- Page 1 and 2: EuropeAid /114385/D/SV/CY Project A
- Page 3 and 4: What is the RCD? • Results from i
- Page 5 and 6: Key Dates • Laid before Parliamen
- Page 7: Craft Excluded from RCD Scope: 1
- Page 11 and 12: RCD Design Categories • Defined b
- Page 13 and 14: Design Category Assessment Module C
- Page 15 and 16: Design Category Assessment Module A
- Page 17 and 18: Design Category Assessment Module A
- Page 19 and 20: Amendment of RCD • Put before Cou
- Page 21 and 22: Session 2
- Page 23 and 24: Essential Safety Requirements • 3
- Page 25 and 26: ESR Observations - 2 • ESRs are n
- Page 27 and 28: Hull Identification Number
- Page 29 and 30: Demonstrations Needn’t be Clever
- Page 31 and 32: Design Category C (Inshore) Assessm
- Page 33 and 34: ESRs in Detail - 5 • 4 Handling C
- Page 35 and 36: ESRs in Detail - 7 • 5.6 Fire pro
- Page 37 and 38: Harmonised Standards • Created by
- Page 39 and 40: Design Category Assessment Module D
- Page 41 and 42: Session 3
- Page 43 and 44: Adequate Demonstration • Technica
- Page 45 and 46: Technical Documentation - 2 • Evi
- Page 47 and 48: Declaration of Conformity • The u
- Page 49 and 50: • Type of boat 01 • sailboat 02
- Page 51 and 52: Summary of Requirements • A boat
- Page 53 and 54: Appointment of NoBos 1. The body, i
- Page 55 and 56: Appointment of NoBos 3. The body sh
- Page 57 and 58: Appointment of NoBos 5. The imparti
- Page 59 and 60:
Appointment of NoBos 7. The staff o
- Page 61 and 62:
Notified Bodies - Operation • Com
- Page 63 and 64:
Conformity Assessment Modules • C
- Page 65 and 66:
Modules - Useful Range! Module A Aa
- Page 67 and 68:
Module Aa (Annex VI) INTERNAL PRODU
- Page 69 and 70:
Module B (Annex VII) EC TYPE EXAMIN
- Page 71 and 72:
Module C (Annex VIII) CONFORMITY TO
- Page 73 and 74:
Other Modules • D - Production Qu
- Page 75 and 76:
Session 4
- Page 77 and 78:
Part Built Boats • Annex IIIa Dec
- Page 79 and 80:
Anomalies of RCD Scope • Home-Bui
- Page 81 and 82:
Kit Boats • RCD has no special re
- Page 83 and 84:
Boats from outside EU • Complianc
- Page 85 and 86:
EU Dependencies • Anguilla • Ar
- Page 87 and 88:
Proving Exemption • Craft must ei
- Page 89 and 90:
RCD Reflections • RCD perceived a
- Page 91 and 92:
Summary of Day 1 • Scope •Exclu
- Page 93 and 94:
Exclusions • Long list of exclusi
- Page 95 and 96:
Essential Safety Requirements • 3
- Page 97 and 98:
Conformity Assessment Modules • C
- Page 99 and 100:
Documentation • Technical Constru
- Page 101 and 102:
Anomalies of RCD Scope • Home-Bui
- Page 103 and 104:
Complexities of RCD Application •
- Page 105 and 106:
Design Categories • Some craft co
- Page 107 and 108:
Channel Weather Conditions Spring S
- Page 109 and 110:
Design Category - Concerns • Inte
- Page 111 and 112:
Systems & Design Categories • Sys
- Page 113 and 114:
Falling Overboard & Design Cat. Opt
- Page 115 and 116:
Stability - ISO 12217 - 1
- Page 117 and 118:
Stability - ISO 12217 - 1
- Page 119 and 120:
Stability - ISO 12217 - 1
- Page 121 and 122:
Freeboard = Downflooding Height
- Page 123 and 124:
Downflooding Openings -2 • d) top
- Page 125 and 126:
Downflooding Openings - 4 • g) op
- Page 127 and 128:
Downflooding Height Category C
- Page 129:
Openings & Design Categories ISO 12
- Page 132 and 133:
Cockpits & Design Categories ISO 11
- Page 134 and 135:
Specific implementation problems
- Page 136 and 137:
Stability Standard - ISO 12217 •
- Page 138 and 139:
Common Non-Conformities • Hull Id
- Page 140 and 141:
Common Non-Conformities • Builder
- Page 142 and 143:
Common Non-Conformities • Cockpit
- Page 144 and 145:
Common Non-Conformities • Annex I
- Page 146 and 147:
Vision from the Helm • Vision to
- Page 148 and 149:
Documentary Problems • Technical
- Page 150 and 151:
Documentary Problems - 3 Owners Man
- Page 152 and 153:
Documentation - What is required?
- Page 154 and 155:
TCF - Most Common Pitfall • Don
- Page 156 and 157:
TCF & Ranges of Craft • TCF for s
- Page 158 and 159:
Market Surveillance Getting the mes
- Page 160 and 161:
Culture Change • Contrast RCD wit
- Page 162 and 163:
Current RCD Surveillance • Differ
- Page 164 and 165:
Point of Import (customs) • Custo
- Page 166 and 167:
Manufacturers of New Craft • Manu
- Page 168 and 169:
Second Hand Craft • Brokers are d
- Page 170 and 171:
Private Sale • Private sale very
- Page 172 and 173:
RCD Investigations • Common cause
- Page 174 and 175:
TCF - Typical Problems • Avoid ge
- Page 176 and 177:
Surveillance Experience -1 • Typi
- Page 178 and 179:
Common Interpretation • All Gover
- Page 180 and 181:
Control of Notified Bodies • Asse
- Page 182 and 183:
Complaints • Many links in the ch
- Page 184 and 185:
Amendment to Directive • Referenc
- Page 186 and 187:
Emissions • Maximum levels set fo
- Page 188 and 189:
Sound Emission Engine Power (kW) Ma
- Page 190 and 191:
Power/Displacement Ratios
- Page 192 and 193:
New RCD Trigger Points • Existing
- Page 194 and 195:
Change to ESR 2.1 Hull Identificati
- Page 196 and 197:
Change to ESR 5.2.2 • Fuel Tanks
- Page 198 and 199:
Change to ESR 5.8 • Discharge Pre
- Page 200 and 201:
Post Construction Procedure • Exi
- Page 202 and 203:
Responsibility at EU Commission •
- Page 204 and 205:
Standards • List of standards for
- Page 206:
• CEproof Ltd. - Commercial opera