final Accounts<br />
-Verification and Signing of the Accounts<br />
-Submission of the Accounts<br />
-Preparatory works on the budgeting process<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Fuel (Litres) 15,407.2 44,681<br />
Internet Bill (MonthBandwidth) 9.5 23,683<br />
Cleaning all offices (Monthly) 9.3 4,640<br />
Electricity bills (Monthly) 12.0 6,000<br />
Rent (Monthly) 12.0 6,000<br />
Water Bills (Monthly) 12.0 4,620<br />
Break Tea (No of Days) 270.0 3,854<br />
Entertaintment during meetings (No of Days) 52.0 7,709<br />
Lunch (No of Days) 270.0 11,562<br />
Telephone Bills recharge (No. of Lines) 192.0 57,600<br />
Certificate Course (No. of Staff) 9.0 2,975<br />
Masters Level (No. of Staff) 2.0 7,500<br />
Medical Expense (No. of Staff) 12.7 1,019<br />
Post Graduate Diploma (No. of Staff) 2.0 4,600<br />
Mechanical Repairs (No. Of Vehicles) 5.0 15,884<br />
Servicing (No. of Vehicles) 44.0 15,400<br />
news papers (new vision and Monitor) (Number) 19,051.7 28,577<br />
Per Diem (Per Night) 838.7 100,647<br />
Permanent staff (Person Years) 0.0 165,503<br />
Batteries (Quantity) 22.0 3,301<br />
General Supplies (Quantity) 12.0 1,863<br />
Servicing of Photocopiers (Quantity) 16.0 3,200<br />
Toner (Printer) (Quantity) 36.0 6,480<br />
Toner(Photocopier) (Quantity) 12.0 4,800<br />
Tyres (Quantity) 88.0 48,400<br />
Envelopes (Quatity) 7,707.5 2,698<br />
Servicing of Computers (Quatity) 60.4 3,020<br />
PhotocopyPaper (Reams) 1,800.0 21,600<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
607,818<br />
165,503<br />
442,315<br />
126
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 01 Headquarters (Finance and Administration)<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5206 Recruitment <strong>Service</strong>s<br />
- 6 adverts released<br />
- Annual exercise for GRE 2010/11 conducted<br />
- submissions from ministries concluded<br />
-process Submissions for presentation to PSC<br />
-submissions for Ministries/Departments regarding recruitments,<br />
confirmation, promotion, discipline, removal of persons from the <strong>Public</strong><br />
service processed and Concluded<br />
-Appeals from Central Ministries/Departments/Agengies handled<br />
Activities to Deliver Outputs:<br />
- Call for returns<br />
- Conduct Annual GRE exercise for 2010/11<br />
- conduct interviews<br />
- release minutes for implementation<br />
Output:<br />
Planned Outputs:<br />
13 5251 Membership to International Organisations (CAPAM, AAPSCOM, AAPAM)<br />
Subscription to International Organisations<br />
Activities to Deliver Outputs:<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
C/M, D/CP and Members travel abroad (Cost Per 9.0 89,103<br />
travel)<br />
Secretariat Staff (Cost Per travel) 12.0 74,093<br />
Fuel (Litres) 44,619.0 117,876<br />
Housing Allowance (Monthly) 11.7 214,557<br />
Medical Treatment (Monthly) 12.0 23,850<br />
Mobile phone Allowance (Monthly) 12.0 1,200<br />
Adverts in NewVision (No. of Adverts) 40.0 224,005<br />
Other Newspapers (No. of Adverts) 14.3 79,866<br />
Chairman Perdiem (No. of Days) 30.0 5,103<br />
D/Chairperson (No. of Days) 30.0 5,100<br />
Members PerDiem (No. of Days) 300.0 48,000<br />
Secretariat Staff (No. of Days) 300.0 42,000<br />
Radio Annoucements (No. of Minutes) 1,200.0 6,600<br />
Sitting Allowance (No. of Represen) 2,896.5 159,309<br />
Permanent staff (Person Years) 0.0 568,174<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1,658,836<br />
568,174<br />
1,090,662<br />
Grant or Transfer<br />
Cost<br />
Membership to CAPAM, AAPSCOM, AAPAM 5,049<br />
Programme 02 Selection Systems Department (SSD)<br />
Programme Profile<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
5,049<br />
0<br />
5,049<br />
2,271,703<br />
733,677<br />
1,538,026<br />
Responsible Officer:<br />
<strong>Commission</strong>er SSD, Mrs Harriet Ssebabi<br />
Objectives:<br />
Outputs:<br />
Profile jobs to identify competencies and advise on appropriate methods of identification of<br />
the competencies, Develop and issue schemes of examinations for the <strong>Public</strong> <strong>Service</strong>, Design<br />
and administer selection and promotion instruments<br />
Profile jobs<br />
Schemes of examinations<br />
Selection examinations administered<br />
Promotion instruments<br />
127
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 02 Selection Systems Department (SSD)<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
13 52 02Selection Systems<br />
Development<br />
UShs Thousand<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- Reviewing Competence<br />
profiles for Positions of CAO,<br />
Directors & <strong>Commission</strong>ers in<br />
Central Government<br />
-Development of 15 Selection<br />
Instruments from approved<br />
competence profiles.<br />
-Administration of Selection<br />
tests at the Center and in Local<br />
Governments.<br />
2009/10<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
- 8 selection instruments<br />
developed<br />
- 11 Selection test for the<br />
Centre and 29 for the Local<br />
Governments administered.<br />
- Developed draft profiles for 18<br />
posts at U4-U3<br />
- Reviewed the profiles for 9<br />
Heads of Department in LG<br />
- Trained 7 PSC staff in<br />
Competence profiling<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- Develop competence profiles<br />
for all top management jobs in<br />
the public service (both at the<br />
centre and in Local<br />
Governments.<br />
-Development of Selection<br />
Instruments from approved<br />
competence profiles.<br />
-Administration of Selection<br />
tests at the Center and in Local<br />
Governments.<br />
-Building Capacity of PSC<br />
Secretariat in Competence<br />
Profiling.<br />
-Gather Views from<br />
stakeholders on the proposed<br />
scheme of examinations for the<br />
<strong>Public</strong> <strong>Service</strong>.<br />
-Building Capacity of PSC<br />
Secretariat in Competence<br />
Profiling.<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
-Gather Views from<br />
stakeholders on the proposed<br />
scheme of examinations for the<br />
<strong>Public</strong> <strong>Service</strong>.<br />
261,002<br />
83,000<br />
178,002<br />
35,973<br />
35,973<br />
0<br />
289,921<br />
111,911<br />
178,010<br />
GRAND TOTAL<br />
261,002<br />
35,973<br />
289,921<br />
Wage Recurrent<br />
83,000<br />
35,973<br />
111,911<br />
Non Wage Recurrent<br />
178,002<br />
0<br />
178,010<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
128
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 02 Selection Systems Department (SSD)<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5202 Selection Systems Development<br />
- Develop competence profiles for all top management jobs in the public<br />
service (both at the centre and in Local Governments.<br />
-Development of Selection Instruments from approved competence<br />
profiles.<br />
-Administration of Selection tests at the Center and in Local Governments.<br />
-Building Capacity of PSC Secretariat in Competence Profiling.<br />
-Gather Views from stakeholders on the proposed scheme of examinations<br />
for the <strong>Public</strong> <strong>Service</strong>.<br />
Activities to Deliver Outputs:<br />
- purchase and adaptation of test instruments especially aptitude tests<br />
- conducting common cadre written examinations as well as technical<br />
examinations<br />
- Developing written examinations<br />
- Training<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Mileage allowance for Specialist (Cost/Exercise) 6.8 4,577<br />
Breakfast, Eats and snacks (days) 256.0 1,536<br />
Hiring of Hall (Days) 3.0 750<br />
Meals for participants (days) 3.0 1,200<br />
Subsistence Allowance for Secretariat (days) 16.0 15,040<br />
Fuel and transport expenses (litres) 5.2 518<br />
Administration of exams (No.) 8.0 25,645<br />
Competence profiling and analysis (No.) 8.0 42,400<br />
Marking and analysis of exams (No.) 8.0 34,800<br />
Purchase of test instrument (No.) 8.0 38,000<br />
Certification in Test administration (No. of Staff) 2.0 4,000<br />
Training in Competence Based Selection (No. of<br />
Staff)<br />
Printing Examination booklets and Question Papers<br />
(Number)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
1.0 3,500<br />
3,362.1 5,043<br />
Permanent staff (Person Years) 0.0 111,911<br />
Reference materials (quantity) 6.7 1,000<br />
289,921<br />
111,911<br />
178,010<br />
Programme 03 Guidance and Monitoring<br />
Programme Profile<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
289,921<br />
111,911<br />
178,010<br />
Responsible Officer:<br />
Deputy Secretary, Mrs RN. Kafeero<br />
Objectives:<br />
Outputs:<br />
To design and develop appropriate policies, guidelines, procedures, system and mechanisms<br />
for; recruitment and selection of persons in the <strong>Public</strong> service; monitoring guidance,<br />
coordination and evaluation of the performance of DSC’s and effective execution of the PSC<br />
roles<br />
Outputs<br />
- Development of guidelines and monitoring their implementation<br />
- Capacity building of DSC’s<br />
- Handle submissions to PSC and ensure their logical conclusion<br />
- Handle appeals<br />
- Monitor and coordinate DSC’s<br />
Activities<br />
- Prepare program for visits<br />
- Conduct monitoring/Performance Audits to DSC’s<br />
- Conduct Capacity enhancement/Induction programes<br />
- Receive, attend and process appeals<br />
- Disseminate and interpret guidelines<br />
129
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 03 Guidance and Monitoring<br />
- Receive, attend and process submissions for Ministries/Departments regarding recruitments,<br />
confirmation, promotion, discipline, removal of persons from the <strong>Public</strong> service<br />
- Review guidelines<br />
- Provide on-spot guidance to DSC<br />
- Mentor DSC and provide hands on support in key performance areas<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 52 01DSC Monitored and<br />
Technical Assistance<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- 80 DCSs to be visited.<br />
- 100% appeals and requests for<br />
guidance concluded<br />
2009/10<br />
418,889<br />
183,607<br />
235,282<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
-95% of requests for Guidance<br />
concluded<br />
-70% of appeals concluded<br />
79,541<br />
79,541<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- All new DCSs to be visited.<br />
- 100% appeals and requests for<br />
guidance concluded<br />
- A performance Audit of all<br />
DSC's conducted.<br />
482,982<br />
247,709<br />
235,273<br />
13 52 05LG DSC Capacity Building - All new DSC members<br />
Inducted<br />
- performance enhancement<br />
programmes conducted for 45<br />
Old DSCs<br />
-All requests for approval of<br />
members for LGs attended to<br />
within one month<br />
-79 DSC's were approved<br />
-<br />
All new DSC members Inducted<br />
- performance enhancement<br />
programmes conducted for<br />
DSCs<br />
-All requests for approval of<br />
members for LGs attended to<br />
within one month<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
82,000<br />
26,269<br />
55,731<br />
10,955<br />
10,955<br />
0<br />
91,172<br />
35,440<br />
55,732<br />
GRAND TOTAL<br />
500,889<br />
90,496<br />
574,154<br />
Wage Recurrent<br />
209,876<br />
90,496<br />
283,148<br />
Non Wage Recurrent<br />
291,013<br />
0<br />
291,005<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
130
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Programme 03 Guidance and Monitoring<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5201 DSC Monitored and Technical Assistance<br />
- All new DCSs to be visited.<br />
- 100% appeals and requests for guidance concluded<br />
- A performance Audit of all DSC's conducted.<br />
Activities to Deliver Outputs:<br />
- Conduct monitoring visits to DSC’s and to provide on spot-technical<br />
guidance.<br />
- Handle appeals from persons aggrieved by the decisions of the District<br />
<strong>Service</strong> <strong>Commission</strong> and <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong>.<br />
- Conduct an annual assessment of performance of DSC’s.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Fuel (litres) 6,017.7 17,451<br />
Reference Materials (No) 60.0 3,000<br />
Stationary (No.) 300.0 3,000<br />
Adverts in the Press (No. of Adverts) 5.0 42,751<br />
Photocopying and distribution of adverts (No. of<br />
Adverts)<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
5.0 6,750<br />
Breakfast (No. of days) 150.0 3,000<br />
Air ticket (No. of flights) 1.0 3,000<br />
Masters Degree Course (No. of Staff) 1.0 4,300<br />
Post graduate Diploma Course (No. of Staff) 2.0 5,300<br />
Allowances (Per Diem) 672.7 74,001<br />
Per diem (Per diem) 607.4 72,719<br />
Permanent staff (Person Years) 0.0 247,709<br />
482,982<br />
247,709<br />
235,273<br />
Output:<br />
Planned Outputs:<br />
13 5205 LG DSC Capacity Building<br />
All new DSC members Inducted<br />
- performance enhancement programmes conducted for DSCs<br />
-All requests for approval of members for LGs attended to within one<br />
month<br />
Activities to Deliver Outputs:<br />
- Conduct Capacity enhancement/Induction programes<br />
- Provide on-spot guidance to DSC<br />
- Mentor DSC and provide hands on support in key performance areas<br />
Inputs Quantity Cost<br />
per diem (Per Diem) 506.7 55,732<br />
Permanent staff (Person Years) 0.0 35,440<br />
Project 0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Project Profile<br />
Total<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
GRAND TOTAL<br />
Wage Recurrent<br />
Non Wage Recurrent<br />
91,172<br />
35,440<br />
55,732<br />
574,154<br />
283,148<br />
291,005<br />
Responsible Officer:<br />
Under Secretary, Mr. JC Dombo<br />
Objectives:<br />
Outputs:<br />
Provide facilitation to the PSC for enhancement of District <strong>Service</strong> <strong>Commission</strong>s<br />
To provide tools and equipment for the functioning of the <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
LG DSC Capacity Enhanced<br />
Buildings & Other Structures maintained<br />
Vehicles & Other Transport Equipment procured<br />
Office and IT Equipment (including Software) procured<br />
Office Furniture and Fixtures providedActivities<br />
- Hold Consultative and dissemination workshops<br />
131
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Project 0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
- Pilot monitoring tool<br />
- Print documents<br />
- Avail copies of reviewed documents to users<br />
- Provide on spot guidance to the users.<br />
- Conduct training of users<br />
- Induction and traiof Officers<br />
-Handle the recruitment process<br />
-Procurement of Vehicles<br />
-Procurement of computer and software<br />
- Procurement of furniture<br />
Start Date:<br />
Projected End Date:<br />
Workplan Outputs for 2009/10 and 2010/11<br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 52 03Regulation and Standards<br />
Development<br />
Total<br />
GoU Development<br />
Donor Development<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
-Manual for Minimum<br />
conditions and Performance<br />
standards for DCSs Developed<br />
and disseminated.<br />
-Revised PSC forms, Checklist<br />
disseminated<br />
- New PSC regulation<br />
disseminated and operational in<br />
Ministries and local Govts<br />
Design and develop induction<br />
Manual for DSCs<br />
- Develop PSC process Manual<br />
2009/10<br />
22,000<br />
22,000<br />
0<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
15,497<br />
15,497<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- Development of guidelines and<br />
monitoring their implementation<br />
- Sensitize <strong>Public</strong> Officers on<br />
the new PSC regulations and<br />
DSC’s on the revised guidelines<br />
-Develop Process manual<br />
22,359<br />
22,359<br />
0<br />
13 52 05LG DSC Capacity Building<br />
Total<br />
GoU Development<br />
Donor Development<br />
- All new DSC members<br />
Inducted<br />
- performance enhancement<br />
programmes conducted for 45<br />
Old DSCs<br />
-All requests for approval of<br />
members for LGs attended to<br />
within one month<br />
235,790<br />
235,790<br />
0<br />
184,853<br />
184,853<br />
0<br />
- All new DSC members<br />
Inducted<br />
- performance enhancement<br />
programmes conducted to the<br />
Old DSCs<br />
-All requests for approval of<br />
members of DSCs attended to<br />
within one month<br />
215,791<br />
215,791<br />
0<br />
13 52 51Membership to<br />
International<br />
Organisations (CAPAM,<br />
AAPSCOM, AAPAM)<br />
Total<br />
GoU Development<br />
Donor Development<br />
0<br />
0<br />
0<br />
80,000<br />
80,000<br />
0<br />
132
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Project 0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Project, Programme<br />
Vote Function Output<br />
UShs Thousand<br />
13 52 72Government Buildings and<br />
Administrative<br />
Infrastructure<br />
Total<br />
GoU Development<br />
Donor Development<br />
Approved Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
-The floor of the corridor tiled<br />
- Partitioning and burglar<br />
proofing for the Resource centre<br />
done.<br />
2009/10<br />
28,000<br />
28,000<br />
0<br />
Releases and Preliminary<br />
Outputs<br />
(Quantity and Location)<br />
19,916<br />
19,916<br />
0<br />
2010/11<br />
Proposed Budget, Planned<br />
Outputs (Quantity and<br />
Location)<br />
- Resource center Completed<br />
- Office Maintained<br />
38,000<br />
38,000<br />
0<br />
13 52 75Purchase of Motor<br />
Vehicles and Other<br />
Transport Equipment<br />
Total<br />
- 3 Vehicles<br />
350,000<br />
191,056<br />
- 3 vehicles procured<br />
270,000<br />
GoU Development<br />
350,000<br />
191,056<br />
270,000<br />
Donor Development<br />
0<br />
0<br />
0<br />
13 52 76Purchase of Office and<br />
ICT Equipment, including<br />
Software<br />
Total<br />
GoU Development<br />
Donor Development<br />
13 52 78Purchase of Office and<br />
Residential Furniture and<br />
Fittings<br />
Total<br />
GoU Development<br />
Donor Development<br />
- 6 Computer Sets<br />
- An online Recruitment System<br />
Developed<br />
48,000<br />
48,000<br />
- 5 Executive and 10 ordinary<br />
furniture sets for offices<br />
procured<br />
0<br />
28,000<br />
28,000<br />
0<br />
33,000<br />
33,000<br />
0<br />
18,000<br />
18,000<br />
0<br />
- 5 computers sets procured<br />
- Online recruitment System<br />
Completed<br />
- 10 Sets of Office Furniture<br />
55,641<br />
55,641<br />
0<br />
30,000<br />
30,000<br />
0<br />
GRAND TOTAL<br />
711,790<br />
462,321<br />
711,791<br />
GoU Development<br />
711,790<br />
462,321<br />
711,791<br />
Donor Development<br />
0<br />
0<br />
0<br />
Annual Workplan for 2010/11 - Outputs, Activities, Inputs and their Cost<br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5203 Regulation and Standards Development<br />
- Development of guidelines and monitoring their implementation<br />
- Sensitize <strong>Public</strong> Officers on the new PSC regulations and DSC’s on the<br />
revised guidelines<br />
-Develop Process manual<br />
Activities to Deliver Outputs:<br />
- Sensitize <strong>Public</strong> Officers on the new PSC regulations and DSC’s on the<br />
revised guidelines.<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
training () 4.0 22,359<br />
Total<br />
GoU Development<br />
Donor Development<br />
22,359<br />
22,359<br />
0<br />
133
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Project 0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5205 LG DSC Capacity Building<br />
- All new DSC members Inducted<br />
- performance enhancement programmes conducted to the Old DSCs<br />
-All requests for approval of members of DSCs attended to within one<br />
month<br />
Activities to Deliver Outputs:<br />
- Preparation of induction programmes<br />
- Procurement of Training Materials<br />
-Induction of the new members<br />
Output:<br />
Planned Outputs:<br />
13 5251 Membership to International Organisations (CAPAM, AAPSCOM, AAPAM)<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Assistant <strong>Commission</strong>ers allowance (2) (Days) 168.1 21,850<br />
Body Guards Allowance (Days) 224.0 15,680<br />
Chairpersons Allowance (days) 56.0 9,520<br />
Deputy Chairperson (days) -62.9 -10,689<br />
Deputy Secretary Allowance (days) 120.0 18,000<br />
Drivers allowance (days) 900.0 49,500<br />
Members allowance (days) 392.0 62,720<br />
Principal & Senior Personnels allowance (days) 286.0 32,890<br />
Secretary allowance (days) 102.0 16,320<br />
Total<br />
GoU Development<br />
Donor Development<br />
215,791<br />
215,791<br />
0<br />
Activities to Deliver Outputs:<br />
Total<br />
GoU Development<br />
Donor Development<br />
80,000<br />
80,000<br />
0<br />
Output:<br />
Planned Outputs:<br />
13 5272 Government Buildings and Administrative Infrastructure<br />
- Resource center Completed<br />
- Office Maintained<br />
Activities to Deliver Outputs:<br />
- Acquisition of contractor<br />
-Management of the Contract<br />
Inputs Quantity Cost<br />
Partitioning & Burglar proofing of resource center () 1.0 38,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
38,000<br />
38,000<br />
0<br />
Output:<br />
Planned Outputs:<br />
13 5275 Purchase of Motor Vehicles and Other Transport Equipment<br />
- 3 vehicles procured<br />
Activities to Deliver Outputs:<br />
- Advertising<br />
- Evaluation of Bids<br />
- Selection of Bidder<br />
-Procurement of vehicles<br />
Inputs Quantity Cost<br />
Vehicle (No) 3.0 270,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
270,000<br />
270,000<br />
0<br />
134
Vote:<br />
146<br />
<strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
MPS Annex 2: Programme/Project Profiles and Workplan Outputs<br />
Vote Function: 1352 <strong>Public</strong> <strong>Service</strong> Selection and Discplinary Systems<br />
Project 0388 <strong>Public</strong> <strong>Service</strong> <strong>Commission</strong><br />
Planned Outputs and Activities to Deliver Outputs<br />
(Quantity and Location)<br />
Output:<br />
Planned Outputs:<br />
13 5276 Purchase of Office and ICT Equipment, including Software<br />
- 5 computers sets procured<br />
- Online recruitment System Completed<br />
Activities to Deliver Outputs:<br />
-Advertising<br />
-Evaluation of Bids<br />
-Procurement<br />
Inputs to be purchased to deliver outputs and their cost<br />
Input<br />
UShs Thousand<br />
Inputs Quantity Cost<br />
Software (Licences) 4.5 22,641<br />
Computer Sets (No) 5.0 15,000<br />
Server (No) 1.0 18,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
55,641<br />
55,641<br />
0<br />
Output:<br />
Planned Outputs:<br />
13 5278 Purchase of Office and Residential Furniture and Fittings<br />
- 10 Sets of Office Furniture<br />
Activities to Deliver Outputs:<br />
-Advertising<br />
-Evaluation of Bids<br />
-Procurement of Furniture<br />
Inputs Quantity Cost<br />
Furniture (No) 10.0 30,000<br />
Total<br />
GoU Development<br />
Donor Development<br />
GRAND TOTAL<br />
GoU Development<br />
Donor Development<br />
30,000<br />
30,000<br />
0<br />
711,791<br />
711,791<br />
0<br />
135
STAFF LIST AS AT 30TH JUNE 2010<br />
MINISTRY OF PUBLIC SERVICE VOTE 005<br />
POST APPR Filled Post VAC. SCALE Name of Incumbent S BASIC<br />
POST POST E SALARY<br />
X (Monthly)<br />
Finance and Administration Department - 01<br />
Administration<br />
Permanent Secretary 1 1 0 U1S Lwamafa Jimmy R. M 2,091,706<br />
Under Secretary 1 1 0 U1SE Ojara Arach Margaret (Mrs) F 1,407,268<br />
Princ. Asst. Secretary 1 1 0 U2L Ettedu J. J. Geoffrey M 970,611<br />
Sen. Asst. Secretary 3 3 0 U3L Kaija John Akiiki M 821,816<br />
U3L Bukone Richard Sajjabi M 788,702<br />
U3L Kaggwa Andrew M 716,870<br />
Assistant Secretary 1 1 0 U4L Vacant 543,169<br />
Resource Centre and Library<br />
Information Scientist 1 1 0 U4L Mubiru Samuel M 451,228<br />
Librian 1 1 0 U7U Ongom Venansio M 205,913<br />
Personnel<br />
Princ. Personnel Officer 1 1 0 U2L Kintu Abudu M 1,014,615<br />
Sen. Personnel Officer 1 1 0 U3L Kutanwa Michael Mugwanya M 716,870<br />
Personnel Officer 1 1 0 U4 Adeka Judith Margaret F 483,827<br />
Registry<br />
Princ. Asst. Records Officer 1 1 0 U3L Atoo Jennifer F 708,892<br />
Sen. Asst. Records Officer 2 2 0 U4L Opio Dan M 504,843<br />
Okweny Omuron Francis M 504,843<br />
Records Assistant 4 4 0 U7U Kambejja Florence F 185,474<br />
Nkwenge Agnes Bagaya F 175,251<br />
Kiiza Amos Amooti M 178,106<br />
Safari Richard M 175,251<br />
Accounts<br />
Principal Accountant 1 1 0 U2 Onen Charles M 1,199,462<br />
Senior Accountant 1 1 0 U3 Atabua Ali M 777,987<br />
Accountant/PAA 3 3 0 U4 Okello John A. M 682,269<br />
Mbuga Joseph M 705,621<br />
Wabunoha Amanda Blanche F 599,788<br />
Sen. Accts. Assistant 4 4 0 U5 Kyengo K. Samali F 390,154<br />
Bituha Kamugisha A. M 416,878<br />
Page 1 of 9<br />
136
Tumushire Elinora F 403,253<br />
Yawe Jotham M 396,637<br />
Asst. Records Officer 1 1 0 U5 Naula Ruth Esther F 294,741<br />
Accts. Assistant 6 6 0 U7 Okwonga Walter B. S. M 205,913<br />
Wamala Benedicto M 157,719<br />
Okello Charles M 205,913<br />
Bukenya Rosemary F 205,913<br />
Byarugaba Gaetano M 205,913<br />
Muhoozi Sanyu Margaret F 205,913<br />
Systems<br />
Systems Administrator 1 1 0 U4 Nattabi Rhoda Ssemugera F 657,490<br />
Secretarial<br />
Princ. Personal Secretary 1 1 0 U2 Mbeiza-Isiko Margaret F 1,026,409<br />
Sen. Personal Secretary 4 4 0 U3 Kyolaba Dorothy Kagwa F 733,120<br />
Nakayiza Sisye Teddy F 733,120<br />
Kulabirawo Nazziwa Josephine F 733,120<br />
Namagala Barbara F 733,120<br />
Stenographer Secretary 1 1 0 U5 Akullo M. Grace F 359,996<br />
Sen. Copy Typist 1 1 0 U7 Nakintu Praxeda F 185,474<br />
Office Typist 4 2 0 U7 Ssali Godfrey M 157,719<br />
Nabunya G. Nakayiza F 157,719<br />
Senior Telephone Operator 1 1 0 U5 Matovu Musisi Sam M 390,154<br />
Receptionist 3 3 0 U7 Sebulime Jeff Ali M 150,975<br />
Atim Rhoda F 150,975<br />
Nakibuule Sarah F 150,975<br />
Askari U8 Ssekajja Julius M 116,551<br />
Sekibenga Jensen M 116,551<br />
Giita Rogers M 116,551<br />
Kalibbala Ronald M 114,385<br />
Muganga Isaac M 116,551<br />
Kimbowa Charles M 116,551<br />
Driver 13 13 0 U8 Mbowa N. M 126,812<br />
Oringa Serafino M 119,863<br />
Pt. Semyalo Yoweri<br />
Mugisa Henry<br />
Twesige Patrick M 129,217<br />
Latim Kenneth M 129,217<br />
Aisu Martin 129,217<br />
Mpanga Fredrick M 129,217<br />
Luyombya David M 129,217<br />
Kateete Fredrick M 124,445<br />
Wanume George M 124,445<br />
Ochan Severino M 122,129<br />
Isingoma Julius Raphael M 115,451<br />
Page 2 of 9<br />
137
Princ. Office Supervisor 1 1 0 U4 Nabyonga Solome F 451,228<br />
Office Supervisor (SCO) 1 1 0 U6 Lutaaya Samuel M 234,317<br />
Office Attendant 12 12 0 U8 Olaki J. Peter M 124,445<br />
Nakyazze Jacqueline F 129,217<br />
Nankinga Jane F 129,217<br />
Hasunahi Sosi M 129,217<br />
Muganga Barbara F 129,217<br />
Ikoro Godfrey A. M 129,217<br />
Baweze Simon M 129,217<br />
Nsisinkano Martin Luther M 122,129<br />
Wamala Peter M 122,129<br />
Sebuuma Tom M 119,863<br />
Nakato Halima F 113,306<br />
Sub-Total 82 82 0<br />
Planning Division<br />
Asst. <strong>Commission</strong>er 1 1 0 U1EU Tegyeza Joses M 1,327,902<br />
Principal Economist 1 1 0 U2U Murengezi Grace M 954373<br />
Senior Economist 1 1 0 U3U Odongo Tomson M 769,517<br />
Economist 1 1 0 U4L Hafiswa Nabatanda F 451,217<br />
Princ. Policy Analyst 1 0 1 U2L Vacant 943,779<br />
Sen. Policy Analyst 1 1 0 U3L Barugahare Brighton M 733,120<br />
Policy Analyst 1 1 0 U4L Mubangizi Amos M 467,527<br />
Office Attendant 1 1 0 U8U Tumusiime Fred M 129,217<br />
Sub-Total 8 7 1<br />
Procurement Unit<br />
Princ. Procurement Officer 1 1 0 U2 Basemera Margaret F 1,014,615<br />
Sen. Procurement Officer 1 1 0 U3 Ssekitto Paddy M 777,987<br />
Procurement Officer 1 1 0 U4 Mukazi Specioza F 599,788<br />
Office Typist 1 1 0 U7 Luyombya Lwanga H. F 193,220<br />
Office Attendant 1 1 0 U8 Nakato Halima F 102,286<br />
Sub-Total 5 5 0<br />
Internal Audit<br />
Princ. Internal Auditor 1 0 1 U2U Vacant 943,779<br />
Sen. Internal Auditor 1 1 0 U3U Nabukeera Aweebwa Deborah F 788,702<br />
Internal Auditor 1 1 0 U4U Adiga Rasul Tumwine M 599,788<br />
Sub-Total 3 2 1<br />
Total 98 96 2<br />
Office of the Deputy Head of <strong>Public</strong> <strong>Service</strong>/Secretary for Administrative Reform<br />
DHOPS/SAR 1 1 0 U1S Musubira Hilda F 2,275,217<br />
Senior Personal Secrtetary 1 1 0 U3L Kiconco Annet 733,120<br />
Driver 1 1 0 U8U Nyombi Lawrence M 129,217<br />
Office Attendant 1 1 0 U8U Musisi Paul Nsubuga M 115,306<br />
Sub-Total 4 4 0<br />
Page 3 of 9<br />
138
Office of the Director Research and Development<br />
Dir.Research & Dev't 1 0 1 U1SE Vacant F 1,643,704<br />
Driver 1 1 0 U8U Lubega Sunday M 113,306<br />
Office Attendant 1 1 0 U8U Nanyombi Leonida F 129,217<br />
Sub-Total 3 2 1<br />
Directorate of Research and Development<br />
<strong>Commission</strong>er/Monitoring & Evaluation 1 1 0 U1SE Basandaara Sarah F 1,407,268<br />
Asst. <strong>Commission</strong>er/Monitoring & Evaluation 1 1 0 U1E Walugembe F. E. M 1,327,902<br />
Prin. Monitoring & Evaluation 1 1 0 U2U Bongomin Richard Akal M 1,014,615<br />
Personal Secretary 1 1 0 U4L Asekenye Jane M. F 599,196<br />
Driver 1 1 0 U8U Doka Ismael M. M 122,129<br />
Sub-Total 5 5 0<br />
Information, Education and Communication Department<br />
<strong>Commission</strong>er/Info, Educ.&Comm. 1 1 0 U1SE Kiggundu Joseph M 1,407,268<br />
Asst. <strong>Commission</strong>er/Info, Educ.&Comm. 1 1 0 U1E Bogere Paul F 1,327,902<br />
Princ. <strong>Communications</strong> Officer 1 1 0 U2U Tumwine Jonas M 1,014,615<br />
Driver 1 1 0 U8 Onen Dennis Odong M 113,306<br />
Office Attendant 1 1 0 U8 Nalubega Sarah F 129,217<br />
Sub-Total 5 5 0<br />
Total 17 16 1<br />
Office of the Director, Human Resource Management<br />
Director/Human Resource Management 1 1 0 U1SE Kabarokole Muwanga Adah (Mrs) F 1,643,704<br />
Personal Secretary 1 1 0 U4L Kigaaga Hawah F 558,925<br />
Driver 1 1 0 U8U Herbex Kizito M 126,812<br />
Office Attendant 1 1 0 U8U Rutaraka Leevan M 119,863<br />
Sub-Total 4 4 0<br />
Human Resource Management Department<br />
<strong>Commission</strong>er/Human Resource Management 1 1 0 U1SE Nanseera Jolly Joe M 1,407,268<br />
Asst. <strong>Commission</strong>er/Wage Bill 1 1 0 U1EL Mbabazi Cissy F 1,327,902<br />
Asst. <strong>Commission</strong>er/Payroll 1 1 0 U1EL Nankya S. Mugwanya F 1,327,902<br />
Asst. <strong>Commission</strong>er/IPPS 1 1 0 U1EL Sendyona Mary Gorreti F 1,343,000<br />
Asst. <strong>Commission</strong>er/Policy 1 1 0 U1EL Mugalu Simon Kamya M 1,327,902<br />
Princ. Personnel Officer 7 7 0 U2L Komugisha Monica F 1,014,615<br />
Arono Arutu Mary F 1,014,615<br />
Kagawa Peter M 988,856<br />
Ezati Godfrey M 988,856<br />
Okello Patrick M 988,856<br />
Kaggwa Sebyuma Denis M 952,365<br />
Tugabirwe Dennis M 988,856<br />
Senior Personnel Officer 8 8 0 U3L Tugume Godwin M 733,120<br />
Ayebazibwe Prudence F 733,120<br />
Ibanda Samalie F 733,120<br />
Nareeba Marion F 733,120<br />
Nabyama Keefa F 483,827<br />
Sembatya Joseph M 716,870<br />
Mania Jane F 716,870<br />
Bagwa Geoffrey M 716,870<br />
Musamali William M 716,870<br />
Page 4 of 9<br />
139
Senior Systems Admin. 2 2 0 U3U Lwasa Robert M 840,749<br />
Rwampwanyi Fred Margach M 821,816<br />
Systems Administrator 1 1 0 U4U Nekesa Hellen F 599,788<br />
Personnel Officer 7 7 0 U4L Muhiirwa Solomon M 207,625<br />
Lumala Elizabeth Dorothy F 599,196<br />
Euchu Grace Anne F 483,827<br />
Okanang Patrick M 483,827<br />
Twinomugisha Apollo M 525,489<br />
Nyinomujuni Nancy F 467,527<br />
Nagadya Mariam F 451,228<br />
Assistant Computer Supervisor 1 1 0 U6L Kawuulu Matovu Joachim M 256,705<br />
Data Entry Clerk 6 6 0 U6U Nakamanyisa Jane Male F 256,705<br />
Nakafeero Irene F 256,705<br />
Nattabi Penninah F 234,317<br />
Namulindwa Teddu F 234,317<br />
Akoko Agnes F 234,317<br />
Achen Harriet F 234,317<br />
Records Assistant 1 1 0 U7U Mukasa Saadi M 234,317<br />
Personal Secretary 1 1 0 U4L Nakazibwe Zaam F 451,228<br />
Pool Stenographer Sec. 1 1 0 U6L Biira Esther F 256,705<br />
Office Typist 3 3 0 U7 Asiimwe Lucy F 185,474<br />
Ocen Grace Atim F 189,300<br />
Natukunda Sylivia F 175,251<br />
Office Attendant 2 2 0 U8U Kirumira Richard M 126,812<br />
Layet Jennifer F 119,863<br />
Driver 3 3 0 U8U Ntalo Joseph M 129,217<br />
Masaba Henry M 129,217<br />
Bukenya Steven M 113,306<br />
Sub-Total 49 49 0<br />
Total 53 53 0<br />
Pensions Department<br />
Office of the <strong>Commission</strong>er<br />
<strong>Commission</strong>er/Pensions 1 1 0 U1SE Kiwanuka-Kunsa Stephen M 1,407,268<br />
Personal Secretary 1 1 0 U4L Nalwoga Alice F 504,843<br />
Office Attendant 1 1 0 U8U Mukasa Charles F 122,129<br />
Driver 1 1 0 U8U Muwanga John M 129,217<br />
Sub-Total 4 4 0<br />
Post Employment Benefits Division<br />
1. Traditional Civil <strong>Service</strong> and Local Governments<br />
Assistant <strong>Commission</strong>er 1 1 0 U1EL Onya Martin G.W. M 1,327,902<br />
Principal Personnel Officer 1 1 0 U2L Natwenda Jalia Joan F 988,856<br />
Page 5 of 9<br />
140
Senior Personnel Officer 1 1 0 U3L Aliwonya Lydia Ssekabira F 716,892<br />
Office Attendant 1 1 0 U8U Nantege Maureen F 122,129<br />
Driver 1 1 0 U8U Lule Fred M 122,129<br />
Sub-Total 5 5 0<br />
2. Teachers and Other category<br />
Assistant <strong>Commission</strong>er 1 1 0 U1EL Bitarakwate M. C. F 1,276,188<br />
Principal Personnel Officer 1 1 0 U2L Eitu Samuel M 988,856<br />
Senior Personnel Officer 2 2 0 U3L Bua Victor Leku M 733,120<br />
Amuriat Bernard M 741,390<br />
Sub-Total 4 4 0<br />
Pensions Accounts Section<br />
Principal Accountant 1 1 0 U2U Obey Christopher M 1,186,513<br />
Senior Accountant 1 1 0 U3U Katoko Amina F 777,987<br />
Accountant 1 1 0 U4U Nyakuta Brian Aleni M 599,788<br />
Senior Accts. Assistant 4 4 0 U5U Iboyomo Seraphis M 396,637<br />
Oloka David J. M 396,637<br />
Mubene Debra F 390,154<br />
Lwanga-Jackson M 390,154<br />
Accounts Assistant 4 4 0 U7U Ebong George M 175,251<br />
Lwanga Stephen M 185,474<br />
Keddi Samuel M 205,913<br />
Kyampaire Clemence F 205,913<br />
Office Typist 1 1 0 U7U Situuke Ruth F 197,239<br />
Sub-Total 13 13 0<br />
Pensions Registry<br />
Principal Records Officer 1 1 0 U2L Onyango Doreen F 733,120<br />
Records Officer/Sen. Asst. 2 2 0 U4L Ekotu John Juventine M 558,925<br />
Records Officer Lwanga Nabirye Joyce F 504,843<br />
Records Assistant 4 4 0 U7U Okwadi Michael M 193,220<br />
Ddumba Paul M 175,251<br />
Mugenyi Raymond M 175,251<br />
Kabali John M 175,251<br />
Sub-Total 9 7 2<br />
Pensions Data Base Unit<br />
Sen. Systems Analyst/Programmer 1 1 0 U3U Lubega Francis Assissi M 634,843<br />
Systems Analyst/Programmer 1 1 0 U6U Ssozi Bernard M 599,788<br />
Sub-Total 2 2 0<br />
Total 34 34 0<br />
Human Resource Development<br />
<strong>Commission</strong>er/Human. Resource Dev't 1 1 0 I1SE Mwesiga Kyarisiima Jane F 1,407,268<br />
Assistant <strong>Commission</strong>er 2 2 0 U1EL Dungu Stephen M 1,311,283<br />
Muwonge Nakaggwa Josephine F 1,311,283<br />
Principal Personnel Officer 3 3 0 U2L Arinaitwe Moses M 1,026,409<br />
Page 6 of 9<br />
141
Behangana P. M 1,026,409<br />
Katana Kuteesa Juliet F 1,026,409<br />
Senior Personnel Officer 2 2 0 U3L Nabwire Flavia F 769,517<br />
Amoding Jennifer F 467,527<br />
Personal Secretary 1 1 0 U5L Aarakit Stella F 247,483<br />
Driver 1 1 0 U8U Kiviri Julius M 122,129<br />
Office Attendant 1 1 0 U8U Nyakato Jolly F 129,217<br />
Total 10 10 0<br />
office of the Director, Efficiency and Quality Assurance<br />
Director/Efficiency &Quality Assurance 1 1 0 U1SE Nyamungu Salome F 1,643,704<br />
Personal Secretary 1 1 0 U4L Nassozi Joan 451,228<br />
Driver 1 1 0 U8U Odwa Isaac M 106,687<br />
Sub-Total 3 3 0<br />
<strong>Public</strong> <strong>Service</strong> Inspection Department<br />
<strong>Commission</strong>er/<strong>Public</strong> <strong>Service</strong> Insp. 1 1 0 U1SE Wenene Mary Teopista F 1,407,268<br />
Assistant <strong>Commission</strong>er 2 1 1 U1EL Kalebbo E. B. F 1,327,902<br />
Vacant 1,327,902<br />
Principal Personnel Officer 2 2 0 U2L Luyinda James M 988,856<br />
Kirunda Nyende Peter M 1,014,615<br />
Senior Personnel Officer 3 3 0 U3L Emojong Pius M 716,870<br />
Kabukole Gregory F 708,892<br />
Komuntu Kaija Stephen M 708,892<br />
Stenographer Secretary 1 1 0 U4L Akello Alice Joyce F 365,523<br />
Driver 2 2 0 U8U Kiyaga Bumali Ssalongo M 129,217<br />
Magara Fred M 122,129<br />
Office Attendant 2 1 1 U8U Nantume Daisy F 129,217<br />
Sub-Total 13 1 2<br />
Total 16 14 2<br />
Management <strong>Service</strong>s Department<br />
Office of the <strong>Commission</strong>er<br />
<strong>Commission</strong>er/<strong>Public</strong> <strong>Service</strong> Insp. 1 1 0 U1SE Banyoya Betty Margaret Angwao F 1,407,268<br />
Personal Secretary 1 1 0 U4L Namayanja Agnes F 483,827<br />
Page 7 of 9<br />
142
Office Attendant 1 1 0 U8U Nassaka Gorreti F 129,217<br />
Driver 1 1 0 U8U Ssekamatte Mohhamed M 129,217<br />
Sub-Total 4 4 0<br />
Organisational Development Division<br />
Assistant <strong>Commission</strong>er 1 1 0 U1EL Mubiru Sebunya Eva M 1,343,000<br />
Principal Management Analyst 1 1 0 U2L Vacant M 943,779<br />
Senior Management Analyst 2 2 0 U3L Kyomukama Alda F 777,987<br />
Sifuna Fred Bob M 777,987<br />
Management Analyst 1 1 0 U4L Dombio Rose Rosana Adiye F 585,433<br />
Stenographer Secretary 1 1 0 U5L Anyumella Brenda F 359,996<br />
Office Attendant 1 1 0 U8U Laker Joyce F 129,217<br />
Sub-Total 7 7 0<br />
Systems Division<br />
Assistant <strong>Commission</strong>er 1 1 0 U1EL Turyatemba Joseph M 1,343,000<br />
Principal Management Analyst 1 1 0 U2L Kakama Allen J. M. F 777,987<br />
Senior Management Analyst 2 1 0 U3L Bukulu Steven M 777,987<br />
Management Analyst 1 1 0 U4L Arinaitwe Narcisio M 525,489<br />
Office Typist 1 1 0 U7L Biira Brenda F<br />
Sub-Total 6 5 1<br />
Productivity Division<br />
Assistant <strong>Commission</strong>er 1 1 0 U1EL Aguma James M 1,327,902<br />
Principal Management Analyst 1 0 1 U2L Vacant 777,987<br />
Senior Management Analyst 2 2 0 U3L Sekitto Haruna M 769,517<br />
Byenkya Julius M 769,517<br />
Management Analyst 1 1 0 U4L Naluutu Lwanga Sarah F 525,489<br />
Sub-Total 5 4 1<br />
Total 22 20 2<br />
Records and Information Management<br />
<strong>Commission</strong>er/Rec.&Info. Management 1 1 0 U1SE Kizito Deogratius Louis M 1,407,268<br />
Asst. <strong>Commission</strong>er (Current Records) 1 0 1 U1EL Vacant 1,311,283<br />
Asst. <strong>Commission</strong>er (Semi Current Records) 1 0 1 U1EL Vacant 1,311,283<br />
Government Archivist 1 1 0 U1EL Okello Ajum A. A. M 1,327,902<br />
Principal Records Officer 2 2 0 U2L Ariso Lillian Rose F 988,856<br />
Nakangu Mary S. F 988,856<br />
Page 8 of 9<br />
143
Princ. Info. & Technology Officer 1 1 0 U2L Muinda Patrick E. M 1,014,615<br />
Senior Archivist 1 0 1 U3L Nalwoga Justine F 952,365<br />
Archivist 1 1 0 U4 Kirabo Eva F 451,228<br />
Records Officer 4 3 1 U4L Chandia Angellah F 467,527<br />
Magimbi Geoffrey M 467,527<br />
Nansikombi Damalie F 467,527<br />
Vacant 467,527<br />
Sen. Asst. Records Officer 1 1 0 U4L Bwanika Richard M 585,433<br />
Stenographer Secretary 2 2 0 U4L Biira Esther Kabaseke F 365,523<br />
Karyekezi Ruth F 365,523<br />
Driver 3 3 0 U8U Kakande Abdullah M 129,217<br />
Vacant M 113,306<br />
Musamya Kato Sam M 113,306<br />
Office Attendant 2 2 0 U8U Kikubira James M 129,217<br />
Lubowa Edirisa M 115,451<br />
Total 19 16 3<br />
Grand Total 265 260 5<br />
Page 9 of 9<br />
144
RECRUITMENT PLAN2010/2011 AS PER APPROVED STRUCTURE<br />
Staff Category Scale No.<br />
Appr<br />
In post<br />
Total<br />
intake<br />
required<br />
at each<br />
level<br />
Monthly<br />
Salary<br />
Annual Salary Timing Comments<br />
Director, Research and Development U1SE 1 0 1 1,643,704 19,724,448.00 Aug-10 Waiting for Interview<br />
outcome from PSC<br />
Assistant <strong>Commission</strong>er (<strong>Public</strong> <strong>Service</strong> Inspection) U1E 2 1 2 1,327,902 15,934,824.00 Aug-10 Post declared to PSC<br />
Assistant <strong>Commission</strong>er (Current Records) U1E 1 0 1 1,311,283 15,735,396.00 Aug-10 Post declared to PSC<br />
Assistant <strong>Commission</strong>er (Semi-current records) U1E 1 0 1 1,311,283 15,735,396.00 Aug-10 Post declared to PSC<br />
Assistant Secretary (Finance and Administration) U4L 1 0 1 543,169 6,518,028.00 Jul-10 Post declared to PSC<br />
Principal Policy Analyst (Planning Division) U2L 1 0 1 943,779 11,325,348.00 Aug-10 Post declared to PSC<br />
Principal Internal Audit U2U 1 0 1 943,779 11,325,348.00 Aug-10 Post declared to PSC<br />
Principal Management Analyst U2L 3 0 3 943,779 33,976,044.00 Aug-10 Post declared to PSC<br />
Records Officer U4L 4 3 4 467,527 5,610,324.00 Aug-10 Post declared to PSC<br />
GRAND TOTAL 15 4 15 9,436,205 135,885,156.00<br />
Establishment Analysis Summary<br />
Apprvd Filled Vacant<br />
Prog 01 - Finance and Administration 93 88 5<br />
Prog 02 - Research and Development<br />
17 16 1<br />
Prog 03 - Human Resource Management<br />
53 53 0<br />
Prog 04 - Human Resource Development<br />
10 10 0<br />
Prog 05 - Pensions<br />
34 34 0<br />
Prog 06 - Efficiency and Quality Assurance<br />
16 14 2<br />
Prog 07 - Management <strong>Service</strong>s Department<br />
22 20 2<br />
Prog 08 - Records and Inforamation Management<br />
24 20 4<br />
Total Established Posts 269 255 14<br />
145
APPROVED MACRO STRUCTURE FOR THE MOPS<br />
MINISTER<br />
<strong>Public</strong> <strong>Service</strong><br />
<strong>Commission</strong><br />
Minister of State<br />
Permanent<br />
Secretary<br />
Deputy Head of <strong>Public</strong> <strong>Service</strong> and<br />
Secretary Administrative Reform<br />
Director of Human<br />
Resources<br />
Management<br />
Director of Efficiency &<br />
Quality Assurance<br />
Director of Research &<br />
Development<br />
<strong>Commission</strong>er<br />
Compensation<br />
<strong>Commission</strong>er<br />
Human<br />
Resource<br />
Development<br />
<strong>Commission</strong>er<br />
Human<br />
Resource<br />
Management<br />
<strong>Commission</strong>er<br />
<strong>Public</strong> <strong>Service</strong><br />
Inspection<br />
<strong>Commission</strong>er<br />
Management<br />
<strong>Service</strong>s<br />
<strong>Commission</strong>er<br />
Records &<br />
Information<br />
Management<br />
Under<br />
Secretary<br />
Finance &<br />
Administration<br />
<strong>Commission</strong>er<br />
Information,<br />
Education &<br />
Communication<br />
<strong>Commission</strong>er<br />
Monitoring &<br />
Evaluation<br />
Policy and Planning<br />
Division<br />
Policy Analysis<br />
Unit<br />
Planning Unit<br />
Procurement<br />
Unit<br />
Internal Audit<br />
Unit<br />
1<br />
146
APPROVED STRUCTURE FOR DEPARTMENT OF FINANCE AND ADMINISTRATION<br />
Permanent Secretary<br />
US/F&A<br />
Principal Accountant<br />
Principal Assistant<br />
Secretary<br />
Principal<br />
Personnel Officer<br />
SAS (PA) SA<br />
SAS SAS<br />
PARO/SRO<br />
SPO<br />
PAA/<br />
Accountant<br />
PAA<br />
Accountant<br />
PAA<br />
Accountant<br />
AS/Transport<br />
POS<br />
Information<br />
Scientist<br />
SARO<br />
SARO<br />
SAA<br />
SAA<br />
SAA<br />
(2)<br />
AA<br />
AA<br />
AA<br />
(2)<br />
AA<br />
(2)<br />
AOS Librarian RA RA RA RA<br />
NB: Total No. of staff -81 Other Administrative and Support Staff are reflected in the Establishment Analysis<br />
2<br />
147
APPROVED STRUCTURE FOR THE POLICY AND PLANNING DIVISION<br />
PERMANENT SECRETARY<br />
Assistant <strong>Commission</strong>er<br />
Policy & Planning U1E<br />
Principal Policy<br />
Analyst<br />
U2, (1)<br />
Principal Economist<br />
U2, (1)<br />
Sen. Policy Analyst<br />
U3 (1)<br />
Senior Economist<br />
(Budget) U3 (1)<br />
TOTAL NO. OF STAFF - 6<br />
Administrative Support Staff<br />
Office Attendant U8 1<br />
3<br />
148
APPROVED STRUCTURE FOR THE PROCUREMENT UNIT<br />
PERMANENT SECRETARY<br />
Senior Procurement Officer<br />
U3 (1)<br />
Procurement Officer<br />
U4 (1)<br />
TOTAL NO. OF STAFF - 4<br />
Administrative Support Staff<br />
Office Typist U7 1<br />
Office Attendant U8 1<br />
4<br />
149
APPROVED STRUCTURE FOR THE INTERNAL AUDIT UNIT<br />
PERMANENT SECRETARY<br />
Principal Internal Auditor<br />
U2, (1)<br />
Senior Internal Auditor<br />
U3, (1)<br />
Internal Auditor<br />
U4, (1)<br />
TOTAL NO OF STAFF - 3<br />
5<br />
150
APPROVED STRUCTURE FOR THE DIRECTORATE OF<br />
RESEARCH AND DEVELOPMENT<br />
Director/Research & Development<br />
U1SE (1)<br />
<strong>Commission</strong>er Information,<br />
Education and Communication<br />
U1SE (1)<br />
<strong>Commission</strong>er Monitoring<br />
and Evaluation<br />
U1SE (1)<br />
Assistant <strong>Commission</strong>er<br />
Information, Education and<br />
Communication<br />
U1E (1)<br />
Assistant <strong>Commission</strong>er<br />
Monitoring and Evaluation<br />
U1E (1)<br />
Principal Communication<br />
Officer<br />
U2 (1)<br />
Principal Monitoring and<br />
Evaluation Officer U2 (1)<br />
Administrative Support Staff<br />
Senior Personal Secretary U3 1<br />
Personal Secretary U4 1<br />
Office Attendant U8 3<br />
Driver U8 4<br />
6<br />
TOTAL NO OF STAFF - 17<br />
151
APPROVED STRUCTURE FOR THE DIRECTORATE OF HUMAN RESOURCE MANAGEMENT<br />
Director/Human Resource<br />
Management (1)<br />
<strong>Commission</strong>er/Human<br />
Resource Management (1)<br />
<strong>Commission</strong>er/Human Resource<br />
Development (1)<br />
<strong>Commission</strong>er/Pensions (1)<br />
7<br />
152
APPROVED STRUCTURE AND ESTABLISHMENT OF HUMAN RESOURCE MANAGEMENT DEPARTMENT<br />
<strong>Commission</strong>er HRM<br />
U1SE (1)<br />
Assistant<br />
<strong>Commission</strong>er<br />
Policy U1E (1)<br />
Assistant<br />
<strong>Commission</strong>er<br />
IPPS U1E (1)<br />
Assistant<br />
<strong>Commission</strong>er<br />
Payroll U1E (1)<br />
Assistant<br />
<strong>Commission</strong>er<br />
Wage bill U1E (1)<br />
PPO Processing<br />
Applications for<br />
Exit/Terminal Benefits<br />
U2 (1)<br />
PPO Policies<br />
U2<br />
(1)<br />
PPO IPPS<br />
U2<br />
(1)<br />
PPO Traditional<br />
Payroll Monitoring<br />
U2 (1)<br />
PPO Teachers<br />
Payroll Monitoring<br />
U2 (1)<br />
PPO Wage bill<br />
U2<br />
(1)<br />
Senior Personnel<br />
Officer U3 (2)<br />
Senior<br />
Personnel<br />
Officer U3 (2)<br />
Senior Systems<br />
Analyst<br />
U3 (1)<br />
Senior<br />
Personnel<br />
Officer U3 (1)<br />
Senior<br />
Personnel<br />
Officer U3 (1)<br />
Senior System<br />
Analyst<br />
U3 (1)<br />
Senior<br />
Personnel<br />
Officer U3 (2)<br />
Senior<br />
Personnel<br />
Officer U3 (1)<br />
Personnel Officer<br />
U4 (2)<br />
Personnel<br />
Officer U4 (1)<br />
Personnel U4<br />
Officer, (2)<br />
Administrative Support Staff<br />
Personal Secretary 2<br />
Pool Stenographer 1<br />
Office Typist 3<br />
Office Attendant 3<br />
Drivers 4<br />
Data Entry<br />
Clerk<br />
U6 (1)<br />
Asst Computer<br />
Supervisor U6<br />
(1)<br />
Data Entry<br />
Clerk<br />
U6 (6)<br />
Records<br />
Assistant<br />
U7 (1)<br />
TOTAL NO. OF STAFF - 49<br />
8<br />
153
APPROVED STRUCTURE FOR THE PENSIONS DEPARTMENT<br />
<strong>Commission</strong>er<br />
Assistant <strong>Commission</strong>er Traditional Civil<br />
<strong>Service</strong> & 7 LGs U1E (1)<br />
Assistant <strong>Commission</strong>er Other<br />
Categories U1E (1)<br />
Pensions Accounts<br />
Principal Accountant<br />
U2 (1)<br />
Senior Accountant<br />
U3 (1)<br />
Principal Personnel<br />
Officer U2 (1)<br />
Senior Personnel<br />
Officer U3 (2)<br />
Pension Database<br />
Senior Systems<br />
Analyst/Programmer<br />
U3 (1)<br />
Principal Personnel<br />
Officer U2 (1)<br />
Senior Personnel Officer<br />
U3 (2)<br />
Pensions Registry<br />
Principal Records<br />
Officer U2 (1)<br />
Accountant<br />
U4 (1)<br />
Senior Accounts<br />
Assistant U5 (4)<br />
Data Entry Clerk U6<br />
(1)<br />
Records<br />
Officer/Sen. Asst.<br />
Records Officer<br />
U4 (2)<br />
Accounts Assistant<br />
U7 (5)<br />
Administrative Support Staff<br />
Personal Secretary U4 1<br />
Driver U8 2<br />
Office Attendant U8 3<br />
TOTAL NO OF STAFF - 35<br />
Records Assistant<br />
U7 (4)<br />
9<br />
154
APPROVED STRUCTURE FOR HUMAN RESOURCE DEVELOPMENT<br />
<strong>Commission</strong>er<br />
(1)<br />
Assistant <strong>Commission</strong>er<br />
Research Policy &<br />
Standards U1E (1)<br />
Assistant <strong>Commission</strong>er<br />
Learning and development<br />
U1E (1)<br />
Principal Personnel<br />
Officer<br />
U2 (1)<br />
Principal Personnel<br />
Officer<br />
U2 (1)<br />
Senior Personnel Officer<br />
U3 (1)<br />
Senior Personnel Officer<br />
U3 (1)<br />
TOTAL NO OF STAFF - 10<br />
Administrative Support Staff<br />
Personal Secretary U4 1<br />
Driver U8 1<br />
Office Attendant U8 1<br />
10<br />
155
APPROVED STRUCTURE FOR THE DIRECTORATE OF EFFICIENCY AND QUALITY ASSURANCE<br />
Director /Efficiency and Quality<br />
Assurance (1)<br />
<strong>Commission</strong>er/Management <strong>Service</strong>s<br />
(1)<br />
<strong>Commission</strong>er/Records and<br />
Information Management<br />
(1)<br />
<strong>Commission</strong>er/<strong>Public</strong> <strong>Service</strong><br />
Inspection<br />
(1)<br />
11<br />
156
APPROVED STRUCTURE OF THE DEPARTMENT OF PUBLIC SERVICE INSPECTION<br />
<strong>Commission</strong>er<br />
<strong>Public</strong> <strong>Service</strong> Inspection<br />
Assistant <strong>Commission</strong>er<br />
Personnel Audit U1E (1)<br />
Assistant <strong>Commission</strong>er<br />
Performance Audit U1E<br />
(1)<br />
Principal Personnel<br />
Officer U2 (2)<br />
Principal Personnel<br />
Officer U2 (1)<br />
Senior Personnel Officer<br />
U3 (1)<br />
Senior Personnel Officer<br />
U3 (1)<br />
TOTAL NO. OF STAFF - 14<br />
Administrative Support Staff<br />
Stenographer Secretary U5 1<br />
Office Attendant U8 1<br />
Driver U8 3<br />
12<br />
157
APPROVED STRUCTURE OF THE DEPARTMENT OF MANAGEMENT SERVICES<br />
<strong>Commission</strong>er<br />
U1SE (1)<br />
Organisational Development<br />
Division Assistant<br />
<strong>Commission</strong>er U1E (1)<br />
Systems Division<br />
Assistant <strong>Commission</strong>er<br />
U1E (1)<br />
Productivity Division<br />
Assistant <strong>Commission</strong>er<br />
U1E (1)<br />
Principal Management<br />
Analyst U2, (1)<br />
Principal Management<br />
Analyst U2, (1)<br />
Principal Management<br />
Analyst U2, (1)<br />
Senior Management Analyst<br />
U3, (2)<br />
Senior Management<br />
Analyst U3, (2)<br />
Senior Management<br />
Analyst U3, (2)<br />
Management Analyst<br />
U4, (1)<br />
Management Analyst<br />
U4, (1)<br />
Management Analyst<br />
U4, (1)<br />
Administrative Support Staff<br />
Personal Secretary U4 1<br />
Stenographer Secretary U5 1<br />
Office Typist U7 1<br />
Office Attendant U8 2<br />
Driver U8 1<br />
13<br />
TOTAL NO OF STAFF - 22<br />
158
APPROVED RECORDS AND INFORMATION MANAGEMENT<br />
<strong>Commission</strong>er RIM<br />
U1SE<br />
Assistant <strong>Commission</strong>er<br />
Current Records<br />
U3 (1)<br />
Assistant <strong>Commission</strong>er<br />
Semi-Current Records<br />
U1E (1)<br />
Government Archivist<br />
U1E (1)<br />
Principal Records Officer<br />
U2 (1)<br />
Principal Records Officer<br />
U2 (1)<br />
Principal IT Officer<br />
U2 (1)<br />
Senior Archivist<br />
U3 (1)<br />
Records Officer<br />
U4<br />
(1)<br />
Senior Assistant<br />
Records Officer<br />
U4 (1)<br />
Records Officer<br />
U4 (1)<br />
Records Officer<br />
U4 (1)<br />
Administrative Support Staff<br />
Stenographer SecretaryU5 1<br />
Driver U8 3<br />
Office Attendant U8 1<br />
14<br />
TOTAL NO. OF STAFF - 17<br />
159
PUBLIC SERVICE COMMISSION - Vote 146<br />
STAFF LIST AS AT JUNE 24TH 2010<br />
PROGRAMME: 01<br />
Post/Title Appr Filled Vacant Scale Name of Incumbent(s) Date of Personal Basic 1st Appt. Present Sex Status<br />
Post Post Post Birth Comp No. Salary P.M Appt.<br />
Chairperson 1 1 0 SO 1 Prof. P.J. Muzaale 04/01/39 C14609057427 2,900,000 04/08/97 08/09/05 M Contra.<br />
Deputy Chairperson 1 1 0 SO Mrs. J.A.N. Kaddu 26/08/39 C14609002350 2,700,000 19/12/88 08/09/05 F Contra.<br />
Members 7 3 4 SO Ms. C.C. Akot 11/11/34 C14609067241 2,600,000 04/08/97 08/09/05 F Contra.<br />
SO Mr. Ben Wanyama 01/11/46 C14609067245 2,600,000 02/08/00 15/03/05 M Contra.<br />
SO Hajjati Kamulegeya 7/3/1950 C14609058614 2,600,000 1.11.99 0.5.2009 F Contra.<br />
SO Mr. Francis Oryang Lagony 5/1/1945 C14609067243 2,600,000 1.11.99 0.5.2009 M Contra.<br />
SO Dr. Laban N.Kirya 19/12/34 C14609067260 2,600,000 2.11.04 0.5.2009 M Contra.<br />
SO Justice Kato C M 2/4/1934 C14609067259 2,600,000 2.11.04 0.5.2009 M Contra.<br />
SO Vacant Contra.<br />
OFFICE OF THE CHAIRPERSON PROGRAMME: 01<br />
Principal Personal Secretary 1 1 0 U2 Mrs. Norah Tumwesigye Bashaburush 08/01/50 C14609002423 943,779 01/08/74 27/01/03 F Conf.<br />
Pool Stenographer 1 1 0 U6 Mrs. L.N. Kaddu 05/11/59 C14609067235 256,705 05/05/87 01/01/00 F Conf.<br />
Driver 1 1 0 U8 Mr. Joel Munghesi 16/08/74 C14909067265 113,306 08/07/05 08/07/05 M Prob.<br />
Office Attendant 1 1 0 U8 Mr. Ssewanyana Patrick 12/08/86 C14609067267 113,306 26/04/07 26/04/07 M Prob.<br />
OFFICE OF THE DEPUTY CHAIRPERSON PROGRAMME: 01<br />
Senior Personal Secretary 1 1 0 U3 Ms. J eniffer Grace Ariko 09/09/66 C14609054286 777,987 06/03/98 06/03/98 F Conf.<br />
Driver 1 1 0 U8 Mr. Sentongo Fahad 10/10/76 C14609067271 113306 19/09/08 19/09/08 M Contra.<br />
Office Attendant 1 1 0 U8 Mr. Alex Otim 13/04/82 C14609067261 113,306 22/11/04 22/11/04 M Prob.<br />
OFFICE OF THE SECRETARY PROGRAMME: 01<br />
160
Post/Title Appr Filled Vacant Scale Name of Incumbent(s) Date of Personal Basic 1st Appt. Present Sex Status<br />
Post Post Post Birth Comp No. Salary P.M Appt.<br />
Secretary, <strong>Public</strong> <strong>Service</strong> Comm. 1 1 0 U1S Mr. Duncan Bigirwa 01/10/57 C14609000036 2,003,105 01/07/81 07/05/04 M Contra.<br />
Principal Personal Secretary 1 1 0 U2 Ms. M.T. Nyafuono 04/10/52 C14609002424 1,014,615 30/01/75 27/01/03 F Conf.<br />
Office Attendant 1 1 0 U8 Ms. Apio Otwi Annette 23/03/76 C14609067251 122,129 05/03/03 05/03/03 F Conf.<br />
Driver 1 1 0 U8 Dadye Charles Peter 13/07/70 C14609067273 113,306 19/11/08 19/11/08 M Prob.<br />
FINANCE AND ADMINISTRATION PROGRAMME: 01<br />
Under Secretary 1 1 0 U1SE Mr. C.J. Dombo 23/08/66 C14609067247 1,407,268 01/10/91 02/04/02 M Conf.<br />
Principal Assistant Secretary 1 1 0 U2 Mrs. Kyeyune M. 16/09/50 C14609000022 1,014,615 10/04/74 28/06/99 F Conf.<br />
Senior Assistant Secrtertary 1 0 1 U3 Vacant<br />
Senior Accountant 1 1 0 U3 Mr. R. Tabaro 08/11/56 C14609003320 732,873 10/07/82 21/06/82 M Conf.<br />
Accountant/Principal Accts Asst 2 2 0 U4 Mr. Nyegenye Fredrick C14609080711 568,036 M Conf.<br />
Accountant/Principal Accts Asst U4 Mr. A. Oliam 25/04/55 C14609003304 604,613 01/11/78 01/08/99 M Conf.<br />
Senior Accts Assistant 1 1 0 U5 Ms. Nabaale Sarah 03/03/60 C14609003478 359,585 01/07/82 01/07/91 F Conf.<br />
Senior Office Supervisor 1 1 0 U5 Mr. J.B. Mugerwa-Ssali 26/01/53 C14609037731 500,466 21/04/75 01/12/99 M Conf.<br />
Office Supervisor 1 1 0 U6 Mr. Masyale Kamya Mica 27/07/59 C14609005420 359,585 22/03/83 01/12/99 M Conf.<br />
Procurement Officer 1 1 0 U4 Mr. Mukasa Silver 25/10/64 C01109068339 596,438 18/04/199630/12/2008 M Conf.<br />
Personal Secretary 1 1 0 U4 Ms. Evelyn Mpairwe C14609067256 429,741 27/10/03 27/10/03 F Conf.<br />
Principal Copy typist 1 0 1 U6 Vacant<br />
Telephone Operator 2 1 1 U7 Ms. Nabirye Leticia 27/11/69 C14609067248 189,300 31/12/02 31/12/02 F Conf.<br />
Receptionist 1 0 1 U7 Ms. Brenda Kasabiiti C14610004342 275,848 F Prob.<br />
Office Attendant 1 1 0 U8 Mr. F. Lukwago 10/12/70 C14609067238 126,812 05/08/92 05/08/92 M Conf.<br />
Drivers 8 7 1 U8 Mr. Nganda Faisal 21/12/79 C14609067262 113,306 22/11/04 22/11/04 M Contra.<br />
U8 Bwire William Were 06/06/73 C14609067277 113,306 19/11/08 19/11/08 M Prob.<br />
U8 Amone Alfred Allan C14610000099 113,306 M<br />
U8 Mr. Munghesi Stephen 16/08/74 705139M 107,911 08/07/05 08/07/05 M Prob.<br />
U8 Tumwijukye Vincent 06/05/79 C14609067274 113,306 19/11/08 19/11/08 M Contra.<br />
U8 Okello Simon Peter 14/04'78 C14609067276 113,306 19/11/08 19/11/08 M Contra.<br />
161
Post/Title Appr Filled Vacant Scale Name of Incumbent(s) Date of Personal Basic 1st Appt. Present Sex Status<br />
Post Post Post Birth Comp No. Salary P.M Appt.<br />
Askaris 2 2 0 U8 Mr. Wathum Lawrence Martin 01/06/58 C14609067254 114,385 25/08/03 25/08/03 M Conf.<br />
U8 Reikonuk John Bosco 15/05/68 C14609067255 102,286 25/08/03 25/08/03 M Conf.<br />
Office Attendants 2 2 0 U8 Mr. Okello Charles 18/12/85 C14609067268 113,306 26/04/07 26/04/07 M Prob.<br />
U8 Mr. Mutaawe Mark 19/12/83 C14609067266 113,306 26/04/07 26/04/07 M Prob.<br />
RESOURCE CENTRE PROGRAMME: 01<br />
Senior Information Scientist 1 1 0 U3 Achal J.B. 01/09/80 C14609001409 708,892 01/01/04 12/02/08 M Conf.<br />
Principal Assistant Records Officer 1 1 0 U3 Mr. J. Angela-Awany 15/12/50 C14609002332 777,987 12/08/70 02/08/99 M Conf.<br />
Senior Asst Records Officer 2 1 1 U4 Mr. H. Kireri 14/02/61 C14609056762 599,196 30/06/80 02/08/99 M Conf.<br />
Asst Records Officer 1 1 0 U5 Mr. Dasan Mugaba 14/02/65 C14609054276 359,996 10/01/86 04/03/04 M Conf.<br />
Asst. Statistical Officer 1 1 0 U5 Vacant<br />
Records Assistant 2 3 -1 U7 Mr. Kyalimpa Witumine Evarist 15/12/68 C14609067252 178,106 20/03/06 20/03/06 M -<br />
Records Assistant U7 Mrs. E. Mubbaale Apiny 18/05/64 C14609067249 172,453 31/12/02 25/09/08 F Conf.<br />
Records Assistant U7 Vacant<br />
Office Attendant U8 Ms. Nnakilijja Phiona C00509002708 113,306 F Prob.<br />
SELECTION SYSTEMS DEPARTMENT Programme 02<br />
<strong>Commission</strong>er 1 1 0 U1SE Ms. Nabusoba Sebabi H. 09/03/66 C14609067269 1,407,268 19/11/07 F Conf.<br />
Principal Personnel Officer 2 1 1 U2 Mr. Malowa Davis Ndanyi 7/5/1969 C14609080865 1,014,615 01/10/94 01/10/05 M Conf.<br />
Principal Personnel Officer U2 Vacant<br />
Senior Personnel Officer 3 0 3 U3<br />
Senior Personnel Officer<br />
U3<br />
Senior Personnel Officer U3 Vacant<br />
Sen Asst Comp. Operator 1 0 1 U5 Vacant<br />
Personal Secretary 1 1 0 U4 Nantale Rehema Mukose 15/4/70 C14609067278 451,228 20.2.09 20.2.09 F Conf.<br />
162
Post/Title Appr Filled Vacant Scale Name of Incumbent(s) Date of Personal Basic 1st Appt. Present Sex Status<br />
Post Post Post Birth Comp No. Salary P.M Appt.<br />
Driver 1 1 0 U8 Kirumira Fred 07/1963 C14609067272 113,306 11/2008 11/2008 M Prob.<br />
Office Attendant 1 0 1 U8 Vacant<br />
OFFICE OF THE DEPUTY SECRETARY PROGRAMME 03<br />
Deputy Secretary 1 1 0 U1SE Mrs. Rose . N. Kafeero 02/02/60 C14609002353 1,534,549 18/08/04 18/08/04 F Conf.<br />
Senior Personal Secretary 1 0 1 U3 Vacant<br />
Personal Secretary 1 1 0 U4 Ms. Namakoye Phidely 26/06/75 C14609067257 525,489 Jul/2001 13/10/03 F Conf.<br />
Office Attendant 1 1 0 U8 Ms. H. Namugga 10/10/70 C14609067237 126,812 01/08/91 01/08/91 F Conf.<br />
Driver 1 1 0 U8 Mr. Mutegeki Patrick 16/03/72 C14609067264 113,306 08/07/05 08/07/05 M Contra.<br />
EXTERNAL GUIDANCE AND MONITORING DIVISION PROGRAMME 03<br />
Assistant <strong>Commission</strong>er 1 1 0 U1E Vacant<br />
Principal Personnel Officer 2 2 0 U2 Mr. E. Tugabiirwe 09/06/65 C14609002599 1,007,102 20/12/94 18/04/06 M Conf.<br />
Sen Principal Asst Personnel Officer U2 Mr. M.L.D Ekamu Edeu 05/09/53 C14609002377 970,611 30/01/75 28/03/08 M Conf.<br />
Senior Personnel Officer 1 1 0 U3 Nayiga Mugisha Miriam. (Mrs.) 19/07/'75 C14609072379 769,517 01/03/01 F Conf.<br />
Stenographer Secretary 1 0 1 U6 Vacant<br />
Driver 1 1 0 U8 Walakira Berus 03/06/74 C14609067275 113,306 19/11/08 19/11/08 M Prob.<br />
INTERNAL GUIDANCE AND MONITORING DIVISION PROGRAMME 03<br />
Assistant <strong>Commission</strong>er (P. Mgt) 1 1 0 U1E Mr. F. Musingwire 02/12/66 C14609002592 1,327,902 1/7/2003 M Conf.<br />
Principal Personnel Officer 3 4 -1 U2 Mr. R. K. Manano 07/05/64 C14609069404 1,007,102 30/12/94 25/05/06 M Conf.<br />
Principal Personnel Officer U2 Mr. Enyomu Richard 27/02/76 C14609003039 970,611 25/09/00 24/10/07 M Conf.<br />
Principal Personnel Officer U2 Mrs. Eva Nazziwa 05/11/74 C14609089814 970,611 25/01/00 01/10/07 F Conf.<br />
Principal Personnel Officer U2 Ms. A.T. Naluyima 23/03/70 C14609049226 970,611 Oct 95 27/07/03 F Conf.<br />
Senior Personnel Officer 7 6 1 U3 Mr. Buyondo B. 28/08/70 C14609068383 777,987 01/07/96 01/03/03 M Conf.<br />
Senior Personnel Officer U3 Mr. Mujungu Kalifa Andrew 09/06/76 C14609038201 741,390 05/04/00 03/04/06 M Conf.<br />
Senior Personnel Officer U3 Mr. N. Mungoma 12/11/65 C14609002633 741,390 03/10/200014/08/03 M Conf.<br />
Senior Personnel Officer U3 Mr. Obong Charles Ogwal 24/04/64 C14609068366 741,390 01/07/96 25/04/06 M Conf.<br />
Senior Personnel Officer U3 Mr. Olum S. 15/05/77 C14609019242 716,870 03/05/04 27/08/07 M Conf.<br />
Senior Personnel Officer U3 Vacant<br />
Senior Personnel Officer U3 Vacant<br />
163
Post/Title Appr Filled Vacant Scale Name of Incumbent(s) Date of Personal Basic 1st Appt. Present Sex Status<br />
Post Post Post Birth Comp No. Salary P.M Appt.<br />
Stenographer Secretary 1 1 0 U5 Christine Nassaka 02/08/75 C14609005153 310,100 2003 2006 F Conf.<br />
Driver 1 0 1 U8 Vacant<br />
Office Attendant 1 0 1 U8 Vacant<br />
91 72 19<br />
SO 1 : Paid as Specified Officer<br />
164
Chairperson<br />
Deputy<br />
Chairperson<br />
Members 7<br />
Secretary<br />
Deputy Secretary<br />
(G & M)<br />
US F&A<br />
C/G & M<br />
C/SSD<br />
AC/IGM<br />
AC/EGM<br />
PAS<br />
PPO 3<br />
PPO 2<br />
PPO 3<br />
PPS<br />
PPS<br />
SIS<br />
SA<br />
SAS<br />
PARO<br />
SPO 7<br />
SPO 1<br />
SPS<br />
SPO 3<br />
SPS<br />
PS 2<br />
PAA 2<br />
PO<br />
SARO<br />
ASO<br />
Steno Sec<br />
SAA<br />
SOS<br />
ARO<br />
SACO<br />
Steno Sec<br />
Pool Steno<br />
OS<br />
Recept.<br />
TO<br />
RA 2<br />
Askari 2 OA 8<br />
Driver 8<br />
Driver<br />
Driver<br />
Driver<br />
Driver<br />
Driver<br />
Driver<br />
Driver<br />
165