04.03.2015 Views

ABAA Process for Approval of Water-Resistive Barriers (WRBs)

ABAA Process for Approval of Water-Resistive Barriers (WRBs)

ABAA Process for Approval of Water-Resistive Barriers (WRBs)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Air Barrier Association <strong>of</strong> America Inc.<br />

8.3 <strong>ABAA</strong> <strong>Approval</strong> <strong>Process</strong> Flow Chart <strong>for</strong> Evaluation <strong>of</strong> <strong>Water</strong>-<strong>Resistive</strong> <strong>Barriers</strong><br />

Manufacturer submits<br />

application and<br />

documentation to<br />

<strong>ABAA</strong><br />

<strong>of</strong>fice<br />

Technical review <strong>of</strong><br />

documentation and application<br />

by <strong>of</strong>ficer<br />

Manufacturer submits<br />

outstanding documentation to<br />

<strong>ABAA</strong><br />

Has all<br />

in<strong>for</strong>mation<br />

required been<br />

submitted and<br />

pass minimum<br />

requirements?<br />

Is all the<br />

in<strong>for</strong>mation<br />

required in the<br />

<strong>Process</strong> <strong>for</strong><br />

<strong>Approval</strong> YES<br />

submitted?<br />

Manufacturer's product listed in<br />

<strong>ABAA</strong> Master Specification<br />

and on web-site.<br />

NO<br />

<strong>ABAA</strong> <strong>for</strong>wards written<br />

response to manufacturer<br />

requesting outstanding<br />

documentation or in<strong>for</strong>mation<br />

Date <strong>of</strong> Issue: 2012-07-11 PR-115-110 Rev 0 <strong>ABAA</strong> <strong>Process</strong> <strong>for</strong> <strong>Approval</strong> <strong>of</strong> <strong>Water</strong>-<strong>Resistive</strong> <strong>Barriers</strong> (<strong>WRBs</strong>) Page 6 <strong>of</strong> 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!